Loading...
HomeMy WebLinkAbout064158-A3 - Construction-Related - Contract - SpawGlass Contractors, Inc.AMENDMENT NO.3 TO AGREEMENT Meacham Airport Field Maintenance Facility Project— Design Build STATE OF TEXAS 64158-A3 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, the City of Fort Worth and SpawGlass Contractors, Inc. of the City of Fort Worth County of Tarrant, State of Texas (Contractor) made and entered into City Secretary Contract No. 64158 (The Contract), which was authorized by the City Council by M&C 25-0229 in the amount of 5,500,000.00 on the 11th day of March 2025, for Meacham Airport Design Build Contract; and WHEREAS, the initial contract price for design services was $545,055.00; and subsequently revised by Amendment Number 1 for $36,438.00, which was approved on the 10th Day of February 2026 and Amendment #2 was approved 15th Day of June 2026 in the amount of $605,544.00; a further amendment is necessary to support contractors' ability to deliver the scope of work for the Meacham Airport Design Build Contract and related costs referred to in Attachment A; and NOW THEREFORE, City and Contractor, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: In accordance with Paragraph 5.2.1 of the contract, it is amended as follows: "The GMP shall be the cost of the Design & Construction Services, in the amount of $5,495,729.00 Five Million Four Hundred Ninety -Five Thousand Seven Hundred Twenty -Nine Dollars. The increase in the amount of $4,308,692.00, Four Million Three Hundred Eight Thousand Six Hundred Ninety -Two Dollars to include: Remaining construction work to complete the 14,076 SF Meacham Maintenance Facility and site work without the add alternates, as defined in Article 1.4.7, plus the Design -Builders fee of 5%, which shall not exceed the Guaranteed Maximum Price set forth in the GMP FAIT, MirPT-is Y This addition will cover, at a minimum, the areas of scope listed in Attachment A: 1. SpawGlass Guaranteed Maximum Price - Owner Change Order #3 Dated 2026- 07-10/Rev 02 2026-07-14 OFFICIAL RECORD City of Fort Worth, Texas Meacham Airport Field Maintenance Project Amendment 3 CITY SECRETARY Page 1 of 3 FT. WORTH, TX Executed and effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth V41 BY: Valerie Washington (Aug 14, 2026 16:09:35 CDT) Name: Valerie Washington Title: Assistant City Manager Date: Approval Recommended: By: Name: Marilyn Marvin Title: Director, Property Management Attest: By: Name Title: o�n Fonr° & PVo o=O ll }Q°a t e44' Jannette Goodall City Secretary CONTRACTOR: LlbyCILraver (JUI 3U. 1UZb U9:4J:Zb UU By: Name: Lloyd Faver Title: President, North Texas Region Date: City of Fort Worth, Texas Meacham Airport Field Maintenance Project Amendment 3 Page 2 of 3 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: Name: Nikita Watts Title: Sr. Capital Project Officer Approved as to Form and Legality: A Stephen Hines (J�ul 31'M26- 15:48:01 CDT) By: Name: Stephen M. Hines Title: Sr. Assistant City Attorney Contract Authorization: M&C: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary Contract No. 64158 -A3 Amendment No. 3 Fund Dept ID Account Project ID CF1- Activity Amount 53002 0550435 5330500 105655 008130 545,055.00 53002 0550435 5330500 105655 008130 36,438.00 53002 0550435 5330500 105655 008130 605,544.00 53002 0550435 5330500 105655 008130 4,308,692.00 Total: $5,495,729.00 City of Fort Worth, Texas Meacham Airport Field Maintenance Project Amendment 3 Page 3 of 3 Ailk low SpawGlass Providing the Absolute Best Construction Experience Y -` -"MMEL.. t OL i r� 'ti ��,• - _ ,ram r � ) j TABLE OF CONTENTS TAB 1 TAB 6 DETAILED COST REPORT PROJECT SCHEDULE TAB 2 TAB 1 GENERAL CONDITIONS PROJECT TEAM TAB 3 TAB 8 ALTERNATES SITE LOGISTICS TAB 4 TAB 9 ASSUMPTIONS & CLARIFICATIONS N/A TAB 5 TAB 10 LIST OF DOCUMENTS Best ice Recap Report Rev 02 7/14/26 Meacham Airport Maintenance Facility Owner Change Order #003 Estimate Date: Project Size (SF): Project Location: 07/10/2026 14,076 Fort Worth, TX ITEM Documents Date Project #: Lead Estimator: COST 04/28/2026 3024100 Justin Hyder COST I SF % OF TOTAL Direct Costs Div. 01 - General Requirements 1 3,166,822 1 134,005 224.98 9.52 I 73.50 3.11 % Div. 03 - Concrete 696,779 49.50 16.17 % Div. 04 - Masonry Div. 05 - Metals 0 0.00 1.62 0.00 0/0 0.53 22,825 27,738 Div. 06 - Wood, Plastics & Composites 1.97 0.64 % Div. 07 - Thermal & Moisture Protection 17,714 1.26 0.41 0/6 Div. 08 - Openings 174,005 12.36 4.04 0/6 Div. 09 - Finishes Div. 10 - Specialties 214,391 22,872 15.23 4.98 0/6 1.62 0.53 Div. 22 - Plumbing 220,100 1.5.64 5.11 % Div. 23 - Heating, Ventilating & Air Conditioning 166,255 11.81 3.86 % Div. 26 - Electrical Div. 27 - Communications 511,401 0 36.33 11.87 0.00 % 0.00 Div. 28 - Electronic Safety & Security 33,572 2.39 0.78 % Div. 31 - Earthwork 537,871 38.21 12.48 % 4.45 4.54 Div. 32 - Exterior Improvements Div. 33 - Utilities 191,798 195,496 13.63 13.89 Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 1 of 2 Documents Date: 0412812026 ITEM I COST COST I SF % OF TOTAL General Conditions 367,413 Builder's Risk Insurance 12,500 General Liability Insurance 47,325 Payment and Performance Bonds 63,782 Subcontractor Bonds 0 12,225 Warranty 97,804 Contractor's Contingency Owner's Contingency 296,246 26.10 8.53 % 0.89 0.29 % 3.36 1.10 % 4.53 1.48 % 0.00 0.00 0.87 0.28 % 6.95 2.27 % 21.05 6.88 % Overhead and Profit 244,575 17.38 5.68 % Total Cost $ 4,308,692 $ 306.10 100.000/0 Meacham Airport Maintenance Facility Owner Change Order #003 Page 2 of 2 Estimate Date: 0711012026 Documents Date: 0412812026 Detail Report Rev 02 7/14/26 Meacham Airport Maintenance Facility Owner Change Order #003 Estimate Date: 07/10/2026 Documents Date: 04/28/2026 Project Size (SF): 14,076 Project #: 3024100 Project Location: Fort Worth, TX Lead Estimator: Justin Hyder ITEM QUANTITY l UM UNIT COST TOTAL COST 11 - General Requirements General Requirements 134,005 14,076.0 SF 0.81 11,428 8.0 Mos 650.00 5,200 1.0 LS 5,000.00 5,000 8.0 Mos 1,623.75 12,990 Final Clean Safety Supplies Small Tools Temp Power Temp Water Connex Connex Delivery & Pickup Water, Ice, Cups 8.0 Mos 1,082.50 8,660 757.75 6,062 1,624.00 3,248 250.00 2,000 8.0 Mos 2.0 Each 8.0 Mos Temp. Protection 14,076.0 SF 1.00 14,076 2,000.00 2,000 20,000.00 20,000 3,897.00 31,176 Safety Signage Layout / Survey 1.0 LS 1.0 LS Site Maintenance/Street Cleaning 8.0 Mos Potholing/Hydrovac Utilities 1.0 LS 10,000.00 10,000 Temporary Fire Extinguishers Bldg. 1 Cast -In -Place Concrete (Building) 4.0 Each 541.25 2,165 298,460 Slab on Grade (Includes Piers & GB's) 14,076.0 SF 21.20 298,460 Cast -In -Place Concrete (Site) Concrete Site Paving 398,319 27,818.0 SF 11.84 329,240 5" Concrete Paving ILO of Asphalt Millings 1 Masonry / Stone 7,986.0 SF 8.65 69,079 0 8" CMU at Int. Walls at Elec Workstation (Add Alt.) 381.1 SF 0.00 0 Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 1 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST ► I Structural/Miscellaneous Steel - Fabrication Steel Pipe Bollards - Fab. 55.0 Each Div. 0.Wood, Plastics & Composites Architectural Woodwork 22,825 415.00 22,825 27,738 Architectural Woodwork - Breakroom Millwork 37.1 LF 298.60 11,078 Architectural Woodwork - Breakroom Solid Surface Countertops Architectural Woodwork - Mudroom Bench Div. 07 - Thermal & Moisture Protection Waterproofing / Dampproofing / Joint Sealants Building Sealants/HM Doors Site Sealants Div. 0: Openings Doors / Frames / Hardware 18.0 LF 314.88 5,668 10,992 17,714 17,714 4,881 1.0 Each 10,991.89 1.0 LS 4,881.00 1.0 LS 12,833.00 12,833 174,005 31,904 Hollow Metal Doors - Supply 8.0 Each 619.62 4,957 Hollow Metal Frames - Supply 15.0 Each 375.00 5,625 Wood Doors - Supply 7.0 Each 476.29 999.20 3,334 Door Hardware - Supply 15.0 Sets 14,988 Installation of Doors/Frames/Hardware 15.0 Each 200.00 3,000 OH/Coiling Doors / Grilles 111,700 8,291.67 99,500 6,100.00 12,200 30,401 10,500.00 10,500 3,110.20 15,551 1,450.00 1,450 Coiling Doors (Motorized) 12.0 Each Fire Shutters for Type W04 2.0 Each Storefronts / Glass / Curtain Walls Type W01 Entrance w/ Hardware Type W02 Exterior Openings 1.0 Each 5.0 Each Type W03 Interior Glass 1.0 Each Type W04 at Firewall Div. ►• Drywall / Acoustical 2.0 Each 1,450.00 2,900 105,598 3 5/8" Mtl. Stud Office Walls 9.5' 391.0 LF 100.16 39,162 6" Mtl. Stud Rated WH Separation Wall 77.0 LF 239.27 18,424 6" Mtl. Stud Office Exterior Wall 135.0 LF 122.42 16,526 Framing & Plywood at Elec. Workstation ILO CMU Masonry 1.0 LS 6,098.00 6,098 Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 2 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST Int. Gypsum Board Ceilings 2' x 2' Acoustical Ceiling Tile & Grid FRP Wall Panels at RR's, Janitor & Storage (8' Tall) Blocking Misc. Equipment/Project Management 187.4 SF 1,810.4 SF 752.0 SF 4.45 834 5.56 10,074 6.68 5,021 1.0 LS 1,112.87 1,113 1.0 LS 8,346.50 8,346 Tile 15,094 Floor Tile - Restrooms 65.0 SF 62.46 4,060 Shower Walls 6.0 Each 1,839.00 11,034 Carpet/Resilient Flooring 28,562 Resilient Flooring (LVT) Sealed Concrete 6" Rubber Base Painting / Wall Coverings Painting Ceilings 1,538.0 SF 10.09 15,511 11,665 1,386 65,137 570 12,320.0 SF 0.95 474.0 LF 2.92 188.0 SF 3.03 Painting HM Doors/Frames 22.0 Each 90.91 2,000 Painting Interior PEMB 11,773.0 SF 3.33 39,245 Painting Interior Walls Signage / Identification Devices 11,840.0 SF 1.97 23,322 4,047 Interior Signage Toilet Compartments/Accessories Toilet Accessories Wall/Corner Guards 13.0 Each 311.31 4,047 10,606 2.0 LS 5,303.00 10,606 2,917 224.38 2,917 5,302 760.40 3,802 1,500.00 1,500 ii 220,100 Corner Guards 13.0 Each Fire Protection Specialties Fire Extinguishers & Cabinets 5.0 Each Knox Box Div. 22 - Plumbing Plumbing 1.0 Each 14,076.0 SF Plumbing Div. 23 - Heating, Ventilating & Air Conditioning HVAC 15.64 220,100 .. ,255 166,255 HVAC Div. 26 - Electrical 14,076.0 SF 11.81 166,255 40 Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 3 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST Electrical Site Electrical 48,365.60 511,401 1.0 LS 48,366 Switchgear/Feeders Lighting Equipment Connections Power/Raceways Misc Communications Cabling and Equipment Communications (By Owner) Div. 28 - Electronic Safety & Security Security / Access Control / Surveillance Security, Access Control, and Surveillance Systems (By Owner) Fire Alarm Systems Fire Alarm System Earthwork 14,076.0 SF 5.25 73,899 14,076.0 SF 9.00 126,684 14,076.0 SF 14,076.0 SF 14,076.0 SF 3.40 47,858 94,948 119,646 0 6.75 8.50 0.0 LS 0.00 0 33,572 O 0.0 LS 0.00 0 33,572 33,572 517,020 14,076.0 SF 2.39 Bldg. Pad Prep (Per Geotech) 14,076.0 SF 11.77 165,691 Site Grading 108,840.0 SF 2.57 279,404 Lime Stabilization Site Demo 36,109.0 SF 1.34 48,250 1.0 LS 23,675.00 3.25 23,675 Erosion Control 18,853 Silt Fence (Non -Reinforced) Erosion Control Log Rock Check Dams 1,487.0 LF 4,833 120 8,400 12.0 LF 10.00 80.0 LF 105.00 Stabilized Construction Entrances (Includes Removal) Inlet Protection 1.0 Each 3,500.00 3,500 500.00 2,000 1,998 4.0 Each Termite Control Termite Control Exterior- nts Traffic Markings/Signage 14,076.0 SF 0.14 1,998 191,798 2,845 Traffic Markings/Signage 1.0 LS 2,845.00 2,845 Fences / Gates 42,250 Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 4 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST 8' h Chain Link Fence Interior Warehouse Double Sided Cedar Wood Plank Fence on Galvanized Posts Mechanical Unit Screening Retaining Walls 38.0 LF 128.0 LF 182.11 6,920 140.23 17,950 790.00 17,380 60,109 22.0 LF Stacked Stone Retaining Walls at Plan East & Pond 265.0 LF 226.83 60,109 Landscaping / Irrigation 71,042.0 SF 71,042.0 SF 12.0 Each 86,594 Temp Irrigation SOD/Hydromulch Stone Vehicle Barricades 0.30 21,313 0.75 53,282 1,000.00 12,000 Site Utilities 195,496 Private Water 1.0 LS 9,404.00 9,404 Private Sanitary 1.0 LS 19,033.00 19,033 Public Storm 1.0 LS 45,211.00 45,211 Private Storm Misc. 1.0 LS 87,055.00 87,055 34,793.00 34,793 1.0 LS Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 5 of 6 Documents Date: 0412812026 Total - Direct Costs $ 3,166,822 General Conditions 367,413 26.10 8.53 % Builder's Risk Insurance General Liability Insurance 12,500 47,325 0.89 0.29 % 3.36 1.10 % Payment and Performance Bonds 63,782 4.53 1.48 % Subcontractor Bonds 0 0.00 0.00 % Warranty 12,225 0.87 0.28 % Contractor's Contingency Owner's Contingency Overhead and Profit 97,804 6.95 2.27 % 296,246 21.05 6.88 % 5.68 % 244,575 17.38 Total Cost $ 4,308,692 $ 306.10 100.000/0 Meacham Airport Maintenance Facility Estimate Date: 0711012026 Owner Change Order #003 Page 6 of 6 Documents Date: 0412812026 Recap Report Rev 02 7/14/26 Meacham Airport Maintenance Facility GMP Estimate Date: 07/02/2026 Documents Date: 04/28/2026 Project Size (SF): 14,076 Project #: 3024100 Project Location: Fort Worth, TX Lead Estimator: Justin Hyder ITEM COST COST I SF % OF TOTAL Direct Costs Div. 01 - General Requirements Div. 03 - Concrete Div. 04 - Masonry Div. 05 - Metals Div. 06 - Wood, Plastics & Composites I 4,245,109 I 749,898 301.58 53.27 I 77.24 13.65 % 696,779 49.50 12.68 % 0.00 0/0 0 22,825 0.00 1.62 1.97 0.42 % 0.50 % 27,738 Div. 07 - Thermal & Moisture Protection 17,714 1.26 0.32 % Div. 08 - Openings 174,005 12.36 3.17 % Div. 09 - Finishes 214,391 15.23 3.90 % Div. 10 - Specialties 22,872 1.62 0.42 % Div. 13 - Special Construction Div. 22 - Plumbing Div. 23 - Heating, Ventilating & Air Conditioning Div. 26 - Electrical Div. 27 - Communications Div. 28 - Electronic Safety & Security Div. 31 - Earthwork Div. 32 - Exterior Improvements Div. 33 - Utilities 455,694 32.37 8.29 % 220,100 166,255 511,401 15.64 4.00 % 11.81 3.03 % 36.33 0.00 9.31 % 0 0.00 % 0.61 % 9.91 % 3.49 % 33,572 2.39 544,571 191,798 38.69 13.63 195,496 13.89 3.56 % Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 1 of 2 Documents Date: 0412812026 ITEM COST COST l SF No OF TOTAL General Conditions Builder's Risk Insurance General Liability Insurance Payment and Performance Bonds Subcontractor Bonds ..-.-.,r Contractor's Contingency Owner's Contingency Overhead and Profit 367,413 I 26.10 6.69 % 13,953 0.99 0.25 % 53,199 3.78 0.97 % 75,953 5.40 0.00 1.38 % 0.00 0.25 % 0 13,739 0.98 109,915 341,662 274,786 7.81 2.00 % 24.27 6.22 % 19.52 5.00 Total Cost $ 5,495,729 $ 390.43 100.00 % Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 2 of 2 Documents Date: 0412812026 Detail Report Rev 02 7/14/26 Meacham Airport Maintenance Facility GMP Estimate Date: 07/02/2026 Documents Date: 04/28/2026 Project Size (SF): 14,076 Project #: 3024100 Project Location: Fort Worth, TX Lead Estimator: Justin Hyder ITEM QUANTITY I UM UNIT COST TOTAL COST General-. - Preconstruction Services 1.0 LS 75,955.00 469,100.00 615,893 Preconstruction Services Design Services 75,955 469,100 1.0 LS Owner Change Order #001 1.0 LS 36,438.00 36,438 Owner Change Order #002 - Additional Design Services General Requirements Final Clean Safety Supplies Small Tools Temp Power Temp Water Connex Connex Delivery & Pickup Water, Ice, Cups Temp. Protection Safety Signage 1.0 LS 34,400.00 34,400 134,005 14,076.0 SF 0.81 11,428 8.0 Mos 650.00 5,200 5,000 12,990 1.0 LS 5,000.00 1,623.75 8.0 Mos 8.0 Mos 1,082.50 8,660 8.0 Mos 757.75 1,624.00 250.00 6,062 3,248 2,000 14,076 2.0 Each 8.0 Mos 14,076.0 SF 1.00 1.0 LS 2,000.00 2,000 Layout / Survey 1.0 LS 20,000.00 20,000 Site Maintenance/Street Cleaning Potholing/Hydrovac Utilities 8.0 Mos 3,897.00 10,000.00 31,176 1.0 LS 10,000 Temporary Fire Extinguishers Bldg. Concrete•. Cast -In -Place Concrete (Building) 4.0 Each 541.25 2,165 ,779 298,460 Slab on Grade (Includes Piers & GB's) 14,076.0 SF 21.20 298,460 Cast -In -Place Concrete (Site) 398,319 Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 1 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST Concrete Site Paving 5" Concrete Paving ILO of Asphalt Millings Div. 04 - Masonry Masonry / Stone 8" CMU at Int. Walls at Elec Workstation (Add Alt.) Div. 05 - Metals Structural/Miscellaneous Steel - Fabrication 27,818.0 SF 7,986.0 SF 381.1 SF 11.84 8.65 329,240 69,079 0 0.00 0 22,825 22,825 Steel Pipe Bollards - Fab. •.Wood, Plastics & Composites Architectural Woodwork 55.0 Each 415.00 22,825 27,738 Architectural Woodwork - Breakroom Millwork Architectural Woodwork - Breakroom Solid Surface Countertops Architectural Woodwork - Mudroom Bench Div. 07 - Thermal & Moisture Protection Waterproofing / Dampproofing / Joint Seal 37.1 LF 298.60 11,078 18.0 LF 314.88 5,668 1.0 Each nts 10,991.89 10,992 17,714 17,714 4,881.00 4,881 12,833.00 12,833 174,005 31,904 619.62 4,957 Building Sealants/HM Doors 1.0 LS Site Sealants 0: Openings Doors / Frames / Hardware 1.0 LS Hollow Metal Doors - Supply Hollow Metal Frames - Supply 8.0 Each 15.0 Each 375.00 5,625 Wood Doors - Supply Door Hardware - Supply Installation of Doors/Frames/Hardware OH/Coiling Doors / Grilles Coiling Doors (Motorized) Fire Shutters for Type W04 Storefronts / Glass / Curtain Walls Type W01 Entrance w/ Hardware Type W02 Exterior Openings Type W03 Interior Glass Type W04 at Firewall •• 7.0 Each 476.29 3,334 15.0 Sets 999.20 14,988 15.0 Each 200.00 3,000 111,700 12.0 Each 8,291.67 99,500 2.0 Each 6,100.00 12,200 30,401 10,500 1.0 Each 10,500.00 5.0 Each 3,110.20 15,551 1.0 Each 1,450.00 1,450 2,900 2.0 Each 1,450.00 Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 2 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST Drywall / Acoustical 3 5/8" Mtl. Stud Office Walls 9.5' 6" Mtl. Stud Rated WH Separation Wall 391.0 LF 100.16 239.27 105,598 39,162 77.0 LF 18,424 6" Mtl. Stud Office Exterior Wall Framing & Plywood at Elec. Workstation ILO CMU Masonry Int. Gypsum Board Ceilings 2' x 2' Acoustical Ceiling Tile & Grid FRP Wall Panels at RR's, Janitor & Storage (8' Tall) Blocking 135.0 LF 122.42 16,526 1.0 LS 6,098.00 6,098 187.4 SF 4.45 834 1,810.4 SF 5.56 10,074 5,021 1,113 752.0 SF 1.0 LS 6.68 1,112.87 Misc. Equipment/Project Management 1.0 LS 8,346.50 8,346 Tile 15,094 Floor Tile - Restrooms Shower Walls 65.0 SF 62.46 4,060 11,034 6.0 Each 1,839.00 Carpet/Resilient Flooring 1,538.0 SF 12,320.0 SF 28,562 Resilient Flooring (LVT) 10.09 15,511 Sealed. Concrete 0.95 11,665 6" Rubber Base 474.0 LF 2.92 1,386 Painting / Wall Coverings 65,137 Painting Ceilings 188.0 SF 3.03 570 Painting HM Doors/Frames 22.0 Each 90.91 2,000 Painting Interior PEMB 11,773.0 SF 3.33 39,245 Painting Interior Walls Specialties Signage / Identification Devices 11,840.0 SF 1.97 23,322 4,047 Interior Signage Toilet Compartments/Accessories Toilet Accessories Wall/Corner Guards Corner Guards Fire Protection Specialties Fire Extinguishers & Cabinets 13.0 Each 311.31 4,047 10,606 10,606 2.0 LS 5,303.00 2,917 13.0 Each 224.38 2,917 5,302 3,802 5.0 Each 760.40 Knox Box Special. . 1.0 Each 1,500.00 1,500 •, Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 3 of 6 Documents Date: 0412812026 ITEM QUANTITY i UM UNIT COST TOTAL COST Pre -Engineered Metal Buildings 455,694 1.0 LS 14,076.0 SF Engineering Design Peer Review (OCO #2) 12,300.00 12,300 31.50 443,394 Pre-engineered Metal Building (OCO #2) Div. 22 - Plumbing 220,100 Plumbing 220,100 Plumbing 14,076.0 SF 15.64 220,100 Heating,-ntilating & Air Conditioning 1.. ,255 HVAC 166,255 HVAC 14,076.0 SF 11.81 166,255 Div. 26 - Electrical 40 Electrical 511,401 Site Electrical 1.0 LS 48,365.60 48,366 Switchgear/Feeders 14,076.0 SF 5..25 73,899 14,076.0 SF 9.00 126,684 Lighting Equipment Connections 14,076.0 SF 3.40 47,858 14,076.0 SF 6.75 94,948 Power/Raceways 14,076.0 SF 8.50 119,646 Misc Communications Cabling and Equipment 0 0.0 LS 0.00 0 Communications (By Owner) Div. 28 - Electronic Safety & Security 33,572 Security / Access Control / Surveillance 0 Security, Access Control, and Surveillance Systems (By Owner) 0.0 LS 0.00 0 Fire Alarm Systems 33,572 Fire Alarm System 14,076.0 SF 2.39 33,572 Div. 31 - Earthwork ., ,571 Earthwork 517,020 Bldg. Pad Prep (Per Geotech) 14,076.0 SF 11.77 165,691 Site Grading 108,840.0 SF 2.57 279,404 Lime Stabilization 36,109.0 SF 1.34 48,250 Site Demo 1.0 LS 23,675.00 23,675 Erosion Control 25,553 Silt Fence (Non -Reinforced) 1,487.0 LF 3.25 4,833 Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 4 of 6 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST Erosion Control Log Rock Check Dams Stabilized Construction Entrances (Includes Removal) Inlet Protection 12.0 LF 10.00 120 105.00 8,400 3,500.00 3,500 500.00 2,000 3,500.00 3,500 400.00 3,200 80.0 LF 1.0 Each 4.0 Each 1.0 Each 8.0 Mos SWPPP Narrative (OCO #2) SWPPP Inspections (OCO #2) Termite Control 14,076.0 SF 1,998 Termite Control Traffic Markings/Signage 0.14 2,845.00 1,998 2,845 Traffic Markings/Signage Fences / Gates 1.0 LS 2,845 42,250 8' h Chain Link Fence Interior Warehouse Double Sided Cedar Wood Plank Fence on Galvanized Posts Mechanical Unit Screening Retaining Walls Stacked Stone Retaining Walls at Plan East & Pond Landscaping / Irrigation Temp Irrigation SOD/Hydromulch Stone Vehicle Barricades i Site Utilities Private Water 38.0 LF 128.0 LF 182.11 6,920 17,950 17,380 140.23 790.00 22.0 LF 226.83 60,109 265.0 LF 71,042.0 SF 60,109 86,594 0.30 0.75 1,000.00 9,404.00 21,313 71,042.0 SF 12.0 Each 53,282 12,000 4•. 195,496 9,404 1.0 LS Private Sanitary 1.0 LS 19,033.00 19,033 Public Storm 1.0 LS 45,211.00 45,211 Private Storm 1.0 LS 87,055.00 87,055 Misc. 1.0 LS 34,793.00 34,793 Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 5 of 6 Documents Date: 0412812026 Total - Direct Costs $ 4,245,109 General Conditions 367,413 26.10 6.69 % Builder's Risk Insurance General Liability Insurance 13,953 0.99 0.25 % 0.97 % 53,199 3.78 Payment and Performance Bonds 75,953 5.40 1.38 % Subcontractor Bonds Warranty Contractor's Contingency 0 0.00 0.98 0.00 % 0.25 % 2.00 % 13,739 109,915 7.81 Owner's Contingency Overhead and Profit 341,662 274,786 24.27 6.22 % 19.52 5.00 % Total Cost $ 5,495,729 $ 390.43 100.00 % Meacham Airport Maintenance Facility Estimate Date: 0710212026 GMP Page 6 of 6 Documents Date: 0412812026 Providing the Absolute Best Construction Experience GENERAL CONDITIONS DESCRIPTION QUANTITY UNIT UNIT COST EXTENDED COST ON SITE PROJECT MANAGEMENT Supervision 1 8 1 Monthsl $ 31.6201 $ 252,961 CONSULTANTS Safety Consultant (ESC) 81 Monthsl $ 550.001 $ 4,400 TEMPORARY PROJECT CONSTRUCTION AND UTILITIES FOR CM STAFF Computers 8 Months $ 520.00 $ 4160 Cell Phones 8 Months $ 200.00 $ 1,732 P6 Schedule 8 Months $ 195.00 $ 1,689 Jobsite Photos 8 Months $ 75.00 $ 650 Documents / Reprographics / (Plangrid) 8 Months $ 270.00 $ 2,338 As Built Documents 1 Sets $ 500.00 $ 541 CM Project Specific Signage 1 LS S 2,977.00 $ 3,719 Postage and Deliveries 8 Months $ 50.00 $ 433 Office Trailer - Mobilization & Demobilization 2 Ea S 1,175.00 $ 2,544 Office Trailer - Set Up & Take Down 1 LS $ 3,860.00 $ 4,178 Office Trailer - Rental 8 Months S 1,412.00 $ 12,228 Printer, Copier, Scanner 1 LS $ 1,050.00 $ 1,137 Job Office Supplies 8 Months S 125.00 $ 1,083 Internet Set Up 1 LS S 2,500.00 $ 2,706 Internet Service Charges 8 Months $ 550.00 $ 4,763 Temp Electricity (Job Trailer) 8 Months $ 300.00 $ 2,598 Temp Water (Job Trailer) 8 Months $ 100.00 $ 866 Water Meter 1 LS S 2,500.00 $ 2,706 Sewage Holding Tank (Job Trailer) 8 Months $ 715.00 $ 6,192 First Aid Kit 1 Ea $ 300.00 $ 325 First Aid Supplies 8 Months $ 50.00 $ 433 Temp Fire Extinguisher (Job Trailer) 1 Ea $ 150.00 $ 162 Portable Toilets - Rental 8 Months $ 765.00 $ 6,625 Portable Handwash - Rental 8 Months $ 365.00 $ 3,161 Temporary Fencing w/ Windscreen 0 LS $ 11,908.00 $ - Construction Clean -Up 17 Wks $ 1,400.00 $ 25,764 Dumpsters 32 Pulls S 500.00 $ 17,320 TOTAL GENERAL CONDITIONS 8 Months $ 45,927 $ 367,413 n � � 0 A L � y O m C r h O y r o o � � o e o o e o W OTC W O O O O O IV AWp O O O O W O N N� D O O O O O IJ o o N O co a i�a N N O O m O NA A .p o CJ1 O O O O O o O e O a IV � N N O L a J W O O O O J ?+D c J O e o O Jo o o N V A e J e e o e e N v N N W N m N� tC < a o o z y o N g N CnMCDD N N 0 T * n 3 rn y co r y D D CD y O z n -{ O M 3roviding the Absolute Best Construction Experience Recap of GMP for Meacham Airport Maintenance Facility Project #: 3024100 Name: Meacham Airport Maintenance Facility Location: Fort Worth, TX Bid Date: July 2, 2026 Lead Estimator: Chris Schwertner Base Bid $ 5,495,729.00 A01 A02 Generator $ 137,745 New Air Compressor $ 36,942 A03 HLVS Fans $ 59,504 A04 Concrete Stacked Block Walls For Spoils $ 106,256 A05 6" Flex Base & Asphalt ILO Concrete Paving $ 59,973 A06 Covered Parking $ 204,223 A07 Lighting Protection System $ 44,918 A08 Network Lighting Controls $ 48,385 A09 CMU ILO Framing & Plywood at Elec. Workstation $ 33,333 A10 Window Shades $ 6,008 A11 Appliances $ 9,035 Al2 Bollard Covers $ 9,681 Downspout Boots $ _ 5,632 Lockers & Bench i $ 22,183 FF&E $ 18,108 A13 A14 A15 Total for All Alternates: $ 801,926 Total Base Bid + All Alternates $ 6,297,655 Recap Report Meacham Airport Maintenance Facility - Alternates GMP Estimate Date: 07/02/2026 Documents Date: 04/28/2026 Project Size (SF): 14,076 Project #: 3024100 Project Location: Fort Worth, TX Lead Estimator: Justin Hyder ITEM COST COST l SF % OF TOTAL Direct Costs Alternate 01 - Generator Alternate 02 - New Air Compressor Alternate 03 - HLVS Fans Alternate 04 - Concrete Stacked Block Walls For Spoils Alternate 05 - 6" Flex Base & Asphalt ILO Concrete Paving Alternate 06 - Covered Parking I 801,926 I 137,745 56.97 9.79 2.62 84.37 14.49 % 3.89 % 36,942 59,504 4.23 6.26 % 106,256 7.55 11.18 % 59,973 4.26 14.51 6.31 % 21.49 % 204,223 Alternate 07 - Lighting Protection System 44,918 3.19 4.73 % Alternate 08 - Network Lighting Controls Alternate 09 - CMU ILO Framing & Plywood at Elec. Workstation Alternate 10 - Window Shades Alternate 11 - Appliances Alternate 12 - Bollard Covers Alternate 13 - Downspout Boots Alternate 14 - Lockers & Bench Alternate 15 - FF&E 48,385 3.44 5.09 % 33,333 6,008 2.37 o 3.51 /o 0.63 % 0.43 9,035 0.64 0.95 % 1.02 % 0.59 2.33 % 9,681 0.69 0.40 5,632 22,183 1.58 18,108 1.29 1.91 % Meacham Airport Maintenance Facility - Alternates Estimate Date: 0710212026 GMP Page 1 of 2 Documents Date: 0412812026 Detail Report Meacham Airport Maintenance Facility - Alternates GMP Estimate Date: 07/02/2026 Documents Date: 04/28/2026 Project Size (SF): 14,076 Project #: 3024100 Project Location: Fort Worth, TX Lead Estimator: Justin Hyder ITEM Direct Costs QUANTITY I UM 1.0 LS UNIT COST TOTAL COST 117,390 99,500.00 99,500 i 2,000.00 2,000 Generator & ATS Gas Regulator 1.0 Each Bollards 6.0 Each 415.00 2,490 Bollard Covers 6.0 Each 150.00 900 Generator Pad 1.0 Each 12,500.00 12,500 Indirect Costs Indirect Costs (17.34%) AlternateNew Direct Costs 20,355 20,355 •, 31,483 1.0 LS 20,355.43 Air Compressor 1.0 LS 31,483.00 31,483 Indirect Costs 5,459 Indirect Costs (17.34%) Direct Costs 1.0 LS 5,459.15 5,459 04 50,711 2,400 PEMB Structure Supports 2.0 Each 1,200.00 HLVS Fans Electric for Fans Indirect Costs Indirect Costs (17.34%) 2.0 Each 17,144.00 7,011.50 ' 34,288 2.0 Each 14,023 8,793 1.0 LS 8,793.29 8,793 Alternate 04 - Concrete Stacked Block Walls Direct Costs For Spoils 106,256 90,554 30,704 33,600 Concrete Stacked Block Walls for Spoils - Install Concrete Stacked Block Walls for Spoils - Supply 96.0 Each 96.0 Each 319.83 350.00 Meacham Airport Maintenance Facility - Alternates Estimate Date: 0710212026 GMP Page 1 of 4 Documents Date: 0412812026 ITEM I QUANTITY I UM UNIT COST TOTAL COST Concrete Foundation 1,050.0 SF 25.00 26,250 15,702 Indirect Costs Indirect Costs (17.34%) 1.0 LS 15,701.98 15,702 - & Asphalt ILO Concrete Direct Costs 51,110 6" Flex Base & Asphalt 7,986.0 SF 15.05 120,189 Concrete Paving 7,986.0 SF -8.65 -69,079 Indirect Costs Indirect Costs (17.34%) Alternate0. -. Parking Direct Costs 8,863 8,862.54 8,863 204,223 174,044 49,044.00 49,044 115,000.00 115,000 1.0 LS 1.0 Each Covered Parking Foundation Covered Parking Structure 1.0 Each Electrical at Covered Parking 1.0 LS 10,000.00 10,000 Indirect Costs 30,179 Indirect Costs (17.34%) Alternate 07 - Lighting Protection System Direct Costs 1.0 LS 30,179.23 30,179 44,918 38,280 Lighting Protection 1.0 LS 38,280.00 38,280 Indirect Costs 6,638 Indirect Costs (17.34%) Alternate 0:Network Direct Costs 1.0 LS 6,637.75 6,638 41,235 Network Lighting Controls 1.0 LS 41,235.00 41,235 Indirect Costs 7,150 Indirect Costs (18.31%) 1.0 LS 7,150.15 j 7,150 Alternate• Framing & Plywood Direct Costs at Elec. 90.54 -6,098.00 28,407 8" CMU at Int. Walls at Elec Workstation (Add Alt.) 381.1 SF 34,505 I� -6,098 Framing & Plywood at Elec. Workstation ILO CMU Masonry Indirect Costs Indirect Costs (17.34%) Window..- 1.0 LS 4,926 1.0 LS 4,925.77 4,926 00. Meacham Airport Maintenance Facility - Alternates Estimate Date: 0710212026 GMP Page 2 of 4 Documents Date: 0412812026 ITEM QUANTITY I UM UNIT COST TOTAL COST Direct Costs 5,120 Manual Operated Window Shades - Exterior 5.0 Each 1,024.00 5,120 Windows Indirect Costs 888 Indirect Costs (17.34%) 1.0 LS 887.81 888 -AppliancesAlternate 11 Direct Costs 1.0 Each 7,700 2,500.00 2,500 Electric Range (No Spec) 1.0 Each Built -In Microwave (By Owner) 0.00 0 Refridgerator (No Spec) 1.0 Each 3,000.00 3,000 Ice Machine (By Owner) 1.0 Each 2,200.00 2,200 Indirect Costs 1,335 Indirect Costs (17.34%) 1.0 LS 1,335.18 1,335 Direct Costs 8,250 Bollard Sleeves 55.0 Each 150.00 8,250 1,431 1,430.55 1,431 Indirect Costs Indirect Costs (17.34%) 1.0 LS Downspout Boots Direct Costs 4,800 600.00 4,800 832 Downspout Boots 8.0 Each Indirect Costs Indirect Costs (17.34%) 1.0 LS 832.32 832 Direct Costs 18,905 Metal Lockers 18"x 18" 6.0 Each 2,817.48 16,905 Locker Bench 1.0 Each 2,000.00 2,000 Indirect Costs 3,278 Indirect Costs (17.34%) 1.0 LS 3,278.11 3,278 Direct Costs 15,432 FF&E 1.0 LS 15,432.00 15,432 Indirect Costs 2,676 Indirect Costs (17.34%) 1.0 LS 2,675.91 2,676 Meacham Airport Maintenance Facility - Alternates Estimate Date: 0710212026 GMP Page 3 of 4 Documents Date: 0412812026 Total - Direct Costs $ 801, 926 Meacham Airport Maintenance Facility - Alternates GMP Page 4 of 4 Estimate Date: 0710212026 Documents Date: 0412812026 m Providing the Absolute Best Construction Experience D/B Meacham Airport Field Maintenance Facility GMP submission SPECIFIC QUALIFICATIONS Division 01 — General Requirements and General Conditions 1. Includes costs for preconstruction and design services. 2. We are assuming that we can use adjacent lot nearby for jobsite trailer and construction laydown area. Refer to attached Site Logistics Plan. 3. Assume normal working hours M-F, 7:00 a.m. to 5:30 p.m. We are assuming early morning concrete pours will be acceptable for SOG and site concrete as deemed necessary. We are assuming we can work on Saturdays as needed to maintain schedule or make-up for weather. 4. We are assuming an 8-month construction schedule. 5. Onsite Supervision will consist of (1) full-time Project Manager, (1) full-time Superintendent, (1) part-time Safety Professional, and (1) part-time Project Administrator. Refer to Salary Matrix Attached. 6. The GMP estimate does not include sales tax. 7. The GMP estimate does not include any cost for ONCOR. 8. The GMP estimate does not include Building Permit cost(s). 9. The GMP estimate does not include any alternates. 10. Line items in the GMP Estimate are not guaranteed. Buyout savings from one line item can be used to cover overruns or estimating errors from other lines. Final buyout gains will be moved to the Contractor Contingency line item. 11. The GMP estimate contains a Contractor's Contingency of 2% of contract value. Contractor's Contingency is to be used for the purpose of covering estimating errors, cost which are related to a subcontractor's failure, scope inadvertently missed in initial approval letters, or otherwise as needed per the contractual agreement. 12. The GMP estimate contains an Owner's Contingency of $341,662. The Owner's Contingency is intended to be used to cover items such as scope of work growth, increases due to hidden or unforeseen conditions, inclusion of items excluded from this GMP, Owner initiated changes, design errors and omissions, and any losses not covered by insurance. 13. The GMP along with the Assumptions and Clarifications are to be incorporated into the project via Owner Change Order. 14. Pricing submitted in this GMP will remain in effect for 30-days, after that period pricing may be subject to change. 15. The GMP estimate includes an SBE of 3.13%. Page 1 of 4 Division 02 — Existing Conditions 1. Existing 8" and 24" water lines are to be removed and rerouted as part of work taking place outside of this Agreement. Utilities must be completed in accordance with Schwarz -Hanson Drawing set dated 6/5/2026. Any unsuitable spoils generated by the Utility scope outside of this Agreement must be removed from site prior to SpawGlass mobilization. 2. Work performed by Utility contractor outside of this Agreement must be completed prior to SpawGlass Mobilization as defined by the Project Schedule. 3. Does not include demolition of existing utilities. 4. Does not include demolition of existing maintenance facility. 5. Does not include any costs associated with removing/relocating existing power pole. 6. This GMP estimate does not include any modifications or new security fencing at LOC. Division 03 — Concrete 1. Piers are bid as dry, no casing. 2. No concrete footings or foundation are included for stacked stone retaining wall. 3. No foundation has been included for concrete bin storage area, see add alternate. 4. Includes Wet Curing of building slab. 5. The GMP estimate does not include the Generator Pad. This is part of Alternate 1. 6. The GMP estimate includes concrete paving in lieu of asphalt or asphalt millings. Division 04 — Masonry 1. The GMP estimate does not include any Masonry. 2. Does not include any exterior masonry or dumpster enclosure. Division 05 — Metals 1. The GMP estimate does not include steel downspout boots. These are priced as a separate add alternate. 2. The GMP estimate does not include (6) exterior bollards around generator. These are included with Alternate #1. Division 06 — Wood, Plastics, and Composites 1. N/A Division 07 — Thermal and Moisture Protection 1. N/A Page 2 of 4 Division 08 — Oneninas 1. Does not include final keying or final cores. 2. Assumes standard colors on overhead doors. Division 09 — Finishes 1. GMP estimate includes framing and plywood for wall at electric workstation in lieu of CMU. 2. The GMP estimate does not include any exterior painting per spec section 09 91 13. Division 10 — Specialties 1. This GMP estimate does not include Metal Lockers and Bench. These are being carried as an add alternate. 2. The GMP estimate does not include covered parking. See add alternate #6 Division 11 — Equipment 1. The GMP estimate does not include appliances from Spec section 11 30 13. These are being carried as an add alternate. Division 12 — Furnishings 1. The GMP estimate does not include any window treatment. These are being carried as an add alternate. 2. The GMP estimate does not include any FFE costs. The FFE is carried as an add alternate per Uplift Desks, quote dated 1/27/26. Division 13 — Special Construction 1. Pre -Engineered metal building cost has been incorporated per Amendment 02. Division 14 — Conveying Equipment 1. Overhead cranes are not included. Division 21 — Fire Suppression 1. Fire suppression is not included. Division 22 — Plumbing 1. N/A Division 23 — HVAC and Controls 1. The GMP estimate includes standalone thermostats only. 2. The GMP estimate does not include HVLS fans, see add alternate. Page 3 of 4 Division 26 — Electrical 1. The GMP estimate does not include utility charges. 2. Does not include 100kw natural gas generator with 250A ATS, see add alternate #1. 3. Does not include lightning protection system. See add alternate #7. Division 27 — Communications 1. Does not include communications scope. Our scope includes raceways stub -ups (ring & string) only. Cabling and devices are to be furnished and installed by Owner. 2. Does not include audio visual system. Division 28 — Electronic Safety & Securitx 1. Does not include security scope. Our scope includes raceways stub -ups (ring & string) only. Assume one drop per exterior door. Cabling and devices are to be furnished and installed by Owner. Division 31 — Earthwork 1. For building pad prep: we are assuming excavation to limestone and moisture conditioning utilizing usable onsite materials and 1' select fill cap; with 5' overbuild around building footprint. 2. For site pavement subgrade prep, we have included 6" lime stabilization. 3. The GMP estimate does not include asphalt millings as we are assuming Ross Ave will be demo'd by utility contractor outside of this Agreement. 4. The GMP estimate includes removing and haul -off of all onsite excavated materials and importing suitable fill material for the project. 5. The GMP estimate includes civil revisions per Addendum #1. Division 32 — Exterior Improvements 1. N/A Division 33 — Utilities 1. Does not include any costs associated with Atmos or Oncor providing new service. 2. Does not include 8" or 24" water lines or Sanitary Sewer manhole or stub out (by others). 3. The GMP estimate includes civil revisions per Addendum #1. SPECIFIC EXCLUSIONS 1. Taps, meters and related fees by utility providers not provided. 2. Building permits 3. Material testing services 4. Contaminated soils, asbestos abatement 5. FF&E 6. Sales Tax Page 4 of 4 0 ding the Absolute Best struction Experience Meacham Airport - Maintenance Facility Fort Worth, Texas 7/2/2026 shoo No. TITLE DRAWINGS ISSUE DATE REVISION DATE GENERAL G0.0 COVER 04,28.2026 06.19.2026 73.1 SHEET INDEX 04.28.2026 G0.2 TEXAS ACCESSIBILITY STANDARDS O4.28.2026 G0.3 TEXAS ACCESSIBILITY STANDARDS O4.28.2026 G0.4 TEXAS ACCESSIBILITY STANDARDS O4.28.2026 G0.5 FRAMING DETAILS O4.28.2026 G0.6 MOUNTING HEIGHTS O4.28.2026 G0.7 FIRE PENETRATION DETAILS O4.28.2026 CIVIL C1.1 COVER SHEET 04.28.2026 06.19.2026 C1.2 GENERAL NOTES O4.28.2026 06.19.2026 C2.1 FINAL PLAT 04.28.2026 C3.1 EXISTING CONDITIONS PLAN 04.28.2026 C3.2 DEMOLITION PLAN 04.28.2026 06.19.2026 74.1 SITE & DIMENSION CONTROL PLAN 04.28,2026 06.19.2026 C5.1 OVERALL UTILITY PLAN 04.28.2026 06.19.2026 77.1 SANITARY SEWER PLAN 04.28.2026 06.19,2026 C7.2 UTILITY DETAILS O4.28.2026 C8.1 PAVING & STRIPING PLAN 04.28.2026 7.2 PAVING DETAILS O4.28.2026 C8.3 PAVING DETAILS O4.28.2026 79.1 GRADING PLAN 04.28.2026 06.19.2026 C10.1 EXISTING DRAINAGE AREA MAP 04.28.2026 C10.2 PROPOSED DRAINAGE AREA MAP 04.28.2026 711.1 DETENTION POND 04.28.2026 06.19.2026 C11.2 DETENTION POND 04.28.2026 06.19.2026 C11.3 DETENTION POND CALCULATIONS O4.28.2026 06.19.2026 C11.4 STORM DETAILS 06.19.2026 C11.5 STORM DETAILS 06.19.2026 C12.1 EROSION CONTROL PLAN 04.28.2026 06.19.2026 C12.2 EROSION CONTROL DETAILS O4.28.2026 LANDSCAPE L1.1 EXISTING CONDITIONS PLAN 04.28.2026 L1.2 LANDSCAPE PLAN 04.28.2026 L1.3 LANDSCAPE SPECIFICATIONS AND DETAILS O4.28.2026 ARCHITECTURAL A0.1 LIFE SAFETY PLAN 04.28.2026 A0.2 3-HR FIRE RATED WALL ASSEMBLY 04.28.2026 A1.0 ARCHITECTURAL SITE PLAN 04.28.2026 06.19.2026 A1.1 SITE DETAILS O4.28.2026 A2.1 DIMENSION PLAN 04.28.2026 A2.2 FLOOR PLAN 04.28.2026 A2.3 FLOOR PLAN - ADD ALTERNATE #06 COVERED PARKING 04.28.2026 72.4 ENLARGED FLOOR PLANS O4.28.2026 A3.1 EXTERIOR ELEVATIONS O4.28.2026 A4.0 BUILDING SECTIONS O4.28.2026 A4.1 WALL SECTIONS O4.28.2026 A4.2 SECTION DETAILS O4.28.2026 A5.1 ROOF PLAN 04.28.2026 A6.1 DOOR SCHEDULE AND DETAILS O4.28.2026 A7.1 REFLECTED CEILING PLAN 04.28.2026 A7.2 REFLECTED CEILING PLAN - ADD ALTERNATE #03 - HVLS FANS O4.28.2026 78.1 INTERIOR ELEVATIONS O4.28.2026 A8.2 CASEWORK DETAILS O4.28.2026 A9.1 FINISH PLAN, SCHEDULE, AND NOTES O4.28,2026 06.19.2026 STRUCTURAL S1.1 SPECIAL INSPECTIONS & GENERAL NOTES O4.28.2026 52.1 FOUNDATION PLAN 04.28.2026 S2.2 SCHEMATIC ROOF FRAMING PLANS O4.28.2026 S3.1 FOUNDATION DETAILS O4.28.2026 53.2 FOUNDATION DETAILS O4.28.2026 MECHANICAL M0.1 MECHANICAL LEGEND, SCHEDULES & NOTES O4.28.2026 M0.2 MECHANICAL DETAILS O4.28.2026 M2.1 FLOOR PLAN - MECHANICAL 04.28.2026 M2.2 FLOOR PLAN - MECHANICAL - ADD ALTERNATE #03 04.28.2026 PLUMBING P0.1 PLUMBING LEGEND, SCHEDULES & NOTES O4.28.2026 P0.2 PLUMBING DETAILS O4.28.2026 P2.1 FLOOR PLAN - PLUMBING WASTE, DRAIN, & VENT 04.28.2026 P2.2 FLOOR PLAN - PLUMBING - DOMESTIC SERVICES O4.28.2026 P2.3 FLOOR PLAN - PLUMBING DOMESTIC SERVICES - ADD ALTERNATE #02 04.28.2026 ELECTRICAL E0.1 ELECTRICAL SINGLE LINE & DETAILS O4.28.2026 E0.2 ELECTRICAL DETAILS O4.28.2026 E1.1 SITE PLAN - ELECTRICAL 04.28.2026 06.19.2026 E2.1 FLOOR PLAN - ELECTRICAL 04.28.2026 E3.1 FLOOR PLAN - LIGHTING 04.28.2026 E3.2 FLOOR PLAN - LIGHTING DAYLIGHT ZONES O4.28,2026 E6.1 ELECTRICAL PANEL SCHEDULES O4.28.2026 E6.2 ELECTRICAL PANEL SCHEDULES O4.28.2026 ES1.1 FLOOR PLAN - SECURITY 04.28.2026 FA2.1 FLOOR PLAN - FIRE ALARM 04.28.2026 SPECIFICATIONS DIVISION 00 — PROCUREMENT & CONTRACTING REQUIREMENTS 0001 10 Table of Contents 04.28.2026 6.19.2026 00 72 00 Standard General Conditions of the Construction Contract 6.19.2026 Wage Rates CFW Horizontal Wage Rate Table 6.19.2026 Wage Rates CFW Vertical Wage Rate Table 6.19.2026 DIVISION 01 -- GENERAL REQUIREMENTS 01 1000 Summary 04.28.2026 06.19.2026 01 23 00 Alternates 04.28.2026 71 25 00 Substitution Procedures 05.22.2026 06.19.2026 01 31 20 Project Meetings 05.22.2026 06.19.2026 01 33 00 Submittals 05.22.2026 06.19.2026 01 45 23 Testing and Inspection Procedures 05.22.2026 06.19.2026 01 50 00 Temporary Facilities and Control 05.22.2026 06.19.2026 71 57 13 Storm Water Pollution Prevention 05.22.2026 06.19.2026 01 60 00 Product Requirements 05.22.2026 06.19.2026 01 66 00 Product Storage and Handling Requirements 05.22.2026 06.19.2026 01 71 23 Construction Staking and Survey 05.22.2026 06.19.2026 71 7423 Cleaning 05.22.2026 06.19.2026 01 77 19 Closeout Requirements 05.22.2026 06.19.2026 01 78 23 Operation and Maintenance Data 05.22.2026 06.19.2026 01 78 39 Project Record Documents 05.22,2026 06.19.2026 DIVISION 03 -- CONCRETE 03 05 16 Underslab Vapor Barrier 04.28.2026 03 10 00 Concrete Formwork 04.28.2026 03 20 00 Concrete Reinforcement 04.28.2026 03 30 00 Cast -in -Place Concrete 04.28.2026 03 35 it Concrete Floor Finishes 04.28.2026 DIVISION 04 -- MASONRY 04 20 00 Unit Masonry 04.28.2026 DIVISION 05 -- METALS 05 50 00 Metal Fabrications 04.28.2026 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES 06 10 00 Rough Carpentry 04.28.2026 06 41 00 Architectural Wood Casework 04.28.2026 06 61 00 Cast Polymer Fabrications 04.28.2026 06 83 16 Fiberglass Reinforced Paneling 04.28.2026 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION 07 21 00 Thermal Insulation 04.28.2026 07 41 13 Metal Roof Panels 04.28.2026 0742 13 Metal Wall Panels 04.28.2026 07 62 00 Sheet Metal Flashing and Trim 04.28.2026 07 71 00 Roof Specialties 04.28.2026 07 84 00 Firestopping 04.28.2026 07 92 00 Joint Sealants 04.28.2026 DIVISION 08 -- OPENINGS 08 11 13 Hollow Metal Doors and Frames 04.28.2026 08 14 16 Flush Wood Doors 04.28.2026 08 31 00 Access Doors and Panels 04.28.2026 08 33 44 Overhead Coiling Fire Shutters 04.28.2026 08 36 13 Sectional Doors 04.28.2026 7843 13 Aluminum -Framed Storefronts 04.28.2026 06.19.2026 08 71 00 Door Hardware 04.28.2026 788000 Glazing 04.28.2026 DIVISION 09 -- FINISHES 09 21 16 Gypsum Board Assemblies 04.28.2026 09 22 16 Non -Structural Metal Framing 04.28.2026 09 30 00 Tiling 04.28.2026 09 51 00 Acoustical Ceilings 04.28.2026 09 65 00 Resilient Flooring 04.28.2026 06.19.2026 09 91 13 Exterior Painting 04.28.2026 09 91 23 Interior Painting 04.28.2026 06.19.2026 DIVISION 10 -- SPECIALTIES 10 1400 Signage 06.19.2026 10 26 00 Wall and Door Protection 04.28.2026 10 28 00 Toilet, Bath, and Laundry Accessories 04.28.2026 74400 Fire Protection Specialties 04.28.2026 10 51 13 Metal Lockers 04.28.2026 10 73 10 Prefinished Aluminum Canopies And Shade Structures 04.28.2026 DIVISION 11 -- EQUIPMENT 11 30 13 Residential Appliances 04.28.2026 DIVISION 12 -- FURNISHINGS 12 24 00 Window Shades 04.28.2026 12 36 00 Countertops 04.28.2026 DIVISION 13 -- SPECIAL CONSTRUCTION 13 34 19 Metal Building Systems 04.28.2026 DIVISION 22 - PLUMBING 2200 10 BASIC PLUMBING REQUIREMENTS O4.28.2026 2205 12 PLUMBING AND ELECTRICAL COORDINATION 04.28.2026 7255 19 PLUMBING METERS AND GAUGES O4.28.2026 22 05 29 PLUMBING SUPPORTS AND ANCHORS O4.28.2026 725553 PLUMBING IDENTIFICATION 04.28.2026 22 05 93 PLUMBING TESTING, ADJUSTING AND BALANCING 04.28.2026 2207 16 PLUMBING PIPING AND EQUIPMENT INSULATION 04.28.2026 22 10 00 PLUMBING PIPING 04.28.2026 22 1001 PLUMBING SPECIALTIES O4.28.2026 22 11 19 PIPING SPECIALTIES O4.28.2026 22 30 00 PLUMBING EQUIPMENT 04.28.2026 22 40 00 PLUMBING FIXTURES O4.28.2026 DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING HVAC 2300 10 BASIC MECHANICAL REQUIREMENTS O4.28.2026 2305 12 MECHANICAL AND ELECTRICAL COORDINATION 04.28.2026 730529 MECHANICAL SUPPORTS AND ANCHORS O4.28.2026 23 05 53 MECHANICAL IDENTIFICATION 04.28.2026 735593 MECHANICAL TESTING, ADJUSTING AND BALANCING 04.28.2026 23 07 13 HVAC DUCT INSULATION 04.28.2026 23 31 13 METAL DUCTWORK 04.28.2026 23 31 13.19 DUCTWORK ACCESSORIES O4.28.2026 23 3400 FANS O4.28.2026 23 37 13 AIR OUTLETS AND INLETS O4.28.2026 23 3723 GRAVITY VENTILATORS O4.28.2026 23 51 00 BREECHING, CHIMNEYS, AND STACKS O4.28.2026 06.19.2026 23 5500 FUEL -FIRED HEATERS O4.28.2026 2381 26 SPLIT DX COOLING/HEATING SYSTEMS 04_28.2026 23 89 65 MOTOR CONTROLLERS O4.28.2026 DIVISION 26 - ELECTRICAL 2605 10 GENERAL REQUIREMENTS FOR ELECTRICAL WORK 04.28.2026 2605 12 MECHANICAL AND ELECTRICAL COORDINATION 04.28.2026 2605 19 WIRES AND CABLES O4.28.2026 26 05 26 GROUNDING 04.28.2026 26 05 26.01 WIRE CONNECTION AND DEVICES (EXO-THERM WELD) 04.28.2026 26 05 27 SEALING OF PENETRATIONS O4.28.2026 26 05 29 SUPPORTING DEVICES O4.28.2026 760532 PULL AND JUNCTION BOXES O4.28.2026 26 05 33 CONDUITS O4.28.2026 06.19.2026 26 05 34 OUTLET BOXES O4.28.2026 26 05 35 WIREWAY 04.28.2026 760926 MISCELLANEOUS ITEMS O4.28.2026 2622 13 DRY TYPE TRANSFORMERS O4.28.2026 7624 16 PANELBOARDS O4.28.2026 2624 17 DISTRIBUTION PANELBOARDS O4.28.2026 2627 13 ELECTRIC SERVICE ENTRANCE 04.28.2026 2627 16 CABINETS O4.28.2026 26 27 26 WIRING DEVICES O4.28.2026 2628 16 OVERCURRENT PROTECTIVE DEVICES O4.28.2026 2628 17 DISCONNECT SWITCHES O4.28.2026 2629 13 MOTORS, MOTOR STARTERS AND CONTROLS O4.28.2026 2641 13 LIGHTNING PROTECTION FOR STRUCTURES O4.28.2026 2643 13 SURGE PROTECTION DEVICES (SPDS) 04.28.2026 06.19.2026 2651 13 LIGHTING 04.28.2026 06.19.2026 DIVISION 27 - COMMUNICATIONS 27 05 28 EMPTY CONDUIT SYSTEMS O4.28.2026 DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 28 31 00 ANALOG ADDRESSABLE FIRE ALARM SYSTEM 04.28.2026 DIVISION 31 -- EARTHWORK 31 6329 Drilled Concrete Piers and Shafts 04.28.2026 END. Ll A TAB 6 PROJECT SCHEDULE SpawGlass A p T fn d D D D D D D D d p d W W W W W V V W W D7 W m W A O A A 8 . . .N 0 0 0 0 0 0 0 0 0 0 0 0 0 N + N + O= m Q o o T T T O Gi V) m m m ° O p 0 .g o p O (/> O C. O 0 p Ow -. T T O T �_ W T Z C) G) p 0 m .p p .g p ,� w N m o 3 O m Q y y c N co mT A - T m 3 3 a w N m w o W o a o w a Oa. 0 3 a a a o ' o m m c3q' - v 2 3 m o m a O m O N a S A 6 p iA p iA p a c - O » m D a m m m 3 A F m m 181 yF N F II d 3 0 �D ? t0 � 0 0� p p W 0 0 0 �•., O O O 0 0 0 0 0 0 0 0� 0 0 0 0- � O O O O O O O O O O O O O V V d L m o 0 o b b b o m 3 N � N N N 61 m N N N O W m D D D D D >> N lb51 N N N O N dNi C N N IN W N W N N D D D D D D D D D D D D D rn D D D OW T` O V Q N d N N q Oq�� O >> z V V � Np tp V W+ O O O V N O f Ntpp ccpp Z O Z Z V L o 0 0 o o= D o o F p D? C d P :::mSSS N P .. -- N `�A� N>> 3 4 N N N I W °� D D ONJ m m T D D D ONi T (NT D D D (NSA (NJt N (Nl� (Nl� °1 VNi fNl� v N m N N D D D D D D D D D D r `I +I D D D D D D D D - � O o 0 0 o e e o 0 0 0 0 °'" o 0 0 0 0 0 0 0 0 0.12 0 0 0 0 0 0 0 0 0 o a off. o 0 0 0 0 0 0 0 0 0 0 o wl m• a -----------gamg-- - h m *------------------------------------- ----- --------------- •----- _--_----- _--- ._________-_---- ........................................................................:...................-____ _--- --- _---- _---------- ------------------- `-------- __ _. ------------------ •__._--------------•-_--------- ______- ------ ,,......__yi .. ______ ____--- __--------- _ __ m --------' •- __"__ __ O - _ ------------------- - --- -- --- - - a I 3 3 -------------------- ---------------- - 3 - a 3 CD ................ r------------------ ---------------- = T .- - --- ----- --_-- •--�- o ------------------ 5 p a '----------------- ° - - ------------- --- ° 0 ------------ ------- ____ O , E� a _---- ---------- +---------------------- m c ___ - ' .a____ .... _ - iD.a---------- m 7 _ '_a______A _____'------------------------------------ A o. ------------------;____3- � b -'� D a. 0 Cl 2 A 2 gm _________� -------------- -----------------;-------- d m- n----�-- -W p --W--N - ---- ----------- C ------------------ �_-----------------`---------------- ---------------- A� D- p m v s m m mm_. a N v ------------- ------- ------ a m g' , d f ai ---------a°(� --------- --------- • _------------------- _ m d -------- -- T ___________*_._______.___-_-.---.__-_;__•________.___.__;_ -------------_----_ - m ---------------'------------------'-----------------'---------------'-----------------`----------------'--------m--------'------------------'------------- --- ---------------`------------'-`------------'--'---'-------------'------------------'-------------------`--------3-------`------------------'------------- �I � --- w d -; ------ i p O i a m - �� m � � � � -= � � D � � D D i i i - , .f iF i •�if i •�i �i �i �i �i � .�i ��i �v .�i �i � D D D p o0 N d m N [t O C O O O A t0 A A 0 0 0 0 _ .F (O O .F .f OJ O O O O O A O O N O 01 A 0 0 0 0 0 0 0 0 0 w�i o O 0 0 O O 0 n T c O c0 A A (� m [n n In m .�. 1.0 3 3 3 `G -= n • O m o £➢ 3 3 m f o A °� Fd W N U p n Q -� N N m y N Noo n m N t0 o m c d= O m y 3 N m m � m � o a o- a v j44ry7 3 3 3 Dy 2 n 3 C) v 3 ? N Ut • O [n Cn J' O W °� N O® Ut E N O In O (l� N O �_ 0� (° N� � N N O O W (n � O O O O O O N 0 0 0 0 O O O• W ' m N W O ➢ � N .� � � � � � j � S � p c � � '� � N m � o a a ♦ � c N N N � " N `N —��� c > > > W W ONi m c c __ m m m m m m m m _ `< m m m m m m m m m m m 3 D D D D •- D D➢ D D D y o y S � m Q � D c d D= y d D d L • (° N N I N J m N m m rn N m m N ONi D D O1 D N N m rn N D D m m n D N m m °� D D 11 N m O1 °� D➢ T N m N N °� n D D D ..-.,.� D D D D 2 m 0 0 Q C1 _________________ ________________ __________________ _ _________________ ------------------- __-------_____--- _ O : 6 m '< __________ ______________ _________ D_------------ _ ----------------------------- __--_.__-___-_-_ o D - - AO . _-___--____ __----------- a� ---------------- _____----------_ i < _. W it_______________;_________________ of ° < NID � °' -�1:3 � N -_ - c 3 c n a N y m 3 3 O m' I v m o I o A o Q-*-_A o�-[--a 2o5. <, o -' A 31 �-'s-'a----`-- .r 3 m 0- m �---- : 5. m �-g-- 3----------- A m L.o 3 c w o m 3: ----� -m--�--zc--3 sf-�j---=- x-- '--31----�--P--zo--v. 5. : n [) ------ --a--- -- 4N U 3 3 , 3 3 _ 3 a 3--a SR: _ _ �._ 3 , ^, O �__________ n c u o. m -I o. s _ OI to ; N ? 3-- 3 r-: 3 m Gl___________ `. v __ O 4. m o A O m rn p o p Q D D D D D D D D D D D D D D D D D D D D D O O O O O O .O. O. t0 . O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o D 0 0 . 0 - r O °i ?! > > � v 5 0 - A ❑ 0 m m � > > 0 w F � n c ❑ o3 rn rn N N r D _I -oC = p, m n v K ❑ 3 a Q X D o a _v �o A ❑ m m a () N v ? o x 1 m A s= O o ° m o a 4= o o $ o N � m ro vl � Q O S d S 3 5 p o 2 � d tli � � N A » � o lD � � �' N ❑ � W � d =� N � � � � N y ai of p 3 m 0 x � 0 3 II d t0 Zt N N N N N J N V N N N N N N N N N N N N N N N a 3 0 -aD -oD D -oD -oD 3 3 3 m L❑ Z m a d a a a L O❑ Z Z o 0 Im � �I �I J JId JI Jle�h J V V J J m m v m m m rn rn A - m 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o e o 0 00 0o e o 0 e 0 0 0 0 0 0 0 0 0 e0 0 0 0 0 0 0 0 m o a - ---------------- ---------------- --------------------------------------- I I I • --------------- ------------------ I S -- 01 I I I ----------- ------------------ ------------------ ;------------------ ;------------------ ;--------------------------------------- ------------------I I w C • I m d 0 0 —' ' --' -----------'----------------'------------------------------ `---------------- ---------- -'- o_ D a• I p CDi —. ----------- '------------------ •------------------------------ ------------------------------------------------------------------ ------------'----- --- - 3 .r d----------- •-------- _______•__ ___------ _---- _------------------ '__________________�_ _ ------ ----------- y I I I p CD N .► K ------------------------------------------------- ----------------- ---------------- -------------------------------------------------- `-------------- ■ ------------------------------------------------ _ ------------- _____________ • --- --�--- a' _-------------O- ' o_ -------------------'------------------------------ ----------------------------------'-------,---- -7�d- - -�— --- --Q----Tm d ',� ________—____N_______o■_____.__;_m______-■----■----■-__________________---------------_-;_-----------------` n___�_ qa _--_ _ AA•� �---------- ¢_ �a'•�N-- ___________ ---------- N_�� —da �v m_ :•—N■ ___>______m'd O ❑-- �m 7f••_ -_---_-_-_-_-_l■_i �dda 9 --------- - C ZF m■ O a O1 A m g. -------------------- ----^ �__ -� d_N--p'•------------------- •____D_O_-p-" Npd� �d •• -od .-�• -"----dd--�_I---�- � . Uri aga N' --- ' ----!---------------- ------------ --o-. --- -m,AG-� ----------------,..... o O p O p D w w 25 D D D l� y D yy y y y D W - N N N N N N N O N d m 0 0 O. O 07 m A 0 N C O N H O O O 0 0 0 0 0 0 0 O O O + N N - O m m v N O O T d• T "000 '� m O y o 0.. 01 _ o m N ICI 0 A D m 2 g W. d O• - O O J J J O O N NO 1. L L Sc L 1. c o 3 ♦ J V V V J V N v N� N `G � 3 O y o I c > > r V V N V V a J� N O O O O O O O O O O O I O O O 0 0 0 0 0 0 0 N O M m o W n C1 ' O CD ID o _ m A Q o D A D K O 0 ---------------------------------------- 5. 0 0 m r rn m ��-- m obi d d __ _� y�-- m O N' o T iK-' m n r________ q,_4_ID_, m o �'�c S. of � o c��n 3 �; - m m � • Best Construction Experience KERRY FELLERS PROJECT MANAGER I EMPLOYEE OWNER As project manager, Kerry will be responsible for the overall management of the project. Kerry's esponsibilities include budget conformance, subcontractor coordination, contract administration and construction operations oversight including safety and quality assurance. MEACHAM AIRPORT FIELD MAINTENANCE FACILITY Fort Worth, TX 1 $5,500,000 11,500 SF New field maintenance facility adjacent to the existing one on a 0.32-acre site that will provide office space and storage for personnel, equipment and materials with a focus on furniture, fixtures and equipment (FF&E) PARMER AND MOPAC H-E-B Austin, TX I Confidential 173,000 SF Phased, complete interior remodel of an active and operational grocery store, including new pharmacy, bakery and curbside departments and new elevator TEXAS STATE UNIVERSITY BRUCE AND GLORIA INGRAM HALL San Marcos, TX 1 $90,403,710 1166,851 SF New six -level, 166,851 SF science and engineering building, including spaces for administrative office, research and teaching labs, maker space, classrooms and common areas; and an extension of the campus utilities to serve the new facility CEDAR HILL STATE PARK CAMP LOOP REPAIRS Cedar Hill, TX 1$20,185,097 Renovations of 160 Camp Sites and construction of four new restroom and shower buildings AUSTIN COMMUNITY COLLEGE HIGHLAND SOUTH PARKING GARAGE Austin, TX 1 $52,858,073 1812,000 SF New seven -level, 2,385-space cast -in -place parking garage with five portal gates, four elevators in two towers, six sets of cast -in -place concrete stairs and a below - grade 1,000,000-gallon rainwater and condensate harvesting cistern that provides irrigation for this area of campus ALTERMAN DALLAS RENOVATION Lewisville, TX 1 $9,721,000 144,600 SF Renovation of existing tilt wall building, including 25,400 SF office space and 19,200 SF warehouse space, and new storage/parking area YEARS OF EXPERIENCE 9 years in the Industry 8 years with SpawGlass EDUCATION / TRAINING B.S. Construction Science and Management, Texas State University OSHA 30-Hour First Aid/CPR/AED SpawGlass LANCE MULLENS SUPERINTENDENT I EMPLOYEE OWNER As superintendent, Lance will be responsible for safety, organization and mobilization of field operations, continuing project planning, documentation of daily activities, inspection of work for quality conformance and ensuring activities align with the project schedule MEACHAM AIRPORT FIELD MAINTENANCE FACILITY Fort Worth, TX 1 $5,500,000 11,500 SF New field maintenance facility adjacent to the existing one on a 0.32-acre site that will provide office space and storage for personnel, equipment and materials with a focus on furniture, fixtures and equipment (FF&E) CORPUS CHRISTI STATE SUPPORTED LIVING CENTER REPAIRS, ROOFING AND MEP- HVAC UPGRADES Corpus Christi, TX 1 $6,806,847 10 SF Renovation of building systems, materials and equipment to meet code requirements CONFIDENTIAL CLIENT CEMENT TERMINAL STORAGE EXPANSION Corpus Christi, TX I Confidential Construction of a tilt -wall warehouse building with MEP scopes, overhead doors, canopies and interior finishes; exterior scope of work includes a 19,000 square -foot parking lot addition, new utilities and fencing BEEVILLE ISO A.C. JONES HIGH SCHOOL AUDITORIUM RENOVATION Beeville, TX 1 $3,003,150 111,380 SF The ACJ Auditorium Renovation includes upgrades to seating, lighting, finishes, acoustics and audiovisual systems, along with improvements to mechanical, electrical and accessibility features FROST LAKE ARLINGTON FINANCIAL CENTER Arlington, TX I $Confidential New 4,000 GSF Frost Financial Center. Demolition of existing Frost building. Storefront & stucco exterior with drywall & storefront interior YEARS OF EXPERIENCE 7 years in the Industry 3 years with SpawGlass EDUCATION / TRAINING A.S. Construction Management, Amarillo College First Aid/CPR/AED OSHA 10-Hour OSHA 30-Hour SpawGlass KAIDEN HAMMOND PROJECT SAFETY ASSISTANT I EMPLOYEE OWNER As project safety assistant, Kaiden will direct and implement SpawGlass' safety program to provide a safe, healthy and accident -free work environment. He will be responsible for conducting jobsite training and orientations; risk assessments; safety inspections; incident reporting; and safety reporting and documentation. MEACHAM AIRPORT FIELD MAINTENANCE FACILITY Fort Worth, TX 1 $5,500,000 11,500 SF New field maintenance facility adjacent to the existing one on a 0.32-acre site that will provide office space and storage for personnel, equipment and materials with a focus on furniture, fixtures and equipment (FF&E) THE UNIVERSITY OF TEXAS AT DALLAS STUDENT SUCCESS CENTER + STUDENT UNION Richardson, TX 1 $246,338,007 1380,000 SF The five -level building includes classrooms, student union, a 400-seat lecture hall, Office of Undergraduate Education, Honors College, Education Abroad Office, Office of Graduate Education, Center for Teaching and Learning, Instructional Technology, administration and support space GREGG COUNTY PARKING FACILITY Longview, TX 1 $23,822,748 1117,735 SF Construction of a 293-space multi -level cast -in -place parking facility with office space; structure is partially enclosed with pre -cast panels to blend in with surrounding downtown buildings ALTERMAN DALLAS RENOVATION Lewisville, TX 1$9,721,000144,600 SF Renovation of existing tilt wall building, including 25,400 SF office space and 19,200 SF warehouse space, and new storage/parking area YEARS OF EXPERIENCE 5 years in the Industry 2 years with SpawGlass EDUCATION / TRAINING B.S. Safety and Health Management, Central Washington University Confined Space Entry Fall Protection First Aid/CPR/AED OSHA 30-Hour OSHA 510 Course Trenching and Excavation Cranes and Derricks Safety 1 Safe Scaffold Erection and Inspection UF_awGlass 1, n SITE LOGISTICS SpawGlass w If If 0 0 m Ck) N Y� a P ME zi 7A hm V ---IF-r--v 17, cN 11 SpawGlass Contractors, Inc. 3000 W. Loop 820 S. Fort Worth, TX 76116 817-288-0890 www.SpawGlass.com Connect with us today! 112 O-C; In Signature: Email: allison.tidwell@fortworthtexas.gov FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: SpawGlass Subject of the Agreement: Amendment #3 - Construction of Meacham Maintenance Facility and Associated Site work M&C Approved by the Council? * Yes ❑ No 0 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ CSC 64158 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No ❑ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. CPN 105655 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑ No ❑✓ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.