HomeMy WebLinkAbout064597-CO1 - Construction-Related - Contract - Peachtree Construction, Ltd.CSC No. 64597-COl
FORT WORTH,.. City of Fort Worth
_ Change Order Request
Project Name 2026 Asphalt Resurfacing Contract 3 City Sec # 64597
Client Project #(s)l 106175
Project Description Pavement rehabilitation, select curb & gutter, ADA ramp, and sidewalk replacement in the Handley NA
Contractor Peachtree Construction, Ltd. Change Order # 1 Date 8/14/2026
City Project Mgr. I Tariqul Islam City Inspector Kevin Jackson
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
TPW
Totals
v CD
$2,998,544.50
$2,998,544.50
180
$2,998,544.50
$2,998,544.50
180
Amount of Proposed Change Order
$677,183.40
$677,183.40
60
Revised Contract Amount $3,675,727.90
Original Funds Available for Change Orders $149,927.00
Remaining Funds Available for this CO $149,927.00
Additional Funding (if necessary) $527,256.40
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$3,675,727.90
240
$149,927.00
$149,927.00
$527,256.40
22.58%
$3,748,180.63
JUSTIFICATION (REASONS) FOR CHANGE ORDE
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and materials as outlined in proposed Change Order #1. This
change order will increase the bid items quantities for flatwork (curb and gutter, driveways, sidewalks, and valley gutters) and full -depth reclamation with 3" asphalt and decrease
bid item quantities for 2" mill and overlay. During construction, a reassessment of existing street conditions revealed that Acapulco Road from Hitson Lane to Pafino Road
exhibited extensive pavement cracking and underlying base failure, making the planned mill and overlay treatment unsuitable. As a result, staff determined that this segment
requires full -depth rehabilitation and recommends revising the project scope accordingly. In addition, field evaluations during construction identified several locations where
existing curb and gutter, driveways, sidewalks, and valley gutters either have inadequate slopes that prevent proper drainage or have deteriorated beyond acceptable condition.
This change order will address these issues by increasing the quantities for replacement of concrete curb and gutter, driveways, sidewalks, and valley gutters. These
modifications are necessary to address unforeseen field conditions encountered during construction and to ensure the completed improvements provide a durable, functional,
and maintainable roadway.
Time: Staff supports the contractor's request for an additional Sixty (60) calendar days to complete the additional work and route the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order, The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
OnFetor Nam
Peachtree Construction, Ltd, Sam Braack
„�„ jai 6raack (Aug 14, 202614 30 18 CDT)
e
08/14/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
08/14/2026
'Mrr
08/14/2026
Program Manager
Date
Senior Capital Project Officer
Date
s.N"A"
08/14/2026
— f-o—
08/14/2026
Assistant Director De t
Date
Director, Contracting Department (Dept)
Date
n �,; 1:�1. 2026 16.59.47 CDT)
08/14/2026
%P 7
08/17/2026
Assistant City Attorney
Date
Assistant City Manager
Date
4Cts-
08/19/2026
08/26/2026
Mill Council Action if required)
ATTEST:
— r.—
Jannette Goodall, City Secretary
M&C Number 26-0746
oovvna
��9dC
P� 0�10
vvo �=d
Pia *0000 000 *��
dads n°E°,x^op°g4oa
M&C Date Approved 811112026
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH City of Fort Worth
v---- Change Order Additions
Project Name 1 2026 Asphalt Resurfacing Contract 3 City Sec # 64597
Client Project# 1 106175
Contractorl Peachtree Construction, Ltd. PM1 Tariqul Islam Inspector Kevin Jackson
Change Order Submittal # O1 Date 8114/2026
ADDITIONS
I
ty
Unit
Unit Cost
Total
7-
0241,1300 Remove Conic Curb & Gutter
3
3216.0102 7" Conc Curb And Gutter
TPW
3,420.00000000
LF
52.75
, 5.
4
0241.0401 Remove Concrete Driveway
TPW
6,425.00000000
SF
3.50
5
3213.0401 6" Concrete Driveway
TPW
6,413.00000000
SF
$14.05
,7 .
6
0241.0 00 Remove Sidewalk
TPW
9,627.00000000
SF
2.95
7
3213.030 4" Conc Sidewalk
TPW
9,735.00000000
SF
13.25
.75
8
0241.1400 Remove Conc Valley Gutter
TPW
26.00000000
SY
$28.00
9
3216.0301 7" Conc Valley Gutter
TPW
73.00000000
SY
145.00
,5
12
3 24.01 11 Asphalt Pavement Base Repair
TPW
36.00000000
CY
1,100.00
13
9999.0000 Cement Treated Base - Class L
TPW
175.00000000
CY
275.00
, 5.
1
3212.0305 3" Asphalt Pvmt Superpave SP-D
TPW
4,600.00000000
SY
$25.89
16
0241.1700 Pavement Pulverization 11"
TPW
4,600.00000000
SY
FEZ
, 5 .
18
3211.0601 CemlimeT @ 32 Lbs y
TPW
73.00000000
TN
410.00
19
3123.0101 Unclassified Excavation
TPW
50.00000000
CY
55.00
$2,750.00
20
3292.0100 Block Sod Replacement
TPW
2,450.00000000
SY
$45.00
21
3217.5001 Curb Adress Painting
TPW
90,00000000
EA
150.00
,5
22
3291,0100 Topsoil
TPW
100.00000000
CY
75.00
26
3213.0506 Barrier Free Ramp, Type P-1
TPW
25.00000000
EA
37550.00
,75 .
28
3305.0117 Concrete Collar For Valve
TPW
3.00000000
9
1,200.00
29
3305.0112 Concrete Collar For Manhole
TPW
18.00000000
EA
$1,450.00
$26,100.00
35
3217.0501 2 "Sld Pvmt Marking HAE W)
TPW
60.00000000
LF
$14.25
37
3471.0001 Traffic Control
TPW
2.00000000
MO
5,000.00
TPW
$1,015,470.90
Sub Total Additions
1,015,470.90
Change Order Additions Page 2 of 3
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name 2026 Asphalt Resurfacing Contract 3 City Sec # 64597
Client Project # 106175 771
Contractor Peachtree Construction, Ltd. PM Tariqul Islam Inspector Kevin Jackson
Change Order Submittal # Date 8/14/2026
DELETIONS
ITEM
DESCRIPTION
L)�:p I
y
Unit
UnitCost
Total
Asphalt m uperpave -
11
024 .1506 2" Surface Milling
TPW
4, 00.00000000
2.75
23
02 .300 Remove ADA Ramp
TP
3.00000000
E
1,000.00
24
32 3.0501 Barrier Free amp, Type R-1
TPW
25.00000000
EA
000.00
27
9999.1000 Irrigation AdjustmentAdjustment& Landscape Repair Allowance
TPW
0.40000000
LT--
25,000.00
30
3305.0107 Manhole Adjustment, Minor
TPW
0.00000000
EA
550.00
31
3305.0111 Valve Box Adjustment
TPW
10.00000000
EA
330.00
32
3110.0101 Site Clearing
TPW
100.00000000
55.00
33
3217.0102 6' Sid Pvmt Marking
TPW
1,000.00000000
F
2.85
34
32 7.2103 Furnish Instal 4 Reflective Marker, Type Ik
TPW
25.00000000
EA
9.50
36
32 2.0401 HMAC Transition
TPW
10.00000000
TT--
350.00
38
9999. 003 Paving Construction Allowance
TPW
0.95000000
L
150,000.00
TPW
338,287.50
u Total Deletions
338,287.50
Change Order Deletions Page 3 of 3
FORT WORTH.
MAYOR AND COUNCIL COMMUNICA ION
7.5.282026 ASPHALT RESURFACING CONTRACT 3 — CHANGE ORDER 1
DATE: 08/11/26 M&C FILE NUMBER: M&C 26-0746
DEPARTMENT: TRANSPORT A TW'IAW r-%l IM le- VkffrN0Rf1rt
SUBJECT
(CD 5) Authorize Execution of Change Order No. 1 in the Amount of $677,183.40 and the
Addition of 60 Calendar Days to the Construction Contract with Peachtree Construction, Ltd,
for the 2026 Asphalt Resurfacing Contract 3 Project for a Revised Contract Amount of
$3,675,727.90
RECOMMENDATION
It is recommended that the City Council authorize execution of Change Order No. 1 in the
amount of $677,183.40, and the addition of 60 calendar days to City Secretary Contract No.
64597 with Peachtree Construction, Ltd., for the construction of the 2026 Asphalt Resurfacing
Contract 3 project (City Project No. 106175) for a revised contract amount of $3,675,727.90.
DISCUSSION
On December 9, 2025, Mayor & Council Communication (M&C) 25-1139 awarded City
Secretary Contract No. 64597 with Peachtree Construction, Ltd., in the amount of
$2,998,544.50 for the construction of the 2026 Asphalt Resurfacing Contract 3 project (City
Project No. 106175) at various locations.
The original scope for this project consists of full -depth rehabilitation with a 3-inch asphalt
surface and 2-inch mill and overlay on selected streets, along with limited replacement of
concrete curb and gutter, driveways, sidewalks, and valley gutters. However, during
construction, a reassessment of existing street conditions revealed that Acapulco Road from
Hitson Lane to Patino Road exhibited extensive pavement cracking and underlying base
failure, making the planned mill and overlay treatment unsuitable. As a result, staff
determined that this segment requires full -depth rehabilitation and recommends revising the
project scope accordingly. In addition, field evaluations during construction identified several
locations where existing curb and gutter, driveways, sidewalks, and valley gutters either have
inadequate slopes that prevent proper drainage or have deteriorated beyond acceptable
condition. To address these deficiencies and ensure proper drainage, long-term pavement
performance, and compliance with current construction standards, this change order
increases the quantities for replacement of concrete curb and gutter, driveways, sidewalks,
1of9
FORT WORTH.
and valley gutters. These modifications are necessary to address unforeseen field conditions
encountered during construction and to ensure the completed improvements provide a
durable, functional, and maintainable roadway.
Staff has reviewed and verified the quantities for the additional work under this Change Order
No. 1. In addition, to complete this work, the staff recommend extending the contract time by
60 calendar days.
The following table summarizes previous contract action and change order:
Construction Contract
Date
Amount
Original Contract (M&C 25-
1139)
12/9/2025
$2,998,544.50
Change Order No. 1
This M&C
$677,183.40
Revised Contract Amount
$3,675,727.90
Funding is budgeted in the General Capital Projects Fund for the Transportation and Public
Works Department for the purpose of funding the 2026 Asphalt Resurfacing Contract 3
project, as appropriated.
This project is located in COUNCIL DISTRICT 5.
This contract requires a Form 1295.
FISCAL INFORMATION/CERTIFICATION
The Director of Finance certifies that funds are available in the current capital budget, as
previously appropriated, in the General Capital Projects Fund for the 2026 Asphalt
Resurfacing Con 3 project to support the approval of the above recommendation and
execution of the change order to the contract. Prior to any expenditure being incurred, the
Transportation and Public Works Department has the responsibility to validate the availability
of funds.
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804
ORIGINATING BUSINESS UNIT HEAD: Lauren Prieur, # 6035
ADDITIONAL INFORMATION CONTACT: Monty Hall, # 8662
ATTACHMENTS
1. Map - 2026 Asphalt Resurfacing Contract 3 COI [7.5.28.1 - 1 page]
2 of 9
FORT WORTH.
2. CONFIDENTIAL - SAM.GOV - Peachtree Construction, Ltd [7.5.28.2 - 2 pages]
3. CONFIDENTIAL - FID Table - 2026 Asphalt Resurfacing Contract 3 C01 [7.5.28.3 - 1 page]
4. CONFIDENTIAL - Form 1295 - 2026 Asphalt Resurfacing Contract 3 COI [7.5.28.4 - 1
page]
5. CONFIDENTIAL - Funds Availability - 2026 Asphalt Resurfacing Contract 3 C01 [7.5.28.5 -
1 page]
3of9
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2026 Asphalt Resurfacing Contract 3, CO#1
M&C: 26-0746 CPN: 106175 CSO: 64597 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Seidi Tovar — Business Support
TPW - Review
TT
ST
08/14/2026
2.
Peachtree Construction - Vendor
Vendor — Signer
51B
08/14/2026
3.
Kevin. Jackson - Inspector
TPW — Signer
V-r
Kevin Jackson
08/14/2026
4.
Lorrie Pitts — Sr. Inspector
TPW - Signer
08/14/2026
5.
Tariqul Islam - PM
TPW - Signer
T?� sam
08/14/2026
6.
Zelalem Arega - PGM
TPW - Signer
08/14/2026
7.
Mary Hanna- SCPO
TPW - Signer
N;cV
08/14/2026
8.
Patricia Wadsack - AD
TPW - Signer
p(.,W
08/14/2026
9.
Lauren Prieur - Director
TPW - Signer
-tjev
Lauren Prieur
08/17/2026
10.
Doug Black - ACA
Legal -Signer
ooias eiaok
08/19/2026
11.
Jesica McEachern - ACM
Signer
08/26/2026
12.
Jannette Goodall - CSCO
Signer
e
08/26/2026
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE
ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the
routing slip, Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No
ROUTING TO CSO
SAME DAY: ❑YES ❑No
®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
❑ Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: []YES []No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please notify TPWContractkfortworthtexas.gov. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Peachtree Construction, Ltd.
Subject of the Agreement: Change Order No. 1 to CSC No. 64597, a Contract for the 2026 Asphalt
Resurfacing Contract 3 Project at Various Locations
M&C Approved by the Council? * Yes 8 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes 8 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106175
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be