Loading...
HomeMy WebLinkAboutContract 44689-CO1 u CiTYSECRETARY FORT WORTH,,,,,. City of Fort Worth ir Change Order Request Breakdown Project Nlamel HMA,C Surface Overlay 2013-06 City Sec# 44689 Client Project#s 021 2 (CAE 7059) Change Order Submittal# bate 1/24/2014 Dept. T/PW Water Sewer Contract Time Totals Original Contract Amount $114221004.00 $0.00 $0.00 $1'1 2 1004.00 Extras to Date $10,0 Credits to Data Pending Change Orders(in M&C Process), Contract Cost to data 1 41 $ , $10422,004.00 Amount of'Proposed Charge rd'ar $ . $ � � � 0�. 1 1 will 1 Revised Contract Amount `$1'1422104:01 $0.:0 0� $1,422,004.01 140 Original funds Available for Change Orders $0.00 40 Q R raininndsailakl for this CO v Additional Funding fit necessary) .0 0.+ 1 CHANGE ORDERS to,DATE(INCLUDING THIS ONE)AS F ORIGI ArL CONTRACT ,,;�. MAC"A LL I "AB'LE CONTRA T AM U T(ORIGINAL C RA T COST+25%) u c ire i r h i This Change Order is necessary ua t o the ad�ditilcn of College Ave, to the contract at the Water Dept.'s request. The limits of College Ave. is from W. Biddison to W. Qic sang.An additional 60 calen dar days will be req,uirad for the additional work, w W �oORr 00 fl ,w W Ka Mary J. Se �o , 00 OFFICIAL RECORD C111TY SICRIZARY "'ItT",T 'X M L I 83J 03AI3338 Fo R T WO XT H City of Fort,Worth Change Order Additions Project Name Surface Overlay 2 13-06 City Sec# 44689 Client Project 4 L 012126 (DOE 70159) Change Order SUbmittal# Date 1/24/201 ADOITIONS nit Cost 77 -- U Mal ITEM! DEMPTIoN nEP'T Q� 1 REPME 7 RrP[ACr S11577K(College Ave.), $11,983. 19 NEW*`00—N CRETE&DEWALK ollege Ave,) T/PW 7,336. 8,F $4.46— $32,719.5; 20! REMOM REPLACE CONCRETE"CURB AND GUTTER(College Ave.) T/PW 3�3368,010 LF $21,40 $72,07510 11 C, I 1 11 211, NEW 7, ON CRETE CURE AND GUTTER(College Ave.) —TFpW 0.'00 LE $210.85 Won 22 6:REMOVE/REPLACE C5NCRETE DRIVEWTY(College Ave.) T/PW 4,69 .00 8F' $7,70 $36,1517 23 REMOVE/REPLACE—EXISTING RAMPS WITH STANDARD ADA RAMPS(Col T/PW 10A--EA $1,150,0 00-00 24 REM NE/REPLACE CO BETE VALLEY GUTTER(College Ave,) T/PW 154.00 Sy $99.79 $77, 7717 2�5 UNC LAS SSIFIED EXCA-VA-M—N(College T/PW­ 40070 CY $25M $10,000.00 26 8"PAVEMENT PULVERIZATIO lege Ave.) T7PlW 4,959DE Sy $5.16 $25, VW 27 CEMENT MODIFICATION 13LBS�SISY(College Ave,) T/PW 33.00 TN $1001 $3,3007 28 ROAD1961ND,EN 1,SOIL STABILIZER i( allege Ave. TIP'S' 401-00 GAL $110..00 $4,-400.00 29 2"ASP ALT PAVEMENT11TYPE D(College Ave.) T7P,W 4,95i9,00 SY $12.35 $61, 41-7 30 PAINTIN6 HOU —ADDRESSES(College Ave.) T/PW 104.00 EA�� $I HO— $1,0411701 31—BL OCR SOD PLATEMENT(,College Ave.) T7PW 1,3 fWO S Y $5.00 $6,550.00 32 WATER VALVE BOX AMOSTMENT W/CONCRETE COLLARS-CCollegile Ave.) T/P`W 5.00' ET $250ZO $1'z3uuui 33 MANHOLE ADJUSTMENTS W CONCRETE COLLARS(Coilleg,e Ave,) —.DPW 5,00 ET 400. ,000.001 34 Remove-Replace Existing Conc,Curb end iNfter(Helen St) /PW 27`6.00 F $29A2 $8,0K50 35 2"H M�IAC PAVE NT TYPE 7(H—ULE N ST) ITIPW 4,000.0-0 1——8-y— 10.9 $43, 00,001 ........... ..... T/PW $341,72._35J Water $0.00 Sewer $0.00 Slub Total Adiditions $341,71935 Change Order Additions Page 1 of 1 R)jp,Wowui-il, City of Fort Worth Change Order Deletions Project Name HMAC Surface Overlay 2013-06 City Sec# Client Project 1 1 (DOE 7059) ........... Change Order Submiftal,# Date 112412014�J -DELETIONS ITE-M r7PT nr n;t7o7tlllllllllll" -TJ6 t a I 11 REM77rTn7R1PLTCEInTURrIR17T Upw $650 --$2 400.001 113 UNCLASSIFIETURPEET EZAVA-riow T/PW 50.00 Cy '$2 $1,250.W "tJ rasa t 25,0 14 HMAC PAVEMENTIEVEE-up 3 5 770-0— TN 1 20.00 $4,200.00 9 7"CONCRETE PAVEME�RF- ---'T/P V Ram SY $6616.00 $ 9,60001 2 REMOVE CONCRETE PAVIMMENT ITIPW 2:500.0 SY U.80 $22,000.001 3 BUTT JOINT-VIELING(MRICRTTE) 5.00-' EA $275,00 $1,375.1 00 4 3"ASPHALT PAVEMENT TYPE D T/PW I 51,000.0 Sy X2.36 $12 0000 7 CONCRETE PAVEMENT—WEE5—GE-MIL INN T/PW 6,999.91 SY 3.15 ,699,721 8 CONCRETE MEMENT 11 1= WMILLIN6- T/'PW 1,000,010 Sly $�5.50,'— $50500,.00 9—­­;�GONCR TEPAVEMENT T/PW 144651,07 SY $66.00 sgm. .bz Iw ........... .......... T/PW $341,71 9.34 Water $0.00 Sewer $0,00 Sub Total DeI5Fo—nsI 341,71 34 Change Girder Deletions Page I of 1 J Breakdown or this Change Order —moiuht,f M/SB�`S-Ub b �� mmmmm"a UNION NI Iv Total e y „r Nn Previous C g:e Orders WIN co DATE AMWNT, Totalz 01 CF W Change Order Approval St-COAppOl Page I of 3 Routin Assigned To Due Date: Assigned By: Due Time-, Link for tworth goy/I,nfrastructure ProjectsZ02126 MAC Surface averts y (2013-6)Z Contractor/Chen ge Order,sZCh.an-qe Order Breakdown #1, DOE 7059 TPW.xIs Attachments(0) No Attachments hiavel been added to this form. https,-//pirojectpoint.buzzsaw.co,m./.—bz—web/1"1"orms/FormPrint.aspx.?Sete ld-515 Pro ceps ld=200&Active..,. 2/17/2014 CF W OChange Order Approval St-COAppO I Page 2 of 3 10 F W.0-%L ft­ft-PV-J1r T City of Fort Worth oKT ORI no 01ft.0 W-01 Change urder Re ues,t A-ft roval 4 V (Change Order Breakdown, Available "in Links) For Change Order Submittal No.: I Change Order No.: St-COApp01 Date Started: 20,14-02-12 City Sec. No.: 44689 Date Due.- 2014-04-03 Project Name: HMAC Surface Overlay (2013-6) 02126 DOE Numbers: Project Numbers: DOE I\J;lo:. 7059 Project Removal and replacement of nonfunct3'-oning curb & gut,tern, Description: drive and limited sddewalk; pavement base repairs, pulverization and stabilization of' the existing pavement and an overlay of 21, -virgin H surface course. Project Manager: Kristian Bu rim City Inspector.- Ali Miotamed Contractor: Advanced Paving Acquisition, Ltd. 0 COUNCIL ACTION If Required),* M&C Log Name: M&C Number: MI&C Date,-, CIOST' AND DAYS SUMMARY, Requested Department: Cost($) Fund Account "enter.- Days: TPW $ 0.00 C2913 541200 203620212683 60 Total Cost,,. $ 01-00 Total Requested Days:, 60 Approval Status: �ttps://projeetpoint.buzz,saw.coi-n/—bz—web/Foirms/For,mPrint.aspx?,Siteld=,51 500&Process 1d=200&Acti've... 2/17/2014 UPS Change Order Approval St-COA Ip A p p rove d: Yes User: Tara Fishback Cate: 2014- 2-12 3:02 P ' Approved': Yes Comments: User: Eric Anderson Date: 2014-02-1,2 3:52 P I Approved: Yes Comments: User: Kristian Sugr,im Date: 2014-02-13 9:51 AMI Approved ed: Yes Comments: User: Najib Fares Date., 2014-02-13 1 3 AM, Approved: Yes Comments: !User: Andy Anderson Cate: 20142-1 1:21 P Approved: Yes Comments: User: Doug iersi Date: 20114-02-1 4 2:54 PM Approved: Yes Comments: User: Doug Black. Date: 2014-02--14 4:15 P Approved: Yes Comments: User: Fernando Costa Cate: 2014021 10:20 P Action Required: ittps / rp eetpolint. uzzsaw.co n/ z wed/Forms/FormPri t.aspx Slte1d 5 5OO&Pr cess .=2 Act ve. . 2/17/20,14