HomeMy WebLinkAbout065228-PM1 - Construction-Related - Contract - Hillwood Alliance Services, LLC and Conatser Construction TX, LPCSC No. 65228-PMI
FORT WORTH
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
STORM DRAIN, STREET LIGHTS, PAVING, & GRADING
IMPROVEMENTS
TO SERVE
MOBILITY WAY
IPRC Record No. IPRC25-0127
City Project No. 106376
FID No. 30114-0200431-106376-EO7685
File No. K-3552
Mattie Parker
JESUS "JAY" CHAPA
Mayor City Manager
Christopher P. Harder, P.E.
Director, Water Department
Lauren Prieur, P.E.
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
PELOTON LAND SOLUTIONS, A WESTWOOD COMPANY
9800 HILLWOOD PARKWAY, SUITE 250
FORT WORTH, TX 76177 ��Q,000$ggo
817-562-3350
TBPE FIRM NO. 12207
KOLE T. WEBER
................................6,
o'. 120316
0 E N SE �G co
BgaONAL `—
�eoo�
06/03/26
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
SECTION 00 00 10
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
Page 1 of 5
Last Revised
00Bidders-O
ni�20
nn�
Irst,.,,efienstoBidders
n�vs20/202
00410
-Bid Fe
0402/2014
00 42 43
Proposal Form Unit Price
05/22/2019
00 43 3
Bid Be
04/02,12014
0045 41
Bidders Pr-eq , i fie ,f;en's
nn /nvTrvr2vi4
0045 12
Prequalification Statement
09/01/2015
0n�
Bidder- Pr-e ,,alifi .atiea A ,.,.i;,.atier
n� in�0
00 45 26
Contractor Compliance with Workers' Compensation Law
04/02/2014
00 4540
091i/20ig
00 52 43
Agreement
06/16/2016
00 61 25
Certificate of Insurance
07/01/2011
0062 13
Performance Bond
01/31/2012
00 62 14
Payment Bond
01/31/2012
00 62 19
Maintenance Bond
01/31/2012
00720
General Conditions
ii45�20i7
007300
Supplementary Conditions
min i
0073 10
Standard City Conditions of the Construction Contract for Developer
Awarded Projects
01/10/2013
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
08/30/2013
01 31 19
Preconstruction Meeting
08/30/2013
01 32 33
Preconstruction Video
08/30/2013
01 33 00
Submittals
08/30/2013
0135 13
Special Project Procedures
08/30/2013
01 45 23
Testing and Inspection Services
03/20/2020
01 50 00
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
07/01/2011
0157 13
Storm Water Pollution Prevention Plan
07/01/2011
01 60 00
Product Requirements
03/20/2020
01 66 00
Product Storage and Handling Requirements
04/07/2014
01 70 00
Mobilization and Remobilization
04/07/2014
01 71 23
Construction Staking
04/07/2014
01 74 23
Cleaning
04/07/2014
0177 19
Closeout Requirements
04/07/2014
01 78 23
Operation and Maintenance Data
04/07/2014
01 78 39
Project Record Documents
04/07/2014
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 106376
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
http://fortworthtexas.gov/tpw/contractors/
or
https:Happs.fortworthtexas.2ov/Pro0ectResources/
Division 02 - Existing Conditions
Last Revised
0241 13
Selective Site Demolition
12/20/2012
0241 14
Utility Removal/Abandonment
12/20/2012
0241 15
Paving Removal
02/02/2016
Division 03 - Concrete
03 34 13
Controlled Low Strength Material (CLSM)
12/20/2012
03 34 16
Concrete Base Material for Trench Repair
12/20/2012
03 80 00
Modifications to Existing Concrete Structures
12/20/2012
Division 26 - Electrical
26 05 00
Common Work Results for Electrical
11/22/2013
2605 10
Demolition for Electrical Systems
12/20/2012
26 05 33
Raceways and Boxes for Electrical Systems
12/20/2012
26 05 43
Underground Ducts and Raceways for Electrical Systems
07/01/2011
26 05 50
Communications Multi -Duct Conduit
02/26/2016
Division 31- Earthwork
31 1000
Site Clearing
12/20/2012
3123 16
Unclassified Excavation
01/28/2013
31 23 23
Borrow
01/28/2013
31 24 00
Embankments
01/28/2013
31 25 00
Erosion and Sediment Control
12/20/2012
31 36 00
Gabions
12/20/2012
31 37 00
Riprap
12/20/2012
Division 32 - Exterior Improvements
301 17
,7Miz1POIL2 �z
3201 18
Temporary Asphalt Paving Repair
12/20/2012
32 01 29
Concrete Paving Repair
12/20/2012
32 11 23
Flexible Base Courses
12/20/2012
32 11 29
Lime Treated Base Courses
12/20/2012
32 1133
Cement Treated Base Courses
12/20/2012
32 1137
Liquid Treated Soil Stabilizer
08/21/2015
32 12 16
Asphalt Paving
12/20/2012
32 12 73
Asphalt Paving Crack Sealants
12/20/2012
32 13 13
Concrete Paving
12/20/2012
32 13 20
Concrete Sidewalks, Driveways and Barrier Free Ramps
06/05/2018
13 733
321373
Paving Joint Sealants
12/20/2012
}2
32 14 ' 16
nC�o��n,�7crete
BYiGYnit Pm4alg
12/20/2012
r
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 106376
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
32 16 13
Concrete Curb and Gutters and Valley Gutters
10/05/2016
32 1723
Pavement Markings
11/22/2013
32 1725
Curb Address Painting
11/04/2013
3231 13
Chain Fences and Gates
12/20/2012
32 31 26
Wire Fences and Gates
12/20/2012
32 31 29
Wood Fences and Gates
12/20/2012
3232 13
Cast -in -Place Concrete Retaining Walls
06/05/2018
3291 19
Topsoil Placement and Finishing of Parkways
12/20/2012
3292 13
Hydro -Mulching, Seeding, and Sodding
12/20/2012
32 93 43
Trees and Shrubs
12/20/2012
Division 33 - Utilities
33 01 30
Sewer and Manhole Testing
12/20/2012
33 01 31
Closed Circuit Television (CCTV) Inspection
03/03/2016
3-3-0-3 40
124i
33 04-19
4-X 0/2012
3304 1
r e fr-,,rY,,..,w.
.sief el Toss Stations,
7 M 4-2
.33-04 12
Magnesium
i2�7-.z 0,2012
33 94 39
Temw,,far-y Wate f co.-.,iees
07o inn
33 04 40
Cleaning and Acceptance Testing of Water Mains
02/06/2013
33 04 50
Cleaning of Sewer Mains
12/20/2012
3305 10
Utility Trench Excavation, Embedment, and Backfill
12/12/2016
3305 12
Water Line Lowering
12/20/2012
3305 13
Frame, Cover and Grade Rings — Cast Iron
01/22/2016
3305 13.10
Frame, Cover and Grade Rings — Composite
01/22/2016
3305 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
Grade
12/20/2012
23�
ivn.- e -ete Water- V.,,,1ts
121/2vrz ozz
3305 17
Concrete Collars
12/20/2012
33 05 2
Auger Big
, 2 �
33�
T,,fmel Liner- Plate
, 7/7roQ040 -2
33�3 05 22
Steel Casing -Pipe
4242 2 0) 12
44-05-23
Hand T+meling
,
33 05 24
installation FC., T,,mel T ; Ul,
Pipe in !`.,sing
06 9Q0 3
wrrr-rvr✓
ffie.-
or- of e-
330526
, / 2012
33 05 30
Location of Existing Utilities
12/20/2012
33 11 05
Bolts, Nuts, and Gaskets
12/20/2012
33 11 10
Ductile Iron Pipe
12/20/2012
33 11 11
Ductile Iron Fittings
12/20/2012
33 11 12
Polyvinyl Chloride (PVC) Pressure Pipe
11/16/2018
33 11 13
Concrete Pressure Pipe, Bar -Wrapped, Steel Cylinder Type
12/20/2012
33 11 14
Buried Steel Pipe and Fittings
12/20/2012
33 12 10
Water Services 1-inch to 2-inch
02/14/2017
, ��42
33 1220
Resilient Seated Gate Valve
12/20/2012
33 1221
AWWA Rubber -Seated Butterfly Valves
12/20/2012
33 1225
Connection to Existing Water Mains
02/06/2013
33 1230
Combination Air Valve Assemblies for Potable Water Systems
12/20/2012
33 1240
Fire Hydrants
01/03/2014
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 106376
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
33 1250
Water Sample Stations
12/20/2012
06,119,L2013
33 31 1
Cur-ed i DlaeePipe(CIDD)
i2Q0Q0i2
'2Z�Fiberglass12/7
z
2Z�
High Density Polyethylene Pipe for- C'an taFy Sewer
17/' 0,Q0i2
z
(NDPE)
33 31 20
Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
06/19/2013
inyl Chloride Closed Pr-eftle Gravity Sa-mitafy Sewer-
33 3121
(PVC)
1 �� /�li
��
11 /�Q
333123
11 /�Q
33 31 50
Sanitary Sewer Service Connections and Service Line
04/26/2013
33317A
Combination A ;. Valve for- Sans ., , Sewer- Fo -ee Main&
12 /�Q
3339 10
Cast -in -Place Concrete Manholes
12/20/2012
33 39 20
Precast Concrete Manholes
12/20/2012
33 39 30
Fiberglass Manholes
12/20/2012
33 39 48
12/20,90112
33 39 60
Epoxy Liners for Sanitary Sewer Structures
12/20/2012
33 41 1
Rei feed r ne-ete St,,..m Sewe,. Pipe/r„l.,o,t.
mm�n
33-41 11
1N12
333 41 12
f ..e Polyetl,lene !CAPE\D;,�.o
1 1 /1 5
3
33 46 0
CD''ei,n,-
,�ubdfaiftage
171 /7z QO/2012
33 46 02
Trench Drains
07/01/2011
3349 10
Cast -in -Place Manholes and Junction Boxes
12/20/2012
33 49 20
Curb and Drop Inlets
12/20/2012
33 49 40
Storm Drainage Headwalls and Wingwalls
07/01/2011
Division 34 - Transportation
3 n� rr.•�llss
34 ^T--ri10.01 zAt of �rni iicrGabine 12/1 �
ttk or� tP6
3^�-r-4z-z 0.03 rArtttaehf ent G Soft've afe Speei ieat36n 2
11 /rrrz IL201a
34 41 20 Roadway Illumination Assemblies 12/20/2012
34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015
3n n�02 Freeway LED -Roo 1.., < I ,i k-es n�/1�4n15
34 4120.03 ResideatW LED Roadway Luffi4taifes 06/1�2n115
34 413eAl*minum11/13
34 415 Single Made Fiber- Optie Cable 02�26QO�6
3471 13 Traffic Control 11/22/2013
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 106376
Revised March 20, 2020
OG 6243
DAP-ampanwsti.
Pqq" I "r2
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Prjmt Item Information
Bidder's Proposal
Btdl"�
Item No.
Description
Spedfica5on
Section No.
Unit Of
Maaeufe
Bid
Quantity
Unit Price
Bid Value
STORMIMPROVEMENTS
1
9999.0001 Remove 7'X5' RCB
00 00 00
LF
146
$50.00
$7 300.00
2
0241.0800 Remove Rip Rap
0241 13
SF
1,008
$4.00
$4 032.00
3
0241.4401 Reprove HeadwaWSET
0241 14
EA
1
$2 500,00
$2.500.00
4
3349.0104 4' Stacked Manhole
33 49 10
EA
14
$5.500.00
$77 000.00
5
9999.0002 Stacked 4' Junction Box
000000
EA
8
$8 500.00
$68 000,00
6
3341.1203 5x5 Box Culvert
3341 10
LF
23
$450.00
$10.350.00
7
3341.1304 6x5 Box Culvert
3341 10
LF
198
$550.00
$108,900.00
8
13341.1404 7x6 Box Culvert
3341 10
LF
4630
$710.00
$3287.300.00
9
3341.1403 7x5 Box Culvert
3341 10
LF
2095
$680.00
$1 424 600.00
10
3341.0201 21" RCP Class 111
3341 10
LF
268
$100.00
$26.800.00
11
3341.0502 54" RCP, Class III
3341 10
LF
38
$320.00
$12 160.00
12
3341.0602 60" RCP, Class III
3341 10
LF
19
$350.00
S6 650.00
13
3349.5001 10' Curb Inlet
33 49 20
EA
14
S5 400.00
$75.600.00
14
3349.5002 15' Curb Inlet
33 49 20
FA
4
$6,400,00
$25 600.00
15
9999.0003 2l'-0" X 8'-0" Junction Box
00 00 00
EA
1
$60.000.00
$60.000.00
16
9999.0004 TxDOT 30" Set D Headwall
00 00 00
EA
4
$6 500,00
$26 000.00
17
3349.0001 5' Stomt Junction Box
33 49 10
EA
2
$11 500.00
$23.00UO
18
3305.0117 Concrete Collar for Valve
33 05 17
EA
1 1
S2 500,00
2.500.00
19
3349.7001 4' Drop Inlet
33 49 20
EA
1
$6 500.00
$6.500.00
20
3341,0402 42" RCP, Class III
3341 10
LF
561
$220.00
$123,420.00
21
3341.0302 30" RCP Class 111
3341 10
EA
501
$140.00
$70140,00
22
3305.0109 Trench Safety
33 05 10
LF
0,457
$2.00
$16 914.00
23
3137.0102 Large Slone Ri ra , dry
31 37 00
SY
1,022
$155.00
$158,410.00
24
9999.0005'rxDOT Headwall Type PW
000000
EA
1
$65.000.00
$65 000.00
25
9999.0006 21'-2" X W-0" Junction Box
00 00 00
EA
2
$72, 000.00
$144 000.00
26
9999.0007 Tx DOT Concrete Wingyvall with Flared Wings 00 Skew- FW-O for6'x5' RCB
000000
EA
1
$21 500.00
$21 500.00
27
19999,0008 VMAX SC250 Turf Reinforcement Mat
1 00 00 00
1 SF
1 12,841
$2.00
$25 682.00
O AL: STORM IMPROVEMENTS
$5,879,858.00
E8VING MPRO EM TS
1
3217.4302 Remove 6" Pvmt Marking
32 1723
LF
1290
$1.00
$1,290.00
2
3217.4402 Reprove Lane Legend Arrow
32 1723
EA
1
$200.00
$200.00
3
0241.0500 Remove Fence
0241 13
LF
2669
$4,00
$10.676.00
4
9999.0009 Remove Gravel Pvmt
00 00 00
SY
305
$8.00
S2 440.00
5
9999.0010 Remove CatOe Guard
00 00 00
EA
1
1 500.00
S1 500.00
6
9999.0011 Remove Roadway Barricade
00 0o DO
FA
1
$500.00
$500.00
7
9999.0012 Remove Overhead Line
00 00 00
LF
305
S6.00
$1,830,00
8
3291.0100 Topsoil
3291 19
CY
850
$28.00
$29 800.00
9
3213.0105 10" Conc Pvmt
32 1313
SY
1 14,861
$142.00
$2 110262.00
10
3216.0101 6" Conc Curb and Gutter
32 1613
LF
7644
$4.00
$30,576.00
11
3211.0502 8" Lime Treatment
32 11 29
BY
16133
$5,00
$80,665.00
12
3211.0400 Hydrated Lime
32 1129
TN
339
$295.00
$100A05.00
14
3213.0301 4" Conc Sidewalk
321320
SF
45846
$6.50
$297999.00
15
2605.3031 4" CONDT PVC SCH 40
26 05 33
LF
168D
S30.00
$50 400.00
16
2605.3011 2" CONDT PVC SCH 40
26 05 33
LF
1,680
$24.00
$40,320.00
17
9999.0013 6" CONDT PVC SCH 40 (T)
00 00 00
LF
1680
$40.00
$67 200.00
18
19999.0014 Remove Overhead Structures
00 09 00
EA
2
$1.000.00
S2.000.00
19
3292.0100 Block Sod Placement
32 92 13
SY
1 5096
$8.00
$40 768.00
20
3125.0101 SWPPP n 1 acre
31 25 00
LS.
1
$45.000.00
$45,000.00
21
3217.0102 6" SLD Pvmt Marking HAS
32 17 23
LF
8552
$5.00
$42 760.00
22
3217.0107 6" BRK Pvmt Markin HAS
32 1723
LF
1911
$5.00
$9.556.00
23
3217.2103 REFL Raised Marker TY II -A -A
321723
FA
198
$6.00
51188.00
24
3217.1003 Lane Legend DBL Arrow
32 1723
FA
13
$950.00
$12 350.00
25
3217.0403 18" SLD Pvmt Markin HAE 'v
32 1723
LF
51
$20.00
$1,020.00
26
3217.0504 Preformed Thermoplastic Contrast Markings - 24' Stop Bars
32 1723
LF
11
150.00
$550.00
27
3217.0201 8" SLD Pvmt Markin HAS
32 1723
LF
300
$7.00
$2100.00
28
3217.2104 REFL Raised Marker TY 11-C-R
32 1723
1 EA
1 16
$6.00
$96.00
29
3217.1002 Lane Legend Arrow
32 17 23
EA
1
$750.00
$750.00
30
3217.0501 24" SLD Pvml Markin HAE
32 17 23
LF
11
$30.00
$330.00
31
3441.4002 Fumish/Install Alum Sign Ground Mount TxDOT Sid.
3441 30
FA
2
$1 250.00
$2,500.00
32
3217.1004 Lane Legend Only
32 1723
EA
1
$750.00
$750.0
TAL.: PAVING MPROV M NTS
$2981380.00
CTFT OF FORT WORTS
STANDARD CONMUR IONSPECOCATIONTH10EA MS-DEl'F2.OPFAAWARDEDPROMi S
F.V.imMy22,2019 202-11 W4241 aid Ropnd_Abbili,%WPhuel P&D-OPLtcd
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Nnhilit W., Psvioc & Drama se
004243
DAP -BID PROPOSAL
P.S —
Bidder's Application
Prjx Item Inf—tim
Bidders N.1-1
Bidlirt
Item No.
Dewiptlon
Specift n
Section No.
Unit of
Measure
Bid
QveRtity
Ut,, Pri_
Bid Velue
ST EET LOGFIT P VEM NTS
1
2605.3015 2" CONDT PVC SCH 80 M
26 05 33
LF
3840
S20.0D
S76 800.00
2
3441.3051 Fumish/lnstall LED Lighting Fixture 137 watt ATB2 Cobra Head
3441 20
EA
-19
$800.00
$15 200.00
3
3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8
3441 20
EA
- 19 -
$1 800.00
$34 200.00
4
3441.3342 R Ilium TY 18 Pole
3441 20
EA
19
$3.800.00
$72 200.00
5
3441.1645 Fumishllnstall Type 33A Ann
344120
EA
19
$1,050.00
$19950.00
6
3441.3411 Reconnect Conductor
344120
EA
4
$1.200.00
$4.800.00
7
3441.1502 Ground Box Type B, YdA ron
3441 10
EA
. 2
$950.00
$1 900.00
8
13441.1405 NO 2 Insulated Else Condr
3441 10 J
LF
15060
$5.50
$82 830.00
STREETGHT IMPROVEMENTS
1 $307.880.00
Bid 8—y
This Bid is submitted by the mdty named below
TeW Cma ructim
BIDDER: BY: BROCK HU GINS
CONATSER CONSTRUCTION TX, L.P.
5327 WICHITA ST. TITLE: fIREfIDENT uov
FORT WORTH, TX 76119 DATE:
Cmtnct.r agree. m emtptete WORK fP. FINAL ACCEPTANCE w115" 220 woeldms day, af- th. del. wbm it.
CONTRACT wmmeo«a to — as provided to 1h. C —I Cmdiaoaa
END OF SECTION
C OFFORTWORM
STANDAPD CONSTR=10N SPECOCAT10N DOCUp@NTS-DEl'ELOPFA AWARDED PROJECTS
Fwm Vmim ALy 23.2019 2026032300424.111WRW dTbAyR'ry2 IPdD-Up&u
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Appendix
GG 4.01 Availability of Lands
GG 4.06 a ,,.,.dour Ewy -offf en4 i r ndition F Sito
GR-01 60 00 Product Requirements
END OF SECTION
Page 5 of 5
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 106376
Revised March 20, 2020
0045 12
DAP PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 45 12
DAP — PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type" box provide the complete major work t�, ,pe and actual description as provided by the Water
Department for water and sewer and TPW for paving
Major Work Type
Contractor/Subcontractor Company Name
Prequalification
Ex iration Date
Storm Drainage Improvements
q- 3 L' Z
Street Paving Improvements
tgf)sKUohar) LP.
1 I i 2O
Street and Pedestrian Lighting
Improvements
n
�t Yii9—PUC-r1- 1.C.iCn TX, L
112J,0129
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
5 a-� VV i C,)u -+ a Sfi . BY: 01"OC� fi1z-igg 1 �S
Ll/-wom t Tx -10 11
UU (Signature)
TITLE:
DATE:
END OF SECTION
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Form Version September 1, 2015 0045 12_Prequalification Statement 2015_DAP
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 2
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on
5 City Project No. 106376. Contractor further certifies that, pursuant to Texas Labor Code,
6 Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of
7 compliance with worker's compensation coverage.
.11
9 CONTRACTOR:
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Company
(Please Print)
wl C�4'�1to �t Signature:
Address
ffj-/+- WQ►/f-h ,T-A -7 o (+c.
City/State/Zip
THE STATE OF TEXAS §
COUNTY OFTARRANT §
Title: Y'c ! dc_.r*
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
Ejocj t Lcrj in S , known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the
same as the act and deed of CGTX , L. - P, forthe purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO. 106376
Revised April2, 2014
004526-2
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 2 of 2
1
2 9*0jty&\,N,KATHERINE ROSE(—�p,/t
NOTARY PUBLIC, STATE OF TEXAS
3 lour 133467933 Notary Public in and for the State of Texas
COMM-EXP. 11-30-2029
4
5 END OF SECTION
CITY OF FORT WORTH MOBILITY WAY— PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO. 106376
Revised April 2, 2014
1
2
3
4
5
6
7
8
005243-1
Developer Awarded Project Agreement
Page 1 of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on 06/03/26 _is made by and between the Developer,
(Hillwood Alliance Services, LLC), authorized to do business in Texas ("Developer") , and
Conatser Construction TX, LP, authorized to do business in Texas, acting by and through its
duly authorized representative, ("Contractor").
Developer and Contractor, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
9 Article 1. WORK
10
11
12
13
14
15
16
17
18
19
20
Contractor shall complete all Work as specified or indicated in the Contract Documents for
the Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:
CITY PROJECT NO...106376,
Article 3. CONTRACT TIME
3.1 Time is of the essence.
All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
Documents are of the essence to this Contract.
21 3.2 Final Acceptance.
22
23
24
25
26
27
The Work will be complete for Final Acceptance within 220working days after the date
when the Contract Time commences to run as provided in Paragraph 12.04 of the
Standard City Conditions of the Construction Contract for Developer Awarded
Projects.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised June 16, 2016
005243-2
Developer Awarded Project Agreement
Page 2 of 6
28 3.3 Liquidated damages
29 Contractor recognizes that time is of the essence of this Agreement and that
30 Developer will suffer financial loss if the Work is not completed within the times
31 specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance
32 with Article 10 of the Standard City Conditions of the Construction Contract for
33 Developer Awarded Projects. The Contractor also recognizes the delays, expense
34 and difficulties involved in proving in a legal proceeding the actual loss suffered by
35 the Developer if the Work is not completed on time. Accordingly, instead of requiring
36 any such proof , Contractor agrees that as liquidated damages for delay (but not as
37 a penalty), Contractor shall pay Developer N/A Dollars ($N/A) for each day that
38 expires after the time specified in Paragraph 3.2 for Final Acceptance until the City
39 issues the Final Letter of Acceptance.
40 Article 4. CONTRACT PRICE
41 Developer agrees to pay Contractor for performance of the Work in accordance with the
42 Contract Documents an amount in current funds of nine million. one hundred sixty-nine
43 thousand. one hundred eighteen Dollars
44 Article 5. CONTRACT DOCUMENTS
45 5.1 CONTENTS:
46 A. The Contract Documents which comprise the entire agreement between
47 Developer and Contractor concerning the Work consist of the following:
48 1. This Agreement.
49 2. Attachments to this Agreement:
50 a. Bid Form (As provided by Developer)
51 1) Proposal Form (DAP Version)
52 2) Prequalification Statement
53 3) State and Federal documents (project specific)
54 b. Insurance ACORD Form(s)
55 c. Payment Bond (DAP Version)
56 d. Performance Bond (DAP Version)
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised June 16, 2016
005243-3
Developer Awarded Project Agreement
Page 3 of 6
57 e. Maintenance Bond (DAP Version)
58 f. Power of Attorney for the Bonds
59 g. Worker's Compensation Affidavit
60 h. MBE and/or SBE Commitment Form (If required)
61 3. Standard City General Conditions of the Construction Contract for Developer
62 Awarded Projects.
63 4. Supplementary Conditions.
64 5. Specifications specifically made a part of the Contract Documents by
65 attachment or, if not attached, as incorporated by reference and described in
66 the Table of Contents of the Project's Contract Documents.
67 6. Drawings.
68 7. Addenda.
70
71
72
73
74
75
76
77
78
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract
Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised June 16, 2016
005243-4
Developer Awarded Project Agreement
Page 4 of 6
79 Article 6. INDEMNIFICATION
80 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its
81 own expense, the city, its officers, servants and employees, from and against any
82 and all claims arising out of, or alleged to arise out of, the work and services to be
83 performed by the contractor, its officers, agents, employees, subcontractors,
84 licenses or invitees under this contract. This indemnification provision is
85 specifically intended to operate and be effective even if it is alleged or proven that
86 all or some of the damages being sought were caused, in whole or in part, by any
87 act, omission or negligence of the city. This indemnity provision is intended to
88 include, without limitation, indemnity for costs, expenses and legal fees incurred
89 by the city in defending against such claims and causes of actions.
91 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own
92 expense, the city, its officers, servants and employees, from and against any and
93 all loss, damage or destruction of property of the city, arising out of, or alleged to
94 arise out of, the work and services to be performed by the contractor, its officers,
95 agents, employees, subcontractors, licensees or invitees under this contract.
96 This indemnification provision is specifically intended to operate and be effective
97 even if it is alleged or proven that all or some of the damages being sought were
98 caused in whole or in partby any act omission or negligence of the citv.
100 Article 7. MISCELLANEOUS
101 7.1 Terms.
102 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions
103 of the Construction Contract for Developer Awarded Projects.
104 7.2 Assignment of Contract.
105 This Agreement, including all of the Contract Documents may not be assigned by the
106 Contractor without the advanced express written consent of the Developer.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised June 16, 2016
005243-5
Developer Awarded Project Agreement
Page 5 of 6
107 7.3 Successors and Assigns.
108 Developer and Contractor each binds itself, its partners, successors, assigns and
109 legal representatives to the other party hereto, in respect to all covenants,
110 agreements and obligations contained in the Contract Documents.
111 7.4 Severability.
112 Any provision or part of the Contract Documents held to be unconstitutional, void or
113 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
114 remaining provisions shall continue to be valid and binding upon DEVELOPER and
115 CONTRACTOR.
116 7.5 Governing Law and Venue.
117 This Agreement, including at[ of the Contract Documents is performable in the State
118 of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for
119 the Northern District of Texas, Fort Worth Division.
120
121 7.6 Authority to Sign.
122 Contractor shall attach evidence of authority to sign Agreement, if other than duly
123 authorized signatory of the Contractor.
124
125 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in
126 multiple counterparts.
127
128 This Agreement is effective as of the last date signed bythe Parties ("Effective Date").
129
Contractor:
Developer:
t �Z.=' . --\ 1. �;��.�.»��9- \1�ay�e� S2�i�eS�LLC
1��2X0.S Ccx�nPa �y
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised June 16, 2016
130
005243-6
Developer Awarded Project Agreement
Page 6 of 6
By: k
(Si tore)
(Printed Na Ch) (Printed Name)
Title: Title:
an Com
Company Name: Company name:
Address: Address:
City/State/Zip: t } City/S
06/03/26
Date
06/03/26
Date
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, &STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised June 16, 2016
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
006125-1
CERTIFICATE OF INSURANCE
Page 1 of 1
SECTION 00 6125
CERTIFICATE OF INSURANCE
END OF SECTION
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO. 106376
Revised July 1, 2011
/ ' ®
' Bond No. 0275548
006213-1
PERFORMANCE BOND
Page I of 3
SECTION 00 62 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Conatser Construction TX, L.P. _ known as
8 "Principal" herein and Berklev Insurance Company , a corporate
9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, lHillwood
I I Alliance Services, LLCI. authorized to do business in Texas ("Developer") and the City of Fort
12 Worth, a Texas municipal corporation ("City"), in the penal sum of, nine million. one hundred
13 sixty-nine thousand. one hundred eiLhteen Dollars ($9,169,118.00), lawful money of the United
14 States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and
15 truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our
16 heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
17 presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number CFA25-0182: and
21 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
22 the 3 day of _ June , 20 26, which Contract is hereby referred to and made a
23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
24 and other accessories defined by law, in the prosecution of the Work, including any Change
25 Orders, as provided for in said Contract designated as Mobility Way.
26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
27 shall faithfully perform it obligations under the Contract and shall in all respects duly and
28 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
29 specifications, and contract documents therein referred to, and as well during any period of
30 extension of the Contract that may be granted on the part of the Developer and/or City, then this
31 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH MOBILITY WAY -PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
O'rHlVtPA?UJ UITV CC7PoDI'S'1t7tV11- DtYtLUMM AWAhDED PROJCCTO CITY PROJECT NO. 100370
Revised January 31, 2012
006213-2
PERFORMANCE BOND
Page 2 of ---
I PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6 accordance with the provisions of said statue.
7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
8 this instrument by duly authorized agents and officers on this the 3 day of June
9 , 2026. _
F
12
13
1.4
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
ATTEST:
(Principal) Secret
1\YC.JVLX- U-tR{t,L
Witness as to Principal
itness as to Surety
PRINCIPAL:
Conatser Construction TX, L.P.
BY:
Signature
Brock Huggins. President
Name and Title
Address: 5327 Wichita St.
SURETY:
Berklev In ura ce Company
Signature
Robbi Morales, Attorne ,-in-fact
Name and Title
Address: 5005 LBJ F_ reeway, Suite 1400
Dallas, TX 75244
Telephone Number: 214/989-0000
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
CITY OF FORT WORTH MOBILITY WAY -PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
S fANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
00 62 13- 3
PERFORMANCE BOND
Page 3 of 3
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH MOBILITY WAY -PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
Bond No. 0275548
006214- 1
PAYMENT BOND
Page 1 of 3
1 SECTION 00 62 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Conatser Construction TX, L.P. known as
8 "Principal" herein, and Berkley Insurance Company _ , a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
I Developer, Millwood Alliance Services, LLC). authorized to do business in Texas
12 "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal
13 sum of nine million. one hundred sixty-nine thousands one hundred ei:?hteen Dollars
14 ($9,169,118.00), lawful money of the United States, to be paid in Fort Worth, Tarrant County,
15 Texas, for the payment of which sum well and truly be made jointly unto the Developer and the
16 City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and
17 assigns, jointly and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number CFA25-0182: and
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the _ 3 day of June _ _, 20 26 , which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to fumish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as Mobilit. Way.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
30 force and effect.
tlf-Y OF FORT WORTH MOBILITY WAY-PAVtN6, DRAINACIE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
006214-2
PAYMENT BOND
Page 2 of 3
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statute.
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
this instrument by duly authorized agents and officers on this the 3 day of
June , 20 26
PRINCIPAL:
Conatser Construction TX,-L.P.
ATTEST: BY:
Signature Iva
(Principal) Se e ary
KOLA—" '
Witness as to Principal
ATTEST:
� C
(Surety) Secretary
ess as to Surety
Brock Huggins, President
Name and Title
Address: 5327 Wichita St.
Fort Worth, TX 76119
SURETY:
Berkley Insurance Com any
BY:
Signature
Robbi Morales, Attorney -in -fact
Name and Title
Address: 5005 LBJ Freewav, Suite 1400
Dallas, TX 75244
Telephone Number: _ 214/989-0000
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. if Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shal I not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH MOBILITY WAY -PAVING, DRAINAGE, a STREET LIGHT IMPROVEMENTS
DtiMT'!N/�0.H fd 1%�•iCjtIiN HI%iIdNiB - t�6Y 5Ld6 �0. AAMM0.df�H pRItIJ@ki'`s L`TY PItOJBCT NO. l Otl]7tl
Revised January 3I,2012
0062 14- 3
PAYMENT BOND
Page 3 of 3
CITY OF FORT WORTH MOBILITY WAY -PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
\Bond No. 0275548
006219- 1
MAINTENANCE BOND
Page 1 of 5
1 SECTION 00 6219
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we Conatser Construction TX, L.P. , known as
8 "Principal" herein and Berkley Insurance Company , a corporate surety
9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whetherone ormore), are held and firmly bound unto the Developer,
11 Hitlwood Alliance Services. LLC. authorized to do business in Texas ("Developer") and the
12 City of Fort Worth, a Texas municipal corporation ("City"), in the sum of,
13 Nine million. one hundred sixty-nine thousand. one hundred eighteen Dollars
14 ($9,169.118.001. lawful money of the United States, to be paid in Fort Worth, Tarrant County,
15 Texas, for payment of which sum well and truly be made jointly unto the Developer and the
16 City as dual obligees and their successors, we bind ourselves, our heirs, executors,
17 administrators, successors and assigns, jointly and severalty, firmly by these presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction
19 of community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number CFA25-0182: and
21 WHEREAS, the Principal has entered into a certain written contract with the
22 Developer awarded the 3 day of June------, 20 26 , which
23 Contract is hereby referred to and a made part hereof for all purposes as if fully set forth
24 herein, to furnish all materials, equipment labor and other accessories as defined by law, in
25 the prosecution of the Work, including any Work resulting from a duly authorized Change
26 Order (collectively herein, the "Work") as provided for in said Contract and designated as
27 MOBILITY WAY and
28 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
29 accordance with the plans, specifications and Contract Documents that the Work is and
CITY OF FORT WORTH MOBILITY WAY -PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 5
1 will remain free from defects inmate ria Is or workmanship for and during the period of two
2 (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period");
3 and
4 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
5 upon receiving notice from the Developer and/or City of the need thereof at any time within
6 the Maintenance Period.
7 NOW THEREFORE, the condition of this obligation is such that if Principal shall
8 remedy any defective Work, for which timely notice was provided by Developer or City, to a
9 completion satisfactory to the City, then this obligation shall become null and void;
10 otherwise to remain in full force and effect.
11 PROVIDED, HOWEVER, if Principal shalt fail so to repair or reconstruct any timely
12 noticed defective Work, it is agreed that the Developer or City may cause any and all such
13 defective Work to be repaired and/or reconstructed with all associated costs thereof being
14 borne by the Principal and the Surety under this Maintenance Bond; and
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas,
17 Fort Worth Division; and
18 PROVIDED FURTHER, that this obligation shall be continuous in nature and
19 successive recoveries may be had hereon for successive breaches.
20 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED
21 this instrument by duly authorized agents and officers on this the 3 day of
22 _ _ June 20 26
23
24
25
26
PRINCIPAL:
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
ATTEST:
(Principal) Secretary
Witness as to Principal
006219-3
MAINTENANCE BOND
Page 3 of 5
Conatser Construction TX. L.P.
Signature
Brock Huggins, President
Name and Title
Address:
5327 Wichita St.
SURETY:
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ATTEST:
(Surety) Secretary
006219-4
MAINTENANCEBOND
Page 4 of 5
Berkley Insurance Company
Signature
Robbi Morales, Attorney -in -fact
Name and Title
Address:
5005 LBJ Freeway, Suite 1400
Dallas, TX 75244
Wit es as to S rety Telephone Number:
214/989-0000
*Note: If signed by an officer of the Surety Company, there must be on file a certified
extract from the by-laws showing that this person has authority to sign such
obligation. If Surety's physical address is different from its mailing address, both
must be provided.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January 31, 2012
F
006219-5
MAINTENANCE BOND
Page 5 of 5
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS- DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised January3l, 2012
No. BI-72801-el
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell, Sophinie Hunter,
Robbi Morales; Kelly A. Westbrook, Tina McEwan, Joshua Saunders; Tonie Petranek; or Mikaela Peppers of Aon Risk
Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the
same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its
principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney -in -fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN WITNESS VaMREOF, the Company has caused these present_ to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this 2d day of Aft . 2024
`saaax�E Attest:Berkley Insurance Company
r
�>�r9ri�Urr : L
W�511I Ix: By _ j By
Philip S. ielt Jef e'N1,112fi
r�weas f Executive Vice President & Secretary Senior Vice President
STATE OF CON IECTICUT )
) ss:
COUNT' OF FAIRFIELD )
Sworn to before me, a Notary Public in the State of Connecticut. this 2d day of Nia ry 2024 , by Philip S. Welt and
Jeffrey M. Hafter who are sworn to me to be. the Executive Vice President and Secretary, and the Senior Vice President,
respectively, of Berkley Insurance Company ,
LVJ M Q RUNDSAKE N rat dj } %. _ d � , ••
NOTARY PllBW Notary Public, State of Connecticut
0DNNEC7X 1JT
WOOMM MMON Dfi' RM 044W2M CERTIFICATE
I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a
true, correct and complete copy of the original Power of Attorney, that said Power of Attorney has not been revoked or rescinded
and that the authority of the Attorney -in -Fact set fordo therein. who executed the bond or undertaking to which this Power of
Att6' �'� l#ached, is in final force and effect as of this date.
�� r'�n"Y3Fise .under my hand and seal of the Company, this day of
Vincent P Forte
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Berkley Surety Group, LLC and its affiliates by
telephone for information or to make a complaint:
BERKLEY SURETY GROUP, LLC
Please send all notices of claim on this bond to:
Berkley Surety Group, LLC
(866) 768-3534
412 Mount Kemble Avenue, Suite 31ON
Morristown, NJ 07960
Attn: Surety Claims Department
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://Www.tdi.state.tx.us
E-mail: ConsumerProtection cDtdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim
you should contact your agent or Berkley Surety Group, LLC first. If
the dispute is not resolved, you may contact the Texas Department of
Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or
condition of the attached document and is given to comply with Texas
legal and regulatory requirements.
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Page
Article 1 — Definitions and Terminology....................................................................................................... I
1.01 Defined Terms..........................................................................................................................1
1.02 Terminology.............................................................................................................................5
Article2 —
Preliminary Matters.....................................................................................................................6
2.01
Before Starting Construction.....................................................................................................6
2.02
Preconstruction Conference......................................................................................................6
2.03
Public Meeting..........................................................................................................................6
Article 3 — Contract Documents and Amending............................................................................................6
3.01 Reference Standards..................................................................................................................6
3.02 Amending and Supplementing Contract Documents................................................................ 6
Article4 — Bonds and Insurance...................................................................................................................7
4.01 Licensed Sureties and Insurers..................................................................................................7
4.02 Performance, Payment, and Maintenance Bonds..................................................................... 7
4.03 Certificates of Insurance...........................................................................................................7
4.04 Contractor's Insurance..............................................................................................................9
4.05 Acceptance of Bonds and Insurance; Option to Replace........................................................ 12
Article 5 —
Contractor's Responsibilities.....................................................................................................12
5.01
Supervision and Superintendent.............................................................................................
12
5.02
Labor; Working Hours...........................................................................................................
13
5.03
Services, Materials, and Equipment.......................................................................................
13
5.04
Project Schedule....................................................................................................................
14
5.05
Substitutes and "Or-Equals"..................................................................................................
14
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors) ...................................
16
5.07
Concerning Subcontractors, Suppliers, and Others.................................................................
16
5.08
Wage Rates............................................................................................................................
18
5.09
Patent Fees and Royalties.......................................................................................................
19
5.10
Laws and Regulations............................................................................................................
19
5.11
Use of Site and Other Areas...................................................................................................
19
5.12
Record Documents.................................................................................................................
20
5.13
Safety and Protection.............................................................................................................
21
5.14
Safety Representative.............................................................................................................
21
5.15
Hazard Communication Programs.........................................................................................
22
5.16
Submittals..............................................................................................................................
22
5.17
Contractor's General Warranty and Guarantee.......................................................................
23
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
5.18
Indemnification......................................................................................................................
24
5.19
Delegation of Professional Design Services...........................................................................
24
5.20
Right to Audit: .......................................................................................................................
25
5.21
Nondiscrimination.................................................................................................................25
Article 6 - Other Work at the Site.............................................................................................................. 26
6.01 Related Work at Site.............................................................................................................. 26
Article 7 - City's Responsibilities............................................................................................................. 26
7.01 Inspections, Tests, and Approvals.......................................................................................... 26
7.02 Limitations on City's Responsibilities................................................................................... 26
7.03 Compliance with Safety Program........................................................................................... 27
Article 8 - City's Observation Status During Construction.........................................................................27
8.01 City's Project Representative................................................................................................. 27
8.02 Authorized Variations in Work.............................................................................................. 27
8.03 Rejecting Defective Work...................................................................................................... 27
8.04 Determinations for Work Performed...................................................................................... 28
Article9 - Changes in the Work................................................................................................................ 28
9.01 Authorized Changes in the Work........................................................................................... 28
9.02 Notification to Surety............................................................................................................. 28
Article 10 - Change of Contract Price; Change of Contract Time...............................................................28
10.01 Change of Contract Price....................................................................................................... 28
10.02 Change of Contract Time....................................................................................................... 28
10.03 Delays.................................................................................................................................... 28
Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ..................... 29
11.01 Notice of Defects................................................................................................................... 29
11.02 Access to Work...................................................................................................................... 29
11.03 Tests and Inspections............................................................................................................. 29
11.04 Uncovering Work................................................................................................................... 30
11.05 City May Stop the Work........................................................................................................ 30
11.06 Correction or Removal of Defective Work............................................................................. 30
11.07 Correction Period................................................................................................................... 30
11.08 City May Correct Defective Work......................................................................................... 31
Article12 -Completion ..............................................................................................................................32
12.01 Contractor's Warranty of Title............................................................................................... 32
12.02 Partial Utilization................................................................................................................... 32
12.03 Final Inspection..................................................................................................................... 32
12.04 Final Acceptance.................................................................................................................... 33
Article 13 - Suspension of Work................................................................................................................33
13.01 City May Suspend Work........................................................................................................ 33
Article14 - Miscellaneous........................................................................................................................ 34
14.01 Giving Notice........................................................................................................................ 34
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
14.02 Computation of Times........................................................................................................... 34
14.03 Cumulative Remedies............................................................................................................ 34
14.04 Survival of Obligations.......................................................................................................... 35
14.05 Headings................................................................................................................................ 35
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Pagel of35
ARTICLE 1— DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
C. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
I . Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
in. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
P. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans — See definition ofDrawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6: 00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples —Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made apart of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of apart of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours — Hours beginning at 9: 00 a.m. and ending at S: 00 p. m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal
holidays authorized by the City for contract purposes, in which weather or other conditions
not under the control of the Contractor will permit the performance of the principal unit of
work underway for a continuous period of not less than 7 hours between 7
a.m. and 6p.m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty or authority
to supervise or direct the performance of the Work or any duty or authority to undertake
responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4 — BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other
insurance or self-insurance programs afforded to the City. The Commercial General Liability
policy, shall have no exclusions by endorsements that would alter of nullify premises/operations,
products/completed operations, contractual, personal injury, or advertising injury, which are
normally contained with the policy, unless the City approves such exclusions in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of35
1) $1, 000, 000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by:
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate:
b. Each Occurrence: :
Enter limits provided by Railroad Company (If none, write none)
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and "Or -Equals"
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of35
❑ Required for this Contract.
(Check this box if there is any City Participation)
❑ Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10-18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
❑ Required for this Contract.
❑ Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's
determination that there is good cause to believe the Contractor or Subcontractor has violated
Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the
difference between wages paid and wages due under the prevailing wage rates, such amounts
being subtracted from successive progress payments pending a final determination of the
violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
F
00 73 10-19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and OtherAneas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page21 of35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to perform
the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.B. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6 — OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work performed
by others under this Article 7, Contractor shall inspect such other work and promptly report to
City in writing any delays, defects, or deficiencies in such other work that render it unavailable
or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so
report will constitute an acceptance of such other work as fit and proper for integration with
Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7 — CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City sProjectRepresentative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 — CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly
proceed with the Work involved which will be performed under the applicable conditions of the
Contract Documents (except as otherwise specifically provided). Extra Work shall be
memorialized by a Participating Change Order which may or may not precede an order of Extra
work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page31 of35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 — COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 — SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 — MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other parry.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
00 73 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised: January 10, 2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 01 11 00
SUMMARY OF WORK
011100-1
DAP SUMMARY OF WORK
Pagel of 3
5 A. Section Includes:
6 1. Summary of Work to be performed in accordance with the Contract Documents
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
11 2. Division 1 - General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
1. Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
3. Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT NO. 106376
Revised December 20, 2012
011100-2
DAP SUMMARY OF WORK
Page 2 of 3
1 b. Excavated and waste materials shall be stored in such a way as not to interfere
2 with the use of spaces that may be designated to be left free and unobstructed
3 and so as not to inconvenience occupants of adjacent property.
4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such
5 manner as not to interfere with the operation of the railroad.
6 1) All Work shall be in accordance with railroad requirements set forth in
7 Division 0 as well as the railroad permit.
8
D. Work within Easements
9
1.
Do not enter upon private property for any purpose without having previously
10
obtained permission from the owner of such property.
11
2.
Do not store equipment or material on private property unless and until the
12
specified approval of the property owner has been secured in writing by the
13
Contractor and a copy furnished to the City.
14
3.
Unless specifically provided otherwise, clear all rights -of -way or easements of
15
obstructions which must be removed to make possible proper prosecution of the
16
Work as a part of the project construction operations.
17
4.
Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
18
lawns, fences, culverts, curbing, and all other types of structures or improvements,
19
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
20
appurtenances thereof, including the construction of temporary fences and to all
21
other public or private property adjacent to the Work.
22
5.
Notify the proper representatives of the owners or occupants of the public or private
23
lands of interest in lands which might be affected by the Work.
24
a. Such notice shall be made at least 48 hours in advance of the beginning of the
25
Work.
26
b. Notices shall be applicable to both public and private utility companies and any
27
corporation, company, individual, or other, either as owners or occupants,
28
whose land or interest in land might be affected by the Work.
29
c. Be responsible for all damage or injury to property of any character resulting
30
from any act, omission, neglect, or misconduct in the manner or method or
31
execution of the Work, or at any time due to defective work, material, or
32
equipment.
33 6. Fence
34 a. Restore all fences encountered and removed during construction of the Project
35 to the original or a better than original condition.
36 b. Erect temporary fencing in place of the fencing removed whenever the Work is
37 not in progress and when the site is vacated overnight, and/or at all times to
38 provide site security.
39 c. The cost for all fence work within easements, including removal, temporary
40 closures and replacement, shall be subsidiary to the various items bid in the
41 project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT NO. 106376
Revised December 20, 2012
011100-3
DAP SUMMARY OF WORK
Page 3 of 3
1 1.5
SUBMITTALS [NOT USED]
2 1.6
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
3 1.7
CLOSEOUT SUBMITTALS [NOT USED]
4 1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9
QUALITY ASSURANCE [NOT USED]
6 1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.11
FIELD [SITE] CONDITIONS [NOT USED]
8 1.12
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
12
13
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT NO. 106376
Revised December 20, 2012
012500-1
DAP SUBSTITUTION PROCEDURES
SECTION 0125 00
SUBSTITUTION PROCEDURES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of
1. The procedure for requesting the approval of substitution of a product that is not
equivalent to a product which is specified by descriptive or performance criteria or
defined by reference to 1 or more of the following:
a. Name of manufacturer
b. Name of vendor
c. Trade name
d. Catalog number
2. Substitutions are not "or -equals".
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 General Requirements
IRM9 S 14jW.1`I77WdUlIMel 8W T114041111.4V
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid. No
separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place of
those specified.
2. Certain types of equipment and kinds of material are described in Specifications by
means of references to names of manufacturers and vendors, trade names, or catalog
numbers.
a. When this method of specifying is used, it is not intended to exclude from
consideration other products bearing other manufacturer's or vendor's names,
trade names, or catalog numbers, provided said products are "or -equals," as
determined by City.
3. Other types of equipment and kinds of material may be acceptable substitutions
under the following conditions:
a. Or -equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors beyond control of Contractor;
or,
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, &STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO.106376
Revised August 30, 2013
012500-2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
b. Contractor proposes a cost and/or time reduction incentive to the City.
1.5 SUBMITTALS
A. See Request for Substitution Form (attached)
B. Procedure for Requesting Substitution
1. Substitution shall be considered only:
a. After award of Contract
b. Under the conditions stated herein
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Complete data substantiating compliance of proposed substitution with
Contract Documents
2) Data relating to changes in construction schedule, when a reduction is
proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number and representative contact name
c) Specification Section or Drawing reference of originally specified
product, including discrete name or tag number assigned to original
product in the Contract Documents
2) Manufacturer's literature clearly marked to show compliance of proposed
product with Contract Documents
3) Itemized comparison of original and proposed product addressing product
characteristics including, but not necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrical or mechanical requirements
4) Product experience
a) Location of past projects utilizing product
b) Name and telephone number of persons associated with referenced
projects knowledgeable concerning proposed product
c) Available field data and reports associated with proposed product
5) Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
1. Written approval or rejection of substitution given by the City
2. City reserves the right to require proposed product to comply with color and pattern
of specified product if necessary to secure design intent.
3. In the event the substitution is approved, if a reduction in cost or time results, it will
be documented by Change Order.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, &STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO.106376
Revised August 30, 2013
012500-3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
4. Substitution will be rejected ii
a. Submittal is not through the Contractor with his stamp of approval
b. Request is not made in accordance with this Specification Section
c. In the Developer's opinion, acceptance will require substantial revision of the
original design
d. In the City's or Developer's opinion, substitution will not perform adequately
the function consistent with the design intent
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. In making request for substitution or in using an approved product, the Contractor
represents that the Contractor:
1. Has investigated proposed product, and has determined that it is adequate or
superior in all respects to that specified, and that it will perform function for which it
is intended
2. Will provide same guarantee for substitute item as for product specified
3. Will coordinate installation of accepted substitution into Work, to include building
modifications if necessary, making such changes as may be required for Work to be
complete in all respects
4. Waives all claims for additional costs related to substitution which subsequently
arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, &STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO.106376
Revised August 30, 2013
012500-4
DAP SUBSTITUTION PROCEDURES
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
TO:
Page 4 of 4
PROJECT: DATE:
We hereby submit for your consideration the following product instead of the specified item for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: For Use by City
Signature
as noted
Firm
Address
Date
Telephone
For Use by City:
Approved
City
Recommended
Not recommended
By _
Date
Remarks
Rejected
Date
Recommended
Received late
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, &STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO.106376
Revised August 30, 2013
01 31 19 - 1
DAP PRECONSTRUCTION MEETING
SECTION 013119
PRECONSTRUCTION MEETING
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 3
1. Provisions for the preconstruction meeting to be held prior to the start of Work to
clarify construction contract administration procedures
B. Deviations from this City of Fort Worth Standard Specification
1. No construction schedule required unless requested by the City.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Attend preconstruction meeting.
2. Representatives of Contractor, subcontractors and suppliers attending meetings
shall be qualified and authorized to act on behalf of the entity each represents.
3. Meeting administered by City may be tape recorded.
a. If recorded, tapes will be used to prepare minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A preconstruction meeting will be held within 14 days after the delivery of the
distribution package to the City.
a. The meeting will be scheduled and administered by the City.
2. The Project Representative will preside at the meeting, prepare the notes of the
meeting and distribute copies of same to all participants who so request by fully
completing the attendance form to be circulated at the beginning of the meeting.
3. Attendance shall include:
a. Developer and Consultant
b. Contractor's project manager
c. Contractor's superintendent
d. Any subcontractor or supplier representatives whom the Contractor may desire
to invite or the City may request
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August 30, 2013
01 31 19 - 2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
£ Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
in. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
f£ Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
J. Questions or Comments
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August 30, 2013
01 31 19 - 3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August 30, 2013
013233-1
DAP PRECONSTRUCTION VIDEO
Page 1 of
SECTION 0132 33
PRECONSTRUCTION VIDEO
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for:
a. Preconstruction Videos
B. Deviations from this City of Fort Worth Standard Specification
1. Though not mandatory, it is highly recommended on infill developer projects.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produce a preconstruction video of the site/alignment, including all areas in the
vicinity of and to be affected by construction.
a. Provide digital copy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
period.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August 30, 2013
01 32 33 - 2
DAP PRECONSTRUCTION VIDEO
Page 2 of 2
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August 30, 2013
013513-1
DAP SPECIAL PROJECT PROCEDURES
Page I of 7
1 SECTION 0135 13
2 SPECIAL PROJECT PROCEDURES
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedures for special project circumstances that includes, but is not limited to:
7 a. Coordination with the Texas Department of Transportation
8 b. Work near High Voltage Lines
9 c. Confined Space Entry Program
10 d. Air Pollution Watch Days
11 e. Use of Explosives, Drop Weight, Etc.
12 f. Water Department Notification
13 g. Public Notification Prior to Beginning Construction
14 h. Coordination with United States Army Corps of Engineers
15 i. Coordination within Railroad permits areas
16 j. Dust Control
17 k. Employee Parking
18 B. Deviations from this City of Fort Worth Standard Specification
19 1. None.
20 C. Related Specification Sections include, but are not necessarily limited to:
21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
22 2. Division 1— General Requirements
23 3. Section 33 12 25 — Connection to Existing Water Mains
24
25 1.2 REFERENCES
26 A. Reference Standards
27 1. Reference standards cited in this Specification refer to the current reference
28 standard published at the time of the latest revision date logged at the end of this
29 Specification, unless a date is specifically cited.
30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
31 High Voltage Overhead Lines.
32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction
33 Specification
34 1.3 ADMINISTRATIVE REQUIREMENTS
35 A. Coordination with the Texas Department of Transportation
36 1. When work in the right-of-way which is under the jurisdiction of the Texas
37 Department of Transportation (TxDOT):
38 a. Notify the Texas Department of Transportation prior to commencing any work
39 therein in accordance with the provisions of the permit
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
01 35 13 - 2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
b. All work performed in the TxDOT right-of-way shall be performed in
compliance with and subject to approval from the Texas Department of
Transportation
B. Work near High Voltage Lines
1. Regulatory Requirements
a. All Work near High Voltage Lines (more than 600 volts measured between
conductors or between a conductor and the ground) shall be in accordance with
Health and Safety Code, Title 9, Subtitle A, Chapter 752.
2. Warning sign
a. Provide sign of sufficient size meeting all OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage -type of guard about the boom or arm
b. Insulator links on the lift hook connections for back hoes or dippers
c. Equipment must meet the safety requirements as set forth by OSHA and the
safety requirements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
a. Notification shall be given to:
1) The power company (example: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
b. Coordination with power company
1) After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de -energize the lines, or raise or
lower the lines
c. No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Space Entry Program
1. Provide and follow approved Confined Space Entry Program in accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. All other confined spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Use of Explosives, Drop Weight, Etc.
1. When Contract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to commencing.
2) Minimum 24 hour public notification in accordance with Section 0131 13
E. Water Department Coordination
1. During the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to determine the best times for deactivating and activating
those lines.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
0135 13 - 3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
1 2. Coordinate any event that will require connecting to or the operation of an existing
2 City water line system with the City's representative.
3 a. Coordination shall be in accordance with Section 33 12 25.
4 b. If needed, obtain a hydrant water meter from the Water Department for use
5 during the life of named project.
6 c. In the event that a water valve on an existing live system be turned off and on
7 to accommodate the construction of the project is required, coordinate this
8 activity through the appropriate City representative.
9 1) Do not operate water line valves of existing water system.
10 a) Failure to comply will render the Contractor in violation of Texas Penal
11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor
12 will be prosecuted to the full extent of the law.
13 b) In addition, the Contractor will assume all liabilities and
14 responsibilities as a result of these actions.
15 F. Public Notification Prior to Beginning Construction
16 1. Prior to beginning construction on any block in the project, on a block by block
17 basis, prepare and deliver a notice or flyer of the pending construction to the front
18 door of each residence or business that will be impacted by construction. The notice
19 shall be prepared as follows:
20 a. Post notice or flyer 7 days prior to beginning any construction activity on each
21 block in the project area.
22 1) Prepare flyer on the Contractor's letterhead and include the following
23 information:
24 a) Name of Project
25 b) City Project No (CPN)
26 c) Scope of Project (i.e. type of construction activity)
27 d) Actual construction duration within the block
28 e) Name of the contractor's foreman and phone number
29 f) Name of the City's inspector and phone number
30 g) City's after-hours phone number
31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit
32 A.
33 3) Submit schedule showing the construction start and finish time for each
34 block of the project to the inspector.
35 4) Deliver flyer to the City Inspector for review prior to distribution.
36 b. No construction will be allowed to begin on any block until the flyer is
37 delivered to all residents of the block.
38 G. Public Notification of Temporary Water Service Interruption during Construction
39 1. In the event it becomes necessary to temporarily shut down water service to
40 residents or businesses during construction, prepare and deliver a notice or flyer of
41 the pending interruption to the front door of each affected resident.
42 2. Prepared notice as follows:
43 a. The notification or flyer shall be posted 24 hours prior to the temporary
44 interruption.
45 b. Prepare flyer on the contractor's letterhead and include the following
46 information:
47 1) Name of the project
48 2) City Project Number
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
01 35 13 - 4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
3) Date of the interruption of service
4) Period the interruption will take place
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector
for review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USAGE)
At locations in the Project where construction activities occur in areas where
USACE permits are required, meet all requirements set forth in each designated
permit.
I. Coordination within Railroad Permit Areas
At locations in the project where construction activities occur in areas where
railroad permits are required, meet all requirements set forth in each designated
railroad permit. This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the
Railroad Company from damage arising out of and/or from the construction of
the project. Proper utility clearance procedures shall be used in accordance
with the permit guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
0135 13 - 5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
1 1.4
SUBMITTALS [NOT USED]
2 1.5
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
3 1.6
CLOSEOUT SUBMITTALS [NOT USED]
4 1.7
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.8
QUALITY ASSURANCE [NOT USED]
6 1.9
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.10
FIELD [SITE] CONDITIONS [NOT USED]
8 1.11
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11
12
13
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
1.3.13— Added requirement of compliance with Health and Safety Code, Title 9.
Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
01 35 13 -6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
2
3
4
Date:
EXHIBIT B
FORT WORTH
DOS NO. XICEX
Project Marne:
0135 13 - 7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER)
OR
MR. AT
(CITY INSPECTOR) (TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
CONTRACTOR
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised August, 30, 2013
01 45 23
DAP TESTING AND INSPECTION SERVICES
Pagel of 2
SECTION 0145 23
TESTING AND INSPECTION SERVICES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordination
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to the City's document management system, or another form of
distribution approved by the City.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised March 20, 2020
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
[,�Z111� Ifh ll•/`.Y.Y11:7\�[�1 �1►`[�YIli1.y �i 7'
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
03/20/2020
D.V. Magana
Removed reference to Buzzsaw and noted that electronic submittals be uploaded
through the City's document management system.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised March 20, 2020
015000-1
DAP TEMPORARY FACILITIES AND CONTROLS
Page 1 of
SECTION 0150 00
TEMPORARY FACILITIES AND CONTROLS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Provide temporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b. Sanitary facilities
c. Storage Sheds and Buildings
d. Dust control
e. Temporary fencing of the construction site
B. Deviations from this City of Fort Worth Standard Specification
1m►"
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Temporary Utilities
Obtaining Temporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules and regulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, heat and other utility services necessary for
execution, completion, testing and initial operation of Work.
Water
a. Contractor to provide water required for and in connection with Work to be
performed and for specified tests of piping, equipment, devices or other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised JULY I, 2011
015000-2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and others performing work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off -site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Final Acceptance.
D. Temporary Fencing
1. Provide and maintain for the duration or construction when required in contract
documents
E. Dust Control
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised JULY 1, 2011
015000-3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1. Contractor is responsible for maintaining dust control through the duration of the
project.
a. Contractor remains on -call at all times
b. Must respond in a timely manner
F. Temporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporary Facilities
1. Maintain all temporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE -INSTALLATION
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised JULY 1, 2011
015000-4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1. Remove all temporary facilities and restore area after completion of the Work, to a
condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised JULY I, 2011
01 55 26 -1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Pagel of 3
SECTION 0155 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative procedures for:
a. Street Use Permit
b. Modification of approved traffic control
c. Removal of Street Signs
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
3. Section 34 71 13 — Traffic Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES
A. Reference Standards
1. Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
1.4 ADMINISTRATIVE REQUIREMENTS
A. Traffic Control
General
a. When traffic control plans are included in the Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
b. When traffic control plans are not included in the Drawings, prepare traffic
control plans in accordance with Section 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for review of proposed Traffic Control.
B. Street Use Permit
1. Prior to installation of Traffic Control, a City Street Use Permit is required.
a. To obtain Street Use Permit, submit Traffic Control Plans to City
Transportation and Public Works Department.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised July 1, 2011
01 55 26 - 2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
1. Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Street Sign
1. If it is determined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirements of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD).
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised July 1, 2011
01 55 26 - 3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised July 1, 2011
015713-1
DAP STORM WATER POLLUTION PREVENTION
Pagel of 3
SECTION 0157 13
STORM WATER POLLUTION PREVENTION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1 — General Requirements
3. Section 3125 00 —Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Activities resulting in less than 1 acre of disturbance
a. Work associated with this Item is considered subsidiary to the various Items
bid. No separate payment will be allowed for this Item.
2. Construction Activities resulting in greater than 1 acre of disturbance
a. Measurement and Payment shall be in accordance with Section 3125 00.
1.3 REFERENCES
A. Abbreviations and Acronyms
1. Notice of Intent: NOI
2. Notice of Termination: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on Environmental Quality: TCEQ
5. Notice of Change: NOC
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Integrated Storm Management (iSWM) Technical Manual for Construction
Controls
1.4 ADMINISTRATIVE REQUIREMENTS
A. General
1. Contractor is responsible for resolution and payment of any fines issued associated
with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised July 1, 2011
01 57 13 - 2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 3125 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
`lWIMYiJ3u inrl cl
A. SWPPP
Submit in accordance with Section 01 33 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised July 1, 2011
01 57 13 - 3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
B. Modified SWPPP
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
in accordance with Section 0133 00.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised July 1, 2011
SECTION 0160 00
PRODUCT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
01 60 00
DAP PRODUCT REQUIREMENTS
Pagel of 2
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A list of City approved products for use is available through the City's website at:
https:Happs.fortworthtexas.gov/ProiectResources/ and following the directory
path: 02 - Construction Documents\Standard Products List
A. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
B. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
C. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
D. See Section 0133 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised March 20, 2020
01 60 00
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
10/12/12
D. Johnson
Modified Location of City's Standard Product List
4/7/2014
M.Domenech
Revised for DAP application
03/20/2020
D.V. Magana
Removed reference to Buzzsaw and noted that the City approved products list is
accessible through the City's website.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised March 20, 2020
01 66 00 - 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page I of
SECTION 0166 00
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Scheduling of product delivery
2. Packaging of products for delivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
016600-2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
4. Deliver products or equipment in manufacturer's original unbroken cartons or other
containers designed and constructed to protect the contents from physical or
environmental damage.
5. Clearly and fully mark and identify as to manufacturer, item and installation
location.
6. Provide manufacturer's instructions for storage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
manufacturer's recommendations and instructions.
C. Storage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Make necessary provisions for safe storage of materials and equipment.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts of Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locations that will
cause minimum inconvenience to other contractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
4. Restrict storage to areas available on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide off -site storage and protection when on -site storage is not adequate.
a. Provide addresses of and access to off -site storage locations for inspection by
City's Project Representative.
6. Do not use lawns, grass plots or other private property for storage purposes without
written permission of owner or other person in possession or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and compactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property owners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public and private driveways and street crossings open.
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
satisfaction of City's Project Representative.
a. Total length which materials may be distributed along route of construction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Representative.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
016600-3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. Tests and Inspections
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non -Conforming Work
1. Reject all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017000-1
DAP MOBILIZATION AND REMOBILIZATION
Page 1 of
SECTION 0170 00
MOBILIZATION AND REMOBILIZATION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mobilization and Demobilization
a. Mobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payment bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another location within the designated Site
5) Relocation of necessary general facilities for the Contractor's operation
from 1 location to another location on the Site.
b. Demobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Removal of all buildings and/or other facilities assembled at the Site for this
Contract
c. Mobilization and Demobilization do not include activities for specific items of
work that are for which payment is provided elsewhere in the contract.
Remobilization
a. Remobilization for Suspension of Work specifically required in the Contract
Documents or as required by City includes:
1) Demobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly or temporarily securing
equipment, supplies, and other facilities as designated by the Contract
Documents necessary to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) Remobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site necessary to resume the Work.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site necessary to resume the Work.
3) No Payments will be made for:
a) Mobilization and Demobilization from one location to another on the
Site in the normal progress of performing the Work.
b) Stand-by or idle time
c) Lost profits
3. Mobilizations and Demobilization for Miscellaneous Projects
a. Mobilization and Demobilization
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017000-2
DAP MOBILIZATION AND REMOBILIZATION
Page 2 of 4
1) Mobilization shall consist of the activities and cost on a Work Order basis
necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site for the issued Work Order.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site for the issued Work Order
2) Demobilization shall consist of the activities and cost necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removal of all buildings or other facilities assembled at the Site for
each Work Oder
b. Mobilization and Demobilization do not include activities for specific items of
work for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
a. A Mobilization for Miscellaneous Projects when directed by the City and the
mobilization occurs within 24 hours of the issuance of the Work Order.
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Mobilization and Demobilization
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and materials furnished in accordance with this Item
are subsidiary to the various Items bid and no other compensation will be
allowed.
Remobilization for suspension of Work as specifically required in the Contract
Documents
a. Measurement
1) Measurement for this Item shall be per each remobilization performed.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Specified Remobilization" in accordance with Contract
Documents.
c. The price shall include:
1) Demobilization as described in Section 1.1.A.2.a.1)
2) Remobilization as described in Section 1.1.A.2.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017000-3
DAP MOBILIZATION AND REMOBILIZATION
Page 3 of 4
Remobilization for suspension of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Claim in accordance with Article 10
of Section 00 72 00.
2) No payments will be made for standby, idle time, or lost profits associated
with this Item.
4. Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Mobilization" in accordance with Contract
Documents. Demobilization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price shall include:
1) Mobilization as described in Section 1.1.A.3.a.1)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and
Demobilization required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Emergency Mobilization" in accordance with
Contract Documents. Demobilization shall be considered subsidiary to
mobilization and shall not be paid for separately.
c. The price shall include
1) Mobilization as described in Section 1.1.A.4.a)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
110 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 70 00 - 4
DAP MOBILIZATION AND REMOBILIZATION
Page 4 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017123-1
CONSTRUCTION STAKING AND SURVEY
Page 1 of 8
1 SECTION 0171 23
2 CONSTRUCTION STAKING AND SURVEY
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Requirements for construction staking and construction survey
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. See Changes (Highlighted in Yellow).
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1— General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A. Measurement and Payment
1. Construction Staking
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will
be allowed.
2. Construction Survey
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will be
allowed.
3. As -Built Survey
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will be
allowed.
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
017123-2
CONSTRUCTION STAKING AND SURVEY
Page 2 of 8
1.3 REFERENCES
A. Definitions
1. Construction Survey - The survey measurements made prior to or while
construction is in progress to control elevation, horizontal position, dimensions and
configuration of structures/improvements included in the Project Drawings.
2. As -built Survey —The measurements made after the construction of the
improvement features are complete to provide position coordinates for the features
of a project.
3. Construction Staking — The placement of stakes and markings to provide offsets
and elevations to cut and fill in order to locate on the ground the designed
structures/improvements included in the Project Drawings. Construction staking
shall include staking easements and/or right of way if indicated on the plans.
4. Survey "Field Checks" — Measurements made after construction staking is
completed and before construction work begins to ensure that structures marked on
the ground are accurately located per Project Drawings.
B. Technical References
1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw
website) — 01 71 23.16.01— Attachment A Survey Staking Standards
2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available
on City's Buzzsaw website).
3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision
4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land
Surveying in the State of Texas, Category 5
25 1.4 ADMINISTRATIVE REQUIREMENTS
26 A. The Contractor's selection of a surveyor must comply with Texas Government
27 Code 2254 (qualifications based selection) for this project.
28 1.5 SUBMITTALS
29 A. Submittals, if required, shall be in accordance with Section 0133 00.
30 B. All submittals shall be received and reviewed by the City prior to delivery of work.
31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
32 A. Field Quality Control Submittals
33 1. Documentation verifying accuracy of field engineering work, including coordinate
34 conversions if plans do not indicate grid or ground coordinates.
35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City
36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards).
37
38 1.7 CLOSEOUT SUBMITTALS
39 B. As -built Redline Drawing Submittal
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
017123-3
CONSTRUCTION STAKING AND SURVEY
Page 3 of 8
1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of
2 constructed improvements signed and sealed by Registered Professional Land
3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A
4 — Survey Staking Standards) .
5 2. Contractor shall submit the proposed as -built and completed redline drawing
6 submittal one (1) week prior to scheduling the project final inspection for City
7 review and comment. Revisions, if necessary, shall be made to the as -built redline
Is drawings and resubmitted to the City prior to scheduling the construction final
9 inspection.
10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
12 A. Construction Staking
13 1. Construction staking will be performed by the Contractor.
14 2. Coordination
15 a. Contact City and Developer's Project Representative at least one week in
16 advance notifying the City of when Construction Staking is scheduled.
17 b. It is the Contractor's responsibility to coordinate staking such that
18 construction activities are not delayed or negatively impacted.
19 3. General
20 a. Contractor is responsible for preserving and maintaining stakes. If City
21 surveyors or Developer's Project Representative are required to re -stake for
22 any reason, the Contractor will be responsible for costs to perform staking. If
23 in the opinion of the City, a sufficient number of stakes or markings have been
24 lost, destroyed disturbed or omitted that the contracted Work cannot take place
25 then the Contractor will be required to stake or re -stake the deficient areas.
26 B. Construction Survey
27 1. Construction Survey will be performed by the Contractor.
28 2. Coordination
29 a. Contractor to verify that horizontal and vertical control data established in the
30 design survey and required for construction survey is available and in place.
31 3. General
32 a. Construction survey will be performed in order to construct the work shown
33 on the Construction Drawings and specified in the Contract Documents.
34 b. For construction methods other than open cut, the Contractor shall perform
35 construction survey and verify control data including, but not limited to, the
36 following:
37 1) Verification that established benchmarks and control are accurate.
38 2) Use of Benchmarks to furnish and maintain all reference lines and grades
39 for tunneling.
40 3) Use of line and grades to establish the location of the pipe.
41 4) Submit to the City copies of field notes used to establish all lines and
42 grades, if requested, and allow the City to check guidance system setup prior
43 to beginning each tunneling drive.
44 5) Provide access for the City, if requested, to verify the guidance system and
45 the line and grade of the carrier pipe.
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
01 71 23 - 4
CONSTRUCTION STAKING AND SURVEY
Page 4 of 8
6) The Contractor remains fully responsible for the accuracy of the work and
correction of it, as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at each pipe
joint and submit daily records to the City.
9) If the installation does not meet the specified tolerances (as outlined in
Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct
the installation in accordance with the Contract Documents.
C. As -Built Survey
1. Required As -Built Survey will be performed by the Contractor.
2. Coordination
a. Contractor is to coordinate with City to confirm which features require as -
built surveying.
b. It is the Contractor's responsibility to coordinate the as -built survey and
required measurements for items that are to be buried such that construction
activities are not delayed or negatively impacted.
c. For sewer mains and water mains 12" and under in diameter, it is acceptable
to physically measure depth and mark the location during the progress of
construction and take as -built survey after the facility has been buried. The
Contractor is responsible for the quality control needed to ensure accuracy.
3. General
a. The Contractor shall provide as -built survey including the elevation and
location (and provide written documentation to the City) of construction
features during the progress of the construction including the following:
1) Water Lines
a) Top of pipe elevations and coordinates for waterlines at the following
locations:
(1) Minimum every 25O linear feet, including
(2) Horizontal and vertical points of inflection, curvature,
etc.
(3) Fire line tee
(4) Plugs, stub -outs, dead-end lines
(5) Casing pipe (each end) and all buried fittings
2) Sanitary Sewer
a) Top of pipe elevations and coordinates for force mains and siphon
sanitary sewer lines (non -gravity facilities) at the following locations:
(1) Minimum every 25O linear feet and any buried fittings
(2) Horizontal and vertical points of inflection, curvature,
etc.
3) Stormwater — Not Applicable
b. The Contractor shall provide as -built survey including the elevation and
location (and provide written documentation to the City) of construction
features after the construction is completed including the following:
1) Manholes
a) Rim and flowline elevations and coordinates for each manhole
2) Water Lines
a) Cathodic protection test stations
b) Sampling stations
c) Meter boxes/vaults (All sizes)
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
017123-5
CONSTRUCTION STAKING AND SURVEY
Page 5 of 8
1 d)
Fire hydrants
2 e)
Valves (gate, butterfly, etc.)
3 f)
Air Release valves (Manhole rim and vent pipe)
4 g)
Blow off valves (Manhole rim and valve lid)
5 h)
Pressure plane valves
6 i)
Underground Vaults
7
(1) Rim and flowline elevations and coordinates for each
8
Underground Vault.
9 3) Sanitary Sewer
10 a)
Cleanouts
11
(1) Rim and flowline elevations and coordinates for each
12 b)
Manholes and Junction Structures
13
(1) Rim and flowline elevations and coordinates for each
14
manhole and junction structure.
15 4) Stormwater — Not Applicable
16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
17 1.11 FIELD [SITE] CONDITIONS [NOT USED]
18 1.12 WARRANTY
19 PART 2 - PRODUCTS
20
A. A construction survey will produce, but will not be limited to:
21
1.
Recovery of relevant control points, points of curvature and points of intersection.
22
2.
Establish temporary horizontal and vertical control elevations (benchmarks)
23
sufficiently permanent and located in a manner to be used throughout construction.
24
3.
The location of planned facilities, easements and improvements.
25
a. Establishing final line and grade stakes for piers, floors, grade beams, parking
26
areas, utilities, streets, highways, tunnels, and other construction.
27
b. A record of revisions or corrections noted in an orderly manner for reference.
28
c. A drawing, when required by the client, indicating the horizontal and vertical
29
location of facilities, easements and improvements, as built.
30
4.
Cut sheets shall be provided to the City inspector and Survey Superintendent for all
31
construction staking projects. These cut sheets shall be on the standard city template
32
which can be obtained from the Survey Superintendent (817-392-7925).
33
5.
Digital survey files in the following formats shall be acceptable:
34
a. AutoCAD (.dwg)
35
b. ESRI Shapefile (.shp)
36
c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use
37
standard templates, if available)
38
6.
Survey files shall include vertical and horizontal data tied to original project
39
control and benchmarks, and shall include feature descriptions
40 PART 3 - EXECUTION
41 3.1 INSTALLERS
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
017123-6
CONSTRUCTION STAKING AND SURVEY
Page 6 of 8
1 A. Tolerances:
2
1. The staked location of any improvement or facility should be as accurate as
3
practical and necessary. The degree of precision required is dependent on many
4
factors all of which must remain judgmental. The tolerances listed hereafter are
5
based on generalities and, under certain circumstances, shall yield to specific
6
requirements. The surveyor shall assess any situation by review of the overall plans
7
and through consultation with responsible parties as to the need for specific
8
tolerances.
9
a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical
10
tolerance. Horizontal alignment for earthwork and rough cut should not exceed
11
1.0 ft. tolerance.
12
b. Horizontal alignment on a structure shall be within .0.1 ft tolerance.
13
c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and
14
walkways shall be located within the confines of the site boundaries and,
15
occasionally, along a boundary or any other restrictive line. Away from any
16
restrictive line, these facilities should be staked with an accuracy producing no
17
more than 0.05ft. tolerance from their specified locations.
18
d. Underground and overhead utilities, such as sewers, gas, water, telephone and
19
electric lines, shall be located horizontally within their prescribed areas or
20
easements. Within assigned areas, these utilities should be staked with an
21
accuracy producing no more than 0.1 ft tolerance from a specified location.
22
e. The accuracy required for the vertical location of utilities varies widely. Many
23
underground utilities require only a minimum cover and a tolerance of 0.1 ft.
24
should be maintained. Underground and overhead utilities on planned profile,
25
but not depending on gravity flow for performance, should not exceed 0.1 ft.
26
tolerance.
27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's
28 specifications or in compliance to standards. The City reserves the right to request a
29 calibration report at any time and recommends regular maintenance schedule be
30 performed by a certified technician every 6 months.
31 1. Field measurements of angles and distances shall be done in such fashion as to
32 satisfy the closures and tolerances expressed in Part 3.1.A.
33 2. Vertical locations shall be established from a pre -established benchmark and
34 checked by closing to a different bench mark on the same datum.
35 3. Construction survey field work shall correspond to the client's plans. Irregularities
36 or conflicts found shall be reported promptly to the City.
37 4. Revisions, corrections and other pertinent data shall be logged for future reference.
38
39 3.2 EXAMINATION [NOT USED]
40 3.3 PREPARATION [NOT USED]
41 3.4 APPLICATION
42 3.5 REPAIR / RESTORATION
43 A. If the Contractor's work damages or destroys one or more of the control
44 monuments/points set by the City or Developer's Project Representative, the monuments
45 shall be adequately referenced for expedient restoration.
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
017123-7
CONSTRUCTION STAKING AND SURVEY
Page 7 of 8
1 1. Notify City or Developer's Project Representative if any control data needs to be
2 restored or replaced due to damage caused during construction operations.
3 a. Contractor shall perform replacements and/or restorations.
4 b. The City or Developer's Project Representative may require at any time a
5 survey "Field Check" of any monument or benchmarks that are set be verified
6 by the City surveyors or Developer's Project Representative before further
7 associated work can move forward.
8 3.6 RE -INSTALLATION [NOT USED]
9 3.7 FIELD [OR] SITE QUALITY CONTROL
10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the
11 City or Developer's Project Representative in accordance with this Specification. This
12 includes easements and right of way, if noted on the plans.
13 B. Do not change or relocate stakes or control data without approval from the City.
14 3.8 SYSTEM STARTUP
15 A. Survey Checks
16 1. The City reserves the right to perform a Survey Check at any time deemed
17 necessary.
18 2. Checks by City personnel or 3' parry contracted surveyor are not intended to
19 relieve the contractor of his/her responsibility for accuracy.
20
21 3.9 ADJUSTING [NOT USED]
22 3.10 CLEANING [NOT USED]
23 3.11 CLOSEOUT ACTIVITIES [NOT USED]
24
25
26
27
28
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
Added instruction and modified measurement & payment under 1.2; added
8/31/2017
M. Owen
definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal
requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ;
Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup.
Removed "blue text"; revised measurement and payment sections for Construction
2/14/2018
M Owen
Staking and As -Built Survey; added reference to selection compliance with TGC
2254; revised action and Closeout submittal requirements; added acceptable depth
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
017123-8
CONSTRUCTION STAKING AND SURVEY
Page 8 of 8
measurement criteria; revised list of items requiring as -built survey "during" and
"after" construction; and revised acceptable digital survey file format
CITY OF FORT WORTH GATEWAY 70/71 SEWER
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106390
Revised February 14, 2018
SECTION 0174 23
CLEANING
PART1- GENERAL
1.1 SUMMARY
017423-1
DAP CLEANING
Page 1 of 4
A. Section Includes:
1. Intermediate and final cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to final
inspection.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 74 23 - 2
DAP CLEANING
Page 2 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning Agents
1. Compatible with surface being cleaned
2. New and uncontaminated
3. For manufactured surfaces
a. Material recommended by manufacturer
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017423-3
DAP CLEANING
Page 3 of 4
6. Handle materials in a controlled manner with as few handlings as possible.
7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
this project.
8. Remove all signs of temporary construction and activities incidental to construction
of required permanent Work.
9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
have the cleaning completed at the expense of the Contractor.
10. Do not burn on -site.
B. Intermediate Cleaning during Construction
1. Keep Work areas clean so as not to hinder health, safety or convenience of
personnel in existing facility operations.
2. At maximum weekly intervals, dispose of waste materials, debris and rubbish.
3. Confine construction debris daily in strategically located container(s):
a. Cover to prevent blowing by wind
b. Store debris away from construction or operational activities
c. Haul from site at a minimum of once per week
4. Vacuum clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which
may become airborne or transported by flowing water during the storm.
C. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers from site.
a. Re -seed areas disturbed by location of trash and debris containers in accordance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flow of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junction boxes and inlets.
4. If no longer required for maintenance of erosion facilities, and upon approval by
City, remove erosion control from site.
5. Clean signs, lights, signals, etc.
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 74 23 - 4
DAP CLEANING
Page 4 of 4
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017719-1
DAP CLOSEOUT REQUIREMENTS
Pagel of 3
SECTION 017719
CLOSEOUT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADNIINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
1. No application for final payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017719-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 0178 39
2. Operation and Maintenance Data, if required, in accordance with Section 0178 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 74 23.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
D. Notice of Project Completion
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017719-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017823-1
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
SECTION 0178 23
OPERATION AND MAINTENANCE DATA
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Product data and related information appropriate for City's maintenance and
operation of products furnished under Contract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Schedule
1. Submit manuals in final form to the City within 30 calendar days of product
shipment to the project site.
A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be
approved by the City prior to delivery.
1.6 INFORMATIONAL SUBMITTALS
A. Submittal Form
1. Prepare data in form of an instructional manual for use by City personnel.
2. Format
a. Size: 8 %2 inches x 11 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly -leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
f. Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
Binders
a. Commercial quality 3-ring binders with durable and cleanable plastic covers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form of the O&M Manual.
B. Manual Content
1. Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 78 23 - 3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Provide operation and maintenance data by personnel with the following criteria:
1. Trained and experienced in maintenance and operation of described products
2. Skilled as technical writer to the extent required to communicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
1.5.A.1 — title of section removed
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017839-1
DAP PROJECT RECORD DOCUMENTS
Page 1 of 4
SECTION 0178 39
PROJECT RECORD DOCUMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and proper entries on each page of Specifications and each sheet of Drawings and
other Documents where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtained from the approved Project
Record Documents.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017839-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
information that the change has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enable future modification of the Work to proceed without lengthy and
expensive site measurement, investigation and examination.
1.10 STORAGE AND HANDLING
A. Storage and Handling Requirements
1. Maintain the job set of Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
data to the final Project Record Documents.
2. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED]
2.2 RECORD DOCUMENTS
A. Job set
1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
charge to the Contractor, I complete set of all Documents comprising the Contract.
B. Final Record Documents
1. At a time nearing the completion of the Work and prior to Final Inspection, provide
the City 1 complete set of all Final Record Drawings in the Contract.
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
1. Immediately upon receipt of the job set, identify each of the Documents with the
title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
5. Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
017839-4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
kgralu /11011 plormle I1101111 Ilil.`l 117I
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH MOBILITY WAY- PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 106376
Revised April 7, 2014
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 03/31/2026
Art Mt, Da a, d� PnP CMS Snrrin—inns
Description Design
Concrete
Class A Sidewalk, ADA Ram s, Driveways, Curb/Gutter, Median Pavement
1/14/2026
132 l3 13
Mix Design
AM Corp
1071
3600 psi
3-5" Slump; 3-6%Air
9/9/2022
32 1320
Mix Design
American Concrete Company
30CAF029
3000 psi
3-5" Slump; 3-6%Air
4/3/2025
32 13 20
Mix DesignBigTown
Concrete
2211
3000 psi
3-5" Slump; 3-6%Air
7/16/2025
32 1320
Mix Design
Big Town Concrete
22113
With 30% Slag
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 20
Mix Designrn
Buco Texas
30U101AG
3000 psi
3-5" Slump; 3-6%Air
4/l/2024
32 1320
Mix Design
Burnco Texas.
30U500BG
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix DesignCarder
Concrete
FWCC502001
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 20
Mix Design
Carder Concrete
FWCC502021
3500 s
3-5"Slump; 3-6%Air
9/9/2022
32 13 20
Mix Design
Chisholm Trail Redi Mix
C13020AE
3000 psi
3-5" Slump; 4.5-7.5% Au
4/28/2025
32 1320
Mix Design
Chisholm Trail Redi Mix
CT6020A
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
132 1320
Mix Daiga
City Concrete Company
30HA2011
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 1320
Mix Design
Cow Town Redi Mix
253-W
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 20
Mix Desin
Cow Town Redi Mix
250
3000 psi
3-5" Slum 3-6%Air
9/9/2022
32 1320
Mix Design
Cow Town Redi Mix
350
3000 psi
3-5" Slump; 3-6% Air
1/29/2024
32 13 20
Mix Desig,
Estrada Ready Mix
R3050AEWR
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 20
Mix Design
Holcim/ Amrize
1261
3000 psi
3-5" Slump; 3-6% Air
9/23/2024
32 13 20
Mix Design
Holcim/ Amrize
5177
3000 psi
3-5" Slump; 3-6%Air
5/8/2025
32 13 20
Mix Design
Holcim/ Amrize
530WA-Tl
3000 psi
3-5" Slump; 3-6% Air
4/7/2023
32 U 20
Mix Dig,
Liquid Stone
C301D
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Martin Marietta
P2136214
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
132 13 20
Mix Design
Martin Marietta
R2136014
3000 psi
3-5" Slump; 3-6%Air
4/l/2023
32 1320
Mix Design
Martin Marietta
R2136N14
3000 psi
3-5" Slump; 3-6%Air
6/l/2023
32 13 20
Mix Design
Martin Marietta
R2136R20
3000 psi
3-5" Slump; 3-6%Air
6/1/2023
32 13 20
Mix Design
Martin Marietta
R2136N20
3000 psi
3-5" Slump; 3-6%Air
11/2/2022
32 13 20
Mix Design
Martin Marietta
R2141K24
4000 psi
3-5" Slump; 3-6% Air
4/7/2023
321320
Mix Design
Martin Marietta
R2136K14
3000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 1320
Mix Desi&n
Martin Marietta
R2131314
3000 psi
3-5" Slump; 3-6 % Air
9/9/2022
32 1320
Mix Design
Martin Marietta
R2132214
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Martin Marietta
D9490SC
3000 psi
3-5" Slump: 4.5-7.5%Air
5/9/2025
32 13 20
Mix Design
Martin Marietta
R2136RI4
3000 psi
3-5" Slump; 3fi %Air
10/4/2023
132 1320
Mix Design
NBR Ready Mix
CLS A-YY
3000 psi
3-5" Slump; 3-6 % Air
10/4/2023
32 1320
Mix Design
NBR Ready Mix
CLS A -NY
3000 psi
3-5" Slump; 3-6% Air
7/1012023
32 13 20
Mix Design
Osbum
30A50MR
3000 psi
3-5"Slum;.3-6%Ai,
l/ 18/2023
32 1320
Mix Design
Rapid Redi Mix
RRM5020A.
3000 psi
3-5" Slump;.3-6% Air
1/24/2023
32 1320
Mix Design
Rapid Redi Mix
RRM5525A
3600 psi
3-5" Slump; 3-6%Air
12/22/2025
32 13 20
Mix Design
Rapid Redi Mix
3250AL
With 50 % Slag
3000 psi
3-5" Slump; 3-6% Air
10/24/2024
32 1320
Mix Design
SRM Concrete
30850
With 20% Fly Ash
3000 psi
3-5" Slump; 3-6%Air
10/24/2024
321320
Mix Design
SRM Concrete
30350
3000 psi
3-5"Slump; 3-6%Air
10/I8/2024
32 13 20
Mix Design
SRM Concrete
30050
With 20% Fly Ash
3000 psi
3-5"Slump; 3-6%Air
1/9/2026
32 13 20
Mix Design
SRM Concrete
36822
With 20% Fly Ash
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
132 1320
Mix Design
Tarrant Concrete
FW5025A
3000 psi
3-5" Slump; 3fi% Air
9/9/2022
32 1320
Mix Design
Tarrant Concrete
CP5020A
3000 psi
3-5" Slump; 3-6%Air
10/10/2022
32 13 20
Mix Design
Tarrant Concrete
TCFW5020A
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Tarrant Concrete
FW5525A2
3000 psi
3-5" Slum.; 3-6%Air
9/9/2022
32 1320
Mix Design
Titan Read Mix
3020AE
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13211
Mix Desi
True Grit Redi Mix
0250.230
3000 s
3-5" Slump, 3-6% Air
9/9/2022
32 1320
Mix Des'
True Grit Redi Mix
0250.2301
3000 si
3-5" Slum ; 3-6 % Air
11/17/2025
32 1320
Mix Design
True Grit Redi Mix
450.230
With 30% Slag3000
s
3-5" Slum ; 3-6%Air
Clnss CIP (inlets Mnnhnlec-.function Rnrres- Encasement- Rlnekino- CnllnrS- (9—nd Fnntina Pedestal Pole Fnundatinns—Reference Detail 34 41 10-D605A)1
9/9/2022
l3 13
is Design
American Concrete Company
40CNF065
4000 psi
3-5" Slump; 0-3%Air
9/9/2022
13 13
Mix Design
Bunco Texas
40U500BG
4000 s
3-5" Slump; 3-6%Air
8/21/2025
13 13
Mix Design
Burnco Texas
36U500BG
1" 20% MRWR AIR (Lighting and Siegal Footing Foundation)
3600 psi
3-5" Slump; 3-6% Air
4/28/2025
U 13
Mix Design
Chisholm Trail Redi Mix
CT6020A
3600 s
3-5" Slump; 3-6% Air
4/28/2025
13 13
Mix Design
Chisholm Trail Redi Mix
CTFW5520A
3600 psi
3-5" Slump-, 3-6% Air
4/28/2025
13 l3
Mix Design
Chisholm Trail Redi Mix
CTFW6020A
4000 psi
3-5" Slump; 3-6%Air
8/4/2025
13 13
Mix Design
Chisholm Trail Redi Mix
CTFW5020A
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
13 13
Mix Design
Cow Town Redi Mix
255-2
3000 s
3-5" Slump; 3-6% Air
9/9/2022
321313
Mix Design
Cow Town Redi Mix
355
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
13 13
Mix Design
Cow Town Redi Mix
255
3500 psi
3-5" Slum ; 3-6%Air
9/9/2022
13 13
Mix Design
Cow Town Redi Mix
270
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
l3 13
Mix Desi
Cow Town Redi Mix
370
5000 s
3-5" Shoup; 3-6% Air
9/9/2027
I3 13
Mix Design
Cow Town Redi Mix
353
3000 si
3-5" Slump; 3-6% Air
9/9/2022
13 13
Mix Design
IM�x�Dcsjgn
Cow Town Redi Mix
257
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
13 13
Mix Design
Cow Town Redi Mix
357
3600 psi
3-5" Slump; 3-6% Air
5/7/2025
13 13
Mix Design
Cow Town Redi Mix
265-4'_
4200 ppsi
3-5" Slump; 3-6%Air
3/3/2026
3000
Mix Design
Estrada Ready Mix
R3555AESC
3500 psi
3-5" Slump; 3-6%Air
2/7/2025
l3 13
Mix Design
Holcim/ Amrize
1701
4000 s
3-5" Slump; 3-6%Air
2/7/2025
13 13
Mix Design
Holcim/ Amriu
1551
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
13 13
Mix Desi
Holcim/ Armize
5409
4000 psi
3-5" Slump; 3-6%Air
8/14/2025
1313
Mix Design
Holclm/Amrize
540WA-TI
With 20% Fly Ash and 30%. Slag
4000 s
3-5"Slump; 3-6%Air
4/27/2023
13 13
Mix Desi
Liquid Stone
C361DNFA
3600 s
3-5" Slump; 3-6%Air
9/9/2022
13 13
Mix Desi
Martin Marietta
R2141230
4000 si
3-5" Slump; 3-6% Air
8/4/2023
13 13
Mix Desi
Martin Marietta
R2141R24
4000 s
3-5" Slump; 3-6%Air
11/20/2023
13 13
Mix Design
Martin Marietta
R2146R33
4000 psi
3-5" Slump; 3-6% Air
11/20/2023
1313
Mlx Design
Martin Marietta
R2146K33
4000 psi
3-5" Slump; 3-6%Air
CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 03/31/2026
... Clp (�rrre 1( 'i)
9/9/21122
32 13 13
Mix Desin
Marlie Marieua
R214-3 3
3600 n
i" Slomp; 4.5-7.5"%Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2136224
3600 psi
3-5" Slump; 3-6%Air
9/9/2022
32 l3 13
Mix Design
Martin Marietta
R2141233
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146038
4500 psi
3-5" Slump; 3-6% Air
10/24/2024
32 l3 13
Mix Design
Martin Marietta
R2146K34
4000 psi
3-5" Slump; 3-6%Air
5/5/2025
32 13 13
Mix Design
Martin Marietta
R2146R35
4000 psi
3-5" Slump; 3-6%Air
5/5/2025
33 13 13
Mix Design
Martin Marietta
R2146K35
4000 psi
3-5" Slump; 3-6%Air
5/5/2025
33 13 13
Mix Design
Martin Marietta
R2146N33
4000 psi
3-5" Slump; 3-6% Air
9/12/2023
32 13 13
Mix Design n
NBR Ready Mix
CLS PI-YY
4000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
NBR Ready Mix
TX C-YY
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13MDes,Design
NBR Read Miz
TX C-NY
3000 psi
3-5" Slump; 3-6"/o Air
1/18/2023
32 13 13sign
Ra id Rdi Mix
RRM5320A
3000 psi
3-5" Slum 3-6% Air
1/18/2023
32 13 13esi
Ra id Redi Miz
RRM6020ASS
4000 si
3-5" Slum ; 3-6%Air
10/24/2024
32 13 13esign
SRM Concrete
40350
4000 si
3-5" Slump; 3-6%Air
10/24/2024
32 13 13esin
SRM Concrete
40850
4000 psi
3-5" Slum ; 3-6%Air
9/16/2024
32 13 13esin
SRM Concrete
35050
3500 psi
3-5" Slump; 3-6% Air
4/28/2025
32 13 13esi
SRM Concrete
36850
3600 psi
3-5" Slum ; 3-6%Air
11/24/2025
03 3000esign
SRM Concrete
45852
4500 si
3-5" Slump; 4.5-7.5% Air
2/27/2026
32 l3 13esi
SRM Concrete
35850
With20%FI Ash
3500 si
3-5"Sl;3-6^/oAir9/9/2022
321313esign
Tarrant Concrete
FW5320A
3000 psi
3-5" Slump; 3-(i% Airl0/l0/2022
32 l3 l3esi
Taaant Concrete
TCFW6025A2
4000 psi
3-5" Slump; 3-6^/o Air
2/25/2026
32 13 13
Mix Design
True Grit Redi Mix
1450.230CIP
I With 30% Slag
3000 psi
13-5" Slump; 3-6%Air
Class C (Drilled Shaft for Traffic Signal Pole Foundations Reference Detail 3141 10-D605)
8/21/2025
3213WDesign
Design
Burnco Texas
40U502BG
1"20%HRWR AIR
3600 s
6-8"Slump; 3-6%Air
6/21/2023
32 13Design
Cow Town Redi Mix
360-DS
3600 s
5.5-7.5" Slum ; 3-6%Air
3/12/2026
3213Desi
Cow Town Redi Mix
360-2DS
3600 psi
5.5-7.5"Slum;0-3%Air
10/30/2024
32 13Design
Estrada Ready Mix
R36575AEWR
3600 s
5.5-7.5" Slum ; 3-6% Air
9/11/2025
3213Desi
Gonzalez Brothers
P6020LA
3600 si
5.5-7.5"Slump; 3-6%Air
12/5/2022
3213Design
Holcim/Amrize
1822
3600 psi
5.5-7.5"Slum;0-3%Air
9/9/2022
32 13Desin
Holeiod Amrize
1959
4000 si
5.5-7.5" Slum ; 3-6%Air
1/14/2026
3213
Desi
City Concrete Comany
36LA2011-MR
With 20%Fl. Ash
3600s
5.5-7.5"Slum;3%Air
4/7/2023
32 13
Desi
Liquid Stone
C361 DHR
3600 si
- -7.5" Slum ; 3-6% Air
6/27/2023
32 13 13
Mix Design
Martin Marietta
U2146N41
3600 si
5-7" Slump; 3-6%Air
6/27/2023
122 13 I3
Mix Desin
Martin Marietta
U2146K45
3600 psi
5-7" Slump; 3-6% Air
5/9/1025
32 13 13
Mix Design
Martin Marietta
1121461141
3600 psi
5-7" Slump; 3-6% Air
8/22/2024
132 13 13
1 Mix Design
NBR Read Mix
135K2524
1
3600 psi
5.5" Slump; 3-6% Air
8122/2024
132 13 13
INC. Design
NBR Ready Mix
135K0524
1
3600 psi
5.5" Slump; 3-6% Air
Class C (Headwalls- Wing walls- Culverts)
9/9/2022
132 13 13
Mix Design
Carder Concrete
FWCC602001
4000 psi
3-5" Slump; 3-6%Air
2/24/2026
03 30 00
Mix Design
Chisholm Trail Redi Mix
CT7020A
With 20% Fly Ash
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Desi n
City Concrete Com an
40LA2011
4000 si
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
260-2
3600 si
3-5"Slump: 3-6%Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
360-1
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 l3 13
Mix DesignCow
Town Redi Mix
260-1
3600 s
3-5" Slump: 3-6%Air
8/11/2025
32 13 13
Mix DesignCow
Town Redi Mix
275
With 20% Fly Ash
5000 psi
4-6"Slum:3-6%Air
8/11/2025
32 13 13
Mix Design
Cow T—Redi Mix
375
5000 psi
4-6" Slump: 3-6% Air
1/29/2024
32 13 13
Mix Design
Estrada Ready Mix
R3655AEWR
3600 si
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix DesignGCH
Concrete Services
GCH4000
4000 psl
3-5" Slump; 3-6% Air
4/l/2023
1321313
Mix Design
Martin Marietta
310LBP
3600 psi
3-5"Shm;4-7%Air
8/30/2023
32 13 13
Mix Desin
Martin Marietta
R2.141R30
4000 s
3-5" Slum ; 3-6%Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146035
4000 psi
3-5" Slump; 3-6% Air
3/10/2026
03 30 00
Mix Design
NBR Ready Mix
TX-C-YY
3600 si
3-5"Slump: 3-6%Air
3/10/2026
03 30 00
Mix Design
NBR Ready Mix
TX-C-NY
3600 si
3-5" Slump: 3-6% Air
9/9/2022
32 13 13
Mix Design
SRM Concrete
40050
4000 Psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
SRM Concrete
35022
With 20% Fly Ash
3600 psi
3-5" Slump; 3-6%Air
3/6/2026
03 30 00
Mix Desi
SRM Concrete
45350
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW6020A2
4000 psi
3-5"Slnmp; 3-6%Air
2/26/2026
03 30 00
Mix Designg
True Grit Redi Mix
455.230C
With 30% Slag3600
s
3-5" Slum ; 3-6%Air
Class P (Machine Placed Paving)
4/3/2025
132 13 13
Mix Design
Bi Town Concrete
4511
3600 psi
I-3" Slump; 3-6% Air
4/3/2025
32 13 13
Mix Desi
Bi Town. Concrete
4411
3600 psi
1-3" Slump; 3-6%Air
6l30/2025
32 13 13
Mix Desi
Big Town Concrete
5211
With 20% Fly Ash
4000 psi
I-3" Slump; 3-6 %Air
6/30/2025
30 13 13
Mix Desi
Bi Town Concrete
52113
With 30^/o Slag
4000 p s
1-3" Slump; 3-6% Air
6/30/2025
30 13 13
Mix Design
Big Town Concrete
5311
4000 psi
I-3" Slump; 3-6 % Air
9/30/2025
301313
Mix Desi
Bumco Texas
40U553BG
I"20%MRWR AIR
4000 s
1-3"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Carder Concrete
FWCC552091
3600 psi
1-3" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Desi
Carder Concrete
FWCC602091
4000 psi
1-3" Slump; 3-6%Air
11/6/2025
32 13 13
Mix Design
Chisholm Trail Redi Mix
CT5520AMP
With 20% Fly Ash
3600 psi
1-3" Slump; 3-6% Air
9/9/2022
132 13 13
Mix Design
City Concrete Company
36LA2011
3600 s
1-3" Slum ; 3-fi^/^ Air
9/9/2022
33 13 13
Mix Design
Cow Town Redl Mix
257-M
3600 psi
I-3" Slump; 3-6%Air
l 1/l4/2022
1321313
Mix Design
Cow Town Redi Mix
357-M
3600 i
1-3"Slnm:3-6%Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
260-M
4000 s1
I-3" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Desi
Cow Town Redi Mix
360-M
4000 sr
1-3" Slump: 3-6%Air
2/6/2024
32 13 13
Mix Design
Estrada Ready Mix
TD3655AEWR
3600 psi
1-3"Slump; 3-6%Air
5/12/2025
32 13 13
Mix Design
Holcim/Amrize
1703
4000 psi
1-3"Slump; 3-6%Air
10/3/2025
32 1313
Mix Design
Holcim/ Amrize
5405
With 20% Fly Ash
4000 psi
1-3" Slump; 3-6% Air
8/4/2023
32 13 13
Mix Desi
Martin Marietta
Q2141R27
4000 si
1-3" Slum ; 3-6% Air
11/2/2022
321313
Mix Design
Martin Marietta
IQ214IK30
4000 psi
11-3"Slump; 3-6%Air
CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 03/31/2026
5/5/2025
32 13 13
Mix Design
Martin Marietta
Q214IN27
4000 psi
1-3" Slump; 3-6% Air
1/23/2026
32 13 13
Mix DesignMartin
Marietta
Q2t46K33
4000 s
1-3"Slump: 3-6%Air
10/4/2023
32 13 13
Mix Design
NBR Ready Mix
TX C SF-YY
3600 psi
1-3" Slump; 3-6%Air
10/4/2023
32 13 13
Mix DesignNBR
Read Mix
TX C SF -NY
3600 psi
1-3" Stomp; 3-6%Air
12/22/2025
32 13 13
Mix Design
Rapid Redi Mix
4050AL
With 50%Slag.
4000 psi
1-3" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Desi
SRM Concrete
40068
4000 psi
1-3" Slump; 3-6 %Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
40825
4000 psi
1-3" Slump; 3-6%Air
9Y1612024
32 13 13
Mix DesignSRM
Concrete
40025
With 20% Fly Ash
4000 psi
1-3" Slump; 3-6%Air
10/18/2024
32 B 13
Mix Design
SRM Concrete
35023
3600 psi
1-3" Slump; 3-6% Air
6/5/2025
32 l3 13
Mix DesignSRM
Concrete
40324
4000 psi
1-3" Slump; 3-6% Air
7/21/2025
32 13 13
Mix Design
SINACOLA
24011-0OOOMP 20%
With 20% Fly Ash
4000 s
1-3"Slump; 3-6%Air
7/21/2025
32 13 13
Mix DesignSINACOLA
24011.400OW Straight Cement
4000 psi
1-3"Slump; 3-6%Air
2/3/2026
32 13 13
Mix Design
Sunrise Redi Mix
1451
4000 psi
1-3" Slump: 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW5520AMP
3600 6
1-3"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
0255.2301
3600 s
1-3" Slump; 3.5-6.5 % Air
9/9/2022
32 13 13
Mix DesignTrue
Grit Redi Mix
0260,2302
4000 psi
1-3" Slump; 3.5-6.5%Ass
6/17/2025
32 13 13
Mix Design
True Grit Redi Mix
460.230M
4000 psi
1-3" Slump; 3-6% Air
6/23/2025
32 t3 13
Mix DesignTrue
Grit Redi Mix
360230M
4000 psi
1-3" Slump; 3-6%Air
1/2/1900
32 13 13
Mix Design
True Grit Redi Mix
1455.230M
I With 30% Slag
3600 psi
11-3" Slump; 3-6%Air
Class H (Hand Placed Pavine- Vallev Gutterl
9/9/2022
32 13 13
Mix Design
American Concrete Company
45CAF076
4500 psi
3-5" Slump; 3-6%Air
5/2/2023
32 l3 13
Mix Design
Big D Concrete
CM14520AE
4500 psi
3-5" Slump; 3-6% Air
4/3/2025
32 l3 13
Mix Design
Bi Town Concrete
6211
4500 psi
3-5" Slump; 3-6%Air
4/3/2025
32 13 13
Mix Design
Big Town Concrete
6311
4500 psi
3-5" Slump;.3-6% Air
4/5/2025
33 13 13
Mix DesignHi
Town Concrete
6017
4500 psi
3-5" Slump; 3-6% Air
7/16/2025
321313
Mix DesignBig
Town Concrete
62113
With 30%Slag
4500 s
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Butnco Texas
45U500BG
4500 psi
3-5" Slump; 3-6%. Air
9/30/2025
331313
Mix Design
Bunco Texas
45UIOOAG
4000 s
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Carder Concrete
FWCC602021
4500 psi
3-5"Slump; 3-6%Air
4/28/2025
32 13 13
Mix Design
Chisholm Trail Redi Mix
CTFW15520A
4500 s
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Dcsi
Ci Concrete Com an
45NA2011
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1313
Mix Design
Cow Town Redi Mix
265
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Desi
Cow Town Redi Mix
365
4500 psi
3-5" Slump; 3-6 % Air
1/29/2024
32 13 13
Mix Design
Estrada Read. Mix
R4560AEWR!
4500 psi
3-5" Slump; 4-G°o Air
9/9/2022
32 13 13
Mix Desi
GCH Concrete Services
GCH4500
4500 psi
3-5" Slump; 3-6% Air
10/4/2024
32 13 13
Mix DesignHolcim/
Amrim
5507
4500 s
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix De
Holcim/ Amrize
1851
4500 psi
3-5" Slump; 3-6% Air
5/8/2025
32 13 13
Mix Design
Amrizc/Hocim
545WA-Tl
4500 s
3-5"Slump; 3-6%Air
4/5/2025
32 13 13
Mix Design
Liquid Stone
C451D
4500 psi
3-5" Slump; 3-6%Air
11/2/2022
132 13 13
Mix Design
Martin Marietta
R2146N35
4500 psi
3-5" Slump; 3-6%Air
8/4/2023
32 13 13
Mix Design
Martin Marietta
R2146R36
4500 psi
3-5" Slump; 3-6%Air
11/2/2022
32 13 13
Mix Design
Martin Marietta
R2.146N36
4500 psi
3-5" Slump; 3-6%Air
5/22/2023
32 13 13
Mix Design
Martin Marietta
R2146K37
4500 psi
3-5" Slump; 3-6% Air
12/22/2023
32 l3 13
Mix Design
Martin Marietta
R2146R44
4500 psi
3-5" Slump; 3-6%Air
12/22/2023
32 13 13
Mix Design
Martin Marietta
R2146K44
4500 psi
3-5" Slump-, 3-6% Air
l l/I5/2022
32 13 13
Mix Design
Martin Marietta
R2146P36
4500 psi
3-5" Slump; 3-6%Air
11/15/2022
32 13 13
Mix Design
Martin Marietta
R2146K36
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2147241
4500 psi
3-5" Slump; 4.5-7.5%Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146236
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
132 13 13
Mix Design
Martin Marietta
R2146036
4500 psi
3-5" Slump: 3-6%Air
9/9/2022
32 13 13
Mix Desi o
Martin Marietta
R2146242
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
32 B 13
Mix Design
Martin Marietta
P2146042
4500 psi
3-5" Slump, 3-6%Air
6/3/2025
32 13 13
Mix Design
Martin Marietta
R2146K43
4500 psi
3-5" Slump; 3-6% Air
1/29/2026
32 13 13
Mix Design
Martin Marietta
R2146R43
4500 psi
3-5" Slump; 3-6 % Air
10/4/2023
32 13 13
Mix Design
NBR Ready Mix
CLS P2-YY
4500 psi
3-5" Slump; 3-6% Air
10A/2023
32 13 13
Mix Design
NBA Ready Mix.
CLS P2-NY
4500 psi
3-5" Slump: 3-6 % Air
7/10/2023
32 13 13
Mix Design
Osborn
45A60MR
4500 psi
3-5" Slump; 3-6% Air
IY24/2023
32 13 13
Mix Design
Rapid Redi Mix
RRM6320AHP
4500 psi
3-5" Slump; 3-6%Air
12/22/2025
32 13 13
Mix Design
Rapid Redi Mix
4550AL
With 50% Slag
4500 psi
3-5" Slump; 3-6% Air
2/7/2025
132 13 13
Mix Design
SRM Concrete
45023
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
SRM Concrete
45000
4500 psi
3-5" Slump; 3-6% Air
5/23/2025
32 13 13
Mix Design
SRM Concrete
45300
4500 psi
3-5" Slump; 3-6%Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
45350
4500 psi
3-5" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
45950
With 20% Fly Ash
4500 psi
3-5" Slnm ; 3-6%Air
10/19/2024
32 1313
Mix Design
SRM Concrete
45050
4500 psi
3-5" Slump; 3-fi°10 Air
7/21/2025
32 13 13
Mix Design
SINACOLA
24011-4500BP 20%
With 20% Fly Ash
4500 psi
3-5"Slump; 3-6%Air
7/21/2025
32 t313
Mix Design
SINACOLA
240I1-4500HP Straight Cement
4500 psi
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW6020ABF
4500 psi3-5"Slum
:3-6%Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW60AHP
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
132 13 13
Mix Design
Tarrant Concrete
TCFW6020ABP
4500 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Titan Ready Mix
TRC4520
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1313
Mix Design
True Grit Redi Mix
0260.2301
4500 p s
3-5" Slump; 3-6 % Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
0265.2301
4500 psi
3-5" Slump; 3.5-6.5% Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
270.230
4500 psi
3-5" Slump; 3-6% Air
6/12/2025
32 13 13
Mix Design
True Grit Redi Mix
465.230H
With 30% Slag
4500 psi
3-5" Slump: 3-6% Air
6232025
32 l3 13
Miz Desi
True Grit Redi Mix.
365.230H
4500 si
3-5" Slum : 3-6% Air
10/9/2024
32 13 13
1 Mix Design
I Wildcatter
14520AI
1 4500 psi
3-5" Slump; 3-6%Air
Page 3 of 6
CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 03/31/2026
Class IlEs diioh Farl, Slrenplh Pavilwt
9,9"0_"
32 13 13
Mix Dcsi u
BiuD Cuncretc
14500AE
I 4500psi
3-5" Slump; 3%<Air
12/10/2025
32 13 13
Mix Design
Burnco Texas
70U100AG
I day average comp strength>4000 psi 7000 psi
3-5"Slump; 3-6%Air
11/18/2025
32 13 13
Mix DesignChisholm
Trail Redi Mix
CTTX70AHES
2600 @24 hrs and/or 3000 @72hrs;4500@28 days
3-5" Slump; 3-6% Air
2/24/2026
3213 13
Mix Design
Chisholm Trail Redi Mix
CT75AHES
3000 psi @ 24 he= and 5000 psi @ 28 days
3-5" Slump; 3-6% Air
9/9/2022
321313
Mix DesignCow
Town. Redi Mix
370-INC
4500 d
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
375-NC
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix DesignCow
Toxm Redi Mix
370-NC
4500 psi
3-5" Slump; 3-6% Air
1/18/2023
3213 13
Mix Design
Cow Town Redi Mix
380-NC
4500 psi
3-5" Slump; 3-6% Air
1/29/2024
32 13 13
Mix DesignEstrada
Read Mix
4575AESC
4500 psi / 3000 sr 3 days3-5"
Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Holcim/ Amrim
2125
5000 psi
3-5" Slump; 3-6% Air
1/24/2023
32 13 13
Mix DesignLiquid
Stone
C45lDHR-A
4500 psi
3-5" Slump; 3-6%Air
4/7/2023
32 13 13
Mix Design
Martin Marietta
R2161 K70
6000 psi / 3000 psi @ 24hrs.
3-5" Slump; 3-6%Air
2/10/2023
32 13 13
Mix DesignSRM
Concrete
50310
5000 psi
3-5" Slump; 3-6%Air
2/7/2025
32 13 13
Mix Design
SRM Concrete
40326
4500 psi / 3000 psi @ 3 days3-5"
Slump; 3-6% Air
2/3/2026
32 13 13
Mix DesignSunrise
Redi Mix
1477
3 dayaveragecom stren th>3000 psi
5500 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW6520AMR
4500 psi / 3000 psi @ 3 days
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix DesignTarrant
Concrete
FW7520AMR
4500 psi / 3000 si (rJ 3 days
3-5" Slump; 3-6%Air
3/30/2026
32 13 13
Mix esign
True it Redi Mix
370.230HES
4500 psi /3000 psi 24 hm
3-5" Slum.; 3-6%Air
Class S (Bridge Slabs. Ton Slabs of Direct Traffic Culverts. Annroach Slabs)
2/24/2026
103 3000
Mix Design
Chisholm Trail Redi Mix
CT7020A
With 20% Fly Ash
5000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Cr- Town Redi Mix
260
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
360
4000 psi
3-5" Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
365-STX
4000 psi
3-5" Slump; 3-6% Air
1/29/2024
32 13 13
Mix Design
Estrada Ready Mix
R4060AEWR
4000 psi
4-6"Slump; 3-6%Air
5/N2023
32 13 13
Mix Design
Martin Marietta
M7842344
4000 psi
3-5" Slump; 4.5-7.5%Air
4/I/2023
32 1313
Mix Design
Martin Marietta
R2146P33
4000 psi
3-5" Slump; 3-6% Air
8/18/2025
32 13 13
Mix Design
Martin Marietta
610LBT
4000 psi
3-5" Slump; 3-6° o Air
4/ 15/2024
32 13 13
Mix Design
NBR Ready Mix
TX S-NY
4000 psi
3-5" Slum; 3-6% Air
4/ 15/2024
32 13 13
Mix Design
NBR Ready Mix
I TX S-YY
4000 psi
13-5" Slump; 3-6% Air
4/5/2025
1321313
Mix DesignSRM
Concrete
49150
With 20%FI Ash
4000 si
3-5"Slum ;3-6%Air
4/5/2025
32 13 13
Mix Desi n
SRM Concrete
40350
4000 s
3-5" Slum : 3-6%Air
3/6/2026
03 30 00
Mix Desi
SRM Concrete
45350
4500 psi
3-5" Slump; 3-6%Air
5/5/2023
132 13 13
Mix Design
I SRM Concrete
IDIO0008553CB
1
4000 psi
13-5" Slump: 3-6 % Air
Concrete Base Trench Renoir
4/1/2023
10334 16
1 Mix Design
Bumco Texas
IOYli50BF
1000 psi
Flowable; 8.5-11.5%Air
2/1/2022
033416
Mix Design
Burnco Texas
08Y450BA
800 s
5-7"Slum.; 3-6%Air
12/19/2025
03 34 16
Mix Desi n
Cow Town Redi Mix
330-SB
750 si
5.5-8.5" Slum ; 5-I5%
9/30/2025
10334 16
MixDesi
Martin Marietta
YN81O001
750 s
8-12" Slum ; 5-10%Air
12/26/20251033416
Mix DesignSRM
Concrete
915
750 si
Flowable; 3-6% Atr
Controlled Low Strength Material (Flowahle Filll
2/7/2025
033413
Mix Design
Bumco Texas
OI Y690BF
100 psi
Flowable; 9.5-11.5%Air
5/19/2025
413
Mix Desi. n
Bumco Texas
OIZ180AF
100 psi
Flowable; 9.5-11.5%Air
11/18/2025
413
Mix Design
Bureau Texas
OIZ40113F
SAND 25%MRWR 17%AIR FLOW FILL
too s
psi
Flowable; 17+/-1.5%air
9/9/2022
033413
Mix Design
Carder Concrete
FWCC359101
50-150
3-5" Slump; 8-12% Air
9/9/2022
4 13
Mix Design
Carder Concrete
FWFF237501
50-I50
Flowable; 8.5-11.5%Air
8/4/2025
033413
Mix Desi n
Chisholm Trail Redi Mix
CT150FF
50-150 psi
Flowable; 7-9.0%, Air
12/26/2025
033413
Mix Design
Chisholm Trail Redi Mix.
CTFWC'LSM
100-I50 s
5-7" slump; 8.5-I L5%Air
9/9/2022
4 13
Mix Design
CityConcrete Company
1 I-350-FF
50-150 psi
Plowable; 8-12 % Air
9/9/2022
4 13
Mix Design
Cow Town Redi Mix
9
70 psi
7-9" Slump; 8-11%Air
9/9/2025
4 13
Mix Design
Cow Town Redi Mix
10
Min 50 psi
Min 9" Slump; ]0-20% Air
5/12/2025
34 13
Mix Desi
Holum/ Amrim
3741
100 psi
Flowable; 12.0-24.U%Air
8/4/2025
033413
Mix Design
H.Ieim/ Annie
901
100 psi
9-11" Slump; 10-30% Air
8/14/2025
34 l3
Mix Design
Holcim/ Amrize
904
150 s
9-11" Slump; 10-30% Air
2/27/2026
033413
Mix Design
Holemn/ Aran.
3747
150 psi
Flowable; 12.0-24.0% Air
9/11/2025
033413
Mix Design
Martin Marietta
FLOW25A
150 psi
8"-12" Slump; 10%Air
10/4/2023
3413
Mix Design
NBR Read Mix
FTW FLOW FILL
150 psi
7-10" Slump; 8-12% Air
2/7/2025
033413
Mix Design
SRM Concrete
910
150 s
Flowable; 8-12%Air
12/26/2025
34 13
Mix Design
SRM. Concrete
900
100 psi
Flowable; 10.30% Air
9/9/2022
3413
Mix Desi
Tarrant Concrete
FWFF150CLSM
50-I50 si
Flowable;8-12%Air
Concrete Ri Ra
4/l/2023
31 3700 Mix Deaigu Mardi Marietta R2141030
4100 psi
3-5" Slump; 3-6% Air
4/1/2023
31 3700 Mix Desi n Martin Marietta R2146033
4000 psi
3-5" Slum : 3-6%Air
Cement- Stabilized Sand CSS
11/21/2025
330510 Mix Desin Bumco Texas 04Z50013A SAND 20%MRWR 17%AIR FLOW FILL
250 p,a
Flowable; 15.5-18.5%Air
Asphalt Paving
9/9/2022
132 1216
Mix Design
Austin Asphalt
FT5B117965
FT5B117965 PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
Austin Asphalt
FTIBI39965
F"CIB139965 PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Deai
Austin As halt
FTIB117.2
FTIB117.2 PG64-22 Type B Fine Base
5/1/2024
3212 16
Mix Design
Reynolds Asphalt
340-DG-B P
340-DG-B PG64-22 Type B Base Course
9/9/2022
32 l2 16
Mix Design
Re olds As halt
1112B
1112B PG64-22 Type B Fine Base
9/9/2022
32 l2 16
Mix Design
Reynolds As halt
1612B
1612B PG64-22 Type B Fine Base
4/4/2025
32 12 16
Mix Desi
Reynolds As halt
2315E
2315B PG64-22 Type B Fine Base
l2/5/2022
33 I2 16
Mix Design
Sunmount Paving
3076BV6422
3076BV6422 PG62-22 Type B Fine Base.
9/9/2022
32 12 16
Mix DesignSunmount
Paving
341-BRAP6422ERC,
341-BRAP6422ERG PG64-22 Type B Fine Base
9/9/2022
32 1216
Mix Design
TXBIT
37-211305-20
37-211305-20 PG64-22 T e B Fine Base
9/9/2022
32 12 16
Mix Desi
TXBIT
44-211305-17
44-211305-17 PG64-22 T e B Fine Base
9/9/2022
32 12 16
Mix Design
TXBIT
2I1305 (1757)
211305 (1757) PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix DesignTXBIT
64-224125-18PG
64-224125-18 PG70-22 Type D Fin, Surfaee
4/l /2024
32 I2 16
Mix Design
I TXBIT
1344 MAC-SP-D 70-22XR
344 MAC-SP-D 70-22XR SAC A-R Type D Fine Surface
(
CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 03/31/2026
Deteclahle )NAruin9 Surface
9/9/30_'
32 13 20
DWS - Pavers
Pine hall Brink ( Winston Salem, NC)
Tactile Pavers
9/9/2022
32 13 20
DWS - Pavers
Western Brick Co. (Houston, TX)
Detectable Warning Pavers
9/9/2022
32 13 20
DWS - Com .site
Armor Tile
9/9/2022
32 1320
DWS- Composite
ADA Solutions (Wilmington, MA)
Heritage Brick CIP Composite Paver
4/7/2023
32 13 20
DWS-Pavers
ADA Solutions (Wilmington, MA)
Detectable Warning Pavers
10/16/2025
321320
DWS- Pavers
EQUALTH.E
EqualTile Brick Pattern Wet -Set Replaceable
10/16/2025
32 13 20
DWS - Pavers
EQUALTH.E
E ua1TOc Cast -In -Place Re lao.ble
Silicone Joint Sealant
9/9/2022
132 13 73
Joint Sealant
Dow
890SL
890SL - Cold Applied, Single Component, Silicone Joint Sealant
ASTM D5893
9/9/2022
132 13 73
Joint Sealant
Tremw
900SL
900SL - Cold Applied. Sin le I—— Silicone Joint Sealant
ASTM D5893
9/9/2022
132 13 73
Joint Sealant
Pecora
1300SL
300SL - Cold Applied. Single Component, Silicone Joint Sealant
ASTM D5893
9/9/2022
132 1373
Joint Sealant
Cmfeo
I RoadSaver Silicone
RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant
ASTM D5893
ITti itv Trench Fmhedment Land
9/9/2022
3305 10
Embedment Sand
Silver Creek Materials
Utility Embedment Sand
ASTM C33
919/2022
3305 10
Embedment Sand
Crouch Materials
UtilityEmbedment Sand
ASTM C33
9/9/2022
3305 10
Embedment Sand
F and L Dirt Movers
Utility Embedment Sand
ASTM C33
9/9/2022
3305 10
Embedment Sand
F and L Dot Movers
Utility Embedment Sand
ASTM C33
9/9/2022
33 05 10
Embedment Sand
Tin Top Martin Marietta
Utility Embedment Sand
AST. C33
Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13
9/28/2018
133 05 13
Manhole Frames and Covers
A —Cast (Govind Steel Company, LTD)
MHRC #220605
MHRC #220605 (Size - **24" Dia.)
ASTM A48 AASHTO M306
9/28/2018
33 05 13
Manhole Cover
Neenah Foundry
NF-1274-T91
NF-1274-T91 (Size - 32" Dia.)
ASTM A48 AASHTO M366
9/28/2018
33 05 13
Manhole Frames and
Covers
Neenah Foundry
NF-1743-LM (Hinged)
NF-1743-LM (Hinged) (Size - 32" Dist.)
ASTM A48 AASHTO M306
9/28/2018
33 05 13
Manhole Frame
Neenah Foundr
NF-1930-30
NF-1930-30 (Size - 32.25" Dia.)
ASTM A48 AASHTO M306
9/28/2018
3305 13
Manhole Frames and
Covers
Neenah Foundry
R-1743-HV
R-1743-HV (Size - 32" Dia.)
ASTM A48 AASHTO M306
2/13/2026
3305 13
from l Manhole lid and
Neenah Foundry
Part number 101560 and 12940110
Size- 24" Die clear opening
AASHTO M306 H-20
4/3/2019
33 05 13
Manhole Frames and Cov
SIP Industries++
2279ST
2279ST (Size - 24" Dia.)
ASTM A48 AASHTO M306
019
3305 13
Manhole Frames and Cov
SIP Industries++
2280ST
228DST (Size -32" Dia.)
ASTM A48 AASHTO M306
2020
r
33 05 13
Manhole Frames and Cov
EJ ( Formally East Jordan Iron Works)
EJ1033 Z2/A
E11033 Z2/A (Size - 32.25" Dia.)
ASTM A536 AASHTO M306
02433
OS ]3
�Ctrrb
Cmb Inlet Covers
SIP IndusMes ++
22967
2296T (Size-***24" Dia.)
ASTM A48 AASFTTO M306
2024
33 05 13
Inlet Covers
SIP Industries++
12179STN
12279STN Size - 24" Dia.)
ASTM A48 AASHTO M306
rvore. nnnew aeveropmertrana rtew msrattanon ma.. —ass soon meerme.....r....penmg ragn—, span)reamutyapecr)rcanon-."nny smanrnp'—g saes—antyoe anonm)or—..gma..—roar regmrerepmremenr)rames... -vacs
Storm Sewer - Inlet & Structures 33-05-13
10/8/2020
334920
Curb Inlets
Fonterra
FRT-10.3-405-PRECAST** (Size - 10' X 3')
ASTM C913
10/8/2020
334920
Curb Inlets
Fonterra
FRT-I Ox3-406-PRECAST** (Size - 10' X 3')
ASTM C913
10/8/2020
334920
Cmb Inlets
Fonterra
FRT-1 Ox4.5-407-PRECAST** (Si,, - 10' X 4.5')
ASTM C913
10/8/2020
334920
Curb I.Iets
Fonterra
FRT-1 Ox4.5A20-PRECAST** (Size - 10' X 4.5')
ASTM C913
I0/8/2020
333920
Manhole
Fonterra
FRT-4X4-409-PRECAST-TOP(Size -4'X4')
ASTM C9l3
10/8/2020
33 39 20
Manhole
Fonterra
FRT-4X4-409-PRECAST-BASE (Size - 4' X 4')
ASTM C913
10/82020
333920
Manhole
Fonterra
FRT-5X5-410-PRECAST-TOP (Size - 5' X 5')
ASTM C913
10/8/2020
33 39 20
Manhole
Fonterra
FRT-5X5-410-PRECAST-BASE (Size - 5' X 5')
ASTM C913
10/8/2020
33 39 20
Manhole
Fonterra
FRT.6X6-411-PRECAST-TOP (Size - 6' X 6')
ASTM C913
10/8/20201333920
Manhole
Fonterra
FRT-6X6-41 I -P RECAST -BASE (Size - 6' X E)
ASTM C913
3/19/2021
334920
Curb Inlets
Thompson Pipe Group
TPG-1 OX3-405-PRECAST INLET"* (Size- I O' X 3')
ASTM 615
3/19/2021
334920
Curb Inlets
Thompson Pipe GroupTPG-15X3-405-PRECAST
INLET** (Size - I5' X 3')
ASTM 615
3/19/2021
334920
Curb Inlets
Thompson Pipe Group
TPG-20X3-405-PRECAST INLET** (Size - 20' X T)
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe GroupTPGAX4-409-PRECAST
TOP (Size - 4' X 4')
ASTM 615
3/19/2021
33 39 20
Manhole
Thompson Pipe GroupTPG-4X4-409-PRECAST
BASE (Size - 4' X 4')
ASTM 615
3/19/2021
33 39 20
Manhole
Thompson Pipe GroupTPG-4X4-412-PRECAST
4-FT RISER (Size- 4' X 4')
ASTM 615
3/192021
33 39 20
Manhole
Thompson Pipe GroupTPG-5X5-410-PRECAST
TOP (Size - 5' X 5')
ASTM 615
3/19/2021
33 39 20
Manhole
Thompson Pipe Group
TPG-5X5-410-PRECAST BASE (Size- 5' X 5')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-5X5-412-PRECAST 5-FT RISER (Size- 5' X 5')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pie Group
TPG-6X6v41 I -PRECAST TOP (Size - 6 X 6')
ASTM 615
3/19/2021
133 3920
Manhole
Thompson Pipe Group
TPG-6X6-411-PRECAST BASE (Size - 6' X 6')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pie Grou
TPG-6X6-412-PRECAST 6-FT RISER (Size- 6' X b').
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-7X7-411-PRECAST TOP (Size - TX T)
ASTM 6t5
3/19/2021
33 39 20
Manhole
Thom son Pie Group
TPG-7X7-411-PRECAST BASE (Size - TX T)
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-7X7412-PRECAST 4-FT RISER (Size- TX T)
ASTM 615
3/19/2021
33 39 20
Manhole
Thompson Pie Group
TPG-8X841I-PRECAST TOP (Size - 8' X 8')
ASTM 615.
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-8X8-41 I -PRECAST BASE (Size - 8' X 8')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pie Group
TPG-8X8-412-PRECAST 5-FT RISER Size- 8' X 8')
ASTM 615
3/19/2021
33 49 20
Drop Inlet
Thompson Pipe Group
TPG-4X4-408-PRECAST INLET (Size - 4' X 4')
ASTM 615
3/192021
33 49 20
Drop Inlet
Thompson Pip. Group
TPG-5X5-408-PRECAST INLET (Size- TX 5')
ASTM 615
3/19/2021
1334920
Drop Inlet
Thompson Pipe Group
TPG-6X6-408-PRECAST INLET (Size - 6' X 6)
ASTM 615
8/28/2023
3349 10
Manhole
Oldcastle
Precast 4' x 4' Stacked Manhole.(Size - 4' X 4')
ASTM C478
8/28/2023
3349 10
Manhole
Oldcastle
Precast Tx 8' Storm Junction Box (Size - 5' X 8')
ASTM C478
828/2023
3349 10
Manhole
01,ha sile
Precast 4' x 4' Storm Junction Box (Size - 4' X 4')
ASTM C478
8/28/2023
33 49 10
Manhole
Oldcaatle
Precast 5' x 5' Storm Junction Box (Size - TX T)
ASTM C478
W28/2023
33 49 10
Manliole
Oldcastle
Precast 6' x 6' Storm Junction Box (Size - 6' X 6')
ASTM C478
8/28/2023
3349 10
Manhole
Oldcastle
Precast 8' x 8' Storm Junction Box Base (Size - 8' X 8')
ASTM C478
8/28/2023
3349 10
Manhole
I Oldeastle
Precast 5' x 8' Storm Junction Box Base (Size - 5' X 8')
ASTM C478
828/2023
3349 10
Manhole
I Rinker Materials
Reinforced 48" Diameter Spread Footing Manhole (Size -4' X 4')
ASTM C433
i
FORT WORTH„ CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 03/31/2026
t Art - Mt, Dec - do erle CM Snrririrntinnc 1
Description I Design
...Storm Sewer - Jnict & Structures Confines
8/28/2023
33 3920
Curb Inlet 10'x 3' Riser
Thom son Pipe Group
Inlet Riser (Size - 3 FT)
ASTM C913-.16
8/28/2023
33 3920
Curb Inlet 15 'x 3' Riser
Thompson Pipe Group
Inlet Riser (Size - 3 FT)
ASTM C913-16
8/28/2023
33 3920
Curb Inlet 20' x 3' Riser
Thom son Pipe Group
Inlet Riser (Size - 3 FT)
ASTM C913-16
1/12/2024
33 49 20
Drop Inlet
AmeriTex Pipe &Products
Drop Inlet (4' X 4')
ASTM C913
1/12/2024
33 49 20
Drop Inlet
AmeriTex Pipe &Products
Drop Inlet (5' X 5')
ASTM C913
t/19/2024
33 49 20
Manhole
AmeriTex Pipe &Products
Precast 4'x4' Storm Junction Box
ASTM C913
1/19/2024
33 49 20
Manhole
AmeriTex Pipe &Products
Precast 5'x5' Storm Junction Box
ASTM C913
l/ 1912024
33 49 20
Manhole
AmeriTex Pipe &Products
5' Precast Transition MB (4' MH on the top of 5' 1B)
ASTM C913
1/19/2024
33 49 20
Manhole
AmeriTex Pipe &Products
1 Precast 6'x6' Storm Junction Box
ASTM C913
l/ 19/2024
33 49 20
Manhole
AmeriTex Pipe &Products
6' Precast Transition MH (4' MH on the top of G JB)
ASTM C913
1/19/2024
33 49 20
Manhole
AmeriTex Pie &Products
Precast 8'x8' Sturm Junction Box
ASTM C913
1/19/2024
33 49 20
Manhole
AmeriTex Pipe &Products
8' Precast Transition MH (4' MH on the top of 8' JB)
ASTM C913
1/19/2024
33 49 20
Manhole
AmeriTex Pipe &Products
Two e C Storm Drain Manhole on Box (4' MH on the top ofRCB)
ASTM C913
7/16/2024
33 49 20
Curb Inlets
AmeriTex Pipe &Products
100 Precast- (Size 1(' x 3')
ASTM C913
7/ 16/2024
33 49 20
Curb Inlets
AmeriTex Pipe &Products
150 Precast** (Size 15' x 3')
ASTM C913
"'Noce: Pre-rnsr in/enu.¢ ovvroveAjorthe crag¢ IPu,rion ojrb¢ mucrure @asin) nnty. Sorge upnrrion njrhe murrure are requ;red m be con in -place. No ucepnon. ra thin regriremrntxhall h¢ alloweA.
Storm Sewer - Pines & Boxes 33-05-13
4/9/2021
3341 13
Storm Dmin Pipes
Advanced Drainage Systems, Inc. (ADS)
ADS HP Storm Polypropylene (PP) Pipe (Size - 12" - 60")
ASTM F2981 & AASHTO M330
8/28/2023
3341 10
Storm Drain Pipes
Rinker Materials
Reinforced Concrete Pipe Tongue and Groove Joint Pipe (Size - 21" or larger)
ASTM C76, C655
8/28/2023
3341 10
Culvert Box
Rinker Materials
Reinforced Concrete Box Culvert (Sze - Various)
ASTM C789, C850
10/12/2023
3341 10
Storm Drain Pipes
AmeriTex Pipe &Products
Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger)
ASTM C76. C506
10/12/2023
3441 10
Culvert Box
AmeriTex Pi &Products
Reinforced Concrete Box Culvert (size- Various))
ASTM C 1433.0 1577
10/18/2023
3541 10
Storm Drain Pipes
The Turner Co.
Reinforced Concrete Pipe Tongue and Gronve Joint Pipe* (Size - 15" or larger)
ASTM C76, C506
10/19/2023
3341 10
Culvert Box
The Turner Co.
Reinforced Concrete Box Culvert (size - Various)
ASTM C1433,CI577
4/ 12/2024
3341 10
Storm Drain Pipes
Thompson Pipe GroupReinforced
Concrete Pipe Tongue and Groove Joint Pipe* (Size Various)
ASTM C76, C506
6/25/2024
3341 10
Culvert Box
Oldeastle
Reinforced Concrete Box Culvert
ASTM C1433,C1577
6/25/2024
13341 10
Storm Drain Pipes
Oldcaute
Reinforced Concrete Pipe Tongue and Groove Joint Pi e* (Size Various
ASTM C76. C506
Revision Comments
(1-29-2025) Removed Argos, Ingram, Redi-Mix, Charley's
(4-32025) Bigtovm Concrete updated Mix ID's
(4-5-2025) 03 34 13 CLSM specification
(11 26-2025) Removed Gilco-site, batch plant
Monthly New Entirea.
CFW Lighting Approved Products List
CFW Product Name
Manufacturer
Manufacturer Product Name &Description
Residential -Standard
MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm,
Makers Sales and Marketing, LLC
Galvanized
MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm,
Type 11 Pole
Makers Sales and Marketing, LLC
Black
DB01373(page 1 of 6)-Shoe Base Pole Type 11,
Valmont Industries, Inc
Galvanized
Makers Sales and Marketing, LLC
Type 33B, 36" Rise Simplex 8' Arm, Galvanized
Makers Sales and Marketing, LLC
Type 33B, 36" Rise Simplex 8' Arm, Black
Type 33B Arm
Valmont Industries, Inc
D1301373(page 4 of 6)-Single Arm Type 33B, Galvanized
American Electric Lighting, ATB0-P101-Mvolt-R2-3K-
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD325607
American Electric Lighting, ATB0-P101-Mvolt-R4-3K-
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD325606
Residential Luminaire
American Electric Lighting, ATB0-P101-Mvolt-R2-3K-BI<
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD325609
American Electric Lighting, ATB0-P101-Mvolt-R4-3K-BI<
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD325608
McFarland Cascade
CREOSOTE 30/35 FOOT TIMBER POLE
Timber Pole
Bayou Forest Products
30-35' .80 CCA Green Timber Pole
Makers Sales and Marketing, LLC
Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized
Wood Pole Arm
Makers Sales and Marketing, LLC
lWood Pole Arm, 36" Rise Simplex 8' Arm, Black
Valmont Industries, Inc
I DB01373(page 6 of 6)-Wood Pole Arm, Galvanized
Arterial -Standard
MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm,
Makers Sales and Marketing, LLC
Galvanized
MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm,
Type 18 Pole
Makers Sales and Marketing, LLC
Black
DB01373(page 2 of 6)-Shoe Base Pole Type 18,
Valmont Industries, Inc
Galvanized
Makers Sales and Marketing, LLC
Type 33A, 60" Rise Simplex 8' Arm, Galvanized
Makers Sales and Marketing, LLC
Type 33A, 60" Rise Simplex 8' Arm, Black
Type 33A Arm
Valmont Industries, Inc
DB01373(page 3 of 6)-Single Arm Type 33A, Galvanized
American Electric Lighting, ATBO-P303-Mvolt-R2-31<-
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD322792
American Electric Lighting, ATBO-P303-Mvolt-R4-31<-
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD322794
Arterial Luminaire
American Electric Lighting, ATBO-P303-Mvolt-R2-3K-BI<
Acuity Brands Lighting, Inc.
M P-N L-P7-AO-RFD322793
Acuity Brands Lighting, Inc.
American Electric Lighting, ATB0-P303-Mvolt-R4-3K-BI<
M P-N L-P7-AO-RFD322795
McFarland Cascade
CREOSOTE 35/40 FOOT TIMBER POLE
Timber Pole
Bayou Forest Products
30-35' .80 CCA Green Timber Pole
Makers Sales and Marketing, LLC
Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized
Wood Pole Arm
Makers Sales and Marketing, LLC
Wood Pole Arm, 60" Rise Simplex 8' Arm, Black
Valmont Industries, Inc
DB01373 page 5 of 6 -Wood Pole Arm, Galvanized
Decorative -Pedestrian
Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB-31-4RFD110736
Washington 10' Pole
Acuity Brands Lighting, Inc.
Holophane, CLA14FT J20DMODC03BK RFD325026, AB -
Washington 14' Pole
Acuity Brands Lighting, Inc.
16-4 SPEC RFD325026
Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7
Washington Luminaire
Acuity Brands Lighting, Inc.
FRGL RFD338699
Washington Globe
Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7
Luminaire
Acuity Brands Lighting, Inc.
AO RFD-315548
Oleander Type A Pole
Acuity Brands Lighting, Inc.
Holophane, PDA 12S5L20POBBK-MOD
Oleander Type B Pole
Acuity Brands Lighting, Inc.
Holophane, PDA20S5L20P08BK-MOD
Oleander Type B Arm
Acuity Brands Lighting, Inc.
Holophane, OHC 151N 2A TN BK
Holophane, AUCL2 P40 30K AS BK L3 N P7 AO
Oleander Luminaire
Acuity Brands Lighting, Inc.
RFD338741
Berry 12' Pole
Acuity Brands Lighting, Inc.
Holophane, RSA 12 50 G12 SC BK AB-26-4 RFD326400
Berry 20' Pole
Acuity Brands Lighting, Inc.
Holophane, PD20S5J20P11BK RFD338816
Berry Arm
Acuity Brands Lighting, Inc.
Holophane, VLC 271N 1A TN QSM BK
Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7
Berry Luminaire
Acuity Brands Lighting, Inc.
AO SH
Banner Arms
Acuity Brands Lighting, Inc.
Holophane, BA-241N-2A-CO-S4J-BL-075P-BK
System
Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651
Cantex Inc.
specifi cations and NEMA TC2, Rated for 90°C Cable,
Sunlight Resistant, 10' Lengths and 20' lengths
Rigid Nonmetallic Schedule 80 Electric Conduit, Meets
UL 651 specifications, RUS listed, NEMA TC-2 and
Heritage Plastics
NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather
Conduit
Resistant
PVC Rigid Schedule 80 Conduit, Conforms to UL 651
Atkore-Heritage Plastics
and NEMA TC 2, Sunlight Resistant, Listed for 90°C
conductors or cable
Schedule 80 PVC Rigid Nonmetallic Conduit, Extra
Prime Conduit, Inc
Heavy Wall EPC-80, Sunlight resistant, Rated for use
with 90°C conductors, Meets UL651
Splice Kit With Connector
NSi Industries, LLC
Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK
Series
Southwire
Type XHHW-2 copper conductor, 600V
TYPE XHHW-2 / RW90, copper conductor, Superslick
Encore Wire
Elite, 600V/1000V
Encore Wire
THHN / MTW / THWN-2 Copper conductor, 600V
Copper Wire/Conductor
Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT
Service Wire Co
Rated
XHHW-2 Low Smoke Halogen Free, Cross -linked
Advanced Digital Cable Inc
Polyethylene Insulated 14 AWG-750 MCM, 600 Volts,
90°C Dry and wet
Aluminum Wire -Triplex
Priority Wire & Cable, Inc
Triplex Overhead Aluminum Conductor
General Purpose, Midget Class MEN Fuses, Voltage
Edison
Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps,
Interrupting Rating: 10,000 RMS Amps @ 125V
Modular Ferrule Fuse Blocks for Midget Class and CC
Edison
Fuses
Fuse & Fuse Holder
In -line fuse holders for Single -Pole 13/32" x 1 1/2"
Cooper
Fuses HEB-AA
Bussmann Series, HEB breakaway and non -breakaway
EATON
in -line fuse holders for UL 13/32" x 1-
1/2"supplemental fuses
Bussmann Series, FNM 13/32- x 1-1/2- 250Vac time -
delay supplemental fuses
Wire Joints for Copper Conductor, Cat No: 54615,
Connector
Thomas &Betts
54620, 54625-TB, 54635, 54640, 54630
Electrol Systems, Inc
TY A (120/240) 100(NS)AL(E)PS(U)
Metered Pedestal 120-240V
WE Manufacturing & Controls
TY A 120/240 100(NS)AL(E)PS(U)
Metered Pedestal 240-
Electrol Systems, Inc
TY A (240/480) 100(NS)AL(E)PS(U)
WE Manufacturing & Controls
TY A 240/480 100(NS)AL(E)PS(U)
480V
Polymer Concrete, PHA132412X0002: TIER 22 (X) 22,
MacLean Highline
500lbs
Polymer Concrete, H-SERIES UNIT, H1730-24 TIER-22 -
Oldcastle
TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING
Ground Box
NUT
Polymer Concrete, H-SERIES UNIT, H1324-24 TIER-15 -
Oldcastle
TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING
NUT
Split Bolt Connectors, Copper Split Bolts 2 Wire, N
Kearneys
NSi Industries, LLC
Series
Dark To Light, DLL Elite, Electronic Locking, Type
Photocell
Acuity Brands Lighting, Inc.
Photocontrol, DLL-127 or DLL-480
Shorting Caps
Acuity Brands Lighting, Inc.
Dark To Light, Part # DSHORT SBK U
Interim Products
Residential Luminaire
ITRASTAR INC.
DURA-STR10A-3K-120-3-GR-SCL
Arterial Luminaire
ITRASTAR INC.
DURA-STR25-3K-120-3-GR-SCL