Loading...
HomeMy WebLinkAbout065589 - Construction-Related - Contract - Walter P. Moore and Associates, Inc.CSC No. 65589 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING -RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Walter P. Moore and Associates, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: NW 20th St — True Creek Bank Stabilization — Project No. 105269. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $488,807.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. ENGINEER shall provide monthly invoices to CITY. The ENGINEER shall provide the CITY sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by ENGINEER of said payment shall release CITY from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this AGREEMENT shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Page 1 of 15 June 5, 2026 FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Designation of Engineer's Personnel (1) The ENGINEER and CITY shall agree upon the designation of the ENGINEER's "Project Manager" prior to starting work on contract. (2) ENGINEER shall inform CITY in writing of a proposed change to their designated project manager prior to making the change or immediately upon receiving notification that the designated project manager is separating employment with the ENGINEER. (3) ENGINEER shall provide resumes to the CITY of the proposed replacement project manager(s), who shall have similar qualifications and experience as the outgoing person, for review and approval. D. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 2 of 15 (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. E. Preparation of Engineering Drawings (1) The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. F. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 3 of 15 anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. G. Opinions of Probable Cost, Financial Considerations, and Schedules The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (1) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. H. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 4 of 15 the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. I. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in effect as of the time copying is City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 5 of 15 performed. K. Insurance Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and CITY has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 6 of 15 compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 7 of 15 ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 8 of 15 (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 9 of 15 C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 10 of 15 interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 11 of 15 CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 12 of 15 during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 13 of 15 association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. P. Compliance with Laws, Ordinances, Rules and Regulations ENGINEER agrees that in the performance of its obligations hereunder, it will comply with all applicable federal, state and local laws, ordinances, rules and regulations and that any work it produces in connection with this AGREEMENT will also comply with all applicable federal, state and local laws, ordinances, rules and regulations. If CITY notifies ENGINEER of any violation of such laws, ordinances, rules or regulations, ENGINEER must immediately desist from and correct the violation. Q. Non -Discrimination Covenant ENGINEER, for itself, its personal representatives, assigns, contractors, subcontractors, and successors in interest, as part of the consideration herein, agrees that in the performance of ENGINEER's duties and obligations hereunder, it will not discriminate in the treatment or employment of any individual or group of individuals on any basis prohibited by law. IF ANY CLAIM ARISES FROM AN ALLEGED VIOLATION OF THIS NON-DISCRIMINATION COVENANT BY ENGINEER, ITS PERSONAL REPRESENTATIVES, ASSIGNS, CONTRACTORS, SUBCONTRACTORS, OR SUCCESSORS IN INTEREST, VENDOR AGREES TO ASSUME SUCH LIABILITY AND TO INDEMNIFY AND DEFEND CITY AND HOLD CITY HARMLESS FROM SUCH CLAIM. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements Duly executed by each party's designated representative to be effective on the date City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CPN 105269. Revised Date: June 5, 2026 Page 14 of 15 subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH A� Dianna Giordano (Jul 28, 2026 15:58:50 CDT) Jesica McEachern Assistant City Manager Date:07/28/2026 ATTEST: Jannette Goodall City Secretary nnnq� F MUt a p pie o, F� 4vo 8Sd a°°aIl neza54q APPROVAL RECOMMENDED: By: ^`Z?� Prieur, Lauren L Director, Transportation Public Works APPROVED AS TO FORM AND LEGALITY By: Douglas Black (Jul 22, 2026 10:53:24 CDT) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Walter P. Moore and Associates, Inc. Ernest L. Fields, P.E., LEED AP Senior Principal Date: 07/20/2026 M&C No.: 26-0501 M&C Date: 06-09-2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Mohanad Habib P.E, OFFICIAL RECORD City of Fort Worth, Texas NW 20th St - True Creek Bank Stabilization Standard Agreement for Engineering Related Design Services CITY SECRETARY CPN 105269. Revised Date: June 5, 2026 Page 15 of 15 FT. WORTH, TX RT WORTH. Stormwater ATTACHMENT "A" Scope for Engineering Design Related Services for Storm Water Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub -consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE This project is for the design of streambank stabilization for NW20th St — True Creek Streambank Stabilization Project. The project location is shown in Attachment E. As part of a separate project, Walter P Moore developed a conceptual design for the stabilization of the streambank which consisted of Redi-Rock walls, turf reinforcement mat, and articulated concrete blocks. Utility adjustments of water and sanitary lines to accommodate the streambank stabilization are also included. This conceptual design was included in a hand- off package which also included an Engineering Report; photographs; topographic survey; jurisdictional determination; plans, calculations, easement exhibits, and OPCC; floodplain development permit memo, risk register, and digital data. For this project Walter P Moore will use the data from the conceptual hand-off as a substitute for the 30% Conceptual Design. Survey from the hand-off package will be utilized for this project supplemented by additional survey in selected locations to update known changes in conditions and to acquire additional property corners needed for easement documents. The geotechnical report DG-22-10508 prepared by HVJ Associates, dated September 26, 2023, developed for the hand-off package will be used for this project. In addition to report DG-22-10508, Geotex Engineering will review available information from the previous reports and provide recommendations for the construction of the proposed retaining walls. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design (30%) Task 3. Preliminary Design (60%) Task 4. Final Design (90% and 100%) Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Permitting Task 10. Quality Control/ Quality Assurance City of Fort Worth, Texas Page 1 of 42 Attachment A Revision Date: 03.21.2025 Page 1 of 42 FORT WORTH:, TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team: • Lead, manage and direct design team activities • Ensure Quality Control / Quality Assurance (QC/QA) is practiced in performance of the work. Refer to Task 10 for further details. • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting: • Attend one (1) constructability review meeting with CITY representatives, including Traffic Management, at the 60% submittal milestone • Conduct and document monthly project update meetings with CITY Project Manager • Conduct review meetings with the CITY at the end of each design phase • Conduct QC/QA reviews and document those activities. Refer to Task 10 for further details • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. Multi -month billing is not allowed. Months in which no work is being invoiced shall require submission of a $0.00 invoice. With the invoices, prepare and submit monthly Project Status Reports during the design phase, in the format provided by the Transportation and Public Works Department. Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, during the design phase, as required in Attachment D to this Standard Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. This PROJECT requires a Tier 23 schedule as defined in the City's Specification 00 31 15 entitled Engineer Project Schedule. • Prepare and submit a preliminary PrejeGt Risk Register. The Project Risk Register that was developed by the ENGINEER in the hand-off package will be used for this project. Review Project Risk Register periodically with CITY Project Manager and make recommendations to mitigate, accept, or remove risks. City of Fort Worth, Texas Page 2 of 42 Attachment A Revision Date: 03.21.2025 Page 2 of 42 RT WORTH. • Coordinate with other agencies and entities as necessary to design the proposed infrastructure and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • ENGINEER will proceed directly to 60% Preliminary Design using the data and information developed by ENGINEER in the hand-off package, including but not limited to design sheets, OPCC, risk register, data collection, project decision log. • llRe (1) r+Fe design pFejeGt kiGkGff/nhaFte FiRg meeting • One (1) constructability review meeting of one (1) hour, during design, is assumed • X'r�Nine (9) monthly project update meetings of one (1) hour, during design, phase is assumed • At least throe ( Two (2) plan review meetings (at 60% and 90%) of two (2) hours are assumed • All submittals to the City shall be Quality checked prior to submission. • Project design phase is anticipated to take XX(X) nine (9) months. • Project construction phase is anticipated to take YXnlne (9) months. • XX Nine (9) monthly updates of Project Status Reports, DVIN fermc and project Schedule during design phase only. • All meetings with City are assumed to be virtual unless specifically noted as being on -site DELIVERABLES A. Meeting summaries with action items B. QC/QA documentation C. Baseline design schedule �+ D_P inar.i PPE)jeGt-Risk Register City of Fort Worth, Texas Page 3 of 42 Attachment A Revision Date: 03.21.2025 Page 3 of 42 RT WORTH. E. Monthly Schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly Project Status Reports Tr. OPCC updates with milestone submittals and when ReW GGGt fig gyres ore available H. Plan Submittal Checklists (See Task 10) I. Monthly invoices j. PFGjeGt Phetes City of Fort Worth, Texas Page 4 of 42 Attachment A Revision Date: 03.21.2025 Page 4 of 42 FORT WORTH:, TASK 2. CONCEPTUAL DESIGN (30 PERCENT). ENGINEER will proceed directly to 60% Preliminary Design using the data and information developed by ENGINEER in the hand-off packages. Task 2.3 Subsurface Utility Engineering shall be performed during Preliminary Design (Task 3). .. ■ .. 32-1 MUMMUMORM City of Fort Worth, Texas Page 5 of 42 Attachment A Revision Date: 03.21.2025 Page 5 of 42 FORT WORTH:, 2.3. Subsurface Utility Engineering Provide Subsurface Utility Engineering (SUE) per Task 8. City of Fort Worth, Texas Page 6 of 42 Attachment A Revision Date: 03.21.2025 Page 6 of 42 FORT WORTH:, • DeGi imentatien of Ley design rderisions • Estimates of probable GonstrUGtion Gost ASSUMPTIONS • All sterrnwater GalrUlations and design shall Genferm to the CITY's Gi irrent Ctromwater Criteria Manual •The SUE and SUE plan sheets shall b in aGGeFdanGe with Cl/ASGE 38 02. • DWF files Greated frern design CAD drawings will be upleaded te the designated proient felyder in eB iilyder • DDF files Greated from design CAD drawings will be uploaded to the designated proieGt felyder in the City's rdoGi invent management system /eB iilyder\ • ENGINEER will net proreerd with Preliminary Design aGt'y'ties without wFitten appreyal by the CITY of the Cop Gepti gal Design DaGkage • See task 8 for SUE related assumptions DELIVERABLES A. GGRGept,,al�al Des;g„Reper B. GeRGep I DesignTaGkaage G. ROW a n rd Easement Needs D. Utility Genflirt Plan PDF and Utility ConfllGt Table E. See task 8 for SUE related deliverables City of Fort Worth, Texas Page 7 of 42 Attachment A Revision Date: 03.21.2025 Page 7 of 42 RT WORTH. TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. The Preliminary Design Drawings and Specifications shall include the following: • Preliminary cover and index of sheets including project limits, area location map and beginning and end station limits. State of Texas • SUE Level A Test Hole Reports signed and sealed by a Professional Engineer licensed in the State of Texas • Utility Conflict Matrix • Traffic Control Plan including all construction signage and pavement markings which will be in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). .- Manual. -See Floodplain Development Permit (9.6) • Updated existing and proposed typical section sheets. • Bearings given on all proposed centerlines, or baselines. • Overall project easement layout sheet(s). • Preliminary roadway details to include curbs, curb expansion joints, driveways, sidewalks, pavement, streetlights, traffic signals and all applicable utility details. • Preliminary signing, pavement marking, illumination and signal layouts. .. bz ■ .. City of Fort Worth, Texas Page 8 of 42 Attachment A Revision Date: 03.21.2025 Page 8 of 42 FORT WORTI • Documentation of key design decisions. • Estimates of probable construction cost (OPCC). This estimate shall use standard CITY or TxDOT bid items, as applicable. • Channel plan and profile drawings shall include existing channel centerline, existing left and right top of channel bank, proposed top of channel backs, and 100-year water surface profile. • Prepare separate drawings for water and/or sanitary sewer mains including an overall water and/or sanitary sewer layout sheet and plan and profile drawings. • Overall project water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines that connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines that are connected to the existing main and connect said service lines to the relocated main. • The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During the City of Fort Worth, Texas Page 9 of 42 Attachment A Revision Date: 03.21.2025 Page 9 of 42 FORT WORTH:, design s pviey if a red ran be 'Rserted three gh the rleanei it to the bottom of the ceniine line the ENGINEER will obtain the flow line elevation and design the corvine line prior to adyerticinn the proem+ for hirl. If the service flow line information cannot be obtained during the design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. 3.2. Geotechnical Investigation Pa„ernent Design The geotechnical report DG-22-10508 prepared by HVJ Associates, dated September 26, 2023, developed for the hand-off package will be used for this project. • In addition to report DG-22-10508, Geotex Engineering will review available information from the previous reports and provide recommendations for the construction of the proposed retaining walls. • The Geotex investigation will include the following field services: Drill a total of five (5) borings across the site to depths of 25 feet. The borings will be drilled and sampled using a truck- or ATV -mounted drilling rig. Conventional tube or split -barrel (standard penetration test) samples will be collected as appropriate for the soils encountered. Bedrock strata, if encountered, will be tested in -place using the Texas Cone Penetration Test. City of Fort Worth, Texas Page 10 of 42 Attachment A Revision Date: 03.21.2025 Page 10 of 42 RT WORTH. The recovered subsurface samples will be preserved and labeled as to the appropriate boring number and depth in the field. These materials will later be described in further detail in the laboratory by a staff geologist or engineer. Groundwater, if observed, will be recorded during and at the completion of drilling. Backfilled borings should be expected to settle over time and should be monitored; Geotex will not be responsible for any additional future back -filling required, nor damage or injury that may result from settlement of the boreholes after the initial backfill process. • The Geotex investigation will include the following laboratory services: • Selected laboratory testing of the recovered samples will be performed to evaluate soil index, volume change, and strength properties of the subsurface materials, and to provide data for analysis. These tests may include but may not be limited to the following: • Moisture content • Atterberg limits • Percent passing No. 200 mesh sieve • Sieve analysis • Hydrometer • Unconfined compressive strength • Direct shear • Geotex Engineering will retain recovered samples for 30 days after submission of the geotechnical report unless other arrangements are made by the client. • Engineering Analysis and Report • Data obtained from the field investigation and laboratory tests will be presented in a geotechnical data report. Information to be provided includes the following: • A plan sheet indicating the approximate location of each boring. • A log of each boring with the boring number, depth of each stratum, material description, soil classification with laboratory test results, and groundwater information. • A discussion of subsurface soil and groundwater conditions. • A brief discussion of site geology. • Estimates of soil movement related to settlement and expansive soils (if present). • Outline of the engineering properties of the natural soils present, and any existing fill, if encountered City of Fort Worth, Texas Page 11 of 42 Attachment A Revision Date: 03.21.2025 Page 11 of 42 FORT WORTH:, • Recommendations for foundation type, depth and allowable loading, and Seismic Site Class (2018 IBC). • Earthwork recommendations, including material type(s), compaction, and backfill requirements. • Retaining wall recommendations. • Global stability analysis. • Electronic copy of the report. 3.3. Constructability Review • Prior or posterior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Community Meeting After the preliminary plans have been reviewed and approved by the CITY, the ENGINEER will prepare project exhibits, assist the project manager in preparing a presentation of the most appropriate format (most usually in Power Point), and attend one (1) community meeting to help explain the proposed project to residents. The CITY shall select a suitable location, time, and date. The Engineer needs to coordinate with the City's project manager to format the mailing list of all affected property owners. 3.5. Utility Clearance The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and, where known and possible, consider potential future utilities in designs. City of Fort Worth, Texas Page 12 of 42 Attachment A Revision Date: 03.21.2025 Page 12 of 42 RT WORTH. • Where conflicts cannot be avoided, coordination of Utility Conflicts will be identified at the GORGeptual PFeIiMiRaFy Design phase and begin at the Preliminary Design phase. In the case of a private Utility Conflict, the ENGINEER shall upload a set of plans in PDF format with the utility conflicts highlighted and a Utility Conflicts Table of those conflicts in the City's document management system (eBuilder). The PDF file should be created directly from the CAD files. At each design milestone, the City PM will issue a Utility Clearance Letter to be accompanied by said plans and table to all utility companies which have facilities within the limits of the project for coordination The ENGINEER may need to coordinate directly with the private utility provider if that provider needs to undertake design to adjust their utility's location. • ENGINEER to obtain utility As -built plans to confirm relocation is complete and that the utility has been relocated in accordance with the plans and the project needs, report any discrepancies found, and provide documentation to support findings. • ENGINEER to upload all utility As -built plans in the City's document management system (eBuilder) 3.6 Meeting minutes. Engineer will provide the meeting minutes for all meetings in which the engineer is in attendance, for this project, and post them on eBuilder in a timely manner. ASSUMPTIONS • The following shall be uploaded to the designated project folder in the City's document management system (eBuilder): ■ Single PDF file created from design CAD drawings. ■ The Project Manual (Contract and Specifications) ■ All other submitted documents and checklists ■ Opinion of Construction Cost • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • One (1) Constructability Review of three (3) hours is assumed. • One (1) Public Meeting of one (1) hour is assumed. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional 1 project specific traffic control sheets will be developed. • Geotex will contact DigTess/Texas One Call for general subsurface utility clearing within the easements. Geotex will locate all observed private non - franchise subsurface utilities or other structures or items which might be damaged during the field exploration program via a third -party locator. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. City of Fort Worth, Texas Page 13 of 42 Attachment A Revision Date: 03.21.2025 Page 13 of 42 RT WORTH. DELIVERABLES A. Preliminary Design drawings and specifications including QC/QA documentation B. Utility Conflict Coordination Package C. Single PDF file created from design CAD drawings. D. The Project Manual (Contract and Specifications) E. All other submitted documents and checklists F. Geotechnical Report G. Opinion of probable construction cost (OPCC) H. Community Meeting exhibits City of Fort Worth, Texas Page 14 of 42 Attachment A Revision Date: 03.21.2025 Page 14 of 42 RT WORTH. TASK 4. A. FINAL DESIGN (90 PERCENT) Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Final draft construction plans (90%) and Project Manual shall be submitted to CITY per the approved Project Schedule. • The ENGINEER will provide a PDF set of plans with the utility conflicts highlighted and a Utility Conflicts Table of those conflicts to be included in the Utility Clearance Letter to be issued by the City PM. • The ENGINEER shall submit an estimate or opinion of probable construction cost (OPCC) B. FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • A Quantity Summary page will be included in both the 90% and 100% design plans. Each design sheet of the plans shall also include a quantity take off table. • The ENGINEER shall submit an estimate of probable construction cost (OPCC) ASSUMPTIONS • A PDF created from design CAD drawings and CAD files for the 90% Design and will be uploaded to the project folder in the City's document management system (eBuilder). • Two (2) sets of 11 "x17" size drawings and one (1) set of specifications will be delivered for the 100% Design package. • A PDF created from design CAD drawings and CAD and CAD files will be uploaded to the project folder in City's document management system (eBuilder). DELIVERABLES A. 90% construction plans and specifications including QC/QA documentation. B. Utility relocation package. C. 100% construction plans and Project Manual including QC/QA documentation. D. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's or TxDOT's standard bid items and format, as applicable City of Fort Worth, Texas Page 15 of 42 Attachment A Revision Date: 03.21.2025 Page 15 of 42 RT WORTH. E. Cover sheet in PDF format for the signatures of authorized CITY officials. F. All other submitted documents and checklists City of Fort Worth, Texas Page 16 of 42 Attachment A Revision Date: 03.21.2025 Page 16 of 42 FORT WORTH:, TASK 5. BID PHASE SERVICES. The CITY reserves the right to deliver the project by bidding it, issuing a work order out of an existing a unit price contract or by alternative delivery. ENGINEER will support the construction procurement phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto the City's document management system (eBuilder) for records. Project Manual shall be uploaded in a single PDF file in eBuilder as well as individual files as required to be included in the City's procurement portal, Bonfire. • Bid Proposal Document of the Contract documents shall be uploaded in a file format of filename extension ".xls". Unit Price Proposal documents are to be created utilizing the city's unit price tool only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, that will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to the City's document management system (eBuilder) in two formats, PDF and CAD files. The PDF will consist of one file of the entire plan set. The ENGINEER will coordinate with the PM to respond to Vendor Discussions (RFI) and issue Public Notices (addenda) when necessary, in Bonfire. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidder's questions and requests in the form of addenda. The ENGINEER will coordinate with the City PM to upload all approved addenda onto Bonfire and eBuilder. • Attend the pre -bid conference in support of the CITY. Incorporate all addenda into the contract documents and issue conformed sets. After the bid opening, ENGINEER will provide at least 5 full-size sets of plans, 5 half-size sets and 2 copies of the conformed Project Manual set incorporating all approved addenda. City of Fort Worth, Texas Page 17 of 42 Attachment A Revision Date: 03.21.2025 Page 17 of 42 FORT WORTH:, ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • Construction documents will only be made available on the City's procurement platform, Bonfire. • Construction documents will not be printed by the CITY and made available for purchase by plan holders and/or given to plan viewing rooms. • All procurement materials will be uploaded to the City's procurement platform, Bonfire, and eBuilder. • One (1) Pre Bid Conference of one (1) hour is assumed. • Three (3) Addenda are assumed. • Five (5) Request For Information (RFI) are assumed. • ENGINEER will not attend the bid opening. DELIVERABLES A. Addenda B. Rer�mendatien of award as required per prejeGt C. Construction documents (conformed) City of Fort Worth, Texas Page 18 of 42 Attachment A Revision Date: 03.21.2025 Page 18 of 42 RT WORTH. TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1. Construction Support • The ENGINEER shall attend the pre -construction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend one (1) public meeting to help explain the proposed project to residents. The CITY shall select a suitable location or media and mail notices to the nearby residents and other stakeholders. • The ENGINEER shall conduct periodic site visits as needed during the duration of construction. The ENGINEER will prepare or collaborate with the CITY PM on a Construction Progress Report using the CITY's standard format and upload in the City's document management system (eBuilder). • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in the City's document management system (eBuilder). • ENGINEER shall review material substitution requests, issue a recommendation and incorporate approved substitutions into the Record Drawings. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, respond to Request for Information (RFI) from the contractor, review change orders, and make recommendations as to the acceptability of the work. The ENGINEER will meet with the Project Delivery Team and Contractor on -site to review any properly communicated field changes. • The ENGINEER shall attend the "Final" project walk through and assist 6.2 Record Drawings • The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. Information provided by the CITY may include, but is not limited to the following: e As -Built Survey provided by the contractor, which includes vertical and horizontal coordinates of all water, sewer and storm drain assets, and in accordance with the Construction (As -Built) Survey Specification. ENGINEER shall verify annUrony ref the data ppeyided by Ge Rtraninr and GGnfermanno With requirements. o Red -Line Markups from the Contractor City of Fort Worth, Texas Page 19 of 42 Attachment A Revision Date: 03.21.2025 Page 19 of 42 RT WORTH. o Red -Line Markups from City Inspector o Approved Substitutions The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or higher). The set must include the cover sheet bearing City official signatures. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the digital files. • There shall be one (1) PDF file and one (1) CAD file for the TPW plan set and a separate PDF and CAD file for the Water plan set, if required. Each PDF file shall contain all associated sheets of the particular plan set. Singular PDF files for each sheet of a plan set will not be accepted. PDF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF files shall be uploaded to the project's Record Drawing folder in the City's document management system (eBuilder). For information on the proper manner to submit Record Drawing files and to obtain a file number for the project, the ENGINEER should coordinate with the City project manager. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. City of Fort Worth, Texas Page 20 of 42 Attachment A Revision Date: 03.21.2025 Page 20 of 42 RT WORTH. ASSUMPTIONS • One (1) Pre -Construction Conference of one (1) hour is assumed. • One (1) Pre GeR6tF61GtiGR GeMMURity Public Meeting of one (1) hour is assumed. • XXX (X) Eight (8) site visits are assumed. • XXITen (10) submittal reviews are assumed. • XXIFour (4) RFI's are assumed. • XX1Two (2) Change Orders are assumed. • Five (5) site visits of thirty (30) minutes to review field changes • One (1) "Final" project walk through of two (2) hours length is assumed. DELIVERABLES A. Community meeting exhibits C. Response to Contractor's Request for Information D. Review of Change Orders E. Review of shop drawings G. Record Drawings in electronic format City of Fort Worth, Texas Page 21 of 42 Attachment A Revision Date: 03.21.2025 Page 21 of 42 FORT WORTH:, TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way and easement needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The ENGINEER shall prepare a ROW and Easement parcel reference map showing and designating all land interests for project. The map shall be revised as necessary throughout the land acquisition process. • The documentation shall be provided in conformance with the checklists and templates available on the City's document management system (eBuilder) Project Resources folder. City of Fort Worth, Texas Page 22 of 42 Attachment A Revision Date: 03.21.2025 Page 22 of 42 FORT WORTH:, ASSUMPTIONS Right -of -Way research includes reviews of property/right-of-way records based on current internet-based Tarrant Appraisal District (TAD) information available at the start of the protect and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD records, right-of-way takings, easement vacations and abandonments, right-of- way vacations, and street closures. • Temporary Right of Entry Letters have already been acquired. City of Fort Worth, Texas Page 23 of 42 Attachment A Revision Date: 03.21.2025 Page 23 of 42 FORT WORTH:, DELIVERABLES A. XX Ten (10) Easement exhibits and meets and bounds provided on CITY forms. B. ROW and Easement parcel map G. XXX (X) T perar y Right of tF y Gever letters D. XX ) Temporary peter ERtry deGUrneRtS E. If appli hlo in t Derna'n S innr�r eG iments �prrEa�� e•nn® �vr v�� City of Fort Worth, Texas Page 24 of 42 Attachment A Revision Date: 03.21.2025 Page 24 of 42 FORT WORTH:, TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER wi" provide survey ,support Survey from 30% hand-off package will be utilized for this project supplemented by additional survey in selected locations to update known changes in conditions and to acquire additional property corners needed for easement documents. The supplemental survey will be provided by PJB as follows: 8.1. Design Survey • Recover previously established project control in 2022. Should project control not recoverable, PJB shall establish new control points to the same datum as previous control. • Topographic survey to capture features as outlined on PDF previously mentioned. Sufficient data shall be collected to create one -foot contours. Features shall include: • Center, toe and top of bank of creek at maximum 50-foot cross sections. Intermediate cross -sections may be necessary to reflect changes in course and grade. • Limits of any gabion mattresses and other erosion prevention improvements (rip - rap, energy dissipaters, etc), if applicable. • Location(s) of erosion within creek. • Headwalls and other drainage structures • Visible utilities, including but not limited to, manholes, valves, blowoffs, utilities markers. • Walls • Edges of street pavement (curb/gutter), sidewalks, driveways • Trees 6 inches and above The minimum survey information to be provided on the plans shall include the following: City of Fort Worth, Texas Page 25 of 42 Attachment A Revision Date: 03.21.2025 Page 25 of 42 RT WORTH. — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). — Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. — No less than two horizontal bench marks, per line or location. — Bearings given on all proposed centerlines, or baselines. Station eg atinnc relating utilities to paving, wheR appFenriato 8.3. Subsurface Utility Engineering Provide Subsurface Utility Engineering (SUE) to Quality Level A, as described below. Utilities were identified and included in the conceptual handoff package survey which will be utilized for this project. Level A SUE is needed to verify the location of underground utilities identified in the conceptual handoff package survey. The SUE shall be performed in accordance with Cl/ASCE 38-02. SUE services will be provided by Solaray Engineering. Utility Quality Levels are defined in cumulative order (from a level of accuracy of least to greatest) as follows: Quality Level A — This Quality Level will incorporate all the other preceding Quality Levels. This Quality level exposes the utility through nondestructive means, establishing a confirmed vertical & horizontal location to be surveyed and visually depicted in the Test Hole Data Sheet Report. a. Gather records of the utilities in question b. Notify Texas 811 of the project so all utilities can mark their facilities around the TH locations before we begin Level A operations in the field. c. Coordinate permitting and any traffic control required. d. Designate the utility in question before digging operations begin. e. Core existing pavement to perform nondestructive vacuum excavation located underneath the pavement. City of Fort Worth, Texas Page 26 of 42 Attachment A Revision Date: 03.21.2025 Page 26 of 42 FORT WORTH:, f. Provide utility size and material g. Provide surface thickness and type when coring the pavement h. Provide general soil type and site conditions i. Backfill with native material and repair any coring of pavement City of Fort Worth, Texas Page 27 of 42 Attachment A Revision Date: 03.21.2025 Page 27 of 42 FORT WORTH:, 8.4. Post -Construction As -built Survey Surveyor shall perform a post -construction as -built survey of the channel improvements for use in development of the LOMR. • This survey shall be based on NAD-83 Texas State Plane Coordinate System with data derived from the ALLTERRA VRS Network. • Data shall be provided in a Surface projection using a Grid to Surface Adjustment Factor of 1.00012. • Vertical will be referenced to previously established project control. City of Fort Worth, Texas Page 28 of 42 Attachment A Revision Date: 03.21.2025 Page 28 of 42 FORT WORTH:, • This post -construction as -built survey shall include the block walls constructed in the locations shown on the conceptual plans. • In addition to the walls, other features shall include final channel grading, mats, erosion/reinforcing items and any other improvements to the channel. Survey shall be detailed as to provide wall "steps". ASSUMPTIONS Up to XX Six (6) Level A test holes are included. Level A test hole information to be provided: 1. Prior to design, to supplement the design survey 7 ❑Fier to RMF i nn at � re�GGati�s�eGenfir RGhicUtility ennflli s —��vrc��rrn�zr rnT,-crr been in fart rlearerl • Temporary Right of Entry Letters have already been acquired. • The SUE investigation shall be in accordance with Cl/ASCE 38-02, 38-22, and 75-22. • For SUE work: traffic control will be performed by Solaray, and no permitting will be required. If permitting is required, then there will be additional costs • For SUE work: when coring pavement, will need to utilize flowable fill per City Standards • Removal of paint markings from SUE activities shall not be the responsibility of the SUE provider nor the ENGINEER • Pavement design will not be performed as part of this contract. • Survey from 30% hand-off package will be utilized for this project supplemented by additional survey in selected locations to update known changes in conditions and to acquire additional property corners needed for easement documents. Unknown changes to site conditions may require additional survey. DELIVERABLES A. Drawing of the project layout with dimensions and coordinate list. DR SUE plan drawings sealed by a profess Rai g-eer r ist in the State of eaT �s+o,,�r-e�9„-rc�eg,��e� Texas. C. Test Hole Reports signed and sealed by a Professional Engineer Licensed in the State of Texas City of Fort Worth, Texas Page 29 of 42 Attachment A Revision Date: 03.21.2025 Page 29 of 42 FORT WORTH:, TASK 9. PERMITTING. ENGINEERS will provide permitting support for the CITY to obtain any and all agreements and/or permits normally required for a project of this size and type, as follows: City of Fort Worth, Texas Page 30 of 42 Attachment A Revision Date: 03.21.2025 Page 30 of 42 RT WORTH. 9.4 Storm Water Pollution Prevention Plan For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) with appropriate regulatory agencies. The Engineer will prepare the Construction Plan according to the current CITY Stormwater Criteria Manual, which the contractor will incorporate into the SWPPP. 9.5 Environmental Services (VRX, Inc.) 1. Evaluate Impacts to WOTUS a. VRX will review design plans provided by Walter P Moore to evaluate impacts to WOTUS at the approximate 90%, and 100% complete design packages. Impacts to WOTUS will be based on delineation of waters of the U.S. conducted in January 2023 as identified and delineated in the Waters of the U.S. Delineation Report. VRX will calculate impact acreages and provide appropriate Section 404 permitting scenarios. A letter will be provided addressing the impacts assessment and the permit scenario for the project. 2. Threatened and Endangered Species Assessment a. VRX will review the U.S. Fish and Wildlife Service Information for Planning and Consultation (IPaC) & Environmental Conservation Online System (ECOS), the Texas Parks and Wildlife Department Natural Diversity Database (TxNDD), as well as Federal and State Threatened and Endangered Species lists. VRX will assess habitat in and adjacent to the City of Fort Worth Channel Rehabilitation NW 20th Street project for the potential for use by listed species. A letter report documenting our findings will be provided. 3. Historical & Cultural Resources Assessment a. The Antiquities Code of Texas provides for protection of historic and archeological landmarks on public lands and applies to all state agencies, counties, cities, and other public authorities. Section 106 of the National Historic Preservation Act requires any project that requires a federal license, permit, or approval to have a Section 106 review. VRX will submit the project to the Texas Historical Commission's (THC's) electronic Review and Compliance (eTRAC) system for THC review. Results of the eTRAC review will be provided. Onsite cultural resource review and associated Antiquities Code permitting is not included in this proposal but can be provided as additional services. 4. Tree Survey and Urban Forestry Compliance a. Tree Survey: VRX conducted a tree survey for Quiddity Engineering in conformance with City of Fort Worth Urban Forestry requirements in December 2024. It is assumed that this data is available for use in preparing City -required Urban Forestry Plans or Tree Removal Permits. b. Urban Forestry Compliance City of Fort Worth, Texas Page 31 of 42 Attachment A Revision Date: 03.21.2025 Page 31 of 42 FORT WORTH:, Part 1: Documentation of Existing Conditions: VRX will prepare 2 copies of a scaled drawing on the project reflecting the existing conditions which include the following information: 1. Boundaries of the property and its calculated area i.e. acres, square feet; 2. Location map showing the proximity of the property to the nearest streets; 3. Outline of the existing tree canopy area on the property and the calculated area (square feet or acres) of existing canopy coverage. Properties with no existing canopy shall indicate such conditions; 4. Scaled existing or proposed utilities regulated by the Public Utility Commission, and/or Texas Railroad Commission. Indicate the calculated area (square footage or acres) for these rights of ways or easements; 5. Location of each Significant or Large Tree as defined in Chapter 9 of Ordinance 18615-05-2009,its species and canopy area; 6. Tables B. C. D, and F in Section 6.302.E of Ordinance 18615- 05-2009 Part 2: Components of the Urban Forestry Plan: Part Two will overlay the proposed improvements and removals/preservations plantings. Two (2) copies shall be provided and shall include the following information: 1. Scaled site plan depicting the location of proposed structures, parking areas, drives and amenities; 2. Tree canopy areas that are desired to be removed; 3. Location and description of trees (large, medium, or small canopy crown) that will be planted from Table F to reach the minimum canopy as stated in 6302E of Ordinance 18615-05- 2009; 4. Tables G and H in Section 6.302.E of Ordinance 18615-05- 2009 5. Nationwide Permit Preconstruction Notification (if necessary) The USACE regulates impacts to WOTUS in accordance with Section 404 of the Clean Water Act. A permit is required from the USACE for discharges of materials into WOTUS. A NWP is a type of general permit issued on a nationwide basis for a category or categories of activities that are either similar in nature and cause only minimal individual and cumulative adverse impacts and the environmental consequences of the activity would be individually and cumulatively minimal. For NWPs requiring a PCN, such notification must be made in writing as early as possible prior to commencing the proposed activity. City of Fort Worth, Texas Page 32 of 42 Attachment A Revision Date: 03.21.2025 Page 32 of 42 FORT WORTH:, If necessary, VRX shall provide the City of Fort Worth with a NWP PCN including the following, as appropriate: a. The purpose of, and need for, the project (to be provided by Walter P Moore). b. A delineation, proposed determination, and characterization of wetlands and other WOTUS, and a description of the project's likely impacts on the aquatic environment, including a brief characterization of each impact to WOTUS. c. Maps clearly showing all known temporary and permanent elements of the project. d. Detailed plan, profile, and cross-section views of all work with ordinary high- water mark or wetland boundary shown (to be provided by Walter P Moore). e. A written discussion of alternatives considered and rationale for selected alternative. An assessment of the adverse and/or beneficial effects of the proposed project. g. Documentation that the amount of area impacted is the minimum necessary to accomplish the project, anticipated impacts due to changes in preconstruction contours, and documentation that changes would not result in more than minimal adverse impact on the aquatic environment. h. The mitigation plan will include the following, as appropriate: i. discussion of the goals and objectives. ii. discussion of efforts to avoid and minimize impacts to WOTUS. iii. discussion of the alternatives that were considered for the proposed project. iv. discussion of the direct and indirect permanent and temporary adverse project impacts to WOTUS both on -site and off -site. v. table summarizing the WOTUS impacts. vi. functional analysis discussion of the WOTUS that would be adversely impacted by the proposed project. vii. proposed mitigation banking credits. A discussion of threatened and/or endangered species for the project area. Note, species specific surveys would be requested as additional services. A discussion documenting whether any cultural resources would be affected by, or are in the vicinity of, the permit area. The project will be submitted to the THC using their eTRAC system. Any additional surveys will be requested as additional services. k. Information on hydrology and hydraulics (to be provided by Walter P Moore). City of Fort Worth, Texas Page 33 of 42 Attachment A Revision Date: 03.21.2025 Page 33 of 42 RT WORTH. 9.6 Floodplain Services • ENGINEER will prepare a Floodplain Development Permit application for the project. • Hydrology for Menefee Creek will not be evaluated. The analysis will utilize the discharges contained in the CITY's effective model for the 2-, 5-, 10-, 50-, 100-, and 500-year storm events. Therefore, it is assumed no hydrological analysis is required. If additional hydrologic analysis is required including 100-year ultimate conditions additional services will be required. • ENGINEER will evaluate survey data during a site visit. ENGINEER assumes survey data will include the regraded area of previous illegal fill in the floodplain and a combined surface of new and previous survey data. • ENGINEER will review and use the previous existing condition HEC-RAS model that was provided in 2023 by ENGINEER and submitted to the city as a support of the conceptual design set as a base model. The model will be updated if required based on the additional survey mentioned in Data Collection section. • ENGINEER will provide a proposed condition model using the existing condition model as based and update the model based on the proposed improvements design. • The 2023 study showed that the proposed design may cause an impact on the velocity within the channel, which was not able to be fully mitigated. Therefore, a variance application will be prepared. • ENGINEER will prepare a written report of the drainage analysis including exhibits and appendices to support the Floodplain Development Permit (FDP) • ENGINEER will submit the Floodplain Development Permit application and supporting documentation for CITY review. • ENGINEER will prepare a variance request (if required) for the velocity issue discussed in the hydraulic modeling in this section. • ENGINEER will receive and address up to 1 round of comments from CITY. More than one round of comments (new comments) from CITY will require additional services. agFeeMeRt and/nr permits. • G E)Mpletinn all fnrm0/annlinatinno non000aFy. • fnrm0/appliGatlnrl0 fnr CITY roWiioN City of Fort Worth, Texas Page 34 of 42 Attachment A Revision Date: 03.21.2025 Page 34 of 42 FORT WORTH:, 9.7 Tree Removal Permit (see 9.5 Environmental Services) 9.8 Letter of Map Revision (LOMR) ENGINEER will request and review a topographic survey to support the Letter of Map Revision (LOMR) post construction. The survey will include the post construction condition of the improvements along the stream. The survey will define all surface features and provide elevations of the site as needed to be provided as part of the Letter of Map Revision documentation needed to revise the floodplain limits. • ENGINEER will visit the site to confirm that constructed elevations concur with as -built survey. • ENGINEER will order and review the effective FEMA models. • ENGINEER will create Duplicate Effective model using a newer version of HEC- RAS. • ENGINEER will utilize the city effective model received in 2023 as the corrective effective model. • ENGINEER will utilize the existing condition model from the Floodplain Development Permit of this contract as the pre -development condition model. If any revision to the model is required, such as updates to the geometry based on the most recent LiDAR data at the time of LOMR study, additional services will be required. • ENGINEER will utilize the proposed condition model from the Floodplain Development Permit of this contract as post -development condition model and update cross -sections with topographic information received from survey. • Hydrology for Menefee Creek will not be evaluated. The analysis will utilize the effective FIMA discharges for the 10-, 50-, 100-, and 500-year storm events. Therefore, it is assumed no hydrological analysis is required. If hydrology analysis is required, additional services will be required. • ENGINEER will not create floodway runs for pre -project and proposed project conditions since the effective FEMA map does not include a floodway for Menefee Creek. If floodway models are required, additional services will be required. • ENGINEER will prepare a written report supporting the LOMR study. City of Fort Worth, Texas Page 35 of 42 Attachment A Revision Date: 03.21.2025 Page 35 of 42 RT WORTH. • ENGINEER will prepare MT-2 Forms and Exhibits to accompany report and will prepare a full package for Submittal to CITY and subsequently to FEMA for a LOMR Request. • ENGINEER will receive and address up to 1 round of comments from the City of Fort Worth in obtaining City acceptance and signature for LOMR Application. More than one round of comments (new comments) from the City of Fort Worth will require additional services. • Upon acceptance of the City of Fort Worth, ENGINEER will submit documentation to FEMA for LOMR and address up to 1 round of comments from the FEMA in obtaining FEMA acceptance and signature for LOMR Application. More than one round of comments (new comments) from FEMA will require additional services. • ENGINEER will prepare an exhibit showing the affected properties and provide a newspaper notification or send certified letters to the property owners. • ENGINEER will review the FEMA remapping. • ENGINEER will order FEMA models of $300 and pay FEMA review fee of $8000 and will reimburse those form the CITY. The fees are based on the current FEMA fees so if the FEMA fee will be different at the time of the LOMR kick-off, the reimbursable amount will be update accordingly. • ENGINEER will reimburse the mileage associated with site visit and newspaper notification form the CITY. 9.9 City of Fort Worth Parks Conversion • Project Manager/Consultant schedule a meeting with Parks and Community Services Department (PACSD) and prepare an aerial with the proposed project overlaid for the meeting. • A field meeting will be scheduled to review the proposal, to address the following: o General location, assess all feasible and prudent alternatives, ensure reasonable planning efforts have been considered to minimize impacts to park land and ensure that the project is viable for approval. • The consultant will submit a letter to PACSD requesting permission to enter the park property to field stake the project. • After the project has been staked and inspected by PACSD, an assessment is conducted to finalize the location of the alignment, identify potential impacts and determine any mitigation measures. • Metes and Bounds of the disturbed area signed by a registered surveyor with a legal description • 8'/z x 11 exhibit of the location (pdf) • Brief description of the project scope to include the approximate size of the disturbed area in acres • Copy of any deeds associated with park land. City of Fort Worth, Texas Page 36 of 42 Attachment A Revision Date: 03.21.2025 Page 36 of 42 RT WORTH. • Project Manager checks the package and submits to PACSD ASSUMPTIONS • Permit preparation will begin after approval of the Conceptual Design. • Assumes 1 Floodplain Development Permit application. • Assumes 1 variance request for channel velocities. • Assessment to finalize the location of the alignment, identify potential impacts and determine any mitigation measures will be conducted by PACSD. • On site meeting with PACSD will be 1 hour. • No meetings are assumed for the Floodplain Development Permit or variance. Preparation of FEMA applications is not included. • To the extent allowed by regulatory agency requirements, the document prepared under this scope will be written in a non -technical, easily readable manner for ease of reading by parties to this agreement. [Environmental Services] • Development designs shall be provided in an ArcMap compatible format. [Environmental Services] • Evaluation of impacts to waters of the U.S. from more than two design plans will be accomplished as additional services. [Environmental Services] • No direct onsite archeological observations or investigations are included in this scope of services. If required, these services can be provided as additional services. [Environmental Services] • No direct onsite surveys for threatened, endangered, or candidate species (including but not limited to freshwater mollusk surveys) are included in this proposal. If required, these services can be provided as additional services. [Environmental Services] DELIVERABLES A. Copies of Permit Applications B. Copies of Approved Permits C. Floodplain Development Permit application D. Variance request for channel velocities. E. A letter report documenting findings of the Threatened and Endangered Species Assessment. F. Results of the eTRAC review City of Fort Worth, Texas Page 37 of 42 Attachment A Revision Date: 03.21.2025 Page 37 of 42 RT WORTH. G. Urban Forestry Compliance documentation H. NWP PCN (if necessary) City of Fort Worth, Texas Page 38 of 42 Attachment A Revision Date: 03.21.2025 Page 38 of 42 RT WORTH. TASK 10. QUALITY CONTROL / QUALITY ASSURANCE ENGINEER to provide to the City a Quality Control/ Quality Assurance Plan (QC/QA Plan) outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are incorporated into the calculations, plans, specifications, and estimates. ENGINEER is responsible for and shall coordinate all subconsultant activity to include quality and consistency of plans. If, at any time, during the course of reviewing a submittal of any item it becomes apparent to the CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may cease its review and return the submittal to the ENGINEER immediately for appropriate action. No additional time will be granted. 10.1. QC/QA of Survey and SUE Data • The ENGINEER's Surveyor shall perform Quality Control/ Quality Assurance on all procedures, field surveys, data, and products prior to delivery to the CITY. The CITY may also require the ENGINEER's Surveyor to perform a Quality Assurance review of the survey and/or subsurface utility engineering (SUE) work performed by other surveyors and SUE providers. • ENGINEER's Surveyor shall certify in writing via a letter that the survey information provided has undergone a Quality Control/ Quality Assurance process. • ENGINEER's Subsurface Utility Engineering provider shall certify in writing via a letter that the SUE information provided has undergone a Quality Control/ Quality Assurance process. 10.2. QC/QA of Design Documentation • ENGINEER shall perform a QC/QA review of all documents being submitted for review at all stages of the design including the-302%, 60%, and 90% and Final Document design review submittals. QA should be performed by an individual within the firm who is not on the design team. ENGINEER is to acknowledge that each item on the Detailed Checklist has been included by checking "done" on the checklist. If a particular checklist item is not applicable, this should be indicated by checking "N/A". If an entire checklist is not applicable, this should be indicated by checking every item on the list as "N/A" and still included with the submittal. The ENGINEER shall use the Detailed Checklist provided by CITY. • A Comment Resolution Log must be used to document conflicting comments between reviewers and to highlight comments made by the CITY that the ENGINEER is not incorporating into the design documents along with the associated explanation. The ENGINEER shall use the Comment Resolution Log provided by CITY. • The documentation of a QC/QA review includes (1) a copy of the color -coded, original marked -up document (or "check print") developed during the QA City of Fort Worth, Texas Page 39 of 42 Attachment A Revision Date: 03.21.2025 Page 39 of 42 RT WORTH. checking process and/or review forms which sequentially list documents and associated comments; and (2) a summary list of the findings of the QC effort. • Evidence of the QC/QA review will be required to accompany all submittals. Documentation shall include, but is not limited to, the following items: - PDF of the completed Detailed Checklists If any of the above information is missing, is incomplete or if any comments are not adequately addressed; the CITY may contact the ENGINEER and request the missing information. If the ENGINEER does not respond to the request within 24 hours, the CITY shall reject the submittal. No additional time will be granted to the design schedule for a returned submittal. ENGINEER shall plan to recover the lost time with future project milestones remaining unchanged. • If the ENGINEER has not adequately addressed the comments, the submittal shall be rejected and returned to the ENGINEER immediately to address the issues. ASSUMPTIONS • All submittals to the City will be Quality checked prior to submission. • A PDF of the QC/QA documentation will be uploaded to the project folder in the City's document management system (eBuilder). DELIVERABLES QC/QA documentation a. Comment Resolution Log b. Summary of the QC effort findings City of Fort Worth, Texas Page 40 of 42 Attachment A Revision Date: 03.21.2025 Page 40 of 42 RT WORTH. TASK 10. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Street Water Tr��n Traffic Traffic "A" Traffic Storm Storm Lights /Sewer Traffic Control Control Control Attachment Signal Water Water (Submit (Submit Engineering o 30 0 60 /° 0 90 /° Type (Submit All 3 60% All @ All @ (Submit All Required for all work in City @ 30%) 30% 60%) @ 60%) ROW Street X X X X X'- X X X Storm Water X X X X X �Ain+Tr�er / .ewer X X X X *If included in street project City of Fort Worth, Texas Page 41 of 42 Attachment A Revision Date: 03.21.2025 Page 41 of 42 RT WORTH. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition, unless included as part of Section 7. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Administration of the construction contract and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Page 42 of 42 Attachment A Revision Date: 03.21.2025 Page 42 of 42 ATTACHMENT B COMPENSATION Design Services for NW20th St — True Creek Bank Stabilization Project City Project No. 105269 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2026 Rate $/hour 2028 Rate $/hour Project Director 382 416 Project Manager 277 302 Project Engineer 223 243 EIT 154 168 CADD 118 128 Administrative 154 168 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). City of Fort Worth, Texas Attachment B Revised Date: 8/18/2025 Page 1 of 4 M ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 8/18/2025 Page 2 of 4 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Walter P. Moore and Civil Engineer Associates, Inc. Proposed Sub -Consultants $342,477.00 70.06 VRX, Inc. Environmental $37,250.00 7.62 PJB Survey/Easement $67,000.00 13.71 Geotex Geotechnical $20,900.00 4.28 Solaray SUE $21,180.00 4.33 TOTAL $488,807.00 100% Project Number & Name Total Fee Sub Fee NW20th St — True Creek Bank $488,807.00 $146,330.00 Stabilization Project CPN:105269 City of Fort Worth, Texas Attachment B Revised Date: 8/18/2025 Page 3 of 4 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 8/18/2025 Page 4 of 4 N d V d cn D d D D C D G/ C Q m 2 w X E 0OrLL .. #t w E N V y 2O L Z 2.5 c ° Z a > N c 10 l0 Lp ❑ ❑ ❑ 01 N C d 47 y Cl. >. E d E.° ° aa>.Z ° i> U inmainm C_ 4) .0 C LO L6 E m G1 m C 41 d V i ° 7 > U � U_ N O � 5.2 C > ina C L Q ay � d 0.d 0.0 E E OQ U c d M E c N = m i O ❑ QQ C vE 0 ° c Ea Q c� d G7 L C aQ r O u N d d a H O C R lL .r d d as T T d d aaa T T d d CL T N r r r r r r Gi Y Y Y Y Y Y 0 0 0 0 0 0 U) 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 to fA tiT M fA to to tH to to H3 tit 69 to C 0 O E Q m E m z d E Ix E E E E c m a n n U) lU C X -- U Z5 C F C OE 'E a n w U a U m O O O 0 0 O o O o� o O O m 0 7 O d C C N O K w `O m C 0 z d r 0 U N O v ' A O � T Q a T y �a O a � W a` m v �u � O f0 'c C 'O y C A y y N � O O. U 'O U � a d w N INI1 N 41 « d a a •o c E a y O L � V L N G d 0 � N N V O C w L N N •O. L N N O s ... cn N ip i d a d a a c a aL a d Q ! d d X E Er d m d d0HU. ui 6o Ev Z m IL>(D a c� m m dam Q wd�QQU O, N= d Q E , L IL U fq(n d(n U) C C_ d C C IC IC E m d m c d d U L o U � a_ T V y O 0 > O C > _ d in a` c � o. a c Q d 7 H o. o E E Ua C r d E d d 7 m 0OQ as c E c_ a O C Ea Q C d va)� c 3 d E Z Q C d E d O �a Q 0 .Q w 0 W d l4 a m voo rn oN M o 0 o mcoo nrovco o coo ro C5 a n O w It e»i» 1ll � to M fA ItV ' FA �f3 Ili FA N w N w OI M 1� M wcss O) � N tH va �_ eA V lO N EA EA (D of a FA EA [T W t0 w M a M ww N M (V N EA N Y N A f y C O to O O u3 V3 O EH O U3 O H3 O O V3 w O bB O w O OD a 2 O N a S O O 0 ( O O N (A 00000 EA fA fH (f3 fA O w 00 (A O (A fA x U wN Nw NM- w U A O f N O U LL O U C N d Yl U C d' w w N x w ro' H c N � O u w o0o m o OI O o a7 O � a L 1� V (00 r M a 7 V w w O O K 3 t h V V t D m V N OM J O w m U H y > E w !N O O O O G � w U F w 0 O L N � w w u0i N W of t0 O �� M f0 W V V tp NO � N N `p 'n O N j N N V Nw Nw V N ap Q7 V O A W M N N N V NN O N N c O '- a` c w U d 1� N y Mw N a a N tD O O a0 V N N V' a a N d R O C V O M et o. o w y m O N N N _ � y 3 E m a C m c O w o E Z U O 0 .3 c �, m a o '� QU' m G `N N yN z � i'N N E ON T= � .2. � F qOF 0 E U OEmoNa J C tll NNc H E N c U m G mo r y c a c m = d af c Y d a c e m O C mU UC U Q 0 d c ' O o N @N Yo LL QNo E U E mN mN No NNO , 0c U 02 o� U aar o ca n=oo co o 2 U n as c7U Z) ii ii cn uaN 7 N N N N N N FO O �- •- N O rvI-' �'N N Y �`N O ch M th th th th th M O V O V ni a a y a u y Y y A f m a7 m M t9 c0 c0 E9 M N N (A a N M� o O tH o O FA v o� EA v W W EA o O EA 0 LO FA 0 T EA 0 O 0 Om M� 0 0 0 0 FA o O N� m It N o N M� y y C O EA O 19 O W O ER O EA O fA O EA O V3 cc to EA O a O O O O O a 0 0 O O O O 0 a 6699 0 O O o 2 N 0 t0 N k o H N N W U A O F y m m LL 0 W 0 (A o M O W o O W � O O U L O m a y m C K oM W oW m Wf9 m A F O O N O 9 O M O V � N y O o u a tlJ O M fA O M (A O Om M 9 !A O N M M Ohl M fA O (O 01 A M O W M N N V N O O O 0 V W a <O O O O (O f3i O t9 O V) 0 0 W FA O EA .% OI O O fA J p 0 � ro o o Ln rn M m U � H y E rW fA o 0 0 o a ao ro o m o o 0 o a U F W o O t � � N O M O N j N N Ma NM NM O N N N N N N O V M N O O O C O '- a` � w U d y p m R O C ` NO 10 O O O O N O � o` o n 3 E a m m w -oo2 O m m u o o E G E m c O :N E F o :opE O U_ -m O �' n m cOU O M a w C N C 00. y m mj U w O d a m L N X Z ¢¢ D L N N m u) U y N C` f O O m y w C C m ` G m U G N m U O y m d Y G N u N N O N ry X d O O p U u) ow U O C O N N m y c F O N N d Q U ~ L. KC U d t ..`• o m y 5; -F c�U O Lu w o .0 m�a o cNU o ��» c m>> 4a Ea m Co mom° E o a� m x c 3 aci E wo. m x o E m co m O a mad' D 0 o- co E L mj" m Q L m L L d L E U J K m> Fa N 'O W O C O C a o 'O -p N X Q X y _ O O Q X Q X a X U X a' d' O w LL X N O m> > N O 01 C O U mm oU wU u3 a a wLL O F V O �O N O t0 f0 (D �}I O I`F f� N f� �'.In' IY- O OJ a0 oD oD V OJ O W T N M W W Z t p L R Y w Q m Q. W V Co w CO � � C O = y d 0 Q: Q J i0 a eD a0 r r� �N� n C T W N V N a U u> v> vs e y Y y A f y y C d _ x y O O O fA N � O H3 0 6? 0 0 V3 E9 0 0 FA U3 0 0 FA to 0 0 O M r N U� y N LL 0 0 0 0 o _ N H W Ffi C O U L O m a y N C K N W O t9 C O V3 di � A F C A y � M �! C u a tlJ O a J rn rn m N � a i m C 10 :.7 EA EA � M 0 E 0 aD o0 .- N ap V N W W V C09 U F W 0 O t O N <o O N r n j N C O '- a` c w V � f9 fA N d R O C o` g d U O � o` o - m n 3 E o E `O E o c C y° E O O U x: w d > O. `u m e mx c o m° L y F O o" aci O o — �j O J Y y N O_ 'O _ N O A .d. 0 .L-L.. N Ul N N O O y a0. .N Ix y f0 f0 C tea. N L> r >O a. a a 3 x o o m 0 m 02 a a oz O m m ��oo '' O Z `-N M Cl? M M V M O M M C� ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for NW20th St — True Creek Bank Stabilization Project City Project No. 105269 <List any changes to the Standard Agreement> None. City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page I of I FORT WORTH ATTACHMENT "D" PROJECT SCHEDULE A. ENGINEER Project Schedule Development ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the requirements of the Agreement and encompassing the Scope of Work defined in Attachment A to the Agreement. ENGINEER shall prepare and maintain project schedule throughout the life of the project as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled Engineer Project Schedule. ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned sequencing of the work activity and timing of the work. B. Schedule "Tier" Selection City has identified three "Tier" levels for project schedules as defined in City's Specification 00 31 15, to align with the size and complexity of the project as a basis for schedule development. City's Project Manager will determine the "Tier" level for the ENGINEER's project schedule as part of the negotiation of the Agreement. C. Project Baseline Schedule ENGINEER will produce an initial project schedule and submit as a "baseline" for review and acceptance by City's Project Manager as defined in City's Specification 00 31 15 which will be referred to as the Project Baseline Schedule. Updates to the baseline schedule follow the requirements of City's Specification 00 31 15. D. Project Progress Schedule ENGINEER will provide to the City, monthly updates to their project schedule indicating progress of the Work in compliance with the requirements of City's Specification 00 31 15 and said schedule will be referred to as the Project Progress Schedule. E. Master Project Schedule City will develop and maintain a master project schedule for the overall project. ENGINEER's project baseline and progress schedule submittals will be an integral part of the development and updating process of City's Master Project Schedule. City of Fort Worth, Texas Attachment D Revision Date: 07.20.2018 Page 1 of 1 i i I r- N O N s N O N x N O N w N N _ 0 n 0 N N � l0 � \ N N N lD l0 l0 l0 \ W W N\ N N N n n N\ N \ \ N N N N Ln l0 l0 N N N c-I \ \ \ -1 N N ^ r \ N \ \ \ \ \ N -i N N \ \ \ N n r-1 \ \ \ N N N l0 N N rN N N \ \ \ \, 00 00 N \ rV N .--I N N rN \ \ N \ N \ Ln c-I c-I c-I lD 1-1 N M \ \ \ —I rV N lf1 Ln \ ro \ N ai w w w w Ol m m m m -4 � —1 —1 —1 � --1 —1 M M -4 C c1 L cc L L L L cc S_ L L L cc L L L cc L L L L L cc L 11 LL G LL LL LL LL LLL G LLL LL LL LL LL G LL LL LL G LL LL LL LL LL G LL W W W W l0 N lU N lU N w N w rN w rN fN \\\ fN rN N I- rN I- N N I- N N N N N N \ \ \ N Cj \ \ \ N O Kt � r \ \ \ \ \ \ \ \ \ \ \ -n l0 \ \ a-i r-I ri \ ry•) -1 -4 N LM Ln N N r14 Kt KZT Kt -4 —j .—I —j r-I N n N N N r- \ \ \ \ N rN N N rV \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N r-I N N N \ \ \ \ \ Ln Ln Ln Ln Ln Ln W W W 0) 61 0) M rP \ -i -i -i CV -4 -1 M ro rY) i C O O O O O O O O O O O O O O O O O O O O O O 2 2 2 :E �E �E 2 �i :E Li 2 :E 2 �E :E L-L :E 2 :E Li 2 �E 2 :E 2 c H ? (A in N n to n to N an T en T 0 m in ::- m T r0 T m T r0 m T T m in T m T r0 m T T m in T T m T T m V) T m T r0 r0 -0 T c0 -O r0 0 c0 m 'O -a -a m c0 -ac0 m 'O m l0 -a(0 -ac0 -0c0 m -a O c0 O rl -0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 00 00 d' O M M M M w r-I w O ci r i m r-1 Ln O r-I ri M O M M r-I r-1 r-I C O ++ o O N _ ID C r0 of n bA C O OM C U V co m m r0 L T LL \ \ o O V1 Y X c m ap cLo aA O U X by v v \ o m Z Q aJ X c O v a a, m iZ a) U- a s= c aJ i i > ,�.� ' >i > o i .O O r— X E n3 3 v C a' 00 io Q O u u aJ C O E E 0J OA _ qA — r0 3 E ° °' rr � v c 4� a 1 o 0 ra p + c, d +, c.7 Ln L y� in >• U m C 0 ii Ln V 0 i_I_ in m C U U Y 3 '� Z a +� u Li- m 60J to Z L a 1 m �t �� �� �� �� �? �+ �? �� �� �� �� �� �? �+ �? �� �� �� �� �� �? �+C\j N N N N 0 i u v c m N o E E N v y, 0 7 T o o m c O N V U Q LA L W W V U n. G VI n. O OC c 0 N N cc E 0 T E > E Yo C E Eo-� VI Y _ EY VI H c E (n z a- u v N O L rl C O N ( a-+ N C 00 N N L U N 7 i H I 41 V s C\J C) -.0O N N � ?j N z 3 s v ~ 44 O � d � Mayor &Council Map I CPN 105269 NW 20th Street Project I CD #2 Channel Rehabilitation FORT WORTH. EXHIBIT F CITY OF FORT WORTH STANDARD INSURANCE REQUIREMENTS (1) INSURANCE LIMITS a. Commercial General Liability — Insured shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance as follows: $1,000,000 each occurrence $2,000,000 aggregate If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this Project or location. City shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to City. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained within the policy, unless City specifically approves such exclusions in writing. ii. Insured waives all rights against City and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with Agreement. b. Business Auto — Insured shall maintain business auto liability and, if necessary, commercial umbrella liability insurance as follows: $1,000,000 each accident (or reasonably equivalent limits of coverage if written on a split limits basis). Such insurance shall cover liability arising out of "any auto", including owned, hired, and non -owned autos, when said vehicle is used in the course of Insured's business and/or the Project. If Insured owns no vehicles, coverage for hired or non -owned autos is acceptable. Insured waives all rights against City and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by Insured pursuant to this Agreement or under any applicable auto physical damage coverage. CFW Standard Insurance Requirements Page 1 of 3 Rev. 5.04.21 c. Workers' Compensation — Insured shall maintain workers compensation and employer's liability insurance and, if necessary, commercial umbrella liability insurance as follows: Coverage A: statutory limits Coverage B: $100,000 each accident $500,000 disease - policy limit $100,000 disease - each employee Insured waives all rights against City and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by Insured pursuant to this Agreement. d. Professional Liability (Errors & Omissions) — Insured shall maintain professional liability insurance as follows: $1,000,000 - Each Claim Limit $2,000,000 - Aggregate Limit Professional Liability coverage may be provided through an endorsement to the Commercial General Liability policy, or a separate policy specific to Professional E&O. Either is acceptable if coverage meets all other requirements. Coverage shall be written on a claims -made basis, and maintained for the duration of the contractual agreement and for five (5) years following completion of services provided. The policy shall contain a retroactive date prior or equal to the Effective Date of the Agreement or the first date of services to be performed, whichever is earlier. An annual certificate of insurance shall be submitted to City to evidence coverage. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that Insured has obtained all required insurance shall be attached to Agreement concurrent with its execution. Any failure to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. b. Applicable policies shall be endorsed to name City as an Additional Insured, as its interests may appear, and must afford the City the benefit of any defense provided by the policy. The term City shall include its employees, officers, officials, and agents as respects the contracted services. Applicable policies shall each be endorsed with a waiver of subrogation in favor of City with respect to the Project. c. Certificate(s) of insurance shall document that insurance coverage limits specified in this Agreement are provided under applicable policies documented thereon. Insured's insurance policy(s) shall be endorsed to provide that said insurance is primary protection and any self -funded or CFW Standard Insurance Requirements Page 2 of 3 Rev. 5.04.21 commercial coverage maintained by City shall not be called upon to contribute to loss recovery. Insured's liability shall not be limited to the specified amounts of insurance required herein. d. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. City must approve in writing any alternative coverage for it to be accepted. e. A minimum of thirty (30) days' notice of cancellation or material change in coverage shall be provided to City. A ten (10) days' notice shall be acceptable in the event of non-payment of premium. f. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A:VII or equivalent measure of financial strength and solvency as determined by the City's Risk Management division. g. Any deductible or self -insured retention in excess of $25,000 that would change or alter the requirements herein is subject to approval in writing by City, if coverage is not provided on a first -dollar basis. City, at its sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to City. h. In the course of the Agreement, Insured shall report, in a timely manner, to City's Risk Management Department with additional notice to the Contract Compliance Manager, any known loss or occurrence which could give rise to a liability claim or lawsuit against City or which could result in a property loss. i. City shall be entitled, upon its request and without incurring expense, to review Insured's insurance policies including endorsements thereto and, at City's discretion, Insured may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims - made basis, shall contain a retroactive date coincidentwith or priorto the date of this Agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the Project until final payment and termination of any coverage required to be maintained after final payments. I. City shall not be responsible for the direct payment of any insurance premiums required by Agreement. m. Subcontractors of Insured shall be required by Insured to maintain the same or reasonably equivalent insurance coverage as required for Insured. Upon City's request, Insured shall provide City with documentation thereof. CFW Standard Insurance Requirements Page 3 of 3 Rev. 5.04.21 DESCRIPTIONS (Continued from Page 1) Certificate Holder with coverage for ongoing operations and products -completed operations where required by written contract. Policy Form: CNA75079 (3-22) Under the Auto Liability policy, Lessors of leased autos are included as additional insured and loss payee. Policy Form: CA 20 01 11 20 Coverage provided on the General Liability and Auto Liability is primary and non-contributory if required by written contract executed prior to a loss. Coverage provided on the Umbrella policy is Primary & Non Contributory to additional insureds when provided on an underlying policy. Blanket Waiver of Subrogation is provided on General Liability, Auto Liability, Umbrella Liability, Workers Compensation, and Professional Liability policies as required by written contract executed prior to a loss, except as prohibited by law, per policy form CNA74858 1-15 (GL); CNA83700 10-2015 (Auto); CNA75504 03-2015 (Umbrella); WC 00 03 13 04/84 (WC - AOS); G-19160-B 11-1997 (WC - CA); LX8533 12 09 (Professional Liability). A 30-Day Notice of Cancellation is provided to Certificate holders for any reason other than nonpayment of premium when agreed to under written contract per policy forms CNA75014 1-15 (GL); CNA68021 02-2013 (Auto); LEXD00O21 (Professional Liability); CC68021A 02-2013 (WC) The Umbrella Policy Is follow form over the General liability, Auto liability, Employer liability, Stop gap liability, and Employee benefits liability policies Insured does not own any Autos. Description of Operations: NW20th St - True Creek Bank Stabilization Project The City of Fort Worth shall be additional insured if required by written contract or written agreement between the named insured and the certificate holder. SAGITTA 25.3 (2016/03) 2 of 2 #S54568002/M51523043 M&C Review Page I of 2 Official site of the City of Fort Worth, Texas A CITY COUNCIL AGEND FoRTI Create New From This M&C REFERENCE **M&C 26- 20NW 20TH ST- TRUE CREEK DATE: 6/9/2026 NO.: 0501 LOG NAME: BANK STABILIZATION- WALTER P MOORE CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 2) Authorize Execution of an Engineering Agreement with Walter P. Moore and Associates, Inc. in the Amount of $488,807.00 for Design of the NW 20th Street True Creek Bank Stabilization Project RECOMMENDATION: It is recommended that the City Council authorize execution of an Engineering Agreement with Walter P. Moore and Associates, Inc. in the amount of $488,807.00 for the design of NW 20th Street True Creek Bank Stabilization project (City Project No. 105269). DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize execution of a contract with Walter P. Moore and Associates, Inc., which will provide engineering and design services for the NW 20th Street True Creek Bank Stabilization project. This project will address the erosion in areas identified by the City where channel degradation is threatening existing infrastructure. This project is part of the Channel Restoration program, where highly eroded and failing channels, which the City is responsible for maintaining, are prioritized for restoration improvements considering risk to adjacent infrastructure and properties. In March 2025, the Transportation and Public Works Department (TPW), Capital Delivery Division (CDD), published a Request for Qualifications (RFQ) for various engineering consulting services in seven different categories. Thirty-one consultants responded to the Storm Water Capital Improvement Project (CIP) Development and Design category with Statements of Qualifications (SOQ). An evaluation team of three City staff subject matter experts from TPW scored the SOQs based on company experience, prior projects, workload, and team experience. A pool of twenty-six consultants was selected for stormwater projects based on these scores to be matched with specific projects. Based on this scoring, Walter P Moore and Associates Services, Inc was selected as the most qualified consultant to perform project development and design services for this project. Walter P. Moore and Associates, Inc., proposes completing the design and engineering services for a fee of $488,807.00. The services provided will include preparing plans and specifications to evaluate environmental and floodplain requirements and assist staff in obtaining any required permits, survey, geotechnical engineering, environmental, bid phase, and construction phase services. Staff consider the fee to be fair and reasonable for the scope of services proposed. Funding is budgeted in the Drainage Rev Bonds Series 2023 Fund for the TPW Department for the purpose of funding the NW 20th Street True Creek Bank Stabilization project, as appropriated. The project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Drainage Rev Ref Bonds 2023 Fund for the NW 20th St - True Creek Bank project to support the approval of the above recommendation and execution of the contract. Prior to http://apps.cfwnet.org/council_packet/mc_review.asp?ID=34544&councildate=6/9/2026 6/15/2026 M&C Review Page 2 of 2 any expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds. r0 Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS Jesica McEachern (5804) Lauren Prieur (6035) Monty Hall (8662) 20NW 20TH ST- TRUE CREEK BANK STABILIZATION- WALTER P MOORE funds avail.docx (CFW Internal) Form 1295 Certificate 101522864 (105269).pd (CFW Internal) MC Map NW20thStreet_CPN105269.pdf (Public) NW 20th ST- TRUE CREEK BANK STABILIZATION- WALTER P MOORE (105269).xlsx (CFW Internal) Signature:y���6 Email: Mohanad.Habib@fortworthtexas.gov Signature: Email: Lissette.Acevedo@fortworthtexas.gov Signature: Email: Thanaa.Maksimos@fortworthtexas.gov Signature: Patricia L. Wadsack (Jul 20. 2026 15:13-53 CDT) Email: patricia.wadsack@fortworthtexas.gov http://apps.cfwnet.org/council_packet/mc_review.asp?ID=34544&councildate=6/9/2026 6/15/2026 FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: NW 20th ST- TRUE CREEK BANK STABILIZATION M&C:26-0501 CPN:105269 CSO: DOC#: Date: 07/17/2026 To: Name Department Initials Date Out 1 WALTER P MOORE Consultant I-Lr- ELF 07/20/2026 2. Mohanad Habib TPW - Project Manager 7/14/2026 3. Thanaa Maksimos TPW — Program Manager 07/20/2026 4. Lissette Acevedo TPW — Sr. CPO 07/20/2026 5. Patricia Wadsack TPW —Assistant Director Lw 07/20/2026 6. Lauren Prieur TPW - Director 07/20/2026 7. Doug Black Legal - Assistant City Attorney Douglas Black 07/22/2026 8. Jesica McEachern CIVIC) — Assistant City Manager w 07/28/2026 9. Katherine Cenicola CSO — City Secretary � 07/28/2026 10. Jannette Goodall CSO — City Secretary AIr 07/28/2026 11. Allison Tidwell CSO — City Secretary Ar 07/29/2026 12. Tpw—SW—Contract TPW Stormwater NEEDS TO BE NOTARIZED: DYES ❑No RUSH: ❑YES ❑No SAME DAY: ❑ YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ❑YES ❑No Action Required: ❑1 Signature/Routing and or Recording FORT WORTH. i City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Walter P. Moore and Associates, Inc. Subject of the Agreement: (CD2) Authorize Execution of an Engineering Agreement with Walter P. Moore and Associates, Inc. In the Amount of $488,807.00 for Engineering Related Professional Services for the Design of NW 20th St- True Creek Bank Stabilization. The project is part of the Channel Restoration program, where highly eroded and failing channels, which the city is responsible for maintaining, are prioritized for restoration improvements considering risk to adjacent infrastructure and properties. M&C Approved by the Council? * Yes 9 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes ❑ No 8 If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes 8 No ❑ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 105269 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.