062766-CO11 - Construction-Related - Contract - Crescent Real Estate, LLC
CSC No. 62766-0011 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Camp Bowie Improvements Montgomery to University CHANGE CONTRACT: ORDER No: CFA # 24-0132 CITY PARTICIPATION: YES CITY PROJECT # 104639 CITY SECRETARY CONTRACT # 62766 FID # 30114-0200431-104639-EO7685 X # X-28250 FILE # K-3288 INSPECTOR: Roderick Baker Phone No: 2143979308 PROJECT MANAGER: Andrew Goodman Phone No: 8173926251 CONTRACT UNIT WORKING DAYS WATER TPW Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $0.00 $3,729,616.00 $0.00 $9,169,041.00 DEVELOPER CONTINGENCY TO DATE $0.00 $186,768.01 $0.00 $221,740.92 AMENDMENTS TO DATE $0.00 $285,500.00 $0.00 $285,500.00 CREDITS TO DATE $0.00 $1,500.00 $0.00 $1,255.00 CONTRACT TO DATE $0.00 $4,200,384.01 $0.00 $9,675,026.92 AMMOUNT OF PROP. DEVELOPER CONTINGENCY $0.00 ($9.100.12) $0.00 $171,588.16 REVISED CONTRACT AMOUNT $0.00 $4,191,283.89 $0.00 $9,846,615.08 0 TOTAL REVISED CONTRACT AMOUNT PER UNIT $4,191,283.89 $0.00 $0.00 $9,846,615.08 $0.00 REVISED COST SHARE Dev. Cost: $0.00 City Cost: $14,037,898.97 TOTAL REVISED CONTRACT $14,037,898.97 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: WATER PAY ITEM # CITY BID ITEM # ANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL M5W NA -0.051239126 LS Construction Contingency NA $ 177,601.00 $ - $ (9,10(1.12) $ (9,100.12) WATER $0.00 ($9,100.12) ($9,100.12) TPW PAY ITEM # CITY BID ITEM # ANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City cost TOTAL WC#4 NA 0.00741537 LS Electrical & Lighting NA $ 1,350,000.00 $ - $ 10,010.75 $ 10,010.75 M1 NA 8.48375E-05 LS General Conditions NA $ 1,203,831.00 $ - $ 102.13 $ 102.13 M2 NA 0.001200632 LS CCIP NA $ 168,428,00 $ - $ 202.22 $ 202.22 M3. NA 0.001348192 LS Fee NA $ 608,259.00 $ - $ 820.05 $ 820.05 M4 NA 0.001218521 LS McCarthy Performance and Payment Bond NA $ 73,105.00 $ - $ 89.08 $ 89.08 W C # 1 NA 0.002097206 LS Earthwork & Demo NA $ 1,452,399.00 1 $ - $ 3,045.981 $ 3,045.98 W C # 5 NA 0.06459503 LS Landscaping and Irrigation NA $ 400,622.00 $ - $ 25,878.19 $ 25,878.19 M1 NA 0.000245117 LS General Conditons NA $ 1,203,831.00 $ - $ 295.08 $ 295.08 M2 NA 0.00346896 LS CCIP NA $ 168,428.00 $ - $ 584.27 $ 584.27 M3 NA 0.003895347 LS Fee NA $ 608,259.00 $ - $ 2,369.38 $ 2,369.38 M4 NA 0.003520689 LS McCarthy Performance and Payment Bond NA $ 73,105.00 $ - $ 257.38 $ 257.38 M6 NA -0.06420232 LS Landscape Enhancement NA $ 500,000.00 $ - $ (32,101.16) $ (32,101.16) WC#2 NA 0,0005786 LS Concrete Paving & Flatwork NA $ 1,924,128.00 $ - $ 1,113.30 $ 1,113.30 M1 NA 9.43654E-06 LS General Conditions NA $ 1,203,831.00 $ - $ 11.36 $ 11.36 M2 NA 0.000133529 LS CCIP NA $ 168,428.00 $ - $ 22.49 $ 22.49 M3 NA 0.000149936 LS Fee NA $ 608,259.00 $ - $ 91.20 $ 91.20 M4 NA 0.000135558 LS McCarthy Performance and Payment Bond NA $ 73,105.00 $ - $ 9.91 $ 9.91 W C # 3 NA -0.022111368 LS Colored & Stamped Concrete NA $ 476,904.00 $ - $ (10,545.00) $ (10,545.00) W C # 4 NA 0-063241244 LS Electrical & Lighting NA $ 1,350,000.00 $ - $ 85,375.68 $ 85,375.68 W C # 6 NA 0.074139703 LS Traffic Control NA $ 233,367.00 $ - $ 17,301.76 $ 17,301.76 M1 NA 0.01641281 LS General Conditions NA $ 1,203,831.00 $ - $ 19.758.251 $ 19.758.25 M2 NA 0.013037618 LS CCIP NA $ 168,428.00 $ - $ 2,195-90 $ 2,195.90 M3 NA 0.014911214 LS Fee NA $ 608,259.00 $ - $ 9,069.88 $ 9,069.88 M4 NA 0.01347719 LS McCarthy Performance and Payment Bond NA $ 73,105.00 $ - $ 985.25 $ 985.25 W C # 1 NA 0.011019968 LS Earthwork & Demo NA $ 1,452,399.00 $ - $ 16,005.39 $ 16,005.39 WC#2 NA 0.005361369 LS Concrete Paving & Flatwork NA $ 1,924,128.00 $ - $ 10,315.96 $ 10,315.96 WC#6 NA 0.019616912 LS Traffic Control NA $ 233,367.00 $ - $ 4,577.94 $ 4,577.94 M1 NA 0.000261856 LS General Conditions NA $ 1,203,831.00 $ - $ 315.23 $ 315.23 M2 NA 0.003705857 LS CCIP NA $ 168,428.00 $ - $ 624.17 $ 624.17 M3 NA 0.004161352 LS Fee NA $ 608,259.00 $ - $ 2,531.18 $ 2,531.18 M4 NA 0.003761165 LS McCarthy Performance and Payment Bond NA $ 73,105.00 $ - $ 274.96 $ 274.96 M1 NA 0.07942845 LS General Conditions NA $ 1,203,831.00 $ - $ 95.618.43 $ 95,618.43 WC#1 NA 0.002534772 LS Earthwork&Demo NA $ 1,452,399.00 $ - $ 3,681.50 $ 3,681.50 WC#5 NA 0.785094179 LS Landscaping and Irrigation NA $ 400,622.00 $ - $ 314,526.00 $ 314,526.00 W C # 6 NA 0.040938179 LS Traffic Control NA $ 233,367.02 $ - $ 9,553.62 $ 9,553.62 M1 NA 0.050796526 LS McCarthy Performance and Payment Bond NA $ 73,105.00 $ - $ 3,713.48 $ 3,713.48 M2 NA 0.03930926 LS CCIP NA $ 168,428.00 $ - $ 6,620.78 1 $ 6,620.78 Revised:12-17-2018 Page 2 M3 NA Fe NA $$ 608,259.00 $$ 34,185.03 NA -0.93579768 LS Landscaping AllwanceM6 - $ (46374819885..8043 )$ $ (467,898.84) TPW $0.00 $171,588.16 $171,588.16 REASONS FOR CHANGE ORDER Lighting for sculpture pad, landscaping revisions, paving for existing sidewalk tie in, additional traffic control and light pole fixture replacement RECOMMENDED: APPROVED: APPROVED: (C (Developer) (Contractor) 9 G �r B �� Q f IMtiA - 06/29/2026 Date: Tro/is Rieff 07/14/2026 By: Tr. Date: 7�l• d d�0� By « � Date: 07/15/2026 Name: Maddie White, PE Name: Travis Rieff Name: Mark Valdez Title: Project Manager Title: Vice President Title: Project Manager APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Water Department CFW - Assistant City Manager CFW - Assistant City Attorney By"7- Date: 07/16/2026 By 060!0,�,10�(Jl 28 2026 09 31 05 CD I, Date: 07/28/2026 By: —"- Date: 07/23/2026 Name: Suby Varughese Name: Dianna Giordano Name: Jessika Williams Title: Title: Assistant City Manager Title: Assistant City Attorney RECOMMENDED: pZi° 40g....... 4;&° pFS ♦0 oY$ 08><p TPW ATTEST °PAdcoXosod� 7 - 07/17/2026 q � By: w P„ ,J�2261n,.zBy: 21 CDT) Date: Kcal — Date: 07/28/2026 � Name: Lauren Prieur Director - TPW Name: Jannette S. Goodall Title: M&C Number: N/A M&C Date Approved: N/A Title: City Secretary L' 4"w 07/15/2026 Andrew Goodman * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, and ensuring all performance and reporting requirements. There are NO City Funds associated with this Contract ® There are City Funds associated with this Contract OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 3 MMARINY Project Name: Project No Camp Bowie 002259.000 DESCRIPTION OF THE PROPOSED CHANGE: CO 27 - Landscape Redesign SCOPE: Installation of Landscape Redesign. OWNER CHANGE ORDER O.C.O. # 00044 DATE: October 31, 2025 Pricing Details: Company Name Description Amount M1 - General Conditions 91,361.00 WC #1 - Earthwork & Demo 3,681.50 WC #5 - LNSCP & IRRG 314,526.00 WC #6 - TRAF CNTRL 9,553.62 Performance & Payment Bond 3,713.48 Cost of Risk 6,620.78 Builders Risk 4,257.43 Fee 34,185.03 LANDSCAPE ALLOWANCE -467,898.84 • General Condition Description: The total cost of $91,361.00 accounts for the additional management, staffing, and resources required to support weekend work from February 9 through May 26, totaling 15 weekends, as well as the extended efforts needed to oversee and close out the added scope. McCarthy anticipates that this level of support equates to approximately one (1) month of extended General Conditions. This cost includes all necessary project staff - Project Manager, Superintendent, Project Engineer, Project Administrator, and Safety Manager - along with associated resources such as company vehicles, computers, jobsite software, and other project support tools. These elements are required to maintain proper oversight, coordination, safety, and operational continuity throughout the extended work period. Net Amount This Proposed Change Net Change in Calendar Days Due to This Proposed Change 0.00 0 Days Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. If the "Net Change in Calendar Days Due to This Proposed Change" is blank the schedule impact will be evaluated at a later date. McCarthy Building Companies 12851 Manchester Rd. St. Louis, MO 63131 Digl[ally signetl by Mark Valtlez DN. C=US. E=MAValde @McCarthy.com, z CCN Mark Valdeiilding Comapnies Inc", Mark Va I d e Dane: 2025.12.23 12:18:59-06'00' SIGNATURE DATE Treble0ak 4849 Greenville Avenue, Suite 100 ballas. TX 75206 Josh Goad. SIGNATURE DATE Crescent Property Services LLC 3230 Camp Bowie Blvd, Suite 500 Fort Worth, TX 76107 Digitally signetl by Travis Rieff DN'. C=US. E=Tri,crescent.com, Travis Rieff .lopme.RCNET,,,,ReR D Date: 2026.01.0913: 15:50-06'00' SIGNATURE DATE Printed on: 12/23/2025 12:02:07 PM Page 1 of 1 OWNER CHANGE ORDER O.C.O. # 00044 DATE: October 31, 2025 PROJECT NAME: Camp Bowie PROJECT NO.: 002259.000 TITLE: CO 27 - Landscape Allowance NOTES: Installation of Landscaping Redesign. CMAR General Conditions for additional coverage. PCI Description Amount 00063 CO 27 - Landscape Redesign 0.00 The Original Contract Value was: Sum of changes by prior Change Orders: The Contract Value prior to this Change Order was: The Contract Value will be changed by this Change Order in the amount of: The new Contract Value including this Change Order will be: The Contract duration will be changed by: The revised Substantial Completion date as of this Change Order is: 12,898,656.00 924,105.08 13,822,761.08 0.00 13,822,761.08 0 Days May 26, 2026 Printed on: 12/23/2025 12:05:33 PM Page 1 of 1 Q ExIST NG TRBBTa RBNna N: tte I rrvc cRePE MrRTLt TREes (9I r0 Be REtitOve2 _ n a ' m zags =431 2428 �— 2430 � y JP�P / � / / �_ / / { - / ENDING DBE PR( )SO `MAN/ _____ 256 AREA NOT- — A X -2DOI O + N — 225 2A3 2254 2002 Q CAMP BOWIE BOULEVARD (VARIABLE WIOTn RIGHT-OF-WA1, FENCI 1994 1995 I99T 1999 2W0 ,i� 1 ssa NG. TTVP. H () Ill No woRK neat y k_ -- lI -, �-1 1N-ANDCPATED IN III R F0o EEDD5 TO D STJR6 5 DEWALK, TREE PROTECT ON TO / �� J , ! Wes-- ..;. —TING TREE TO - BE NSTALIED AT TIEB EDGE Of TREE DRIP L N-15r NG s DEWALK—NG AT NO ADDITIONAL CST TO OWNER -- R—N. M �1TREE MITIGATION PLAN I I -2oO - - GRAPHIC SCALE IN FEET Ar 2003 2005 ® I9ss Lss3. Ls54 Isss _. - _ 1950 195 C 952 ._ CAMP BOWIE BOULEVARD 943 J, TE E PRorEc Io (VARIABLE wIDm RIGIrr-ov-wan rF NC NG ---� --- Z Is -Fl \ Fr - `IXST NG iP,EE TD \ RENaIN. M ( / 945 �5\ Q 943 PP f/ ��TIZEE MITIGATION PLAN 5 '0 ° o-0 GRAPHIC SCALE IN FEET 1 ® zA zazs z mU. oa zoza ® es os. Ozs A k ON LvLT/2025 ® —UNOVN .w TBEE Pu. °POATE o.{zz/mze LEGEND m BE MOV D —TINGTREe TO REMAIN -e—� TREE PROTCT101 IND. REVIEWED By— GoodmanatARr2X-6 Westwood n .o CONSTRUCTION NOTES�R AIE ° oon --TT °Xi au 1 AT .— ae�xa 1 IR w mm cc. N1 Al TV o . TH wA,ER OEET FELO OEE T.Rs mm >sz-0zss. ® CITY PROJECT N0. 105654 X-2H250 IPRC IPRC22-0119 WPSCO NO. TAR-07M fl0 30114-020043331-105654-EO]665 TAO AIAP NO. 2036-392 CITY OF FORT WORTH, TEXAS oar o "59A� CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS TREE MITIGATION 18+50 - 32+00 r a h 're OF z�+" R DESIGNED: OJW PK JOB N0. DATE: SHEET v DRAWN: BJW SOBS-22.692 JUL 2024 720F 90 2398 'PLED OAK 0 REMOVE 2399 'CnINfSE R5?Knf O REMOTE 2400 2401 'CHINES! PISTAGHf 'CEDAR ELM 0 REMOVE REMOTE 2410 'D$AGE 0 REMOVE RE OAK 0 CITY FORESTER NOTES PARNo— WLINC To ALL WORK IN KA MCA � MANAGOD AND MAINTTAA)INED EL TARDANCWD(NG RIGHT O -WAD THROUGH CITY TO ROUNDABOUTS, CORNfk CUTS. PARKWAYS. AND MAY PERTAIN TO WORK ADJACENTT TO CITY PARKLAND CITY PARKS( CONTACT PARK FANNER 8 I7-392-5): 1 ALL PROPO5fD HTILITY IMPR0VEMfNT5 OUTSIOf or A RECORDED A5EMENTO) AND (LOCATED IN AMOCKTHROUGH A PARK 5NALL REQUIRE PARKLAND CONVER5ION IN ACCORDANCE TO SATE DF TE%A5. PARKS AND WILDLIFE CODE CIA_ 26. I. CONSTRUCT ION EQUIPMENT AND/OR 5TAGING, MATERIALS STORAGE, AND MATfR1AL5 TESTING MAY NOT OCCUR ON CITY PARKLAND WITHOUT PRIOR WRITTEN APPROVAL FROM PARD. 2. PROR TO BEGINNING WORD ON PARKAND, CONTACT PARD AT 81 R392-57G4, TO 5CHEOUIf AN ON -SITE MEETING TO LOCATE CARD UTILITIf5. TREE PROTECTION, AND PARKLAND FENCING. PROVIDE 72-HOURS MINIMUM NOTICE. 3. INSTALL FENCING AT PARK PROPERTY LINE TO PROTECT PARKLAND. FENCING TO REMAIN UNTIL CONSTRUCTION COMPLETED, ,T ALLRBANCE TO EXISTING s0a, VEGETATION. INRGATDN, DR EQUIPMENT ON MUST BE _o 0R REPLACED TO EXISTING PRE -CONSTRUCT ION CONDPIO15 OR BETTER AT NO ADDITIONAL GOET TO 11HI 5 5DIL 51ALL BE FREE OF N5TRUCTTDN DEBR15 AND ROCK5 GREATER HAN 1-INCH. BACII TH CLEAN 501L PRIOR TO SEEDING OR 50DDING. (RFFER TO 32 91 19. 32 92 13 AND 32 92 14) G. TURF INSTALLATION MU5T COMPLY WITH Cfi4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 32 92 13-SODDING AND/OR 32 92 14-NON-NATIVE SEEDING. ]. UPON REQUEST. HE CDNTRACTDR 5HALL PROVIDE TO PARD A COPY Of CEKTIFTCATION5 ON SOIL. 5DD. SEEDING. AND HYDROMULDI ING PRIOR TO 11,51FALLATIQN: ALONG WITH HE DELVERY TICKET. IRFER TO 32 92 13 AND 32 92 14 9 ALL DROP ON CONTROL MATERIALS AND FENCING TO BE REMOVED. INCLUDING BUT PENCE AND TREE PROTECTION, AT COMPLETIOIJ OF PROJECT. PUTTLEEE5 (CONTACT CITY FORC5TER B 1 T-392-5]29. 81 Z-392-5239): 10. P CHAPTER 33. PARK I RECREATIDN-FORESTRY 5ECTION (FARE fOREETRY) TAB JUMBDICIION OVERT ROD ON CITY.OWNDO PROPERTY INCLUDING RIGHT QFWAY. APPROVAL DF PLANS DOES NOT CON5TIME APPROVAL TO PROCEED WITH WORK UNTIL CORRESPONDING FERMTC HAD BEEN PERMITS FOR REMOVAL, PANTING Cl PRUNING of CITY OWNED TREE5 5HALL BE OBTATNEO FROM PARD FORESTRY. PRUNING REQUIRED FOR PRECONSTRUCNON PURPOSES REQUIRE5 THE UTILIZATION OF AN ISA-CERTIFIED ARBORIST. A5 STATED IN THE PERMIT, AT ND - ELAND -FDRESTRT: WWW.EoNDMRIHTE%AS GOV/DEPARTMENTS?ARKC5ERVIGRGFORESTRY OR LIMREEPERMITS@FOR ORHTE%AS.GOV. OR 617/362-5729 OR 61 Z/392-5/39, CfION 5TALL BE PUT IN PUCE BEFORE GRADINGICONSTRUCT ON BEGINS, BE IN5PECTECU 6Y CITY FORESTER AND REMAIN UNTIL COMPLTION OF THE PROJECT. I. 4FOOT TALL, CHAIN LINK FENCING TN51AIJED AT THE TREE DRPLINE WITH BILINGUAL 511N ON ARAE ("NO ENTREIVI N AREA BE FROTTECTION DO ARBDLESI- 5 KEEP OUT. TREE PROTECTION 11. NO ENTRY, GRADING. EXCAVATION. PARKING OR51ORING OF EQUIPMENT OR 5UPPUES INSIDE cT EFE TREE FENCING WITHOUT CHY FDRE51DR AFFROVAL II ALL WORKE1151DE PROTECTIVE TREE FENCING TO BE DONE BY LAND. UNL55 PRIOF. APPROVAL GIVEN BY CITY FORESTER. IV. NOOT52-INCH OR LARGER 5HALL NOT BE CUT WITHOUT Cltt FORESTER APPROVAL. ROOTS E CLEAN CUT WITH A SAW, V. ALE ON OAK TREES, INCLUDING RCOT5, SHAL BE PAINTED WITH GENERAL FURPD5E SPRAY PAINT WIHIN 30 MINUTE5 OF MLAC5URf TO PREVENT OAK WILL 51REA E, DE IT CIF . el. TREE PROTECTION FENCE (CHAIN -LINK) 1. 11 5 I. THE CONTRACTOR WILL CHECK TREES IN THE Co —AREA BEFORE CONTRACT WORK II BEGINS,AN�Y�gDMIN15TP.AAGE WIL FFOR WILL CD MCHECRSE ECTED AND IFF-1. TO THE N OF HE TREE50URIRACT TNG THE CONTRACT PERIOD, III. AOr— OF ALL TREE5 MAY BE MADE AT THE END OF THE CONTRACT PERIOD, CITY FORESTER, CONTRACT AOMIw15TRATOR. AND CONTRACTOR WILL ATTEND THE INSPECTIDN. IV. DAMAGE55HALL BE DOCUMENTED BY MEMO- TO THE CITY FORESTER WITH COPY TD CONTRACT FILE AND THE CONTRACTOR. V. CONTRACTOR MAY HAVE THE OPTION OF REPI.ACC,DDT OR PAYMENT FOR 5fVERPLY DAMAGED CAL- OCAnON TO BE DESIGNATED BY FARO. -—ENT SHALL BE MADE ON A IPER INCH PER CALIPER INCH —15 WITH A MINIMUM SIZE OF REPLACEMENT TREE OF 2-INCH IN CALIPER FORTRESS DAMAGED OR REMOVED WHICH ARE LE55 TIAN 30-INCH DOH AND 2-INCH PER HILT FOR TREED WHICH ARE 361NCH UBH OR GREATER. THE CONTRACTOR SHALL BE R£SPON5IBTE FOR THE PANTING. WATERING. MULCHING AND MAINTENANCE Of 1.11aGUMVV LATHE2-YEEAAR C5ADLCEMMENTT PERIOD HALL DE COMT2NSATC FORE TDOES NOT CONTRACTORTO TREE FUND AT A RATE OF £200 PER CALIPER INCH. L SLIGHT DAMAGE SHALL BE BEFINEO. IN THE OPINION OF THE CITY FORESTER, AS DAMAGE THAT MAYCCMPARTMPLI INCLUDE BUT ARE NOT LIMITED TO: SLAB IRNG OF THE CH IN BUT LE55 TIAN 1 UNK CIRCUMFERENCE, OR BREAKING OF LIM55bLE55TIAN 12 �INCI IN DIAMETER OR LIMBS LE55 THAI 1 /3 TRUNK CALIPER. WHICHEVER IS LE55- SLIGHT DAMAGE 5HALL AL`O INCLUDE! DING EOUIPMENT OR SUPPLIES WITHIN THE CRITIC ROOT ZONE (CTS.OR DISPOSING CHOROF ORCONCRETEWITHINHE.CRZ,BUTNOTCLOSERTOTHETRUNKTHAN50 RADIU5OF THE CR2. $LIGHT DAMAGE TO TREES 5HALL BE ASSE55E0 AT A RATE OF 51GOOD FOR ARI INSTANCE. (ACT DAY TREE FENCING IS NOT PROPERLY PLACED, EQUIPMENT OR SUPPLED ARE 5TORE0. WITHIN CRZ. DR FILL I5 STORED WITHIN THE TURZ 5HALL BE CONSIDERED ONE INSTANCE. V11. MODERATE UAMAGf 5HALL BE DEFINED. IN TIE OPINION OF THE Cltt FDRESTER, A5 DAMAGE THAT CONHIB S TO THE POOR HEALTH AND REDUCED LONGEVITY OF THE TREE. fHAMPLES BUT ARE NOT LIMITED TEL 5CARRING OF THE TRUNK INTO FIE CAMBIAL AVER GREATER THAN 2-I1CH. BUT LE55 THAN 1 l3 THE TRUNK CIRCUMFERENCE; OR BREAKING OF LIMBS MORE THAN 2 1LOU IN DIAMETER. BUT 1f55 THAN 1 /3 TRUNK CALIPER. MODERATE COMPACTION OF SOIL GRADING OP. F,LLING IN 209E OF THE DAMAGE SHALL ALso wcwDE CRZ ON 1 OF 4 51DE5, BUT OUTSIDE THE IT CR ,RADID5MOD OF THE CRZI OR DISPOSING LC PAINT OR CRATE Tf WITHIN 55 RADIUS OF TIE CRZ. MODERATE DAMAGES SHALL BE LALLULAHp AT A RATE OF.%THE ASSESSED VALUE OF THE TREE PER EACH INSTANCE 0 DAMAGE. REMOVAL OFAGED FOR SUBJECTE3 THAI 3 OF $HOO PER DIAMETER CH OFTTREEH REMOVER IF OP. DAMAGED FOP. TREES ID B THAN 50-INCH OBH OR REMOVAL IIA AMETEK INCH FORTRESS 30 TO 5 OBn OR GREATER. SEVERE DAMAGE IA REMOVAL EATER PER INCIDTHAN 11 BUT IS NOT LIMITED TO: MEE. FE I OF THE TRLNK TO THE CAMBIAL LATER GREATER THAN)3THE TRUNKCIRCUMFERENCEUPROOTINGER CAUSING ATAPE TO LAN;ORDAMAGE TOASCAFFOLDING BRANCH ORANY BRANCH GRATER THAN IG OF TRUNK CALIPER.SEVERE DAMAGE SHAL AL50 INCW D R COMPACTION CR SOIL GRADING THAN Fl W NG MORE THAN 2O% OF THE CR2. OR WIHIN TLEC5C IU5 OF THE CR2. OR ON MORE THAN ONE OF 4 SIDES. CUTTING 1/3OFNG RODT54 ROOTSWFUEN RGREA3TIMES LED DISTANCE4 HE DBHOFTHE U TRUNK, OR TTTNG 4 ERED5 ONCHVERE A GREATER IN DIAMETER WITHIN 4-FEET OF THE TRUNK CONSIDERED SDAT TDAMAGE. IH. BRANCHES 5HALL DEBMEASURED AT TIEPOPACC DF ATTACHMENT DRAT THE LATERAL TO WHICH THE BRANCH WOULD BE PRUNED BACK TO ACCORDING TO AND STANDARDS. TREES CALIPER BE MA5UR 5FACCORDINGTOACL51NG PLADU5TRYTTAND HETREESBEU THAN THAT IN CALIPER SHALL BE MEASURED USING DIAMETER AT BREAST HEIGHT (DBHI. TREES THAT MUST BE Rf 5OV I DUE TO DAMAGE LOON BYTHf LONTRALTORSnALL BE REMOVED BY Hf AGE 5LYSECTION'S TREEREMOVALE FUND LTDRAT To CONCEON,PYE%PENsf. % DAMAGE E5 LL DHAL MCCULT.PAID To HE CITY DUFAC of CO. FA CT AND R t CONTRA FAY FOR DAMAGED TREf5 5HALL Rf5DA IN A BREACH OE CONTRACT AND HE CONTRACTOR WILL BE UTM AVWENYA55E55ED DAMAGES DAMAGES AS DESCRIBED HEREIN SHALL BE DEDUCED FROM PAYMENTS OTHERWISE DUE THE CONTRAC I DR. i5 OF — — C NAl ROOT ZONEINC IRIPLINEOFTREE r TREE PROTECTION INC— \ FxTSTINS FIND TO REMAIN ozo i wHaIEVERSC AT P11 L BE TREE PROTECTION FENCING - PLAN VIEW m m I2625 ® - LH LK ANSESUE W II/12/2- ® AUDENUUM W - TREE FLWRF UPDATE 9.1-11.2a TREE PRESERVATION NOTE5 —TING TREf5 TO REMAIN 5— BE PROTECTED DURNG CONSTRUCTION DAMAGE AND COMPACTON OF SOIL UNDER AND AROIND THE GTICAL ROOT 20NE OF THE TREE. ALL ROOTS 2. OR LARGER IN DIAMETER WHICH ARE EXPOSED AS A RESULT OF BENCHING OR OTHER EXCAVATION 51ALL BE REPORTED TO CITY FORESTER WITHIN TWO HOURS OF INITIAL W—URE. L NO OCTUREANCE OF THE 501L WITH IN THE CRITICAL ROOT ZONE U ANY FINE GRADING DONE WITHIN THE CRITICAL ROOT ZONE OF PROTECTED E APPROVED BY HE CItt of FORT WORIF5 c- FORESTER IN ADVANCE OF ANY WORK AND DONE BY HAND. NO MATERIALS INTENDED FOR use IN CONSTRUCTION OR WASTE MATERIALS ACCUMULATED DUE To EXCAVATION OR DEMOLITION 5HALL BE PACED WIHIN FILE AL ROOT ZONE OF ANY TREE, NOEDUIPMEN'r MAY BE CLEANED OR TO%IC 50LL TION5. OR OTHER LIQUID CIIEMICAL5 5HALL BE DDLO51TED WITHIN THE. CRTICAL ROOT ZONE OF A TREE, NO DING BUT NOT LIMITED TO'. FAINT. OIL. 50L,ENT5. ASFHALT. CONCRETE. MORTAR. PRIMERS, ETC. NO SIGNS. WIRES OR OTTER ATTACHMENTS, OTHER THAN THOSE OF A 51TALL BE ATTACHED TO ANY TREE. f NO VE CUATVCON5TRUCT ON EQUIPMENT TRA ED DR PARKING 15 ALLOWED THE CRITICAL ROOT [ONE OF TREES. I IRRIGATION iRENCFING WHICH MUST BE DONE WITHIN HE CRITCAL ROOT ZONE HALF BE DUG BY HAND AND ENTER THE AREA IN A RADIAL MANNER AFTER BEING APPROVED BY THE CITY OF FORT WORTH'S URBAN FORESTER. 0. AL TREf5 TO BE REMOVEO FROM THE SITE 5HALL Bf FLAGGED BY THE CONTRACTOR WIm BRIGHT ROD VINYL TAPE (3" W OFTE WRAPPED AROUND HE. OWNER REGARDING A REMOVED. IF A LOW T CONSTRUCTION. THE. IMMEDIATELY. UNDER PORTION OF HE DAM REP. REVIEWED By Andrew Goodman atl9�pm, Apr 21, }B26 ° PTWestwood.o CONSTRUCTION NOTESaNa ORT 1p 1 WA16R oEPT._n[Lp GRIATIRI (111) ]92-b29b. CIlY PROJECT N0. 10565d X-26Z50 IPRC IPRC22-0119 MAPSCO NO. TAR-07M fl0 J0114-0200433JI-)05654-EO]665 TAD WP NO, 2036-392 CITY OF FORT WORTH, TEXAS CAMP BOWIE BOULEVARD Olt ROADWAY IMPROVEMENTS TREE TABLE + DETAILS DESIGNED: DJW I PR JOB NO. I DATE: (EHEET DRAWN: DJW 5085-22,692 JUL 2024 ,AL JOE 90 J I I DD-D PLANT SCHEDULE PLANTING GENERAL NOTES 5YMBOL CODE OTY 1 2 3 4 BOTANICAL/ COMMON NAME 51ZE/COND. REMARN5 TREESRIEGEL -. RAC LEADER. PC 5 Pill 11 A S 5 CUFFS STACnE� 3 JCON( MATCH M CLING M E C E5, MIN ME OF GET, GOOT BALL NOT TO 36 .s �. On 35 �4.. 6 RISE V RG A F GH 5"GA 8 V HGH RLS VE OAK ' FACEW BE %. ED CIRCLE STRAIGHT LfADfR. MATCHING 1 OH2 13 J 6 lam' J,J OUERCUS VIRGI NIANA'1111 WSE 4GALJ CONT HIGH RLSe uve oAK + SINGLE. STWUGHT LEADER. MATCHING ORNAMENTAL TREES CT 14 9 5 ����✓✓✓ LERGI5 CANAOEN515 MAN515 45 GAL TO. REDBUD 51NGI,E STRAEADER, IGHTL MATCHING Q IND 21 I4 ] LEE X ROLIE R.. STEVLLE 45 GAL SREIFF.1STRAGHT LEADER. EJU, .�. M,20 5 O 9 MAGNOLIA GRAND IFLORA' LITRE 6 GEM' 45GAL DWARF SOUTHERN MAGNOLIA 51JGLE, 5T IGHT LEADER. MATCHING 5YMBOL CODE OTY 1 2 3 4 BOTANICAL/COMMON NAME 51ZE SPACING REMARN5 51FRU55 CAD 1,566 G42 630 54 24O—GVUL'A 1 GAL IT o.c. FULL. MATCHING RXELEY SEDGE HP 84 31 1O 5 38 HESPERALOE PARVIFLOTN 3 GAL —os. FULL. MATCHING RED YUCCA O ICC FAR 13] 2B9 19 121 ILEX CORNUTA CARISSa' 5 GAL 39 FULL. MATCHING -. -.- - -IUD o au„ �A - _. -- - - - -- o FYAUPON - 0 20 D 3 GAL 30 MATCH NG nUP - -2.]20 "1- 86] 69G - N N" OFI EMOMLME TrA�I£MON-LME' - 29 cc FULL MATCHNG 463 3GAL _ OPUNTIA. ELLISIANA O OE 58 53 5 PRICKLY FEAR' CACTUS SPINELE55 5 GAL FULL. MATCHING ANNUALS/PERENNIALS E2 J 54 4G 108 PUHPNACEA PURPU DA I GAL 24" o,c. FULL. MATCHING LE CORELOWER + DU "1 22 140. 267 52 6AURA ERA LINEEDMEG 3GAL 24-o.c. FULL, MATCHING PEROVSFJA ATRIPUCIFOLIA PA2 289 269 20 RUSSIAN SAGE 3GAL 33" a.c. PULL. MATCHING GROUND COVER5 SEASONAL COLOR �� SC 90B 168 452 93 215 IGAL Io.c. PULL. MATCHING ANNUALS 50Dj5EED I ALL PLANT5 5HALL BE SE OUT FOR APPROVAL BY THE OWNER'S RERESfNTATE/D PRIOR TO INSTALLATION. 2 FINE GRADING SHALL BE FERFOREOEo IN ALL AREAS TO BE LANDSCAPED FINE. GRADING SHALL INCLUDE THE REMOVAL OF DEBRIS ROCKS ETC. FROM THE STE AND INSURS POSITIVE ORANAGS IN ALL AREAS, 3. THE CONTRACTOR SHALL LOCATE ALL LTILTIF5 AND EASEMENTS INTHE HELD PRIOR TO COMMENCEMENT Of WORK, CONTRACTOR 5 RESPONDELE FOR ANY DAMAGE To uTL UUMNG THE COUFFOf 01 c05 croN. 4_ 1RTTENDMEN50155HAU GDVERN OVER SCALED DMEN51ON5, 5 ALL P1AM MATERIALS SHALL MEET ANSI Z60.1 STANDARDS FOR CALIPER. HEIGHT AND ROOT BALL SIZE. ANY MATERIALS THAT DO NOT MEET OR EXCEED SUCH STANDARDS 5HALL BE REJECTED AND REPLACED AT THE CONTRACTORS ENPENSE, 6 AND 6URLAPPES TREE55TIALLAV HE THE TOP HALF OF ME WIRE SKET REMOVED. THE BURLAP 5HALL BE REMOVED TO Thf GRVM5T CUCRT POSSIBLE. U51NG A KNIFE TO CUT AND REMOVE THE DOMM HALF UNDER THE WIRE BASKET THAT REMAINS. ]. QUANTITIES ARE 5HOWN FOR CONVEMRCE ONLY, CONTRACTOR'S RESPONSIBLE FOR VE—NO ALL QUANTITIES 8. ENHANCED LANDSCAPING N ROW INCLUDING TREES. 5HRUB5. FLO— AND GRASSES OtnER THAN TURF R-FOUIRES MAINTENANCE AGREEMENT WITH THE CITY. TEE MAINTENANCE AGREBE ENT MUST BE EXECUTED PRIOR TO FINAL INSPECTION BY FARO. A GREEN 5HEET WILL NOTBE 155UED UNTIL ME MAINTENANCE AGREEMENT 151N PLACE AND VEGETATION 15 f5TABU5HeD PER SPECIFICATIONS, FARD FORESTRY (CITY CODE 33-I 1 CONTRACTOR 15 RC5PON51BLE FOR SCHEDULING AN ONCTE INSPECTION Of THE ROW TESECTO eE PUNTED WMM THE PAR1c c RECRE ION5 on FORESTER'5 OfFICE P OR TO 5]-9ANB/ORCMREEF 83925J2ERM50FDRTWEXAS ORTFT.GO, TREES MAT HAVE NOT BEEN JUSOBOTED PRIOR TO PLANTING ARE SUBJECT TO REJECTION, 2) PRIOR OSURSTITUTINGANY II OTHER ISSUE, A REVEOU RO FREEPRMII 5HALL BE OBTAINED FROM OARDDCTANY Y FORESTER BEFORE IKSTALLATION OF THE FROP05ED 5PECIE5 CHANGE CONTACT: 81 ]-392-5]29 DR 81 ]-392-5735 OR U1FMA£EMWIT50 FORTWORTHTEXAS.GOV (CITY (s 145 GAL T t21 a5 GALT 310.INCHESC c ND MUD I3.455 SF 4.D6B sF E.TB] BE sso BE cTN000N oAcmoN — so NTG CTA TIGHT. rEST AND NARD5CAPE D .-FDA GRA DISEASE E SUBMITTAL NOTES: a� R VER ROCK PAMEK5 COBBLf SMALL (I'-3') 51 CONTRA O.O DVDE MOF05 WITH MEASUREMENTS BLOWN FOR ALL TREES AND S '.4C 1.0525 2O BE 4635E 44 sF 3255E NONE WHIZ-D ONE DR APPROVED HRU85_ OTO5, MELANOSCAPE ARCH iELT MAT REOLESTA NURSERY �YJ fARMERS COBBLE EQUAL ST V 5 T TO TA4 TREC3 FOR APPROVAL. NO TREE5 SHALL BE DELIVERED TO THE 51TE WITHOUT A ROV L FROM ME LANDSCAPE AR N O CONTRACTOR 5HALL RFE5TAB DE SH 50D AND ADJUST —TING IRRIGAT ON OR PRE TEMPORARY WRmEN CH ECT 4, a1 BEGATION UNTIL ESTABLISHMENT N AREA DISTURBED BY CONSTRUCTION. AT NO ADDITIONAL 2) 5ELECTON WU BE EASED ON SPECES 512E FORM BRANCH 5TRUCNRE AND EG DDSf TD OWN . REFERENCE I G O PIA.N5. --- OVERALL NALTn THE CONTRACTOR SHALLBRARUE SUfF C EM NOT Cf AND ENSURE ALL SPEC FIED PLANT MATERIALS ARE AVAILABLE FDA REVIEW AT THE TIME OF THE VISIT. ,DD o0 GRADED SCALE INFEET 64 - PLANTING PLAN REVIEWED By Andrew Goodman atl-ApF22,2826 5 PLANT SCHEDULE SYMBOL CODE BOTANICAL/COMMON NAME TR2E5 LOTACIA O FC CHINE5E PI5TNACHE ON OUERCUS VIRGINIANARICH RISE' HIGH M5E LIVE OAR PH2 D1EP.CU5 VIRGINIANA'HIGn 1I5E' HIGH 815E LIVE OAK ORNAMENTAL TREP5 11-115 CANADEN515—N- `! IN2 NELLIE Nf TI-1 EVfNS' R. S11, I HOLLY ML MAG.N LA GRANDFLORA' UTTLE pWARF SDUTHERN MAGNODA 5HRUb5 DI—CAp S BERML£Y 5EDGE T,F HESPERALO FARVIFLDRA y+� RED YUCCAE 1 t ICC I-COR—A'CARI55A' CARI551 nO11Y (`y IN UED VOMIiORIA' NANA �J pWARF YAUPON } NDF NANO:NADOMEAUCA'LEMCN-LIME - NANDINA LEMON -LIME- OE OPUNTIA fLLISANA PRICKLY PEAR CACTUS SPIN— ANNUALS/PERENNIALS +i EFz —E-REA I —LE CON oWER .. OTHERA UNCLE ou CAUIMERI RA PA2 PfROV5KA ATRIPUCIFOLIA RIJ551AN RAGE GROUND COVER5 ( 5EAS11AL COLOR ANNUAL5 50D/5EED OYNIIERMUOA GRAS1 11 CONTRACTOR IS RESPONSIBLE FOR 5CHEDUUNG AN ON51TE INSPECTION OF THE ROW TI—TO SE PLANTED WITn THE PARK! RECREATIONS CITY FORE5TER'50fT1Cf PRIORTO INSTALfATION. FROVIDE 72 HOURS MINIMUM NOTICE TO B 1 T-392-5T39 OR B 7-392-5729 AND/OR CIMREEPERMITS@FORTWORTHTE%A5. NOV. TREE THAT HAVE NOT BEEN INSPECTED PRIOR TO 1-1- ARE SUBJECT TO REJECTION 21 PRIOR TO 5UB5T1TUTING ANY ROW TREE 5FECIE5 DUE TO AVAI IABILRY, OUANY OR ANY OTHER I55UE. A REV 15ED ROW TREE PERMIT SHALL BE OBTAINED FROM PARR CITY FORESTER BEFORE INSTALLATION OP THE PROPO5fD 5PECIE5 CHANGE. CONTACT: 0 17 392 S729 OR B 1 ]-392-5]3D OR CIM—E5RMIT5@?DRDMORTNTExAS.GOV (Ott DOME ® TY x�Ns ® NON _ wPLa PoA os ,z ,azr ® 30 LE 5 40 GRAPHIC SCALE IN FEET REVIEWED By— Goodmanat—Ap 2X 1028 Westwood n .o CONSTRUCTION NOT.S�E TRas, texas uTxlwxc wins .xo BRT wTx wA,ER Devi-DeLx —Al— mm >sz-szss. 105651 X-2H250 MAPSCO NO. TAR-07M 33I-105654-EO]665 TAD WP NO. 2036-392 CITY OF FORT WORTH, TEXAS vas CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS PLANTING PLAN p DE tO 84rJ0 - 26400 7$// DESIGNED: DJW I PK J0B N0. DATE: SHEET R`/zs/zo2a DRAWN: OJW 5085__2 92 1 JUL 2024 830E 90 A I I EHl M.FceT DETON PURPOSES ONLY ORE A L I HAs <+owN ON E-N NO 5UE TONAL omslRocr oN TaFOIDNus. I I I I I I �sE TN ON o�Toi o D O oN O NiRAROR OIfORE O ROR ,55 F.%IS IS ING� O E I I Ain T II I 6 O 9 8 7.3 Q I UJ zc -- ------------ = j CAMP 80WIE 60ULEVARO ~Q (VARAWE WIDTH RIGHT -OF -WA % CAUTION GAS LINEHM CONTACT: DIG-TE55 1-800-DIG-TOSS ATMOS ENERGY 214-426-7026 " HOURS PRIOR TO CONSTRUCTION IRRIGATION PLAN IRRIGATION 5CHEDULE SYMBOL MANUFACTURER/MODEL 9r F R IN BIRO I B04-SAM-PR5 I STRIP SERIES RAN— Ieo4-sAM-PRS I55ERI.M R R e la RAIN BIRO I B045AM— AOl HUNTER 1R05-ER530-0G£V-EC1 SYMBOL MANUFACTUPMMODEL 6 HUNTER 1a-1.o 1 15 AREA TO RECEIVE OR RUNE uNTER HDL-04-12-CV 77�� C NTFA O nrn rlr P — ION ANo REPLACE AS. O Reosr SYMBOL MANUFACTURER/MODE HUNTER PGV-101G ►N N1eco T-1 le ( PEBCO 550 2' © Cl. CORPORATION LET k20 �5 HUNT ER MINILLiK (2) A WATER MET€Rr O - — - / O F- F Q i NO WORK TI1s— — rA s Ao -WALK ® ux w weE PLATER uPOATc o /12/21a26 a no GRAPHIC SCALE IN FEET REVIEWED By— Goodmaxatl94 ARr2X 2828 Westwood CONSTRUCTION NOTES �E n xTN.TRLEs, �Ex s uTAxuxc w>us .xo R `b1817 EP a°°oo A,I .. m,» k°Ia,r��I P1,1 za,�az„ CxE (e�)RAx�s9,9 HARreR coax. fe+r) ws-bnz ExT. baa3 ;ItY PROJECT N0. 105654 X-2H250 'PRC IPRC22-0119 MCC NO. TAR-O7. ID 30114-020043331-105654-EO]6B5 TAD WP ND. 2D36-392 CITY OF FORT WORTH, TEXAS [ `i CAMP BOWIE BOULEVARD a ROADWAY IMPROVEMENTS C IRRIGATION PLAN G 18+50-26+00 °< DESIGNED: I" PK JOB N0. DATE: SHEET C DRAWN: DJW SOBS-22.692 JUL 2024 890E 90 A Project Name: Project No Camp Bowie 002259.000 OWNER CHANGE ORDER O.C.O. # 0032 DATE: April 15, 2026 DESCRIPTION OF THE PROPOSED CHANGE: CO 32 - Sculpture Pad Electrical Install SCOPE: This scope entails adding additional electrical conduit and junction boxes to allow for future light fixtures at the sculpture pads near Montgomery Street and University Drive. Pricing Details: Company Name Description Amount Bean Electrical LLC WC #4 - ELEC & LIGHT 10,010.75 CCIP 202.22 Builders Risk 102.13 Fee 820.05 Performance & Payment Bond 89.08 Net Amount This Proposed Change 11,224.23 Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. If the "Net Change in Calendar Days Due to This Proposed Change" is blank the schedule impact will be evaluated at a later date. McCarthy Building Companies 12851 Manchester Rd. St. Louis, MO 63131 olgltally signed by Mark Valdez DN'. Mark ValdezMa a g aP es.hb CN=Mark Valdez Dale: 2026 05,08 15:53:25-05DU SIGNATURE DATE Treble0ak 4849 Greenville Avenue, Suite 100 Dallas. TX 75206 Josh Goad oK SIGNATURE DATE Crescent Property Services LLC 3230 Camp Bowie Blvd, Suite 500 Fort worth, TX 76107 Digitally signed by Travis Rieff DN:C=US E Tr0&rescent.-m, ff O=Crescent Real Estate LLC OU VP Travis Rie Develop—( CN=Travis Rieff Date: 2026.05.11 10 44:12-05'00' SIGNATURE DATE Printed on: 4/15/2026 5:07:48 PM Page 1 of 1 MRARINY TITLE: CO 32 - Sculpture Pad Electrical Install OWNER CHANGE ORDER O.C.O. # 0032 DATE: April 15, 2026 NOTES: This scope entails adding additional electrical conduit and junction boxes to allow for future light fixtures at the sculpture pads near Montgomery Street and University Drive. PCI Description Amount 00071 CO 32 - Sculpture Pad Electrical Install 11,224.23 The Original Contract Value was: 12,898,656.00 Sum of changes by prior Change Orders: 976,753.92 The Contract Value prior to this Change Order was: 13,875,409.92 The Contract Value will be changed by this Change Order in the amount of: 11,224.23 The new Contract Value including this Change Order will be: 13,886,634.15 The Contract duration will be changed by: 0 Days The revised Substantial Completion date as of this Change Order is: May 26, 2026 Printed on: 4/15/2026 5:09:13 PM Page 1 of 1 MRARINY- Project Name: Project No Camp Bowie 002259.000 DESCRIPTION OF THE PROPOSED CHANGE: CO 33 - Landscaping Tree Swap SCOPE: OWNER CHANGE ORDER O.C.O. # 0033 DATE: March 25, 2026 • Quantity Deduction - 54 EA of Nandina Demostica, 15 EA of Hesperaloe Parviflora quantity reduced from scope. • Nellie and Magnolia Swap - 15 Gallon size swap for 45 Gallon size • Chinese Pistache Tree Swap - Swap 5 EA of Texas Redbud at Crescent Hotel for 5 EA Chinese Pistache including additional demolition for tree beds Pricing Details: Company Name Description Amount Ruppert Landscape Inc WC #5 - LNSCP & IRRG 25,878.19 CC I P 584.27 Builders Risk 295.08 Fee 2,369.38 Performance & Payment Bond 257.38 WC #1 - EW & DEMO 3,045.98 LANDSCAPE ALLOWANCE-32,101.16 Net Amount This Proposed Change 329.12 Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. If the "Net Change in Calendar Days Due to This Proposed Change" is blank the schedule impact will be evaluated at a later date. McCarthy Building Companies 12851 Manchester Rd. St. Louis, MO 63131 SIGNATURE DATE Treb'IeDak Crescent Property Services LLC 4849 Greenville Avenue, Suite 100 3230 Camp Bowie Blvd, Suite 500 Dallas. TX 75206 Fart worth, TX 76107 SIGNATURE Digitally Mq-d by Trevis RIeR DN: C=US, E=Tn0&1emem—. Travis Rieff D-'ope° ,CN=T,a,e«D DD Development, CN=Trevis0 Date: 2026.04.23 1143:04-05 '00' DATE SIGNATURE DATE Printed on: 3/25/2026 4:51:42 PM Page 1 of 1 OWNER CHANGE ORDER O.C.O. # 0033 DATE: March 25, 2026 PROJECT NAME: Camp Bowie PROJECT NO.: 002259.000 TITLE: CO 33 - Landscaping Tree Swap NOTES: • Quantity Deduction - 54 EA of Nandina Demostica, 15 EA of Hesperaloe Parviflora quantity reduced from scope. • Nellie and Magnolia Swap - 15 Gallon size swap for 45 Gallon size • Chinese Pistache Tree Swap - Swap 5 EA of Texas Redbud at Crescent Hotel for 5 EA Chinese Pistache including additional demolition for tree beds PCI Description Amount 00070 CO 33 - Landscaping Tree Swap 329.12 The Original Contract Value was: 12,898,656.00 Sum of changes by prior Change Orders 976,753.92 The Contract Value prior to this Change Order was 13,875,409.92 The Contract Value will be changed by this Change Order in the amount of: 329.12 The new Contract Value including this Change Order will be: 13,875,739.04 The Contract duration will be changed by: 0 Days The revised Substantial Completion date as of this Change Order is: May 26, 2026 Printed on: 3/25/2026 4:52:59 PM Page 1 of 1 Project Name: Project No Camp Bowie 002259.000 OWNER CHANGE ORDER O.C.O. # 0035 DATE: April 10, 2026 DESCRIPTION OF THE PROPOSED CHANGE: CO 35 - ADA Ramp Extension at Boland SCOPE: This Change Order includes additional labor and materials required to construct a sidewalk extension from the newly installed ADA ramp at the northeast corner of the Boland Street and Camp Bowie Boulevard intersection to the adjacent narrower sidewalk. Pricing Details: Company Name Description Amount WC #2 - CONC PV & FW 1,113.30 CC I P 22.49 Builder's Risk 11.36 Fee 91.20 P&PBond 9.91 Net Amount This Proposed Change 1,248.26 Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. If the "Net Change in Calendar Days Due to This Proposed Change" is blank the schedule impact will be evaluated at a later date. McCarthy Building Companies 12851 Manchester Rd. St. Louis, MO 63131 SIGNATURE DATE Treble0ak Crescent Property Services L.LC 4849 Greenville Avenue, Suite 100 3230 Camp Bowie Blvd, Suite 500 Dallas. TX 75206 Fort Worth, TX 76107 SIGNATURE DATE SIGNATURE DATE Printed on: 4/10/2026 12:23:33 PM Page 1 of 1 OWNER CHANGE ORDER O.C.O. # 0035 DATE: April 10, 2026 PROJECT NAME: Camp Bowie PROJECT NO.: 002259.000 To The Contract for the above -referenced project ("Contract') is hereby revised by the following items: TITLE: CO 35 - ADA Ramp Extension at Boland NOTES: This Change Order includes additional labor and materials required to construct a sidewalk extension from the newly installed ADA ramp at the northeast corner of the Boland Street and Camp Bowie Boulevard intersection to the adjacent narrower sidewalk. PCI Description Amount 00073 CO 35 - ADA Ramp Extension at Boland 1,248.26 The Original Contract Value was: 12,898,656.00 Sum of changes by prior Change Orders 976,753.92 The Contract Value prior to this Change Order was: 13,875,409.92 The Contract Value will be changed by this Change Order in the amount of: 1,248.26 The new Contract Value including this Change Order will be: 13,876,658.18 The Contract duration will be changed by: 0 Days The revised Substantial Completion date as of this Change Order is: May 26, 2026 Printed on: 4/10/2026 12:25:38 PM Page 1 of 1 T 1 i- / ,11 / LOT 1 K 1 REVISIONS BLOCK 5 _ VAN ZANDTS HILLSIDE ADDITION GREGORY HI. Q ° o I ♦ RE 1 ®EIFCTRICAL -CONDUIT RUN R2-38 PHASE 1 3 itH. A 2025 (VOL. 388 104 PG 46) (INST. NO yy 2 ® FLATWORK - ADA RAMP CALL OUTS J/12/202 ( A ILL loll V 9 L / cx BMAC ON THE BRIM LLC saAcs EASFNEnTF 3 ® PCCO 12 8/28 202E (INST NO. D207304053) =so 00 M 1 . p RFI se a se 1/19/2025 / STA 17+94.99. 51.5' LT I BOLANO BFR 3 13 2026 /- L=14.37 / . , v S '// TYPE P 1 TAPER 5 3 OR To 22' N10E DRIVEWAY s ® / e Q T ° EXISTING SIDEWALK 17.51 0. J; r� NEAREST EXISTING / T Q TEP-1 - _ - DI-r"° 50 --- -=41°0956'/ V----- _ _ _ ® -T` -- 1 - SIDEWALK JOINT - b - O 0 0 11 41 50 - �OXZXNTAL x FEET ° T O OU 142 ® R=400 L 835' T L 1571' ° a 2 ml�� M - 8 A'"^ ;�� 45 T=406' _ FE ).1 I [� r 5Y]958 T 000' —{ =90 5053 - W-" T W 90 00•00 140 TIP E I s 'a . .� .. iH4.9, >• T-++ R.1000' ' _ - 92 n + + * L�S81 4' �WEAATUT TONM ONAry uxE rta y J _'.I_ -. 0 '- - .: i ° • R.10.00• 0_.61iti�" navos sxa L vA a _ w BOX - - a R 10.00• - 1 0' - —DE . _ --_ _ _ _ E F n cF9�T C 3 Q.� R 1000, s } i�L=15 JI' -(-- - mEE alloTEcnoxA(REF a vLANs)� C L 1571' 'm T 10.00' 94 `LliT1 CC 90°00'00° cxA �•I� T 1000. CARP 8O VXRtr ', JT I y — 90°DD•OD•_EL EDGING TYf�"""r"�-If1l. =9o°ao'aa - . nc a I ( ) I - ` �p - Y, I Ll NE) J/�- ,-A p�.M.� J °* LOT I /. THE KIMDELL `, J 'fit-+ REFERENCE GR AGING J T RpyNR Euc WEER rs Ax xoER THE TEx E"' ExmxEemxc vxAcn¢FEnsE u 1 As (INST.. NO D270262133) \ L ! SHEETS FOR DETAILED 1 1 IA — CITY SIDEWALK AND RAMP Nln NSINo Cm of FORT WORTH ELEVATIONS (INST. No. Dzooazssas) � 1 NEw xEo '"`"xssE REVIEWED REFERENCE LANDSCAPE FOR B .F_W G"°6man a(2:4]Pm, _,, Y026 PAVEMENT TYPE AND FINISHEE Y CAMP BOWIE POET TEEABLES FOR DESIGN 595 59s 590 ` 590 EXISTI IDE 0 ¢ EXI9 O Ll ING GRADIE RGW 585 585 5TN RT IOW . GR )E y� \ Fl 19HEO GRAD O OL \ 5)1 D GR O ET TE . \ 580 IX TING o GRAD RT T \ 580 575 �>r 575 Westwood CONSTRUCTION NOTESIF FIATnn o(Ti) an els°�"c An oxs (mG ass-azsa vA(eliav�l(el7j ilsmis .A;- cw ((�» wo-asiiz ExT. 3xa :ITY PROTECT NO. 105654 X-26T50 'FRG TPRC24-0119 .NAPSCO NO. TAR-076A 'TO 30114-020043331-105654-E0766L5 TAO A/AP NO. M36-392 CITY OF FORT WORTH, TEXAS `a CAMP BOWIE BOULEVARD i ROADWAY IMPROVEMENTS 3 PAVING PLAN & PROFILE STA a 13+80 TO STA 18+00 a DESIGNEO:CTL/MKB PK JOB N0. DATE: SHEET Q DRAWN: CSC/MKB 5085-22.692 JUL 2024 27 OF 92 L OWNER CHANGE ORDER O.C.O. # 0036 DATE: April 24, 2026 Project Name: Camp Bowie Project No: 002259.000 DESCRIPTION OF THE PROPOSED CHANGE: CO 36 - Light Pole Redesign SCOPE: This Change Order provides for the installation of the existing 30-foot poles in an alternating sequence, to be completed prior to the City of Fort Worth FIFA blackout period from May 26 through August 3. It includes additional traffic control costs required for interior lane closures to allow Bean to proceed with Option 1 (see attached), consisting of the replacement of the existing 8-foot light heads with 16-foot light heads on the 30-foot poles, as well as general conditions costs for post -FIFA project oversight. This Change Order and its associated pricing are contingent upon acceptance by the Developer and the City of Fort Worth that the work described herein is not required to achieve contractual Substantial Completion. Such work will instead be designated as punch list items and completed by the date identified as "Final Completion" in the attached schedule. Retainage on work completed through Substantial Completion shall be eligible for release in accordance with Article 14, Section 8 of the Contract, "Final Completion Delayed and Partial Retainage Release." Pricing Details: Company Name Description Amount WC #4 - ELEC & LIGHT 85,375.68 WC #6 - TRAF CNTRL 17,301.76 General Conditions 16,575.50 CC I P 2 195.90 Builder's Risk < Fee 9,069.88 P & P Bond 985.25 Construction Contingency -9,100.12 WC #3 - CL & ST CONC -10,545.00 General Conditions Description: The total cost of $16,575.50 reflects the additional management, staffing, and resources required to support traffic control activities, the electrical contractor's 16-foot light head replacement work, and punch list completion from August 3 through August 18. This cost also accounts for the extended effort necessary to oversee and close out the added scope of work. McCarthy anticipates that this level of effort equates to approximately 15 additional days of General Conditions. The cost includes all required project staffing - comprised of a part-time Project Manager, a full-time Project Engineer, and a full-time Project Administrator - along with supporting resources such as company vehicles, computers, jobsite software, and other essential project support tools. These resources are necessary to ensure proper oversight, coordination, safety, and continuity throughout the extended work period. Net Amount This Proposed Change 115,041.60 Net Change in Calendar Days Due to This Proposed Change 63 Days Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy will be reimbursed for work completed. Printed on: 4/24/2026 7:38:07 AM Page 1 of 2 McCarthy Building Companies nemeomx 12851 Manchester Rd. 4x«eGreenville Avenue, Suite 1mo St. Louis, MO 63131 Dallas. TX 75206 SIGNATURE DATE SIGNATURE Crescent Property ServiceaULC 3230Camp Bowie Blvd, Suite 500 Fort Worth, TX761or DATE SIGNATURE CMAR Reduction (P&P Bond, Fee, CCIP, Etc.)= (1.569.16'1 :REV2 - In Sequence Install - New Value with Discounts - $ 110,557.10 CMAR, Increase (P&P Bond. Fee. C CIP, Etc.1 = 2,497.36 resourceslmateriat on site untiLthe deUverylinstakation of new heads. oversight in August. Printed onwo4/2oz*7:nn:o7mw Page 2cx2 OWNER CHANGE ORDER O.C.O. # 0036 DATE: April 24, 2026 PROJECT NAME: Camp Bowie PROJECT NO.: 002259.000 TITLE: CO 36 - Light Pole Redesign NOTES: This Change Order provides for the installation of the existing 30-foot poles in an alternating sequence, to be completed prior to the City of Fort Worth FIFA blackout period from May 26 through August 3. It includes additional traffic control costs required for interior lane closures to allow Bean to proceed with Option 1 (see attached), consisting of the replacement of the existing 8-foot light heads with 16-foot light heads on the 30-foot poles, as well as general conditions costs for post -FIFA project oversight. This Change Order and its associated pricing are contingent upon acceptance by the Developer and the City of Fort Worth that the work described herein is not required to achieve contractual Substantial Completion. Such work will instead be designated as punch list items and completed by the date identified as "Final Completion" in the attached schedule. Retainage on work completed through Substantial Completion shall be eligible for release in accordance with Article 14, Section 8 of the Contract, "Final Completion Delayed and Partial Retainage Release." PCI Description Amount 00074 CO 36 - Light Pole Redesign 115,041.60 The Original Contract Value was: 12,898,656.00 Sum of changes by prior Change Orders: 976,753.92 The Contract Value prior to this Change Order was: 13,875,409.92 The Contract Value will be changed by this Change Order in the amount of: 115,041.60 The new Contract Value including this Change Order will be: 13,992,794.88 The Contract duration will be changed by: 63 Days The revised Substantial Completion date as of this Change Order is: August 21, 2026 Printed on: 4/24/2026 7:39:21 AM Page 1 of 1 OWNER CHANGE ORDER O.C.O. # 0037 DATE: May 08, 2026 Project Name: Camp Bowie Project No: 002259.000 DESCRIPTION OF THE PROPOSED CHANGE: CO 37 - Sculpture Pad Redesign SCOPE: This pricing covers the transition of traffic control from Phase 4 to Phase 4.5 to facilitate completion of the remaining electrical work and sculpture pedestals, including the installation and maintenance of Phase 4.5 traffic control. It also includes excavation, placement of select fill, installation of rebar, and concrete placement for the pedestals at Montgomery and University, as well as the footing at Montgomery. McCarthy will self -perform this work, including hauling and disposal of spoils. In addition, ATS Drilling will drill the shaft at University to bedrock, with concrete supplied by McCarthy. An allowance of up to $8,000 is included for crane support should unforeseen subsurface conditions require casing. This pricing also includes a credit for the materials, equipment, and labor associated with the installation of (3) 4-inch sculpture pads and the four bollards at each location, which were included in the original bid plans but were replaced with pedestal installations as part of the redesign. Pricing Details: Company Name Description Amount WC #1 - EW & DEMO 16,005.39 WC #2 - CONC PV & FW 10,315.96 WC #6 - TRAF CNTRL 4,577.94 CC I P 624.17 Builder's Risk 315.23 Fee 2,531.18 P & P Bond 274.96 Net Amount This Proposed Change 34,644.83 Net Change in Calendar Days Due to This Proposed Change Days Substantial Completion moved from 5/26 to 6/2 with Final Completion still set for 8/21. Attached is an itemized quotation for changes in the Contract sum and/or time on subject Project as described herein. This document, when fully executed, as accepted, shall constitute authorization to proceed with the work described herein. Due to schedule impact, this work may be performed prior to approval of the formal Change Order. The Owner agrees that McCarthy Building Companies. will be reimbursed monthly for the cost of this work as completed, whether or not the Change Order has been fully executed. If the "Net Change in Calendar Days Due to This Proposed Change" is blank the schedule impact will be evaluated at a later date. McCarthy Building Companies Treble0ak Crescent Property Services LLC 12851 Manchester Rd. 4849 Greenville Avenue, Suite 100 3230 Camp Bowie Blvd, Suite 500 St. Louis, MO 63131 Dallas. TX 75206 Fort worth, TX 76107 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Printed on: 5/11 /2026 3:43:12 PM Page 1 of 2 OWNER CHANGE ORDER O.C.O. # 0037 DATE: May 08, 2026 PROJECT NAME: Camp Bowie PROJECT NO.: 002259.000 TITLE: CO 37 - Sculpture Pad Redesign NOTES: This pricing covers the transition of traffic control from Phase 4 to Phase 4.5 to facilitate completion of the remaining electrical work and sculpture pedestals, including the installation and maintenance of Phase 4.5 traffic control. It also includes excavation, placement of select fill, installation of rebar, and concrete placement for the pedestals at Montgomery and University, as well as the footing at Montgomery. McCarthy will self -perform this work, including hauling and disposal of spoils. In addition, ATS Drilling will drill the shaft at University to bedrock, with concrete supplied by McCarthy. An allowance of up to $8,000 is included for crane support should unforeseen subsurface conditions require casing. This pricing also includes a credit for the materials, equipment, and labor associated with the installation of (3) 4-inch sculpture pads and the four bollards at each location, which were included in the original bid plans but were replaced with pedestal installations as part of the redesign. PCI Description Amount 00075 CO 37 - Sculpture Pad Redesign 34,644.83 The Original Contract Value was: 12,898,656.00 Sum of changes by prior Change Orders: 1,104,597.13 The Contract Value prior to this Change Order was: 14,003,253.13 The Contract Value will be changed by this Change Order in the amount of: 34,644.83 The new Contract Value including this Change Order will be: 14,037,897.96 The Contract duration will be changed by: 0 Days The revised Substantial Completion date as of this Change Order is: August 21, 2026 Substantial Completion moved from 5/26 to 6/2 with Final Completion still set for 8/21. Printed on: 5/11/2026 3:44:20 PM Page 1 of 1 g E ry W -2100,00 B+50.00 3+o0D0 ;+so 0a Z O � 0 R �, , tz, 6'1 PROPOSED LOCAL DISCONNECT FOR SCULPTURE LIGHTING: s A 4*00V � 1_2 • tr CAMP B A A '(N 1C' ZC. �/- �Oxr Uxicn ` �- \ As rvccvRv, nOx LIxE ---`---_-_- WIE BOULEVARD 3LE WIOiH Rr(21T-OF-WAY) r MwwRRnav�TAVIE� �E � VaR# 1 x \ONE—T R1-1 Ri-5 Rt-8 Rf-B Rt-) R1 e i /------- - - - - - - - - - � i- - - - -- - - - - - �4Ap` 5A3® 's® AiA SBA A �F 9A`A c �o9A L GiA 5..5 N + — CAMP BOWIE BOULEVARD 3a6B o m 1-11 IA sxEETs i " (VARIABLE WIDTH RIGHT-OF-WAY) h B A --- G F A - p urR N 1 24 1-1 ®1D 1 1TM { R1 1 --� .0 - --- � -- --- — -- 1 T.e o +sa oo— -- a*—o oo oo a+s000 � 9+000o Z 1 W ITA a9 Q A ® 9K x G 0 7C+ ~ �o«,R�iR, _ ,« E RED o«'� RxlxniE RE�nr • :: oFEON IE"ilaL ;3C 4C ®5C " -T. ©6C a a /j ----- --- -- --_ 1i ------ --------_—_-- -----------------_---- ---- �_ — T — R116 � nwxvmcv Hurt xE, NATERLLLraIW..lmv xnTER xvvN I — — — ' — TA 7. W„ERIAL D.KxONx _ / / IICAUTIGNH CONTRACTOR TO LOCATION ALL UNDERGROUND UTILITIES BEFORE BEGINNING EXCAVATION. IN AREAS WHERE UTIUTY CONGESTION EXISTS THE CONTRACTOR aeR SEE CONTRACTOR NOTES ON THE ILLUMINATION DESIGN CHARTS SHEET SHOWN ON SHEET 65. SHALL VACUUM EXCAVATE OR HAND DIG TO AVOID DAMAGING ANY EXISTING UNDERGROUND UTILITIES. CONTRACTOR TO ENSURE 3' CLEARANCE FROM EDGE EH OF POLE FOUNDATION AND WALL OF UNDERGROUND WATERLINES. NG f( �TAYLOR N. BATESt <•cexscA a� '�10NALE�- C# 18 LIGHT POLE BO LIGHT POLE ELECTRICAL METER SYMBOLS 0 GROUNDBOX - - - - - --- 2'TRENCH ---------- 2"BORE FENCELINES _� a= OVERHEAD ELECTRIC WATERLINE --xY.4rtAnn SANITARYSEWER —�'++•�• '+ STORM DRAIN --. --- ROW LINE STRUCNRALPOLE TRANSFORMER N WARNING Z — /UNOERGROUNO UTILITIES IN THE D THE AREA CONTRACTOR SHALL LOCALE ALL UNDERGROUND UTILITIES BEFORE EXCAVATING. CONTACT UTILITY 48 OURS PRIOR TO CONSTRUCTION AT I-BOO-XG-TESS. REVIEWED By AR —Goof Al2A6PR,APr09, 2026 I Pacheco Koch.. —NA IT T RPR,H . - 'Pr REI. a R TIR 5 ,xI Ate, CITY PRCVECT NO. f05654 X-16150 IPRC IPRC14 0119 .MAPSCO NO TAR O]69 n0 .Rntts Oa004.TTn t0565s EO]6W5 TAO MAP NO. 1036-391 CITY OF FORT WORTH, TEXAS CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS ILLUMINATION PLAN DESIGNED: TNB I PK JOB N0. DATE: SHEET DRAWN: RAH 50B5-22.692 JUL 2024 1 51 OF 92 REVISIONS DATE L 3 c A wn�m / Uv ��g� L ----------------------------- _-------- o zD 4 \ sTAIv�z,.sz i A; 1 ' I _ p2_T 'GRAPHIC SCALE IN FEET L _L_ _ _ __ __ - --_ _ ��_ O ED -- -- s---- ---- C# 18 LIGHT POLE - Fc s ---------- R2 , 10A' R2-2 --- 1-1A — -- RZ-' 12A------- `--- ®13A --LT "S -14A#� RUE-6 6 A 15A o - .'TRENCH ','i nvaxwxcvv xxo PLANS 444 vATve Lpar. v°'E ¢wcv vn,Ea vxz. r __________ 2^BORE w."cau �, nica IMCEUHNES a ' A B O -- n*calx uuxrpvx —�—a— OVERHEAD ELECTRIC Z 2-2 3DI�� - - - _-__-_____ , WATERLINE m -� W .sa SANITARY SEW ER n 00 IO«50 Op It.bffOO i 11 5000 _ 12 0000 12 5000 13 0000 13+5000 14 Z .,,—..ram STORM DRAIN I Azv.sz—__.--_— ROW LINE uzz.es STRUCNRAL POLE CAMP BOWIE BOULEVARD ", 2 TRANSFORMER o o a LI-E: --- gwgeLE WIDTH RICH ns ED. Nw o I_� r -L 2 A e�w. ---- ------ ------ ---- -------�---- ----- a xnT,ex o`8C 9C-4 10C 12C 13C1 ---- - - - ------ - - - ------------- — - ---' S 1 ' WARN/NG s T.—DRm RG ClANO.S HE AREAHCONT/RACTOR 5 ALL LOCALE2-3 ROUND UTL TEN BETg2E OR TO TNG.CT UTLtt TB OURS IG OR TORUCTON AT 1-600-GIG-IEEE ' REVIEWED ByAn6rew Ooa6man e12:06 pm, Apr09, 1026 MATCHLINE 'A' - SEE SHEET 65 FOR TRANSFORMER DETAIL y Q13A ; T R°"n aEa Po `" ® Pacheco Koch eR" "'IRwNaaN / Ov ��� sD�x �TH or scaxa • YW'lwood wmpaM I "n,`o�'. u`,uoo ELECTn,EUL sE xcEYREDEETA, CONSTRUCTION NOTES ,Reee. RN R�Aw A«D R2-] RROPoszD , D�REET R1NU ED_PDRANAI RE ,s npD nu. Nv.TWn" Rrpn A"nu a s uxLcss Onexws Rz-6 -----------� - Nme"EvomE«LOE. m �g '"' \ --- A n R " xo m m�R aw T p.--- © k � jj IG.93s" ETA mn� �pwNGAT�n "�R"m�RTOvnRGnT n 16A R2 ,8Ao-- i 19Ao I�20Alz ,.eL o ' , a�R nw 61„ a L, o mT an e,eR IF, ,,. �xevee !� �:rm, a`r4°„ O "R': E�ce',ac rn.R VL>IRu.mx 1 z-z `� I --- 0F0 6B _--- 00 nuwAn Ra.iu pDHL(TOaN1'NR, IZONTz EAxsrL. v&e.T VERTICAL 00 ta•SOGO y- Is• o sa00 —OU00 16,5oa0 1 oo.00 ewes e"I ea eu�n �5 � (Az_z is co.po----1 _------ — - W"sS68. °` "�RE s� Cw o ]sN, - Z elEv .� euv e$in.Re18 oou, �mW ews.� � eN. nW:;'S`�u�v CAMP BOWIE BOULE . NeP �` eaN�� � xwr A °"'SnY " 1AY e"icw } (VARIABLE WIDTH RIGHT-OF-WAY) r _�3.LY's.LN3S'�), O --�r ._... --_ V - + ~ CII N PPR014O �EcT NO.g 105654 MAp800 N0. iAR-O]6A �C AO JO114-02004JJJ)-105654-EO]665 TAD MAP NO. 2036-392 t/ L-' ____ - __—. CITY OF FORT WORTH, TEXAS / OC? 0 ptE-�-��F iE~gs�L � CAMP BOWIE BOULEVARD TAYLOR N RATES ROADWAY IMPROVEMENTS TONAL E�'� ikkl. ILLUMINATION PLAN NCAVIICT Ne CONTRACTOR TO LOCATION ALL UNDERGROUND OIILIDAM BEFORE BEGINNING EXCAVATION. D AREAS WHERE ACTOR CONGESTION EXISTS THE CONTRACTOR 'NwTza�� e� DESIGNED: TNB PR 10. N0. DATE: SHEET SEE CONTRACTOR NOTES ON THE ILLUMINATION DESIGN CHARTS SHEET SHOWN ON SHEET 65. SHALL VACUUM EXCAVATE OR HANG pIG TO AVOID DAMAGING ANY EXISTING UNDERGROUND UTILITIES. CONTRACTOR TO ENSURE 3' CLEARANCE FROM EDGE [ —NON U, THE OF POLE FOUNDATION AND WALL OF UNDERGROUND WATERLINES. S DRAWN: BAH SOBS-22.692 JUL 2024 52 OF 92 REVISIONS DA 'EL 6- v a---- �v o 1. 2.ED GRAPHIC SCALE IN FEET IS' LIGHT POLE 1-7 . ...... II'LIGHT POE 3 21A, El E2 E3 LEO ICALMETER SINIEG� s 11 "N21 1 0- �A23 G OUNDBOX + OENCELINES7B, TRENCH --------- .. ........ 4 VERHEAD ELECTRIC m------ -- ,7 —7 - - - - - - - - - - - - - WATERLINE 1--- — 26+�-000 - — - — - — 18-50,00 19+00.0'0 19+5M- E- w Lu SANITARYSEWER ROW LINE STORM DRAIN V: "1+.%.' > F1 I CAMP BOWIE BOULEVARD = STRICTU ALIOUE (VMAME WIDTH RIGHT-OF-WAY) TRANSFORMER ---------------------___ -------- -4 N WARNING lARICUS --/U UTUDES IN THE — CONTENEEIGROUN. AETOR SNAU- -A. ALL UDERGRO NO UTUnES BEFORE EXCA-- ONSTRUCTON AT 1-BOO-EIG-- G44 C CONTACT UXITY � HOURS PR OR TO I649 —I648 I G-4- 45 REVIEWED SyA,—GPPI—I2X5jPPNAIP,W,20nj •hi - =ANT ==A. Pacheco Koc NNN Viastood ..p CONSTRUCTION NOTES 1E —11 PEP-11 1. C%7ACREE III —Tjrll� TEr1l -1. FEN= NG � All Z �E TRIa A' -.A.TE. A=. E...A.:- . .7=.-T ..--cl- E7 E9 —1TNE—AT-1--M—AT _f E4 E5 E6 E8 0 ON ��-POP (UN FPPT IN r v~iA...— RUE ."l- - - - - - - HORIZONTAL & VERTICAL CONTROL 27+SO - — - — - -- ------- T,- LLJ U IN - - - - - - - - - - - - - - - - - 4t - - - - - - - - - - - - IV "E Ell I Al%F4- Me NF UN j N AU_. x 1111wel + -.-m- Lj E! CAMP BOWIE BOULEVARD 11�A'51 hAff V.311WEET (VARIABLE WIDTH RIGHT-OF-WAY) + L 2W 0 ^L ON PRCVECT No. 10654 X-282M IPRL IPRC24-0119 WPSC0 NO TAR-076A 10 rAD MAPNO. 2036-392 ------------------------- ------ i II II CITY OF FORT WORTH, TEXAS % N A CAMP BOWIE BOULEVARD !Q1.111 F�AFES, ROADWAY IMPROVEMENTS ILLUMINATION PLAN -U..T 11CAUTION11 AU wAs CONTRACTOR TO LOCATION ALL UNDERGROUND UTILITIES R111IRF BEGINNING EXCAVATION. IN AREAS WHERE UTILITY CONGESTION EXISTS 11 CONTRACTOR .1—N.." A `EA= -A7 SEE CONTRACTOR NOTES ON THE ILLUMINATION DESIGN CHARTS SHEET SHOWN ON SHEET 65. SHALL VACUUM EXCAVATE Of? HAND DO TO AVOID DAMAGING ANY EXISTING UNDERGROUND UTILITIES. CONTRACTOR TO ENSURE 3' CLEARANCE FROM EDGE INPUT � DESIGNOD: TNR I PI 10. NoSHEET OF POLE FOUNDATION AND WALL OF UNDERGROUND WATERLINES. EIGIEONlS�R UN- THE TEXAs DRAWN: BAN, 5085-n.692 F 24 jlOgIZ� JULjuL 2o 3 OF 92 T Y -F-�Z51 25A; --/�` m ETA R Is ; _r &26A A 27A; _ / O r DD u... RI-e j RI-9 ©116 _ N - --- — _- --- --- __ y .,{ 0,00 26*5000 27 +001 .0 2�+5000 280000 28 5000 29+0000 29+50.00 + CAMP BOWIE BOULEVARD O Y (VARIABLE WIDTH RIGHT-OF-WAY) - t�i1-.)r .%� T� \ 4 f. �� l XY�''. _ r • �17 fly YL� ti A-4 PROPOSED LOCAL DISCONNECT -FOR SCULPTURE LIGHTING. Wb) ti. 31+50.00 32+00.00 32+5D.00 33+R 0 3a+19.50 FUTURE SCULPTURE LIGHTING 4 EA CONE AT EACH CORNER ❑F SCULPTURE. J� ; TA^J N P I / A ._ s 1 _ I HCAUTIONH CONTRACTOR TO LOCATION ALL UNDERGROUND UTILITIES BEFORE BEGINNING EXCAVATION. IN AREAS WHERE UTILITY CONGESTION EXISTS THE CONTRACTOR SEE CONTRACTOR NOTES ON THE ILLUMINATION DESIGN CHARTS SHEET SHOWN ON SHEET 65. SHALL VACUUM EXCAVATE OR HAND DIG TO AVOID DAMAGING ANY EXISTING UNDERGROUND UTILITIES. CONTRACTOR TO ENSURE 3' CLEARANCE FROM EDGE OF POLE FOUNDATION AND WALL OF UNDERGROUND WATERLINES. Y.---- —_— zasD°° '°' CAMP BOW/E v �I J z BOULEVARD , (VARIABLE 'WIDTH RIGHT-OF-WAY) - - - � nn' C# IS' LIGHT POLE 11'LIGHT POLE ELECTRICAL METER SYMBOLS 0 GROUNDBOX - - - - - - - - - - 2"TRENCH ---------- 2"BORE FENCELIN ES OVERHEAD ELECFRIC WATERLINE .sa SANITARYSEWER -•'�� STORM DRAIN ---. --- ROW LINE STRUCNRALPOLE TRANSFORMER NI WARN/NG II/ EAo/uNOERGRouNo UTLIRE9 VNRTHE AREANCONTRACTOR SHALL LOCALE ALL UNDERGROUND UTILITIES BEFORE EXCAVATING. CONTACT URL tt 18 OURS PRIOR TO CONSIRUCRON AT 1 R00 OIG TESS REVIEWED SyAn0lreWOooI RI 2:06PR,AP(R9, 2026 L Pacheco Koch I ; 1, 9 YW'lwood wmpaM n CONSTRUCTION NOTESIT NUST Y wwnf RA- —ELD q+ERAnaxs (RIN snz eEas CITY PRLVECT N0. f05654 W- CO0 IPRC TPRC14 0TT9 MAPSCO N0. TAR 6-39 n0 .3ntts Da0D4.TTn TD565s FO]6fl5 TAO MAP NO. 1036-391 CITY OF FORT WORTH, TEXAS PtE'T ��F iE~gs�l TAYLOR N. RATES � 109R2 9rF <CENSEO ?� '�IONALE�'- CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS N NG TM _ 1RIXTRiOiFIG1°01! ILLUMINATION PLAN H, , a�NRIWCH m- DESIGNED: TNB PK JOB N0. DATE: SHEET 1 THEAs DRAWN: BAH 50B5-22.692 JUL 2024 64 OF B2 KIMa0oo���m© MI m=M®man IIIIIIIIM IIIIIIIIM m©000m��m© ©DOOI♦���© m ©o o��©o on INS m©m©oM�MmEa IMIIIIIIIIIIIM IIIIIIIIM mooa��oo�� mmeeom im TRANSFORMER LOCATION DETAIL .-Ha--- 1(]qq pp 2 1-----X PROPOSED 120/240V TRANSFORMER TO BE COORDINATED WITH ONCOR PROPOSED 120/240V METERED ELECTRICAL SERVICE PEDESTAL POLE DATA 2 OF 2 LUMFNBLADE-MEMUM POLE BANNER POLE HEIGHT Bfi0 MiaO 1 30' ��oeoo; ��oovo; ©oeeo; ��000a; ,00eoo; ooee�; ��000m� �000m ®oevo; ®oeem; ®ooee; ©oeoa; 0000a; �0000; ©000�1 �oeoo; �0000' All ie' poles will be square (6") aluminum. All 30 poles will be square (6") steel. All Lumenblade-medium S60 futures to be mounted at 18'. All Lumerlblade-medium M100 futures to be mounted at 30'. Banner arms mounted to poles shall accommodate 24 x72" mers and may need W be custom ordered. P M naming convention's descdbed as IdloWs: = Poles ) 0' "l. ba POM uandxo3apofawansspfixwremoMnteaatlB mg the sidewalk and M100 fixture mounted at 30' height facing the Khroy. Sae sheet 65 for pole specification details. Contractor to Coordinate with maintaining agency on salvaged Itedals. Poles Ei-E9 are to be replaced in place with 18' pedestrian ltirg pole. Contractor to exrify anchor bolt panem and adjust pole ecification as needed to fit the existing fixture so long as it Itches the $60 Lumenblade specification as defined in thK plan L Existlng power cable and conduit can be ufil'¢ed to facilitate new installations. A S(: P R�IGHTIN NG OTES_ PROVIDE SCULPTURE UPLIGHTING BY CONNECTING A SINGLE PHASE CONDUCTOR OF THE AVAILABLE 24OV, 10 MEDIAN STREET LIGHTING CIRCUIT, UTILIZE PHASE CONDUCTOR AND NEUTRAL CONDUCTOR TO SERVE 120VAC UPLIGHT FlXTURES. PROVIDE THE LOCAL NON —FUSED DISCONNECT AT EACH SCULPTURE, FURNISH AND INSTALL ALL REQUIRED CONDUIT, PULL BOXES/HANDHOLES, CONDUCTORS (INCLUDING EQUIPMENT GROUNDING CONDUCTOR), SPLICES, AND TERMINATIONS PER NEC AND AHJ REQUIREMENTS. THE LOCAL, NON —FUSED DISCONNECT FOR THE SCULPTURE LIGHTING CIRCUIT(S) SHALL BE A LOCKABLE. TAMPER —RESISTANT, WEATHERPROOF, LOW—PROFlLI ENCLOSURE SUITABLE FOR ROW CONDITIONS AND ACCESSIBLE FOR MAINTENANCE. ter . P R-1-1—( f TAYLOR N. BATES Y 1a9aR 9<F <cExscA a� �IpNALE�— GENERAL NOTES FOR CONTRACTOR 11T1LIII CONTRACTOR AND VER Fl LOCATE • THE CONTRACTOR SHALL LOCATE ALL UNDERGROUNDUTILITIES PRIOR TO CONSTRUCTION. • THE CONTRACTOR SHALL VACUUM EXCAVATE OR HAND DIG POLE FOUNDATION LOCATIONS WHERE UTILITY CONGESTION EXISTS. • THE CONTRACTOR SHALL MAXIMIZE CLEARANCE BETWEEN UNDERGROUND UTILITIES WHEREVER POSSIBLE. • IF THE CTR IS TO EA CLOSE TO INSTALL THE R ANDT PR THE CONTRACTOR IS TO REACH OUT TO THE ENGINEER AND PROVIDE SPACING INFORMATION BETWEEN UTUTES AND PICTURES OF EXISTING. EXCAVATED UTILITIES. • CONTRACTOR TO COORDINATE ALL POT HOLE LOCATIONS WITH CITY AND PROVIDE 72 HOURS NOTICE TO FIELD OPERAEONS AND INSPECTIONS. THE CON AND R SHALL • THE CONTRACTOR SHALL COORDINATE ANY DEVIATIONS FROM THE PLANS WITH CITY STAFF/INSPECTORS. • THE CONTRACTOR SHALL COMMUNICATE ANY DEVIATIONS TO THE DESIGN ENGINEER PRIOR TO INSTALLING REVISED POLE AND CONDUIT LOCATIONS. AOA COMPLIANCE: • THE CONTRACTOR SHALL ENSURE PROPER MINIMUM ADA REQUIREMENTS ARE MET WERE POLES MUST BE INSTALLED WITHIN THESI THE SIDEWALK AREA. • THE CONTRACTOR SHALL AIM FORA MINIMUM SIDEWALK W10T1 5 FEET AT PINCH POINTS'.4 FEET IS ACCEPTABLE WHERE IMITATIONS NS EXIST. CONDUIT INSTALLATION: • THE CONTRACTOR SHALL NOTE THAT CONDUITS ARE DRAWN THESCHEMATICAU_YCONTRACT IN THE PLANS TO MAXIMIZE CLARITY. • THE CONTRACTOR SHALL CONSIDER THE LAYOUT IN N TO AVOIDING TREE WELLS AND SURFACE UTU11E5 AS SHOWNOM ININ THE PLANS. • EMPTY CONDUIT SHALL HAVE PULL CORD FOR FUTURE INSTALLATIONS. POLE RING • WIRING INSIDE OF THE POLES SHALL BE CONSIDERED SUBSIDIARY TO THE MATERIALS NEEDED TO INSTALL THE POLES AND Fl%NRES, REVIEWED ByAnOrew OoOdman e12:06 pm, Apr09, 1016 I�Pacheco Koch;oNaae� o T aoRm, w - -.-neon aFaaAna,s lam .,az-a�aa CITY PRLVECT N0. f05654 X-16150 IPRC IPRC14-0119 .MA A N0. TAR 6-39 n0 .3ntts Oa0o4.T3.n-t0.565s-e0]66.5 TAO MAP NO. 1036-J91 CITY OF FORT WORTH, TEXAS CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS DESIGN CHARTS DESIGNED: TNI PK 10B N0. DATE: SHEET DRAWN: BAN 5085-22.692 JUL 2024 65 OF 92 .�,mxnmi.emm,� 0-1 OV IT uc.erm.wm :,m,xrvm o.nm..,m.muwnm 9ro NPW alm,ienl .e a +, '� _ 'r rreraert W wm.mem.wlm•.'+�. conxpVree ipenncenon sneN ppW, glnlpepfao6it. IYmeN)Ip6e p J'^_G CYNIpYrM.igePcplm— r , m - Ir"�-+x•4�-•� DRILL FOR MOUNTING ANp Fir "'�.'�• �`n WITH FIXED BANNER ARMSFOR • x. r^••�^.Y �"'f ^:." t6'X36' BANNER NOTE: FIXTURE ARM TO HAVE 8' EFFECTIVE ARM LENGTH. I NO-. SPECIFICATION SHEET NOT AVAILABLE FOR. POLES A AN 2CAT THE TIME OF SUBMITTAL, CONTRACTOR TO COORDINATE WITH VE G THE FOLLOWING FOR ORDERING: GLOM SO 24D CST [OUTPUT] 4UK CRI 80 2 EK DIM G 30' MH -AM 24C CBL [OUTPUT] 440K CRI RO [DISTRIBUTION] BK C BK DIM ® 18' MIT FL-S 6 AL S 30 M BK P—MSIE®JO'AB//TAM W 18 MH ® o180Ueg T WARNING "0 EAo/uNOERGRouNo UTU IDS INRTHE AREAHCCNTRACTOR —UL LOCATE ALL UNDERGROUND UTUTEN BEFGRE EXCAVATING. CONTACT UTLItt 48 OURS PRIOR TO CONSTRUCTON AT 1-6G0-DIG-LESS. REVIEWED RyA—GppI l2X5MAWW, 2026 I Pacheco Koch l ;Ee �plN�oN�F� 1 Yldtm WATFR glp1.-FE. g4RATYNS UII .uE-eZde CITY PRLVECT N0. f05654 WIRSCO0 IPRC IPRC14-0119 MAPSCO N0. TAR-O]6A n0.3ntts-Da0D4.T3.n-tD.5s5s-EO]6R5 TAO MAP NO. 1036-391 CITY OF FORT WORTH, TEXAS CAMP BOWIE BOULEVARD ROAD WAY IMPROVEMENTS 3 ILLUMINATION DETAILS DESIGNED: TNB PK JOB N0. DATE: SHEET DRAWN: BAH 6085-22.692 JUL 2024 66 OF . spec®cepm $� LlUL- pNwlw. wlw,R, .R, Nw o9.. oa u p p a ON/OFF 040V I im taMpiKaa SpxllkarpnMM pewx aNmLaece � �- E~•'�^ sera Cenlpwea speelOpmwn sM G. YY�t p o-�A_ „�rTffi Rim LN WARN/NG N NDER EAD/UNGROUNT UTLITES INRTI AREA.CCNiRACTOR SHALL LOCALE ALL UNDERGROUND UTUTES BEFORE E%C—TNG. CONTACT UTLITY 48 HOURS PRIOR TO CONS RUCTON AT 1-BOO-DIG-TES. REVIEWED ByAnarew Oopaman e12:06 pm, Apr09, 1016 I�Pacheco Koch�;E�.wplN�oHRNF� r woRm wn FR T.- E. ptRATnxs (II f ssz-azae CITY PRLVECT N0. f05654 X-16150 IPRL IPRC14-0119 MAPSCO N0. TAR-O]6A nO.Sntts-Oa004�3.n-t0.565s-EO]66.5 TAO MAP NO. 1036-391 CITY OF FORT WORTH, TEXAS CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS 3 ILLUMINATION DETAILS DESIGNED: TNB PK JOB N0. DATE: SHEET DRAWN: BAH 60B5-22.692 JUL 2024 67 OF 92 ipecMc—SReel poles, arms 6 ecceszori M1SMw �/ my„imw �emione�smi�wls sPeclnconon ineal poN0. armti accea�A� Nma•mvI IAe«amN IAa.aeoan IA�ew{ N®M SpeciRCNon SNeel poles, arms R occeszsrles _ 0 SpxMcoSen SNea poles, arms n oc<euorles N WARNING �0 VARIOUS —HEAD/UN—GROUND DER[AD/UNGROUND UTILITIES IN THE AREA. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES BEFORE EXCAVATING. CONTACT UTILITY 48 HOURS PRIOR TO CONSTRUCTION AT 1-800-DIG-TESS. REVIEWED By A—G—Imm e12X5 Pm, Apr 09, 2026 1 RNAI I.Pacheco Koch ;— 1L • YW'lwood wmpaly CONSTRUCTION NOTESM IT cM,l an-RIDo cMR::E -NI cam rs-RBI. LATER ca Awl". tXr. }SR.T ;IlY PRLVECT No. 105654 X-THT50 'PRL IPRC24-0119 WA CO N0. TAR-076A 10 J0114-02004JJJ)-105654-EO]685 TAD MAP NO. 2036-392 CITY OF FORT WORTH, TEXAS f CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS i ILLUMINATION DETAILS (PRIVATE) E DESIGNED: TNB I PK 10B N0. DATE: SHEET ' DRAWN: BAN 5085-22.692 JUL 2024 1 68 OF 92 M1�S 113 �1 .F�I2 - .. > III FTN �m.�.3,�I�IP AS, 46. u A,xU. E— o �a „-1 BED ESW... FROM VIEW t/A I )i/n 22 zw[ 1 NOTE: USE SPECIAL XHHW W IRE! A �/a ml� LyyLy a[mvrn JLT SINGLE PHASE Ar ". RCOCSTAL'uuRTw amv AxR 2aov� pn v FVL- T RTH, TEXAB CRY OFLT ftEVI5E0: 12-2321118 SI 120.240 VOLT SINGLE PHASE • METERED PEDESTAL 344120-D025 aFAGE3OF3 - •E^Is4 O��ttL. • CRY OF FORT WORTH,TEXAB •REWBED: 12-232018 120-240 VOLT SINGLE PHASE METERED PEDESTAL 344120-0825 m WARN/NG �0 EAD/UNDERGROUND C—'R�CDE HE AREA.NCONTRACTORSHALL LOCALEROUND UTILITIES BEFORE EXCAVATING. CT U11LItt ,B NOURS PRIOR TO RUCTION AT I-6OO-DIG-TESS. REVIEWED Sy AR6reWOpo6mpp R1203 pm, Ap)09, 2026 I�Pacheco KochI:FR�Rx�oNRNF� Dl p u-RuEm CITY PRWECT N0. 105654 X-THT50 IPRC IIWN-0119 WP5CO NO. TAR -OM 10 J0114-02004JJJ)-105654-EO]685 TAD MAP NO. 2036-392 CITY OF FORT WORTH, TEXAS CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS ILLUMINATION DETAILS DESIGNED: TNB PK JOB N0. DATE: SHEET DRAWN: BAH 5OB5-22.692 JUL 2024 89 OF 92 eNauws @6 I�`REOJinm F �I y ;{1 F10R O" Px MT F11.O AND. i�e OLE „ G6 - a ° (TYP) �LD neINAL REINFDRCEMENi"SPRi $ x ALAT6.— E ioP AND BOTToIa) 1111JNNF p SPIRAL (TYP) B/ FX DRILLED SHAFT DETAIL g8 R U BAR BAR A BAR S S SPREAD FOOTING DETAIL uuE TERN JNDA CN pETNL NAT dILY BE USED wiTH TXE 10 TAl1 PdETI 3/3 xc m0f16 PdE FI/x Ft/2 2.1D. 2 FOUNDATION PEDESTAL POLE DETAILI BE x0. B. ll AND °`A s, AND ,RAm° EBRIOINLs. AND ADC E . LA sT NEX°ID � I. °r L_NA1.110R. INFw.,, , SHE z o p FH rFBIT ITEM 1. 3 0 CI (HF 1C) TEsnNC LAB RI IBXALTHEL BE SUBMITTED TO THE ENGINEER FDA EVALUATIT"DTON AND APPROVAL. OT ITEN 41 I. REHIE.1— FOR BE E_DNI Ico"DmDESME'AL Hs AAE s"owN ar To wT of BRA. ANo/aR vER 10 EISINI CONDITIONS SHALL v si "rEe M cuss Al. corvTRAcrDA SHALL vERlry cn nary aF �solL MEErs eR`w ExcEEDs THE DESICNFA AvISEB L T,I 1ME1 IN.1H DATON DESIGN. EEHIl.TOR TO VEBIFY SOBS N1LL NOT .1AN— ARE uL 11,1-,:Ani-1 ENALL CONFORM IFAII TEM ♦1BN woniv THE ENauEER. SEE ELECTRICAL PLANS FOR GROUND ROD REBIIIREMENTS, TENWED. IF mE MANUFAc1UR REDUIRES TDRquEO BOLTS NOnF'r"TINE ENGI CXOR Bars sxpu NOT az STAFF DESIGN SS— 36- ELT. E�EDMENT ADT I" DIAMETER BDL_ ON A 18" B-I CIRCLE wTH A K.8' J 'NET THE .1a POLE. FOR THE 18 FL P A ES' BOLT FMBEDNENT, .1H Jj4" EOLIS ON A II BOLT .ROTE IS p55'NEp. IIXIMUM E HEIGHT ASSUMEp Is Jp FT IN THE DESGN Oi THE 2'- DRILLED SHAFT SAND A MAYALN HEIGHT OF 18 FT IN THEP2=0' DIAMETER oRa sxAFT. DESIGN OF POLE, BASE PLATE, AND BOLTS BY OTHERS. FEE MANUFACTURER DRANINGS FOR BOLT, BABE PUTS, 11 CRAB, AND BOLT D.IBEDMENT REOUIRF]IErs AND LAYOUT. READ F pcslolrE oR TH s LTENATME FOJNDADON To Tr PRONDE 1/r NBILATON JONNT WTI — FIFER AND APPAo JOINT SEALANT waEN ADJ GENT a sDEwALxICUAB, REVIEWED By Antlnw Goodman.1-S Pm, Apr DR. 2D2B BPREAe FDOnNG FOUNDAnaN ISSUED FOR PRELIMINARY PRICING PURPOSES ONLY pEsGvlFn[N (SUBJECT TOREVISION PRIOR TO CONSTRUCTION) NEBE MENIS HAVE BEEN PRER BY THE E RI THE INDENT OF 16 FT POLE _ 11 Y6p Eq SPA _ i4AO S. NpPPBFEN APEOYALL Dl RELEASED FOR CONSTRUCION BY INSD0 OF"A BBIRS 11 SQU Ox SHALL APPLY TO LENGTH AND wmTH. FwNonnON SHALL DAlSpyY LE OF OF THE ATNEEE °°" "S OF mE THE U SER AND mE S NORFAl RE DISH IRNYR I. ANY OINSTRUOI.N. Pacheco Koch ; BflYPNi1PV1 :BE. ENDINEEIN.FIRM P T NION wpTE DBPT. Fmn aFEAAnaxs (SB.]B SN. �E o E rFx 1P...........c..9 ♦: t 1—IPRC22-xxXX MAPSCO No. iAR-FNx-X Wl XXSMDY IIW-XXXXXXXXXNXXX TAD MAP No. XXXX-XXX W/55 51UDY k'W55-20XX-XXXX CITY OF FORT WORTH, TEXAS ............................... CONNER J. RUSCH CAMP BOWIE BOULEVARD ROADWAY IMPROVEMENTS .. 146672 .c ENS E''� FS, ONA,_F��' (% LIGHT POLE FOUNDATION AUTIORIMB BYAPIEAC E RHD "J."RUSCH�"P.E. Ell 146672 ON DETAIL (PRIVATE) 7/17/24. ALTERATION OF A BEAL£0 DOCUMENT WTHOUT PROPS NOTIFICATION TO THE DESIGNED: AZ PK JOB N. DATE: SHEET RESPONSIBLE ENGINEER IS AN OFIETIBE UNDER THE TEYAS ENGINEERING PRACTICE T. DRAWN: AT 5095-22.692 JUL 2824 70 OF 90 FORT WORTH, City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Crescent Real Estate LLC Subject of the Agreement: _ Change Order 11 covers PCCO 32-37 and includes Landscape modifications, lighting _ redesign, sculpture pad design and earthwork. M&C Approved by the Council? * Yes ❑ No ■ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 62766, 62766-A1,62766-A2 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: 7/25/2027 If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No ■ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: Ifapplicable. 104639 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.