HomeMy WebLinkAbout056603-A3 - Construction-Related - Contract - Freese and Nichols, Inc.OFFICIAL RECORD CSC No. 56603-A3 CITY SECRETARY AMENDMENT No . 3 FT. WORTH, TX TO CITY SECRETARY CONTRACT No. 56603 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56603, (the CONTRACT) which was authorized by M&C 21-0770 on the 28th day of September, 2021 in the amount of $ 1,291,465.00; and WHEREAS, the CONTRACT was subsequently revised by:Amendment No. 1 in the amount of $40,193.00 which was administratively authorized on May 09, 2022, and Amendment No. 2 in the amount of $613,052.00 which was authorized by M&C 24-0518 on June 11, 2024; and WHEREAS, the CONTRACT involves engineering services for the following project: West Fork Collector Parallel, Phase-1 - Trinity River Siphon to Walker Branch Connection, CPN 103291; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $21,805.00 (Sewer). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,966,515.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas West Fork Collector Parallel, Phase 1 - Trinity River Siphon to Walker Branch Connection Prof Services Agreement Amendment Template 103291 Revision Date: June 13, 2025 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Freese and Nichols, Inc. N Jesica McEachern Assistant City Manager DATE: 08/27/2026 o �nnuIl p O� FORT�pdd ATTEST: lG��(.��./Q/L/t'L� �GGti dace nEXA?a4` Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christopher Hard& (Aug 19, 2026 07:42:34 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: Nicholas Lester, P.E. Vice President DATE: 08/07/2026 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. r_-XLT�� Cla on M. Torrance, P.E. Pr ject Manager APPROVED AS TO FORM AND LEGALITY: a&-gor— Douglas Black (Aug 19, 2029 14:05:10 CDT) Douglas W. Black Sr. Assistant City Attorney M&C No.#: N/A M&C Date: N/A City of Fort Worth, Texas West Fcrk Collector Parallel, Phase 1 - Trinity River Siphon to Walker Branch Connection Prof Services Agreement Amendment Template 103291 Revision Date: June 13, 2025 Page 2 of 2 801 Cherry Street, Suite 2800 + Fort Worth, Texas 76102 + 817-735-7300 + FAX 817-735-7491 July 30, 2026 Clayton M. Torrance, P.E. Project Manager City of Fort Worth Water Department 100 Fort Worth Trail Fort Worth, TX 76102 Re: Amendment No.3 for the West Fork Collector Parallel, Phase 1 (City Project No. 103291) Geomorph Areas 4 and 5 at VCWRF Dear Mr. Torrance: www.freese.com Freese and Nichols, Inc. (FNI) is providing this proposal to amend the Engineering Design Services for the Geomorph Areas 4 and 5 (City Project Number 103291). The following fee includes the costs for an archeological surveying as required by the Texas Historical Commission (THC). FNI records show that this proposal would serve as Contract Amendment No. 3. A summary of the additional costs is shown below: Item Archeological Survey Total Fee $21,805 $ 21, 805 CPN 103291 Amendment No. 3 Geomorph Areas 4 and 5 at VCWRF July 30, 2026 Page 2 of 2 Original Contract Amount $ 1,291,465 Amendment No. 1 $ 40,193 Amendment No.2 $ 613,052 Amendment No. 3 $ 21,805 Contract Amount to Date $ 1,966,515 Freese and Nichols, Inc. appreciates this opportunity, and we would like to meet with you to discuss these additional services at your convenience. Sincerely, J W�0. �'� Amanda Johnson, P.E. Associate Attachments Level of Effort Spreadsheet Attachment A - Scope ATTACHMENTA DESIGN SERVICES FOR WEST FORK COLLECTOR PARALELL, PHASE 1 ATTACHMENT A Scope for Engineering Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WEST FORK COLLECTOR PARALLEL, PHASE AMENDMENT NO.3 CITY PROJECT NO.: 103291 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Task Nos. 1-11 were previously defined under the original contract. Although not included here the language in the original contract apply to this amendment, as if included herein. The purpose of this amendment is to amend Task 11 (Area 4 Bank Protection and Area 5 Outfall Protection Plan Development) by including additional effort for performing an archaeological investigation due to the requirement by the Texas Historical Commission (THC). WORK TO BE PERFORMED Task 11.12 Archeological Investigation Task 11.12 Archeological Investigation An archaeological investigation shall be carried out by a subcontractor and will include the following: • Coordinate with THC and United States Corps of Engineers (USACE) to develop scope of work and permit application of the field survey. • Conduct field survey that will involve visual inspection supplemented by backhoe trenching. Assumed to perform approximately 8 shovel tests and 4 backhoe trenches. • Draft a single report that summarizes all background data, previous investigations, the results of the current investigation, and regulatory investigations. • Draft report will be submitted for review. • Submit draft report to THC and USACE for regulatory review and concurrence of findings. • Submit final report and curate all project documents. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — Refer to original contract for additional services not included in the scope of services. City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 1 EXHIBIT 6.2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Geornorph - Areas 4 and 5 Pge.m RpunIt .. n Drt.:Fmm S.rvin DN.:To %Xx m.om. on.: na ICPN 103291 nonnopm I ESp.... ToEDnen ke pnon "n"'°l'r lel.ox o.m.Ae s.nmr JPIC EnRlnnr Tnnl I GBTnnI Env Owlolnn Fnpinnr Selenll.t I rrol.cl D snlor 10.0 Pnvit GI31 Atlmin wlnlMljJH Env G13 Tpml Lebpr Cost s x Im t u emu n Tomt E.pmn T. a pm ni br I ae Tnv.l R.protlupAtlmin wBrom roml Butlpn t0%aub 'uep.l t IAArtxertollnie0(mpuon 1 apl teal eI ) 511 I ��� S_0 SST,Bl0 SDI StT.ipl Sli Sy 301 51.18]]0 tt1,BDB.N SD.D0 i^l,B0f.T1 0•J f0J St.IB).JD 5 1BI 0000 S 1b1b 0 m l t 1 01 DI 0 C �I 1 sa0B/I StT.BT' S01 511, t]D.0IB s l n/ 8501 t 1 o ill sL18'1..1ri fm.B05.]I f0l snaD5.1t1 D 1 �mo �pe✓� Rom Ip c1ry: romrlsonouooeonAG5d01lm1. rn.-r..nI 02 on SUF0nl m0riup. Olson, c0lumm AB .ntl. vnr. no ptleetl c0 N01 numb.n mucxn pttpcFm.nl B -t Ipl oml Fop (BI SurvM Fen I uBEISBE Su® �m 211 B]] I OnuBE/sBE subcOmulla to M., F.,g�I00% IIC1 I 3 .00 I I I 1ptpl en,. ' . I P l.0n T.t.B0t.0D A,�pIFpBWenn, np AIAO,trsnr , Ira vi.. EBoe S10,rtmenl lyprnl Wpm.0m Sever O0µ31tmem FYVATR Oneul Releooe Dole 101.2012 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Freese and Nichols, Inc. Subject of the Agreement: West Fork Collector Parallel, Phase 1 - Trinity River Siphon to Walker Branch Connection M&C Approved by the Council? * Yes ❑ No M If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 56603-A3 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: N/A If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No ED *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 103291 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.