Loading...
HomeMy WebLinkAbout062461-FP1 - Construction-Related - Contract - RPMX Construction-FP1 City Secretary Contract No. 62461 FORT WORTH.., Date Received 8/12/2026 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Parks of Village Creek Phase 1 City Project No.: 105369 Improvement Type(s): 0 Paving ❑ Drainage ❑ Street Lights ❑ Traffic Signals Original Contract Price: $2,139,218.75 Amount of Approved Change Order(s): $181,858.00 Revised Contract Amount: $2,321,076.75 Total Cost of Work Complete: $2,321,076.75 /3ni ilx-' 7�ai 114 na ani (A 111 �m . 27 cDT) Contractor Project Manager Title RPMX Construction Company Name %�P JaW Ino ncio (Aua 10. 2026 10:57:26 CDT Project Inspector !Chid'. I it P. >:. Khal )Q IR,91 CDT) Project Manager CFA Manager de .Z� Lauren Prieur (Aug 12, 2026 10:18:46 CDT) TPW Director 08/10/2026 Date 08/10/2026 Date 08/12/2026 Date 08/12/2026 Date 08/12/2026 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Parks of Village Creek Phase 1 City Project No.: 105369 City's Attachments Final Pay Estimate 0 Change Order(s): 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 245 WD Days Charged: 250 WD Work Start Date: 2/25/2025 Work Complete Date: 8/4/26 Completed number of Soil Lab Test: 1493 Completed number of Water Test: 37 Page 2 of 2 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name PARKS OF VILLAGE CREEK PH 1 Contract Limits Project Type PAVING City Project Numbers 105369 DOE Number 5369 Estimate Number I Payment Number I For Period Ending City Secretary Contract Number Contract Date Project Manager NA Contractor RPMX CONSTRUCTION 6500 MEYER WAY SUITE 100 MCKINNEY, TX 75070 Inspectors M.GLOVER / 1.INOCENCIO Contract Time Days Charged to Date Contract is 100.00 8/4/2026 WD 243VD 250 Complete Thursday, August 6, 2026 Pagel of4 City Project Numbers 105369 Contract Name PARKS OF VILLAGE CREEK PH 1 Contract Limits Project Type PAVING Project Funding UNIT IV: PAVING IMPROVEMENTS DOE Number 5369 Estimate Number 1 Payment Number 1 For Period Ending 8/4/2026 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 HYDRATED LIME(CO#2) 540 TN $310.00 $167,400.00 540 $167,400.00 2 6" LIME TREATMENT(CO#2) 31846 SY $3.50 S111,461.00 31846 $111,461.00 3 8" LIME TREATMENT 3253 SY $3.50 $11,385.50 3253 $11,385.50 4 6" CONC PVMT(CO#2) 28950 SY $49.50 433,025.00 28950 1,433,025.00 5 8" CONC PVMT 3075 SY $60.00 $184,500.00 3075 $184,500.00 6 5" CONC SIDEWALK (BY DEVELOPER) 6493 SF $8.25 $53,567.25 6493 $53,567.25 7 BARRIER FREE RAMP, TYPE R-1 12 EA $2,700.00 $32,400.00 12 $32,400.00 8 BARRIER FREE RAMP, TYPE P-1 8 EA $2,300.00 $18,400.00 8 $18,400.00 9 TOPSOIL(CO#2) 866 CY $110.00 $95,260.00 866 $95,260.00 10 BLOCK SOD PLACEMENT(CO#2) 5199 SY $8.50 $44,191.50 5199 $44,191.50 11 SEEDING, HYDROMULCH (OPEN SPACE) 5568 SY $2.50 $13,920.00 5568 $13,920.00 12 TRAFFIC CONTROL 1 MO $5,000.00 $5,000.00 1 $5,000.00 13 REMOVE CONC PVMT(CO#2) 406 SY $30.00 $12,180.00 406 $12,180.00 14 6" SLD PVMT MARKING HAS (W)(CO#2) 285 LF $7.00 $1,995.00 285 $1,995.00 15 8" SLD PVMT MARKING HAS (W)(CO#2) 185 LF $5.00 $925.00 185 $925.00 16 24" SLD PVMT MARKING HAE (W)(CO#2) 22.5 LF $32.00 $720.00 22.5 $720.00 17 REFL RAISED MARKER TY II-C-R(CO#2) 10 EA $16.00 $160.00 10 $160.00 18 CONNECTION TO EXISTING ASPHALT 2 EA $3,325.00 $6,650.00 2 $6,650.00 STREET(CO#2) 19 RIGHT TURN ONLY SIGN (R3-5L(R), 30" X 1 EA $500.00 $500.00 1 $500.00 12")(CO#2) 20 LEFT TURN ONLY SIGN (R3-5L(L), 30" X 1 EA $500.00 $500.00 1 $500.00 12")(CO#2) 21 PAVING/LIME REMOBILIZATION(CO#2) 1 LS $89,536.50 $89,536.50 1 $89,536.50 22 BOND INCREASE(CO#2) 1 LS $2,400.00 $2,400.00 1 $2,400.00 23 P&P/MAINTENANCE BONDS(CO#2) 1 LS $35,000.00 $35,000.00 1 $35,000.00 -------------------------------------- Sub -Total of Previous Unit $2,321,076.75 $2,321,076.75 Thursday, August 6, 2026 Page 2 of 4 City Project Numbers 105369 Contract Name PARKS OF VILLAGE CREEK PH 1 Contract Limits Project Type PAVING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 2 DOE Number 5369 Estimate Number 1 Payment Number 1 For Period Ending 8/4/2026 $2,139,218.75 $181,858.00 Total Contract Price $2,321,076.75 Total Cost of Work Completed $2,321,076.75 Less % Retained $0.00 Net Earned $2,321,076.75 Earned This Period $2,321,076.75 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,321,076.75 Thursday, August 6, 2026 Page 3 of 4 City Project Numbers 105369 Contract Name PARKS OF VILLAGE CREEK PH 1 Contract Limits Project Type PAVING Project Funding Project Manager NA Inspectors M.GLOVER / J.INOCENCIO Contractor RPMX CONSTRUCTION 6500 MEYER WAY SUITE 100 MCKINNEY , TX 75070 DOE Number 5369 Estimate Number 1 Payment Number 1 For Period Ending 8/4/2026 City Secretary Contract Number Contract Date Contract Time 245 WD Days Charged to Date 250 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $2,321,076.75 Less % Retained $0.00 Net Earned $2,321,076.75 Earned This Period $2,321,076.75 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,321,076.75 Thursday, August 6, 2026 Page 4 of 4 W U Z Z W W S U O N O Z Z O F- a U I- }a F- U UI N O L m (O � O W a N m � U ai � O M m - j v a O a o o O G N m O1 P m N y M O ro O a a U o cC'o r�i X u k- U ¢ F- Z O U } W u of < r ¢ z U r r U U ¢ w W Z y > a U 0 0 0 U- at X � w � N N 10 Cl) co M I� O N LO m Cl) Cl) �- r ro co C m U (U o m C � r U N r ¢ Z � O U N O U o O 0 00 00 r 2' uoi :n uoi w :n in L J r U „ n o in en in in W W r en in v > 0 O0 U o0 N ti 0 U C0 0 o 0 0 00 0 0 Z' w w uoi :n w voi �n Z U a o M a O > N M N O en N M N W O N M N F ti 0 U 0 0 0 o 0 0 0 Z �` w eon o eoie w w o � W r a U U r• Q U rl� r � N N M O Z U U N� U `u a o 0 o :n in in 0 0 o in n 0 U o 0 0 0 0 0 0 0 � W N U � � r o M N U n O ow c o O 0 O h a 0 U>, o 0 0 0 0 0 0 0 a, Y U W OM N M N N W r 3 � d O O 00 00 d o > i O O O O O o en 0 U > 0 U �N a W W a r z Z. O r U w O H Q K ¢ a K r W (D Z 7 r UQ x N 2 O z O K r U ¢ _ � ¢ r r Z vcl O w U W U r o 7 U en ¢ O a0 Q 0 U o w w 0 o 0 O 0 a z m N w w a a J Q O en U ¢ O UO o W of O r Z U Q r w � z Z O W j J F 0 w U OU ¢ � r0 O o O u>ooQ00000000�n0000 O 0 0 0 0 0 0 0 0 0 0 0 o�� o��00000�ao U IR M N N M f9 m M H o U U w w wMwwww�n wujw wrn win y�IIII -J 0 00 o Q o 0 0 0 0 0 0 0 0 0 0 0 O N O p p 0 0 0 0 0 0 0 0 N 0 0 0 U1 V N UD N W (V O> n m m N N (T V 0 N 0 41 m � f9 to W M f9 19 fA e9 19 t9 fA t9 b9 M U O O 0 0 h t7 0 0 Un 0 m (J 0 0 Lq O m IJ 0 0 O O I� N 0 0 O O tV (O 0 0 O O h 0 0 0 O 0 0 t0 0 0 O O 0 O M N � O a M a; N Z � Vi t9 Ui f9 19 M f9 19 !9 1A fA M 1/i !9 N 69 u U c Z a W c � � W OR U a z Z x x Q 3 W U« 0. o v > U U x = m p m aci u E=x E > o.KJ =� a um H a E E d a o,rn� c c d y7�= Q o A d Z _E ! rn E w W� E c m O x o u E E> a cL -E> d m� F m o o a O p IL a in m N c c i c =a o c If U Lm K J = }}}}} LL LL LL Q Q Q Q U UA U Z (] f in ((j U (n inJ J J W W W W J J J F O 0 0 O 0 0 0 0 0 0 0 0 0 O Z O 0 m N u� O O 0 0 0 0 M,, uj of w a N m UNV O N .- U d W F (_] O O O O m 0 O O O 0. 0 0 00 V O O � O O N O O 7 O O N O N O O 0 0 O O O O 0 0 0 0 O o 0 0 0 0 m M '� M �rnmvrrt�n nrNi �NioMMMM rnrnrnrnmm mrnrnrnrnrn U u w W N N N N } a m o y z e ( ) \ C y \` § G 2 � 2 - ) / ) a S G b ƒ K » § / f z � q 0 CN Itz 0 § � E n LO CN � m 423 W ® � (13 Uj ui �. cc �a FORTWORTH. TRANSPORTATION AND PUBLIC WORKS August 5, 2026 RPMX Construction, LLC 6500 Meyer Way Suite 100 Mckinney, TX 75070 RE: Acceptance Letter Project Name: Parks of Village Creek phase 1 Project Type: Paving City Project No.: 105369 To Whom It May Concern: On June 10, 2026 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on August 4, 2026. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on August 5, 2026, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7872. Sincerely, Kh.1 Ja fa P E. (Aug 12. 2026 09.38,21 CDT) Khal Jaafari, Project Manager Cc: Jason Inocencio, Inspector Mike Glover, Inspection Supervisor Cristobal Fuentes, Senior Inspector Andrew Goodman, Program Manager Shield Engineering Group, Consultant RPMX Construction LLC, Contractor Pulte Homes of Texas LP, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF COLLIN Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Amy Stavola, Accounting Manager Of RPM xConstruction, LLC, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Parks of Village Creek Phase 1 CPN: 105369 BY Amy Stavola, Accounting Manager Subscribed and sworn before me on this date 10th of August, 2026. Notary Public Collin, TX R E►V P o9-13'2 Contract Billings and Receipts Contract: 4846P. Parks of Village Creek Phase 1 Contract Current Customer # 32 Pulte Homes of Texas LP Billed Retainage Tax Due Billings Invoice : 4846P-1 01/20/25 JB App #1 20,000.00 -2,000.00 0.00 18,000.00 Invoice: 4846P-1 REV 01/20/25 JB App #1 REV -20,000.00 2,000.00 0.00 -18,000.00 Invoice : 4846P-1A 01/20/25 JB App #1A 20,000.00 -2,000.00 0.00 18,000.00 Invoice : 4846P-2 07/20/25 JB App #2 202,344.00 -20,234.40 0.00 182,109.60 Invoice : 4846P-2REV 07/20/25 JB App #2REV -202,344.00 20,234.40 0.00 -182,109.60 Invoice : 4846P-2A 08/20/25 JB App #2A 163,370.00 -16,337.00 0.00 147,033.00 Invoice : 4846P-3 09/20/25 JB App #3 261,149.90 -26,114.99 0.00 235,034.91 Invoice : 4846P-4 10/20/25 JB App #4 1,431,854.10 -143,185.41 0.00 1,288,668.69 Invoice : 4846P-5 11/20/25 JB App #5 0.00 0.00 0.00 0.00 Invoice : 4846P-5A 12/20/25 JB App #5A 35,064.00 -3,506.40 0.00 31,557.60 Invoice : 4846P-6 01/20/26 JB App #6 0.00 0.00 0.00 0.00 Invoice : 4846P-6A 01/20/26 JB App #6A 224,375.25 -22,437.53 0.00 201,937.72 Invoice: 4846P-7 02/20/26 JB App #7 121,400.00 -12,140.00 0.00 109,260.00 Invoice : 4846P-8 03/20/26 JB App #8 59,063.50 -5,906.35 0.00 53,157.15 Invoice : 4846P-RET 03/20/26 JB App #9RET 0.00 0.00 0.00 0.00 Invoice : 4846P-RET 03/20/26 Released Retainage 0.00 231,627.68 0.00 231,627.68 Invoice : 4846P-WO1 04/20/26 Work Order #1 7,500.00 0.00 0.00 7,500.00 Invoice : 4846P-RETR 03/20/26 JB App #11 0.00 -231,627.68 0.00 -231,627.68 Invoice : 4846P-9 05/20/26 JB App #9 4,800.00 -480.00 0.00 4,320.00 Invoice : 4846P-RET 05/20/26 JB App #10RET 0.00 0.00 0.00 0.00 Invoice : 4846P-RET 05/20/26 Released Retainage 0.00 232,107.68 0.00 232,107.68 Total Billings : 2,328,576.75 0.00 0.00 2,328,576.75 Receipts Check # 03/12/25 Trans # 206 0.00 Check # ACH032825 03/28/25 Trans # 581 -18,000.00 Check # 08/20/25 Trans # 357 0.00 Check # ACH091925 09/19/25 Trans # 603 -147,033.00 Check # ACH101725 10/17/25 Trans # 115 -235,034.91 Check # ACH111425 11/14/25 Trans # 383 -1,288,668.69 Check # ACH011626 01/16/26 Trans # 279 -31,557.60 Check # ACH031326 03/13/26 Trans # 104 -311,197.72 Check # ACH043026 04/30/26 Trans # 523 -53,157.15 Check # 05/11/26 Trans # 1,329 0.00 Check # ACH052226 05/22/26 Trans # 2,027 -7,500.00 Check # ACH062626 06/26/26 Trans # 799 -4,320.00 Check # ACH080326 08/03/26 Trans # 1 -232,107.68 Total Receipts:-2,328,576.75 -2,328,576.75 Current Balance Remaining: 4846P. 0.00 25 RPM xConstruction LLC - Paving Division Page 1 08/10/26 07:58:08 AM Date Format - MM/DD/YY ARContractBillingsReceipts.rpt 006213-1 PERFORMANCE BOND Page 1 of 2 Bond No. 2362079 1 SECTION 00 6213 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, RPM xConstruction, LLC., known as "Principal" herein and 9 swiss Re Corporate solutions America Insurance Corporation , a corporate surety(sureties, if more than one) duly 10 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), 11 are held and firmly bound unto the Developer, Pulte Homes of Texas L-P., authorized to do 12 business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation 13 ("City"), in the penal sum of, TWO MILLION ONE HUNDRED THIRTY NINE 14 THOUSAND TWO HUNDRED EIGHTEEN DOLLARS AND SEVENTY-FIVE CENTS 15 ($2,139,218. 75).lawful money of the United States, to be paid in Fort Worth, Tarrant County, 16 Texas for the payment of which sum well and truly to be made jointly unto the Developer and the 17 City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and 18 assigns, jointly and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number CFA24-0074; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 23 the day of , 20_, which Contract is hereby referred to and made a 24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 25 and other accessories defined by law, in the prosecution of the Work, including any Change 26 Orders, as provided for in said Contract designated as Parks cf Village Creek Phase I 27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 28 shall faithfully perform it obligations under the Contract and shall in all respects duly and 29 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 30 specifications, and contract documents therein referred to, and as well during any period of 31 extension of the Contract that may be granted on the part of the Developer and/or City, then this 32 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH PARKS OF VILLAGE CREEK PIll STANDARD CITY CONDITIONS -- DEVELOPER AWARDED PROJECTS CPN:105369 Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 2 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the 9 , 20 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 ATTEST: (Principa eere 7 A [A 410, Witness as to Principal Wi ess as& Suety PRINCIPAL: RPM xConstruction LLC BY: Signature day of Pel DawS•00 i (1Pres) joy_� Name and Title Address: 6500 Meyer Way, Suite 100 McKinney, TX 75070 SURETY: Swiss Re Corporate Solutions America Insurance Corporation B ignatur Andrea Rose Crawford, Attorney -in -Fact Name and Title Address: 1200 Main Street, Suite 800 Kansas City, MO 64105 Telephone Number: 816-235-3738 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided_ The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTII PARKS OF VILLAGE CREEK PII1 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN:105369 Revised January 31, 2012 006214-1 PAYMENT BOND Page 1 of2 Bond No. 2362079 1 SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, RPM xConstruetion LCC., known as "Principal" herein, and 8 Swiss Re Corporate solutions America Insurance Corporation , a corporate surety ( or sureties if more than one), 9 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or 10 more), are held and firmly bound unto the Developer, Pulte Homes of Texas L.P,authorized to 11 do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation 12 ("City"), in the penal sum of TWO MILLION ONE HUNDRED THIRTY NINE 13 THOUSAND TWO HUNDRED EIGHTEEN DOLLARS AND SEVENTY-FIVE CENTS 14 ($2,139,218.7-D, lawful money of the United States, to be paid in Fort Worth., Tarrant County, 15 Texas, for the payment of which sum well and truly be made jointly unto the Developer and the 16 City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and 17 assigns, jointly and severally, firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number CFA24-0074; and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the day of , 20 , which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as Parks cf Village Creek Phase 1. 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 30 force and effect. CITY Or PORT WORTII PARKS OF VILAGE CREEK PIII STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN_ 105369 Revised January i 1, 2012 006214-2 PAYMENT BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the day of r 7 8 9 10 11 12 13 14 20 ATTEST: ('Principal ecre ary _-%rl A f 4-Ot Witness as to Principal ATTEST: (Surety) Secretary W ess as to rety PRINCIPAL: RPM xConstruction, LLC Signature J i s rej j6x f Name and Title Address: 6500 Meyer Way, Suite 100, McKinney, TX 75070 SURETY: Swiss Re Corporate solutions America Insurance Comoration gnature Andrea Rose Crawford, Attomey-in-Fact Name and Title Address: 1200 Main Street, Suite 800 Kansas City, MO 64105 Telephone Number: 816-235-3738 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH PARKS OF VILAGE CREEK PHl STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN:105369 Revised January 31, 2012 Bond #022232592 006219-1 MAINTENANCE BOND Page 1 of 3 Bond No. 2362079 1 SECTION 00 6219 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 S That we RPM xConstruction. LLC., known as "Principal" herein and 9 swiss Re Corporate Solutions America lnsuraH Coinoration , a corporate surety (sureties, if more than one) duly 10 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), 11 are held and firmly bound unto the Developer, Pulte Homes of Texas L.P.. authorized to do 12 business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation 13 ("City"), in the sum of TWO MILLION ONE HUNDRED THIRTY NINE THOUSAND 14 TWO HUNDRED EIGHTEEN DOLLARS AND SEVENTY-FIVE CENTS ($2,139,218.75), 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment 16 of which sum well and truly be made jointly unto the Developer and the City as dual obligees and 17 their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, 18 jointly and severally, firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreement, CFA Number CFA24-0074; and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the _ day of , 20_, which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forty herein, to furnish all 26 materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as Parks of Village Creek Phase 1; 29 and 30 31 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 32 accordance with the plans, specifications and Contract Documents that the Work is and will 33 remain free from defects in materials or workmanship for and during the period of two (2) years 34 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORTWORTH PARKS OF VILLAGE CREEK PIII STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN:105369 Revised January 31, 2012 Bond#022232592 006219-2 MAINTENANCE BOND Page 2 of 3 1 2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 3 upon receiving notice from the Developer and/or City of the need thereof at any time within the 4 Maintenance Period. 5 6 NOW THEREFORE, the condition of this obligation is such that if Principal shall 7 remedy any defective Work, for which timely notice was provided by Developer or City, to a 8 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 9 remain in full force and effect. 10 11 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 12 noticed defective Work, it is agreed that the Developer or City may cause any and all such 13 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 14 by the Principal and the Surety under this Maintenance Bond, and 15 16 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 17 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 18 Worth Division; and 19 20 PROVIDED FURTHER, that this obligation shall be continuous in nature and 21 successive recoveries may be had hereon for successive breaches. 22 23 24 CITY OF FORT WORTH PARKS OF VILLAGE CREEK PIII STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN:105369 Revised Janiuvy 31, 2012 Bond #022232592 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the day of 3 , 20 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 ATTEST: j (Principa cret Witness as to Principal ATTEST: 37 *Note: 38 39 40 41 42 PRINCIPAL: RPM xConstruction, LLC BY: /1l/VY Signatire AA,- Da,w6A vi,R pres,144 Name and Title Address: 6500 Meyer Way, Suite 100 McKinney, TX 75070 SURETY: Swiss Re Corporate Solutions America insurance Corporation B. J Signature Andrea Rose Crawford, Attorney -in -Pact Name and Title Address: 1200 Main Street, Suite 800 Kansas City, MO 64105 Telephone Number: 816-235-3738 If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF PORT WORTH PARKS OF VILLAGE CREEK PIII STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPNA05369 Revised January 31, 2012 SWISS RE CORPORATE SOLUTIONS SWISS RC CORPORATE SOLUTIONS AM17RICA INSURANCE CORPORATION ("SRCSAIC") SWISS RE CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION ("SRCSPIC") WESTPORTINSURANCECORPORATION ("WIC") GENERAL POWER OF ATTORNEY KNOW ALL M17N BY THESE PRESENTS, THAT SRCSAIC, a corporation duly organized and existing under laws of the State of Missouri, and having its principal office in the City of Kansas City, Missouri, and SRCSPIC, a corporation organized and existing under the laws of the State of Missouri and having its principal office in the City of Kansas City, Missouri, and WIC, organized under the laws of the State of Missouri, and having its principal office in the City of Kansas City, Missouri, each does hereby make, constitute and appoint: JOHN R. WARD, THOMAS DOUGLAS MOORS, EMiLY ALLISON MIKESKA, ALLYSON W. DEAN, MONICA RUBY VEAZ Y, tOHN WILLIAM NLWBY, TROY RUSSELL KLY, DEBRA LEE. MOON, ANDREA ROSE CRAWFORD, SANDRA LEE RONEY, FAITH ANN I IIIA-Y, ANDREW GARS I'll ADDISON, PATRICK THOMAS COYLE, MICI IAEL DONALD HENDRICKSON. BRYAN KLLLY MOORL, L'LIZABLTl l OWFIZ, ANA OWENS, nE'FTY J REEIi, AND ANDREW PATRICK. CLARK JOINTLY OR SEVERALLY Its true and lawful Attorney(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the amount of: TWO IIUNDRED MILLION (S200,000,000.00) DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the 18th of November 2021 and WIC by written consent of its Executive Committee dated July 18, 2011. "RESOLVED, that any two of the President, any Managing Director, any Senior Vice President, any Vice President, the Secretary or any Assistant Secretary be, and each or any of them hereby is, authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf'ofthe Corporation bonds, undertakings and all contracts of surety, and that each or any ofthein hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is I-URTHER RESOLVED, that the signature of'such officers and the seal of the Corporation may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power ol'Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Corporation when so affixed and in the future .with regard to anv bond, undertaking or contract of surety to which it is attached." ' t�O S AAicRf "" ,3tAs P,Rt/ �"' py p� P 0 R,;% �tid, �� 4 S O R ii� �� , �0 1 < s� = By �1: ^ ` °g4 Erik Janssens, Senior Vice President of SRCSAIC & Senior Vice President m of SRCSPIC & Senior Vice President of WIC p - '� . 1973 Utss*n iS;; ,SSsoUh�vBy ` O, Gerald Jagrowski, Vice President of SRCSAIC & Vice President orSRCSPIC ••• „ & Vice President of WIC IN WITNESS WHEREOF, REOF, SRCSAIC, SRCSPIC, and WIC have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized officers this l lth day of January , 20 24 Swiss Re Corporate Solutions America Insurance Corporation State of Illinois Swiss Re Corporate Solutions Premier Insurance Corporation County of Cook ss Westport Insurance Corporation On this I Ith day of January , 20 24 , before me, a Notary Public personally appeared Erik Janssens , Senior Vice President of SRCSAIC and Senior Vice President of SRCSPIC and Senior Vice President of WIC and Gerald Jagrowski , Vice President of SRCSAIC and Vice President of SPCSPiC and Vice President of WIC, personally known to tile, who being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. OFFIGIAL SEAL. GFiRISTtNtL MANtSC,O NBTMY Plltiii IC, RTATF OF iiB1016 tf {� Cemn+fs+latt E+iphq �rfed{ 2a.2DY6 t; i�vi���i1 ' l uco, 1cq 1, Jeffrey Goldberg, the duly elected Senior Vice President and Assistant Secu ary of SRCSAIC and SRCSPIC and WIC, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said SRCSAIC and SRCSPIC and WIC, which is still in full force and effect, IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this day of 20 Jeffrey Goldberg, Senior Vice President & Assistant Secretary of SRCSAIC and SRCSPIC and WIC In order to obtain information or make a complaint: You may contact the Surety Claims Department at 1-816-235-3702 You may call Swiss Re Corporate Solutions America Insurance Corporation or Swiss Re Corporate Solutions Premier Insurance Corporation for information or to make a complaint at: 1-816-235-3702 You may also write to Swiss Re Corporate Solutions America Insurance Corporation or Swiss Re Corporate Solutions Premier Insurance Corporation at the following address: 1200 Main Street, Suite 800 Kansas City, MO 64105 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httjj:/hvww.tdi.state.tx.us E-mail:ConsumcrProtectionntdi.state.ix. us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the Swiss Re Corporate Solutions America Insurance Corporation or Swiss Re Corporate Solutions Premier Insurance Corporation. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. Para obtener informacion o para someter un queja: Puede comunicarse con Surety Claims Department al 1-816-235-3702. Usted puede llamar Swiss Re Corporate Solutions America Insurance Corporation o Swiss Re Corporate Solutions Premier Insurance Corporation para informacion o para someter una queja al: 1-816-235-3702 Usted tambien puede escribir a Swiss Re Corporate Solutions America Insurance Corporation o Swiss Re Corporate Solutions Premier Insurance Corporation al: 1200 Main Street, Suite 800 Kansas City, MO 64105 Puede escribir al Departmento de Seguros de Texas para obtener informacion acerca de companies, coberturas, derechos o quejas al: 1- 800-252-3439 Puede escribir al Departmento de Seguros de Texas: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail:_Cons umerProt ction(a�tdi, tate.tx.us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el Swiss Re Corporate Solutions America Insurance Corporation o Swiss Re Corporate Solutions Premier Insurance Corporation prunero. Si no se resuelve la disputa, puede entonces comunicarse con el Departmento de Seguros de Texas. UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de infromacion y no se converte en parte o condicion del documento adjunto.