HomeMy WebLinkAbout064425-CO4 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 64425-CO4
FORT WORTH.
Project Name Citywide Storm Drain Rehabilitation Open -Cut
City of Fort Worth
Change Order Request
City Sec # 64425
Client Project #(s) 100092
Project Description Replacement and/or Improvement of Existing City Drainage Infrastructure
Contractor Woody Contractors,Inc Change Order # 4 Date 7/6/2026
City Project Mgr. I Mohanad Habib City Inspector IN/A
ContIact Time
Dept. TPW Totals CDI
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $2,500,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Additional bid items are required that were not included in the original unit price contract. These items are necessary to complete the storm drain improvements for the
following projects:
Heron Drive Embankment (CPN 106413): The additional work includes restoring and backfilling the eroded area around the outfall culvert, constructing a retaining wall,
installing TRM 25 and gravel edge protection, dewatering the work area, and installing guardrail to complete the project.
Eastern Hills (CPN 01363): The additional work includes modifying the spillway and removing and reinstalling the existing carport.
Attached are the cost breakdowns for the lump sum bid items for clarification and supporting documentation.
The proposed unit prices have been compared with recent Drainage Improvement Reactive Contract unit prices, bid tabulations, and pricing for similar work items and have
been determined to be fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor Name
Contract Signature
Woody Contractors, Inc
Troy Woody
I
' ervi
Date
Project and Contract Compliance Manager
Date
Date
Senior Capital Project Officer
Date
Date
Director, Contracting Department (Dept)
Date
Date
I Assistant City Manager
Date
ONE
—Council Action if re uired
M&C Number I N/A
ATTEST:
Jannette Goodall, City Secretary
M&C Date Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
V-- Change Order Additions
Project Name Citywide Storm Drain Rehabilitation Open -Cut City Sec # 64425
Client Project# 100092
Contractor Woody Contractors,lnc PMJ Mohanad Habib Inspector NIA
Change Order Submittal # ® Date 71612026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
429
REM 12" RCP
TPW
0.00000000
LF
$19.00
$0.00
430
CONIC EDGE RETAINER
TPW
0.00000000
LF
$150.00
$0.00
431
12" RCP(CL.III)
TPW
0.00000000
LF
$172.00
$0.00
432
SITE PREP
TPW
0.00000000
LS
$17,700.00
$0.00
433
DEWATERING
TPW
0.00000000
LS
$77,000.00
$0.00
434
RETURNING WALL- PER DESIGN
TPW
0.00000000
LS
$91,000.00
$0.00
435
EXTRA DEPTH ON TOE (>3')
TPW
0.00000000
VF
$8,910.001
$0.00
436
PYRAMAT 25
TPW
0.00000000
SY
$22.00
$0.00
437
GUARDRAIL
TPW
0.00000000
LF
$33.00
$0.00
438
GUARDRAIL END TREATMENT
TPW
0.00000000
EA
$13,200.00
$0.00
439
REM & REPL PVMT MARKING HAS (W)
TPW
0.00000000
LF
$13.00
$0.00
440
REM & REPL PVMT MARKING HAS (Y)
TPW
0.00000000
LF
$13.00
$0.00
441
4" TYPE II -A -A RPM
TPW
0.00000000
EA
$22.00
$0.00
442
STREET SIGN
TPW
0.00000000
EA
$770.00
$0.00
443
GRAVEL EDGE
TPW
0.00000000
SY
$132.00
$0.00
444
54" Iron Gate
TPW
0.00000000
EA
$550.00
$0.00
445
4' Wrought Iron Fence
TPW
0.00000000
LF
$95.00
$0.00
446
Remove & Reinstall Carport for C01363
TPW
0.00000000
LS
$9,500.00
$0.00
447
Spillway & Weir Modifications for C01363
TPW
0.00000000
LS
$7,000.00
$0.00
448
Remove Debris from Primary Overflow Structure for C01363
TPW
0.00000000
EA
$1,850.00
$0.00
TPW
$0.00
Sub Total Additions
$0.00
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name I Citywide Storm Drain Rehabilitation Open -Cut City Sec # 64425
Client Project # 1 100092
Contractor Woody Contractors,lnc PM Mohanad Habib Inspector N A
Change Order Submittal # ® Date 7I612026
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW $0.00
Sub Total Deletions $0.00
Change Order Deletions Page 3 of 4
MISBE for this Change Order
Previous Change Orders
CO # DATE AMOUNT
Total $0.00
2/11/26, 1:56 PM M&C Review
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA F°RT-OR H
Create New From This M&C
REFERENCE **M&C25- 20SW M C ITYW ID E
DATE: 11/11/2025 NO.: 1042 LOG NAME: STORMDRAIN
IMPROVEMENTS 2025
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: (ALL) Authorize Execution of a Contract with Woody Contractors, Inc. in the Amount of
$2,000,000.00 for the Citywide Storm Drain Improvements Project, with a One Year
Renewal Option
RECOMMENDATION:
It is recommended that the City Council authorize execution of a contract with Woody Contractors, Inc.
in the amount of $2,000,000.00 for the Citywide Storm Drain Improvements project (City Project No.
100092), with one renewal option.
DISCUSSION:
This Mayor and Council Communication (M&C) will authorize execution of a construction contract with
Woody Contractors, Inc. in the amount of $2,000,000.00 for the extension, replacement, and/or
improvement of existing City drainage infrastructure on an on -call basis. Work on individual locations
will be authorized by work orders. The cost of each work order will be based on the unit prices bid by
the contractor for the work items in the solicitation. The maximum cumulative amount for all work
orders under this contract is $2,000,000.00. While the total bid amount is $24,199,785.00, the actual
contract amount will be $2,000,000.00, which represents the budgeted limit for the on -call services.
The bid amounts cited in the solicitation were based on hypothetical quantities for the purpose of
establishing unit prices for each work item. Payment for each work order will be made based on actual
quantities measured at those bid prices. Funding will be verified individually for each work order prior to
its execution.
The project was advertised for bid in the Fort Worth Star -Telegram on August 27, 2025, and September
3, 2025. On September 18, 2025, one bid was received:
Bidder Amount
Woody Contractors, Inc $24,199,785.00
The term of the contract will be until the work is completed or funds are expended, whichever occurs
first. The contract may be renewed one (1) time, with the same terms, conditions, and unit prices, at
the City's discretion.
An additional $292,000.00 is needed for contingencies, construction management, surveying,
inspection, materials testing, and GIS/project controls.
Project Cost Description
Amount
Woody Contractors, Inc.
$2,000,000.00
Contingencies, Construction Management,
Surveying, Inspection, Material Testing
$292,000.00
Total Project Budget
$2,292.000.00
apps.cfw net.org/council_packet/mc_review.asp?ID=33905&councildate=11/11/2025 1/2
2/11/26, 1:56 PM
M&C Review
These projects are not currently defined, and the impacts on Operations Budgets are unknown.
Projects that replace or improve existing infrastructure should not have an impact on the operational
budget, as the City already maintains infrastructure in these locations. However, extensions, such as
additional storm drainpipes or inlets, would increase future maintenance responsibilities.
Funding is budgeted in the Drainage Improvement Projects programmable project (City Project No.
P00043) within the Stormwater Capital Projects Fund for the purpose of funding various work order
projects, as appropriated.
The projects are located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the Stormwater Capital Projects Fund for the Drainage Improvements Projects
programmable project to support the approval of the above recommendation and execution of the
contract. Prior to any expenditure being incurred, the Transportation and Public Works Department
has the responsibility to validate the availability of funds.
TO
Fund
Department
Account
Project
Program
Activity
Budget
Reference #
Amount
ID
ID
Year
(Chartfield 2)
FROM
Fund
Department
Account
Project
Program
Activity
Budget
Reference #
Amount
ID
ID
Year
(Chartfield 2)
Submitted for City Manager's Office by-.
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
Jesica McEachern (5804)
Lauren Prieur (6035)
Thanaa Maksimos (2485)
1295 Form.pdf (CFW Internal)
20SWM CITYWIDE STORMDRAIN IMPROVEMENTS 2025 funds avail.docx (CFW Internal)
20SWM CITYWIDE STORM DRAIN PROJECT FID TAB LE.xlsx (CFW Internal)
Citywide Bid Tabulation.pdf (CFW Internal)
SAMS Search 2025.10.7.pdf (CFW Internal)
apps.cfwnet.org/council packet/mc_review.asp?ID=33905&councildate=11 /11 /2025 2/2
H_ stun Dr- Cost Breakdown
-
-
_
Supervision
bond
ant
_
_
E uipment
Insurance
insurance.
_
_
Office Personnel
rnelku
DESCRIPTION
QUANTITY
LABOR
MIATLS
RENTAL EQUIP
SUBS
STEEL
CONC.
SAND
ROCK
TRUCK
OVERHEAO
COST
PROFIT
WOODY
UNIT PR.
I TOTAL
1x
ISITEPREP
1 LS
7,451.OD
_
7,06700
$ 14.518.00
1,582.00
1,Baa.oO
$ 17,700.00
$ 17,70000
2x
DEWATER'ING
IRETAINING WALL- PER DESIGN
1 L.
20,268.00
I 25,520.a0
_ 7,267.00
2,333.m
_1fi,MAO
f9,0aS.00
S 62,840.00
7,154.00
1,0011.00
$ 77,000,00
$ 77,000.00_
$ 91.0aa.00
3x
1 L S
-8,495.00
12,18a.00
946.00
1,173.00
23,842.00
S 74,469A0
8,231.00
8,300.0a
$ 91,000.Oa
mil@
Eastem Hills- Cost Breakdown
PALE
-
-
SUPERVISION
TIME
—�- -
EQUIPMENT
DESCRIPTION
QUANTITY
INSURANCE
OFFICE PERSONNEL
TRUCK OVERHEAD COST
LABOR
MATERIALS
SUBS
HMAC
CONC.
SAND
ROCK
PROFIT
UNIT PR.
TOTAL
- —
—
$
$
$
$
$ 8,550.00
950.00
73X
HEM & REINSTALL CARPORT
1
LS_
1,050.00
5,000.00
--
2,500.00
$. 9,500.00
$ 7,000.00
$ 9,500.00SPILLWAyMODIFICATIONLS805A0
$ 7,000.00
-
100.00
- ---
3,750.00
$ 8,230.00 770.00
$
-
$ -
$.
Signature:
Tr (Jul 15, 2026 09:59:54 CDT)
Email: twoody202O@aol.com
Signature:
Email: Mohanad.Habib@fortworthtexas.gov
Signature:
Email: Lissette.Acevedo@fortworthtexas.gov
Signature:
Email: monty.hall@fortworthtexas.gov
Signature: 0%f&k-
Dianna Giordano (Jul 28, 2026 16:03:26 CDT)
Email: dianna.giordano@fortworthtexas.gov
Signature:
Email: Michael.Glover@fortworthtexas.gov
Signature:
Email: Thanaa.Maksimos@fortworthtexas.gov
Signature: 04- "
Mary Hanna ul 20, 2026 08:21:26 CDT)
Email: Mary.hanna@fortworthtexas.gov
Signature:
Douglas Black (Jul 20, 2026 12:09:34 CDT)
Email: Douglas.Black@fortworthtexas.gov
Signature: Ks�
Email: Katherine.Cenicola@fortworthtexas.gov
bo "oMaQ
�� � FORT�aaa
�0
p°�o o9.1dd
PVa a=d
daa� �'EXPSop
�b06404
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Citywide Storm Drain Improvements Project Construction Contract
M&C:25-1042 CPN:100092 CSO:64425 DOC#:
Date:07/14/2026
To:
Name
Department
Initials
Date Out
1
Troy Woody
Contractor
/10
07/15/2026
2.
Mike Glover
TPW - Inspector
07/15/2026
3.
Mohanad Habib
TPW - Project Manager
�j/
7/6/2026
4.
Thanaa Maksimos
TPW — Program Manager
07/15/2026
5.
Lissette Acevedo
TPW — Interim Sr. CPO
rxV
07/15/2026
6.
Patricia Wadsack
TPW —Assistant Director
W
07/20/2026
7.
Lauren Prieur
TPW - Director
07/20/2026
8.
Doug Black
Legal - Assistant City Attorney_
oo"ias B1111
07/20/2026
9.
Jesica McEachern
CIVIC) — Assistant City Manager
07/28/2026
10.
Katherine Cenicola
CSO — City Secretary
cc
07/28/2026
11.
Jannette Goodall
CSO — City Secretary
07/28/2026
12.
Allison Tidwell
CSO — City Secretary
07/29/2026
13.
Tpw_SW_Contract
TPW Stormwater
NEEDS TO BE NOTARIZED: DYES ❑No
RUSH: DYES ❑No SAME DAY: ❑ YES ❑No NEXT DAY: DYES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Signature/Routing and or Recording
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement: Additional bid items are needed but were not included in the original unit
price contract of existing City drainage infrastructure under the Citywide Programmable Project
(City Project No. 100092).
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ❑ No 0
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes 0 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 100092
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.