HomeMy WebLinkAbout065836 - Construction-Related - Contract - ACS DC Hicks Field Road, LLCCSC No. 65836 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT This Economic Development Program Agreement ("Agreement") is entered into by and between the City of Fort Worth, a Texas home -rule municipal corporation ("City") and ACS DC Hicks Field Road, LLC, a Delaware limited liability company (its successors and assigns, "Company"). Company and the City are sometimes referred to herein individually as a "party" and collectively as the "parties". RECITALS A. Company intends to construct or cause to be constructed in one or more phases, which may extend over a period of years, one or more Data Center(s), as well as certain accessory uses or buildings and other related or associated uses, buildings or structures such as utility buildings, substation(s), infrastructure, structures, improvements and appurtenances (collectively, the "Project") at an approximately 106.64 acre site located in northwest Fort Worth near Hicks Field Road and Wagley Robertson Road, more particularly described on Exhibit A attached hereto and incorporated herein for all purposes ("Project Site"). B. For the Phase 1 Project (defined herein), as a condition to receipt of the Phase 1 380 Grants, the Company, at a minimum, commits to (i) expend, or cause to be expended, at least $1,082,800,000 in property capital improvements, equipment, and related expenditures at the Project Site ($240,800,000 in Construction Costs for real property improvements and $842,000,000 in installed or located Taxable Business Personal Property; collectively "Phase 1 Required Improvements") and (ii) create, or cause to be created, 28 New Jobs with an average Salary of such 28 New Jobs of $150,000, all as further set forth and described herein in more detail. Together, the Phase 1 Required Improvements and Phase 1 Project Employment/Salary Commitments (defined herein) are referred to as "Phase 1 Total Commitments." C. In exchange for Company timely fulfilling its Phase 1 Total Commitments, City will provide Company with annual grants, for ten years beginning in the Second Operating Year ("Grant Period") based on a percentage as further detailed herein. D. For the Phase 2 Project (defined herein), as a condition to receipt of the Combined Phases 380 Grants, the Company, at a minimum, commits to (i) expend, or cause to be expended, at least $1,082,800,000 in property capital improvements, equipment, and related expenditures at the Project Site ($240,800,000 in Construction Costs for real property improvements and $842,000,000 in installed or located Taxable Business Personal Property; collectively "Phase 2 Required Improvements") and (ii) create, or cause to be created, 9 New Jobs with an average salary of all New Jobs counted to meet the Phase 1 Project Employment Commitment and the Phase 2 Project Employment Commitment of at least $150,000, all as further set forth and described herein in more detail. Together, the Phase 2 Required Improvements and Phase 2 Project Employment/Salary Commitments are referred to as "Phase 2 Total Commitments." E. In exchange for Company timely fulfilling both the Phase 1 Total Commitments and Phase 2 Total Commitments, City, for the remaining years in the Grant Period, will provide Company annual grants based on seventy percent (70%) of the incremental property taxes on Taxable Business Personal Property as further described herein. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 1 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 F. The Company's commitments described herein will benefit the City by leading to increased employment in a target industry. G. As recommended by the City's 2023 Comprehensive Plan, adopted by the City Council pursuant to Ordinance No. 26050-03-2023 ("Comprehensive Plan"), and in accordance with the City of Fort Worth's Economic Development Program Policy ("Policy"), the City has established an economic development program pursuant to which the City will, on a case -by -case basis, offer economic incentives authorized by Chapter 380 of the Texas Local Government Code that include monetary loans and grants of public money, as well as the provision of personnel and services of the City, to businesses and entities that the City Council determines will promote state or local economic development and stimulate business and commercial activity in the City in return for verifiable commitments from such businesses or entities to cause specific employment and other public benefits to be made or invested in the City ("380 Program"). H. The City Council has determined that the feasibility of the Company's proposed commitments described herein are contingent on Company's receipt of the Grants. I. The City Council has determined that the Company's Project and proposed commitments described herein will benefit and stimulate the local economy, promote state and local economic development and stimulate business and commercial activity in the City and that the 380 Program is an appropriate means to achieve construction of the Project. J. In addition, the City Council has determined that, by entering into this Agreement, the potential economic benefits that will accrue to the City are consistent with the City's economic development objectives, as outlined in the Comprehensive Plan and the Policy. K. This Agreement is authorized by Chapter 380 of the Texas Local Government Code. NOW, THEREFORE, in consideration of the mutual benefits and promises contained herein and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows: AGREEMENT 1. Incorporation of Recitals. The City Council has found, and the City and Company hereby agree, that the recitals set forth above are true and correct and form the basis upon which the parties have entered into this Agreement. 2. Definitions. In addition to other terms defined in the body of this Agreement, the following terms will have the definitions ascribed to them as follows: a. Affiliate means a Person controlling Company, which the Company controls or which is under common control with the Company or its parent company. For purposes of this definition, "control," "controlled," or "controlling" means, in the case of a corporation, limited liability company or limited partnership, direct or indirect ownership of at least 50% of the interest entitled to a vote for a majority of the Board of Directors or equivalent body or otherwise of the interest entitled to direct the business and affairs of such entity or, in the case of all other Persons, direct or indirect ownership of the right to receive at least 50% of the profits thereof. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 2 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 b. Applicable City Rules means all of the rules, regulations, and ordinances duly adopted by the City and in force and effect. c. Benchmark I Percentage has the meaning ascribed to that term in Section 6.b. d. Benchmark II Percentage has the meaning ascribed to that term in Section 6.c. e. Business Day shall mean a day that is not (i) a Saturday, Sunday, (ii) holiday in the State of Texas, or (iii) a day designated as a holiday by the City. All other references to "days" hereunder shall mean calendar days. Combined Phases 380 Grants has the meaning ascribed to that term in Section 6.c. g. Commencement of Construction shall mean when Company or an Affiliate has executed a construction contract, construction equipment has been mobilized on the Project Site, and the construction contractor has commenced or caused the commencement of installation of footings for buildings to begin vertical construction on the Project Site for the Phase 1 Project. h. Construction Costs means the aggregate of Hard Construction Costs and the following costs directly expended for real property improvements: engineering fees; architectural and design fees; costs of third -party consultants, including attorneys and environmental consultants; contractor fees; zoning fees; insurance and taxes directly related to the construction; and financing costs, including capitalized interest and FF&E. Property acquisition costs for the Project Site do not constitute "Construction Costs." i. Data Center means real and personal property consisting of one or more buildings or structures specifically designed or modified to house networked computers and data and transaction processing equipment and related infrastructure support equipment, including, without limitation, power and cooling equipment, used primarily to provide, as a service to persons other than the company operating the data center, data and transaction processing services, outsource information technology services and computer equipment colocation services, or, used primarily to provide, to a single user, including the user's affiliates, customers, lessees, vendors and other persons authorized by the user, data and transaction processing services. j. Director means the director of the City's Economic Development Department or that person's authorized designee. k. Effective Date is the date of execution of this Agreement by the last of the parties hereto. I. First Combined Grant Year means the calendar year following the year in which all of the Phase 2 Total Commitments were achieved. By way of clarification, the year in which the Phase 2 Required Improvements is achieved is the year Company achieves at least $240,800,000 in cumulative Construction Costs expenditures and at least $842,000,000 in aggregate Taxable Business Personal Property has been installed ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 3 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 or located (i.e., not necessarily the year such expenditures are reported as it is possible the report could be submitted the year following the actual expenditures and/or installation). Notwithstanding the foregoing, in no event shall the First Combined Grant Year occur prior to the Second Operating Year, but the First Combined Grant Year could be the same year as the Second Operating Year. By way of example, if Company achieves the Phase 1 Total Commitments and the Phase 2 Total Commitments in the same year, then the First Combined Grant Year would be the Second Operating Year (and Company would receive the Grants at the Benchmark II Percentage for the full Grant Period). m. First Operating Year means the first full calendar year following the year in which all of the Phase 1 Total Commitments were achieved. By way of clarification, the year in which the Phase 1 Required Improvements is achieved is the year Company achieves at least $240,800,000 in cumulative Construction Costs expenditures and at least $842,000,000 in aggregate Taxable Business Personal Property has been installed or located (i.e., not necessarily the year such expenditures are reported as it is possible the report could be submitted the year following the year the actual expenditures and/or installation occur). n. Grants means the ten (10) economic development grants paid by the City to Company in accordance with this Agreement and as part of the 380 Program. o. Grant Period has the meaning ascribed to that term in the Recitals. The first year of the Grant Period is the Second Operating Year. For the avoidance of doubt, the Second Operating Year and the First Combined Grant Year could be the same year. p. Hard Construction Costs means the aggregate of the following costs expended by or on behalf of Company or an Affiliate for real property improvements: actual site development and construction costs, infrastructure improvements and the costs of supplies, materials and labor, but does not include land acquisition costs paid by Company for the Project Site. For clarification, Hard Construction Costs will be based on construction contracts or direct work, but does not include insurance, fee(s) or general conditions. q. Intended Use has the meaning ascribed to that term in Section 4.a. herein. r. Job means a job on the Project Site provided by Company, its Affiliates, a staffing agency, or other owners, operators, lessees and/or sublessees on the Project Site to one individual for at least thirty-five (35) hours per week. A different industry standard or union standard for equivalent full time for a category of jobs may be approved by the Director in his/her discretion upon Company's request. s. New Job means a Job that was not in existence before, and the individual was hired after, the Effective Date. t. Person means any natural person, corporation, general partnership, limited partnership, limited liability company, limited liability partnership, proprietorship, joint venture, joint stock company, trust, unincorporated association, enterprise, or any other form of business or legal association or entity. u. Phase 1 380 Grants has the meaning ascribed to that term in Section 6.b. herein. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 4 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 v. Phase 1 Project means the first building, portion of a building, or group of buildings to be constructed and completed on the Project Site as part of the Project which meets the Phase 1 Project RPI and may be designated by Company as the Phase 1 Project. w. Phase 1 Project Employment/Salary Commitments has the meaning ascribed to that term in the Section 4.e.i. x. Phase 1 Project RPI has the meaning ascribed to that term in Section 4.b.i. herein. y. Phase 1 Required Improvements has the meaning ascribed to that term in the Recitals. z. Phase 1 Total Commitments has the meaning ascribed to that term in the Recitals. aa. Phase 2 Project means a building, portion of a building or group of buildings to be constructed and completed on the Project Site as part of the Project which meets the Phase 2 Project RPI and may be designated by Company as the Phase 2 Project. For the avoidance of doubt, the Phase 2 Project may be (but is not required to be) connected to and/or part of the same building as the Phase 1 Project. bb. Phase 2 Project Employment/Salary Commitments has the meaning ascribed to that term in the Section 4.e.ii. cc. Phase 2 Project RPI has the meaning ascribed to that term in Section 4.b.ii. herein. dd. Phase 2 Required Improvements has the meaning ascribed to that term in the Recitals. ee. Phase 2 Total Commitments has the meaning ascribed to that term in the Recitals. ff. Project has the meaning ascribed to that term in the Recitals. gg. Project Site has the meaning ascribed to that term in the Recitals. hh. Salary means a cash payment or remuneration made to an individual for services rendered as an employee, including any paid time off, commissions, bonuses, or equity paid in accordance with a company's established bonus plan, but does not include the value of any benefits provided to an employee or any reimbursements for actual and necessary expenses incurred by the employee in the course and scope of the employee's job duties. ii. Second Operating Year means the first full calendar year following the First Operating Year. jj. Small Business Firm ("SBF") is a business entity that is located in Tarrant County, Wise County, Johnson County, Parker County or Denton County, Texas and that ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 5 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 holds certification as a small business from the North Central Texas Regional Certification Agency (NCTRCA), Women's Business Council —Southwest (WBCS), Dallas —Fort Worth Business Council (formerly DFW/MSDC), Texas Unified Certification Program (TUCP) — DBE / ACDBE or other organization approved by the City Manager of the City. For the avoidance of doubt, in order to be considered an SBF, the business entity's principal place of business is not required to be the Company's headquarters, and may be located in Tarrant County, Wise County, Johnson County, Parker County or Denton County, Texas. Otherwise stated, the business entity is not required to be located within the City limits to be considered an SBF. kk. Taxable Business Personal Property or TBPP means property that is Project -related (i) that can be owned and is not permanently attached to the land or building which would include, but is not limited to, furniture, fixtures, equipment and machinery, computers, inventory held for sale or rental, raw materials, finished goods, work in process that is used in a business or used to produce income and any other personal property that is subject to ad valorem taxation and is rendered for that purpose to the Tarrant Appraisal District or another appraisal district having jurisdiction over the Project Site; (ii) is located on the Project Site (or within improvements on the Project Site); and (iii) was not located in the City prior to the Effective Date. For the avoidance of doubt, TBPP includes property installed or located at the Project Site by Company, any Affiliate, any tenant or subtenant, and any other owner or operator on the Project Site, whether or not this Agreement has been assigned to such party. Company is solely responsible for satisfying all TBPP-related commitments and requirements in this Agreement and for obtaining, compiling, and timely delivering, or causing to be delivered, all reports, information, and documentation reasonably necessary to verify the existence, location, valuation, and tax account number(s) of all such TBPP within the Project Site in order for TBPP Property Tax Revenues attributable to all such TBPP to be included in calculating the Grants. II. TBPP Property Tax Revenues means the total amount of City ad valorem taxes on TBPP within the overall Project Site (or within improvements located thereon). For clarification purposes, TBPP Property Tax Revenues (which will be used to calculate the amount of the Grants) include City ad valorem taxes on TBPP for any and all TBPP tax accounts within the Project Site including without limitation Company's TBPP, any TBPP installed and/or owned by tenants or sub -tenants within the Project Site and any TBPP installed and/or owned by other owners or operators within the Project Site whether or not this Agreement has been formally assigned to such other parties or not. The intent of this Agreement is for the Grants to be based on City ad valorem taxes for any and all TBPP tax accounts within the Project Site. Company is solely responsible for ensuring the City receives all information reasonably necessary to identify all such TBPP tax accounts so that the TBPP Property Tax Revenues attributable to such accounts will be included in calculating the Grants and for coordinating with any tenants, subtenants, owners, operators, or Affiliates to obtain and provide such information on a timely basis in accordance with any requirements herein. mm. Twelve -Month Period means the period between February 1 of a given year and January 31 of the following year. 3. Term. This Agreement will be effective as of the Effective Date and unless terminated earlier pursuant to and in accordance with this Agreement, will expire on the date as ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 6 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 of which the City has paid all Grants due to Company hereunder, as more specifically set forth herein ("Term"). 4. Company Obligations and Commitments. a. Use of Project Site. From January 1 of the First Operating Year until expiration of the Term of this Agreement, any use by Company operating at the Project Site must include one or more Data Centers (which may include accessory uses or buildings and other related or associated uses, buildings or structures such as utility buildings, substation(s), administrative buildings, customer support buildings, infrastructure, structures, improvements and appurtenances) and/or related operations (the "Intended Use"). Any development by Company of the Project Site will be subject to and in accordance with the permits and plan(s) approved by the City from time to time as required by and in accordance with Applicable City Rules (and as may be amended in accordance with Applicable City Rules), subject to any rights established or preserved by applicable law. As part of construction and operation of the Project, Company agrees to install and maintain a closed loop water cooling system for the Project in accordance with the approved building permit no. PB25-17349 or any other building permit(s) approved by the City from time to time in future submittals by or on behalf of Company. Further, for each platted lot with one or more Data Center buildings on the Project Site, Company agrees to obtain or cause to be obtained a Non -Significant Industrial User (NSIU) permit ("NSIU Permit") prior to the earlier of (i) the release of a water meter; or (ii) occupancy of the first permanent building within such platted lot. Except as required herein, any NSIU Permit for the Project, or portion thereof, will be submitted, processed, approved, and amended (if applicable) in accordance with Applicable City Rules in effect as of the Effective Date and applicable state and federal laws (as may be implemented and/or amended), including without limitation § 12.5-632, Permit Application Process and § 12.5- 641, Wastewater Discharge Permit Contents of the Code of the City of Fort Worth, Texas. City's approval of the NSIU Permit will not be unreasonably withheld, conditioned or delayed. Company agrees that it will not construct a Data Center building on the portion of the Project Site more particularly described and depicted on Exhibit B attached hereto (the "9.75 Acre Tract"). Notwithstanding anything to contrary contained in this Section 4(a), should the City be required to amend Applicable City Rules to comply with state and federal law, Company agrees, subject to any rights established or preserved by applicable law, to be bound by such amended Applicable City Rules. b. Conditions to Receipt of the Benchmark I Percentage or Benchmark II Percentage for the Grants — Real Property Improvements ("RPI"). i. Phase 1 Project RPI. In order for Company to be eligible for any Grants, subject to Force Majeure (defined herein), by December 31, 2031, Company must expend, or cause to be expended, at least Two Hundred Forty Million Eight Hundred Thousand and 00/100 Dollars ($240,800,000.00) in Construction Costs for the Phase 1 Project ("Phase 1 Project RPI"). ii. Phase 2 Project RPI. In order for Company to be eligible for the increased Benchmark II Percentage for the Grants, subject to Force Majeure, by December 31, 2034, Company must expend, or cause to be expended, at least Two Hundred Forty Million Eight Hundred Thousand and 00/100 Dollars ($240,800,000.00) in Construction Costs for the Phase 2 Project ("Phase 2 Project RPI"). By way of clarification, failure to meet the Phase 2 Project RPI shall ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 7 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 not be a default hereunder; however, the percentage for the Grants will remain at the Benchmark I Percentage in such an instance as further detailed in Section 6 herein. c. Required Improvements —Taxable Business Personal Property ("TBPP"). i. Phase 1 Project TBPP. In order for Company to be eligible for any Grants, subject to Force Majeure, by January 1, 2032, Company must install or locate, or cause to be installed or located, at least Eight Hundred Forty -Two Million and 00/100 Dollars ($842,000,000.00) of TBPP on the Project Site for or as part of the Phase 1 Project ("Phase 1 Project TBPP"). ii. Phase 2 Project TBPP. In order for Company to be eligible for the increased Benchmark II Percentage for the Grants, subject to Force Majeure, by January 1, 2035, Company must install, or cause to be located, at least Eight Hundred Forty -Two Million and 00/100 Dollars ($842,000,000.00) of TBPP on the Project Site for or as part of the Phase 2 Project ("Phase 2 Project TBPP"). By way of clarification, failure to meet the Phase 2 Project TBPP shall not be a default hereunder; however, the percentage for the Grants will remain at the Benchmark I Percentage in such an instance as further detailed in Section 6 herein. d. Construction Spending Commitment for SBFs. By the earlier to occur of (i) the date of submittal to the City of the Phase 1 Project Final RPI Report; or (ii) January 31, 2032, Company, its tenant(s) and/or contractors must collectively expend or caused to be expended at least Two Million Dollars ($2,000,000.00) of Construction Costs for the Phase 1 Project and/or the Phase 2 Project with SBFs ("SBF Construction Commitment"). e. Employment/Salary Commitment. i. Employment/Salary Commitment — Phase 1 Protect. On or before December 31, 2031, subject to Force Majeure, a minimum of 28 New Jobs must be based out of the Project Site and maintained throughout the Term of the Agreement ("Phase 1 Project Employment Commitment"). The average annual salary for all 28 New Jobs counted to meet the Phase 1 Project Employment Commitment must be a minimum of $150,000.00 ("Phase 1 Project Salary Commitment" and together with the Phase 1 Project Employment Commitment, the "Phase 1 Project Employment/Salary Commitments"). By way of clarification, the New Jobs counted to meet the Phase 1 Project Employment/Salary Commitments may be based out of any phase(s) within the Project Site. Failure to meet the Phase 1 Project Employment/Salary Commitments is not a default under the Agreement, but, subject to any notice and cure periods, it will result in a reduction of the Grant percentage for that year proportional to the percent by which the Phase 1 Project Employment/Salary Commitments were not met (rounded to the nearest whole percentage number). The Grant percentage will be increased to the maximum Grant percentage for Benchmark I Percentage in future years for which the Phase 1 Project Employment/Salary Commitments are met. By way of example, if on or after December 31, 2031, if the total number of New Jobs based out of the Project Site is 26 New Jobs, it would be below the Phase 1 Project Employment Commitment of 28 New Jobs by approximately seven percent (7%), so the Benchmark I ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 8 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 Percentage would be reduced by seven percent (7%) from 35% to 32.55%. If, in the following year, the total number of New Jobs based out of the Project Site is 28 New Jobs, then the Benchmark I Percentage would be increased back to 35% for that year. ii. Employment Commitment — Phase 2 Project. In order for Company to be eligible for the full Benchmark II Percentage for the Grants, on or before December 31, 2034, subject to Force Majeure, a minimum of nine (9) additional New Jobs (resulting in a total aggregate of thirty-seven (37) new Full -Time Jobs on or before December 31, 2034) must be based out of the Project Site and maintained throughout the Term of the Agreement ("Phase 2 Project Employment Commitment"). By way of clarification, the New Jobs counted to meet the Phase 2 Project Employment/Salary Commitments may be based out of any phase(s) within the Project Site. The average annual salary for all New Jobs counted to meet the Phase 1 Project Employment Commitment and the Phase 2 Project Employment Commitment must be a minimum of $150,000.00 ("Phase 2 Project Salary Commitment" and together with the Phase 2 Project Employment Commitment, the "Phase 2 Project Employment/Salary Commitments"). Failure to meet the Phase 2 Project Employment/Salary Commitments is not a default under the Agreement, but, subject to any notice and cure periods, it will result in a reduction of the Grant percentage for that year proportional to the percent by which the Phase 2 Project Employment/Salary Commitments were not met (rounded to the nearest whole percentage number). The Grant percentage will be increased to the maximum Grant percentage for Benchmark II Percentage in future years for which the Phase 2 Project Employment/Salary Commitments are met. By way of example, if Company otherwise qualifies for the Benchmark II Percentage and on or after December 31, 2034 if the total number of New Jobs based out of the Project Site is 34 New Jobs, it would be below the Phase 2 Project Employment Commitment of 37 New Jobs by approximately eight percent (8%), so the Benchmark II Percentage would be reduced by eight percent (8%) from 70% to 64.4%. If, in the following year, the total number of New Jobs based out of the Project Site is 37 New Jobs, then the Benchmark II Percentage would be increased back to 70% for that year. iii. Determination of each year of compliance with the employment commitments will be based on the employment data provided to the City pursuant to this Agreement for the year under evaluation. f. New Jobs Average Annual Salary. The average annual Salary used to determine whether the Phase 1 Project Salary Commitment or the Phase 2 Project Salary Commitment have been met, as applicable, is measured on a calendar year basis after the respective commitment has been initially met. g. Reports. i. Plan to Utilize SBFs. Company will provide or cause its contractor to provide a report detailing the plan to utilize SBFs for the Project (or portion thereof) to the City by December 31, 2026. ii. Quarterly Reports — Construction Costs. From the Commencement of Construction through the earlier to occur of (1) the completion of the Phase 2 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 9 of 38 (City 260518) 493 8-0236-4246v.29 71034-1 8/26/2026 Required Improvements or (2) December 31, 2034, Company must provide the Director with a calendar -year, quarterly report in a format substantially similar to the Construction Report attached as Exhibit C, that specifically outlines separately for the Phase 1 Project and Phase 2 Project, respectively (1) the then -current aggregate Construction Costs expended for the RPI; and (2) the then -current aggregate Construction Costs expended with SBFs for the same. For clarification purposes, if the Phase 1 Project and Phase 2 Project are part of the same construction contract(s), then Company may allocate costs between the two phases using a reasonable methodology determined by Company. These reports will be due on the dates as follows (provided that, if the due date falls on day that is not a Business Day, then the due date will be the next Business Day): 1. First Quarter (Jan. through Mar.) report — April 7. 2. Second Quarter (Apr. through Jun.) report — July 7. 3. Third Quarter (Jul. through Sep.) report — Oct. 7. 4. Fourth Quarter (Oct. through Dec.) report — Jan. 7. iii. Final ReDort — Construction Costs. 1. Phase 1 Project. No later than January 31, 2032, in order for the City to assess whether the Phase 1 Project RPI has been met, and the extent to which the SBF Construction Commitment was met, Company must provide the Director with a report, in a format substantially similar to the Construction Report attached as Exhibit C, that specifically outlines the total Construction Costs expended or caused to be expended to meet the Phase 1 Project RPI and the total Construction Costs expended with SBFs, together with supporting invoices and other documents necessary to demonstrate that such amounts were actually paid, including, without limitation, final lien waivers signed by the general contractor for the Phase 1 Project RPI (the "Phase 1 Project Final RPI Report"). For clarification purposes, if the Phase 1 Project and Phase 2 Project are part of the same construction contract(s), then Company may allocate costs between the two phases using a reasonable methodology determined by Company. For the avoidance of doubt, in order to satisfy the reporting requirement for the Phase 1 Project Construction Costs as provided herein, Company is only required to submit sufficient documentation in the report to show that at least $240,800,000.00 in Construction Costs has been expended or caused to be expended for the Phase 1 Project (and shall not be required to submit additional documentation for any Construction Costs that exceed $240,800,000.00). 2. Phase 2 Project. If Company completes the Phase 2 Project, in order to receive the increased Benchmark II Percentage for the Grants, no later than January 31, 2035, in order for the City to assess whether the Phase 2 Project RPI has been met, and the extent to which the SBF Construction Commitment was met, Company must provide the Director with a report, in a format substantially similar to the Construction Report attached as Exhibit C, that specifically outlines the total Construction Costs expended or caused to be expended to meet the Phase 2 Project RPI and the total Construction Costs expended with SBFs, together with supporting invoices and other documents necessary to ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 10 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 demonstrate that such amounts were actually paid, including, without limitation, final lien waivers signed by the general contractor for the Phase 2 Project RPI (the "Phase 2 Project Final RPI Report"). For clarification purposes, if the Phase 1 Project and Phase 2 Project are part of the same construction contract(s), then Company may allocate costs between the two phases using a reasonable methodology determined by Company. For the avoidance of doubt, in order to satisfy the reporting requirement for the Phase 2 Project Construction Costs as provided herein, Company is only required to submit sufficient documentation in the report to show that at least $240,800,000.00 in Construction Costs has been expended or caused to be expended for the Phase 2 Project (and shall not be required to submit additional documentation for any Construction Costs that exceed $240,800,000.00). iv. Quarterly Reports - Taxable Business Personal Property. From the Commencement of Construction through the earlier to occur of (1) the completion of the Phase 2 Required Improvements or (2) January 1, 2035, Company must provide the Director with a calendar -year, quarterly report in a form reasonably acceptable to the Director that specifically outlines the then -current aggregate TBPP, including TBPP installed and/or owned by any tenant, subtenant, other owner or operator, or Affiliate within the Project Site, whether or not this Agreement has been assigned to such party, and the value of each item installed, or caused to be located, for both the Phase 1 Project and the Phase 2 Project. An example of a form reasonably acceptable to the Director for TBPP quarterly report is attached hereto as Exhibit D. These reports will be due on the dates as follows (provided that, if the due date falls on a day that is not a Business Day, then the due date will be the next Business Day): 1. First Quarter (Jan. through Mar.) report — April 7. 2. Second Quarter (Apr. through Jun.) report — July 7. 3. Third Quarter (Jul. through Sep.) report — Oct. 7. 4. Fourth Quarter (Oct. through Dec.) report — Jan. 7. Final Reports — Taxable Business Personal Property. 1. Phase 1 Project. No later than January 31, 2033, in order for the City to assess whether the Phase 1 Project TBPP has been met, Company must provide, or cause to be provided, a report in a form reasonably acceptable to the Director that specifically outlines all TBPP installed or located at the Project Site to meet the Phase 1 Project TBPP, including any TBPP installed and/or owned by Company, any tenant, subtenant, other owner or operator, or Affiliate within the Project Site, whether or not this Agreement has been assigned to such party, included to meet the Phase 1 Project TBPP, and the value of each item installed, or caused to be located, at the Project Site for the Phase 1 Project (the "Phase 1 Project Final TBPP Report"). For the avoidance of doubt, in order to satisfy the reporting requirement for the Phase 1 Project Final TBPP Report as provided herein, Company is only required to submit sufficient documentation in the Phase 1 Project Final TBPP Report to show that at least $842,000,000.00 in TBPP has been installed or located at the Project Site for the Phase 1 Project (and shall not be required to submit ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 11 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 additional documentation for any investment in TBPP that exceeds $842,000,000.00). An example of a form reasonably acceptable to the Director for the Phase 1 Project Final TBPP Report is attached hereto as Exhibit D. The Company may, but is not required to, base its Phase 1 Project Final TBPP Report on the rendition provided to the applicable appraisal district for TBPP installed or located at the Project Site. 2. Phase 2 Project. If Company completes the Phase 2 Project, in order to receive the increased Benchmark II Percentage for the Grants, no later than January 31, 2036, in order for the City to assess whether the Phase 2 Project TBPP has been met, Company must provide, or cause to be provided, a report in a form reasonably acceptable to the Director that specifically outlines all TBPP installed or located at the Project Site to meet the Phase 2 Project TBPP, and the value of each item installed, or caused to be located, at the Project Site for the Phase 2 Project (the "Phase 2 Project Final TBPP Report"). For the avoidance of doubt, in order to satisfy the reporting requirement for the Phase 2 Project Final TBPP Report as provided herein, Company is only required to submit sufficient documentation in the Phase 2 Project Final TBPP Report to show that at least $842,000,000.00 in TBPP (which may include TBPP installed and/or owned by Company, any tenant, subtenant, other owner or operator, or Affiliate within the Project Site, whether or not this Agreement has been assigned to such party) has been installed or located at the Project Site for the Phase 2 Project (and shall not be required to submit additional documentation for any investment in TBPP that exceeds $842,000,000.00). An example of a form reasonably acceptable to the Director for the Phase 2 Project Final TBPP Report is attached hereto as Exhibit D. The Company may, but is not required to, base its Phase 2 Project Final TBPP Report on the rendition provided to the applicable appraisal district for TBPP installed or located at the Project Site. vi. Annual Employment and Salary Report. 1. Phase 1: On or before March 31, 2032 and by March 31 of each year thereafter of the Term, in order for the City to assess the degree to which the Phase 1 Project Employment/Salary Commitments for the previous calendar year was met, including verification of the degree to which the Phase 1 Project Salary Commitment was met, Company must provide, or cause to be provided, the Director with a report, in a form reasonably acceptable to the Director, that sets forth the individuals counted to meet the Phase 1 Project Employment Commitment, and their individual salaries, to determine compliance with the Phase 1 Project Salary Commitment, all as of December 31 (or such other date requested by Company and reasonably acceptable to the Director) of the previous calendar year, together with reasonable supporting documentation. Reports shall be redacted to remove confidential employee information. An example of a form reasonably acceptable to the Director for this report, including reasonable supporting documentation is attached hereto as Exhibit E. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 12 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 2. Phase 2: If Company completes the Phase 2 Project, in order to receive the increased Benchmark II Percentage for the Grants, on or before March 31, 2035 and by March 31 of each year thereafter of the Term, in order for the City to assess the degree to which the Phase 2 Project Employment/Salary Commitments for the previous calendar year was met, including verification of the degree to which the Phase 2 Project Salary Commitment was met, Company must provide, or cause to be provided, the Director with a report, in a form reasonably acceptable to the Director, that sets forth the individuals counted to meet the Phase 2 Project Employment Commitment, and their individual salaries, to determine compliance with the Phase 2 Project Salary Commitment, all as of December 31 (or such other date requested by Company and reasonably acceptable to the Director) of the previous calendar year, together with reasonable supporting documentation. Reports shall be redacted to remove confidential employee information. An example of a form reasonably acceptable to the Director for this report, including reasonable supporting documentation is attached hereto as Exhibit E. vii. Additional Information. Company agrees to provide the City with any reasonable additional information that the Director may reasonably require solely to ascertain Company's compliance with this Agreement and to assist the City in properly calculating Grants payable in accordance with this Agreement. h. Inspections of Project Site. At any time during Company's and any tenants' (within the Project) normal business hours throughout the Term and following at least seven (7) days' prior written notice to Company, the City will have the right to inspect and evaluate the Project Site, and any Project improvements thereon, and Company will provide reasonable access to the same, solely in order for the City to monitor compliance with the terms and conditions of this Agreement. Company will reasonably cooperate with the City during any such inspection and evaluation. Notwithstanding the foregoing, Company will have the right to require that any representative of the City be escorted by a representative or security personnel of Company during any such inspection and evaluation, and Company shall be able to exercise its sole, reasonable discretion in scheduling a requested inspection so as not to interfere with ongoing business or construction operations on the Project Site. i. Audits. Provided at least ten (10) calendar days' notice is given and to the extent necessary to verify compliance with the terms of this Agreement, but no more than once per calendar year, the City will have the right throughout the Term to audit the financial and business records of Company that relate solely to the Phase 1 Total Commitments and Phase 2 Total Commitments and are necessary to evaluate Company's compliance with this Agreement or with the commitments set forth in this Agreement (collectively "Records"). If documentation of any Construction Costs or costs of TBPP is contained in financial and business records of Company that also contain unrelated matters, Company may redact any unrelated matters. Company must make all Records available to the City at either of the Project Site or at another location in the City with reasonable advance notice that is acceptable to both parties. Company will otherwise cooperate fully with the City during any audit assuming that reasonable advance notice acceptable to both parties has been provided. If any TBPP owned and /or installed by tenants, subtenants, other owners or operators or Affiliates were included in the Phase 1 Project Final TBPP Report or the Phase 2 Project Final TBPP Report, as applicable, to ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 13 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 the extent of any such parties included, Company will use commercially reasonable efforts to cause the applicable tenants, subtenants, other owners or operators, and Affiliates within the Project Site (with TBPP included in such reports) to reasonably cooperate in providing Records necessary to verify such TBPP. included in such final reports. If such a third party with TBPP included in either such final reports declines to provide Records directly, Company shall use commercially reasonable efforts to provide alternative documentation reasonably sufficient to verify TBPP location, timing, and value, such as the rendition(s) provided to the applicable appraisal district for such TBPP. Company may require that all individuals reviewing the financial and business records of Company, an Affiliate or another party must first sign a reasonable confidentiality agreement under which they agree to not discuss or publicize information contained in those records except for discussion that is necessary for them to complete an audit of such records in accordance with this Agreement. 5. Certificates of Completion. The City shall issue separate certificates of completion for completion of the Phase 1 Project and the Phase 2 Project. a. Phase 1 Project. Within thirty (30) days following the City's receipt of both the Phase 1 Project Final RPI Report and the Phase 1 Project Final TBPP Report, the Director will issue Company a certificate confirming that the Phase 1 Project RPI, the SBF Construction Commitment and the Phase 1 Project TBPP have been met (or the extent to which such commitments have been met) (the "Phase 1 Certificate of Completion"). The Phase 1 Certificate of Completion will state the total Construction Costs expended to meet the Phase 1 Project RPI by the applicable deadline, as well as the amount of Construction Costs expended specifically with SBFs; and the total costs of TBPP that was installed or otherwise located on the Project Site by the applicable deadline to meet the Phase 1 Project TBPP. If the City does not respond within the thirty (30) day period, then the Phase 1 Project Final RPI Report and the Phase 1 Project Final TBPP Report (and information contained therein) shall be deemed approved and confirmed as accepted by the City and the SBF Construction Commitment shall be deemed to have been met. b. Phase 2 Project. Within thirty (30) days following the City's receipt of both the Phase 2 Project Final RPI Report and the Phase 2 Project Final TBPP Report, the Director will issue Company a certificate confirming that the Phase 2 Project RPI, the SBF Construction Commitment (if not met in the Phase 1 Project), and the Phase 2 Project TBPP have been met (or the extent to which such commitments have been met) (the "Phase 2 Certificate of Completion"). The Phase 2 Certificate of Completion will state the total Construction Costs expended to meet the Phase 2 Project RPI by the applicable deadline, as well as the amount of Construction Costs expended specifically with SBFs, and the total costs of TBPP that was installed or otherwise located on the Project Site by the applicable deadline to meet the Phase 2 Project TBPP. If the City does not respond within the thirty (30) day period, then the Phase 2 Project Final RPI Report and the Phase 2 Project Final TBPP Report (and information contained therein) shall be deemed approved and confirmed as accepted by the City as submitted and the SBF Construction Commitment shall be deemed to have been met. c. The issuance of the Phase 1 Certificate of Completion or the Phase 2 Certificate of Completion, as applicable, by the City will not unreasonably be conditioned, withheld or delayed. 6. Grants. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 14 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 a. Number of Available Annual Grants. The number of annual Grants available to Company under this Agreement is ten (10), regardless of whether one or both phases have been completed. This is also referred to as the Grant Period. Otherwise stated, if Company timely meets the Phase 1 Total Commitments, but does not timely meet the Phase 2 Total Commitments, then Company will still receive Grants for the full ten-year Grant Period; however, the percentage in the aforementioned example would be limited to the Benchmark I Percentage, as further set forth below. b. Phase 1 380 Grant. Following the Company's timely completion of the Phase 1 Total Commitments in accordance with Section 4, the City, beginning in the Second Operating Year and continuing annually thereafter for the Grant Period, will provide a Grant based on thirty-five percent (35%) ("Benchmark I Percentage") of the aggregate TBPP Property Tax Revenues collected by the City in the Twelve -Month Period ending in the same year in which the Grant is paid ("Phase 1 380 Grants"). The City will annually continue to fund this Phase 1 380 Grant at the Benchmark I Percentage provided Company maintains its Phase 1 Project Employment/Salary Commitments. As described in Section 4.e.i., the Benchmark I Percentage may be reduced if the Company does not maintain the Phase 1 Project Employment/Salary Commitments throughout the Grant Period. The Phase 1 380 Grants will be paid by the City on or before June 1 of the Second Operating Year and on or before June 1 of each subsequent year for the Grant Period, unless and until the Grants are increased to the Benchmark II Percentage described in subsection 6.c. below. As noted in the definition of TBPP Property Tax Revenues, the intent of this Agreement is for the Grants to be based on City ad valorem taxes for all TBPP tax accounts within the Project Site. Company shall be solely responsible for identifying, tracking, and notifying the City, or causing the City to be notified, of all TBPP tax accounts (including without limitation TBPP tax accounts for Company, any tenants or subtenants within the Project Site and any other owners or operators within the Project Site) to ensure that taxes paid to the City for all such accounts are included as TBPP Property Tax Revenues for calculating the Grants. Company will satisfy the aforementioned responsibility by providing, or causing to be provided, the City a written list of TBPP tax accounts within the Project Site (i.e., a list of business personal property appraisal district account numbers within the Project Site) and the corresponding names of the holders of such accounts on or prior to May 1 of the Second Operating Year and on or before May 1 of each subsequent year for the Grant Period. The City agrees to include all TBPP tax accounts provided in the notice by Company that are within the Project Site in calculating the Grants. Company's failure to identify and provide notice to the City of any TBPP tax accounts within the Project Site shall not be a default hereunder; however, such failure may result in the TBPP Property Tax Revenues for any such TBPP tax accounts that were not identified and provided in the notice to the City prior to payment of a Grant not being included in the Grant calculation for that Grant Year. i. Deduction for Failing to Meet SBF Construction Commitment. Unless a waiver is granted in accordance with Section 7.e., if Company fails to timely meet the SBF Construction Commitment, then it shall not be a default hereunder, but the total amount of each annual Phase 1 380 Grant during the Grant Period calculated in accordance with Section 6.b. will be reduced by ten percent (10%) of that total. By way of example, if the total amount of the grant calculated for year 1 was $100,000 and the SBF Construction Commitment was not met then the total amount of the grant would be reduced by $10,000 and would be $90,000. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 15 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 c. Combined Phases 380 Grant. Following the Company's timely completion of the Phase 2 Total Commitments in accordance with Section 4, the City, beginning with the First Combined Grant Year; and continuing annually thereafter for the remainder of the Grant Period, will provide, in the place of the Phase 1 380 Grants, an annual combined phases Chapter 380 Grant based on seventy percent (70%) ("Benchmark II Percentage") of the aggregate TBPP Property Tax Revenue collected by the City in the Twelve -Month Period ending in the same year in which the Grant is paid ("Combined Phases 380 Grants"). For clarification, the Grant percentage will increase to the Benchmark II Percentage for all phases and TBPP within the Project Site, including any previously installed or constructed prior to the increase. Provided the Company annually maintains both its Phase 1 Project Employment/Salary Commitments and the Phase 2 Project Employment/Salary Commitments, the City will continue to fully fund the Combined Phases 380 Grants for the remainder of the Grant Period. As described in Section 4.e.ii., the Benchmark II Percentage may be reduced if the Company does not maintain the Phase 2 Project Employment/Salary Commitments throughout the Grant Period. The Combined Phases 380 Grants will be paid by the City on or before June 1 of the First Combined Grant Year and on or before June 1 of each subsequent year for the Grant Period. As noted in the definition of TBPP Property Tax Revenues, the intent of this Agreement is for the Grants to be based on City ad valorem taxes for all TBPP tax accounts within the Project Site. Company shall be solely responsible for identifying, tracking, and notifying the City of all TBPP tax accounts (including without limitation TBPP tax accounts for Company, any tenants or subtenants within the Project Site and any other owners or operators within the Project Site) to ensure that taxes paid to the City for all such accounts are included as TBPP Property Tax Revenues for calculating the Grants. Company will satisfy the aforementioned responsibility by providing the City a written list of TBPP tax accounts within the Project Site (i.e., a list of business personal property appraisal district account numbers within the Project Site) and the corresponding names of the holders of such accounts on or prior to May 1 of the First Combined Grant Year and on or before May 1 of each subsequent year for the Grant Period. The City agrees to include all TBPP tax accounts provided in the notice by Company that are within the Project Site in calculating the Grants. Company's failure to identify and provide notice to the City of any TBPP tax accounts within the Project Site shall not be a default hereunder; however, such failure may result in the TBPP Property Tax Revenues for any such TBPP tax accounts that were not identified and provided in the notice to the City prior to payment of a Grant not being included in the Grant calculation for that Grant Year. i. Deduction for Failing to Meet SBF Construction Commitment. Unless a waiver is granted in accordance with Section 7.e., if Company fails to meet the SBF Construction Commitment, then it shall not be a default hereunder, but the total amount of each annual Combined Phases 380 Grants during the Grant Term calculated in accordance with Section 6.c. will be reduced by ten percent (10%) of that total. By way of example, if the total amount of the grant calculated for year 1 was $100,000 and the SBF Construction Commitment was not met then the total amount of the grant would be reduced by $10,000 and would be $90,000. Notwithstanding the foregoing or any statement to the contrary herein, if the Company was unable to timely meet the SBF Construction Commitment in accordance with the timeframe specified in Section 4.d., but is able to demonstrate in the Phase 2 Project Final RPI Report that it has met (or caused to be met) the SBF Construction Commitment, as confirmed by the Phase 2 Certificate of Completion, then Company shall be entitled to the full Benchmark II Percentage ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 16 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 and will not be subject to a reduction in such percentage for any of the Combined Phases 380 Grants. The Grant percentages set forth above are shown in the chart below for ease of explanation: Expenditure of Construction Costs for Real Property Improvements Investment in TBPP Percentage 380 grant rebate for real property taxes Percentage 380 grant rebate for TBPP (a) Benchmark I $240,800,000 $842,000,000 0% 35% Percentage (b) Benchmark It An additional An additional 0% 70% Percentage investment of investment of $240,800,000 (for a $842,000,000 (for a total of $481,600,000 total of in the aggregate) $1,684,000,000 in the aggregate) As noted above, Company may meet the Phase 1 Required Improvements in line (a) in the chart above and will be eligible to start receiving Grants based on the percentage set forth in line (a) above; and, upon showing documentation of an additional investment that causes the total aggregate investment to increase to the Phase 2 Required Improvement numbers in line (b) in the chart above, the Grants percentage will increase (for all phases and TBPP within the Project Site, including any previously constructed or installed prior to the increase). d. Source of Grant Funds. i. It is understood and agreed that all Grants paid pursuant to this Agreement will come from currently available general revenues of the City and not directly from ad valorem taxes on the Project Site or improvements thereon that are received by the City. ii. Company understands and agrees that any revenues of the City other than those dedicated for payment of a given annual Grant pursuant to and in accordance with this Agreement may be used by the City for any lawful purpose that the City deems necessary in the carrying out of its business as a home -rule municipality and will not serve as the basis for calculating the amount of any future Grant or other obligation to Company. iii. Appropriation of Funds. The City Council of the City is authorized under applicable law to annually budget and appropriate funds to make Grant payments. The City presently intends to appropriate funds to make Grant payments pursuant to this Agreement; provided, however, that this is an expression of current intent and shall not be construed as creating a general obligation of the City to appropriate such funds for any fiscal year. The decision to appropriate such funds for a fiscal year shall be made solely by the City Council in accordance with applicable law, rules, policies, and procedures. For the avoidance of doubt, this Agreement will continue until the date the City has paid all Grants due to Company hereunder; and this provision shall not be interpreted to nullify the ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 17 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 City's obligation to pay Grants due and owing hereunder. Further, in the event that the City does not appropriate funds for a Grant payable pursuant to the terms of this Agreement, Company shall have the right to pursue all available rights and remedies under the law or in equity. 7. Default, Termination, and Failure by Company to Meet Company Obligations and Commitments Save and Except SBF Construction Commitment, Employment/Salary Commitments and the Required Improvements for the Phase 2 Protect. a. Failure of Company to Meet Phase 1 Project Required Improvements. Notwithstanding anything to the contrary herein, the City will have the right, as its sole remedy, to terminate this Agreement after provision of written notice to Company and an opportunity to cure as provided herein, without further obligation to Company hereunder, if Company fails to timely meet the Phase 1 Project RPI and/ or Phase 1 Project TBPP set forth in Section 4. Upon written notice, Company will have ninety (90) days to cure, or otherwise remedy the default, as applicable, or the City will have the right to terminate this Agreement. For the avoidance of doubt, failure of Company to timely meet the Phase 2 Project RPI or the Phase 2 Project TBPP shall not be a default hereunder; however, the percentage for the Grants will remain at the Benchmark I Percentage as discussed in Section 6 herein. b. Failure to Use Project Site for Its Intended Use. If Company timely completes or causes the timely completion of the Phase 1 Total Commitments, but subsequently the Company uses all of the Project Site for a use other than the Intended Use, then Company will be in default under this Agreement and the City will have the right to terminate this Agreement following provision of notice in accordance with Section 11 and opportunity to cure in accordance with Section 7.d. of this Agreement. For the avoidance of doubt, Company shall only be considered in default if the entirety of the Property is used for a use other than the Intended Use and shall not be in default if only part of the Property is used for a use other than the Intended Use. c. Failure to Submit Reports. If Company fails to submit any report required by and in accordance with this Agreement, the City's obligation to pay any Grants at the time, if any, will be suspended until Company has provided all required reports; provided, however, that if any report required hereunder is delinquent by more than one (1) year, following provision of notice in accordance with Section 11 and opportunity to cure in accordance with Section 7.d., then the City may reduce the Grant Period by a year. The suspension of Grant payments and reduction of the Grant Period shall be the sole remedies in the event of the Company's failure to submit any report required hereunder. d. General Breach. Unless stated elsewhere in this Agreement, a party will be in default under this Agreement if such party breaches any material term or condition of this Agreement and such breach is not cured within the notice and cure period described in this section. In the event that such breach remains uncured after sixty (60) calendar days following receipt of written notice from the non -defaulting party referencing this Agreement and identifying the default and curative action required to cure the same (or, if the party in breach has diligently and continuously attempted to cure following receipt of such written notice but reasonably requires more than sixty (60) calendar days to cure, then such additional amount of time as is reasonably necessary to effect cure, as determined by both parties mutually and in good faith), the non -defaulting party will have the right to terminate this Agreement immediately by providing written notice to the other ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 18 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 party. Notwithstanding the foregoing, the aforementioned cure period shall not be applicable to the City's obligation to pay a Grant due and owing hereunder. In the event of City's default that is not cured within any applicable cure period, Company may terminate this Agreement or seek any other remedy allowable at law or in equity. e. Waiver of Abatement Percentage Reduction for Failure to Meet SBF Construction Commitment. If the Company does not meet the SBF Construction Commitment or cause such commitment to be met, such event will not constitute an event of default hereunder or provide the City with the right to terminate this Agreement, but, rather, will only cause the Benchmark I Percentage or Benchmark II Percentage, as applicable, used to calculate the Grants available pursuant to this Agreement to be reduced in accordance with Section 6.b.i or Section 6.c.i herein, respectively, as applicable. Notwithstanding the foregoing or anything to the contrary in this Agreement, the Director may, in his/her sole discretion, waive the aforementioned reduction that would otherwise result from the Company's noncompliance with the SBF Construction Commitment, if the Company demonstrates to the Director's satisfaction, through documentation sufficient to the Director, that despite the Company's Best Efforts (defined below) it was unable to comply with the SBF Construction Commitment. i. Best Efforts Standard. For purposes of this Section 7.e., "Best Efforts" means diligent, proactive, and sustained efforts by the Company or its contractor, consistent with a prudent developer or contractor in similar circumstances and of similar size and resources, to achieve the SBF Construction Commitment. In addition to the delivery of a plan to utilize SBFs as provided for under Section 4.g.i., a demonstration of Best Efforts by Company or its contractor shall include documentation demonstrating: (a) early planning and outreach through the timely identification of SBF participation opportunities; (b) reasonable outreach to SBFs; (c) advertising of subcontract opportunities through customary industry channels and/or any City -designated platforms; (d) direct solicitation of qualified SBFs; and (e) ongoing efforts throughout the applicable construction phase(s) to identify additional or replacement SBF opportunities if initial efforts do not achieve the SBF Construction Commitment. ii. Waiver Request Procedure. To request a waiver under this section, the Company shall comply with the following: 1. Company must submit a written waiver request to the City at least thirty (30) days prior to the submission of the Phase 1 Project Final RPI Report. 2. Company must deliver the waiver request, together with all supporting documentation to the Director at the address and in the manner specified in the Notice provision of this Agreement. 3. Any waiver request must include: (a) a summary narrative of efforts undertaken; (b) identification of the shortfall relative to the SBF Construction Commitment; (c) an explanation of the specific impediments encountered; and (d) a statement of any partial SBF participation achieved. iii. City Review and Determination. The Director will provide a written determination within forty-five (45) days after receiving a compliant waiver request. In determining whether to grant a waiver, the Director will consider whether the Company's actions meet the Best Efforts standard and any constraints or market ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 19 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 conditions. Subject to Director's review and determination as described above, the Director may: (a) grant the waiver in whole or in part, including a proportional reduction of the applicable ten percent (10%) penalty; or (b) deny the waiver. The Director's determination shall be final under this Agreement, subject to any dispute resolution procedures expressly provided herein or to any amendment to this Agreement approved by both parties. The Director may condition any waiver on reasonable remedial measures, including implementation of an SBF participation improvement plan for future phases of the Project, if any, provided such conditions are consistent with applicable law, policies, regulations, and this Agreement. iv. Reservation of Rights. Nothing in this section obligates the Director to grant a waiver. Knowing Employment of Undocumented Workers. i. Company acknowledges that the City is required to comply with Chapter 2264, Texas Government Code, which relates to restrictions on the use of certain public subsidies. Company hereby certifies that Company, and any branches, divisions, or departments of Company, does not and will not knowingly employ an undocumented worker, as that term is defined by Section 2264.001(4) of the Texas Government Code. In the event that Company, or any branch, division, or department of Company, is convicted of a violation under 8 U.S.C. Section 1324a(f) (relating to federal criminal penalties and injunctions for a pattern or practice of employing unauthorized aliens): if such conviction occurs during the Term of this Agreement, this Agreement will terminate contemporaneously upon such conviction (subject to any appellate rights that may lawfully be available to and exercised by Company), and Company must repay, within one hundred twenty (120) calendar days following receipt of written demand from the City, the aggregate amount of the Grants received by Company hereunder, if any, plus Simple Interest at a rate of four percent (4%) per annum; or 2. if such conviction occurs after expiration or termination of this Agreement based on conduct that occurred during the Term of this Agreement, subject to any appellate rights that may lawfully be available to and exercised by Company, Company must repay, within one hundred twenty (120) calendar days following receipt of written demand from the City, the aggregate amount of the Grants received by Company hereunder, if any, plus Simple Interest at a rate of four percent (4%) per annum. ii. For the purposes of this section, "Simple Interest" is defined as a rate of interest applied only to an original value, in this case the aggregate amount of Grants paid hereunder. This rate of interest can be applied each year but will only apply to the aggregate amount of Grants paid hereunder and is not applied to interest calculated. For example, if the aggregate amount of the Grants paid ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 20 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 hereunder is $10,000 and such amount is required to be paid back with four percent (4%) interest five years later, the total amount would be $10,000 + [5 x ($10,000 x 0.04)], which is $12,000. This section does not apply to convictions of any subsidiary or affiliate entity of Company, by any franchisees of Company, or by a person or entity with whom Company contracts. Notwithstanding anything to the contrary herein, this section will survive the expiration or termination of this Agreement. 8. Performance by Affiliates. Performance by Affiliates. The City will accept performance of any obligations of Company set forth in this Agreement by an Affiliate, as well, with the understanding that Company (unless it formally assigns this Agreement to an Affiliate) (i) is not released whatsoever from any of its obligations, responsibilities, or liability under this Agreement, (ii) shall remain responsible for any Affiliates in the performance of any of the commitments or obligations set forth in this Agreement, and (iii) will be responsible for preparing and providing all reports required hereunder, including the assembly of and access by the City to any data or information of an Affiliate that is reflected in any such report. 9. Independent Contractor. It is expressly understood and agreed that Company will operate as an independent contractor in each and every respect hereunder and not as an agent, representative or employee of the City. Company will have the exclusive right to control all details and day-to-day operations relative to the Project and the Project Site and any improvements thereon and will be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractors, subcontractors, licensees and invitees. Company acknowledges that the doctrine of respondeat superior will not apply as between the City and Company, its officers, agents, servants, employees, contractors, subcontractors, licensees, and invitees. Company further agrees that nothing in this Agreement will be construed as the creation of a partnership or joint enterprise between the City and Company. 10. INDEMNIFICATION. COMPANY, AT NO COST TO THE CITY, AGREES TO DEFEND, INDEMNIFY, AND HOLD THE CITY, ITS OFFICERS, AGENTS, SERVANTS, REPRESENTATIVES, AND EMPLOYEES, HARMLESS AGAINST ANY AND ALL CLAIMS, LAWSUITS, ACTIONS, COSTS AND EXPENSES OF ANY KIND, INCLUDING, BUT NOT LIMITED TO, THOSE FOR PROPERTY DAMAGE OR LOSS (INCLUDING ALLEGED DAMAGE OR LOSS TO COMPANY'S BUSINESS AND ANY RESULTING LOST PROFITS) AND PERSONAL INJURY, INCLUDING, BUT NOT LIMITED TO, DEATH, THAT MAY RELATE TO, ARISE OUT OF OR BE OCCASIONED BY (i) COMPANY'S BREACH OF ANY OF THE TERMS OR PROVISIONS OF THIS AGREEMENT OR (ii) ANY NEGLIGENT ACT OR OMISSION OR INTENTIONAL MISCONDUCT OF COMPANY, ITS OFFICERS, AGENTS, ASSOCIATES, EMPLOYEES, CONTRACTORS (OTHER THAN THE CITY OR ANY CITY PARTIES) OR SUBCONTRACTORS, RELATED TO THE PROJECT SITE, OR ANY IMPROVEMENTS THEREON, INCLUDING THE REQUIRED IMPROVEMENTS, OR ANY OTHER NEGLIGENT ACT OR OMISSION OF THE COMPANY THAT IS RELATED TO THE PERFORMANCE OF THIS AGREEMENT. THE COMPANY HAS NO INDEMNIFICATION OBLIGATION BEYOND THAT WHICH IS SET FORTH IN CATEGORIES (i) AND (ii) ABOVE. BY WAY OF EXAMPLE, THE COMPANY HAS NO DUTY TO INDEMNIFY THE CITY, ITS OFFICERS, AGENTS, SERVANTS, REPRESENTATIVES OR EMPLOYEES FOR ANY NEGLIGENT ACT OR OMISSION OR INTENTIONAL MISCONDUCT OF THE CITY, ITS OFFICERS, AGENTS, SERVANTS, REPRESENTATIVES, OR EMPLOYEES ("CITY PARTIES"). ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 21 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 11. Notices. All notices called for or required by this Agreement must be in writing and shall be delivered (i) by electronic mail with a confirming copy being forwarded by a reliable overnight courier service within 24 hours thereafter to the recipient at the mailing address set forth below; (ii) personally, with acknowledgment of receipt being obtained by the delivering party, (iii) by U.S. Certified Mail, return receipt requested; or (iv) by overnight delivery service by a reliable company, such as Federal Express or United Parcel Service, with acknowledgement of receipt being obtained by the delivering party; provided that, any notice delivered to Company in the manner described in items (ii), (iii), or (iv) shall also be sent by electronic mail addressed as provided herein. Notice given in the manner described in (ii), (iii) or (iv) shall be deemed given when received. Notice given in the manner described in (i) shall be deemed given on the day delivered if delivered by 5:00 pm Central Time on a Business Day, otherwise notice shall be deemed given on the next Business Day. Until further notification by written notice in the manner required by this Section 11, notices to the parties shall be addressed to the following: City: City of Fort Worth Attn: City Manager 100 Fort Worth Trail Fort Worth, Texas 76102 E-mail: jessica.rogers@fortworthtexas.gov with copies to: Company: ACS DC Hicks Field Road, LLC c/o ACS Infrastructure Development, Inc. One Alhambra Plaza, Suite 1200 Coral Gables, FL 33134 USNotices@acsinfra.com Attention: General Counsel with copies to: the City Attorney AND the City's Winstead PC Economic Development Director Attn: Laura Hoffmann at the same address 2728 N. Harwood St., Suite 500 E-mail: michael.doss@fortworthtexas.gov; Dallas, Texas 75201 Jessica.rogers@fortworthtexas.gov Ioffmann@winstead.com 12. Assignment and Successor. Company may, at any time, assign, transfer or otherwise convey any of its rights or obligations under this Agreement, in whole or in part, to one or more Affiliates without the approval of the City, provided Company and such Affiliate(s) first execute an assignment and assumption agreement under which such assignee agrees to assume and be bound by the covenants and obligations of Company under the Agreement, to the extent of any rights and obligations so assigned ("Affiliate Assignment Agreement"). Any Affiliate Assignment Agreement is subject to the approval by the City Manager or his/her designee, which approval shall not be unreasonably withheld, conditioned or delayed and shall be limited to confirming Affiliate status and the assumption of obligations under this Agreement to the extent assigned. Otherwise, Company may assign, transfer or otherwise convey any of its rights or obligations under the Agreement, in whole or in part, to any other person, entity or entities only with the prior consent of the City Council, which consent will not be unreasonably withheld, conditioned or delayed, provided, however, that such consent shall be conditioned on (i) the prior approval of the assignee or successor and a finding by the City Council that the proposed assignee or successor is financially capable of meeting the terms and conditions of this Agreement to the extent of any rights or obligations so assigned and (ii) prior execution by the proposed assignee or successor of a written agreement with the City under which the proposed assignee or successor agrees to assume and be bound by all covenants and obligations of Company under this Agreement to the extent of any rights or obligations so assigned. Except for assignment to one or more Affiliates as provided above, any attempted assignment without the ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 22 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 City Council's prior consent will constitute grounds for termination of this Agreement on or after thirty (30) calendar days of receipt of written notice from City to Company. Any lawful assignee or successor in interest of Company of all rights under this Agreement will be deemed "Company" for all purposes under this Agreement. 13. Force Majeure Defined. Neither party shall be responsible for delay of the final completion date or nonperformance of its contractual obligations due to Force Majeure. Force Majeure shall be any event beyond the reasonable control of a party or its suppliers, contractors and/or subcontractors and shall include without limitation: (1) acts of God; (2) acts of a public enemy; (3) war, acts of terror and warlike events; (4) catastrophic weather conditions such as hurricanes, tornadoes and typhoons; (5) fire, earthquakes, floods, epidemics, pandemics, any governmental orders, actions, shut -downs, mandates, restrictions or quarantines, or any quasi - governmental orders, actions, shut -downs, mandates, restrictions or quarantines resulting from any epidemics or pandemics, and any public health emergencies, whether declared by local, state or federal governmental authorities or agencies; (6) strikes, lockouts, work stoppage or slowdown or other labor disputes or material shortages; (7) sabotage, riot and embargoes, (8) utility delays or interruptions; (9) any emergency event that threatens imminent harm to property or injury to persons; (10) any force majeure event or excusable delay under the general contractor's construction contract; (11) discovery or remediation of an environmental issue on the Project Site; (12) inability or delay in obtaining any easements needed for construction or bringing power or a substation to the Project Site; and (13) other unforeseen and extraordinary events, which in every case are beyond the reasonable control and without the fault of the party affected or its suppliers or subcontractors ("Force Majeure"). For an event to qualify for Force Majeure relief hereunder: (1) the event must be beyond the control and without fault or negligence of a party or its subcontractors hereunder; (2) the resulting delay cannot be circumvented by reasonable efforts to mitigate such delays; and (3) the party whose performance is delayed due to a Force Majeure event shall provide the other party with written notice thereof as soon as possible but in no event later than thirty (30) days after such party's performance is impacted by such an event. Failure to provide written notice is a waiver of the Force Majeure event. Notwithstanding anything to the foregoing: (i) inability to pay any invoice when due hereunder shall not qualify for Force Majeure relief hereunder (except where such circumstance is itself caused by a Force Majeure event); (ii) payment of any Grant due and owing hereunder shall not be subject to Force Majeure; and (iii) any failure by a subcontractor to meet its obligations shall not constitute a Force Majeure event (except where such circumstance is itself caused by a Force Majeure event), and shall not relieve Company from meeting any of its obligations under this Agreement. The party affected by a Force Majeure event shall use reasonable efforts to minimize the effect of any Force Majeure event. In the event Company claims a Force Majeure event, Company's written notice called for above shall include a detailed description of the portion of the work known to be affected by such delay, as well as a proposed work -around plan reasonably satisfactory to City. The work -around plan shall: (1) set forth Company's reasonable efforts to mitigate the effect of any such Force Majeure event and include a schedule for such mitigation and (2) contain sufficient detail for City to be able to evaluate such plan. In the event of a Force Majeure event, the final completion date shall be extended for such period as is supported by the evidence provided. Any adjustment of time appropriate under this provision shall be formalized promptly by the execution of a mutually acceptable amendment to this Agreement, which may be executed by the City Manager or his/her designee. City acknowledges that following the end of an excusable delay event, Company shall resume full performance as soon as commercially practicable after the end of an excusable delay event, and the final completion date shall be deemed modified to reflect such recommencement of performance. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 23 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 14. Estoppel Certificate. Upon written request by Company to the City, as reasonably necessary to Company, the City will provide Company with a certificate stating, as of the date of the certificate, (i) whether this Agreement is in full force and effect and, if Company is in breach of this Agreement, the nature of the breach; (ii) a statement as to whether this Agreement has been amended and, if so, the identity of each amendment; and (iii) any other factual matters reasonably requested that relate to this Agreement. 15. Compliance with Laws, Ordinances, Rules, and Regulations. This Agreement will be subject to all applicable federal, state and local laws, ordinances, rules and regulations, including, but not limited to, all provisions of the City's Charter and ordinances, as amended. 16. Confidentiality. Company may designate any trade secrets or confidential business information included in any report or other writing delivered to City pursuant to or in connection with this Agreement by any method intended to clearly set apart the specific material that Company claims to be either its trade secrets or confidential business information that, if released, would give an advantage to competitors or result in unfair competitive injury to Company (such information, whether specifically designated by Company or not, collectively, "Confidential Business Information"). Unless or until the Texas Attorney General renders a final decision indicating that all or part of the information must be disclosed, City shall redact or delete any Confidential Business Information from any records it makes available for inspection or of which it provides copies. Within two (2) Business Days following City's receipt of any request to inspect or obtain copies of public records relating to this Agreement or the Project, City shall provide written notice of the same to Company, which notice shall include a copy of such request. Such notice shall also include instructions and deadline(s) for Company to make its argument of confidentiality to the Texas Attorney General. City shall not allow inspection or provide copies of any such requested records until Company shall have had not less than 10 Business Days (following and excluding the day on which Company receives such notice) to determine whether to contest the right of any party to inspect or receive copies of such records. Any action to enjoin the release of Confidential Business Information may be brought to the Texas Attorney General in the name of Company or City. If such an action is brought, City shall not allow inspection or provide copies of any Confidential Business Information unless and until the Texas Attorney General renders a final decision indicating that all or part of the information must be disclosed (pursuant to the processes outlined in the TPIA). The costs, damages, if any, and attorneys' fees in any proceeding commenced by Company or at its request by City to prevent or enjoin the release of Confidential Business Information in any public records relating to this Agreement or the Project shall be borne by Company. 17. Governmental Powers. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities, except as expressly stated herein. The parties are entering into this Agreement in reliance upon its enforceability. Consequently, the City unconditionally and irrevocably waives all claims of sovereign and governmental immunity which it may have (including, but not limited to, immunity from suit and immunity to liability), if any, to the extent, but only to the extent, that a waiver is necessary to enforce specific performance of this Agreement (including all of the remedies provided under this Agreement) and to give full effect to the intent of the parties under this Agreement. Notwithstanding the foregoing, the waiver contained herein shall not waive any immunities that the City may have with respect to claims of injury to persons or property, which claims shall be subject to all of their respective immunities and to the provisions of the Texas Tort Claims Act. Further, the waiver of immunity herein is not enforceable by any party not a party to this Agreement. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 24 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 18. No Waiver. The failure of either party to insist upon the performance of any term or provision of this Agreement or to exercise any right granted hereunder will not constitute a waiver of that party's right to insist upon appropriate performance or to assert any such right on any future occasion. 19. Venue and Choice of Law. If any action, whether real or asserted, at law or in equity, arises on the basis of any provision of this Agreement, venue for such action will lie in state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas — Fort Worth Division. This Agreement will be construed in accordance with the laws of the State of Texas. 20. No Third -Party Rights. The provisions and conditions of this Agreement are solely for the benefit of the City and Company, and any lawful assign or successor of Company, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 21. Interpretation. In the event of any dispute over the meaning or application of any provision of this Agreement, this Agreement must be interpreted fairly and reasonably, and neither more strongly for or against any party, regardless of the actual drafter of this Agreement. 22. Captions. Captions and headings used in this Agreement are for reference purposes only and will not be deemed a part of this Agreement. 23. Severability. If any provision of this Agreement is held to be invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions will not in any way be affected or impaired. If any law is enacted after the Effective Date that prohibits either party from materially performing its duties and obligations under this Agreement, the parties agree to meet and confer in good faith for a period of no less than thirty (30) and no more than ninety (90) days to seek to effectuate an amendment to this Agreement that preserves, to the extent reasonably possible, the original intentions of the parties under this Agreement, with the understanding that this Agreement cannot be amended without the approval of the City Council, as specified in Section 24. 24. Entirety of Agreement. This Agreement, including any exhibits attached hereto and any documents incorporated herein by reference, contains the entire understanding and agreement between the City and Company, and any lawful assignee and successor of Company, as to the matters contained herein. Any prior or contemporaneous oral or written agreement is hereby declared null and void to the extent in conflict with any provision of this Agreement. Notwithstanding anything to the contrary herein, this Agreement may not be amended unless executed in writing by both parties and approved by the City Council of the City in an open meeting held in accordance with Chapter 551 of the Texas Government Code. 25. Counterparts. This Agreement may be executed in multiple counterparts, each of which will be considered an original, but all of which will constitute one instrument. 26. Electronic Signatures. This Agreement may be executed by electronic signature, which will be considered as an original signature for all purposes and have the same force and effect as an original signature. For these purposes, "electronic signature" means electronically scanned and transmitted versions (e.g. via pdf file or facsimile transmission) of an original signature, or signatures electronically inserted via software such as Adobe Sign. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 25 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 27. Authority to Execute Agreement. The City Council of the City, after conducting a duly -noticed public meeting, adopted Mayor and Council Communication No. 25-0301 on April 8, 2025, effective immediately upon adoption, which Mayor and Council Communication (i) confirmed the City Council's approval of this Agreement and the City Council's finding that the provisions of this Agreement are consistent with Applicable City Rules and (ii) authorized the execution of this Agreement by the signatory below. Each party represents that it has obtained all necessary approvals, consents and authorizations to enter into this Agreement and to perform its duties under this Agreement; the person executing this Agreement on its behalf has the authority to do so; upon execution and delivery of this Agreement by the parties, it is a valid and binding contract, enforceable in accordance with its terms; and the execution, delivery, and performance of this Agreement does not violate any bylaw, charter, regulation, state or federal law or any other governing authority of the party. 28. Effect on Other Vested Rights. This Agreement does not abrogate any rights established or preserved by any applicable law in connection with the Project or any portion thereof, or that have vested or may vest pursuant to common law or otherwise. Developer does not waive any of Developer's rights including any vested rights for the Project or portion thereof that have already accrued or may accrue in the future under Chapter 245 of the Texas Local Government Code or any other state law. 29. Exhibits to Agreements. The following are the exhibits to the Agreement and are incorporated herein: A. Exhibit "A" — Legal Description of Project Site; B. Exhibit "B" — 9.75 Acre Tract; B. Exhibit "C" — Quarterly Construction Report; C. Exhibit "D" — Final Report — Taxable Business Personal Property; and D. Exhibit "E" — Annual Employment and Salary Report. ----- This space left blank intentionally. ----- ----- Signature pages follow. ----- ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 26 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 EXECUTED as of the last date indicated below. CITY City of Fort Worth, a Texas home -rule municipal corporation frba u kd off 51d 6 (Sep , By: Dana Burghdoff Printed Name Assistant City Manager Title 16 Signed on the day of September , 2026. FOR CITY OF FORT WORTH INTERNAL PROCESSES: Approval Recommended: By: Name Title: Jess�ogers (Sep 15, 2026 13:25:53 CDT) Jessica Rogers Director, Econ. Development Approved as to Form and Legality Michael Doss (Sep 15, 2026 13:29:15 CDT) By: Name: Michael Doss Title: Sr. Assistant City Attorney Contract Authorization: M&C: Form 1295: Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Cherie Gordon (Sep 15, 2026 09:30:58 CDT) By: Name: erle or on Title:Economic Development Coordinator City Secretary: By: Name Title: Jannette Goodall City Secretary abp at HOgo �Oq 44 do�'4X3d db OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 27 of 38 (City 260518) 4938-0236-4246v.29 71034-1 8/26/2026 Docusign Envelope ID: EB8E29B8-BCE0-85DB-81DF-256F9BC4C3C6 COMPANY ACS DC Hicks Field Road, LLC, a Delaware limited liability company Signed by: ?�t�17C46F... By: Howard Boville Printed Name Authorized Representative Title Signed on the 9th day of September , 2026. ECONOMIC DEVELOPMENT PROGRAM AGREEMENT (ACS DC Hicks Field Road, LLC) Page 28 of 38 (City 260518) 4938-0236-4246v.22 71034-1 7/13/2026 EXHIBIT A LEGAL DESCRIPTION OF THE PROJECT SITE TRACT 1 Being a lot, tract or parcel of land situated in the Benjamin Thomas Survey, Abstract No. 1497, City of Fort Worth, Tarrant County, Texas, and being a portion of a tract of land conveyed to CJC Keyes Texas, LLC, by deed recorded in Instrument No. D209109964, Official Public Records, Tarrant County, Texas, and being more particularly described by metes and bounds as follows: BEGINNING at a 5/8 inch iron rod found for corner, said corner being the Northeast corner of that tract of land conveyed to ISF Hicks Field Road LLC, by deed recorded in Instrument No. D222214367, Official Public Records, Tarrant County, Texas, said corner being along the West line of that tract of land conveyed to Retreat at Fossil Creek, LTD., by deed recorded in Instrument No. D221035680, Official Public Records, Tarrant County, Texas; THENCE North 77 degrees 01 minute 28 seconds West, along the North line of said ISF Hicks Field Road LLC tract, a distance of 264.10 feet to a Mag nail found in concrete for corner; THENCE North 59 degrees 57 minutes 38 seconds West, along the North line of said ISF Hicks Field Road LLC tract, a distance of 255.94 feet to a 5/8 inch iron rod found for corner, said corner being the Southeast corner of Lot 1, Block 1 of Saginaw Compressor Site, an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat thereof recorded in Instrument No. D20913109, Plat Records, Tarrant County, Texas; THENCE North 00 degrees 22 minutes 01 second West, along the East line of said Saginaw Compressor Site, a distance of 819.75 feet to a 3 inch metal post found for corner; THENCE South 85 degrees 41 minutes 22 seconds East, a distance of 453.79 feet to a 5/8 inch iron rod found with yellow plastic cap stamped "LJA" for corner, said corner being along the West line of said Retreat at Fossil Creek, LTD. tract; THENCE South 01 degree 41 minutes 46 seconds East, along the West line of said Retreat at Fossil Creek, LTD. tract, a distance of 556.69 feet to a 1 inch iron pipe found for corner; THENCE South 02 degrees 05 minutes 14 seconds East, along the West line of said Retreat at Fossil Creek, LTD. tract, a distance of 416.88 feet to the POINT OF BEGINNING and containing 424,542 square feet or 9.75 acres of land. TRACT 2 BEING Lot 1 R, Block 1 of SAGINAW COMPRESSOR SITE, an Addition to the City of Fort Worth, Tarrant County, Texas, accordingto the plat thereof recorded in Instrument No. D224163154, Plat/Map Records, Tarrant County, Texas. EXHIBIT A, PROJECT SITE LEGAL DESCRIPTION Page 29 of 38 4938-0236-4246v.29 71034-1 8/26/2026 TRACT 3 BEING A 76.97 ACRE TRACT OF LAND OUT OFTHE BENJAMIN THOMAS SURVEY, ABSTRACT NO.1497 TARRANT COUNTY, TEXAS AND BEING THE REMAINDER OF THE ISF HICKS FIELD ROAD LLC CALLED 77.72 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN DOCUMENT NUMBER D222214367 OF THE DEED RECORDS OF TARRANT COUNTY, TEXAS (D.R.T.C.T.) AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 5/8" IRON ROD WITH CAP STAMPED "DUNAWAY ASSOC LP" FOUND AT THE SOUTHWEST CORNER OF SAID 77.72 ACRE TRACT SAME BEING THE NORTHWEST CORNER OF THE TEXAS ELECTRIC SERVICE COMPANY, CALLED 6-851/1000 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN DOCUMENT NO. D180327434 (D.R.T.C.T.), AND BEING IN THE EAST LINE OF THE COWBOY DTR, LLC, CALLED 2.201 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN COUNTY DOCUMENT NO. D219143672 (D.R.T.C.T.); THENCE NORTH 07 DEGREES 02 MINUTES 06 SECONDS WEST A DISTANCE OF 94.67 FEET TO 5/8" IRON ROD WITH YELLOW CAP STAMPED "LJA SURVEYING" FOUND AT THE SOUTHWEST CORNER OF THE COWBOY DTR LLC, CALLED: 0.718 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN COUNTY DOCUMENT NO. D222205739 (O.P.R.T.C.T.) AND BEING IN THE EAST LINE OF SAID 2.501 ACRE TRACT AND THE COMMON WEST LINE OF SAID 77.72 ACRE TRACT; THENCE LEAVING SAID COMMON LINE AND GOING OVER AND ACROSS SAID 77.72 ACRE TRACTTHE FOLLOWING THREE (3) COURSES AND DISTANCES: 1. NORTH 82 DEGREES 58 MINUTES 59 SECONDS EAST A DISTANCE OF 84.77 FEET TO A 5/8" IRON ROD WITH YELLOW CAP STAMPED "LJA SURVEYING" FOUNDATTHE SOUTHEAST CORNER OF SAID 0.718 ACRE TRACT; 2. NORTH 07 DEGREES 02 MINUTES 34 SECONDS WEST A DISTANCE OF 368.89 FEET TO A 5/8" IRON ROD WITH YELLOW CAP STAMPED "LJA SURVEYING" FOUND AT THE NORTHEAST CORNER OF SAID 0.718 ACRE TRACT; 3. SOUTH 82 DEGREES 58 MINUTES 41 SECONDS WEST A DISTANCE OF 84.72 FEET TO A 5/8" IRON ROD WITH YELLOW CAP STAMPED "LJA SURVEYING" FOUND AT THE NORTHWEST CORNER OF SAID 0.718 ACRE TRACT AND BEING IN THE EAST LINE OF SAID 2.501 ACRE TRACT AND THE COMMON WEST LINE OF SAID 77.72 ACRE TRACT; THENCE NORTH 07 DEGREES 02 MINUTES 06 SECONDS WEST AT A DISTANCE OF 59.97 FEET PASS A 5/8" IRON ROD FOUND 0.27 FEET TO THE LEFT THE NORTHEAST CORNER OF SAID 2.501 ACRE TRACT SAME BEING THE SOUTHEAST CORNER OF LOT 1, BLOCK1 OFTHE EL [AGO ADDITION AS DESCRIBED IN PLAT RECORDED IN DOCUMENT NUMBER D222204710 PLAT RECORDS TARRANT COUNTY, TEXAS AT A DISTANCE OF 363.86 FEET PASS A 5/8" IRON ROD FOUND 0.41 FEET LEFT OF THE NORTHEAST CORNER OF SAID LOT 1, BLOCK 1 AND THE SOUTHMOST SOUTHEAST CORNER OF THE RODOLFO PEDROZA EXHIBIT A, PROJECT SITE LEGAL DESCRIPTION Page 30 of 38 4938-0236-4246v.29 71034-1 8/26/2026 CALLED 2.395 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN DOCUMENT NUMBER D207069709 (D.R.T.C.T.) CONTINUING FOR A TOTAL DISTANCE OF 370.34 FEET TO 5/8" IRON ROD WITH YELLOW CAP STAMPED "W. HANDCOCK 1326" FOR THE NORTHWEST CORNER OF SAID 77.72 ACRE TRACT AND BEING AT AN ELL CORNER OF SAID 2.395 ACRE TRACT; THENCE NORTH 77 DEGREES 30 MINUTES 22 SECONDS EAST ALONG THE NORTHERLY LINE OF SAID 77.72 ACRE TRACT, AT A DISTANCE OF 117.59 FEET PASS THE EASTMOST SOUTHEAST CORNER OF SAID 2.395 ACRE TRACT AND THE COMMON SOUTHMOST SOUTHWEST CORNER OF LOT 1, BLOCK 1 OF THE SAGINAW COMPRESSOR SITE AS RECORDED IN DOCUMENT NUMBER D209103109 (P.R.T.C.T.), FROM WHICH A 1/2" IRON ROD FOUND WITH CAP STAMPED "STANGER" BEARS NORTH 12 DEGREES 29 MINUTES 38 SECONDS WEST A DISTANCE OF 1.65 FEET AND CONTINUING ALONG THE NORTHERLY LINE OF SAID 77.72 ACRE TRACTATOTAL DISTANCE OF 2111.74 FEETTO A 7/8" IRON ROD FOUND ATA COMMON ANGLE POINT IN THE NORTH LINE OF SAID 77.72 ACRE TRACT AND THE SOUTH LINE OF SAID SAGINAW COMPRESSOR SITE; THENCE SOUTH 63 DEGREES 32 MINUTES 15 SECONDS EAST A DISTANCE OF 837.63 FEET TO A PK NAIL FOUND AT THE COMMON ANGLE POINT IN THE NORTH LINE OF SAID 77.72 ACRE TRACT AND THE SOUTH LINE OF SAID SAGINAW COMPRESSOR SITE; THENCE SOUTH 59 DEGREES 59 MINUTES 39 SECONDS EAST AT A DISTANCE OF 266.99 FEET PASS A 5/8" IRON ROD FOUND AT THE SOUTHEAST CORNER OF SAID SAGINAW COMPRESSOR SITE AND THE SOUTHMOST SOUTHWEST CORNER THE CJC KEYES TEXAS, L.L.C., CALLED 47-924/1000 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN DOCUMENT NUMBER D209109964 (D.R.T.C.T.), CONTINUING ALONG THE NORTH LINE OF SAID 77.72 TRACT AND THE SOUTHERLY LINE OF SAID 7-924/1000 ACRE TRACT, IN ALL, A TOTAL DISTANCE OF 522.83 FEET TO A 60D NAIL FOUND ATA COMMON ANGLE POINT; THENCE SOUTH 76 DEGREES 58 MINUTES 00 SECONDS EAST A DISTANCE Of 264.09 FEET TO A 5/8" IRON ROD WITH CAP STAMPED "DUNAWAY ASSOC LP" AT THE SOUTHEAST CORNER OF SAID 47-924/1000 TRACT SAME BEING THE COMMON NORTHEAST CORNER OF SAID 77.72 ACRE TRACT AND BEING A ANGLE POINT ON THE WEST LINE OF THE RETREAT AT FOSSIL CREEK, LTD. CALLED 282.234 ACRE TRACT AS DESCRIBED IN DEED RECORDED IN DOCUMENT NUMBER D221035680 (D.R.T.C.T.); THENCE SOUTH 05 DEGREES 09 MINUTES 20 SECONDS EASTA DISTANCE OF420.44 FEET TO A 5/8" IRON ROD FOUND WITH RED CAP STAMPED "JOM" AT THE EASTMOST SOUTHEAST CORNER OF SAID 77.72 ACRE TRACT AND BEING THE COMMON NORTHEAST CORNER OF THE HICKS FIELD SEWER CORPORATION CALLED 3.8064 ACRE TRACT AND BEING AT A COMMON ANGLE POINT IN THE WEST LINE OF SAID 282.234 ACRE TRACT FROM WHICH A 5/8" IRON ROD WITH YELLOW CAP STAMPED "DUNAWAY ASSOC. LP" BEARS SOUTH 22 DEGREES 50 MINUTES 34 SECONDS EAST, A DISTANCE OF 170.66 FEET AT THE SOUTHWEST CORNER OF SAID 282.234 ACRE TRACT; EXHIBIT A, PROJECT SITE LEGAL DESCRIPTION Page 31 of 38 4938-0236-4246v.29 71034-1 8/26/2026 THENCE NORTH 89 DEGREES 44 MINUTES 24 SECONDS WESTA DISTANCE OF 368.11 FEET TO A 5/8" IRON ROD FOUND WITH RED CAP STAMPED "JOM" AT THE NORTHWEST CORNER OF SAID 3.8064 ACRE TRACT AND ALSO BEING A COMMON ANGLE POINT FOR SAID 77.72 ACRE TRACT; THENCE SOUTH 47 DEGREES 02 MINUTES 41 SECONDS WEST A DISTANCE OF 235.32 FEET TO A 5/8" IRON ROD FOUND AT A ANGLE POINT ON THE SOUTH LINE OF SAID 77.72 ACRE TRACT SAME BEING THE COMMON NORTHEAST CORNER OF SAID 6-851/1000 ACRE TRACT, FROM WHICH A FOUND 3/4 -INCH IRON ROD BEARS SOUTH 46 DEGREES 34 MINUTES 55 SECONDS WEST, A DISTANCE OF 185.62 FEET FOR THE SOUTHWEST CORNER OF SAID 3.8064 ACRE TRACT; THENCE SOUTH 89 DEGREES 48 MINUTES 31 SECONDS WEST LEAVING THE WEST LINE OF SAID 3.8064 ACRE TRACT A DISTANCE OF 2209.68 FEET TO A 5/8" IRON ROD WITH YELLOW CAP STAMPED "DUNAWAY ASSOC. L.P" FOUND AT A COMMON ANGLE POINT IN THE SOUTH LINE OF SAID 77.72 ACRE TRACT AND THE NORTH LINE OF SAID 6-851/1000 ACRE TRACT; THENCE SOUTH 89 DEGREES 33 MINUTES 47 SECONDS WEST A DISTANCE OF 707.32 FEET TO THE POINT OF BEGINNING AND CONTAINING 76.97 ACRES OF LAND MORE OR LESS. EXHIBIT A, PROJECT SITE LEGAL DESCRIPTION Page 32 of 38 4938-0236-4246v.29 71034-1 8/26/2026 EXHIBIT B 9.75 Acre Tract Being a lot, tract or parcel of land situated in the Benjamin Thomas Survey, Abstract No. 1497, City of Fort Worth, Tarrant County, Texas, and being a portion of a tract of land conveyed to CJC Keyes Texas, LLC, by deed recorded in Instrument No. D209109964, Official Public Records, Tarrant County, Texas, and being more particularly described by metes and bounds as follows: BEGINNING at a 5/8 inch iron rod found for corner, said corner being the Northeast corner of that tract of land conveyed to ISF Hicks Field Road LLC, by deed recorded in Instrument No. D222214367, Official Public Records, Tarrant County, Texas, said corner being along the West line of that tract of land conveyed to Retreat at Fossil Creek, LTD., by deed recorded in Instrument No. D221035680, Official Public Records, Tarrant County, Texas; THENCE North 77 degrees 01 minute 28 seconds West, along the North line of said ISF Hicks Field Road LLC tract, a distance of 264.10 feet to a Mag nail found in concrete for corner; THENCE North 59 degrees 57 minutes 38 seconds West, along the North line of said ISF Hicks Field Road LLC tract, a distance of 255.94 feet to a 5/8 inch iron rod found for corner, said corner being the Southeast corner of Lot 1, Block 1 of Saginaw Compressor Site, an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat thereof recorded in Instrument No. D20913109, Plat Records, Tarrant County, Texas; THENCE North 00 degrees 22 minutes 01 second West, along the East line of said Saginaw Compressor Site, a distance of 819.75 feet to a 3 inch metal post found for corner; THENCE South 85 degrees 41 minutes 22 seconds East, a distance of 453.79 feet to a 5/8 inch iron rod found with yellow plastic cap stamped "LJA" for corner, said corner being along the West line of said Retreat at Fossil Creek, LTD. tract; THENCE South 01 degree 41 minutes 46 seconds East, along the West line of said Retreat at Fossil Creek, LTD. tract, a distance of 556.69 feet to a 1 inch iron pipe found for corner; THENCE South 02 degrees 05 minutes 14 seconds East, along the West line of said Retreat at Fossil Creek, LTD. tract, a distance of 416.88 feet to the POINT OF BEGINNING and containing 424,542 square feet or 9.75 acres of land. EXHIBIT B, 9.75 Acre Tract Page 33 of 38 4938-0236-4246v.29 71034-1 8/26/2026 N O N N 7 Y M O H n d rn a'O m� �o m. xrn EXHIBIT C Form of [Quarterly/ Final] Construction Report CITY OF FORT WORTH — 380 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT Date: Company: Effective Date of Agreement: Calendar Year Reported Construction Costs for [Phase 1 Project]/ [Phase 2 Project] Reported Construction Costs with SBF for [Phase I Project]/ [Phase 2 Project] Notes: (1) Report to be accompanied by invoices and proof of payment for dollars reported necessary to properly document the above referenced totals. EXHIBIT C, FORM OF QUARTERLY CONSTRUCTION REPORT Page 35 of 38 4938-0236-4246v.29 71034-1 8/26/2026 EXHIBIT D Form of [Quarterly/ Final] TBPP Report CITY OF FORT WORTH - 380 ECONOMIC DEVELOPMENT PROGRAM AGREEMENT Date: Company: Effective Date of Agreement: Calendar Year Reported TBPP for [Phase 1 Project]! [Phase 2 Project] Total $ EXHIBIT D, FORM OF FINAL TBPP REPORT Page 36 of 38 4938-0236-4246v.29 71034-1 8/26/2026 EXHIBIT E Form of Employment and Salary Report Date: Company: Effective Date of Agreement: Report is being submitted to document the [Phase 1 Project Employment/Salary Commitments]/ [Phase 2 Project Employment/Salary Commitments] Number Employer Redacted Employee Number (last 3 digits) Start Date Full -Time (Yes/No) Annual Salary for Reporting Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 EXHIBIT E, FORM OF EMPLOYMENT AND SALARY REPORT Page 37 of 38 4938-0236-4246v.29 71034-1 8/26/2026 37 Average annual Salary of all New Jobs reported to meet the [Phase Project Employment Commitment] /[Phase 2 Project Employment Commitment]: $ EXHIBIT E, FORM OF EMPLOYMENT AND SALARY REPORT Page 38 of 38 4938-0236-4246v.29 71034-1 8/26/2026 City of Fort Worth, Texas Mayor and Council Communication DATE: 04/08/25 M&C FILE NUMBER: M&C 25-0301 LOG NAME: 17ACS_EDPA SUBJECT (CD 7) Authorize Execution of an Economic Development Program Agreement with ACS DC Hicks Field Road, LLC or an Affiliate, to Provide Up to Ten Annual Grants, Ranging from 35% and Increasing to 70% of Business Personal Property, Based on Certain Requirements, to Establish a Data Center Campus in the City of Fort Worth and Associated Employment Commitments RECOMMENDATION: It is recommended that the City Council authorize execution of an Economic Development Program Agreement with ACS DC Hicks Field Road, LLC or an Affiliate, to provide up to ten annual grants, ranging from 35% and increasing to 70% of Business Personal Property, based on certain requirements, to establish a Data Center Campus in the City of Fort Worth and associated employment commitments. DISCUSSION: ACS is a global leader in infrastructure development and Global Fortune 500 company headquartered in Madrid, Spain, with operations in over 25 countries, and revenue over $35 billion in US dollars annually. Affiliates include Turner Construction, a top contractor in the U.S., and ACS DC Hicks Field Road, LLC (Company). Top clients for data centers in the last five years include Meta, Microsoft, Google, Apple & AWS. The company will establish a Data Center Campus in the City of Fort Worth, after a competitive process with alternative sites. The project site will be located at a 107 acre greenfield site near Hicks Field Road (Project Site). Address references in this site include 10059 Hicks Field Road, 10197 Hicks Field Road, and 9401 Wagley Robertson Road. In order to facilitate the establishment of a Data Center Campus, and related investment in equipment and Business Personal Property (BPP), the City proposes to enter into an Economic Development Program Agreement (Agreement) to provide up to ten annual grants as authorized by the Chapter 380, Texas Local Government Code, and as authorized under the City's General Chapter 380 Policy relating to incentives for Mega Projects in section 3.4. Company's commitments under the proposed Agreement include the following: Minimums to be completed in order to qualify for the first grant: • Company must expend or cause to be expended a minimum of $240.8 million for construction and real property improvements by December 31, 2031 • Company must expend or cause to be expended 15% of all hard construction costs for the Project Site with contractors or suppliers of goods or services that are Business Equity Firms as defined in Chapter 20, Article X of the City Code. Failure to meet this commitment will not constitute a default, but the value of grant will be reduced by 10% • Company must locate or cause to be located taxable BPP that is new to the City on the Project Site having a minimum taxable appraised value upon assessment of $842 million on or before January 1, 2032 • Company must provide a minimum of 28 full-time jobs by December 31, 2031 • Average annual salaries for the required jobs must be at least $150,000.00 during the entire term of the agreement City's commitment under the proposed Agreement include the following, starting with the first grant: • Annual Grant based on thirty-five percent (35%) of the incremental value of City ad valorem taxes on BPP at the Project Site as determined by the Tarrant Appraisal District multiplied by the applicable tax rate for the year. If the company completes the following additional requirements, the City will agree to increase the percentage for the grant: • Company must expend or cause to be expended an additional minimum of $240.8 million (for a total of $481.6 million) for construction and real property improvements by Dec 31, 2034 • Company must expend or cause to be expended 15% of all construction costs for the Project Site as defined in Chapter 20, Article X of the City Code. Failure to meet this commitment will not constitute a default, but the value of grant will be reduced by 10% • Company must locate or cause to be located taxable BPP that is new to the City on the Project Site having a minimum taxable appraised value upon assessment of an additional $842 million or before January 1, 2035. (Combined value of investment at $1.685 billion for BPP) • Company must provide a minimum of an additional 9 jobs, for a total of 37 jobs by December 31, 2034 City's commitment under the proposed Agreement once the additional requirements are met: • Annual Grant based on seventy percent (70%) of the incremental value of City ad valorem taxes on BPP at the Project Site as determined by the Tarrant Appraisal District multiplied by the applicable tax rate for the year • Number of Annual Grants will be 10 total Company will initially be located in COUNCIL DISTRICT 7. A Form 1295 is not required because: This contract will be with a publicly -traded business entity or a wholly -owned subsidiary of a publicly -traded business entity: ACS Group FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that approval of this agreement will have no material effect on the Fiscal Year 2025 Budget. While no current year impact is anticipated from this action, any effect on expenditures and revenues will be budgeted in future Fiscal Years and will be included in the long-term financial forecast. Submitted for City Manager's Office by: Jesica McEachern 5804 Originating Business Unit Head: Kevin Gunn 2663 Additional Information Contact: Cherie Gordon 6053 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: ACS DC Hicks Field Road, LLC Subject of the Agreement: EPDA Economic Development Program Agreement M&C Approved by the Council? * Yes 0 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes O No 0 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes O No 0 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No O Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.