Change Order Request
Project Name Storm Drain Rehabilition Program -Citywide Storm Drain Rehabilitation Open -Cut Contract
City Sec # 65078
Client Project #(s) Citywide Storm Drain Rehabilitation Open -Cut Contract - Citywide Various Projects Site Locations and CPNs
Project Replacement; extension and/or improvements of existing storm infrastructure through Citywide Storm Drain Rehabilitation Open Cut Contract through
Description citywide work orders.
Contractor Woody Contractors Inc. Change Order # 2 Date 8/10/2026
City Project Mgr. Caleb Luebbert City Inspector N/A
Contract Time
Dept. TPW Totals I ICD)
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $3,750,000.00
titional bid items are needed but were not included in the original unit price contract. The items being added are needed for the construction of 21" storm infrastructure
irovements at McCart & Cantey. The proposed cost cover replanting of asian jasmine and striping of the road due to unexpected pipe alignment. The proposed unit cost
planting Asian Jasmine have been compared to the TxDOT standard bid item 193 that often include mobilization and minimum purchase. The City finds that the
itractor's proposed installation price is fair and reasonable.
Additional bid items are required but were not included in the original unit -price contract. These items are necessary to complete the Storm Drain Rehabilitation Open -Cut at
Lisbon and Ashland (CPN 105007). The additional work includes relocating the light pole, relocating the fire hydrant that conflicts with the proposed storm -water pipe
alignment, backfilling and re -compacting the SS ditch, and completing the required landscaping and pavement striping on W. Vickery Blvd.
For comparison, the proposed price for the light pole relocation is reasonable and consistent with previous project pricing. Project 105964 had a price of $10,785.00 for
similar light pole relocation work several months ago. Attached is the contractor -provided cost breakdown for the additional bid items for review and reference.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name A Contractor (Namel Contract Signature
Woody Contractors Inc. Troy Wood , ,,; 1129— 7
08/25/2026
Date
Project and Contract Compliance Manager
Date
08/25/2026
•. -,
08/25/2026
Pro ram Pal
Date
Senior Capital Project Officer
Date
08/25/2026
—
08/25/2026
Assis
Date
Director, Contractinq Department Dept
Date
08/26/2026
08/27/2026
MSIAtPAt CIZA
Date
Assistant City Manager
Date
4�It
08/27/2026
08/31 /2026
Council Action (if required)
4 o�aangIl
ATTEST:
1f,OR>4o00,
07
Jannette Goodall, City Secretary
a � L
aaa�n�X456
M&C Number IN/A M&C Date Approved N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
1'*'--- Change Order Additions
Project Name Storm Drain Rehabilition Program -Citywide Storm Drain Rehabilitation Open -Cut Contract I City Sec # 65078
Client Project # Citywide Storm Drain Rehabilitation Open -Cut Contract- Citywide Various Projects Site Locations and CPNs
Contractorl Woody Contractors Inc. PMJ Caleb Luebbert Inspector N/A
Change Order Submittal # 0 Date 8I10/2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
410
9999.9991 CUT IN SX6 TEE
TPW
0.00
EA
$9,850.00
$0.00
411
9999.9992 STRIPING / MARKERS (LESS THAN 200 LF)
TPW
0.00
LS
$5,000.00
$0.00
412
9999.9993 BACKFILL AND RECOMPACT SS DITCH
TPW
0.00
CY
$54.29
$0.00
413
3441.3502 RELOCATE STREET LIGHT POLE
TPW
0.00
EA
$12,705.00
$0.00
414
9999.9994 LANDSCAPE ALLOWANCE
TPW
0.00
LS
$2,500.00
$0.00
415
9999.9995 PLANT ASIAN JASMINE
TPW
0.00
SF
$36.40
$0.00
TPW
$0.00
Sub TotalAdditions
Change Order Additions Page 2 of 4
FoRTW RTHH City of Fort Worth
Change Order Deletions
Project Name Storm Drain Rehabilition Program Citywide Storm Drain Rehabilitation Open -Cut Contract City Sec # 65078
Client Project # Citywide Storm Drain Rehabilitation Open -Cut Contract - Citywide Vadous Projects Site Locations and CPNs
Contractor Woody Contracto s Inc. PM Caleb Luebbert Inspector N/A
Change Order Submittal # = Date 8I10I2026
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost Total
TPW
$0.00
Sub Total Deletions b0.00
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub
Type of Service
Amount for this CO
Citywide Storm Drain Rehabilitation Open -Cut C
Total
$0.00
Previous Change Orders
CO # DATE AMOUNT
1 6/18/2026 $0.00
Total $0.00
8/12/26, 11:38 AM M&C Review
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA FORT OORTH
Create New From This M&C
REFERENCE **M&C 26- 20SWM CITYWIDE
DATE: 3/10/2026 NO.: 0177 LOG NAME: STORMDRAIN
IMPROVEMENT
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT. (ALL) Authorize Execution of a Contract with Woody Contractors, Inc., in an Amount Up to
$3,000,000.00, for the 2025 Citywide Storm Drain Rehabilitation Open -Cut Project, and
Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal
Years 2026-2030 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a construction contract with Woody Contractors, Inc. in an amount up to
$3,000,000.00, for the 2025 Citywide Storm Drain Rehabilitation Open -Cut project , with
the option to renew the contract one time; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Water and Sewer Capital Projects Fund in the amount of $200,000.00, transferred from
available Paygo funds within the Water and Sewer Fund, for the purpose of funding the 2025
Citywide Storm Drain Rehabilitation Open -Cut project (City Project No. 106778) to effect a
portion of Water's contribution to the Fiscal Years 2026-2030 Capital Improvement Program.
DISCUSSION:
Approval of this Mayor and Council Communication (M&C) will authorize execution of a contract for the
extension, replacement, and/or improvement of existing City storm drain infrastructure on an on -call
basis. This contract will also provide for repair/reroute of water and sewer lines conflicting with storm drain
lines. Work on individual locations will be authorized by work orders and prioritized based on storm drain
rehabilitation needs and risks.
The bid documents included a stipulation that the total quantities listed may not reflect actual quantities
and that the amount budgeted for the projects is $3,000,000.00. Final payments will be made based on
actual measured quantities. The bid documents also included a stipulation giving the City the option to
renew this contract one time under the same terms, conditions and unit prices subject to appropriated
funding.
This project was advertised in the Fort Worth Star -Telegram on November 5, 2025, and November 12,
2025. On December 4, 2025, the following bid was received. The term of the contract will be until work is
completed, funds are expended, or the expiration of the contract after two years, whichever occurs first.
Bidders I Amount
Woody Contractors, Inc.
$25,988,285.00
Small Business (SB) Goal - Woody Contractors, Inc. is in compliance with the small business goal.
The Transportation & Public Works Department's (TPW) share of this contract is $2,800,000.00. The
Water Department's share of this contract is $200,000.00 (Water: $100,000.00 and Sewer: $100,000.00)
and will be available in the Water & Sewer Capital Projects Fund for the project. In addition to the contract
amount, $459,150.00 (TPW) is required for project management, material testing, and inspection.
It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan
throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence,
additional funding needs are identified, and to comply with bond covenants.
apps.cfwnet.org/counciI_packet/mc_review.asp? I D=34220&counciIdate=3/10/2026 1 /3
8/12/26, 11:38 AM
M&C Review
Funding is budgeted in the Transfer to Water/Sewer account of the Water & Sewer Fund for the purpose
of funding the Water and Wastewater portion of the Stormwater's 2025 Citywide Storm Drain
Rehabilitation Open -Cut project within the Water & Sewer Capital Projects Fund.
FY2026 - Water PAYGO Appropriations per City Ordinance 27979-09-2025
FY2026 Amended
PayGo (Includes
YTD PayGo
FY2026
FY2026 Original
any council
Approved
This M&C
Remaining
Adopted PayGo
actions
for/Moved to
PayGo Balance
subsequent
Capital Projects
budget adoption)
$101,090,082.00
$101,090,082.00
($29,564,777.00)
($200,000.00)
$71,325,305.00
Note: There may be other pending actions or recently approved actions that are not reflected in the table
due to timing.
These projects are not currently defined, and the impacts on the Operations Budgets are unknown.
Projects that replace or improve existing infrastructure should not have an impact on the operational
budget, as the City already maintains infrastructure in these locations. However, extensions, such as
additional stormdrain pipes or inlets, would increase future maintenance responsibilities.
Funding is budgeted in the Stormdrain Pipe Rehab programmable project (City Project No: P00114) within
the Stormwater Capital Projects Fund for the purpose of funding various work order projects, as
appropriated. This task order contract will serve current and future capital projects as -needed, and a funds
availability verification will be performed by Transportation & Public Works Contract Compliance Managers
prior to task order assignment.
Appropriations for the W/WW/20SWCWSDI project are as depicted below:
Fund
Existing
Appropriations
Additional Appropriations
Project Total
W&S Capital
Projects —
$0.00
$200,000.00
$200,000.00
Fund 56002
Project Total
$0.00
$200,000.00
$200,000.00
The projects are located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Stormdrain Pipe Rehab
programmable project within the Stormwater Capital Projects Fund and Water and Sewer Fund and upon
approval of the above recommendations and adoption of the attached appropriation ordinances, funds will
be available in the Stormwater Capital Project Fund and in the W&S Capital Projects Fund to support the
award of the agreement. Prior to an expenditure being incurred, the Transportation & Public Works and
the Water Departments has the responsibility of verifying the availability of funds.
Fund
Department
Account
Project
Program
Activity
Budget
Reference #
Amount
ID
ID
Year
(Chartfield 2)
FROM
Fund Department
Account Project
I
Program Activity Budget
Reference #
Amount
ID
ID
Year
(Chartfield 2)
Submitted for City Manager's Office by_ Jesica McEachern (5804)
Originating Department Head: Lauren Prieur (6035)
apps.cfwnet.org/council_packet/mc_review.asp?I D=34220&councildate=3/10/2026
2/3
8/12/26, 11:38 AM
M&C Review
Additional Information Contact: Thanaa Maksimos (2485)
ATTACHMENTS
1295 Form.pdf (CFW Internal)
20SWM CITYWIDE STORMDRAIN IMPROVEMENT -WOODY FundsAvail.docx (CFW Internal)
20SWM CITYWIDE STORMDRAIN IMPROVEMENTS -WOODY FID TABLE (WCF 01.30.26).xlsx (CFW Internal)
Bid Table.xlsx (CFW Internal)
ORD.APP 20SWM CITYWIDE STORMDRAIN IMPROVEMENT 56002 A026(R2).docx (Public)
SAM.gov Search.pdf (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp? I D=34220&counciIdate=3/10/2026 3/3
The Breakdown of the change order items for the Lisbon and Ashland project, 1050067
1 X— Cut In 8" x 6" Tee
This item requires to cut in and install the new 8" x 6" tee connection for the fire hydrant
relocation the existing water main is under pressure and requires shutdown, tapping. The
work is required as part of the proposed fire hydrant relocation and is shown on Sheet 8 of
the plans. The price is $8,950.00, which is reasonable
2X—Striping
This item is required to re -stripe the pavement markings following the removal and
replacement of pavement along W. Vickery Blvd., restoring the existing striping within the
affected areas(less than 200 LF). The price is $5000.00, which is reasonable
3X— Backfill and Recompact Sewer Ditch (If needed)
This item for backfill, and recompact the existing sewer ditch if movement, instability, or
failure occurs during construction. The proposed storm drain excavation will run parallel to
the existing sewer ditch, and the existing sewer line is deeper than the proposed storm
drain. Due to the proximity and difference in elevations, there is a potential for the existing
sewer ditch to cave or become unstable during excavation. The the price is $54.29 per CY
which is reasonable
Note: This item will only be utilized if necessary. If the existing sewer ditch remains stable
with no movement or failure during construction, this item will not be charged.
1 a. — Relocate the Light Pole
This item is required to remove and relocate the light pole as shown on Sheet 6 of the plans. We
will reuse the existing light pole assembly and reconnect it at the new location. The proposed
price is $12,705.00, which is reasonable and consistent with similar project pricing. For
comparison, Project 105964 had a price of $10,785.00 several months ago.
tD V r1 rl C) v-1 r♦ N r-1 -I
U
U
t
C
i�
lIl
v o Q0j o o c? o a o 0 0
pp Ci Oi Oi N 01 Oi N to
In' �
� o
o �
� m
CY
Oj
c wl wt
ckD
w
tmil W V1 N
_c w)
m
W
w to
a y `� in
m g g m[j g g ui
Ea m 11 tA M
t n; 0 r4 4 .
IT c In H bill
in //1 W to
w
E ca a o o c? c? o oN n o
r v 01 01 N 0/ OI ri OD ID
00
X
1U
E o 0 0 0 0 0 0 0 0
m Or T Oi Oi N m 10
m
c_
2
0 0 0 qq
v � W
01
IL
N
7 Z
E ¢ m a
a
r
O o u.
0 0 z Z 2 Z
O �
N 1. = 5 S, Q
'T Vl L
c a a a a a a i
v� w aw u a a
o A, 9' a it 0 0 0 0 a
v q Y r r Y w
C U.1
In S In VI In Vl
A Ll A l7 C7
z
O m J n N
Y
N
L ~
w N
+' u W N M V n co m O in;F ai A 0 0 O 0 b S O O' HO
a+ tT 0 no O O no
kj
7 N OMi OM1 OMl 0 M Ol O*1 01 pMp�� �
Q r7p
A c
N o
U
a a r YIn r N X W N
V O N q
v E°� E i
O a+ a ► m t o f t t
iL Inv m ¢ m o v aLi >
FORT WORTH,",,
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE' Citywide Storm Drain Rehabilitation Open -Cut Contract
M&C: 26-0177 CPN: 102527 CSO: 65078 DOC#: CO #2
Date:
To:
Name
Department
Initials
Date Out
1
Troy Woody — Signature
(twoody202O@aol.com)
Contractor
14
Troy woody
08/25/2026
2.
Mike Glover - Signature
TPW Inspector Supervisor
Yv y r
08/25/2026
2.
Caleb Luebbert - Signature
TPW Project Mgr. Manager
C�-
08/25/2026
3.
Thanaa Maksimos — Signature
TPW Program Mgr.
TiN
08/25/2026
4.
Lissette Acevedo — Signature
TPW Sr. CPO
A
08/25/2026
5.
Patricia Wadsack - Signature
TPW Asst. Dir.
I>LW
08/26/2026
6.
Lauren Prieur - Signature
TPW Dir.
A& Pf1e
08/27/2026
7.
Doug Black - Signature
Legal
Sill—
ou las Black
08/27/2026
8.
Jesica McEachern - Signature
CMO
CA
08/31/2026
9.
Katherine Cenicola - Review
CSO
Kc
09/01/2026
10.
Jannette Goodall - Signature
CSO
09/01/2026
11.
Allison Tidwell - Review
CSO
L
09/01/2026
12.
TPW SW Contracts
TPW SW
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ®No
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(&fortworthtexas.gov Call 817-229-3283 with questions. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors Inc.
Subject of the Agreement: Change order in regards to the construction contract for the Citywide
Storm Drain Rehabilitation Open -Cut Contract - Citywide Various Projects Site Locations and CPNs
(City Project No. 102527) for additional bid items are needed but were not included in the original unit price
contract.
M&C Approved by the Council? * Yes 9 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ CS65078-CO2
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 9 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 4/18/2026
If different from the approval date.
Expiration Date: 4/17/2031
If applicable.
Is a 1295 Form required? * Yes ❑ No M
*If so, please ensure it is attached to the approving AM or attached to the contract.
Project Number: If applicable. 102527
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if'the information is not provided, the contract will be
returned to the department.