HomeMy WebLinkAbout063232-CO1 - Construction-Related - Contract - Mountain Cascade of Texas, LLCFC�RT WC?1:z-r City of Fort Worth
�ps Change Order Request
CSC No. 63232-CO1
Project Name Westside Ill - Phase II -42" Water Transmission Main City Sec No. 63232
Project No.(s)L56O23-O6OO43O-574OO1O 1480 =� ODE No. N/A j City Proj. No. 102688-2
Project Description:
Westside 3 - Phase 2 - 42 Inch Dia, Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank
at 1-20 (Markum Ranch)
Contractor: Mountain Cascade of Texas, LLC
1 Change Order: Date: L.LL6Ii
City Project Mgr. Walter Norwood I
City Inspector: j Nakia McCain
Phone Number: 817-392-5026
Phone Number: (817) 392-8347
Dept. Water
Totals Contract Time
(Calender days)
Original Contract Amount $7,086,991.00
$7,086,991.00 430
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $7,086,991.00
$7,086,991.00 430
Amount of Proposed Change Order
$0.00
$0.00
Revised Contract Amount $7,086,991.00
$7,086,991.00
430
Original Funds Available for Change Orders $283,480.00
$283,480.00
Remaining Funds Available for this CO $283,480.00
$283,480.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $8,858,738.75
S) FOR CHANGE ORDER
Change Order No. 1 allows for the additon of a fire hydrant in an easement, installation of 48" wire
fence in lieu of temporary 8' chain link fence and 2-16' wide gates.The change order will also reimburse
the contractor for payment to the property owner at 1 Live Oak Place, Tarrant County which a segment
of the water main was installed, to resolve any and all claims by the property owner pertaining to silt
removal (that will be conducted by the property owner) in an adjacent pond. Staff visited the site and
decided that it was in the City's best interest for the property owner to dispose of the silt himself with
the City reimbursing him the cost via the contractor. Staff was unable to determine that the contractor
cause the silt to accumulate.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and aareed that the acceptance of this Chanoe Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor
Contractor Name
Contractor Signature
Date
Mountain Cascade of Texas, LLC j
Jason Williford
�/Z
Insp for a
Date
Project Manager
Date
i7
74kb
_____________'4
Director (Water Dept)
Date
Construction Supervisor Wat r Dept)
Date
Ch ictopl2eOCflT T <,
9/11 /2026
, -
y - 2. ',
Senior Assistant City Attorney
Date
Assistant City Manager
Date
O9/15/2O26
9/17/2026
Council Action If Required)
M&C Number I N/A j M&C Dale Appi
FoR_U Wc3RTH
City of Fort Worth
Change Order Additions
Project Name J Westside ill - Phase 11- 42" Water Transmission. Main J City Sec No. 63232
Project No(s) 56023-0600430-5740010-1480 DOE No. N/A I City Proj. No. 102688-2
Project
Description
Westside 3 - Phase 2 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank at
1-20 (Markum Ranch)
Contractor I Mountain Cascade of Texas, LLC I Change Order: 0 Date: 9/4/2026
City Project Mgr. I Walter Norwood 1 City Inspector Nakia McCain
ADDITIONS
DEPT
Qty
Unit
Unit Cost
Total
37
Fire Hydrant Assembly
Water
1
EA
$14,136.06
$14,136.06
38
6'x6' Protective Frame for FH
Water _
1
EA
$6,210.00
$6,210.00
39
12" Gate Valve
Water
1
EA
$5,628.26
$5,628.26
40
48" Field Fence -Temporary
Water
1,289
LF
$12.07
$15,558.23
41
16' Gates W/Braces-Temporary
Water
2
EA
$2,070.00
$4,140.00
42
Reimbursement for payment to property a owner
Water
1.00
LS
$4,000,00
$4,000.00
Page 1 of 1
Water
$49,672.55
Additions Sub Total
$49,672.55
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Westside III - Phase II - 42" Water Transmission Main I City Sec No. 63232
Project No.(s) 56023-0600430-5740010-1480 DOE No. N/A City Proj. No. 102688-2
Project Description
Weslside 3 - Phase 2 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage
Tank at 1-20 (Markum Ranch)
Contractor Mountain Cascade of Texas, LLC Change Order: 1 Date 9/412026
City Project Mgr. I Walter Norwood I City Inspector Nakia McCain
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
16 8' Chain Link, Steel Water 764.1931 LF $65.00 $49,672.55
Water
IDeletions Sub Total I$49,672.55 1
Page 1 of 1
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
"40�7 �
Signature
Walter Norwood
Name of Employee
Project Manager
Title
nn
ATTEST: 6Fuxr°°aa
dam° °gad
d F.a °o.1d
Od°� aaoo 564
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Mountain Cascade of Texas, LLC
Subject of the Agreement:
Westside III Phase II 42" Water Transmission Main
M&C Approved by the Council? * Yes ❑ No II
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No 0 63232-CO1
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 102688-2
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No 0
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.