Loading...
HomeMy WebLinkAbout065625-PM1 - Construction-Related - Contract - Forestar (USA) Real Estate Group Inc. and Burnsco Construction Inc.CSC No. 65625-PM1 FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF COHIX PHASE 3 IPRC Record No. IPRC23-0157 City Project No. 105162 FID No. 30114-0200431-105162-E07685 File No. W-3011 X File No. X-27976 Mattie Parker Jesus "Jay" Chapa Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth August 2026 Shield Engineering Group TBPE Firm #F-11039 TBPLS Firm # 10193890 1600 W 7`h St., Suite 400, Fort Worth, TX. 76102 817-810-0696 Owner/Developer Forestar (USA) Real Estate Group Inc. 2221 E Lamar Blvd., Suite 790 Arlington, TX. 76006 817-769-1860 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 1113 Invitation to Bidders 03'20/2920 00 2113 Instructions to Bidders 03/20/2020 00 41 00 Bid Form 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 001313 BidBond 01,'02/2011 00 45 11 Bidders Pre ualification's 04/02/2014 00 45 12 Pre uglification Statement 09/01/2015 00 45 13 Bidder Pregualification Application 03/09,'2020 00 45 26 Contractor Compliance with Workers' Compensation ensation Law 04/02/2014 00 45-49 Minority Business Enterprise Goal 08,'2 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 007209 General Conditions 11/15/2017 00-7-3 00 Supplementary Conditions 07 iO1i r 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded Projects 01/10/2013 Division 01 - General Requirements Last Revised 01 11 00 Summaiy of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 3119 Preconstruction Meeting 08/30/2013 01 31 20 Project Meetings 0710vnin01 1 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements uirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Cohix PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: http://fortworthtexas.gov/tpw/contractors/ or https://apps.fortworthtexas.goviProj ectResources/ Division 02 - Existing Conditions Date Modified 02 4113 Selective Site Demolition 02/11/2022 02 4114 Utility Removal/Abandonment 12/20/2012 02 4115 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 03/11/2022 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03-88-00 Modifications to Existing Concrete Stmctures /z 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 03/11/2022 26 05 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2016 Division 31- Earthwork 31 10 00 Site Clearing 03/22/2021 31 23 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 04/29/2021 31 36 00 Gabions 12/20/2012 31 37 00 Ri p ra 12/20/2012 Division 32 - Exterior lm rovements 32 0117 Permanent Asphalt Paving Repair 12/20,'20 12 32 0118 Temporaiy Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 37 11 23 Flexible Base Courses 12�7zzr20/2012 2 11 29 Lime e Treated Base Courses 12/20/2012 32 11 2 Cement Treated Base Courses 06/lvvr-10/zO22 32 11 37 Liquid Treated Soil Stabilizer 08/21/2015 32 12 10 12/20/2012 � 32 12 72 12/20/2012 �� CITY OF FORT WORTH Cohix PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 32 13 13 Concrete Paving 06/10/2022 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 6 Brick Unit Paving 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 12/09/2022 32 17 23 Pavement Markings 06/10/2022 32 17 25 Curb Address Painting 11,'04/2013 o 37 3113 Chain Fences .,...1 Gates 12/')rz4040Q 32 31 26 Wire Fences and Gates 12/')r�-20i'2v12 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast -in -Place Concrete Retaining Walls 06/05/2018 32 9119 Topsoil Placement and Finishing of Parkways 03/11/2022 32 92 13 Hydro -Mulching, Seeding, and Sodding 05/13/2021 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 09/07/2018 33 01 31 Closed Circuit Television (CCTV) Inspection 03/11/2022 33 03 10 Bypass Pumping of Existing Sewer Systems stems 12/20/2022 33 04 10 Joint Bonding and Electrical Isolation 12/20/2022 33 04 11 Corrosion Control Test Stations 12/20/2022 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2022 33-04-3-9 Temporary Water Services 0/0m7�T 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 03/11/2022 33 05 10 Utility Trench Excavation, Embedment, and Backfill. 04/02/2021 33 05 12 Water Line Lowering 12/20/2012 33 05 13 Frame, Cover and Grade Rings - Cast Iron 09/09/2022 33 05 13.10 Frame, Cover and Grade Rings s - Composite 09/09/2022 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 03/11/2022 33 05 16 Concrete Water Vaults 12/20/2022 33 05 17 Concrete Collars 03/11/2022 33 05 20 Auger Boring 12/20/2022 33 05 21 Tu...-.el Liner Plate 12/20/2022 33 05 22 gpe1 71 /2z 3333 Hand Tunneling 171 /7z 3-3-05 24 Installation Carrier Pipe in Casing Tunnel Liner Plate 12/20/2022 of or 33 05 26 Utility Markers/Locators 12/20/2022 33 05 30 Location of Existing Utilities 12/20/2022 33 11 05 Bolts, Nuts, and Gaskets 12/20/2022 33 1110 Ductile Iron Pipe 1 2 m�=2 33 11 11 Ductile Iron Fittings 09/20/2017 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 09/09/2022 33 1 1 1 3 Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type 12/20/2022 334 Buried Steel Pipe and Fittings 121 /2z 33-11 15 Pre Stressed Concrete Cylinder Pipe ______________ 33 12 10 Water Services 1 -inch to 2 -inch 02/14/2017 33 12 11T 12/20/7012 �z CITY OF FORT WORTH Cohix PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 12 20 Resilient Seated Gate Valve 05/06/2015 33 12 21 04/23/2019 33 12 25 Connection to Existing Water Mains 02/06/2013 33 12 30 Combination Air Valve Assemblies for Potable Water Systems 12/20/2022 33 12 40 Fire Hydrants 01/03/2014 33 12 50 Water Sample Stations 12/20/2022 33 12 60 Standard Blow off Valve Assembly 06/19/2013 32 12/20/2022 1 3113 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2022 33-34 15 04 /�9 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 09/09/2022 33 31 2^1 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer 12/20/2022 33 2 Sanitary Sewer Slip Lining 12/20/2022 32 31 23 Sanitary Sewer Pipe Enlargement 12/20/2022 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 1 70 Combination Air Valve for Sanitary Sewer Force Mains 12/20/2022 33 39 10 Cast -in -Place Concrete Manholes 12/20/2022 33 39 20 Precast Concrete Manholes 12/20/2022 33-39-3s Fiberglass Manholes 12,'20/2022 33-39-49 12/20/2022 33 39 60 Epoxy Liners for Sanitary Sewer Structures 04/29/2021 33 4110 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 3s 44 12,'20/2022, 33 4112Polyethlene11�15 33 46 00 Subdrainage e 06/10/2022 33 16-01 Slotted Storm Drains 07/01/2011 33 16 02 Trench Drains O7/OmTO1/2O11 33 49 10 Cast -in -Place Manholes and Junction Boxes 12/20/2022 33 49 20 Curb and Drop Inlets 03/11/2022 33 49 40 Storm Drainage Headwalls and Win. walls 07/01/2011 Division 34 - Transportation 344-4.1-1 03/11/2022 3 4, , n n, Attachment Contoller Cabinet 12/18/2015 7TTITCT. �l Controller ' 344110.02 Attachment B Controller Specification 12 0 4f40 40 34 ^T-'11 10.03 021 34 4111 Temporary Traffic Signals 11/22/2013 31� '1113 Removing Traffic Signals 03/1 1/2022 3n5 Rectangular Rapid Flashing Beacon 12/2 34 4116 Pedestrian Hybrid Signal 07/26/2021 34-4-2A Roadway illumination Assemblies 12/20/2012 31 11 20.01 erial LED Roadway Luminafres 06/wr15/2015 31 11 20.02 Freeway LED Roadway Luminafres 06/1 15 inn n03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Si s 11/12/2013 34 7113 Traffic Control 03/22/2021 CITY OF FORT WORTH Cohix PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 5 Appendix GC 1.01 Availability Lands GC -4.02 GC 4.04 of Subsurface and Physical Conditions Underground Facilities Hazardous Environmental Condition at Site GC 4.06 GC 6.06.D Minority and Women Owned Business ess Enterprise Compliance GC 6.07 Wage Rates Permits and Utilities GC -6.09 6. 1 GC GR-01 60 00 Nondiscrimination Product Requirements END OF SECTION CITY OF FORT WORTH Cohix PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 WATER, SANITARY SEWER, DRAINAGE CITY OF FORT WORTH COHIXPH3 CPN 105162 Cohix Phase 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page 1 of4 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT I: WATER IMPROVEMENTS 1 3311.0261 8" PVC Water Pipe 33 11 12 LF 3,866 $48.00 $185,568.00 2 3312.0001 Fire Hydrant w/ Gate Valve 33 1240 EA 4 $7,700.00 $30,800.00 3 3312.2003 1" Water Service 33 12 10 EA 125 $1,590.00 $198,750.00 4 3312.3003 8" Gate Valve & Box 33 12 20 EA 9 $2,370.00 $21,330.00 5 3305.0109 Trench Safety 33 05 10 LF 3,866 $0.10 $386.60 6 3311.0001 Ductile Iron Water Fittings W/ Restraint 33 1111 TON 1.10 $16,200.00 $17,820.00 7 3471.0013 Traffic Control 34 71 13 MO 1 $250.00 $250.00 8 3005.0003 8' Waterline Lowering 3305 10 EA 11 $4,300.00 $47,300.00 9 9999.0001 1" Irrigation Service 33 12 10 EA 5 $1,570.00 $7,850.00 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 45 TOTAL UNIT I: WATER IMPROVEMENTS $510,054.60 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS. DEVELOPER AWARDED PROJECTS (PHASE 3) 00 42 43_Bid Proposal_ DAP_ Utilities Form Version May 22, 2019 Cohix Phase 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page 2 of4 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT II: SANITARY SEWER IMPROVEMENTS 1 3331.4115 8" Sewer Main 3331 20 LF 2,018 $53.00 $106,954.00 2 3339.1001 4' Manhole 3339 10 EA 14 $5,290.00 $74,060.00 3 3339.1003 Extra Depth Manhole (> 6.0') 3339 10 VF 39 $220.00 $8,580.00 4 3331.3101 4" Sewer Service 33 31 50 EA 66 $1,639.00 $108,174.00 5 3301.0002 Post -CCTV Inspection 33 01 31 LF 2,253 $2.90 $6,533.70 6 3301.0101 Manhole Vacuum Testing 33 01 30 EA 14 $150.00 $2,100.00 7 3305.0109 Trench Safety 3305 10 LF 2,253 $1.00 $2,253.00 8 3471.0013 Traffic Control 34 71 13 MO 1 $250.00 $250.00 9 3339.0001 Epoxy Manhole Liner 3339 60 VF 53 $420.00 $22,260.00 10 3305.0202 Imported Embedment/Backfill, CSS 33 05 10 LF 130 $57.00 $7,410.00 11 9999.0002 4" Sewer Service (Tap into Exist Main) 33 31 50 EA 59 $1,710.00 $100,890.00 12 3331.4119 8" DIP Sewer Pipe 33 11 10 LF 235 $151.00 $35,485.00 13 9999.0010 20" Steel Casing 00 0000 LF 40 $164.00 $6,560.00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 45 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $481,509.70 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS (PHASE 3) 00 42 43 Bid Proposal_ DAP_ Utilities Form Version May 22, 2019 Cohix Phase 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page 3 of4 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3341.0201 21" RCP, Class III 33 41 10 LF 94 $84.00 $7,896.00 2 3341.0205 24" RCP, Class III 3341 10 LF 619 $91.00 $56,329.00 3 3341.0208 27" RCP, Class III 3341 10 LF 143 $104.00 $14,872.00 4 3341.0402 30" RCP, Class III 33 41 10 LF 51 $116.00 $5,916.00 5 3341.0309 36" RCP, Class III 3341 10 LF 677 $146.00 $98,842.00 6 3341.0402 42" RCP, Class III 3341 10 LF 614 $188.00 $115,432.00 7 21" Polypropylene (ASTM F2881) Strom Drain Pipe 00 0000 LF 21 $100.00 $2,100.00 8 24" Polypropylene (ASTM F2881) Strom Drain Pipe 33 4111 LF 177 $100.00 $17,700.00 9 3305.0109 Trench Safety 3305 10 LF 2,396 $0.50 $1,198.00 10 3349.0001 4' Storm Junction Box 3349 10 EA 2 $5,700.00 $11,400.00 11 3349.0002 5' Storm Junction Box 3349 10 EA 1 $6,500.00 $6,500.00 12 3349.5002 10' Curb Inlet 33 49 20 EA 12 $6,100.00 $73,200.00 13 3349.5003 15' Curb Inlet 33 49 20 EA 6 $8,500.00 $51,000.00 14 3349.7002 4' Drop Inlet 33 49 20 EA 1 $6,400.00 $6,400.00 15 9999.0008 36" Sloping Headwall 33 49 40 EA 1 $3,600.00 $3,600.00 16 9999.0004 42" Sloping Headwall 33 49 40 EA 1 $4,000.00 $4,000.00 17 3137.0102 Large Stone Riprap, dry 31 37 00 SY 479 $92.00 $44,068.00 18 9999.0011 Conc Lined Channel 00 00 00 SY 1,221 $147.00 $179,487.00 19 3231.0113 6' Chain Link, Steel 3231 13 LF 1,490 $39.00 $58,110.00 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $758,050.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS (PHASE 3) 00 42 43_Bid Proposal_ DAP_ Utilities Form Version May 22, 2019 Cohix Phase 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page 4 of4 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification I Unit of I Bid Description Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Burnsco Construction Inc 6331 Southwest Blvd Benbrook, Texas 76132 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. $481,509.70 $758,050.00 Total Construction Bidi $1 BY: ,/} TITLE: Vice President DATE: July 2, 2026 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 95 working days after the date when the 4.30 (PHASE 3) 00 42 43_Bid Proposal_ DAP_ Utilities 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004511 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004511 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid 2 the prequalified work types until the expiration date stated in the letter. 3 8 END OF SECTION CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004512 DAP PREQUALIFICATION STATEMENT PageIof] SECTION 00 45 12 DAP - PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Type" box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water and Wastewater New Burnsco Construction Inc. 6/30/2027 Development, Rehabilitation, 6331 Southwest Blvd. and Redevelopment Open Cut Benbrook, TX 76132 and Trenchless (all sizes) Drainage Improvements The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. 1.j11)11D1:; Burnsco Construction Inc. BY: (J/ ,tL__ 6331 Southwest Blvd. Benbrook, TX 76132 (Signatu TITLE: Vice President DATE: August 3, 2026 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUAU FICATION STATEMENT — DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 Cohix Phase 3 CPN: 105162 00 45 12_Prequalifrcation Statement 2015 DAP 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of l 2 3 4 5 6 7 8 9 t 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105162. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Bumsco Construction Inc. By: Albert Grantges Company 6331 Southwest Blvd. Signature: Address Benbrook, TX 76132 Title: City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § Vice President (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Albert Grantges , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of Bumsco Construction, Inc. for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 3rd day of August . 20 26 `,►►11RIIIIIII/lI,jf4vu4rv&) �ffcxas Notary Public in and for the S END OF SECTION • • /qTf Zvi '� ..133c/h".. OF ,� CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Cohix PH3 CPN: 105162 005243- I Developer Awarded Project Agreement Page I of4 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on 8/5/26 is made by and between the Developer, 4 Forestar (USA) Real Estate Group Inc., authorized to do business in Texas ("Developer") , and 5 Burnsco Construction Inc, authorized to do business in Texas, acting by and through its duly 6 authorized representative, ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: I5 Cohix Phase 3 16 City Project Number: 105162 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within {jJ working days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard 29 City Conditions of the Construction Contract for Developer Awarded Projects. The 30 Contractor also recognizes the delays, expense and difficulties involved in proving in a 31 legal proceeding the actual loss suffered by the Developer if the Work is not completed on 32 time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated 33 damages for delay (but not as a penalty), Contractor shall pay Developer Dollars ($650) 34 for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance 35 until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105162 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of4 36 Article 4. CONTRACT PRICE 37 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of One Million Seven Hundred Forty -Nine Thousand 39 Six Hundred Fourteen Dollars and Thirty Cents ($1,749,614.30). 40 Article 5. CONTRACT DOCUMENTS 41 5.1 CONTENTS: 42 A.The Contract Documents which comprise the entire agreement between Developer and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement 3) State and Federal documents (project specific) b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit h. MBE and/or SBE Commitment Form (If required) 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 00 5243 -3 Developer Awarded Project Agreement Page 3 of4 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or proven that all or some of the damages being 81 sought were caused, in whole or in part, by any act, omission or negligence of the city. 82 This indemnity provision is intended to include, without limitation, indemnity for costs, 83 expenses and legal fees incurred by the city in defending against such claims and causes 84 of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification provision 91 is specifically intended to operate and be effective even if it is alleged or proven that all 92 or some of the damages being sought were caused, in whole or in part, by any act, 93 omission or negligence of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are defined in Article l of the Standard City Conditions of the 98 Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Developer and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon DEVELOPER and 110 CONTRACTOR. 1 l 1 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 115 116 7.6 Authority to Sign. 117 118 119 120 121 122 123 124 125 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Burnsco Construction Inc B (Signature) Albert Grantges (Printed Name) Title: Vice President Company Name: Burnsco Construction Inc Address: 6331 Southwest Blvd Developer: Forestar (USA) Real Estate Group Inc. By: (Signature) s7LPHE4 B,uM (Printed Name) Title: J►r, ��cs�a, ,�r Company name: Forestar (USA) Real Estate Group Inc. Address: 2221 E Lamar Blvd. Suite 790 City/State/Zip: Benbrook, TX 76132 City/State/Zip: Arlington, TX 76006 S 20 f31�12crZ� Dat Date CITY OF FORT WORTH Cohix P113 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 Bond #022246946 006213-1 PERFORMANCE BOND Page Io12 1 SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Burnsco Construction Inc , known as "Principal" herein 8 and Liberty Mutual Fire Insurance Company , a corporate surety(sureties, if more 9 than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether 10 one or more), are held and firmly bound unto the Developer, Forestar (USA) Real Estate Group 1 1 Inc., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas I municipal corporation ("City"), in the penal sum of One Million Seven Hundred Forty -Nine Thousand Six Hundred Fourteen Dollars And Thirty Cents ($1,749,614.30), lawful money of 14 the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum 15 well and truly to be made jointly unto the Developer and the City as dual obligees, we bind 16 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 17 firmly by these presents. 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 20 CFA Number CFA25-0066; and 21 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 22 the 5th day of August , 2026, which Contract is hereby referred to and made a 23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 24 and other accessories defined by law, in the prosecution of the Work, including any Change 25 Orders, as provided for in said Contract designated as Cohix Phase 3. 26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 27 shall faithfully perform it obligations under the Contract and shall in all respects duly and 28 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 29 specifications, and contract documents therein referred to, and as well during any period of 30 extension of the Contract that may be granted on the part of the Developer and/or City, then this 31 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH Cohix PH3 STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS CPA': 105162 Revised January 31, 2O12 006213-2 PERFORMANCE BOND Page 2 of 2 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the 5th day of 9 August , 2026. 10 12 13 14 15 16 ATTESP��- 1917 18 (Principal) ecretary 20 21 22 23 ,/ 24 fJ_ 25 Witness as to Principal 26 27 28 29 30 31 32 33 34 35 36 40 Wi Hess as to Surety 41 42 PRINCIPAL: Burnsco Construction Inc B Y: ignature Kenneth Arwine, Vice President Name and Title Address: 6331 Southwest Blvd Benbrook, TX 76132 SURETY: Liberty Mutual Fire Insurance Cori anv BY: Wti Sigr ature hinie Hunter, Attorney -In -Fact Name and Title Address: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Telephone Number: 214-989-0000 43 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 44 from the by-laws showing that this person has authority to sign such obligation. If 45 Surety's physical address is different from its mailing address, both must be provided. 46 47 Tile date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cohix PH3 STANDARD CITY CONDITIONS -- DEVELOPER AWARDED PROJECTS CPlf.105162 Revised January 31, 2012 Bond #022246946 006214 - PAYMENT BOND Pagel of2 1 SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Burnsco Construction Inc , known as "Principal" herein, and 8 Liberty Mutual Fire Insurance Company , a corporate surety ( or 9 sureties if more than one), duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Forestar I 1 (USA) Real Estate Group Inc., authorized to do business in Texas "(Developer"), and the City of 12 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of One Million Seven 13 Hundred Forty -Nine Thousand Six Hundred Fourteen Dollars And Thirty Cents 14 ($1,749,614.30) lawful money of the United States, to be paid in Fort Worth, Tarrant County, 15 Texas, for the payment of which sum well and truly be made jointly unto the Developer and the 16 City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and 17 assigns, jointly and severally, firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number CFA25-0066; and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the 5th day of August , 20 26 , which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as Cohix Phase 3. 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 30 force and effect. CITY OF FORT WORTH Cohix P1/3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN: 105/62 Revised January 31,201 2 006214-2 PAYMENT BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 5th day of b August , 20 26 . 7 8 9 10 11 12 13 14 ATTEST: (Principal Secretary Witness as to Principal ATTEST: (Surety) Secretary Witness as to Surety PRINCIPAL: Burnsco Construction Inc BY: S' attire Kenneth Arwine, Vice President Name and Title Address: 6331 Southwest Blvd Benbrook TX 76132 SURETY: Liberty Mutual Fire Insurance Company BY: Signatll!re Sophinie Hunter, Attorney -In -Fact Name and Title Address: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Telephone Number: 214-989-0000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTI-I CohLe PH3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPM- 105162 Revised January 31, 2012 Bond #022246946 006219-1 MAINTENANCE BOND Page 1 of3 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we Burnsco Construction Inc ,known as "Principal" 8 herein and Liberty Mutual Fire Insurance Company , a corporate surety (sureties, if 9 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the Developer, Forestar (USA) Real Estate II Group Inc., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas 12 municipal corporation ("City"), in the sum of One Million Seven Hundred Forty -Nine 13 Thousand Six Hundred Fourteen Dollars And Thirty Cents ($1,749,614.30), lawful money of 14 the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum 15 well and truly be made jointly unto the Developer and the City as dual obligees and their 16 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 17 and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number CFA25-0066; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 5th day of August , 20 26, which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 25 materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 27 the "Work") as provided for in said Contract and designated as Cohix Phase 3; and 28 29 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 30 accordance with the plans, specifications and Contract Documents that the Work is and will 31 remain free from defects in materials or workmanship for and during the period of two (2) years 32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 33 CITY OF FORT WORTH Cohix PH 3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CP11': /05/62 Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 006219-2 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Cobh PH 3 CPN: 105162 006219-3 MAINTENANCE BOND Page 3 of 3 I I1' WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 5th day of August 3 , 2026. 4 5 6 7 8 9 10 11 ATTEST 12 13 14 (Principal Secretary 15 16 17 18 20 Witness as to Principal 21 22 23 24 25 26 27 28 29 ATTEST: 30 31il�„r�� 32 (Surety) SecretaW 35 Witness as to Surety 36 37 *Note: 38 39 40 41 42 PRINCIPAL: Burnsco Construction Inc BY: rte- tgnature ` Kenneth Arwine, Vice President Name and Title Address: 6331 Southwest Blvd Benbrook, TX 76132 SURETY: Liberty Mutual Fire Insurance Company Sophinie Hunter, Attorney -In -Fact Name and Title iA Address: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Telephone Number: 214-989-0000 If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shal I not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cohix PH 3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPNU: 105162 Revised January 31, 2012 Liberty POWER OF ATTORNEY Mutual: Certificate No: 8213588-022020 Liberty Mutual Fire Insurance Company SURETY Wausau, Wisconsin KNOWN ALL PERSONS BY THESE PRESENTS: Liberty Mutual Fire Insurance Company, being a Wisconsin Corporation having its principal office in the City of Wausau, State of Wisconsin does hereby make, constitute and appoint Don E. Cornell: Sophinic 1 -hinter: Tina McEwan; Robbi Morales; Mikaela Peppers; Tonic Petranek: Ricardo J. Reyna: Joshua Saunders: Kelly A. Westbrook all of the city of Dallas state of TX each individually if there be more than one named, its true and lawful attorney(s)-in-fact, with full power and authority hereby conferred in theirfits name, place and stead, to sign, execute, acknowledge and deliver in their/its behalf, and as their/its act and deed, without power of redelegation, as follows: Bonds, undertakings, recognizances, contracts of indemnity, and all other surety obligations, as required, unlimited as to Dollar amount and to bind the Company(ies) making this appointment thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Company(ies), and all the acts of said attorney(s), pursuant to the authority herein given, are hereby ratified and confirmed. AUTHORITY FOR MAKING APPOINTMENT OF ATTORNEYS -IN -FACT Appointment of Attorneys -in -Fact by Liberty Mutual Fire Insurance Company are made pursuant to Article V, Section 10 of Liberty Mutual Fire Insurance Company's By -Laws, as amended and by Unanimous Consent of the Board of Directors dated May 21st, 2013. Further, the President of Liberty Mutual Fire Insurance Company, executed a Delegation of Authority and authorized the assistant secretary signing below to appoint attorneys -in -fact as may be necessary to act on behalf of Liberty Mutual Fire Insurance Company to make - E ai execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances, and other surety obligations. • m o 2 IN WITNESS WHEREOF, Liberty Mutual Fire Insurance Company has caused these presents to be signed by its authorized representatives, and its Corporate Seal to be hereto affixed, C this 2nd day of April 2025 = �E Liberty Mutual Fire Insurance Company �M 1908 d h'scoNs, a3 By: Nathan J. Zangerle, Assistant Secretary 6o a� c Attest: m Heather B. Magee m State of PENNSYLVANIA o . County of MONTGOMERY Eo a) The foregoing instrument was acknowledged before me this 2nd day of April 2025 by Nathan J. Zangerle, an authorized representative of Liberty Mutual Fire Insurance } Insurance Company. 0 > =O �A Sr �Q�'�� \ Commonwealth of Pennsylvania - Notary Seal u' �, C Teresa Pastella, Notary Public �/ n Z U �' v Montgomery County By: B (/ \ // My commission expires March 28, 2029 Commission number 1126044 Member, Pennsylvania Association of Notaries Teresa Pastella, Notary Public CERTIFICATE I, the undersigned, an Assistant Secretary of Liberty Mutual Fire Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney was one of the officers or officials specially authorized by the Board of Directors to appoint attorneys -in -fact as provided in the Unanimous Consent and Vote of the Board of Directors of Liberty Mutual Fire Insurance Company dated May 21, 2013. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the Board of Directors of Liberty Mutual Fire Insurance Company evidenced by the Unanimous Consent and Vote of the Board of Directors dated June 28, 2006 wherein it was VOTED that the signatures of such officers and the seal of the Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signature and facsimile seal shall be valid and binding upon the Company when so affixed and in the future with respect to any surety undertakings, bonds, recognizances and other surety obligations to which it is attached. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, affixed, this day of f1RE INsv hQY GOgpor7gJ'P9y W^ r F n `1908 n By: o Renee C. Llewellyn, Assistant Secretary rd, h'Sco'A yb3 LMS-22023 02/24 a) -O FC`o 00 v N 3 0° 0 N 0 a(C) B U O Liberty, Mutual, SURETY TEXAS IMPORTANT NOTICE To obtain information or make a complaint You may call toll -free for information or to make a complaint at 1-877-751-2640 You may also write to: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance Consumer Protection (Ill -IA) P.O. Box 149091 Austin, TX 78714-9091 FAX: (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection a.tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the agent or call 1-800-843-6446. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. TEXAS AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede Ilamar al numero de telefono gratis para informacion o para someter una queja al 1-877-751-2640 Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas Consumer Protection (ill -IA) P.O. Box 149091 Austin, TX 78714-9091 FAX # (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiena una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI) UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del docurnento adjunto. NP 70680901 LMS-15292 10/15 PAVING CITY OF FORT WORTH COHIX PH3 CPN 105162 Cob ix Phase 3 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 0042 43 DAP - BID PROPOSAL Page 1 of 2 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6" Conc Pvmt 32 13 13 SY 7,683 $49.85 $382,997.55 2 3213.0102 7" Conc Pvmt 32 13 13 SY 7,002 $51.55 $360,953.10 3 3211.0501 6" Lime Treatment (40 Ibs/sy) 32 11 29 SY 8,452 $3.60 $30,427.20 4 3211.0502 8" Lime Treatment (40 Ibs/sy) 32 11 29 SY 7,703 $3.60 $27,730.80 5 3211.0400 Hydrated Lime 32 11 29 TON 325.0 $300.00 $97,500.00 6 3213.0301 4" Conc Sidewalk 32 13 20 SF 2,167 $7.65 $16,577.55 7 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 6 $1,980.00 $11,880.00 8 3441.4003 Furnish/Install Alum Sign Ground Mount 3441 30 EA 8 $415.00 $3,320.00 9 3471.0001 Traffic Control 34 71 13 MO 1 $1,500.00 $1,500.00 10 3292.0100 Block Sod Placement 32 92 13 SY 262 $12.75 $3,340.50 11 3291.0100 Topsoil 32 91 19 CY 45 $92.65 $4,169.25 12 9999.0006 Install EOR Barricade 00 00 00 EA 3 $1,500.00 $4,500.00 13 9999.0007 Remove EOR Barricade 00 00 00 EA 4 $500.00 $2,000.00 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 TOTAL UNIT IV: PAVING IMPROVEMENT $946,895.95 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Farm Version May 22, 2019 (PHASE 3) 00 42 43_Bid Proposal_DAP_Paving.xls Cohix Phase 3 554243 DAP- BID PROPOSAL Page 2 of2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item No. Description Section No. Measure Quantity Unit Price Bid Value Bid This Bid is submitted by the entity named below BIDDER: Gilco Civil LLC. 6331 Southwest Blvd. Benbrook, TX 76132 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction BY)_ TlTl.l:: Manager DATE: 8-4-2026 END OF SECTION 35 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2519 (PHASE 3) 054243_Bid Proposal DAPPaving.xls 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004511 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004511 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid 2 the prequalified work types until the expiration date stated in the letter. 3 8 END OF SECTION CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP - PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Type" box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving_ Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Concrete Paving Construction Gilco Civil LLC. 6-15-28 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Gilco Civil LLC. 6331 Southwest Blvd. Benbrook, TX 76132 BY: IA G cE,v'— TITLE: Manager DATE: 8-4-2026 END OF SECTION (Signature) CITY OF FORT WORTH Cohix Phase 3 CPN: 105162 STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 004512_Prequalification Statement 2015_DAP.docx Form Version September 1, 2015 004526 - CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of I SECTION 00 45 26 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105162. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Leia McQuien Gilco Civil LLC. By: Company lease Print) 6331 Southwest Boulevard Signature: Address Benbrook, Texas 76132 Title: Manager City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Leia McQuien , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of Gilco Civil LLC for the purposes and consideration therein expressed and in the capacity therein stated. GIV UND R M HAND AND SEAL OF OFFICE this 5 day of ,20*U "- 1,,a r Notary Public in3Ind for tl State of Texas 38 END OF SECTION 39 F° LESLEY SUZANNE CLAYTON Notary ID #135558370 My Commission Expires June 24, 2030 CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 105162 Revised April 2, 2014 005243-1 Developer Awarded Project Agreement Page 1 of 4 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on 8/4/26 is made by and between the Developer, 4 Forestar (USA) Real Estate Group Inc., authorized to do business in Texas ("Developer") , and 5 Gilco Civil LLC., authorized to do business in Texas, acting by and through its duly authorized 6 representative, ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Cohix Phase 3 16 Cit,yProject Number: 105162 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within {3J{jJ working days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard 29 City Conditions of the Construction Contract for Developer Awarded Projects. The 30 Contractor also recognizes the delays, expense and difficulties involved in proving in a 31 legal proceeding the actual loss suffered by the Developer if the Work is not completed on 32 time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated 33 damages for delay (but not as a penalty), Contractor shall pay Dollars ($650) for each day 34 that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City 35 issues the Final Letter of Acceptance. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 36 Article 4. CONTRACT PRICE 37 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of Nine Hundred Forty -Six Thousand Eight Hundred 39 Ninety -Five Dollars and Ninety -Five Cents ($946,895.95). 40 Article 5. CONTRACT DOCUMENTS 41 5.1 CONTENTS: 42 A.The Contract Documents which comprise the entire agreement between Developer and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 2. Attachments to this Agreement: 46 a. Bid Form (As provided by Developer) 47 1) Proposal Form (DAP Version) 48 2) Prequalification Statement 49 3) State and Federal documents (project specific) 50 b. Insurance ACORD Form(s) 51 c. Payment Bond (DAP Version) 52 d. Performance Bond (DAP Version) 53 e. Maintenance Bond (DAP Version) 54 f. Power of Attorney for the Bonds 55 g. Worker's Compensation Affidavit 56 h. MBE and/or SBE Commitment Form (If required) 57 3. Standard City General Conditions of the Construction Contract for Developer 58 Awarded Projects. 59 4. Supplementary Conditions. 60 5. Specifications specifically made a part of the Contract Documents by attachment or, 61 if not attached, as incorporated by reference and described in the Table of Contents 62 of the Project's Contract Documents. 63 6. Drawings. 64 7. Addenda. 65 8. Documentation submitted by Contractor prior to Notice of Award. 66 9. The following which may be delivered or issued after the Effective Date of the 67 Agreement and, if issued, become an incorporated part of the Contract Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. 72 73 CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 4 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or proven that all or some of the damages being 81 sought were caused, in whole or in part, by any act, omission or negligence of the city. 82 This indemnity provision is intended to include, without limitation, indemnity for costs, 83 expenses and legal fees incurred by the city in defending against such claims and causes 84 of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification provision 91 is specifically intended to operate and be effective even if it is alleged or proven that all 92 or some of the damages being sought were caused, in whole or in part, by any act, 93 omission or neglinence of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the 98 Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Developer and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon DEVELOPER and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 115 116 7.6 Authority to Sign. 117 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized 118 signatory of the Contractor. 119 120 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 121 counterparts. 122 123 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 124 125 Contractor: Gilco Civil LLC. Gnv E k (Signature) Leia McQuien (Printed Name) Title: Manager Company Name: Gilco Civil LLC Address: 6331 Southwest Blvd. City/State/Zip: Benbrook, TX 76132 8-4-2026 Date Developer: Forestar (USA) Real Estate Group Inc. By: (Signature) 576PNsJ 9wh (Printed Name) Title: Jtcc. Przr'D&'7 Company Name: Forestar (USA) Real Estate Group Inc. Address: 2221 E Lamar Blvd. Suite 790 City/State/Zip: Arlington, TX 76006 L4 ZC)Z(o Date CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 POLICY NUMBER: 10110801061 COMMERCIAL GENERAL LIABILITY CG 20 100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations City of Fort Worth All Projects 100 Fort Worth Trail Fort Worth TX 76102 Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. Page 2 of 2 © Insurance Services Office, Inc., 2012 CG 20 10 0413 POLICY NUMBER: 10110801061 COMMERCIAL GENERAL LIABILITY CG 20370413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location And Description Of Completed Operations City of Fort Worth 100 Fort Worth Trail Fort Worth, TX 76102 All Projects Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to required by a contract or will pay on behalf of the amount of insurance: the additional insured is agreement, the most we additional insured is the 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of I Policy Number: 10158222877 Effective Date: 06-20-2026 COMMERCIAL AUTO CA044911 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 Policy Number: 10158222877 COMMERCIAL AUTO Effective Date: 06-20-2026 CA 04 44 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Gilco Contracting, Inc. Endorsement Effective Date: 06-20-2026 SCHEDULE Name(s) Of Person(s) Or Organization(s): Blanket Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a contract with that person or organization. CA 04 44 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 Policy Number: 10110801061 Effective Date: 06-20-2026 CG 72 86 04 25 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - WITH PRODUCTS -COMPLETED OPERATIONS COVERAGE - INCLUDING OTHER PARTIES IN COMPLIANCE WITH WRITTEN CONTRACTUAL REQUIREMENTS (THROUGH ISO 07/04, 10/01 and 11/85 COVERAGE OPTIONS) The following items modify insurance provided under the following: CO RCIAL GENERAL LIABILITY COVERAGE FORM A. Section II — Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph A.1. above. B. The insurance provided to the additional insured is limited as follows: 1. The person or organization is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: a. Your acts or omissions, or the acts or omissions of those acting on your behalf, in the performance of your ongoing operations specified in the "written contract"; or b. "Your work" that is specified in the "written contract" but only for "bodily injury" or "property damage" included in the "products -completed operations hazard", and only if: (1) The "written contract" requires you to provide the additional insured such coverage; and (2) This coverage part provides such coverage; and (3) Such coverage will not apply subsequent to the first to occur of the following: (a) The expiration of the period of time required by the "written contract"; or (b) The expiration of any applicable statute of limitations or statute of repose with respect to claims arising out of "your work". 2. If the "written contract" specifically requires you to provide additional insured coverage via the 04/13 edition of CG2010 or CG2037, then in paragraph B.1. above, the words "caused, in whole or in part, by" still apply. 3. If the "written contract" specifically requires you to provide additional insured coverage via the 07/04 edition of CG2010 or CG2037, then in paragraph B.1. above, the words "caused, in whole or in part, by" still apply 4. If the "written contract" specifically requires you to provide additional insured coverage via the 10/01 editions of CG2010 or CG2037, then in paragraph B.1. above, the words "caused, in whole or in part, by" are replaced by the words "arising out of". 5. If the "written contract" specifically requires you to provide additional insured coverage via the 11/85 edition of CG2010, then in paragraph B.1. above, the words "caused in whole or in part by" are replaced by the words "arising out of your work." CG 72 86 04 25 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 2 CG 72 86 04 25 6. With regard to B.1. and B.2. above only, the following conditions are added: a. The insurance afforded to such additional insured only applies to the extent permitted by law; and b. If coverage provided to the additional insured is required by a "written contract", the insurance afforded to such additional insured will not be broader than that which you are required by the "written contract" to provide for such additional insured. c. Notwithstanding anything to the contrary Section IV — Conditions, 4. Other Insurance, this insurance is excess over all other insurance available to the additional insured whether on a primary, excess, contingent or any other basis. However, if the insurance is required by the "written contract" to be primary and non-contributory, this insurance will be primary and non-contributory relative solely to insurance on which the additional insured is a named insured. 7. The insurance provided to the additional insured by this endorsement does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of: a. The rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawing and specifications; and (2) Supervisory, inspection, architectural or engineering activities. b. Any premises or work for which the additional insured is specifically listed as an additional insured on another endorsement attached to this coverage part. C. O ly for the purpose of the insurance provided this endorsement, SECTION V - DEFINITIONS is amended to add the following definition: "Written Contract" means a written contract or written agreement that requires you to make a person or organization an additional insured on the coverage part, provided the contract or agreement: 1. Is currently in effect or becoming effective during the term of this policy; and 2. Was executed prior to: a. The "bodily injury" or "property damage" or b. The offense that caused the "personal and advertising injury", for which the additional insured seeks coverage under this coverage part. CG 72 86 04 25 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 2 of 2 POLICY NUMBER: 10110801061 COMMERCIAL GENERAL LIABILITY CG 02051204 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCT WITHDRAWAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: SCHEDULE 1. Name: PER SCHEDULE ON FILE WITH BROKER 2. Address: 118 2ND AVE SE, CEDAR RAPIDS, IA 52401 3. Number of days advance notice: 30 Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 02 05 12 04 © ISO Properties, Inc., 2003 Page 1 of 1 Policy Number: 10110801061 Effective Date: 06-20-2026 COMMERCIAL GENERAL LIABILITY CG 20011219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: 10110801061 Effective Date: 06-20-2026 COMMERCIAL GENERAL LIABILITY CG 24531219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) - AUTOMATIC This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against any person or organization, because of any payment we make under this Coverage Part, to whom the insured has waived its right of recovery in a written contract or agreement. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person or organization prior to loss. CG 24 53 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: 10175330425 Effective Date: 06-20-2026 COMMERCIAL LIABILITY UMBRELLA CU 24 80 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) - AUTOMATIC This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE PART The following is added to Paragraph 9. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against any person or organization, because of any payment we make under this Coverage Part, to whom the insured has waived its right of recovery in a written contract or agreement. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person or organization prior to loss. CU 24 80 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 03 04 B (Ed. 6-14) TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (x) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: The premium charge for this endorsement shall be percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 06/20/2026 Insured Insurance Company WC 42 03 04 B (Ed. 6-14) Policy No. 10184291070 Endorsement No. Premium Countersigned by © Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. Policy Number: 10158222877 Effective Date: 06-20-2026 COMMERCIAL AUTO CA044911 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 Policy Number: 10158222877 COMMERCIAL AUTO Effective Date: 06-20-2026 CA 04 44 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Gilco Contracting, Inc. Endorsement Effective Date: 06-20-2026 SCHEDULE Name(s) Of Person(s) Or Organization(s): Blanket Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a contract with that person or organization. CA 04 44 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 Policy Number: 10110801061 Effective Date: 06-20-2026 CG 72 86 04 25 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - WITH PRODUCTS -COMPLETED OPERATIONS COVERAGE - INCLUDING OTHER PARTIES IN COMPLIANCE WITH WRITTEN CONTRACTUAL REQUIREMENTS (THROUGH ISO 07/04, 10/01 and 11/85 COVERAGE OPTIONS) The following items modify insurance provided under the following: CO RCIAL GENERAL LIABILITY COVERAGE FORM A. Section II — Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph A.1. above. B. The insurance provided to the additional insured is limited as follows: 1. The person or organization is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: a. Your acts or omissions, or the acts or omissions of those acting on your behalf, in the performance of your ongoing operations specified in the "written contract"; or b. "Your work" that is specified in the "written contract" but only for "bodily injury" or "property damage" included in the "products -completed operations hazard", and only if: (1) The "written contract" requires you to provide the additional insured such coverage; and (2) This coverage part provides such coverage; and (3) Such coverage will not apply subsequent to the first to occur of the following: (a) The expiration of the period of time required by the "written contract"; or (b) The expiration of any applicable statute of limitations or statute of repose with respect to claims arising out of "your work". 2. If the "written contract" specifically requires you to provide additional insured coverage via the 04/13 edition of CG2010 or CG2037, then in paragraph B.1. above, the words "caused, in whole or in part, by" still apply. 3. If the "written contract" specifically requires you to provide additional insured coverage via the 07/04 edition of CG2010 or CG2037, then in paragraph B.1. above, the words "caused, in whole or in part, by" still apply 4. If the "written contract" specifically requires you to provide additional insured coverage via the 10/01 editions of CG2010 or CG2037, then in paragraph B.1. above, the words "caused, in whole or in part, by" are replaced by the words "arising out of". 5. If the "written contract" specifically requires you to provide additional insured coverage via the 11/85 edition of CG2010, then in paragraph B.1. above, the words "caused in whole or in part by" are replaced by the words "arising out of your work." CG 72 86 04 25 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 2 CG 72 86 04 25 6. With regard to B.1. and B.2. above only, the following conditions are added: a. The insurance afforded to such additional insured only applies to the extent permitted by law; and b. If coverage provided to the additional insured is required by a "written contract", the insurance afforded to such additional insured will not be broader than that which you are required by the "written contract" to provide for such additional insured. c. Notwithstanding anything to the contrary Section IV — Conditions, 4. Other Insurance, this insurance is excess over all other insurance available to the additional insured whether on a primary, excess, contingent or any other basis. However, if the insurance is required by the "written contract" to be primary and non-contributory, this insurance will be primary and non-contributory relative solely to insurance on which the additional insured is a named insured. 7. The insurance provided to the additional insured by this endorsement does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of: a. The rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawing and specifications; and (2) Supervisory, inspection, architectural or engineering activities. b. Any premises or work for which the additional insured is specifically listed as an additional insured on another endorsement attached to this coverage part. C. O ly for the purpose of the insurance provided this endorsement, SECTION V - DEFINITIONS is amended to add the following definition: "Written Contract" means a written contract or written agreement that requires you to make a person or organization an additional insured on the coverage part, provided the contract or agreement: 1. Is currently in effect or becoming effective during the term of this policy; and 2. Was executed prior to: a. The "bodily injury" or "property damage" or b. The offense that caused the "personal and advertising injury", for which the additional insured seeks coverage under this coverage part. CG 72 86 04 25 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 2 of 2 POLICY NUMBER: 10110801061 COMMERCIAL GENERAL LIABILITY CG 02051204 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCT WITHDRAWAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: SCHEDULE 1. Name: PER SCHEDULE ON FILE WITH BROKER 2. Address: 118 2ND AVE SE, CEDAR RAPIDS, IA 52401 3. Number of days advance notice: 30 Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 02 05 12 04 © ISO Properties, Inc., 2003 Page 1 of 1 Policy Number: 10110801061 Effective Date: 06-20-2026 COMMERCIAL GENERAL LIABILITY CG 20011219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: 10110801061 Effective Date: 06-20-2026 COMMERCIAL GENERAL LIABILITY CG 24531219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) - AUTOMATIC This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against any person or organization, because of any payment we make under this Coverage Part, to whom the insured has waived its right of recovery in a written contract or agreement. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person or organization prior to loss. CG 24 53 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: 10175330425 Effective Date: 06-20-2026 COMMERCIAL LIABILITY UMBRELLA CU 24 80 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) - AUTOMATIC This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE PART The following is added to Paragraph 9. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against any person or organization, because of any payment we make under this Coverage Part, to whom the insured has waived its right of recovery in a written contract or agreement. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person or organization prior to loss. CU 24 80 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 03 04 B (Ed. 6-14) TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (x) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: The premium charge for this endorsement shall be percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 06/20/2026 Insured Insurance Company WC 42 03 04 B (Ed. 6-14) Policy No. 10184291070 Endorsement No. Premium Countersigned by © Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. Bond #022246948 006213-1 PERFORMANCE BOND Page 1 of2 SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Gilco Civil LLC. ,known as "Principal" herein and g Liberty Mutual Fire Insurance Company a corporate surety(sureties, if more than 9 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer, Forestar (USA) Real Estate Group Inc., 11 authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal 12 corporation ("City"), in the penal sum of Nine Hundred Forty -Six Thousand Eight Hundred 13 Ninety -Five Dollars And Ninety -Five Cents ($946,895.95), lawful money of the United States, 14 to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to 15 be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, 16 executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number CFA25-0066; and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 21 the 4th day of August , 2026, which Contract is hereby referred to and made a 22 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 23 and other accessories defined by law, in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Cohix Phase 3. 25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 26 shall faithfully perform it obligations under the Contract and shall in all respects duly and 27 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 28 specifications, and contract documents therein referred to, and as well during any period of 29 extension of the Contract that may be granted on the part of the Developer and/or City, then this 30 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH Cohix PH3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN 105162 Revised January 31, 2012 0062 I3-2 PERFORMANCE BOND Page 2 o12 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the 4th day of 9 August - , 2026-. 10 12 13 14 15 16 TTEST: 19 (Principal) Secretary 20 21 22 23 24 25 Witness as to Principal 26 27 28 29 30 31 32 33 34 35 36 37 38 40 Wit ss a to Surety 41 42 PRINCIPAL: Gilco Civil LLC. BY: Signature Leia McQuien, Manager Name and Title Address: 6331 Southwest Blvd. Benbrook. TX 76132 SURETY: Liberty Mutual Fire lnsurance�Com any Sig ature Sophinie Hunter, Attorney -In -Fact Name and Title Address: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Telephone Number: 214-989-0000 43 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 44 from the by -laves showing that this person has authority to sign such obligation. If 45 Surety's physical address is different from its mailing address, both must be provided. 46 47 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cohix P113 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105162 Revised January 31, 2012 Bond #022246948 006214-1 PAYMENT BOND Page I oft 1 SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Gilco Civil LLC., known as "Principal" herein, and 8 Liberty Mutual Fire Insurance Company , a corporate surety ( or 9 sureties if more than one), duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Forestar 11 (USA) Real Estate Group Inc., authorized to do business in Texas "(Developer"), and the City of 12 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Nine Hundred Forty - 13 Six Thousand Eight Hundred Ninety -Five Dollars And Ninety -Five Cents ($946,895.95), 14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the 15 payment of which sum well and truly be made jointly unto the Developer and the City as dual 16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 17 and severally, firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number CFA25-0066; and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the 4th day of August , 20 26 , which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as Cohix Phase 3. 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 30 force and effect. CITY OF FORT WORTH Cohix PH3 STANDARD CITY CONDITIONS- DEVELOPER AWARDED PROJECTS CPN 105162 Revised January 31, 201 2 006214-2 PAYMENT BOND Page 2 of2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 4th day of 6 __August 20 26 7 PRINCIPAL: Gilco Civil LLC. ATTEST: BY: ature Leis McQuien, Manager (Principal) Secretary Name and Title Address: 6331 Southwest Blvd. Benbrook TX 76132 Witness as to Principal SURETY: Liberty Mutual Fire Insurance Company 8 9 10 11 12 13 14 ATTEST: (Surety) Secretary Witne s as Surety BY: [l I Signs re Sophinie Hunter, Attorney -In -Fact Name and Title Address: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Telephone Number: 214-989-0000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH Cohix PH3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN 105162 Revised January 31, 2012 Bond #022246948 006219-1 MAINTENANCE BOND Page 1 of3 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we Gilco Civil LLC.. known as "Principal" herein and 8 Liberty Mutual Fire Insurance Company a corporate surety (sureties, if more than 9 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer, Forestar (USA) Real Estate Group Inc., 11 authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal 12 corporation ("City"), in the sum of Nine Hundred Forty -Six Thousand Eight Hundred Ninety - 13 Five Dollars And Ninety -Five Cents ($946,895.95), lawful money of the United States, to be 14 paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made 15 jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, 16 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 17 presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number CFA25-0066; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 4th day of.AUg.Ust_____.____._______, 20 26 , which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 25 materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 27 the "Work") as provided for in said Contract and designated as Cohix Phase 3; and 28 29 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 30 accordance with the plans, specifications and Contract Documents that the Work is and will 31 remain free from defects in materials or workmanship for and during the period of two (2) years 32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 33 CITY OF FORT WORTH Cohix PH 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN 105162 Revised January 31,201 2 006219-2 MAINTENANCE BOND Page 2 of3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 8 remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OF FORT WORTH Cohix PI1 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised January 31, 2O12 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 4th day of 3 August , 2o26 . 5 6 7 8 9 10 11 ATTEST: �/� 13 'J {�'` 1 l0 14 (Principal) Secretary 15 16 l7 I8 19 20 fitness as to Principal 21 22 23 24 25 26 27 28 29 ATTEST: 30 31 i,w thlclwc.�--- 32 (S ety)Secrets 33 34 35 Witne s as Surety 36 37 *Note 38 39 40 41 42 PRINCIPAL: Gi1co Civil LLC. Signature Leia McQuien, Manager Name and Title Address: 6331 Southwest Blvd. Benbrook TX 76132 SURETY: Liberty Mutual Fire Insurance Company BY: Sig ature Sophinie Hunter, Attorney-Ip-Fact Name and Title Address: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 119406-2755 Telephone Number: 214-989-0000 If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cohix PH 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN 105162 Revised January31.2012 ai tv a) to O� N:3 a C rn m 02 6O cco ID rnS to LU) iD) Cc Er `Dm Liberty Mutual. SURETY POWER OF ATTORNEY Liberty Mutual Fire Insurance Company Wausau, Wisconsin Certificate No: 8213588-022020 KNOWN ALL PERSONS BY THESE PRESENTS: Liberty Mutual Fire Insurance Company, being a Wisconsin Corporation having its principal office in the City of Wausau, State of Wisconsin does hereby make, constitute and appoint Don E. Cornell; Sophinie Hinter; Tina McEwan; Robbi Morales: Mikaela Peppers; Tonic Petranek; Ricardo J. Reyna• Joshua Saunders; Kelly A. Westbrook all of the city of Dallas state of TX each individually if there be more than one named, its true and lawful attorney(s)-in-fact, with full power and authority hereby conferred in their/its name, place and stead, to sign, execute, acknowledge and deliver in their/its behalf, and as their/its act and deed, without power of redelegation, as follows: Bonds, undertakings, recognizances, contracts of indemnity, and all other surety obligations, as required, unlimited as to Dollar amount and to bind the Company(ies) making this appointment thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Company(ies), and all the acts of said attorney(s), pursuant to the authority herein given, are hereby ratified and confirmed. AUTHORITY FOR MAKING APPOINTMENT OF ATTORNEYS•IN.FACT Appointment of Attorneys -in -Fact by Liberty Mutual Fire Insurance Company are made pursuant to Article V. Section 10 of Liberty Mutual Fire Insurance Company's By -Laws, as amended and by Unanimous Consent of the Board of Directors dated May 21st, 2013. Further, the President of Liberty Mutual Fire Insurance Company, executed a Delegation of Authority and authorized the assistant secretary signing below to appoint attorneys -in -fact as may be necessary to act on behalf of Liberty Mutual Fire Insurance Company to make rri execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances, and other surety obligations. m IN WITNESS WHEREOF, Liberty Mutual Fire Insurance Company has caused these presents to be signed by its authorized representatives, and its Corporate Seal to be hereto affixed, this 2nd day of April , 2025 . Liberty Mutual Fire Insurance Company By: 1 J. Zangerle, Attest: Lh a d aa eJL Heather B. Magee State of PENNSYLVANIA County of MONTGOMERY ss foregoing instrument was acknowledged before me this 2nd day of April , 2025 by Nathan J. Zangerfe, an authorized representative of Liberty Mutual Fire Insurance 'anon Company. CERTIFICATE Commonwealth of Pennsylvania - Notary Seal Teresa Pastella, Notary Public Montgomery County My commission expires March 28, 2029 Commission number 1126044 Member, Pennsylvania Association of Notaries By:fr) /QQil4) eresa Pastella, Notary Public I, the undersigned, an Assistant Secretary of Liberty Mutual Fire Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney was one of the officers or officials specially authorized by the Board of Directors to appoint attorneys -in -fact as provided in the Unanimous Consent and Vote of the Board of Directors of Liberty Mutual Fire Insurance Company dated May 21, 2013. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the Board of Directors of Liberty Mutual Fire Insurance Company evidenced by the Unanimous Consent and Vote of the Board of Directors dated June 28, 2006 wherein it was VOTED that the signatures of such officers and the seal of the Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signature and facsimile seal shall be valid and binding upon the Company when so affixed and in the future with respect to any surety undertakings, bonds, recognizances and other surety obligations to which it is attached. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, affixed, this day of ftRE INS& i�� �4 Fd m B g 1908 y' Renee C. Llewellyn, Assistant Secretary LMS-22023 02/24 Qo N 3°O ico `oo 0 - C CO cc C U DU) N J � Liberty tua ........ ...._......._. SURETY TEXAS IMPORTANT NOTICE To obtain information or make a complaint: You may call toll -free for information or to make a complaint at 1-877-751-2640 You may also write to: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance Consumer Protection (Ill -IA) P. O. Box 149091 Austin, TX 78714-9091 FAX: (512) 490-1007 Web: http:f/www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texgov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the agent or call 1-800-843-6446. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. TEXAS AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al numero de telefono gratis para informacion o para someter una queja al 1-877-751-2640 Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas Consumer Protection (Ill -IA) P.O. Box 149091 Austin, TX 78714-9091 FAX # (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi texas gov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiena una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI) UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. NP 70 68 09 01 LMS-15292 10/15 STREET LIGHTS CITY OF FORT WORTH COHIX PH3 CPN 105162 Cohix Phase SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP -BID PROPOSAL Page I of 2 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT V: STREET LIG TING IMPROVEMENTS 1 2605.3015 2" CONDT PVC SCH 80(T) 2605 33 LF 978 $22.07 $21584.46 2 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 978 $6.06 $5,926.68 3 3441.1646 Furnish/Install Type 336 Arm 34 41 20 EA 19 $401.00 $7,619.00 4 3441.3050 Furnish/Install LED Lighting Fixture (70 watt 3441 20 EA 19 $401.00 $7,619.00 5 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 3441 20 EA 19 $2,465.00 $46,835.00 6 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 3441 20 EA 19 $2,034.00 $38,646.00 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTt $128,230.14 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION D(X'UMENTS - DEVELOPER AWARDED PROJECTS F,xm Version May 22, 2019 (PHASE 3) 00 42 43_Bid Pmpsai_DAP_ELcuical Ci'htx Phase ; SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 004243 D.AP -BID PROPOSAL P.ge2of2 Bidder's Application Project Item Information Bidder's Proposal Bidlist It Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity Bid LIGHTING This Bid is submitted by the entity named below: BIDDER: Independent Utility Construction, Inc. 5109 Sun Valley Dr Fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction Bid BY: Ri Wolfe TITLE: President DATE: 07/02/2026 END OF SECTION $128,230.14 30 working days after the date when the 14 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Few Version May 22.2019 (PHASE 3) 00 42 43_Bid ProPmat_D.AP_Etearical 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004511 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 004511 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid 2 the prequalified work types until the expiration date stated in the letter. 3 8 END OF SECTION CITY OF FORT WORTH COHIX PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2, 2014 00 45 12 DAP PREQUALIFICATION STATEMENT Pipe! of! SECTION 00 45 12 DAP - PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Type" box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Roadway and Pedestrian Street Independent Utility Construction, Inc 02/05/2027 Lighting The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Independent Utility Construction, Inc BY: and W 5109 Sun Valley Drive Fort Worth, TX 76119 (Signature) TITLE: President DATE END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS Cohix Phase 3 CPN: 105162 00 45 12_Prequalification Statement 2015_DAP Form Version September 1, 2015 0045 26-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 105162. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: 10 11 Independent Utility Construction. Inc By: RI and Wolfe 12 Company lease Print) 13 14 5109 Sun Valley Drive Signature: 15 Address 16 17 Fort Worth, Texas 76119 Title: President 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME, the undersigned authority, on this day personally appeared 26 Richard Wolfe , known to me to be the person whose name is 27 subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of Independent Utility Construction Inc. for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 GIN UNDER M HAND AND SEAL OF OFFICE this day of 32 '1 S , 20•,{;� 33 - 34 35 �`''va''�� CHRISTINA GARCIA s'` !� ] 36 =:; Notary Public, State of Texas Notary Public in and for the State of Texas So.% Comm. Expires 12-20-2028 Notary ID 130940785 38 END OF SECTION 39 CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised April 2.2014 00514:-1 Developer Awarded Project Agreement Page I of4 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on 8/5/26 is made by and between the Developer, 4 Forestar (USA) Real Estate Group Inc.. authorized to do business in Texas ("Developer") , and 5 Independent Utility Construction, Inc. , authorized to do business in Texas, acting by and 6 through its duly authorized representative; ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Cohix Phase 3 16 City Project Number: 105162 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within /Q/ working days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard 29 City Conditions of the Construction Contract for Developer Awarded Projects. The 30 Contractor also recognizes the delays, expense and difficulties involved in proving in a 31 legal proceeding the actual loss suffered by the Developer if the Work is not completed on 32 time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated 33 damages for delay (but not as a penalty), Contractor shall pay Dollars ($6.50) for each day 34 that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City 35 issues the Final Letter of Acceptance. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16. 2016 005243.2 Developer Awarded Project Agreement Page 2 0£4 36 Article 4. CONTRACT PRICE 37 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of One Hundred Twentv-Eight Thousand Two 39 Hundred Thirty Dollars and Fourteen Cents ($128,230.14). 40 Article 5. CONTRACT DOCUMENTS 41 5.1 CONTENTS 42 A.The Contract Documents which comprise the entire agreement between Developer and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 2. Attachments to this Agreement: 46 a. Bid Form (As provided by Developer) 47 1) Proposal Form (DAP Version) 48 2) Prequalification Statement 49 3) State and Federal documents (project specific) 50 b. Insurance ACORD Form(s) 51 c. Payment Bond (DAP Version) 52 d. Performance Bond (DAP Version) 53 e. Maintenance Bond (DAP Version) 54 f. Power of Attorney for the Bonds 55 g. Worker's Compensation Affidavit 56 h. MBE and./or SBE Commitment Form (If required) 57 3. Standard City General Conditions of the Construction Contract for Developer 58 Awarded Projects. 59 4. Supplementary Conditions. 60 5. Specifications specifically made a part of the Contract Documents by attachment or, 61 if not attached, as incorporated by reference and described in the Table of Contents 62 of the Project's Contract Documents. 63 6. Drawings. 64 7. Addenda. 65 8. Documentation submitted by Contractor prior to Notice of Award. 66 9. The following which may be delivered or issued after the Effective Date of the 67 Agreement and, if issued, become an incorporated part of the Contract Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. 72 73 CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16. 2016 005243-3 Developer Awarded Project Agreement Page 3of4 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or proven that all or some of the damages being 81 sought were caused, in whole or in part, by any act, omission or negligence of the city. 82 This indemnity provision is intended to include, without limitation, indemnity for costs, 83 expenses and legal fees incurred by the city in defending against such claims and causes 84 of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification provision 91 is specifically intended to operate and be effective even if it is alleged or proven that all 92 or some of the damages being sought were caused, in whole or in part by any act, 93 omission or negligence of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the 98 Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Developer and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon DEVELOPER and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16. 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 115 116 7.6 Authority to Sign. 117 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized 118 signatory of the Contractor. 119 120 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 121 counterparts. 122 123 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 124 125 Contractor: Inde en t Utility Construction, Inc. B ature) Richard Wolfe (Printed Name) Title: President Company Name: Independent Utility Construction, Inc. Address: 5109 Sun Valley Drive Developer: Forestar (USA) Real Estate Group Inc. By: (Signature) S7EaKEI 9sum (Printed Name) Title: � 4�RE D ,,7 — Company name: Forestar (USA) Real Estate Group Inc. Address: 2221 E Lamar Blvd. Suite 790 City/State/Zip: Fort Worth, TX 76119 City/State/Zip: Arlington, TX 76006 Date Date CITY OF FORT WORTH Cohix PH3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised June 16, 2016 006113-I PERFORMANCE BOND Page I of 2 Bond No. 551036M SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Independent Utility Construction, Inc. , known as "Principal" herein and 8 Westfield Insurance Company , a corporate surety(sureties, if more than one) duly 9 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), 10 are held and firmly bound unto the Developer, Forestar (USA) Real Estate Group Inc., authorized Ii to do business in Texas ("Developer") and the City of Fort Worth. a Texas municipal corporation 12 ("City"), in the penal sum of, One Hundred Twenty -Eight Thousand. Two Hundred Thirty Dollars 13 & Fourteen Cents ($128,230.14) lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made, jointly unto the 15 Developer and the City as dual obliges, we bind ourselves, our heirs, executors, administrators, 16 successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number 25-0066 ; and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer 21 awarded the 5th day of August , 20 26, which Contract is hereby referred to and 22 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 23 labor and other accessories defined by law, in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Cohix Phase 3. 25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 26 shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 27 perform the Work, including Change Orders, under the Contract, according to the plans, 28 specifications, and contract documents therein referred to, and as well during any period of 29 extension of the Contract that may be granted on the part of the Developer and/or City, then this 30 obligation shall be and become null and void, otherwise to remain in full force and effect. 31 32 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Cohix Phase 3 City Project No. 105162 Revised January 31. 2012 006113-2 PERFORMANCE BOND Page 2 of 2 Bond No. 551036M 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 8 instrument by duly authorized agents and officers on this the 5th day of August , 2026. 9 10 1I 12 13 14 I5 jT:, 16 17 18 Secr ary Richard Wolfe 19 20 21 22 23 24 Witness as to Principal Christina Garcia 25 26 27 28 29 30 31 32 33 34 35 QiiI1M t121 36 37 38 Witne s as to Surety Eliza eth Gra 39 PRINCIPAL INDEPENQP9f UTILITY CSTQ1ti0N INC. BY: Sig ature Richard Wolfe, President Name and Title Address: 5109 Sun Valley Drive Fort Worth, Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY BY: Signature Kyle W. Sweeney, Attorney -in -Fact Name and Title Address: 955 Garden Park Drive, Suite 230 Allen, Texas 75013 Telephone Number: 972-516-2600 40 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 41 from the by-laws showing that this person has authority to sign such obligation. If 42 Surety's physical address is different from its mailing address, both must be provided. 43 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Cohix Phase 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS City Project No. 105162 Revised January 31.2012 0061 14- I PAYMENT BOND Page I of 2 Bond No. 551036M SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Independent Utility Construction, Inc , known as "Principal" herein, 8 and Westfield Insurance Company , a corporate surety (or sureties if more than 9 one). duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer Forestar (USA) Real Estate Group Inc I I authorized to do business in Texas ("Developer"), and the City of Fort Worth, a Texas municipal 12 corporation ("City"), in the penal sum of One Hundred Twenty -Eight Thousand Two Hundred 13 Thirty Dollars & Fourteen Cents ($1 28 230 14) lawful money of the United States, to be paid in 14 Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly 15 unto the Developer and City as dual obligees, we bind ourselves, our heirs, executors, 16 administrators, successors and assigns, jointly and severally, firmly by these presents: 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth, by and through a Community Facilities 19 Agreement, CFA Number 25-0066; and 20 WHEREAS, Principal has entered into a certain written Contract with Developer, 21 awarded the Filth day of August , 20 26, which Contract is hereby referred to 22 and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, 23 equipment, labor and other accessories as defined by law, in the prosecution of the Work as 24 provided for in said Contract and designated as Cohix Phase 3. 25 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 26 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 27 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 28 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 29 force and effect. 30 31 CITY OF FORT WORTH Cohix Phase 3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 105162 Revised January 31.2012 006114-2 PAYMENT BOND Page 2 o12 Bond No. 551036M 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 5th day of August , 2026. ATTE . (Pri ipa Secre ary Richard Wolfe Witness as to Principal hristina Garcia ATTEST: 44/9 (Surety) Secretary Frank A. Carrino CLuiix3L€4 Jdu1 Witness as to Surety Elizabeth Gray P PRINCIPAL: INDEPENDENT UTILITY CONSTR ION INC. BY: Signature Richard Wolfe, President Name and Title Address: 5109 Sun Valley Drive Fort Worth, Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY BY: Signature Kyle W. Sweeney, Attorney -in -Fact Name and Title Address: 955 Garden Park Drive, Suite 230 Allen, Texas 75013 Telephone Number: 972-516-2600 7 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 8 bylaws showing that this person has authority to sign such obligation. If Surety's physical 9 address is different from its mailing address, both must be provided. 10 I! The date of the bond shal I not be prior to the date the Contract is awarded. I? 13 END OF SECTION CITY OF FORT WORTH Cohix Phase 3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Pizject No. 105162 Revised January 31. 2012 0062 19- I MAINTENANCE BOND Page 1 of 3 Bond No. 551036M I SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Independent Utility Construction, Inc. , known as "Principal" herein and 9 Westfield Insurance Company, a corporate surety (sureties, if more than one) duly 10 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), II are held and firmly bound unto the Developer, Forestar (USA) Real Estate Group, Inc. 12 authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal 13 corporation ("City"), in the sum of One Hundred Twenty -Eight Thousand Two Hundred Thirty 14 Dollars & Fourteen Cents ($128,230.14) lawful money of the United States, to be paid in Fort 15 Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the 16 Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, 17 executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Is 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number 25-0066 ; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the h day of August , 202., which Contract is hereby referred to 24 and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, 25 equipment labor and other accessories as defined by law, in the prosecution of the Work, 26 including any Work resulting from a duly authorized Change Order (collectively herein, the 27 "Work") as provided for in said Contract and designated as Cohix Phase 3; and 28 29 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 30 accordance with the plans, specifications and Contract Documents that the Work is and will 3 I remain free from defects in materials or workmanship for and during the period of two (2) years 32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 33 CITY OF FORT WORTH Cohix Phase 3 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 105162 Revised January 31, 2012 0062 19-2 MAINTENANCE BOND Page 2 of 3 Bond No. 551036M 1 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 23 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised January 31. 2012 Cohix Phase 3 City Project No. 105162 006219-3 MAINTENANCE BOND Page 3 of 3 Bond No. 551036M IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 5th day of August , 2026. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 AT (Pri cipal) Secretary Richard Wolfe fitness as to Principal Christina Garcia ATTEST: (Surety) Secretary Frank A. Carr' Witness as to Surety Elizabeth Gray PRINCIPAL: INDEPENDENT UTILITY CONSTR ION INC. BY: Signature Richard Wolfe, President Name and Title Address: 5109 Sun Valley Drive Fort Worth, Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY BY: Signature Kyle W. Sweeney, Attorney -in -Fact Name and Title Address: 955 Garden Park Drive, Suite 230 Allen, Texas 75013 Telephone Number: 972-516-2600 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Cohix Phase 3 City Project No. 105162 IMPORTANT NOTICE To obtain information or make a complaint You may call Westfield Insurance Company's and/or Ohio Farmers Insurance Company's toll -free telephone number for information or to make a complaint at: 1-800-368-3597 You may also write to Westfield Insurance Company and/or Ohio Farmers Insurance Company at: 955 Garden Park Drive, Suite 230 Allen, Texas 75013-3742 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin. TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection(�tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or Westfield Insurance Company and/or Ohio Farmers Insurance Comapny first. If the dispute is not resolved you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede Ilamar al numero de telefono gratis de Westfield Insurance Company's / Ohio Farmers Insurance Company's para informacion o para someter una queja al: 1-800-368-3597 Usted tambien puede escribir a Westfield Insurance Company / Ohio Farmers Insurance Company: 955 Garden Park Drive, Suite 230 Allen, Texas 75013-3742 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companies, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection(c2tdi.state.tx.us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o Westfield Insurance Company / Ohio Farmers Insurance Company primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER # AND ISSUED PRIOR TO 09/28123, FOR ANY PERSON OR PERSONS NAMED BELOW General POWER NO. 4220052 06 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. CERTIFIED COPY Ohio Farmers Insurance Co. Westfield Center. Ohio Know An Mien oy These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations. hereinafter referred to individually as a -Company- and collectively as "Companies." duly organized and existing under the laws of the State _r Chia. and having its principal office in Westfield Center. Medina County. Ohio, do by these presents make, constitute and appoint CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W. SWEENEY, ELIZABETH GRAY, DAVID W. SWEENEY, JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorneyts-ir.-Fact. with full power arc, authority hereby conferred in its name. place and stead, to execute. acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship in any penal limit. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President. sealed with the corporate seal of the applicable Company and July attested by its Secretary. hereby ratifying and confirming all that the said Attorneyis)-ir-Fact may do in the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY. WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: "Be It Resolved, that the President, any Senior Executive. any Secretary or any Fidelity & Surety Operations Executive or other Executive shall he and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneytsi-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute. acknowledge and deliver, any and all bonds. recognizances. contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary." Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.- Each adopted at a meetirg held on February 8. 2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY. WES-FIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to oe hereto affixed this 28th day of SEPTEMBER A.D.. 2023 Corporate ii ..^ ...,...,,..,,,. Seals ,r•�VSUA,f,o-cw ,:. •. HWESTFIELD INSURANCE COMPANY r' WESTFIELD NATIONAL INSURANCE COMPANY lffixedO ea '� i OHIO FARMERS INSURANCE COMPANY N 5L = SEAL ° $_ Al ; _'•.,1848 :� State of Ohio " " County of Medina Gary W. Stumper, National Surety Leader and Senior Executive On this 28th day of SEPTEMBER A.D.. 2023 . before me personally came Gary W. Stumper to me known, who. being by me duly sworn. did depose arc say. that he resides in Medina. OH; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE COMPANY. WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above instrument: that he knows the seals of said Companies: that the seals affixed to said instrument are such corporate seals: that they were so affixed by order of the Boards o₹ Directors of said Companies: and that he signed his name thereto by like order. Notarial �YNryNIMM.y /� Seal A�.. L 1�s 4ffiKed O P���1�I/,/� 9i State of Ohio z N ��o David A. Kotnik. Attorney at Law, Notary Public Count] of Medina ss.: , y �: My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code) re0Fo I. Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY. WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies. which is still in full force and effect: and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Wryness Whereof. I have hereunto set my hard and affixed the seals of said Companies at Westtield Center. Ohio, this day of A.D.. MTERtSEAL. `f i �' loq �a } i a f � t%��,.(� Secretary 1y, . S8'•. 1848 ,:� .--�' ' • Frank A. Carrino, Secretary BPOAC2 (combined) (03.22) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 — Definitions and Terminology........................................................................................................... l 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology.................................................................................................................................. 5 Article2 — Preliminary Matters......................................................................................................................... 6 2.01 Before Starting Construction......................................................................................................... 6 2.02 Preconstruction Conference.......................................................................................................... 6 2.03 Public Meeting.............................................................................................................................. 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards...................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents................................................................... 6 Article4 — Bonds and Insurance........................................................................................................................ 7 4.01 Licensed Sureties and Insurers...................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds......................................................................... 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace ...........................................................12 Article 5 — Contractor's Responsibilities.........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) ......................................16 5.07 Concerning Subcontractors, Suppliers, and Others....................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas........................................................................................................19 5.12 Record Documents...................................................................................................................... 20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................. 21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals.................................................................................................................................... 22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 5.18 Indemnification...........................................................................................................................24 5.19 Delegation of Professional Design Services............................................................................... 24 5.20 Right to Audit:.............................................................................................................................25 5.21 Nondiscrimination....................................................................................................................... 25 Article 6 — Other Work at the Site................................................................................................................... 26 6.01 Related Work at Site................................................................................................................... 26 Article 7 — City's Responsibilities.................................................................................................................. 26 7.01 Inspections, Tests, and Approvals................................................................................................... 26 7.02 Limitations on City's Responsibilities........................................................................................26 7.03 Compliance with Safety Program............................................................................................... 27 Article 8 — City's Observation Status During Construction............................................................................ 27 8.01 City's Project Representative......................................................................................................27 8.02 Authorized Variations in Work...................................................................................................27 8.03 Rejecting Defective Work...................................................................................................... 27 8.04 Determinations for Work Performed..........................................................................................28 Article9 — Changes in the Work.....................................................................................................................28 9.01 Authorized Changes in the Work................................................................................................28 9.02 Notification to Surety..................................................................................................................28 Article 10 — Change of Contract Price; Change of Contract Time................................................................. 28 10.01 Change of Contract Price............................................................................................................28 10.02 Change of Contract Time............................................................................................................ 28 10.03 Delays.......................................................................................................................................... 28 Article 11 — Tests and Inspections; Correction, Removal or Acceptance ofDefective Work.......................29 11.01 Notice of Defects........................................................................................................................29 11.02 Access to Work...........................................................................................................................29 11.03 Tests and Inspections..................................................................................................................29 11.04 Uncovering Work.................................................................................................................. 30 11.05 City May Stop the Work............................................................................................................. 30 11.06 Correction or Removal of Defective Work............................................................................ 30 11.07 Correction Period........................................................................................................................ 30 11.08 City May Correct Defective Work............................................................................................. 31 Article12 — Completion.................................................................................................................................. 32 12.01 Contractor's Warranty of Title.................................................................................................... 32 12.02 Partial Utilization........................................................................................................................ 32 12.03 Final Inspection........................................................................................................................... 32 12.04 Final Acceptance......................................................................................................................... 3 3 Article13 — Suspension of Work..................................................................................................................... 33 13.01 City May Suspend Work............................................................................................................. 33 Article14 — Miscellaneous.............................................................................................................................. 34 14.01 Giving Notice.............................................................................................................................. 34 CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 14.02 Computation of Times................................................................................................................34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations...............................................................................................................35 14.05 Headings...................................................................................................................................... 3 5 CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1- DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recordedplat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions I. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are notContract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of theAgreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of theAgreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the ContractDocuments. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of theProject. 28. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will bejudged. CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at theSite. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor orSubcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the ContractDocuments. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2- PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3— CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the ContractDocuments. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the followingways: 1. A Field Order; CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16. C); or 2. City's written interpretation or clarification. ARTICLE 4- BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 eachoccurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired andnon-owned. CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of35 1) $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence: : Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH COHIX PH 3 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS CPN: 105162 Revised: January 10, 2013 0073 10-12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repairwork performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5- CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made byparticipating change orders. 5.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2 Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City s Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors andSubcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of35 ❑ Required for this Contract. (Check this box if there is any City Participation) Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates 0 Required for this Contract. 0 Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shallbe open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and OtherAreas A. Limitation on Use of Site and OtherAreas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve theDamage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean- up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endangerit. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 0O5 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the ContractDocuments. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage causedby: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or finalpayment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes ofactions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing Cityfunds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of35 ARTICLE 6- OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7- CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City s Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8— CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City s Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of35 8.04 Determinations for WorkPerformed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9— CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipatedproject. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of35 ARTICLE 11- TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed anegative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of35 Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 - COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 - SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 - MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the otherparty. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receivingparty. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 011100017839-1 DAP SUMMARY OF WORKPROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 01 11 00 2 SUMMARY OF WORK 3 GENERAL 4 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN: 105162 Revised December 20, 2012 011100017839-2 DAP SUMMARY OF WORKPROJECT RECORD DOCUMENTS Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 All Work shall be in accordance with railroad requirements set forth in Division 7 0 as well as the railroad permit. 8 B. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, 18 plants, lawns, fences, culverts, curbing, and all other types of structures or 19 improvements, to all water, sewer, and gas lines, to all conduits, overhead pole 20 lines, or appurtenances thereof, including the construction of temporary fences 21 and to all other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or 23 private lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of 25 the Work. 26 b. Notices shall be applicable to both public and private utility companies and 27 any corporation, company, individual, or other, either as owners or 28 occupants, whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character 30 resulting from any act, omission, neglect, or misconduct in the manner or 31 method or execution of the Work, or at any time due to defective work, 32 material, or equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the 35 Project to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the 37 Work is not in progress and when the site is vacated overnight, and/or at all 38 times to provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN: 105162 Revised December 20, 2012 011100017839-3 DAP SUMMARY OF WORKPROJECT RECORD DOCUMENTS Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 IN END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN: 105162 Revised December 20, 2012 01 31 01 783919- 1 DAP PRECONSTRUCTION MEETING PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 0131 19 2 PRECONSTRUCTION MEETING 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. No construction schedule required unless requested by the City. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 31 01 783919-2 DAP PRECONSTRUCTION MEETING PROJECT RECORD DOCUMENTS Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 31 01 783919-3 DAP PRECONSTRUCTION MEETING PROJECT RECORD DOCUMENTS Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839- 1 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Pagel of8 1 SECTION 01 33 00 2 DAP SUBMITTALS 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following Work - 7 related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. W rk associated with this Item is considered subsidiary to the various items bid. No 20 separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals 25 from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing 28 the related Work or other applicable activities, or within the time specified in the 29 individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by processing 31 times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839-2 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 2 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. A. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9 -character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A -Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: [I 1IIIhIIi: 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing B. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) "By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." C. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations D. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839-3 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of: 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8 -inch x 3 -inch blank space for Contractor and City stamps 15 E. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. W ere correct fabrication of the Work depends upon field measurements 31 Provide such measurements and note on the drawings prior to submitting for 32 approval. 33 F. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation instructions 41 2) Availability of colors and patterns 42 3) Manufacturer's printed statements of compliances and applicability 43 4) Roughing -in diagrams and templates 44 5) Catalog cuts CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 33 0001 78 39-4 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 4 of 8 1 6) Product photographs 2 7) Standard wiring diagrams 3 8) Printed performance curves and operational -range diagrams 4 9) Production or quality control inspection and test reports and certifications 5 10) Mill reports 6 11) Product operating and maintenance instructions and recommended spare -parts 7 listing and printed product warranties 8 12) As applicable to the Work 9 H. Samples 10 1. As specified in individual Sections, include, but are not necessarily limited to: 11 a. Physical examples of the Work such as: 12 1) Sections of manufactured or fabricated Work 13 2) Small cuts or containers of materials 14 3) Complete units of repetitively used products color/texture/pattern swatches and 15 range sets 16 4) Specimens for coordination of visual effect 17 5) Graphic symbols and units of Work to be used by the City for independent 18 inspection and testing, as applicable to the Work 19 I. Do not start Work requiring a shop drawing, sample or product data nor any material to be 20 fabricated or installed prior to the approval or qualified approval of such item. 21 1. Fabrication performed, materials purchased or on -site construction accomplished which 22 does not conform to approved shop drawings and data is at the Contractor's risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance with 26 approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be uploaded 30 to City's Buzzsaw site, or another external FTP site approved by the City. 31 b. Shop Drawings 32 1) Upload submittal to designated project directory and notify appropriate City 33 representatives via email of submittal posting. 34 2) Hard Copies 35 a) 3 copies for all submittals 36 b) If Contractor requires more than 1 hard copy of Shop Drawings returned, 37 Contractor shall submit more than the number of copies listed above. 38 c. Product Data 39 1) Upload submittal to designated project directory and notify appropriate City 40 representatives via email of submittal posting. 41 2) Hard Copies 42 a) 3 copies for all submittals 43 d. Samples 44 1) Distributed to the Project Representative 45 2. Hard Copy Distribution (if required in lieu of electronic distribution) 46 47 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839-5 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a. 8 copies for mechanical submittals 5 b. 7 copies for all other submittals 6 c. If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved product 17 data and samples, where required, to the job site file and elsewhere as directed by 18 the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance with 23 the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City does 30 not relieve the Contractor from his/her responsibility with regard to the fulfillment of 31 the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the Work 35 with all other associated work and trades, for selecting fabrication processes, for 36 techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of the 39 City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an exception. 41 5. Submittals will be returned to the Contractor under 1 of the following codes: 42 a. Code 1 43 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 44 comments on the submittal. 45 a. When returned under this code the Contractor may release the equipment 46 and/or material for manufacture. 47 b. Code 2 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839-6 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 6 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a. The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839-7 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 7 of 8 1 9. W en the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be used 9 on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 If specifically required in other Sections of these Specifications, submit a P.E. Certification 12 for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. W en the Contractor believes there is a conflict between Contract Documents 17 c. W en the Contractor believeslthere is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Sufficient information shall be attached to permit a written response without further 21 information. 22 23 24 25 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 330001 7839-8 DAP SUBMITTALSPROJECT RECORD DOCUMENTS Page 8 of 8 OA El PART 2- PRODUCTS [NOT USED] 6 PART 3- EXECUTION [NOT USED] 7 9 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 35 1301 78 39 - 1 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 1 of 7 1 SECTION 01 35 13 2 SPECIAL PROJECT PROCEDURES 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. W rk near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. W ter Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference standard 28 published at the time of the latest revision date logged at the end of this Specification, 29 unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High 31 Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. W en work in the right-of-way which is under the jurisdiction of the Texas Department 37 of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit 40 b. All work performed in the TxDOT right-of-way shall be performed in compliance 41 with and subject to approval from the Texas Department of Transportation CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 01 35 1301 7839-2 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 2 of 7 1 B. Work near High Voltage Lines 2 1. Regulatory Requirements 3 a. All Work near High Voltage Lines (more than 600 volts measured between 4 conductors or between a conductor and the ground) shall be in accordance with 5 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 6 2. Warning sign 7 a. Provide sign of sufficient size meeting all OSHA requirements. 8 3. Equipment operating within 10 feet of high voltage lines will require the following 9 safety features 10 a. Insulating cage -type of guard about the boom or arm 11 b. Insulator links on the lift hook connections for back hoes or dippers 12 c. Equipment must meet the safety requirements as set forth by OSHA and the safety 13 requirements of the owner of the high voltage lines 14 4. Work within 6 feet of high voltage electric lines 15 a. Notification shall be given to: 16 1) The power company (example: ONCOR) 17 a) Maintain an accurate log of all such calls to power company and record 18 action taken in each case. 19 b. Coordination with power company 20 1) After notification coordinate with the power company to: 21 a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower 22 the lines 23 c. No personnel may work within 6 feet of a high voltage line before the above 24 requirements have been met. 25 C. Confined Space Entry Program 26 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA 27 requirements. 28 2. Confined Spaces include: 29 a. Manholes 30 b. All other confined spaces in accordance with OSHA's Permit Required for 31 Confined Spaces 32 D. Use of Explosives, Drop Weight, Etc. 33 1. When Contract Documents permit on the project the following will apply: 34 a. Public Notification 35 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior 36 to commencing. 37 2) Minimum 24 hour public notification in accordance with Section 01 3113 38 E. Water Department Coordination 39 40 1. During the construction of this project, it will be necessary to deactivate, for a 41 period of time, existing lines. The Contractor shall be required to coordinate with 42 the Water Department to determine the best times for deactivating and activating 43 those lines. 44 2. Coordinate any event that will require connecting to or the operation of an existing 45 City water line system with the City's representative. 46 a. Coordination shall be in accordance with Section 33 12 25. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 35 1301 7839-3 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 3 of 7 b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. B. Public Notification Prior to Beginning Construction 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and fmish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. C. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 013513017839-4 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 4 of 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 01 35 1301 7839-5 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.3.B — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 01 35 1301 7839-6 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 6 of 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: NOTICE OF CONSTRUCTION THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 01 35 1301 7839-7 DAP SPECIAL PROJECT PROCEDURES PROJECT RECORD DOCUMENTS Page 7 of 7 I PA 3 M Date; EXHIBIT B FORT WORTH DOE NO. XXXX Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August, 30, 2013 044523017839-I DAP TESTING AND INSPECTION SERVICES PROJECT RECORD DOCUMENTS Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another form of distribution approved 38 by the City. 39 40 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 044523017839-2 DAP TESTING AND INSPECTION SERVICES PROJECT RECORD DOCUMENTS Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered 11 load of Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 27 28 29 30 PART 2- PRODUCTS [NOT USED] PART 3- EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised August 30, 2013 01 500001 78 39 - I DAP TEMPORARY FACILITIES AND CONTROLSPROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 01 50 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1— General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired 41 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised JULY 1, 2011 01 500001 7839-2 DAP TEMPORARY FACILITIES AND CONTROLSPROJECT RECORD DOCUMENTS Page 2 of 4 l d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH COHDC PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised JULY 1, 2011 01 500001 7839-3 DAP TEMPORARY FACILITIES AND CONTROLSPROJECT RECORD DOCUMENTS Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS [NOT USED] PART 3- EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH COHDC PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised JULY 1, 2011 01 500001 7839-4 DAP TEMPORARY FACILITIES AND CONTROLSPROJECT RECORD DOCUMENTS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, 2 to a condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] N 7 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH COHDC PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised JULY 1, 2011 01 552601 78 39 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROLPROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 01 55 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. 39 40 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised July 1, 2011 01 552601 7839-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROLPROJECT RECORD DOCUMENTS Page 2 of 3 2 1) Allow a minimum of 5 working days for permit review. 3 2) Contractor's responsibility to coordinate review of Traffic Control plans for 4 Street Use Permit, such that construction is not delayed. 5 C. Modification to Approved Traffic Control 6 1. Prior to installation traffic control: 7 a. Submit revised traffic control plans to City Department Transportation and 8 Public Works Department. 9 1) Revise Traffic Control plans in accordance with Section 34 71 13. 10 2) Allow minimum 5 working days for review of revised Traffic Control. 11 3) It is the Contractor's responsibility to coordinate review of Traffic Control 12 plans for Street Use Permit, such that construction is not delayed. 13 D. Removal of Street Sign 14 1. If it is determined that a street sign must be removed for construction, then contact 15 City Transportation and Public Works Department, Signs and Markings Division to 16 remove the sign. 17 E. Temporary Signage 18 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 19 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 20 Devices (MUTCD). 21 2. Install temporary sign before the removal of permanent sign. 22 3. When construction is complete, to the extent that the permanent sign can be 23 reinstalled, contact the City Transportation and Public Works Department, Signs 24 and Markings Division, to reinstall the permanent sign. 25 F. Traffic Control Standards 26 1. Traffic Control Standards can be found on the City's Buzzsaw website. 27 1.5 SUBMITTALS [NOT USED] 28 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED 29 1.7 CLOSEOUT SUBMITTALS [NOT USED] 30 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 31 1.9 QUALITY ASSURANCE [NOT USED] 32 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 33 1.11 FIELD [SITE] CONDITIONS [NOT USED] 34 1.12 WARRANTY [NOT USED] 35 PART 2- PRODUCTS [NOT USED] 36 PART 3- EXECUTION [NOT USED] 37 END OF SECTION C: CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised July 1, 2011 01 552601 7839-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROLPROJECT RECORD DOCUMENTS Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised July 1, 2011 01 57 1301 78 39 - 1 DAP STORM WATER POLLUTION PREVENTION PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 — General Requirements 13 3. Section 31 25 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 A. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 B. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. 38 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised July 1, 2011 01 57 1301 7839-2 DAP STORM WATER POLLUTION PREVENTION PROJECT RECORD DOCUMENTS Page 2 of 3 B. Construction Activities resulting in: 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) 'TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review 48 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised July 1, 2011 01 57 1301 7839-3 DAP STORM WATER POLLUTION PREVENTION PROJECT RECORD DOCUMENTS Page 3 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USEDI 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- -PRODUCTS [NOT USED] PART 3- EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised July 1, 2011 01 600001 78 39 - 1 DAP PRODUCT REQUIREMENTS PROJECT RECORD DOCUMENTS Page 1 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SECTION 01 60 00 PRODUCT REQUIREMENTS PART 1- GENERAL Ills t. U051 / .1 '1 A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: https://apps.fortworthtexas.gov/ProjectResources/ and following the directory path: 02 — Construction Documents\Standard Product List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 01 33 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH COHDX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 01 600001 7839-2 DAP PRODUCT REQUIREMENTS PROJECT RECORD DOCUMENTS Page 2 of 2 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS [NOT USED] 6 PART 3- EXECUTION [NOT USED] 7 s 9 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/20 D.V. Magana Removed reference to Buzzsaw and noted that the City approved product list is accessible through the City's website. CITY OF FORT WORTH COHDX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SECTION 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1- GENERAL Ills t 0051 / .1 '1 A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 6600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 6600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 o1'4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS [NOT USED] PART 3- EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 016600-4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017423-1 DAP CLEANING Page 1 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 SECTION 01 74 23 CLEANING PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 7423 -2 DAP CLEANING Page 2 of 4 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED FOR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3- EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 7423 -3 DAP CLEANING Page 3 014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 0174 23-4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 77 19-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SECTION 01 7719 CLOSEOUT REQUIREMENTS PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 1. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PAT 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] E:3 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 W 40 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 01 78 39 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 77 19-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 7823 - 1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 1 SECTION 01 78 23 2 OPERATION AND MAINTENANCE DATA 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 V2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten 38 39 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017823-2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly -leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3 -ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used, correlate the data into related consistent 19 groupings. 20 4. If available, provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor, name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List, with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 7823 -3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017823-4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings 37 CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 7823 -5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] PART 3- EXECUTION [NOT USED] 6 7 8 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 01 7839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 1 2 3 PART 1- GENERAL r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WE 30 31 32 33 34 35 36 37 SECTION 01 78 39 PROJECT RECORD DOCUMENTS A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.1 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2- PRODUCTS 18 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3- EXECUTION 29 30 31 32 33 34 35 36 37 38 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum clearly mark any deviations from Contract Documents 11 associated with installation of the infrastructure. 12 4. Making entries on Drawings 13 a. Record any deviations from Contract Documents. 14 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 15 change by graphic line and note as required. 16 c. Date all entries. 17 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 18 e. In the event of overlapping changes, use different colors for the overlapping 19 changes. 20 5. Conversion of schematic layouts 21 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 22 ducts, and similar items, are shown schematically and are not intended to 23 portray precise physical layout. 24 1) Final physical arrangement is determined by the Contractor, subject to the 25 City's approval. 26 2) However, design of future modifications of the facility may require 27 accurate information as to the final physical layout of items which are 28 shown only schematically on the Drawings. 29 b. Show on the job set of Record Drawings, by dimension accurate to within 1 30 inch, the centerline of each run of items. 31 1) Final physical arrangement is determined by the Contractor, subject to the 32 City's approval. 33 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 34 ceiling plenum", "exposed", and the like). 35 3) Make all identification sufficiently descriptive that it may be related 36 reliably to the Specifications. 37 c. The City may waive the requirements for conversion of schematic layouts 38 where, in the City's judgment, conversion serves no useful purpose. However, 39 do not rely upon waivers being issued except as specifically issued in writing 40 by the City. 41 B. Final Project Record Documents 42 1. Transfer of data to Drawings 43 a. Carefully transfer change data shown on the job set of Record Drawings to the 44 corresponding final documents, coordinating the changes as required. 45 b. Clearly indicate at each affected detail and other Drawing a full description of 46 changes made during construction, and the actual location of items. 47 c. Call attention to each entry by drawing a "cloud" around the area or areas 48 affected. CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 017839-4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 105162 Revised April 7, 2014 SECTION 02930 - SEEDING PART 1- GENERAL 1.01 DESCRIPTION A. Work Included: Seeding of grass seed or wildflower seed, as specified on the plans. B. Related Work Specified Elsewhere: Section 02300, Earthwork. 1.02 REFERENCE STANDARDS A. Standardized Plant Names 1. For exotic plant materials: American Joint Committee of Horticultural Nomenclature, Second Edition, 1942. 2. For native materials a. Manual of the Vascular Plants of Texas by Correll and Johnston b. Check List of Vascular Plants of Texas by Hatch c. Flora of North Central Texas by Shinners and Moller B. Texas Highway Department: Standard Specifications for Construction, Item 164, "Seeding for Erosion Control" and Item 180, "Wildflower Seeding". 1.03 SUBMITTALS A. Seed 1. Vendors' certification that seeds meet Texas State seed law including: a. Testing and labeling for pure live seed (PLS) b. Name and type of seed 2. If using native grass or wildflower seed, seed must have been harvested within one hundred (100) miles of the construction site. 3. All seed shall be tested in a laboratory with certified results presented to the City, in writing, prior to planting. 4. All seed to be of the previous season's crop and the date on the container shall be within twelve months of the seeding date. 5. Each species of seed shall be supplied in a separate, labeled container for acceptance by the City. B. Fertilizer 1. Unopened bags labeled with the analysis 2. Conform to Texas fertilizer law 1.04 JOB CONDITIONS A. Planting Season: The season varies according to species (see Part 2 - Products). Do not seed when soil is excessively wet or dry or when wind exceeds ten (10) miles per hour. B. Schedule After All Other Construction and planting is complete. SECTION 02930 - SEEDING -1- C. Protect and Maintain Seeded Areas 1. From erosion 2. From traffic and all other use 3. Until seeding is complete and accepted 1.05 QUALITY CONTROL The contractor who plants the seeds, whether the general contractor or a subcontractor, is responsible for daily supervision of his crew, and for the planting and maintaining of seedlings until acceptable, viable growth is achieved and the project accepted by the City. PART 2— PRODUCTS 2.01 MATERIALS A. Seed All seed shall be planted at rates based on pure live seed (PLS = purity x germination) per acre. Substitution of individual seed types due to lack of availability shall be made only by the City at the time of planting. The Contractor shall notify the City, prior to bidding, of difficulties locating certain species. Only those areas indicated on the plans and areas disturbed by construction shall be seeded. Prior to seeding, each area shall be marked in the field and approved by the City. Any adjustment of area location by the City shall be considered incidental and shall not entitle the Contractor to additional compensation. Weed seed shall not exceed ten percent (10%) by weight of the total of pure live seed (PLS) and other material in the mixture. Johnsongrass and nutgrass seed shall not be allowed. The seed shall be clean, dry and harvested within one year of planting. Non-native grass seed shall consist of: If planted between April 15 and September 10: Lbs./Acre Common Name Scientific Name Purity 25 Bermuda (unhulled) Cynodon dactylon 85% 75 Bermuda (hulled) Cynodon dactylon 95% Substitute the following if planted between September 10 and April 15: 220 Rye Grass Lolium multforum 82% 40 Bermuda (unhulled) Cynodon dactylon 84% Germination 90% 90% 80% 85% 2 Native grass seed — (to be used in open areas as specified) The seed shall be planted between February 1 and October 1 and shall consist of: Lbs. PLS/Acre Common Name Botanical Name SECTION 02930 - SEEDING -2- 1.6 5.5 3.7 17.0 1.8 0.5 6.0 8.0 1.2 1.8 10.0 Green Sprangletop Sideoats Grama* Little Bluestein* Buffalograss Indian Grass* Sand Lovegrass* Big Bluestein Eastern Grama Blue Grama Switchgrass Prairie Wildrye* Leptochloa dubia Bouteloua curtipendula Schizachyrium scoparium Buchloe dactyloides Sorghastrum nutans Eragrostis trichodes Andropogon gerardii Tripscacum dactyloides Bouteloua gracilis Panicum virgatum Elymus canadensis *These grasses are not to be planted within ten feet of a road or parking lot or within three (3) feet of a walkway. 3 Wildflower seed — (to be used in open fields as specified) All wildflower seeds are to be hand broadcast, (see 3.02,A). The seed shall be planted between March 5 and May 31 or between September 1 and December 1 and shall consist of: Lbs. PLS/Acre 3.0 5.0 2.0 3.0 13.4 13.6 2.0 8.0 8.0 2.0 18.0 2.0 3.0 2.0 8.0 Common Name Bush Sunflower Butterfly Weed Clasping Coneflower* Golden - Wave Illinois Bundleflower Partridge Pea Prairie Verbena Texas Yellow Star Winecup Black-eyed Susan Cutleaf Daisy Obedient Plant Pitcher Sage Plains Coreopsis Scarlet Sage Botanical Name Sinsia calva Asclepias tuberosa Rudbeckia amplexicaulis Coreopsis basalis Desmanthus illinoensis Cassiafasciculata Verbena bipinnatifida Lindheimeri texana Callirhoe involcrata Rudbeckia hirta Engelmannia pinnatifida Physostegia intermedia Salvia azurea Coreopsis tinctoria Salvia coccinea *These wildflowers are not to be planted within ten feet of a road or parking lot or within three feet of a walkway. 4. Temporary erosion control seed When specified on the plans, temporary control measures shall be performed. These measures shall consist of the sowing of cool season plant seeds and the work and materials as required in this section. B. Mulch 1. Mulch should be designed for use with conventional mechanical or hydraulic planting of seed, either alone or with fertilizer. SECTION 02930 - SEEDING -3- 2. Mulch should be wood cellulose fiber produced from virgin wood or recycled paper -by-products (waste products from paper mills or recycled newspaper). 3. Mulch should contain no growth or germination inhibiting factors. 4. Mulch should contain no more than ten percent (10%) moisture, air dry weight basis. 5. Additives shall include a binder in powder form. 6. Material shall form a strong moisture retaining mat. C. Fertilizer 1. All fertilizer shall be delivered in bags or containers clearly labeled showing the analysis. 2. All fertilizer shall be in acceptable condition for distribution and shall be applied uniformly over the planted area. 3. Analysis of 16-20-0, 16-8-8, or as designated on the plans. Fertilizer rate: a. No fertilizer is required for wildflower seeding. b. Where applying fertilizer on newly established seeding areas - 100 pounds of Nitrogen per acre. c. Where applying fertilizer on established seeding areas - 150 pounds of Nitrogen per acre. D. Erosion Control Measures 1. For seeding application in areas up to 3:1 slope, use cellulose, fiber or recycled paper mulch, (see 2.01, B. Mulch and 3.03). 2. For seeding application in areas 3:1 slope or greater, use the following soil retention blanket (Follow the manufacturer's directions): "Curlex I" from American Excelsior, 900 Ave. H East, Post Office Box 5624, Arlington, Texas 76001, 1 -800 -777 -SOIL. 2.02 MIXING Seed, mulch, fertilizer and water may be mixed provided that: 1. Mixture is uniformly suspended to form a homogenous slurry. 2. Mixture forms a blotter -like ground cover impregnated uniformly with grass seed. 3. Mixture is applied within thirty (30) minutes after placed in the equipment. SECTION 02930 - SEEDING -4- PART 3- EXECUTION 3.01 SEEDED PREPARATION A. Clear Surface of All Materials, Such As: 1. Stumps, stones, and other objects larger than one inch. 2. Roots, brush, wire, stakes, etc. 3. Any objects that may interfere with seeding or maintenance. B. Tilling 1. In all compacted areas till one inch (1") deep. 2. If area is sloped greater than 3:1, run a tractor parallel to slope to provide less seed/water run-off. 3. In areas near trees: Do not till deeper than one half (1/2") inch inside "drip line" of trees. C. Water: Shall be furnished by the Contractor as an ancillary cost to the Contract by the Contractor by means of temporary metering / irrigation, water truck or by any other method necessary to achieve viable, acceptable stand of turf as noted in 3.04.B. of this specification. The water source shall be clean and free of industrial wastes or other substances harmful to the germination of the seed or to the growth of the vegetation. The amount of water will vary according to the weather variables. Generally, an amount of water that is equal to the average amount of rainfall plus one half inch (1/2") per week should be applied until such time 100% full growth coverage is achieved and one mowing cycle is performed by the Contractor and accepted by the Owner. Watering: Soil should be watered to a minimum depth of four inches within forty eight (48) hours of seeding. 3.02 SEEDING A. If Sowing Seed By Hand 1. Broadcast seed in two directions at right angles to each other. 2. Harrow or rake lightly to cover seed. 3. Never cover seed with more soil than twice its diameter. 4. For wildflower plantings, scalp existing grasses to one (1") inch, remove grass clippings, so seed can make contact with the soil. B. Mechanically Seeding (Drilling): If mechanically seeding (drilling) the seed or seed mixture, the quantity specified shall be uniformly distributed over the areas shown on the plans or where directed. All varieties of seed, as well as fertilizer, may be distributed at the same time provided that each component is uniformly applied at the specified rate. Seed shall be drilled at a depth of from one quarter inch to three eighth inch (1/4"-3/8") utilizing a pasture or rangeland type drill. All drilling is to be on the contour. After planting, the area shall be rolled with a roller integral to the seed drill, or a corrugated roller of the "Cultipacker" type. All rolling of slope areas shall be on the contour. 3.03 MULCHING SECTION 02930 - SEEDING -5- A. Apply uniformly after completion of seeding in areas up to 3:1 slope. Mulch may be applied concurrently with fertilizer and seed, if desired. B. Apply at the following rates unless otherwise shown on plans: 1. Sandy soils, flat surfaces - minimum 1,500 lbs./acre. 2. Sandy soils, sloping surfaces - minimum 1,800 lbs./acre. 3. Clay soils, flat surfaces - minimum 2,500 lbs./acre. 4. Clay soils, sloping surfaces - minimum 3,000 lbs./acre. 5. "Flat" and "sloping" surfaces will be shown on the plans if not visually obvious. C. Apply within thirty (30) minutes after placement in equipment. Keep mulch moist, by daily water application, if necessary: 1. For approximately twenty-one (21) days, or 2. Until seeds have germinated and have rooted in soil, (see 3.04.B.2.) and project has been accepted by the City. 3.04 ESTABLISHMENT, MAINTENANCE AND ACCEPTANCE A. Includes initial seed and / or sod application and establishment, protection, replanting as necessary, maintaining grades and immediate repair of erosion damage until the project receives final acceptance. Refer to Part 2 — 2.01 — D. for watering requirements to be executed by the contractor. B. Initial full coverage turf establishment shall be considered as 100% grow in to a height of three (3") inches with a minimum of one mow cycle performed by the Contractor on all newly established areas prior to consideration of acceptance by the Owner.. C. Replanting 1. Replant areas where a stand of grass or wildflowers are not present in a reasonable length of time, as determined by the City. 2. A "stand" shall be defined as: a. Bermuda/Rye grasses: See 3.04 B b. Native grass and wildflowers: eighty percent (80%) coverage of growing plants within seeded area within twenty-one days of seeding date on a smooth bed free of foreign material and rocks or clods larger than one - inch diameter. END OF SECTION SECTION 02930 - SEEDING -6- APPENDIX GC -4.01 Availability of Lands - None GC -4.02 Subsurface and Physical Conditions —Geotechnical Report Provided GC -4.04 Underground Facilities - None GC -4.06 Hazardous Environmental Condition at Site -None GC -6.06.D Minority and Women Owned Business Enterprise Compliance — Not Required GC -6.07 Wage Rates - Not Required GC -6.09 Permits and Utilities - Urban Forestry Permit GC -6.24 Nondiscrimination - None GR-01 60 00 Product Requirements — COFW Water Department & TPW Standard Product List Provided CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 105162 Revised July 1, 2011 GC -4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 105162 Revised July 1, 2011 GC -6.09 Permits & Utilities THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 105162 Revised July 1, 2011 FORT WORTH Application for Urban Forestry Permit (Complete all information listed below) Check one Date Rec'd : UFC#: ® Residential (1&2 Family) ❑ Industrial ❑ MU/UR Zoning ❑ Public Project ❑ Commercial ❑Institutional ❑ Agricultural ❑ Multi -Family Select Preservation Method If Applicable To Site ❑ Method Option 'A' ® Method Option `B' ❑No trees on site Project Name: Walters Ranch (Cohix) Building Permit #: Final Plat #: PP -20-060 ® Trees to be removed from site ❑ No trees to be removed from site Site Street Address and/or Legal Description of Property (Lot, Block, Subdivision): SE of Cleburne Road and N Crowley Cleburne Road intersection See attached legal description. Applicant (Developer/Sub-divider) Printed Name: Stephen Brim Phone: 682-321-9380 Fax: Signature: Date: Address: 2221 E. Lamar Blvd., Suite 790 Email: stephenbrim@forestar.com City, State & Zip: Arlington, Texas 76006 Agent Or Consultant Representing Applicant Printed Name: Ryan Hill, PE Phone: 817-810-0696 Fax: Address: 1600 W. 7th St. City, State & Zip: Fort Worth, TX 76102 Email: ryan.hill@segpllc.com Record Owner of Property (if different from Applicant) Printed Name: Phone: Fax: Address: City, State & Zip: NOTE: An Approved Urban Forestry Plan/Permit will run with the land and can only be amended by the Urban Design Commission (Urban Forestry Ordinance No. 18615) Email: County: Tarrant County Gross Site Area or Artificial Lot (Sq Ft): 5,599,598 sq ft. Acreage: 128.55 Applicant's Certification I, the undersigned, hereby certify that the attached plans and data are correct and complete to the best of my knowledge and ability. I understand that if any of the required items are deemed missing from the submittal, the plan will be marked as incomplete and not routed for review. My client is aware of these criteria and will accept all responsibility for delays due to the incomplete submittals. I am enclosing an explanation for each item which I feel is not required and therefore, has not been included in the submittal package. 5---- Applicafif'si�m4ture 2/15/2021 Date Revised: 11/09/20 FORT WORTH® LETTER OF AUTHORIZATION FOR URBAN FORESTRY PERMIT REPRESENTATION I (PRINT OWNER'S NAME) Stephen Brim CERTIFY THAT I AM THE CURRENT OWNER OF THE PROPRTY DESCRIBED BELOW AND HEREBY GRANT AUTHORITY TO (NAME) Ryan Hill TO ACT ON MY BEHALF IN MAKING APPLICATION AND SUBMITTING TO THE CITY OF FORT WORTH, TEXAS, A REQUEST FOR AN URBAN FORESTRY PERMIT FOR THE FOLLOWING PROPERTY: Walters Ranch (Cohix) See attached legal description. (CERTIFIED LEGAL DESCRIPTION] ACKNOWLEDGEMENTS: I certify that the above information is correct and complete to the best of my knowledge and ability and that I am now, or will be, fully prepared to carry out the Urban Forestry Plan as approved should the above representative or their agents fail to do so, or if the property is sold, I will make the new owner and their representatives fully aware of the approved Urban Forestry Plan and the requirements that run with the land. I further certify that I have read and understand the information provided concerning the procedure for consideration of my Urban Forestry Permit request as well as Section 6.302 of the City of Fort Worth Comprehensive Zoning Ordinance concerning the overall Urban Forestry regulations. I understand that acceptance of an Urban Forestry Permit application does not guarantee that the City will issue the permit unless it is in compliance with all applicable codes, laws, and regulations and all fees have been paid. I understand that once approved, this permit will expire and become invalid on the fifth anniversary of the approval date if either no progress has been made toward implementation of the plan or the project scope and configuration changes prior to tree removal or site disturbance. I understand that should progress toward implementation, tree removal, or site disturbance occur, the approved permit will not expire until the warranty period for new and preserved trees has ended or a new permit and plan are submitted and approved subject to conditions of the original permit. I understand that an approved plan will run with the land until is revised and replaced with another approved plan under this or another Urban Forestry Permit. I understand that warranty for new and preserved trees begins once the last building is complete and receives a certificate of occupancy or when all improvements shown on the plan have been completed, whichever is the later date. I further authorize my representative to act as my agent, if needed, before the Urban Design Commission during any appeal hearings. I understand that if I am not present or represented at a public hearing for an appeal of any requirements of Section 6.302, the Urban Design Commission may deny the request. THIS AUTHORIZATION WILL REMAIN IN ORCE UNLESS REVOKED BY WRITTEN NOTICE. OWNER'S SIGNATURE: OWNER'S NAME (printed) Stephen Brim ADDRESS and ZIP 2221 E. Lamar Blvd., Suite 790, Arlington, Texas 76006 TELEPHONE: 682-321-9380 EMAIL: stephenbrim@forestar.com X N J OY � :J 9 a� Vl MjZ m.�- ZN ZU F o gQ moo, c�NoJ ��mo��c�osma w 1 a� al -m ioY Q,n�o o a; %� 4mcYi©oma caz�rw� z 0 [)mr 0 ' H-09 - yIyni Y G U -St Ua,OU, o Ww, a R 3 m S 03 d.ONeu-. OJ Y�N�Q G o & S 6 s _ LJ U O. z. I �mO ,o UQ�I�wo N O ;: d T UO mx WG(7Za0 N A Y ~~ W p U m U W xW iJ1O mW K Qz g 3�C NtOUN N ,O N F o w 0_o 4D 00 _ N ' m m m m e� Sa0-124TE.123632' m � SS � — 31� — — — '�r3s.z 3o.m — _. 3o.af av �.m — 3om-' — '�. �. q• 511 3R $ 9n o e, 1KK(>& ' \5 \ ,mI 4I m a n n¢ n n n -L'1-- 80 1 - _. n I` CI Z em a R m �^ � "°�.°` -�.., -Sd.— 61r jl ��m_t,m K/-4 133ais -- �8n W w \ a,8 I � } u � � _ � gym' 30 rEE a�1 1, T T_- � f. Im ! '° cdAl SIL _ � R Iam ' V11�n - I ' t±:N a ,W 9 _ r i _ ; $ I. 1 I I` I .a N m� � au LL s � m au sLL I N dus—r I z d 9oa �$ °I � IR RI �o n I1!i___ 4 R IR Wls ~ _ - dA15LL � o � x $ SITN ry dµ S44 s ' dAL.5LL $ / �� e•R� / I - - � S1 r `l 13 1, 19. R. R A g 91 81 , IN 4 I IR h A - a / _ 1 2 I - 'fr 3R" -faz3 ih'A.ear es f SF— 9. rS I.. 1 o f �4.� .� zeu w ��3�1T� • ly / S- � � a'1 2g 839 I 2 !` Z2 ^+ �' ff /8 8l5 I9 9O3 s[g B FLg X18 N09"6232"W 2456.42' It9 I W i i 9 S m Atl 30 -ro ,96 r TgV0EI3rNN1f63�J 153M r _ _ w r _ _ _ Y"') w ? 3 £m AVM 30-1H91\]//I 3590 39815534903 I 1 __ -_-_-- _ _ _- �� / � ]5y dAl a N -J __ �� ✓d $ O keHH o s�� U CNo�N J� WO �� NI VIN V] X F- Y.x W - °•' m � I 1�4� cnpQSN X In a VJ O\ - ��p / .e9' 'Iz I _ o 18 ��- xQmYoom �rza pa /s� '�� ;�\n I. P3 U oJd ZY o / ozmw '° / 4%� �'� _ Qom= mNY vo�Y01o�o�Nl-oa / a I�I _ O UxOCJ o\UU� /' J / n o u� �0d OrmCJ UJ `Q}H N�Y�� / N / dAl sil I J � o<0 z'wm WUO Y m 21-Z o U / .� 8 /S' °' U /N- o Pm / 9.� �' 4 809 2' Nm�xom �m I� zoo O9rr/"T� 4/ / / f a I 9„ �I - o i m I OJ x 6 m o O /8 a'V `•a ds / " /\/J of -IW N s / p B ww gg _ © •�I- q a� ¢ la I si ���� I c" /4 �L�'-' 3 �I�v'�19 w � I Islj g°m or �� / e I '��- Av v v dus 4 i � f �' ausll Qta I 590 8 / B� v \ n FO9 8 S \ a m v \iH--- 54 L _ a w n e§S•" � �i � i I � � — w Qo wo ^ I � I I Sog. /" o v i — o N 004232" W 245442' I'd 054 3Q-1HOS 95-09%M-31491908 - 0V0E13N�30' � GaG tb 15351H3az(SG�NV------y _ f_ LL OI1— OJ 3NVMb 3G tl " S3 _ 153x03 I I _ _ tlNC- Z 1JVa1 JO 3f101S3i1 x&x CNm,O6 �l 9� m m m ^yam m �L�NU1 'X0 UX > N 2 R g2 O! O O .O z . OZO wU = too x �Na 90 o._O oxw> w2 �o o�Fm E �m � m x <.00.00 9 8>-w� zv a O/ maw O mNY U�ym Qt<Ca w tt d qqz Hd O O m�U C Ux�0UaiUza�O�a>-F�tdl0��v �osnw lZ m� mUXOQU KS~m!C <_/0._ b�ti �q E E E � g _ tma a fY � � m°J to<9z 8 iv3v mw� 0~o wm >oUO OJ �� m� mj �myx0m S x < z Ul �ImN�I U�1 18'UN .O9 O p � N J 3q w O n asL T ter^ w n r � ry 5 -F 08 _� ' a tl&L _e N she- wry o _ �9b � O6 t cG o �9b dA1.94.L $ �g9 dAl.5rol � r6 Z6L a. �� A v e s3J F � a _.vss dAi su aj N I ° a 66L osQ <H& .OS dAL,S44 - - FUt�RC - � ems" ay a _ ►a°� bOB � � � 1� �D is � .� -- — •• n's ���wDDw9OwO ww o9 ��woW ow �xWw O�wxxW�W wD OE wpW 9�o9 woW W�w��OW wo��oo 0 0 �� pR,� A 4 q Il �gp���Rp��S�p�����9R�xRxRppx�pgqxR�K'YJq�p�xR 'c 'oo ≤o�¢ o f o so≤aQos sy� 0 3 0 soao� 0 a g o 0 o a f da o f o o �y f f o .fib oS�s000�o�oo 6omo� o 0000000�oo oioo��b -W HA N ggg m �ppn ��m Mm P�F'm"��AR���A���A�B� �m8 'a x�xtimF�ARI s�FP.1 g�A���PAA�^mfr XIHOO X • 0 2 = W t F z e W 50 0 of OLL LL n 0 Z �Sw�9WW9WB9w999B�WS89w��wq�95W9���E99BE�ESB8B�9gSE8wgBW596�E sag pp yy $s p'����R��RRxRs �.�R�Rq�xRRR R��ga������R�m�WgR�Rp�xR���RRRn�R�R.�Rp d � In z F 4 ffif f E5ff4oEfE44EZ4o4440 9f44EE4ffEs E400ggooq »�x�R�R�XIRh��9J a 99mA A�RIA�R� ���,�FFRYJ�o^Y9 RI^„PRA«� ��� �W�AA��F9d X53 gg ssqq 00 CD CD o _o CD 000 p Jh b o w tl? o d z 3 a��e�oWaFo aF� Q a �e< edQ ww m jL'' �LL< FIa swaw�awoo E°�F�� - �a � s I � II III : ;; ii II /iI f it �9�y X9 oNa �o5„ �_ wzF3� zw` / w � S s r d� !L' ;T 01 , ` ir�l �I rc 1\ P -g II yip � - �rE `sa SS $s a555s.58 8 aa�x� s"m3as`ab -------- iD »mo �,. )§ , m / rT'Io; / , LL O � Use the following tables: **** If Significant Trees on site, complete chart on page 2 first. A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Net Urban Forestry Area (phase 1 and 2) Gross area of property (or artificial lot) Regulated utility easements and other deductable areas Net Urban Forestry Area Required l 'tree Canopy Area (phase 2) Minimum Canopy Coverage Requirement: Commercial/Institutional/Public Project (30%) Industrial (20%) Agricultural (0%) Urban Ag (30%) Residential (40%)/ New Subdivision Option (25%) Multifamily (50% of open space requirement) Mixed Use/Urban Residential Zoned site (5%) Additional 5% if using reservation method B ("protected trees") Total required canopy coverage for site (including mitigation) Preservation/Retention of Existing Canonv (phase 1 and 21 Existing tree canopy within net urban forestry area If seeking approval for phase 1 only, then preserve a minimum of 50% canopy and stop after completing line M. Preservation requirement uirement (25%) Additional 5% if using preservation method B ("protected trees" Additional preservation option for mitigation of significant tree removal (only if removing significant trees - see pg 2) Total preservation requirement Area of existing canopy reserved Total preservation credit toward planting New Tree Planting (phase 21 Calculation (A -B) Cx%) I (Cx.05) .05) I (Gx.5) .5) .25) (Gx.05) .05 (If) ((H or I)+J+K)) (M + dd) Square Feet Acres 5,599,598 128.55 1,752,035 40.22 3,847,563 88.33 961,891 22.08 192,378 4.42 1,806,432 41.47 7,785 0.18 1,946 0.045 389 0.089 2,335 0.054 2,516 0.058 12,717 0.29 Required uired new planting coverage (F — M - dd) 1,793,715 41.18 902 large canopy trees 2000 sq ft per tree (Qty x 2000) 1,804,000 41.41 0 medium canopy trees @ 700 sq ft per tree (Qty x 700) - - 0 small canopy trees @ 100 sq ft per tree x 100) - - Total Planting (P+Q+R) 1,804,000 41.41 Parking Areas: 1 or 2 family residential are exemut (chase 2) Area of parking Required canopy coverage of parking areas (40%) Area of canopy coverage being rovided for parking Excess/deficient parking canopy Fulfillment of Requirements (phase 2) Total required canopy coverage for site Provided canopy coverage Excess/deficient overall canopy (Tx.40) .40) - - (V -U) - - (F) (M+S+dd) (Y -X) 1,806,432 41.47 1,816,717 41.71 10,285 0.236 1 DBH Canopy Significant Trees Calculation (inches) Area (SF) aa All Post Oaks/Blackjack Oaks > 18" dbh (if east of 1-35) I - - bb All other trees > 27" dbh (regardless of species or location) 3,340 150,834 cc Total of Significant Trees to be preserved 323 20,402 dd Significant Tree preservation credit (cc sf x 0.5) 10,201 ee Total of Significant Trees to be removed aa + bb - cc 3,017 130,433 Significant Tree Removal Mitigation Options ff Preservation of existing canopy 1.5X the canopy of removed significant trees in exceess of required canopy OR _ gg Planting additional trees 5X the canopy of removed significant trees in excess of required canopy OR 652,163 Payment into Tree Fund for total dbh inches of significant trees removed @ $300 per inch dbh N/A N/A N/A Provide tree survey data in table below or equivalent. Use of the Excel Tree Data & Calculations spreadsheet is recommended for sites with numerous trees, particularly if there are multiple significant trees. You may obtain a copy of the spreadsheet from urban forestry staff at urbanforestry@fortworthtexas.gov. Canopy may be recorded as a combined total for clustered trees if preservation status is the same for all trees within cluster. If canopy data is estimated from aerials, you must still individually identify all existing significant trees. Tree Survey Data Tree # Common name or species DBH (in) Canopy Area (ftz ) Preserved / Removed Significant (Y or No) Exclusions Mitigation Method * Comments * Mitigation options for removal of significant trees are: additional preservation, additional planting, or payment into City of Fort Worth Tree Fund 2 SIGNIFICANT TREE LEGEND (27+ DIAMETER) TREE NO. DIAMETER (IN) TYPE CANOPY RADIUS CANOPY (SF) 26 31.6 HONEY MESQUITE 15 707 REMOVED 31 30.7 HONEY MESQUITE 15 707 REMOVED 32 35.5 OSAGE-ORANGE 20 1257 REMOVED 33 27.8 HONEY MESQUITE 18 1018 REMOVED 34 28.3 HONEY MESQUITE 18 1018 REMOVED 35 29.1 HONEY MESQUITE 20 1257 REMOVED 50 34.5 HONEY MESQUITE 30 2827 REMOVED 53 27.8 HONEY MESQUITE 30 2827 REMOVED 55 35.2 HONEY MESQUITE 20 1257 REMOVED 60 35.6 HONEY MESQUITE 18 1018 REMOVED 71 29.5 HONEY MESQUITE 15 707 REMOVED 72 28.1 HONEY MESQUITE 15 707 REMOVED 74 31.2 HONEY MESQUITE 20 1257 REMOVED 75 34.2 HONEY MESQUITE 18 1018 REMOVED 78 27.2 HONEY MESQUITE 20 1257 REMOVED 83 34.2 AMERICAN ELM 12 452 REMOVED 89 30.3 HONEY MESQUITE 18 1018 REMOVED 102 29.8 HONEY MESQUITE 30 2827 REMOVED 134 34.2 OSAGE-ORANGE 20 1257 REMOVED 138 48.4 OSAGE-ORANGE 20 1257 REMOVED 167 30.1 HONEY MESQUITE 20 1257 REMOVED 178 35.6 HONEY MESQUITE 20 1257 REMOVED 193 27 HONEY MESQUITE 12 452 REMOVED 194 33.5 HONEY MESQUITE 18 1018 REMOVED 197 28.8 OSAGE-ORANGE 15 707 REMOVED 216 46 OSAGE-ORANGE 9 254 REMOVED 225 28.4 HONEY MESQUITE 12 452 REMOVED 229 27.8 HONEY MESQUITE 18 1018 REMOVED 231 27.8 HONEY MESQUITE 15 707 REMOVED 265 29.4 OSAGE-ORANGE 15 707 REMOVED 285 29.8 OSAGE-ORANGE 18 1018 REMOVED 291 28.2 OSAGE-ORANGE 15 707 REMOVED 380 31 OSAGE-ORANGE 20 1257 REMOVED 487 32.4 OSAGE-ORANGE 10 314 REMOVED 538 28.4 OSAGE-ORANGE 8 201 REMOVED 570 29.2 HONEY MESQUITE 15 707 REMOVED 576 27.4 HONEY MESQUITE 18 1018 REMOVED 580 27.2 HONEY MESQUITE 15 707 REMOVED 596 30.4 OSAGE-ORANGE 20 1257 REMOVED 681 32.4 HONEY MESQUITE 15 707 REMOVED 704 29 OSAGE-ORANGE 20 1257 PRESERVED 737 27.3 OSAGE-ORANGE 12 452 REMOVED 750 33.5 HONEY MESQUITE 25 1963 REMOVED 758 31.5 HONEY MESQUITE 30 2827 REMOVED 760 28.9 OSAGE-ORANGE 20 1257 PRESERVED 771 33.5 HONEY MESQUITE 38 4536 PRESERVED 861 28.5 HONEY MESQUITE 15 707 REMOVED 866 32 HONEY MESQUITE 18 1018 REMOVED 885 28.5 HONEY MESQUITE 20 1257 REMOVED 907 29.8 HONEY MESQUITE 20 1257 REMOVED 929 26.9 HONEY MESQUITE 20 1257 REMOVED 967 34.2 OSAGE-ORANGE 25 1963 REMOVED 978 30.2 OSAGE-ORANGE 18 1018 REMOVED 985 28.5 OSAGE-ORANGE 25 1963 REMOVED 987 33.5 OSAGE-ORANGE 25 1963 REMOVED 1003 27.4 OSAGE-ORANGE 25 1963 REMOVED 1011 29.6 OSAGE-ORANGE 25 1963 REMOVED 1024 28.5 OSAGE-ORANGE 20 1257 REMOVED 1025 26.9 OSAGE-ORANGE 25 1963 REMOVED 1061 31.4 OSAGE-ORANGE 25 1963 REMOVED 1066 28.2 OSAGE-ORANGE 25 1963 REMOVED 1080 27.8 OSAGE-ORANGE 25 1963 REMOVED 1090 28.9 OSAGE-ORANGE 25 1963 REMOVED 1104 30.2 OSAGE-ORANGE 25 1963 REMOVED 1107 32.5 HONEY MESQUITE 25 1963 REMOVED 1123 32.6 OSAGE-ORANGE 15 707 REMOVED 1128 27.1 OSAGE-ORANGE 15 707 REMOVED 1129 28.9 OSAGE-ORANGE 15 707 REMOVED 1141 30.4 OSAGE-ORANGE 25 1963 REMOVED 1145 29.1 OSAGE-ORANGE 15 707 REMOVED 1164 32 OSAGE-ORANGE 12 452 REMOVED 1166 29.7 OSAGE-ORANGE 15 707 REMOVED 1222 32.6 OSAGE-ORANGE 25 1963 REMOVED 1224 36.5 OSAGE-ORANGE 25 1963 REMOVED 1225 27.6 OSAGE-ORANGE 18 1018 REMOVED 1249 29.4 OSAGE-ORANGE 25 1963 REMOVED 1260 28 BLACK WILLOW 10 314 REMOVED 1296 31.5 OSAGE-ORANGE 25 1963 REMOVED 1454 28.2 OSAGE-ORANGE 12 452 REMOVED 1456 29.8 OSAGE-ORANGE 12 452 REMOVED 1458 29.6 OSAGE-ORANGE 12 452 REMOVED 1475 27.5 OSAGE-ORANGE 15 707 REMOVED 1484 29.8 OSAGE-ORANGE 15 707 REMOVED 1502 30.4 OSAGE-ORANGE 15 707 PRESERVED 1521 28 OSAGE-ORANGE 18 1018 REMOVED 1544 31.3 OSAGE-ORANGE 20 1257 REMOVED 1550 28.2 OSAGE-ORANGE 15 707 REMOVED 1553 29.3 HONEY MESQUITE 30 2827 REMOVED 1595 28.4 OSAGE-ORANGE 20 1257 REMOVED 1597 30.4 OSAGE-ORANGE 30 2827 REMOVED 1611 27.9 OSAGE-ORANGE 20 1257 REMOVED 1659 28.4 OSAGE-ORANGE 25 1963 REMOVED 1668 27.9 OSAGE-ORANGE 22 1521 REMOVED 1707 36.1 OSAGE-ORANGE 30 2827 REMOVED 1751 29.9 HONEY MESQUITE 25 1963 REMOVED 1792 28.7 OSAGE-ORANGE 25 1963 REMOVED 1814 30.4 HONEY MESQUITE 25 1963 REMOVED 1841 30.4 OSAGE-ORANGE 25 1963 PRESERVED 1887 29.4 OSAGE-ORANGE 30 2827 REMOVED 1900 26.9 OSAGE-ORANGE 20 1257 REMOVED 1914 35.2 OSAGE-ORANGE 25 1963 REMOVED 1917 29.9 OSAGE-ORANGE 25 1963 REMOVED 1927 32.6 OSAGE-ORANGE 25 1963 REMOVED 1996 32 BLACK WILLOW 25 1963 PRESERVED 2002 28 BLACK WILLOW 25 1963 PRESERVED 2034 29.7 HONEY MESQUITE 25 1963 PRESERVED 3079 32.7 HONEY MESQUITE 25 1963 PRESERVED 3106 47.9 HONEY MESQUITE 30 2827 PRESERVED 11477 28.4 HONEY MESQUITE 20 1257 REMOVED TOTALS 3,340 150,834 20,402 130,433 323 PRESERVED 3,017 REMOVED Large Trees Site Credit Spacing Notes Species Pecan 2,000 sqft 40 ft # Carya illinoinensis Deodar Cedar 2,000 sqft 40 ft Cedrus deodara Green Ash 2,000 sqft 40 ft Fraxinus pennsylvanica Southern Magnolia 2,000 sqft 40 ft # Magnolia grandiflora Bur Oak 2,000 sqft 40 ft * Quercus macrocarpa Chinquapin Oak 2,000 sqft 40 ft Quercus muhlenbergii Shumard Oak 2,000 sqft 40 ft # Quercus shumardii Texas Red Oak 2,000 sqft 40 ft Quercus buckleyi Live Oak 2,000 sqft 40 ft * Quercus virginiana American Elm 2,000 sqft 40 ft Ulmus americana Cedar Elm 2,000 sqft 40 ft * Ulmus crassifolia Lacebark Elm 2,000 sqft 40 ft Ulmus parvifolia Medium Trees Site Credit Spacing Notes Species Caddo Maple 700 sqft 25 ft * Acer barbatum var. Caddo Bigtooth Maple 700 sqft 25 ft * Acer grandidentatum Common Persimmon 700 sqft 25 ft Diospyros virginiana Texas Ash 700 sqft 25 ft Fraxinus texensis Ginkgo 700 sqft 25 ft Ginkgo biloba Kentucky Coffeetree 700 sqft 25 ft Gymnocladus dioicus Eastern Red -Cedar 700 sqft 25 ft * Juniperus virginiana Golden Raintree 700 sqft 25 ft Koelreuteria paniculata Eldarica (Afghan) Pine 700 sqft 25 ft * Pinus eldarica Italian Stone Pine 700 sqft 25 ft Pinus pinea Chinese Pistache 700 sqft 25 ft * Pistacia chinensis Honey Mesquite 700 sqft 25 ft * Prosopis glandulosa Blackjack Oak 700 sqft 25 ft * Quercus marilandica Monterrey (Mex. White) Oak 700 sqft 25 ft * Quercus polymorpha Western Soapberry 700 sqft 25 ft * Sapindus drummondii Pond Cypress 700 sqft 25 ft Taxodium ascendens Bald Cypress 700 sqft 25 ft * Taxodium distichum Small Trees Site Credit Spacing Notes Species Japanese Maple 100 sqft 8 ft # Acer palmatum Common Button -bush 100 sqft 8 ft Cephalanthus occidentalis Redbud 100 sqft 8 ft * Cercis canadensis Desert Willow 100 sqft 8 ft * Chilopsis linearis Rough -leaf Dogwood 100 sqft 8 ft # Cornus drummondii Texas Persimmon 100 sqft 8 ft * Diospyros texana Carolina Buckthorn 100 sqft 8 ft # Frangula caroliniana Yaupon Holly 100 sqft 8 ft * Ilex vomitoria Deciduous Holly 100 sqft 8 ft hex decidua Creape Myrtle 100 sqft 8 ft * Lagerstroemia indica Mexican Plum 100 sqft 8 ft * Prunus mexicana White Shin Oak 100 sqft 8 ft * Quercus sinuata var. breviloba Flameleaf Sumac 100 sqft 8 ft * Rhus lanceolate Eve's Necklace 100 sqft 8 ft * Sophora affinis Mexican Buckeye 100 sqft 8 ft * Ungnadia speciosa Rusty Blackhaw 100 sqft 8 ft Viburnum rufidulum * Drought tolerant species # Not recommended for parking lots or high heat areas GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH COHIX PH 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105162 Revised July 1, 2011 Q w m m m fA N y N V: II) V] V] fA h y ti N h h y y h y ti y ti h N ti ti h N y ti h N N y h N y h h (/0 [ V] V] VI VI V] � � o ti h w w ti t s 5 3 33 3 3 E R YYY Qo N w o�3 m o O N oNNtryyryryryryry NNtryyry NNaryryrr�-1 w.� �,� i W oM �L. G m m rOn k3i U U fn a N h U ai R R R Ci C p ai p 4 P U U m l n N k3- U FU' f3i o o a Fr T.J � L F � U x x •L E3 E3 �--�--uu E� oz"S �N'�i'��5_�'S S_�SF i° A y 00 1-.)- E �N 5 W E a _ 0]0 c 0 0 U U U F F U U F U W a3 pq� 66.-1,i N v N55kk .9 .9 C C i .5 .c C C i 5 C i i . C i i C C i 55ZZ C NNq 6 a C0.' ti FFFFFFF F E Si O Ca A Q fa f] L1 t? f� L1 Q Q A f] L1 Q Q Q Q Q f� fa Q L1 !a A A Q f� fa O Q fa A A Q Ca C3 Ca Ca Ca Q A Q A A 0NCINCIN = 0 0 ONNO ONNO ONO NNNNNNN NNNNNNN c R uUM �nvvv N N O N \ 0 0 0 0 0 � \ a \ N N 0 0 N 0 N N N N 0 0 0 N N N o a N2 0 0 0 0 a w � o = 3 O Q Q z ow -A V 3G:2tyt_aa V V U U U U N N N N d d a N U N NNOON N N C 0000 U K K F 0F F F'� F - C F$ C '+ 0 C C O N C o C C 0 S = = 2 2 � —' Z S . y .9 E -- o FF-'rcH v v v .0 5 ,c c A AAWCa Ca Ca Af]L1 Ll Ca Ca Qf]CIRQAQQQAA A O N N N N N N N of N O OO ( N(VVN O N N O O N N 0 0 0 h 0 0 N N 0 0 N N 0 n \\ a a ��=oe�°o>00000evo�oo SoSSo °aaaaaa� SSoSo 000 Maaa�°a�a oSSoSS M N N m N����z}iNl- >- of No v M== y U V O vMrenv m' G. H Q QQQQQQQfaQQfaQQQQQQQ Q N N V O of N N N N V N O N an O N N aaaaaa oM Maooae F5 N N N N N. E 9 9 000C 0 0 0 0 0 0 M o 00000 0 0 n 0 0 0 0 C7 aQ'^oNrn�vvv�`�l v ffi vE� A ce p 'n o_ u v .� 0 F pp � - d �� . � 9 �Y� bi $ � � w Uwc7 h ad mmw' FCc z A Q A� A Q A Q AQ Q Q N � N O O � N N O N N a a N O ¢aQa¢aaQQQ E E M Ce oSSSSSSoSoSoSSo a v n n v M v v v n v w 0 w 0 � 3 3 3 o — 3 � o N cv x x U o 3p O 3p3 o o o U U FFFFF `ii U.5 .5 .GUU ryryq U UUUUUU W C7 Q Q O Q Q Q Q Q Q Q Q Q Q Q Q N N N O O N N O N E O O a ��a�aaaaa�a�aaaza M a a v a M a M My o M a o v a � e N 33 3 3 m e a� by wwUM .�'„cvMF.-add � a c c ffiit vY8w- . Cd .u2 -F m m F F m m F m m q q U U y U U F H 0 0 U U F - H 0 0 U U I- pqqp W 6 5 }}qq Y Y III 6 Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q as 000000 eo��oo v d d v a v a d v v SASS v m m v a a - Q U, Q ri 0 0 3 3 3 cv oN u N z Y Y N N N X F X F v O v v 00 a d m 0 o Nry 0 n3, �D o o a b a m 9 zzamtn ZI1 4 zzoi t/i to toF 2 2 F F 2 F F F O O L Q Q L O O L1 Q A Q Q Q Q Q o o o o g= o o -gjg -g a o o o e o o o o o o o o �o o o o o o a o o ao o o o o o ao o ao o �e ao o M4MaM 0000 v v a a v a 000aoSS v a v v a v v v o v a oSooSS000S000SSooSSSSSoSSSSS�SoSoSSSSS�S v v a v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v c v v a v v a o 3 3 3 3 r w N ti �a w _ Nn- 'a.731W-Z��nvu�mvvcc��ryryttyyryryryryryryryryryrycc��ryryttyyryryryryryrya.Na¢ v�oo dodoodo,33U UW'�.o o v� U � dapp ! v U U U g ry�i c u app c -• _ _ _ _ _ _ J ¢ ¢ o c' � C z w .. E �p _xx UUUUUUuu� a QpL AQQL1lapAQf�faQQQAAQggO�.a.�aOL?f�t?P�Ofa ACa P�OP�QlaPOOOOPQPQ00!]f�PL p of N N N N N N N N N N N N �n �n N m N N 0 O N N N N N �n N N N N O wt N a�a N O O O N N N N N ry N N N N N N N ti Y, 56 byti mv^i M M 671M h v ^ Y N O o v r VOOi A 0 v�vv 0 0 p O O O p0 O Ana^ ? O O O C O O O O O c _ 0 0 0 v v v v 6 o g z x-zzz� U U U 1 �vNi - U 4 W V U a 2 v z z vv� v 0 saaaa OH F 3 30.'.G N'� 0 0UU g rF E F NO ON O N N N N Np N N rn N �n N N MGM ti ti ti M a h ti n ti ti ti ti ti ti O O a a O O a a O O v v 0 0 a v 0 0 v v 0 0 vv I H��amz� o O �c_ornti� o p bb ryry M 3v 3v a o O FFF-�.s U UUw�'�'�zzrai, v .saaUuu rai, ci, D0 Q Q Q Q Q Q Q Q Q Q Q Q a O1CC' C' w wwMww�,wr�'w o, rwww vi m y O m m v� O a Woo ..1 O O O W W U U— vpi W W P I W k % x o o F� jc� p9p9 9 9 J U a(-0 v 55�� J W U U U U U 0 3 U U l z u i Q Q Q Q P Q Q Q Q Q Q Q Q Q Q QQ Q a v v v 0 <r V 0 0 d' C' 0 0 C' V 0 0 C' V 0 0 a V 0 0 d' a 0 0 v 0 V N ) N N E COIL) N N y mro W mC m m m Q U �, C F F I I @ W cv m m C C [t m F N v F a v F N v F W X F F ry N N N a a�. �`oNNN0.rvaa°c�.Q �rnr�mC7 CC� rN V 0.�1mmQGNI W LrF W M RNIm��M O M M VMO V N VV M rommQmw�me�=�oN .c -O 2 2 Q Q HHHH'� 6 Qd av 0.v'av 0.v'�v:FF�� XF E o €d Q Q Q Q Q Q Q Q Q Q Q Q Q Q N N ososo N V N N N oos�o N N N N HE o ^ F " yNH07H ¢F%FFFFF% W FH�FFF HHHEHHHHHHH W HHHHF HHFHHHH W .� _ _ _ _ _ W N¢`Nd N6 NQ'6dOOOW UWW W W a -qq' -pp' _ -' J �jU' �jU�j'' WUv.� WUW WUW WUW WUW WWWI WUW C WU�.7 WUW WUW WUW WUW WUW WUW WUW WUW WU WU WUW WUW WUW WU WUW WUW `0 0 0 0 " a paoCCCCCL Jae aaaaaa,,, CP�.4 W ,"a0.0.awac�, C C C C C CCCC n,aaaawa0.aa0.� 0.'CCCC�CC m 0` �O x x OOOoggk,,�,�ww9 ie`�hdggmw`,��`�vvvYYY�e��n�ovomvc�w'v YYY"k'�vkie�wn�n Xmm kmq�kiw �.%i 'v v, x��.%i� [=EF[-�FFHEi H[�U UC7OU V V ththth C7U CJUCJ 0 0 oc�c�5ooc�000�5�oc�c�oc�c�5ci 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 uFi N :+, Fi p.. LL. 6 6i u. V.a 5i ❑.a �+Fi W O FFFFF O O FEFFFFFFFFFFFFFF O OOO O O O O N N ON N N N N ON N N ON N N N N N ON N ON N N ON N N ON N N N N� N� O O N N O O N N N N O N ON ON O N N N N N N O N N N 0 N N N N 0 0 N N N N N ON N N 0 0 N N N 0 0 N N N N 0 0 N N N N N N N 0 0 N N N N N 0 0 N N N N 0 0 N N N N N N N N N O O O N N N 17 O w U U U U U U U U U U U U V V U ai O O O O �+ O O O W 'C's'Cx'Cs - - U UUp-d dl d1 dl dS v'S 31�a14132 HHH ill jH .0.0.0 M•• •• •.• v v v v v v w suc'c�iQou u w ON ON O O O O O O ti T � N M N N v v v a N� a c c v N a v N v v 3 h E � N N v v NN a a N NO a v N NO v a NO N v a N N v v N N FORT WORTH,, CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Approval Spec No. Classsiftcation Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 3303 13 Urethane Hydrophilic Watorotop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/D792 04/26/00 3305 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-00I 04/26/00 3305 13 Profile Gasket for 4' Diam. MH. Press -seal Gasket Corp. 250-4G Gasket ASTM C -443/C-361 SS MH 1/26/99 3305 13 HOPE Manhole Adjustment Bingo Ladtech, Inc HOPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS Wra idSeal Manhole Encapsulation Syatens Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) 1/26199 3339 13 Fiber lass Manhole Fluid Containment, Inc. Flowtite ASTM 3753 Non -traffic area 08/30/06 33 39 13 Fiber lass Manhole L.F. Manufacturing Non -traffic area Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) 33 05 13 Manhole Frames and Covers I Western Iron Works, Bass & Hays FoundIry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) 3305Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 08/24/1.8Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18Manhole Frames and Covers Neenh Found NF 1274 ASTM A48 & AASHTO M306 30" Dia. Manhole Frames and Covers Si a Co oration MH-144N Manhole Frames and Covers Si a Cor ration MH-143N Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 3305 13 Manhole Frames and Covers Neenah Crating 24" dia. 10/31/06 3305 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) 5E32 -REFS 30" Dia. 01/31/06 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V 1483 Designs AASHTO M306-04 30" Dia. 11/02/10 3305 13 30" Dia. Mll Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/1 I 3305 13 30" Dia. MH Ring and Cover Star Pie Products MH32FTWSS-DC 30" Dia 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Rine 30" Dia 10/14/13 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works 30" ERGO XL Assembly with Cam Lnok/MPIC/T-Gasket ASSHTO MISS & ASTM A53b 30" Dia 06/01/17 3405 13 30" Dia. MH Ring and Cover Lockable) CI SIP Industries 2280(32") ASTM A 48 30" Dia. 12/05/23 3403 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 4267WT - Hinged (32") ASTM A 48 30" Dia. 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. CAP-ONE-30-FTW, Composite, WI Lock w/o Ring 30" Dia. 10/07/21 3403 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamli t 24" Dia. 3303 13 Manhole Frames and Covers Neanah Costing 24" Dia. 33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Has Foundry 300-24P 24" Dia. 3305 13 Manhole Frames and Covers McKinley It.. Works Inc. WPA24AM 24" Dia. 03/08/00 33 05 13 Manhole Frames and Covers Accucast RC -2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Seram ore Industries Private Ltd. 300-24-23.75 Ringand Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) 33 39 10 Manhole, Precast Concrete Hydra Conduit CorpSPL Item #49 ASTM C 478 48" 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 12/05/23 3339 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Tumor Company48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 09/03/24 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. Manhole, 32 Opemng and at top, Transition Cones) ASTM C 478 48" 10 84" I.D. 06/09/10 3339 10 Manhole, Precast (Reinforced Pol er)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 3920 Manhole, Precast Concrete Forterm Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete Artnorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC Geneva Pipe and Precast Predl Systems) 48" & 60" LD. Manhole w/32" Cone 48" Sc 60" Non Traffic Areas 03/07/23 33 39 20 Manhole, Precast Concrete AmeriTex Pie and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-478; ASTM C-923; ASTM C-443 03/07/23 33 39 20 Manhole, Precast einforced Pol ar) Concrete P3 PoIsoners, RockHardsc 48" & 60" ID. Manhole w/32" Cone 04/28/07 Manhole, Precast Reinforced Polymer) Concrete Amitech USA Meyer Pol Grote Pipr Sewer -(WAC) Wastewater Access Chamber 33 39 40 12/29/23 33 39 20 For use when Std. MH cannot be Wastewater Access Chamber Quickstream Solutions, Inc. T e 8 Maintenace Shaft (Poo it) installed due to depth Water & Sewer - Manholes & Bases/Rehab Systems/Cementitious El -14 Manhole Rehab Systems Quadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP E1-14 Manhole Rehab Systems AP/M Permeform 4/20/01 El -14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab Stem 5/12/03 E1-14 Manhole Rehab System (Liner) Triples Lining System MH repair roduct to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Sopair Product Misc. Use * From Original Standard Products List FORT WORTH.,, CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Systems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Spraysv, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion rotoction(Exterior) ERTECH Series 20230 and 2100 (As hatic Emulsion Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, SIHB, 51, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 03/19/18 33 OS 16,3339 10, 333920 Coating for Corrosion rotection(Exterior) Sherwin Williams RR&C Dampproofing Non-Fibered Spray Grade As hatic Emulsion) For Exterior Coating of Concrete Structures Ooly Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16) 33 05 13 Manhole Insert Knutson Enter rises Made to Order - Plastic ASTM D 1248 Far 24" dia. 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 Far 24" dia. 33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. Lifesaver- Stainless Steel For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up 10 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Pewerchock Up to 48" 03/19/18 Casing Spacers BWM SS -12 Casing Spacer(Stainless Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non pressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 09/03/24 33 05 13 Casing Spacers Raci (Completely HDPE) Per Manufacturers Requirements (Sewer Applications Only) 8" - 12" (Sewer Only) Water & Sewer -Pipes/Ductile Iron 33-11-10(1/8/13) 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, Art/WA O150, C I5I 3" thea 24" 08/24/18 33 It 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Futile Pipe (Bell Spigot) AWWA C 150, C l5l 4" thra 30" 08/24/18 33 I l 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AWWA C150, C151 4" thou 30" 331110 Ductile Iron Pipe U.S. Pipe and FoundryCo. AWWA C150, C(51 33 I1 l0 Ductile Iron Pipe McWane Cast Iron Pipe Co. AWWA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatings/Epoxy 33-39-60 (01/08/13) 02/25/02 EpoxyEpany Lining System Sauereisen, Inc SewerGard 210195 LA County #210-1.33 12/14/01 EpoxyLining System Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Indmon Protecto 401 ASTM B -I 17 Ductile Iron Pie Duly 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, $IHB, 51, 02 Acid Resistance Test Sower Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications Sewer - Coatings/Polyurethane Sewer - Combination Air Valves 05/25/18 33-31.70 Air Release Valve A.M. USA, Inc. D025LTP02(Com Bite Body) Sewer - Pipes/Concrete El -04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 EI-04 Cone. Pipe, Reinforced Hydra Conduit Corporation Class Ill T&G, SPL Item #77 ASTM C 76 EI-04 Conc. Pipe, Reinforced Hanson Concrete Products CPL lInes IFS IlIanholo, 555 Pipe ASTM C 76 EI-04 Conc. Pipe. Reinforced Concrete Pipe & Produas Co. Inc. ASTM C 76 Sewer - Pipe Enlargment System (Method)33-31-23 (01/18/13) PIM System PIM Corporation polyethylene PIM Corp., Piscata Way, N.J. Approved Prrviouuly McConnell Syntemo McLat Construction Polyethylene Houston, Texas Approved Proviously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Proviouoly Sewer - Pipe/Fiberglass Reinforced/ 33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiber lass (FRP) Hobas Pipe USA, Inc. Hoban Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiber lass Pipe (FRP) Arneran Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 33 31 13 Glass -Fiber Reinforced Polymer Pie (FRP) Thompson Pipe Group Thom son Pie (Flowtite) ASTM D3262/D3754 03/07/23 353113 Fiberglass Pipe (FRP) Future Pipe Industries Fibersteong FRP ASTM D3262, ASTM O3681, ASTM O4161, AWWA M45 09/03/24 33 31 13 Fiberglass Pipe (FRP) Suporlit Born Sanayi A.S. Superlit FRP ASTM O3262, ASTM D3517, ASTM 3754, AWWA C950. " From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Sewer - Pipe/Polymer Pipe 4/14/05 Polymer Modified Concrete Pipe Amitech USA MeyerPol Crete Pipe ASTM C33, A276, F477 8" to 102", Class V 06/09/10 EI-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76. Sewer - Pipes/HDPE 33-31-23(1/8/13) High -density of eth lene pipe Phillips Deiseopipe, Inc. 0ptieore Ductile Polyethylene Pipe ASTM D 1248 8" High -density of eth lene pipe Plexco Inc. ASTM D 1248 8" High -density 1 eth lene pipe Pelly Pie, Inc. ASTM D 1248 8" High -density 1 eth lene pipe CSR Ho Conduit/Pipelineelissn Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-12 DR -14 PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AWWA C900 4" thee 12" 10/22/14 33-11-12 DR -14 PVC Pressure Pipe Royal Budding Products Royal Seal PVC Pressure Pipe AWWA C900 4" then 12" Sewer - Pipes/PVC* 33-31-20 (7/1/13) 33-31-20 PVC Sewer Pipe J -M Manufacturing Co, Inc. (JM Ea le) SDR-26 (PSI15) ASTM D 3034 4" - 15" 12/23/97" 33-31-20 PVC Sewer Pipe Diamond Plastics Cenperasien SDR-26 (PS I15) ASTM D 3034 4" then 15" 33-31-20 PVC Sewer Pipe Lamson Vylon lon Pipe SDR-26 (PSI 15) ASTM D 3034 4" then 15" 12/05/23 33-31-20 PVC Sewer Pipe Vin (tech PVC Pipe SDR-26 (PSI 15) ASTM O3034 4" thee 15" 12/05/23 33-31-20 PVC Sewer Pipe Vin ltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" 33-31-20 PVC Sewer Pipe J -M Manufacturing Co, Inc. (JM Ea le) PS 115 ASTM F 679 IS" -28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation pS 115 ASTM F-679 18" 5o48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D -3034,.D-1784, etc 4" - 15" 33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlake) Gasketed PVC Sewer Main Fittings ASTM D 3034 3/19/2018 33 31 20 PVC Sewer Pipe Pi life Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 3/19/2018 3331 20 PVC Sewer Pipe Pi life Jet Stream SDR 26 ASTM D3034 4"- 15" 3/29/2019 33 31 20 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM O3034 4"- I S" 10/21/2020 33 31 20 PVC Sewer Pie NAPCO(Westlake) SDR 26 ASTM D3034 4"- 15" 10/22/2020 33 31 20 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 10/21/2020 333120 PVC Sewer Pi NAPCO(Westlake) SDR26 PS115 ASTM F-679 18"- 36" " From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Approval Spec No, Classsification Manufacturer Model No. National Spec Size Water - Appurtenances 33-12-10 (07/01/13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co., Inc. 202B 1"-2" SVC, op to 16" Pipe 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strop DI Saddle AWWA 0800 1 "-2" SVC, ap to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Db1 Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Slept -Ball Meter Valves McDonald 6100M,6100MT & 6IOMT 3/4" and I" 10/27/87 Cub Stops -Boll Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6I01M 1Y" and 2" 5/25/2018 33-12-10 Curb Slops -Ball Meter Valves. Ford Meter Box Co., Inc. FB600-7NL, FB1600-7-NL, FV23-777-W-NL, L22-77NL AWWA 0800 2" 5/25/2018 33-12-10 Curb Slept -Ball Meter Valves Ford Meter Box Co., Inc. FB600-6-NL, FBI600-6-NL, FV23-666-W- NL, L22-66NL AWWA C800 1-1/2" 5/25/2018 33-12-10 Curb Slaps -Ball Meter Valves Ford Meter Be. Co., Inc. FB600-4-NL, FBI600-0-NL, BI 1-444-WR- NL, B22444-WR-NL, L28-44NL AWWA C800 I" 5/25/2018 33-12-10 Curb Slops -Bell Meter Valves Mueller Co., Ltd. B -25000N, B -24277N-3, B -20200N-3, H- 15000N, , H -1552N, H142276N AWWA C800, ANSF 61, ANSI/NSF 372 2" 5/25/2018 33-12-10 Curb Slops -Ball Meter Valves Mueller Co., Ltd. B -25000N, B -20205N-3, B -24277N -3,H- 15000N, H -14276N, H -15525N AWWA C800, ANSF 61, ANSI/NSF 372 1-1/2" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. B -25000N, B -20200N -3,H -15005N, H- 15530N AWWA C800, ANSF 61, ANSI/NSF 372 1" 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 1 "-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping''appiag Sleeve (Coated Steel) JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up 10 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) JCM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipo Only 05/10/11 "upping Sleeve (Stainless Steep Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve Coated Steel) Romac FTS 420 AWWA C-223 Up to42" a/24" Dot 02/29/12 33-12-25 Tapping''appiag Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up 10 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve Stainless Steel Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Re air Clamp Powerseal 3232 Bell Joint Repair Clam. 41030" Plastic Meter Box er/Composite Lid DFW Plastics Inc. DFW37C-12-IEPAF FTW Plastic Meter Box w/Com osite Lid DFW Plastics Inc. OFW39C-12-IEPAF FTW 08/30/06 Plastic Meter Box w/Catepotite Lid DFW Plastics Inc. 17FW65C-14-IEPAF FTW Class"A" Concrete Meter Box Bass & Hayx CMB37-B12 1110 LID -9 Concrete Meter Bex Bass & Harp CMB-18-Dual 1416 LID -9 Concrete Meter Box Bass & Flays CMB65-B65 1527 LID -9 Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13) None Water - Combination Air Release 33-31-70 (01/08/13) ° El -I1 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" El -I1 Combination Air Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2" I" & 2" El -1 l Combination Air Release Valve Valve and Primer Carp. APCO #143C, #145C and #147C 1", 2" & 3" Water - Dry Barrel Fire Hydrants 33-12-40 (01/15/14) 10/01/87 E -I-12 DryBarrol FireHdrant American-Darlin Valve Drawin Nos. 90-18608,94-18560 AWWA C-502 03/31/88 E-1-12 fey Barrel Fire Hydrant American Darling Valve OhoDrawing No.94-18791 AWWA C-502 09/30/87 E -I-12 Dry Barrel FireHdrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E -I -I2 Dry Barrel FireHdrant Clow Corporation Drawings D20435, 020436, B20506 AWWA C-502 E-1-12 fey Barrel Fire Hydrant ITT Kroaody Valve Shop Drawing No. D-80783FW AWWA C-502 09/24/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 10/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Cam an Shop Drawings No. 6461 A-423 Centurion AWWA C-502 01/15/88 El -12 Dry Barrel Fire Hydrant Mueller Company Shop Drawing FH-12 A-423 Super Centuion 200 AWWA C-502 10/09/87 E-1-12 fey Barrel FireHdrant U.S. Pie & Fanndry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 fey Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer \t/B67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant ES (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 5101-S Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hoesoy Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" " From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13) 12/05/23 33-11-12. PVC Pressure Pie Vin ltech PVC Pi e DR14 AWWA C900, AWWA C605, ASTM D1784 4"-16" 12/05/23 33-11-12 PVC Pressure Pie Vin tech PVC Pipe DRIB AWWA C900, AWWA C605, ASTMD1784 16-18" 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DRI4 AWWA C900, AWWA C605, ASTM D1784 4"-16' 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR18 AWWA C900, AWWA C605, ASTM D1784 16-18" 3/19/2018 33 1112 PVC Pressure Pie Pi life Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 1 112 PVC Pressure Pipe Pi elife Jet Stream DRIB AWWA C900 16-24" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pie Diamond Plastics Corporation DR 18 AWWA C900 16-24" 12/6/2018 33 1 112 PVC Pressure Pipe J -M Manufacturing Co, Inc d/b/a JM Eagle DR 14 AWWA C900-16 UL 1285 ANSUNSF 6l FM 1612 4"-28" 12/6/2018 33 11 12 PVC Pressure Pipe J -M Manufacturing Co, Inc d/b/a JM Eagle DRIB AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 16-24" 9/6/2019 33 1112 PVC Pressure Pipe Underground Solutions. Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 3311.12 PVC Pressure Pipe NAPCO(Westleke) DR18 AWWA C900 16" -24" 9/6/2019 331112 PVC Pressure Pipe NAPCO(Westlake) DR14 .AWWA C900 4"- 12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 .AWWA C900 4"- 12" Water - Pipes/Valves & Fittin¢s/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 E1-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AWWA C153 & Cl 10 Ei-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittings AWWA C 110 E1-07 Ductile Iron Fittings McWane/T ler Pie/ Union Utilities Division Mechanical Joint Fittings, SSB Class 350 AWWA C 153, C 110,C I 1 I 08/11/98 E1-07 Ductile Iron Fittings Si a, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, Cl 12 02/26/14 E1-07 MI Fittings Accucast Class 350 C-153 MJ Fittings AWWACI53 4"-12" 05/14/98 EI-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flan a Uni-Flange Series 1400 AWWA Cl 11/C153 4" 10 36" 05/14/98 EI-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flan a Uni-Flange Series 1500 Circle -Lock AWWA C1 11/CI53 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA CII I/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile lmn Pie Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series I100 (for DI Pipe) AWWA C I I I/C I16/C153 4" 61 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iran, Inc. Megalug Series 2000 If. PVC Pipe) AWWA CIIL/C 116/C153 4" to 24" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One -Lek SLC4 - SLCIO AWWA ClI l/CI53 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Si a. Co. Sigma Gate -Lob SLCS4- SLCS12 AWWA CI Ii/C153 4"to12" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma Ono-Lok SLCE AWWA Cl t I/CI53 12" 10 24" 08/10/98 Ei-07 NJ Fittings(DIP) Sigma, Co. Sigma On&Lok SLOE AWWAC153 4"- 24" 10/12/10 EI-24 Interior Restrained Joint Syntam S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 04/07/69 Interior Restrained Joint System Haltee JJydrogeip-R ASTM O395. D412, D471, D573, D883, O1 149, D 1229, O1349. D1414, D1415, D1566, F913 4'-12" 08/16/06 E]-07 Mechanical Joint Fittings SIP Industries Seram or Mechanical Joint Fittings AWWA Cl 53 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AWWA Cl I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AWWA CIII 03/19/18 33-11-1 l Mechanical Joint Retainer Glands SIP Industries Seram ore) EZ Grip Joint Restraint (EZD) Black For DIP ASTM A536 AWWA CIII I 3"-48" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serempore) EZ Grip Joint Restraint (EZD) Red for C900 DR I4 PVC Pipe ASTM A536 AWWA CIII l 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industri Seram pure) EZ Grip Joint Restraint (EZD) Red for C900 DR18 PVC Pipe ASTM A536 AWWA C I 1 I 16"-24" " From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 6-18-25 Approval Spec No. Classsification Manufacturer Model No. National Spec Size Water - Pipes/Valves & Fittines/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing #94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 ASS/WA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524(SD 94-20255) AWWA C515 20" and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 I6" 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA 0515 4" 10 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 ASS/WA C515 42" and 48" 05/23/91 El -26 Resilient Wedge Gate Valve American AVK Company American AVKResilient Seeded GV AWWA C509 4" to. 12" 01/24/02 E1-26 Resilient Wedge Gale Valve American AVK Company 20" and smaller o El -26 Resilient Seated Gate Valve Keaned 4" - 12" E1-26 Resilient Seated Gate Valve M&H 4" - 12" El -26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/00/95 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 I6" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18-24" (SD 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36". C-515 AS/WA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/89 E1-26 Resilient Wedge Gate Valve Clow Volvo Co. AWWA C509 4"- 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16" 11/08/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AS/WA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" 10 48" (Note 3) 05/08/91 El -26 Resilient Seated Gate Valve Stackham Valves & Fittings AWWA C 509, ANSI 420 -stem, 4"- 12" El -26 Resilient Seated Gate Valve U.S. Pipe and Foundsy Co. Metroseal 250, roqnieoeseotsSPL #74 3" to. 16" 10/26/16 33-12-20 Resilient Seated Gate Valve E7 (East Jordan Iran Works) ES FlowMasrer Gate Valve & Boxes 08/24/18 Mateo Gate Valve Mateo-Norca 225 MR AWWA/ANSI Cl15/An21.15 4" to 16" Water - PipesNalves & Fittings/Rubber Seated Butterfl-' Valve 33-12-21 (07/10/14) E1-30 Rubber Seated Butterfly Valve HenryPratt Co. AWWA C-504 24" E1-30 Rubber Seated Butterfly Valve Mueller Co. AWWA C-504 24"and smaller 1/11/99 El -30 Rubber Seated Butterfly Valve De urik Valves Co. AWWA C-504 24" and larger 06/12/03 El -30 Valmatic American Butterfly Valve Valmotic Valve and Manufacturing Corp. Valmatie American Butterfly Valve. AWWA C-504 Up 10 84" diameter 04/06/07 El -30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504 24" 10 48" 03/19/18 331221 Rubber Scaled Butterfly Valve G. A. Industries (Golden Anderson) AWWA C504 Butterfl Valve AWWA C-504 30-54" 09/03/24 33 1221 Rubber Scaled Butterfly Valve American AVK Company AWWA C504 Butterfly Valve Class 250B AWWA C-504 24" - 48" Water - Polyethylene Encasement 33-11-10 (01/08/13) 05/12/05 El -13 Polyethylene Encasment Flousol Packaging Fulton Enterprises AWWA C105 8 mil LLD 05/12/05 El -13 Polyethylene Encasment Mountain States Plastics (MOP) and AEP Ind. Standard Hardware AWWA 0105 8 mil LLD 05/12/05 El -13 Polyethylene Encasment AEP Industries Bcllslroog by Cowtown Bolt & Gasket AWWA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AWWA C105 8 mil LLD Water - Sampling Station 03/07/23 33 1208 Water Sampling Station Ku ferle F000Company Eclipse. Number 88, 12 -inch DepOt of Bur As shown in spec. 33 12 50 09/02/24 30-02-50 Wstcr Sumplie Etutiea MealIer Water Produoto, !Be. lodal - This product removed Water - Automatic Flusher 10/21/20 Automated Flashing System Mueller Hdra uard HG6-A-IN-2-BRN-LPRR(Portable) HG2-A-IN-2-PVC-0I8-LPLG(Pcrmanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes " From Original Standard Products List CFW Lighting Approved Products List CFW Product Name Manufacturer Manufacturer Product Name & Description Residential -Standard MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Type 11 Pole Makers Sales and Marketing, LLC Black DB01373(page 1 of 6) -Shoe Base Pole Type 11, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Type 33B Arm Valmont Industries, Inc DB01373(page 4 of 6) -Single Arm Type 33B, Galvanized American Electric Lighting, ATBO-P101-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P -N L -P7 -AO -R F D325607 American Electric Lighting, ATBO-P101-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P -N L -P7 -AO -R F D325606 Residential Luminaire American Electric Lighting, ATB0-P101-Mvolt-R2-3K-BK Acuity Brands Lighting, Inc. M P- N L -P7 -AO -R F D3 25609 American Electric Lighting, ATB0-P101-Mvolt-R4-3K-BK Acuity Brands Lighting, Inc. M P -N L -P7 -AO -R F D325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 6 of 6) -Wood Pole Arm, Galvanized Arterial -Standard MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Type 18 Pole Makers Sales and Marketing, LLC Black DB01373(page 2 of 6) -Shoe Base Pole Type 18, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Type 33A Arm Valmont Industries, Inc DB01373(page 3 of 6) -Single Arm Type 33A, Galvanized American Electric Lighting, ATBO-P303-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P- N L -P7 -AO -R F D322792 American Electric Lighting, ATBO-P303-Mvolt-R4-3K- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD322794 Arterial Luminaire American Electric Lighting, ATB0-P303-Mvolt-R2-3K-BK Acuity Brands Lighting, Inc. M P- N L -P7 -AO -R F D322793 Acuity Brands Lighting, Inc. American Electric Lighting, ATB0-P303-Mvolt-R4-3K-BK M P- N L -P7 -AO -R F D322795 McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373 page 5 of 6) -Wood Pole Arm, Galvanized Decorative -Pedestrian Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB -31-4 Washington 10' Pole Acuity Brands Lighting, Inc. RFD110736 Holophane, CLA14FT J20DMODC03BK RFD325026, AB - Washington 14' Pole Acuity Brands Lighting, Inc. 16-4 SPEC RFD325026 Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 Washington Luminaire Acuity Brands Lighting, Inc. FRGL RFD338699 Washington Globe Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 Luminaire Acuity Brands Lighting, Inc. AO RFD -315548 Oleander Type A Pole Acuity Brands Lighting, Inc. Holophane, PDA 12S5L20POBBK-MOD Oleander Type B Pole Acuity Brands Lighting, Inc. Holophane, PDA20S5L20P08BK-MOD Oleander Type B Arm Acuity Brands Lighting, Inc. Holophane, OHC 151N 2A TN BK Holophane, AUCL2 P40 30K AS BK L3 N P7 AO Oleander Luminaire Acuity Brands Lighting, Inc. RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc. Holophane, RSA 12 50 G12 SC BK AB -26-4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc. Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc. Holophane, VLC 271N 1A TN QSM BK Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 Berry Luminaire Acuity Brands Lighting, Inc. AO SH Banner Arms Acuity Brands Lighting, Inc. Holophane, BA-241N-2A-00-S4J-BL-075P-BK System Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 Cantex Inc. specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10' Lengths and 20' lengths Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC-2 and Heritage Plastics NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather Conduit Resistant PVC Rigid Schedule 80 Conduit, Conforms to UL 651 Atkore-Heritage Plastics and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Prime Conduit, Inc Heavy Wall EPC-80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK Series Southwire Type XHHW-2 copper conductor, 600V TYPE XHHW-2 / RW90, copper conductor, Superslick Encore Wire Elite, 600V/1000V Encore Wire THHN / MTW / THWN-2 Copper conductor, 600V Copper Wire/Conductor Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT Service Wire Co Rated XHHW-2 Low Smoke Halogen Free, Cross -linked Advanced Digital Cable Inc Polyethylene Insulated 14 AWG-750 MCM, 600 Volts, 90°C Dry and wet Aluminum Wire -Triplex Priority Wire & Cable, Inc Triplex Overhead Aluminum Conductor General Purpose, Midget Class MEN Fuses, Voltage Edison Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Modular Ferrule Fuse Blocks for Midget Class and CC Edison Fuses Fuse & Fuse Holder In -line fuse holders for Single -Pole 13/32" x 1 1/2" Cooper Fuses HEB-AA Bussmann Series, HEB breakaway and non -breakaway EATON in -line fuse holders for UL 13/32" x 1- 1/2"supplemental fuses Bussmann Series, FNM 13/32" x 1-1/2" 250Vac time - EATON delay supplemental fuses Wire Joints for Copper Conductor, Cat No: 54615, Connector Thomas & Betts 54620, 54625 -TB, 54635, 54640, 54630 Electrol Systems, Inc TY A (120/240) 100(NS)AL(E)PS(U) Metered Pedestal 120-240V WE Manufacturing & Controls TY A 120/240 100(NS)AL(E)PS(U) Metered Pedestal 240- Electrol Systems, Inc TY A (240/480) 100(NS)AL(E)PS(U) WE Manufacturing & Controls TY A 240/480 100(NS)AL(E)PS(U) 480V Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, MacLean Highline 5001bs Polymer Concrete, H -SERIES UNIT, H1730-24 TIER -22 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING Ground Box NUT Polymer Concrete, H -SERIES UNIT, H1324-24 TIER -15 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING NUT Split Bolt Connectors, Copper Split Bolts 2 Wire, N Kearneys NSi Industries, LLC Series Dark To Light, DLL Elite, Electronic Locking, Type Photocell Acuity Brands Lighting, Inc. Photocontrol, DLL -127 or DLL -480 Shorting Caps Acuity Brands Lighting, Inc. Dark To Light, Part # DSHORT SBK U Interim Products Residential Luminaire TRASTAR INC. DURA-STR10A-3K-120-3-GR-SCL Arterial Luminaire TRASTAR INC. DURA-STR25-3K-120-3-GR-SCL