HomeMy WebLinkAbout062993-CO1 - Construction-Related - Contract - Vortex Lining Systems, LLCCSC No. 62993-COl
Fowl, woler".
Project Name 1 2023 Trenchless Storm Drain Rehabilitation
City of Fort Worth
Change Order Request
City Sec # 62993
Client Project #(s) 102527
Project Replacement and/or Improvement of Existing City Drainage Infrastructure
Description
Contractor Vortex Lining Systems, LLC Change Order # 1 Date 8/12/2026
City Project Mgr. Pratima Poudyal City Inspector Steve Cisneros
Dept. TPW Contract Time
Totals 1CDt
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,000,000.00
$2,000,000.00
1,825
$0.00
$0.00
$2,000,000.00
$2,000,000.00
1,825
Amount of Proposed Change Order
$0.00
Revised Contract Amount $2,000,000.00
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$2,000,000.00
1,825
$0.00
0.00%
$2,500,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Additional bid items are required but were not included in the original unit price contract. These additional items are necessary for the construction of the Central Arlington
Heights Storm Drain Pipe Rehabilitation project (Work Order No. 23-WOVTX-01 on CPN 102527) in order to repair the sprinkler system and the surface restoration of the lot
where the construction was staged. The proposed unit costs were compared with recent Storm Drain Rehabilitation Open -Cut Contract (CSC 65078) unit prices and are
considered reasonable given the site conditions. The City finds that the contractor's proposed installation prices are fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
tractor's Company Name
Vortex Lining Systems, LLC
Contractor Name
B. Ross Cooke
kract Si nature=
Ross Cooke (Aug 25, 2026 09:42:39 EDT)
08/25/2026
Ins ector/Ins ec
Daf
5/2026
Project and Contract Compliance Manager
e
08/26/2026
Pro ram Manager
Date
E08/26/2026
ct Officer
Date
�Q 6
08/26/2026
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
08/26/2026
z"�
08/27/2026
oAa: ei.a wA zz zoze ss:sssz eon
Date
08/27/2026
Assistant City Manager
Date
08/31 /2026
Council Action if required)
4 "o XLTJ M&C Number NIA
foRr
ATTEST:
�9d0
11 ~e
P �10
pC1 0 8=p-
Jannette Goodall, City Secretary
dann4)°.E°X ogap
M&C Date Approved NlA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
rUNI AMPU-rn City of Fort Worth
Change Order Additions
Project Name 2023 Trenchless Storm Drain Rehabilitation City Sec # 62993
Client Project# 102527
Contractor Vortex Lining Systems, LLC PMJ Pratima Poudyal Inspector Steve Cisneros
Change Order Submittal # 0 Date 8/12 2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
623
3292.0400 Seeding, Hydromulch
TPW
0.00000000
SF
$0.99
$0.00
625
3291.0100 Topsoil
TPW
0.00000000
CY
$150.00
$0.00
624
9999.0001 Surface Grading less than 4,000 SF
TPW
0.00000000
EA
$1,200.00
$0.00
626
9999.0002 Sprinkler System Repair
TPW
0.00000000
LS
$2,350.00
$0.00
TPW
$0.00
Sub Total Additions
0.00
Change Order Additions Page 2 of 4
r4 r I "kPid-re City of Fort Worth
Change Order Deletions
Project Name 2023 Trenchless Storm Drain Rehabilitation City Sec # 62993
Client Project # 102527
Contractor Vortex Lining Systems, LLC PM Pratima Poudyal Inspector FSTewe Cisneros
Change Order Submittal # 0 Date 81?12026
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW $0.00
Sub Total Deletions $0.00
Change Order Deletions Page 3 of 4
MISBE for this Change Order
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: 2023 Trenchless Storm Drain Rehabilitation
M&C: N/A CPN: 102527 CSO: 62993 DOC#: 1
Date:
To:
Name
Department
Initials
Date Out
1
B. Ross Cooke - Signature
Vortex Lining Systems, LLC
rcooke@vortexcompani es. com
Contractor
vo
RC
08/25/2026
2.
Mike Glover - Signature
TPW Inspector
08/25/2026
3.
Pratima Poud al - Signature
TPW Project Manager
�P
"`d``�
08/26/2026
4.
Thanaa Maksimos - Signature
TPW Program Manager
TM
08/26/2026
5.
Lissette Acevedo - Signature
TPW Sr. CPO
V
08/26/2026
6.
Patricia Wadsack - Signature
TPW Asst. Director
p( VY
08/26/2026
7.
Lauren Prieur - Signature
TPW Director
xer
L- ,P,„,,
08/27/2026
8.
Doug Black - Signature
Legal - Assistant City
ttorne
�
08/27/2026
Douglas Black
9.
Jesica McEachern - Signature
CMO — Assistant City
Manager
08/31 /2026
10.
Jannette Goodall - Signature
CSO — City Secretary
U
01/0,/2026
11.
Allison Tidwell - Review
CSO — City Secretary
A,
09ro1/2026
12.
TPW SW Contracts
TPW SW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: EYES ®No
RUSH: []YES Hlo SAME DAY: ❑YES []No NEXT DAY: ❑YES []No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(&fortworthtexas.2ov Call 817-229-3283 with questions. Thank you!
FORT WORTH,
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Vortex Lining Systems, LLC
Subject of the Agreement:
2023 Trenchless Storm Drain Rehabilitation
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes M No ❑ CSC 62993 - C01
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes M No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No [Xl If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 1A
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
102527
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes [Xl No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.