("CITY"), and Shield Engineering Group, LLC., authorized to do business in Texas,
("ENGINEER"), for a PROJECT generally described as: WSM-E Water and Sanitary Sewer
Replacement Contract 2025, Ridglea Phase 4— Project No. 106910.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $1,089,424.00 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date.
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025 OFFICIAL RECORD
Page 1 of 14
CITY SECRETARY
FT. WORTH, TX
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Designation of Engineer's Personnel
(1) The ENGINEER and CITY shall agree upon the
designation of the ENGINEER's "Project Manager" prior to starting work on
contract.
(2) ENGINEER shall inform CITY in writing of a proposed
change to their designated project manager prior to making the change or
immediately upon receiving notification that the designated project manager
is separating employment with the ENGINEER.
(3) ENGINEER shall provide resumes to the CITY of the
proposed replacement project manager(s), who shall have similar
qualifications and experience as the outgoing person, for review and
approval.
D. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 2 of 14
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
E. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
F. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on -site observation(s) of a
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 3 of 14
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
G. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
H. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 4 of 14
I. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 5 of 14
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondeat superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 6 of 14
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 7 of 14
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 8 of 14
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 9 of 14
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 10 of 14
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
I. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto.
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 11 of 14
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time -employees and the contract value is $100,000 or more, the
City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the City
that if Chapter 2271, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
ENGINEER acknowledges that in accordance with Chapter 2276 of the
Texas Government Code, the CITY is prohibited from entering into a
contract for goods or services that has a value of $100,000 or more, which
will be paid wholly or partly from public funds of the City, with a company
(with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of
the contract. The terms "boycott energy company" and "company" have the
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 12 of 14
meaning ascribed to those terms by Chapter 2276 of the Texas Government
Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, ENGINEER
certifies that ENGINEER's signature provides written verification to
the CITY that ENGINEER: (1) does not boycott energy companies; and
(2) will not boycott energy companies during the term of this
Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code, the CITY is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more
which will be paid wholly or partly from public funds of the City, with a
company (with 10 or more full-time employees) unless the contract contains
a written verification from the company that it: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or
firearm trade association; and (2) will not discriminate during the term of the
contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, ENGINEER
certifies that ENGINEER's signature provides written verification to the
CITY that ENGINEER: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate against a firearm entity or
firearm trade association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
same instrument.
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B - Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Attachment F — Insurance Requirements
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 13 of 14
Docusign Envelope ID: 413F1 C5A-4D96-845D-813B-308C41 BA9F58
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
Jesica McEachern
Assistant City Manager
Date: 09/16/2026
ATTEST:
Jannette Goodall
City Secretary
nnnIl
o° 1 O9.Idd
pv8 °sd 09/17/2026
ddp f °ao �`o
aaGbnn6XA5ea
APPROVAL RECOMMENDED:
Christopher f-farder 09/10/2026
By: Christopher Harder Sep 10. 2026 16:4920 CDT)
Chris Harder, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY
By. Douglas Black (Sep 10, 2026 19:42:36 CDT) 09/10/2026
Douglas W Black
Sr. Assistant City Attorney
Contract Compliance Manager:
BY:
ENGINEER
Shield Engineering Group, LLC
Signed by:
Jean-Marie Alexander, P.E.
Chief Operating Officer
Date: 8/26/2026 16:17 PM CDT
M&C No.: 26-0737
M&C Date: August 11, 2026
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Jaikso Jacob
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas WSM-E Water and Sanitary Sewer Replacement Contract 2025 Ridglea Phase 4
Standard Agreement for Engineering Related Design Services 106910
Revised Date: August 18, 2025
Page 14 of 14
ATTACHMENT A
DESIGN SERVICES FOR
WSM-E WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2025, RIDGLEA PHASE4
CITY PROJECT NO.: 106910
ATTACHMENT A
Scope for Engineering Design Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
WSM-E WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025,
RIDGLEA PHASE 4
CITY PROJECT NO.: 106910
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
WSM-E W & SS Replacements
Street
Council
Limits
Lateral/Main
Water
Water
Sanitary
Sewer
Comments
District
Number
Repl
Size
Sewer
Size
(LF)
(in)
Repl (LF)
(in)
Campe
CD -3
1802.03
12"
12" Cl W
Bowie Blvd
708.24
8"
8" Cl W
Clayton Rd E - Bernie
X-09687
Anderson Ave
99.92
6"
6" Cl W
40.72
10"
10" Cl W
Hilldale Ct
CD -3
239.84
4"
4" Cl W
X-0
Hilldale Rd - End of
L-4026
193.68
6"
6" Non Reinf. CONC SS
Hilldale Ct
Hilldale Rd
CD -3
919.22
8"
8" Cl W
X-0
406.75
6"
6" Cl W
Edgehill Rd - Camp
L-4024
387.12
8"
8" Non Reinf. CONC SS
Bowie Blvd
L-4024
249.59
8"
8" Non Reinf. CONC SS
L-4025
603.28
6"
6" Non Reinf. CONC SS
Waverly
CD -3
622.19
8"
8" Cl W
Way
X-0
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
Edgehill Rd, Bernie
L-4268
88.34
6"
6" V.C SS
Anderson Ave -
Hilldale Rd
Ridgehaven
CD -3
Waverly Way - End of
X-0
2901.26
8"
8" CI W
Rd
Ridgehaven Rd
Ridgehaven
CD -3
341.49
8"
8" CI W
Ct
Ridgehaven Rd - End
X 0
of Ridgehaven Ct
1213.43
6"
6" CI W
Ridglea PI
CD -3
X-0
479.79
8"
8" CI W
Waverly Way -
Westridge Ave
Crestmore
CD -3
X-0
991.95
6"
6" CI W
Rd
Pelham Rd - Edgehill
L-4501
427.81
6"
6" Non Reinf. CONC SS
Rd
L-4503
443.25
6"
6" Non Reinf. CONC SS
Edgehill Rd
CD -3
2404.25
12"
12" CI W
653.57
8"
8" CI W
87.2045
6"
6" CI W
8.28
6"
6" CONC W
X-0
125.68
12"
12" CONC W
Camp Bowie Ave -
Sealands Ln
19.81
24"
24" CONC W
633.45
24"
24" CI W
5.9
14"
14CONCW
L-6648
216.81
6"
6" Non Reinf. CONC SS
L-2877
411.94
6"
6" Non Reinf. CONC SS
Kirkwood
CD -3
L-4039
612.14
6"
6" Non Reinf. CONC SS
Dr
Clayton Rd E - Edgehill
Rd
L-4276
302.01
6"
6" Non Reinf. CONC SS
Fortune Rd
CD -3
L-4038
533.04
6"
6" Non Reinf. CONC SS
Pelham Rd - Edgehill
L-4269
457.39
6"
6" Non Reinf. CONC SS
Rd
L-4268
278
6"
6" Non Reinf. CONC SS
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 2 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
Floyd Dr
CD -3
L-4811
303.49
6"
6" V.C SS
Floyd Dr - Pelham Rd
Woodstock
CD -3
Woodstock Rd -
L-4500
251.92
6"
6" Non Reinf. CONC SS
Rd
Pelham Rd
Not In
CD -3
Alley from Edgehill Rd
L-2877
500.85
8"
8" Non Reinf. CONC SS
Steet
to Camp Bowie Blvd
Alley from Edgehill Rd
L-7310
377.25
6"
6" V.C SS
to Alley to West
Ridgehaven Rd -
L-2876
615.78
8"
8" Non Reinf. CONC SS
Country Club Parking
Lot
Ridglea Country Club
L-3692
492.97
6"
6" V.C SS
West
Ridglea Country Club -
1488.21
8"
8" Non Reinf. CONC SS
Alley Between
L-3965
40
6"
6" V.C SS
Ridgehaven Rd &
Ridgehaven Ct
Ridglea Country Club
L-4322
260.7
6"
6" Non Reinf. CONC SS
West from Woodstock
Rd & Edgehill Rd
10" Non Reinf. CONIC
M-185
2601.58
10"
SS
Ridglea Country Club
West from Hilldale Rd
10" Non Reinf. CONC
to about Sumac Rd
M-185
568.44
10"
SS
2010.47
6"
6" V.C SS
Ridglea Country Club
L-3964
856.92
8"
8" Non Reinf. CONC SS
East
Ridglea Country Club
L-3966
361.6
8"
8" V.C
East
Alley from Waverly
L-4027
385.63
6"
6" Non Reinf. CONC SS
Way towards
Ridgehaven Rd
L-4268
184.55
6"
6" Non Reinf. CONC SS
160.44
6"
6" V.C SS
Alley from Waverly
Way to Fortune Rd
L-4268
664.69
6"
6" V.C SS
Ridglea Country Club
L-4502
199.64
6"
6" Non Reinf. CONC SS
West from Floyd Dr &
Edgehill Rd
Total
Total Water
(LF)
14705
Sewer
17530
(LF)
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 3 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey
Task 9. Permitting
Task 10 Additional City Directed Services
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively,
• coordinate internally and externally as needed, and
• proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
• Conduct review meetings with the CITY at the end of each design phase
• Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports (assume 12 months) in the format
provided by the Water Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Coordinate with Ridglea Country Club Golf Course for the design of the proposed
infrastructure, and provide and obtain information needed to prepare the design. It is the
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 4 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
ENGINEER's understanding that coordination with other agencies and entities will be
provided by the CITY. The ENGINEER will make the initial contact with Ridglea Country
Club Golf Course to gather necessary information; however, if the ENGINEER is unable
to obtain the required information, It is assumed the CITY will handle further
coordination.
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
1.3. Plan Submittal Checklists
• Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Traffic
Traffic
Traffic
Traffic
Street
Water
Traffic
Control
Control
Control
Attachment "A"
Signal
Storm
Storm
Lights
/Sewer
Engineering
30%
60%
90%
Type
(Submit All
Water
Water
(Submit
(Submit
(Submit All
@ 30%)
30%
60%
All @
All @
@ 60%)
30%
60%)
Required for all work in City
ROW
Water / Sewer
X
X
X
• *If included in street project
ASSUMPTIONS
• No Monthly MWBE or SBE reports will be prepared
• 3 design submittal review meetings with city water department staff
• 12 monthly water department progress reports will be prepared
• 12 monthly project schedule updates will be prepared
• 1 pre -design coordination meetings with city staff
• Additional meetings not discussed in this section, if necessary, can be provided
on an hourly basis
DELIVERABLES
A. Meeting summaries with action items
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 5 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Plan Submittal Checklists (See Task 1.3)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
• Study the project,
• Identify and develop alternatives that enhance the system,
• Present (through the defined deliverables) these alternatives to the CITY
• Recommend the alternatives that successfully addresses the design problem, and
• Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project. Any proposed improvements developed by either city
or private entities after the execution of this agreement will not be included. If
additional improvements must be considered that alter the design or
implementation of the proposed project, they can be added as additional
services.
• The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
• The ENGINEER will obtain meter size from CITY GIS data and will survey the site
for visible meters within City right-of-way. The ENGINEER will make initial contact
with affected property owners and businesses to gather necessary meter number
or size for each meter and FDC connections, meters, etc. that are not visible from
the city streets including but not limited to connections internal to the existing
structures. If the Engineer is unable to obtain the required information, it is
assumed the CITY will handle further coordination & data collection efforts.
• The ENGINEER shall visit the project site and assess existing visible infrastructure
elements and site characteristics, including existing utility appurtenances, roadway
features, and other critical infrastructure items. The ENGINEER will identify
potential constraints, opportunities, or issues early in the process, ensuring that
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 6 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
proposed improvements can be effectively planned and designed with a clear
understanding of existing field conditions. It is assumed that the engineer will not
locate any meters, FDC connections, etc. that are not visible from the city streets
including but not limited to connections internal to the existing structures.
2.2. The Conceptual Design Package shall include the following:
• Cover Sheet
• Conceptual Design Drawings will show alternative design concepts considered,
on a scale of not less than 1:40.
• Documentation of key design decisions.
• Estimates of probable construction cost.
2.3. Utility Clearance
• The ENGINEER shall provide a Utility Clearance Matrix Identifying all existing
utilities in the project vicinity potentially affected by the proposed improvements.
It is assumed that the engineer will only identify utilities marked in the field by
utility locater. Any existing utilities not identified by field utility locating company
will not be the responsibility of the ENGINEER.
ASSUMPTIONS
• 0 Geotechnical borings are expected for this project.
• _1 copies of the conceptual design package (30% design) will be delivered
in PDF format.
• PDF files created from design CAD drawings will be uploaded to the designated
project folder in Trimble. ENGINEER shall prepare the meeting minutes of the
Concept Review meeting, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without written
approval by the CITY that all 30% review comments have been supplied to the
ENGINEER and that the ENGINEER may proceed with Preliminary Design.
ENGINEER will make one 30% submittal and address CITY 30% Comments with
the 60% submittal
• ENGINEER assumes no water profiles will be included in the 30% conceptual
design submittal.
• ENGINEER assumes no sanitary sewer reroutes or special coordination
meetings will be necessary, if reroute design is necessary these can be provided
as additional services.
DELIVERABLES
A. Conceptual Design Package
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 7 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
• A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descriptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street) Project Control sheet will be limited to one (1) sheet.
• Overall project easement layout sheet(s) with property owner information. The
overall project easement layout shall be limited to one (1) sheet on a scale of no
less than 1:150.
Overall project water and/or sanitary sewer layout sheets. The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity. The overall project water and sanitary sewer
layouts shall be limited to one (1) sheet each on a scale of no less than 1:150.
• Overall water and/or sanitary sewer abandonment sheet. The overall project
water and sanitary sewer abandonment sheet shall be limited to one (1) sheet
each on a scale of no less than 1:150.
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet — two or more.
• Station equations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, and existing meter
sizes that are to be replaced, existing sample locations, existing fire line
locations, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view. The plan and profile sheets will be on a scale not less than 1:40. Profiles
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 8 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
will be provided for all sewer mains and only for proposed water mains greater
than or equal to 12".
The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines visible from the right-of-way which connect directly to any
main being replaced, including replacement of existing service lines within City
right-of-way or utility easement. When the existing alignment of a water and
sanitary sewer main or lateral is changed, provisions will be made in the final plans
and/or specifications by the ENGINEER to relocate all service lines which are
connected to the existing main and connect said service lines to the relocated
main.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction.
Modified standard details or special specifications are not anticipated under this
task, if modified standard details and or special specifications are necessary these
can be provided as additional services. The ENGINEER will analyze Existing
Water Main Systems, Traffic Systems and nearby scheduled events to come up
with a Phasing Plan for proposed water mains greater than or equal to 24". The
ENGINEER will coordinate and work with Water Department Field Operations
Group to determine valve closure impact and find out best sequencing plan to
replace water lines and minimize impacts. Phasing Plan sheet will be limited to one
(1) sheet on a scale not less than 1:100.
• Develop a traffic control plan utilizing standard traffic reroute configurations posted
as "Typicals" on the CITY's Trimble website. The typicals need not be sealed
individually, if included in the sealed contract documents. Traffic control plan shall
be limited to work within neighborhood residential streets located in the CITY's
right-of-way (ROW).
3.2. Fire Line Reconnection
• The ENGINEER shall visit the project site and shall identify fire line locations for
reconnection. It is assumed that the engineer will not locate Fire Line and Fire
Department Connections that are not visible from the city streets including but
not limited to connections internal to the existing structures.
3.3. Utility Clearance
The ENGINEER shall provide a Utility Clearance Matrix Identifying all existing
utilities in the project vicinity potentially affected by the proposed improvements. It
is assumed that the engineer will only identify utilities marked in the field by utility
locater. Any existing utilities not identified by field utility locating company will not
be the responsibility of the ENGINEER.
3.4 Public Meeting
• The ENGINEER shall attend one (1) public meeting in support of the city. The
ENGINEER shall provide the overall plan sheet prepared with the 60% drawings
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 9 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
to be used at the public meeting. Additional exhibits can be provided as
additional services. The CITY shall select a suitable location and mail the
invitation letters to the affected customers.
ASSUMPTIONS
• _1_ public meeting will be conducted or attended during the preliminary design
phase.
• 0_ borings at an average bore depth of _0 feet each will be provided.
• Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an
additional _0_project specific traffic control sheets will be developed for
• 1_ sets of _11"x17" size plans in PDF format will be delivered for
the Preliminary Design (60% design).
• 1 sets of specifications in PDF format will be delivered for the Preliminary
Design (60% design).
• PDF files created from design CAD drawings will be uploaded to the designated
project folder in Trimble.
• The CITY's front end and technical specifications will be used.
• 1_ sets of 11 "xl 7" size drawings will be delivered in PDF format
for Utility Clearance.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
• ENGINEER will make one 60% submittal and address CITY 60% Comments with
the 90% submittal.
• ENGINEER will include water profiles for main lines equal to and greater than
12".
• Additional profiles not identified in the above task can be provided as additional
services.
• It is assumed no sanitary sewer reroutes will be necessary, if reroute design is
necessary these can be provided as additional services.
• Partial Specification book to be provided limited to coversheet and table of
contents under this task.
• Modified standard details or special specifications are not included under this task.
• ENGINEER shall not proceed with 90% Design activities without written approval
by the CITY that all 60% review comments have been supplied to the
ENGINEER and that the ENGINEER may proceed with 90% Design. ENGINEER
will make one 60% submittal and address CITY 60% Comments with the 90%
submittal.
DELIVERABLES
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 10 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
A. Preliminary Design drawings and specifications
B. Utility Clearance Matrix
C. Traffic Control Plan
D. Estimates of probable construction cost
E. Data Base listing names and addresses of residents and businesses affected by
the project.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• For projects that disturb an area greater than one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies.
• Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule.
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
• 1 sets of 11"x17" size drawings and _1 sets of 22"x34"
size drawings and _1 specifications will be delivered all in PDF format for the 90%
Design package.
• A PDF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Trimble.
• 1 sets of 11"x17" size drawings and _1 specifications will be
delivered all in PDF format for the 100% Design package.
• A PDF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in Trimble.
• ENGINEER shall not proceed with 100% Final Design activities without written approval
by the CITY that all 90% review comments have been supplied to the ENGINEER and
that the ENGINEER may proceed with 100% Final Design. ENGINEER will make one
90% submittal and address CITY 90% Comments with the signed and sealed 100%
submittal. If additional comments are made after the 100% signed and sealed plans are
delivered, these can be done as additional services.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 11 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
DELIVERABLES
A. 90% construction plans, specifications, and estimate.
B. 100% construction plans, specifications, and estimate.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Trimble for
access to potential bidders.
• Contract documents shall be uploaded in a .xls file.
• Unit Price Proposal documents are to be created utilizing CFW Bid tools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Trimble, as a. pdf file. The .pdf will consist of
individual files, one for each plan sheet, and will be numbered and named in
a manner similar to that of the plan set index.
The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Trimble folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto Trimble and
mail addenda to all plan holders.
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 12 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bid tools only
are to be uploaded into the project's Bid Results folder on Trimble.
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in Adobe Acrobat PDF format
(version 6.0 or higher) format. There shall be one (1) PDF file for the Water
plan set. Each PDF file shall be created from the original CAD drawing files and
shall contain all associated sheets of the particular plan set. Singular PDF files
for each sheet of a plan set will not be accepted. PDF files shall conform to
naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_orgl8.pdf
PDF file shall be uploaded to the project's Final Drawing folder in Trimble.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 1 sets of construction documents will be made available on Trimble for
plan holders and/or given to plan viewing rooms.
• 5 sets of 11 "xl 7" size and 5 sets of 22"x34" size
drawings plans and _3 specifications (conformed, if applicable) will be
delivered to the CITY.
• PDF and DWG files will be uploaded to Trimble.
DELIVERABLES
A. Addenda
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 13 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference.
After the pre -construction conference, the ENGINEER shall provide project
exhibits utilizing the overall plan sheet from the final construction drawings and
attend public meeting to help explain the proposed project to residents. Additional
or new exhibits, if necessary, can be provided as additional services. The CITY
shall select a suitable location and mail the invitation letters to the affected
customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe progress. It is assumed no more than 1 monthly site visit is
required, and it is assumed no more than 12 site visits in total will be requested by
the CITY.
As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work. It is assumed no more than
three (3) Requests for Information will be submitted by the contractor and that
none of the Request's will require significant design changes. If additional
Requests for Information are submitted or if significant design changes are
requested due to field conditions outside of the control of the ENGINEER, these
services will be considered additional.
The ENGINEER shall review contractor material submittals for conformance with
only city pre -approved material standards and contract documents. The
ENGINEER assumes that reviews of contractor requests for approved equal
materials will be performed by the CITY. It is assumed no more than three (3)
material submittal packages will be submitted by the contractor for review.
Resubmittals resulting from contractor revisions or incomplete submittals shall
count toward the total number of reviews. Additional submittals or reviews beyond
the three (3) assumed herein, or reviews requiring significant revisions to the
contract documents, shall be considered additional services. The ENGINEER
shall attend the "Final" project walk through and assist with preparation of final
punch list
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 14 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
o As -Built Survey
o Red -Line Markups from Contractor
o Red -Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
• The ENGINEER shall modify the Final Drawing PDF's and shall place a stamp
on the plans indicating that they represent Record Drawings of the project as
constructed. The stamp shall be signed and dated by the ENGINEER and shall
be placed on each plan sheet, whether there are any revisions on the sheet or
not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit an Electronic set of sealed Final Drawings,
modified and stamped as Record Drawings, for record storage. The ENGINEER
may keep copies of the information provided by the CITY for their files, but all
original red -lined drawings shall be returned to the CITY.
2) Record Drawings shall also be submitted in Adobe Acrobat PDF format (version
6.0 or higher) format. There shall be one (1) PDF file for the Water plan set.
Each PDF file shall contain all associated sheets of the particular plan set.
Singular PDF files for each sheet of a plan set will not be accepted.
PDF file shall be uploaded to the project's Record Drawings folder in Trimble.
ASSUMPTIONS
• 3 RFI's are assumed.
• 0_ Change Orders are assumed
• Any additional RFI's required not identified above can be provided as additional
services.
• Three (3) Material Submittals
• 12 one (1) hour site visits during construction phase
DELIVERABLES
A. Public meeting exhibits
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 15 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
B. Response to Contractor's Request for Information
C. Material Submittals
D. Final Punch List items
E. Record Drawings
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right -of -Way Research
• The ENGINEER shall determine rights -of -way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations will be made for approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM
for real property acquisition
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Trimble site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property. The
Temporary Right of Entry documents will be prepared for survey purposes only, and it is
assumed the Contractor or CITY will acquire further Temporary Rights of Entry documents
for construction related activities.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Trimble site.
ASSUMPTIONS
• 16 Permanent Easements documents will be necessary.
• 10 Temporary Construction Easements documents will be necessary.
• 178 Temporary right -of -entry documents will be necessary.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 16 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
• Right -of -Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) information available at the
start of the project and available on -ground property information (i.e. iron rods, fences,
stakes, etc.). It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD, right-of-way takings, easement
vacations and abandonments, right-of-way vacations, and street closures.
• Easement acquisitions, appraisals, Title Survey's, or other services related to the
purchase of easements will be handled by the CITY.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY
ENGINEER will provide survey support as follows
8.1. Design Survey
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of known buried utilities,
Dig-tess flags, structures, trees (measure caliper, identify overall canopy), and other
features relevant to the final plan sheets. The Firm is not responsible for any underground
facilities not marked in the field by dig-tess prior to the Firm's field collection.
• The minimum survey information to be provided on the plans shall include the following:
— A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base.
Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North
Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main
Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 17 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
— No less than two horizontal bench marks, per line or location.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of
Entry to landowners.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Trimble site.
ASSUMPTIONS
• Topographic survey at intersections will include no more than 100 ft. in each direction.
Design Survey will be limited to outside of buildings.
• ENGINEER understands that no permitting or traffic control devices will be required and
have not been provided in this Task.
• Special coordination with the Ridglea Country Club Golf Course is anticipated for access
arrangements and will be required to perform the field topographic survey. Should other
or additional coordination, training, or impact fees be necessary to access properties or
perform the standard Services, this can be provided as an additional service.
DELIVERABLES
A. Copies of field survey data and notes
TASK 9. PERMITTING
9.1. Environmental Services — WOTUS Delineation and Report (CPN 106910 & CPN
106907) — VRX, inc.
• Delineation of Waters Features
A. Maps and GPS resources will be developed prior to field visits to direct
attention to potential water features and set up the GPS to collect
required information. Delineations of the boundaries of wetlands and
other water features will be conducted within the proposed project area.
VRX will perform a field investigation of the proposed project area
to determine the extent of observed water features. VRX will follow
the 1987 U.S. Army Corps of Engineers (USACE) Wetlands
Delineation Manual and March 2010 USACE Regional Supplement
to the Corps of Engineers Wetland Delineation Manual to delineate
wetlands, other regulations (e.g., 33 CFR 328.3(e)), guidance to
delineate non -wetland water features, and in accordance with the
Supreme Court's decision in Sackett v. EPA and amendments to
40 CFR 120.2 and 33 CFR 328.3 regarding the revised definition of
waters of the U.S.
Water features will be flagged and mapped using a Global
Positioning System (GPS). This GPS system is capable of sub -
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 18 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
meter accuracy.
VRX will post process GPS data and develop a map illustrating
water features with the study area.
Water Feature Delineation Report
Information gathered during the delineation will be incorporated into the
Water Feature Delineation Report. This report will be prepared in
accordance with USACE guidelines and shall include the following:
General purpose statement regarding Water Feature Delineation
Report.
Methods Used:
a. Description of the approach used to delineate wetlands and other
water features.
b. Description of the conventions used to map the limits of
wetlands and other water features.
Results of the Delineation:
a. Vicinity map depicting the locations of the sites and showing
the limits of the site investigated.
b. Approximate size of areas evaluated for water features.
c. Name and characterization of the nearest waterway.
d. Description of physical features of the properties.
e. Information on existing site conditions for present and past land
uses.
f. Characterization of hydrology.
g. Identification of named waterways.
h. Characterization of vegetative communities and dominant species.
i. Characterization of soils.
j. Description of riparian or upland buffer features.
k. Photographs with the date that the photos were taken.
I. 100 -year floodplain map with project area defined.
m. Aerial photograph with project areas defined.
n. USGS 7.5 -minute topographic quad with project areas defined.
4. Conclusions:
a. Description of size/dimensions of water features, such as linear
feet and approximate distance between ordinary high-water
marks for open waters (streams).
3 Map depicting potential WOTUS with the type (e.g., forested
wetland) labeled within the project area.
Letter Providing Methods of Section 404 Permit Compliance
VRX will review design plans provided by ENGINEER to evaluate impacts
to WOTUS, as identified and delineated in the delineation of water features.
This effort includes the development and assessment of map and
hydrology resources necessary to assess potential jurisdictionally of
delineated water features. VRX will calculate impacts and provide
appropriate Section 404 permitting scenarios. The particular type of permit
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 19 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
will be determined as design plans are developed. A letter will be provided
addressing the impacts assessment and the permit scenario for the project.
The letter will identify anticipated impacts, estimated jurisdictional
quantities, likely permit pathway, and recommended permitting strategy
based on available design information.
9.2. TxDOT Utility Permitting & Coordination
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with TxDOT authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain up to one (1) permit approval of the designs, and make
changes necessary to meet their requirements, as part of the design scope.
• TxDOT Traffic Control "Typicals" will be utilized to the extent possible.
ENGINEER will develop site specific traffic control drawings as needed for review
and approval by TxDOT. These drawings shall be sealed by a professional
engineer registered in the State of Texas. The site specific traffic control sheets
shall be limited to one (1) sheet on a scale of no less than 1:100.
TASK 10. Additional City Directed Services
10.1. Additional City - Directed Services
• ENGINEER will complete additional Tasks not defined in the above scope, as
directed in writing by the City. The tasks will be performed for a fee agreed upon
by the City and Engineer at the time of authorization. Should the required scope
of work exceed $30,000, Engineer will submit a request to cover the additional
work required.
10.2 Additional Environmental Services — VRX, Inc.
10.2.1. Threatened and Endangered Species Assesment - City Directed Services
VRX will review the U.S. Fish and Wildlife Service Information for Planning and
Consultation (IPaC) & Environmental Conservation Online System (ECOS), the
Texas Parks and Wildlife Department Natural Diversity Database (NDD), as well
as Federal and State Threatened and Endangered Species lists. VRX will assess
habitat in and adjacent to the project area for the potential for use by listed
species. The findings of this assessment will be provided in a letter report.
10.2.2. Historic and Cultural Resources Desktop Assessment - City Directed Services
• The Antiquities Code of Texas provides for protection of historic and
archeological landmarks on public lands and applies to all state agencies,
counties, cities, and other public authorities. Section 106 of the National Historic
Preservation Act requires any project that requires a federal license, permit, or
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 20 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
approval to have a Section 106 review. If a USACE Nationwide Permit
Preconstruction Notification is required VRX will provide a desktop historic and
cultural resources evaluation to identify and describe existing cultural resources
in the project area and discuss the potential for discovering previously unknown
cultural resources, and make recommendations about the need for further
archeological work so that the project can proceed. Onsite cultural resource
review and associated Antiquities Code permitting is not included in this proposal
but can be provided as additional services.
10.2.3. USACE Nationwide Permit PCN - City Directed Services
• If necessary, VRX shall provide ENGINEER with a PCN for the project, including
the following, as appropriate:
1. The purpose of, and need for, the project.
2. A delineation, proposed determination, and characterization of
wetlands and other water features, and a description of the
project's likely impacts on the aquatic environment, including a
brief characterization of each impact to WOTUS.
3. Maps clearly showing all known temporary and permanent elements
of the project.
4. Detailed plan, profile, and cross-section views of all work (with
ordinary high-water mark or wetland boundary shown)
5. A written discussion of alternatives considered and rationale for
selected alternative.
6. An assessment of the adverse and/or beneficial effects of the
proposed project.
7. Documentation that the amount of area impacted is the minimum
necessary to accomplish the project, anticipated impacts due to
changes in preconstruction contours, and documentation that
changes would not result in more than minimal adverse impacts
on the aquatic environment.
8. A discussion of threatened and/or endangered species for the project
area.
9. A discussion documenting whether any cultural resources would
be affected by, or are in the vicinity of, the permit area. Note, if
onsite investigation by an archeologist is required, VRX will
request this as additional services and will subcontract this activity.
10. Information on hydrology and hydraulics.
If the USACE requires compensatory mitigation, the mitigation plan will
include the following, as appropriate:
1. A discussion of the goals and objectives.
2. A discussion of efforts to avoid and minimize impacts to WOTUS.
3. A discussion of the alternatives that were considered for the proposed
project.
4. A discussion of the direct and indirect permanent and temporary
adverse project impacts to WOTUS both on -site and off -site.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 21 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
5. A table summarizing the WOTUS impacts.
6. A functional analysis discussion of the WOTUS that would be
adversely impacted by the proposed project.
7. Proposed mitigation banking credits.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right -of -
entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and
re -bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase beyond what is scoped above
• Additional design phase public meetings beyond what is scoped above
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc...) beyond what
is scoped above
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to Environmental Permitting beyond what is scoped above
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 22 of 23
ATTACHMENT A
DESIGN SERVICES FOR
WATER & SANITARY SEWER REPLACEMENTS CONTRACT 2025 WSM-E
CITY PROJECT NO.: 106910
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right -of -entries.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by the
contractor beyond what is scoped above.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
• Services related to cathodic protection design & coordination
Water Meter number investigation & Water service line scratch testing
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.1.2014
Page 23 of 23
ATTACHMENT B
COMPENSATION
Design Services for
WSM-E Water and Sanitary Sewer Replacements Contract
2025
City Project No. 106910
Fee Not To Exceed
Compensation
A. The ENGINEER shall be compensated a not to exceed total fee of
$1,089,424.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV —
Summary of Total Project Fees. The total lump sum fee shall be considered full
compensation for the services described in Attachment A, including all labor
materials, supplies, and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
Ill. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department monthly progress reports and schedules in the format required
by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 08/18/2025
Page 1 of 3
1:551
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Fee Amount %
Prime Consultant
Design, Survey, ROW/easements,
Permitting $968,989.00
88.9%
Proposed Sub -Consultants
Visintainer Engineering
PLLC
Project Management, QA/QC
$89,535.00
8.2%
VRX
Environmental Services
$29,300.00
2.7%
Falcon
Reproduction
$1,600.00
0.2%
TOTAL
$1,089,424.00
100%
Project Number & Name
Total Fee
Sub Fee
$ 1,089,424.00
$ 120,435.00
WSM-E Water & Sanitary
Sewer Replacements
Contract 2025 CPN 106910
City of Fort Worth, Texas
Attachment B
Revised Date: 08/18/2025
Page 2 of 3
Z`,
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 08/18/2025
Page 3 of 3
E
E
Cl)
\
/
DC
\
DC
U)
\
Ui
E
>C
C
E
0
\\\
E
�
!f
7f
ip
f|
a
/E
�
G�
22
88
§IR(
a
(00
/
C
k�
§0
E
0
\
k
I-
I.-
\
•
o_
k
{)
f (
)/
000000
)§§§§§§
2kkkkkk
j
Co
.01
ccl
0
/
U)
e
i
I-
00
E
\
!) i
O)O 0
\
IE
\
®% §
kj)
;a g
=-_
)}
k
-
�)5
/
CO
CO)k) !
CO
I
ai
_<L
k/k) )
»
7
%
m
k
�@
e#
u '
k\\
}
\\
!;
;§
k k
kin
)
x)11..
/.
0 �
k
`)/Rink
§
CLCL>--)
///Aa/
a aG/E3)
O
000)
Eo
2
Jr
4'
/i0
ao
0<
Eo
0,E
k!
\<
\k
EZ
Eo
E
0
C.
E
a
5
0
§
j
OO
0.
00
0O
/ CD
0 0
7
\ / )
)
\
\\
0
Q a !
-(k
!2J
]\ §
I
�k
\
k/k)
3
%
@
woo \
o \ o
/ *
-
U)� 3
_
-
�§_{
. m 7.
«±§
k k
kk
k
-/!
a
E
kk())}
a ILe/�3�
u
2«0.Aa=
Ew'
J/
!
)co
- EE
u`
E0F
<4
k!
\<
C
00
EZ
k00
|4
a
O.
cJ
U)
E
-
IL
I'hII
I'
l
@I1
|
f
||III
&IIIII!
&PII
!I!!
IlihIllili
111$iiiiiiliii
illiib|illilil|
1111111Ii@lili|
flilillllli
111$iiiiillil
uli
IIi|ihilil|
III@II
Iii
lii
mililllili
111111111111111I1111111
IN
11111
11iililb11111
IIIIII
11
IllI11|@111�111111
NINI
SI1111
lH
flhllllllll
1
IllIll
1111|1111111|
1111111ollINIS1111111
liiiiiiiii
iiiii
111111111111111111111111111111
liiIN11111111111
DilililIli
1
@ HiHilli
liii
11111111
11111111
1111ISIN
1111111
rniiiiiii...
....,
11111
IllIllIll
1111|@11111|11111111ollINliii
11111111
IIIIIIIIII
8iiii..i.i
11111
IllIlli
lii|1111111|11111111liiiillliii
1111111
M011111111
11111
ulililIll
1111|1111111|11111111liii
ICI
11111111111
iuIIIIIIII
11111
ullIllill
1111|1111111|11111111ECi1ll1111111111|
Eli
IllIllIll
11111
ullilil
lii|1111111|11111111ICCIIll1111111111
EIIIIIIIIIII
11111
IlIlilill
1111|1111111|11111111lollMii
11111111111
IllIllIll
lll
lii|1111111|
1111111111111111111111
I
11111
ill
isillililill
iIIIIIIIII
11111
11111111
11111
1111111|111111111111111ISIN111|
N1
hullA8|@11111|11111111lollI
1111IN11
BI1IIIIIIII
11111
111111111
1111|
1111111|
11111111
1111111
1111111111|
tI:iIII..iIi
111111111
1111|@11111|11111111iii
iilii
iiiii|
11111
IIIIIIIII
11111
111111111
1111|1111111|111111111111111liii
111111|
DilIllIlIll
11111
ilIlilill
1111|1111111|111111111111111IN1111111|
rir!!i
I:F
IF![!
�,�yy..:
!I
IF
.
f
MINES
2�
B�u
|M
�I
|loll
111
E
Hil
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Water and Sanitary Sewer Replacements Contract 2025 WSM-E
City Project No. 106910
NONE
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page 1 of I
0I
0
N
2
C,]:
O
N
N
2
N
a
0
rn
O
o
O
N
O
�
N
Ql
Ifli
Z
in
S w
w
a
v
N
O
C
C
�
U
0
_
� _
N
O
N
0
V
❑ v
a
r E
Z m
=
a
^
s°
a
z
< w
v
d
m
N
CO..
-C
-I
- - O
0
C
5
C
N
N
N
N
lD
N
lD N
10
N
N
.m-
\
.V
N
.ill-
N
.ltl-
N
\
\
C
m
en
•�
LL
N
7
i
H
N
7
L
H
Ut
J
--
I-
J
.C
I-
T
01
3
F
Ol
01
I- --�
00
W
J
F-
N N
01
J
F- 4L
\
fM
IL
Ol
Cl)
J
I-
O
"
LL
Ol
3
N
3
\
N
J
I-
.--I
\
fV
LL
M
M
H
In CO pl n
CO
M ^ O
LL C IL G
n
O
G
tD
CO
N
N
CD
N \D
N \
t0
\
lD
\
lD
\
lD
\
1�
N
n n N
N
\
CO
\
Ifl
\
CO
\
N
l0
00
CO
\
Ifl
N
Ut
N
\
CU
NN
\
N
CU
N
\
Ill
N
CU
N N
\
tP
\ \
CO t0
"O
\
CO
c
N
00
\
D1
\
CO\
\
CU
"O
1
\
Ol
c'.
N
N
N
i .-
\
N
N
N
.--I
\
N
I�
\ \ \
N m M m IC
\
M C C C
\
C
C
Z,
-c
p
Z'
Y
._
LL
._
LL
._
ll
._
1
_
LL
_
LL
._
LL
N 0
C
0
G
v
C0O
0
C
O)
J
h
H
._
11
._
ll
._ OO CCO CCO
L1 L C C
CCO
C
E
W
E
E
W
d
C
O
Cp
>
10
>
(0
>
j
CC
0.
m
0.
(0
>
m
> m
(0 -0
m
-0
>
100
-0
>
m
"O
0.
T
j.
CO
N
m j.
> '0 CO T
0.
£5
-
'O
M
N
'O
CO
N
CU
6
O
N
"6
m
N
'23
m
N
'O
M0
CU
O
ti
N d'
O
0
N
m
V
O
O
0
.-I
m
N
O
0-
.--I
m
V
N
m
V
.--I
'O
VI
N
m lD V (0
V N O $
N N 01 -
m
V
'i
C
E
CO
o
J
i E
-
O
❑
V A
OS
Q c
Ob
w
0
m
3
c
E
•2
(0
=
v
CO W
O
1r
Oj
V
H U
N
O
Z
Q
O
bc0
V
00 t1
N
o
c
o
v
❑
a
o
a
a m c
'�
vi
C
CU
m
u
y
m
-
(0
.E a
❑
_
O 01 J J G CI(0
a u ❑ ' ❑ o- "a m . v ❑ Z' m
t0
Z
u
d
C
t1
v
c
Cl)
d
o
m
N
E
d
o
(0
C
y
Z
o
u
0
0
u
05E
> 10
c E
0
CC
O
E
C.
CO
CO
w
\
O`
a
N
E
N
❑
N
c
Y
c
v O
u
m
u
3
c
m v
CO
o
-Y
O
a
p
0.
(0
CO
m
Z m
�
a`
a
❑
v v
N
M
V
LA
CO
C--
CO CU
O
N
M
V
Vl
t0
f
CD
01
O
N
N ti
�
a �
0
0
OC
d
O)
CU
0
0
0'
m
o
N
rn
N
2
W
CD]:
0
N
2
=
N
0
a _
N
N
—
a c
N
-
a
x
y
ti
►-
►_
C
OS
NI
0
0
►-
0t
O
N
S
N �
z
a
V
T J f
o - -
to
O
N
_
N
in S w w
C
o =
0 N
N
F- E
NJ
z5z 5
w �
2 w
a
N
V a
y
01
v
E E
v
ai
o E E
C
v
O
m
C'
V
10
co
01
O
O
ri
ri
V'
In
m
oo
O
N
N
F
_ a - _
3 3
a
N
N
N
N
N
N
N
N
m
m
m
m
m
m
m
m
10
m
.--I
Co
N
N
d'
N
V
N
'5
N
N
N
N
\
lD
r
N
\
N
N
\
N
N
\
N
N
\
\
O
N
\
N
\
N
N
N
\
N
N
\
N
\
10
N
N
\
N
\
m
r
N
\
r
N
\
N
N
N
N
\
N
\
N
>
w
N
L
N
C._
LL
m
N
0
l0
CO
._
O-
oo
0
c
C
oo
0
cc
G
\
O-
\
a
F
N
of
F
H
d
>
a
F-
N
>
\
`
._
Il
N
a
F
N
a
F
\
`~
._
LL
N
a
F
\
._
a
f-
._
a
N
\
N-
N
N
N
N
N
N
IS-
N
N
\
N
\
O
N
\
N
\
N
N
N
N
N
N
N
N
N
N
N
\
O
N
N
N
N
N
N
\
N
\
N
C
CO
C
CO
C
W
W
CC
a
10
H
.-1
.-I
O
N
N
N
r
N
`~
\
aD
op
c -I
.-I
10
a
Z`
O
m
V1
0
o
o
O
I-.
F
a
a
3
F-
F-
ii
.
lY
ll
11
lL
Co
C
CO
L
CCo
C
m
F
N
E E
E W E
v v
C
o
a
a
m
'O
a
a
a
m
m
T
m
"a
a
m
m
>
m
'O
o
>
m
'o
m
O
T
m
'o
T
m
'a
m
'o
?
m
m
m
-a
>
m
-a
T
m
-a
>
m
'O
m
o
t
c
a-
m
a
m
t
?
m
m
m
-a
O
m
a -I
10
00
r-i
N
e-1
10
.
.
N
.
.
O
N
l0
.-I
10
0
-
N
10
0
-
O
O
O
m
J
O
O
_
'
LL
V
_
m
C
o
O
.0
F
a
y
o
c
o
a
Y�
.E
051
E
a
y
w
•o-
J
O
. E
N
O
O
O
Q
O
N
O
O
N
u
Q
N
.0
c
a
c
y
=
c z
i
y
mv-
a1
ac
N
c
c
@
Ea
'D
C
O1
0
V
a
K
o
. c
E
:n
c
v
a
N
a
c
m
a
o o
V u
ti
c
E
J
m
a
yl wa C ma C o! C .0 a a (� U o
+' C 0- C m m
a
c
CO
d
it
LL of
-
m N
V
w
m
a
O/
'5
E
C
:
C
S
w
N
o
a
J
a
m
d
O
C
N
O
v
C
LL
O1
(n
N
O`
a
O C
O. m
m C
>O oa
a
O
N
=
a
N
w
K
N
y
y
•E
d
m
O
E
>
> LL
C
0
O
W
1
d
�°
O
4
J
>
o
O
O C
m
a N
G
m
N
d
N
m
w
F
O
tOS
0 \
N
C,
a
CC
F-
Z m
m
m
a a
M
N
N
V1
N
50
N
r
(Si
CO
(Si
01
N
O
CO
r-
m
(Si
CO
(55
m
V
CO
to
CO
to
CO
N
CO
00
CO
01
CO
O
V
C
nl
V
CO
V
N 0)
O m
O
aO
o =
m
CO
N
C
2
o]:
O
CO
CO
2
E
N
L
►[
o
�
CO
2
n =
CO
CO
CO
O_
r
=
L.
0EE
z
s
U
CO
y
w
CO
CO
O
to 2
CO
CO
N
U
N
E
z o
w
z
to
O_
y
UQ oc
HO
v
W
O
?. E E
o 00
3
Q �n
v
v
CO
CO
CO
CO
CO
ti
CO
co
CO
+N
LL
CO
—
°——
m
C
In
a
a
N
\
V
N
v
N
\
CO
v
N
N
\
14
N
-
\
M
v
CO
\
N
N
v
N
\
N
to
N
N
\
to
N
N
\
O
CO
00
N
\
0
CO
CO
N
\
CO
N
N
CO
N
N
N
CO
N
to
N
N
\
0
CO
\
0
CO
\
0
CO
0
CO
\
CO
0
CO
\
-p
C
to w
N
'C
U..L
~
N
^
V
ry
N
\
ti
J
N
N
J
L
N
v
N
N
CO-
J
L
CO
\
N
J
L
N
N
J
L
N
\
N
'-
N
C
\
CO
'-
N
CO
t
N
N
J
N
CO\
N
'-
N
M
J
L
N
N
M
J
L
N
O
0!
3
CO
\
rl
N
J
L
CO
\
N
N
J
L
00
\
\
N
'-
00
N
CO
OJ
J
N
CO
0!
J
0
\
t
ry
N
\
Ol
\
O
\
CO
N
\
N
N
N
N
\
\
CO
N
\
�
0/1M
\
\
M
\
N
\
m
\
\
M
\
\
M
\
\
M
\
CO
N
\
\
N
N
CO
N
\
O1
N
\
N N
\
N
\
CO
N
\
CO
\
N N
\
t0
V1
y
>
J
H
J
H
H
J
H
J
H
J
H
_to
LL
H
0
0
O
0
0
._
LL
H
_
LL
>
to.
3
. _
LL
_
LL
O
O!
3
E
E
—
C
O
T
>
T
T
T
T
T
>
>
>
>
T
y
T
m
a
.�
- -
�o
O
T
tO
O
00
to
-O
O
T
r0
'0
ti
f0
'6
N
R
to
-O
O
r-1
N
-O
O
N
T
tO
'D
N
t0
-O
O
a-1
T
t0
'0
CO
01
'0
CO
0-
CO
T
t0
'0
c'i
01
'0
0
0-
1!1
t0
L
01
CO
T
f0
'O
N
N
>
tO
9
CO
f0
'0
CO
CO
01
'0
CO
CO
t0
'0
0
N
(0
O
N
CO
a
01
a
O
CO
a
01
'O
N
CO
a
0f
9
N
N
T
01
V
0
CO
O_
Q
3
a
>
01
>
o!
C
C
J
w
O
2
E
N
c
LL
a
u
>
o
w
0
v
.'
v
v
e
N
c
O
Q
tO
O
C
to
O'
N
E
"O
C
E
U
U
C
Cp
C
C
•C
Q
p
0
00
Q
O
U
a
k
V
Y
O
<
u
u
c
c
a
c
E
a
d
W
++
C
N
N
00
>
E
O
O
ry
O
N
O
U
N
to
a
O
CO
E
3
v
Y
E
w
-
a
3
a
r+
J
v
`
m
C
a
e
c
o
L
•
a
u
a
c
m
m N
io
z
'�
c
O
u
'�
u
j
a.
O
•O
v
Q
C
c
a
U
u
L
O
N
O'
W
d
O N
H
W
U
u
Q
U v
V
v
Lit
v
'CO
v
I�
v
CO
v
CO
v
O
001
0/1
N
0/1
m
Un
V
vi
CO
(.n
N-
Un
CO
Un
t0
00
CO
00
m
C-
CO
r
m
co
CO
CO
CO
CO
CO
CO
CO
ATTACHMENT E
GARLAND ,4
O $.IgJIiJ U,
1" 0
y t S r e r
GFL�G� 0p�1\� �� p`l�� O2 �P ROUNDABOUTI
am1 I' JJjjn
LLLL1�....-.
HILLDALE • Z
COURT , ,1
Z
pOS�pG;: i(
�
SHARON
ROAD
.J, ww
EDGEHILL
ROAD �` l • '
A.-� � _ � 9; •� - I-Oi '� Jam.
p a
FORTWORTH.SE.
of 17
ATTACHMENT "F"
CERTIFICATE OF INSURANCE
Design Services for
WSM-E Water and Sanitary Replacement Contract 2025
City Project No. 106910
City of Fort Worth, Texas
Attachment F
FORT WORTH.
MAYOR AND COUNCIL COMMUNICATION
7.5.26 SHIELD ENGINEERING GROUP, LLC ENGINEERING AGREEMENT FOR WSM-E WATER
AND SEWER REPLACEMENT IN RIDGLEA
DATE: 08/11/26 M&C FILE NUMBER: M&C 26-0737
DEPARTMENT: WATER
SUBJECT
(CD 3) Authorize Execution of an Engineering Agreement with Shield Engineering Group, LLC in
the Amount of $1,089,424.00 for the WSM-E Water and Sewer Replacement Contract 2025,
Ridglea Phase 4 Project, Adopt Resolution Expressing Official Intent to Reimburse Expenditures
with Proceeds of Future Debt, and Adopt Appropriation Ordinance to Effect a Portion of
Water's Contribution to Fiscal Years 2026-2030 Capital Improvement Program
RECOMMENDATION
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Shield Engineering Group, LLC,
in the amount of $1,089,424.00, for the WSM-E Water and Sewer Replacement
Contract 2025 Ridglea Phase 4 project;
2. Adopt the attached resolution expressing official intent to reimburse expenditures with
proceeds from future debt for WSM-E Water and Sewer Replacement Contract 2025
Ridglea Phase 4 project; and
3. Adopt the attached appropriation ordinance adjusting appropriations in the Water &
Sewer Commercial Paper Fund in the amount of $1,593,685.00 by increasing
appropriations in the WSM-E Water and Sewer Replacement Contract 2025 Ridglea
Phase 4 project (City Project No. 106910) and decreasing appropriations in the Water
& Sewer Commercial Paper project (City Project No. UCMLPR) by the same amount, to
effect a portion of Water's contribution to the Fiscal Years 2026-2030 Capital
Improvement Program.
DISCUSSION
This Mayor and Council Communication (M&C) is to authorize execution of an engineering
agreement with Shield Engineering Group, LLC, in the amount of $1,089,424.00 for the WSM-E
Water and Sewer Replacement Contract 2025, Ridglea Phase 4 project for the preparation of
plans and specifications for sanitary sewer and water main replacements on the following
streets and easements:
1 of 17
FORT WORTH.
Street
From
To
Scope of Work
Bernie Anderson
Camp Bowie Boulevard
Clayton Road east
Water
Avenue
200 feet west of
Easement west of Edgehill
Camp Bowie
Road
Boulevard/ Edgehill
south 600 feet
Sewer
Road intersection
625 feet south of
Easement south of Camp
Camp Bowie
Bowie Boulevard
Boulevard/ Edgehill
west 350 feet
Sewer
Road intersection
Hilldale Road
Camp Bowie
Waverly way
Water/Sewer
Boulevard
Hilldale Court
Hilldale Road
southeast 250 feet
Water
Easement east of Hilldale
Waverly Way
south 220 feet
Hilldale Court
Road
400 feet east and 130
Easement south of
feet south of Waverly
Waverly Way
Way/ Hilldale Road
east 140 feet
Sewer
intersection
Edgehill Road
Camp Bowie
Hildale Road
Water/Sewer
Boulevard
Kirkwood Road
Edgehill Road
Clayton Road
Sewer
Fortune Road
Edgehill Road
Tamworth Road
Sewer
160 feet south then
Easement east of Clayton
Kirkwood road
150 feet west, then
Sewer
Road east
south Fortune Road
Woodstock
Woodstock Road
Road/Pelham Road
east 250 feet
Sewer
Intersection
2 of 17
FORT WORTH.
Ridglea Place
Westridge Avenue
roundabout
Water
Easement south of
130 feet south of
630 feet southwest
Sewer
Waverly Way
roundabout
Ridgehaven Road
roundabout
Cal -de -sac
Water
Ridgehaven Road court
Ridgehaven Road
Cal -de -sac
Water
400 feet south of
Easement Between
Ridgehaven Road/
south 1250 feet then
Ridgehaven Court/
Sewer
Ridgehaven court
275 feet southeast
Ridgehaven Road
Intersection
west 500 feet of Floyd
Floyd Drive
Drive/ Edgehill Road
west 300 feet
Sewer
Intersection
400 feet south of
Easement south of
Crestmore
Crestmore Road
Road/Edgehill Road
east 200 feet
intersection
350 feet north and
west 140 feet
Easement East of
Ridgehaven Road/
south 3700 feet
Sewer
Ridgehaven Court
Ridgehaven Court
Intersection
west 200 Feet of
Easement West of
Westridge Avenue/
southwest 350 feet
Sewer
Westridge Avenue
Sharon Road
Intersection
Edgehill Road/
Edgehill Road
Crestmore Road
Sealands Lane
Water/Sewer
Intersection
Easement east of Edgehill
Edgehill Road
south 2650 feet
Sewer
Road
3 of 17
FORT WORTH.
Woodstock Road
Easement east of Edgehill
/Edgehill Road
south 250 feet
Sewer
Road
intersection
360 feet west of
Easement west of
Ridgehaven
Ridgehaven Road
Road/Ridgehaven
Southwest 450 feet
Sewer
Court
*Water main in inaccessible easement at rear of residences will be relocated in public right-
of-way as shown on the attached location map.
In addition to the contract amount of $504,261.00 (Water $214,251.00; Sewer $290,010.00) is
required for project management, real property acquisition, utility coordination, and material
testing. This project will have no impact on the Water Department's operating budget when
completed. The sewer component of the project is part of the Water Department's Sanitary
Sewer Overflow Initiative Program.
Available cash within the Water and Sewer portfolio and the City's portfolio along with the
appropriation authority authorized under the Callable Commercial Paper Program (CP) will
be used to provide interim financing for this project until the debt is issued. Once debt of this
project is sold, bonds proceeds will be used to reimburse the Water and Sewer portfolio and
the City's portfolio in accordance with the attached reimbursement resolution. Under federal
law, debt must be issued within approximately three years in order for these expenses to be
reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds
but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds.
It is the practice of the Water Department to appropriate its Capital Improvement Program
(CIP) plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as
projects commence, additional funding needs are identified, and to comply with bond
covenants. The actions in the M&C will appropriate funds in support of the Water's portion of
the City of Fort Worth's Fiscal Years 2026-2030 Capital Improvement Program.
Funding is budgeted in the Commercial Paper project within the W&S Commercial Paper
Fund for the Water Department for the purpose of funding the WSM-E W/S REPL
2025RidgleaPH4 project.
Appropriations for the WSM-E W/S REPL 2025RidgleaPH4 project are as depicted below:
Fund
Existing
Additional
Project Total*
Appropriations
Appropriations
4 of 17
FORT WORTH.
W&S Commercial
Paper - Fund 56032
$0.00
$1,593,685.00
$1,593,685.00
Project Total
$0.00
$1,593,685.00
$1,593,685.00
*Numbers rounded for presentation purposes.
The project is located in COUNCIL DISTRICT 3.
This contract requires a Form 1295.
FISCAL INFORMATION/CERTIFICATION
The Director of Finance certifies that funds are currently available in the Commercial Paper
project within the W&S Commercial Paper Fund and upon approval of the above
recommendations and adoption of the attached appropriation ordinance, funds will be
available in the WAS Commercial Paper Fund for the WSM-E W/S REPL 2025RidgleaPH4
project to support the execution of the agreement. Prior to an expenditure being incurred, the
Water Department has the responsibility of verifying the availability of funds.
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804
ORIGINATING BUSINESS UNIT HEAD: Chris Harder, # 5020
ADDITIONAL INFORMATION CONTACT: Jaikson Jacob, # 7866
ATTACHMENTS
1. Map - WSM-E Water and Sewer Replacement Contract 2025 [7.5.26.1 - 1 page]
2. Resolution Reimburse (R2) - WSM-E Water and Sewer Replacement Contract 2025
[7.5.26.3 - 2 pages]
3. Ordinance Approp (R3) - WSM-E Water and Sewer Replacement Contract 2025
[7.5.26.4 - 2 pages]
4. CONFIDENTIAL - Form 1295 - Shield Engineering Group, LLC [7.5.26.6 - 1 page]
5. CONFIDENTIAL - Project Budget Summary - WSM-E Water and Sewer Replacement
Contract 2025 [7.5.26.7 - 1 page]
6. CONFIDENTIAL - Commercial Paper as of 07-08-26 [7.5.26.8 - 3 pages]
7. CONFIDENTIAL - FID Table - WSM-E Water and Sewer Replacement Contract 2025
[7.5.26.9 - 1 page]
8. CONFIDENTIAL - Funds Availability - WSM-E Water and Sewer Replacement Contract
2025 [7.5.26.10 - 1 page]
5 of 17
O
J
w_
S
y
w
U)
U)
U)
N
N
U)
U)
U)
ra
o
O
O
O
N
+
i
+
•
Co
o
0
c
v)
o
o
s
a
o
c
o
f
ro
�
N
U
u
U
U
U
-
v
a
a
a
O
7
O
O
I-
.N
O
C
C
c
c
O
Vl
U
O
O
m
.O
N"
v
Cl)
0)
v
O
--
a
D
OO
O
m
CO
m
m
+�
F
N N o
F
w
w
w
w
O
O
O
O
O
O
O
O
O
O
O
O
O
OOOOOOOOOOOOO
ci
-1
O
O
O
O
O
m
O
O
O
O
O
M
m
O
O
.--1
ci
ci
01
O
O
O
O
O
N
00
O
In
ci
Lr
Lr
O
O
O
O
In
N
m
N
m
r1
N
l0
0
0
0
0
N'
lD
In
i/?
i/}
N
N
00
M
O
V
N
V}
in
In
s -I
t/}
1/A
In
a --1
Q
i/i
i/F
i/)•
i/I•
01
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
01
01
Cl
Cl
Cl
Cl
Cl
01
Cl
Cl
Cl
01
01
01
Cl
01
Cl
Cl
01
Cl
Cl
01
01
Cl
01
01
01
01
01
01
01
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
01
Cl
Cl
Cl
O
C
C
O
O
O
O
O
O
C
C
m
m
m
N
00
00
m
m
a
V
00
N
N
N
N
N
N
N
N
N
N-
N
N
N
N
N
ci
ci
ci
ci
ci
ci
ri
ci
ci
,—I
ci
ci
0
0
0
0
0
0
0
0
0
0
0
0
0
OOOOOOCOOOOOO
o
o
O
o
O
O
O
o
O
O
o
0
0
0
0
0
0
0
0
0
0
0
0
0
ci
ci
ci
ci
1-1
-1
ci
c-i
c-1
ci
,1
ci
ci
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
01
Cl
Cl
Cl
lD
l0
l0
lD
iD
l0
(O
(O
'a
iD
(O
t0
0
0
0
0
0
0
0
0
0
0
0
0
0
ci
ci
ci
c-1
ci
.-
O
.-1
0
0
0
0
0
ei
0
0
0
O
O
C
V1
O
V1
0
O
O
-1
O
O
.-1
In
ci
O
m
In
m
r1
In
O
0
In
O
m
O
O
O
OV
O
O
O
O
O
O
O
O
OO
O
M
M
m
M
m
N
m
M
ci
In
ci
ci
N
In
In
U)
In
In
In
U)
U)
Ill
Vl
In
U)
U)
O
O
O
O
O
O
O
O
O
O
O
O
O
M
M
M
M
M
M
M
M
M
M
M
M
M
O
O
0
0
0
0
0
0
0
0
0
0
0
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
0
0
O
O
O
O
a
O
a
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N
N
N
N
N
N
N
N
N
N
N
N
N
m
m
m
m
m
en
m
m
m
m
m
M
M
0
0
0
0
0
0
0
0
0
0
0
0
0
l0
CD
CD
l0
CD
lD
l0
l0
CD
lD
l0
lD
l0
V1
U
In
In
In
In
«1
V1
In
m
In
In
m
O
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Shield Engineering Group, LLC
Subject of the Agreement: WSM-E Water and Sanitary Sewer Replacement Contract 2025, Ridglea Phase 4
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 0 N/A
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 8/11/2026
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106910
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No 0
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be