AMENDMENT No.2
2
TO CITY SECRETARY CONTRACT No. 63028
WHEREAS, the City of Fort Worth (CITY) and Pape -Dawson Consulting
Engineers, LLC, (ENGINEER) made and entered into City Secretary Contract
No. 63028, (the CONTRACT) which was authorized by M&C 25-0161 on the 25th
day of February, 2025 in the amount of $ 1,214,684.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $155,641.00 authorized by M&C 26-0442 on June 9, 2026; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Eastside Transmission Main in Beach Street, CPN 105720; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $40,150.00.
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1, 410,475. 00. OFFICIAL RECORD
CITY SECRETARY
3.
FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Eastside Water Transmission Main in Beach Street
Prof Services Agreement Amendment Template 105720
Revision Date: June 13, 2025
Page 1 of 2
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 09/16/2026
nnIlIl
opiF.....
ATTEST:
� *sa°
H QanIl QEXAsa
Jannette Goodall
City Secretary
of the date subscribed by the City's
APPROVAL RECOMMENDED:
Christopher {ender 09/09/2026
Christopher Harder (Sep 9, 2026 17:2539 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Pape -Dawson Consulting Engineers, LLC
Jc.hn Reidy, P.E.
7inaging Principal
DATE: August 26, 2026
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Di., it Ily q— by Bl�.y UP-
Bijay Upreti o iivorFo.wo.no _wa,,
Bijay Upreti, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Sep 10, 2026 19:27:36 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 2 of 2
M&C No.#: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Eastside Water Transmission Main in Beach Street
105720
PAPE - DAWSON
August 10, 2026
Mr. Bijay Upreti, P.E.
Senior Professional Engineer
City of Fort Worth Water Department
100 Fort Worth Trail
Fort Worth, TX 76102
Re: Eastside Transmission Main in Beach Street
City Project No. 105720
CSC No. 63028
Additional Services Request No. 2 (Amendment #2)
Dear Mr. Upreti:
Pape -Dawson proposes to expand the original scope of services through the attached Amendment #2 in
the amount of $40,150.00. Based on the results of the completed field testing, cathodic protection is
recommended for the proposed 42 -inch transmission water main, regardless of whether a steel or bar -
wrapped pipe is ultimately selected. This amendment includes the additional cathodic protection
engineering services necessary to complete the design.
Summary of Contract Fee
Original Contract Amount $1,214,684.00
Amendment #1 (Water: $72,418, Sewer: $83,223) $155,641.00
Requested Amendment #2 (Water: $40,150, Sewer: $0) $40,150.00
Contract Amount to Date $1,410,475.00
A budget increase of $40,150.00 is the estimated cost of Pape-Dawson's current understanding of the
additional services identified above.
If you have questions or if I may be of further assistance, please contact me at 817-813-8290.
Sincerely,
Pape -Dawson Consulting Engineers, LLC
Greg aughn, P.E/
Managing Vice President, Water/Wastewater
Cc: Tony Sholola, P.E.
Assistant Director
201 Main Street, Suite 901, Fort Worth, Texas 76102 817-870-3668 PAPE-DAWSON.COM
Texas Engineering Firm #470 Texas Surveying Firm #10028800
Eastside Transmission Main in Beach Street — CPN 105720
Amendment #2
Page 2 of 2
Attachments:
Attachment A — Additional Scope of Services
Attachment B — V&A Consulting Engineers, Inc. Proposal
201 Main Street, Suite 901, Fort Worth, Texas 76102 817-870-3668 PAPE-DAWSON.COM
Texas Engineering Firm #470 Texas Surveying Firm #10028800
PAPE - DAWSON
City of Fort Worth
Eastside Transmission Main in Beach Street — CPN 105720
Amendment #2
ADDITIONAL SCOPE OF SERVICES
FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT) (TASK 4)
4.1 Cathodic Protection Design - Based on the results of the completed cathodic protection
evaluation and field testing, cathodic protection is recommended for the proposed 42 -
inch transmission water main regardless of whether a steel or bar -wrapped pipe is
ultimately selected. The ENGINEER shall provide cathodic protection design services and
incorporate the cathodic protection system into the 90 percent and 100 percent
construction documents. The ENGINEER shall also review contractor shop drawing
submittals associated with the cathodic protection design.
Note: Any professional opinions or recommendations related to our scope of work shall be provided
in written format on Pape -Dawson letterhead and not solely expressed verbally in meetings or as part
of any demonstrative presentation or email discussions.
201 Main Street, Suite 901, Fort Worth, Texas 76102 817-870-3668 PAPE-DAWSON.COM
Texas Engineering Firm #470 Texas Surveying Firm #70028800
15720 Park Row Blvd. ,713,568.9067
Suite 500 vaengineering.com
Houston, TX 77084
V&A Project No. 26-0303 AM1
August 4, 2026
Greg Vaughn, P.E.
Managing Vice President, Water/Wastewater
Pape -Dawson
201 Main St, Suite 901
Fort Worth, TX 76102
Subject: City of Fort Worth Eastside 42 -inch Transmission Main Cathodic Protection Design
Proposal for Engineering Services
Dear Mr. Vaughn
Thank you for requesting a proposal for the Eastside 42 -inch Transmission Main project located in Fort
Worth, Texas. Pape -Dawson is currently designing a 42 -inch water transmission main along N. Beach St.
(from IH-820 to Western Center Blvd.) for the City of Fort Worth. According to Pape -Dawson, the pipeline
material is anticipated to be steel or bar wrapped pipe. Following a previous corrosion study which
indicated the need for a cathodic protection system, Pape -Dawson is requesting a cathodic protection
system design for the proposed pipeline. V&A Consulting Engineers, Inc. (V&A) is prepared to provide
cathodic protection system design drawings, specifications, bidding assistance and opinion of probable
construction cost.
Per your request, the following is our proposal and detailed scope of work for the subject services:
Scope of Work
Task I Description
1. Project Management: Monitor and report project progress and changes, manage the quality of all
work activities and project deliverables, and execute the project per the defined scope, schedule,
and budget. Submit monthly invoices and communicate project updates. The project duration is
assumed to be 6 months. This task includes the following project management work activities:
a. Prepare progress reports accompanying monthly invoices.
b. Meetings: Attend meetings up to 4 hours. Time spent over 4 hours will be invoiced on a time
and materials basis at the rates shown on the attached Resource Allocation Estimate.
c. Technical Assistance: Provide up to 4 hours of technical assistance and participation in
conference calls, as required. Time spent over 4 hours will be invoiced on a time and materials
basis at the rates shown on the attached Resource Allocation Estimate.
2. Design:
Plans and Specifications: Prepare plans and technical specification Section 13 47 13,
"Cathodic Protection," for the cathodic protection system. Plans will be prepared in AutoCAD
and will be provided as PDFs. Plans and specifications will be prepared for the 90% and 100%
submittals. One round of comments will be addressed at each submittal. If more submittals are
requested, submittals will be invoiced on a time and materials basis at the rates shown on the
attached Resource Allocation Estimate.
Opinion of Probable Cost: Prepare an opinion of probable cost for the construction of the
cathodic protection system.
V&A I Project No. 26-0303 I 1
3. Bidding Assistance: Provide up to 8 hours of bidding assistance and participation in conference
calls, as required. Bidding assistance includes preparing conformed documents and responding to
questions from potential bidders for the cathodic protection system. Time spent over 8 hours will be
invoiced on a time and materials basis at the rates shown on the attached Resource Allocation
Estimate.
Any changes to the following assumptions, prevailing wage assumption, exclusions and limitations, or
proposed schedule may necessitate an adjustment to the proposed fee.
Assumptions
The following is a list of additional assumptions used to develop V&A's scope of work.
■ V&A will submit monthly invoices in electronic format via email. Time spent submitting the invoice
via a different method may incur additional charges.
Prevailing Wage Assumption
V&A understands that this project is NOT subject to prevailing wage rate requirements. If at any time a
different determination is reached, all project labor subject to prevailing wage requirements will incur a
30% markup on the associated labor fee. This markup covers the higher base hourly labor rates
associated with prevailing wage rates, additional premium pay requirements, and reporting
requirements. Additional Project Labor Agreement requirements may incur additional fees billed on a
Time & Materials Basis.
Exclusions and Limitations
The following items, unless otherwise indicated, are not included in the scope of work:
■ Traffic Control Plans and Permits
■ Traffic Control Measures, including but not limited to sign boards, cones, and flaggers
■ Project Specific Health and Safety Plan
■ Encroachment Permits
■ Permitting
■ Notification
■ Bonds
■ Shutdown, Dewatering, and Cleaning of Structures
■ Excavations
■ Structure Access, including but not limited to ladders, scaffolding, and cranes
■ Confined Space Entry
■ Supplied Air
■ Vendor Portal Registration
■ Payment Portal Invoice Submission
■ Project Labor Agreements, including union specific requirements
rii v&Ai Project No. 26-0303 1 2
Schedule
V&A proposes the following schedule for completion of the scope of work:
2 Design - 90% Submittal 8/9/2026
2 Design - 100% Submittal 9/13/2026
4 Bidding Assistance Bidding Duration
Fee Proposal
V&A proposes to complete this work on a lump sum basis at a total cost not to exceed $36,451 with
terms of Net 15 days (Pay When Paid payment terms dependent on timely processing of V&A's
submitted invoice). This fee is valid for 90 days from the date of this proposal (after which the total cost
may be adjusted to reflect annual updates to the attached Fee Schedule). The scope of work was
developed as a result of our discussions and represents our mutual understanding.
If unforeseen circumstances should arise which indicate that more work is required, V&A will provide a
written estimate of additional required work and cost. The attached Fee Schedule (subject to annual
adjustments) will serve as the basis for developing future cost estimates. V&A will not proceed with
work beyond the not -to -exceed figure without written authorization from your office.
We are prepared to begin work on your project upon receiving written approval, a notice to proceed
(NTP), or a purchase order from your office.
On behalf of our staff and myself, I would like to thank you for the opportunity to be of service to you,
Pape -Dawson, and the City of Fort Worth. We look forward to working with you.
Sincerely,
V&A Consulting Engineers, Inc.
!Jarred Rivera, P.E.
Project Manager
Texas Registered Engineering Firm F-9154
Accepted:
Pape -Dawson
Date:
V&AI Project No. 26-0303 I 3
Resource Allocation Estimate
JOB NO: 26-0303 AMI
CLIENT: Pape -Dawson
JOB TITLE: City of Fort Worth Eastside 42 -inch Transmission Main Cathodic Protection System Design
Date: 8/4/2026
1 Protect Management 2 12 16 10 40 $9,960 $0 $9,960
2 Design 2 8 14 36 40 100 $24,090 $0 $24,090
a Plans and Specifications 2 6 12 32 40 92 $21,962 $0 $21,962
b Opinion of Probable Construction Cost 2 2 4 8 $2,128 $0 $2,128
3 Bidding Assistance 1 3 4 8 $2,401 $0 $2,401
Subtotal 5 23 34 36 40 10 148
Hourly $347 $306 $284 $237 $211 $105
Total Direct Labor $1,735 $7,038 $9,656 $8,532 $8,440 $1,050 $36,451
GRAND TOTAL ESTIMATED COST $36,451
V&A1 Project No. 26-0303 1 4
Position Rate
Principal -in -Charge $347
Senior Project Manager
$306
Project Manager
$284
Senior Project Engineer
$263
Project Engineer
$237
Deputy Engineer
$224
Associate Engineer
$211
GIS Specialist
$211
Graduate Engineer
$172
CAD Designer
$171
Engineering Associate
$160
Senior Technician
$150
Technician
$132
Project Administrator
$105
Deposition/Court Appearance
$634
Other Direct Costs
Subcontractor/Subconsultant, Lab Analysis: Cost + 10%
Travel (Air/Hotel/Per Diem/Car Rental), Printing, Shipping: @ Cost
Auto/Truck Mileage: @ Federal Rate
Field Truck: $125/Day
Confined Space Entry Truck and Safety Equipment: $250/Day
r-
Project No. 26-0303 I 5
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Pape -Dawson Consulting Engineers, LLC
Subject of the Agreement:
Eastside Transmission Main in Beach Street
M&C Approved by the Council? * Yes ❑ No II
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No 0 63028-A2
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 8/26/2026
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 105720
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No 0
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.