HomeMy WebLinkAbout26-0112 - 2026-09-29 - Informal ReportFORT WORTH® INFORMAL REPORT TO CITY COUNCIL MEMBERS SUBJECT: PROPOSED PERMANENT ASPHALT AND CONCRETE BATCH PLANT ZONING AMENDMENTS - D.J. HARRELL, DEVELOPMENT SERVICES DIRECTOR DATE: 09/29/26 NUMBER: IR 26-0112 TO THE MAYOR AND MEMBERS OF THE CITY COUNCIL This Informal Report provides an overview of existing and proposed zoning regulations pertaining to Asphalt and Concrete Batch Plants. The current Zoning Ordinance separates batch plants into two categories: "Permanent Asphalt and Concrete Batch Plants" and "Temporary Asphalt and Concrete Batch Plants". The current zoning regulations for each category are below. The zoning regulations for Permanent Asphalt or Concrete Batch Plants were most recently amended in June 2024 by Ordinance No. 27030-06-2024. • Permanent Asphalt and Concrete Batch Plants: May operate indefinitely (subject to maintaining state permits) and serve a variety of users for commercial, residential and infrastructure projects. o Not allowed by right in any district o Allowed by Conditional Use Permit within "I" Light Industrial, "J" Medium Industrial and "K" Heavy Industrial o No required zoning setback distance from other land uses • Temporary Asphalt and Concrete Batch Plants: Typically used during the initial construction of new developments to facilitate infrastructure and large volume homebuilders for a short period of time. o Allowed by right in industrial districts (I/J/K) for up to six months (longer if Special Exception approved by the Board of Adjustment (BOA)) o Allowed by Conditional Use Permit within commercial and residential districts for up to six months (longer if Special Exception approved by BOA) o Site must be located 600 feet or more from properties upon which dwellings are constructed 1 of 3 FORT WORTH® Staff propose regulatory amendments to Permanent Asphalt and Concrete Batch Plants to address two important issues: • Long-term negative effects on surrounding residential uses related to dust, noise, vibrations, and operating hours associated with Permanent Asphalt or Concrete Batch Plants • Long-term negative effects of heavy industrial traffic regularly using local residential streets Proposed regulations for Permanent Asphalt or Concrete Batch Plants include: • Restrict the land use to only "K" Heavy Industrial zoning districts while maintaining the Conditional Use Permit requirement o The purpose of the Light (I) and Medium (J) Industrial districts is to provide for a limited range of industrial uses, provided the uses are not noxious or offensive due to odors, smoke, dust, noise, fumes or vibrations. o Batch Plants are operated outdoors and have the potential to generate dust that can be carried by wind to adjacent residential districts. The nuisance of dust covering structures, yards, driveways and vehicles has the potential to reduce the quality of life for surrounding neighborhoods. Land uses that generate excessive dust are not compatible with residential land uses. o High summer temperatures often result in concrete operators working in early mornings or at night to ensure the concrete cures properly and maintains required structural characteristics. Nighttime noise from batch plants coupled with trucks and machinery equipped with safety devices emitting loud warning sounds have the potential to lower the quality of life for surrounding residential areas by reducing sleep quality and/or sleep amounts. • Add a 1,000 -foot minimum separation between permanent batch plants and residential or school uses o Separation distance would be required to be shown on the Conditional Use Permit site plan in addition to other site plan requirements as described in Section 4.407 "Conditional Use Permit ("CUP") Overlay District", Article 4 "Overlay Districts", Chapter 4 "District Regulations", Zoning Ordinance. 2 of 3 FORT WORTH.; o This distance separation addresses noise and dust concerns as well as reduces the potential for conflicts with school traffic on local streets. The tentative schedule for the ordinance amending Supplemental Standards for Permanent Concrete Batch Plants is as follows: • September 29, 2026: Informal Report to City Council • October 14, 2026: Zoning Commission considers ordinance amendment • November 10, 2026: City Council considers ordinance amendment For questions regarding this information, please contact D.J. Harrell, Development Services Department Director at d.j.harreling fortworthtexas.aov. Jesus "Jay" Chapa City Manager ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS 3 of 3