Loading...
HomeMy WebLinkAbout062757-A1 - Construction-Related - Contract - Kimley-Horn and Associates, Inc.CSC No. 62757-Al AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 62757 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 62757, (the CONTRACT) which was administratively authorized on the 14th day of January, 2025 in the amount of $ 789,340.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Wastewater Replacement Contract 2023 WSM-X, CPN 105716; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $66,800.00(Water: $57,500.00; Sewer: $9,300.00) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $856,140.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD City of Fort worth, Texas CITY SECRETARY w&ww Repl. contract 2023, WSM-x Prof Services Agreement Amendment Template 105716 Revision Date: June 13, 2025 FT. WORTH, TX Page 1 of 2 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 08/28/2026 vna� O� FORt�O ATTEST: Pvo aSo c��l A danIl nE�A56.d Jannette Goodall City Secretary APPROVAL RECOMMENDED: chrlr Lopher 1tader Christopher Har er (Aug 25, 2026 09:51:19 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER Kimley Horn and Associates, Inc. Chris Igo, P.E. Associate DATE: 08/24/2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Z�111-4� ?i6 r Dena Johnson, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C No.#: N/A M&C Date: N/A Douglas Black (Aug 27, 2026 14:18:04 CDT) Douglas W. Black Sr. Assistant City Attorney OFFICIAL RECORD CITY SECRETARY City of Fort Worth, Texas W&WW Repl. Contract 2023, WSM-X Prof Services Agreement Amendment TemplateFT. WORTH, TX 105716 Revision Date: June 13, 2025 Page 2 of 2 Kimley>»Horn August 21, 2026 Ms. Dena Johnson, P.E. Project Manager City of Fort Worth Water Department 100 Fort Worth Trail Fort Worth, TX 76102 Re: Water and Sanitary Sewer Replacements Contract 2023, WSM-X (Forest Park Phase 1) KHA No. 061018483 City Project No. 105716 Dear Liam: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. ("Engineer" or "Kimley-Horn") and the City of Fort Worth (the City) dated 01-14-2025 referred herein as the "Contract". The City has requested that Kimley-Horn perform additional services under Amendment Number 1 for the Water and Sanitary Sewer Replacements Contract 2023, WSM-X (Forest Park Phase 1) project which are out of the scope of services as defined in the Contract. These additional services include the following: • Breaking out and revising final design for —5,000 LF of 12-inch water line and —650 LF of 8- inch sanitary sewer line to include in the WSM-Y (Forest Park Phase 2) construction documents (designed by others). The sheets include plan and profiles, details, traffic control, and surface repair. Supplemental bidding phase services associated with the WSM-Y Final design for 100 LF of 8-inch water and 150 LF for 8-inch sanitary sewer improvements along Mistletoe Drive including additional plan and profiles, traffic control, and surface repair. The revised scope of services are further described as follows: CONTRACT TASK 4 — FINAL DESIGN (90%) (Water$37,300, Sewer $6,100) 43,40 Kimley-Horn $ 43,400 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Design of the following to be included in the WSM-X design package: c —100 LF of 8-inch water line o —150 LF of 8-inch sanitary sewer line o Traffic Control o Surface Repair o Engineer's Opinion of Probable Construction Cost • Incorporate the following into the WSM-Y design package: o--5,000 LF of 12-inch water line pp K i Gy ),) H o r 1 „ 1 Page 2 o —650 LF of 8-inch sanitary sewer line o Traffic Control o Surface Repair • Attend one (1) meeting with City to review design submittal CONTRACT TASK 5 — CONSTRUCTION DOCUMENT PREPARATION (100%) ( Water $7,100, Sewer $1,100) $ 8,200 Kimlev-Horn $ 8,200 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Address CITY comments on the WSM-X and WSM-Y design packages • Finalize the design of the following for WSM-X o —100 LF of 8-inch water line o —150 LF of 8-inch sanitary sewer line o Traffic Control o Surface Repair • Finalize the design of the following for WSM-Y o —5,000 LF of 12-inch water line o —650 LF of 8-inch sanitary sewer line o Traffic Control o Surface Repair CONTRACT TASK 6 — BID PHASE SERVICES (Water$13,100, Sewer$2,100) $15,200 Kimlev-Horn $15,200 Total ENGINEER will complete the following additional tasks in accordance with the Original Contract: • Provide supplemental bidding phase support for Water and Sanitary Sewer Replacements Contract 2023, WSM-Y (Forest Park Phase 2) including the following: o Prepare for Bonfire Upload o Address Bidder Questions o Issue Addenda o Prepare Agenda for Pre -Bid Meeting o Attend Pre -Bid Meeting o Prepare Conformance Plans and Specifications Kimley»>Horn Page 3 We recommend that the City increase the budget by $66,800 for these additional services. The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: Description Water Sewer Total Task 1 - Design Management $0 $0 $0 Task 2 - Conceptual Design (30%) $0 $0 $0 Task 3 - Preliminary Design (60%) $0 $0 $0 Task 4 - Final Design (90%) $37,300 $6,100 $43,400 Task 5 - Construction Document Preparation (100%) $7,100 $1,100 $8,200 Task 6 - Bid Phase Services $13,100 $2,100 $15,200 Task 7 - Construction Phase Services $0 $0 $0 Task 8 - ROW/Easement Services $0 $0 $0 Task 9 - Survey and SUE Services $0 $0 $0 Task 10 -Additional Services $0 $0 $0 Total $57,500 $9,300 $66,800 The following table summarizes the Fee per Work Phase breakdown: Work Phase Water Sewer Total 31 $686,726 $102,614 $789,340 The following table summarizes our recommended budget revisions and shows the revised contract amount: Original Contract Amendment No. 1 Revised Contract Task 1 $197,400 $0 $197,400 Task 2 $83,700 $0 $83,700 Task 3 $160,600 $0 $160,600 Task 4 $133,500 $43,400 $176,900 Task 5 $22,100 $8,200 $30,300 Task 6 $23,400 $15,200 $38,600 Task 7 $0 $0 $0 Task 8 $8,580 $0 $8,580 Task 9 $130,060 $0 $130,060 Task 10 $30,000 $0 $30,000 Total Project $789,340 $66,800 $856,140 Kimley»>Horn The following breakdown for water and sewer services is recommended: Water Fee Sewer Fee Survey Fee Total Original Contract $573,574 $85,706 $130,060 $789,340 Amendment No. 1 $57,500 $9,300 - $66,800 Total $631,074 $95,006 $130,060 $856,140 Page 4 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES u P.. Chris Igo, P.E. Associate CPI/waw Copy to: Tony Sholola, P.E., City of Fort Worth Attachments - Level of Effort Spreadsheet KAFTW Utilities\061018483-WSM-X-Forest-Park-Ph1\PPP\POST NTP\Amendment\Amendment-l\Amendment-No-1 WSM-X-Forest Park Phase1.doc 04 H Z W w W W O W J r 2 od W N a 2 a Y a a w w Z O N � LL � t N O w X n o 'o Y y U O m CDw O,rnr O E p= N Q d a a ❑ Z U J r O U U) r Z W 2 w U J a W a' Q' W W r Q H Z a a d' w Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p o V}EA00 Vf N ooF»0000ujo N M N oFn A N Clt aD _oo r u� � ocn000000e3 N 1n V CNN V 0 i0 r fA EA � � fA fA ER di fA d) co m Y y a) r y 0 0 �n »F»f»e»e»f»<»us 0 0 0 0 0 0 0 0 vi 0 0 f»E»f»F»u3 0 0 0 0 v� 0 we»fn 0 0 0 e»F»en 0 0 0 o 0 0 nf»e»f»v>F»af» 0 0 0 0 0 0 0 o N 0 C W M N o FN K U W � O1 O H fA N l0 N_ al t5 W EA Yi a o r a y v m K a LL C y Y C o u M y OM OM O O m LL L � m o o 0 e va V M 0 0 e»ML W N 0 0 ooenooNl ao �_ N 0 0 0 M 0 M 0 0 r M �O M 0 0 u N N 0 0 oe» N 0 c N w 0 0 ci f» 0 oo � r 0 0 ua 0 1� 1' P1 0 0 »,T � 0 0 m N 0 0 000e» rM 0 0 M 0 o N J y0 V� 69 fA EAR�fA fA EAR M M� W EA Vi SEA W� A U O r = oo c N c o o Q oo O O N M V 7 N O 7 V o N CO,' N O n M N w w a o rn 5T Q � � � oo N M M N N N V N 7 N N O N N N N N N t o O d N z1 aa�W m J C O W O m C V O N N N C' � LO N � � N M N O G N al a a m C C O 0 0 o W 0 0 0 y _ M N O a` d d o a a) ° m y U a n m ° C O O } C O L m m L m N r a 'a �E�� � ����N U d�E a G m (� 0 M L a Eo d ❑ m a� O m m N a m 3 m U N a c c Y m °� 0 u oa`a`o�O'a`'vo� w2 0 0 a) L a1 O L Y O O E E O Y y 0 0 N m� E E F� o moo' p E H qqO G O) c Ia a3 C C C y O 0 n1 V- C ❑ c C m of C O c y y d) G VJ v o m O O) to y y 0 U N y O U N a1 U O O O U U O C N N O y m N N Q N a N C O. a o o -�°- �. C a "3 D Q o N .. U a ` c ,Ul ❑ U L} a in 2 N a C 2 z� a c swarm@n- m m M (n a, c o a ama¢Na¢a iLLL0 o Om UU co) O m� O z N r O M O N O N Y a N N IC 'o kw 00 co s N o a O cl ID EA u FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Kimley-Horn and Associates, Inc. Subject of the Agreement: Water and Wastewater Replacement Contract 2023 WSM-X M&C Approved by the Council? * Yes ❑ No M If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 62757-Al If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 8/24/2026 If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No 21 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 105716 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.