Loading...
HomeMy WebLinkAbout065857 - Construction-Related - Contract - Evans and Rosedale Texas LLCReceived Date: 09/28/2026 Received Time: 11:07 a.m. Developer and Project Information Cover Sheet: Developer Company Name: I Evans and Rosedale Texas LLC Address, State, Zip Code: Phone & Email: 111 E Kilbourn Ave, Suite 2100, Milwaukee, WI 53202 262-613-9396 & b.mays(royalcapital.net Authorized Signatory, Title: Brian Mays, Authorized Represenative Project Name: Brief Description: Project Location: Plat Case Number: Council District: CFA Number: The Rosedale Water, Sewer, Paving, Storm Drain, and Streetlights 900 Evans Ave, Fort Worth, TX 76104 FS -23-089 Plat Name: The Rosedale 8 Phased or Concurrent None Provisions: CFA26-0067 City Project Number: 104821 / IPRC26-0045 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 1 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 City Secretary Number: 65857 STANDARD COMMUNITY FACILITIES AGREEMENT WITH CITY PARTICIPATION This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and Evans and Rosedale Texas LLC ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as The Rosedale ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City desires to participate in this Agreement in an amount not to exceed $55,925.00 to enlarge the scope of the Improvements beyond what Developer is responsible for constructing by replacing approximately 410 linear feet of an existing 8 -inch cast iron water main with an 8 -inch PVC water main ("City Participation"); and WHEREAS, the City Participation includes reimbursement to Developer in amounts not to exceed $41,610.00 for construction costs, $1,664.40 for material testing costs, and $10,620.00 for engineering costs. The remaining City Participation in the amount of $2,030.60 shall not be paid to Developer, but will be used by City to pay for the City's portion of construction inspection service fees, administrative material testing service fees, and water lab testing fees; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: OFFICIAL RECORD City of Fort Worth, Texas Page 2 of 17 Standard Community Facilities Agreement with City Participation CITY SECRETARY Rev. 4/2/20 FT. WORTH, TX 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: © Exhibit A: Water ® Exhibit B: Sewer ® Exhibit C: Paving ❑x Exhibit D: Storm Drain ® Exhibit E: Street Lights & Signs ❑ Exhibit F: Traffic Signal & Striping The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, B, C, D, E, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the. Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. City of Fort Worth, Texas Page 3 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. If the Improvements are not completed at the end of the Term, and any Extension Periods, there will be no further obligation for City Participation to be paid to the Developer. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: City of Fort Worth, Texas Page 4 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. City of Fort Worth, Texas Page 5 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. (h) Developer shall ensure the contractors are paid the City's wage rates in effect during construction of the Improvements. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS A GREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHTFOR OR ONA CCOUNT OFANYINJURIES OR DAMA GES SUSTAINED BYANYPERSONS, INCLUDING DEA TH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ON ACCOUNT OF ANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, City of Fort Worth, Texas Page 6 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. City of Fort Worth, Texas Page 7 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: DEVELOPER: Development Contract Management Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 Evans and Rosedale Texas LLC 111 E Kilbourn Ave, Suite 2100 Milwaukee, WI 53202 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, City of Fort Worth, Texas Page 8 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. City of Fort Worth, Texas Page 9 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full- time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. City of Fort Worth, Texas Page 10 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. 28. Compliance with Public Information Act Requests The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Agreement and Developer agrees that the Agreement can be terminated if Developer knowingly or intentionally fails to comply with a requirement of that subchapter. Developer acknowledges that section 552.371 of the Texas Government Code applies to this Agreement i£ (1) this Agreement has a stated expenditure of at least $1 million in public funds for the purchase of good or services by the City; or (2) this Agreement results in the expenditure of at least $1 million in public funds for the purchase of goods or services by the City in a fiscal year of the City. To the extent that section 552.371 of the Texas Government Code applies to this Agreement, Developer shall comply with section 552.372 of the Texas Government Code by: (1) preserving all contracting information relating to this Agreement as provided by the records retention requirements applicable to the City for the duration of the Agreement; (2) promptly providing the City any contracting information related to this Agreement that is in the custody or possession of Developer on request of the City; and (3) on completion of the Agreement, either (a) providing at no cost to the City all contracting information related to the Agreement that is in the custody or possession of Developer; or (b) preserving the contracting information relating to the Agreement as provided by the retention requirements application to the City. 29. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth, Texas Page 11 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 30. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 31. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 32. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 33. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 34. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 35. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 36. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. City of Fort Worth, Texas Page 12 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 37. City Participation; Fiscal Funding Limitation (a) The City shall reimburse Developer in amounts not to exceed $41,610.00 for construction costs, $10,620.00 for engineering costs, and $1,664.40 for material testing costs. The remaining City Participation in the amount of $2,030.60 shall not be paid to Developer but will be used by City to pay for the City's portion of construction inspection service fees, administrative material testing service fees, and water lab testing fees. During construction of the Improvements, Developer will receive applications for payment from Developer's contractors. Developer shall verify that each application for payment is due and payable under the construction contracts between Developer and the contractors and that the Improvements that are the subject of the application for payment have been constructed. Developer shall submit payment requests to the City, in the form of an invoice, no more frequently than one time per month to obtain reimbursement of the City Participation (each a "Payment Request"). Each Payment Request shall be delivered to the City utilizing the City's eBuilder software application and the spreadsheet approved by the City. Each Payment Request submitted by Developer shall be accompanied with proof that: (1) Developer has paid the contractors for the amount included in the Payment Request; and (2) an affidavit and lien release from the contractors indicating that Developer has paid the contractors in full for the amount included in each Payment Request and the contractors have paid all subcontractors and material suppliers in full. The City shall reimburse the engineering design costs within 30 days of approval of the plans by the City and execution of this CFA. The City will reimburse the bidding services portion of the engineering costs with the fist construction invoice. The City will reimburse construction administrative engineering costs with the final construction invoice. Developer must register as a vendor of the City in order for the City Participation to be paid to Developer. The cost ta¢ Iaidoc Unit of 'f-n-iin Bid Quanrify Unitkke Bidllabm City UnitPriie B.idVahie CityCnA T NIT I: WATER LIIPRO EMENT5 3 8PVC WATE 9 70.04 $ 28,700.00 $880 536,15.00 $28„7m0.Q4 16 S' GATE VALVE 1! 2.575.00 $ 2,576.40 $2,2W-00 S'.' D0.00 $2.240.00 12 lDCFCTILE [RONWATEFi.FITTINGS TONE G 73.717.02 $ 44,230.21 $5,5#}6-00 S3,360.et1 $3.370.00 13 COHHECTIONTOEXISYING4.12'WATERKA 1 ' 2 5 4.302!.33 $ 8,604-55 $3,E0m_0Q $7.OO $7.000-00 23 TferkhSafet ii 410 $ 1.00 $ 410..00 $2.00 Sa2.Go $410-00 CP7UTAL $41,54040 of any change orders must be agreed upon in writing by the parties and the party or parties benefiting from the change order must pay the costs as outlined in the written change order signed by the parties. The City Participation for construction costs was calculated as follows: (b) In the event no funds or insufficient funds are appropriated and budgeted or are otherwise unavailable by any means whatsoever in any fiscal period for payments due under this Agreement, then the City will immediately notify Developer of such occurrence and this Agreement shall be terminated on the last day of the fiscal period for which appropriations were received without penalty or expense to the City of any kind whatsoever, except to the portions of annual payments herein agreed upon for which funds shall have been appropriated. (c) Substantial completion of the Improvements shall occur after Developer's contractors notify the City that the Improvements are constructed and ready for their intended use, the City and Developer's contractors inspect the Improvements, and the City concurs that the Improvements are substantially complete. The City will withhold 5% in retainage from each payment made to Developer. Retainage shall be paid by City to Developer 60 days after the Improvements are constructed and accepted by the City and Developer delivers an invoice to the City. City of Fort Worth, Texas Page 13 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 38. Cost Summary Sheet Project Name: The Rosedale City Project No.: 104821 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee E. Material Testing Cost (unknown cost) F. Engineering Costs Total Estimated Construction Fees: TOTAL PROJECT COST Financial Guarantee Options_ choose one Bond = 100% $ 2,823,556.50 X Completion Agreement = 100% / Holds Plat $ 2,823,556.50 Cash Escrow Water/Sanitary Sewer= 125% $ 772,738.69 Cash Escrow Paving/Storm Drain = 125% $ 2,756,706.94 Letter of Credit = 125% $ 3,529,445.63 IPRC26-0045 CFA26-0067 Developer's Cost City's Cost Total Cost $ 362,083.97 $ 41,610.00 $ 403,693.97 $ 214,496.98 $ - $ 214,496.98 $ 576,580.95 $ 41,610.00 $ 618,190.95 $ 786,152.55 $ - $ 786,152.55 $ 1,132,355.00 $ - $ 1,132,355.00 $ 286,858.00 $ - $ 286,858.00 $ - $ - $ $ 2,205,365.55 $ - $ 2,205,365.55 $ 2,781,946.50 $ 41,610.00 $ 2,823,556.50 $0.00 $1,687.50 $109,350.00 $0.00 $275.60 $275.60 $0.00 $67.50 $67.50 $0.00 $1,664.40 $1,664.40 $0.00 $10,620.00 $10,620.00 $ - $ 14,315.00 $ 121,977.50 $ 2,781,946.50 $ 55,925.00 $ 2,945,534.00 Choice Amount (Mark one) City of Fort Worth, Texas Page 14 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH ba LAi & i. Dana Burohdoff (Sep 2 2026 10.4 :03 CDT) Jesica McEachern Assistant City Manager Date: 09/28/2026 Recommended by: Leonel Rios Sr. Contract Compliance Specialist Development Services Department Approved as to Form & Legality: Jessika Williams Assistant City Attorney M&C No. NA Date: 09/28/2026 Form 1295: 4Rr .044UQnnn 0� FO * ATTEST: ono `a9.io a a .n.nrraa. A .J�.uC a aa�IN-1 ga4a Jannette Goodall City Secretary City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation Rev. 4/2/20 DEVELOPER Evans and Rosedale Texas LLC, a Wisconsin limited liability company By: Royal Capital Group, LLC, its sole member Brian Mays Authorized Represenative Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kandice Merrick Contract Compliance Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 15 of 17 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. T__ _1__-1_-1 Au__1_____._ ® Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions © Location Map ® Exhibit A: Water Improvements ® Exhibit B: Sewer Improvements ® Exhibit C: Paving Improvements z Exhibit D: Storm Drain Improvements ® Exhibit E: Street Lights and Signs Improvements ❑ Exhibit F: Traffic Signal and Striping Improvements ❑x Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 16 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 F-11 "T�' i ► I liiiiF� Changes to Standard Community Facilities Agreement City Project No.104821 None City of Fort Worth, Texas Page 17 of 17 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 '■ -1' iNI 111 LOCATION MAP .C :11111 11 111111 C ■ pllft ■ 111111 = I1 jlIIiIlPIuuhhIihIhIhU 1111= � �:.� ■ 1I;1 =■IiIIIIIII'Iii1111111111- II= = -� 1" = 1000' 32 44'05.61" N, 97 19'08.69" W MAPSCO NO 77K COUNCIL DISTRICT 8 PRC # 26-0045 ENIGNEER: TRACY LaPIENE, PE, CFM McADAMS COMPANY 4400 STATE HIGHWAY 121, SUITE 800 LEWISVILLE, TEXAS, 75056 Z:\ZDrive\Projects\!SPEC\2024\SPEC24369 Evans and Rosedale\04-Production\Engineering\Exhibits\CFA Exhibits\CFA Exhibits.dwg, 8/12/2026 850:55 AM, Shane Pierce THE ROSEDALE VICINITY MAP CITY PROJECT NO. 104821 E TERRELL AVE & EVANS AVE FORT WORTH, TX 76104 OWNER\DEVELOPER: BRIAN MAYS ROYAL CAPITAL GROUP 111 E KILBOURN AVE., SUITE 2100 MILWAUKEE, WISCONSIN, 53202 PLAN INFORMATION SCALE 1" = 1000' DATE 06.25.2026 I I EX. 8" CAST IRON I EX. 6" CAST IRON EX. 10" CAST IRON EX. 6" CAST IRON IRRIGATION 1" COPPER °�— E TERRELL AVENUE ETERRELL AVENUE W "°"` ® wreow Howl is ❑ EXISTING METER I I ❑ B USED EX. 36" CONC. FORIRRIGATION I EX. 6" PVC I (ABANDONED) PUBLIC 2" COPPER I II I FIRE 4" PVC II I ❑ I II I FIRE 4" PVC 2" COPPER p p IRRIGATION 1" COPPER PUBLIC II I PUBLIC 1.5" COPPER FIRE 4" PVC FIRE 4" PVC l l FIRE 6" PVC o a ❑ AREA NOT INCLUDED PUBLIC 1.5" COPPER FIRE 4" PVC ii'IN PROJECT ❑ PUBLIC 1.5" COPPER ❑ ❑ =1 ¢ PUBLIC 2" COPPER IRRIGATION 1" COPPER EHUMBOLT STREET PUBLIC 6" PVC ❑ '°��°`°"°wasp"""`"`"°' a I I PUBLIC W-1 8" PVC I PUBLIC 3" PVC EX 10" PVC PUBLIC W-2 12" PVC (ABANDONED) ! FIRE 4" PVC I PUBLIC 1.5" COPPER I PUBLIC 2" COPPER __ x. 8" PVC I I FIRE 6" PVC I i PUBLIC 1" COPPER EDASHWOOD STREET PUBLIC W-3 10" PVC I O LEo ° EDASVWOODSTREET FIRE 6" PVC I ❑ I ° ° — — II IRRIGATION 1" COPPER PUBLIC 1.5" COPPER ❑ II EX. 8" CAST IRON I ❑ I I +� PUBLIC W-2 12" PVC I # EX. 12" PVC II _ - PUBLIC W-3 10" DIPI PUBLIC 2" COPPER ENIGNEER: w off EX. 8" PVC TRACY LaPIENE, PE, CFM PUBLIC 2" COPPER McADAMS COMPANY 4400 STATE HIGHWAY 121, SUITE 800 I - / -J - LEWISVILLE, TEXAS, 75056 I EET WATER LEGEND N O PROPOSED WATER LINE EXISTING WATER LINE OWNER\DEVELOPER: WATER REDUCER BRIAN MAYS WATER VALVE ROYAL CAPITAL GROUP GRAPHIC SCALE WATER METER 111 E KILBOURN AVE., SUITE 2100 0 50 100 200 MILWAUKEE, WISCONSIN, 53202 PRIVATE DEVELOPMENT 1inch =100ft. Z:\ZDrive\Projects\!SPEC\2024\SPEC24369 Evans and Rosedale\04-Production\Engineering\Exhibits\CFA Exhibits\CFA Exhibits.dwg, 8/12/2026 85102 AM, Shane Pierce THE ROSEDALE EXHIBIT A WATER CITY PROJECT NO. 104821 E TERRELL AVE & EVANS AVE FORT WORTH, TX 76104 PLAN INFORMATION SCALE 1" = 100' DATE 06.25.2026 -- _ ETERRELLL AVENUE icnue Aowi ETERRELLAVENUE weownowi � O Cr— 'Q ❑ PUBLIC SS -1 EX. 8" PVC ❑ EX. 8 PVC PUBLIC SS -2 4" SDR26 PVC Ex. 8" PVC II I I II I PUBLIC SS -1D 8" SDR26 PVC I ❑ ❑ - II I it ❑ ❑ r -I II I PUBLIC SS -2A 4" SDR26 PVC I I z Cf PUBLIC SS -1C 8" SDR26 PVC IAREA NOT INCLUDED IN PROJECT I ❑ I — ❑ owl (�sL E T S HUM10LT TREE .. w ca eaox T ST aa ❑ {I i I � � m I I I II IIILL --- I{ _ E DASHWOOD STREET 111 ❑ -- E DASHWOOD STREET I ❑ I 04eP — PUBLIC SS -1A 8" SDR26 PVC 11 L,IIrS=1B8R26PVO II -- ENIGNEER: TRACY LaPIENE, PE, CFM V i CEX.8McADAMS COMPANY .4400 STATE HIGHWAY 121, SUITE 800LEWISVILLE, TEXAS, 75056 -SKI SREET T,oA SANITARY SEWER LEGEND PROPOSED SEWER LINE OWNER\DEVELOPER: N SS SS EXISTING SEWER LINE • SANITARY SEWER MANHOLE BRIAN MAYS •SANITARY SEWERCLEANOUT ROYAL CAPITAL GROUP GRAPHIC SCALE 111 E KILBOURN AVE., SUITE 2100 0 50 100 200 PRIVATE DEVELOPMENT MILWAUKEE, WISCONSIN, 53202 1inch =100ft. Z:\ZDrive\Projects\!SPEC\2024\SPEC24369 Evans and Rosedale\04-Production\Engineering\Exhibits\CFA Exhibits\CFA Exhibits.dwg, 8/12/2026 85110 AM, Shane Pierce THE ROSE DALE PLAN INFORMATION SCALE 1" = 100' EXHIBIT B DATE 06.25.2026 SEWER CITY PROJECT NO. 104821 E TERRELL AVE & EVANS AVE FORT WORTH, TX 76104 II ' ■ I, P—i I I P-2 M-1 II III InlI 1- Ii AREA NOT INCLUDED IN PROJECT II N II I _ —' I I M-1 I I I � I I I P—, j II I I H. ERaE as� ENIGNEER: TRACY LaPIENE, PE, CFM �I McADAMS COMPANY Sz 4400 STATE HIGHWAY 121, SUITE 800 LEWISVILLE, TEXAS, 75056 PAVING LEGEND PUBLIC PAVEMENT BARRIER FREE RAMP LEGEND CONCRETE SIDEWALK TYPE M-1 STAMPED CONCRETE I I III TYPE P-1 PRIVATE DEVELOPMENT TYPE P-2 LH I L1TJ OWNER\DEVELOPER: BRIAN MAYS ROYAL CAPITAL GROUP 111 E KILBOURN AVE., SUITE 2100 MILWAUKEE, WISCONSIN, 53202 N GRAPHIC SCALE 0 75 150 300 1inch =150ft. Z:\ZDrive\Projects\ISPEC\2024\SPEC24369 Evans and Rosedale\04-Production\Engineering\Exhibits\CFA Exhibits\CFA Exhibits.dwg, 8/12/20268:51:18 AM, Shane Pierce THE ROSEDALE EXHIBIT C PAVING CITY PROJECT NO. 104821 E TERRELL AVE & EVANS AVE FORT WORTH, TX 76104 PLAN INFORMATION SCALE 1" = 150' DATE 06.25.2026 E HUMBOLT STREET Ienu�cv Raw _HUT Pn," rUDLI', JI— Il. .JU MUJ nr JIVRIVI ��rtII1! i ilillil Li E DASH WOOD STREET I ¢u�omnowi - u w o ae �d8 l ❑ > Y 1 PUBLIC ST -1 24" ADS HP STORM IPUBLIC ST -1 36" ADS HP STORMI L S8 II .1 fl E DASHWOODoSTREET PUBLIC ST -1B 24" ADS HP STORM PUBLIC ST -1A 24" ADS HP STORM ❑ / I —I YL HL). nr JIVRPA ST -2 36" ADS HP STORM . VERBENA STREET ENIGNEER: TRACY LaPIENE, PE, CFM McADAMS COMPANY 4400 STATE HIGHWAY 121, SUITE 800 LEWISVILLE, TEXAS, 75056 STORM SEWER LEGEND � PROPOSED STORM LINE EXISTING STORM LINE JUNCTION BOX PRIVATE PAVEMENT EX. 8" PVC ST -2 36" ADS HP STORM _ E PUTASKI STREET - r - VERBENA STREET OWNER\DEVELOPER: BRIAN MAYS ROYAL CAPITAL GROUP 111 E KILBOURN AVE., SUITE 2100 MILWAUKEE, WISCONSIN, 53202 I 1 GRAPHIC SCALE L 0 50 100 200 1inch =100ft. Z:\ZDrive\Projects\ISPEC\2024\5PEC24369 Evans and Rosedale\04-Production\Engineering\Exhibits\CFA Exhibits\CFA Exhibits.dwg, 8/12/20268:51:25 AM, Shane Pierce THE ROSEDALE EXHIBIT D STORM DRAIN CITY PROJECT NO. 104821 E TERRELL AVE & EVANS AVE FORT WORTH, TX 76104 PLAN INFORMATION SCALE 1" = 100' DATE 06.25.2026 I L I 37. ETERRELL AVENUE W3 cuirnwRrnn AREA NOT INCLUDED IN PROJECT - V E DASHWOOD STREET iwue awe I IJ ENIGNEER: htrl TRACY LaPIENE, PE, CFM McADAMS COMPANY 4400 STATE HIGHWAY 121, SUITE 800 LEWISVILLE, TEXAS, 75056 PAVEMENT MARKING LEGEND SITE LEGEND LANE LINES/MARI<INGS 24"WHITE STOPBAR 24" WHITE CROSSWALK LINE 12" WHITE DIAGONAL Y1 6" SOLID DOUBLE YELLOW ®H HANDICAP PARKING OS STREET SIGN • STREET LIGHTS PRIVATE DEVELOPMENT jj Ln V E TERRELL AVENUE (GALLED 5, ROSS r-® j: ❑ IIgU ❑ r fLs< E HUMSOLTT STREET �4 �caim 5a Row. � W4 R o,w,asv El E DASHWOOD STREET �caueo+aaow� I ❑ 9 OWNER\DEVELOPER: BRIAN MAYS tt ROYAL CAPITAL GROUP 111 E KILBOURN AVE., SUITE 2100 MILWAUKEE, WISCONSIN, 53202 E PULASKI STREET WALLED 1a RDNR SIGN LEGEND O O STOP LJ!fl MUTCD MUTCRiiD R�$ - GRAPHIC SCALE 0 50 100 20C 1inch =100ft. Z:\ZDrive\Projects\ISPEC\2024\SPEC24369 Evans and Rosedale\04-Production\Engineering\Exhibits\CFA Exhibits\CFA Exhibits.dwg, 8/12/20268:51:33 AM, Shane Pierce THE ROSEDALE EXHIBIT E STREET LIGHTS CITY PROJECT NO. 104821 & SIGNS E TERRELL AVE & EVANS AVE FORT WORTH, TX 76104 PLAN INFORMATION SCALE 1" = 100' DATE 06.25.2026 004243 Proposal Form DAP -BBD PROPOSAL Page I o17 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check UNIT I: WATER IMPROVEMENTS 1 3311.0441 12" Water Pipe 33 11 10, 33 11 12 LF 467 $156.86 $73,253.62 Good 2 3311.0341 10" Water Pie 33 11 10, 33 11 12 LF 101 $222.35 $22,457.35 Good 3 3311.0241 8" Water Pipe 33 11 10, 33 11 12 LF 41 $70.00 $2,870.00 od 4 3311.0141 6" Water Pipe 33 11 10, 33 11 12 LF 50 $66.00 $3,300.00 od 5 3311.0041 4" Water Pipe 33 11 10, 33 11 12 LF 273 $64.00 $17,472.00 od 6 3312.2203 2" Water Service 33 12 10 EA 4 $2,700.00 $10,800.00 od 7 3312.2003 1" Water Service 33 12 10 EA 5 $5,174.40 $25,872.00 od 8 3305.1004 24" Casing By Open Cut 33 05 22 LF 30 $297.00 $8,910.00 od 9 0241.1015 Remove 12" Water Line 0241 14 LF 1245 $18.00 $22,410.00 od 10 0241.1118 4"-12"Pressure Plug 024114 EA 12 $1,769.00 $21,228.00 od 11 3311.0354 10" DIP Water, CLSM Backfill 33 11 10 LF 4 $772.00 $3,088.00 od 12 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 1 $73,717.02 $73,717.02 Good 13 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 6 $4,302.33 $25,813.98 Good 14 3312.3005 12" Gate Valve 33 1220 EA 2 $4,537.00 $9,074.00 od 15 3312.3004 10" Gate Valve 33 1220 EA 2 $3,659.00 $7,318.00 od 16 3312.3003 8" Gate Valve 9999 17 EA 1 $2,576.00 $2,576.00 od 17 3312.3002 6" Gate Valve 33 12 20 EA 11 $1,803.00 $19,833.00 od 18 3312.0001 Fire Hdrant 331240 EA 2 $5,610.00 $11,220.00 od 19 9999.01 3" Water Service EA 1 $2,485.00 $2,485.00 od 20 3312.2103 1 1/2" Water Service 33 12 10 EA 5 $2,325.00 $11,625.00 od 21 0241.1510 Salvage Fire Hydrant 02 41 14 EA 1 $1,536.00 $1,536.00 od 22 3471.0001 Traffic Control 34 7113 MO 4 $5,649.00 $22,596.00 od 23 3305.0109 Trench Safety 3305 10 LF 1403 $1.00 $1,403.00 od 24 3311.0451 12" DIP Water 33 11 10 LF 2 $1,418.00 $2,836.00 od 25 26 27 28 29 30 31 32 33 34 35 36 37 38 TOTAL UNIT I: WATER IMPROVEMENTS $403,693.97 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Northbound Brewer Blvd City Project No. 103435 Evans and Rosedale - CFA Bid Takeoff- Ramsey Construction 08.19.2026 - AA 004243 Proposal Form DAP - BBD PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check UNIT II: SEWER IMPROVEMENTS 1 3331.4115 8" Sewer Pipe 33 11 10, 33 31 12, 33 31 20 LF 79 $148.00 $11,692.00 Good 2 3331.4108 6" Sewer Pipe 33 11 10, 33 31 12, 33 31 20 LF 12 $141.00 $1,692.00 Good 3 3311.0262 8" PVC Water Pipe, CSS Backfill 33 11 12 LF 120 $63.00 $7,560.00 Good 4 0241.2013 Remove 8" Sewer Line 02 41 14 LF 132 $60.00 $7,920.00 Good 5 0241.2201 Remove 4' Sewer Manhole 02 41 14 EA 1 $2,007.00 $2,007.00 Good 6 9999.02 (Connect to Existing Manhole) EA 3 $5,344.00 $16,032.00 Good 7 0241.2103 8" Sewer Abandonment Plug 02 41 14 EA 3 $1,715.00 $5,145.00 Good 8 3339.1002 4' Drop Manhole 33 39 10, 33 39 20 EA 2 $21,015.00 $42,030.00 Good 9 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 6 $9,275.33 $55,651.98 Good 11 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 3 $5,277.00 $15,831.00 Good 12 9999.03 4" Single Cleanout EA 2 $1,398.00 $2,796.00 Good 13 3301.0101 Manhole Vacuum Testing 3301 30 EA 1 $1,547.00 $1,547.00 Good 14 3305.0109 Trench Safety 3305 10 LF 91 $5.00 $455.00 Good 15 3301.0001 Pre -CCTV Inspection 3301 31 LF 1111 $2.00 $2,222.00 Good 16 3301.0002 Post -CCTV Inspection 3301 31 LF 1111 $2.00 $2,222.00 Good 17 3301.0004 Final MH-CCTV Inspection 3301 31 EA 91 $17.00 $1,547.00 Good 18 3339.1003 4' Extra Depth Manhole 33 39 10, 33 39 20 VF 2 $11,158.00 $22,316.00 Good 19 3305.0112 Concrete Collar for Manhole 33 05 17 EA 3 $5,277.00 $15,831.00 Good 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 TOTAL UNIT II: SEWER IMPROVEMENTS $214,496.98 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22.2019 Northbound Brewer Blvd City Project No. 103435 Evans and Rosedale - CFA Bid Takeoff- Ramsey Construction 08.19.2026 - AA 004243 Proposal Form DAP - BBD PROPOSAL Page 3 o17 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check UNIT III: DRAINAGE IMPROVEMENTS 1 3341.3501 42" PP Pipe 3341 13 LF 170 $242.00 $41,140.00 Good 2 3341.3501 36" PP Pipe 3341 13 LF 840 $195.00 $163,800.00 Good 3 3341.3501 30" PP Pipe 3341 13 LF 30 $174.00 $5,220.00 Good 4 3341.3501 24" PP Pipe 33 41 13 LF 241 $119.00 $28,679.00 Good 5 3341.1103 4x4 Box Culvert 33 41 10 LF 8 $388.00 $3,104.00 Good 6 3305.0116 Concrete Encasement for Utility Pipes 3305 10 CY 20 $142.00 $2,840.00 Good 7 0241.3019 Remove 36" Storm Line 02 41 14 LF 546 $49.00 $26,754.00 Good 8 9999.04 (Connect to Existing Storm) EA 1 $1,536.00 $1,536.00 Good 9 9999.05 (Underground Detention System) EA 1 $702,999.00 $702,999.00 Good 10 9999.06 (Outlet Structure) EA 1 $13,770.00 $13,770.00 Good 11 3349.0002 5' Storm Junction Box 3349 10 EA 3 $8,891.00 $26,673.00 Good 12 3349.0001 4' Storm Junction Box 3349 10 EA 7 $7,939.00 $55,573.00 Good 13 3349.8003 20' Type 2 Inlet 33 49 20 EA 1 $22,104.00 $22,104.00 Good 14 3349.5002 15' Curb Inlet 33 49 20 EA 1 $9,659.00 $9,659.00 Good 15 3349.5001 10' Curb Inlet 33 49 20 EA 1 $8,469.00 $8,469.00 Good 16 3305.0117 Concrete Collar for Valve 33 05 17 EA 3 $773.00 $2,319.00 Good 17 9999.07 (PP Storm Fittings) EA 12 $1,106.00 $13,272.00 Good 18 3301.0012 Post -CCTV Inspection of Storm Drain 3301 32 LF 1111 $2.00 $2,222.00 Good 19 3305.0109 Trench Safety 33 05 10 LF 1111 $2.00 $2,222.00 Good 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 TOTAL UNIT III: DRAINAGE IMPROVEMENTS 1,132,355.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Northbound Brewer Blvd City Project No. 103435 Evans and Rosedale - CFA Bid Takeoff- Ramsey Construction 08.19.2026 - AA 004243 Proposal Form DAP - BBD PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check UNIT I: WATER IMPROVEMENTS $403,693.97 UNIT II: SEWER IMPROVEMENTS $214,496.98 UNIT III: DRAINAGE IMPROVEMENTS $1,132,355.00 UNIT IV: PAVING IMPROVEMENTS _ UNIT V: STREET LIGHTING IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid $1,750,545.95 Good This Bid is submitted by the entity named below: BIDDER: Rumsey Construction 4336 Marsh Ridge Rd Carrollton, TX 75010 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF BY: David Huchinson TITLE: Vice President DATE: 8/18/2026 115 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22.2019 Northbound Brewer Blvd City Project No. 103435 Evans and Rosedale - CFA Bid Takeoff- Ramsey Construction 08.19.2026 - AA 00 42 43 Proposal Form DAP- BID PROPOSAL Page 6 of 8 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check UNIT V: STREET LIGHTING IMPROVEMENTS 1 3441.3502 Relocate Street Light Pole 3441 20 EA 29 $518.00 $15,022.00 Good 2 3441.3025 Furnish/Install Berry Pole and Luminaire 3441 20 EA 10 $11,150.00 $111,500.00 Good 3 9999.13 (Light Pole Bases) EA 53 $1,175.00 $62,275.00 Good 4 2605.3015 2" CONDT PVC SCH 80(T) 26 05 33 LF 3400 $9.56 $32,504.00 Good 5 9999.14 (#6 Copper Wire) LF 4800 $5.84 $28,032.00 Good 6 3441.1501 Furnish/Install Ground Box Type B 34 41 10 EA 15 $2,035.00 $30,525.00 Good 7 2605.0111 Furnish/Install Elec Sery Pedestal 26 05 00 EA 1 $7,000.00 $7,000.00 Good 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $286,858.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May22. 2019 Northbound Brewer Blvd City Project No. 103435 Evans and Rosedale - CFA Bid Takeoff- (ES Residential 08.20.2026 - AA 00 42 43 Proposal Form DAP- BID PROPOSAL Page 8 of 8 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist I Description Specification Unit of Bid Quantity Unit Price Bid Value Item No. Section No. I Measure Bid UNIT V: STREET LIGHTING IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: IES Residential 11841 S. Sam Houston Pkwy. W Houston, TX 77031 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction BY: Hnden Reddington TITLR.: Prgpea II,,n:cc� , DATE: 7.:a0 515 120 working days after the date when the END OF SECTION 858.00 Check Good CITY OF FORT WORTH Northbound Brewer Blvd STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Ciry Project No. 103435 Fonn Version May 22, 2019 Evan& and Rosedale - CFA BidTakeoff- IES Residential 08.20.2026 - AA 00 42 43 Proposal Form DAP- BID PROPOSAL Page 5 of 8 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Check UNIT IV: PAVING IMPROVEMENTS 1 3213.0401 6" Concrete Driveway 32 13 20 SF 41221 $6.07 $250,211.47 Good 2 9999.08 (Stamped & Stained Concrete) SF 3748 $15.21 $57,007.08 Good 3 9999.09 (Approaches) SF 2063 $8.99 $18,546.37 Good 4 3216.0101 6" Conc Curb and Gutter 32 16 13 LF 690 $13.79 $9,515.10 Good 5 9999.10 (6" Circular Drive) LF 898 $19.12 $17,169.76 Good 6 3213.0503 Barrier Free Ramp, Type M-1 32 1320 EA 22 $1,350.00 $29,700.00 Good 7 3213.0506 Barrier Free Ramp, Type P-1 32 1320 EA 5 $1,350.00 $6,750.00 Good 8 3213.0507 Barrier Free Ramp, Type P-2 32 1320 EA 2 $1,350.00 $2,700.00 Good 9 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 32 1723 LF 130 $40.00 $5,200.00 Good 10 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars 32 1723 LF 48 $40.00 $1,920.00 Good 11 3213.0302 5" Conc Sidewalk 32 1320 32249 $9.73 $313,782.77 Good 12 3217.0109 Preformed Thermoplastic Contrast Markings — 6" SLD (W) 32 1723 LF 190 $15.00 $2,850.00 Good 13 9999.11 (Preformed Thermoplastic Contrast Markings - 12" SLD (W)) LF 200 $25.00 $5,000.00 Good 14 3217.0111 Preformed Thermoplastic Contrast Markings — 6" SLD (Y) 32 1723 LF 600 $10.00 $6,000.00 Good 15 9999.12 (Preformed Thermoplastic Contrast Markings - Handicap Stencil) EA 2 $325.00 $650.00 Good 16 3471.0001 Traffic Control 34 71 13 MO 12 $4,500.00 $54,000.00 Good 17 3441.4003 Furnish/Install Alum Sign Ground Mount City Std. 344130 EA 5 $1,030.00 $5,150.00 Good 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 TOTAL UNIT IV: PAVING IMPROVEMENTS $786,152.55 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Northbound Brewer Blvd Ciry Project No. 103435 Evans and Rosedale - CFA Bid Takeoff- Tealstone -08202026 - AA 00 42 43 Proposal. Form DAP - BID PROPOSAL Page 8 of 8 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist I Description Specification Unit of Bid Quantity Unit Price Bid Value Item No. Section No. I Measure Bid UNIT IV: PAVING IMPROVEMENTS Total Construction Bid BY: Brian Zimmerman This Bid is submitted by the entity named below: BIDDER: Tealstone Commercial, Inc. 2620 Cooper Creek Rd'. 'Addrean Here or Blank> TITLE: General Manager Denton, 9'ecas 762119 DATE: 7/2)1/21)26 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 42 working days after the date when the CONTRACT commences to run as provided in the General Conditions, END OF SECTION Check Good CITY OF FORT WORTH Northbound Brewer Blvd STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project No. 103435 Form Version May 22, 2019 Evans and Rosedale - CFA Bid Takeoff- Tealstone - 0820.2026 - AA FORT WORTH® City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Evans and Rosedale Texas LLC Subject of the Agreement: M&C Approved by the Council? * Yes ❑ No II If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No ❑✓ If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes ✓❑ No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No ❑✓ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104821 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ✓❑ No O Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.