HomeMy WebLinkAbout064868-CO1 - Construction-Related - Contract - Stabile and Winn, Inc.CSC No. 64868-CO1
FORT WORTH,., City of Fort Worth
Change Order Request
Project Name 106012 - Round 6- CD9 Street Repair Program City Sec # 64868
Client Project #(s) 106012
Project Combined Street Paving Improvements, Water and Sanitary Sewer Main Replacements for Round 6 of the Near Southside Repair Program
Description
Contractor Stabile and Winn, Inc. Change Order # 1 Date 8/25/2026
City Project Mgr. I Gustavo A. Vallejo City Inspector Carlos San Martin
Dept. Unit 1: Water
Original Contract Amount $429,218.0C
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date S429.218.0C
Revised Contract Amount
Original Funds Available for Change Oi
Remaining Funds Available for this CO
Additional Funding (if necessary)
Uinit 2: Sewer I Unit 3: Paving
Contract Time
Totals (CD)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $2,533,418.06
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and materials as outlined in proposed Change Order #1.
This change order adds a new pay item for the Furnish and Install Fish -Eye Detection System at the southeast corner of S. Henderson Street and Pennsylvania
Avenue. During construction, field evaluations and coordination with the Transportation Management Division determined that a Fish -Eye Detection System
is the most appropriate solution for maintaining reliable traffic signal vehicle detection at this intersection. This approach replaces the originally planned saw -
cut loop detectors in the pavement and provides a more effective and maintainable detection system for the intersection. This change order also adds a new
pay item for the Removal of 24" Pavement Marking at W. Cannon Street and S. Henderson Street. During the concrete flatwork construction on S.
Henderson Street, an asphalt transition and pavement patch were required to provide a smooth surface and transition. As a result, the existing pavement
marking had to be removed and subsequently replaced.
Time: Staff support the contractor's request for an additional ten (10) calendar days to complete the installation of the Fish -Eye Detection System, the
pavement marking removals and process the associated change order.
Cost: Staff has reviewed the contractor's proposed unit prices and compared them with pricing from recent, similar projects. Based on this evaluation, the
proposed pricing is determined to be fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor (Name)
Contract Signature
Date
Stabile and Winn, Inc.
Jerry Henderson
d ar4—
08/31/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
MA"G FYI?
09/01/2026
llfk
09/01/2026
Program Manager
Date
Sei Jificer
Date
09/01/2026
.. -'
09/01/2026
Assistant Director (Dept)
Date
Diir acting Department (Dept)
Date
09/02/2026
09/02/2026
,
t "^T ` "-
A is n -.C' .
Date
09/03/2026
As City Manager
Tq.(
Date
09/15/2026
ouncil Action (if required)
o1! v u M&C Number I N/A
ATTEST: FORtn C
va
aE -rd
Jannette Goodall, City Secretary PP as nEx 4g44�
M&C Date Approved I N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name 106012 - Round 6- CDR Street Repair Program City Sec # 64868
Client Project # 106012
Contractor Stabile and Winn, Inc. PM Gustavo A. Vallejo Inspector Carlos San Martin
Change Order Submittal # C1� Date 8/25/2026
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
88 3441.1217 Furnish/Install Fish -Eye Detection System Unit 3: Paving 1 EA $34,080.00 $34,080.00
89 3217.4306 Remove 24" Pvmt Marking Unit 3: Paving 70 LF $6.90 $483.00
Unit 1: Water $0.00
Uinit 2: Sewer $0.00
Unit 3: Paving $34,563.00
Sub Total Additions i $34,563.00
Change Order Additions Page 2 of 3
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name 106012 - Round 6- CD9 Street Repair Program J City Sec # 64868
Client Project # 106012
Contractor l Stabile and Winn, Inc. PM Gustavo A. Vallejo Inspector Carlos San Martin
Change Order Submittal # Date 8/25/2026
DELETIONS
ITEM DESCRIPTION DEPT qty Unit Unit Cost Total
87 9999.1000 Construction Allowance Unit 3: Paving 0.35 EA $100,000.00 $34,563.00
Unit 1: Water
Uinit 2: Sewer
Unit 3: PavingAM34,563.00
Sub Total Deletions 1 $34,563.00
Change Order Deletions Page 3 of 3
106012-CNCO-Round 6— CD9 Street Repair
Program
Interim Agreement Report
Created: 2026-08-31
By: Andrea Munoz(Andrea.Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAALp9ZKa-thi7SbmpJp65wA5i0hMocO6=
Agreement History
2026-09-01
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"106012-CNCO-Round 6 — CD9 Street Repair Program" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2026-08-31 - 7:06:26 PM GMT- IP address: 208.184.124.181
'-- Document emailed to Ann Estes (ann.estes@fortworthtexas.gov) for filling
2026-08-31 - 7:20:17 PM GMT
Document emailed to Jerry Henderrson (ferry@stabilewinn.com) for signature
2026-08-31 - 7:20:18 PM GMT
Document emailed to Carlos San Martin (Carlos.SanMartin@fortworthtexas.gov) for signature
2026-08-31 - 7:20:18 PM GMT
Email viewed by Jerry Henderrson (jerry@stabilewinn.com)
2026-08-31 - 7:23:21 PM GMT- IP address: 12.89.161.150
Email viewed by Ann Estes (ann.estes@fortworthtexas.gov)
2026-08-31 - 7:23:51 PM GMT- IP address: 104.47.64.254
e'y , Form filled by Ann Estes (ann.estes@fortworthtexas.gov)
Form filling Date: 2026-08-31 - 7:24:17 PM GMT - Time Source: server- IP address: 208.184.124.181 - Signature Appearance Selected:
TYPE
o Document e -signed by Jerry Henderrson (jerry@stabilewinn.com)
Signature Date: 2026-08-31 - 7:25:27 PM GMT - Time Source: server- IP address: 12.89.161.150 - Signature Appearance Selected: IMAGE
FORTWORTH.Paweredby
I Adobe
Acrobat Sign
II Email viewed by Carlos San Martin (Carlos.SanMartin@fortworthtexas.gov)
2026-08-31 - 8:07:49 PM GMT- IP address: 166.205.54.57
Document e -signed by Carlos San Martin (Carlos.SanMartin@fortworthtexas.gov)
Signature Date: 2026-09-01 - 12:41:52 PM GMT - Time Source: server- IP address: 204.10.91.100 - Signature Appearance Selected:
IMAGE
Document emailed to Marc Cantrell (Marc.Cantrell@fortworthtexas.gov) for signature
2026-09-01 - 12:41:56 PM GMT
-': Document emailed to Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) for signature
2026-09-01 - 12:41:57 PM GMT
o `l Email viewed by Marc Cantrell (MarcCantrell@fortworthtexas.gov)
2026-09-01 - 12:42:15 PM GMT- IP address: 166.205.58.59
r'6 Document e -signed by Marc Cantrell (Marc.Cantrell@fortworthtexas.gov)
Signature Date: 2026-09-01 - 12:43:54 PM GMT - Time Source: server- IP address: 166.205.58.59 - Signature Appearance Selected:
MOBILE_IMAGE
Email viewed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov)
2026-09-01 - 12:59:17 PM GMT- IP address: 66.169.101.43
Document e -signed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov)
Signature Date: 2026-09-01 - 12:59:57 PM GMT - Time Source: server- IP address: 66.169.101.43 - Signature Appearance Selected: DRAW
Document emailed to Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) for signature
2026-09-01 - 1:00:00 PM GMT
Email viewed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov)
2026-09-01 - 1:00:35 PM GMT- IP address: 104.47.65.254
FORTWORTHPaweredaby
Adobe
Acrobat Sign
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Round 6- CD9 Street Repair Program Change Order #1
M&C: CPN: 106012 CSO: 64868 DOC#:
Date: 08/31/2026
To:
Name
Department
Initials
Date Out
1.
Ann Estes
TPW - initial
Aa'
08/31/2026
2.
Jerry Henderson
Contractor - signature
9'
08/31/2026
3.
Carlos San Martin
TPW - signature
�CSSM
09/01/2026
4.
Gustavo Vallejo
TPW - signature
G`- VOVaIIeo
09/01/2026
5.
Greg Robbins
Water - signature
09/01/2026
6.
Mary Hanna
TPW - signature
w
09/01/2026
7
Patricia Wadsack
TPW - signature
09/02/2026
8
Lauren Prieur
TPW - signature
17VL
09/02/2026
9
Doug Black
Legal - signature
Dgs Beck
09/03/2026
10.
Jesica McEachern
CM0 - signature
09/15/2026
11.
Jannette Goodall
CM0 - signature
e11eG ode„
09/15/2026
12.
TPW Contracts
TPW
13.
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES No
RUSH: DYES No SAME DAY: DYES No NEXT DAY: DYES No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts 2l FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!
FORT WORTH;
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Stabile and Winn, Inc.
Subject of the Agreement:
Change Order No. 1 to CSC No. 64868, a Contract for Combined Street
Paving Improvements and Water and Sanitary Sewer Main Replacements for Round Six of the CD 9 Street
Repair and Reconstruction Program and Near Southside Medical District Water and Sanitary Sewer Mains Project
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes N No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106012
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.