HomeMy WebLinkAbout056946-A1 - Construction-Related - Contract - Walter P. Moore and Associates, Inc.CSC No. 56946-Al
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 56946
WHEREAS, the City of Fort Worth (CITY) and Walter P. Moore
and Associates, Inc., (ENGINEER) made and entered into City Secretary
Contract No. 56946, (the CONTRACT) which was authorized by M&C 21-0755
on the 28th day of September 2021 in the amount of $ 200,000.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
20FEMA LOMR Updates, CPN 103627; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $ 163, 695. 00. (See Attached Funding Breakdown Sheet,
Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $ 363,695.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
City of Fort worth, Texas CITY SECRETARY 20FEMA LOMR Updates
Prof Services Agreement Amendment Template 103627
Revision Date: June 13, 2025
Page 1 of 4 FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
08/11 /2026
DATE:
ATTEST:
4 a99 nnn�
00
�a
C\�4. )� .�..+�%u�r paQ4pdEX6 4d
J(\/annette Goodall
City Secretary
ENGINEER
Walter P. Moore and Associates,
Inc. 4j*gah(�&
Rebekah Campbell
Principal
07/24/2026
DATE:
APPROVAL RECOMMENDED:
X. 711, n_
Lauren Prieur (Jul 27, 2026 10:19:36 CDT)
Lauren Prieur
Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
�OL2
Lisa Biggs, P.E., CFM
Engineering Manager/Floodplain Administrator
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 2 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
20FEMA LOMR Updates
103627
APPROVED AS TO FORM AND LEGALITY:
wor-
Douglas Black (Aug 3, 2026 11:37:54 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services. Agreement Amendment Template
Revision Date: June 13, 2025
Page 3 of 4
M&C No.#: 26-0548
M&C Date: June 23, 2026
20FEMA LOMR Updates
103627
FUNDING BREAKDOWN SHEET
City Secretary No. 56946
Amendment No. 1
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 -
Bond
Reference
Amount
52002
0200431
5330500
103627
002830
163,695.00
Total:
163,695.00
City of Fort Worth, Texas 20FEMA LOMR Updates
Prof Services Agreement Amendment Template 103627
Revision Date: June 13, 2025
Page 4 of 4
H. Floodplain Management
ATTACHMENT "A"
Scope for Engineering Related Services for Watershed Study
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, "ENGINEER"
is expanded to include any sub -consultant, including surveyor, employed or contracted by
the ENGINEER.
OBJECTIVE
This Amendment to the Primary Agreement serves to finalize the two (2) outstanding Task
Orders of the Primary Agreement. Outstanding items of the Task Orders are tasks not
anticipated or outside of the scope of the agreed upon Task Orders.
Task Order No.
Watershed
Date Authorized
01
Stream SC-7
February 24, 2022
03
Eastland Creek
May 10, 2022
WORK TO BE PERFORMED
Task 1. Additional Services for Stream SC-7
Task 2. Additional Services for Eastland Creek
Task 3. Survey TxDOT Crossing
TASK 1. ADDITIONAL SERVICES FOR STREAM SC-7.
Walter P Moore (WPM) provided additional services for Stream SC-7 to maintain project
progress and ensure compliance with Federal Emergency Management Agency (FEMA)
requirements for approval of the Letter of Map Revision (LOMR). The following tasks were
necessary to advance the submittal process and avoid missing FEMA review timelines. The
proposed tasks and fee therefore reflects the effort required to finalize FEMA approval of the
LOMR.
1.1. Address Additional FEMA Comments
• Project coordination and communication
• Update modeling, mapping, and exhibits to address three (3) additional rounds of
FEMA comments
• Finalize LOMR Case Number (24-06-0940P), including Property Owner
Notifications
DELIVERABLES
A. Final, FEMA approved Stream SC-7 study, including report, appendices, exhibits,
hydrologic and hydraulic models
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 1 of 22
20FEMA LOMR Updates
103627
H. Floodplain Management
B. FEMA comment letters and WPM response letters
C. Property Owner Notification letters, map, and certified mail documentation
TASK 2. ADDITIONAL SERVICES FOR EASTLAND CREEK.
Walter P Moore (WPM) will provide additional services for Eastland Creek to support the
CITY for a public meeting, update an under -construction Texas Department of
Transportation (TxDOT) crossing in the hydraulic model, and update the hydraulic model to
better support the CITY's needs prior to submittal to Federal Emergency Management
Agency (FEMA). The effort includes modification of the existing HEC-RAS model, evaluation
of flood elevations and floodway limits, and preparation of the necessary documentation to
support submittal to the CITY and FEMA.
2.1. Project Management and Coordination
• Internal project coordination and communication
• Project coordination and communication with the City of Fort Worth
2.2. Data Collection and Review
Review TxDOT construction plans and as -built survey for Interstate 820 (1-820)
crossing
• Remove Zone A mapping upstream of HEC-RAS model extents
2.3. 1 D Steady -State Hydraulic Analysis: Update Bridge
• Update 1-820 bridge in the existing HEC-RAS model geometry based on as -built
survey and TxDOT construction plans
• Run existing conditions multiple profile plan
• Run existing floodway model with updated bridge geometry and revised bridge
floodway encroachments set in HEC-RAS
• Quality Assurance/Quality Control (QA/QC) the updated 1 D steady-state
hydraulics model
2.4. Convert existing HEC-RAS Model from 1 D Unsteady -State with Two -Dimensional
(2D) Overflow to 1 D Steady -State with 2D Shallow Flooding
HYDROLOGIC ANALYSIS
• Run flow step down analysis for existing unsteady hydrologic boundary
conditions to convert to steady state peak discharges at the same location
Create single multiprofile flow file for hydraulic model from the flow step down
analysis
• QA/QC flow file
HYDRAULIC ANALYSIS
• Add one (1) cross section at upstream end of model to extend Eastland Creek
modeled cross sections upstream approximately 92 feet
City of Fort Worth, Texas
Attachment A
PMO Release Date. 07/23/2012
Page 2 of 6
20FEMA LOMR Updates
103627
H. Floodplain Management
• Update the existing 2D geometry associated with the addition of the cross
section at the upstream end of the model
• Convert 1 D/2D unsteady -state HEC-RAS geometry to separate 1 D steady-state
and 2D HEC-RAS geometries
• Run both existing conditions models for the 50%, 20%, 10%, 4%, 2%, 1 %, and
0,2% (as known as 2-, 5-, 10-, 25-, 50-, 100-, and 500-year) storm events and
review results
• Compare results to 1 D unsteady -state model
• Map shallow flooding for each modeled storm event
• QA/QC hydraulic model
2.5. Documentation
• Update report narrative, including tables
• Update exhibits and figures, including the Annotated FIRM map, Topographic
Work Map, and profiles
• Review and update MT-2 forms and tables. Certify MT-2 forms by WPM and
CITY's Floodplain Administrator
• QAQC report and Letter of Map Revision (LOMR) application data
DELIVERABLES
A. Updated Eastland Creek study, including report, appendices, exhibits, hydrologic
and hydraulic models
B. Survey data as part of the appendix of the report
C. MT-2 forms
2.6. Agency Review Process
• Prepare public meeting exhibits
• Mail public notice letters
• Prepare and submit submittal packaging to City of Fort Worth
• Response to one (1) additional round of City of Fort Worth comments beyond
Task Order 3 scope
Prepare and submit submittal packaging to FEMA
ASSUMPTIONS
• CITY will be included on all correspondence with FEMA throughout the FEMA
review process
• No additional rounds of review with FEMA beyond Task Order 3 scope
• Cost of sending the public meeting mailers to be included as reimbursable items
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 3 of 6
20FEMA LOMR Updates
103627
H. Floodplain Management
• Cost of FEMA LOMR submittal fee to be included as reimbursable item
• Cost of sending the Public Notification Letters as certified mail to be included as
reimbursable items
DELIVERABLES
A. Public meeting exhibits
B. One additional WPM response letter to CITY comments
C. Final, FEMA approved Eastland Creek study, including report, appendices,
exhibits, hydrologic and hydraulic models
D. FEMA comment letters and WPM response letters
E. Property Owner Notification letters, map, and certified mail documentation
2.7. Contingency
Additional coordination with FEMA beyond Task Order 3 scope, including general
email correspondence or similar
• Two (2) additional virtual meetings with FEMA beyond Task Order 3 scope
• Up to three (3) additional rounds of responses to FEMA comments beyond Task
Order 3 scope
ASSUMPTIONS
• Written authorization from the CITY required for use of any of the contingency
budget
• Previous deliverable expectations will continue if contingency is activated.
TASK 3. SURVEY TXDOT CROSSING.
Walter P Moore (WPM) will hire PJB Surveying as a subconsultant to survey nine cross
sections along Eastland Creek at Interstate Loop No. 820, known locally as "East Loop", in
Fort Worth, Texas.
3.1 Survey Interstate 820 (1-820) along Eastland Creek
• All survey services based on NAD-83 Texas State Plane Coordinate System with
data derived from the ALLTERRA VRS Network. Vertical will be tied to the City of
Fort Worth benchmark network through differential leveling. Data shall be
provided in surface coordinates obtained by using the Tarrant County grid to
surface adjustment factor of 1.00012.
Topographic survey to capture features up to nine (9) cross sections shown on
the survey request map. Sufficient data shall be collected to create one -foot
contours.
Features shall include:
- Eight (8) creek channel cross sections including:
City of Fort Worth, Texas
Attachment A
PMO Release Date. 07/23/2012
Page 4 of 6
20FEMA LOMR Updates
103627
H. Floodplain Management
■ Four (4) creek channel cross sections upstream from TxDOT
bridge
• One (1) creek channel cross section along the upstream face of
the bridge,
• One (1) creek channel cross section along the downstream face of
the bridge, and
■ Two (2) creek channel cross sections downstream from bridge.
— One (1) creek channel cross section, if accessible, generally centered
between the main traffic lanes of Interstate Loop No. 820.
— Creek channel cross sections shall consist of tops of bank, toes of slope
(or bank), and bottom of channel. Cross sections taken perpendicular to
the flow of the channel.
— Photograph upstream bridge face, upstream channel, downstream bridge
face, and downstream channel.
— Map the locations of storm drain pipes discharging into Eastland Creek
within the scope area. Measure flowline elevations and diameters of
pipes. Photograph the pipes.
— Draw field sketches showing survey point locations.
• Bridge culvert survey to capture features shown on the Culvert A4 typical section
prepared by Kiewit, dated January 16, 2024.
Features shall include:
— Locate the upstream and downstream faces of the bridge culverts.
— Locate and measure elevations of the top of curbs, curb gutters, top of
road pavement, top of sidewalks.
— Measure flowlines of each culvert.
— Locate and measure elevations high and low chords at top of each
culvert.
— Locate and measure elevations of any abutments.
— Locate any erosion control structures such as retaining walls, rip rap, or
gabions.
— Locate concrete walls on the bridge deck and measure elevations on top
of the walls. Locate the flood openings at the bottom of the walls. Locate
metal guardrails on top of the walls and measure the elevations on top of
the metal guardrails.
— Locate and measure any storm drain pipes existing under the bridge and
discharging into the creek.
DELIVERABLES
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 5 of 6
20FEMA LOMR Updates
103627
H. Floodplain Management
A. All topographic data in surface coordinate values prepared within AutoCAD Civil
3D.
B. Tin files and ASCII point list.
C. Certified drawings of the survey point locations.
D. Pictures of upstream bridge face, upstream channel, downstream bridge face,
and downstream channel in JPEG format.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 6 of 6
20FEMA LOMR Updates
103627
H. Floodplain Management
ATTACHMENT B
COMPENSATION
Engineering Related Services for
20FEMA LOMR Updates Amendment #1
City Project No. 103627
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
Rate
$/hour
Rate
$/hour
Senior Principal/Managing Principal
415
Principal
370
Chief Hydrologist
365
Managing Director
350
Team Director
340
Senior Project Manager
330
Project Manager
290
Senior Engineer
280
Engineer
215
Graduate Engineer
195
Senior Transportation Planner
265
Transportation Planner
195
Graduate Transportation Planner
175
Senior Graphic Designer
160
Senior GIS Specialist
265
GIS Specialist
210
Senior Designer
270
Designer
190
BIM Manager
300
CAD Manager
280
Senior CAD Technician
190
CAD Technician
150
Senior Field Representative
195
Field Representative
170
Engineering Intern
145
Project Accountant
175
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 1 of 6
B-1
20FEMA LOMR Updates
103627
H. Floodplain Management
ATTACHMENT B
COMPENSATION
Senior Administrative Assistant 175
Administrative Assistant 140
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 2 of 6
B-2
20FEMA LOMR Updates
103627
H. Floodplain Management
ATTACHMENT B
COMPENSATION
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 3 of 6
B-3
20FEMA LOMR Updates
103627
H. Floodplain Management
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Initial Contract, CSC 56946
Please note: Fee amounts listed below are updated to reflect the final fees
authorized Task Orders.
Firm Primary Responsibility Fee Amount
based on
%
Prime Consultant
Walter P Moore
LOMR Modeling, Mapping, and
Processing
$167,500.00
83.75
Sub -Consultants
Carrillo Engineering
Technical Engineering Report
Writing
$20,000.00
10.00
PJB Surveying
Surveying
$12,500.00
6.25
TOTAL
$200,000.00
100%
Amendment #1
Firm
Primary Responsibility
Fee Amount
%
Prime Consultant
Walter P Moore
LOMR Modeling, Mapping, and
Processing
$138,695.00
84.73
Proposed Sub -Consultants
PJB Surveying
Surveying
$25,000.00
15.27
TOTAL
$163,695.00
100%
Total Contract
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 4 of 6
B-4
20FEMA LOMR Updates
103627
Firm
Prime Consultant
ATTACHMENT B
COMPENSATION
Primary Responsibility
H. Floodplain Management
Fee Amount %
Walter P Moore LOMR Modeling, Mapping, and $306,195.00 84.19
Processing
Proposed Sub -Consultants
Carrillo Engineering Technical Engineering Report $20,000.00 5.50
Writing
PJB Surveying Surveying $37,500.00 10.31
TOTAL $363,695.00 100%
Pro'ect Number & Name
Total Fee
Sub Fee
E20FEMALOMRUpdate, CPN 103627
$_363,695.00
$ 57,500.00
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 5 of 6
B-5
20FEMA LOMR Updates
103627
H. Floodplain Management
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
No change with Amendment #1.
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 6 of 6
B-6
20FEMA LOMR Updates
103627
CERTIFICATE OF INTERESTED PARTIES H. Floodplain Management
FORM 1295
1of1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2026-1455785
Walter P. Moore and Associates, Inc.
Fort Worth, TX United States
Date Filed:
05/01/2026
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Fort Worth, Texas
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
CPN 103627
Additional Services for Eastland Creek, Stream SC-7, Eastland Creek and Survey TxDOT Crossing
Nature of interest
4
Name of Interested Party
City, State, Country (place of business)
(check applicable)
Controlling
Intermediary
Choudhuri, Dilip
Houston, TX United States
X
Hanuschak, Blair
Washington, DC United States
X
Jimenez -Lopez, Gabriel
Houston, TX United States
X
Landis, David
Kansas City, MO United States
X
Magnusson, Thomas
Houston, TX United States
X
McKeown, Doug
Houston, TX United States
X
Peek, Jennifer
Houston, TX United States
X
Shah, Abhijit
Pune Maharashtra India
X
Lo, Annie
San Francisco, CA United States
X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION
My name is Rebekah Campbell and my date of birth is
My address is 1301 McKinney, Suite 1100 Houston TX 77010 USA
(city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in Harris County, State of Texas on the 29 day of May 20 26
(month) (year)
bignaturi
of authorized agent of ntracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us 20KUeMArL0ME�.lOPd2t@A)
103627
FORT WORTH,,
H. Floodplain Management
CMAYOR AND COON L COMMUNICATION
7.5.15 FEMA FSOODPLAIN MAPPIN UPDATES PROJECT - CON RACT AMENDMENT N 1
DATE: 06/23/26 M&C FILE NUMBER: M&C 26-0548
DEPARTMENT: TRANSPORTATION PUBLIC WORKS
SUBJECT
(CD 5, CD 6, CD 7, CD 8 and CD 11) Authorize Execution of Amendment No. 1 in an Amount Up
to $163,695.00 to a Professional Services Agreement with Walter P. Moore and Associates, Inc.
for a Revised Contract Amount Up to $363,695.00 for the Federal Emergency Management
Agency Letter of Map Revision Updates Project
RECOMMENDATION
It is recommended that the City Council authorize execution of Amendment No. 1 in an
amount up to $163,695.00 to City Secretary Contract No. 56946, a Professional Services
Agreement with Walter P. Moore and Associates, Inc., for a revised contract amount up to
$363,695.00 for the Federal Emergency Management Agency Letter of Map Revision Updates
project (City Project No. 103627).
DISCUSSION
The purpose of this Mayor and Council Communication (M&C) is to authorize execution of
Amendment No. 1 to a Professional Services Agreement with Walter P. Moore and Associates,
Inc. to complete the Federal Emergency Management Agency (FEMA) floodplain mapping
updates.
On September 28, 2021, M&C 21-0755 authorized a Professional Services Agreement
with Walter P. Moore and Associates, Inc. City Secretary Contract (CSC) No. 56946 in the
amount of $200,000.00 to update FEMA floodplain maps for three areas of the city:
1. Lake Worth in Council District 7;
2. Sycamore Creek Tributary SC-7 Watershed in Council Districts 6 and 8; and
3. Eastland Creek from generally Miller Avenue downstream to Lake Arlington in Council
Districts 5 and 11.
Additional contract capacity is needed for changes to scope resulting from FEMA review
comments and additional effort requested by the City's Floodplain Administrator. The primary
components of this amendment include refining existing flood risk mapping based on new
data and engineering modeling methodologies and developing new flood risk maps
1of3
20FEMA LOMR Updates
103627
FORT WORTH,,
H. Floodplain Management
consistent with FEMA mapping requirements through the Letter of Map Revision (LOMR)
process.
The consultant proposes completing this additional work for an additional fee in the amount
up to $163,695.00, for a revised contract amount up to $363,695.00. Staff considers the fee to
be fair and reasonable for the scope of services.
The following table summarizes previous contract actions and amendments:
Agreement
Amount
Justification
M&C No.
Date
Initial Contract
$200,000.00
Initial Agreement
M&C 21-0755
09/28/2021
CSC No. 56946
Scope updates from FEMA
comments and requested
Amendment No. 1
$163,695.00
This M&C
effort by Floodplain
Administrator
Contract Total
$363,695.00
Funding is budgeted in the Stormwater Capital Projects Fund for the Transportation and
Public Works Department for the purpose of funding the FEMA LOMR Updates-SWS-091
project, as appropriated.
The project is located in Council Districts 5, 6, 7, 8 and 11.
This contract requires a Form 1295.
FISCAL INFORMATION/CERTIFICATION
The Director of Finance certifies that funds are available in the current capital budget, as
previously appropriated, in the Stormwater Capital Projects Fund for the FEMA LOMR Updates-
SWS-091 project to support the approval of the above recommendation and execution of the
contract amendment. Prior to any expense being incurred, the Transportation and Public
Works Department has the responsibility to validate the availability of funds.
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804
ORIGINATING BUSINESS UNIT HEAD: Lauren Prieur, # 6035
ADDITIONAL INFORMATION CONTACT: Monty Hall, # 8662
ATTACHMENTS
1. Map - FEMA LOMR Updates [7.5.15.1 -1 page]
2. CONFIDENTIAL REDACTED - Form 1295 Certificate 101531227_ Signed [7.5.15.2 - 1 page]
2 of 3
20FEMA LOMR Updates
103627
FORT WORTH,,
H. Floodplain Management
3. CONFIDENTIAL REDACTED - FID Table - FEMA LOMR Updates [7.5.15.3 - 1 page]
4. CONFIDENTIAL REDACTED - Funds Availability - FEMA LOMR Updates [7.5.15.4 - 1 page]
5. CONFIDENTIAL REDACTED - SAM.Gov Entity Information [7.5.15.5 - 3 pages]
3of3
20FEMA LOMR Updates
103627
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Consultant- Walter P. Moore and Associates, Inc.
Subject of the Agreement: FIRST AMENDMENT TO CITY SECRETARY CONTRACT
NUMBER 56946 20FEMA LOMR Updates
M&C Approved by the Council? * Yes 9 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 56946 -this will be amendment 1
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 9 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes 8 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103627
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if'the information is not provided, the contract will be
returned to the department.
FORTWORTH
Routing and Transmittal Slip
TPW Stormwater Management
DOCUMENT TITLE: 20FEMA LOMR Updates Amendment 1
M&C: 26-0548 CPN 103627 CSO 56946 DOC
Remarks: Amendment 1 to the 20FEMA LOMR Updates will update the agreement to
increase the scope of work and revised fee per M&C 26-0548 and as discussed in the June 2,
2026 IR 26-0066.
DEPARTMENT
INITIALS
DATE
1. Rebekah Campbell — Principal
Walter P. Moore and Associates, Inc.
ENGINEER Signature
PLC
07/24/2026
2. Lisa Biggs, Eng. Mgr
TPW Contract
Compliance Manager
Signature
07/24/2026
3. Jennifer M. Dyke, Asst. Dir
TPW- Initial
07/24/2026
4. Lauren Prieur, Dir.
TPW- Signature
07/27/2026
5. Doug Black, Sr. Assistant City
Attorney
Legal- Signature
-'
08/03/2026
6. Jesica McEachern
CMO- Signature,
08/11/2026
7. Katherine Cenicola
Approver
08/11/2026
8. Jannette Goodall
CSO- Signature"
08/12/2026
9. Allison Tidwell
Form Filler
J�
08/13/2026
NEEDS TO BE NOTARIZED: ❑ Yes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes X No
ROUTING TO CSO: X Yes ❑ No
Action Required:
❑ As Requested
❑ Attach Signature, Initial and Notary Tabs
❑ For Your Information
NEXT DAY: ❑ Yes X No
X Signature/Routing and or Recording
❑ Comment
❑ File
Return originals to Lisa Biggs. Please call Lisa Biggs at ext. 2446 or Jennifer Dyke at ext. 2714
for questions or concerns. Thank you.