HomeMy WebLinkAbout025656 - Construction-Related - Contract - Sutton & Associates, Inc.�,
��1 tr0��0� � 1 r n n� �� �'> i r� n y �
w. ' �"1�J-�
COtslRACTt�R� ,
"' COt ►�C��'S BGtdDiNG C0. ,,
z
��������, SPECIFICA.TION� �j-�Y �ECREI'�ARY n�/ �
8 , �. CONTRACT (V�? . ��✓ ` �✓`-Q
� CiiY ?,9.1�li:��R S Q�riC@ �D ' .- - ,-
N '.s" AIy
! ��c'c7i������ic1 rrov. " . rc �
�,,.
dl��ft - E#d� �G�Y CONTRACT DOCUME,�TS
;
P
1�".y}�
� A�
9 � ,
�
�' ��I
�.r
� �}�
� ���
��
� �
a �A
� �
��
�
. w.
t -��.
`��
�
.` �
�
�
, �
..z��
^� ���
F
�
a�
1'
��
.
FOR y„
' ��
H.M.A.C. SURFACE OVERL�Y (2000-2)
�
•!
AT VARIOUS LOCA�IONS
. ,�
IN THE CITY OF FORT W�RTH, TEXAS
PROJECT NO. GS93-020��30522060
f�
2000 {p
•�
��
�
w
��
KENNETH L. BARR
��
:
_���, ��a�61�b �C��OQD
� � ��Qb
��� �f�.,Q
�»..� ��d�W4 94h�i r
BOB TERRELL
MAYOR ° CITY MANAGER
.
�
HUGO A. MA.LANGA, P.E;., DIRECTOR
DEPARTMENT OF TRANSPORTATIO�T AND PUBLIC WORKS
A
A. DOUGLAS RADEMAKER, P.E., DIRECTOR
DEPARTMENT OF ENCfiINEERING
PREPARED BY TRANSPORTATION AND �PUBLIC WORKS DEPARTMENT
ENGINEERING COOR;�INATION ���.��4F•T� q�'
EXHIBIT "�" � � � *�,
. ,� . '.t�A,MH N. ���cS �. . .�
... •-�
�e -�r•. , fx�31� ��� .
, c y�,s-
�,' o
� � , +►
I 1' .?
'/ /
�
, City of Fort Wo�h, Texas
�� A a� And i aunc�il� � an�n�un�cA�ian
f �� !1 C �
..0
DATE REFERENCE NUMBER LOG NAME "' PAGE
° 2/15/00 **C-17851 I �; . 20SUTTON I 2 of 2
SUBJECT AWARD OF CONTRACT TO SUTTQN �� ASSOCIATES, INC. FOR HMAC SURFACE
OVERLAY 2000-2 AT VARIOUS LOCATIC�NS
This project was advertised for bid December 16 and 23, 1999. The following bids were received
:lanuary 13, 2000. #�
„
` BIDDERS AMOUNT
Sutton & Associates. Inc. $��7.275.00
J. L. Bertram Construction & Engineering, Inc. $��8,532.00 .
Peachtree Construction $5�5,773.00 �
APAC Texas, Inc. $6 4,946.00 �
, Austin Bridge & Road, Inc. $631,189.20
Branch & Sons Contractors, Inc. $��3,195.00
�, Pavecon, Inc. $7�5,540.00
�` ,
The low bidder, Sutton & Associates, Inc., is in comp�iance with the City's M/WBE Ordinance by
committing to 15% M/V1/BE participation. The City's goal o'n this project is 15%. �
FISCAL INFORMATION/CERTIFICATION:
°fhe Finance Director certifies that funds are available in t�ie current capital budgets, as appropriated, of '
the Contract Street Maintenance Fund and the Street Improvements Fund.
MG:j �F .
.,
a�
#�
m
Submitted for City Manager's
Office by: •
Mike Groomer
Originating Department Head:
i�ugo Malanga
Additional Information Contact:
Najib Fazes i
4
�.�.
FUND I ACCOUNT �
(to)
6140
ti
��
ip
��
CENTER
�
7801 � (from) �R
GS93 541200 0209�0522060
� C111 541200 020111053213
� AMOUNT I
I '!
� I
� �
$564,225.00 I
$ 3,050.00
�so2 � � -- �-,. � G �����
t+�''`i�°� �; R,, � c! n Q�
�'J l� u U �!S ��:
� �v f'�'l�° �5�'v^G�C��G��l
,�
r ' �t�� d i � �a
h��
---- —�-�� L o �.:� �yli � .� __...._. °
u
C�.
�
�
�
C�
�
�
�
P
�
�
. �
u
CITY SECRETARY a
,.���
-�
�`
I �
�
� ' -
���
City of Fo�t Warth, Texas
� . . . �
. �1►���a� �nd �,aunc�l c,,a�m�n�c�t�an
I I� DATE REF�RENCE NUMBER LOG NAME .PAGE
`"+ , 2/15/00 **C-17851 I � 20SUTTON I . �1 of 2
�•' SUBJECT AWARD OF CONTRACT TO SUTTON & ASSOCIATES, INC. FOR HMAC SURFACE
� OVERLAY 2000-2 AT VARIOUS'LOCATIONS . . �
�
�
u
1�1
�
In the 1999-2000 Contract Major Maintenance Program, various types of street maintenance
techniques are grouped into specific contract packages. HMAC Surface Overlay 2000-2 �rovides for
surface and base rehabilitation, curb and gutter, and valley gutter replacements for asphalt streets at
various locations� funded from the Contract Street Maintenance Fund and the Street Improvements
Fund.
The following list details the I'imits for ea�h of the streets included in this project:
' STREET
� South Adams Street
Cando Drive
Cloverdale Dri�e
� Cloverdale Drive
Comer Drive
i Conlin Drive
� De Cory Road
Dublin Drive
Engblad Drive
a Erath Street '�
Erath Street
Glasgow Road
�4 Hazel Leigh Lane
Hensley Drive
Howard Street
� Kirkwall Drive
Mansel Lane
Neystel Road
� Savage Drive
Stafford Drive
FROM
West Jarvis Street
Limerick Drive .
Engblad Drive
Roma Lane
Limerick Drive
Limerick Drive
Limerick Drive
Conroy Strest
Oak Grove Road
Knox Drive
Wilb,arger Street
Con�oy Street
West Oak Grove Road
Limerick Drive
Tallman Street
Hensley Drive
Glasgow Road
Hazel Leigh Lane
East Deadend
.Engblad Lane
pThis project is located in COUNCIL DISTRICT 8.
_0 .
�
�° RECOMMENDATION:
� It is recommended that the City Council authorize the City Manager to execute a contract with Sutton &
� Associates, Inc. in the amount of $567,275.00 for 70 working days fo�- HMAC Surface Overlay 2000-2.
DISCUSSION:
TO
Pennsylvania Avenue
West Oak Grove Road
Glasgow Road
I-20 Service Road
West Oak Grove Road
Dublin Drive
West Oak Grove Road
Comer Drive
(Highlar�d Hills Park Line)
Martin Street
Howard Street • �
Oak Grove Road West .
Oak Grove Road .
Glasgow Road
Shackleford Street
Conlin Drive
Oak Grove Road
Oak Grove, Road
West Oak Grove�Road
Glasgow Road
���0���� ��C�G�G°�D
���U ���'�Q � ° Q�
d, tl D9 tii�� u)�U lill 4[.5i�)n
�
� �
'`: � '
� .•
`
,,
w
(
�
w
�"
w
�
�
�
�
�
�
�
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
H.M.A.C. SURFACE OVERI,AY (2000-2)
AT VARIOUS LOCATIONS
IN THE CITY OF FORT WORTH, TEXAS
PROJECT NO. GS93-020930522060
2000
/�- a�,Q�
A. DOUGLAS RADEMAKER, P.E.
DIRECTOR, DEPARTMENT OF ENGINEERING
�� • 1 � ��
GEORGE A. BEHNlANESH, P.E.
ASSISTANT DIRECTOR
TRANSPORTATION �UBLIC WORKS DEPARTMENT
1 /`�l� �;�� . .� � _� "_: �
,_
DOO K�, � . E . Ii
CAP PROJECT NGI WATER DEPARTMENT
JO RNUS, P.E.
ASS STANT DIRECTOR
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
l
DA E
� �C � � ���
DATE
-,,iJ, .
; s 7 �°r`1
�,
�ATE '
/0��3` � � �
DATE
'�'������� �"L�C�JG�@
�� � b' ��C�� ����
�i�a 1llv':����'GUIID �ISf/Ua
�,
�
...
r�
i�
�y
�.
�.
�.
�
�
�
�
�
T
0
�
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
TABLE OF CONTENTS
Notice to Bidders
Special Instructions to Bidders
Prevailing Wage Rates
Proposal
Vendor Compliance
Disadvantaged Business Enterprise
Special Provisions
Contractor Compliance with Worker's Compensation Law
Certificate of Insurance
Performance Bond
Payment Bond
Contract
Project Designation Sign
Details
Street Locations
����O�GOQ� ����uG�D
�0� �����Gl[�`�G��
C�o � G���, ���.
�w;
�.
�
NOTICE TO BIDDERS
Sealed proposals for the following project:
H.M.A.C. SURFACE OVERLAY (2000-2)
�
��
��
�
�
�
�
�
�
�
AT VARIOUS LOCATIONS
Project No. GS93-020930522060
Addressed to Mr. Bob Terrell, City Manger of the City of Fort
Worth, Texas will be received at The Purchasing Office until 1:30
P.M.,January 13, 2000 and then publicly opened and read aloud at
2:00 P.M. Plans, Specifications and Contract Documents for this
project may be obtained at the office of the Department of
Engineering, Municipal Office Building, 1000 Throckmorton Street,
Fort Worth, Texas.
A pre-bid conference will be held at 9:00 A.M.,December 28, 1999
in the Transportation and Public Works Conference Room 27p� 2nd
floor, Municipal Building.
One set of documents will be provided to prospective bidders for
a deposit of twenty dollars ($20.00): such deposit will be
refunded if the document is returned in good condition within 10
days after bids are opened. Additional sets may be purchased on
a non-refundable basis for twenty dollars ($20.00) per set.
For additional information contact Mr. Najib N. Fares at (817)
871-7802.
Bob Terrell Hugo Malanga, Director
City Manger Transportation and Public Works
PUBLICATION:
December 16, 1999
December 23, 1999
By= '� �2���'��
Naj N.�Fares, P.E.,
Street and Storm Drainage, TPW
'������G��� G`[�CJ��
'�;��`u c��° ��I ° ��(
Il l�a UV��� II ��9 ��Wo
�
[J
ls�
�
L�
SPECIAL
INSTRU4"CION TO BIDDERS
�� 1. BID SECURITY: Cashier's check or an acceptable bidde,�'s bond payable to the City of Fort Worth,
in an amount of not less than ftve (5%) per cent of the total�of the bid submitted must accompany the
bid, and is.subject to forfeit in the event the successful bidder fails to execute the contract documents
• within ten (10) days after the contract has been awarded.
To be an acceptable surety on the bond, (1) the name of the;surety shall be included on the current
U.S. Treasury, oi {2) the surety must have capital and surplus equal to ten times the limit of the bond.
�' The surety must be licensed to do business in the state of Texas. The amount of the bond shall not
exceed the amount shown on the treasury list or one-tenth ��/10) the total capital and su�plus.
��
� , 2
� �
� i
a�
� 's
�o
�
� *,.
�
��
�
�
�J
L�'
�
�
PAYMENT BOND AND PERFORMANCE BOND: The successful bidder entering into a contract
for the work will be required to give the City surety in a sum equal to the amount oF the contract
awarded. In this connection, the successful bidder shall be �equired to furnish a performance bond as
well as payment bond, both in a sum equal to the amount of!the contract awarded. The fQrm of the
bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished
hereunder shall meet the requirements of Article 5160 of the Revised Civil Statutes of Texas, as
amended. • '
In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the
current U.S. Treasury List of Acceptable Sureties (Circular 870), or (2) the surety must have capital
and surplus equal to ten times the amount of the bond. The�surety must be licensed to do business in
the State of Texas. The amount of the bond shall not excee� the amount shown on the Treasury list or
one-tenth (1/10) of the total capital and surplus. If reinsura�ce is required, the company writing the
reinsurance must be authorized, accredited or trusteed to do��usiness in Texas.
No sureties-will be accepted by the City which are at the ti� F in default or delinquent on any bonds or
which are interested in any litiga�ion-against ttte City. Shouid any surety. on the, cohtracti'be,determinetl`
unsatisfactoiy.�at any time ti'y the City, notice will be given t� the contractor to that effecC' and the
contractor shall immediately provide a new surety Satisf.actory to the City.
�� If the contract amount is in excess of $25,000 a Payment Bo d shall be executed, in the amount of the
contract, solely for the protection of all claimant� supplying �abor and materials in the�prosecutibn of
the work. ;; �_
0.�
' If the contract amount is in excess of $100,000, a Performa�e Bond shall be executed, in the amount
' of the contract conditioned on the faithful performance of th� work in�accordance with the plans,
specifications, and contract documents. Said bond shall solely be for the protection of the City of fort
p Worth. . .
3. LIOUIDATED DAMAGES: The Contractoc's attention is ��1led to PaR 1, Item 8, paragraph 8.6, of
' the "General Provisions" of the Standard Specifications for Construction of the Ciry of Forc Worth,
� Texas, concerning liquidated damages for late completion o��rojects. '
4. AM$IGUITY: In case of ambiguity or lack of clearness in stating prices in the proposal, the City
reserves the right to adopt the most advantageous construction thereoF to the City or to reject the
°' proposal. .
5. EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended
• by Ciry Ordinance No. 7400 (Foct Worth City Code Section 13-A-21 through 13-a-29) prohibiting
discrimination in employment practices. .
� � �C��� �Ol�� G�C��C�Q@
, { ���� ����G?[�Q�
, �o �u�� �.���o �[�a
�
��
�
l!�'
�
O
6. NAGE RATES: All bidders will be required to comply w�th provision 5159a oE "Vemons Annotated
Civil Statutes" of the State of Texas with respect to the pay�ent of prevailing wage rates as established
by the City of Fort Worth, Texas and set forth in Contract Documents for this pcoject.
1 �
7. FINANCIAL STATEbiENT: A current certified financial��statement may be required by the
Deparhnent of Engineering if required for use by the CITY°�F FORT WORTH in determining the
successful bidder. This statement, if required, is to be prepa�ed by an independent Public Accountant
holding a valid permit issued by an appropriate State Licens�ng Agency. '
8. INSURANCE: Within ten (10) days of receipt of notice of award of contract, the Contractor must
provide, along with executed contract documents and appro�iriate bonds, proof of insurance for
Worker's Compensation and Comprchensive General Liabil}ry (Bodily Injury-$250,000 each person,
$500,000 each occurrence; Property Damage -$300,000 eaih occurrence). The City resecves the right
to request any other insurance coverages as may be requirecilby each individual project.
NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of FoR
Worth will not award this contract to a non resident bidder unle� the nonresident's bid is lower �than the
lowest bid submitted by a responsible Texas resident bidder by the s�me amount that a Texas resident
bidder would be required to underbid a nonresident bidder to obt�in a comparable contract in the state in
which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder who��e principal place of business is not in this
sfate, but excludes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state.
"Texas resident bidder" means a bidder �v�ose principal place of business is in this
state, and`includes a contractor whose ulti�iate parent company or majority owner
has its principal place of business in this state.
.. �� _ .
�' :.
��
L''9
�
1�]
�
�
This provision does not apply if this contcact involves federal fund's.
The appropriate blank's of the Proposal must be filled out by all �i�bn resident bidders in brder for its bid to
meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that
bidder. '�
10. MINORIT!' AND �VONIEN BUSINESS ENTERPRISES:, In accord with City`- of Fort Wo�rth
Ordinance No. 11923, as amended by Ordinance 13471, the City of Fort Worth� has goals for the
participation of minority business enterprises and women bu�iness enterprises in Ciry contracts. A
� copy of the Ordinance can be obtained from the office of the�City Secretary. In addition, the bidder
shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACfOR WAIVER FpRM
and/or the GOOD FAITH EFFORT FORi�t ("Documentation") as appropriate. The Documentation
must be received no later than �:00 p.m., five (5) City busine�s days after the bid opening date. The
bidder shall obtain a receipt from the appropriate employee o�f the managing department to whom
delivery was made. Such receipt shall be evidence that the Documentation was received by the City:
Failure to comply shall render the bid non-responsive. �
Upon request, Contractor agrees to provide to owner comple e and accurate information regarding
actual work performed by Minority Business Enterprise (WB�) on the contract and payment therefore.
Contractor further agrees to permit an audit and/oe examinat`i n of any books, records or files in its
possession that will substantiate the actual work performed bi�+ an MBE and/or WBE. The
misrepresentation of facts (other than a negligent misrepreselitation) andlor the commission of fraud
by the Contractor will be grounds for termination of the cont�act and/or initiation action under
appropriate federal, state or local laws or ordinances relatingfto false statement; further, any such
misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in
� ��� �Q�� �t�C�GQD
C 6� �����G��`�Q�
r� nnr✓.�,r,s��n car�m
O
�
�
�
�
{_�J
!J
L'"'J
lJ
���
�
�
l�
L�1
�
the Contractor b�ing determined to be irresponsible and barred from participation in City work"for a
period of time of not less than three (3) years. �
11. A�VARD OF CONTRACT: Contract will be aw�rded tap the lowest responsive bidder. The City
reserves the right to reject any and/or all bids and waive �ny and/or all irregularities. No bid may be
withdrawn until the expiration of forty-nine (49) days frdm the date the M/WBE UTILIZATI0�1
FORM, PRIME CONTRACTOR WAIVER FORM and%pr the GOOD FAITH EFFORT FORM
("Documentation") as appropriate is received by the Cicyti'� The award of contract, if made, will be
within forty-nine (49) days after this documentation is received, but in no case will the award be made
until the responsibiliry of the bidder to whom it is proposed to award the contract has been verified.
�
12. PAYI�IENT: The Contractor will receive full payment (minus 5% retain age) from the City for all
work for each pay.period. Payment of the remaining ambunt shall be made with the final payment,
and upon acceptance of the project. '
13. ADDENDA: Bidders are responsible for obtaining all addenda to the contract documents prior to the
bid receipt time and acknowledging them at the time of �iid receipt. Information regarding� the status
of addenda may be obtained by contacting the Departm�t of Engineering Construction Division at
(817) 871-7910. Bids that so not acknowledge all applicdble addenda may be rejected as non-
resoonsive.
i4. CONTRACTOR COMPLIANCE WITH �VORKER'S COMP�NSATION LA�V;
,�u,
A. Workers Compensation Insurance Coverage
a. Definitions:
Certain of coverage ("certificate"). A copy of a," ertificate of insurance, a certificate of
authority to self-insure issued by tlie commissi' , or a coverage agreement (TWCC-81,
TWCC-82, TWCC-83, or TWCC-84), showing� tatutory� worker's compensation insurance
coverage for the person's or entity's employeesop"roviding services on a project, for the
duration of the project. ,�
Duration of the project 'includes the time from �,he beginning of the w.ork on the project until
the contractor's/person's work on the project h�s been completed and accepted by the �
gov�'mmental entity, R� .
: {
IM
Persons providing services on the project ("sub�ontractor" in §406.096)-includes all persons
or entities performing all or part of the services the contractor has undertaken to perform on
the project, regardless of whether that person c�ntracted directly with the contractor and
regardless of whether that person has employees. This includes, without limitation,
independent contractors, subcontractors, leasin�` companies, motor carriers, owner-operators,
employees of any such entity, or employees of �ny entity which furnishes persons to provide
services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or.tnaterials, or providin�labor, transportation, or toner services related�
to a project. "Services" does not include activities unrelated to the project, such as
food/beverage vendors, office supply deliverie�r and delivery of portable toilets.
b. The contractor shall provided coverage, based on proper reporting of classification codes
and payroll amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011 (44) or all employees of the
contractor providing services on the project, for the duration of the project.
c. The Contractor must provide a certificate of coverage to the governmental entity prior to
being awarded the contract. .
'� ���� Q�' � �?�'��Q�
�CO�^ ���Q����
�l. N!1'flS:+)���e �I!aWa
�
� d. If the coverage period shown on the contra� tor's current certificate of coverage ends
during the duration of tRe project, the cont��ctor must, prior to the end of the coverage
�"j period, file. a new certificate of coverage w},th the govemmental entity showing that
� coverage has been extended. ,�
L�`J
e. The contractor shall obtain froin each person providing services on a project, and provide
to the governmental entity: •
(1) a certificate of coverage, prior to that erson beginning work on the project, so the
A govecnmental entity will have on file �ertificates of coverage showing covera�e for
� �„ all persons providing services on the project; and
.� , �
�} ,� (2) no later than seven tiays after receipt li� the contractor, a new ceRificate of coverage •
�{ � showing extension of coyerage, if the �coverage period shown on the current
eJ certificate of coverage ends during th�duration of the project.
9
� f. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter
g. The contractor shall notify the governmenfal entity in writing by certified mail or
�personal delivery, within ten (10) days aft�r the conhactor knew or should have.known,
41� of any change that materially affects the provision of coverage of any person providing.
services on the project. ° , '
�
�
�;.
� ,.
O
�
�
L�9
�
h. The contractor shall post on each project �,}te a.notice, in the text, form and manner '
• prescribed by the Texas-Worker's Compeiisation Comrriission, informing all persons
providing services on the project that the}�lare required to be covered, and stating how a
person may verify coverage and report lack of coverage. �
. . , �� : .. .
-Y.. The contractor shall cbntractually require each�person with whom if contracts to provide
services on a project, to: �
. �r -
(1) provide coverage, based on proper,re�orting on cla'ssification c�des and payroll
amounts and fling of any coverage a reements, which meets the statutory
requirements of Texas labor Code, S� tion 401.011 (44) for all of,its employees
providing services on the project, for��he�duration of the project;
(2) provide to the contractor, prior to tha��person beginning work on the project, a
� certificate of coverage showing that c�verage is being provided for all employees of
the person providing services on the project, for the duration of the project;
(3) provide the contractor, prior to the e"nd of the coverage period, a new certificate of ,
coverage showing extension of covec�ge, if the coverage period shown on the
current certi f icate o f coverage en ds c�µring t he duration o f t he project;
(4) obtain from each other person with �hom it contracts, and provide to the contractor:
��
k
(a) a certificate of coverage, prio� to the other person beginning work on the
project; and
,, . .(b) a new certificate of coverage �howing extension of coverage, prior to the end
� of the coverage period, if the � overage period shown on the current certificate
of coverage ends during the ��ration of the project;
(5) retain all required certificates of cov�rage on file for the duration of the project and
� � for one year thereafter. ` `
��
2� J
��V'lr����WL� D`�LS��I��
� G�'bf ��'�G?(� °IQI�
fr.'ri? �I.I/U,;, G,ran n nH� ..
�
O
�
(6) notify the govemmental entity in wiring �y certified mail or personal delivery,
�vithin Cen (10) days after the person kne�$'or should have known, of any change that
materially affects the provision of covera��e of any person providing services on the
project; and .
(7) contractually require each person with �vl� m it contracts, to perform as required•by
paragraphs (1) -(7), �vith the certificates �f coverage to be provided to the person for
whom they are providing services. i.
�
L""1
���
�
!�`J
�
�
[!J
0
�
�
[�J
�
k
j. By signing this contract or providing or causi�g to be provided a certificate of coverage,
the contractor is representing to the governmental entiry that all employees of the
contractor who will provide services on the p��ject will be covered by worker's
compensation coverage for the duration of the°�roject, that the coverage will be based on
proper reporting of classification codes and pa oll amounts, and that all coverage
agreements will be filed �vith the appropriate insurance carrier or, in the case of a self
insured, with the commission's Division of Self-Insurance Regulation. Providing false or
misleading information may subject the contractor to administrative, criminal, civil
penalties or other civil actions. a
' k. The contractor's failure to comply with any of these provisions is a breach of contract by
' the contractor does not remedy the breach within ten days after receipt of notice of
y„ breach from the governmental entity.
.�
;; B. The contractor shall post a notice on each project site informing all persons providing services on the
, project Chat they are required to be covered, and stating ho�v a person may verify current covera�e and
'report failure to provide coverage, This notice does not sat"isfy other posting requirements imposed by
the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules.
This notice must be printed with a title in at least"30 point ti�old type and text in at least 19 point normal
." ty'pe, and.�hall be in both English and Spanish and any oth�r language cc�mmon to�the worker
�� population. "The text for the notices shall be the following text, without any additional words or
� changes: . �
"REQUIRED WORKER'S COMPENSATION C(JV�R.AGE"
� 'The law requires•that each person working on this site or p�oviding services related to this copstruction
pioject must be covered by worker" compensation insurance. This includes persons providing, hauling
or delivering equipment or materials, or providin� labor oc�,�ansportation or other service related to the
'� project, regardless of the identity of their employer or status as an employee".
i Call the Texas Worker's Compensation Commission at 51�-440-3789 to receive information on fhe
i� legal requirement for coverage, to verify whether your employer has provided the required coverage,
`' or to report an employer's failure to provide coverage". �; �
.p
15. NON�DISCRIMIPIATION: The contractor shall not discr'iminate against any person or persons
because of sex, race, religion, color, or national origin and�shall comply with the provisions of City
Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13A-21 through
13A-29), prohibiting discrimination in employment practi�:es.
16. AGE DISCRIMINATION:, In accordance with the policy� ("Policy") of the Executive Branch of the
federal government, contractor covenarits that neither it no"`r any of its officers, members, agents, or
employees, will engage in performing this contract, shall, �� connection with the employment,
advancement or discharge of employees or in connection �`vith the terms, conditions or privileges of
their employment, discriminate against person because of their age except on the basis of a bona fide
occupational qualiFcation, retirement plan or statutory rec�irement.
��U"�I��QL� GSIS�O� US�
�Q� ����USI51�i=�1I�S U
�a V� Ce�Y U U9 �UfNo�`
�
�
�
�
�
�
�
�
�
'
�-
�
�
�
�
�
�
�
�
�
:,
n
�
�
. �
Contractor fiirther coveuants that neither it nor its office �s, members, a?ents, or employees, or person
acting on their behalf, shall specify, in solicitations or ac�vertisements for employees to work on this
Contract, a maximum age limit for such employment un'less the specified ma;cimum age limit is based
upon a bona fide occupational qualification, retirement p�lan or statutory requirement.
Coutractor warrants it wili fully comply with the Polic$��and �vill defend, indemnify and hold Ciry
�harntless against any and all claims or allegations asserted by third parties a�ainst City arising out of
Contractor's alleged failure to comply with the above re�'erenced Policy concerning a�e discrimination
in the performance of this Contract. .
17. DISCI2IMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans
with Disabilities Act of 1990 ("ADA"), Contractor �varr'ants that it will not unla�vfully discriminate on
the basis of disability in the provision of services to the general public, nor in the availability, terms
and/or conditions of employment for appiicants for emgloyment with, or current employees of
Contractor. Contractor warrants it will fully comply wit�} ADA'sprovisions and any other applicable
federal state and local laws concerning disability an¢ w�l1 defend indemnify and hold City harmless
a�ainst any claims or allegations asserted by third parti�s against City arising out of Contcactor's
. alleged failure to comply with the above-referenced la«7� concerning.disability discrimination in the
performance of this Contract. '
Revised March 15, 1996
�[
i . �
x
. � _
. ��.
��
�
�
�
F �[��OC�O�� �?C��UQ�
�0� �������
�o �GG���19 ���o
�
�
3ri
.�
CITY OF FORT `VORTH
HIGHWAY CONTRUCTION
PREVAILING W�GE RA.T� FOR 1999
r
CLASSIFACTION
HOURLY RATE
�
�
AIIZ TOOL OPERATOR
ASPHALT RAKER
ASPHALT SHOVELER
BATCHING PLANT WEIGHER
CARPENTER
CONCRETE FINISHER-PAVING
CONCRETE FINISHER-STRUCTURES
CONCRETE RUBBER
ELECTRICIAN
FLAGGER
FORM BUII.DER-STRUCTURES
FORM LINER-PAVING & CURB
FORM SETTER-PAVING & CURB
FORM SETI'ER-STR.UCTURES
LABORER-COMMOI�I
LABORER-U'I ILITY
MECHANIC
OILER
SERVICER
PAIIVTER-STRUCTURES
PIPE LAYER
BLASTER
ASPHALT DISTRIBUTOR OPERATOR
ASHPALT PAVING MACHINE
BROOM OR SWEEPER OPER.ATOR
BULLDOZER
CONCRETE CUR.ING MA.CHINE
CONCRETE FINISHING MACHINE
CONCRETE PAV]NG JOINT MACHINE
CONCRETE PAVING JOINT SEALER
CONCRETE PAVING SAW
CONCRETE PAVING SPREADER
SLIPFORM MACHINE OPER.A.TOR
CRANE, CLAMSHELL, BACKHOE, DERRICK, DR.AGLTNE, SHOVEL
FOUNDATION DRILL OPER.ATOR CRAWLER MOUNT'ED
FOUNDATION DRILL OPERA.TOR TRUCK MOUNTED
FRONG END LOADER
MILLING MACHINE OPERATOR
MLXER
MOTOR GRADER OPERATOR FINE GRADE
MOTOR GRADE OPERATOR
$9.00
9.55
8.80
11.51
10.30
10.50
9.83
8.84
15.37
7.55
9.83
9.00
9.24
9.09
732
8.94
12.68
10.17
9.41
11.00
8.98
11.50
10.29
10.30
8.72
10.74
9.25
11.13
10,42
9.00
10.39
10.50
9.92
11.04
10.00
11.83
9.96
8.62
10.30
11.97
10.96
'�_:���'����G��i� V-;I���U`��
'':��ti`ur ��'� °?���(
���o G�ti�;,�;�p q�o
�
�
r�
�
�.
ti..
�,
r„�.
CITY OF FORT `VORTH
HIGHWAY CONTRUCTION
PREVAILING WAGE RATE FOR 1999
CLASSIFACTION
PAVEMENT MARICING MACHINE
ROLLER, STEEL WHEEL PLANT-MIX PAVEMENTS
ROLLER, STEEL WHEEL OTHER FLATWHEEL OR TAMPING
ROLLER, PNEUMATIC, SELF-PROPELLED SCRAPER
SCRAPER
TRACTOR-CR.AWLER TYPE
TRACTOR-PNEUMATIC
TRAVELING MIXER
WAGON-DRILL, BORING MACHINE
REINFORCING STEEL SETTER PAVING
REINFORCING STEEL SETTER STRUCTURES
STEEL WORKER-STRUCI'UItAL,
SPREADER BOX OPERATOR
WORK ZONE BARRICADE
TRUCK DRNER-SINGLE AXLE LIGHT
TRUCK DRIVER-SiNGLE AXI,E HEAVY
TRUCK DRNER-TANDEM AXLE SEMI TRAILER
TRUCK DRIVER-LOWBOY/FLOAT
TRUCK DRNER-TRANSIT MIX
TRUCK DRNER-WINCH
VIBRATOR OPERATOR-HAND TYPE
WELDER
�
�
��
�
�.
2
HOURI�Y RATE
7.32
9.06
8.59
8.48
9.63
10.58
9.15
8.83
12.00
13.21
13.31
14.80
10.00
732
8.965
9.02
, 8.77
10.44
9.47
9.00
7.32
11.57
a
� J��I��U'; ���:� G.'��J��
��� �� �,'� c���� G?�G��l �
!�`�' �JG_'l�o ��o �
, �,
, �
city of Fort wortn
Minority and Women Business Enterprise Specifications
r
SPECIAL INSTRUCTIONS FOR BIDDERS
�
�
APPLICATION OF POLICY
If the total dollar:value�of the contract is a25,000 0� more� the M/WBE goal is applicable. If the total dollar
value of the contract is less than 525,000, the M/V1fBE goal is not applicable: �
- POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business
Ente�prises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective
of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide
goods and services directly or indirectly to the City. �
�.�
M/WBE PROJECT GOALS '
The City's MBE/VVBE goal on this project is I� % of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
.� On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's MlWBE Ordinance
by either of the following: �
1. Meet or exceed the above stated MNVBE goal, or;
2. Good Faith Effort documentation, or;
-.. 3. Waiver documentation.
� SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following times allocated, in
order for the entire bid to be considered responsive to the specifications.
�
1. MM/BE Utilization Form:
..--
�
r
�
�
2. Prime Contractor Waiver Form:
3. Good Faith Effo�t Form:
received by 5:00 p.m., five (5) City business days after the
bid opening date, exclusive of the bid opening date.
received by 5:00 p.m., five (5) City business days after the
bid opening date, exclusive of the bid opening date.
�eceived by 5:00 p.m., fve (5) City business days after the
bid opening date, exclusive of the bid opening date.
�FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE� WILL RESULT IN THE BID BEING
CONSIDERED NON-RESPONSIVE TO SPECIFICATI(1NS
Any questions, please contact the M/V1lBE Office at (81T) 871-6104.
_,�V�,�s���j��Ol��ti� G"�(C�°��
�� r�"'� r"��' � ''� Ini=�1 c���
„e t� u � � u
��, ��Lr�'['�iG��9 �[��o
Rev. 6l2/98
� , �
r
�.
r
;.•,
ATTACHMENT 1A ,
Page 1 of 2 '""
Cit�y of Fort Worth
Minority and Women Business Enterprise Specifications
MBE/WBE UTILIZATION
���ti��---� ! .�° ��>r; r �� �, -t c �� :Tv c . � � l � ��-(,24Z;
� PRIME OMPANY ME � BID DAT � �
�; �-�k Vl ,� ( _ ��.L�n:.r c�_ ((`%,�,�, ,��r��:� �- ��? � -�5� `I , 3 •- DU���9� i l/��;�a�l� �%
PROJECT NAME �,� � PROJECT NUMBER
� � CITI"S A1/1'V[3E PROJECi' GOAL:
� �M/WI3E PERCENTACEACHIEVED:
Failure to complete this form, in its entirety with supporting documentation, and �eceived by the Managing Department
""' on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid
being considered non-responsive to bid specifications.
The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this
� schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional andlor knowing
misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered
� non-responsive to specifications.
�.,.,
Company Name, Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount
,�, Address, and Telephone No. � Scope of Work (•) ' Supplied(") �,�
Q f, > . .
. � oo d �
U X � N �"'
2 ~ _ .
1� � 1 //
..._. CC�'FL'lCl'�C�.C: `.)CGh�j�-\'?IOV'i'%
�,� �
_�.'� ��y L� - �; c_ks c�t_,
�.. _:r��_t<,%.s�,::i�.—r-Z��_L� _._
4���1-�liq-�GI�?a
_� —_T= � 1`I - qa-fn - 8"b7 �
--. - . �_,.�e.�..---
.-,
r,
Cur�7 � �v�"CCr �f�U�;i
5; cQ��,::al << I� e, l l e y.
t�, I�f c l � i,� r.,', r r c,v,n�
L'.� r �J �4�.r-!� c c- (� �'
�.
Dc':ve�, S , e�ie•..c:c.��L �
�
�����e� � wti,e<>I��,�„�-
` �. �, P
I ��c l2�".Pt'
—, � M/WBEs must be located in the 9(nine) county marketplace or curre�tly doinq business in the marketplace at the Mme of 1�dg i;:, ;i i4�r�:,r�,' l s �
- � • '_ I 2�.u�l+;LS UeIS\:C �
(') Specify all areas in which MWBE's a�e to be utilized andlor items to be supplied: "�,I 'r:�l=���1��
(') A complete listing of items to be supplied is required in order to receive credit toward the M/WBE goaL �
('•) Identify each Tier level. Tier: Means the level of subco�tracting below the prime contractor/consultani, i.e., a direct paymerr.
from the prime cont�actor to a subcontractor is considered 1" tier, a payment by a subcontractor to �
I its supplier is considered 2^° tier.
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID
'" OPENING, EXCLUSIVE OF THE BID OPENING DATE
Rev. 6l2/98
Pages 1 and 2 of Attachment 1A must be received by the Managing Department
:�'��,
�_,
r
d,..
.
city of Fort wortn
Minority and Women Business Enterprise Specifications
MBENVBE UTILIZATION
Company Name, Contact Name, Certified Specify All Contracting Specify All Items to be
Address� and Telephone No. Scope of Work (•) Supplied(•) ,r;
cai a o ' u �
� o dd
_ � � rn �-
r,,, The bidder further agrees to provide� directly to the City upon request, complete and accurate information regarding
actual work performed by all subcontractors� including MBE(s) andlor WBE(s) arrangements submitted with this bid.
The bidder also agrees to allow an audit and/or examination of any books, records and �les held by their company that
will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or
' employee of the City. Any intentional and/or knowing mis�epresentation of facts will be grounds for terminating the
contract or debarment from City work for a period of not less than three (3) yeats and for initiating action under Federal,
State or Local laws conce�ning false statements. Any failu�e to comply with this ordinance and creates a material
breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work
for a period of time not less than one (1) year.
�
�
ALL MBE and B s MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
,
,�� �; , , /� �f f
%% 1 � r � �E' ��`�--+ G � �,;
Authorize Signatur� Printed Signature
� C
�� �� � , �! �',;,.. -� i' P �c � r � �`n,-: E_ 7Gc'�FS
Title ' Contact Nam��nd Title (�F different)
�
, >c,_:����.,, � �.l ����%c � ,;...�, �.�.� �,-�c . ,� � ?� .t,-7�J- ,S J"7 -7
Company Name ' Telephone Number (s)
��� (�, _ ��oX �� �7 � ;�� `7 ,'�7 l- l��? �
ATTACHMENT 1A `;''
Page 2 of 2 �
Dollar Amount �
,�F� 7���' Sr c �y; YE
Address Fax Number
��� I.IF, , �� X .1(r ���1 ; �r�u; . 13 �O7i7� ------�.
City/StatelZip Cdde Date J ' �i � �� ^� r e
c%cl�� co��� �_��,��� �
�_r�?�'�r rf ;,^r�f'�G1r"�7
. ��
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSIt-ESS DAYS AFTER BID
OPENING, EXCLUSIVE OF THE BID OPENING DATE
Rev. 6/?198
Pages 1 and 2 of Attachment 1A must be received by the Managi�g Depa�tment
:�.�
ATTACHMENT16
Page 1 of 1
Cit�y of Fort Worth
Minority and Women Business Enterprise Specifications
'� Prime Contractor Waiver
�.,2t���,��--�� �-�� ;r� c , ,�•��'' �-�-�'� F-� t�� AL� (��� C � �c� � ��'7%z �
P�ime Company Name �' 1 Project Name � �
'��„4� � i 1> �-��:�'�%2% �'„> `r � -/�-'� �i' -:� ��,��C- �r C�
Bid Op��ing Date � Project Number T v
If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form).
. All questions on this form must be completed and a detailed explanatio� p�ovided, if applicable. If
the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only
� applicable if both answers are yes.
Failure fo complete'tHis `forrn .in its entirety and be received by`:the�Mana;panp Department on or
before 5:00 p.rti:; five`(5) Citv business days after bid oneninq, ezclusive of the bid opening date;
will result in the bid being considered non-responsive to bid specifications.. „.
..,
Will you perform this entire contract without subcontractors? Yes ,�No
, If yes, please provide a detailed explanation that proves based on the size and scope of
�
this project, this is your normal business practice and provide an operational profile of
your business. �
" Will you perform this entire contract without suppliers? Yes �No
If yes, please provide a detailed explanation that proves based on the size and scope of
this project, this is you� normal business practice and provide an inventory profile of
you� business.
`"" The bidder further agrees to provide, directly to the City upon �equest, complete and accurate
�information regarding actual work performed by all subcontractors,� including MBE(s) and/or
� WBE(sj on this contract, the payment therefore and any proposed changes to the original MBE(s)
�- and/or WBE (s) arrangements submitted with this bid. The bidder also agrees to allow an audit
andlor examination of any books, records and files held by their company that will substantiate
�` the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer
or employee of the City. Any intentional and/or knowing misrep�esentation of facts will be grounds
for terminating the contract or debarment from City work for a period of not less than three (3)
years and for initiating action under Federal, State o� Local laws conce�ning false statemertts. Any
failure to comply with this ordinance and creates a material breach of contract may result in a
M� dete�mination of an irresponsible offeror and barred from participating in City work for a period of
time not less than one (1) year.
f..
r
y� �� � . ..� �
Authorized Signature
E �� { � � ,� �� �:.�`�_ _.
Title
�_ I l
� L .,� `t
�=�N� �t �� ;i' � r�. c: ,� r�' ._I,,, �'
Company Name �
1�f;- 11>f�X l�l:)
Address
, ��
,�i� il ( l �` ; ),A, Lc�
Printed Signature
�-// � (/` �.! ' ' � ! /' , �?C{,f 2° � K 7`.'/�i'T'�rl /��f�, ✓e
Contact'Mame (if ifferent) �
�-
�4 l 1- � �`i i.�7 ._7
Contact Telephone Number (s)
��l J� '� % �� 1��'> Z�
Fax Number
Authorized Signature C��„N zny Name �
,;: :,
_; ��� �� �� J�=;.�� �� ���_. _.
�� -: I p U C�'�LS��.•Ui� I����i� Rev. 6/2/98
I�`�a �''G,��J� �C�
�. .
r
cify of Fort wortn
Minoriiy and Women Business Enterprise
GOOD FAITH EFFORT
�.�_
� c.ti�-rti� ��-- �'�'���,`c�-r�, -� �, c .
'' Prime Company Name �
. �-� ��'1 �L (��� � �F� t � L-��r ���c-n(!�-.�
. Project Name (
�
r
�. :
r
��
.
ATTACHMENT1C
Page 1 of 3
�--�lD.- �l , l l> . ��rZ17,�
Bi� Date �
(=-- ; ��' � �,y��� �-3D, � �ac��U�
Project Number
If you have'failed to secure M/V1fBE participation and you have subcontracting and/o� supplier opportunities or ifI
your M/WBE participation is less than the City's project goal, you must co.mplete this fo�m. I
�
If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a
"good faith effort", the bidder will have the burden of correctly and accurately preparing and
submitting the documentation required by the City. Compliance with each item, 1 thru 6 below,
shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or
knowing misrepresentation the facts or intentional discrimination by the bidder.
Failure to com`plete :.this form, in its entiret with' su " - '
y pporting documentation, and received by the;
- _ ,
Managi�g Depa�finent�on. o.r:before-5 00 p-m: five �5) City business days affer tiid opening, exclusive of tiid,
openin� date, will �result in the b%d'being considered non responsive to tiid specificatio:ns.
1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF
FIRMS) which will be used in the completion of this project, regardless of whether it is to be provided
by a M/WBE or non- M/WBE.
(Use additional sheefs, if necessary)
, List of:
�
.�
,
w..
�
.�-
�
�
Subcontractinq Opportunities
List of: Supplier Opportunities
�
�������"0���:� G'�r�GG�@
r��
U�-�; l �( �IS�:: U•�� E �
�0 17�'1Lyl GIIIIy Ill;��o
ATTACHMENT 1C
Page 2 of 3
.-
�
2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The list is considered in
compliance, if it is not mo�e than 3 months old from the date of bid opening.
�Yes
No
Date of Listing I� / /(_�' ��L
3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously
listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are
opened?
�Yes If yes� attach M/WBE mail listing to include name of firm and address and a dated
No copy of letter mailed. �
4.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously
listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are
opened?
Yes If yes, attach list to include name of M/WBE firm, erson contacted,
`�( No phone number and date and time of contact.
NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile
is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and
documentation faxed.
NOTE: If a SIC list of M/WBE is ten or less, the bidder must contact the entire list to be in compliance with
�-- questio�s 3 and'.4. If,.�a sic.list of M/WBE-is mo;re than ten, the bidder must contact at least two-thirds of
the list but not=less than ten to be:in compliance with questions 3 and 4:
5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of
plans and specifications in order to assist the M/VYBEs?
r
�
�
....
Yes
�No
6.) If M/WBE bids were received and �ejected� you must:
(1) List the M/WBE firms and the reason(s) for rejection (i.e., quotation not commercially reasonable,
qualifications� etc.) and
(2) Attach affidavit andlor documentation to support the reason(s) listed below (i.e.. letters, memos,
bids, telephone calls, meetings� etc.)
(P/ease use addifiona/ sheets. !t necessary� and atta�h.)
Company Name Telephone Contact Person Scope of Work Reason for
Rejection
;''��1.��1��:��1� �"��L'JI��
I Il�,li���'j l���lf -Uj�IVNUc. U �
l� � C��
'�S' s�r � � li I� ����___.
�J Vc �'i���J �� � I.., o
�, ,. , �
ATTACHMENT1C
Page 3 of 3
� ADDITIONAL INFORMATION:
.
�
�
.-,
f
r
.
�-
Please provide additional information you feel will further explain you� good and honest efforts to obtain
M/WBE participation on this project.
The bidder further agrees to provide, directly to the City upon request, complete and
accurate information regarding actual work performed on this contract, the payment
thereof and any proposed changes to the original arrangements submitted with this bid.
The bidder also agrees to allow an audit andlor examination of any books, records and
files held by their company ihat will substantiaie the actual work performed on this
cont�act, by an authorized officer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be grounds for
terminating the cont�act or debarment from City work for a period of not less than three
(3) years and for initiating action under Federal, State or Local laws concerning false
statements. Any failure to comply with this ordinance and creates a material breach of
contract may result in a determination of an irresponsible offeror and barred from
participating in City work for a.period of time not less than one (1) year.
The undersigned certifies that the information provided and the M/WBE(s) I'isted
was/were contacted in good faith.' It is' understood that any M/WBE(s) listed in
Attachment 1C will be contacted and the reasons for not using them will be verified by
the City's M/WBE Office.
. • � -
� � � Yli l.i n' � � �C �� t _,�. ��-E,.,,t.,
Autho�ize Signature P�inted Signatu�e __ �
{..)( i���� � C!C_�-�`�
Title
y ���-ti`�'�-c,�, ..� �.1�"f�,C�C.,.�``1'r`� .S r�L
. Company Name i
� �' C� l�> �, � (� � 1
.
Address
�
��
�}`�t'1�fl�- iK �7(����`�{
City/State2ip '
T � /
�l d l �.� ) ( C° jc„ � t'"✓ ,� : �r�>'E�: fs
'��r'�' � : /
Contact fYart�e and Tit� (if differentj �
iSl I" 'il��" J� � �
Telephone Number(s)
� I l> >, I�! ' (� �i�)O
Fax Number
� � - I �� r� /'7_.�Z'
Date �
, _ __ _.�
�::''�'U�1'����`:�- �'����@ �
'` '� � l `u ���'�; G��i�Q�l ;
�o �F'�:; �'.��I, �ly " � �
, - - -.�
0
P R O P O S A L
TO: IvIlt. BOB TERRELL Fort Worth, Texas
City Manaqer
Fort Worth, Texas
FOR: H.M.A.C. SURFACE OVERLAY (2000-2)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930522060
Pursuant to the £oregoing "Notice to Bidders", the undersigned has thoroughly
examined the plans, specifications and the site, understands the amount of work
to be done, and hereby proposes to do all the work and furnish all labor,
equipment; and materials necessary to fully complete all the work as provided
in the plans and specifications, and subject to �he inspection and approval of
the Director of the Department of Engineering of the City of Fort Worth.
Total quantities given in the bid proposal may not reflect actual quantities;
however, they are given for the purpose of bidd.ing on and awarding the
contract.
Upon acceptance of this proposal by the City Council, the bidder is bound to
execute a contract and furnish Performance and Payment Bond approved by the
City of Fort Worth for performing and completing the said work within the time
stated and for the following sums, to-wit:
SPEC PAY APPROX. DESCRIPTION OF ITEMS WZTH BID UNIT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE
S.P. 1 2 Ea. Project Designation Sign @
Two-Hundred Dollars &
No Cents Per Ea. $ 200.00
S.P. 2 Lump Sum Utility Adjustment @
Six-Thousand Dollars �
No Cents Per L.S. $ 6,000.00
406 3 55 Ea. Manhole Adjustment @
450 Two-Hundred and Fifty Dollars &
S.P. No Cents Per Ea. $ 250.00
406 4 40 Ea. Water Valve Boxes Adjustment @
450 Two-Hundred Dollars &
S.P. No Cents Per Ea. $ 200.00
S.P. 5 3 Ea. Wate= Meter Boxes Adjustment @
Thirty-Five Dollars �
No Cents Per Ea. $ 35.00
TOTAL
AMOUNT BID
$ 400.00
$ 6,000.00
$13,750.00
$ 8,000.00
$ 105.00
,
p-1 �,�;;'!�����G�L� U'_'�'�^Jc'�
��� ����Ur � 15���o�W U
U�o �v I:'GUII� ��o
�I�
�
$PEC PAY APPROX. DESCRIPTION OF ITEMS WITH BIDUNIT TOTAL
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID
104 6 2;60Q L.F. Removal and Replacement of
502 Concrete Curb and Gutter @
g,p, �(,���;�,,.;�. Dollars �
�(; v Cents Per L. F. $/�J . l`Z' $�/ i�/C�"G' . lg�'
r
700 S.Y. Removal and Replacement of 6"
Concre e Driveway @
:�,�q� - (�;N�-S� Dollars &
fvv Cents Per S.Y. $ N�• G`Z% $�1i yC'C�-d��
100 S.Y. Removal and Replacement of 4"
Concrete S,i.dewalks @
�
�(�,,,�� . ��;-���;� Dollars �
l� i�� Cents Per S. Y. $<�]`1 ,(;`�,� $ 7��1 GC; . ��T',
200 C.Y. Removal and Replacement of /
H.M.A.C. Pavement and
Base (Base Repair) @
�', ,�%����,] - ��.,,�;_,� ; Dollars &
l)n;�,� Cents Per C.Y. $,Sf�� �'"�' $ ��i' AIGZ>. �`-Z.'
- 104 7
504
'" S.P.
104 8
504
," S.P.
. 300 9
304
312
S.P.
a
208 10 100 C.Y. Graded Crushed Stones @
S.P. c�•�,�r,�z Dollars �
� (? � Cents Per C . Y . $ ��`' • G�' $ ;� /Z'Z' 2�`"�
�
S.P. 11 50,200 L.F. Wedge Milling 2" to 0" Depth
5.0' Wide @
A,y (� Dollars � v�
��ti,,_i-�-,,_, Cents Per L. F. $ ' l � $ '`�<�7 � !1�- �'
� �
S.P. 12 40 Ea. But Joint-Mille @
i
� ��;�. �t,,.,,`�;�u Dollars �
/� (� Cents Per Ea. $ . � L'7% - G°"�' $ / � l`t�7% -l�,
300 13 300 Ton H.I�.A.C. Level-Up @
312 �,,.�.;�,�,, . ���(,' Dollars �
A? (j ` Cents Per Ton $ �`�L� � i°-C $% C r�'l' �1 l�'
�
312 14 86,2Q0 S.Y. 2" H.M.A.C. Surface Course
313 (TYP� ��D�� MiX� @
g,p, �,�,�` Dollars &
,
`<.; �'y� Cents Per 3.Y. $ -_3 " -� �� $. �r`�l `Ifr��-l'rG'
/
104 15 100 S.Y. Removal 6 Replacement of 7"
314 Concr te ValTey Guttier @
S . P . �`�I� �� � �,,,�e.. Dollars &
` �C �y Cents Per S . Y . $ . � � �� r� $ �� ,
314 16 61 S.Y. New 7'��Conarete Valley Gutter @
g,p, ��, Dollars &
,��} j�`� cents Per s.Y. S �5�1. ��? S,3 n�'� .��;
�
Pr2 ���GD���G�� ��L�C��°?D
�u � 11J C'�+� 4N�W U
fs� �l�V'�1C�R�'I �i(�(_
4.�
r-
SPEC PAY APPROX.
ITEM ITEM QUANTITY
104 17 25 S.Y.
505
S.P.
402 18 800 I,.F.
500
620
S.P.
502 19 200 L.F.
504 20 20 S.Y.
214 21 6,800 S.Y.
S.P.
214 22 110 Ton
S.P. 23 5 Ea.
106 24 100 C.Y.
S.P.
S.P. 25 5000 S.Y.
DESCRIPTION OF ITEMS WITH BIDUNIT TOTAL
PRICES WRITTEN IN WORDS PRICE AMOUNT BID
Standard 4" Reinforced Concrete
Whe�lchair Ramps @
_{ti Dollars &
�(!�� Cents Per S.Y. $ ��' ., �""�' S l a 7r -L"i.%
i
6" PVC Perforated Pipe Subdrain @
� �,,.�L Dollars &
,�; �r-�, cents Per z. F. S 1� lt��- S'� .�z c-z; . c� .f.�
New�Concrete Curb and Gu�ter @
�, -;;,;,�,�e,t, ., Dollars &
�f ��� Cents Per L. F. $ �`7 L�'�:'
New 4" Concrete Sidewalk @
�`,�� � � �:tt Dollars &
�; (?� Cents Per S.Y. $ ,3> °��
8" Pavement Pulverization @
` Dollars &
( 1n .�'
�j , � Cents Per S . Y . $ �� �3 i)
C ent @
(���� ���,� Dollars &
j�) � Cents Per Ton $//CJ • G"l�
Remobilization @
Five Hundred Dollars &
No Cents Per Ea. S 500.00
Unclassified Street Excavation
,, �1,,,.� Dollars &
/L� G� Cents Per C. Y. $% �' �'2'
2" Surface Milling @
�`�,G,,,--�� Dollars &
/� U Cents Per S. Y. $�.� Z'
TOTAL BID
S � �I L`F.� � ��'��-
s 7c��c � ��;:
S� �i�tD- 0�'
s ia i c c� ��T
$ 2,500.00
$ � CZ'� •-c'2,
!
$ /�' �'�' -�'Z'
$ �`>� � v2 � 5 - 0 L� � � �
�
� �"�f�O�G�i�� G'C�CJ�D
P-3 �::6�1�r �����..�,U���Ivnl,��U
��o �i��C'��a �[��30
l_J
A
This contract is issued by an organization which qualifies for exemption
pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales,
Excise and Use Tax Act.
�Taxes. Al1 equipment and materials not consumed by or incorporated into the
� project construction, are subject to State sales taxes under House Bill 11,
� enacted August 15, 1991.
'' The Contractor shall comply with City Ordinance 7278, as amended by City
Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29),
prohibiting discrimination in, employment practices.
�
r
6
s
The undersigned agrees to complete all work covered by these contract documents
within Seventy (70) Working Days from and after the date for commencing
work as set forth in the written Work order to be issued by the Owner, and to
pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility
Construction" as established by the City of Fort Worth, Texas.
The Contractor shall start work within 15 calendar days of executing the
contract. Within ten (10) days of receipt of notice of acceptance of this bid,
the undersigned will execute the formal contract and will deliver an approved
Surety Bond for the faithful performance of this contract. The attached
deposit check in the sum of ,
Dollars ($ ) is to become the property of the City of Fort Worth,
Texas, or the attached Bidder's Bond is to be forfeited in the even� the
contract and bond are not executed within the time set forth, as liquidated
damages for delay and additional work caused thereby.
. I(we), acknowledge receipt of the following addenda to the plans and
specifications, all of the provisions and requirements of which have been taken
into consideration in preparation of the foregoing bid:
Addendum No. 1 (Initials)
Addendum No. 2 (Initials)
Addendum No. 3 (Initials)
Res ect ully submitted
��i`�'�M, `T ��..-Ci>�C-i ����`_'c�' ---�E�L��,.
i
sy: �%'�° ,t �. �.v ,r ,��,I��
Aaaress: P��� �o� (�-��
--KnLl�r iX �(ca�f�
L
0
(seal�
Date: �ti, • 1"?i �b�77)
-1 �
,
Telephone : � ( �1- �v � �1- �,� 7 �
P-4 "�'���r��l� G`������!L�'
�� 0�'ll � ��rG� � ° ��
I�o �� G'l�l, ���o ,
�
�
r.�
��
��
VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of
contracts to non-resident bidders. This law provides that, in order to be awarded a contract as
a low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal
place of business are outside the state of Texas) bid projects for construction, improvements,
supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the
same amount that a Texas resident bidder would be required to underbid a non-resident bidder
in order to obtain a comparable contract in the state in which the non-resident's principal place
of business is located. The appropriate blanks in Section A must be filled out by all out-of-state
or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state
or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Non-resident vendors in (give state), our principal place
� of business, are required to be percent lower than resident
bidders by state law. A copy of the statute is attached.
Non-resident vendors in (give state), our principal
place of business are not required to underbid resident bidders.
� B. Our principal place of business or corporate offices are in the State of Texas. �
Bidder:
�' c� i i� Tw-t�v, . C �L��� f';f' , r� P`-> ��,1 C_
Company �
� � � _�, i?7,�, y: �'"1. d
Address
L�/� C�
f r ICl(1 � . )v.:� -�, �.__
By (Please Print)
/./,/��,r�l �F` :(' ���°�Y�f',�'-iv
Signature
L�. �f � �
� 1.�f'ti� i Y. ' 1�c�"_�f�I �i�� f`��`; r.�yti�.
� City/State/Zip Title (Please Print) _.-.:..� .� -
.� ��;��i��O�OG�� �'L��C���
' �` �� ����G�G�G��
�. THIS FORM MUST BE RETURN�� 1NITH YOUR C�QJ�4T10� i���57. ;�;� ����.�'��9 ��,
� :..� ..�_ �
���
��
�
�
r
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
SPECIAL PROVISIONS
FOR: H.M.A.C. SURFACE OVERI�P►Y (2000-2)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930522060
("' 1. SCOPE OF WORK: The work covered by these details and specifications
� consists of the surface rehabilitation of existing pavement. Including the
addition of a new surface layer of H.M.A.C. as described in the Special
�. Provision of these specifications. The work shall include all other
miscellaneous items of construction to be performed as outlined in the
details and specifications which are necessary to satisfactorily complete
the work.
L
f�
The contractor is encouraged to conduct site visits and survey all these
possibilities. The contractor shall verify these locations with the
Construction Engineer.
For street locations see list at the back of this document. Additional
locations may be added if needed.
All short cul-de-sac streets and turnouts that intersect with a street
listed above shall be included in this contract, even though they may not
be listed due to their size. The contractor shall mill, clean, apply tack
� coat, overlay and adjust facilities.
�- Included, in addition to the resurfacing process, will be the removal
(only) of all traffic buttons, removal and replacement of concrete curb
and gutter, base repair, and all other miscellaneous items of construction
to be performed as outlined in these specifications which are necessary to
satisfactorily complete the work.
�r.,
Total quantities given in the bid proposal may not reflect actual
� quantities, but represent the best accuracy based on a reasonable effort
of investigation; however, they are given for the purpose of bidding on
and awarding the contract.
� 2. Contract will be awarded to the lowest responsible and responsive bidder.
3. The Contractor agrees to complete the Contract within the allotted number
of days. If the Contractor fails to complete the work within the number
�„ of days specified, liquidated damages shall be charged, as outlined in
Part 1, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard
r. Specification for Construction of the City of Fort Worth, Texas.
'�. 4. The City reserves the right to abandon, without obligation to the
Contractor, any part of the project, or the entire project, at any time
� before the Contractor begins any construction work authorized by the City.
�
�
5. This contract and project are governed by the two following published
SP-1 ,
,.:_ . _fi ; �.I �^:�^I Ir`,�
I i
�'i'"�,!�J�`c'`; �_L5`;�u,.Lv
��:UU U C����'Uu}LIIWINU
�� Uu�I;�U'+�Ullg ��Wa
�
�
specifications, except as modified by these Special Provisions:
�^ STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF
FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH
CENTRAL TEXAS
A copy of these specifications may be purchased at the office of the
�� Department of Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal
Building, Fort Worth, Texas 76102. The specifications applicable to each
(� pay item are indicated in the call-out for the pay item by the designer.
�, If not shown, then applicable published specifications in any of these
documents may be followed at the discretion of the Contractor. General
�. Provisions shall be those of the Fort Worth document rather than Division
1 of the North Central Texas document.
6. Bidders shall not separate, detach or remove any portion, segment or
sheets from the contract documents at any time. Failure to bid or fully
4,, execute contract without retaining contract documents intact may be
grounds for designating bids as "non-responsive" and rejecting bids or
voiding contract as appropriate and as determined by the Director of the
� Transportation and Public Works Department.
� 7. The Contractor shall be responsible for defects in this project due to
faulty materials and workmanship, or both, for a period of one (1) years
from date of final acceptance of this project by the City of Fort Worth
and will be required to replace at his expense any part or all of the
project which becomes defective due to these causes.
8. TRAFFIC CONTROL: The Contractor shall be responsible for providing
traffic control during the construction of this project consistent with
� the provisions set forth in the "Latest Edition Texas Manual on Uniform
Traffic Control Devices for Streets and Highways" issued under the
authority of the "State of Texas Uniform Act Regulating Traffic on
� Highways", codified as Article 6701d Vernon's Civil Statues, pertinent
sections being Section Nos. 27, 29, 30 and 31.
The Contractor will not remove any regulatory sign, instructional sign,
� street name sign, or other sign which has been erected by the City. If it
is determined that a sign must be removed to permit required construction,
� the Contractor shall contact the Transportation and Public Works Depart-
ment, Signs and Markings Division (phone number 871-6075), to remove the
sign. In the case of regulatory signs, the Contractor must replace the
permanent sign with a temporary sign meeting the requirements of the above
referenced manual and such temporary sign must be installed prior to the
�,,,, removal of the permanent sign. If the temporary sign is not installed
correctly or if it does not meet the required specifications, the
permanent sign shall be left in place until the temporary sign
�, requirements are met. When construction work is completed to the extent
that the permanent sign can be re-installed, the Contractor shall again
contact the Signs and Markings Division to re-install the permanent sign
� and shall leave his temporary sign in place until such re-installation is
� completed.
�
L,.'
\
sP-2 ��;��G���'G�G�� �'L��GU�'�
':: ��'b' c�[�'� �i ` � �'�'�
C°� ������'���1➢ V��{o
�
�
The Contractor shall limit his work within one continuous lane of traffic
at a time to minimize interruption to the flow of traffic.
9. PAYMENTa The Contractor will receive bi-weekly payment (minus 5�
. retainage) from the City for all work for each pay period. Payment of the
remaining amount shall be made with the final payment, and upon acceptance
�"' of the project.
10. DELAYS: The Contractor shall receive no compensation for delays or
, hindrances to the work, except when direct and unavoidable extra cost to
the Contractor is caused by the failure of the City to provide information
�� or material, if any, which is to be furnished by the City. When such
extra compensation is claimed a written statement thereof shall be
presented by the Contractor to the Engineer and if by him found cor=ect
shall be approved and referred by him to the Council for final approval or
disapproval; and the action thereon by the Council shall be final and
� binding. If delay is caused by specific orders given by the Engineers to
stop work, or by the performance of extra work, or by the failure of the
City to provide material or necessary instructions for carrying on the
work, then such delay will entitle the Contractor to an equivalent
extension of time, his application for which shall, however, be subject to
�� the approval of the City and no such extension of time shall release the
Contractor or the surety on his performance bond from all his obligations
`" hereunder which shall remain in full force until the discharge of the
contract.
� 11. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a
manner as to create a minimum of interruption to traffic and pedestrian
"' facilities and to the flow of vehicular and pedestrian traffic within the
project area. Contractor shall protect construction, as required by
Engineer, by providing barricades.
Barricades, warning and detour signs shall conform to the Standard
`''°' Specifications "Barriers and Warning and/or Detour Signs", Item 524,
and/or as shown on the plans.
Construction signing and barricades shall conform with the latest edition
of the "Texas Manual on Uniform Traffic Control Devices, Vol. No. 1".
12. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill
material, the contractor shall advise the Director of the Department of
Engineering acting as the City of Fort Worth's Flood Plain Administrator
("Administrator"), of the location of all sites where the contractor
i... intends to dispose of such material. Contractor shall not dispose of such
material until the proposed sites have been determined by the Administra-
tor to meet the requirements of the Flood Plain Ordinance of the City of
�, Fort Worth (Ordinance No. 10056). All disposal sites must be approved by
the Administrator to ensure the filling is not occurring within a flood
�. plain without a permit. A flood plain permit can be issued upon approval
of necessaxy engineering studies. No fill permit is required if disposal
'� sites are not in a flood plain. Approval of the contractors disposal
sites shall be evidenced by a letter signed by the Administrator stating
� SP-3
L"J
��:i��'�����1^�S U�_LS��(iJ'���I
�� ��� ��G'� G��`i�Q�
�uo ���;G�_'��la ��,
_... _..___ .............`i� ."f����i-ii'___ - J
1
�
that the site is not in a known flood plain or by a Flood Plain Eill
� Permit authorizing fill within the flood plain. Any expenses associated
with obtaining the fill permit, including any necessary engineering
�" studies, shall be at contractors expense. In the event that the
contractor disposes of spoil/fill material at a site without a fill permit
� or a letter from the administrator approving the disposal site, upon
�. notification by the Director of the Department of Engineering, Contractor
shall remove the spoil/fill material at its expense and dispose of such
r materials in accordance with the Ordinance of the City and this section.
13. Dusing the construction of this project, the Contractor shall comply with
present zoning requirements of the City of Fort Worth in the use of vacant
property for storage purposes.
14. Final cleanup work shall be done for this project as soon as the work has
' been completed. No more than seven days shall elapse after completion of
construction before the roadway and right-of-way is cleaned up to the
satisfaction of the Engineer.
r
15. PROPERTY ACCESS: Access to adjacent property shall be maintained at all
times unless otherwise directed by the Engineer.
16. CONSTR[3CTION SCHEDULE: It shall be the responsibility of the Contractor
to furnish the Construction Engineer, prior to construction, a schedule
outlining the anticipated time each phase of construction will begin and
be completed, including sufficient time being allowed for cleanup.
17. SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following
procedures will be followed regarding the subject item on this contract:
� (1) A warning sign not less than five inches by seven inches, painted
yellow with black letters that are legible at twelve feet shall be
placed inside and outside vehicles such as cranes, derricks, power
shovels, drilling rigs, pile drivers, hoisting equipment or similar
apparatus. The warning sign shall read as follows:
"WARNING --UNLAWFtTL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF
HIGH VOLTAGE LINES."
(2) Equipment that may be operated within ten feet of high voltage lines
shall have an insulating cage-type of guard about the boom or arm,
except back hoes or dippers, and insulator links on the lift hood
connections.
(3) When necessary to work within six feet of high voltage electric
lines, notification shall be given the power company (TU Electric
Service Co.) which will erect temporary mechanical barriers, de-
�' energize the line, or raise or lower the line. The work done by the
power company shall not be at the expense of the City of Fort Worth.
T The notifying department shall maintain an accurate log of all such
ly,� calls to TU Electric Service Company, and shall record action taken
in each case.
�
�
Sp—� :.Ur«�������� b����`���C��
�" 4� :�. ��;`�' ���� G?��Q�
�Ll U
�� �,��'�r'��s ���'--
�
�
r
�
i...
(4) The Contractor is required to make arrangements with the TU Electric
Service Company for the temporary relocation or raising of high
voltage lines at the Contractor's sole cost and expense.
(5) No person shall work within six feet of a high voltage line without
protection having been taken as outlined in Paragraph (3).
18. RIGHT TO AUDIT:
(a) Contractor agrees that the City shall, until the expiration of three
(3) years after final payment under this contract have access to and th
, e
r. right to examine any directly pertinent books, documents, papers, and
records of the Contractor involving transactions relating to this
' contract.
�
�
�..
Contractor agrees that the City shall have access during normal working
hours to all necessary Contractor facilities and conduct audits in
compliance with the provisions of this section. The City shall give
contractor reasonable advance notice of intended audits.
(b) Contractor further agrees to include in all its subcontracts
hereunder a provision to the effect that the subcontractor agrees that the
City shall, until the expiration of three (3) years after final payment
under the subcontract, have access to and the right to examine any
directly pertinent books, documents, papers, and records of such
subcontractor, involving transactions to the subcontract, and further,
that City shall have access during normal working hours to all appropriate
work space, in order to conduct audits in compliance with the provisions
of this article. City shall give subcontractor reasonable advance notice
of intended audits.
CONSTRUCTION
�: The City of Fort Worth maintains a"CONFINED SPACE ENTRY PROGi2AM" for its
employees and all contractors and their sub-contractors must comply with
� this program as a condition of the contract. Al1 active sewer manholes,
�. .
regardless of depth, are defined as "permit required confined spaces".
Contractors will be required to complete the "CONFINED SPACE ENTRY PERMIT"
� used by the Fort Worth Water Department (Field Operations Division) for
each entry and possess and use the equipment necessary to comply with this
� program. The cost of complying with this program will be considered
subsidiary to the pay items involving work in confined spaces (e.g. vacuum
testing, cleaning, televising, construction, etc.).
.__.
NON-PAY ITEM NO. 1- SPRINKLING FOR DUST CONTROL:
Al1 applicable
�" "Sprinkling for
�
will be made for
contract.
�
�.
�—�
L
provisions of Standard Specifications Item No. 200,
Dust Control" shall apply. However, no direct payment
this item and it shall be considered incidental to this
sP-s '�J�U���CD%� G'C��C���
'GD�ti'� ���'GG�L�U��
_�o �� G���9 ���ti
�
�
�
NON-PAY ITEM NO. 2- REMOVAL OF TRAFFIC BUTTONS AND TF�ORARY LANE TAPE:
All traffic buttons shall be removed from the existing asphalt surface
before resurfacing bogins. The contractor shall be responsible for the
removal of all buttons. Upon completion of the job the City will install
new buttons after proper notification.
�..+
The contractor shall also be responsible for all materials, equipment and
� labor to place temporary adhesive lane marking tape, at locations as
directed by the Construction Engineer, to direct traffic flow until
permanent markers are installed.
r
The contractor shall notify the Construction Engineer to arrange for the
replacement of the buttons and adhesive lane markers (arrows, etc.). Al1
costs to the contractor shall be figured as subsidiary to this contract.
� NON-PAY ITEM NO. 3- LOCATION AND EXPOSURE OF MANHOLES AND WATER VAL�7ES:
The contractor shall be responsible for locating and marking all
previously exposed manholes and water valves in each street of this
contract before the resurfacing process commences for a particular street.
The contractor shall attempt to include the Construction Engineer (if he
is available) in the observation and marking activity. In any event a
street shall be completely marked a minimum of two (2) workinq days before
resurfacing begins on any street. Marking the curbs with paint is a
.,,,, recommended procedure.
� It shall be the contractors responsibility to notify the utility companies
that he has commenced work on the project. As the resurfacing is completed
(within same day) the contractor shall locate the covered manholes and
valves and expose them for later adjustment. Upon completion of a street
�v the contractor shall notify the utilities of this completion and indicate
the start of the next one in order for the utilities to adjust facilities
accordingly. The following are utility contact persons:
�
�
�
�
,,.
�,
0
SP-6 '��������d ����J��
'� ��V' �[�'� � � " Q�l
�t�� �'���:'�b, �L�`}��
r
��
L..,
�
��
r
�
�
Company
Southwestern Bell Telephone
Texas Utilities
Lone Star
City of Fort Worth,
Street Light and Signal
Telephone Number
338-6275
336-9411
Ext. 2121
336-8381
Ext. 6982
871-8100
Contact Person
"Hot Line"
Mr. Roy Kruger
Mr. Jim Bennett
Mr. Jim Bob Wakefield
Of course, under the terms of this contract, the contractor shall complete
adjustment of the storm drain and Water Department facilities, one traffic
lane at a time within five (5) working days after completinq the laying of
proposed H.M.A.C. overlay adjacent to said facilities.
Any deviation from the above procedure and allotted working days may
result in the shut down of the resurfacing operation by the Construction
Engineer.
The contractor shall be responsible for all materials, equipment and labor
to perform a most accurate job and all costs to the contractor shall be
figured subsidiary to this contract.
PAY ITEM NO. 1- PROJECT DESZGNATION SIGN:
The Contractor shall construct and install two (2) Project Designation
Signs and it will be the responsibility of the Contractor to maintain the
signs in a presentable condition at all times on each project under
construction. Maintenance will include painting and repairs as directed
by the Engineer.
It will be the responsibility of the Contractor to have the individual
project signs lettered and painted in accordance with the enclosed detail.
The quality of the paint, painting, and lettering on the signs shall be
approved by the Engineer.
The height and arrangement of the lettering shall be in accordance with
the enclosed detail.
The sign shall be constructed of 3/4" fir plywood, grade A-C (exterior) or
better.
These signs shall be installed on barricades or as directed by the
Engineer, and in place at the project site upon commencement of construc-
tion.
The work, which includes the painting of the signs, installing and
removing the signs, furnishing the materials, supports and connections to
the support, and maintenance shall be to the satisfaction of the Engineer.
Sp-� � ���� 0�� u��� ���D
���1( �[�''.:G��JG�1�
G�a I�►G��bp ���v
.�._
�
r
The unit price pre bid per each will be full compensation for all labor,
material, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 2- UTILITY ADJUSTMENT:
.,.. This item is included for the basic purpose of establishing a contract
price which will be comparable to the final cost of making necessary
r adjustments required due to street improvements to water, sanitary sewer,
and natural gas service lines and appurtenances where such service lines
and appurtenances are the property owner's responsibility to maintain. An
arbitrary figure has been placed in the Proposal; however, this does not
guarantee any payment for utility adjustments, neither does it confine
� utility adjustments to the amount shown in the Proposal. It shall be the
Contractor's responsibility to provide the services of a licensed plumber
P to make the utility adjustments determined necessary by the Engineer. No
payment will be made for utility adjustments except those adjustments
determined necessary by the Engineer. Should the Contractor damage
- service lines due to his negligence, where such lines would not have
required adjustment or repair otherwise, the lines shall be repaired and
" adjusted by the Contractor at the Contractor's expense.
The payment to the Contractor for utility adjust�nents shall be the actual
cost of the adjustments plus ten percent (10�) to cover the cost of bond
and overhead incurred by the Contractor in handling the utility adjust-
' ' ments .
PAY ZTEM NO. 3- MANHOLE ADJUSTMENT:
This item shall include adjusting the tops of existing manhole to match
proposed grade as shovm on the plans, in the detail at the back of this
document or as directed by the Engineer. Standard Specification Item ldos.
450 "Adjusting Manholes and Inlets" and 406 "Concrete for Structures"
shall apply except as herein modified.
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Work shall be completed and street open to
traffic within seven (7) calendar days.
If the contractor fails to complete the work within seven (7) calendar
days, a$100 dollars liquidated damage will be assessed per each manhole
per day.
�, Prior to beginning of work, the Contractor shall make an inventory of the
condition of existing manholes. The Engineer will field verify this
inventory and provide the Contractor replacements for broken manhole
� covers. The contractor shall replace the manhole covers which are damaged
' during construction at no cost to the City.
�
�
sP-s �::�''�'���Q�� �'.���°��
�� C� ��'G�����
1711a 1'�vt�'1'j�lU9 ��•-1
ii u
'
�
�
Included as part of this pay item shall be the application of a
p�- cold-applied preformed flexible butyl rubber or plastic sealing compound
for sealing interior and/or exterior joints on concrete manhole sections,
as per current City Water Department Special Conditions.
The unit price pre bid per each will be full compensation for all labor,
�- materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 4- WATER VALVE BOXES ADJUSTMENT:
Contractor will be responsible for adjusting water valve boxes to match
new pavement grade. The water valves themselves will be adjusted by City
of Fort Worth Water Department forces.
Prior to beginning of work, the Contractor shall make an inventory of the
►�, condition of existing water valve boxes. The Engineer will field verify
this inventory and provide the Contractor replacements for broken valve
boxes. The contractor shall replace the valve boxes which are damaged
� during construction at no cost to the City.
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Work shall be completed and street open to
traffic within seven (7) calendar days.
If the contractor fails to complete the work within seven (7) calendar
days, a$100 dollar liquidated damage will be assessed per each water
valve box per day.
� The unit price pre bid per each will be full compensation for all labor,
`" materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 5- WATER METER BOX ADJUSTMENT:
� This item only apply when the adjacent curb and gutter has been determined
to be removed and replaced as directed by the Engineer. The adjustment
shall include raising or lowering the existing water meter box to the
r, proper grade.
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessa=y to complete the
work.
�..
PAY ITEM NO. 6- REMOVAL AND REPLACEMENT OF CONCRETE CURB AND GUTTER:
� These provisions require the contractor to remove all failed existing curb
and gutter, as designated by the Construction Engineer, and replace with
standard concrete curb and gutter, laydown curb and gutter, or in like
� kind, as governed by the standard City Specifications. Pay limits for
+� laydown curb and gutter are as shown in Drawing No. 5-55 of the Standard
Specifications. Included, and figured subsidiary to this unit price, will
� SP-9 '
�
�
�:; ��O��l�f� U`�'��O�U
r �� �C��cG°? � ° ��f
�o �'�� °���U Uy ��� �
�
�
�
�
�
�
be the required excavation into the street to aid in the construction of
the curb and gutter. The pay limit will be 9" out from the gutter lip,
with same day haul-off of the removed material to a suitable dump site.
The street void shall be filled with H.M.A.C. "Type D" mix and compacted
to standard City densities and top soil, if needed, shall be added and
leveled to grade behind the curb. Existing improvements within the parkway
such as water meters, sprinkler system, etc. damaged during construction
shall be replaced with same or better at no cost to the City.
Backfill for curb and gutter shall be completed within fourteen (14)
calendar days from the day of demolition to date of completion. if the
contractor fails to complete the work within fourteen (14) calendar days,
a$100 dollar liquidated damage will be assessed per block per day.
The unit price bid per linear foot shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
PAY ITEM NO. 7- REMOVAL AND REPLACEMENT OF 6" CONCRETE DRIVEWAYS:
This item shall include the removal and replacement of existing concrete
driveways, due to deterioration or in situations where curb and gutter is
replaced to adjust grades to eliminate ponding water with same day haul-
off of the removed material to a suitable dump site. For specifications
governing this item see Item No. 104 "Removing Old Concrete", Item No.
504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway
are as shown in Drawing No. S-S5 of the Standard Specifications.
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, supplies, and incidentals necessary to
complete the work.
PAY ITEM N0. 8- REMOVAL AND REPLACEMENT OF 4" CONCRETE SIDEWALK:
This item shall include the removal and replacement of existing concrete
� sidewalk due to failure or in situation where curb and gutter is replaced
to adjust grades to eliminate ponding water with same day haul-off of the
removed material to a suitable dump site. For specifications governing
�,,, this item see Item No. 104 '�Removing Old Concrete", and Item No. 504
"Concrete Sidewalk and Driveways".
�
�"
�
,
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, supplies, and incidentals necessary to
complete the removal and replacement work.
PAY ITEM NO. 9- REMOVAL AND REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE:
The contractor shall remove all existing deformed H.M.A.C. pavement and/or
bad base material that shows surface deterioration and/or complete
failure. The Engineer will identify these areas upon which time the
contractor will begin work. The failed area shall be saw cut, or other
similar means, out of the existing pavement in square or rectangular
SP-10 '
�����I����GGw'� G����G�v,��� �
,.���'V �����G�C����G�`�
�,..
� �� �� �:'�'�, ���ap _
r
�
r
%..
fashion. The side faces shall be cut vertically and all failed and loose
material excavated. As a part of the excavation process, all
unsatisfactory base material shall be removed, if required, to a depth
sufficient to obtain stable sub-base. The total depth of excavation could
range from a couple of inches to include the surface-base-some sub-base
removal for which the Engineer will select the necessary depth. The
remaining good material shall be leveled and uniformly made ready to
accept the fill material. All excavated material shall be hauled off site,
the same day as excavated, to a suitable dump site.
After satisfactory completion of removal as outlined above, the contractor
r� shall place the permanent pavement patch, with "Type D" surface mix. This
item will always be used even if no base improvements are required. The
proposed H.M.A.C. repair shall match the existing pavement section or the
depth of the failed material, whichever is greater. However, the patch
thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C.
� pavement thickness will not exceed 6". Before the patch layers are
applied, any loose material, mud and/or water shall be removed. A liquid
asphalt tack coat shall be applied to all exposed surfaces. Placement of
^ the surface mix lifts shall not exceed 3 inches with vibrator compactions
to follow each lift. Compactions of the mix shall be to standard densities
�.., of the City of Fort Worth, made in preparation to accept the recycling
process.
�,.
L�
�
�.
V
�
All applicable provisions of Standard Specification Item Nos. 300
"Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot-Mix
Asphaltic Concrete" shall govern work.
The unit price bid per cubic yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
PAY ITEM NO. 10 - GRADED CRUSHED STONES:
This item shall be used to repair the failed base material in areas exceed
8" deep as directed by the Engineer. The material shall be graded crushed
stones.
For specifications governing this item see Item No. 208 "Flexible Base".
The unit price bid per cubic yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
PAY ITEM NO. 11 - WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE:
1. Description
This item shall consist of milling the existing pavement from the lip
of gutter at a depth of 2" and transitioning to match the existing
pavement (0" cut) at a minimum width of 5'. The existing pavement to
be milled will either be asphalt, concrete, or brick pavement. The
removal and disposal of the milled materials shall be as directed by
SP-11 ,
IyII IIII ,�,��`^/�,l o
Ivl�r'll Ylv 4L�,1� Jz�(��."(V It1
'���'� �����G�(� ' °�l
��� 4��������1, �1�, �
�
�
the Engineer. The milled surface shall provide a smooth surface free
r from gouges, ridges, oil film, and other imperfections of workmanship
and shall have a unifozm textured appearance. In all situations where
the existing H.M.A.C. surface contacts the curb face the wedge milling
shall include the removal of the existing asphalt covering the gutter
up to and along the face of curb.
The wedge milling operations for this project will be performed in a
continuous manner along both sides of the street. Details of milling
locations are at the back of this document. Contractor is required to
begin the overlay, within five (5) calendar days from the date of the
wedge milling completion of any one street. Should the contractor fail
to meet this condition, the wedge milling will be shut down, and
liquidated damage of $500.00 per day per street will be assessed until
all wedge milled streets are overlayed. The overlay, once begun on a
street shall continue uninterrupted until complete.
The Contractor shall haul-off the removed material to a suitable dump
site.
2. Equipment
� The equipment for removing the pavement surface shall be a power
�... operated milling machine or other equal or better mechanical means
capable of removing, in either one pass or two passes, the necessary
� pavement thickness in a five-foot minimum width. The equipment shall
be self-propelled with sufficient power, traction and stability to
maintain accurate depth of cut and slope.
; The machine shall be equipped with an integral loading and reclaiming
�"' means to immediately remove material being cut from the surface of the
roadway and discharge the cuttings into a truck, all in one operation.
� Adequate back-up equipment (mechanical street sweepers, loaders, water
�.. truck, etc.) and personnel will also be provided to keep flying dust
to a minimum and to insure that all cuttings are removed from street
surface daily. Stockpiling of planed material will not be permitted on
� the project site unless designated by the Engineer. The machine shall
be equipped with means to control dust created by the cutting action
�,,. and shall have a manual system providing for uniformly varying the
depth of cut while ttie machine is in motion thereby making it possible
to cut flush to all inlets, manholes, or other obstructions within the
paved area. The speed of the machine shall be variable in order to
leave the desired grid pattern specified under Surface Texture.
�
The unit price bid per linear feet shall be full compensation for all
labor, material, equipment, tools, and incidentals necessary to
� complete the work.
i
,
SP-�2 � �;:»��O�c�l�d �?[�C��V�D
;��� ���������(
�� ���G'i�lP ��o
__ �
�
�
PAY ITEM NO. 12 - BUTT JOINTS - MILLED:
Description:
This item requires the contractor to mill "butt joints" into the existing
surface, in association with the wedge milling operation (PAY ITEM NO. 9)
�� to the depth and at locations as described below. The but joint will
provide a full width transition section, whereby the new overlay shall
� maintain constant depth at the point the new overlay is terminated and the
new surface elevation matches the existing pavement. The construction
activities, performance standards and equipment needed for the butt joints
r. milling operations shall be governed by the special provisions of Pay Item
No. 9- Wedge Milling. The configuration of the butt joints is described
in more detail below. General details of butt joint locations - along
with wedge milling in general - are shown in plan form at the back of this
document.
w
Construction Details:
Prior to the milling of the butt joints, the contractor shall consult with
the construction Engineer for proper location of these joints and verify
that the selected limits of the projects street are correct.
� The general locations for but joints are at all beginning and ending
points of streets listed in the project and as more graphically detailed
at the back of this specification book. The joints are also required on
„ both sides of al railroad tracks and concrete valley gutters, bridge decks
and culverts and all other items which transverse the street and end the
� continuity of the asphalt surface. Each butt joint shall be 20 feet long
and milled out across the full width of the street section to a tapered
depth of 2". This milled area shall be tapered within the 20 feet to a
depth from 0" to 2" at a line adjacent to the beginning and ending points
� or intermediate transverse items. This butt joint - when overlayed - will
consist of a asphalt section that will transition the new overlay to match
the existing pavement elevation.
The contractor shall provide a temporary wedge of asphalt at all butt
joints to provide a smooth ride over the bump.
r
Measurement and Payment:
Butt joints as prescribed above, will be measured by the unit of each butt
joint milled. The disposal of excess material involved will not be
k„ measured for payment.
� Each butt joint-milled, measured as above, complete-in place-in accordance
with these specifications, will be paid for at the unit price shown in the
proposal for "Butt Joints". The unit price bid per each shall be full
compensation for all milling, including material haul-off, tools, labor,
� equipment and incidentals necessary to complete the required work.
r�.
�.
��J
SP-13 ����UU"D�G�(rll� G,��151`;UU�D
�� ���� Sr�;; U�L517n1US U
�o ��� r����P ��a
�..
�
�"
PAY ITEM NO. 14 - 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX):
All applicable provisions of Standard Specifications, Item Nos. 312 "Hot-
Mix Asphaltic Concrete" and 313 "Central Plant Recycling-Asphalt Concrete"
shall apply to the construction methods for this portion of the project.
� Standard Specification 312.5 (1) shall be revised as follows: The prime
coat, tack coat, or the asphaltic mixture shall not be placed unless the
� air temperature is fifty (50) degrees Fahrenheit and rising, the tempera-
ture being taken in the shade and away from artificial heat. Asphaltic
material shall also not be placed when the wind conditions are unsuitable
� in the opinion of the Engineer.
' The contractor shall furnish batch design of the proposed hot mix
asphaltic concrete for City approval 48 hours prior to placing the
H.M.A.C. overlay. The City will provide laboratory control as necessary.
:..
The unit price bid per square yard of H.M.A.C. complete and in place,
shall be full compensation for all labor, materials, equipment, tools, and
incidentals necessary to complete the work.
PAY ITEM NO. 15 - REMOVAL AND REPLACEMENT OF 7" CONCRETE VALLEY GUTTER:
�- This item shall include the removal and reconstruction of existing
concrete valley gutters at locations to be determined in field:
�,,. Removal of existing concrete valley, asphalt pavement, concrete base, curb
and gutter, and necessary excavation to install the concrete valley
� gutters all shall be subsidiary to this pay item. E�rnishing and placing
of 2:27 concrete base and crushed limestone to a depth as directed by the
Engineer and necessary asphalt transitions as shown in the concrete valley
gutter details, shall be subsidiary to this Pay Item.
� See standard specification Item No. 314, "Concrete Pavement", Item 312
"Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item
� No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base."
Measurement for final quantities of valley gutter will be by the square
yard of concrete pavement and the curb and gutter section will be
F.., included.
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu
of Crushed Stone at no additional cost. See Item 314" Concrete Pavement".
;r Asphalt base material may be required at times as directed by the Engineer
to expidite the work at locations idenfified in the field.
� The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Contractor shall work on one-half of
Valley Gutter at a time, and the other half shall be open to traffic. Work
shall be completed on each half within seven (7) calendar days.
If the contractor fails to complete the work on each half within seven (7)
� SP-14
n
��::�U�'J'�: uL=,;s UL;� ;(V (��'ciL
'� 0�' ����� G?��°I��
_�ua G��J���a,����.
�
r�
L,.
calendar days, a$100 dollars liquidated damage will be assessed per each
~' half of valley gutter per day.
The unit price bid per square yard for Concrete Valley as shown on the
proposal will be full compensation for materials, labor, equipment, tools
and incidentals necessazy to complete the work.
�
�
PAY ITEM NO. 16 - NEW 7" CONCRETE VALLEY GUTTER:
This item shall include the construction of concrete valley gutters at
various locations to be determined in field.
Removal of existing, asphalt pavement, concrete base, curb and gutter, and
necessary excavation to install the concrete valley gutters all shall be
subsidiary to this pay item. Furnishing and placing of 2:27 concrete base
and crushed limestone to a depth as directed by the Engineer and necessary
� asphalt transitions as shown in the concrete valley gutter details shall
be subsidiary to this Pay Item.
L� See standard specification Item No. 314, "Concrete Pavement", Item 312
"Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item
No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base."
Measurement for final quantities of valley gutter will be by the square
' yard of concrete pavement and the curb and gutter section will be
included.
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu
of Crushed Stone at no additional cost. See Item 314, "Concrete Pavement".
� The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Contractor shall work on one-half of
� Valley gutter at a time, and the other half shall be open to traffic. Work
shall be completed on each half within seven (7) calendar days.
�.,,
�:
�
L.
�
If the Contractor fails to complete the work on each half within seven (7)
calendar days, a$100 dollars liquidated damage will be assessed per each
half of valley gutter per day.
The unit price bid per square yard for Concrete Valley as shown on the
proposal will be full compensation for materials, labor, equipment, tools
and incidentals necessary to complete the work.
PAY ITEM NO. 17 - NEW 4" STANDARD WHEELCHAIR RAMP:
The Contractor shall construct standard concrete wheelchair ramps as shown
on the enclosed details, or as directed by the Engineer.
The removal of existing substandard wheelchair ramps and sidewalk as
required for the installation of new wheelchair ramps shall be subsidiary
to this pay item. The removal and replacement of existing curb and gutter
as required for the installation of new wheelchair ramps shall be included
in Pay Item 5(Removal and Replacement of Curb and Gutter). Pay limits for
SP-15 �
,�=;���;;��;���uG�:� G?�CJG�D
�
!:���u` �"���G�[� �' f��'�
��� l��r�UWp ��Wo
�
�
laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-
� 1). The pay limit will extend from 9" outside the lip of gutter to 15"
back from the face of curb. Any asphalt tie-in shall be subsidiary to the
curb and gutter pay item. Pay limits £or "Standard Wheelchair Ramp" will
start 15" back from the face of curb and encompass the remainder of the
ramp and sidewalk.
All applicable provision of standard Specifications Item 104 '�Removing Old
Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as
herein modified.
� All concrete flared surface shall be colored with LITHOCHROME color
hardener as manufactured by L.M. Scofield Company or equal. The color
hardener shall be brick red color and dry-shake type, and shall be used in
accordance with manufactures instructions. Concrete stain may be applied
after concrete is poured (Product sold by BAER).
"Contractor shall provide a colored sample concrete panel of one foot by
one foot by three inches dimension, or other dimension approved by the
�_ Engineer, meeting the aforementioned specification. The sample, upon
approval by the Engineer, shall be the acceptable standard to be applied
r-
for all construction covered in the scope of this pay item.
The method of application shall be by screen, sifter, sieve or other means
in order to provide for a uniform color distribution."
�
r
�.
�
r
�. ,.
1
The unit price bid per square yard for 4" standard wheelchair ramp as
shown on the proposal will be full compensation for materials, labor,
equipment, tools and incidentals necessazy to compete the work.
PAY ITEM NO. 18 - 6" PERFORATED PIPE SUBDRAIN:
This item shall consist of furnishing and installing 6" perforated
subdrain and filter material all as shown on the enclosed details, or as
directed by the Engineer.
All applicable provision of standard Specifications Item 500 "SUBDRAINS"
shall apply except as herein modified. The pipe material shall be poly
vinyl chloride (P'VC) with the standard dimensional ration of 35 (SDR35)
and meet the ASTM D 1784. Filter fabric shall have the capability of
passing ground water without transporting the soil placed around the
filter fabric. The fabric shall be constructed exclusively of synthetic
thermoplastic fibers and may be either woven or nonwoven to form a mat of
uniform quality. Fabric fibers may be either continuous or discontinuous
and oriented in either a random or a aligned pattern throughout the
fabric. The fabric shall be mildew resistant, rot proof, shall be
satisfactory for use in a wet soil and aggregate environment, contain
ultraviolet stabilizers and have nonravelling edges.
The fabric shall meet the following requirements when sampled and tested
in accordance with the methods indicated.
SP-16 ��,,° , - �+'� r
� %�, I��<< m
i;����-I����„ G�:i� Ue�'1����It�D
�:: ����i ti� c"C�� G���1�1�
� !�� �ti�`:'�'�'�o �C��o
�
�
r
Test
Original Physical Properties Method
Fabric weight, on an ambient SDHPT Test Method
temperature air-dried tension Tex-616-J
free sample, expressed in "Testing of Construc-
�. oz/sq. yd. tion Fibers"
Water flow rate by falling
head method, 7.9 inches
(20 cm) to 3.9 inches (10 cm)
on 2 inch ID cylinder with 1
inch diameter orifice, with
flow rate expressed in
gal/sq. ft/minute.
Breaking load in either
machine or cross-machine
�„ direction, expressed
in pounds.
�
�..
i�
�
Equivalent opening size
(US Standard sieve no.)
"Apparent elongation" at
breaking load in either
machine or cross-machine
direction, expressed as
percent.
Tex-616-J
ASTM Designation:
D 1682 grab method G
as modified by Tex-
-616-J
Requirements
4.0 minimum for under
drains and Slope
Stabilization, 6.0
minimum for Gabions
Revetment
BO minimum
100 minimum
CW-02215, US Army 70 to 100
Corps of Engineers,
Civil Works Construction
Guide Specification.
"Plastic Filter Fabric",
November, 1977.
ASTM Designation: 100 maximum
D 1682 grab method G
as modified by Tex
-616-J
� The "Filter Fabric" shall be installed in accordance with the
manufacturer's recommendations, as indicated or as directed by the
Engineer. When lapping is required, it shall be in accordance with the
manufacturer's recommendations. Backfilling around the Filter Fabric shall
� be done in such a way as not to damage the Filter Fabric material during
� the placement.
The unit price bid per L.F. shall be full compensation for all labor,
materials, equipments, tools, and incidentals necessary to complete the
work.
�
PAY ITEM NO. 21 - 8" PAVEMENT PULVERIZATION:
Contractor shall pulverize the existing pavement to a depth of 8". After
� pulverization is completed, contractor shall temporary remove and store
the 8" deep pulverized material, then cut the base 2" to provide place for
the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8"
SP-17
��
�
��r�., i n r.:,��� ^.,��� . .
��u' U'J�.� I��I,jl �15�5��`i'i��U
�v�l� �� ����G��IfWUSU
(�o I���G���o �[��o ,
�
i,
�
r
r
'µ
from the existing pulverized surface. After the undercut operation is
completed, contractor shall spread, mix, and compact the pulverized
material to a 95� compaction per City's 5tandard Specifications or as
directed by the Engineer in the field. A 5% portland cement shall be used
to mix the pulverized material.
If the existing pavement has a combinata.on of 10" H.M.A.0 and crushed
stone/gravel, undercut will not be required, the contractor will pulverize
10" inches, the 2" inch cut will be taken from the 10" pulverized
material. (see soil test report)
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, tools, and incidentals necessary to pulverize,
..- remove and store the pulverized material, undercut the base, mixing,
compaction, haul off, sweep, and dispose of the undercut material.
The 2" H.M.A.C. surface will be paid by separate item.
PAY ITEM NO. 23 - REMOBILIZATION:
This item shall compensate the Contractor to remobilize personnel,
equipment, supplies, and material to perform an additional work as
directed by the Engineer. Remobilization will be considered when concrete
"Flat-work" has been completed, personnel and equipments were demobilized,
and the street is clean and ready for the overlay. Remobilization shall be
determined by the Engineer. Any Remobilization without the approval of the
Engineer will not be compensated.
The unit price per bid per each will be full compensation for all labor,
equipment, material, tools, and all i.ncidentals necessary to complete the
work.
PAY ITEM NO. 24 - UNCLASSIFIED STREET EXCAVATION:
This item will be used if additional excavation is needed that is not
covered by Pay Item No. 21 -" 8" PAVEMENT PULVERIZATION". Additional
Excavation is the removal of the excessive crown and base to bring the new
base to proper grade & City standard specifications for street
reconstruction. All applicable provisions of Item 106 shall apply, work
shall be paid per cubic yard.
PAY ITEM NO. 25 - 2" SURFACE MILLING:
�
This item shall consist of milling the existing pavement at a depth of 2".
� All applicable provisions of Item No. 11 "Wedge Milling" shall apply. The
unit price bid per square yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
�
�
END OF SECTION
SP-18
�. ::� � ,- , - �:.
u I�-Ii 1N�" �
�
v�,i; i���;'�ul=�,:� �,_L�;�U�L
��� �.�''� c�[��� G?��G�`�
i�1�' "\fi1,�;\ ,����j� ����o
# � � -- 0
�
�
CONTR.ACTOR COMPLLANCE WITH
WORKER'S COMPENSATION LAW
Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor,
, certifies that it provides worker's compensation
insurance coverage for a11 of its employees employed on City of Fort Worth project:
, projectnumber, . ,
Contractor
:
Title
Date
STATE OF TEXAS §
COUNTY OF TA,RRANT §
BEFORE ME, the undersigned authority, on this day personally appeazed
, known to me to be the person
whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same
as the act and deed of ,
for the purposes and considerations therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this
, 19 .
day of
Notary Public in and for the State of Texas
(a) Contractor agrees to provide to the Ciry a certificate showing that it has obtained a policy of workers compensation
insurance covering each of its employees on the project in compliance with state taw. No Notice to Proceed will be issued until
the Contractor has complied with this section.
(b) Contractor agrees to require each and every subcontractor who•wil( perform work on the project to provide to it a
certificate from such subcontractor stating that the subcantractor has a policy of workecs compensation insurance covering each
employee omployed on the project. Contractor will not permit any subcontractor to perform work on the project until such
certificate has been acquired. Contractor shall provide a copy of all such certificates to the City. �
,�:`r�:;j,�:;�,��� �`?��''�'��
' ���: �� v' ���� �� � ° G��1
��u, C��l�;!�'��1, ��o
��
�
— � - �- - ` - � ``-\
To: City of Fort Worth, Texas
Project Name:
ProjectNumber:
This is to certify that:
Address:
Comprehensive
General
Liability Insurance
(Public Liability)
Blasting
Collapse of Buildings
or structures adjacent
to excavations
is at the date of this certificate, insured by this company with respect to the business operations hereinafter described,
r for the type of insurance and in accordance with the provisions of the standard policies used by this Company, and
further hereinafter described. Exceptions to standard policy noted on reverse side thereof.
Tvne ofinsurance
�
„ . Workecs
Compensation
r
Damage to
underground
Utilities
�
�
�
Builder's Risk
Comprehensive
Automobile Liability
Contractual Liability
Date:
(Name and Address of Insured)
Bodily Injury:
Each Occurance:
Property Damage:
Each Occurence:
Each Occurence
Each Occurence
Each Occurence
Bodily Injury
Each Person
Each Occurence
Property Damage
Each Occurence
Bodily Injury
Each Occurence
Property Damage
Each Occurence
$
�
$
$
�
$
$
�
S
S
Other
.ocations covered:
Description of operations covered:
The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or cancelled by
the insurer in less than five (5) days after the the insured has received written notice of such change or cancellations.
Whei+i applicable local laws or regulations require more than five (5) days actual notice of change or canceflation to be assured,
the above policies contain such special reguirements, either in the body thereof or by appropriate endorsement theceto
.�..�"�' `rn
. � . . , � ��-�:i>>���� �l
Agency � ���i��lf�'�'d�:u ti<��..,u�
Fort Worth Agent By: �r�� ��!��°���9�
� �r.a ",.,;1n..t� ;�A I� S?fc'Cy(
Address Title: � ,
� .� ,
pOLICY NO. EFFECTIVE �XPIRES LIMITS OF Z.IABILITY
. '
, List of equipment owned by Bidder thac is in sery���ble condition and a'
�
vatlable for use
�
�
�
'�"
Portions of work bidder proposes to sublet in case of qward of Contracts '
mcluding amount and type:
.- ,
� � �:�;�G��t�� ^,� G'�C�C�G?�
� �:; D�'u ��G�� G����1
U iln UUU�?,�Ully �ISW�
r
�'
�
�
.
r
�
�
�
�
�
r
�
`� . . � . � . i
�� � - -
Gist of projects your organization has successfully completed:
AMOUNT UF TYPE OF WORK
corrrRncr Awnxn
� .� , T ,
DATE NAME AND A,DDRESS
ACCEPTED OF OWTIER
List of projects your organization is now engaged in completing:
AMOUNT OF TYPE OF WORK ANTICIPATED DATE
CONTitACT AWARD OF COMPLETION
List Surety Bonds in Force on above incomplete work:
AMOUNT OF TYPE OF WORK AMOUNT OF BOND
corr�ncT Awax� BOND
.�
\
NAME AND ADDRESS
OF OWNER
NAME AND ADDRESS
OF OWNER
�
�... ,, �� � - �c���� J ���
..,i����' �
!�,!. ,��1��� '�
11�'�'7`"� ���i!sVj'� 6 c U
.;uu u cls•� �
U��ti����"�r.VWo ul5/n1e
, _, �
n
� � � � � � � � � � � � � � � � � � �
,
�
��
G
I
N
v
;���''��'
. ��
����
���
� ����
���
���
����
� ��
�
a q , _�„
ia 1'-5"
��i
�� i
PMS 288 (BLUE)
:
� i� T �I�T
�
� ..�,.. ,,a- _,
..�
0 �.�� ���. •
.,,,�� 11;1:, „
��rt �� PMS 167 (COPPER)
� --� w�--
STREE T MA I�1TENANCE PROGRAM
� .
� �
CONTRACTOR' S NAME �-
�- �
� TELEPHONE NUMBER .
� �
�
�
�
�
�
PROJE�T �ESIGNATION SI�N
—, — — — — — — '----: -- �- �--, ;�. �. _. �_ � �
1
1 .
� . I
iC=�)
Q ;,� �r=-)> —�nt
�0
�s=:>
c>>�� •
� CS -?) �
���
���
��,C�
� �
� ,
/
u
<
�
�
z
0
u
�e '
�
0
�l ��
�
�
z
0
u
z
�
0
:
n
L EGEPtD
� � H.M;A.C. REHAsiLITATION
MI 11 /1 !q WEDOEMILLMIQ
(RECYCLE /OVERIAY ONI.Y �)
NOTE: BU7T JOINTS NOT
REGuiREO wiTH
REMIXIN� PROCESS.
0
TNE INTERSECTIN(3
STREETS ANGLE.
.
i'YPICAL
LAYOUT FOR RECYCLINB ACTIVITES
UHt,ESS NOTEO' OTMERIMISE IN STREET SCHEOUL£ '
�.. - �
BUTT JOINT ,
�� � .
REvISE�:
R[V.M�, I OAT[:
i I t990
I
I '
I �
_= i �'_.! �"'_7 �"i !-"'� �"� r .. __. _ _ _ �. �. �
,
0
�
r
� ,, �.,ti -
����>��,�
� ��
-� � t�`�
����
c� �.
i
�
� �
3,T . �
I.EGEND�
� ,� N.M.A.C.RENABII,ITATION ~�'
Q'
�� � �� �� �� WEO�EMILLING ( RECYCLE �,
/OVERLAY ONLY.) �
�
NOTE �I)If ANY COMB1NA110N Of ISLANOS �
ANO RIGHT TURN LANEC ARE ABSENT �
TURN RAOIUS SHALL 8E TREATED
. AS STAN�ARD. BUTT JOtNT SHALI
8E SQUARED O�f� IF NEEOE�
AS A RESULT OF EXISTINQ CONC.
VALLEY (3UTTER.
�2) BUTT JOINTS NOT REOUtREO
WITH REMIXING PROCESS,
TYPICAL
�A1fbUT FOR RECYCLtNB ACTIVITIES WHEN iNTER3ECTiNG .
STREETS ARE RECYCLED 31MULTANEOUSLY
UNLESS NOTEO OTHERWISE ItV STREET SCHEOULE
"�
��
�,.
�
�
�-4
REviSE�:
RfV. M�, I OAT[!
I I 19 90
�
�
I
LJ
�
CiTY QE' FORT WOR'�H
CONSTRUCTTON SERVICES,
I,ABORATORY RESt1LTS FOR
TEST HOLE AND PL3o►.S�ICITY INDEX
'" PROJ�CT: ERATH
, aoE rro. : osa9
k'UND CODE: 03
(WILEARGER TO HOWARDf
Q,��.� ��.�����.�ffiffi������---�� __�=—�__ �;=s�=�,�_�z��=����==��w�=�_�.�,�..�. �
` Hp�,� � 1 iAB NO.: 60923 {
L4CATICIN: ERATH E�4 25' NORTH OF HOWi�RD �
-------......�_..__--__------__..�..__�_....,----�--^---_�_�----�--�----------��w_---- J
, 8.5Qn NMAC '
3.50'° BROWN SANDY CLAY WIGI2AVEL �
� �. �
s:s� svc _—c��o.—�===sasmc��—�ee��cxi��===aa��ao==�x��c��==—�x��. : ��eemc�s�xa=s — -- —.�....
HOLE # 2 LAB NO.: 60924 1
�,OCATTON: A517 ERATH E/4 (
r�Fl��Tw��������IrrYAr���wWMAA�A��L�WYr��A�^�������'������.�rY�n���.���������.�w�� I
7.40p HMAC '
3.Q�" GRAY SANDY CLAY W�GRAVEL �
' v�x�e3rs=�:3rWcaW��X=cn������G�C.:����amzcac��====�aacaa�rec+vf�aaa�c.������asawaa�—Q�s I
HOLE � 3 LAH N4.: 60925 �
LOCI�TY(1N: 45p9 Ei�ATH CL �
Y ' 111����r��������M�I���������w�MwM^��������r�Y�r��1��r����rlrMnrr�����w1�^aw^ww+w� �
?.50" HMAC I
2.50" BROWN SANDY CLAY WIGRAVEL �
�:�srsq.�.zac�sacz�c�e�co— :���=;.=���oemcsec—o—=====��rr.=ucue�eace� :��s—xamG.—ca�.-.—��rse.r�ecn.s:w I
HOLE � 4 LAS NO.: 6Q926 !
' LOCP,TIQN: 4446 EFtATN W!a �
��rlsl�i�MWIK��W�.�����WY����Y�r1�Yr�r�lr�rw�����������Y��R����r��w��WWM�����/YWY�YI�rMMr �.
, 6. 7 5" HIdAC �
3.25" HROWN CLAY W/GRAVEL �
�acit:a�:�� � :x�����a'e._"�.��C���: ._....�.—,--==��me�a�.ce������==�ccsaec��e���m�rs�¢as��aw�a I
HaLE �k 5 LAB N�.: 60927 1
LOCATION: 4923 ERATH E/4 (
r.�iarr��ra��n�n�����.���.�vrwv�wwwww��������������r�w�wnw����r��.���r�.r...��.�r�+..r�...w.w..+� (
S.7s� �C i
3.25'° BRQWN SANDY CLAY W/GRAVEL �
.' C�M`"�.n7'w:%.�ZE"'..'L73.-"'�'�Y'L'�L^�.."IIC�.'�=������OC��i+�.��i`—=�CC=CC..'�l��@��S:iii4i�'+::�lit`tLakC�lRRE7��5�. L:"'—J' .""—tL4Tl�CY�ElS24.[7 �
HOLE � 6 LAB NO.: 60928 1
LQG2ITI ON :� 410 ERATH GL �
' �. .r.r....r.r..w.rr.rrrw.....�..�.-�������������r�.a.r����...w���������.�...+�.�ww�����.�.�rr....,a._�.��.. �
. fi, "i5� HMAC �
� 3.25" SROWN SANDY CLAY W/GRAVEL �
aa�. �x ��.a���=—===—ca�a�ss��r��Y�ereaes��meQmm�����e�c��a�semR.7�a�m���seezam���YJe=�Y�ri� �
DOE # U909
�
�'
I
� Z 'd
5�88iL8Lt8 'ON Xb�
PAG� 2 � ,_ ��, - � ��-- � � I'�1I
��J/I��IJ�1-JII'�I�G�:I... Y�,�UI�iIUL��✓
��:�� �� ����::G��G��
ir�' ji!1^^�;�;,i���� �j�M
. ..: �I�'�,1�: I �:� 1',�,0
��nxns �oQ N[d 8� : i 1 Q�M 66-5I-��Q
�
r'"
w
1�..
�,
�--
PROJECT: HOWARU
DOE NO.: �909
FUND COD�: 03
CITY OE' FORT WORT�t
CONS�RUCTION SERVIC�S
LABQRATORX RESULTS FOR
T�ST HOLE AND PIaASTICITY INDFX
(TAI,7�M�1N TO SHACIQ,EFORD)
�
.���=L�s���'�s�—=�at`�C..�..���I�COCGCC��.�R�`�—"..�.��.....��=C�CGZ���.� =CL^.�'..,L�.f-.���=C:2G.�F. ���e.��6.��=sraGe,
HOLE # 1 LAB NO.: 6100g !
LOGI��iON: HOWARQ ST. CL 37' EAST OF TALI�MAN (
�..�..w•�v.«.n.w�^������r���.�..����rww�����rr����������rw�.�����r�ww��.��...wr����.���.ro I
*"' 2 . OQ" NMAC �
6.50" HRUWN SANDY CZ,AY W/GRAVEL (
2. �aM BFtOWN SANDY CLAY �
...._�...�..d...._ -----�..._..�..--------_--_------�.�..--------��.....---..�_...�^----......____ I
.�
UNIT WEIGIiT: 133.0 LBS PER CUBIC FO�T �
�.:rczac��c�mx�cG�.: .::=�����.:: ��—===m��acco�^^=sa�c�—.--==cc.:zc���Q��ecasa��a.e�rs■a� I
HOLE �F 2 LAB NO.: 61009 1
� LOCI�TION: HOTi�ARD ST. �/4 44• EAST OF ERATH
.._.....,,...._�..........,.._-------__�.....__.,_�-------�__—,------------,-----_��..___��_.��..�.� j
1. ?5" i�iAC �
�8.25" BROWN SA,NDY CZ�AY W/GRAVEL �
�=gas��ae:m�r�a�a�lr�lrlrf�rti��t�arrr�e��ww����a�rrre�s��a���w�����r�rr�ww�ir���orner�w�mewan�er�w_r.c�'�m �
HOL� � 3 LAB NO.: 61010 �
�LOCATiON: �iOWARb $T. CL 58' WEST OF SHACKLEF�RD (
T��www�ww�waw�M��������rM►��wr.����..n�r�.nW����w�������WMN�w�w����wtLw�w�����wMMNa���w� �
2.50" i�II�I74C (
�` 2.5fl� BROWN S�1NDY CLAY W/G12AVFL j
5.QQ" GRAY SANDY CLAX �
wnassxraac������=a�reem�aa�.����r,�c��oma�c+��sw��rre�cscmrac����--�uc��T=m�saa�aras��� I
�`" AP PROVAT� :
� !.'ys '
- F� JERI
� DAT� TES�ED: 12�-10�99
� DATE �tEPORTED: 12-15-99
TESTED BY: SOIL I,RB
�
�
. � 'd
5�88IG8Lj8 'ON Xb�
ROUTING
JOSEPH GAGI,ZARDI
ABE CALDERON
NAJIB FARES
FII,�
��e�ns �oQ
o__._..�..
` �����U9GDI��� ���C�O��
t� Cl �' ���� G��`���1
� - ,,;; ! ��p �r�,7
�� _ �,;,�����,
Y�Id 6�:Ii Q�M 66-5I-��Q
�
�
STREET
S ADAMS ST
CANDO DR
CLOVERDALE DR
CLOVERDALE DR
COMER DR
CONLIN DR
DE CORY RD
DUBLIN DR
ENGBLAD DR
ERATH ST
ERATH ST
GLASGOW RD
HAZEL LE[GH LA
HENSLEY DR
HOWARD ST
KIRKWALL DR
MANSEL LA
NEYSTEL RD
SAVAGE DR
STAFFORD DR
HMAC SURFACE OVERLAY (2000-2)
FROM TO TYPE MAP LM
W JARVIS ST PENNSYLVANIA AV MOL 76H 0.7
LIMERICK DR W OAK GROVE RD MOL 91U 0.28
ENGBLAD DR GLASGOW RD MOL 91U 0.42
ROMA LA I-20 SERVICE RD MOL 91U 1.06
LIMERICK DR W OAK GROVE RD MOL 91 U 0.85
LIMERICK DR DUBLIN DR MOL 91 U 0.48
LIMERICK DR W OAK GROVE RD MOL 91 U 0.42
CONROY ST COMER DR MOL 91U 0.69
OAK GROVE RD (Highland Hills Park line) MOL 91 U 0.42
KNOX DR MARTIN ST MOL 92G 0.3
WILBARGER ST HOWARD ST POL 92C 0.6
CONROY ST OAK GROVE RD W MOL 91 U 1.36
W OAK GROVE RD OAK GROVE RD MOL 91U 0.32
LIMERICKDR GLASGOWRD MOL 91U 0.87
TALLMAN ST SHACKLEFORD ST POL 92C 0.4
HENSLEY DR CONLIN DR MOL 91 U 0.18
GLASGOW RD OAK GROVE RD MOL 91U 038
HAZEL LEIGH LA OAK GROVE RD MOL 91U 0.22
E DEADEND W OAK GROVE RD MOL 91 U 1.55
ENGBLAD LA GLASGOW RD MOL 91U 0.39
Total Lane Miles 1 t.89
POL = Pulverized Overlay MOL = Mill Overlay
CD
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
���If����l,�� U�'��VU��
I`, � U U/ CN��I�,"11��Q U
� �'� M
ir!!� �'''�'��'�'r'�JUP �..���' p
_ A._. _. ,�
Tuesday, December 14, 1999
�
�a
�^
�..
�
�
�
�
F
i
THE STATE OF TEXAS
COUNTY OF TARRANT
CITY OF FORT WORTH, TEXAS
CONTRACT
KNOW ALL MEN BY THESE PRESENTS:
This agreement made and entered into this the 15th day of February , 20 00
by and between the CITY OF FORT WORTH, a municipal corporaiion of Tarrant County, Texas,
organized and existing under and by virtue of a special charter adopted by the qualified voters within
said City on the 11th day ofi December, A.D., 1924, under the authority (vested in said voters by the
"Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at
a regular meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed
Owner, and Sutton & Associates, Inc. HEREINAFTER CALLED Contractor.
WITNESSETH: That said parties have agreed as follows:
1.
` That for and in consideration of the payments and agreements hereinafter mentioned to be
made and perFormed by the Owner, and under the conditions expressed in the bond bearing even date
herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
HMAC SURFACE OVERLAY 2000-2
AT VARIOUS LOCATIONS
Designated as project number, GS93-020930522060/ C11'110201 1 1 05321 3
2.
-,,
�
��
�
That the work herein contemplated shall consist of furnishing as an independent contractor all
labor, tools, appliances and materials necessary for the construction and completion of said project in
accordance with the Plans and Specifications and Contract Documents prepared by the Department of
Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by
the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are
hereto attached and made a part of this contract the same as if written herein.
����C�bl�d ��[�C�CJ °'�
�0� ���GQ�Q�(
C-1 �� �014J���W� a��
�..�.;�,�� � — � — —
�
3.
r�
The Contractor hereby agrees and binds himself to commence the construction of said work
within ten (10) days after being notified in writing to do so by the Department of Engineering of the City
of Fort Worth.
�°
�. ,
C�
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
"� commencement thereof and to fully complete and finish the same ready for the inspection and approval
�n� of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth
r
within a period of 70 working days.
�Y � If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
�, Contract Documents within the time so stipulated, plus any additional time allowed as provided in the
General Conditions, there shall be deducted from any monies due or which may thereafter become due
` him, the sum of $ 315.00 per working day, not as a penalty but as liquidated damages, the
,� Contractor and his Surety shall be liable to the Owner for such deficiency.
5.
Should the Contractor fail to begin the work herein provided for within the time herein fixed or to
� carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications, and Contract Documents, then the Owner shall have the right to either demand the
surety to take over the work and complete the same in accordance with the Contract Documents or to
take charge of and complete the work in such a manner as it may deem praper, and if, in the
completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said
Plans and Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on
demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said
excess cost.
�
Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and
agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants
and employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of, the work and services to be
performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or
� invitees, whether or nof anV such inlury, damape or death is caused, in whole or in �art, bv the
LJ
'�'�ri��'��G;:� ����LUD1I�
G2 �.-�'r� c����Cl ��Q�
�� � �'� U�i Il U U��� a
neqliqence or alleqed neqliqence of Owner, its officers, servants, or emplovees. Contractor
� likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and
all injuries to Owner's officers, servants and employees and any damage, loss or destruction to
�property of the Owner arising from the performance of any of the terms and conditions of this
Contract, whether or not anv such inlury or damaqe is caused in whole or in part bv the
neqliqence or alleqed neqliqence of Owner, its officers, servants or emploVees.
�
In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner
satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or
�(b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been
referred to the insurance carrier.
�
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work
� performed under a City Contract.
7.
�+ The Contractor agrees, on the execution of this Contract, and before beginning work, to make,
execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
perFormance of the terms and stipulations of the Contract and for the payment to all claimants for labor
and/or materials furnished in the prosecution of the work, such bonds being as provided and required in
�,; Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract
Documents, and such bonds shall be 100 percent (100%) of the total contract price, and the said surety
shall be a surety company duly and legally authorized to do business in the State of Texas, and
acceptable to the City Council of the City of Fort Worth.
:
Said City agrees and binds itself to pay, and the said agrees to receive, for all of the aforesaid
work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted
by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly
installments upon actual work completed by contractor and accepted by the Owner and receipt of
invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates
N/A shall be
FIVE HUNDRED SIXTY-SEVEN THOUSAND TWO HUNDRED SEVENTY FIVE AND N0/100
DOLLARS
�
$567,275.00
, �,�, �� ,� =_�;���r ��� .
��� ����U��,�.����,� I� � �.
�:��' ����G��G�`�
-••, (�111�4"..r��M I.
4
; ���, .G�F���;�., �;!�i" �.! I; �, � L ��' %�`�,n
I :.
C-3
�
�
�'7
�
lt is further agreed that the performance of this Contract, either in whole ar in part, shall not be
sublet or assigned to anyone else by said Contractor without the written consent of the Director of the
Department of Engineering.
�,
10.
The Contractor agrees to pay at least the minimum wage per hour for all fabor as the same is
�' ciassified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto
� and made a part hereof the same as if it were copies verbatim herein.
11.
F The Contractor shall procure and shall maintain during the life of this contract insurance as
�-' specified in paragraph 8 of Special Instruction to Bidders of this contract documents.
12.
' It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of
� the State of Texas with references to and governing all matters affecting this Contract, and the
Contractor agrees to fully comply with all the provisions of the same.
N WITNESSETH WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six 6
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through
� its duly authorized officers in Six 6 counterparts with its corporate seal attached.
1
�
.�
e
0
"'1
�
U���C�I�b �v��'���
�d� ����G����l
If lo VUu"i'���y ��� .
C-4
Done in Fo� wo�h Texas, this the
, RECOMMENDEp;
15th
day o{ F�bruary
, 20 Qp .
�� ���,
DIRECTpR �EPA
r ENGWEERING RTMENT OF
�
�
�
�
Sutton & Associates, Inc.
(Contractor)
� BY: _��`,�.u�-.'� u�
�Re r, �-'�°.��ti �____
p esentative)
.
�
�
Mar�e Sutton president
P.o. �TITLE�
BOX 677
(Address)
Keller, TX 76244
cirY oF FORr woR
ASS1STqNT C11-y ''��.�
MANAGER (�, ,
V
APP �p:
���
_ - ,
DIRECTOR, TRqNSp _r._ ._�... �,......_-
P�BLIC WORKS �RTqTION qND
A�EST:
CITY SECRETqRY
(SEAL� �'� �l�a
�`'-/��
Contract Authori
za�ion
Date � /`c� _�C.-�
APPROVEp qS TO Fp�M &
LEGqLITY:
(Crty/State/Z�p�
ASSIS NT CITY
A�ORNEY
November 1960
`..� Revised May 9988
Revised Sept�mber 1 g92
� Reviseq January 1993
4— Revrsed Ap��� Tg99
Revrsed June lggg
�
LI
��?�i���L�lr�l� ff;���V��
C-5 f� Q �u� ���� �? � ° °1�
�i �v`@<+�IlUp U�W.
t�
�
�
�
,•
�.
�
�
STATE OF TEXAS 3
COUNTY OF TARRANT 3
CONTRACTOR COMPLIANCE WITH
WORKER'S COMPENSATION LAW
Pursuant to Article 8308-323 of Vernon's Annotated Civil Statutes, Contractor, Sutton & Associates, Inc.
certifies that it provides worker's compensation insurance coverage for all of its employees employed on
City of Fort Worth project HMAC Surf�ce Overlav 2000-2 �t Various Locations project number,
GS93/020930522060 / C111/020111053213,.
�� r,
By: �\J��� 1.�S5uC�c���es sh c.
�
1'� c� � e��`�-�.�- i�� � s� �� �-r„��--
`
�
Title
_ c. t-- -� i� f�� C' 1�_ U
Dat�
BEFORE ME, the undersigned authority, on this day personally appeared
��'� � i�,� known to me to be the person
Gt� , L �t,_, � .t..�� ?
whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as
��
the act and deed of ��.��,-�,.ti �- (, r� �c�r'� c:�r._ �� �-��:� c , far
the purposes and considerations therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL
�� �p �c,
'.S-�1.L:..uLw� � j � � •
(- /
OF OFFICE this -,�Na�- day of
.��',/ti1iLl.Ll, ��i. K-J�L:�21.--_
%�
Notary Public in and for tne State of Texas
(a) Contractor agrees to provide to the City a certificate showing that it has obtained a policy
of workers compensation insurance covering each of its employees on the project in compliance
with state Law. No Notice to Proceed will be issued until the Contractor has complied with this
section.
(b) Contractor agrees to require each and every subcontractor who will perform work on the
praject to provide to it a certificate from such subcontractor stating that the subcontractor has a
policy of workers compensation insurance covering each employee employed on the project.
Contractor will not permit any subcontractor to perform worl. on the project until such certificate
has been acquired. Contractor sha11 provide a copy of all such certificates to the City.
A:13WORKCOM.FRM
�����(�4�6�� �������@ �
� �� ���'�r °?�w����
Y tlr U�IV�r,L,t(U4 �lSL�ld
�
I
�,
r ,
r
PERFORMANCE BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
KNOW A[,L MEN SY THESE PRESENT: That �ve ( I) Sutton & Associntes.
Inc. (2) Cornorltion of TeYas hereinafter called Principal ancl (3)
C��rb�c�lar3 C:��ltv t� S�etv
, a corporation organized and existing �mder t1�e laws of the State �nd fiilly authorized to transact
business in the State of Texas, as Surety, are helci and firmly bound unto the City of Fort Worth, a
mun'scipal corporation organized and existing under the laws of the State of Tesas hereinafter called
Owner, in the penal sum of:
FIV� HUNDR�D SIXTY S�VEN THOUSAND TWO HUNDRED S�VENTY FLV� AND NO(100
DOLLARS
$567,275.00 Dolllrs in lawful money of the United States, to be paid in Fort Worth, Tarrant County,
Texas, for the payment of which sum well and truly be m1de, we hereby bind ourselves, our heirs,
erecutors, administrators, and successors, jointly and severally, frmly by these presents.
THE COND[TION OF TH[S OBL[GATION is such that Whereas, the Principal entered into 1
certain contract �vith the City of Fort Worth, the Owner, dated the l�th day of Februnry , 2000 , 1
copy of which is hereto attached and made a part hereof, for the construction of:
HMAC SURFACE OVERLAY 2000-2 AT VARIOUS LOCATIONS
designated as Project Number GS93/020930�22060 / C111/020111053213 , a copy
of which contract is heceto �►ttached, referred to, 1nd made a plrt hereof as fully and to the s�me extent as
if copies at length herein, such project �nd construction being hereinafter referred to as the "work".
�
'"
�
NOW THEREFORE, if the Principal shall �vell, truly and faithfully perform the work in
accordance �vith the plans, specificltion, and contract document during the original term thereof, 111a illly
extensions thereof �vhich may be granted by the Owner, with or without notice to the Surety, and if he
shalf satisfy all claims and demands incurred under such contr�ct, and sh111 fulty indemnify and save
harmless the Owner from all costs and damlges �vhich it may suffer by reason of failure to do so, and
shall reimburse and repay the owner all outlay and expense which the Owner may incur in making good
any default, then this obligation shall be void; otherwise to remain in full force and effect.
PROV[DED FURTHER, that if �ny legal lctiotl be filed upon this bond, veniie s(lall lie in
Tarrant County, State of Texas.
, �°
,. - AND PROVIDED FURTHER, thlt the saicl Surety, for v11ue reeeivecl, hereby stipulates and
aarees that no change, extension of time, alteration or lddition to the terms of the contract or to the work
" to be performed thereunder or the specifications accompanying the same shall in 1ny wise affect its
;, � obligation on this bond, and it does hereby waive notice of any such change, extension of time alteration
or addition to the terms of the contract or to the work or to the specifications.
R �
�
i '--'
A:14PERBOND.FRM
� r
� '�,v
��I��)'���� �?��U°��
�d�l ��'r�?� ° �l�
I�tl� tiICIVU���uup �o
�
�
..:,
.
.
r
.
I
IN WITNESS WHEREOF, this instrument is erecuted in 6 Counterparts each one of �vhich
shall be deemed an original, tliis the 15th day of February , 2000.
ATTEST:
I �
a�,'�i�,u� ,��i :'���'%'l,�
( rincipal) Secreta�`q'
(SEAL.)
� P.O. B� 796428
(Address)
L�llas, 'IX 75379
ATTEST:
(Sur.•ety) Secretary
�.,
y ; �
.e �
ru
Mu �
�
�,
��
(SCAL) -�
/ J �
/
Vitness as to Surety
A:\4PERBOND.FRM
S1ztt�n & As�ociaties, Inc.
Principal (4)
,
By: ,� �' ��2 u` �i,� ��-'�___
�
Ma�-ie Slzttrn, Presic�t
(Printed Name/Title)
P.O. Bcr� 677
ADDRCSS
KPl l �r. 'IX 76244
CITY/STAT�/ZIP
Q�r�e�']�d C.'��aalty & �y
(Surety)
�. �
By:
(Attorney-in-Fact) (5)
F�ve Slzthn
(Printed Attorney-in-Fact)
No�e:
(�)
(�)
(3)
�'%)
(S)
Dnte ojBond nnrsl not be prior !o da�e of
Contrncl
Correct mm�e ojContractor
fl Corporcuion, a Parinership or und
hrdrvrclunl, as case may be
Correcl Nnme of Surery
/jConrraclor is pnrinershrp n!1 Partners
should execule bond
fl true eopy of Poiver oJAttorney shal! 6e
artached to bond by Allorney-in-Facl
'�;�(�����Qd ���C��GQ�
�� ��' ����r� r ° Q17
��a Vu�IIiI�UUp ��o �
0
. ,
• J CUT-THROUGH ENDORSEMENT NO. TRGCCS-00-0004
Attached to and made a part of
REINSURANCE AGREEMENT NUMBERS 200202548 & 200202561
between
CUMBERLAND CASUALTY & SURETY COMPANY
(hereinafter referred to as the "Direct Writing Company")
and
TRANSATLANTIC REINSURANCE COMPANY
(hereinafter referred to as the "Reinsurer")
Obligee Address
CITY OF FORT WORTH 1000 THROCKMORTON
FT. WORTH, TX 76102
`" Direct Writing Company
� Cumberland Casualty & Surety Company
431 1 West Waters, Suite 501
Tampa, FL 33614
� Reinsuring Company
�Transatlantic Reinsurance Company
" 80 Pine Street, 9th Floor
New York, NY 10005
Date Direct Writing Company Executes
This Agreement
FEBRUARY 15TH, 2000
State of Incorporation
Amount of this Reinsurance
Florida
$567,275.00
Date Reinsuring Company Executes
This Agreement
FEBRUARY 15TH, 2000
State of Incorporation New York
�; DESCRIPTION OF BOND
��
Description of Bond (Type, purpose, etc.) Penal Sum of Bond
(Ifassociated with contract rra�mber, date, amount, $567, 275.00
� elc., inclarde na�ne of Governrnent agency involved.) Date of Bond Bond No
HMAC SURFACE OVERLAY 2000-2 FEBRUARY 15TH, 2000 CC-23882
� AT VARIOUS LOCATIONS. PROJECT Principal SUTTON & ASSOCIATES, INC.
NOS. GS93/020930522060 AND 820 NORTH MAIN STREET
C111/020111053213 KELLER, TX 76248
F�J
� AGREEMENT:
State of Incorporation (if Corporate Principal)
TEXAS
a) The Direct Writing Company named above is bound as a surety to the Principal, on the bond described above. The bond is given
� for the protection of the Obligee and the Direct Writing Company has applied to the above Reinsuring Company to be reinsured and
counter-secured in the amount shown opposite the name of the Reinsuring Company (referred to as the "Amount of this
Reinsurance"), or for whatever amount less than the "Amount of this Reinsurance" the Direct Writing Company is liable to pay under
or by virtue of the bond.
1�
�
b) For a sum mutually agreed upon, paid by the Direct Writing Co�npany to the Reinsuring Company which acknowledges its
receipt, the parties to this Agreement covenant and agree to the terms and conditions of this Agreement.
TERMS AND CONDITIONS:
� The purpose and intent of this Agreement is to guarantee and indemnify the Obligee against loss under the bond to the extent of the
"Amount of this Reinsurance," or for any less sum than the "Amount of this Reinsurance," that is owing and unpaid hv thP i3ir�,ct
Writing Company to the Obligee due to insolvency ofthe Direct Writing Company. IJ'������C ri���,�r
I, V;. ��l �
� � ��V ���rG? � ° ��
f�� �u<<���Q ��o_�
CUT-THROUGH ENDORSEMENT NO. TRC-CCS-00-0004
�
�
�
�
THEREFORE:
I) If the Direct Writing Company fails to pay any default under the bond equal to or in excess of the "Amount of this Reinsurance,"
due to insolvency of the Direct Writing Company, the Reinsuring Company covenants and agrees to pay to the Obligee, the "Amount
of this Reinsurance." If the Direct Writing Company fails to pay to the Obligee any default for a sum less than the "Amount of this
Reinsurance," due to insolvency of the Direct Writing Company, the Reinsuring Company covenants and agrees to pay to the Obligee
the full amount of the default up to the "Amount of Reinsurance," or so much thereof that is not paid to the Obligee by the Direct
Writing Company.
2) The Reinsuring Company further covenants and agrees that in case of default on the bond for the "Amount of this Reinsurance,"
or more, and the Direct Writing Company fails to pay any default due to insolvency of the Direct Writing Company, the Obligee may
sue the Reinsuring Company for the "Amount of this Reinsurance" or for the full amount of the default when the default is less than
the "Amount of this Reinsurance."
3) In the event the Direct Writing Company fails to pay any default under the bond due to insolvency and the Reinsurer pays the
Obligee, the Reinsurer shall assume all of the legal rights of the Direct Writing Company as Surety.
� 4) The Reinsuring Company agrees to comply with the terms and conditions of the bond including an automatic twenty percent
(20%) extension of the contract price, if so required.
� WITNESS:
The Direct Writing Company and the Reinsuring Company, respectively, have caused this Agreement to be signed and impressed
with their respective corporate seals by offcers possessing power to sign this instrument, and to be duly attested to by officers
' empowered theretq on the day and date above-written opposite their respective names.
C
DIRECT WRITING COMPANY
A
� �' � ��.�
Signature ��N e and Tit (typed)
-- EDWARD J. D NFIELD IV., PRESIDENT
z�
��h
l �'I
�
�
�
A st: Si na ure� Name and Titie (ty�ed)
CA�OL SUE BLACK, SECRETARY Cor�+�rate
Seal
REINSURING COMPANY
�,— � �G
Signature�
George C. Barone
Vice President
Jeffrey M. Kyan Corporate
Assistant ��ice President Seal
'�'���'G�l�� �����J `l�
�U�� ���'.: � ' °��
�jj��1����������SI�Mn, �I�
0 YV\i'���.uL'U� _ _ Y
'
r
r_
PAYMEN'F BOND
THE STATE OF TEXAS
COUNTY OFTARRANT
BOND NO. 141503264
KNOW ALL MEN SY TI-IESES PRESENTS: Tl�at we, Sutton & Associntes. Inc. a
corporation of Tarr<int County, Tex�s , hereinafter called Principl)
and (3) Qn�rla�d C��alty & �y
, a corporation organized a��d e�istinD under the laws of tl�e St1te and fully authorized to
transact business in the State of Te:cas, as Surety, are held and firmly bound unto the City of Fort Worth,
a municipal corporation orglnized and existing under the la�vs of the State of Texas, hereinafter called
Owner, and unto all persons, tirms, 111CI COCpOflilOtlS WIlO I111y fUl'i11SIl materials for, or perform labor
upon, the building or improvements hereinafter referred to in the penal s�un of:
FIV� HUNDRED SIXTY-SEVEN THOUSAND TWO FIUNDRI;D S�VTNTY-FIV� AND NO/100.
DOLLARS
$567,275.00 lawful money of the United States, to be paid in Fort Worth, Tarrint County, TeYas, for the
payment of which sum well and truly be made, �ve bind ourselves, our I�eirs, executors, administrators
and successors jointly and severally, firmly by these presents.
THG CONDITION OP THIS OBLIGATION is such that Whereas, the Principal entered into a
certain contr�ct �vith the City of Fort Worth, the Owner dated the 15t� day of February , 2000, a
copy of which is hereto attached and made a part llereof, for the construction of:
HMAC SURFACE OVEItLAY 2040-2 AT VARIOUS LOCATIONS
designated as Project Number GS93/020930�22060 / C111/0201110�3213 copy of
which contract is hereto �ttached, referred to, and mlde a part hereof as fully and to the slme extent as if
copied at lenbth herein, such project �nd construction being hereinafter referred to �s the "�vorks".
� NOW, THEREFORE, the condition of the obligation is such that, if the Principal shall promptly
�,,,, ma{ce payment to all claimants as defined in Article 5160 of tl�e Revised Civil Statutes of Texas,
supplying (abor and materials in the prosecution of the �vork provided for in said Contract, then this
obliaatio�� shall be ►�ull attd void, otherwise it sizall remain in ful( force and effect.
�
�,
r
h�_.
W
!RI r
�
�tl
THIS BOND [S MADE AND ENTERED into solely for the protection of all claimants supplying
labor and mlterial in the prosecution of the work provided for in said Contr�ct, �s claimants are defined
in said Article 5160, �nd all such claimants sh111 have a direct ri�ht of action under the bond as provided
in Article 5160 of the Revised Civil Statutes.
PROVIDED FURTHER, thlt if any leg�l action be filed upon this bond, venue shall lie in
Tarrant County, St�te of Te�cas, and that the said Surety, for value received, hereby stipulates and agrees
that no change extension of time, alteration or addition to the terms of the contract or to the �vork to be
performed thereunder or the specification accompanying the same shall in 1ny �vise affect its obligations
on this bond, and it does hereby waive notice of any such change, e�ctension of time, alteration or
addition to the terms of the contract or to the �vork or the specifications.
PROVIDED FURTHER, th�t no final settlement between the O�vner and the Contractor shall
A:15PAYBOND.FRM
'\�)���D����d �����C�G�f�
{v � U U ���(u It�,L�i IVIV� U
�o UV�;•�I:I�V UQ Il ��
abridge the right of �ny beneficiary hereunder �vhose claim shall be unsatisfied.
IN WITNESSETH WHEREOF, this instrument is executed in 6 counterparts, each one of �vhich
shall be deemed an original, this the 15th day of Febru:�ry , 2000.
ATTEST:
� �i
�
�
, �/ �'/t�„�.� _ � -�-_V,ti���la--
(Principal) Secret�y
� (SEAL)
S1zL1xn & As9ociates, Ir�.
Principal (4)
,
i
BY: 9 Y1 /.-4,'(� �_ X�(�-' �,�_
l -
Ma�-ie �itbn, Pr�sic7mt
(Printed Name/Title)
P.O. Hc� 677
ADDRESS
FCPI l Pr-, 'IX 76244
CITY/STAT�/ZIP
P.O. Bc� 796428, Iaa�7las 7X 75379
(Address)
• ��.a ... _� _ . � �.�.
ATTEST:
(Surety} Secretary
u
1
� 'EA )
��. /�_ ^
/] / �
� Witness as to Surety
�
�
�
�. �
aia
rp
�
�
�
By: —�.
Attorney-in-Fact) (5)
Fay� 51it`�
(Printed Attorney-in-Fact)
Nore
(�)
(Z)
(j)
(�)
Dale o( Bond musl not 6e priar !o dule of
Cann•ncl
Corrrc! nume of Con[raclor
tl Corporation, a Pnrb�erslrip or u»d
/r7clrvicGral, as case nmy be
Correcl Name of Surety
If Contraclor is Partnersltip alt Partners
shot�ld exec:�te bond
����'G��� ����Q�
:���'V ��'��� ' Q�
f�io �L��G���a ��o
CUMBERLAND CASUALTY & SURETY COMPANY
TAMPA, FLORIDA
POWER OF ATTORNEY
� PRINCIPAL: S1ztt�n & As9oc�iai�, Ir�. EFFECTIVE DATE: p2/15/2000
�
' 820 I�t-h Nk�in Stzeet K�71er 'IX 76248
' " (STREEI' ADDRESS) (CITY) (STATE) (ZIP CODE)
CONTRACT AMOUNT: ��'- �� S�' �� � '� � ��MOUNT OF BOND: $ ���2�•�
F�ve Ibllt�s & I�IJ/100****k
POWER NO. C C- 2 3 8 8 2
KNOW ALL MEN BY THFSE PRESENTS: That Cumberland Casualty & Surety Company, a corporation duly organized under the laws of the State
of Florida, having its principal office in the City of Tampa, Florida, pursuant to the following resolution, adopted by the Board of Directors of the said
Company on the 15th day of April, 1999, to wir.
"Resolved, that the President of the Company shall have authority to make, execute and deliver a Power of Attorney constituting as
attorney(s)-in-fact, such persons, firms, or corporations as may be selected from time to time.
Be it Further Resolved, that the signature of the President, Secretary and the Seal of the Company may be affixed to any such Power of
Attorney or any certificate relating thereto by facsimile, and any such powers so executed and certified by facsimile signature and facsimile seal shall
be valid and binding upon the Company in the future with respect to any bond or consents for the release of retained percentages and/or final estimates
on engineering and construction contracts or similar authority or undertaking to which it is attached."
Cumberland Casualty & Surety Company does hereby make, constitute and appoint Charles M. Mapes or Derwood P. Phillips
or Rodney H. Zeigler or Fay Sutton or J. D. Wysong
its true and lawful attorney(s)-in-fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and
deliver in its behalf, and its act and deed, as follows:
The obligation of the Company shall not exceed ($2,000,000.00) dollars.
And to bind Cumberland Casualty & Su�ety Company thereby as fully and to the same extent as if such bond or undertaking was signed by
the duly authorized of6cer of Cumberland Casualty & Surety Company, and all the acts of said attorney(s)-in-fact pursuant to the authoriry herein given,
and hereby ratified and confirmed.
IN WITNESS WHEREOF, Cumberland Casualty & Surety Company has caused these presents to be signed by an officer of the
Company and its Corporate Seal to be hereto affixed.
��,� CUMB�ND C r SU LTY & SUR Y COMPANY
�d'�.5r'�"�. F
� S� � - . C.�- �� .e,�L'� . ._
dward J. E enfield IV, President
J Y�
�f2�16'�
STATE OF FLORIDA )
) SS
COUNTY OF HILLSBOROUGH)
On this 15th day of April, A.D. 1999, before me personally came Edward J. Edenfield IV, to me known, who being by me duly sworn did
depose and say; that he resides in the County of Hillsborough, State of Florida; that he is President of Cumberland Casualty & Surety Company, the
corporation described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said
instruments is such corporate seal; that it was so affixed by order of the Board of Directors of said corporation and that he signed his name, thereto
by like order.
,E��oT'"H� .�PaYP�a Beverly Ann Jerry
: � �` �'� i ���Commission # CC 75B867
wsuc � �, aQ Expires August 22, 2002
� nM e� q �
BONDEO TNRU
!Na ����� Go�= �F �' ATLANTIC BONDING CO., INC.
��DUGH
i.�iL(.(� �'✓\� 1,
�everl Ann J�
Y Y �
My commission expires
STATE OF FLORIDA )
) SS
COUNTY OF HILLSBOROUGI�
I, the undersigned, Secretary of Cumberland Casualry & Surery Company, a Florida Corporation, DO HEREBY CERTIFY that the foregoing
and attached POWER OF ATTORNEY remains in full force.
Signed and Sealed at the City of Tampa. Dated the 15 day of � , 2000 .
i;' +
����� �\ �L������
� � /
� $� Cae�- ' ck.,.$eG[Gtary .
� r
I', a� �
T "��II ��� / C'1 r � I •'�
����� - �:�0��� G������.���H
THIS BOND NOT '+✓.ALID TJNI.�SS PRINTED ON GREEN PAP�R �< �l �J c�15��; Ih.11517i�11A; II
�-��"'� �t����'�M_ i�f� ._:_:
�.
��
+a , CERTIFICATE OF INSURANCE
�Certiiicate Holder: City of Fort Worth
, Date: Febru�ry 15, 2040
Project Name: HMAC Surface Overiay 2000-2 at Various Locations
�'` Project Number: G593/020930522060 / C111/020111053213
, This is to certify that: Sutton & Associ�tes, Inc.
Adclress: 820 N. Main
j� Fort Worth, Tex�s 76248
4
� is at the date of this certificate, insured by this company with respect to the business operations hereinafter described, for the
;-. type of insurance and in accordance �vith the provisions of the stanclard policies used by this Company, and further
I, hereinafter described. Exceptions to standard policy noted on revcrse side thereof.
Tvne of Insur�ncc
� I Workers Compensation
�
Comprehensive Generai
Liability Insurance
' (Public Liability)
� � � Blasting
I ^
I Collapse of Buildings
� - or structures adjacent to
excavations
i
ii � llamage to underground
Utilities
Builders Risk
Comprehensive
Automobile Liability
� � Contractual Liability
Uther
POLICY NO. EFFGCTIVG E�PIRES
Zo�o�o 02�2o/a000 o2��or2ooi
I:.��..1. • AI I
:� 1. • 11
04/Ol/1999 04/O1/2000
04/Ol/1999 04/O1/2000
LIMITS OF I.IABILITY
1,OQO,OOOj1,000,000 1,Q00.000
Bodily injury: • $1 � �
Gach Occurrence: ' '
Property Dmnage:
Bach Occurrence: $1,�.�
Gach Occurrence $
Bach Occurrence $
Each Occurrence
Bodily lnjury
Each Person CSL
Each Occurrence
Property Damage Lq,
Each Occurrence
E3odily Injury
Each Occurrence
Property Damage
Each Occurrence
$
$1��.�
$ o�r�.iined
��
�1inri.t
$
$
Locations covered: State of 'I��as — all- ].ncatia�s
Description of operations covered: S�t �c, i�inci
TIZe above policies either in the body thereof or by appropriate endorsement provide that they may not be chan?ed or canceled by the
insurer in less than five (5) days after the insured has received written notice of such change or cancellations.
Where applicable local laws or regulations require more than five (5) days actual notice of dlange or cancellation to be assured, the above
policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached.
� Agency Ir� C7� Aq�c.V, � i / ,� � �� _ -/ �,
L" By• '�CG+ - ��� � `'- 1 � ���i�
Fo��t Worth Agent _
� Address 16300 Ps�ii�cn I3�. St� 100 Title: Pr.�nt i ''�
�, Ac�a'�c-n� ZX 75001 '�K ���%� ��(�;VUS�
� �U�
� A:121NSURAN.FRM ��L�U u� c'�'`,��G��UWUS�
:� :_ 1' ��; ;�;; �??ru� ��`
� !,�: ,�� ,�. � � r� li L�ln.o
City of Fort Wpr�th, Texas
�1►�A�a� And C,aunc�l Can�mun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
2/15/00 **C-17851 20SUTTON L 1 of 2
SUBJECT AWARD OF CONTRACT TO SUTTON & ASSI�CIAT�S, INC. FOR HMAC SURFACE
OVERLAY 2000-2 AT VARIOUS LOCATIONS
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with Sutton &
Associates, Inc. in the amount of $567,275.00 for 70 working days for HMAC Surface Overlay 2000-2.
DISCUSSION:
In the 1999-2000 Contract Major Maintenance Program, various types of street maintenance
techniques are grouped into specific contract packages. HMAC Surface Overlay 2000-2 provides for
surface and base rehabilitation, curb and gutter, and valley gutter replacements for asphalt streets at
various locations funded from the Contract Street Maintenance Fund and the Street improvements
Fund.
The following list details the limits for each of the streets included in this project:
STREE7
South Adams Street
Cando Drive
Cloverdale Drive
Cloverdale Drive
Gomer Drive
Conlin Drive
De Cory Road
Dublin Drive
Engblad Drive
Erath Street
Erath Street
Glasgow Road
Hazel Leigh Lane
Hensley Drive
Howard Street
Kirkwall Drive
Mansel Lane
Neystel Road
,.��Savage Drive
5tafford Drive
FROM
West Jarvis Street
Limerick Drive
Engblad Drive
Roma Lane
Limerick Drive
Limerick Drive
Limerick Drive
Conroy Street
Oak Grove Road
Knox Drive
Wilbarger Street
Conroy Street
West Oak Grove Road
Limerick Drive
Tallman Street
Hensley Drive
Glasgow Road
Hazel Leigh Lane
East Deadend
Engblad Lane
TO
Pennsylvania Avenue
West Oak Grove Road
Glasgow Road
I-20 Service Road
West Oak Grove Road
Dublin Drive
West Oak Grove Road
Comer Drive
(Highland Hills Park Line)
Martin Street
Howard Street
Oak Grove Road West
Oak Grove Road
Glasgow Road
Shackleford Street
Conlin Drive
Oak Grove Road
Oak Grove Road
West Oak Grove Road
Glasgow Road
„� This project is located in COUNCIL DISTRICT 8.
.Ciiy of Fnri.��� Wa�rth, Texas �
�1►���ar snd Caunc�[ �,a�rtn�t�n�cAt��an
DATE REFERENCE NUMBER LOG NAME PAGE
2/15/00 **-C-�17851 . 20S-UTTON I 2 of 2
SUBJECT AWARD OF CONTRACT TO SUTTON & i4SSOCIATES, INC. FOR HMAC SURFACE
OVERLAY 2000-2 AT VARIOUS LOCATIONS � .
This project was advertised for bid December 16 and 23, 1999. The following bids were received
January 13, 2000.
��BIDDERS
Sutton & Associates, Inc.
J. L. Bertram Construction & Engineering, Inc.
Peachtree Construction
APAC Te�cas, Inc.
Austin Bridg+e.& Road, Inc.
Branch & Sons Contractors, Inc.
Pavecon, Inc.
AMOUNT
$567.275.00
$578,532.00
$585,773.00
$604,946.00
$631,189.20
$673,195.00
$735,540.00
The low bidder, Sutton & Associates, Inc., is in compliance with the City's M/WBE Ordinance by
committing to 15% M/WBE participation. The City's goal on this project is 15%.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets,.as appropriated, of
the Contract Street Maintenance Fund and the Street Improvements Fund.
MG:j
Submitted for City Manager's
OfFce by:
Mike Groomer
Originating Department Head:
Hugo Malanga
Additional Information Contact:
Najib Fares
� FUND I ACCOUNT
I (to)
�
6140
�
7so1 � (from)
GS93
C111
�
7802 I
CENTER � AMOUNT
�.
541200 020930522060 $564,225.00
541200 020111053213 $ 3,050.00
CITY SECRETARY