Loading...
HomeMy WebLinkAbout26-28781 - City Council - OrdinanceORDINANCE 26-28781 AN ORDINANCE AMENDING IDENTIFIED PROVISIONS OF THE CODE OF THE CITY OF FORT WORTH (2015), AS AMENDED, TO REFLECT CHANGES IN THE FEES STATED IN THOSE CODE SECTIONS; ADDING NEW FEES AND CHANGING CERTAIN FEES AND RATIFYING AND CONTINUING PREVIOUSLY ESTABLISHED UNCODIFIED FEES; ALLOWING FOR CHANGES IN CERTAIN FEES DUE TO MARKET CONDITIONS; PROVIDING FOR DOCUMENTATION OF AMBULANCE -RELATED FEES SUBJECT TO ADJUSTMENT BASED ON FEDERAL DIRECTIVES; DESIGNATING OTHER DEPARTMENTS ACTING ON BEHALF OF THE FINANCIAL MANAGEMENT SERVICES DEPARTMENT; PROVIDING THAT THIS ORDINANCE SHALL BE CUMULATIVE; PROVIDING A SEVERABILITY CLAUSE; PROVIDING A SAVINGS CLAUSE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, certain City functions are provided on a fee -for -service basis, with such fees designed to recover some or all of the costs incurred by the City to provide such services; WHEREAS, adoption and revision of the utility rates for water and wastewater and for municipal drainage (stormwater) are subject to specific processes and are therefore handled by separate action in order to ensure compliance with those utility -rate -setting processes, but certain other non -rate miscellaneous fees are simply set by Council; WHEREAS, in limited instances the fees for other non -utility City services are reflected in codified ordinances that can be found in the Code of the City of Fort Worth (2015), as amended; WHEREAS, for a number of other fee -based services, the City Code simply refers to fees being set by City Council, which action may not take the form of an ordinance; WHEREAS, the operations of the City's Public Events Department involve booking business for conventions and other gatherings at the Fort Worth Convention Center months or sometimes years in advance, necessitating the adoption of fees for such facilities beyond just the immediately coming year; WHEREAS, it is anticipated that the City Council will formally authorize (i) a `lift assist' charge to recover a portion of the costs for non -emergency, non -medical services provided by the City's emergency medical services (EMS) personnel at institutional care facilities, and (ii) on -site sewer facility rates, and it is advisable to set the levels for those fees, subject to and conditioned on adoption of the City Code amendment, with imposition of such fees noted herein as being contingent on amendment of the City Code; WHEREAS, certain EMS fees may legally only be increased by an amount equal to the lesser of (i) 10% of the current rates or (ii) a percentage inflation factor determined by the Centers for Medicare and Medicaid (CMS) with such changes to take effect January 1, 2027; and Ordinance No. 26-28781 Page 1 of 73 WHEREAS, it is recommended that the City Council approve EMS fees at the rates reflected herein with the caveat that fees designated with an asterisk may be lowered based on CMS's determination and with a mechanism provided to memorialize the final rates after CMS issues its direction; and WHEREAS, in an effort to improve transparency and facilitate locating the various uncodified fees, staff recommends adopting a single ordinance as part of the annual budget to reflect changes to codified fees other than utility rates for water and stormwater and changes to non -codified fees and to ratify all previously established fees that will continue to be charged for the coming fiscal year; and WHEREAS, in connection with the adoption of the Fiscal Year 2026 budget, the City Council deems it appropriate to adopt this instrument to amend certain non -utility fee schedules in the City Code, to update the non -codified fee schedule as reflected herein, and to ratify all previously enacted uncodified fees. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: SECTION 1. The following sections of the City Code of the City of Fort Worth are hereby amended in accordance with the attached Exhibit "A" to reflect changes in certain fees and associated language: Chapter 2, Article XII, Section 2-321, "Development Application Fees"; Chapter 7, Article II, Section 119, "Fee Tables"; Chapter 12.5, Article VIII, Division 4, Section 12.5-841.1, "Residential Collections Fees", - Chapter 12.5, Article VIII, Division 4, Section 12.5-841.2, "Commercial Garbage Collection Fees"; Chapter 12.5, Article VIII, Division 4, Section 12.5-844, "Non City Waste Landfill Environmental Fee"; Chapter 12.5, Article IX, Division 2, Section 12.5-865, "Registration"; Chapter 13, Article I, Section 13-2, "Amendments," Section H104, "Fees for Inspections and Operational Permits"; Chapter 13, Article I, Section 13-2, "Amendments," Section H105, "Fees for False Alarms"; Chapter 13, Article I, Section 13-2, "Amendments," Section 1106, Appendix I, Section 1102.3; Chapter 13, Article I, Section 13-2, "Amendments," Section 1106, Appendix I, Table 1102.1; Chapter 13, Article I, Section 13-2, "Amendments," Appendix J, Section J401; Chapter 13, Article I, Section 13-2, "Amendments," Appendix K, Table K101.1; Chapter 29, Article V, Division 2, Section 5.01, "Registration of Off -Premises Signs"; Ordinance No. 26-28781 Page 2 of 73 Chapter 30, Article I, Division 2, Section 30-14, "Painting House Numbers on Curbs or Driveways — License and Bond Required; License Fee; Permission from Property Owners"; Chapter 30, Article 11, Section 30-32, "License; Bond; Permit"; Chapter 35, Article III, Division 1, Section 35-57.4, "Water Tap Connections"; and Chapter 35, Article III, Division 1, Section 35-57.4, "Sewer Tap Connections" SECTION 2. With the exception of Water and Wastewater utility rates charged by the Water Department and Municipal Drainage utility rates charged by the Stormwater Division of the Transportation and Public Works Department, all fees for the Aviation, Development Services, Environmental Services, Financial Management Services, Fire, Park and Recreation, Property Management, Public Events, Transportation and Public Works, and Water Departments beginning and effective October 1, 2026 shall be those previously authorized by City Council action and are ratified and shall continue to be in effect by the adoption of this Ordinance, save and except those fees where a change is being implemented as detailed on Exhibit "B" to this Ordinance, including changes to pre-existing fees and enactment of new fees, and all such fees and changes are hereby approved. SECTION 3. The Aviation, Development Services, Environmental Services, Financial Management Services, Fire, Park and Recreation, Property Management, Public Events, Transportation and Public Works, and Water Departments operate facilities and programs that compete with public and private sector facilities for business and periodically need to make adjustments in response to market demands and for promotional and educational purposes. Approval of this Ordinance authorizes the Directors of the departments identified above (or their designees) to adjust or waive fees in response to market demands, including, but not limited to, seasonal, weather -related, and facility condition -driven factors; customer service resolutions; memberships; advertising opportunities; special marketing promotions; and educational purposes. In addition, to the extent any City -owned facility is managed or operated by a non-profit support group, the Director of the department having responsibility for such facility may exercise the discretion to adjust fees by acting in concert with such non-profit organization. The maximum amount of fees will continue to be capped at those amounts previously approved by the City Council. SECTION 4. Certain fees for providing emergency medical services (EMS) established in Exhibit B are subject to limitation by the ambulance inflation factor (AIF) prescribed by the Centers for Medicare and Medicaid (CMS) and could be reduced. Following CMS's pronouncement of AIF, staff in the Fire Department is directed to complete a notice to Council in substantially the form laid out in Exhibit C to memorialize the final fees as modified by CMS's AIF and to file a copy thereof with the Fort Worth City Secretary as an addendum to this Ordinance. Ordinance No. 26-28781 Page 3 of 73 SECTION 5. Approval of this Ordinance will also officially designate other personnel and departments as acting on behalf of the Financial Management Services (FMS) Department in collecting fees and issuing licenses, as applicable. The City Charter charges the City's Finance Department "with the administration of the financial affairs of the city, including the keeping and supervision of all accounts and the issuance of licenses and the collection of license fees." As the City has grown over the years, responsibilities for issuing licenses and collecting fees became decentralized, with various departments and personnel being assigned as reflected in the City's revenue manual. In connection with the adoption of the Fiscal Year 2016 budget, the City Council approved M&C G- 18545 (September 15, 2015), which formally designated the assigned personnel and departments to act on behalf of FMS in collecting fees and issuing licenses, where applicable. Adoption of this Ordinance continues that designation through Fiscal Year 2027. SECTION 6. This Ordinance shall be cumulative of all provisions of ordinances and of the Code of the City of Fort Worth, Texas (2015), as amended, except where the provisions of this ordinance are in direct conflict with the provisions of such ordinances and such Code, in which event conflicting provisions of such ordinances and such Code are hereby repealed. SECTION 7. It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses and phrases of this Ordinance are severable, and, if any phrase, clause, sentence, paragraph or section of this ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTION 8. All rights and remedies of the City of Fort Worth, Texas, are expressly saved as to any and all violations of any previously existing ordinances which have accrued at the time of the effective date of this Ordinance, and, as to such accrued violations and all pending litigation, both civil and criminal, whether pending in court or not, under such ordinances, same shall not be affected by this ordinance but may be prosecuted until final disposition by the courts. Ordinance No. 26-28781 Page 4 of 73 SECTION 9. This Ordinance shall take effect on October 1, 2026 and after publication as required by law, if necessary, with certain fees having later effective dates or being subject to certain preconditions as indicated herein. APPROVED AS TO FORM AND LEGALITY By: '-0' CNk� Denis C. McElroy, Assistant City Attorney ADOPTED: September 15, 2026 EFFECTIVE: October 1, 2026 ATTEST: b �g Jannette Goodall, City Secretary Ordinance No. 26-28781 Page 5 of 73 EXHIBIT A Highlighted information indicates changes; language and fees that are not highlighted remain the same as before. I. Chapter 2, Article X11, Section 321 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 2-321 Development Application Fees (a) For services rendered, the following schedule of fees and charges is hereby adopted; provided, however, that such fees may be waived or refunded by action of the city council in accordance with policies adopted by the city council: Application Fees Alarm system permits Residential $50.00 Other alarm system locations $100.00 Alcohol Variance request to City Council $591.00 Distance check $119.00 Annexation 75 acres or less $827.00 (Fee waived for commercial/industrial use only of 25 acres or less) More than 75 acres $827.00* (*Plus $11.81 per acre over 75 acres) Limited purpose annexation $3,544.00 Appeals Downtown Design Review Board $355.00 Historic and Cultural Landmarks Commission $355.00 Urban Design Commission $355.00 City Plan Commission Concept plan $1,064.00 Plats: Preliminary plat $1,005.00* (*Plus $35.44 per each acre nonresidential) Ordinance No. 26-28781 Page 6 of 73 (*Plus $17.71 per lot residential) Final plat $455.00* (*Plus $35.44 per lot residential) (*Plus $29.53 per acre nonresidential) Re -plat (with public hearing) $591.00* (*Plus $29.53 per lot residential) (*Plus $29.53 per acre nonresidential) Minor plat and re -plat (no public hearing) $503.00* (*Plus $29.53 per lot residential) (*Plus $29.53 per acre nonresidential) Conveyance plat $237.00 Plat revisions after first revision $260.00 Plat correction $59.06 Plat vacation $473.00 Waivers and other matters of business $500.00 Filing fees with the county: Collection of filing fees for the appropriate county will be in addition to the fee rates above Agreements Application Fees Community Facilities Agreement and amendments $2,750.00 Stormwater Facilities Management Agreement or Amendment $760.00 Transportation Impact Fee Credit Agreement $1,125.00 Easements and Vacations by Separate Instrument (Initial) $827.00 Easement Amendment by Separate Instrument $850.00 (Fee for processing application) Maintenance Agreement or Amendment $500.00 Credit Access Business $119.00 (Application and renewal) Comprehensive Plan Inconsistency $709.00 (For a change in zoning that is incompatible with the city comprehensive plan and future land use) Hearing Continuance $709.00* * At applicant's request (after public notice) of board of adjustment, city plan commission and zoning commission public hearings Ordinance No. 26-28781 Page 7 of 73 Inspection and Testing Fees a. Administrative Material Testing Service Fee $28.94 per test b. Construction Inspection Service Fee $355.00 per day c. Water Testing Lab Fee $33.75 per test Infrastructure Plan Review Center Design Review Fee: Cost Per Design Page $458.00 per page The total number of detail pages shall be considered one page IPRC Pre/Post Submittal Conference $1,182.00 Transportation Impact Analysis Review Peak Trips less than 150 per day $500.00 Peak Trips between 150 and 300 per day $1,400.00 Peak Trips at or above 301 per day $1,800.00 Master Thoroughfare Plan - Amendment $827.00 Small Scale Infrastructure Program (Miscellaneous Projects) Application Fee $1,772.00 Review Fee $458.00 per design sheet Project Management Fee $1,575.00 Newsracks Permit Fees $33.08 Application fee per applicant plus, per newsrack $11.81 Paper Filing Fee $59.06* * Additional fee assessed for any development application that can be submitted online Parkway Permit Commercial $296.00 Residential $266.00 Reinspection $66.15 Pre -submittal Meeting Half Hour $250.00 One Hour $500.00 Private ETJ Release $473.00 Sexually Oriented Businesses; Application for Specialized Certificate of Occupancy Amended, modified, renewal or transfer $1,182.00 New $1,182.00 Special Districts (MUDS/WCIDS) Petition $17,719.00 Ordinance No. 26-28781 Page 8 of 73 Per agreement or amendment $11,813.00 Street Name Change $827.00 Street Use Permit Commercial $296.00 Residential $266.00 Reinspection $66.15 Technology Fee for all Permits $16.87 Traffic Control Review Plan $119.00 "CR," "C," and "D" Zoning Districts Site Plan New $709.00 E Revised $355.00 Unified Sign Agreement New $1,800.00 Amended $1,800.00 Urban Forestry Application fee for staff review Base fee - First five acres (up to 5.00 acres), including one revision $296.00* Additional acreage - 5.01 acres and over, per acre above base fee $17.71 Additional revisions (each) $119.00* After -the -fact base fee - First five acres (up to 5.00), including one revision $591.00* After -the -fact additional acreage - 5.01 acres and over, per acre above base fee $35.44* * The acreage will be based on the preliminary plat or site plan, whichever is appropriate, at the time of submission of the urban forestry plan Vesting Letters $237.00 Permit Renewal $148.00 Developer Agreement $1,772.00 Specialized additional application fee for OF appeal hearing before urban design commission: Waivers to Urban Forestry Ordinance; waiver from tree planting and nonprotected trees $650.00 Waiver from preservation of protected trees $1,182.00 ver from preservation of significant trees or alargrees -city wide $5,907.00 Ordinance No. 26-28781 Page 9 of 73 Waiver from preservation of significant tree or $3,544.00 large trees east of I35 (lower threshold) Vacations or Closures, ROW, Emergency and Public Access Easements Public access or emergency easement vacation $473.00 Street and alley vacations $827.00 Zoning Board of Adjustment Interpretation request $473.00 Variance Nonresidential/other residential $886.00 Plus an additional $473.00 for each additional variance requested in same application for nonresidential property or other residential property. Residential (owner -occupied) $591.00 Plus an additional $296.00 for each additional variance requested in the same application for owner- occupied residential. Sign - Nonresidential/other residential $1,182.00 Plus an additional $1,182.00 for each additional variance requested in the same application. Special exception Nonresidential/other residential $1,772.00 Plus an additional $355.00 for each additional special exception requested in the same application for nonresidential property or other residential property. Residential (owner -occupied) $866.00 Plus an additional $178.00 for each additional special exception requested in same application for owner -occupied residential. Multifamily Dwelling (MFD/PD) Waiver $709.00 for first waiver, $355.00 for each next waiver Administration site plan amendment $296.00 "CD" Conservation District overlay rezoning No fee "HC", "HSE" and "DD" Historic and Cultural No Fee Landmarks District overlay rezoning Ordinance No. 26-28781 Page 10 of 73 Planned Development (PD) or Conditional Use $945.00* Permit (CUP) site plan review* 05 acres $1,418.00 For application requests of less than one acre in size, when down zoning to a one- or two-family districts that is consistent with the most current adopted Comprehensive Plan, a fee of $532.00 is required. 5.0110 acres $3,190.00 Zoning Commission 10 acres or more acres* $3,899.00 (Plus $88.59 per acre, not to exceed $10,632.00) PD or CUP Waiver Fee $886.00 (PD or CUP with requested development standard waivers) Vendor permit: holiday and 10-day $59.06 Zoning Application: Designated fee shall be twice the amount shown when double noticing and special city council consideration is required or requested, apart from the normal processing schedule. Double fee charge is not exempt of incentive programs granted to the project. Less than 1 acre* $1,418.00 For application requests of less than one acre in size, when down zoning to a one- or two-family districts that is consistent with the most current adopted Comprehensive Plan, a fee of $506.25 is required. 15 acres* $2,127.00 5.0110 acres* $3,190.00 10.0125 acres* $3,899.00 25.01 or more acres (base fee)* $3,899.00 (Plus $88.59 per acre, not to exceed $10,632.00) Multi Family Dwelling (MFD/PD) $709.00 for the first waiver $355.00 each additional waiver Zoning verification letter: 10-day letter $59.06 Ordinance No. 26-28781 Page 11 of 73 3-day letter $119.00 Notes: *In addition to Zoning Change Application Fee (b) No final approval of a plat shall be given by the city plan commission of the city unless and until a receipt is furnished to the secretary of such commission showing that the fee provided for in this section has been paid; no petition shall be docketed with the zoning commission of the city unless and until a receipt has been furnished to the secretary of such commission showing that the fee provided for in this section has been paid; no application for relief shall be docketed with the board of adjustment of the city unless and until a receipt is furnished the secretary of such board showing that the fee provided for in this section has been paid and no petition shall be docketed with other boards and commissions of the city unless and until a receipt has been furnished to the secretary of such commission and boards showing that the fee provided for in this section has been paid. II. Chapter 7, Article II, Section 119 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: SECTION 119 - FEE TABLES TABLE NO. 1-A NON-RESIDENTIAL REMODEL AND ACCESSORY BUILDING PERMIT FEES INCLUDES FEES FOR NEW CONSTRUCTION WITH NO SQUARE FOOTAGE TOTAL VALUATION Permit Fee l° 2 $0 to $2,000.00 $102.00 >$2,000.00 to $25,000.00 (a) $102.00 (a) for first $2,000 (b) $20.33 (b) for each additional $1,000.00, or fraction thereof, to and including $25,000.00 >$25,000.00 to $50,000.00 (a) $570.00 (a) for first $25,000 (b) $14.68 (b) for each additional $1,000.00, or fraction thereof, to and including $50,000.00 >$50,000.00 to $100,000.00 (a) $937.00 (a) for first $50,000 (b) $10.16 (b) for each additional $1,000.00 or fraction thereof, to and including $100,000.00 Ordinance No. 26-28781 Page 12 of 73 >$100,000.00 to $500,000.00 (a) $1446.00 (a) for first $100,000 (b) $7.90 (b) for each additional $1,000.00 or fraction thereof, to and including $500,000.00 >$500,000.00 to $1,000,000.00 (a) $4610.00 (a) for the first $500,000.00 (b) $6.77 (b) for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 >$1,000,000.00 (a) $8001.00 (a) for the first (b) $4.50 $1,000,000.00 (b) for each additional $1,000.00 or fraction thereof 'Residential projects (one- and two-family dwellings, and townhouses regulated by the IRC, and their accessory structures]: i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 35% [0.35]. The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70J. The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. 'Commercial projects (those not included in item 1 above): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 25% (0.25). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. TABLE IA-1 RESIDENTIAL REMODEL FEES Based upon the number of trades required for the pr Ject Number of Trades Minimum Permit Feel 1 $119.00 2 $238.00 3 $357.00 4 $476.00 5 $595.00 Residential projects (one- and two-family dwellings, and townhouses regulated by the IRC, and their accessory structures): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. Ordinance No. 26-28781 Page 13 of 73 ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.5 5). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. TABLE No. 1-B Building Permit Fee Schedule 1. Permit Application Fee, Applicable to All Permit Types, Excluding Signs: $33.08 2. Paper Filing Fee: $33.08 3. Technology Fee applicable to all applications/permits: $16.87 4. Simultaneous Plat and Early Plan Review Fee, per permit: $1,323.00 5. Expedited Plan Review: Application Fee: $500.00 Plan Review with Meeting, per hour, two hours minimum $1,125.00 Plan Review without Meeting, per hour, one hour minimum $1,125.00 Revisions, per hour, pro -rated, 15-minute time periods $1,125.00 6. Change of Occupancy Permit Fee: $94.50 7. Ordinance Inspection Fee (per inspectorf $66.15 7a. Ordinance Inspection Fee Urban Forestry New Plantings Verification, 1-5 acres, per inspector $150.00 7b. Ordinance Inspection Fee Urban Forestry New Plantings Verification, >5<15 acres, per inspector $225.00 7c. Ordinance Inspection Fee Urban Forestry New Plantings Verification >15<25 acres, per inspector $300.00 7d. Ordinance Inspection Fee Urban Forestry New Plantings Verification >25<50 acres, per inspector $350.00 7d. Ordinance Inspection Fee Urban Forestry New Plantings Verification >50 acres, per inspector $400.00 8. Inspection Card Replacement: $33.08 9. Record Change Fee per record or permit, applicable to all permit types: $33.08 10. Plan Review Deposit* Those requiring circulation: $291.00 Ordinance No. 26-28781 Page 14 of 73 Those without circulation: $113.00 Third party requiring circulation: $51.98 Third Party without circulation: $25.99 * Deposit is not required for additions and remodels to existing Group R-3 Occupancies and additions, remodels or new construction of their accessory structures. 11. Annual Contractor Registration Fee- Building and Sign: $178.00 12. Annual Contractor Registration Fee- Parkway and Utility Contractor $591.00 13. Vendor Certificate of Occupancy for Temporary Vendors: $110.00 14. Application for Specialized Certificate of Occupancy related to Sexually Oriented Businesses: a. New: $1,182.00 b. Amended, modified, renewal or transfer $1,182.00 15. CFPBOA Application Fee 1st item per address $237.00 Each additional item per address: $119.00 16. Demolition and Moving Fees cost per square foot: Demolition of structure 45 years or older $59.06 0 to 1000: $88.59 1001 through 2000: $180.00 2001 through 3000: $336.00 3001 through 5000: $504.00 5001 through 10000: $675.00 10001 through 20000: $902.00 20001 and Above: $1,804.00 17. Sidewalk Caf6 , annually $199.00 18. Temporary or Limited Certificate of Occupancy $397.00 Inspection and Plan Review Fees Applicable to All Permit Types: 1. Inspections outside of normal business hours per hour (minimum of 4 hours): $140.00 2. Reinspection fee: $66.15 Ordinance No. 26-28781 Page 15 of 73 3. Inspections for which no fee is specifically $66.15 indicated, per hour, half hour minimum: 4. Additional plan review required by changes, additions or revisions to plans, per revision, per hour, half hour minimum: first revision $66.15 second revision $119.00 third and fourth revision $237.00 fifth revision and up $375.00 Third Party plan revisions for Building, $41.34 Mechanical, Electrical, Plumbing, Energy, per revision, per hour, half hour minimum: 5. Inspections outside of city limits, per hour, 4 $99.23 hours minimum: 6. Same Day Inspection (in addition to all other $140.00 applicable fees) 7. Concealed work — applies when work that $400.00 required inspection has been covered by other work, applies to each item of concealed work 'for Urban Foresty Ordinance Inspection, the base fee, per inspector, is for properties up to 1 acre in size TABLE 1-C-1 A,B,E,H,I,&MUSE GROUPS NEW CONSTRUCTION OR ADDITION BUILDING PERMIT FEES NEW SQUARE FOOTAGE Permit Feel,2 0 to 30 $102.00 >30 to 400 (a)$102.00 (a) for first 30 square feet (b) $1.25 (b) for each additional square foot, to and including 400 >400 to 790 (a)$570.00 (a) for first 400 square feet (b) $0.94 (b) for each additional square foot, to and including 790 >790 to 1365 (a)$937.00 (a) for first 790 square feet (b) $0.89 (b) for each additional square foot, to and including 1365 >1365 to 5850 (a)$1,446.00 (a) for first 1365 square feet (b) $0.71 (b) for each additional square foot, to and including 5850 >5850 to 18,000 (a)$4,610.00 (a) for the first 5850 square (b) $0.28 feet Ordinance No. 26-28781 Page 16 of 73 (b) for each additional square foot, to and including 18,000 >18,000 (a)$8,001.00 (a) for the first 18,000 square (b) $0.26 feet (b) for each additional square foot 1 Residential projects (one- and two-family dwellings, and townhouses regulated by the IRC, and their accessory structures): i. When plan review and field inspections are performed by Third Party', the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. 2 Commercial projects (those not included in item 1 above): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 25% (0.25). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55) The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. TABLE 1-C-2 F & S USE GROUPS NEW CONSTRUCTION OR ADDITION BUILDING PERMIT FEES NEW SQUARE FOOTAGE Permit Feel,2 0 to 75 $102.00 >75 to 1080 (a)$102.00 (a) for first 75 square feet (b) $0.46 (b) for each additional square foot, to and including 1080 >1080 to 1980 (a)$570.00 (a) for first 1080 square feet (b)$0.41 (b) for each additional square foot, to and including 1980 >1980 to 3365 (a)$937.00 (a) for first 1980 square feet (b) $0.36 (b) for each additional square foot, to and including 3365 >3365 to 24,675 (a)$1,446.00 (a) for first 3365 square feet (b) $0.15 (b) for each additional square foot, to and including 24,675 >24,675 to 50,050 (a)$4,610.00 (a) for the first 24,675 square (b) $0.13 feet (b) for each additional square foot, to and including 50,050 Ordinance No. 26-28781 Page 17 of 73 >50,050 (a)$8,001.00 (a) for the first 50,050 square (b) $0.13 feet (b) for each additional square foot Residential projects (one- and two-family dwellings, and townhouses regulated by the IRC, and their accessory structures): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. Commercial projects (those not included in item 1 above): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 25% (0.25). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. TABLE 1-C-3 R USE GROUPS NEW CONSTRUCTION OR ADDITION BUILDING PERMIT FEES NEW SQUARE FOOTAGE Permit Feel,2 0 to 65 $102.00 ($61.01)* >65 to 700 (a)$102.00 (a) for first 65 square feet ($61.01)* (b) for each additional square (b)$0.74 foot, to and including 700 ($0.45)* >700 to 1400 (a)$570.00 (a) for first 700 square feet (b) $0.53 (b) for each additional square foot, to and including 1400 >1400 to 2700 (a)$937.00 (a) for first 1400 square feet (b) $0.39 (b) for each additional square foot, to and including 2700 >2700 to 11,800 (a)$1,446.00 (a) for first 2700 square feet (b) $0.35 (b) for each additional square foot, to and including 11,800 >11,800 to 24,500 (a)$4,610.00 (a) for the first 11,800 square (b) $0.27 feet (b) for each additional square foot, to and including 24,500 Ordinance No. 26-28781 Page 18 of 73 >24,500 (a)$8,001.00 (a) for the first 24,500 square (b) $0.20 feet (b) for each additional square foot *New square footage for Group R-3, up to and including 500 sq. ft., shall be charged the fee in ( ). 1 Residential projects (one- and two-family dwellings, and townhouses regulated by the IRC, and their accessory structures): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. 2 Commercial projects (those not included in item 1 above): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 25% (0.25). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. TABLE 1-C-4 U USE GROUP NEW CONSTRUCTION OR ADDITION BUILDING PERMIT FEES NEW SQUARE FOOTAGE Permit Feel,2 0 to 175 $102.00 ($61.01)* >175 to 2500 (a)$102.00 (a) for first 175 square feet (b) $0.20 (b) for each additional square foot, to and including 2500 >2500 to 5200 (a)$570.00 (a) for first 2500 square feet (b)$0.13 (b) for each additional square foot, to and including 5200 >5200 to 10,200 (a)$937.00 (a) for first 5200 square feet (b) $0.11 (b) for each additional square foot, to and including 10,200 >10,200 to 46,500 (a)$1,446.00 (a) for first 10,200 square feet (b) $0.09 (b) for each additional square foot, to and including 46,500 >46,500 to 96,500 (a)$4,610.00 (a) for the first 46,500 square (b) $0.07 feet (c) for each additional square foot, to and including 96,500 Ordinance No. 26-28781 Page 19 of 73 >96,500 (a)$8,001.00 (a) for the first 96,500 square (b) $0.06 feet (b) for each additional square foot *New square footage for accessory Group U uses associated with existing R-3's shall be charged the fee in ( ). 1 Residential projects (one- and two-family dwellings, and townhouses regulated by the IRC, and their accessory structures): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. Commercial projects (those not included in item I above): i. When plan review and field inspections are performed by Third Party, the permit fee shall be reduced by multiplying the sum by 25% (0.25). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. ii. When plan review is performed by Third Party with field inspections performed by City Staff, the permit fee shall be reduced by multiplying the sum by 70% (0.70) The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. iii. When plan review is performed by City Staff with field inspections performed by Third Party, the permit fee shall be reduced by multiplying the sum by 55% (0.55). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure Table 1-D Contractor Registration Fee (including Plumbing Irrigator) First year or portion thereof $178.00 Yearly renewal $178.00 Qualified Plumbing Inspection Company Registration, annually $1,182.00 Table 1-E Temporary Encroachment Fees Time Fee 3 or less days If the time does not exceed three (3) days, the fee will be $50.56 per day up to and including the third day. More than 3 days If the time exceeds three (3) days, the fee per day will be three cents ($0.03) per square foot of sidewalk or alley space and four cents ($0.04) per square foot of street space used with a minimum fee of $152.00 per permit. Table 1-F Permanent Encroachments Fee Ordinance No. 26-28781 Page 20 of 73 Applications, Amendments, Assignments and $1,200.00 Terminations Annual Fee $2.36 per linear or square foot of encroachment, as applicable Table 1-G Minimum amount retained by City for hermit fee refunds The Building Official shall retain the application fee plus the largest of the following: (a) 5% of the permit fee; or, (b) the plan review deposit; or, (c) 59.06 dollars ($59.06). Table 1-H Schedule of Mechanical Fees* Forced Air Heating -Furnaces Including Ducts and/or Vents Attached Thereto: Capacity to and including 100,000 BTU input or 20 KW: $6.10 Over 100,000 BTU input or 20 KW and Including 400,000 BTU or 40 KW: $10.34 Heating Appliances Non -Ducted Air Gas Unit or Room Heater, including vent: $6.10 Gas Wall Heater, including vent: $6.10 Gas Floor Furnace, including vent: $6.10 Gas Infra -red Heating Unit: $6.10 Electric Heater, Wall, Space, Unit, etc.. $6.10 Energy -Using Heat Appliance Other Than Above Per 1,000 BTU Input: $0.12 Minimum: $6.57 Per 1 KW: $0.31 Minimum: $6.57 Ordinance No. 26-28781 Page 21 of 73 Each Low or High Pressure Steam or Hot Water Boiler Rated in either BTU's Input Boiler Horsepower Output or KW Per 1,000 BTU's Input: $0.12 Minimum: $6.57 Per Boiler HP Output: $2.71 Minimum: $6.57 Per KW: $0.31 Minimum: $6.57 Each Absorber Unit, Electrical Reciprocating, Centrifugal, or Rotary Compressor, Condensing Unit, or Chiller Unit, Each on its Normal Capacity Rating Up to and including 2 tons: $6.10 Over 2 up to and including 3 tons: $10.34 Over 3 up to and including 5 tons: $16.46 Over 5 up to and including 7-1/2 tons: $22.59 Over 7-1/2 up to and including 10 tons: $29.17 Over 10 up to and including 30 tons, per ton: $2.61 Over 30 up to and including 100 tons, per ton: $2.40 Over 100 up to and including 320 tons, per ton $2.06 Over 320 up to and including 520 tons, per ton: $1.56 Over 520 tons, per ton $1.19 Mechanical Hydronic Piping First 120 feet $10.34 Each additional 100 feet or portion thereof $9.85 Each Roof -Top or Combination Including Ducts and Drains Cooling Only Heating and Cooling Up to and including 3 tons $10.34 $20.71 Over 3 and including 5 tons: $16.46 $29.17 Over 5 and including 7-1/2 tons: $22.59 $38.59 Over 7-1/2 and including 10 tons: $29.17 $49.13 Ordinance No. 26-28781 Page 22 of 73 Over 10 tons per ton: 1 $4.22 1 $5.16 Roof -Top Heating Only Unit per 1,000 BTU: $0.12 Minimum: $6.57 Through -the -Wall A/C Units All Sizes, Each: $8.46 Cooling Tower, Evaporative or Air -Cooled Condenser, Tonnage Based on Local Design Conditions All size units per ton refrigeration capacity: $1.01 Minimum: $6.57 Cooling -Heating Coils D.E. or Chill Water per ton: $1.01 Minimum: $6.57 Steam or Hot Water, per 1,000 BTU: $0.12 Minimum: $6.57 Fan and Coil Units including Drains and Ducts Cool and Heat, per ton: $2.06 Minimum: $6.57 Cool only, per ton: $1.01 Minimum: $6.57 Heating Unit only, per 1,000 BTU $0.12 Minimum: $6.57 Electrical Heat Strips for Units or Duct Installations Per KW: $0.31 Minimum: $6.57 Mixing Box - Conditioned Air: $2.06 Mixing Box - Forced Air: $4.22 Duct Addition or System not included elsewhere Per outlet: $1.01 Ordinance No. 26-28781 Page 23 of 73 Minimum: $6.57 Miscellaneous Commercial food preparation hood - Grease Type I: $16.46 Commercial food preparation hood - Heat or Moisture Type 11: $12.23 Commercial hood exhaust fan - Grease: $10.34 Commercial hood exhaust fan - Heat or Moisture: $8.48 Commercial hood exhaust duct - Grease: $10.34 Commercial hood exhaust duct - Heat or Moisture: $8.48 Commercial kitchen make-up air unit: $10.34 Commercial hood automatic electronic smoke extractor: $32.94 Automatic fire -extinguishing equipment system: $32.94 Range hood exhaust duct, for R Occupancy: $2.06 Toilet exhaust fan and/or duct (per inlet): $2.06 Ventilation fan and duct system: $8.48 Industrial hood: $12.23 Mechanical ventilator: $8.48 Flue replacement - U.L. labeled: $8.48 Flue or stack for commercial and industrial appliances: $10.34 Humidifier: $4.22 Vented decorative appliance: $8.48 Commercial clothes dryer exhaust duct: $10.34 Domestic clothes dryer exhaust duct: $2.06 Incinerator, per 1,000 BTU: $0.12 Minimum: $6.57 Incinerator modification: $104.00 Condensate drain -French sump: $6.57 Fire or smoke damper: $2.06 Circulating water pump: $2.06 Evaporative cooler: $8.48 Automatic shutoff - products of combustion: $10.34 Solar energy system: $62.14 Heat recovery devices per 1,000 BTU: $0.12 Minimum: $19.99 Ordinance No. 26-28781 Page 24 of 73 Gas Extension - Test: $10.34 For each appliance or piece of equipment for which no $10.34 other fee is listed: *When inspections are performed by third party the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. Table 1-I Schedule of Plumbing Fees* First Fixture or Appliance: $10.34 Additional Fixtures or Appliances (each): $4.22 Sewer - First 120 feet: $10.34 Each additional 100 feet or portion thereof: $9.85 Gas Service: $10.34 Each Lawn Sprinkler System: $120.00 Water Service - First 120 feet: $10.34 Each additional 100 feet or portion thereof: $9.85 Water Submeter: $4.22 Grease Trap or Interceptor: $10.34 Sand Trap: $19.75 Each Roof Drain: $9.85 Temporary Gas Service: $10.34 Backflow Preventer: $10.34 Floor Drain: $4.22 Mobile Homes/Mobile Units: Each mobile unit/space: $37.65 Each sewer vent: $22.59 Manhole: $32.94 Test Well: $10.34 Medical gasses and vacuum system: $43.66 * For the purpose of this table a sanitary plumbing outlet on or to which a plumbing fixture or appliance may be set or attached or any plumbing fixture or appliance to which a water connection may be made shall be construed to be a fixture. Fees for reconnection and retesting of existing plumbing systems in relocated buildings shall be based on the number of plumbing fixtures, gas systems, water heaters, etc. involved. When inspections are performed by third party the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. Temporary Power Letters, per bank of six meters 1 $43.66 Ordinance No. 26-28781 Page 25 of 73 Light Fixtures, Outlets, Switches, and Receptacles -per item Up to 100, each: $0.54 Over 100, each: $0.45 Fixed Appliances Ceiling Fan: $1.49 Vent Fan: $1.49 Smoke Detectors: $1.49 Bath Heater: $1.49 Disposal: $1.49 Compactor: $1.49 Dishwasher: $1.49 Washing Machine: $1.49 Water Heater: $2.99 Dryer: $2.99 Range: $2.99 Air Conditioner - 3 to 5 ton: $6.10 Air Conditioner - over 5 ton to 7 1/2 ton: $9.85 Air Conditioner - over 7 1/2 ton: $19.75 Heating Unit, Gas: $2.99 Heating Unit, Electric, per KW: $1.01 Motors 1 to 3 hp: $2.99 Over 3 to 5 hp: $6.10 Over 5 to 7 1/2 hp: $9.85 Over 7 1/2 hp: $19.75 Transformers, Generators and Welders 0 to 10 KW: $6.10 Over 10 KW to 20 KW: $9.85 Over 20 KW: $19.75 Welders: $6.10 Ordinance No. 26-28781 Page 26 of 73 Services and Subpanels 60 amps to 100 amps: $19.75 Over 100 amps to 150 amps: $29.17 Over 150 amps: $39.53 Miscellaneous Swimming pools: $56.48 Construction pole: $29.17 Sign connections: $9.39 New mobile home hookups": $43.59 Submeters-buildings, leases, apartments, etc. (per submeter): $20.71 *When inspections are performed by third party the permit fee shall be reduced by multiplying the sum by 35% (0.35). The resulting amount will be calculated to the penny with no rounding for the tenth of a penny figure. **A Building Code Ordinance Inspection shall be required to inspect and approve power to existing mobile homes in mobile home parks where the name changes on the electric utility account except when the account is being transferred from an individual to the park's name. Table 1-K Schedule of Sign Fees Application fee: $38.98 Permit Fee for New signs = Application Fee + Display Area Fee + Height Above Grade Fee + Electrical Amperage Fee Display Area Fee: $28.22or $0.26 per square foot for each display surface, whichever is greater Height Above Grade Fee, in Feet: 1-20: $28.22 21-30: $56.47 31-40: $84.75 41-50: $113.00 51-60: $142.00 Over 60: $198.00 Ordinance No. 26-28781 Page 27 of 73 Electrical Amps Fee: 1-40: $39.55 41-60: $56.47 61-80: $84.75 81-100: $113.00 Over 100: $170.00 Banners and Temporary Signs = Application Fee + Display Area + Height Above Grade Display Area: $28.22 Height above grade at: $28.22 *When permits are required for allowable repairs or sign removal the non-refundable application fee shall cover the required permit fee. Chapter 12.5, Article VIII, Division 4, Section 12.5-841.1 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 12.5-841.1 RESIDENTIAL COLLECTION FEES. The following residential collection fees are adopted: Service Rate (Plus Sales Tax) Residential curbside32 gallon cart $16.50 per month per cart Residential curbside64 gallon cart $23.40 per month per cart Residential curbside96 gallon cart $30.90 per month per cart Elective carryout Additional $30 per month above cart rate Disabled carryout Applicable Residential curbside cart rate with no additional cost (based on qualification) Excess bulky waste and brush collection $75 per 5 cubic yards over 10 cubic yards (on a one-time monthly basis) and $65 per 5 cubic yards thereafter, up to 30 cubic yards Ordinance No. 26-28781 Page 28 of 73 Excess bulky waste and brush collection for piles To be determined by the director over 30 cubic yards based upon city collector's fee and city administration costs Out -of -cycle and contaminated bulky waste pile $123.52 per 5 cubic yards and collection $107.40 per 5 cubic yards thereafter, up to 30 cubic yards ($123.52 shall be minimum charged to household) Cart delivery -exchange fee One exchange per year per household at no cost; thereafter $5 per request Pay bag $3.60 per bag with minimum purchase of 5 bags Optional 96 gallon yard trimmings cart $75 per cart Violation bag tag $10 per bag Bag outside cart fee $3.60 per bag Overloaded cart fee $7.50 per cart Nothing out trip charge $62 per incident IV. Chapter 12.5, Article VIII, Division 4, Section 12.5-841.2 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 12.5-841.2 COMMERCIAL GARBAGE COLLECTION FEES. The following commercial garbage collection fees are adopted based on ninety -six-gallon carts: Frequency of Service Monthly Rate (Plus Sales Tax) 1 X per week $51.23 2 X per week $64.97 3 X per week $83.71 4 X per week $104.95 5 X per week $129.94 6 X per week j $159.93 V. Chapter 12.5, Article VIII, Division 4, Section 12.5-844 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 12.5-844 NON CITY WASTE LANDFILL ENVIRONMENTAL FEE. Ordinance No. 26-28781 Page 29 of 73 All persons disposing of non city waste at the Southeast Landfill who do have a current, valid Grant of Privilege Agreement with the city pursuant to § 12.5-850 and/or do possess a current, valid hauling permit pursuant to § 12.5-857 shall pay a Landfill Environmental Fee of $7.00 per ton. All persons disposing of non city waste at the Southeast Landfill who do not have a current, valid Grant of Privilege Agreement with the city pursuant to § 12.5-850 and/or do not possess a current, valid hauling permit pursuant to § 12.5-857 shall pay a Landfill Environmental Fee of $13.00 per ton. The Landfill Environmental Fee shall be collected with the tipping fee assessed by the operator of the Southeast Landfill. VI. Chapter 12.5, Article IX, Division 2, Section 12.5-865 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 12.5-865 REGISTRATION. (a) Except as provided in § 12.5-870, no fill material may be placed on any tract, parcel or platted lot within the city limits unless a valid registration and site map is filed with the development services department of the city, the registration fee in the amount of $178.00 is paid to the city, notification is provided to all applicable property owners within 300 feet of the property and registered neighborhood associations within one -quarter mile of the property, and a sign is posted on the property as required by this article. (b) All registrations must be renewed annually with city prior to the expiration of the current registration, but shall be exempted from the notice requirements of this chapter. (c) Placement of fill material is used for landscaping purposes on improved property is exempted from the requirements of this section. Ordinance No. 26-28781 Page 30 of 73 VII. Chapter 13, Article I, Section 13-2, "Amendments," Section H104 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: SECTION H104 FEES FOR INSPECTIONS AND OPERATIONAL PERMITS H104.1 General. Fees for fire inspections and operational permits will be in accordance with Section 104 of this Appendix. Fees for the inspection of mobile home and recreational vehicle parking facilities will be in accordance with Appendix J of this code. H104.2 Fees for fire inspections. A fire inspection fee will be charged not more than once per calendar year for a fire inspection of all occupancies requiring a Certificate of Inspection as set forth in Section 102 of this Appendix. These fees shall be paid before a Certificate of Inspection is issued. The fees for fire inspection will be the sum of the base fee as set forth in Table H104.1 and the multiple -story fee as set forth in H104.2.1. Table H104.1 Base Fees for Fire Inspections Number of Square Feet of Floor Area in Building or Business Base Fee Less than 5,000 $60.00 5,001-10,000 $65.00 10,001-25,000 $75.00 25,001-50,000 $100.00 50,001-75.000 $150.00 75,001-100,000 $205.00 Greater than 100,000 $205.00 plus $30.00 for each additional 50,000 sq. ft. or portion H104.2.1 Multiple -story fee. An additional fee of $10.00 per floor will be added to the base fee for inspection of buildings with four or more occupied floors above the street level. H104.2.2 Shopping malls. Shopping malls shall be assessed an inspection fee based on total floor area of the public areas within the structure plus the per story charge. The individual tenant spaces will be assessed fees based on the square footage of the individual space. H104.3 Fees for operational permits. The fee for all operational permits will be as set forth in Table H104.2. Fees for Mobile Fueling Permits will be in accordance with Appendix K. Ordinance No. 26-28781 Page 31 of 73 Table H104.2 Fees for Operational Permits IFC Section Operational Permit Fee Amount 105.5.1 Additive Manufacturing $175.00 105.5.2 Aerosol Products $115.00 105.5.3 Amusement Buildings $175.00 105.5.4 Aviation Facilities $175.00 105.5.6 Cellulose nitrate film $85.00 105.5.7 Combustible Dust -Producing $85.00 105.5.8 Combustible Fibers $85.00 105.5.9 Compressed Gases $175.00 105.5.11 Cryogenic Fluids $175.00 105.5.12 Cutting and Welding $115.00 105.5.14 Energy Storage Systems $85.00 105.5.16 Explosives $175.00 105.5.18 Flammable and Combustible Liquids $115.00 105.5.19 Floor Finishing $115.00 105.5.20 Fruit and Crop Ripening $115.00 105.5.21 Fumigation and Thermal Insecticide Fogging $115.00 105.5.21 Hazardous Materials $410.00 105.5.22 HPM Facilities $410.00 105.5.24 High -Piled Storage $175.00 105.5.25 Hot Work Operations $85.00 105.5.26 Industrial Ovens $115.00 105.5.27 Lumber Yards and Woodworking Plants $320.00 105.5.28 Liquid or Gas -Fueled Vehicles/Equipment in Assembly $175.00 105.5.29 LP -Gas $175.00 105.5.30 Magnesium $175.00 105.5.31 Miscellaneous Combustible Storage $85.00 105.5.34 Trench Burning $205.00 105.5.35 Open Flames and Torches $115.00 Ordinance No. 26-28781 Page 32 of 73 105.5.36 Open Flames and Candles $85.00 105.5.37 Organic Coatings $85.00 105.5.39 Places of Assembly $85.00-Occupant Load <300. $175.00-Occupant Load 301-1000 $410-Occupant Load > 1000 105.5.42 Pyrotechnic Special Effects $205.00 Material Single Day Permit (Application $175.00 received 10 business days or more prior to event) Monthly Permit Renewal of $1,000.00 existing permit $500.00 Seasonal Permit Renewal of $1,500.00 existing permit $500.00 Late Application Fee (if requested $205.00 within 15 days of the event) Additional Late Fee Additional $175.00 (application received between 5-9 business days prior to fireworks display) 105.5.43 Pyroxylin Plastics $175.00 105.5.45 Repair Garages and Motor Fuel- $115.00 Dispensing Facilities 105.5.46 Rooftop Heliports $115.00 105.5.47 Spraying and Dipping $85.00 105.5.48 Storage of Scrap Tires and Tire $65.00 Byproducts 105.5.49 Temporary Membrane Structures, $295.00 Tents, and Canopies 105.5.50 Tire Rebuilding Plants $175.00 105.5.51 Waste Handling $175.00 105.5.52 Wood Products $115.00 105.5.53 Special Operational Permit $145.00 (If Inspector is required onsite beyond 1 hour, hourly rate of $125.00 shall be charged) 105.5.54 Mobile Fueling See Appendix K Ordinance No. 26-28781 Page 33 of 73 VIII. Chapter 13, Article I, Section 13-2, "Amendments," Section H105 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: SECTION H105 FEES FOR FALSE ALARMS 11105.1 General. Fees will be assessed to commercial establishments for excessive false alarms in accordance with Section 105 of this Appendix. 11105.2 Definitions. For the purpose of this Appendix the following definitions shall apply in addition to those in Section 202, General Definitions, and Section 902, Definitions, of the Fire Code. 11105.2.1 False alarm. For the purpose of this section, a false alarm is defined as an alarm which causes the emergency response by the fire department and which is initiated by one of the following: 1. A fire alarm system malfunction. 2. Improper maintenance of a fire alarm or an automatic fire suppression system. 3. Improper use or misuse of a fire alarm system or an automatic fire suppression system. 4. Damage to a fire alarm system or automatic fire suppression system due to carelessness while performing other procedures in the building. 5. The initiation of a fire alarm system during construction, painting, or other procedure in which care should have been taken to protect initiating devices from sending a false signal. 11105.3 Procedure. The procedure used to assess false alarm complaints and application of the fees contained herein will be in accordance with Section H105.3. 11105.3.1 Review of Incident Reports. False alarm incidents will be reviewed by the Fire Prevention Bureau on a regular basis to determine if those incidents meet the criteria stated in Section HI 05.2.1 of this Appendix. 11105.3.2 Notification. Upon the review of a false alarm incident report, a member of the Fire Prevention Bureau will verify the validity of the complaint. The owner or manager of the premises in question will then be issued a written notice to take measures to correct any problem that may be causing the false alarms. The notice will state that future false alarms at the referenced address, which occur within twelve months of the original complaint, will cause the owner or manager of the establishment to be invoiced in accordance with Section 105.4 of this Appendix, Fees. Ordinance No. 26-28781 Page 34 of 73 H105.3.3 Invoice for false alarms. An invoice will be mailed to any establishment for all reported false alarms which occur after the written notification in accordance with Section 105.3.2 of this Appendix is issued, and which occur before a period of twelve months has passed since the written notification. The invoice will be in accordance with Section 105.4 of this Appendix, Fees. H105.4 Fees. A fee in accordance with Table H105.1 will be assessed for each false alarm reported to the Fire Prevention Bureau after written notification is issued in accordance with Section 105.3.2 of this Appendix. Table H105.1 Number of False Alarms in a 12 Month Period Fee Amount 1-2 No Fee/Warning 3 $145.00 4 $295.00 5 $590.00 6 $1,060.00 7 or more $1,770.00 IX. Chapter 13, Article I, Section 13-2, "Amendments," Section 1106, Appendix I, Section 1102.3 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: 1102.3 Additional plan review. When the original plans have been reviewed and found to be acceptable, an additional plan review fee of $235.00 shall be charged to the fire protection system contractor for each additional plan review conducted. Ordinance No. 26-28781 Page 35 of 73 X. Chapter 13, Article I, Section 13-2, "Amendments," Section 1106, Appendix I, Table 1102.1 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: TABLE 1102.1 FEES BASED ON TYPE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT TYPE PERMIT FEES OTHER FEES New Sprinkler $125.00 per hour fee for any Installations: $350.00 additional inspections after two 1 to 20 sprinklers $590.00 inspections. 21 to 100 sprinklers $590.00 plus $115.00 for Over 100 sprinklers each additional 100 sprinklers or fraction thereof in excess of 100 With fire pump $590.00 additional With foam $590.00 additional Each additional floor $95.00 With private water storage $590.00 additional Add/Relocate Sprinkler No Fee/No Inspection Installations: Same as New Sprinkler 1 to 10 sprinklers fee schedule above. 11 and more sprinklers Underground Installation $235.00 $125.00 per hour fee for any additional inspections after two inspections. Pre -Engineered Kitchen $235.00 per kitchen hood $125.00 per hour fee for any Hood Extinguishing having the preengineered additional inspections after one Systems (per Hood) extinguishing system inspection. New Fire Alarm $125.00 per hour fee for any Installation: $350.00 additional inspections after one 1 to 4 initiating devices $590.00 inspection. 5 to 25 total devices $590.00 plus $115.00 for Over 25 total devices each additional 100 devices or fraction thereof in excess of 25 Each additional panel $95.00 Each additional floor $95.00 Ordinance No. 26-28781 Page 36 of 73 Other New Suppression $125.00 per hour fee for any Systems: $590.00 additional inspections after one (Gaseous, CO2, Dry $590.00 plus $80.00 per inspection. Chemical, etc.) nozzle over 5 nozzles. 1 to 5 nozzles Over 5 nozzles Standpipe Systems: $125.00 per hour fee for any 1 to 3 risers $825.00 additional inspections after two 4 or more risers $1,180.00 inspections. With fire pump $590.00 additional Smoke Control or Exhaust $590.00 $125.00 per hour fee for any Systems Installations additional inspections after one inspection. Compressed Gas Tanks $175.00 per tank $125.00 per hour fee for any Installation additional inspections after two inspections. Cryogenic Fluid Tank $175.00 per tank $125.00 per hour fee for any Installations additional inspections after one inspection. Flammable and $410.00 per tank or per $125.00 per hour fee for any Combustible Liquids site for additional inspections after two Installations, Alterations, piping/dispensing/other inspections. and Removals Hazardous Materials $410.00 $125.00 per hour fee for any Facility additional inspections after one Installation/Construction inspection. Industrial Oven $175.00 per oven $125.00 per hour fee for any Installations additional inspections after one inspection. LP Gas $175.00 per tank $125.00 per hour fee for any Tanks/Facilities Installation additional inspections after one inspection. Temporary Membrane $175.00 per tent type $125.00 per hour fee for any Structure, Tents, and structure additional inspections after one Canopies Installations (per inspection. event) Access Control Systems $125.00 per hour fee for any 1 to 4 devices $235.00 additional inspections after one 5 to 25 devices $320.00 inspection. More than 25 devices $320.00 Plus $115.00 for each 100 devices over 25 or fraction thereof. Ordinance No. 26-28781 Page 37 of 73 Emergency Responder $320.00 per building $125.00 per hour fee for any Radio Coverage additional inspections after one Equipment (Installation) inspection. Energy $175.00 per battery $125.00 per hour fee for any Systems (Installation) system installation additional inspections after one inspection. Firefighter Air $320.00 per building 125.00 per hour fee for any Replenishment Systems additional inspections after one (FARS) (Installation) inspection. XI. Chapter 13, Article I, Section 13-2, "Amendments," Appendix J, Section J401 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: SECTION J401 INSPECTION FEES J401.1 An annual fee is hereby charged to the owner of each manufactured home park and recreational vehicle park located within the city, to provide for inspections by the fire code official to determine compliance with the requirements of the Fire Code and of the requirements of this appendix relative to fire safety. J401.1.1 Calculation of inspection fee. The annual inspection fee for inspections required by this section are calculated as the total of the following: a. Base fee of $235.00. b. Additional fee of $5.50 per individual lot within the park. XII. Chapter 13, Article I, Section 13-2, "Amendments," Appendix K, Table K101.1 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: Table K101.1 Mobile Fueling Permit Fees For Each Site For Each Refueling Vehicle. Initial Permit Fee $1,180 $295 Permit Annual Renewal Fee $590 $235 Ordinance No. 26-28781 Page 38 of 73 XIII. Chapter 29, Article V, Division 2, Section 5.01 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: SECTION 5.01: REGISTRATION OF OFF -PREMISES SIGNS 5.01 REGISTRATION OF OFF -PREMISE SIGNS. (a) (1) The owner of any off -premises sign existing within the City of Fort Worth on November 5, 1997, shall register such sign with the building official and pay the registration fee as required in Table 5.01 on or before January 2, 1998. The owner of any off -premises sign in the extraterritorial jurisdiction shall register such sign with the building official and pay the registration fee as required in Table 5.01 on or before October 1, 2000. (2) Exceptions: Signs listed in § 6.402 of the zoning ordinance or § 5.02.2 and signs subject to a unified sign agreement shall be exempt from the registration requirements. (b) (1) The owner of any off -premise sign installed after November 5, 1997, shall submit an application for registration simultaneously with the sign permit application. This initial registration shall be exempt from the registration fee as required in Table 5.01. If the sign permit is approved and the sign constructed, this initial registration shall expire three years after the date of permit application. (2) Exceptions: Signs listed in § 6.402 of the zoning ordinance and signs subject to a unified sign agreement shall be exempt from the registration requirements. (c) (1) Registrations approved under subsections (a) and (b) above and all renewals shall expire after three years. Before such registration or renewal expires the registration must be renewed and the registration fee must be paid in accordance with Table 5.01. It is the owner's responsibility to monitor expiration dates and to renew the registration in a timely manner. (2) Exceptions: Based upon staffing and work loads, the building official may adjust expiration dates to be less than three years as long as the fees are appropriately prorated. (d) (1) Registration shall be applied for on forms provided by the building official. The building official may require the filing of plans or other pertinent information when, in his or her opinion, such information is necessary to ensure compliance with this section. (2) Whenever information on the form changes, including but not limited to names and addresses, a new registration form shall be filled out by the owner and submitted to the building official within 30 days, along with a change of record fee as required by Table 5.01. Ordinance No. 26-28781 Page 39 of 73 (e) (1) A late fee shall be assessed against the owners of off -premises signs who fail to register as required by this section. The late fee as shown in Table 5.01 shall be assessed if the registration fee is not received within ten calendar days after the due date. (2) Failure to register or renew registration of a sign within 30 calendar days after the due date in accordance with the provisions of this section shall constitute a violation of this code. Table 5.01 Sign registration, per 3 years $375.00 Late fee $75.00 Change of record $29.53 XIV. Chapter 30, Article I, Division 2, Section 30-14 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 30-14 PAINTING HOUSE NUMBERS ON CURBS OR DRIVEWAYS —LICENSE AND BOND REQUIRED; LICENSE FEE; PERMISSION FROM PROPERTY OWNERS. It shall be unlawful for any person to paint or print any house number or street address on any curb or driveway approach within the city without first having obtained, from the city's department of transportation and public works, a license to do such work, having made and executed a bond to the city in the sum of $500, having paid a license fee of $29.53 and having obtained from the owner, lessee or other person responsible for the premises written permission and approval, which shall state the price to be paid, both to paint or print the number of the curb or driveway approach and to obliterate, mark out, damage or otherwise remove any existing markings on the curb. XV. Chapter 30, Article 11, Section 30-32 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows § 30-32 LICENSE; BOND; PERMIT. It shall be unlawful for any person or firm to perform the work of a parkway contractor, as defined in this article, without first having obtained from the director of public works a license to Ordinance No. 26-28781 Page 40 of 73 do such work, having made and executed a bond to the city in the sum of $10,000, without having obtained a parkway contractor's license, the fee for which shall be $591.00, and without having obtained a permit from the director of public works to do such work. The license provided for in this article shall be renewed annually, and the renewal fee shall be $591.00. XVI. Chapter 35, Article III, Division 1, Section 35-57.4 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 35-57.4 WATER TAP CONNECTIONS. (a) City installed tap. In the case where the city installs a two-inch or smaller water tap, a charge shall be made for each tap made to a water main. The charges shall be payable by the property owner prior to the tap being made and shall be as follows: Water Tap Fees Pavement 1-inch 1.5-inch 2-inch Short Long Short Long Short Long Unpaved $2,900 $3,300 $3,000 $3,500 $3,400 $3,800 Asphalt* $3,700 $4,000 $4,400 $4,700 $5,000 $5,300 Concrete $3,500 $3,900 $3,600 $4,000 $4,000 $4,600 *See also section (b) below for additional asphalt pavement repair fees. (b) City installed tap within asphaltpavement. Any tap connection performed within an asphalt street constructed more than two years prior to the proposed tap connection will be assessed an additional charge associated with the age and pavement condition index (PCI) as adopted by the city council. (c) Taps within new pavement. Proposed tap connections within concrete or asphalt pavement less than two years of age will not be performed by the city and will be required to be made under a Community Facilities Agreement (CFA) between the customer and the city. (d) Other taps. Any tap connection larger than two inches, or involving unusual circumstances, shall be made through the Community Facilities Agreement process between the customer and the city or through the city's Miscellaneous Contracts. Ordinance No. 26-28781 Page 41 of 73 (1) Community Facilities Agreement. The customer shall comply with the requirements of the CFA process and pavement repair in accordance with the city's Utility Construction Policy. (2) Miscellaneous contract. At the discretion of the city, tap installations may be eligible to be performed through the city's Miscellaneous Contracts. Any installations requiring excavation in a newly paved street (within two years of age) are not eligible for the Miscellaneous Contract process. Construction within the city's Downtown Central Business District are not eligible for the Miscellaneous Contract process unless granted prior approval from the Water Department Director. The Miscellaneous Contract may be used for the following types of infrastructure: a. Fire line taps; b. Water service lines two -inches, or smaller; and c. Water service taps greater than two -inches. Three -inches and greater will require a meter vault in accordance with standard details. (e) New developments. Developers shall pay the full cost of all water service taps constructed by contract in new developments through a CFA. (f) Pavement removal. In the case that installation of a water tap connection requires the removal of pavement, the city and/or pre -qualified contractor will abide by the city's Utility Construction Policy for all pavement cuts or excavations within the city right-of-way and easements. All construction must be in accordance with city standard construction specifications. All pre -planned utility construction within city right-of-way, including drainage or other applicable easements, requires a Street Use Permit for Utility Construction ("Permit") prior to construction. (g) Other fee. The tap charges shall be in addition to the applicable fees provided for in the city plumbing code and in any other city codes, including, but not limited to, impact fees. (h) Violations. Any service connection made in violation of the City Code may be removed at the property owner's expense. (i) Ownership and maintenance. (1) The water tap and service line installation shall be constructed at the expense of the property owner/customer. The city shall then be the owner of the tap and service line. (2) The city shall maintain water service connections from the main to the meter. 0) Tap removal. The permanent removal or abandonment of a water service line or meter may be performed under a Community Facilities Agreement (CFA), Miscellaneous Projects or the city and comply with city's Utility Construction Policy. Ordinance No. 26-28781 Page 42 of 73 (1) The city shall not perform a removal of a tap within concrete or asphalt pavement less than two years of age and will be required to be made under a Community Facilities Agreement. (2) If the tap removal request is through the city, a removal fee as shown below shall be due and payable to the city prior to the tap being removed. Any tap connection removed within an asphalt street constructed more than two years prior to the proposed tap connection will be assessed an additional charge associated with the age and pavement condition index (PCI) as adopted by the City Council in accordance with the city's Utility Construction Policy. Water Tap Removal Fees Pavement Fee Unpaved $1,400 Asphalt* $1,400* Concrete $2,800 * Additional asphalt pavement repair fees will apply. XVII. Chapter 35, Article III, Division 1, Section 35-57.4 of the Code of the City of Fort Worth, Texas (2015), as amended, is amended in its entirety to be and read as follows: § 35-57.5 SEWER TAP CONNECTIONS. (a) City installed tap. The city may install sewer taps eight -inches, or smaller, with a depth not exceeding eight feet of cover. The property owner and or customer shall pay a charge as detailed below for any sanitary sewer tap installed by the city prior to the tap being made. Sewer Tap Fees Pavement 4" 6" * 8" * Short Long Short Long Short Long Unpaved $3,300 $3,400 $5,100 $5,750 $5,600 $6,250 Asphalt** $4,200 $7,700 $7,700 $9,000 $9,200 $10,200 Concrete $3,200 $6,900 $8,500 $10,500 $10,000 $12,700 *See also Section (b) for additional costs associated with manholes. ** See also section (c) below for addition asphalt pavement repair fees. Ordinance No. 26-28781 Page 43 of 73 (b) Manhole requirement. All sewer taps greater than four -inch require connection to an existing or installed manhole and shall be contracted and paid for by the customer. If a connection to an existing manhole cannot be made, an additional charge of $4,500 shall be payable by the property owner for the new manhole installation. (c) City installed tap within asphaltpavement. Any tap connection performed within an asphalt street constructed more than two years prior to the proposed tap connection will be assessed an additional charge associated with the age and pavement condition index (PCI) as adopted by the city council in accordance with the city's Utility Construction Policy. (d) Taps within new pavement. Proposed tap connections within concrete or asphalt pavement less than two years of age will not be performed by the city and will be required to be made under a CFA between the customer and the city. (e) Other taps. Any sanitary sewer tap involving unusual conditions, connections to the city's deep sewer system, connections to mains exceeding eight feet of depth, or taps larger than eight inches shall be made through the Community Facilities Agreement process between the customer and city or through the city's Miscellaneous Contracts. (1) Community Facilities Agreement. The customer shall comply with the requirements of the CFA process and pavement repair in accordance with the city's Utility Construction Policy. (2) Miscellaneous contract. At the discretion of the city, tap installations may be eligible to be performed through the city's Miscellaneous Contracts. Any installations requiring excavation in a newly paved street (within two years of age) are not eligible for the Miscellaneous Contract process. Construction within the city's Downtown Central Business District are not eligible for the Miscellaneous Contract process unless granted prior approval from the Water Department Director. The Miscellaneous Contract may be used for any size of sewer tap where the depth of cover does not exceed 12 feet. (f) New developments. Developers shall pay the full cost of all sewer service taps constructed by contract in new developments through a CFA. (g) Pavement removal. In the case that installation of a sewer tap connection requires the removal of pavement, the city and/or pre -qualified contractor will abide to the city's Utility Construction Policy for all pavement cuts or excavations within the City of Fort Worth rights of way (ROW) and easements. All construction must be in accordance with city standard construction specifications. All pre -planned utility construction within city right-of-way, including drainage or other applicable easements, requires a Street Use Permit for Utility Construction ("Permit") prior to construction. (h) Other fees. The tap charges shall be in addition to the applicable fees provided for in the city plumbing code and in any other city codes, including, but not limited to, impact fees. Ordinance No. 26-28781 Page 44 of 73 (i) Grade verification. Prior to any construction of a building sewer lateral, the property owner shall verify in writing that the sewer lateral is capable of being installed to such a grade that will permit a sanitary sewer tap to be made by the city and that will meet all applicable city codes. Verification will be made by a drawing depicting the grade of the sanitary sewer lateral and the elevation of the sanitary sewer tap. In the absence of such verification, that portion of any building sewer to be constructed by the plumber or the person securing the permit shall not be constructed prior to the completion of the sanitary sewer tap by the water department forces. 0) Violations. Any service connection made in violation of the City Code shall be removed at the property owner's expense. (k) Ownership and maintenance. (1) The sanitary sewer tap shall be constructed at the expense of the owner/customer. The city shall then own and maintain the sewer tap upon completion and acceptance. (2) The city shall maintain wastewater service connections from the main to the property line. (1) Tap removal. When a property owner requests permanent removal or abandonment of a sanitary sewer service line, then the tap removal shall be made through the Community Facilities Agreement process between the customer and city or through the city's Miscellaneous Contracts. The city shall not perform any sewer tap removal. (1) Community Facilities Agreement. The customer shall comply with the requirements of the CFA process and pavement repair in accordance with the city's Utility Construction Policy. (2) Miscellaneous Contract. At the discretion of the city, tap removal may be eligible to be performed through the city's Miscellaneous Contracts. Any installations requiring excavation in a newly paved street (within two years of age) are not eligible for the Miscellaneous Contract process. Construction within the city's Downtown Central Business District are not eligible for the Miscellaneous Contract process unless granted prior approval from the Water Department Director. The Miscellaneous Contract may be used for any sewer tap removal where the depth of cover does not exceed 12 feet. Ordinance No. 26-28781 Page 45 of 73 EXHIBIT B New Fee Current Fee Fee Title Amount Amount Description of Change Owl- Development- - Fill Permit Fee Replacement for Codified Fee $178.00 Found in 12.5-865(a) Flmposition of the fill permit fee is subject to City Council's adoption of an amendment to the City Code. Environmental- - Health Permit Fee- Ltd Service Hotels/Motels $773.00 $580.00 Fee Increase Health Permit Fee- Hotels/Motels per employee $0.00 $5.00 Elimination Health Permit Fee - Swimming Pools/Spa $773.00 $580.00 Fee Increase Health Permit Fee - Childcare (Before/After School Only) $400.00 $385.00 Fee Increase Health Permit Fee- Restructured as tiered system. Childcare Tier 1 $440.00 $385.00 Fee Increase. Health Permit Fee- Restructured as tiered system. Childcare Tier 2 $480.00 $385.00 Fee Increase. Health Permit Fee- Restructured as tiered system. Childcare Tier 3 $520.00 $385.00 Fee Increase. Certified Pool Operator Course Fee $350.00 $275.00 Fee Increase. Plan Review Fee - Food Service Establishments, Childcare Facilities, Bed & Breakfasts <-150 sgft $175.00 $165.00 Fee Increase. Plan Review Fee- Fee Increase. Food Service Establishments, Childcare Facilities, Bed & Breakfasts >150!c1,000 sgft $265.00 $250.00 Plan Review Fee- Fee Increase. Food Service Establishments, Childcare Facilities, Bed & Breakfasts >1,00&c4,000 sgft $315.00 $300.00 Ordinance No. 26-28781 Page 46 of 73 Ordinance No. 26-28781 Page 47 of 73 Fee Title New Fee Amount Current Fee Amount Description of Change Plan Review Fee- Fee Increase. Food Service Establishments, Childcare Facilities, Bed & Breakfasts >4,00&c8,000 sgft $370.00 $350.00 Plan Review Fee- Fee Increase. Food Service Establishments, Childcare Facilities, Bed & Breakfasts >8,00&c20,000 sgft $445.00 $425.00 Plan Review Fee- Fee Increase. Food Service Establishments, Childcare Facilities, Bed & Breakfasts >20,000 sgft $525.00 $500.00 Plan Review Fee -Mobile Food Units, including Pushcarts $0.00 $165.00 Elimination Plan Review Fee- Fee Increase. Public Swimming Pools and Spas $265.00 $250.00 Plan Review Fee -Hotels Fee Increase. or Motels $210.00 $200.00 Plan Review Fee - Farmer's Markets $0.00 $0.00 No Change On -Site Sewage Facility (OSSF) Fees° OSSF New Construction $435.00 Application New Fee OSSF Repair $255.00 New Fee Application OSSF Inspection $190.00 New Fee Request OSSF General $168.75 New Fee Contractor Regis.Fee OSSF Admin. Fee for $100.00 New Fee Ownership Change OSSF Water Resources $10.00 Management Fee for TCEQ — Per Unit New Fee °Imposition of the OSSF Fees is subject to further required City Council action. Ordinance No. 26-28781 Page 48 of 73 Fee Title New Fee Amount A Current Fee Amount Description of Change Fire Lift -Assists 71 $750.00 $0.00 New Fee Stand By Fire Marshal $100.00 $80.00 Fee Increase (per person, per hour) Stand By Fire Engine - $337.50 $270.00 Fee Increase includes 4 person crew (per hour) Stand By Fire Brush $175.00 $140.00 Fee Increase Truck - includes 2 person crew (per hour) Stand By Fire Watch $100.00 $80.00 Fee Increase (per person, per hrr) Stand By Fire $100.00 $80.00 Fee Increase Pyrotechnic (per person, per hour) Divers (per person- $81.25 $65.00 Fee Increase Paddleboards) Stand By Fire Dive Boat $312.50 $250.00 Fee Increase - includes 4 person crew (per hour) Stand By Fire $143.75 $115.00 Fee Increase Command (per hour) 4mposition of the Lift Assist charge is subject to City Council's adoption of an amendment to the City Code Municipal Court Technology Fee - Civil $5.00 n/a New Fee Parking Security Fee - Civil $5.00 n/a New Fee Parking Boot Fee $75.00 $50.00 Fee Increase Recreation/Community Center Fees Day Pass (Resident) $5.00 Varies Reduce to single fee Day Pass (Non - Resident) $10.00 Varies Reduce to single fee Basic Adult (Resident) - gold & silver $40.00 $40.00 New fee title Basic Adult (Non - Resident) - gold& silver $80.00 $60.00 Fee Increase. Basic Adult (Resident) - bronze $10.00 $40.00 Decrease Basic Adult (Non - Resident) - bronze 1 $20.00 1 $60.00 1 Decrease Ordinance No. 26-28781 Page 49 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Ctr Fees (cont'd) Basic Veteran & Active Military (Resident) - gold & silver $20.00 $30.00 Decrease Basic Veteran & Active Military (Non -Resident) - gold & silver $40.00 $30.00 Fee Increase. Basic Veteran & Active Military (Resident) - bronze $5.00 $30.00 Decrease Basic Veteran & Active Military (Non -Resident) - bronze $10.00 $30.00 Decrease Basic COFW Employee & Retiree (Resident) - gold & silver $20.00 $20.00 New fee title Basic COFW Employee & Retiree (Non - Resident) - gold & silver $40.00 $20.00 Fee Increase. Basic COFW Employee & Retiree (Resident) - bronze $5.00 $20.00 Decrease Basic COFW Employee & Retiree (Non - Resident) - bronze $10.00 $20.00 Decrease Basic Special Fee Increase. Populations (Resident) - gold & silver $20.00 $15.00 Basic Special Fee Increase. Populations (Non - Resident) - gold & silver 1 $40.00 1 $15.00 Ordinance No. 26-28781 Page 50 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Ctr Fees (cont'd) Basic Special Populations (Resident) - bronze $5.00 $15.00 Decrease Basic Special Populations (Non - Resident) - bronze $10.00 $15.00 Decrease Basic Senior (Resident) - gold & silver $20.00 $20.00 New fee title Basic Senior (Non - Resident) - gold & silver $40.00 $35.00 Fee Increase. Basic Senior (Resident) - bronze $5.00 $20.00 Decrease Basic Senior (Non - Resident) - bronze $10.00 $35.00 Decrease Basic Youth (Resident) $0.00 $0.00 New fee title Basic Youth (Non - Resident) $20.00 $45.00 Decrease Gold Fitness - Adult (Resident) - monthly $20.00 $24.00 Decrease Gold Fitness - Adult (Non -Resident) - monthly $40.00 $48.00 Decrease Silver Fitness - Adult (Resident) - monthly $10.00 $14.00 Decrease Silver Fitness - Adult (Non -Resident) - monthly $20.00 $28.00 Decrease Gold Fitness - Adult (Resident) - annual $180.00 $190.00 Decrease Gold Fitness - Adult (Non -Resident) - annual $360.00 $380.00 Decrease Silver Fitness - Adult (Resident) - annual $90.00 $115.00 Decrease Silver Fitness - Adult (Non -Resident) - annual $180.00 $230.00 Decrease Ordinance No. 26-28781 Page 51 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Ctr Fees (cont'd) Gold Fitness - Veteran & Active Military (Resident) - monthly $10.00 $20.00 Decrease Gold Fitness - Veteran & Active Military (Non - Resident) - monthly $20.00 $20.00 New fee title Silver Fitness - Veteran & Active Military (Resident) - monthly $5.00 $12.00 Decrease Silver Fitness - Veteran & Active Military (Non - Resident) - monthly $10.00 $12.00 Decrease Gold Fitness - Veteran & Active Military (Resident) - annual $90.00 $158.00 Decrease Gold Fitness - Veteran & Active Military (Non - Resident) - annual $180.00 $158.00 Fee Increase. Silver Fitness - Veteran & Active Military(Resident) - annual $45.00 $95.00 Decrease Silver Fitness - Veteran & Active Military (Non - Resident) - annual $90.00 $95.00 Decrease Gold Fitness - COFW Employee & Retiree (Resident) - monthly $10.00 $14.00 Decrease Gold Fitness - COFW Employee & Retiree (Non -Resident) - monthly $20.00 $14.00 Fee Increase. Silver Fitness - COFW Employee & Retiree (Resident) - monthly 1 $5.00 1 $8.00 1 Decrease Ordinance No. 26-28781 Page 52 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Ctr Fees (cont'd) Silver Fitness - COFW Employee & Retiree (Non -Resident) - monthly $10.00 $8.00 Increase Gold Fitness - COFW Employee & Retiree (Resident) - annual $90.00 $110.00 Decrease Gold Fitness - COFW Employee & Retiree (Non -Resident) - annual $180.00 $110.00 Fee Increase. Silver Fitness - COFW Employee & Retiree (Resident) - annual $45.00 $65.00 Decrease Silver Fitness - COFW Employee & Retiree (Non -Resident) - annual $90.00 $65.00 Fee Increase. Gold Fitness - Special Populations (Resident) - monthly $10.00 $14.00 Decrease Gold Fitness - Special Populations (Non - Resident) - monthly $20.00 $32.00 Decrease Silver Fitness - Special Populations (Resident) - monthly $5.00 $8.00 Decrease Silver Fitness - Special Populations (Non -Resident) monthly $10.00 $16.00 Decrease Gold Fitness - Special Populations (Resident) - annual $90.00 $110.00 Decrease Gold Fitness - Special Populations (Non - Resident) - annual $180.00 $240.00 Decrease Silver Fitness - Special Populations (Resident) - annual $45.00 $60.00 Decrease Ordinance No. 26-28781 Page 53 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Ctr Fees (cont'd) Silver Fitness - Special Populations (Non -Resident) - annual $90.00 $120.00 Decrease Gold Fitness - Senior (Resident) - monthly $10.00 $18.00 Decrease Gold Fitness - Senior (Non - Resident) - monthly $20.00 $36.00 Decrease Silver Fitness - Senior (Resident) - monthly $5.00 $10.00 Decrease Silver Fitness - Senior (Non - Resident) - monthly $10.00 $20.00 Decrease Gold Fitness - Senior (Resident) - annual $90.00 $140.00 Decrease Gold Fitness - Senior (Non - Resident) - annual $180.00 $280.00 Decrease Silver Fitness - Senior (Resident) - annual $45.00 $80.00 Decrease Silver Fitness - Senior (Non -Resident) - annual $90.00 $160.00 Decrease Gold Fitness - Youth (Resident) - monthly $10.00 $19.00 Decrease Gold Fitness - Youth (Non -Resident) - monthly $20.00 $38.00 Decrease Silver Fitness - Youth (Resident) - monthly $5.00 $11.00 Decrease Silver Fitness - Youth (Non -Resident) - monthly $10.00 $22.00 Decrease Gold Fitness - Youth (Resident) - annual $90.00 $145.00 Decrease Gold Fitness - Youth (Non -Resident) - annual $180.00 $290.00 Decrease Ordinance No. 26-28781 Page 54 of 73 New Fee Current Fee Fee Title Amount Amount Description of Change PARD • • Rec/Comm Ctr Fees (cont'd) Silver Fitness - Youth (Resident) - annual $45.00 $85.00 Decrease Silver Fitness - Youth (Non - Resident) - annual 1 $90.00 1 $170.00 1 Decrease Log Cabin Village Fees Log Cabin Village: "Pioneer School" Program $7.00 $6.00 Fee Increase. Log Cabin Village: Adult Admission (age 18-59) $8.00 $7.00 Fee Increase. Log Cabin Village: Name change Discounted Adult Admission $7.00 $6.00 Fee Increase. Log Cabin Village: Youth Admission - 4-17 Years Old $7.00 $6.00 Fee Increase. Log Cabin Village: Group Rate (10 or more) $6.00 $5.00 Fee Increase. Fort Worth Nature Center & Refuge Nature Center & Refuge: Commercial Photography $100.00 $75.00 Fee Increase. Nature Center & Refuge: Commercial 500 + $500 Filming, <10 crew restoration members deposit New Fee Nature Center & $2,000 + Refuge: Commercial $1,500 Filming,10-30 crew restoration members deposit New Fee Nature Center & $4,000 + Refuge: Commercial $3,000 Filming, 30+ crew restoration members deposit New Fee FWNC - Birthday Fee Increase. Party Package 12 hr (Member) $175.00 $100.00 Ordinance No. 26-28781 Page 55 of 73 FWNC - Birthday Fee Increase. Party Package 12 hr (Non -Member) $200.00 $125.00 Nature Center & New Discount for free entry for Refuge: Discounted $0.00 $0.00 U.S. military veterans with valid Veteran Admission identification Ordinance No. 26-28781 Page 56 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PAR • • Fort Worth Nature Center &Refuge (cont'd) FWNC - Birthday Fee Increase. Party Package II 3 hr (Member) $300.00 $175.00 FWNC - Birthday Fee Increase. Party Package II 3 hr (Non -Member) $325.00 $200.00 FWNC 0- 4 hr Indoor/Outdoor Rental Meeting/Party 1 - 50 (Member) $175.00 $175.00 Update fee description FWNC 0- 4 hr Indoor/Outdoor Rental Meeting/Party 1 - 50 (Non -Member) $200.00 $200.00 Update fee description FWNC 5 -8 hr 1 - 50 Indoor/Outdoor Meeting/Party (Member) $325.00 $325.00 Update fee description FWNC 5 -8 hr 1 - 50 Indoor/Outdoor Meeting/Party (Non - Member) $350.00 $350.00 Update fee description FWNC 0 -4 hr 51- 75 Indoor/Outdoor Meeting /Party (Member) $225.00 $225.00 Update fee description FWNC 0 -4 hr 51- 75 Indoor/Outdoor Meeting /Party (Non -Member) $250.00 $250.00 Update fee description FWNC 5 -8 hr 51 - 75 Indoor/Outdoor Meeting /Party (Member) $375.00 $375.00 Update fee description FWNC 5 -8 hr 51 - 75 Indoor/Outdoor Meeting /Party (Non -Member) $400.00 $400.00 Update fee description FWNC 0 -4 hr 76 - 100 Indoor/Outdoor Meeting/Party (Member) $275.00 $275.00 Update fee description Ordinance No. 26-28781 Page 57 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PAR • • Fort Worth Nature Center &Refuge (cont'd) FWNC 0 -4 hr 76 - 100 Indoor/Outdoor Meeting/Party (Non - Member) $300.00 $300.00 Update fee description FWNC 5 -8 hr 76 - 100 Indoor/Outdoor Meeting/Party (Member) $400.00 $400.00 Update fee description FWNC 5 -8 hr 76 - 100 Indoor/Outdoor Meeting/Party (Non - Member) $425.00 $425.00 Update fee description Nature Center Birthday Goodie Bag $10.00 New fee Nature Center Portalet $70.00 $65.00 Increase; update description Nature Center Admission Military Adult (13-64) $5.00 $5.00 Update fee description Nature Center Admission Military Senior (65+) $2.00 $2.00 Update fee description Nature Center Admission Military Child (3-12) $1.00 $1.00 Update fee description Nature Center Admission Dog $2.00 $1.00 Fee Increase. Nature Center Guided Tour Admission (child) $2.00 $2.00 Update fee description Nature Center Guided Tour Admission $5.00 $5.00 Update fee description Title I Discount New discount Small Group Entry Discount New discount Nature Center Overnight Adventure (per person) $60.00 New fee Nature Center After Hours Staff Fee (per hour) $30.00 New fee Ordinance No. 26-28781 Page 58 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PAR • • Fort Worth Nature Center &Refuge (cont'd) Nature Center & Refuge: Evening Stroll with a Naturalist (Member) $5.00 Remove Nature Center & Refuge: Nature Center, Refuge After -Hours $15.00 $10.00 Fee Increase. Nature Center Bus Tour $15.00 New Fee Nature Center & Refuge: Canoe Fest (Member) $3.00 Remove Nature Center & Refuge: Guided Tours - Adults $10.00 $10.00 Update fee description Nature Center & Refuge: Bison Feeding Hayride (Member) $10.00 Remove Nature Center & Updated description Refuge: Hayride $20.00 $16.00 Fee Increase. Nature Center & Refuge: Misc. Naturalist Programs Maximum Fee (Member) $75.00 Remove Nature Center & Refuge: Miscellaneous Naturalist Programs Maximum Fee $100.00 $100.00 Update fee description Nature Center & Refuge: Miscellaneous Naturalist Programs Minimum Fee (Member) $0.00 Remove Nature Center & Refuge: Miscellaneous Naturalist Programs Minimum Fee $5.00 Remove Ordinance No. 26-28781 Page 59 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PAR • • Fort Worth Nature Center &Refuge (cont'd) Nature Center & Refuge: Off -site Education Program - lst Hour (Member) $90.00 Remove Nature Center & Refuge: Off -site Education Program - lst Hour (Non - Member) $125.00 Remove Nature Center & Refuge: Off -site Education Program - Each 1/2 Additional H (Member) $20.00 Remove Nature Center & Refuge: Off -site Education Program - Each 1/2 Additional H (Non-member) $35.00 Remove Education Outreach Programs .5 hour of programs $40.00 Remove Paddle Tours 2 hr. (Member) $20.00 Remove Nature Center & Refuge: Preschool Discovery Club (Member) $5.00 Remove Nature Center & Refuge: Preschool Discovery Club $15.00 $10.00 Fee Increase. Nature Center & Refuge: Nature Center Ind Animal Program - Schools (Member) $125.00 Remove Nature Center & Refuge: Nature Center Indoor Animal Program $125.00 $125.00 Update fee description Nature Center & Refuge: School Tours (Non -Member) $5.00 Remove Ordinance No. 26-28781 Page 60 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PAR • • Fort Worth Nature Center &Refuge (cont'd) Nature Center Habitat Naturalist Fieldtrip- All $5.00 $5.00 Update fee description Nature Center Bio Naturalist Fieldtrip - AII $5.00 $5.00 Update fee description Nature Center Field Naturalist Fieldtrip - AII $10.00 $10.00 Update fee description Nature Center Eco Naturalist Fieldtrip - AII $20.00 $20.00 Update fee description Summer Natural History Adventures Early Bird (Member) $160.00 Remove Summer Natural History Adventures Early Bird (Non - Member) $180.00 Remove Nature Center & Refuge: Summer Natural History Adventures - 1st - 6th grades (Member) $140.00 Remove Nature Center & Refuge: Summer Natural History Adventures - 1st - 6th grades (Non - Member) $160.00 Remove Nature Center & Refuge: Summer Natural History Adventures - Kindergarten (Member) $15.00 Remove Nature Center & Refuge: Summer Natural History Adventures - Kindergarten (Non - Member) $20.00 Remove Ordinance No. 26-28781 Page 61 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PAR • • Fort Worth Nature Center &Refuge (cont'd) Nature Center & Refuge: Canoe Tour (Member) $15.00 Remove Nature Center & Refuge: Canoe Tour (Non -Member) $20.00 Remove Nature Center & Refuge Guided Tours - Home School Groups (Non - Member) Remove Nature Center & Refuge: Guided Tours - Other Groups (Non - Member) $7.00 Remove Nature Center & Refuge: Guided Tours (Member) $0.00 Remove Nature Center & Refuge: Naturalist Led Nature Hikes (Member) $3.00 Remove Nature Center & Refuge: Naturalist Led Nature Hikes (Non -Member) $5.00 Remove Guided Hikes/Tours 1-2 hr (Member) $3.00 Remove Guided Hikes/Tours 1-2 hr (Non - Member) $5.00 Remove Rec/Comm Centers Afterschool Program and Rentals Activity Fee -Athletics: Youth Sports (YS)- Resident $40.00 $30.00 Fee Increase. Activity Fee -Athletics: YS - Non -Resident $55.00 $45.00 Fee Increase. Activity Fee -Athletics: YS Team Fees $250.00 $400.00 Range - per team Merchandise -Jersey $20.00 $15.00 Fee Increase. Ordinance No. 26-28781 Page 62 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Centers Afterschool Program and Rentals (cont'd) Merchandise -Shorts $20.00 $15.00 Fee Increase. Commercial Photography/Filming Fees $50.00 $100.00 Decrease Community Center - After School Program $40.00 $30.00 Fee Increase. Community Center - After School Program with Transportation $50.00 $40.00 Fee Increase. Community Centers Camp Fort Worth $75.00 $65.00 Fee Increase. Room Rental Fee - Small Room Non - Profit $45.00 $35.00 Fee Increase. Room Rental Fee - Fee Increase. Small Room For - Profit $90.00 $70.00 Room Rental Fee - Fee Increase. Large Room Non - Profit $70.00 $60.00 Room Rental Fee - Fee Increase. Large Room For - Profit $140.00 $100.00 Room Rental Fee - Fee Increase. Large Kitchen Non - Profit $45.00 $35.00 Room Rental Fee - Fee Increase. Large Kitchen For - Profit $90.00 $70.00 Room Rental Fee - Fee Increase. Half -Gymnasium Non -Profit $120.00 $50.00 Room Rental Fee - Fee Increase. Half -Gymnasium For -Profit $240.00 $100.00 Room Rental Fee - Fee Increase. Half -Gymnasium Athletics Non -Profit $60.00 $50.00 Room Rental Fee - Fee Increase. Half -Gymnasium Athletics For -Profit $120.00 $100.00 Ordinance No. 26-28781 Page 63 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Rec/Comm Centers Afterschool Program and Rentals (cont'd) Room Rental Fee - Fee Increase. Full -Gymnasium Non -Profit $180.00 $75.00 Room Rental Fee - Fee Increase. Full -Gymnasium For -Profit $360.00 $150.00 Room Rental Fee - Fee Increase. Full -Gymnasium Athletics Non -Profit $90.00 $75.00 Room Rental Fee - Fee Increase. Full -Gymnasium Athletics For -Profit $180.00 $150.00 Pool Rentals Pool Rental Fee (2- Fee Increase. hr. Rental) - Marine Park Pool $500.00 $400.00 Pool Rental Fee (2- Fee Increase. hr. Rental) - Forest Park Pool $650.00 $400.00 Pool Rental Fee (2- Fee Increase. hr. Rental) - Swimming teams $100.00 $80.00 Disc Golf Disc Golf Tournament Fee: 100 - 500 attendees. Full Day $650.00 $0.00 New Fee Disc Golf Tournament Fee: 100 - 500 attendees. Half Day $325.00 $0.00 New Fee Disc Golf Tournament Fee:99 and under attendees. Full Day $300.00 $0.00 New Fee Ordinance No. 26-28781 Page 64 of 73 Fee Title New Fee Current Fee Amount Amount Description of Change PARD • • Disc Golf (cont'd) Disc Golf Tournament Fee: 99 and under attendees. Half Day $150.00 $0.00 New Fee Disc Golf Tournament Fee: Over 500 attendees. Full Day $1,500.00 $0.00 New Fee Disc Golf Tournament Fee: Over 500 attendees. Half Day $750.00 $0.00 New Fee Culture &Tourism 20101 Public Events Exhibit Hall F $4,640.00 $3,180.00 Increased Fee for FY2030 Exhibit Hall G $14,985.00 N/A New Rate for FY2030 Exhibit Hall A-G $48,175.00 N/A New Rate for FY2030 Meeting Room 305 $460.00 N/A New Rate for FY2030 Meeting Room 306 $460.00 N/A New Rate for FY2030 Meeting Room 307 $460.00 N/A New Rate for FY2030 Meeting Room 308 A- D $1,840.00 N/A New Rate for FY2030 Meeting Room 308 A $460.00 N/A New Rate for FY2030 Meeting Room 308 B $460.00 N/A New Rate for FY2030 Meeting Room 308 C $460.00 N/A New Rate for FY2030 Meeting Room 308 D $460.00 N/A New Rate for FY2030 Meeting Room 309 A- C $1,380.00 N/A New Rate for FY2030 Meeting Room 309 A $460.00 N/A New Rate for FY2030 Meeting Room 309 B $460.00 N/A New Rate for FY2030 Meeting Room 309 C $460.00 N/A New Rate for FY2030 Meeting Room 310 A- D $1,840.00 N/A New Rate for FY2030 Meeting Room 310 A $460.00 N/A New Rate for FY2030 Meeting Room 310 B $460.00 N/A New Rate for FY2030 Meeting Room 310 C $460.00 N/A New Rate for FY2030 Meeting Room 310 D $460.00 N/A New Rate for FY2030 Meeting Room 311 A-C $1,380.00 N/A New Rate for FY2030 Meeting Room 311 A $460.00 N/A New Rate for FY2030 Meeting Room 311 B $460.00 N/A New Rate for FY2030 Ordinance No. 26-28781 Page 65 of 73 Fee Title Public Events (cont'd) Meeting Room 311 C New Fee Amount $460.00 Current Fee Amount N/A Description of Change New Rate for FY2030 Meeting Room 312 A- C (Junior Ballroom) $1,380.00 N/A New Rate for FY2030 Meeting Room 312 A $460.00 N/A New Rate for FY2030 Meeting Room 312 B $460.00 N/A New Rate for FY2030 Meeting Room 312 C $460.00 N/A New Rate for FY2030 Meeting Room 313 (Boardroom) $500.00 N/A New Rate for FY2030 Meeting Room 314 (Boardroom) $500.00 N/A New Rate for FY2030 North Ballroom A-F $12,150.00 N/A New Rate for FY2030 North Ballroom A $2,050.00 N/A New Rate for FY2030 North Ballroom B $2,050.00 N/A New Rate for FY2030 North Ballroom C $2,050.00 N/A New Rate for FY2030 North Ballroom D $2,050.00 N/A New Rate for FY2030 North Ballroom E $2,050.00 N/A New Rate for FY2030 North Ballroom F $2,050.00 N/A New Rate for FY2030 North Ballroom A-C $6,150.00 N/A New Rate for FY2030 North Ballroom D-F $6,150.00 N/A New Rate for FY2030 North Ballroom AB $4,100.00 N/A New Rate for FY2030 North Ballroom BC $4,100.00 N/A New Rate for FY2030 North Ballroom DE $4,100.00 N/A New Rate for FY2030 North Ballroom EF $4,100.00 N/A New Rate for FY2030 West Terrance $1,130.00 N/A New Rate for FY2030 Exhibit Hall F Move In/Move Out $2,320.00 N/A New Rate for FY2030 Exhibit Hall G Move In/Move Out $7,492.50 N/A New Rate for FY2030 Exhibit Hall A-G Move In/Move Out $24,087.50 N/A New Rate for FY2030 Meeting Room 312 A- C (Junior Ballroom) Move In/Move Out $690.00 N/A New Rate for FY2030 North Ballroom A-F Move In/Move Out $6,075.00 N/A New Rate for FY2030 North Ballroom A-C Move In/Move Out $3,075.00 N/A New Rate for FY2030 North Ballroom D-F Move In/Move Out $3,075.00 N/A New Rate for FY2030 North Ballroom A Move In/Move Out $1,025.00 N/A New Rate for FY2030 Ordinance No. 26-28781 Page 66 of 73 Fee Title New Fee Amount Current Fee Amount Description of Change Public Events North Ballroom B Move In/Move Out $1,025.00 N/A New Rate for FY2030 North Ballroom C Move In/Move Out $1,025.00 N/A New Rate for FY2030 North Ballroom D Move In/Move Out $1,025.00 N/A New Rate for FY2030 North Ballroom E Move In/ Move Out $1,025.00 N/A New Rate for FY2030 North Ballroom F Move In/Move Out $1,025.00 N/A New Rate for FY2030 North Ballroom AB Move In/Move Out $2,050.00 N/A New Rate for FY2030 North Ballroom BC Move In/Move Out $2,050.00 N/A New Rate for FY2030 North Ballroom DE Move In/Move Out $2,050.00 N/A New Rate for FY2030 North Ballroom EF Move In/Move Out $2,050.00 N/A New Rate for FY2030 .• AR FW Junior Pass $500.00 $150.00 Fee Increase. FW Jr Summer Pass $150.00 N/A New Fee EnAronmental Protection Fund 25005 Environmental Single -Family Residential $2.50 $2.25 Fee Increase Residential Duplex $3.33 $3.00 Fee Increase Residential Multi- Fee Increase Family (>2 units), per unit $2.50 $2.25 Non-Profit/Municipal $2.78 $2.50 Fee Increase Commercial Single Fee Increase Unit $41.63 $37.50 Commercial Multi- Fee Increase Unit 1 $33.30 1 $30.00 Industrial 1 $130.43 1 $117.50 1 Fee Increase Ordinance No. 26-28781 Page 67 of 73 Emergency -• • • 20201 NOTE Fees in the following chart are subject to limitation by the ambulance inflation factor (AIF) prescribed by the Centers for Medicare and Medicaid (CMS) and could be reduced. Following CMS's pronouncement of AIF, staff will file an addendum to this Ordinance in form shown in Exhibit C to reflect the final fees as modified by CMS's AIF. New Fee Effective January 1, Current Fee Fee Title 2027c Amount Description of Change Fire Stand By EMS Team - $187.50 $150.00 Fee Increase Advanced Life Support (ALS) (per hour) Stand By EMS Team - $175.00 $140.00 Fee Increase Basic Life Support (BLS) (per hour) Stand By EMS $200.00 $160.00 Fee Increase Kubota Team - Advanced Life Support (ALS) (per hour) Stand By EMS $187.50 $150.00 Fee Increase Kubota Team - Basic Life Support (BLS) (per hour) Stand By EMS $237.50 $190.00 Fee Increase Ambulance - Advanced Life Support (ALS) (per hour) Stand By EMS $212.50 $170.00 Fee Increase Ambulance - Basic Life Support (BLS) (per hour) Stand By EMS $137.50 $110.00 Fee Increase Command (per hr) Ordinance No. 26-28781 Page 68 of 73 Fee Effective January 1, Current Fee Fee Title 2027c AmountNew Description of Change Fire (cont'd) Advanced Life $1,963.50 $1,785.00 Fee Increase Support (ALS) - Emergency ALS - Level 2 - $1,963.50 $1,785.00 Fee Increase Emergency ALS - Non- $1,112.10 $1,011.00 Fee Increase Emergency ALS Disposable $171.60 $156.00 Fee Increase Supplies Basic Life Support $1,853.50 $1,685.00 Fee Increase (BLS) - Emergency BLS - Non- $1,112.10 $1,011.00 Fee Increase Emergency BLS Disposable $110.00 $100.00 Fee Increase Supplies Oxygen $127.60 $116.00 Fee Increase ET3 Treatment in $1,963.50 $1,785.00 Fee Increase Place - ALS ET3 Treatment in $1,853.50 $1,685.00 Fee Increase Place - BLS Ambulance $550.00 $500.00 Fee Increase Response, Treatment, No Transport - Patient Initiated Specialty Care $2,904.00 $2,640.00 Fee Increase Treatment, or Transport Mileage (per mile)* $29.70 $27.00 Fee Increase Flight Crew $247.80 $225.27 Fee Increase Transport Only Wait Time, per $1.65 $1.50 Fee Increase minute, charged in [, hour blocks c Fee amounts could be reduced based on direction of Centers for Medicare and Medicaid Ordinance No. 26-28781 Page 69 of 73 Municipal.. New Fee Current Fee •0 Amount Amount Description of Change AAation Hangar Space - Fee Increase. Spinks Box -Hangar: 3,000 Sq. Ft. $1,100.00 $1,060.00 Hangar Space - Fee Increase. Spinks Box -Hangar: 3,472 Sq. Ft. $1,300.00 $1,285.00 Hangar Space - Fee Increase. Spinks Box -Hangar: 3,600 Sq. Ft. $1,350.00 $1,325.00 Hangar Space - Fee Increase. Spinks Box -Hangar: 6,600 Sq. Ft. $2,350.00 $2,310.00 Hangar Space - Fee Increase. Meacham T-Hangar; 907 Sq. Ft. $465.00 $450.00 Hangar Space - Fee Increase. Meacham T-Hangar; 983 & 997 Sq. Ft. $490.00 $475.00 Office Space - Fee Increase. Meacham $14.50- Administration $15-$23/Sq. $22.50/Sq. Building Ft. Ft. Non -Signatory Fee Increase. Landing Fee per 1,000 pounds (AFW) $2.38 $2.30 Non -Signatory Fee Increase. Minimum Landing Fee (AFW) $101.60 $98.26 Airport Access Fee - Fee Increase. Air carrier or large aircraft user (AFW) $1,732.50 $1,650.00 Airport Access Fee - Fee Increase. General aviation or small aircraft user (AFW) $682.50 $650.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 10,501 lbs. to 12,500 lbs. / Per Month $150.00 $110.00 Ordinance No. 26-28781 Page 70 of 73 Fee Title New Fee Amount Current Fee Amount Description of Change Aviation• • Aircraft Parking - Fee Increase. Meacham & Spinks - 10,501 lbs. to 12,500 lbs. / Per Day $40.00 $25.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 12,501 lbs. to 18,000 lbs. / Per Month $450.00 $300.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 12,501 lbs. to 18,000 lbs. / Per Day $40.00 $30.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 10,501 lbs. to 12,500 lbs. / Per Month $150.00 $110.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 18,001 lbs. to 60,000 lbs. / Per Month $750.00 $600.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 100,001 lbs. to 300,000 lbs. / Per Day $130.00 $120.00 Aircraft Parking - Fee Increase. Meacham & Spinks - 300,001 lbs. and above/ Per Day $175.00 $150.00 Aircraft Parking - Fee Increase. Perot Field - 12,500 lbs and under / Per Day $25.00 $20.00 Aircraft Parking - Fee Increase. Perot Field - 100,001lbs. to 300,000 lbs. / Per Day $150.00 $120.00 Aircraft Parking - Fee Increase. Perot Field - 300,001 lbs. and above / Per Day $ 200.00 $150.00 • • - 00 Transportation and Public Works (TPW) Drainage Study $3500+$25/acre Fee Increase/Tiered Structure Review Fee <_25 acre Max fee $30,000.00 $3000+$25/acre Drainage Study $3500+$50/acre Fee Increase/Tiered Structure Review Fee >25 acre Max fee $30,000.00 $3000+$25/acre Ordinance No. 26-28781 Page 71 of 73 Fee Title New Fee Amount Current Fee Amount Description of Change TPW Drainage & Flood Fee Increase/Tiered Study Fee �c25 $4000+$25/acre Structure acres Max fee $30,000.00 $3500+$25/acre Drainage & Flood Fee Increase/Tiered Study Fee >25 $4000+$50/acre Structure acres Max fee $30,000.00 $3500+$25/acre Flood Study No Change Review Fee — Cap Imp Proj $0 $0 Flood Study No Change Review Fee — Ltr of Map Rev $1,000 $1,000 Flood Study Fee Increase Review Fee — All Others $4,000 $2,000 Grading Permit $1500+$25/acre Fee Increase/Tiered <c25 acres Max fee $7,000.00 $1000 +$25/acre Structure Grading Permit $1500+$50/acre Fee Increase/Tiered >25 acres Max fee $7,000.00 $1000 +$25/acre Structure Water .00 Water Pre-treatment Fee Increase. Administrative Unit $323.57 $202.31 Wastehauler trip Fee Increase. ticket books $25.00 $10.00 Water Study Fee Increase. Review $ 3, 850.00 $3, 400.00 Sewer Study Fee Increase. Review $ 3, 600.00 $3, 200.00 Water Loading $2,050.00 $1,750.00 Fee Increase. Fee Increase. Sewer Loading $2,050.00 $1,750.00 Fireflow Review Request $140.00 $125.00 Fee Increase. Ordinance No. 26-28781 Page 72 of 73 Exhibit C Memorandum of Emergency Medical Services Rates To: Fort Worth City Council From: Fort Worth Fire Department On DATE, the Centers for Medicare and Medicaid (CMS) announced its ambulance inflation factor (AIF) to apply to rates for emergency medical services (EMS) effective January 1, 2027. The chart below reflects the fees for EMS provided by Fort Worth Fire as of January 1 based on the application of the AIF prescribed by CMS. -- . Adjusted by Change from Fee Adopted by Fee Title CMS All' Council Advanced Life Support (ALS) - Emergency ALS - Level 2 - Emergency ALS - Non -Emergency ALS Disposable Supplies Basic Life Support (BLS) - Emergency BLS - Non -Emergency BLS Disposable Supplies Oxygen ET3 Treatment in Place - ALS ET3 Treatment in Place - BLS Ambulance Response, Treatment, No Transport - Patient Initiated Specialty Care Treatment, or Transport Mileage (per mile)* Flight Crew Transport Only Wait Time, per minute, charged in hr blocks Ordinance No. 26-28781 Page 73 of 73