FORT WORTH City of Fort Worth CSC No. 63170-COl
Change Order Request
Project Name 105907 - FY25 Guardrails and ERB City Sec # 1 63170
Client Project #(s) Various - On -Call Contract
Project) TPW Transportation Management Contract for Repair of Damaged Guardrails and End -of -Road Barricades
Contractor VannlElli, Inc. Change Order# 1 1 Date 7/1012026
City Project Mgr. Clint Hoover City Inspector) Manuel Torres
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Contract Time
TPW Totals I fCD)
$0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%
0.00%
$750,000.00
365
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 1 will only add additional pay items and not increase funding. These items are necessary for guardrail and end -of -road barricades.
Unit Prices were compared against TxDOT specification 540 Metal Beam Guard Fence bid tabs for statewide TxDOT maintenance projects and were determined to be fair
and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name
Contractor Name
C-Co—MW Signature
Date
VannlElli, Inc.
Bonnie Davis �'�ft-
//
n� l Ck' k,�/
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Manuel Torres
Clint Hoover
Pro ram Manager
Date
Senior Capital Project Officer
Date
Clint Hoover C
Rajnish Gupta -a;
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Alartir. A. PIu:CC4.v
Martin Phillips MahnA Phillips (Aug 10 202pi3461]G1T)
Lauren Pneur �`
Assistant City Attorney
Date
JAssistant City Manager
Date
Doug Black aarc
Jessica McEachern a t- _
08/16/2026
Council Action if required)
FogTaa
a = °�yddee
G~° °gyp
Jannette Goodall, City Secretary °0oda ona$aa4d
M&C Number 1
M&C Date Approved 7-1
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 1
CPN 105907
FOeT�WWORTH City of Fort Worth
Change Order Additions
Project Name 105907 - FY25 Guardrails and ERB City Sec # 63170
Client Project # Various - On -Call Contract
Contractor Vann/Ell!, Inc. PMI Clint Hoover Inspector Manuel Torres
Change Order Submittal # 0 Date 7I10I2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
82
MISCELLANEOUS UTILITY ADJUSTMENTS
TPW
LS
$ 30,000.00
$30,000.00
83
REMOVE AND REPLACE METAL BEAM GUARD FENCE TRANSITION THRIE BEAM
TPW
1
LF
$ 290.00
290.00
84
REMOVE AND REPLACE DEAD END BARRICADE FLAT RAIL
TPW
LF
$ 60.00
60.00
85
REMOVE AND REPLACE DEAD END BARRICADE GROUND MOUNTED SUPPORT
TPW
1
EA
$ 100.00
100.00
86
GUARD FENCE REPAIR
TPW
1
LF
$ 42.00
42.00
87
REPAIR CRASH CUSHION ATTENUATOR
TPW
1
LS
$ 70,000.00
70,000.00
88
CONSTRUCTION ALLOWANCE
TPW
1
LS
$ 50,000.00
$50,000.00
89
REMOVE AND REPLACE FLARED END WINGS
TPW
1
EA
$ 200.00
$200.00
90
REMOVE AND REPLACE MBGF LONG SPAN SYSTEM
TPW
i
EA
$ 2,500.00
$2,500.00
91
REMOVE AND REPLACE ERB-OBJECT MRKS OM4-1
TPW
1
EA
$ 65.00
65.00
92
REMOVE AND REPLACE ERB-OBJECT MRKS OM4-3
TPW
1
EA
$ 83.25
$83.25
93
RAIL HANDRAIL PR11
TPW
1
LF
$ 720.00
$720.00
94
RAIL HANDRAIL TY PR2
TPW
1
LF
$ 720.00
$720.00
95
RAIL HANDRAIL TY PR22
TPW
1
LF
$ 720.00
720.00
96
RAIL HANDRAIL TY PR3
TPW
1
LF
$ 850.00
$850.00
HANDRAIL MISCELLANEOUS
TPW
1
LF
$ 1,200.00
1,200.00
GUARDRAIL END TREATMENT INSTALLED TxDot 544-7001
TPW
1
EA
$ 5,419.00
$5,419.00
GUARDRAIL END TREATMENT REMOVED TxDot 544-7003
TPW
1
EA
$ 300.00
300.00
K17RAIL
INSTALL DELIN ASSM D-SW SZ1 BRF GF1 TxDot 658-7015
TPW
1
EA
$ 25.00
25.00
INSTALL DELIN ASSM D-S SZi BRF GFi BI xDot658-7016
TPW
1
EA
$ 25.00
25.00
INSTALL DELIN ASSM D-SY SZ1 BRF GFt BI TxDot 658-7034
TPW
1
EA
$ 25.00
INSTALL DELIN ASSM D-SY SZt BRF GFt BI TxDot658-7036
TPW
1
EA
$ 25.00
25.00
INSTALL DELIN ASSM D-SW SZ1 BRF GF2 TxDot 658-7018
TPW
1
EA
$ 89.00
$89.00
105
INSTALL DELIN ASSM D-S SZi BRF GF2 BI xDot 658-7019
TPW
1
EA
$ 89.00
$89.00
106
INSTALL DELIN ASSM D-SY SZt BRF GF2 TxDot 658-7036
TPW
1
EA
$ 89.00
$89.00
107
INSTALL DELIN ASSM D-S SZ1 BRF GF2 BI TxDot 658-7037
TPW
1
EA
$ 89.00
89.00
108
REMOVE AND REPLACE TRACC N
TPW
i
EA
$ 71,000.00
$71,000.00
109
REMOVE AND REPLACE CRASH CUSH ATTEN R N L2
TPW
1
EA
$ 69,500.00
69,500.00
110
REMOVE AND REPLACE CRASH CUSH ATTEN L N TL2
TPW
1
EA
$ 69,500.00
$69,500.00
ill
REMOVE AND REPLACE CRASH CUSH ATTEN R N TL3
TPW
1
EA
$ 71,000.00
$71,000.05
112
REMOVE AND REPLACE CRASH CUSH ATTEN R N TL3
TPW
1
EA
$ 71,000.00
$71,000.00
113
IREMOVE CRASH CUSHION ATTEN
TPW
1
EA
$ 50,000,00
50,000.00
114
REMOVE POST & CABLE FENCE
TPW
1
EA
$ 10.00
$10.00
115
REMOVE AND REPLACE POST & CABLE POST
TPW
1
EA
$ 150.00
150.00
116
REMOVE AND REPLACE POST & CABLE ANCHOR
TPW
1
EA
$ 1,750.00
$1,750.00
117
REMOVE AND REPLACE POST & CABLE CABLE
TPW
1
EA
$ 15.00
P5.00
118
POST & CABLE DELINEATOR REFLECTOR INSTALL
TPW
1
EA
$ 50.00
$50.00
119
CFW STREET USE PERMIT
TPW
1
EA
$ 112.50
$112.50
120
TRAFFIC CONTROL DAILY
TPW
i
EA
$ 2,400.00
$2,400.00
TPW
$0.00
Sub Total Additions
somoll
Page 2 of 4
CPN 105907
FORT WORTH City of Fort Worth
— — Change Order Deletions
Project Name 105907 - FY25 Guardrails and ERB City Sec # 63170
Client Project # Various - On -Call Contract
Contractor Vann/Elli. Inc. PM Clint Hoover nspector Manuel Torres
Change Order Submittal # F-I --- 1 Date 7/10/2026
Page 3 of 4
CPN 105907
MISBE for this Change Order
Previous Change Orders
CO # DATE AMOUNT
Total $0.00
Page 4 of 4
FORT WORTH,
Routing and Transmittal Slip
Transportation & Public Works
DOCUMENT TITLE: FY25 Guardrails and ERB — Contract 63170
(Change Order 1)(Various Locations)
For: Vann/Elli, Inc. 1st Change Order
M&C:
CPN: 105907 CSO: 63170 DOC#:
Date: 7/10/26
To:
Name
Department
Initials
Date Out
1.
Manuel Torres
TPW - Signature
OIL -
I
Clint Hoover
TPW - Signature
C
2.
Anna Benavides
TPW — Initial
B
3.
Rajnish Gupta
TPW - Signature
4.
Martin Phillips
TPW — Signature
Pp
5.
Lauren Prieur
TPW - Signature
11!5, ,1
6.
Doug Black
Legal — Signatures
7.
Jesica McEachern
CMO - Signature
8.
Katherine Cenicola
CSO - Approver
Kc
9.
Jannette Goodall
CSO - Signature
10.
Allison Tidwell
CSO - Initial
12.
Tabitha Giddings
TPW - Initial
13.
Packyen Wilson
CC:TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ❑No
ROUTING TO CSO
SAME DAY: ❑YES ❑No
®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ❑No
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsgFortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!
CSC 63170-COI
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Vann/Elli, Inc.
Subject of the Agreement: 105907 - FY25 Guardrails and ERB - Contract 63170
1st Change Order
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ CSC 63170-COl
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 105907
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.