Loading...
HomeMy WebLinkAbout065831 - Construction-Related - Contract - SRPF D/Hyde Ranch Holdings, LP65831 CSCO NO. TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal corporation, and SRPF D/Hyde Ranch Holdings, LP, a Delaware limited partnership authorized to do business in Texas (the "Owner") (the City and the Owner a "Party", and collectively, the "Parties"). RECITALS WHEREAS, the Owner is the owner of approximately 173.046 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit "B"; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit "C ", which identifies the on - site and/or off -site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended, under which transportation impact fees are imposed on new development for impacts to the City's transportation facilities as a result of said development; and WHEREAS, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City's adopted Transportation Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development is located; and WHEREAS, the Transportation Impact Fee Program provides for credits against impact fees for dedication of right-of-way and/or construction of transportation improvements identified as impact fee eligible on the adopted TIP; and WHEREAS, the Property is located within service area S; and WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the transportation improvements shown on Exhibit "D" for which credits against transportation impact fees shall be granted; and OFFICIAL RECORD CITY SECRETARY Transportation Impact Fee Credit Agreement- CA -26-012 FT. WORTH, TX Page 1 of 16 Hyde Ranch 9/1/2026 WHEREAS, the Owner has received preliminary plat approval for Hyde Ranch, PP -23- 028, on 9/13/2023; and WHEREAS, the Owner has dedicated 22,625 square feet of right-of-way for Silver Creek Road with FP -24-104, recorded as Instrument D226138990, on 7/16/2026; and WHEREAS, the Owner has dedicated 405,482 square feet of right-of-way for N Academy Blvd with FP -24-104, recorded as Instrument D226138990, on 7/16/2026; and WHEREAS, the Owner has received approval for construction plans (IPRC23-0174) on 9/30/2024, and executed a Community Facilities Agreement (CFA24-0066, CSCO 64958), on 3/31/2026 with a (development bond) financial guarantee, NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner agrees to dedicate the rights -of -way for and/or construct the system facilities identified in Exhibit "D". For any transportation improvement which has been previously dedicated or constructed by Owner on the Property and accepted by the City prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit "D". 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shown on Exhibit "E" shall be considered as exact. 4. Phasing. The Parties acknowledge that, where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit "D", which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit "F", which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement (for 75% of the eligible roadway construction credit) and final acceptance by the City has been obtained (for 100% of the eligible roadway construction credit). 6. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. Transportation Impact Fee Credit Agreement- CA -26-012 Page 2 of 16 Hyde Ranch 9/1/2026 7. Assignment. Owner shall have the right to assign this Agreement to any person or entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. A credit agreement amendment executed by the City, any remaining Owners, and the Owner's Assignee will be required to formally transfer any credits for use. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any revision, amendment, assignment, or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, assignment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement- CA -26-012 Page 3 of 16 Hyde Ranch 9/1/2026 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's Assistant City Manager. CITY OF FORT WORTH, TEXAS o�� v Jesica McEachern Assistant City Manager 09/16/2026 Date: Recommended By: Dalton Harrell (Sep 10, 2026 08:57:14 CDT) DJ Harrell Director, Development Services Approved as to Form and Legality: Douglas Black (Sep 10, 2026 19:31:32 CDT) Douglas Black Assistant City Attorney M&C: None required Form 1295: None required ATTEST: 004FOA IlIId ¢„000 �,d / —1 -..O9pd 0-10 per; dO= e=d �" cdQn Qez as4a Jannette Goodall City Secretary OWNER SRPF D/Hyde Ranch Holdings, LP a Delaware limited partnership By: SRPF D/Hyde Ranch Holdings GP, LLC a Delaware limited liability company Its general partner Lee Belland (Sep 9, 2026 22:10:21 CDT) Lee C. Belland President City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kamal L. Crues Sr. Capital Projects Officer, Development Services Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Transportation Impact Fee Credit Agreement- CA -26-012 Page 4 of 16 Hyde Ranch 9/1/2026 EXHIBIT LIST "A" Description of the Property "B" Map of Property "C" Development Plan "D" Eligible Transportation Improvements "E" Credits Against Transportation Impact Fees "F" Allocation of Credits Transportation Impact Fee Credit Agreement- CA -26-012 Page 5 of 16 Hyde Ranch 9/1/2026 FXHTRIT A Description of Property: Hyde Ranch Preliminary Plat, PP -23-028 BEING that certain tract of land situated in the R.W. Tannahill Survey, Abstract Number 1540 and the J.B. Odell Survey, Abstract Number 1189, City of Fort Worth, Tarrant County, Texas, being a portion of that tract of land described by deed to Pozo Hermosa, LLC, recorded in Instrument Number D219292763 (Tract 1), County Records, Tarrant County, Texas, and being more particularly described by metes and bounds as follows: BEGINNING at the northeast corner of said Tract 1, in the south right-of-way line of Verna Trail North (a 60 foot right-of-way), and the west right-of-way line of Silver Creek Road (a variable width right-of-way); THENCE with the east line of said Tract 1 and said west right-of-way line, the following courses and distances: S 00°05'26"W, 605.52 feet, to the beginning of a curve to the right; With said curve to the right, an arc distance of 27.33 feet, through a central angle of 00'18'56", having a radius of 4964.00 feet, the long chord which bears S 00°14'54"W, 27.33 feet; S 00°24'22"W, 663.17 feet; N 89°52'44"E, 18.97 feet, to an "ell" corner in said common line; S 00°17'16"E, 30.84 feet, to the beginning of a curve to the left; With said curve to the left, an arc distance of 120.09 feet, through a central angle of 29°19'36", having a radius of 234.63 feet, the long chord which bears S 14°48'52"E, 118.79 feet; THENCE S 00°04'54"W, 2257.41 feet, continuing with said east line, to the southeast corner of said Tract 1, the northeast corner of that tract of land described by deed to Texas Electric Service Company, recorded in Volume 4541, Page 834, said County Records, and being in the west line of that tract of land described by deed to FW 820, LLC, recorded in Instrument Number D222014220, said County Records; THENCE N 87°58'44"W, 2773.06 feet, with the south line of said Tract 1, to the most easterly corner of that tract of land described by deed to Texas Utilities Electric Company, recorded in Volume 9023, Page 1411, said County Records; THENCE N 85°37'40"W, 301.25 feet, with the north line of said T.U. Electric Co. tract and continuing with said south line; Transportation Impact Fee Credit Agreement- CA -26-012 Page 6 of 16 Hyde Ranch 9/1/2026 THENCE over and across said Tract 1 the following bearings and distances: N 00°09'55"W, 587.86 feet; N 89°18'21"E, 707.57 feet; N 00°29'29"E, 2170.37 feet; S 89°54' 13"E, 1794.72 feet, to an "ell" corner in the north line of said Tract 1 and the southeast corner of that tract of land described by deed to Emily Reichenbach, recorded in Volume 12597, Page 411, said County Records; THENCE N 00°03'26"E, 815.11 feet, to an "ell" corner in said north line, the northeast corner of that tract of land described by deed to Emily Reichenbach, recorded in Volume 14127, Page 303, said County Records, and being in the aforementioned south right-of-way line of Verna Trail North; THENCE S 89°56'28"E, 511.24 feet, with said south right-of-way line, to the Point of Beginning and containing 7,537,899 square feet or 173.046 acres of land more or less. Transportation Impact Fee Credit Agreement- CA -26-012 Page 7 of 16 Hyde Ranch 9/1/2026 EXHIBIT B Map of Property: Description of Property: Hyde Ranch Preliminary Plat, PP -23-028 // a. .. II •. II ;I .• I: m .. u. I -- N• PROJECT LOCATION • II 0 11 •. ii >-at It 11 •• w III, ii w •• 0 1/ U .. .. 11 a 4l . a. • RD •i 5. 11 II 11UI U. 11 1A 1 NORTH Transportation Impact Fee Credit Agreement- CA -26-012 Hyde Ranch Page 8 of 16 9/1/2026 EXHIBIT C Development Plan: Hyde Ranch Preliminary Plat, PP -23-028 8 , 5� I ill'•.., .. ' N.TS. _ i�yffi I _J( j •. Y• wP I J! u u%d '$iii f f� '✓x.,�"`..,� "°�''""R'F:m �aP��""z""n..6',".w I ! .R�.. �� I P"�.'..:- �� . •�Mw. may,..... .• •Y ' . vd:' i C�Zt, �' fYNABt ran. on,nniwa OEYELOPER •,evYw�P•oxn .•oneinwsan PLANNERIEG NEER sauna+•%uwc n.an nxes•wo . —CH HYDE RANCH ° m".:Wew°O'u cn�,aoi ..rwr Transportation Impact Fee Credit Agreement- CA -26-012 Page 9 of 16 Hyde Ranch 9/1/2026 EXHIBIT D Eligible Transportation Improvements FORT WORTH® Hyde Ranch Eligible Transportation Improvements for Credit against Transportation Impact Fees ! Key fevelnnment Plan Area Transportation Impact Fee Credit Agreement- CA -26-012 Hyde Ranch Page 10 of 16 9/1/2026 EXHIBIT E Credits Against Transportation Impact Fees Hyde Ranch Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument # Final Plat # Eligible Arterial Value D226138990 FP -24-104 N Academy Blvd $1,317,816.50 D226138990 FP -24-104 Silver Creek Rd $73,531.25 TOTAL ROW TRANSPORTATION IMPACT FEE CREDIT $1,391,347.75 TrIF Eligible Community Facilities Agreement Construction - 75% Eligible City Secretary # CFA # Eligible Arterial Value CFA24-0066 64958 CPN 105523 N Academy Blvd $5,048,755.00 IPRC23-0174 75% COMMUNITY FACILITIES AGREEMENT CREDIT $3,786,566.25 Engineering, Surveying, and Material Testing = 20% of total eligible $757,313.25 construction costs TOTAL TRANSPORTATION IMPACT FEE CREDIT $5,935,227.25 Transportation Impact Fee Credit Agreement- CA -26-012 Page 11 of 16 Hyde Ranch 9/1/2026 Right -of -Way Valuation for Hyde Ranch Valuation Method 1- Percentage of TIP Project Cost Eligible Arterial Academy Silver Creek 2022 Transportation Improvements Plan Project Number S-21 S-3 Estimated Construction Costs from 2022 Transportation Improvements Plan $5,337,000 $1,509,000 Value of Total Project Right -of -Way (20% of Construction Cost) $1,067,400 $301,800 Total Project Length (LF) 2990 845 Arterial Cross -Section Width (LF) 110 110 Additional ROW needed for Roundabout (SF) 0 0 Total Project Right -of -Way (SF) 328900 92,950 Right -of -Way Value Per Square Foot $3.25 $3.25 Valuation Method 2 - Percentage of Construction Project Cost Eligible Arterial Academy Silver Creek City Project Number 105523 0 Final Construction Costs from Notice of Completion (Green Sheet) $5,048,755.00 0 Value of Total Project Right -of -Way (20% of Construction Cost) $1,009,751 $0 Total Project Length (LF) 110 0 Arterial Cross -Section Width (LF) 3527 0 Additional ROW needed for Roundabout (SF) 0 0 Total Project Right -of -Way (SF) 387,970 0 Right -of -Way Value Per Square Foot $2.61 $0.00 Valuation Method 3 - TAD appraised value TAD Value as of 08/9/2023 Academy Silver Creek TAD Account 4520041 4520041 Total Area (SF) 217,800 217,800 Appraised Value $75,000.00 $75,000.00 Value per Square Foot $0.35 $0.35 Right -of -Way Dedication Academy Silver Creek Recording Instrument Number D226138990 D226138990 Final Plat Number FP -24-104 FP -24-104 Recording Date 7/16/2026 7/16/2026 Total area of ROW dedicated (SF) 405,482 22,625 Value per SF $3.25 $3.25 ROW Credit Available $1,317,816.50 $73,531.25 Transportation Impact Fee Credit Agreement- CA -26-012 Page 12 of 16 Hyde Ranch 9/1/2026 Hype Ranch - 75% TrIF credit since roadway is not complete Value of Eligible Community Facilities Agreement Construction, CPN 105523 Bidlist Item No. Description Unit Quantity Bid Eligible QuantityUnit Price Credit Available UNIT III: DRAINAGE IMPROVEMENTS 1 241.3024 Remove 54" Storm Line 9999.0014 Remove Headwall 9999.0015 Remove Storm Drain Manhole 9999.0016 Remove RCB 3341.0201 21" RCP, Class III LF EA EA 115 2 1 60 115 2 1 60 510 2,115 800 $47.00 $5,405.00 2 $1,995.00 $3,990.00 $2,356.00 $3,720.00 $53,040.00 3 $2,356.00 4 _ LF LF LF $62.00 5 510 2,115 $104.00 6 3341.0205 24" RCP, Class III $114.00 $241,110.00 7 3341.0302 30" RCP, Class III LF LF LF 800 70 $174.00 $139,200.00 8 3341.0409 48" RCP, Class III 70 $228.00 $15,960.00 9 3341.0502 54" RCP, Class III 40 4 40 4 $274.00 $2,006.00 $10,960.00 $8,024.00 10 9999.0017 Connect to Existing Storm 11 3341.1303 6x4 Box Culvert LF LF 310 310 $569.00 $176,390.00 12 3341.1101 4x2 Box Culvert 3349.00014' Storm Junction Box 3349.0002 5' Storm Junction Box 250 250 $239.00 $59,750.00 $97,290.00 $8,079.00 $10,444.00 13 EA 10 10 $9,729.00 14 EA 1 1 $8,079.00 15 3349.0003 6' Storm Junction Box EA 1 1 $10,444.00 16 3349.6001 10' Recessed Inlet EA 12 12 $8,722.00 $104,664.00 17 3349.6002 15' Recessed Inlet EA 2 2 $11,534.00 $23,068.00 18 3349.7002 5' Drop Inlet EA 1 1 $8,722.00 $144.00 $8,722.00 19 3137.0102 Large Stone Riprap, dry 9999.0018 TxDot Wingwall FW-0 9999.0019 TxDot Pedestrian Railing SY 1,515 1,515 $218,160.00 $59,690.00 $27,280.00 20 EA 1 1 _ $59,690.00 21 LF 110 110 $248.00 22 9999.0020 TxDot 24" SETP-CD EA 3 3 $3,163.00 $9,489.00 $14,769.00 $18,564.00 $18,564.00 23 9999.0021 TxDot 30" SETP-CD EA 3 3 $4,923.00 24 9999.0022 TxDot 4x2 SETB-PD 9999.0023 TxDot 4x2 SETB-PD WINo Cross Pipe EA 2 2 $9,282.00 25 EA 2 2 $9,282.00 26 9999.0024 Concrete Lined Spillway SF EA 3,650 1 3,650 1 $17.00 $7,806.00 $62,050.00 27 9999.0025 Riser Box 9999.0026 TxDot Box Culvert End Cap BC-ECD(FTW) 3305.0109 Trench Safety 9999.0027 Traffic Control $7,806.00 28 EA 1 4,200 1 1 $3,900.00 $3,900.00 $4,200.00 $7,500.00 29 LF 4,200 1 $1.00 30 LS $7,500.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $1,424,144.00 Transportation Impact Fee Credit Agreement- CA -26-012 Page 13 of 16 Hyde Ranch 9/1/2026 UNIT IV: PAVING IMPROVEMENTS 1 3110.0101 Site Clearing 241.01 Remove Sidewalk 241.05 Remove Fence LS 1 1 $7,500.00 $7,500.00 $1,260.00 $900.00 $9,295.00 2 SF 1,260 1,260 $1.00 3 LF SY 200 200 $4.50 4 241.1 Remove Conc Pvmt 1,430 1,430 $6.50 5 241.11 Remove Asphalt Pvmt SY SY 1,440 1,120.0 0 0 $6.50 $3.00 $0.00 6 9999.0028 Remove Gravel Road $0.00 7 9999.0029 Remove Barricade 3211.04 Hydrated Lime 3211.0502 8" Lime Treatment EA 2 2 $1,500.00 $325.00 $3,000.00 $164,125.00 $98,000.00 8 TN 505 28,000 1,110 505 9 SY SY 28,000 $3.50 10 3211.0702 8" Cement Treatment 3213.0106 11" Conc Pvmt 3213.0301 4" Conc Sidewalk 3213.0501 Barrier Free Ramp, Type R-1 3213.0506 Barrier Free Ramp, Type P-1 .011 Preformed Thermoplastic Contrast Markings — 6" DOT 1,110 26,000 $23.00 $81.75 $25,530.00 $2,125,500.00 11 SY 26,000 12 SF 73,000 73,000 $7.65 $558,450.00 13 EA 2 2 $2,600.00 $5,200.00 14 15 EA LF LF 12 12 $2,600.00 $31,200.00 $102.00 34 34 $3.00 16 _321 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 100 100 $17.50 $1,750.00 17 18 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars LF 29 29 $45.00 $45.00 $1,305.00 $810.00 3217.101 Preformed Thermoplastic Contrast Markings — Legend Single Head Curve Arrows EA 18 18 19 3217.1011 Preformed Thermoplastic Contrast Markings — Legend 3217.1022 Preformed Thermoplastic Contrast Markings — Legend Lane EA EA 20 20 $61.66 $1,233.13 20 746 746 $61.66 $45,995.86 21 3291.01 Topsoil CY 2,200 2,200 $0.00 22 3292.04 Seeding, Hydromulch 9999.0030 Unclassified Excavation by Plan SY 12,600 12,600 $1.00 $12,600.00 23 LS 1 1 $0.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $3,093,756.00 UNIT V: STREET LIGHTING IMPROVEMENTS 1 3441.1405 NO 2 Insulated Elec Condr 3441.1501 Furnish/Install Ground Box Type B 3441.1502 Furnish/Install Ground Box Type B, w/Apron LF 15,990 15,990 $2.59 $41,414.10 2 EA 14 14 $1,551.74 $21,724.36 3 EA EA EA 21 40 21 $1,551.74 $32,586.54 4 3441.3201 LED Lighting Fixture 40 $961.00 $38,440.00 $46,500.00 $24,508.29 5 6 3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8 31 31 $1,500.00 3441.3342 Rdwy Illum TY 18 Pole EA 31 31 $790.59 7 2605.0111 Furnish/Install Elec Sery Pedestal EA 1 1 $8,982.61 $8,982.61 8 2605.3014 2" CONDT RM (Riser) 2605.3015 2" CONDT PVC SCH 80 (T) LF 40 5,385 40 5,385 $36.53 $58.54 $1,461.20 $315,237.90 9 LF TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $530,855.00 UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS 1 $0.00 TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00 Transportation Impact Fee Credit Agreement- CA -26-012 Page 14 of 16 Hyde Ranch 9/1/2026 Bid Summa UNIT III: DRAINAGE IMPROVEMENTS $1,424,144.00 UNIT IV: PAVING IMPROVEMENTS $3,093,756.00 UNIT V: STREET LIGHTING IMPROVEMENTS $530,855.00 UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00 VALUE OF CFA24-0066, CPN 105523 ELIGIBLE CONSTRUCTION SUBTOTAL $5,048,755.00 Transportation Impact Fee Credit Agreement- CA -26-012 Page 15 of 16 Hyde Ranch 9/1/2026 EXHIBIT F Allocation of Credits Allocation of Credits shall be as listed below and then on a first-come/first-served basis within the preliminary plat boundary of Hyde Ranch Preliminary Plat, PP -23-028 and shall run with the land; provided, however, that no development within the boundary shall have the right to utilize credits under this agreement unless the Owner submits to the City a written request or notice approving the use of credits for the applicable development. Lot Number Credit allocation Lot 1 Block 1 $1,633,604.62 Lot 1 Block 2 $1,167,971.94 Lot 2 Block 1 $1,056,025.00 Lot 2 Block 2 $1,082,671.54 Lot 3 Block 1 $464,033.12 Lot 3 Block 2 $530,921.03 Transportation Impact Fee Credit Agreement- CA -26-012 Page 16 of 16 Hyde Ranch 9/1/2026 FORT WORTH® City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: SRPF D/Hyde Ranch Holdings LP Subject of the Agreement: ROW dedication and Roadway Construction M&C Approved by the Council? * Yes ❑ No II If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 0 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: When ACM signs If different from the approval date. Expiration Date: 10 years from when ACM signs If applicable. Is a 1295 Form required? * Yes ❑ No 21 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. CA -26-012 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No 0 Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.