Loading...
HomeMy WebLinkAboutContract 41006 CITY SECRETARY SPECIFICATIONS CONTRACT NC. 41 ou *AND CONTRACT DOCUMENTS FOR 2007 CRITICAL CAPITAL PROJECT COUNCIL DISTRICT 6 - PART 3 GLENMONT DR. (Westcreek Dr. to Calousa Dr.) - GROUP A WHARTON DR. (Wedgemont Cir. N. to Walton Ave.) -GROUP A WONDER DR. (Winfred Dr. to Walton Ave.) - GROUP A D.O.E. No. 5919, City Project No. 00965 IN THE CITY OF FORT WORTH, TEXAS TPW Project No. C295-541200-206400096683 Water Project No, P264-541200-606170096683 Sewer Project No. P-274-541200-706170096683 TPW File No. K-2079 W & S File No. X-21022 MIKE MONCRIEF J MAYOR DALE A. FISSELER, P.E. CITY MANAGER WILLIAM A. VERKEST, P.E. IDIRECTOR, TRANSPORTATION AND PUBLIC WORKS DECEMBER 2009 PREPARED BY Lockwood,Andrews &Newnam, Inc. A LEO A DALY COMPANY Firm Registration No. 2614 1320 SOUTH UNIVERSITY DRIVE, SUITE 41(bFFICi4L RECOR I FORT WORTH, TEXAS 76107 CITY -,;E-"CRE1rARY 1 (817) 820—0420 City of Fcrt,Worth, Texas GOPAL SAHU Mayor and Council Communication COUNCIL ACTION: Approved on 10/12/2010 - Ord. No. 19406-10-2010 DATE: Tuesday, October 12, 2010 LOG NAME: 202007CIP CD6 PART 3 REFERENCE NO.: C-24535 SUBJECT: Authorize the Execution of a Contract in the Amount of$1,068,520.50 with Stabile & Winn, Inc., for Pavement Reconstruction and Water Main Replacement on Glenmont Drive, Wharton Drive and Wonder Drive and Adopt Appropriation Ordinance (COUNCIL DISTRICT 6) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$394,169.97 from the Water and Sewer Fund to the Water Capital Projects Fund in the amount of$140,605.94 and Sewer Capital Projects Fund in the amount of$253,564.03; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$140,605.94 and the Sewer Capital Projects Fund in the amount of$253,564.03 from available funds; and 3. Authorize the City Manager to execute a contract with Stabile & Winn, Inc., in the amount of $1,068,520.50 for pavement reconstruction and Water main replacement for the streets listed below. DISCUSSION: On March 6, 2007, (M&C G-15621) the City Council authorized the sale of$42,325,000.00 in Certificates of Obligation for the purpose of funding part of the Critical Capital Needs Program. That amount included funds for pavement reconstruction at various locations. On December 2, 2008, (M&C C-23209) the City Council authorized the City Manager to execute an engineering agreement with Lockwood, Andrews and Newnam, Inc., for the design of Glenmont Drive, Wharton Drive and Wonder Drive. Street improvements will include pavement reconstruction; construction of standard concrete curb and gutter; driveway approaches and reconstruction of existing sidewalks. Water Department has determined that severely deteriorated water and sanitary sewer lines should be replaced prior to street reconstruction. This project has been divided into three construction contracts based on geographical locations to facilitate. Construction Contract Part 3 Logname: 202007CIP CD6 PART 3 Group 6A: CD6: Glenmont Drive 00965 ( ) Westcreek Drive to Calousa Drive) Group 6A: CD6: Wharton Drive (00965) (Wedgemont Circle North to Walton Avenue) Group 6A: CD6: Wonder Avenue (00965) (Winfred Drive to Walton Avenue) This contract was advertised on June 10, 2010 and June 27, 2010 in the Fort_Worth Star-Telegram. On July 1, 2010 the following bids were received: Bidders Base Bid Alternate Bid Base Bid (Sidewalks) + Alternate Stabile & Winn, Inc. $986,600.50 $81,920.00 $1,068,520.50 Conatser Construction $1,018,177.80 $62,251.25 $1,080,429.05 McClendon Construction Company $1,023,698.40 $84,098.25 $1,107,796.65 JLB Contract, LP $1,033,479.26 $82,665.75 $1,116,145.01 Utilitex Construction, LLP $1,484,466.00 $95,897.50 $1,580,363.50 Time of completion: 240 calendar days Staff recommends that the base plus alternate option submitted by Stabile & Winn, Inc., be selected, and the contract be awarded to Stabile & Winn, Inc. The new pavement will consist of seven and a half inch concrete, over six inch lime with a seven inch curb. Steps and lead walks will be removed and reconstructed. The stabilized mate bid subgrade allow construction of new sidewalks as indicated on the plans. In addition to the contract cost, funding in the amount of$33,882.00 is included for water and sanitary sewer construction survey, project management, material testing, field inspection and project close out (water: $12,482.00 and sewer: $21,400.00). The contingency funds to cover change orders total $17,158.00 (water: $6,102.00 and sewer: $11,056.00). In addition to the contract cost funding in the amount of$59,856.00 is included for TPW associated costs for survey, project management, material testing, field inspection and project close out. The Contingency funds to cover change orders for pavement reconstruction work total $25,000.00 Stabile & Winn, Inc., is in compliance with the City's M/WBE Ordinance by committing to nine percent M/WBE participation and documenting good faith effort on this combined project. Stabile & Winn, Inc., identified several subcontracting opportunities. However, the M/WBEs contacted in the areas identified did not respond or did not submit the lowest bids. The City's M/WBE goal on this combined project is 21 percent. This project is located in COUNCIL DISTRICT 6, Mapsco 90S and 89U. FISCAL INFORMATION /CERTIFICATION: Logname: 202007CIP CD6 PART 3 The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund, the Sewer Capital Projects Fund and the 2007 Critical Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/AccounVCenters 1&2) P253 476045 6061700965ZZ $140,6059 4 1) PE45 538040 0609020 21-P253 531350 606170096552 1R $140,605.94 2 44 0.00 E45 538040.0709020 2253 531350 6061_ 70096580 $253.564.03 $500.00 4N53 541200 .606170096583 2) P253 531350 606170096582 500.00 3�P258 541200 706170096583 X22'-002.80 21F253-541200 606170096583 $221,108.6 0 X128.123 94 3 C295 541200 206200096583 2) P253 531350 606170096584 $725.409.1.0 1 220.00 2) P253 531350 606170096585 $7 322.00 2) P253 531350 606170096591 500.00 1&2) P258 476045 7061700965ZZ $253,564.03 2) P258 531350 70617009655 $4,422.0 2) P258 531350 706170096580 500.00 2) P258 531350 706170096582 500.00 2) P258 541200 706170096583 $232,164.03 2) P258 531350 706170096584 $2,211.00 2) P258 531350 706170096585 $13,267.00 2) P258 531350 706170096591 00.00 CERTIFICATIONS: Submitted for City Manager's Office by Fernando Costa (6122) Originating Department Head William Verkest (7801) Additional Information Contact: Gopal Sahu (7949) ATTACHMENTS 1. 00965 202.007CIP CD6­PART 3_FAR-00004.pdf (CFW Internal) 2. 00965 202007CjP CD6 PART 3 financial nfo.doc (CFW Internal) 3. 202007CIP CD6 PART 3. MAP pdf.pdf (Public) 4. 202007CIP CD6 Pt_3 AO.doc (Public) 5. FAR 20-07 CO 6A Part 3 Sewer pdf.pdf (CFW Internal) 6. FAR 2007_CO 6A Part 3_Water_pdf (CFW Internal) 7. MWBE_2007 CD 6A_PART 3 pdf ..pdf (CFW Internal) 8. PE45 538040 0609020.doc (CFW Internal) 9. PE45 538040_0709020.doc (CFW Internal) Logname: 202007CIP CD6 PART 3 No. 0051 P. .2/94 CITY OF FORT WORTH,TEXAS ADDENDUM NO. 1 To the Plans, Specifications &General Contract Documents 2007 Critical Capital Project, Council District 6—Part 3 GLENMONT DR. (Westcreek Dr. to Calousa Dr. - g ) GROUP A WHARTON DR, WONDER DR. (Wed emont Cir.N. to Walton Ave.)- GROUP A (Winfred Dr. to Walton Ave.)- GROUP A D.O.E.No. 5919, City Project No. 00965 IN THE CITY OF FORT WORTH, TEXAS TPW Project No. C295-541200-206400096583 ' Water Project No. P264-541200-606170096583 Sewer Project No. P-274-541200-706170096583 IBid Date: July 15,2010; 1:30 PM Addendum No. l: Issued June 30, 2010 IThis Addendum, forms part of the Plans, Contract Documents& Specifications for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shal acknowledge receipt of this addendum in the space provided below,in the proposal(proposal 1 Signature Page)and acknowledge receipt on the outer envelope of your bid.Failure to cknowle receipt of this addendum could subject the bidder to disqualification. dge The plans and specification documents are hereby revised by Addendum No. 1 as follows: SPECIFICATIONS& CONTRACT DOCUMENTS: I. ALL SECTIONS AND UNITS The following numbers have been revised TPW Project No. C295-541200-206400096583 Water Project No. P264-541200-606170096583 Sewer Project No.P-274-541200-706170096583 2. SECTION 4-BID PACKAGE: Section 4.2—Bid Proposal,All Units and Sections Replace these sheets with the attached sheets dated 6-29-10. Section 4.2—Bid Proposal An excel spreadsheet is provided on the city website, buzzsaw httn://www for(wort haoy ora/ urchasinan, to be used at the bidders discretion. The excel spreadsheet form of the Bid Proposal will be accepted as an official bid. Any discrepancies between the excel spreadsheet prepared by the contractor will be replaced by the descriptions, quantities and pre-bid amounts shown in Section 4.2—Bid Proposal. Addendum No. 1,Page 1 No, 0051 P. 3/14 Section 4.2—Bid Proposal, Unit/Section Paving-Concrete, Base Bid CPMS Record Number 13IDOO137, Grass Sod Install THIS ITEM IS DELETED Section 4.2—Bid Proposal, Unit/Section Paving-Concrete, Base Bid CPMS Record Number BID00843, Curb-7 Inch—Install Replace the quantity 5,814 with 6,680 Linear Feet Section 4.2—Bid Proposal, Unit/Section Paving-Concrete,Base Bid CPMS Record Number BID00445, Pavement—2 Inch Min Overlay—Replace ' THIS ITEM IS DELETED NEW ITEM ' Section 4.2—Bid Proposal, The Quantity is 32 Tons. Unit/Section Paving-Concrete, Base Bid CPMS Record Number . ID00471, Pavement-Transition-Min 6 Inch HMAC Install ISection 4.2—Bid Proposal, Unit/Section Paving-Concrete Base Bid CPMS Record Number BID00848, Meter Box Adjustment—Services IChange the quantity to 64 Each and your Bid to$2,240 CLARIFICATION Section 4.2—Bid Proposal,All Units, Base Bid and Alternate Bid The Unit of Measure FOOT shall be taken as LINEAR FOOT. Section 4.2—Bid Schedule, Bid Schedule Item No. 1 —Bid-00213 Std 4 Ft Diam-(0-6 Ft Depth)—Install, Replace"stainless steel insert'with`water tight insert". 3. SECTION 5—GENERAL AND SPECIAL CONDITIONS: CLARIFICATION Section 5.5—Part E Specifications, Special Technical Specifications, STS-035,B.4. The concrete pavement strength shall be 3,000 psi at 28 days. This section shall take precedence over the reference to concrete strength in Section 9, Geotechnical Report,in regard to concrete strength testing. CLARIFICATION i Section 5.6—Special Provisions(Paving and Drainage) Item 75(b)Progress Construction Schedule Contractor shall use Tier 3 schedule. The schedule shall be submitted during the ' Preconstruction Meeting. I Section 5.7—Wage Rates,2008 Prevailing Wage Rates Construction Industry THIS PAGE IS DELETED I i Addendum No. 1,Page 2 I No. 0051 P. ,4114 4. SECTION 6—CONTRACTS BONDS& INSURANCE: Section 6.7—City of Fort Worth Contract-R revised sheet C-1R &C-2R. The contract eplace sheet C-1 &C-2 with the attached tune has been revised to 240 calendar days. 5. SECTION 10—EPA CONSTRUCTION ACTIVITY PERMITS: Section 10.1 —EPA Notice of Intent(NOI) CLARIFICATION The NOI shall be submitted during the Preconstruction Meeting A signed copy of the Addendum should be included submittal. Failure to acknowledge the receipt of this Addend um could cause the time of bid ' be considered'WONRESPONSIVE,"resulting in disqualification. subject bidder to RECEIPT ACKNOWLEDGEMENT: William A. Verkest, PE Director,Transportation&Public I Works Department By: Company._a1a1 %.1 " ^V BY: Gopal Sahu, PE Title: Project Manager Address: .1), o x �.q 3 6 n City: SRC i�1A 1� State: Tr ycP�.f OF"r .i* 0 WALTER ................ ... 0D f 82049 0'�'ti9 p f p S fST,E. ✓�a . `.,oNA V i i I 1 i Addendum No. 1,Page 3 i No, 0051 P. .13114 CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRE=SENTS COUNTY OF TARRANT This Contract made and entered into this the day of 20_, by and between the City of Fort Worth, a home-rule municipal 1 corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, by and through its duly authorized Assistant City Manager, ("Owner„), and ("Contractor"). Owner and Contractor may be referred to hereln individually as a'Party"or collectively as the'Parties.- ' WITNESSETH: That said Parties have agreed as follows. I 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing I even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: FOR: 2007 Critical Capital Project Council District 6—Part 3 City Project No. 00966 DOE No. 5921 GLENMONT DR. (Westcreek Dr. to Calousa Dr.)-GROUP A WHARTON DR. (Wedgemont Cir. N. to Walton Ave.)-GROUP B WONDER DR. (Winfred Dr. to Walton Ave.)- GROUP B UNIT I Water Project No. P264-541200-606170096583 UNIT I Sewer Project No. P-274-541200-706170096583 UNIT II TPW Project No. C295-541200-206400096583 That the work herein contemplated shall consist of the Contractor furnishing as an independent contractor all labor, tools, appliances and materials, necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by or on behalf of the City of Fort Worth for the Department of Transporation and Public Works of the City of Fort Worth adopted by the City Council of the City of Fort Worth,which Plans and Specifications and Contract Documents are hereto attached and made a part of this Contract the same as if written herein. 3. The Contractor hereby agrees and binds itself to commence the construction of said work within ten(10)days after being noted in writing to do so by the Transportation and Public Works Department of the City of Fort Worth. 6/17/09 C-1K I No. 0051 . ' P. 1,4/14 The Contractor hereby agrees and binds Itself to commence the construction of said work within ten(10)days after being notified in writing to do so by the Transportation and Public Work Department of the City of Fort Worth, s 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Transportation and Public Works Department of the City of Fort Worth an Council of the City of Fort Worth within a period of 240 Calendar days. d City If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided In the General Conditions, there shall be deducted from any monies due or which may thereafter become due him,the sum of$ ' penalty but as liquidated damages, the Contractor and its Surety shall be per working liable to he O;h e�as a such deficiency, or Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the Intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the Surety to take over the work and complete same In accordance manner as it may deem xce with the Contract Documents or to take charge of and complete the work In such I proper, and if in the completion thereof, the cost to the Owner shall eed the contract price or Prices set forth in the Plans and Spe cations made a part hereof, the Contractor and/or its Surety shall pay Owner on demand in writing,setting forth and specifying and itemized statement of the total cost thereof, said excess cost. 6. Contractor Covenants and agrees to indemnify the Owner, Owner's Engineer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmle s d d s anefend,at its own expense, the Owner, its officers,servants and employees, from and against any and all claims or suits for property loss, property damage,personal injury, including death,arising out of, or alleged to arise out of,the work and services to be performed hereunder by Contractor, Its officers, agents, employees, subcontractors, licensees or Invitees,whether or not an such In u dama a or death is caused In whole or,i art b the ne li ence or ails ed ne II once of Owner Its oho ar servants or emplovees Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers,servants and employees and any damage, loss or destruction to property of the Owner arising from the Performance of any of the terms and conditions of this Contract, whether or not an or dama a is caused In whole or in art b the n oaf i ence or ails ed ne II ence of Owner i V rn�Ury Its OffCefS servants or Am 10 ees, In the event Owner receives a written claim for damages I subcontractors prior to final payment,final payment shall not be madenuntil Contractor oeither(a) submits to.Owner satisfactory evidence that the claim has been settled and/or a release from the I claimant involved, or(b)provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if deemed appropriate, i Worth public work from a Contractor against whom refuse claim for damages Is outstanding as result of work performed under a City of Fort Worth contract. I I 6/17/09 I I C-2R CITY OF F FORT WORTH, TEXAS ADDENDUM NO. 2 To the Plans, Specifications & General Contract Documents 2007 Critical Capital Project, Council District 6—Part 3 ' GLENMONT DR. estere �'�' ek Dr. to Calousa Dr.) - GROUP A WIIARTON DR. (Wedgemont Cir.N. to Walton Ave.) - GROUP A ' WONDER DR. (Winfred Dr. to Walton Ave.)- GROUP A D.O.E. No. 5919, City Project No. 00965 IN THE THE CITY OF FORT WORTH, TEXAS TPW Project No. C295-541200-206400096583 ' Water Project No. P264-541200-606170096583 Sewer Project No. P-274-541200-706170096583 IBid Date: July 15, 2010; 1:30 PM Addendum No. 2: Issued July 14, 2010 This Addendum, forms part of the Plans Contract Documents & Specifications for the I referenced Project and modifies the original Specifications and above acknowledge receipt of this addendum in the space provided below,in the)pru sal (Proposal Signature Page)and acknowledge receipt on the outer envelope of your bid. Failure to acknowled e receipt of this addendum could subject the bidder to disqualification. g The plans and specification documents are hereby revised by Addendum No.2 as fo llows: SPECIFICATIONS & CONTRACT DOCUMENTS: L SECTION 4 -BID PACKAGE: Section 4.2—Bid Proposal, Unit/Section Paving-concrete; Base Bid Replace this sheet with the attached sheet dated 7-14-10. i Section 4.2—Bid Proposal, Unit/Section Paving-Concrete,Record Number BID00528, Walk ti b Concrete, Base Bid Change the Quantity from 1,051 Square Feet to 38 Square Feet. Section 4.2—Bid Proposal, Unit/Section Paving-Concrete, Base Bid CPMS Record Number BID00530, Walk 4 Ft—Install Change the Quantity,from 114 Square Feet to 1,051 Square Feet. i i Addendum No. 2,Page 1 A signed copy of the Addendum should be included in the sealed bid envelope at the time of bid submittal. Failure to acknowledge the receipt of this Addendum could cause the subject bidder to he considered "_NONRESPONSIVE,"resulting in disqualification. RECEIPT ACKNOWLEDGEMENT: William A. Verkest, PE Director, Transportation &Public Works Depa.Lnent I3 Company: Me1Lf .I- -1 By: Gopal Sahu,P O ST �'''��• Title:Project Manager Address: _P.0,pox -4-9380 ' City: SwL'AkV J State: TX IB sti•' .. ............. a �TFR P.'NORWt�pp S 82049 •...'a° �d�oNA X11 Addendum No.2,Page 2 'AAIIRIlI4 r CITY OF FORT WORTH TEXAS CONTRACT THE STATE OF TEXAS ' KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT This agreement made and entered into this the OCT 12 2M between the CITY OF FORT WORTH, a municipal corporation day of A.D., 2010, by and of existing under and by virtue of a special charter adopted by the qualified voters County, within said City n the ' 11 day of December, A.D. 1924, under the authority provision) of the Constitution of Texas, and in accordance with anreso upon dulyy the "Home Ruler meeting of the City Council of said city , and the City of Fort Worth being hereinafter termed Owner, Stabile& Winns Inc., HEREINAFTER CALLED Contractor. I WITNESSETH: That said parties have agreed as follows: I 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Pavement reconstruction and WaterMain Re lacement on Glenmont Drive Wharton Drive and Wonder Drive(Groan A)(Council District 61 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the in ction and a proval of OFFICIAL (RECORD CITY SECRETARY I FT WORT} TX L----- i the Department of Engineering of the City of Fort Worth and the City Council of the City of F within a period of 240 calendar days. h Fort Worth If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the ' sum of 420 Per working day, not as a penalty but as liquidated damages, the Contractor and his Sure shall be liable to the Owner for such deficiency. ty ' S. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to ' carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of ' and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, p el at the hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, arising out of or alleged to arise out of the work and services to be performed e hereunder by Contractor,, its officers, agents, employees, subcontractors, licensees or invitees, whether or not an such in'u y ry, ama a or death is caused in whole or in Pqrt, by the n ants e ence or alle ed ne li ence o Owner, its olrcers sery or em loyees Contractor li likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not rny such in&ry or nave is caused in whole or in Part by the ne li ence or alle ed ne li ence o Owner, its o acers servants or employees., In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient sure on s or a faithful performance of the terms and stipulations of the Contract and for the pa W11I AL r labor CITY SECRETARY FT WORTH, TX i 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in the prosecution of the work, such bonds being provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be for 100 percent of the total contract price, and said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. ' Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment ' will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates Na shall be One Million Siz -ei ht Thousand Five Hundred Twenty and 50/100.....................Dollars ($1,068,520.50). 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written Director of the Department of Engineering. consent of the I 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a co y of which is I attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affectin this Contract, and the Contractor agrees to fully comply with all the provisions of the same. g IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in ei ht counterparts in its name and on its behalf by the City Manager and attested b its Secretary,�- the corporate seal of the City of Fort Worth attached. y executed with instrument through its duly authorized officers in eight co nterpartsmwrth has corporate seal attached. Done in Fort Worth, Texas, this the OCT 12 20'i day of A.D.,2010. OFFICIAL RECORD CITY SECRETARY FT, WORTH, TX APPROVAL RECOMMENDED: CITY OF FORT WORTH WILLIAM VERK , P.E. DIRECTOR, DEPARTMENT OF TRANSPORTATION/PUBLIC WORKS FERNANDO COSTA,ASST CITY MANAGER ' ATTEST: �4pbaQq�� , p a�*aR , o Y Stabile& Winn Inc. ° �'0 ° PO Box 79380 Fo o o o I Saginaw TX 76176 � CONTRACTOR °°°0000000°0° � CITY SECRETARY (S E A L) BY: Jerry Henderson, Vice-President Cunt)Ct AuthoziaatioA TITLE Date P 0 Box 79380 Saginaw, TX 76179-0380 APPROVED AS TO FORM AND LEGALITY: ADDRESS November 1960 ASST. ITY TTORNEY Revised May 1986 Revised September 1992 Revised March 2006 OFFICIAL RECORD CITY SECRETARY FT. WORTH, Tx rnrnioarn=