FORT WORTH . City of Fort Worth
Change Order Request
Project Name 2022 Bond Year 3 Contract 16 City Sec # 63830
Client Project #(s) 104317
Water, sewer, stormwater and paving improvements on various streets
Contractorl McClendon Construction Company, Inc. Change Order #1 1 Date 8/14/2026
City Project Mgr. Justina Samaan City Inspector Adrian Aranda
Dept. Unit 1 -Water
Original Contract Amount $3,714,421.00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $3.714.421.00
Revised Contract Amount $3,714,421.00
Original Funds Available for Change Orders $111,433.00
Remaining Funds Available for this CO $111,433.00
Additional Funding (if necessary)
Unit 2 -Sewer I Unit 3 -Paving I Unit 4-
104.00
121,977.50
121,977.50
,460.00
Totals
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $11,517,011.88
Contract Time
425
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and materials as outlined in proposed Change Order #1. This
Change Order adds new bid items necessary to address unforeseen field conditions encountered during construction on Fox Drive and Grapewood Street. During
construction on Fox Dr, it was discovered that two lots containing duplexes are served by separate private water services. To avoid addifional connections directly into the
newly installed water main, the Water Department recommended installing bullhead meter assemblies and reconnecting the existing private services to the new assemblies.
During street excavation on Grapewood St, the existing subgrade was found to consist of low -plasticity -index (PI) sandy material. Based on the actual field conditions, cement
stabilization is more appropriate than the lime treatment included in the original contract. This Change Order adds the necessary cement stabilization bid items and reduces
the quantities associated with lime treatment. The resulting savings from the reduced lime treatment quantities will be used to offset the additional costs within the paving unit.
Cost: City staff reviewed the contractor's proposed unit prices for the new bid items and compared them with available average unit pricing for similar work. Based on this
review, staff has determined that the proposed unit prices are fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting
requirements.
Contractor's Company Name Contractor (Name) Contract Signature
McClendon Construction Company, Inc. Dan McClendon t2 08/26/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Adrian Aranda (Sep 4, 2026 09:28:40 CDT) c b
09/04/2026
`'na'Sa"aa"
. Samaan (Sep 8. 2026 07.17:54 CDT)
09/08/2026
Date
Senior Capital Project Officer
Date
�E4
09/14/2026
09/14/2026
sistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
09/18/2026
..__.Z_.
09/21/2026
Assistant City Attorney
4a=a� k saP z" CDT)
Date
09/21/2026
Assistant eager
Date
10/02/2026
Council Action (if required)
rena M&C Number N/A
M&C Date Approved N/A
OFORT as
ATTEST: F
—
a .rim... A
pVo o=d
OFFICIAL RECORD
Jannette Goodall, City Secretary 4p °o*dp
?d
CITY SECRETARY
°
aaannEX Ago;p
FT. WORTH. TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name I 2022 Bond Year 3 Contract 16 I City Sec # I 63830
Client Project# I 104317
Contractorl McClendon Construction Company, Inc. PM Justin Samaan Inspector Adrian Aranda
Change Order Submittal # 1 Date 8/14/2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
Water Service, Meter Reconnectior
Urnt 1 - Water
4.0000000
EA
6475.0
81.9000
71
9999.0008 Install Bullhead
Unit 1 - Water
2.00000000
EA
$1,500.00
66
3211.0600 Cement
Unit 3- Paving
21.00000000
TN
$550.00
67
3211.0702 8" Cement Treatmenl
Unit3- - Paving
1,309.00000000
SY
$9.00
$11,781.00
Change Order Additions Page 2 of 3
Unit 1 - Water
$4,900.00
Unit 2 -Sewer
$0.00
Unit 3 -Paving
$23,331.00
Unit 4 - Stormwater
$0.00
Sub Total Additions
$28,231.00
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name 2022 Bond Year 3 Contract 16 City Sec # 63830
Client Project # I 104317
Contractorj McClendon Construction Company, Inc. PM Justina Samoan inspector Adrian Aranda
Change Order Submittal # 1 Date 8/14/2026
DELETIONS
11010 Utbt Kn' l 1UN unv l /try unit uni u sor i oral
70 9999.0002 Construction Allowance(Water) Unit I - Water 0.0326666, LS $150,000.0U $4,900.00
11 3211.05028" Lime Treatment Unit 3 -Paving 1,347.8888888h
12 3211.0400 Hydrated ime Unit 3 -Paving 28.00000001, TN $400.01, $11,200.04
Unit 1 - Water $4,900.00
Unit 2 - Sewer $0.00
Unit 3- Paving $23,331.00
Unit 4- Stormwater $0.00
Sub ota Deletions
Change Order Deletions Page 3 of 3
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE • 2022 Bond Year 3 Contract 16 — Change Order #1
M&C: N/A CPN: 104317 CSO: 63830 DOC#:
Date: 08/18/2026
To:
Name
Department
Initials
Date Out
1.
Lizbeth Medina
TPW - initial
-
08/26/2026
2.
Dan McClendon
Contractor - signatureocieoeon
08/26/2026
3.
Adrian Aranda
TPW - signature
.
09/04/2026
4.
Cody Horton
TPW - signature
-
09/04/2026
5.
Justina Samaan
TPW - signatures
09/08/2026
6.
Greg Robbins
TPW - signature
*
09/14/2026
7
Mary Hanna
TPW - signature
NY'
09/14/2026
8
Patricia Wadsack
TPW - signature
PLW
09/18/2026
9
Lauren Prieur
TPW - signature
leX9 prieur
09/21/2026
10.
Doug Black
Legal - signature
Dough
09/21/2026
11.
Jesica McEachern
CMO - signature
10/02/2026
12.
Jannette Goodall
CSO - signature
J en� eGootlall
10/02/2026
13.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: [I]YES ZNo
RUSH: ❑YES No SAME DAY: ❑YES ZNo NEXT DAY: EYES No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(2 FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: McClendon Construction Company, Inc.
Subject of the Agreement:
2022 Bond Year 3 Contract 16 - Change Order 1
M&C Approved by the Council? * Yes ❑ No EZI
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes IN No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ® No ❑
If unsure, see back page for permanent contract listing.
63830, #1
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No IZI
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
104317
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes O No fT
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.