Loading...
HomeMy WebLinkAbout061005-A1 - Construction-Related - Contract - Teague Nall & Perkins, Inc.CSC No. 61005-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 61005 WHEREAS, the City of Fort Worth (CITY) and Teague Nall & Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 61005, (the CONTRACT) which was authorized by M&C 24-0100 on the 30th day of January, 2024 in the amount of $ 1,142,215.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Northside IV 24-inch Water Transmission Main, Phase 1C, CPN 105114; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $22,785.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,165,000.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas OFFICIAL RECORD 14SIV 24-inch 11T1-1, PHASE 1C Prof Services Agreement Amendment Template CPN 105114 Revision Date: June 13, 2025 CITY SECRETARY Page 1 of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City,s designated Assistant City Manager. APPROVED: City of Fort Worth 08/28/2026 Jesica McEachern Assistant City Manager DATE: Qoovona a pORt�Il>r ATTEST: p0 ° p F'o 0.10 dv8 g=d '1 �C�-ldtR. daQu nEXASoao Jannette Goodall City Secretary APPROVAL RECOMMENDED: Chris f ci rd er 08/17/2026 Chris Harder (Aug 17, 2026 15:27:50 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Teague Nall & Perkins, Inc., Ryan Jo es, P.E. Team Leader, Principal DATE: August 14, 2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. w��Kc Preeti KC, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: )q� 08/19/2026 Douglas Black (Aug 19, 2026 17:33:06 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2 M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX NSIV 24-inch 11Tt•1, PHASE 1C CPN 105114 tnp August 11, 2026 Chris Harder, P.E. Water Director City of Fort Worth Water Department 100 Fort Worth Trail Fort Worth, Texas 76102 RE: Fee Proposal for Contract Amendment No. 1 Northside IV Water Transmission Main, Phase 1 C City Project No. 105114 Dear Chris: www.tnpinc.com engineers surveyors londscope architects TEXAS FORT WORTH DENTON ALLEN HEATH KATY THE WOODLANDS Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above -referenced contract based on additional services required. The following is a brief description and cost for the additional services to be provided on this project: Additional Design Services for 16" Water Line along Bonds Ranch Road This amendment will add the additional efforts associated with the design of approximately 900 LF of additional 16" water line along Bonds Ranch Road near Eagle Mountain High School. The intent is for this additional water line to be added to an existing construction contract through a change order. TNP will provide an additional layout sheet and two additional plan and profile sheets for the water line. It is assumed that all construction details and specifications are included in the original construction documents. Fee Proposal for Contract Amendment No. 1: TNP proposes a total fee of $22,785.00 to accomplish the scope of services described above for this Contract Amendment No. 1. Summary of Contract Fee Water Sewer Total Original Contract Amendment No. 1 $ 1,11 A2,21 5.00 $ 22,785.00 $ - $ - $ 1,142,215.00 $ 22,785.00 Revised Contract Amount $ 1,165,000.00 $ $ 1,165,000.00 Sincerely, tnp Ryan Jones, P.E. Team Leader Attachments: (1) Exhibit B-2 - Level of Effort Spreadsheet (2) Attachment E - Project Map TNP Firm Registrations Texas Board of Professional Engineers and Land Surveyors I Engineering Firm No. F-230 I Surveying Firm No. 1001 1600 1 10194381 1 10011601 Texas Board of Architectural Examiners Firm No. BR 2673 E ! - 111111M 111111111111 m IIIIIIIIIIIII m � • - --� Legend or PProject •� s y Parcels E P+det 1;,1 Location Existing Water Line lip Proposed Water Line J It ok i •�+' or JI oil to 4 AID j" ar� 900 LF PROPOSED • , 16" WATER LINE t. r �1 EX 16" -... tf EX 16" T • ,,I , WATER LINE + ; v v r �,. WATER LINE t` I �. � +'• ,!. � R 4 ...� .r yr• �F'�` _ - .:� 4� f :. i ' .• �, � •�� !-� 4 • y',Ia t L ' ti •7`' 1� j rl y •'��� �' T , r-, .r , DI �yyf[ , ♦ • 1 I n Y y I 0 75 150 225 City of Fort Worth, Texas FORT WORTH tnp Northside IV Water Transmission Main i N I inch =150Feel Phase 1 C Amendment No. 1 �r r August 2026 FORTWORTHO City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Teague Nall & Perkins, Inc. Subject of the Agreement: Northside IV 24-inch Water Transmission Main„ Phase 1C M&C Approved by the Council? * Yes ❑ No If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 61005-Al If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent conb•act listing. Is this entire contract Confidential? *Yes ❑ No ® If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 8/14/2026 If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: Ifapplicable. 105114 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ® No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided the contract will be rettirned to the department.