Loading...
HomeMy WebLinkAbout059647-A2 - Construction-Related - Contract - Lockwood, Andrews & Newnam, Inc.CSC No. 59647-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 59647 WHEREAS, the City of Fort Worth (CITY) and Lockwood, Andrews & Newnam, Inc., (ENGINEER) made and entered into City Secretary Contract No. 59647, (the CONTRACT) which was authorized by M&C 23-0464 on the 13th day of June, 2023 in the amount of $ 575,208.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $42,135.00 which was administratively authorized on May 16th, 2025; and WHEREAS, the CONTRACT involves engineering services for the following project: 2022 Bond Year 3, Contract 14, CPN 104315; and WHEREAS, it has become necessary to execute Amendment Number 2 to the CONTRACT to incorporate a storm drain scope of services and fee required to address project needs identified during construction. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $29,210.00. (See Attached Funding Breakdown Sheet, Page -4-) OFFICIAL RECORD CITY SECRETARY 2. FT. WORTH, TX Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $646,553.00. City of Port Worth, Texas 2022 Bond Year 3, Contract 14 Prof Services Agreement Amendment Template CPN 104315 Revision Date: June 13, 2025 Page 1 of 4 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth I Jesica McEachern Assistant City Manager DATE: 08/15/2026 p 44p4 �n ATTEST: P o� FORT�a� Qaa��nE� 0544 Jannette Goodall City Secretary APPROVAL RECOMMENDED: ENGINEER Lockwood, Andrews & Newman, Inc. Justin C. Reeves (Jul 31, 2026 06:41:38 CDT) Justin Reeves Vice President DATE: 07/31 /2026 Lauren Prieur (Aug 6, 2026 10:25:39 CDT) Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Gustavo Vallejo (Jul 30, 2026 16:56:16 CDT) Gustavo Vallejo Graduate Engineer City of Port Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 4 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 2022 Bond Year 3, Contract 14 CPN 104315 APPROVED AS TO FORM AND LEGALITY: 4&40e- Douglas Black (Aug 7, 2026 17:01:57 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2023 Page 3 of 4 M&C No.#: N/A M&C Date: N/A 2022 Bond Year 3, Contract 14 CPN 104315 FUNDING BREAKDOWN SHEET City Secretary No. 59647 Amendment No. 2 Fund Dept ID Account Project ID CF1- Activity CF2 - Bond Reference Amount 52002 0200431 5330500 104315 002830 9999 $29,210.00 Total: $29,210.00 City of Fort Worth, Texas 2022 Bond Year 3, Contract 14 Prof Services Agreement Amendment Template CPN 104315 Revision Date: June 13, 2025 Page 4 of 4 Greg Robbins, PE City of Fort Worth March 23, 2026 Page 1 City of Fort Worth I TPW Department Attention: Greg Robbins, PE 100 Fort Worth Trail Fort Worth, Texas 76102 RE: REQUEST FOR CONTRACT ADD SERVICES & AMENDMENT 2 City of Fort Worth Project 104315 2022 Bond Year 3 Contract 14— Project Number 104315 Dear Mr. Robbins: The following amendment is submitted due to additional engineering services requested by the City of Fort Worth (CITY) on 2022 Bond Year 3 Contract 14. The additional effort rendered requires additional engineering design for the project plans. Purpose of Work This additional services request involves the design and realignment of an existing 30" RCP storm drain line at the intersection of Meadowbrook Drive and Watson Street as part of the 2022 Bond Year 3 Contract 14 — CPN 104315 project. This work is to prevent unnecessary disturbance to private property at 4925 Meadowbrook Drive, replace a deficient section of existing RCP as identified during construction, and upsize an existing undersized curb inlet. Summary of Work The requested changes to the storm drain system at the Meadowbrook Drive and Watson Street intersection involve full redesign of approximately 150 LF of existing 30" RCP storm line. The project limits are from the originally planned spot repair improvements at the edge of pavement at 4920 Meadowbrook Drive to the newly installed portion on the left-hand side of Watson Street as part of the originally planned spot repairs. LAN will design a revised alignment for the proposed storm line, including a new Type 2 curb inlet on the north side of Meadowbrook Drive, based on confirmed capacity from an inlet sizing analysis. LAN will verify that the conveyance capacity of the realigned storm system meets applicable CITY stormwater criteria, prepare (1 expected) drainage area map (DAM) sheet, (2 expected) storm drain plan and profile sheets, (1 expected) storm drain lateral sheet, and (1 expected) set of drainage computation sheets. LAN will revise (9 expected) existing plan sheets to incorporate design changes resulting from these additional services, prepare an Opinion of Probable Construction Cost (OPCC) for the additional storm improvements, and update the project manual as necessary. LAN will also provide the CITY with one preliminary plan set for review, hold one comment review meeting, submit one comment response log, and deliver one final signed and sealed plan set. Lockwood, Andrews & Newnam, Inc • 1300 Summit Avenue • Fort Worth, Texas 76102 • 817.820.0420 • Fax 817.820.0441 • www.lan-inc.com Greg Robbins, PE City of Fort Worth March 23, 2026 Page 2 Assumptions This additional services scope and fee is based on the project assumptions as listed below: • Project limits are from edge of pavement at 4920 Meadowbrook Drive to the newly installed pipe laid in Watson Street. • LAN will perform a drainage analysis referencing existing as-builts for Meadowbrook Drive. • LAN will perform an existing and proposed pipe HGL analysis and inlet sizing analysis using flow information provided from as-builts for Meadowbrook Drive. o LAN will NOT calculate new runoff values "Q", delineate new drainage basins "A", incorporate updated rainfall intensities "i", or runoff coefficients "C". • Tie-in invert elevations at the beginning and end of project limits will be determined from provided as-builts. • No additional survey or QLA subsurface investigation will be performed. • Relevant CCTV information on the existing storm drain will be provided to LAN by CITY. • As -built information for Meadowbrook Drive in the project area will be provided to LAN by CITY. • Invert elevation of newly installed RCP for project tie-in point will be provided to LAN by CITY. • CITY will review Engineered plans ONCE before LAN issues signed and sealed construction plans. • LAN will respond to ONE set of City comments before issuing signed and sealed plans. • PDF and .DWG files will be uploaded to the CITY document management system (Trimble Unity Construct) Lockwood, Andrews & Newnam, Inc • 1300 Summit Avenue • Fort Worth, Texas 76102 • 817.820.0420 • Fax 817.820.0441 • www.lan-inc.com Greg Robbins, PE City of Fort Worth March 23, 2026 Page 3 Anticipated Schedule Activity Days Date Amendment Approved (Council Date) 0 31-Mar Signed Amendment 7 7-Apr Pre -final Submittal 21 28-Apr City Review (Assumed two weeks) 14 12-May Final signed/Sealed 14 26-May Please review this as a formal request to consider and process the requested add services and Amendment 2 to City Project Number 104315 in the amount of $29,210. The following presents the project fee summary to date, including this request: Original Contract (including previous add services) $ 575,208.00 Amendment No. 1 (Previously Approved) $ 42,135.00 Amendment No. 2 (To be paid by City of Fort Worth Storm Water) $ 29,210.00 Revised Contract Amount $ 646,553.00 Should you require further documentation or additional information regarding this request, my primary contact number is 214-765-8753. Respectfully, Adam T. Giblin, PE, Project Manager CC: Gustavo Vallejo (City of Fort Worth) Attachments: LOE for TPW-Addtl-Svcs-2-Req Lockwood, Andrews & Newnam, Inc • 1300 Summit Avenue • Fort Worth, Texas 76102 • 817.820.0420 • Fax 817.820.0441 • www.lan-inc.com L. O N c,> d N C Of LO .N r d L M y c O O CL O a)c Z 0 L 0-0 LO or- -0 N (-) O d N C O O CL N C f� 0 0000�u�u� n n� n0000 0 S r r r N co N r V N CDN @ N I� M I- N N N O O M N W CO CO N J N V N ItM N is U N 0 r v3 (» f» (» <» (» (» (» e3 V» (» (» (s3 (» E» (» brs 0 0 0 r > N E Q O O O Go Q U O N 'V co V V V V V V N co V oo oo [O N � N r F 64 r W N O O O W N N N N N N c N N - T N N L a) d 69 O � O '— Q J a W O O O y a) N O Q a` '- . c cl) W �n v r r oo oo v i V N h N N N a) � !d � O C a` !d G � M ER r_ a` a) fA W O o- U H m a) o ( E `o Y (n O E o T O @ Q - J O u U � E to N o co O E m 7 Y C i al Y E X N m O n a O m 7 m N E N E V a' a N T @ y @ Eo ac a) @ N E n to C1 j O O U 45 > ,O N O vl O E > O@@ O O U E U o N O L O > y N O E @ @ F 3 U n o° N m O m > � .E @ @ a a o o O r o. �_ c E N �@ U a F ._ p@ v @@ mr O w @ O O U O N C -O "O u w E O 1= y o U C @ O L @ O ,E C CA r-J O @ @ N E c E E m E E N UJ fn fn a) c c v c N N a a a a o w a aa) � b@ Q a C� 2 d d d d aa) a K o 0 0 -aa Q Q 0 Z Y N M V Lo (O r co m O r N M V lf) N O r H E E N a O_ O O_ N 7 (n O W In W @ CU 0 F > N > @ w J � O 4) m @ O 0 C LU LL E E O o U C) Q d 104315-EPAM-2022 Bond Year 3 Contract 14 - Amendment #2 Final Audit Report 2026-08-04 Created: 2026-07-30 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAaKs64uUkio_ecMyQ7PD48Llia-vH3Q3 "104315-EPAM-2022 Bond Year 3 Contract 14 - Amendment #2 " History '21 Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-07-30 - 9:17:08 PM GMT- IP address: 204.10.90.100 Document emailed to Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) for filling 2026-07-30 - 9:48:23 PM GMT Document emailed to jreeves@Ian-inc.com for signature 2026-07-30 - 9:48:23 PM GMT Document emailed to Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) for signature 2026-07-30 - 9:48:24 PM GMT i Email viewed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) 2026-07-30 - 9:55:53 PM GMT- IP address: 208.184.124.181 Document e-signed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) Signature Date: 2026-07-30 - 9:56:16 PM GMT - Time Source: server- IP address: 208.184.124.181 - Signature Appearance Selected: DRAW -i Email viewed by jreeves@Ian-inc.com 2026-07-30 - 10:01:33 PM GMT- IP address: 104.28.97.15 Email viewed by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) 2026-07-30 - 10:06:05 PM GMT- IP address: 204.10.91.100 Form filling delegated to Ann Estes (Ann.estes@fortworthtexas.gov) by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) 2026-07-30 - 10:12:48 PM GMT- IP address: 204.10.91.100 FoRTWORTH. p atsy Adobe Acrobat Sign Document emailed to Ann Estes (Ann.estes@fortworthtexas.gov) for filling 2026-07-30 - 10:12:48 PM GMT Signerjreeves@Ian-inc.com entered name at signing as Justin C. Reeves 2026-07-31 - 11:41:36 AM GMT- IP address: 98.97.82.127 y Document e-signed by Justin C. Reeves (jreeves@Ian-inc.com) Signature Date: 2026-07-31 - 11:41:38 AM GMT - Time Source: server- IP address: 98.97.82.127 - Signature Appearance Selected: MOBILE —DRAW Email viewed by Ann Estes (Ann.estes@fortworthtexas.gov) 2026-07-31 - 12:14:27 PM GMT- IP address: 104.47.64.254 Form filled by Ann Estes (Ann.estes@fortworthtexas.gov) Form filling Date: 2026-07-31 - 12:17:02 PM GMT - Time Source: server- IP address: 204.10.90.100 - Signature Appearance Selected: TYPE 's Document emailed to Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) for filling 2026-07-31 - 12:17:03 PM GMT t i Email viewed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) 2026-08-03 - 12:21:26 PM GMT- IP address: 62.10.205.4 Form filled by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) Form filling Date: 2026-08-04 - 7:54:13 PM GMT - Time Source: server- IP address: 208.184.124.181 - Signature Appearance Selected: TYPE Document emailed to Mary Hanna (Mary. Han na@fortworthtexas.gov) for filling 2026-08-04 - 7:54:16 PM GMT Email viewed by Mary Hanna (Mary.Hanna@fortworthtexas.gov) 2026-08-04 - 7:56:49 PM GMT- IP address: 104.47.65.254 Form filled by Mary Hanna (Mary.Hanna@fortworthtexas.gov) Form filling Date: 2026-08-04 - 8:01:12 PM GMT - Time Source: server- IP address: 204.10.90.100 - Signature Appearance Selected: TYPE Document emailed to thang.sum@fortworthtexas.gov for filling 2026-08-04 - 8:01:15 PM GMT Email viewed by thang.sum@fortworthtexas.gov 2026-08-04 - 8:02:07 PM GMT- IP address: 104.47.65.254 Y Signer thang.sum@fortworthtexas.gov entered name at signing as Thang Sum 2026-08-04 - 8:03:45 PM GMT- IP address: 204.10.90.100 Form filled by Thang Sum (thang.sum@fortworthtexas.gov) Form filling Date: 2026-08-04 - 8:03:47 PM GMT - Time Source: server- IP address: 204.10.90.100 - Signature Appearance Selected: TYPE FoRTWORTH. p Eby Adobe Acrobat Sign Document emailed to Anthony Sholola (Anthony.Sholola@fortworthtexas.gov) for filling 2026-08-04 - 8:03:50 PM GMT Document canceled by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-08-04 - 8:04:44 PM GMT- IP address: 204.10.90.100 FoRTWORTH. p 'dby Adobe Acrobat Sign FORTWORTH., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2022 Bond Year 3 Contract 14 — Amendment #2 M&C: CPN: 104315 CSO: 59647 DOC#: Date: 7/30/2026 To: Name Department Initials Date Out 1. Filogonio Munoz TPW - initial A Jul 31, 2026 2. Justin Reeves Consultant - signature ' ' Jul 31, 2026 3. Gustavo Vallejo TPW - signature cow„eD Jul 30, 2026 4. Greg Robbins TPW - signature 3c,lk Aug 4, 2026 5. Mary Hanna TPW - signature N// Aug 4, 2026 6. Patricia Wadsack TPW - signature pLVY 08/06/2026 7. Lauren Prieur TPW - signature xxp Lauren Pneur 08/06/2026 g, Doug Black Legal - signature you lo=6hcY 08/07/2026 9. Jesica McEachern CMO -signature 08/15/2026 10. Jannette Goodall CSO - signature "` 08/17/2026 11. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: [—]YES ®No ROUTING TO CSO: ®YES ❑No Action Required:. ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContractsgFortWorthTexas.gov at ext. 7233 for pick up when completed. Thank you! FORT WORTHo City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Lockwood, Andrews & Newnam, Inc. Subject of the Agreement: Amendment No. 2 to CSC No. 59647, an Engineering Services Agreement for 2022 Bond Year 3, Contract 14 Project M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 59647-A2 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No IN *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104315 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.