HomeMy WebLinkAbout063360-CO4 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 63360-CO4
FORT WORTH . City of Fort Worth
Change Order Request
Project Name 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project #(s) 104213
Water, sewer and paving improvements on various streets
Contractorl Woody Contractors, Inc. Change Order#I 4 Date 8/14/2026
City Project Mgr, Justine Samaan City Inspector Hector Montoya
Unit 4: Unit 5: I Contract Time
Dept. Unit 1: Water Unit 2: Sewer Unit 3: Paving
Streetlights Stormwater Totals I (CD)
Original Contract Amount $4,051,626.25 $1,071,153.50
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $4.051.626.25 $1.071.153.50
Revised Contract Amount
$4,116,691.75
Original Funds Available for Change Orders
$202,581.00
Remaining Funds Available for this CO
$202,581.00
Additional Funding (if necessary)
156.50 I $411,746.50 I $100,561.40 I $571,464.40 I 95
141,097.50 $0.00
$81,941.00 $0.00
,236.50
,080.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT I 6.97%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $11,409,809.69
0
545
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL Furnish all labor and materials as outlined in proposed Change Order # 4. Change Order No. 4
increases the quantities of several existing bid items under Unit 1— Water to address additional work identified during construction on Lisbon Street, Landers Street, and Rutledge Street.
This includes the removal and replacement of damaged concrete pavement, sidewalks, driveways, curb and gutter, and valley gutters encountered within the project limits. The
increased quantities included in this change order are necessary to complete these additional improvements and restore the affected areas. In addition, this change order adds a new
bid item for the removal of concrete driveways. This item was inadvertently omitted from the original Unit 1— Water bid items but is necessary to properly remove and replace existing
driveway sections affected by the Water Department's replacements.
Cost: Staff reviewed the contractor's proposed unit price for the new bid item and compared it with pricing from recent, comparable City projects. Based on this evaluation, staff has
determined that the proposed unit price is fair and reasonable. The remaining adjustments are increases to quantities for existing contract bid items and will be paid at the previously
established contract unit prices. The cost of this Change Order will be partially funded through the construction allowance included in the contract, and the removal of quantities from
existing bid items that are no longer required under Unit 1— Water.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both
time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the
person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name I Contractor (Name) I Contract Signature I. Woody Contractors, Inc. Troy Woody X26 921�C0T1 09/14/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
09/15/2026
09/15/2026
Date
Senior C8p cer
Date
09/16/2026
f9' ^
09/16/2026
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
09/18/2026
xn Pn°ur( 12 3026094636 COTI
09/21/2026
Assistant City Attorney
Date
ACft
Date
oa ma=a d se° z, 2636 r, w:6o cor,
09/21/2026
10/02/2026
Council Action (if "
M&C Number N/A
anU
ATTEST: F F9Rr➢oa
°° Ay,�000
dv' uz
Jannette Goodall, City Secretary
M&C Date Approved N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name I 2022 Bond Year 2 Contract 12 I City Sec # I 63360
Client Project# I 104213
Contractorl Woody Contractors, Inc. PM Justin Samaan Inspector Hector Montoya
Change Order Submittal # 4 Date 8/14/2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
25
3201.0614 Conc Pvnrt Repair, Residential
Un')Water
630.0000000
SY
$200.0
$126,000.0
40
0241.1000 Remove Conc Pvml
Unit 1: Water
630.00000000
SY
27.00
41
0241.1300 Remove Conc Curb&Gutter
Unit 1: Water
600.00000000
LF
$7.00
42
0241.1400 Remove Conc Valley Gutter
Unit 1: Water
100.00000000
SY
$24.00
47
3213.040 6" Concrete Driveway
Unit 1: Water
247.00000003
SF
$16.00
48
3216.0101 6" Conc Curb and Gutter
Unit 1: Water
600.00000000
LF
$55.00
50
3216.0301 7" Conc Valley Gutter, Residential
Unit 1: Water
100.00000000
SY
$125.00
72
0241.0401 Remove Concrete Drive
Unit 1: Water
247.00000000
SF
$4.00
Unit 1: Water
$200,050.00
Unit 2: Sewer
$0.00
Unit 3: Paving
$0.00
Unit 4: Streetlights
$0.00
Unit 5: Stormwater
$0.00
Sub Total Additions
$200,050.03
Change Order Additions Page 2 of 3
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name 2022 Bond Year 2 Contract 12 City Sec # 63360
Client Project # I 104213
Contractorj Woody Contractors, Inc. PM Justine Samoan inspector Hector Montoya
Change Order Submittal # 4 Date 8/14/2026
DELETIONS
11010
utbt Kn' l 1UN
unv i
/try
unit
uno u osr
i otal
61
9999.0002 Construction Allowance(Water)
nit Water
0.1357000u
LS
$15000/i0U
$203550.3
1
3201.0111 4Wide Asphalt Pvmt Repair, Residential
Unit 1:Water
170.0000000/,
22
3201.0121 4' Wide Asphalt Pvmt Repair, Arterial
Unit 1 Water
100.0000000u
LF
$157.0i
915,700.0/,
23
.3201.0201 Asphalt Pvmt Repair Beyond De6eedt esi entia
nit : Water
550.0000000i.
SY
$65.70
24
.3201.0202 Asphalt Pvmt Repair Beyond De6nedt rtena
nitWater
500.0000000u
SY
$86.7i
943,365.0J
Unit 1: Water
$1349845.3
Unit 2: Sewer
$0.00
Unit 3: Paving
$0.00
Unit 4: Streetlights
$0.00
Unit 5: Stormwater
$0.00
Sub ota Deletions
Change Order Deletions Page 3 of 3
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: 2022 Bond Year 2 Contract 12 — Change Order #4
M&C: N/A CPN: 104213 CSO: 63360 DOC#:
Date: 09/14/2026
To:
Name
Department
Initials
Date Out
1.
Lizbeth Medina
TPW - initial
09/14/2026
2.
Troy Woody
Contractor - signature
Troy Woody
09/14/2026
3.
Hector Montoya
TPW - signature
orMonroya
09/15/2026
4.
Gary Deyon
TPW - signature
ayon
09/16/2026
5.
Justina Samaan
TPW - signatures
09/15/2026
6.
Greg Robbins
TPW - signature
4
09/16/2026
7
Mary Hanna
TPW - signature
m>'
09/16/2026
8
Patricia Wadsack
TPW - signature
7 L. W
09/18/2026
9
Lauren Prieur
TPW - signature
Am
09/21/2026
10.
Doug Black
Legal - signature
- Douglas Black
09/21/2026
11.
Jesica McEachern
CMO - signature
CA
10/02/2026
12.
Jannette Goodall
CSO - signature
J n e�ooda„
10/02/2026
13.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: [I]YES ZNo
RUSH: ❑YES No SAME DAY: ❑YES ZNo NEXT DAY: EYES No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(2 FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement:
2022 Bond Year 2 Contract 12 - Change Order 4
M&C Approved by the Council? * Yes ❑ No EZI
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes IN No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ® No ❑
If unsure, see back page for permanent contract listing.
63360, #4
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No IZI
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
104213
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ® No O
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.