Project Name: Fort Worth Water SCADA Replacement City Sec No.: 62240
Project No.(s):I 56022/060043015330500/CAPEXP M&C: I N/A City Proj. No.: 103086
Project Description:
Fort Worth Water SCADA Replacement - Construction Project
contractor:I Remont Engineering and Design Group, LLC I Change Order # 4 Date: 8/10/2026
City Project Mgr. Jacob Pena City Inspector: I Todd Kay
Phone Number: 817-392-4910 Phone Number: 817-392-2744
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
JAmount of Proposed Change Order
Revised Contract Amount
Water
Totals
Contract Time
(Calendar days)
$8,233,836.00
$8,233,836.00
1,382
$125,732.39
$125,732.39
015
$8,359,568.39
$8,359,568.39
1,397
$95,716.11
$95,716.11
030
$8,455,284.51
$8,455,284.51
1,427
Original Funds Available for Change Orders $0.00 $0.00
Remaining Funds Available for this CO $0.00 $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.69%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $10,292,295.00
Provides for qty (6) new Industrial Panel -mounted Touchscreen Computers (IPCs) and qty (2) associated rolling cabinets for North and
South Holly WTPs, and qty (4) new Industrial Panel -mounted Touchscreen Computers (IPCs) and qty (4) associated rolling cabinets for the
Rolling Hills WTP, per RFI-12. This provision shall include procurement, configuration, installation and post maintenance work of mentioned
Industrial Panel -Mounted Touchscreen Computers (IPCs).
In addition to this, add the Distribution Phase 2 covering additional scope not included in the original contract for the SCADA Replacement
Project. This scope integrates the Distribution System (Phase 2) —currently being developed by Prime Controls —into the new Central
SCADA system enterprise level developed by RED Group.
This change order applies to 37 Sewer Lift Stations.
The Distribution System and Central SCADA projects are being developed separately; therefore, this change formalizes the scope required
to ensure proper integration, reporting, and commissioning support at the enterprise level. The Distribution System project and related
schedule are owned and managed by Prime Controls. Therefore, the timeline to complete the scope detailed in this
change order is dependent on the Distribution system schedule and considered outside of the Contract Time of the SCADA Replacement
project No 103086.
Staff concurs with contractor's request for an additional 30 calendar dayts for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name I
Contractor Name
I Contractor Signature
Date
Remont Engineering and Design Group, LLC
9 9 9 P,
Cesar Lossa
Cesar L0526
CesarLossa (Au 11, 2026'13:12:? CClr.
Aug 11, 2026
Inspector
Date
Project Manager
Date
;__ .
Aug 11, 2026
�g P—
Aug 11, 2026
Director (Water Dept)
Date
Construction Supervisor (Water Dept)
Date
c d&r TS
08/19/2026
2 `
Aug 11, 2026
Senior Assistant City Attorney
Date
Assistant City Manager
Date
08/31/2026
09/11/2026
Council Action (If Required)
M&C Number I N/A I M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT PORT H City of Fort Worth
Change Order Additions
Project Name Fort Worth Water SCADA Replacement City Sec No.: 62240
Project No.(s): I 56022/0600430/5330500/CAPEXP DOE No. N/A City Proj. No.: 103086
Project
Description
Fort Worth Water SCADA Replacement - Construction Project
Contractor I Remont Engineering and Design Group, LLC I Change Order: ® Date: 8/10/2026
City Project Mgr. I Jacob Pena I City Inspector Todd Kay
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
#1-17
New IPCs and new Rolling carts. Provide materials and configuration
Water
1.00
LS
$63,957.00
$63,957.00
services for North and South Holly WTPs.
#1-18
New IPCs and new Rolling carts. Provide materials and configuration
Water
1.00
LS
$50,143.00
$50,143.00
services for the Rolling Hills WTP.
#1-19
Central SCADA Config, Cutover & Startup Phase —Distribution System
Water
1.00
LS
$88,126.00
$88,126.00
(Phase 2)
Water $202,226.00
Additions Sub Total $202,226.00
Page 2 of 4
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
FII RT V" RT 14 City of Fort Worth
Change Order Deletions
Project Name Fort Worth Water SCADA Replacement
Project No.(s): 56022/0600430/5330500/CAPEXP DOE No. N/A
Project Description
Fort Worth Water SCADA Replacement - Construction Project
City Sec No
City Proj. No
62240
103086
Contractor
Remont Engineering and Design Group, LLC
Change Order: E4
Date 8/10/2026
City Project Mgr.
Jacob Pena
City Inspector:
Todd Kay
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
#1-10
Allowance: $75,000 for Additional Familiarization,
Preliminary Assessment, and Design Services
Water
0.1108133
LS
$75,000.00
$8,311.00
#1-11
Allowance: $75,000 for Procurement of
Additional Hardware and Software
Water
0.7365959
LS
$75,000.00
$55,244.69
#1-12
Allowance: $75,000 for Additional Configuration,
Cutover, and Startup Services
Water
0.4567093
LS
$75,000.00
$34,253.20
#1-13
Allowance: $75,000 for Additional Data
Warehouse/Database Programming Services
Water
0.1160133
LS
$75,000.00
$8,701.00
Water
$106,509.89
Deletions Sub Total
$106,509.89
Page 1 of 1
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
ature
Jacob Pena
Name of Employee
SCADA Manager
Title 4� FpgT uQQ
pfe 90
ATTEST:
PQn np,4p 5aa
Jannette S. Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Remont Engineering and Design Group, LLC
Subject of the Agreement: Forth Worth Water SCADA Replacement
M&C Approved by the Council? * Yes ❑ No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8 62240-CO4
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes 0 No 8 If only spec fc information is
Confidential, please list what information is Confidential and the page it is located
Effective Date: N/A
If different from the approval date.
Expiration Date:
N/A
If applicable.
Is a 1295 Form required? * Yes 0 No 8
*If, so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103086
`Did you include a Text field on thejontract to add the City Secretary Contract (CSC)
number? Yes ® No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.