Loading...
HomeMy WebLinkAbout064503-A1 - Construction-Related - Contract - Driven Brands, Inc.Date Received: 07/28/2026 City Secretary Time Received: 9:38 a.m. Contract No.: 64503-A1 FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 64503 A COMMUNITY FACILITIES AGREEMENT BETWEEN THE CITY OF FORT WORTH AND Driven Brands, Inc. This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 64503 ("First Amendment") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the state of Texas, and Driven Brands, Inc. ("Developer"). WHEREAS, the City and Developer entered into a Community Facilities Agreement for the construction of public infrastructure Improvements for a Project known as Take 5 - E. Bonds Ranch Rd, City Project Number 106194, City Secretary Contract Number 64503 ("CFA"); and WHEREAS, Developer provided the City with a development bond as the financial guarantee for the Improvements in the CFA; and WHEREAS, Developer has hired a new contractor to construct the Improvements pursuant to the CFA and the construction costs have increased; and WHEREAS, City and Developer desire to amend the CFA to reflect the revised Cost Estimates and Cost Summary Table, Cost Estimates and increase the financial guarantee; and WHEREAS, Developer has provided the City with a rider to the development bond to increase the penal sum of the development bond to correspond with the new construction costs; NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends City Secretary Contract Number 64503: 1. Section 36 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of this First Amendment, which is attached hereto and incorporated herein by reference. 2. The Cost Estimates in the CFA are amended in their entirety to be and read as set forth in Exhibit B of this First Amendment, which is attached hereto and incorporated herein by reference. 3. a. All other provisions of City Secretary Contract Number 64503 which are not expressly amended herein shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY City of Fort Worth, Texas FT. WORTH, TX First Amendment to City Secretary Contract No. 64503 Page 1 of 4 b. All terms in this First Amendment that are capitalized, but not defined, shall have the meanings ascribed to those terms in City Secretary Contract Number 64503. [SIGNATURES ON FOLLOWING PAGE] City of Fort Worth, Texas First Amendment to City Secretary Contract No. 64503 Page 2 of 4 IN TESTIMONY WHEREOF, the City and Developer have executed this First Amendment to be effective on the date signed by the City's Assistant City Manager. CITY OF FORT WORTH AM%-M&— Dianna Giordano (Jul 28, 2026 09:28:02 CDT) Jesica McEachern Assistant City Manager Date: 07/28/2026 Recommended by: )0AI4gw, W- Dwayne Hollars/Leonel Rios Sr. Contract Compliance Specialist Development Services Approved as to Form & Legality: Qom Grl)lwlah-1 JOOessika Williams Assistant City Attorney Date: 07/17/2026 gQg4OAnnIla a�. � F o0o rlla�0 ATTEST: p"° Pvo o=4 * oo *�a d da�� nEXA?o4p Jannette S. Goodall City Secretary City of Fort Worth, Texas First Amendment to City Secretary Contract No. 64503 Page 3 of 4 DEVELOPER: Driven Brands, Inc. Anthony WinchesMr (Jul 17, 2026 09:14:28 EDT) Anthony Winchester Vice President - Legal, Real Estate Date: 07/17/2026 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. jzu�) Kandice Merrick Contract Compliance Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX EXHIBIT A 36. Cost Summary Sheet Project Name: Take 5 - E. Bonds Ranch Rd CFA No.: 25-0177 City Project No.: 106194 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 134,250.00 2. Sewer Construction $ 268,512.00 Water and Sewer Construction Total $ 402,762.00 B. TPW Construction 1. Street $ 104,865.00 2. Storm Drain $ 18,899.00 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total $ 123,764.00 Total Construction Cost (excluding the fees): $ 526,526.00 Estimated Construction Fees: C. Construction Inspection Service Fee $36,112.50 D. Administrative Material Testing Service Fee $1,378.00 E. Water Testing Lab Fee $270.00 Total Estimated Construction Fees: $ 37,760.50 IPRC No.: 25-0056 Financial Guarantee Amount Bond = 100% $ 526,526.00 x City of Fort Worth, Texas First Amendment to City Secretary Contract No. 64503 Page 4 of 4 EXHIBIT B Cost Estimates SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page I of 7 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. I Unit of Measure Bid Quantity Unit Price Bid Value UNIT I: WATER IMPROVEMENTS 1 0241.1118 - 8" Plug 3305.0003 - 8" Water Line Lowering 3305.0109 - Trench Safety 0241 14 33 05 12 EA 1 $1,000.00 $1,000.00 2 EA 1 $9,250.00 $9,250.00 3 33 05 10 LF 216 $10.00 $2,160.00 4 3311.0001 - Ductile Iron Water Fittings w/ Restraing 3311 11 TON 1 $750.00 $750.00 5 3311.0241 - 8" Water Line 3311 12 LF 216 $415.00 $89,640.00 6 3312.0001 - Fire Hydrant Assembly 33 12 40 EA 1 $5,750.00 $5,750.00 7 3312.0117 - Connect to Existing - Cut In Tee 33 12 25 EA 1 $1,500.00 $1,500.00 8 3312.2003 - 1" Irrigation Water Service Line 33 12 20 EA 1 $7,550.00 $7,550.00 9 3312.2003 - 1" Domestic Service Line 33 12 20 EA 1 $7,550.00 $7,550.00 10 3312.3003 - 8" Gate Valve 33 12 20 EA 2 2 $4,250.00 $300.00 _ $8,500.00 11 3110.0103 - 12"-18" Tree Removal - 1 Tree & 1 Stump 31 1000 EA $600.00 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 _ 40 41 42 TOTAL UNIT I: WATER IMPROVEMENTS $134,250.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal_ DAP._ REV TO MATCH PROPOSAL SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP -BID PROPOSAL Page 2 of 7 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. I Unit of Measure Bid Quantity Unit Price Bid Value UNIT II: SANITARY SEWER IMPROVEMENTS 1 3301.0001 Pre -CCTV Inspection 3301 31 LF 136 $ 1.00 $136.00 2 3301.0002 Post CCTV Inspection 3301 31 LF 136 $ 1.00 $136.00 3 3305.1103 - 20" Steel Encasement 33 05 22 LF 136 $ 1,250.00 $170,000.00 $400.00 4 3305.0109 - Trench Safety 33 05 10 LF 40 $ 10.00 5 3331.4119 - 8" Ductile Iron Pipe 3311 10 LF 336 $ 505.00 $68,680.00 6 3339.1001 - 4' Diameter Sanitary w/ Hydraulic Slide 3339.0001 - Epoxy Manhole Liner 3339.1102 - External Drop on Existing Manhole 3301.0004 - Final MH-CCTV Inspection 33 39 10, 33 39 20 33 39 60 EA 1 $ 16,350.00 $16,350.00 7 VF 16 $ 285.00 $4,560.00 8 03 80 00, 33 39 10 EA 1 $ 7,500.00 $7,500.00 9 3301 31 3301 30 EA EA 2 2 $ 125.00 $ 250.00 $250.00 $500.00 10 3301.0101 -Manhole Vacuum Testing 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $268,512.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal_DAP._REV TO MATCH PROPOSAL SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP -BID PROPOSAL Page 3 of 7 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. I Unit of Measure Bid Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3341.0205 - 24" RCP, Class III 3349.3003 - Reset 24" Headwall 3341 10 03 80 00, 024114 LF EA 10 $245.00 $2,450.00 2 1 $1,656.00 $1,656.00 3 3301.0012 - Post -CCTV Inspection of Storm Drain 3301 32 LF 68 $1.00 $68.00 4 3292.0100 - Block Sod Placement 32 92 13 SY 615 $15.00 $9,225.00 5 3123.0101 - Unclassified Excavation by Plan - Import Fill and Channel Grading 31 2316 CY 220 $25.00 $5,500.00 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 38 40 41 42 _ 43 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $18,899.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43 Bid Proposal_DAP._REV TO MATCH PROPOSAL SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP -BID PROPOSAL Page 4 of 7 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. I Unit of Measure Bid Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3211.0502 - 8" Lime Treated Subgrade 3212.0401 - 2' Wide HMAC Pavement Patch 3211 29 32 12 16 SY 168 $40.00 $6,720.00 2 TON SF 10 1407 $350.00 $65.00 $3,500.00 $91,455.00 3 3213.0402 - 7" Concrete Pavement w/Curb and Gutter 32 13 13„ 32 13 20 4 3216.0101 - 6" Conc Curb and Gutter 32 16 13 LF 120 $12.00 $1,440.00 5 3123.0101 - Unclassified Excavation by Plan - Import Fill and Grading for Driveway 31 2316 CY 70 $25.00 $1,750.00 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 TOTAL UNIT IV: PAVING IMPROVEMENTSI $104,865.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal_DAP._REV TO MATCH PROPOSAL SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page 7 ol'7 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: NORTH TEXAS CONTRACTING, INC. 7368 FM 2449 PONDER, TX 76259 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction Bid BY: CARSON COLLIER 7 � TITLE: VP -PM DATE: 6/29/2026 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Forni Version May 22, 2019 $134,250.00 $268,512.00 $18,899.00 $104,865.00 90 working days after the date when the 00 42 43_Bid Proposal_ DAP._ REV TO MATCH PROPOSAL FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Driven Brands, Inc. Subject of the Agreement: CFA - amendment M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 64503 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 106194 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.