AMENDMENT NO. 2
STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 23145
(No M&C Needed)
WHEREAS, the City of Fort Worth (City) and J.B. Davies,
Inc., (Engineer) made and entered into City Secretary
Contract No. 23145, (the Contract) which was authorized by
the City Council by M&C C-16212 on the 12th day of August,
1997; and subsequently revised by one (1) previous
amendment; and
WHEREAS, the Contract involves engineering services for
the following project:
Engineering contract for M-206 Drainage Area Sanitary
Sewer System Evaluation Study and Improvements (Group 7,
Contract 5).
WHEREAS, it has become necessary to execute Amendment
No. two (2) to said Contract to include an increased scope
of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into
the following agreement which amends the Contract:
l.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal
letter dated February l, 2000, a copy of which is attached
hereto and incorporated herein. The cost to City for the
additional design services to be performed by Engineer total
$11,368.19.
�;�;G������.'� ���C�u�D
� 0�� ����� G����
U Uo 4"J�^I�'�IIU9 U�o
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all
work and services performed under the Contract, as amended,
so that the total fee paid by the City for all work and
services shall not exceed the sum of $342,878.77.
3.
All other provision of the Contract which are not
expressly amended herein shall remain in full force and
effect.
EXECUTED on this the
2000, in Fort Worth, Tarrant
ATT T:
��1�, �; ,ea.�'�
G�oria Pearson, City Secretary
3�-�' �D
APPROVAL RECOMMENDED:
i�^
(� '�' _
Dale A. Fiss��er� P.E.
Director, Water Department
�� day of ��,�i�_,�,
County, Texas.
J.B. Davies, Inc.
ENGINEER
BY � ��� �...�..f'.�-----
Name:Edward L. Green, P.E.
Vice President
1412 W. Magnolia Ave.
Fort Worth, Texas 76104
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
�� � r� ��, ,��I,�.f rz�
Contract Authorization
Date
PP�QV
��i � ���� �-_
Mike Groomer
Assistant City Manager
- 2 - � "I� [;,� G��:% ����J�@
�:: ll U U� c�r��� U�.�LS 17r,�bd,t!
�� �J�'��, ��10
J.B. DAVIES INC., ENGINEERS & SURVEYORS
February 1, 2000
Jody Zabolio, P.E.
City of Fort Worth
Water Departrnent
1000 Throckmorton St.
Fort Worth, Texas 76102
Re: Main 206 and 170 Drainage Area Sanitary Sewer Evaluation and Cleaning (Group 7, Contract 5),
PS58-070580410090
Request for Contract Amendment
Dear Jody,
J.B. Davies has expended the Study Phase budget of the above referenced project. As you know, additional
work beyond the originally agreed scope remains to be completed in this phase and that considerable work
beyond the scope has already been completed. We respectfully request an amendment to the contract.
There have been some unforeseen circumstances in the performance of the Study Phase in which we feel
has led to the overage. Those circumstances are summarized below and detailed in the attached table:
1. Additional field and office work associated with researching unmapped sanitary sewer connections
from the City of River Oaks and the Castleberry Independent School District. $2,916.00
2. The additional TV inspection work necessary in the M170 Basin will increase the amount of work to
be conducted, with resulting delays in the completion of the supplemental feld report for that basin.
The additional work consists of researching various maintenance and overflow records, checking
against acrive on-going projects, and deternuning limits of existing shallow sewer lines. Maps will be
prepared for use by Ace Pipe Cleaning, Inc. and City inspectors. Additional project tracking will be
required, as well as reporting. $11,364.00
J.B. Davies recognizes the utility of maximizing the cleaning and TV inspection work in the Ace contract,
for the investigation, consistent reporting and the improvement of the sewer system. However, there is
legitimate additional cost involved in our review and mapping of the TV work to be conducted.
We have prepared an attached table, which detail the contact amounts, amounts expended, amounts
remaining, and the additional amount needed to complete the additional scope of services. As shown on
the table, an amended amount totaling $14,280.00 is or has been required to complete the additional work.
Please allow us to shift $2,911.81 of unspent funds from unused portion of the SSES Expenses to the
M-170 basin portion of the funding needed to cover the additional services. This will reduce the amount of
the amendment request to $11,368.19. Note the credit shown on the attached Amendment Request Table.
fI r -. �
��������U�� G;��LU��
�:: 0�^ � C��� G�� ; G�l�
p� M5�
'��r, U�'J��'r:��Wp U o
1412 West Magnolia Avenue / Fort Worth, Texas 761 04-4249 / 81 7-335-31 54 / Fax 817-870-1503
February 1, 2000
Request of Contract Amendment
Please contact us if you have any questions or require further information.
Sincerely,
��G��` �-� i�
Edward L. Green, P.E.
Vice President
Encl.
cc: Peter Fu, P.E., Water Department
Tony Sholola, P.E., Department of Engineering
�:�:�����D'� ��'�.i� U?C`��CU�U
� =��'V ��C�u G? � ° G��
��l'� U'!��� �r'��o �C�}�o
�����>>
�
� � ���
`�;��
—;, �s�y '�
��c � ,.��
c���7
o��L>
� �
�
Service
Engineering Rehab Design Fee/Expense
Amendment #1 Rehab Design Fee
Rehab Design DBE Expenses
Amendment #1 Rehab Design Fee
Subtotal Remaining Engineering Design Fee
Amendment Request Table
(amount remaining through 11/01/99)
Contract Amount
$95,838.50
$17,810.17
$25,654.00
$5,350.00
$144,652.67
Total Previous
Invoice (-)
$95,838.50
$15,777.42
$22,662.45
$5,348.74
$139,627.11
SSES Engineering Fee/Expenses $141,511.76 $141,511.76
SSES DBE Expenses $45,346.15 $42,434.34
Subtotal Remaining SSES Engeering Fee $186,857.91 $183,946.10
TOTAL $331,510.58 $323,573.21
Total Remaining Design Fee
Total SSES Amount Required for additional work (see detail on Overages Table)
Total SSES Amount to be tranfered Original Contract to Amendment request
Total SSES Amendment Request
Contract Amount
Remaining
$0.00
$2,032.75
$2,991.55
$1.26
$5,025.56
$0.00
$2,911.81
$2,911.81
$7,937.37
$5,025.56
�
$2,911.81
Additional Amount
Required
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$14,280.00 I
$11,368.19
OVERAGES DETAIL TABLE
Contract Labor Rates
�PM PE DE ET INSP
� $108 $84 $57 $51 $51
Total Cost
�S� L'�
� �'
�'
� � <<=r�
c -�� � G�
,--� c�a �-,
� �5-?> �' „
�s � .�
��
��C�
���
0
_ ��
1. River Oaks/Castleberry ISD research
Hours: 2 11 24 8 0
Cost: � $216 $924 $1,368 $408 $0 $2,916
2. Additional (Fall'98 & Summer'99) M170 N/Cleaning research
Hours: 5 57 71 15 24
Cosf: $540 $4,788 $4,047 $765 $1,224 $11,364
$14,280
TO: Dale A. Fisseler, P.E., Director, Water Department and
Mike Groomer, Assistant City Manager
From: Jody Zabolio, P.E.;
Date: February 2, 2000 /
RE: AMENDMENT NO. 2 TO MAIN 206 DRAINAGE AREA SANITARY SEWER SYSTEM
EVALUATION STUDY AND IMPROVEMENTS (GROUP 7, CONTRACT 5), PROJECT NUMBER
PS-58-070580410090
The proposed amendment will reimburse J.B. Davies, Inc. for the additional engineering services that will
or have been provided on the project as requested by the City.
During the course of conducting the sewer evaluation study rivo major issues were discovered or requested
to be addressed by the City, which were not in the original scope of services:
1. Additional iield and offce work associated with researching unmapped sanitary sewer connections
from the City of River Oaks and the Castleberry Independent School District. $2,916.00
2. The additional TV inspection work necessary in the M170 Basin will increase the amount of work to
be conducted. The additional work consists of researching various maintenance and overflow records,
checking against active on-going projects, and determining limits of existing shallow sewer lines.
Maps will be prepared for use by Ace Pipe Cleaning, Inc. and City inspectors. Additional project
tracking will be required, as well as reporting. $8,452.19
J.B. Davies, Inc. has requested a fee of $11,368.19 for the additional services to be provided thereby
increasing the contract fee from $331,510.58 to $342,878.77. I believe this fee is fair and reasonable for
the additional services that will be provided.
Please authorize the additional design fee by your signatures on the attached contract amendment form.
cc: Tony Sholola, P.E., Department of Engineering
Berdena Hamilton, Water Deparrinent
Dan Pepon, Water Deparhnent
�����OG�,� �'L�C�U�D �
�0� �����G�C�;1Q�1 �
f�o �� �.���o ��o