HomeMy WebLinkAbout065831 - Construction-Related - Contract - SRPF D/Hyde Ranch Holdings, LP65831
CSCO NO.
TRANSPORTATION IMPACT FEE CREDIT AGREEMENT
THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the
"Agreement") is made and entered into effective as of the Effective Date (as defined below), by
and among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal
corporation, and SRPF D/Hyde Ranch Holdings, LP, a Delaware limited partnership authorized to
do business in Texas (the "Owner") (the City and the Owner a "Party", and collectively, the
"Parties").
RECITALS
WHEREAS, the Owner is the owner of approximately 173.046 acres in Tarrant County,
Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the
corporate boundaries of the City. A map of the Property showing its location is attached hereto as
Exhibit "B"; and
WHEREAS, the Owner desires to proceed with development of the Property as described
or illustrated on the Development Plan, attached hereto as Exhibit "C ", which identifies the on -
site and/or off -site transportation facilities necessary for serving full development of the Property;
and
WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas
Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended,
under which transportation impact fees are imposed on new development for impacts to the City's
transportation facilities as a result of said development; and
WHEREAS, transportation impact fees are collected and must be spent by the City on
impact fee eligible transportation facilities identified within the City's adopted Transportation
Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development
is located; and
WHEREAS, the Transportation Impact Fee Program provides for credits against impact
fees for dedication of right-of-way and/or construction of transportation improvements identified
as impact fee eligible on the adopted TIP; and
WHEREAS, the Property is located within service area S; and
WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as
impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and
WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the
transportation improvements shown on Exhibit "D" for which credits against transportation
impact fees shall be granted; and
OFFICIAL RECORD
CITY SECRETARY
Transportation Impact Fee Credit Agreement- CA -26-012 FT. WORTH, TX Page 1 of 16
Hyde Ranch 9/1/2026
WHEREAS, the Owner has received preliminary plat approval for Hyde Ranch, PP -23-
028, on 9/13/2023; and
WHEREAS, the Owner has dedicated 22,625 square feet of right-of-way for Silver Creek
Road with FP -24-104, recorded as Instrument D226138990, on 7/16/2026; and
WHEREAS, the Owner has dedicated 405,482 square feet of right-of-way for N Academy
Blvd with FP -24-104, recorded as Instrument D226138990, on 7/16/2026; and
WHEREAS, the Owner has received approval for construction plans (IPRC23-0174) on
9/30/2024, and executed a Community Facilities Agreement (CFA24-0066, CSCO 64958), on
3/31/2026 with a (development bond) financial guarantee,
NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and
conditions contained herein, and other good and valuable consideration, the City and the Owner
hereby covenant and agree as follows:
1. Recitals. The recitals contained in this Agreement are true and correct as of the
Effective Date and form the basis upon which the Parties negotiated and entered into this
Agreement.
2. Transportation Improvements. Owner agrees to dedicate the rights -of -way for
and/or construct the system facilities identified in Exhibit "D". For any transportation
improvement which has been previously dedicated or constructed by Owner on the Property and
accepted by the City prior to execution of this Agreement, the improvement shall be identified as
completed on Exhibit "D".
3. Credits. The Parties agree that the estimated value of the credits for each
transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The
value of credits associated with the improvements first shall be reduced by the Schedule 2 impact
fee associated with any lot for which a building permit has previously been issued, and the net
value of credits shown on Exhibit "E" shall be considered as exact.
4. Phasing. The Parties acknowledge that, where it is anticipated that the project will
be developed in phases, the anticipated construction of improvements by phase shall be as depicted
in Exhibit "D", which is attached hereto and incorporated herein by reference.
5. Allocation of Credits by Phase. The general allocation of credits to each phase of
the development shall be as shown on Exhibit "F", which is attached hereto and incorporated
herein by reference. The Parties agree that the credits identified in this Agreement shall not be
deemed to have been created until the system facility for which credit is to be granted has been
dedicated and accepted (in the case of right-of-way) or constructed through an executed
Community Facilities Agreement (for 75% of the eligible roadway construction credit) and final
acceptance by the City has been obtained (for 100% of the eligible roadway construction credit).
6. Term and Effective Date. The term of this Agreement shall be ten (10) years from
its Effective Date.
Transportation Impact Fee Credit Agreement- CA -26-012 Page 2 of 16
Hyde Ranch 9/1/2026
7. Assignment. Owner shall have the right to assign this Agreement to any person or
entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is
in writing executed by the Owner and its assignee; and (b) the assignment incorporates this
Agreement by reference and binds the Owner's Assignee to perform (to the extent of the
obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a
Party to this Agreement upon the execution of such assignment. In no event may this Agreement
be construed to authorize assignment of any credits attributable to a system facility to be dedicated
or constructed hereunder for use outside the boundaries of the Property. A credit agreement
amendment executed by the City, any remaining Owners, and the Owner's Assignee will be
required to formally transfer any credits for use.
8. Amendment. This Agreement shall not be modified or amended except as follows:
(a) Any revision, amendment, assignment, or modification to this Agreement
or any Exhibit or schedule hereto shall be in writing and signed by the Parties.
(b) Any revision, amendment, assignment, or modification to this Agreement,
the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date
executed by the Parties or, as applicable, upon the date of approval by the City Council or
designated city official.
9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this
Agreement for all purposes as if set forth in full in the body of this Agreement.
(Remainder of Page Intentionally Left Blank)
Transportation Impact Fee Credit Agreement- CA -26-012 Page 3 of 16
Hyde Ranch 9/1/2026
IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be
effective as of the date subscribed by the City's Assistant City Manager.
CITY OF FORT WORTH, TEXAS
o��
v
Jesica McEachern
Assistant City Manager
09/16/2026
Date:
Recommended By:
Dalton Harrell (Sep 10, 2026 08:57:14 CDT)
DJ Harrell
Director, Development Services
Approved as to Form and Legality:
Douglas Black (Sep 10, 2026 19:31:32 CDT)
Douglas Black
Assistant City Attorney
M&C: None required
Form 1295: None required
ATTEST:
004FOA IlIId
¢„000 �,d
/ —1
-..O9pd 0-10 per;
dO= e=d
�" cdQn Qez as4a
Jannette Goodall
City Secretary
OWNER
SRPF D/Hyde Ranch Holdings, LP
a Delaware limited partnership
By: SRPF D/Hyde Ranch Holdings GP, LLC
a Delaware limited liability company
Its general partner
Lee Belland (Sep 9, 2026 22:10:21 CDT)
Lee C. Belland
President
City Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Kamal L. Crues
Sr. Capital Projects Officer, Development
Services Department
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Transportation Impact Fee Credit Agreement- CA -26-012 Page 4 of 16
Hyde Ranch 9/1/2026
EXHIBIT LIST
"A" Description of the Property
"B" Map of Property
"C" Development Plan
"D" Eligible Transportation Improvements
"E" Credits Against Transportation Impact Fees
"F" Allocation of Credits
Transportation Impact Fee Credit Agreement- CA -26-012 Page 5 of 16
Hyde Ranch 9/1/2026
FXHTRIT A
Description of Property: Hyde Ranch Preliminary Plat, PP -23-028
BEING that certain tract of land situated in the R.W. Tannahill Survey, Abstract Number
1540 and the J.B. Odell Survey, Abstract Number 1189, City of Fort Worth, Tarrant County,
Texas, being a portion of that tract of land described by deed to Pozo Hermosa, LLC, recorded in
Instrument Number D219292763 (Tract 1), County Records, Tarrant County, Texas, and being
more particularly described by metes and bounds as follows:
BEGINNING at the northeast corner of said Tract 1, in the south right-of-way line of Verna
Trail North (a 60 foot right-of-way), and the west right-of-way line of Silver Creek Road (a
variable width right-of-way);
THENCE with the east line of said Tract 1 and said west right-of-way line, the following
courses and distances:
S 00°05'26"W, 605.52 feet, to the beginning of a curve to the right;
With said curve to the right, an arc distance of 27.33 feet, through a central angle of
00'18'56", having a radius of 4964.00 feet, the long chord which bears S 00°14'54"W,
27.33 feet;
S 00°24'22"W, 663.17 feet;
N 89°52'44"E, 18.97 feet, to an "ell" corner in said common line; S 00°17'16"E,
30.84 feet, to the beginning of a curve to the left;
With said curve to the left, an arc distance of 120.09 feet, through a central angle of
29°19'36", having a radius of 234.63 feet, the long chord which bears S 14°48'52"E,
118.79 feet;
THENCE S 00°04'54"W, 2257.41 feet, continuing with said east line, to the
southeast corner of said Tract 1, the northeast corner of that tract of land described by
deed to Texas Electric Service Company, recorded in Volume 4541, Page 834, said
County Records, and being in the west line of that tract of land described by deed to
FW 820, LLC, recorded in Instrument Number D222014220, said County Records;
THENCE N 87°58'44"W, 2773.06 feet, with the south line of said Tract 1,
to the most easterly corner of that tract of land described by deed to Texas Utilities
Electric Company, recorded in Volume 9023, Page 1411, said County Records;
THENCE N 85°37'40"W, 301.25 feet, with the north line of said T.U.
Electric Co. tract and continuing with said south line;
Transportation Impact Fee Credit Agreement- CA -26-012 Page 6 of 16
Hyde Ranch 9/1/2026
THENCE over and across said Tract 1 the following bearings and distances:
N 00°09'55"W, 587.86 feet;
N 89°18'21"E, 707.57 feet;
N 00°29'29"E, 2170.37 feet;
S 89°54' 13"E, 1794.72 feet, to an "ell" corner in the north line of said Tract 1 and the
southeast corner of that tract of land described by deed to Emily Reichenbach, recorded in
Volume 12597, Page 411, said County Records;
THENCE N 00°03'26"E, 815.11 feet, to an "ell" corner in said north line, the
northeast corner of that tract of land described by deed to Emily Reichenbach,
recorded in Volume 14127, Page 303, said County Records, and being in the
aforementioned south right-of-way line of Verna Trail North;
THENCE S 89°56'28"E, 511.24 feet, with said south right-of-way line, to
the Point of Beginning and containing 7,537,899 square feet or 173.046 acres of land
more or less.
Transportation Impact Fee Credit Agreement- CA -26-012 Page 7 of 16
Hyde Ranch 9/1/2026
EXHIBIT B
Map of Property: Description of Property: Hyde Ranch Preliminary Plat, PP -23-028
//
a.
..
II •.
II
;I
.• I: m
..
u.
I --
N•
PROJECT LOCATION •
II
0 11
•.
ii >-at
It
11
•• w III,
ii w
•• 0
1/ U
.. ..
11 a 4l
.
a.
• RD •i
5.
11
II
11UI
U.
11
1A 1
NORTH
Transportation Impact Fee Credit Agreement- CA -26-012
Hyde Ranch
Page 8 of 16
9/1/2026
EXHIBIT C
Development Plan: Hyde Ranch Preliminary Plat, PP -23-028
8 , 5� I ill'•.., .. '
N.TS. _ i�yffi I
_J( j
•. Y•
wP I J!
u u%d '$iii f f� '✓x.,�"`..,�
"°�''""R'F:m �aP��""z""n..6',".w I ! .R�.. �� I P"�.'..:- �� . •�Mw. may,.....
.• •Y ' . vd:' i C�Zt,
�'
fYNABt
ran. on,nniwa
OEYELOPER
•,evYw�P•oxn
.•oneinwsan
PLANNERIEG NEER
sauna+•%uwc
n.an nxes•wo
. —CH
HYDE RANCH
° m".:Wew°O'u
cn�,aoi ..rwr
Transportation Impact Fee Credit Agreement- CA -26-012 Page 9 of 16
Hyde Ranch 9/1/2026
EXHIBIT D
Eligible Transportation Improvements
FORT WORTH®
Hyde Ranch
Eligible Transportation Improvements for
Credit against Transportation Impact Fees !
Key
fevelnnment Plan Area
Transportation Impact Fee Credit Agreement- CA -26-012
Hyde Ranch
Page 10 of 16
9/1/2026
EXHIBIT E
Credits Against Transportation Impact Fees
Hyde Ranch
Transportation Impact Fee Credit Overview
Value of ROW Dedication
Instrument # Final Plat # Eligible Arterial
Value
D226138990 FP -24-104 N Academy Blvd
$1,317,816.50
D226138990 FP -24-104 Silver Creek Rd
$73,531.25
TOTAL ROW TRANSPORTATION IMPACT FEE CREDIT
$1,391,347.75
TrIF Eligible Community Facilities Agreement Construction - 75% Eligible
City Secretary # CFA # Eligible Arterial
Value
CFA24-0066
64958 CPN 105523 N Academy Blvd
$5,048,755.00
IPRC23-0174
75% COMMUNITY FACILITIES AGREEMENT CREDIT
$3,786,566.25
Engineering, Surveying, and Material Testing = 20% of total eligible
$757,313.25
construction costs
TOTAL TRANSPORTATION IMPACT FEE CREDIT
$5,935,227.25
Transportation Impact Fee Credit Agreement- CA -26-012 Page 11 of 16
Hyde Ranch 9/1/2026
Right -of -Way Valuation for
Hyde Ranch
Valuation Method 1- Percentage of TIP Project Cost
Eligible Arterial
Academy
Silver Creek
2022 Transportation Improvements Plan Project Number
S-21
S-3
Estimated Construction Costs from 2022 Transportation
Improvements Plan
$5,337,000
$1,509,000
Value of Total Project Right -of -Way (20% of Construction
Cost)
$1,067,400
$301,800
Total Project Length (LF)
2990
845
Arterial Cross -Section Width (LF)
110
110
Additional ROW needed for Roundabout (SF)
0
0
Total Project Right -of -Way (SF)
328900
92,950
Right -of -Way Value Per Square Foot
$3.25
$3.25
Valuation Method 2 - Percentage of Construction Project
Cost
Eligible Arterial
Academy
Silver Creek
City Project Number
105523
0
Final Construction Costs from Notice of Completion (Green
Sheet)
$5,048,755.00
0
Value of Total Project Right -of -Way (20% of Construction
Cost)
$1,009,751
$0
Total Project Length (LF)
110
0
Arterial Cross -Section Width (LF)
3527
0
Additional ROW needed for Roundabout (SF)
0
0
Total Project Right -of -Way (SF)
387,970
0
Right -of -Way Value Per Square Foot
$2.61
$0.00
Valuation Method 3 - TAD appraised value
TAD Value as of 08/9/2023
Academy
Silver Creek
TAD Account
4520041
4520041
Total Area (SF)
217,800
217,800
Appraised Value
$75,000.00
$75,000.00
Value per Square Foot
$0.35
$0.35
Right -of -Way Dedication
Academy
Silver Creek
Recording Instrument Number
D226138990
D226138990
Final Plat Number
FP -24-104
FP -24-104
Recording Date
7/16/2026
7/16/2026
Total area of ROW dedicated (SF)
405,482
22,625
Value per SF
$3.25
$3.25
ROW Credit Available
$1,317,816.50
$73,531.25
Transportation Impact Fee Credit Agreement- CA -26-012 Page 12 of 16
Hyde Ranch 9/1/2026
Hype Ranch - 75% TrIF credit since roadway is not complete
Value of Eligible Community Facilities Agreement Construction, CPN 105523
Bidlist
Item
No.
Description
Unit
Quantity
Bid
Eligible
QuantityUnit
Price
Credit Available
UNIT III: DRAINAGE IMPROVEMENTS
1
241.3024 Remove 54" Storm Line
9999.0014 Remove Headwall
9999.0015 Remove Storm Drain Manhole
9999.0016 Remove RCB
3341.0201 21" RCP, Class III
LF
EA
EA
115
2
1
60
115
2
1
60
510
2,115
800
$47.00
$5,405.00
2
$1,995.00
$3,990.00
$2,356.00
$3,720.00
$53,040.00
3
$2,356.00
4
_
LF
LF
LF
$62.00
5
510
2,115
$104.00
6
3341.0205 24" RCP, Class III
$114.00
$241,110.00
7
3341.0302 30" RCP, Class III
LF
LF
LF
800
70
$174.00
$139,200.00
8
3341.0409 48" RCP, Class III
70
$228.00
$15,960.00
9
3341.0502 54" RCP, Class III
40
4
40
4
$274.00
$2,006.00
$10,960.00
$8,024.00
10
9999.0017 Connect to Existing Storm
11
3341.1303 6x4 Box Culvert
LF
LF
310
310
$569.00
$176,390.00
12
3341.1101 4x2 Box Culvert
3349.00014' Storm Junction Box
3349.0002 5' Storm Junction Box
250
250
$239.00
$59,750.00
$97,290.00
$8,079.00
$10,444.00
13
EA
10
10
$9,729.00
14
EA
1
1
$8,079.00
15
3349.0003 6' Storm Junction Box
EA
1
1
$10,444.00
16
3349.6001 10' Recessed Inlet
EA
12
12
$8,722.00
$104,664.00
17
3349.6002 15' Recessed Inlet
EA
2
2
$11,534.00
$23,068.00
18
3349.7002 5' Drop Inlet
EA
1
1
$8,722.00
$144.00
$8,722.00
19
3137.0102 Large Stone Riprap, dry
9999.0018 TxDot Wingwall FW-0
9999.0019 TxDot Pedestrian Railing
SY
1,515
1,515
$218,160.00
$59,690.00
$27,280.00
20
EA
1
1
_
$59,690.00
21
LF
110
110
$248.00
22
9999.0020 TxDot 24" SETP-CD
EA
3
3
$3,163.00
$9,489.00
$14,769.00
$18,564.00
$18,564.00
23
9999.0021 TxDot 30" SETP-CD
EA
3
3
$4,923.00
24
9999.0022 TxDot 4x2 SETB-PD
9999.0023 TxDot 4x2 SETB-PD WINo
Cross Pipe
EA
2
2
$9,282.00
25
EA
2
2
$9,282.00
26
9999.0024 Concrete Lined Spillway
SF
EA
3,650
1
3,650
1
$17.00
$7,806.00
$62,050.00
27
9999.0025 Riser Box
9999.0026 TxDot Box Culvert End Cap
BC-ECD(FTW)
3305.0109 Trench Safety
9999.0027 Traffic Control
$7,806.00
28
EA
1
4,200
1
1
$3,900.00
$3,900.00
$4,200.00
$7,500.00
29
LF
4,200
1
$1.00
30
LS
$7,500.00
TOTAL UNIT III: DRAINAGE IMPROVEMENTS $1,424,144.00
Transportation Impact Fee Credit Agreement- CA -26-012 Page 13 of 16
Hyde Ranch 9/1/2026
UNIT IV: PAVING IMPROVEMENTS
1
3110.0101 Site Clearing
241.01 Remove Sidewalk
241.05 Remove Fence
LS
1
1
$7,500.00
$7,500.00
$1,260.00
$900.00
$9,295.00
2
SF
1,260
1,260
$1.00
3
LF
SY
200
200
$4.50
4
241.1 Remove Conc Pvmt
1,430
1,430
$6.50
5
241.11 Remove Asphalt Pvmt
SY
SY
1,440
1,120.0
0
0
$6.50
$3.00
$0.00
6
9999.0028 Remove Gravel Road
$0.00
7
9999.0029 Remove Barricade
3211.04 Hydrated Lime
3211.0502 8" Lime Treatment
EA
2
2
$1,500.00
$325.00
$3,000.00
$164,125.00
$98,000.00
8
TN
505
28,000
1,110
505
9
SY
SY
28,000
$3.50
10
3211.0702 8" Cement Treatment
3213.0106 11" Conc Pvmt
3213.0301 4" Conc Sidewalk
3213.0501 Barrier Free Ramp, Type R-1
3213.0506 Barrier Free Ramp, Type P-1
.011 Preformed Thermoplastic Contrast Markings — 6" DOT
1,110
26,000
$23.00
$81.75
$25,530.00
$2,125,500.00
11
SY
26,000
12
SF
73,000
73,000
$7.65
$558,450.00
13
EA
2
2
$2,600.00
$5,200.00
14
15
EA
LF
LF
12
12
$2,600.00
$31,200.00
$102.00
34
34
$3.00
16
_321
3217.0502 Preformed Thermoplastic Contrast Markings - 24"
Crosswalk
100
100
$17.50
$1,750.00
17
18
3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop
Bars
LF
29
29
$45.00
$45.00
$1,305.00
$810.00
3217.101 Preformed Thermoplastic Contrast Markings — Legend
Single Head Curve Arrows
EA
18
18
19
3217.1011 Preformed Thermoplastic Contrast Markings — Legend
3217.1022 Preformed Thermoplastic Contrast Markings — Legend
Lane
EA
EA
20
20
$61.66
$1,233.13
20
746
746
$61.66
$45,995.86
21
3291.01 Topsoil
CY
2,200
2,200
$0.00
22
3292.04 Seeding, Hydromulch
9999.0030 Unclassified Excavation by Plan
SY
12,600
12,600
$1.00
$12,600.00
23
LS
1
1
$0.00
TOTAL UNIT IV: PAVING IMPROVEMENTS $3,093,756.00
UNIT V: STREET LIGHTING IMPROVEMENTS
1
3441.1405 NO 2 Insulated Elec Condr
3441.1501 Furnish/Install Ground Box Type B
3441.1502 Furnish/Install Ground Box Type B, w/Apron
LF
15,990
15,990
$2.59
$41,414.10
2
EA
14
14
$1,551.74
$21,724.36
3
EA
EA
EA
21
40
21
$1,551.74
$32,586.54
4
3441.3201 LED Lighting Fixture
40
$961.00
$38,440.00
$46,500.00
$24,508.29
5
6
3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8
31
31
$1,500.00
3441.3342 Rdwy Illum TY 18 Pole
EA
31
31
$790.59
7
2605.0111 Furnish/Install Elec Sery Pedestal
EA
1
1
$8,982.61
$8,982.61
8
2605.3014 2" CONDT RM (Riser)
2605.3015 2" CONDT PVC SCH 80 (T)
LF
40
5,385
40
5,385
$36.53
$58.54
$1,461.20
$315,237.90
9
LF
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $530,855.00
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
1
$0.00
TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00
Transportation Impact Fee Credit Agreement- CA -26-012 Page 14 of 16
Hyde Ranch 9/1/2026
Bid Summa
UNIT III: DRAINAGE IMPROVEMENTS $1,424,144.00
UNIT IV: PAVING IMPROVEMENTS $3,093,756.00
UNIT V: STREET LIGHTING IMPROVEMENTS $530,855.00
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00
VALUE OF CFA24-0066, CPN 105523 ELIGIBLE CONSTRUCTION
SUBTOTAL $5,048,755.00
Transportation Impact Fee Credit Agreement- CA -26-012 Page 15 of 16
Hyde Ranch 9/1/2026
EXHIBIT F
Allocation of Credits
Allocation of Credits shall be as listed below and then on a first-come/first-served basis within
the preliminary plat boundary of Hyde Ranch Preliminary Plat, PP -23-028 and shall run with the
land; provided, however, that no development within the boundary shall have the right to utilize
credits under this agreement unless the Owner submits to the City a written request or notice
approving the use of credits for the applicable development.
Lot Number
Credit allocation
Lot 1 Block 1
$1,633,604.62
Lot 1 Block 2
$1,167,971.94
Lot 2 Block 1
$1,056,025.00
Lot 2 Block 2
$1,082,671.54
Lot 3 Block 1
$464,033.12
Lot 3 Block 2
$530,921.03
Transportation Impact Fee Credit Agreement- CA -26-012 Page 16 of 16
Hyde Ranch 9/1/2026
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: SRPF D/Hyde Ranch Holdings LP
Subject of the Agreement: ROW dedication and Roadway Construction
M&C Approved by the Council? * Yes ❑ No II
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: When ACM signs
If different from the approval date.
Expiration Date: 10 years from when ACM signs
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. CA -26-012
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No 0
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.