Loading...
HomeMy WebLinkAbout062925-CO2 - Construction-Related - Contract - McMahon Contracting and Construction, LLCCSC No. 62925-0O2 FORT WORTH: City of Fort Worth s 11" Change Order Request Project Name Golden Triangle Boulevard City Sec # 62925 Client Project #(s)l 101013 Project Golden Triangle realignment, paving, striping, sidewalks, traffic signals, drainage, and waterline from Misty Redwood Trail to 1-35W Description Contractor McMahon Contracting and Construction, L.L.C. Change Order# 2 Date 6/18/2026 City Project Mgr. Bereket Birhane I City InspectorL___ Ben Weaverling Dept. TPW Contract Time Totals (CD) Original ContractAmount $10,824,277.43 $10,824,277.43 575 Extras to Date 38 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $10,824,277.43 $10,824,277.43 613 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0,00% MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $13,530,346.79 1 Delete a duplicate Bid Item No. 27 (0241.1510 Remove & Salvage Existing Fire Hydrant) from the contract. Installing the Location 8 blow -off valve required additional time and cost due to an unexpected 25 ft waterline depth, which exceeded the anticipated 10 ft. Added costs include haring, extra manhole component materials, and additional crew and equipment time. Attached is a detailed breakdown for labor, materials, and equipment. The storm sewer line "D" was shifted at STA 18+43.79 to avoid conflict with an existing gas line, which was not located as shown in the plans. Attached is a detailed reakdown for labor, materials, and equipment. Vacuum excavation was used to find and uncover a water valve that was needed to isolate a section in Location 4 for a fire hydrant relocation. Attached are a detailed of labor and equipment, and the subcontractors itemized invoice. An additional 8" gate valve was installed to isolate a section for water line Location 1 due to the high pressure on the 12" gate valve coming from the 24' main. Attached is a etailed breakdown for labor, materials, and equipment. With the property owner's approval, an automation system was added to the proposed 40 ft rolling gate at STA 62+50 to match existing conditions. Attached is a detailed reakdown for labor, materials, and equipment. Payment was made to Tri-County to power the traffic signal at the Golden Triangle and Golden Heights intersection. Attached is an itemized Tri-County invoice. Water barriers were used to block off a drop off during the installation of the 8" gate valve at Location 1. The unit price has been verified to be consistent with the original All six TY B ground boxes were replaced with TY D boxes as recommended by the City's signal inspectors due to limited space in the TY B boxes. The total net cost of $97,199.60 is being offset by an equal reduction in the Construction Allowance bid item. Therefore, the net contract amount increase is $0.00. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractors Company Name Contractor Name Contract Signature Date McMahon Contracting and Construction, L.L.C. Sam Reynolds ic5eynolds (Jul 1 , 2026 lei 494 07/15/2026 Supervisor Date Project and Contract Com liance Mana er Date 07/09/2026 �Le - 8. 202E 6.31 �51 CDTanager 07/08/2026 Llns�Dectorllnspecton Date Senior Capital Project Officer Date 07/22/2026 _ 07/22/2026 Date Director, Contracting Da rtment Dept Date Patricia L Wadsack (Jul 28, 2026 10:58:28 CDT) 07/28/2026 %w 07/28/2026 Assistant City Attom �, a26 z a e or Date O 08/03/2026 Assistant City Manager Date 08/11/2026 Council Action (if required) 4 000n M&C Number j N/A M&C Date Approved WA ATTEST: Od o ��10_ Jannette Goodall, City Secretary 0 *ova 4 0 v OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth Iv-- Change Order Additions Project Name Golden Triangle Boulevard City Sec # 62925 Client Project # 101013 Contracto McMahon Contracting and Construction, L.L.C. PMJ Bereket Birhane Inspectol Ben Weaverling Change Order Submittal # Date 6/18/2026 ADDITIONS ITEM I DESCRIPTION DEPT I Qtv Unit Unit Cost I l 915 Blow -off 8 Additional Depth TPW 1.00000000 LS $50,233.95 $50 233.95 916 Storm D Gas Conflict TPW 1.00000000 EA $7,143.18 $7,143.18 917 Pothole Existing Water- Location 4 TPW 1.00000000 EA $4,331.84 $4,331.84 918 Added 8" GV American Track TPW 1.00000000 EA $3,477.08 $3 477.08 919 Gate Automation TPW 1.00000000 LS $15,234.46 $15,234.46 920 Tri-CountyPower Drop TPW 1.00000000 LS $6,716.7 $6,716.79 911 Barrier- Water or Low Profile TPW 2.00000000 MO $3,232.5 $6 465.14 827 F&I Ground Box TY D W/ Apron TPW 6.000000001 EA $2,891.901 $17,351.40 TPW $110,953.84 Sub Total Additions $110 953.84 Change Order Additions Page 2 of 4 FORTWORTH City of Fort Worth —�- Change Order Deletions Project Name Golden Triangle Boulevard City Sec # 62925 Client Project# 101013 Contr=brF McMahon Contracting and Construction, L.L.C. PM Bereket Birhane Inspector Ben Weaveriing Change Order Submittal # Date 6118/2026 DELETIONS ITEM DESCRIPTION DEPT O Unit Unit Cost Total 27 0241.1510 Remove & Salvage Existing Fire Hydrant TPW 4.00000000 EA $911.51 $3,646.04 826 F&I Ground Box TY B W/Apron TPW 6.00000000 EA $1,684.70 $11 8.20 906 9999.XXXX Construction Allowance TPW 97,199.60000000 EA $1.00 $97,199.60 TPW $110,953.84 Sub Total Deletions 110 953.84 Change Order Deletions Page 3 of 4 M/SBE for this Change Order Previous Change Orders CO# DATE AMOUNT 1 9/10/2025 $0.00 Total $0.00 a� c O a O N L O N LO L LL H- U W Lii Q � c a O ui x J 0) C)r w O O U a (D 0() O m H C`7 0 O CU C CO C C a O N N V @ O U C)CV O L 00 L N 0 a d N m N m L Q �� O C C O Y M Y E E M O p L N N CU U) M 0-U-m 00 m w O LL C Vl O O m (DLO O fT6 O O r W 0 zLO i Cn - � p r r CD N V C"! m N W O M O � .�� M co ' U 6 E» E» E» Ey 61> E» 60 E» H W z U rn `tq o co P- to Po m a. Cl) N M I- M (V O M W m M 't r- N CO w vs c} H lW Z O O O O O O o CD Cl O CD O o O O O O O W Q co CD 06 U U � � H C1 W Z O O O O O O O o O O O O O O _ O C� O o CY a a� Z� O O O O O V (D N QO 00 U. W O� H Q Z J W W W J J W W W C C c0 U O O O it a)U 6 U 2 H Q O O Q Q z -j o 0 3 O ccc o U � @ a� E 3 IL L) "O a N E Q O O d O x p CT c > T c N is O m O m W , -: o E .O x 00 (aO U U > "a > "C _o o C7 i O O _O m 6 Q m 7 C r W H W Z W Z W Z W Z W Z W Z rn N 00 N co O 0 r N Cfl LO v CO O 0 ti C O O. C d V l6 'a l0 w w x O C. w O = L d 3 L m L Y 'O o C A d of c 'O 'C m c c c o Q E = C a U a m � y E G = ° a 0) cf :2 O C CO O C) m (A ` a LL Y yN M m m L` C 0f L s L CO E m 3a da d x O o p •` C L E O m as d ch O = M ° tm � r s tLa 0 p ° U d d O.0 H'a.0 a C N U = Y m M v Q 2 N R C ql tllw C Gf6 = E 10 . = L Y ° O <0 s O ` — e E ° a m E c O s m E O y o 0 LL d i �wdm.�. C O O N C In M w d= M O H R C m -0 U 31 3, � d '� 0 O V 0 W c mfOO�ea�'imwo c 3 0 c x vi c U w C C O O v O c Y 'C •L E a o� .o U L O C N°- 7> I CO zamcnaa_==�� : �: N M 14 N CD 1.: 2 EMA"ON CONTRACTING L.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Ilowoff Location 8 Additional Depth LABOR DESCRIPTION QTY UNIT HR REQUIRED Hr RATE EXTENDED COST Foreman Excavation 1.00 Hr 10.00 $ 47.50 $ 475.00 Excavation Operator 1.00 Hr 10.00 $ 26.00 $ 260.00 Excavation Laborer 2.00 Hr 10.00 $ 20.00 $ 400.00 Hr $ - Hr I$ Hr $ Hr $ Hr $ Hr $ LABOR COST $ 1,135.00 LABOR MARKUP 20%$ 170.25 55% LABOR BURDEN $ 624.25 TOTAL LABOR COST $ 1,929.50 E UIPMENT DESCRIPTION QTY UNIT HR REQUIRED HR RATE EXTENDED COST Track Hoe 1.00 HR 10.00 $ 174.16 $ 1,741.60 Foreman Truck 1.00 HR 10.00 $ 47.17 $ 471.70 HR $ 47.17 $ - HR $ HR $ EQUIPMENT COST $ 2,213.30 15% EQUIPMENT MARKUP 20% $ 332.00 TOTAL EQUIPMENT COSI MATERIALS DESCRIPTION I QTY I UNIT UNIT COST EXTENDED COST Winwater Risers Invoice Attached 2.001 EA 2067.00 $ 4,134.00 CBS $ LS 1 1$ MATERIAL COST $ 4,134.00 MATERIAL MARKUP 20% $ 620.10 I D I AL MA I LKIAL GU5 I $ 4,154.1U SUBCONTRACTORS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Laughley- Removals (Invoice Attached) 1.00 LS $11,266.67 $11,266.67 Lau hley- Install Invoice Attached 1.00 LS $22,489.74 $22,489.74 SUBCONTRACTOR COST $33,756.41 SUBCONTRACTOR MARKUP 20% $ 6,751.28 TOTAL SUBCONTRACTOR COST $40,507.69 COSTSUMMARY TOTAL LABOR COST $ 1,929.50 TOTAL EQUIPMENT COST $ 2,545.30 TOTAL MATERIAL COST $ 4,754.10 TOTAL SUBCONTRACTOR COST $40,507.69 1 % BOND $ 497.37 TOTAL COST $50,233.95 Total Cost: $50,233.95 Unit Cost: $50,233.95 1 EA "Notes- See Attached invoices for back-up and breakdown of cost. $ 2,545.30 CQUkTY 1 tier �YA;'Ea SSW-H SiJP.h^ JOHNSON COUNTY WINWATER CO. 7636 S INTERSTATE 35 WEST ALVARADO, TX 76009-3429 MCMAHON CONTRACTING AND CONSTR 3019 ROY ORR BLVD GRAND PRAIRIE, TX 75050-7108 Page Date Printed Invoice No. 7] 1 7/14/25 007183 02 To Reorder Contact Us At J Phone No. (817)345-0500 Fax No . (817) 345-0533 DB# 10 7 F Ship To: L MCMAHON GOLDEN TRIANGLE BLVD 2581 GOLDEN TRIANGLE BLVD FORT WORTH, TX 76177-5002 Customer N,,,be_ Customer Purchase order Job Name 00421-001438 24-032 FTW GOLDEN TRIANGLE Placed - - Type Shipment Sh , -. ,. Gate Shipoed SAM O11-KENNETH YUHAS Stock OUR TRUCK 7/14/25 THANK YOU FOR YOUR ORDER! Units Ordered U/M Item De s c r i p t i on Shipped Units B/C P r i c e Per Discount E x t e n d e d Tax 1 EA HM30 ERGO HINGED WT R/C SAN 0 B 1,240.2600 .00 .00 N 2 EA 72X78RSR 2 2,067.0000 .00 4,134.00 N 72X78 RISER "View and print your Invoices online! Go to www.winsupplyinc.com" Terms: Monthly Finance Charge May Pe Applied To Past Due Accou nts. Tax Area ID: Net Shces 4, 134.00 1 . 5 0 30, NET 31 TX - 442513025 Freight .00 If Paid By 8/13/25 You May Deduct 62.01 state Tax o .000 state Tax .00 Pay full balance by 8/14/25 Local Tax .a .000 Local Tax .00 J Invoice Amount 4,134.00 I—— cQ 11 '�N1;�ERS<W<_p5IJP3' When you provide a check as payment, you authorize us either to use information from your check to make a one-time electronic fund transfer from your account or to process the payment as a check. transaction. For inquiries please call (817) 345-0500. T&C: You agree that the sale of these products/services is subject to all of our standard terms and conditions of sale located at www.winsupplyinc.com/tcsale. INVOL[ELP Lauer Ivvoice FORT WORTK., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Golden Triangle Boulevard Change Order 42 M&C: N/A CPN: 101013 CSO: 62925 DOC#: N/A Date: 6/18/2026 To: Name Department Initials Date Out 1. Filo Munoz TPW - Review r-M FM 07/08/2026 2. Bereket Birhane TPW - Signature BBB 07/08/2026 3. Sam Reynolds McMahon - Sign SJR 07/15/2026 4. Ben Weaverling TPW - Signatures 07/09/2026 5. Raul Lopez TPW - Signature 07/22/2026 6. Lissette Acevedo TPW — Signature 07/22/2026 7. Patricia Wadsack TPW — Signature pLW 07/28/2026 8. Lauren Prieur TPW — Signature "ee' P�e� 07/28/2026 9. Doug Black Legal — Signature 08/03/2026 10. Jesica McEachern CMO — Signature 08/11 /2026 11. Jannette Goodall CSO - Signature neH2n eGoodall 08/12/2026 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Return To: Please notify TPWContracts(a fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: McMahon Contractinq and Construction, LLC Subject of the Agreement: Change Order No. 2 to CSC No. 62925, a Contract for Golden Triangle Boulevard Project M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 101013 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department. Laughley Bridge and McMahon Contracting - Golden Triangle Construction, Inc. Storm Drain Scope Work Description: 8" BLOW OFF VALVE Work Performed: DATE: 6/18/25-7/16/25 EBMLStation: 8" BLOW OFF VALVE -EXCAVATION, DEMO EXISITNG EBML Station: MANHOLE +THRUST BLOCKS Quantity: Hours Worked Name of Team Member Employee No. Regular Hours Rate Per Reg. Hour Overtime Hours Rate per Overtime Hour Extended Labor Costs Labor Burden (55%) Total Burdened Labor Costs Time Work Started Time Work Finished Comments (Work Performed) H. Laughley 10.00 $ 47.50 $ 71.25 $ 475.00 $ 261.25 $ 736.25 R. Quintana 10.00 $ 24.00 $ 36.00 $ 240.00 $ 132.00 $ 372.00 J. Villanueva 10.00 $ 2400 $ 36.00 $ 240.00 $ 132.00 $ 372.00 J. Villanueva, Jr. 10.00 $ 26.00 $ 39.00 $ 260.00 $ 143.00 $ 403.00 A. Sanchez 10.00 $ 23.50 $ 35.25 $ 235.00 $ 129.25 $ 364.25 P. Martinez 10.00 $ 23.00 $ 34.50 $ 230.00 $ 126.50 $ 356.50 E. Rodriguez 10.00 $ 21.50 $ 32.25 $ 215.00 $ 118.25 $ 333.25 SUBTOTAL, LABOR: 70.00 $ 1,895.00 $ 1,042.25 $ 2,937.25 LABOR MARKUP (15%) $ 440.59 TOTAL LABOR AMOUNT: $ 3,377.84 EQUIPMENT: Equipment Description Equipment No. Hours Worked Hourly Work Rate Extended Costs Comments (Work Performed) 1 Ton Diesel Truck -4x4 10.00 $ 37.50 $ 375.00 Utility Trailer 10.00 $ 14.66 $ 146.60 3/4 Ton Diesel Truck - 44 10.00 $ 34.18 $ 341.80 Generator 10.00 $ 14.16 $ 141.60 Stihl Chop Saw 10.00 $ 13.91 $ 139.10 Jack Hammer -60# 10.00 $ 24.12 $ 241.20 Water Pump -2"+Hoses 10.00 $ 22.02 $ 220.20 Water Pump -3"+Hoses 10.00 $ 27.03 $ 270.30 Wheel Loader (3.4 - 4.2 CY) 10.00 $ 32.18 $ 321.80 Excavator - (100,000#) 10.00 $ 155.63 $ 1,556.25 SUBTOTAL, EQUIPMENT: 100.00 - $ 3,753.85 EQUIPMENT MARKUP (10%) $ 375.39 TOTAL EQUIPMENT AMOUNT: 1 $ 4,129.24 MATERIALS: Material Description Quantity Unit of Measure Unit Price Extended Costs Taxes as Applicable Costs with Tax Comments (Work Performed) TRENCH BOX 1.00 LS $ 3,417.81 $ 3,417.81 $ $ 3,417.81 SUBTOTAL, MATERIALS: $ 3,417.81 $ $ 3,417.81 MATERIAL MARKUP(10%) $ 341.78 TOTAL MATERIAL AMOUNT: $ 3,759.59 Lower -Tier SUBCONTRACTORS: Subcontractor Name Quantity or Hours Unit of Measure Unit Price Extended Costs Taxes as Applicable Costs with Tax Comments (Work Performed) $ $ $ $ $ $ SUBTOTAL, SUBCONTRACTORS: $ $ $ SUBCONTRACTOR MARKUP (5%) 5.00% $ TOTAL, SUBCONTRACTORS: $ - Total, Labor: $ 3,377.84 Total, Equipment: $ 4,129.24 Total, Materials: $ 3,759.59 Total, Subcontractors: $ - TOTAL, All Costs: $ 11,266.67 Bond (0%): TOTAL PRICE: $ 11,266.67 Resources & Time Recorded By: Charles Laughley Subcontractor Representative Resources & Time Agree To By: Client Representative Laughley Bridge and McMahon Contracting - Golden Triangle Construction, Inc. Storm Drain Scope Work Description: 8" BLOW OFF VALVE Work Performed: DATE: 6/18/25-7/16/25 EBMLStation: 8" BLOW OFF VALVE - LAY DUCTILE IRON PIPE,FORM & EBMLStation: POUR MANHOLE BASE, SET NEW MANHOLE, INSTALL Quantity: VALVE STACK+ VALVE AND BACKFILL Hours Worked Name of Team Member Employee No. Regular Hours Rate Per Reg. Hour Overtime Hours Rate per Overtime Hour Extended Labor Costs Labor Burden (55%) Total Burdened Labor Costs Time Work Started Time Work Finished Comments (Work Performed) H. Laughley 20.00 $ 47.50 $ 71.25 $ 950.00 $ 522.50 $ 1,472.50 R. Quintana 20.00 $ 24.00 $ 36.00 $ 480.00 $ 264.00 $ 744.00 J. Villanueva 20.00 $ 24.00 $ 36.00 $ 480.00 $ 264.00 $ 74400 J. Villanueva, Jr. 20.00 $ 26.00 $ 39.00 $ 520.00 $ 286.00 $ 806.00 A. Sanchez 20.00 $ 23.50 $ 35.25 $ 470.00 $ 258.50 $ 728.50 P. Martinez 20.00 $ 23.00 $ 34.50 $ 460.00 $ 253.00 $ 713.00 E. Rodriguez 20.00 $ 21.50 $ 32.25 $ 430.00 $ 236.50 $ 666.50 $ $ $ $ $ $ $ $ SUBTOTAL, LABOR: 140.00 $ 3,790.00 $ 2,084.50 $ 5,874,50 LABOR MARKUP (15%) $ 881.18 TOTAL LABOR AMOUNT: $ 6,755.68 EQUIPMENT: Equipment Description Equipment No. Hours Worked Hourly Work Rate Extended Costs Comments (Work Performed) 1 Ton Diesel Truck -4x4 20.00 $ 37.50 $ 750.00 Utility Trailer 20.00 $ 14.66 $ 293.20 3/4 Ton Diesel Truck - 44 20.00 $ 34.18 $ 683.60 Generator 20.00 $ 14.16 $ 283.20 Stihl Chop Saw 20.00 $ 13.91 $ 278.20 Jack Hammer -60ri $ 24.12 $ Water Pump -2"+Hoses - $ 22.02 $ - Water Pump -3"+Hoses $ 27.03 $ Wheel Loader (3.4 - 4.2 CY) 20.00 $ 32.18 $ 643.60 Excavator - (100,000#) 20.00 $ 155.63 $ 3,112.50 SUBTOTAL, EQUIPMENT: 1 $ 6,04730 EQUIPMENT MARKUP (10%) $ 604.43 TOTAL EQUIPMENT AMOUNT: $ 6,648.73 MATERIALS: Material Description Quantity Unit of Measure Unit Price Extended Costs Taxes as Applicable Costs with Tax Comments (Work Performed) TRENCH BOX 1.00 LS $ 6,835.63 $ 6,835.63 $ $ 6,835.63 24"-33" TRENCH BEHIND ROLLER 1.00 LS $ 1,209.37 $ 1,209.37 $ - $ 1,209.37 ROCK 6.70 TON $ 32.00 $ 214.40 $ $ 214.40 SUBTOTAL, MATERIALS: $ 8,259.40 $ $ 8,259.40 MATERIAL MARKUP(10%) $ 825.94 TOTAL MATERIAL AMOUNT: IS 9,085.34 Lower -Tier SUBCONTRACTORS: Subcontractor Name Quantity or Hours Unit of Measure Unit Price Extended Costs Taxes as Applicable Costs with Tax Comments (Work Performed) $ $ $ $ $ $ SUBTOTAL, SUBCONTRACTORS: $ $ $ SUBCONTRACTOR MARKUP (5%) 5.00% $ TOTAL, SUBCONTRACTORS: $ - Total, Labor: $ 6,755.68 Total, Equipment: $ 6,648.73 Total, Materials: $ 9,085.34 Total, Subcontractors: $ - TOTAL, All Costs: $ 22,489.74 Bond (0%): TOTAL PRICE: $ 22,489.74 Resources & Time Recorded By: Charles Laughley Subcontractor Representative Resources & Time Agree To By: Client Representative EMA"ON CONTRACTING L.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Storm D Gas Conflict LABOR DESCRIPTION QTY UNIT HR REQUIRED Hr RATE EXTENDED COST Hr $ 42.00 $ Hr $ 22.75 $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr J 1$ LABOR COST $ LABOR MARKUP #REF! $ 55% LABOR BURDEN $ TOTAL LABOR COST EQUIPMENT DESCRIPTION QTY UNIT HR REQUIRED HR RATE EXTENDED COST HR $ 165.00 $ HR $ 165.00 $ HR $ HR $ HR $ EQUIPMENT COST $ 15% EQUIPMENT MARKUP #REF! $ TOTAL EQUIPMENT COST MATERIALS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST MO $ CBS $ LS I Is MATERIAL COST $ MATERIAL MARKUP #REF! $ TOTAL MATERIAL COST SUBCONTRACTORS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Laughley Bridge & Road T&M 1.00 LS $ 5,893.71 $ 5,893.71 $ $ SUBCONTRACTOR COST $ 5,893.71 SUBCONTRACTOR MARKUP 20% $ 1,178.74 TOTAL SUBCONTRACTOR COST $ 7,072.45 COSTSUMMARY TOTAL LABOR COST $ TOTAL EQUIPMENT COST $ TOTAL MATERIAL COST $ TOTAL SUBCONTRACTOR COST $ 7,072.45 1%BOND $ 70.72 TOTAL COST $ 7,143.18 Total Cost: $7,143.18 Unit Cost: $7,143.18 1 LS **Notes- See attached invoice for breakdown of charges Laughley Bridge and McMahon Contracting- Golden Triangle Construction, Inc. Storm Drain Scope Work Description: RE -LAY 21" RCP Work Performed: DATE: 8/16/2025 EBML Station: EBML Station: F2V' RCP Quantity: LABOR: Hours Worked Rate per Labor Total Name of Team Member Employee Regular Rate Per Overtime Overtime Extended Burden Burdened Time Work Time Work Comments No. Hours Reg.Hour Hours Hour Labor Costs (55%) Labor Costs Started Finished (Work Performed) H. Laughley 7.00 $ 47.50 $ 71.25 $ 332.50 $ 182.88 $ 515.38 R. Quintana $ 24.00 7.00 $ 36.00 $ 252.00 $ 138.60 $ 390.60 J. Villanueva $ 24.00 7.00 $ 36.00 $ 252.00 $ 138.60 $ 390.60 J. Villanueva, Jr. $ 26.00 7.00 $ 39.00 $ 273.00 $ 150.15 $ 423.15 A.Sanchez $ 23.50 7.00 $ 35.25 $ 246.75 $ 135.71 $ 382.46 P. Martinez $ 23.00 7.00 $ 34.50 $ 241.50 $ 132.83 $ 374.33 B. Bennett $ 23.00 7.00 $ 34.50 $ 241.50 $ 132.83 $ 374.33 $ $ $ $ $ $ $ $ $ $ $ $ SUBTOTAL, LABOR: 7.00 42.00 $ 1,839.25 $ 1,011.59 $ 2,850.94 LABOR MARKUP (15%) $ 427.63 TOTAL LABOR AMOUNT: $ 3,278.46 EQUIPMENT: Equipment Description Equipment No. Hours Worked Hourly Work Rate Extended Costs Comments (Work Performed) 1 Ton Diesel Truck - 44 7.00 $ 37.50 $ 262.50 Utility Trailer 7.00 $ 14.66 $ 102.62 3/4 Ton Diesel Truck -4x4 7.00 $ 34.18 $ 239.26 Generator 7.00 $ 14.15 $ 99.12 Excavator 7.00 $ 110.63 $ 774.41 Wheel Loader (3.4 - 4.2 CY) 7.00 $ 32.18 $ 225.26 24"-33" Trench Roller 7.00 $ 87.19 $ 610.33 $ $ SUBTOTAL, EQUIPMENT: 49.00 $ 2,313.50 EQUIPMENT MARKUP (10%) $ 231.35 TOTAL EQUIPMENT AMOUNT: $ 2,544.85 MATERIALS: Material Description Quantity Unit of Measure Unit Price Extended Costs TaApplixes as cable Costs with Tax Comments (Work Performed) ROCK 2.00 TON $ 32.00 $ 64.00 $ $ $ $ $ $ SUBTOTAL, MATERIALS: $ 64.00 $ $ 64.00 MATERIAL MARKUP (10%) $ 6.40 TOTAL MATERIAL AMOUNT: $ 70.40 Lower -Tier SUBCONTRACTORS: Subcontractor Name Quantity or Hours Unit of Measure Unit Price Extended Costs Taxes as Applicable Costs with Tax Comments (Work Performed) $ $ $ $ $ - $ - SUBTOTAL, SUBCONTRACTORS: $ $ $ SUBCONTRACTOR MARKUP (5%) 5.00% $ TOTAL, SUBCONTRACTORS: $ Total, Labor: $ 3,278.46 Total, Equipment: $ 2,544.85 Total, Materials: $ 70.40 Total, Subcontractors: $ TOTAL, All Costs: $ 5,893.71 Bond (0%): TOTAL PRICE: $ 5,893.71 Resources & Time Recorded By: Charles Laughley Subcontractor Representative Resources & Time Agree To By: Client Representative Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Pothole Existing Water- Location 4 LABOR EMAHON CONTRACTING L.P. DESCRIPTION QTY UNIT HR REQUIRED Hr RATE EXTENDED COST Laborer Skilled 1.00 Hr 10.00 $ 21.50 $ 215.00 Hr $ - Hr $ Hr $ Hr I $ Hr $ Hr $ Hr $ Hr $ LABOR COST $ 215.00 LABOR MARKUP #REF! $ 32.25 55% LABOR BURDEN $ 118.25 TOTAL LABOR COST EQUIPMENT $ 365.50 DESCRIPTION QTY UNIT HR REQUIRED HR RATE EXTENDED COST Foreman Truck 1.00 HR 10.00 $ 47.17 $ 471.70 HR $ - HR $ HR $ - EQUIPMENT COST $ 471.70 15% EQUIPMENT MARKUP #REF! $ 70.76 TOTAL EQUIPMENT COST MATERIALS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Dump Fees EA 1 $ LBS $ LS $ MATERIAL COST $ MATERIAL MARKUP #REF! $ TOTAL MATERIAL COSI SUBCONTRACTORS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Bulldog Services (Invoice Attached) 1.00 LS $2,817.50 $ 2,817.50 $ $ $ SUBCONTRACTOR COST $ 2,817.50 SUBCONTRACTOR MARKUP 20% $ 563.50 TOTAL SUBCONTRACTOR COSI COSTSUMMARY TOTAL LABOR COST $ 365.50 TOTAL EQUIPMENT COST $ 542.46 TOTAL MATERIAL COST $ - TOTAL SUBCONTRACTOR COST $ 3,381.00 1% BOND $ 42.89 TOTAL COST $ 4,331.84 Total Cost: $ 4,331.84 Unit Cost: $ 4,331.84 1 LS **Notes- See Attached invoices for back-up and breakdown of cost. $ 3,381.00 $ 542.46 Bulldog Services LLC 249 Capital Lane Rhome TX 76078 Work:866-488-0220 Fax:817-887-9878 McMahon Contracting and Construction LLC 3019 Roy Orr Blvd Grand Prairie TX 75050 Date Ticket# Job Description 11.10.2025 20090 Terms: Net 30 HydroExcavation Travel Wooden Stakes Dump Fuel Surcharge (10% * 2,275.00) Thank you for your Business! Please Remit To: Bulldog Services, LLC PO BOX 93571 Southlake, TX 76092 *Our credit card processing adds 3% on the invoice total Invoice 12416 November 18, 2025 Page: 1 PO#: 24-032 Quantity Rate Amount 7.00 hour 275.00/hour 1,925.00 2.00 hour 175.00/hour 350.00 10.00 each 1.50/each 15.00 2.00 load 150.00/load 300.00 227.50 Invoice Total 2.817.50 Bulldog Services LLC 249 Capital Lane Rhome TX 76078 Ticket#: 20090, Ticket Date: Nov 10, 2025 Bill To Name: McMahon Contracting and Construction LLC Ticket Driver Names: Molsby, Zachary Ticket Equipment H529 Names: Start Time: 07:30 Rep Name: Cristian Rep Phone: 972-804-7991 OnSite Contact: cristian Work Job Description HydroExcavation Other Charges Description Travel Wooden Stakes Dump Driver Reminders Completed Pre DVIR Quantity uOM 7.00 hour Charge Quantity Amount uOM 2.00 hour 10.00 each 2.00 load Completed Post DVIR Ticket#: 20090 Ticket Date: Nov 10, 2025 Location: Ft. Worth,Tx Sales Man: Cisco Carder Completed JSA Completed: ALL GOOD Completed: ALL GOOD Completed: ALL GOOD Comments: customer provided dump location and water source located utilities JSA One Call Confirmed: yes Soil Conditions: Shoring Required: no Dump Site Confirmed: yes Waiver Hazardous no Waste: Flying Debris: yes Walk Controlled Area: yes Electrical: no One Call Confirmation Number: Size of Excavation: Landowners no Permission: Contaminated Soil: no Overhead Lines and yes Obstacles: Excessive Noise yes Signage: Natural Gas: yes Sewer Water: yes Telephone TV Cable: no Weather Conditions: yes Recommended PPE: yes Truck Position: yes OnSite Contact Printed Name: OnSite Contact DateSigned: Driver Printed Name: Driver DateSigned: ?7 � Driver Cristian Nov 10, 2025 Zak Nov 10, 2025 Fiberoptic: no Surface Road yes Conditions: Appropriate Barricade yes or Flagging: Hazard Assessment yes Topic: 0255'/l Gt15TO1►+�A� ORDER NO. HATE �/ !%� `� �✓ � ADDRESS � r / s-,6 a1Y, STATE, ZIP � Tx " U f �j h gcCT. MUSE. RFt D. ND IPJT SOLD BY CASH C.o .. cK G� ON 1 2 3 4 (� 5 6 7 8 9 10 11 12 DESGRIPTION PRICE — AMOUNT �T fFwzD- BY ..cca THt SUP FOB EMA"ON CONTRACTING LY Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Added 8" GV American Track LABOR DESCRIPTION QTY UNIT HR REQUIRED Hr RATE EXTENDED COST Leadman Utility 1.00 Hr 4.00 $ 24.00 $ 96.00 Laborer -Skilled 2.00 Hr 4.00 $ 21.50 $ 172.00 Laborer -Common 2.00 Hr 4.00 $ 20.00 $ 160.00 Hr $ - Hr $ Hr $ Hr $ Hr $ Hr $ LABOR COST $ 428.00 LABOR MARKUP 15% $ 64.20 55% LABOR BURDEN $ 235.40 TOTAL LABOR COST EQUIPMENT $ 727.60 DESCRIPTION QTY UNIT HR REQUIRED HR RATE EXTENDED COST Foreman Truck 1.00 HR 4.00 $ 47.17 $ 188.68 Skid Steer 1.00 HR 4.00 $ 95.18 $ 380.72 HR $ - HR $ - EQUIPMENT COST $ 569.40 15% EQUIPMENT MARKUP 15% $ 85.41 TOTAL EQUIPMENT COST MATERIALS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Valve Box 1.00 EA 210.00 $ 210.00 8" GV 1.00 EA 1 1486.88 $ 1,486.88 Bolt Kit 2.00 EA L 47.32 $ 94.64 MATERIAL COST $ 1,791.52 MATERIAL MARKUP 15% $ 268.73 TOTAL MATERIAL COST $ 2,060.25 'See Invoices for Above Materials SUBCONTRACTORS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST $ $ $ SUBCONTRACTOR COST $ SUBCONTRACTOR MARKUP 20% $ TOTAL SUBCONTRACTOR COS1 COSTSUMMARY TOTAL LABOR COST $ 727.60 TOTAL EQUIPMENT COST $ 654.81 TOTAL MATERIAL COST $2,060.25 TOTAL SUBCONTRACTOR COST $ - 1% BOND $ 34.43 TOTAL COST $3,477.08 Total Cost: $3,477.08 Unit Cost: $3,477.08 1 LS $ 654.81 Rem_r To: JU h':.'SU4 CQUkTY t tier �YA;'Ea SSW-H SiJP.h^ JOHNSON COUNTY WINWATER CO. 7636 S INTERSTATE 35 WEST ALVARADO, TX 76009-3429 MCMAHON CONTRACTING AND CONSTR 3019 ROY ORR BLVD GRAND PRAIRIE, TX 75050-7108 Page Date Printed Invoice NO. 71 1 7/14/25 007330 01 To Reorder Contact Us At J Phone No. (817)345-0500 Fax No . (817) 345-0533 DB# 10 7 F Ship Ta: 7 MCMAHON GOLDEN TRIANGLE BLVD 7636 S I 35 W Alvarado, TX 76009-3429 L J Customer N,,,b, Customer Purchase. Order Job Name 00421-001438 Placed ,, - i Type Shipment Ship 'J ➢ate Shipped 611 KENNETH YUHAS Stock COUNTER 7/l4/25 THANK YOU FOR YOUR ORDER! Units Ordered U/M I t e m De s c r i p t i o n Shipped B/C P r i c e Per Discount E x t e n d e d Tax 1 EA 8 AVK MJXMJ GATE VLV OR 1 1,486.8800 .00 1,486.88 N "View and print your Invoices online! Go to www.winsupplyinc.com" Terms: Monthly Finance Charge May Fe Applied To Past Due Accounts. Tax Area ID: Net Shces 1., 46'6.88 1 . 5 0 30, NET 31 TX - 442513025 Freight .00 If Paid By 8/13/25 You May Deduct 22.30 state Tax o .000 state Tax .00 Pay full balance by 8/14/25 Local Tax .a .000 Local Tax .00 Invoice Amount 1,486.88 I—— cQ 11 '�N1;�EHS<W<_p5IJP3' When you provide a check as payment, you authorize us either to use information from your check to make a one-time electronic fund transfer from your account or to process the payment as a check. transaction. For inquiries please call (817) 345-0500. T&C: You agree that the sale of these products/services is subject to all of our standard terms and conditions of sale located at www.winsupplyinc.com/tcsale. INVOL[ELP Lauer Ivvoice EMA"ON CONTRACTING L.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Gate Automation LABOR DESCRIPTION QTY UNIT HR REQUIRED Hr RATE EXTENDED COST Concrete Foreman 1.00 Hr 5.00 $ 48.75 $ 243.75 ConcreteLabor- Skilled 2.00 Hr 5.00 $ 24.75 $ 247.50 Concrete- Laborer 2.00 Hr 5.00 $ 23.00 $ 230.00 Hr $ - Hr $ Hr $ Hr $ Hr $ Hr $ LABOR COST $ 721.25 LABOR MARKUP 15% $ 108.19 55% LABOR BURDEN $ 396.69 TOTAL LABOR COST EQUIPMENT $ 1,226.13 DESCRIPTION CITY UNIT HR REQUIRED HR RATE EXTENDED COST Foreman Truck 1.00 HR 5.00 $ 47.17 $ 235.85 Mini Track Hoe 1.00 HR 5.00 $ 122.83 $ 614.15 HR $ - HR $ - EQUIPMENT COST $ 850.00 15% EQUIPMENT MARKUP 15% $ 127.50 FOTAL EQUIPMENT COST MATERIALS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Concrete 3.00 CY 200.00 $ 600.00 Rebar/ Forms 1.00 LS 250.00 $ 250.00 EA $ - MATERIAL COST $ 850.00 MATERIAL MARKUP 15% $ 127.50 TOTAL MATERIAL COST $ 977.50 *See Invoices for Above Materials SUBCONTRACTORS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Tbar Fence Sub- Proposal Attached 1.00 LS $10,350.00 $10,350.00 $ $ - $ SUBCONTRACTOR COST $10,350.00 SUBCONTRACTOR MARKUP 15% $ 1,552.50 TOTAL SUBCONTRACTOR COST $11,902.50 COSTSUMMARY TOTAL LABOR COST $ 1,226.13 TOTAL EQUIPMENT COST $ 977.50 TOTAL MATERIAL COST $ 977.50 TOTAL SUBCONTRACTOR COST $11,902.50 1%BOND $ 150.84 TOTAL COST $15,234.46 Total Cost: $15,234.46 Unit Cost: $15,234.46 1 LS **Notes- See Attached invoices for back-up and breakdown of cost. $ 977.50 T-Bar Fence, Inc. 6749 Bennet Lawson Road Mansfield, Texas 76063 Phone: 817-467-0412 February 16, 2026 TO: McMahon Contracting ATTN: Sam Reynolds samrgmcmahoncontracting com SUBJECT: Change Order Proposal — Rolling Gate Automation Golden Triangle Ft. Worth, Texas Sam: We propose the following change to our scope of work and contract price: Add Gate Automation for 40-ft Rolling Gate: $10,350.00 Notes: 1. No specifications were provided. Automation system is quoted with the following: • Liftmaster INSL24UL operator • Inside and outside safety loops • Automatic exit loop • UL-required safety devices • Pedestal -mounted entry control (card reader or digital keypad) • Emergency vehicle access devices required by Ft. Worth Fire Department — Knox key switch and manual chain drop with fire box and Knox padlock. 2. Prices exclude sales tax on incorporated materials. 3. Permit submittal and permit fees are included. We look forward to working with you on this project. If you have any questions or comments, please feel free to call. Respectfully Submitted, Gary Hinson, B.S.C.E. Commercial Division ghinson@tbarfence.com (817)829-7968 Page 1 of 1 EMA"ON CONTRACTING LY Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Tri County Power Drop Charges LABOR DESCRIPTION QTY UNIT HR REQUIRED Hr RATE EXTENDED COST Concrete Foreman Hr $ 48.75 $ ConcreteLabor- Skilled Hr $ 24.75 $ Concrete -Laborer Hr $ 23.00 $ Hr $ Hr $ Hr $ Hr $ Hr $ Hr $ LABOR COST $ LABOR MARKUP 15% $ 55 % LABOR BURDEN $ TOTAL LABOR COST EQUIPMENT DESCRIPTION QTY UNIT HR REQUIRED HR RATE EXTENDED COST HR $ 47.17 $ HR $ 122.83 $ HR $ HR $ EQUIPMENT COST $ 15% EQUIPMENT MARKUP 15% $ TOTAL EQUIPMENT COST MATERIALS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST CY $ LS $ EA $ MATERIAL COST $ MATERIAL MARKUP 15% $ TOTAL MATERIAL COST *See Invoices for Above Materials SUBCONTRACTORS DESCRIPTION QTY UNIT UNIT COST EXTENDED COST Tri County- PT48290 1.00 LS $ 4,407.03 $ 4,407.03 Tri County- PT49292 1.00 LS $ 1,926.58 $ 1,926.58 $ $ SUBCONTRACTOR COST $ 6,333.61 SUBCONTRACTOR MARKUP 5% $ 316.68 TOTAL SUBCONTRACTOR COST $ 6,650.29 COSTSUMMARY TOTAL LABOR COST $ TOTAL EQUIPMENT COST $ TOTAL MATERIAL COST $ TOTAL SUBCONTRACTOR COST $ 6,650.29 1%BOND $ 66.50 TOTAL COST $ 6,716.79 Total Cost: $ 6,716.79 Unit Cost: $ 6,716.79 1 LS **Notes- See Attached invoices for back-up and breakdown of cost. PROJECT CONSTRUCTION ESTIMATE Fv DESIGNED FOR cl "CTRI LUMINATE PROJECT #: PT48290 STAKED BY: Kyale Campbell PROJECT NAME: LUMINATE GOLDEN TRIANGLE / GOLDEN HEIGHTS DESIGN DATE: 01/13/2026 INSTALLATION ASSEMBLY STATUS DESCRIPTION CITY MATERIAL COST CONSTRUCTION COST UNIT COST G135 Install XFRMR ASSEMBLY 10 ON 10 OR 30 POLE (<-50 1 $ 191.76 $ 749.89 $ 941.65 LA8AB4 Install LIGHT EXTENSION ARM -8" 1 $ 69.54 $ 370.91 $ 440.45 LF1BA4 Install LIGHT LED COBRA GRAY -250WATT EQUIVALE 1 $ 602.36 $ 364.77 $ 967.12 VG 10 Install XFRMR, CONV - 10 KVA- 1201240 - 14.4 1 $ 1,404.03 $ 317.91 1,721.93 $ SUBTOTAL: $ 2,267.68 $ 1,803.48 $ 4,071.16 TOTAL COSTS Total Material Cost: $ 2,267.68 Total Construction Cost: $ 1,803.48 Total Project Costs: $ 4,071.16 Miscellaneous Sales: $ 0.00 Miscellaneous Credit: $ 0.00 Sub Total: $ 4,071.16 Total Taxes: $ 335.87 GRAND TOTAL: $ 4,407.03 THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 04/29/2026 1 TRI-COUNTY ELECTRIC COOPERATIVE 4 FV Field Services: 817-752-8172 cl "CTRI TO: PROJECT #: PT48290 LUMINATE DATE: 01/29/2026 EXPIRES: 04/29/2026 BY: Lani FOR: GOLDEN TRIANGLE BLVD AND GOLDEN HEIGHTS RD JOB COSTS Project Costs: $ 4,071.16 Miscellaneous Sales: $ 0.00 Total Costs: $ 4,071.16 JOB CREDITS Miscellaneous Credit: Total Cost: Tax: Expires On: April 29, 2026 $ 0.00 $ 4,071.16 $ 335.87 Grand Total: $ 4,407.03 Cost Estimate TYPE PRI SVC SEC CONS POLES TRANSF LIGHTS METERS INSTALL OH 0 0 1 0 0 0 1 1 0 INSTALL UG 0 0 0 0 RETIRE OH 0 0 0 0 0 0 0 0 RETIRE UG 0 0 0 0 AZLE GRANBURY KELLER SEYMOUR 600 N W Parkway 1623 Weatherford Hwy 4900 Keller Hicks Rd 419 North Main Street Azle, TX 76020 Granbury, TX 76048 Keller, TX 76244 Seymour, TX 76380 THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 04/29/2026 2 PROJECT CONSTRUCTION ESTIMATE I DESIGNED FOR CTRIC CITY OF FTW PROJECT #: PT49292 STAKED BY: Paul Viaille PROJECT NAME: CITY OF FORT WORTH 2497 GOLDEN HEIGHTS DESIGN DATE: 04/13/2026 INSTALLATION ASSEMBLY STATUS DESCRIPTION CITY MATERIAL COST CONSTRUCTION COST UNIT COST 1/OTXU Install CONDUCTOR -110 TRIPLEX SECONDARYUG 64 $ 145.60 $ 260.43 $ 406.03 U M 5-2 Install CONDUIT - SECONDARY RISER 2" 1 $ 110.77 $ 484.53 $ 595.30 UM6-39 Install RISER -STANDOFF BRACKET KIT18"" 4 $ 522.60 $ 150.92 $ 673.52 UM6-39.2 Install RISER -STANDOFF BRACKET STRAPS "" 4 $ 42.22 $ 62.67 $ 104.90 SUBTOTAL: $ 821.20 $ 958.56 $ 1,779.75 TOTAL COSTS Total Material Cost: $ 821.20 Total Construction Cost: $ 958.56 Total Project Costs: $ 1,779.75 Miscellaneous Sales: $ 0.00 Miscellaneous Credit: $ 0.00 Sub Total: $ 1,779.75 Total Taxes: $ 146.83 GRAND TOTAL: $ 1,926.58 THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 07/28/2026 1 TRI-COUNTY ELECTRIC COOPERATIVE Field Services: 817-752-8172 ii. CTRI TO: P ROJ ECT #: PT49292 CITY OF FTW DATE: 04/29/2026 EXPIRES: 07/28/2026 ' BY: Kylie FOR: 2497 GOLDEN HEIGHTS RD JOB COSTS Project Costs: $ 1,779.75 Miscellaneous Sales: $ 0.00 Total Costs: $ 1,779.75 JOB CREDITS Miscellaneous Credit: $ 0.00 Total Cost: Tax: Expires On: July 28, 2026 $ 1,779.75 $ 146.83 Grand Total: $ 1,926.58 Cost Estimate TYPE PRI SVC SEC CONS POLES TRANSF LIGHTS METERS INSTALL OH 0 0 0 0 0 0 0 0 INSTALL UG 0 0 24 1 RETIRE OH 0 0 0 0 0 0 0 0 RETIRE UG 0 0 0 0 AZLE GRANBURY KELLER SEYMOUR 600 N W Parkway 1623 Weatherford Hwy 4900 Keller Hicks Rd 419 North Main Street Azle, TX 76020 Granbury, TX 76048 Keller, TX 76244 Seymour, TX 76380 THIS COST ESTIMATE IS GOOD FOR 90 DAYS. EXPIRATION: 07/28/2026 2 101013-CNCO-Golden Triangle Boulevard Change Order #2 Interim Agreement Report 2026-07-21 Created: 2026-07-09 By: Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) Status: Out for Signature Transaction ID: CBJCHBCAABAAay_Cdcw1enXEVwR2-kJOIAYDska05TkP Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "101013-CNCO-Golden Triangle Boulevard Change Order #2" H istory ,_j Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-07-09 - 3:43:27 PM GMT- IP address: 204.10.90.100 Document emailed to samr@mcmahoncontracting.com for signature 2026-07-09 - 3:52:22 PM GMT Document emailed to Ben Weaverling (Ben.Weaverling@fortworthtexas.gov) for signature 2026-07-09 - 3:52:22 PM GMT D Email viewed by samr@mcmahoncontracting.com 2026-07-09 - 4:57:24 PM GMT- IP address: 172.225.24.23 Li Email viewed by Ben Weaverling (Ben.Weaverling@fortworthtexas.gov) 2026-07-09 - 5:30:55 PM GMT- IP address: 166.199.250.8 uA Document e-signed by Ben Weaverling (Ben.Weaved ing@fortworthtexas.gov) Signature Date: 2026-07-09 - 5:32:28 PM GMT - Time Source: server- IP address: 166.199.250.8 - Signature Appearance Selected: MOBILE —DRAW fj Email viewed by samr@mcmahoncontracting.com 2026-07-15 - 3:17:17 PM GMT- IP address: 172.225.18.65 C%'Q Signer samr@mcmahoncontracting.com entered name at signing as Sam Reynolds 2026-07-15 - 7:49:45 PM GMT- IP address: 71.78.122.98 FoRTWORTH.. I P`edl:y Adobe Acrobat Sign Document e-signed by Sam Reynolds (samr@mcmahoncontracting.com) Signature Date: 2026-07-15 - 7:49:47 PM GMT - Time Source: server- IP address: 71.78.122.98 - Signature Appearance Selected: TYPE Document emailed to Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) for signature 2026-07-15 - 7:49:51 PM GMT Email viewed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) 2026-07-15 - 7:57:05 PM GMT- IP address: 104.47.64.254 F_ ORT WQRTH., I power¢d by Adobe Acrobat Sign