HomeMy WebLinkAbout065655 - Construction-Related - Contract - Kimley-Horn and Associates, Inc.CITY OF FORT WORTH, TEXAS CSC No. 65655
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality
("CITY"), and Kimley-Horn and Associates, Inc, authorized to do business in Texas,
("ENGINEER"), for a PROJECT generally described as: Chapel Hill Park, Cibolo Hill Park,
Harriet Creek Ranch Park and Kristi Jean Burbach Park Improvements— Project No.106675.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $461,475.00 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date.
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025 OFFICIAL RECORD
Page 1 of 14
CITY SECRETARY
FT. WORTH, TX
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Designation of Engineer's Personnel
(1) The ENGINEER and CITY shall agree upon the
designation of the ENGINEER's "Project Manager" prior to starting work on
contract.
(2) ENGINEER shall inform CITY in writing of a proposed
change to their designated project manager prior to making the change or
immediately upon receiving notification that the designated project manager
is separating employment with the ENGINEER.
(3) ENGINEER shall provide resumes to the CITY of the
proposed replacement project manager(s), who shall have similar
qualifications and experience as the outgoing person, for review and
approval.
D. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 2 of 14
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
E. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
F. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on -site observation(s) of a
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 3 of 14
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
G. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
H. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 4 of 14
I. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 5 of 14
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 6 of 14
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 7 of 14
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 8 of 14
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 9 of 14
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 10 of 14
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
I. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto.
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 11 of 14
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time -employees and the contract value is $100,000 or more, the
City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the City
that if Chapter 2271, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
ENGINEER acknowledges that in accordance with Chapter 2276 of the
Texas Government Code, the CITY is prohibited from entering into a
contract for goods or services that has a value of $100,000 or more, which
will be paid wholly or partly from public funds of the City, with a company
(with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of
the contract. The terms "boycott energy company" and "company" have the
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 12 of 14
meaning ascribed to those terms by Chapter 2276 of the Texas Government
Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, ENGINEER
certifies that ENGINEER's signature provides written verification to
the CITY that ENGINEER: (1) does not boycott energy companies; and
(2) will not boycott energy companies during the term of this
Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code, the CITY is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more
which will be paid wholly or partly from public funds of the City, with a
company (with 10 or more full-time employees) unless the contract contains
a written verification from the company that it: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or
firearm trade association; and (2) will not discriminate during the term of the
contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, ENGINEER
certifies that ENGINEER's signature provides written verification to the
CITY that ENGINEER: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate against a firearm entity or
firearm trade association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument.
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B -
Compensation
Attachment C
- Amendments to Standard Agreement for Engineering Services
Attachment D
- Project Schedule
Attachment E -
Location Map
Attachment F
— Insurance Requirements
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 13 of 14
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
Dana Burghdoff
Assistant City Manager
Date: 08/11 /2026
a� pORTwad
ATTEST:
nEXoso.d
Jannette Goodall
City Secretary
cc
cc
BY:
ENGINEER
Kimley-Horn and Associates, Inc.
Scott R. Arnold, P.E.
Vice President
Date: 08/05/2026
APPROVAL RECOMMENDED:
%Vela 7howtaim -1y S P
Tc, 10, 2026 14:1843 CDT)
gy. SP
Teresa Thomason
Deputy Director, Park & Recreation Department
APPROVED AS TO FORM AND LEGALITY
warn
By: Douglas Black (Aug 10. 2026 14:30:43 CDT)
Douglas W Black
Sr. Assistant City Attorney
Contract Compliance Manager:
M&C No.: 26-0419
M&C Date: 06/09/2026
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Blaise Grissom
Park Planner
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Chapel Hill, Cibolo Hill, Harriet Creek Ranch & Kristi Jean Burbach Park Improvements
Standard Agreement for Engineering Related Design Services CPN 106675
Revised Date: August 18, 2025
Page 14 of 14
M&C Review
Page I of 3
r_I
CITY COUNCIL AGEND
Create New From This M&C
DATE: 6/9/2026 REFERENCE **M&C 26- LOG NAME:
NO.: 0419
CODE: C TYPE: CONSENT PUBLIC
HEARING:
Official site of the City of Fort Worth, Texas
FORTWORTI-I
"111v
80CHAPEL HILL, CIBOLO, HCR
AND KJB PARKS
ENGINEERING SERVICES
NO
SUBJECT: (CD 4, CD 7 and CD 10) Authorize Execution of an Engineering Agreement with Kimley
Horn and Associates, Inc. in an Amount Up to $560,000.00 for Fiscal Year 2026 Chapel
Hill, Cibolo Hill, Harriet Creek Ranch and Kristi Jean Burbach Park Improvements
Project, Adopt Appropriation Ordinance, and Amend the Fiscal Years 2026-2030 Capital
Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Kimley Horn and Associates, Inc. in
an amount up to $560,000.00 for Fiscal Year 2026 Chapel Hill, Cibolo Hill, Harriet Creek
Ranch and Kristi Jean Burbach Park Improvements project (City Project No. 106675);
2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations
in the PARD Dedication Fees Fund in the cumulative amount of $1,493,787.00, with no net
change to overall appropriations, by (I) increasing estimated receipts and appropriations in
the PARD New Enhancements Programmable project (City Project No. P00132) in the amount
of $1,493,787.00 and (II) decreasing the (a) PARD Maintenance & Replacement
Programmable project (City Project No. P00133) by $849,000.00; (b) PARD Studies
Programmable project (City Project No. P00119) by $75,000.00; (c) PARD Dedication Fee
Unspecified Funds (City Project No. UNSPEC) by $368,000.00; and (d) Neighborhood Unit
5-17 (City Project No. UN8048) by $201,787.00; and
3. Amend the Fiscal Years 2026-2030 Capital Improvement Program.
DISCUSSION:
The purpose of the Mayor and Council Communication (M&C) is to authorize an engineering
agreement with Kimley Horn and Associates, Inc. in an amount up to $560,000.00 for the Fiscal Year
(FY) 2026 Chapel Hill, Cibolo Hill, Harriet Creek Ranch and Kristi Jean Burbach Park Improvements
project and to reallocate funds among various projects to pay for the agreement without increasing
total appropriations.
The purpose of this project is to prepare plans and construction documents for four parks, including
Master plan designs for Chapel Hill Park and Cibolo Hill Park, and construction documents for
improvements in Cibolo Hill Park, Harriet Creek Ranch Park and Kristi Jean Burbach Park.
Improvements include walking trails, pavilions, playgrounds, lighting, natural areas, sports courts, site
furniture, and sports fields. After construction documents have been prepared for Cibolo Hill Park,
Harriet Creek Ranch Park and Kristi Jean Burbach Park the City will go out to bid for construction
services.
Total Project Funding (Design and Construction Phases):
PARK NAME
Chapel Hill
CAPITAL FUND NAME
PARD Dedication Fees
�(301 10)
JAUTHORITY11
this M&C
MOUNT
$75,000.00
Cibolo Hill IF
this M&C 11
$820,787.00
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=34462&councildate=6/9/2026 6/11/2026
M&C Review
Page 2 of 3
PARD Dedication Fees
(30110)
Harriet Creek
PARD Dedication Fees
Ranch
�(301 10)
this M&C
$598,000.00
Kristi Jean
PARD Dedication Fees
Burbach
�(301 10)
FY25 CIP
$274,258.00
Total
1
1$1,768,045.00
Funding for this project was not included in the FY2026-2030 Capital Improvement Program due to
projects initially budgeted in other PARD Programmables. The action in this M&C will amend the
FY2026-2030 Capital Improvement Program as approved in connection with Ordinance 27979-09-
2025.
Adoption of the attached appropriation ordinance will move funds within the PARD Dedication Fees
Fund from the PARD Maintenance & Replacement Programmable project, the PARD Studies
Programmable project, Neighborhood Unit 5-17 project and Unspecified -All Funds project to the
same PARD New Enhancements Programmable project for the FY 2026 Chapel Hill, Cibolo Hill,
Harriet Creek Ranch and Kristi Jean Burbach Park Improvements project for the Park & Recreation
Department.
Kristi Jean Burbach Park is located in COUNCIL DISTRICT 4.
Chapel Hill Park and Cibolo Hill Park are located in COUNCIL DISTRICT 7.
Harriet Creek Ranch Park is located in COUNCIL DISTRICT 10.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the PARD Maintenance &
Replacement Programmable project, the PARD Studies Programmable project, Neighborhood Unit
5-17 project and Unspecified -All Funds project within the PARD Dedication Fees Fund and upon
approval of the above recommendations and adoption of the attached appropriation ordinance, funds
will be available in the PARD Dedication Fees Fund for the PARD New Enhancements project to fund
the 26 Chapel Hill Cibolo HCR KJB project to support execution of the agreement. Prior to an
expenditure being incurred, the Park & Recreation Department has the responsibility of verifying the
availability of funds.
TO
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
Submitted for City Manager's Office by: Dana Burghdoff (8018)
Originating Department Head: Teresa Thomason (5708)
Additional Information Contact: Joel McElhany (5745)
ATTACHMENTS
80 Chapel Hill Cibolo Harriet Creek Ranchv2.xlsx (CFW Internal)
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=34462&councildate=6/9/2026 6/11/2026
M&C Review
Page 3 of 3
80CHAPEL HILL CIBOLO HCR AND KJB PARKS ENGINEERING SERVICES ordinance hwk5.13.26 CLEAN.docx
(Public)
80CHAPEL HILL, CIBOLO, HCR AND KJB PARKS ENGINEERING SERVICES funds avail.docx (CFW Internal)
CHAPEL HILL SITE MAP.docx (Public)
CIBOLO HILL SITE MAP.docx (Public)
Form 1295 Certificate 101530330.pdf (CFW Internal)
HARRIET CREEK RANCH SITE MAP.docx (Public)
KRISTI JEAN BURBACH SITE MAP.docx
(Public)
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=34462&councildate=6/9/2026 6/11/2026
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1of1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2026-1454944
Kimley-Horn and Associates, Inc.
Dallas, TX United States
Date Filed:
04/29/2026
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Fort Worth, Texas
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
Fort Worth Park Proposal
Chapel Hill Park, Cibolo Hill Park, Harriet Creek Park, and Kristi Jean Burbach Park
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
I Intermediary
Flanagan, Tammy
Dallas, TX United States
X
McEntee, David
Dallas, TX United States
X
Keil, Ashley
Dallas, TX United States
X
Mutti, Brent
Dallas, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION
My name is Tyler Henrichs and my date of birth is 09/28/1990
My address is 13455 Noel Road, Two Galleria Office Tower, Suite 700 Dallas TX 75240 USA
(city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Dallas County, State of Texas on the 29th day of April 2026
(month) (year)
Signature of autAbrized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V4.1.0.b6ef2aab
Attachment "A"
DESCRIPTION OF SERVICES
City of Fort Worth, TX
PROJECT #1: CHAPEL HILL PARK MASTER PLAN
Proiect Understandin
It is our understanding that the City of Fort Worth, Texas (City) would like Kimley-Horn and Associates, Inc.
(KH) to provide Master Plan design services for Chapel Hill Park which is located in North-West Fort Worth,
south of Bonds Ranch Road, west of Saginaw Boulevard, north of Boat Club Road, and east of Morris Dido
Newark Road. It is approximately 68.16 acres.
Citv Resaonsibilities
KH understands that City will provide the following information, on which it may rely, for its use in completing
this Scope of Services:
A) Boundary survey has been provided by the City
B) Any City of Fort Worth design requirements or standards applicable to each park in the project.
C) Any record drawings (infrastructure and development record plan), existing plans and
specifications of the park; City standards or examples for the proposed site improvements, within
or adjacent to the site.
Services
Task 1 Project Management and Meetings
KH will manage its design team and subconsultants, facilitate communication, coordinate internally and
externally with members of the project team and City staff, and address project issues and review design
decisions with the City's Project Manager and other assigned City representatives. KH will attend up to five
(5) meetings with City staff as described below. This task includes up to 50 hours of KH effort.
Meetings
KH will attend the following meetings with City as part of this task.
A) Meeting #1 — Project Kickoff Meeting
KH attends one (1) project kickoff meeting with the City to review the project scope, schedule,
deliverables, status reporting, and expectations for the project.
B) Meeting #2 -Public Meeting No.1
KH coordinates with the City to conduct one (1) public work session before design work
commences to gather input from residents by presenting initial programmatic ideas, precedent
images, possible design elements as agreed upon with City. KH will provide two representatives to
attend the public meeting and provide the related meeting notes.
C) Meeting #3 — Master Plan Design Review Meeting
KH attends one (1) meeting with the City staff to review the preliminary Master Plan and receive
comments from the City.
2
D) Meeting #4 - Public Meeting No.2
KH coordinates with the City to conduct one (1) public presentation session after the preliminary
Master Plan design to gather input from the residents and other stakeholders to further refine the
plan. KH will provide two representatives to attend the public meeting and provide the related
meeting notes.
E) Meeting #5 — Park Board Meeting
KH attends one (1) regularly scheduled Park Board meeting to present the final Master Plan as an
information item. KH will provide one representative to attend the board meeting.
Task 2 Field Visit and Data Collection
KH shall perform the following tasks:
A) Gather and review available relevant project data provided by the City and other sources.
B) One project site visit to observe and photographically document existing observable above -ground
conditions within the project limit.
C) Prepare a project base map for the project site utilizing KH's gathered relevant project data. Project
Base Map will be in digital (PDF/ACAD2020) format. It includes black and white line work and color
aerial (300dpi).
Task 3 Illustrative Master Plan Booklet
KH shall perform the following tasks:
A) Production efforts for exhibition boards to be presented at the public meetings listed in Task 1.
B) Illustrative Master Plan
Based upon data gathered and input received in previous tasks, KH shall prepare preliminary and
final Master Plans. Two (2) preliminary Master Plan options will be prepared in a hand -sketched
format and submitted to the City for review and comment, which will be incorporated into the final
Master Plan. KH will attend one (1) design review meeting included in Task 1.
C) Preliminary Opinion of Probable Construction Cost (OPCC) for Final Master Plan
Once the final Master Plan is approved. KH will provide a preliminary OPCC based on the quantities
indicated on the Master Plan. Because KH does not control the cost of labor, materials, equipment
or services furnished by others, methods of determining prices, or competitive bidding or market
conditions, any opinions rendered as to costs, including but not limited to opinions as to the costs
of construction and materials, will be made on the basis of its experience and represent its judgment
as an experienced and qualified professional, familiar with the industry. KH cannot and does not
guarantee that proposals, bids or actual costs will not vary from its opinions of cost.
DeliverahlPs
KH shall provide a Master Plan booklet that consists of site background, bubble diagram, site context
analysis, public meeting summaries, stakeholder & public comments, preliminary and final Master Plans,
and OPCC. The booklet will be in 22" x 34" digital PDF format.
3
Task 4 On -Call Services
At the City's request, KH will provide assistance on Project related matters including preparing for and
attending meetings or conference calls with the City and City's consultant outside of those listed in the
previous tasks. Due to the unpredictability of the effort required at the time of this Agreement, Kimley-Horn
will provide these services on an hourly basis at the Client's request at our then current hourly rates.
4
PROJECT #2: CIBOLO HILL PARK MASTER PLAN AND PHASE 1 DEVELOPMENT
Project Understandin
It is our understanding that the City of Fort Worth, Texas (City) would like Kimley-Horn and Associates, Inc.
(KH) to provide professional design services for Cibolo Hill Park, which is located in North-West Fort Worth,
south of Peoria Drive, west of N Saginaw Blvd, north of Cibolo Hills Pkwy, and east of Shoshoni Dr. It is
approximately 15.21 acres. Total budget for phase 1 construction is $1.2 Million. Phase 1 design plans will
be prepared to align with the available construction budget. Design of additional park elements or additional
scope in excess of $1.2 Million estimated construction value will be provided as an additional service. Plat
for this park has been done.
The fees and level of effort presented herein are based on Parks #2, #3, and #4 progressing through design
review, bidding, and construction administration concurrently as a coordinated program. Should any of the
projects be advanced separately, require independent review cycles, separate bid packages, or additional
coordination beyond the assumptions of this scope, such effort shall be considered Additional Services and
shall be authorized through a mutually agreed upon amendment.
Citv ReWonsibilities
KH understands that the City will provide the following information, on which it may rely, for its use in
completing this Scope of Services:
1) Any Boundary information of the park.
2) Any City of Fort Worth design requirements or standards applicable to each park in the project.
3) Any record drawings (infrastructure and development record plan), existing plans and specifications of
the park; City standards or examples for the proposed site improvements, within or adjacent to the site.
Services
Task 1 Project Management and Meetings
KH will manage its design team and subconsultants, facilitate communication, coordinate internally and
externally with members of the project team and City staff, and address project issues and review design
decisions with the City's Project Manager and other assigned City representatives. KH will attend up to four
(4) meetings with the City staff as described below. This task includes up to 45 hours of KH effort.
Meetings
KH will attend the following meetings with the City as part of this task.
A) Meeting #1 - Public Meeting No.1
KH coordinates with City to conduct one (1) public work session before design work commences
to gather input from residents by presenting initial programmatic ideas, precedent images, and
possible design elements as agreed upon with the City. KH will provide two representatives to
attend the public meeting and provide the related meeting notes.
B) Meeting #2 - Public Meeting No.2
KH coordinates with City to conduct one (1) public presentation session after initial conceptual
design has been completed to gather input from residents and other stakeholders to further refine
design. KH will provide two representatives to attend the public meeting and provide the related
meeting notes.
If a project kick-off meeting or a Master Plan design review meeting is required for this project, they will be
combined into the meeting for Chapel Hill Park.
A) Meeting #3 — 30% Construction Document Review Meeting
B) Meeting #4 — 60% Construction Document Review Meeting
C) Meeting #5 — 90% Construction Document Review Meeting
Task 2 Field Visit and Data Collection
KH shall perform the following tasks:
A) Gather and review available relevant project data provided by the City and other sources.
B) One project site visit to observe and photographically document existing observable above -ground
conditions within the project limit.
C) Prepare a project base map for the project site utilizing KH's gathered relevant project data. Project
Base Map will be in digital (PDF/ACAD2020) format. It includes black and white line work and color
aerial (300dpi).
Task 3 Illustrative Master Plan Booklet
KH shall perform the following tasks:
A) Production efforts for exhibition boards to be presented at the public meetings listed in Task 1
B) Illustrative Master Plan
Based upon data gathered and input received in previous tasks, KH shall prepare preliminary and
final Master Plans. Two (2) preliminary Master Plan options will be prepared in a hand -sketched
format and submitted to the City for review and comment, which will be incorporated into the final
Master Plan. KH will attend one (1) design review meeting included in Task 1.
C) Preliminary Opinion of Probable Construction Cost (OPCC) for Final Master Plan
Once the final Master Plan is approved. KH will provide a preliminary OPCC based on the quantities
indicated on the Master Plan. Because KH does not control the cost of labor, materials, equipment
or services furnished by others, methods of determining prices, or competitive bidding or market
conditions, any opinions rendered as to costs, including but not limited to opinions as to the costs
of construction and materials, will be made on the basis of its experience and represent its judgment
as an experienced and qualified professional, familiar with the industry. KH cannot and does not
guarantee that proposals, bids or actual costs will not vary from its opinions of cost.
Deliverables
KH shall provide a Master Plan booklet that consists of site background, bubble diagram, site context
analysis, public meeting summaries, stakeholder & public comments, preliminary and final Master Plans,
and OPCC. The booklet will be in 22" x 34" digital PDF format.
0
Task 4 30% Construction Documents for Phase 1
Based on the approved final Master Plan and the construction budget as listed in Project Understanding,
KH shall perform the following tasks:
A) Identify the amenities to be developed in Phase 1
Based on the construction budget as listed in Project Understanding, KH will work with the City and
identify the amenities and the limit of work for Phase 1.
B) Prepare and submit 30% design/construction documents for Phase 1 to the City for review. These
documents shall incorporate the City comments and input from the previous review during Master
Plan design phase
C) The design/construction documents shall plan and instruct the installation of park improvements,
as based on the Phase 1 development in the approved final Master Plan. Park improvements will
consist of the following elements.
a. Vehicular pavement if necessary
• concrete parking areas
• A geotechnical report will be required to determine appropriate vehicular
pavement construction.
b. Pedestrian walks/trails
• concrete connecting walkways
c. Enhanced landscape
• Sod, seed, shrubs and groundcover
d. Other amenities within the construction budget as listed in Project Understanding
Note: All improvements will follow applicable City standards and details, unless directed otherwise.
Park Facility Standards will be provided by the City. All other required standards will need to be
researched, verified, and acquired separately.
D) 30% construction documents will include:
a. Design/construction plans
E) Per Meeting #3 listed in Task 1, KH shall attend a meeting with the City to discuss review comments
regarding the 30% submittal and obtain the City input prior to KH's preparation of 60% construction
documents.
Task 5 60% Construction Documents for Phase 1
Based on the approved final Master Plan and the construction budget as listed in Project Understanding,
KH shall perform the following tasks:
F) Identify the amenities to be developed in Phase 1
Based on the construction budget as listed in Project Understanding, KH will work with the City and
identify the amenities and the limit of work for Phase 1.
7
G) Prepare and submit 60% design/construction documents for Phase 1 to the City for review. These
documents shall incorporate the City comments and input from the previous review during Master
Plan design phase
H) The design/construction documents shall plan and instruct the installation of park improvements,
as based on the Phase 1 development in the approved final Master Plan. Park improvements will
consist of the following elements.
e. Site grading and drainage
• erosion control measures
f. Vehicular pavement if necessary
• concrete parking areas
• A geotechnical report will be required to determine appropriate vehicular
pavement construction.
g. Pedestrian walks/trails
• concrete connecting walkways
h. Enhanced landscape
• Sod, seed, shrubs and groundcover
i. Other amenities within the construction budget as listed in Project Understanding
Note: All improvements will follow applicable City standards and details, unless directed otherwise.
Park Facility Standards will be provided by the City. All other required standards will need to be
researched, verified, and acquired separately.
1) 60% construction documents will include:
b. Design/construction plans
c. Anticipated technical specifications (outline only)
d. OPCC
J) Per Meeting #4 listed in Task 1, KH shall attend a meeting with the City to discuss review comments
regarding the 60% submittal and obtain the City input prior to KH's preparation of 90% construction
documents.
Task 6 90% Construction Documents for Phase 1
KH shall perform the following tasks:
A) Prepare and submit 90% design documents for Phase 1 park improvements to the City for review,
incorporating previous City review comments and input.
B) 90% construction documents will include:
a. Design/construction plans and necessary details
b. Anticipated technical specifications (approximated final copies)
c. OPCC
W
C) Per Meeting #5 listed in Task 1, KH will attend a meeting with the City to discuss review comments
regarding the 90% submittal and obtain the City input prior to KH's preparation of 100% final
construction documents.
Task 7 100% Construction Documents (IFC) for Phase 1
KH shall perform the following tasks:
A) Prepare and submit 100% construction documents for Phase 1 park improvements to the City for
review, incorporating previous City review comments and input.
B) 100% construction documents will consist of:
a. Cover sheet (electronic format — template to be supplied by the City
b. Design/construction plans and necessary details
c. OPCC
d. Final technical specifications (considered ready for bidding documents)
e. Construction manual including the bidding forms, the construction agreement, and
applicable City specifications. (This single project manual will cover the necessary info for
Cibo/o Hill Park, Harriet Creek Park and Krisit Jean Burbach Park.)
Task 8 Irrigation Plans for Phase 1 — Contingent Service
KH will prepare irrigation plans and details for the project in general conformance with the directives of the
City and the current published landscape and irrigation requirements set forth in the City development
regulations. The irrigation plans will be prepared upon the City's approval of the 90% landscape
construction documents and will illustrate head layout, pipe sizing, controller/valve locations and standards
details. The City is to specify preferred irrigation equipment brand (Toro, Hunter, Weathermatic, or Rainbird)
prior to KH starting the irrigation design. This task includes addressing up to one round of ordinary and
reasonable simultaneous comments from the City. Additional rounds of revisions to obtain approvals shall
be considered an additional service. Additional services for this task will be billed to the City on an hourly
basis.
Task 9 Electrical Engineering for Phase 1 — Contingent Service
KH shall perform the following tasks through the use of a subconsultant:
A) Providing electrical engineering design services including:
Designing new lighting at select locations throughout the park. The lighting fixtures will be
pedestrian scale solar lighting fixtures on direct buried concrete poles.
• Completion of the COMCheck IECC compliance forms for the new lighting defined within the scope
of work. This document will be required for permitting.
B) Preparation of one (1) set of reproducible PDF drawings using Autodesk Revit or AutoCAD suitable
for bidding, permit, and construction.
0
C) Preparation of one (1) set of reproducible PDF technical specifications using MS Word suitable for
bidding and construction.
Note: Site photometrics analysis is not included in the scope.
Task 10 Limited Topographic Survey for Phase 1
Kimley-Horn will prepare a Limited Topographic Survey of a portion of Lots 16X and 17X, Block 26 of Cibolo
Hill, situated in the B. Thomas Survey, Abstract No. 1497 and J.A. Gill Survey, Abstract No. 570, City of
Fort Worth, Tarrant County, Texas, and shown on the attached exhibit. This survey will be based on a
nominal 50' grid system, including grade breaks, on -site utilities, flow lines of accessible utilities and
DigTESS markings. Kimley-Horn will prepare an electronic map showing existing contour lines at 1'
intervals and existing visible on -site improvements and applicable information from available as -built plans
to be provided by others. The information will be tied to existing control points and City of Fort Worth
benchmark system.
Kimley-Horn reserves the right to revise this fee if the Client requires evidence of underground utilities
existing on or serving the surveyed property as determined by markings coordinated by the surveyor
pursuant to a private utility locate request.
Reference Attachment "D" for limit of work for this task.
Task 11 Geotechnical Investigation for Phase 1
KH shall perform the following tasks through the use of a subconsultant:
A) Provide through the use of a subconsultant, a geotechnical investigation, analysis, up to seven (7)
site borings, and engineering as required for Phase 1 of the park site.
• Shade Structures (Pavilions) and Sport Court — Three (3) borings drilled to depths of 15 to 20 feet,
depending on depth to gray limestone.
• Area Trails/Parking — Four (4) borings drilled to a depth of 5 feet.
B) An engineering report will be prepared to present the results of the field and laboratory data together
with analyses of the results and recommendations. The subconsultant will provide an electronic
copy of the report which will address:
• General soil and groundwater conditions
• Recommendations for foundation type, depth and allowable loading including the use of a
monolithic, slab -on -grade
• Foundation construction requirements
• Recommendations for floor slab support, including an evaluation of the swell characteristics (PVR)
of the subgrade soils
• Earthwork recommendations
• Guidelines for parking lot and trail pavement design
10
Task 12 TDLR Plan Review Submittal (TAS)
Kimley-Horn will utilize a subconsultant that is a Registered Accessibility Specialist (RAS) for the purposes
of reviewing the Cibolo Hill Park Phase 1 construction plans, for conformance with the Texas Accessibility
Standards (TAS).
Kimley-Horn will coordinate with the RAS for project registration with the Texas Department of Licensing
and Regulation (TDLR), and project inspection at the site, upon completion of construction. Kimley-Horn
will prepare plans in an effort to conform to TAS and will make one (1) round of revisions to the plans based
on comments received from the RAS. Inspection and registration fees for TDLR are included in this fee.
Task 13 Bid Phase Assistance
KH shall perform the following tasks:
A) Prepare and submit written responses to bidder requests for information (RFI's), through the City
B) Attend pre -bid conference, in support of the City
C) Assist the City with bid analysis, bid tabulation, and bid award recommendation
This task includes up to 12 hours of effort. If additional effort is required or the bid phase is extended beyond
a reasonable time due to difficulty in securing qualified bids, administrative delays, or other unforeseen
circumstances, an additional service will be required.
Task 14 Construction Phase Service
KH shall perform the following tasks:
A) Visits to Site and Observation of Construction. KH will make visits at intervals as directed by the
City in order to observe the progress of the Work. Such visits and observations by KH are not
intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Based on
information obtained during such visits and such observations, KH will evaluate whether
Contractor's work is generally proceeding in accordance with the Contract Documents, and KH will
keep the City informed of the general progress of the Work.
B) KH shall not, during such visits or as a result of such observations of Contractor's work in progress,
supervise, direct, or have control over Contractor's work, nor shall Kimley-Horn have authority over
or responsibility for the means, methods, techniques, equipment choice and usage, sequences,
schedules, or procedures of construction selected by Contractor, for safety precautions and
programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and
regulations applicable to Contractor's furnishing and performing the Work. Accordingly, KH neither
guarantees the performance of any Contractor nor assumes responsibility for any Contractor's
failure to furnish and perform its work in accordance with the Contract Documents.
C) Clarifications and Interpretations. KH will respond to reasonable and appropriate Contractor
requests for information and issue necessary clarifications and interpretations of the Contract
Documents to Client as appropriate to the orderly completion of Contractor's work. Any orders
authorizing variations from the Contract Documents will be made by Client.
11
D) Change Orders. KH may recommend Change Orders to Client and will review and make
recommendations related to Change Orders submitted or proposed by the Contractor.
E) Shop Drawings and Samples. KH will review and approve or take other appropriate action in
respect to Shop Drawings and Samples and other data which Contractor is required to submit, but
only for conformance with the information given in the Contract Documents. Such review and
approvals or other action will not extend to means, methods, techniques, equipment choice and
usage, sequences, schedules, or procedures of construction or to related safety precautions and
programs.
F) Substitutes and "or -equal." Evaluate and determine the acceptability of substitute or "or -equal"
materials and equipment proposed by Contractor in accordance with the Contract Documents, but
subject to the provisions of applicable standards of state or local government entities.
G) Limitation of Responsibilities. KH shall not be responsible for the acts or omissions of any
Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing
or furnishing the Work. Kimley-Horn shall not have the authority or responsibility to stop the work
of any Contractor.
H) Construction Coordination Meetings. Attendance for construction coordination meetings once
Landscape Architecture services are under construction. Frequency of meetings will be determined
once construction begins.
This task includes up to 12 hours of KH effort. Should additional effort be required, this effort will be billed
on an hourly basis in addition to the budget amount after written authorization from the Client.
Tree tagging and Nursery visits are not included in this task. Any additional effort beyond the specified
amount will be billed to the City hourly, accordingly to the current Professional's rates, as authorized by the
City or its representatives.
12
PROJECT #3: HARRIET CREEK PARK PHASE 2 DEVELOPMENT
Project Understandin
It is our understanding that the City of Fort Worth, Texas (City) would like Kimley-Horn and Associates, Inc.
(KH) to provide professional design services for Phase 2 of Harriet Creek Park which is located in North
Fort Worth, south and west of Cowboy Trail, north of Mariet Creek Drive, and east of Elementary Drive.
The overall park is approximately 32.17 acres. Phase 1 of this park has been built. Phase 2 development
will be based on the Master Plan dated Aug. 2008 provided by the City. Total budget for Phase 2
construction is $400,000. Phase 2 design plans will be prepared to align with the available construction
budget. Design of additional park elements or additional scope in excess of $400,000 estimated
construction value will be provided as an additional service. Final plat for this park has been done.
The fees and level of effort presented herein are based on Parks #2, #3, and #4 progressing through design
review, bidding, and construction administration concurrently as a coordinated program. Should any of the
projects be advanced separately, require independent review cycles, separate bid packages, or additional
coordination beyond the assumptions of this scope, such effort shall be considered Additional Services and
shall be authorized through a mutually agreed upon amendment.
City Responsibilities
KH understands that the City will provide the following information, on which it may rely, for its use in
completing this Scope of Services:
1) Boundary survey for Harriet Creek Park has been provided by the city.
2) Any City of Fort Worth design requirements or standards applicable to each park in the project.
3) Any record drawings (infrastructure and development record plan), existing plans and specifications of
the park; City standards or examples for the proposed site improvements, within or adjacent to the site.
Services
Task 1 Project Management and Meetings
KH will manage its design team and subconsultants, facilitate communication, coordinate internally and
externally with members of the project team and City staff, and address project issues and review design
decisions with the City's Project Manager and other assigned City representatives. KH will attend up to
three (3) meetings with the City staff as described below. This task includes up to 10 hours of KH effort.
Meetings
KH will attend the following meeting with the City, as part of this task.
A) Meeting #1 - Public Meeting
KH coordinates with City to conduct one (1) public work session before design work commences
to gather input from residents on developments amenities for Phase 2 of the park. KH will provide
two representatives to attend the public meeting and provide the related meeting notes.
If a project kick-off meeting or a Schematic Design review meeting is required, KH will combine it into the
single meeting for Chapel Hill Park.
B) Meeting #2 — 60% Construction Document Review Meeting
13
C) Meeting #3 — 90% Construction Document Review Meeting
Task 2 Field Visit and Data Collection
KH shall perform the following tasks:
A) Gather and review available relevant project data provided by the City and other sources.
B) One project site visit to observe and photographically document existing observable above -ground
conditions within the project limit.
C) Prepare a project base map for the project site utilizing KH's gathered relevant project data. Project
Base Map will be in digital (PDF/ACAD2020) format. It includes black and white line work and color
aerial (300dpi).
Task 3 Landscape Schematic Plan
Based on the Master Plan dated Aug. 2008 provided by the City, the input from the public meeting, the
City's direction, and the budget for Phase 2 Construction listed in the Project Understanding, KH will
develop the illustrative Schematic Design for Phase 2 of the park.
Production efforts for exhibition boards to be presented at the public meetings listed in Task 1 are included
in this task.
The schematic plans will illustrate the general scope, scale, theme, and relationship of various design
components for the following areas:
A) Schematic landscape plans
B) Proposed hardscape improvements (walks, walls, shade structure, etc.)
C) Conceptual fine grading
D) General clarifications, assumptions, and narratives provided for pricing
Drawings will be conceptual in nature and will include general materials callouts for each of the areas listed
above. The information will be thorough enough for pricing take -offs to be completed by the City or a general
contractor to determine overall costs for the project, but not enough for the construction of the project.
KH will also prepare a preliminary Opinion of Probable Construction Cost (OPCC) for the landscape
architecture items listed above for the schematic design. KH will address up to one (1) round of comments
from the City on the landscape schematic plans and OPCC, and resubmit the documents to the City as the
final submittal.
Civil engineering, electrical engineering, and structural engineering are not included in this scope.
Deliverables
Illustrative SD set digital files in 22" x 34" PDF format.
Task 4 60% Construction Documents
KH shall perform the following tasks:
14
A) Prepare and submit 60% design/construction documents for Phase 2 park improvements to the
City for review. These documents shall incorporate the City comments and input from Task 3.
B) The design/construction documents shall plan and instruct the installation of park improvements,
as based on the Phase 2 development. Park improvements will consist of the following elements.
a. Site grading and drainage
a. Erosion control measures
b. Vehicular pavement if necessary
• concrete parking areas
• a geotechnical report will be required to determine appropriate vehicular
pavement construction.
c. Pedestrian walks/trails
• concrete connecting walkways
j. Enhanced landscape
• Sod, seed, shrubs, and groundcover
d. Other amenities within the construction budget as listed in Project Understanding
Note: All improvements will follow applicable City standards and details, unless directed otherwise.
Park Facility Standards will be provided by the City. All other required standards will need to be
researched, verified, and acquired separately.
C) 60% construction documents will include:
• Design/construction plans
• OPCC
D) Per Meeting #2 listed in Task 1, KH will attend a meeting with the City to discuss review comments
regarding the 60% submittal and obtain the City input prior to KH's preparation of 90% construction
documents.
Task 5 90% Construction Documents
KH shall perform the following tasks:
A) Prepare and submit 90% design documents for Phase 2 park improvements to the City for review,
incorporating previous City review comments and input.
B) 90% construction documents will include:
• Design/construction plans and necessary details
• OPCC
C) Per Meeting #3 listed in Task 1, KH will attend a meeting with the City to discuss review comments
regarding the 90% submittal and obtain the City input prior to KH's preparation of 100% final
construction documents.
Task 6 100% Construction Documents (IFC Set)
KH shall perform the following tasks:
15
A) Prepare and submit 100% construction documents for Phase 2 park improvements to the City for
review, incorporating previous City review comments and input.
B) 100% construction documents will consist of:
• Cover sheet (electronic format — template to be supplied by the City
• Design/construction plans and necessary details
• Detailed opinion of probable costs
• Construction manual including the bidding forms, the construction agreement, and
applicable City specifications will be combined into the single document under Cibolo Hill
Park,
Task 7 Irrigation Plans — Contingent Service
KH will prepare irrigation plans and details for the project in general conformance with the directives of the
City and the current published landscape and irrigation requirements set forth in the City development
regulations. The irrigation plans will be prepared upon the City's approval of the 90% landscape
construction documents and will illustrate head layout, pipe sizing, controller/valve locations and standards
details. The City is to specify preferred irrigation equipment brand (Toro, Hunter, Weathermatic, or Rainbird)
prior to KH starting the irrigation design. This task includes addressing up to one round of ordinary and
reasonable simultaneous comments from the City. Additional rounds of revisions to obtain approvals shall
be considered an additional service. Additional services for this task will be billed to the City on an hourly
basis.
Task 8 Electrical Engineering — Contingent Service
KH shall perform the following tasks through the use of a subconsultant:
A) Providing electrical engineering design services including:
Designing new lighting at select locations throughout the park. The lighting fixtures will be
pedestrian scale solar lighting fixtures on direct buried concrete poles.
• Completion of the COMCheck IECC compliance forms for the new lighting defined within the scope
of work. This document will be required for permitting.
B) Preparation of one (1) set of reproducible PDF drawings using Autodesk Revit or AutoCAD suitable
for bidding, permit, and construction.
C) Preparation of one (1) set of reproducible PDF technical specifications using MS Word suitable for
bidding and construction.
Note: Site photometrics analysis is not included in the scope.
Task 9 Limited Topographic Survey
16
Kimley-Horn will prepare a Limited Topographic Survey of a portion of Lot 22, Block 16 of Harriet Creek
Ranch, situated in the Guadalupe Cardinas Survey, Abstract No. 214, City of Fort Worth, Tarrant County,
Texas, and shown on the attached exhibit. This survey will be based on a nominal 50' grid system, including
grade breaks, on -site utilities, flow lines of accessible utilities and DigTESS markings. Kimley-Horn will
prepare an electronic map showing existing contour lines at 1' intervals and existing visible on -site
improvements and applicable information from available as -built plans to be provided by others. The
information will be tied to existing control points and City of Fort Worth benchmark system.
Kimley-Horn reserves the right to revise this fee if the Client requires evidence of underground utilities
existing on or serving the surveyed property as determined by markings coordinated by the surveyor
pursuant to a private utility locate request.
Task 10 Geotechnical Investigation
KH shall perform the following tasks through the use of a subconsultant:
A) Provide through the use of a subconsultant, a geotechnical investigation, analysis, up to seven (7)
site borings, and engineering as required for Phase 1 of the park site.
• Shade Structures and Sport Court — Three (3) borings drilled to depths of 20 to 25 feet, depending
on depth to gray limestone.
• Area Trails — Four (4) borings drilled to a depth of 5 feet.
B) An engineering report will be prepared to present the results of the field and laboratory data together
with analyses of the results and recommendations. The subconsultant will provide an electronic
copy of the report which will address:
• General soil and groundwater conditions
• Recommendations for foundation type, depth and allowable loading including the use of a
monolithic, slab -on -grade
• Foundation construction requirements
• Recommendations for floor slab support, including an evaluation of the swell characteristics (PVR)
of the subgrade soils
• Earthwork recommendations
• Guidelines for parking lot and trail pavement design
Task 11 TDLR Plan Review Submittal (TAS)
Kimley-Horn will utilize a subconsultant that is a Registered Accessibility Specialist (RAS) for the purposes
of reviewing the Harriett Creek Park Phase 2 construction plans, for conformance with the Texas
Accessibility Standards (TAS).
Kimley-Horn will coordinate with the RAS for project registration with the Texas Department of Licensing
and Regulation (TDLR), and project inspection at the site, upon completion of construction. Kimley-Horn
will prepare plans in an effort to conform to TAS and will make one (1) round of revisions to the plans based
on comments received from the RAS. Inspection and registration fees for TDLR are included in this fee.
17
Task 12 Flood Study — Contingent Service
At the City's request, KH will prepare a Flood Study to support construction plans for the park improvements.
This flood study will support all proposed improvements included within the construction documents. The
flood study will not evaluate any future phases of the park or the impacts, this will be done as part of a
future flood study to support the construction drawings of those phases. Kimley-Horn will utilize the effective
model provided by the City as the baseline model. Kimley-Horn will update the hydraulic model with
topographic survey and proposed grading. Kimley-Horn will compare the two scenarios and document no
adverse impact is created with the proposed project.
Kimley-Horn will prepare a flood study submittal for the City and submit via Accela. Any fee for the flood
study will be paid for by the City. Kimley-horn will address up to two rounds of comments. Additional rounds
of comments will be considered additional services.
Task 13 Floodplain Development Permit — Contingent Service
At the City's request, KH will prepare a floodplain development permit and submit via Accela once the flood
study has been approved. All fees associated with the Permit will be paid for by the City. Kimley-Horn will
address one round of comments. Additional rounds of comments will be considered additional services.
Task 14 Bid Phase Assistance
KH shall perform the following tasks:
A) Prepare and submit written responses to bidder requests for information (RFI's), through the City
B) Attend pre -bid conference, in support of the City
C) Assist the City with bid analysis, bid tabulation, and bid award recommendation
This task includes up to 10 hours of effort. If additional effort is required or the bid phase is extended beyond
a reasonable time due to difficulty in securing qualified bids, administrative delays, or other unforeseen
circumstances, an additional service will be required.
Task 15 Construction Phase Service
KH shall perform the following tasks:
A) Visits to Site and Observation of Construction. KH will make visits at intervals as directed by the
City in order to observe the progress of the Work. Such visits and observations by KH are not
intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Based on
information obtained during such visits and such observations, KH will evaluate whether
Contractor's work is generally proceeding in accordance with the Contract Documents, and KH will
keep the City informed of the general progress of the Work.
B) KH shall not, during such visits or as a result of such observations of Contractor's work in progress,
supervise, direct, or have control over Contractor's work, nor shall Kimley-Horn have authority over
18
or responsibility for the means, methods, techniques, equipment choice and usage, sequences,
schedules, or procedures of construction selected by Contractor, for safety precautions and
programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and
regulations applicable to Contractor's furnishing and performing the Work. Accordingly, KH neither
guarantees the performance of any Contractor nor assumes responsibility for any Contractor's
failure to furnish and perform its work in accordance with the Contract Documents.
C) Clarifications and Interpretations. KH will respond to reasonable and appropriate Contractor
requests for information and issue necessary clarifications and interpretations of the Contract
Documents to Client as appropriate to the orderly completion of Contractor's work. Any orders
authorizing variations from the Contract Documents will be made by Client.
D) Change Orders. KH may recommend Change Orders to Client and will review and make
recommendations related to Change Orders submitted or proposed by the Contractor.
E) Shop Drawings and Samples. KH will review and approve or take other appropriate action in
respect to Shop Drawings and Samples and other data which Contractor is required to submit, but
only for conformance with the information given in the Contract Documents. Such review and
approvals or other action will not extend to means, methods, techniques, equipment choice and
usage, sequences, schedules, or procedures of construction or to related safety precautions and
programs.
F) Substitutes and "or -equal." Evaluate and determine the acceptability of substitute or "or -equal"
materials and equipment proposed by Contractor in accordance with the Contract Documents, but
subject to the provisions of applicable standards of state or local government entities.
G) Limitation of Responsibilities. KH shall not be responsible for the acts or omissions of any
Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing
or furnishing the Work. Kimley-Horn shall not have the authority or responsibility to stop the work
of any Contractor.
H) Construction Coordination Meetings. Attendance for construction coordination meetings once
Landscape Architecture services are under construction. Frequency of meetings will be determined
once construction begins.
This task includes up to 10 hours of KH effort. Should additional effort be required, this effort will be billed
on an hourly basis in addition to the budget amount after written authorization from the Client.
Tree tagging and Nursery visits are not included in this task. Any additional effort beyond the specified
amount will be billed to the City hourly, accordingly to the current Professional's rates, as authorized by the
City or its representatives.
19
PROJECT #4: KRISTI JEAN BURBACH PARK PHASE 1 DEVELOPMENT
Proiect Understanding
It is our understanding that the City of Fort Worth, Texas (City) would like Kimley-Horn and Associates, Inc.
(KH) to provide professional design services for Kristi Jean Burbach Park which is located in North Fort
Worth, south of Basswood Blvd., west of N Riverside Dr., north of Fossil Park Dr., and east Genevieve Dr.
It is approximately 14.71 acres. Total budget for Phase 1 construction is $250,000. Phase 1 design plans
will be prepared to align with the available construction budget. Design of additional park elements or
additional scope in excess of $250,000 estimated construction value will be provided as an additional
service. Plat for this park has been done. It is anticipated that the development will include trails and a
pavilion.
The fees and level of effort presented herein are based on Parks #2, #3, and #4 progressing through design
review, bidding, and construction administration concurrently as a coordinated program. Should any of the
projects be advanced separately, require independent review cycles, separate bid packages, or additional
coordination beyond the assumptions of this scope, such effort shall be considered Additional Services and
shall be authorized through a mutually agreed upon amendment.
Citv Resaonsibilities
KH understands that the City will provide the following information, on which it may rely, for its use in
completing this Scope of Services:
1) Any Boundary information of the park.
2) Any City of Fort Worth design requirements or standards applicable to each park in the project.
3) Any record drawings (infrastructure and development record plan), existing plans and specifications of
the park; City standards or examples for the proposed site improvements, within or adjacent to the site.
Services
Task 1 Project Management
KH will manage its design team and subconsultants, facilitate communication, coordinate internally and
externally with members of the project team and City staff, and address project issues and review design
decisions with the City's Project Manager and other assigned City representatives. This task includes up to
10 hours of KH effort.
No separate meetings are included in this task. If a project kick-off meeting or a design review meeting is
required for this project, they will be combined into the meetings for Chapel Hill Park.
Task 2 Field Visit and Data Collection
KH shall perform the following tasks:
A) Gather and review available relevant project data provided by the City and other sources.
B) One project site visit to observe and photographically document existing observable above -ground
conditions within the project limit.
20
C) Prepare a project base map for the project site utilizing KH's gathered relevant project data. Project
Base Map will be in digital (PDF/ACAD2020) format. It includes black and white line work and color
aerial (300dpi).
Task 3 60% Construction Documents for Phase 1
Based on the construction budget as listed in Project Understanding, KH shall perform the following tasks:
A) Identify the amenities to be developed in Phase 1
Based on the construction budget as listed in Project Understanding, KH will work with the City and
identify the amenities and the limit of work for Phase 1.
B) Prepare and submit 60% design/construction documents for Phase 1 to the City for review.
C) The design/construction documents shall plan and instruct the installation of park improvements,
as based on the Phase 1 development budget. Park improvements will consist of the following
elements.
a. Site grading and drainage
b. Pedestrian walks/trails
• concrete connecting walkways
c. Enhanced Landscape
• Sod, seed, shrubs, and groundcover
d. Other amenities within the construction budget as listed in Project Understanding
Note: All improvements will follow applicable City standards and details, unless directed otherwise.
Park Facility Standards will be provided by the City. All other required standards will need to be
researched, verified, and acquired separately.
K) 60% construction documents will include:
a. Design/construction plans
b. OPCC
Task 4 100% Construction Documents (IFC Set) for Phase 1
KH shall perform the following tasks:
A) Prepare and submit 100% construction documents for Phase 1 park improvements to the City for
review, incorporating previous City review comments and input.
B) 100% construction documents will consist of:
• Cover sheet (electronic format — template to be supplied by the City
• Design/construction plans and necessary details
• Detailed opinion of probable costs
• Construction manual including the bidding forms, the construction agreement, and
applicable City specifications will be combined into the single document under Cibolo Hill
Park.
21
C) Submit plans to a Texas Licensed Registered Accessibility Specialist (RAS) for review.
Note: Electrical engineering and lighting design are not included in this scope.
Task 5 Irrigation Plans for Phase 1 — Contingent Service
KH will prepare irrigation plans and details for the project in general conformance with the directives of the
City and the current published landscape and irrigation requirements set forth in the City development
regulations. The irrigation plans will be prepared upon the City's approval of the 60% landscape
construction documents and will illustrate head layout, pipe sizing, controller/valve locations and standards
details. The City is to specify preferred irrigation equipment brand (Toro, Hunter, Weathermatic, or Rainbird)
prior to KH starting the irrigation design. This task includes addressing up to one round of ordinary and
reasonable simultaneous comments from the City. Additional rounds of revisions to obtain approvals shall
be considered an additional service. Additional services for this task will be billed to the City on an hourly
basis.
Task 6 Limited Topographic Survey for Phase 1
Kimley-Horn will prepare a Limited Topographic Survey of a portion of Lot 1, Block 129 of Summerfields
Phase One `B', situated in the Heirs of W.W. Thompson Survey, Abstract No. 1498, City of Fort Worth,
Tarrant County, Texas, and shown on the attached exhibit. This survey will be based on a nominal 50' grid
system, including grade breaks, on -site utilities, flow lines of accessible utilities and DigTESS markings.
Kimley-Horn will prepare an electronic map showing existing contour lines at 1' intervals and existing visible
on -site improvements and applicable information from available as -built plans to be provided by others. The
information will be tied to existing control points and City of Fort Worth benchmark system.
Kimley-Horn reserves the right to revise this fee if the Client requires evidence of underground utilities
existing on or serving the surveyed property as determined by markings coordinated by the surveyor
pursuant to a private utility locate request.
Task 7 Geotechnical Investigation for Phase 1
KH shall perform the following tasks through the use of a subconsultant:
A) Provide through the use of a subconsultant, a geotechnical investigation, analysis, up to seven (7)
site borings, and engineering as required for Phase 1 of the park site.
Picnic Shelter/Playground — Two (2) borings drilled to depths of 15 to 20 feet, depending on depth
to gray limestone.
Area Trails — Three (3) borings drilled to a depth of 5 feet.
B) An engineering report will be prepared to present the results of the field and laboratory data together
with analyses of the results and recommendations. The subconsultant will provide an electronic
copy of the report which will address:
0 General soil and groundwater conditions
22
• Recommendations for foundation type, depth and allowable loading including the use of a
monolithic, slab -on -grade
• Foundation construction requirements
• Recommendations for floor slab support, including an evaluation of the swell characteristics (PVR)
of the subgrade soils
• Earthwork recommendations
• Guidelines for parking lot and trail pavement design
Task 8 TDLR Plan Review Submittal (TAS)
Kimley-Horn will utilize a subconsultant that is a Registered Accessibility Specialist (RAS) for the purposes
of reviewing the Cibolo Hill Park Phase 1 construction plans, for conformance with the Texas Accessibility
Standards (TAS).
Kimley-Horn will coordinate with the RAS for project registration with the Texas Department of Licensing
and Regulation (TDLR), and project inspection at the site, upon completion of construction. Kimley-Horn
will prepare plans in an effort to conform to TAS and will make one (1) round of revisions to the plans based
on comments received from the RAS. Inspection and registration fees for TDLR are included in this fee.
Task 9 Bid Phase Assistance
KH shall perform the following tasks:
A) Prepare and submit written responses to bidder requests for information (RFI's), through the City
B) Attend pre -bid conference, in support of the City
C) Assist the City with bid analysis, bid tabulation, and bid award recommendation
This task includes up to 10 hours of effort. If additional effort is required or the bid phase is extended beyond
a reasonable time due to difficulty in securing qualified bids, administrative delays, or other unforeseen
circumstances, an additional service will be required.
Task 10 Construction Phase Service
KH shall perform the following tasks:
A) Visits to Site and Observation of Construction. KH will make visits at intervals as directed by the
City in order to observe the progress of the Work. Such visits and observations by KH are not
intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Based on
information obtained during such visits and such observations, KH will evaluate whether
Contractor's work is generally proceeding in accordance with the Contract Documents, and KH will
keep the City informed of the general progress of the Work.
B) KH shall not, during such visits or as a result of such observations of Contractor's work in progress,
supervise, direct, or have control over Contractor's work, nor shall Kimley-Horn have authority over
or responsibility for the means, methods, techniques, equipment choice and usage, sequences,
23
schedules, or procedures of construction selected by Contractor, for safety precautions and
programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and
regulations applicable to Contractor's furnishing and performing the Work. Accordingly, KH neither
guarantees the performance of any Contractor nor assumes responsibility for any Contractor's
failure to furnish and perform its work in accordance with the Contract Documents.
C) Clarifications and Interpretations. KH will respond to reasonable and appropriate Contractor
requests for information and issue necessary clarifications and interpretations of the Contract
Documents to Client as appropriate to the orderly completion of Contractor's work. Any orders
authorizing variations from the Contract Documents will be made by Client.
D) Change Orders. KH may recommend Change Orders to Client and will review and make
recommendations related to Change Orders submitted or proposed by the Contractor.
E) Shop Drawings and Samples. KH will review and approve or take other appropriate action in
respect to Shop Drawings and Samples and other data which Contractor is required to submit, but
only for conformance with the information given in the Contract Documents. Such review and
approvals or other action will not extend to means, methods, techniques, equipment choice and
usage, sequences, schedules, or procedures of construction or to related safety precautions and
programs.
F) Substitutes and "or -equal." Evaluate and determine the acceptability of substitute or "or -equal"
materials and equipment proposed by Contractor in accordance with the Contract Documents, but
subject to the provisions of applicable standards of state or local government entities.
G) Limitation of Responsibilities. KH shall not be responsible for the acts or omissions of any
Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing
or furnishing the Work. Kimley-Horn shall not have the authority or responsibility to stop the work
of any Contractor.
H) Construction Coordination Meetings. Attendance for construction coordination meetings once
Landscape Architecture services are under construction. Frequency of meetings will be determined
once construction begins.
This task includes up to 10 hours of KH effort. Should additional effort be required, this effort will be
billed on an hourly basis in addition to the budget amount after written authorization from the Client.
Tree tagging and Nursery visits are not included in this task. Any additional effort beyond the specified
amount will be billed to the City hourly, accordingly to the current Professional's rates, as authorized by the
City or its representatives.
24
Exclusions for Park #1121314
Services not specifically described in the Scope of Services are excluded from this Agreement. The
professional services fee has been developed based solely on the tasks, deliverables, meetings, and level
of effort expressly identified herein. Performance of any service beyond the defined Scope of Services shall
require written authorization from the City and may require an amendment to the Agreement.
The following services are specifically excluded from the Scope of Services unless otherwise identified
elsewhere in this Agreement:
Revisions due to changes in regulations
Archaeological Survey
Time Extensions in excess of six months, during design and construction phases
Separate Engineering Site Development Review Process Sets and Submittals
Contractor Type Detailed Estimates (As Prepared by Estimating Service)
Record Drawing Survey and Record Drawings
HVAC/MEP Design Services of Any Kind
Additional Services
Kimley-Horn can provide the services listed below upon request by the City; however, these services are
not included in the current Scope of Services or compensation. If requested, such services shall be
considered Additional Services and shall be authorized through a mutually agreed upon amendment prior
to commencement of the work.
Additional Services may include, but are not limited to:
Franchise Utility Coordination
Traffic Impact Studies or Signal Design and Preparation of Traffic control plans
Tree Survey
Coordination and/or revisions due to any Grant Funding Requirements
Topographic survey beyond the area specified in Attachment D
Subsurface Utility Engineering (SUE)
Additional meetings
ALTA Land Title Survey and Platting
Preparation of Record Drawings
Floodplain related study and coordination for Park #1/2/4
Drainage and flood related study and design for Park #1/2/4
Flood modeling and any efforts related to the preparation of documents required for floodplain
development permitting
Hydrology and Hydraulic related study, design and modeling
CLOMR/LOMR
Wetlands Permitting / Delineation
Environmental Impact Statement and Environmental Permitting
SWPPP Plan Manual / Submissions
3D Renderings and Fly Through Videos
Submittal, Permitting Fees, or Impact Fees
Construction Staking
Off -Site Drainage and Utility Design
25
Off -Site Roadway Design
Off -Site Easement Descriptions
Preparation of Preliminary or Final Plat
Environmental Impact Statement
Detention/Retention Pond Design
Signage Design of Any Kind
U.S. Army Corps of Engineers Coordination and Permitting
Sanitary Sewer Design Services of Any Kind
Park and Trail design outside of project limits
Bidding and Construction Phase Services for Chapel Hill Park
Additional work due to increase in project cost and scope
Fee and Billing for Park #1121314
KH will perform the services described in the Scope of Services for the Lump Sum Fee amounts shown in
`Professional Fees' (See Attachment "B").
Tasks designated below will be billed on a percent complete basis. All permitting, application, and similar
project fees will be paid directly by the City.
Fees and times stated are valid for one hundred eighty (180) days.
Schedule for Park #1121314
KH has prepared an initial project schedule for the performance of services (See Project Schedule -
Attachment "C".) This schedule includes reasonable allowances for review and approval times required by
the City, performance of services by City's consultants, and review and approval times required by public
authorities having jurisdiction over the Project. This schedule shall be equitably adjusted as the Project
progresses, allowing for changes in scope, character or size of the Project requested by the City, or for
delays or other causes beyond KH's reasonable control.
Proiect Limit of Work for Park #1121314
See Project Limit of Work - Attachment "D" for each park.
Attachment `B"
Kimley>»Horn
PROFESSIONAL FEES BY TASKS
City of Fort Worth, TX
PROJECT #1: CHAPEL HILL PARK
Task 1
Project Management and Meetings
$
15,000 (H)
Task 2
Field Visit and Data Collection
$
5,300 (LS)
Task 3
Illustrative Master Plan Booklet
$
54,700 (LS)
Task 4
On -Call Services
As requested
(H)
Subtotal
$
75,000
PROJECT #2: CIBOLO HILL PARK MASTER PLAN AND PHASE 1 DEVELOPMENT
Task 1
Project Management and Meetings
$
14,000 (H)
Task 2
Field Visit and Data Collection
$
3,000 (LS)
Task 3
Illustrative Master Plan Booklet
$
37,000 (LS)
Task 4
30% Construction Documents - Phase1
$
13,000 (LS)
Task 5
60% Construction Documents - Phase1
$
29,000 (LS)
Task 6
90% Construction Documents - Phase 1
$
32,000 (LS)
Task 7
100% Construction Documents - Phase 1
$
20,000 (LS)
Task 8
Irrigation Plan - Phase 1 — Contingent Service
$
5,000 (LS)
Task 9
Electrical Engineering - Phase 1 — Contingent Service
$
8,600 (LS)
Task 10
Limited Topographic Survey - Phase 1
$
13,000 (LS)
Task 11
Geotechnical Investigation - Phase 1
$
10,000 (LS)
Task 12
TDLR Plan Review Submittal (TAS)
$
3,500 (H)
Task 13
Bid Phase Assistance
$
4,000 (H)
Task 14
Construction Phase Service — Contingent Service
$
4,000 (H)
Subtotal
$
196,100
Kimley>»Horn
PROJECT #3: HARRIET CREEK PARK PHASE 2
Task 1
Project Management and Meetings
$
3,500 (H)
Task 2
Field Visit and Data Collection
$
1,500 (LS)
Task 3
Landscape Schematic Plan (30%)
$
13,000 (LS)
Task 4
60% Landscape Construction Document
$
13,500 (LS)
Task 5
90% Landscape Construction Document
$
13,500 (LS)
Task 6
100% Landscape Construction Document
$
7,000 (LS)
Task 7
Irrigation Plan — Contingent Service
$
4,000 (LS)
Task 8
Electrical Engineering — Contingent Service
$
6,000 (LS)
Task 9
Topographic Survey
$
11,000 (LS)
Task 10
Limited Geotechnical Investigation
$
9,800 (LS)
Task 11
TDLR Plan Review Submittal (TAS)
$
3,500 (H)
Task 12
Floodplain Study — Contingent Service
$
23,000 (LS)
Task 13
Floodplain Development Permit — Contingent Service
$
2,000 (LS)
Task 14
Bid Phase Assistance
$
3,000 (H)
Task 15
Construction Phase Service
$
3,500 (H)
Subtotal
$
117,800
PROJECT #4: KRISTI JEAN BURBACH PARK
Task 1
Project Management and Meetings
$
3,000 (H)
Task 2
Field Visit and Data Collection
$
1,500 (LS)
Task 3
60% Landscape Construction Documents - Phase1
$
9,000 (LS)
Task 4
100% Landscape Construction Documents - Phase 1
$
9,000 (LS)
Task 5
Irrigation Plan - Phase 1 — Contingent Service
$
3,600 (LS)
Task 6
Limited Topographic Survey — Phase 1
$
6,000 (LS)
Task 7
Geotechnical Investigation - Phase 1
$
8,500 (LS)
Task 8
TDLR Plan Review Submittal (TAS)
$
3,500 (H)
Task 9
Bid Phase Assistance
$
3,000 (H)
Task 10
Construction Phase Service
$
3,000 (H)
Subtotal
$
50,600
Office Expense 5%
$ 21,975
Total Fee $ 461,475
Kimley>»Horn
Hourly Labor Rate Schedule
Classification
Rate
Analyst
$175 - $260
Professional
$250 - $315
Senior Professional 1
$275 - $380
Senior Professional II
$370 - $400
Senior Technical Support
$170 - $295
Support Staff
$115 - $160
Technical Support
$130 - $165
Effective through June 30, 2026
Subject to adjustment thereafter
Internal Reimbursable Expenses will be charged at 5% of Labor Billings
External Reimbursable Expenses will be charged at 15% mark-up, or per the Contract
Sub -Consultants will be billed per the Contract
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Chapel Hill, Cibolo Hill, Harriet Creek Ranch, & Kristi Jean Burbach Park Improvements
City Project No. 106675
NONE
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page I of 1
Attachment "D"
Kimley>»Horn
The project is anticipated to be completed within 420 calendar days. Several of the tasks noted below will
be completed concurrently with other tasks, and design and bidding is anticipated to be completed within
420 calendar days. Shown below is the anticipated time duration breakdown by task:
(if projects run simultaneously, the task durations will be extended accordingly.)
TASKS
DURATION
Project #1: Chapel Hill Park
Task 1 Project Management and Meetings
120 Days
Task 2 Field Visit and Data Collection
30 Days
Task 3 Illustrative Master Plan Booklet
90 Days
Project #2: Cibolo Hill Park
Task 1
Project Management and Meetings
420 Days
Task 2
Field Visit and Data Collection
30 Days
Task 3
Illustrative Master Plan Booklet
60 Days
Task 4
60% Landscape Construction Documents - Phase1
60 Days
Task 5
90% Landscape Construction Documents - Phase 1
60 Dyas
Task 6
100% Landscape Construction Documents - Phase 1
45 Days
Task 7
Irrigation Plan - Phase 1
30 Days
Task 8
Electrical Engineering - Phase 1
45 Days
Task 9
Topographic Survey - Phase 1
45 Days
Task 10
Geotechnical Investigation - Phase 1
60 Days
Task 11
TDLR Plan Review Submittal (TAS)
20 Days
Task 12
Bid Phase Assistance
45 Days
Task 13
Construction Phase Service
180 Days
Kimley>»Horn
Project #3: Harriet Creek Park Phase 2
Task 1
Project Management and Meetings
360 Days
Task 2
Field Visit and Data Collection
30 Days
Task 3
Landscape Schematic Plan (30%)
60 Days
Task 4
60% Landscape Construction Document
60 Days
Task 5
90% Landscape Construction Document
60 Days
Task 6
100% Landscape Construction Document
45 Days
Task 7
Irrigation Plan
30 Days
Task 8
Electrical Engineering
45 Days
Task 9
Topographic Survey
45 Days
Task 10
Geotechnical Investigation
60 Days
Task 11
TDLR Plan Review Submittal (TAS)
20 Days
Task 12
Floodplain Study
45 days
Task 13
Floodplain Development Permit
45 Days
Task 14
Bid Phase Assistance
45 Days
Task 15
Construction Phase Service
120 Days
Project #4: Kristi Jean Burbach Park
Task 1
Project Management and Meetings
360 Days
Task 2
Field Visit and Data Collection
30 Days
Task 3
60% Landscape Construction Documents - Phase1
60 Days
Task 4
Landscape Construction Documents IFC - Phase 1
60 Days
Task 5
Irrigation Plan - Phase 1
45 Days
Task 6
Topographic Survey — Phase 1
45 Days
Task 7
Geotechnical Investigation - Phase 1
60 Days
Task 8
TDLR Plan Review Submittal (TAS)
20 Days
Task 9
Bid Phase Assistance
45 Days
Task 10
Construction Phase Service
120 Days
Times for performance shall be extended as necessary for delays or suspensions due to circumstances
that KH does not control.
Attachment "E"
Kimley)))Horn
Project "Limit of Work" for each park is shown below.
Project #1: Chapel Hill Park
TV
Y*
Pik
Project #2: Cibolo Hill Park
Park Boundary
�41
A44
Bob..
1�
Topographic survey scope as below:
Approximate Coordinates: 32.910292, 97.412013
Kimley>»Horn
Project #3: Harriet Creek Park
Park Boundary
Project #4: Kristi Jean Burbach Park
Park Boundary
Topographic survey scope as below:
Approximate Coordinates: 33.040187,-97.321726
Topographic survey scope as below:
Approximate Coordinates: 32.867426,-97.304976
-k4qwF
6
ATTACHMENT "F"
CITY OF FORT WORTH
STANDARD INSURANCE REQUIREMENTS
(1) INSURANCE LIMITS
a. Commercial General Liability — Insured shall maintain commercial general
liability (CGL) and, if necessary, commercial umbrella insurance as follows:
$1,000,000 each occurrence
$2,000,000 aggregate
If such Commercial General Liability insurance contains a general aggregate
limit, it shall apply separately to this Project or location.
City shall be included as an additional insured with all rights of defense
under the CGL, using ISO additional insured endorsement or a
substitute providing equivalent coverage, and under the commercial
umbrella, if any. This insurance shall apply as primary insurance with
respect to any other insurance or self-insurance programs afforded to
City. The Commercial General Liability insurance policy shall have no
exclusions or endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertising injury, which are normally contained
within the policy, unless City specifically approves such exclusions in
writing.
ii. Insured waives all rights against City and its agents, officers, directors
and employees for recovery of damages to the extent these damages
are covered by the commercial general liability or commercial umbrella
liability insurance maintained in accordance with Agreement.
b. Business Auto — Insured shall maintain business auto liability and, if
necessary, commercial umbrella liability insurance as follows:
$1,000,000 each accident (or reasonably equivalent limits
of coverage if written on a split limits basis).
Such insurance shall cover liability arising out of "any auto", including owned,
hired, and non -owned autos, when said vehicle is used in the course of Insured's
business and/or the Project. If Insured owns no vehicles, coverage for hired or
non -owned autos is acceptable.
Insured waives all rights against City and its agents, officers, directors and
employees for recovery of damages to the extent these damages are
covered by the business auto liability or commercial umbrella liability
insurance obtained by Insured pursuant to this Agreement or under any
applicable auto physical damage coverage.
CFW Standard Insurance Requirements Page 1 of 3
Rev. 5.04.21
c. Workers' Compensation — Insured shall maintain workers compensation and
employer's liability insurance and, if necessary, commercial umbrella liability
insurance as follows:
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
Insured waives all rights against City and its agents, officers, directors and
employees for recovery of damages to the extent these damages are
covered by workers compensation and employer's liability or commercial
umbrella insurance obtained by Insured pursuant to this Agreement.
d. Professional Liability (Errors & Omissions) — Insured shall maintain
professional liability insurance as follows:
$1,000,000 - Each Claim Limit
$2,000,000 - Aggregate Limit
Professional Liability coverage may be provided through an endorsement to
the Commercial General Liability policy, or a separate policy specific to
Professional E&O. Either is acceptable if coverage meets all other
requirements. Coverage shall be written on a claims -made basis, and
maintained for the duration of the contractual agreement and for five (5) years
following completion of services provided. The policy shall contain a retroactive
date prior or equal to the Effective Date of the Agreement or the first date of
services to be performed, whichever is earlier. An annual certificate of insurance
shall be submitted to City to evidence coverage.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that Insured has obtained all required
insurance shall be attached to Agreement concurrent with its execution. Any
failure to attach the required insurance documentation hereto shall not
constitute a waiver of the insurance requirements.
b. Applicable policies shall be endorsed to name City as an Additional Insured,
as its interests may appear, and must afford the City the benefit of any
defense provided by the policy. The term City shall include its employees,
officers, officials, and agents as respects the contracted services. Applicable
policies shall each be endorsed with a waiver of subrogation in favor of City
with respect to the Project.
c. Certificate(s) of insurance shall document that insurance coverage limits
specified in this Agreement are provided under applicable policies
documented thereon. Insured's insurance policy(s) shall be endorsed to
provide that said insurance is primary protection and any self -funded or
CFW Standard Insurance Requirements Page 2 of 3
Rev. 5.04.21
commercial coverage maintained by City shall not be called upon to
contribute to loss recovery. Insured's liability shall not be limited to the
specified amounts of insurance required herein.
d. Other than worker's compensation insurance, in lieu of traditional
insurance, City may consider alternative coverage or risk treatment
measures through insurance pools or risk retention groups. City must
approve in writing any alternative coverage for it to be accepted.
e. A minimum of thirty (30) days' notice of cancellation or material change in
coverage shall be provided to City. A ten (10) days' notice shall be acceptable
in the event of non-payment of premium.
f. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A:VII or equivalent measure of financial strength
and solvency as determined by the City's Risk Management division.
g. Any deductible or self -insured retention in excess of $25,000 that would
change or alter the requirements herein is subject to approval in writing by
City, if coverage is not provided on a first -dollar basis. City, at its sole
discretion, may consent to alternative coverage maintained through insurance
pools or risk retention groups. Dedicated financial resources or letters of credit
may also be acceptable to City.
h. In the course of the Agreement, Insured shall report, in a timely manner, to
City's Risk Management Department with additional notice to the Contract
Compliance Manager, any known loss or occurrence which could give rise
to a liability claim or lawsuit against City or which could result in a property
loss.
i. City shall be entitled, upon its request and without incurring expense, to
review Insured's insurance policies including endorsements thereto and, at
City's discretion, Insured may be required to provide proof of insurance
premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a claims -
made basis, shall contain a retroactive date coincidentwith or priorto the date
of this Agreement. The certificate of insurance shall state both the retroactive
date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall be
maintained without interruption nor restrictive modification or changes from
date of commencement of the Project until final payment and termination of
any coverage required to be maintained after final payments.
I. City shall not be responsible for the direct payment of any insurance
premiums required by Agreement.
m. Subcontractors of Insured shall be required by Insured to maintain the same
or reasonably equivalent insurance coverage as required for Insured. Upon
City's request, Insured shall provide City with documentation thereof.
CFW Standard Insurance Requirements Page 3 of 3
Rev. 5.04.21
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Kimley-Horn and Associates, Inc.
Subject of the Agreement: Chapel Hill, Cibolo Hill, Harriet Creek Ranch, and Kristi Jean Burbach Park Improvements
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes 0 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106675
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be