HomeMy WebLinkAbout062257-R1CO1 - Construction-Related - Contract - Nortex Concrete Lift and Stabilization, Inc.CSC No. 62257-R1 CO1
FORT WORTH,, City of Fort Worth
V Change Order Request
Project Name Pavement Leveling Service Unit Price Contract City Sec # 62257-R1
Client Project #(s)l
Project Description Leveling uneven concrete pavement slab, soil densificaiton and joint grinding
Contractor Nortex Concrete Lift and Stabilization, Inc. Change Order #1 1 Date 8/28/2026
City Project Mgr. I Tariqul Islam City Inspector Eddie Walker
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
TPW
Totals
CD
$1,000,000.00
$1,000,000.00
$1,000,000.00
$1,000,000.00
Amount of Proposed Change Order
$0.00
Revised Contract Amount $1,000,000.00 $1,000,000.00
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1,250,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL furnish all labor, materials, equipment, and incidentals necessary to complete the work
described in Change Order No. 1. Change Order No. 1 increases the unit prices of the following bid items by $0.30 per pound:
•Bid Item No.5— — Pavement Leveling with Foam Injection
•Bid Item No.7— — Soil Dens cation with Foam Injection (4-8 feet)
•Bid Item No.8— — Soil Densification with Foam Injection (9-15 feet)
The price adjustment is necessary due to significant increases in the cost of the raw materials used to manufacture high -density polyurethane foam (HDPF), the primary material
required for the foam -injection work. The contractor provided price -increase notices from its material suppliers to support the requested adjustment.
Staff reviewed the supporting documentation and evaluated the proposed adjustment against recent bid tabulations and pricing for comparable work. Based on this review, staff
determined that the proposed increase of $0.30 per pound is fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ntract Si e
Nortex Concrete Lift and Stabilization, Inc. I Casey DeRosa 09/04/2026
Ins p ector/tns ection Supervisor ervisor
Date
Project and Contract Compliance Manager
Date
09/04/2026
:c-rzr..�.,._..,1<
un
08/31 /2026
'Mrr
Program Manager
Date
Senior Capital Project Officer
Date
e+-
09/04/2026
09/08/2026
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
-- . �•. -
09/08/2026
-e'
09/08/2026
Assistant City Attorney
Date
Assistant City Manager
Date
4dfs�
09/09/2026
09/14/2026
Council Action (if required)
aIlIl
oaf Four °%
ATTEST: ��
�..,•-''A- Ogg° /�\j,X10
Jannette Goodall, City Secretary
M&C Number N/A M&C Date Approved N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Pavement Leveling Service Unit Price Contract City Sec # 62257-R1
Client Project#
Contractorl Nortex Concrete Lift and Stabilization, Inc. PM Tariqul Islam Inspector Eddie Walker
Change Order Submittal # O1 Date 8/28/2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
-
Pavement eve ing with oam Injection 5000)
IPW
0.00000000
LB
$4.10
$0.00
5
Pavement Leveling with oam Injection
TPW
0.00000000
LB
$4.10
5Pavement
Leveling with oam Injechon
TPW
0.00000000
LB
5
Pavement Leveling with oam Injection (50001+)
TPW
0.00000000
LB
S3.90
7
Soil Densification with Foam njection(ft- ft) (1-1000)
TPW
0.00000000
LB
$4.80
7
Soil Densification with Foam Injection(4ft- 8 ft) (1001-5000)
TPW
0.00000000
LB
54.80
7
Soil Densification with Foam njection(ft- ft) (5001-10000)
TPW
0.00000000
LB
7
Soil Densification with Foam Injection(4ft- 8 ft) (100001+)
TPW
0.00000000
LB
S4.80
Soil Densification with Foam njection(ft- 5ft)( - )
TPW
0.00000000
LB
8
Soil Densification with Foam lnjection(9ft-15ft)(1001-5000)
TPW
0.00000000
LB
54.30
30i1 Densification with Foam njection(ft- 15ft)(5001-10000) )
TPW
0.00000000
LB
8
Soil Densification with Foam Injection(9ft-15ft)( 0001+)
TPW
0.00000000
LB
S4.30
TPW
$0.00
Sub Total Additions
$0.00
Change Order Additions Page 2 of 3
FORT City of Fort Worth
Change Order Deletions
Project Name Pavement Leveling Service Unit Price Contract City Sec # 62257-R1
Client Project #
Contractor Nortex Concrete Lift and Stabilization, Inc. PM Tariqul Islam Inspector Eddie Walker
Change Order Submittal # I Date I 8/28/2026
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW $0.00
Sub Total Deletions $0.00
Change Order Deletions Page 3 of 3
FORT WORTH®
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Pavement Leveling Service Unit Price Contract, CO#1
M&C: CPN: CSO: 62257 -RI DOC#:
Date:
To:
Name
Department
Initials
Date Out
I.
Seidi Tovar — Business Support
TPW - Review
Lr
09/01/2026
2.
Casey DeRosa - Vendor
Vendor — Signer
.
09/04/2026
3.
Eddie Walker - Inspector
TPW — Signer
0W
Eddie Walker
08/31/2026
4.
Cristobal Fuentes — Sr. Inspector
TPW - Signer
-
09/04/2026
5.
Tariqul Islam - PM
TPW - Signer
?�I sam
09/04/2026
6.
Zelalem Arega - PGM
TPW - Signer
Z
09/04/2026
7.
Mary Hanna- SCPO
TPW - Signer
m�
09/08/2026
8.
Patricia Wadsack - AD
TPW - Signer
09/08/2026
9.
Lauren Prieur - Director
TPW - Signer
_.�
09/08/2026
10.
Doug Black - ACA
Legal - Signer
ooIzs alack
09/09/2026
11.
Jesica McEachern - ACM
Signer
09/14/2026
12.
Jannette Goodall - CSCO
Signer
ene��dall
09/15/2026
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE
ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the
routing slip, Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES No
ROUTING TO CSO
SAME DAY: ❑YES ❑No
®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
❑ Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ❑No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please notify TPWContractkfortworthtexas.gov. Thank you!
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Nortex Concrete Lift and Stabilization, Inc.
Subject of the Agreement: Change Order No. 1 to CSC No. 62257-R1, a Unit Price Contract for Task
Order Construction Services Related to Pavement Leveling Service Projects at Various Locations
M&C Approved by the Council? * Yes ❑ No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.