HomeMy WebLinkAbout063798-A1 - Construction-Related - Contract - UES Professional Solutions 44, LLCCSC No. 63798-Al
AMENDMENT No. 1
TO CITY SECRETARY CONTRACT No. 63798
WHEREAS, the City of Fort Worth (CITY) and UES Professional Solutions
44, LLC, (ENGINEER) made and entered into City Secretary Contract No. 63798,
(the CONTRACT) which was administratively authorized on the 7th day of
August, 2025 in the amount of $56,790.00; and
WHEREAS, the CONTRACT involves architectural services for the
following project:
Far Northwest Library, CPN 103980; and
WHEREAS, it has become necessary to execute Amendment No. one to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ARCHITECT, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
Architectural Services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Architect totals $8,029.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Architect for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $64,819.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas.
Prof Services. Agreement Amendment Template
Revision Date: 12/08/2023
Page 1 of 3
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX Far NW library
[1039801
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Valerie Washington (Aug 21, 2026 17:33:44 CDT)
Valerie Washington
Assistant City Manager
DATE: 08/21 /2026
�yovuan�n
FFOAT .
ATTEST: pis=o
ilA,r�Gaizccitt� � a$°°�� a54 °'
Jannette Goodall
City Secretary
APPROVED AS TO FORM AND LEGALITY:
Stephen Hines (Aug 21, 2026 14:59:50 CDT)
Stephen M. Hines
Sr. Assistant City Attorney
Contract Compliance Manager:
Engineering Firm
UES Professional Solutions 44, LLC
84iaiU l i&r
Balaii lyerTAua i . 2026 13749740 CDT)
Balaji B. Iyer, P.E.
Senior VP Construction Material Testing
DATE: 08/19/2026
APPROVAL RECOMMENDED:
Marilyn Marvin
Director Property Management
M&C No.#: NA
M&C Date: NA
By signing, I acknowledge that I am the person
monitoring and administration of this contract,
performance and reporting requirements.
S-2-
Nikita N. Watts
Senior Capital Projects Officer
City of Fort Worth, Texas.
Prof Services. Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 3
responsible for the
including ensuring all
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Far NW Library
[1039801
FUNDING BREAKDOWN SHEET
City Secretary No. 63798
Amendment No. 1
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 - Bond
Reference
Amount
34027
0840455
5330102
103980
008480
22030199
56,790.00
34027
0840455
5330102
103980
008480
22030199
8,029.00
Total:
$64,819
City of Fort Worth, Texas Li1-.-a-y
Prof Services Agreement Amendment Template 1039801
Revision Date: 12/08/2023
Page 3 of 3
VIIA U E S
Nicholas George
City of Fort Worth Architectural Department - Fort Worth
401 West 13th Street
Fort Worth, Texas,76102
Re: UES Proposal No. 114764
Construction Materials Testing
Far Northwest Library
Fort Worth, Texas
Dear Nicholas Georqe:
Environmental
Geotechnical Engineering
Materials Testing
Field Inspections Code Compliance
Geophysical Technologies
June 22, 2026
This Change Order Serves as an amendment to the original agreement between City of Fort Worth Architectural
Department - Fort Worth and UES Professional Solutions 44, LLC (UES), dated 08/14/2025, for Far Northwest
Library / Project Number: F253485.
We are submitting the following Change Order for the performance of additional services on the project referenced
above. This Change Order consists of work not originally included in the original scope of services. These additional
services are listed below.
Except as specifically modified by this Change Order, all terms, conditions, scope limitations, rates, and provisions
of the original agreement shall remain in full force and effect. The additional or revised services described herein
will be performed in accordance with the original agreement and this Change Order upon written authorization by
the Client.
Respectfully submitted,
UES
Kshitij KC
Senior CMT Estimator
Balaji B. lyer, P.E.
Sr. VP Construction Material Testing
5058 Brush Creek • Fort Worth, TX 76119 - ph 817-496-5600 • fax 817-496-5608
TeamUES.com
UES Proposal No. 114764
June 22, 2026 UES
Construction Materials Engineering and Testing
Basic Services and Cost Estimate
Project Name: Far Northwest Library; Fort Worth, Texas
Estimated
Unit
Estimated
DESCRIPTION
Quantity
Rate
Total
EARTHWORK
Density Testing /Hour
31.00
$49.00
$1,519.00
Nuclear Density Gauge/Trip
7.00
$120.00
$840.00
Vehicle Trip Charge/Trip
7.00
$75.00
$525.00
Project Management and Report Review/Hour
5.00
$95.00
$475.00
MECHANICAL LIME STABILIZATION
Density Testing /Hour
3.00
$49.00
$147.00
Nuclear Density Gauge/Trip
1.00
$120.00
$120.00
Lime Depth Checks/Hour
1.00
$55.00
$55.00
Field Gradations/Hour
1.00
$49.00
$49.00
Vehicle Trip Charge/Trip
1.00
$75.00
$75.00
Project Management and Report Review/Hour
1.00
$95.00
$95.00
CONCRETE TESTING
Prepour Monitoring/Hour
4.00
$49.00
$196.00
Concrete-Testing/Hour
31.00
$49.00
$1,519.00
Concrete Comp. Test/Each
35.00
$25.00
$875.00
Cylinder Pickup/Hour
6.00
$49.00
$294.00
Vehicle Trip Charge/Trip
9.00
$75.00
$675.00
Project Management and Report Review/Hour
6.00
$95.00
$570.00
ORIGINAL CONTRACT VALUE $56,790.00
PRIOR CHANGES N/A
CONTACT VALUE PRIOR TO THIS CHANGE ORDER $56,790.00
CURRENT CHANGE $8,029.00
REVISED CONTRACT VALUE $64,819.00
CHANGE ORDER ACCEPTED BY:
Signature:
Title:
Date Accepted:
Telephone:_
(printed name)
5058 Brush Creek • Fort Worth, TX 76119 - ph 817-496-5600 • fax 817-496-5608
TeamUES.com 2
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: UES Professional Solutions 44, LLC
Subject of the Agreement:
Amendment to the contract to increase the budget amount by $8,029.00 over the
original agreement in order to complete the materials testing needed to finish the project. This increase would bring the total
contract amount to "not to exceed" $64,819.00.
M&C Approved by the Council? * Yes ❑ No
If so, the MSC must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 9 No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ❑ No 8
If unsure, see back page for permanent contract listing.
CSC 63798
Is this entire contract Confidential? *Yes ❑ No 9 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date: 12-18-26
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No R
*If so, please ensure it is attached to the approving MSC or attached to the contract.
Project Number: If applicable. 103980
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the following order:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.