Loading...
HomeMy WebLinkAbout065035-CO1 - Construction-Related - Contract - GPFT HF Alliance 2026, LPFo, Developer -Awarded -Project Change Order Change Order Number: 1 Project Name: INDCO 1-35 Eagle IPRC Record: IPRC25-0170 City Secretary Number: 65035 X Number: X-28758 City Participated Project: O yes O No Inspector Name: Rowdy Glover Project Manager Name: Madiha Alshammry Date: 8/4/2026 CPN: 106547 CFA Number: 25-0189 FID: 30114-0200431-106547-EO7685 File Number: Email: rowdvalover2fortworthtexas.00v Email: madiha.alshammw(rDfortworthtems.00v Phone: Phone: 817-395-5887 817-392-7252 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Working Days Credits/Extras Developer Cost City Cost Developer Cost City Cost Developer Cost Ci Cost Developer Cost CityCost Developer Cost CityCost Original Contract $914,868.24 $907,287.76 $94,561.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 120 Extras to Date $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Credits to Date $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Contract to Date $914,868.24 $907,287.76 $94,561.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 120 Amount of Proposed CO $1,924.00 $3,120.'0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 Revised Contract Amount $912,944.24 $904, 16T76 $94,561.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 120 Total Revised Contract Per Unit $1,817,112.00 $94,561.00 $0.00 $0.00 $0.00 Revised Cost Share Dev. Cost: $1,007,505.24 City Cost: $904,167.76 Total Revised Contract $1,911,673.00 Reason for Change Order 16inch Water Line shortened by 26ft at end of line due to an existing 24inch Sewer Line conflict. We evaluated potentially lowering the 16inch Water Line below the 24inch Sewer Line but there is insufficient space to lower the waterline below the 24inch sewer while staying within the Public 20' Water Easement. Per input from City of Fort Worth DSWS (Development Services Water Section), ending the line 26ft shortis acceptable. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH STANDARD CONSTRUCTION DOCUMENT - DEVELOPER AWARDED PROJECTS REVISED DATE: March 10.2026 1 of 3 FORT WORTH. Change Order Number: Project Name: INDCO 1-35 Eagle You are directed to make the following changes in the contract documents: Asterisk (') indicates New Pay Item Developer -Awarded -Project Change Order Date: 8/4/2026 CPN: 106547 REVIEWED By Madiha Alshammry at 8:f8 am, Aug 17, 2026 UNIT I: WATER IMPROVEMENTS PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION CIFW DELTA PRICE UNIT PRICE Developer Cost City Cost TOTAL 8 3311.0541 26 LF 16" Water Pie $120.00 $194.00 $1 924.00 $3 120.00 $5 044.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 TOTAL UNIT I: WATER IMPROVEMENTS ($1,924.00) 1 ($3,120.00) ($5,044.00) UNIT It: SANITARY SEWER IMPROVEMENTS PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 1 0.00 $0.00 $0.00 1 $0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.000.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL UNIT It: SANITARY SEWER IMPROVEMENTS $0.00 1 $0.00 $0.00 CITY OF FORT WORTH STANDARD CONSTRUCTION DOCUMENT - DEVELOPER AWARDED PROJECTS REVISED DATE: March 10.2026 2 of 3 FORT WORTH. Developer -Awarded -Project Change Order REVIEWED By Madlha A1shammryat 8:18 am, Aug 17, 2026 Change Order Number: 1 Date: 8/4/2026 Project Name: INDCO 1-35 Eagle CPN: 106547 MM Name: FA Peinado Construction LLC - Title: Trey Walker Contractor Requested: g3iqnature: % 7t/aPln Date: 8/4/2026 Name: Kimle Hom - Jared Earney Title: Associate Engineer Recommended: ISignature: 14211� V Date: 8/12/2026 Name: GPFT HF Alliance 2026, LP - Title: Michael Flowers — Manager Developer Approved: '"� '" 8-12-2026 Signature: Date: r Madiha Alshammry Senior Professional Engineer Name: Title: Project Manager: 08/17/2026 Signature: Date: Suby Varughese Engineering Manager Name: Title: CoFW Participating Department: 08/24/2026 Signature: Date: Jessika Williams Assistant City Attorney Name: Title: CoFW Assistant City Attorney: 08/26/2026 Signature: Date: Jesica McEachern Assistant City Manager Title: aName: CoFW Assistant City Manager: 08�31/2O2G nature: 4aFORtnn4 Date: p� �,,.o ., o�y0 0 Name: Jannette Goodall o°max om�ao Title: City Secretary CoFW City Secretary: Opa * *tea Signature: U 4 datt� tp5 o Date: nna 4�� M&C Number: 26-0225 M&C Date Approved: 3/31/2026 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH STANDARD CONSTRUCTION DOCUMENT — DEVELOPER AWARDED PROJECTS REVISED DATE: March 10.2026 3 of 3 3 VI REVIEWED `\ ` ` \. erm.mn. am,Rmr•, m:aan,,�msT, xss eIN �a .N �v,11 ''P��a I �RFRfI a ., CRY uL.,PI I . FRONTAGEROAO _ FOR PUBLIC WATER PLAIN - — J � INTERSTATE IGHWA 35W � NUMBERDP wATBIEAMNlNG TAB4E D nonawATsasaNPUNG MscR DPsnrvvlrs al o of i TA 3.1 RR . — u1NGER'IHA D AI FREUNE l 5: HroRAM lll FA sUSTOTAI 4 TOiArsAMPU,FS,FD CO INGI= �/Eaa MATEn wsrvonwARERsnMmuNG Immw,ua wnrzRsarwr,u,mey �®00m SEEPUBLIC PUBLISHEC WATER ] _ E FOR WATEE R J PLAN . 8 T I dO2 c scetElry FEET LEGEND-- Pru�snNc waTER UNE EMTNG SEWER UNE w — PRovosMPURUG Fl UNE —w PROPOSED PRIVATE —ER UM PROPOSED us'- "' E SENERUNE PROPOSED—M REHYDRANT HIGHWA"'W RONTAGE ROAD VOL�B1'� F !• SEE SHEETS iFOft 77 PUBUCWATERPLAN �41 INTERSTATE HIGHWAY 35W -- eu��t� .�.........,.,Te... I LOT2 BL.C— NORTHPORTAOOITION (DEC. NO. 2DIB-340) I "° xW EP.. oN °N KROw, what'sow. I^w r Call befom before you dig. in Z J J J d of Of i O3 aLEET f R1ER 6 0 Iurxr ., \ \, . . ........ 1 _ 2 / � vwc¢rn m L 1 ------ ------ ------ ---- W --- a.w r rt v/ i T — � n•w ae-w w.ao s rw,cwn—ux¢n-- t 1 p va -]HIGHWAY 35W FRONTAGE ROAD$sr uwnww�wnww>aa✓.ai F. �—� ® c y INTERSTraATEorxmwTwwn-oHIGHWAY.11, � 1 rnvnms,ervmn PUBLIC WATER LINE A n 665 665 660 66o 655 NM i sv.. ceno 650 — 4 — — 660 645 645 - "a ru Pa .x s ssca x•ea „xc 640 as REVIEWED ernroam,4,:nPmPrn•ae ao:u.m. aP,sr.mx FAPHIe C: FEET NOTESAN- NIAIL vm ncreuru.eenr v a9.00 x.00 asoo Tsoa aT•w aeoo ) 38.00 ( AIM - � j AY���t9�' u KDoWwhat's below. Call before yor, dig. .GEND Pn 3 Ne pa r"awe uue wre"n m rr�aree¢n rwucvmren wre" � s vvv� k VICINITY MAP N.T.S. WI J X I. to c� 3 0-. Z 0 0 Z LL go a 'D �w J >LLI � (Y a 11-R1 I ¢oe I Imal+o.grmmm�l f v. \ \ \ asPANcs J \ L \\ sw \ /J \ \ r Bo wos auuEJ ' SEE SHEET I3FR PUBLIC SEW ER VLtW � — I I I PROP. 1 STORY BUILDING 111 923 SF � s \ 60 \ \ y REVIEWED \ `\ C EE-. N rEEr 120 \ \ \ \ 1 \ \ xa. V'maYs� 1 I I I i ��ff3 HIGHWAY ES RONTAGE ROAD aP.ui \ sEwiB u.Eme �TE HIGHWAY 3EVJ —1% P�aYN".,o as,=r�m TERBTAN.P�E 40/0 LEGEND— srtE eourvoARv LINE EMETING SEVER LINE • paoposEo pueuc WgreauNp PROPOSED PRIVATE-TEa 11 ..� PROPOSED PUBYO SEwEa YNE PROPOSED PRIVATE SEVER LINE PRO10SEDN9.TERMETER $O PROPOSEDMPNHOIE {I} RE HYDRANT �,VOL A BENCH MARK LIST Z O W O 2C"c. NTIDN • IM Know what's I76IOW. TL < Call before you dig. HEErry E B12-R1R FORT WORTH., City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: GPFT HF Alliance 2026, LP Subject of the Agreement: The 16-inch water main was reduced in length by 26 feet at the end of the line due to a conflict with an existing 24-inch sewer Iine.The engineer evaluated lowering the 16-inch water main below the 24-inch sewer line; however, there is insufficient space to do so while remaining within the 20-foot Public Water Easement Per DSWS (Development Services Water Section), reducing the water main by 26 feet is acceptable. M&C Approved by the Council? * Yes ❑ No 0 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page, for permanent contract listing. 65035 Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 0 *Ifso, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 106547 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑■ No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.