`RT WORTH City of Fort Worth
Change Order Request
Project Name:L South Westside V 36 -Inch Water Line 7 City
Sec No.: 59065
Project No.(s): 56021 /0600430/5740010/103428 /001480 DOE No. N/A J City
Proj. No.: 103428-2
Project Description:
Construction of the South Westside V 36 -inch Water Trasmission Main
Contractor. L McKee Utility Contractors, LLC 1 Change Order// 2 Date: J 8/27/2026
City Project Mgr. Russell Redder, PE City Inspector. J
Carmen Drake
Phone Number. 817-392-4970 I Phone Number. 682 432-5486
Dept. Water Sewer
Totals Contract Time
Original Contract Amount $11,395,255.00
(Calender days)
$11,395,255.00 365
Extras to Date
90
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $11,395,255.00
$11,395,255.00 455
Amount of Proposed Change Order
$ 40,867.09
$40,867.09
60
Revised Contract Amount $11,436,122.09
$11,436,122.09
515
Original Funds Available for Change Orders $222,105.00
$222,105.00
Remaining Funds Available for this CO $222,105.00
$222,105.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.36%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$14,244,068.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order 2 provides for all known cost impacts associated with additional remobilzation and installation of an additional
pipe segment at Station 2+40. The pipe segment is 36" in diameter, with flange -by -plain -end (FL x PE) that will connect, via
butt strap, to make up the distance to the valve.
Staff concurs with the contractors request for an additional 60 calendar days for the change order. The contract was paused
on 6/13/2025 with work resumption on 4/06/2026. The contract final completion date following Change Order 1 was
7/05/2026. The contract completion date following this change order will be 09/03/2026.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents oavment in
toll (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Company Name
:Contractor Name
Cont actor Sianature
Date
McKee Utility Contractors, LLC
Ton Ferguson
O9 09 2 6
)n ector
Date
mject Manager,
Date
ll 1--4 r - ----
.
'i ' L0 ≤
Dtreotor, W aterDep f
'Date
•Construction Su ervisor .
Date
Christopher Harder (Sep 15. 2026 08:5237 CDT)
09/15/2026
Assistant City Attorney
Date
Assistant City Manager
_____________
Date
09/15/2026
09/17/2026
Council Action If Required)
M&C Number I N/A J M&C Date Approved N/A
F(7 RT WO RT H City of Fort Worth
Change Order Additions
Project Name South Westside V 36 -Inch Water Line City Sec No.: 59065
Project No.(s): I 56021 /0600430/5740010/103428/001480 DOE No. N/A I City Proj. No.: 103428-2
Project
Description
Construction of the South Westside V 36 -inch Water Trasmission Main
Contractor I McKee Utility Contractors, LLC I Change Order:® Date: 8/27/2026
City Project Mgr. I Russell Redder, PE City Inspector Carmen Drake
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
33 Pipe segment to connect to valve at EST piping. Water 1.00 LS $40,867.09 $40,867.09
Water $40,867.09
Sewer
Page 1 of 1 Additions Sub Total $40,867.09
FO 12T WO KT H City of Fort Worth
Change Order Deletions
Project Name South Westside V 36 -Inch Water Line I City Sec No.: 59065
Project No.(s): 56021 / 0600430 / 5740010/103428/001480 DOE No. N/A City Proj. No.: 103428-2
Project Description
Construction of the South Westside V 36 -inch Water Trasmission Main
Contractor McKee Utility Contractors, LLC Change Order: =2 Date 8/27/2026
City Project Mgr. Russell Redder, PE I City Inspector: Carmen Drake
DELETIONS
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Russell Redder, P.E
Name of Employee
Project Manager
Title
- 4V
FORM°o
l.g
ATTEST:
ouo Rio
PPp,� oo 4j
j
aaaCb�XA?o4
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: McKee Utility Contractors, LLC
Subject of the Agreement:
South Westside V 36 -Inch Water Line
M&C Approved by the Council? * Yes 0 No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
59065-CO2
Is this entire contract Confidential? *Yes 0 No N If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If dfferent from the approval date.
Expiration Date:
N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103428-2
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes R No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.