HomeMy WebLinkAbout065886 - General - Contract - U.S. Environmental Protection Agency (EPA)CSC No. 65886
4Z - 03FO5001 -0 Page 1
ZED STgr
GRANT NUMBER (FAIN): 03F05001
a Fs
U.S. ENVIRONMENTAL
MODIFICATION NUMBER: 0
DATE OF AWARD
PROGRAM CODE: 4Z
09/16/2026
3i W
PROTECTION AGENCY
TYPE OF ACTION:
MAILING DATE
0 c
New
09/21/2026
o=
Cooperative Agreement
PAYMENT METHOD:
ACH#
PROS
ASAP
66678
RECIPIENT TYPE:
Send Payment Request to:
Municipal
Contact EPA RTPFC at: rtpfc-grants@epa.gov
RECIPIENT:
PAYEE:
CITY OF FORT WORTH
CITY OF FORT WORTH
100 Fort Worth Trl
100 Fort Worth Trail
Fort Worth, TX 76102-2661
Fort Worth, TX 76102
EIN: 75-6000528
PROJECT MANAGER
EPA PROJECT OFFICER
EPA GRANT SPECIALIST
James Keezell
Kelly Longfellow
Kayla Kelley
4100 Columbus Trail
1201 Elm St., Suite 500, LCRPU
Mission Support Division, MSDGG
Fort Worth, TX 76133
Dallas, TX 75270-2102
1201 Elm St., Suite 500
Email: james.keezell@fortworthtexas.gov
Email: Longfellow. Kelly@epa.gov
Dallas, TX 75270-2102
Phone: 817-392-5153
Phone: 214-665-6756
Email: Kelley.Kayla@epa.gov
Phone: 214-665-7422
PROJECT TITLE AND DESCRIPTION
Reuse Program and Recycling Enhancement Project in Fort Worth
See Attachment 1 for project description.
BUDGET PERIOD
PROJECT PERIOD
TOTAL BUDGET PERIOD COST
TOTAL PROJECT PERIOD COST
10/01/2026 - 09/30/2029
10/01/2026 - 09/30/2029
$ 4,817,344.00
$ 4,817,344.00
NOTICE OF AWARD
Based on your Application dated 12/18/2024 including all modifications and amendments, the United States acting by and through the US Environmental
Protection Agency (EPA) hereby awards $ 4,817,344.00. EPA agrees to cost -share 100.00% of all approved budget period costs incurred, up to and not
exceeding total federal funding of $ 4,817,344.00. Recipient's signature is not required on this agreement. The recipient demonstrates its commitment to carry
out this award by either: 1) drawing down funds within 21 days after the EPA award or amendment mailing date; or 2) not filing a notice of disagreement with
the award terms and conditions within 21 days after the EPA award or amendment mailing date. If the recipient disagrees with the terms and conditions
specified in this award, the authorized representative of the recipient must furnish a notice of disagreement to the EPA Award Official within 21 days after the
EPA award or amendment mailing date. In case of disagreement, and until the disagreement is resolved, the recipient should not draw down on the funds
provided by this award/amendment, and any costs incurred by the recipient are at its own risk. This agreement is subject to applicable EPA regulatory and
statutory provisions, all terms and conditions of this agreement and any attachments.
ISSUING OFFICE (GRANTS MANAGEMENT OFFICE)
AWARD APPROVAL OFFICE
ORGANIZATION / ADDRESS
ORGANIZATION /ADDRESS
U.S. EPA, Region 6, Grants Management Section
U.S. EPA, Region 6, LAND, CHEMICALS, AND REDEVELOPMENT DIVISION
1201 Elm Street, Suite 500
OLEM - Office of Land and Emergency Management
Dallas, TX 75270-2102
1201 Elm St., Suite 500
Dallas, TX 75270-2102
THE UNITED STATES OF AMERICA BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY
Digital signature applied by EPA Award Official Christopher Watkins - Grant Management Officer
DATE
09/16/2026
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
4Z - 03FO5001 -0 Page 2
EPA Funding Information
FUNDS
FORMER AWARD
THIS ACTION
AMENDED TOTAL
EPA Amount This Action
$ 0
$ 4,817,344
$ 4,817,344
EPA In -Kind Amount
$ 0
$ 0
$ 0
Unexpended Prior Year Balance
$ 0
$ 0
$ 0
Other Federal Funds
$ 0
$ 0
$ 0
Recipient Contribution
$ 0
$ 0
$ 0
State Contribution
$ 0
$ 0
$ 0
Local Contribution
$ 0
$ 0
$ 0
Other Contribution
$ 0
$ 0
$ 0
Allowable Project Cost
$ 0
$ 4,817,344
$ 4,817,344
Assistance Program
Statutory Authority
Regulatory Authority
66.920 - Solid Waste Infrastructure Financing -
Save Our Seas Act Grants
33 USC 4282 & Infrastructure Investment and Jobs
Act (IIJA) (PL 117-58)
2 CFR 200, 2 CFR 1500 and 40 CFR 33
Fiscal
Site Name
Req No
Code
Organization
PRC
Object
Class
Site/Project
CostObligation
Organization
Deobligation
2606BTR026
23
E1SD
06B5
000D11X81
4183
-
$ 1,795,121
2606BTR026
25
E1SD
06B5
000D11X81
4183
-
-
$ 3,022,223
$ 4,817,344
4Z - 03F05001 -0 Page 3
Budget Summary Page
Table A - Object Class Category
(Non -Construction)
Total Approved Allowable
Budget Period Cost
1. Personnel
$ 0
2. Fringe Benefits
$ 0
3. Travel
$ 0
4. Equipment
$ 794,350
5. Supplies
$ 781,925
6. Contractual
$ 0
7. Construction
$ 3,241,069
8. Other
$ 0
9. Total Direct Charges
$ 4,817,344
10. Indirect Costs: 0.00 % Base
$ 0
11. Total (Share: Recipient 0.00% Federal 100.00%)
$ 4,817,344
12. Total Approved Assistance Amount
$ 4,817,344
13. Program Income
$ 0
14. Total EPA Amount Awarded This Action
$ 4,817,344
15. Total EPA Amount Awarded To Date
$ 4,817,344
4Z - 03F05001 -0 Page 4
Attachment 1 - Project Description
Specifically, the City of Fort Worth will launch the Reuse Program and Recycling Enhancement Project to
collect appliances, building materials, furniture, and electronics for reuse at the City's four (4) Drop -Off
Stations (Old Hemphill, Southeast, Brennan, and Hillshire); make significant site improvements at the Old
Hemphill Drop -Off Station to support the Reuse Program and address site limitations (retaining wall,
asphalt surface, security fencing, automatic gate, signage, speed bumps, and traffic control measures);
purchase ten (10) recycling compactors across all four (4) locations to collect a higher volume of
recyclables and reduce hauling loads; update electronic signboards at each Drop -Off Station; and
provide targeted community outreach to educate the public about the new Reuse Program and other
Drop -Off Station services.
The activities to be performed under this assistance agreement are organized into three (3) tasks
supporting the City of Fort Worth's (COFW) Reuse Program and Recycling Enhancement Project at the
City's four (4) Drop -Off Stations — Old Hemphill, Southeast, Brennan, and Hillshire.
Task 1 — Material Management Infrastructure and Upgrades to Drop -Off Stations: Site improvements at
the Old Hemphill Drop -Off Station, including installation of a retaining wall, asphalt surfacing, security
fencing, automatic gate, signage, speed bumps, and other traffic control measures; purchase and
installation of one (1) high -definition LED electronic signboard at each of the four (4) Drop -Off Stations;
and procurement of ten (10) recycling compactors (six [6] cardboard/single-stream and four [4] pre -crush
units) across the four (4) locations.
Task 2 — Development of Reuse Infrastructure: Establishment of the COFW Reuse Program at each of
the four (4) Drop -Off Stations, including procurement of one (1) 40 -foot shipping container per location to
house reuse materials such as appliances, building materials, furniture, and electronics; and
development of partnerships with local reuse organizations to redistribute collected materials.
Task 3 — Targeted Community Outreach and Education: Development and implementation of a 3 -year
targeted education and outreach plan to promote the Reuse Program, increase Drop -Off Station
participation, and reduce contamination in the recyclables stream. Activities include citywide and targeted
postcard campaigns, print/digital advertising, promotional signage, annual partner events, and
coordination with neighborhood associations, independent school districts, and area higher -education
institutions. One (1) contracted Public Education Specialist will support outreach over the 3 -year
performance period.
The anticipated deliverables include site improvements at the Old Hemphill Drop -Off Station (retaining
wall, asphalt surface, security fencing, automatic gate, signage, and traffic -control measures); four (4)
high -definition LED electronic signboards (one [1] per Drop -Off Station); ten (10) recycling compactors
deployed across the four (4) Drop -Off Stations; four (4) Reuse Program collection points (one [1] 40 -foot
shipping container per Drop -Off Station); established partnerships with local reuse organizations; a 3 -
year targeted community outreach and education plan supported by one (1) contracted Public Education
Specialist; and quarterly progress reports with a draft final technical report and project closeout submittal
in the final quarter.
The expected outcomes include diversion of an estimated 600 tons of furniture, building materials,
electronics, and other durable items from the landfill in the first full year of the Reuse Program; an
approximate 10% increase in cardboard and mixed recyclables (an additional 65 tons annually) through
expanded compactor capacity; an estimated 55 tons of additional recyclables and 17 tons of mixed
4Z -03F05001 - 0 Page 5
electronics captured annually through improved electronic signage and outreach; reduced contamination
of approximately 16 tons of scrap metal and 5 tons of tires; cumulative diversion of approximately 8,332
tons over 10 years (factoring 2.2% annual population growth); reduced hauling demand of approximately
two (2) trips per day per Drop -Off Station; improved site safety, drainage, and stormwater quality at Old
Hemphill (adjacent to Sycamore Creek and the Trinity River Basin); and one (1) contract position created
to support outreach for 3 years.
The intended beneficiaries include COFW residents (estimated population 1,001,741), particularly the
more than 280,000 annual visitors to the four (4) Drop -Off Stations; communities surrounding the Old
Hemphill Drop -Off Station, who benefit from reduced flooding, improved traffic flow, and enhanced site
security; downstream communities in the Sycamore Creek and Trinity River Basin watersheds, who
benefit from improved stormwater quality; low- and moderate -income households accessing free
reclaimed building materials, furniture, and appliances for home repair and affordability; local teachers
served through reuse partners such as The Welman Project; and local reuse organizations participating
in the regional circular -economy network.
No subawards are included in this assistance agreement.
4Z - 03F05001 -0 Page 6
Administrative Conditions
General Terms and Conditions
The recipient agrees to comply with the current Environmental Protection Agency (EPA) general terms
and conditions available at: https://www.epa.gov/grants/epa-general-terms-and-conditions-effective-
october-1-2025-or-later
These terms and conditions are in addition to the assurances and certifications made as a part of the
award and the terms, conditions, or restrictions cited throughout the award.
The EPA repository for the general terms and conditions by year can be found at: https://www.epa.
gov/grants/grant-terms-and-conditions#general.
A. Correspondence Condition
The terms and conditions of this agreement require the submittal of reports, specific requests for
approval, or notifications to EPA. Unless otherwise noted, all such correspondence should be sent to the
following email addresses:
•Federal Financial Reports (SF -425): rtpfc-grants@epa.gov and rtpfc rtpfc-c.irants@epa.gov and [Kayla Kelley,
Grants Specialist at kelley.kayla�epa.gov, R6 EPA Grants Pro rams(a�epa.govl.
•All other forms/certifications/assurances, Indirect Cost Rate Agreements, Requests for Extensions of the
Budget and Project Period, Amendment Requests, Requests for other Prior Approvals, updates to
recipient information (including email addresses, changes in contact information or changes in authorized
representatives) and other notifications: [Kayla Kelley, Grants Specialist at kelley.kaylagepa.gov, Kelly
Longfellow, Project Officer at Longfellow. Kelly(aepa.gov]; R6 EPA Grants Proe rams e epa.govl.
•Payment requests (if applicable):, Kelly Longfellow, Project Officer at Longfellow.Kelly?epa.govl;
R6 EPA Grants Programs@epa.aov].
•Quality Assurance documents, workplan revisions, equipment lists, programmatic reports and
deliverables: [Kelly Longfellow, Project Officer at Longfellow. Kelly&epa.gov].
4Z -03F05001 - 0 Page 7
Programmatic Conditions
B. Performance Reporting and Final Performance Report
Performance Reports — Content
In accordance with 2 CFR 200.329, the recipient must relate financial data and project or program
accomplishments to the performance goals and objectives of the EPA award and must provide cost
information to demonstrate cost-effective practices (for example, through unit cost data) when reporting
program performance. The recipient agrees to submit performance reports that include information on
each of the following areas:
A comparison of accomplishments to the outputs/outcomes established in the assistance
agreement work plan for the reporting period (for example, comparing costs to units of
accomplishment);
Explanations on why established outputs/outcomes were not met; and
Additional information, analysis, and explanation of cost overruns or higher -than -expected unit
costs.
Additionally, the recipient agrees to notify the EPA when a significant development occurs that could
impact the award. Significant developments include events that enable meeting milestones and
objectives sooner or at less cost than anticipated or that produce different beneficial results than
originally planned. Significant developments also include problems, delays, or adverse conditions which
will impact the ability to meet the milestones or objectives of the award, including outputs/outcomes
specified in the assistance agreement work plan. If the significant developments negatively impact the
award, the recipient must include information on their plan for corrective action and any assistance
needed to resolve the situation.
For State Categorical Program Grants Only: Interim performance and final progress reports must
prominently display the three Essential Elements for state work plans: 1) Strategic Plan Goal; (2)
Strategic Plan Objective; and (3) Workplan Commitments plus time frame.
(See Grants Policy Issuance 11-03 State Grant Workplans and Progress Reports for more information)
Performance Reports - Frequency
The recipient agrees to submitannualperformance reports electronically to the EPA Project Officer
within 90 days after the annual reporting period ends on September 30, 2027, September 30, 2028, and
September 30, 2029. The recipient must submit the final performance report no later than 120 calendar
days after the end date of the period of performance.
1. Quarterly performance reports are required, and they are to be submitted electronically to the EPA
Project Officer within 30 days after the reporting period (every three- month period). The reporting
periods arel0/01/2026 - 9/30/2029. Quarters will be 10/01/2026-12/31/2026, 01/01/2027-03/31/2027,
04/01/2027-06/30/2027 ,07/01/2027-09/30/2027,10/01/2027-12/01/2027, 01/01/2028-03/31/2028,
04/01/2028-06/30/2028, 07/01/2028-09/30/2028, 10/01/2028-12/01/2028, 01/01/2029-03/31/2029,
4Z - 03F05001 -0 Page 8
04/01/2029-06/30/2029, 0710112029-0913012029,1010112029-1210112029.
Subaward Performance Reporting
N/A
C. Cybersecurity Condition
Cybersecurity Grant Condition for Other Recipients. Including Intertribal Consortia
(a) The recipient agrees that when collecting and managing environmental data under this assistance
agreement, it will protect the data by following all applicable State or Tribal law cybersecurity
requirements.
(b) (1) EPA must ensure that any connections between the recipient's network or information system and
EPA networks used by the recipient to transfer data under this agreement are secure. For purposes of
this Section, a connection is defined as a dedicated persistent interface between an Agency IT system
and an external IT system for the purpose of transferring information. Transitory, user -controlled
connections such as website browsing are excluded from this definition.
If the recipient's connections as defined above do not go through the Environmental Information
Exchange Network or EPA's Central Data Exchange, the recipient agrees to contact the EPA Project
Officer (PO) no later than 90 days after the date of this award and work with the designated
Regional/Headquarters Information Security Officer to ensure that the connections meet EPA security
requirements, including entering into Interconnection Service Agreements as appropriate. This condition
does not apply to manual entry of data by the recipient into systems operated and used by EPA's
regulatory programs for the submission of reporting and/or compliance data.
(2) The recipient agrees that any subawards it makes under this agreement will require the subrecipient
to comply with the requirements in (b)(1) if the subrecipient's network or information system is connected
to EPA networks to transfer data to the Agency using systems other than the Environmental Information
Exchange Network or EPA's Central Data Exchange. The recipient will be in compliance with this
condition: by including this requirement in subaward agreements; and during subrecipient monitoring
deemed necessary by the recipient or subrecipient under 2 CFR 200.332(e), by inquiring whether the
subrecipient has contacted the EPA Project Officer. Nothing in this condition requires the recipient to
contact the EPA Project Officer on behalf of a subrecipient or to be involved in the negotiation of an
Interconnection Service Agreement between the subrecipient and EPA.
C. Conditional Award
NA
D. Competency Policy
Competency of Organizations Generating Environmental Measurement Data
In accordance with Agency Policy Directive Number FEM-2012-02, Policy to Assure the Competency of
Organizations Generating Environmental Measurement Data under Agency -Funded Assistance
Agreements:
4Z - 03F05001 - 0 Page 9
Recipient agrees, by entering into this agreement, that it has demonstrated competency prior to award,
or alternatively, where a pre -award demonstration of competency is not practicable, Recipient agrees to
demonstrate competency prior to carrying out any activities under the award involving the generation or
use of environmental data. Recipient shall maintain competency for the duration of the project period of
this agreement and this will be documented during the annual reporting process. A copy of the Policy is
available online at https://www.epa.gov/sites/production/files/2015-03/documents/competency-policy-
aaia-new.pdf or a copy may also be requested by contacting the EPA Project Officer for this award.
E. Geospatial Data Standards
All geospatial data created must be consistent with Federal Geographic Data Committee (FGDC)
endorsed standards. Information on these standards may be found at https://www.fgdc.gov/.
F. EPASS Security
N/A
G. Quality Assurance
Authority: Quality Assurance applies to all assistance agreements involving environmental information
as defined in 2 C.F.R. § 1500.12 Quality Assurance.
The recipient shall ensure that subawards involving environmental information issued under this
agreement include appropriate quality requirements for the work. The recipient shall ensure sub -award
recipients develop and implement the Quality Assurance (QA) planning documents in accordance with
this term and condition; and/or ensure sub -award recipients implement all applicable approved QA
planning documents.
1. Quality Management Plan (QMP)
a. Prior to beginning environmental information operations, the recipient must:
• Option 1
Develop a QMP,
ii. Prepare the QMP in accordance with the current version of EPA's Quality Management Plan
(QMP) Standard.
iii. Submit the document for EPA review, and
iv. Obtain EPA Quality Assurance Manager or designee (hereafter referred to as QAM) approval.
Option 2:
i. Submit a previously EPA -approved and current QMP,
4Z - 03F05001 -0 Page 10
ii. The EPA Quality Assurance Manager or designee (hereafter referred to as QAM) will notify the
recipient and EPA Project Officer (PO) in writing if the QMP is acceptable for this agreement.
b. The recipient must submit the QMP within 30 or 60 days after grant award.
OR Submit the QMP 30/60 days prior to expiration [for existing approved QMP]
c. The recipient must review their approved QMP at least annually. These documented reviews shall be
made available to the sponsoring EPA organization if requested. When necessary, the recipient shall
revise its QMP to incorporate minor changes and notify the EPA PO and QAM of the changes. If
significant changes have been made to the Quality Program that affect the performance of environmental
information operations, it may be necessary to re -submit the entire QMP for re -approval. In general, a
copy of any QMP revision(s) made during the year should be submitted to the EPA PO and QAM in
writing when such changes occur. Conditions requiring the revision and resubmittal of an approved QMP
can be found in section 6 of EPA's Quality Management Plan (QMP) Standard.
2. Quality Assurance Project Plan (QAPP)
a. Prior to beginning environmental information operations, the recipient must:
• Develop a QAPP;
• Prepare the QAPP in accordance with the current version of EPA's Quality Assurance Project
Plan (QAPP) Standard, ;
• Submit the document for EPA review; and
• Obtain EPA Quality Assurance Manager or designee (hereafter referred to as QAM) approval.
b. The recipient must submit the QAPP within 90 days after grant award and/or no more than 180 days
after grant award.
c. The recipient shall notify the PO and QAM when substantive changes are needed to the QAPP. EPA
may require the QAPP be updated and re -submitted for approval.
d. The recipient must review their approved QAPP at least annually. The results of the QAPP review and
any revisions must be submitted to the PO and the QAM at least annually and may also be submitted
when changes occur.
For Reference:
• Quality Management Plan (QMP) Standard and EPA's Quality Assurance Project Plan (QAPP)
Standard contain quality specifications for EPA and non -EPA organizations and definitions
applicable to these terms and conditions.
• EPA QA/G-5: Guidance for Quality Assurance Project Plans.
• EPA's Quality Program website list of QA managers and Specifications for EPA and Non -EPA
Organizations.
• The Office of Grants and Debarment Implementation of Quality Assurance Requirements for
Organizations Receiving EPA Financial Assistance.
4Z -03F05001 - 0 Page 11
H. Real Property
The City of Fort Worth owns the Old Hemphill Drop -Off Station; this term and condition applies to
improvements made with EPA grant funds. No real property will be purchased under this agreement.
In accordance with 2 CFR 200.311, title to real property acquired or improved under this agreement will
vest upon acquisition in the recipient. This property must be used for the originally authorized purpose as
long as needed for that purpose, during which time the recipient must not dispose of or encumber its title
or other interests except as provided by the EPA.
Recordation
As authorized by 2 CFR 200.316, EPA requires that recipients who use EPA funds to improve real
property record a lien or similar notice in the jurisdiction in which the real property is located. The lien
must indicate the amount of grant funds paid for the improvement, when the improvement was
completed, that use of the property is restricted to the authorized purpose of the grant, and that the
recipient is required to request disposition instructions when it ceases using the real property for the
authorized purpose. For example:
The City of Fort Worth, Texas, made improvements to this real property with federal funds under a grant
program from the U.S. Environmental Protection Agency (EPA). The City of Fort Worth, Texas may only
use this real property for the purpose of operating the Old Hemphill Drop -Off Station as part of the Reuse
Program and Recycling Enhancement Project, as described in EPA grant No. 03F05001-0 The City of
Fort Worth, Texas will be responsible for maintaining this deed restriction in perpetuity. In the event the
City of Fort Worth, Texas wishes to change the use of the real property from the identified grant purpose
or encumber the property, the City of Fort Worth, Texas must contact EPA Region 6 and request written
instructions for disposition pursuant to 2 CFR 200.311.
Recipient shall provide a copy of the recorded notice (stamped by the appropriate recording office),
reflecting the recordation of the Federal Interest in the improvements, to the EPA Project Officer and
Grant Specialist.
Improvements to real property may require recordation by the recipient as applicable. The lien shall
indicate the amount of grant funds paid for the improvement, when the improvement was completed, use
of the property is restricted to the authorized grant purpose, and requirement for recipient to request
disposition instructions when it ceases using property for the authorized purpose. All appraisals shall be
conducted in accordance with 49 C.F.R. § 24.103.
Disposition
Pursuant to 2 CFR 200.311(c), when real property improved under this agreement is no longer needed
for the originally authorized purpose, the recipient must obtain disposition instructions from EPA. The
instructions will provide for one of the following alternatives:
Retain title after compensating EPA. The amount paid to EPA will be computed by applying
EPA's percentage of participation in the cost of any improvements to the fair market value of the
property. However, in those situations where the recipient is disposing of real property improved
with a Federal award and acquiring replacement real property under the same Federal award, the
net proceeds from the disposition may be used as an offset to the cost of the replacement
4Z - 03F05001 -0 Page 12
property.
Sell the property and compensate EPA. The amount due to EPA will be calculated by applying
EPA's percentage of participation in the cost of any improvements to the proceeds of the sale
after deduction of any actual and reasonable selling and fixing -up expenses. If the Federal award
has not been closed out, the net proceeds from sale may be offset against the original cost of the
property. When the recipient is directed to sell property, sales procedures must be followed that
provide for competition to the extent practicable and result in the highest possible return.
Transfer title to the Federal government or to a third party designated/approved by EPA. The
recipient is entitled to be paid an amount calculated by applying the recipient's percentage of
participation in the cost of any improvements to the current fair market value of the property.
Appraisals
Recipient must obtain an appraisal of the property conducted by an independent licensed appraiser. All
appraisals must be conducted in accordance with 49 C.F.R. § 24.103.
The cost of the appraisal may be offset by the share of proceeds from the sale of the property. An
appraisal prior to the improvement and after may be necessary to determine the value of the
improvement.
Improvements
Recordation and Disposition Provisions above apply to improvements made to property using grant
funds.
Appraisal may be needed as well. Appraisal prior to the improvement and after may be necessary to
determine the value of the improvement.
Program Income
N/A
E. Use of Logos
If the EPA logo is appearing along with logos from other participating entities on websites, outreach
materials, or reports, it must not be prominently displayed to imply that any of the recipient or
subrecipient's activities are being conducted by the EPA. Instead, the EPA logo should be accompanied
with a statement indicating that the City of Fort Worth, Texas received financial support from the EPA
under an Assistance Agreement. More information is available at: https://www.epa.gov/stylebook/using-
epa-seal-and-logo#policy.
rte.
F. Paperwork Reduction Act
Notwithstanding any references to collection of information in the recipient's application or proposal for
EPA funding, the scope of work for this cooperative agreement does not include a survey or other
information collection of identical information from 10 or more parties. No EPA funds (directly paid by
4Z - 03F05001 -0 Page 13
EPA or from the recipient's cost share) may be used for the design or administration of such an
information collection, and EPA personnel may not participate in such activities. Reasonable costs for
analyzing independently collected information and publishing the results of such information collections
are allowable to the extent authorized in the EPA approved budget for this agreement.
G. DURC/iDURC
N/A
H. Substantial Involvement
EPA will be substantially involved in this agreement. Substantial involvement by the EPA Project Officer
may include:
1. Monthly telephone calls and other monitoring (or meeting on an alternate schedule suggested by
EPA's Project Officer);
2. Reviewing project phases and providing approval to continue to the next phase;
s. Reviewing and commenting on any documents, web content, or other materials developed under
this agreement (the recipient will make final decisions on these matters);
4. Approving substantive terms included in contracts or subawards (EPA's Project Officer will not
suggest, recommend, or direct the recipient to select any particular contractor or subrecipient
except to the extent permitted in Section 10 of EPA's Subaward Policy);
5. Reviewing and commenting on the programmatic progress reports;
6. Consultation with EPA regarding the selection of key personnel (EPA's involvement is limited to
reviewing the technical qualifications of key personnel and the recipient will make the final
decisions on selection. EPA's Project Officer will not suggest, recommend, or direct the recipient
to select any individual);
7. Joint operational involvement, participation, and/or collaboration between EPA and the recipient.
EPA's Project Officer or designee may provide data, advice, and information that will help the
grantee carry out the agreement effectively.
I. National Programmatic Term and Condition for Fellowship, Internship Programs and Similar
Programs Supported by EPA Financial Assistance
J. National Environmental Policy Act (NEPA)
Include this term and condition if DC and Territories are performing construction activities, or if a state is
providing subawards to local governments for equipment installation or construction activities.
If the recipient and any subawardees are performing equipment installation or construction activities, then they
must first coordinate with their EPA Project Officer to ensure that EPA has complied with the National
Environmental Policy Act (NEPA), 42 U.S.C. § 4321 et seq., and implementing EPA regulations at 40 CFR Part 6,
4Z - 03F05001 -0 Page 14
as well as any other applicable environmental cross -cutter review requirements. In order for EPA to carry out its
environmental review obligations under NEPA, recipient must provide EPA with information on all impacts the
construction activities may have on the quality of the human environment. This may include, at the direction of the
EPA Project Officer, providing an Environmental Information Document to EPA to assist EPA in preparing the
required NEPA review document. The recipient may charge costs for providing this information to the initial award.
No funds may be drawn down or used for equipment installation or construction activities until EPA provides
to the recipient written notification that EPA completed its NEPA and other environmental cross -cutter
reviews, as applicable. The proposed project may be subject to the following requirements:
National Environmental Policy Act The recipient, and any subrecipients, agree to identify to the awarding
agency all impact that this award may have on the quality of the human environment, and provide
information the awarding agency may need to comply with the National Environmental Policy Act (NEPA,
42 U.S.C. 4321, et. seq.) in order to prepare the appropriate level of environmental review (i.e.,
environmental impact statement, environmental assessment, or CATEX) or other required environmental
documentation. In such cases, the recipient agrees to take no action that may have an adverse
environmental impact (e.g., physical disturbance of a site such as breaking of ground) until the awarding
agency provides written notification of compliance with NEPA.
Endangered Species Act The recipient, and any subrecipients, agree to comply with applicable
provisions of the following national policies concerning live organisms: Rules of the Departments of Interior
(50 CFR Parts 10-24) and Commerce (50 CFR Parts 217-227) implementing laws and conventions on the
taking, possession, transport, purchase, sale, export, or import of wildlife and plants, including the:
Endangered Species Act of 1973 (16 U.S.C. 1531-1543); Marine Mammal Protection Act (16 U.S.C. 1361-
1384); Lacey Act (18 U.S.C. 42); and Convention on International Trade in Endangered Species of Wild
Fauna and Flora. The recipient agrees to take no action that may perform any destruction, excavation, or
other ground -disturbing work (including (a) construction, reconstruction, rehabilitation and replacement
activities; (b) modifying, removing, or demolishing structures; and (c) changing the visual, atmospheric,
audible, or land use characteristics of the area) until the borrower has demonstrated to the awarding
agency with satisfaction that it met the following: (i) any final concurrence or biological opinion from the
relevant government authority with respect to any project component subject to the ESA is in the full force
and effect; and (ii) prior to concluding the required process with all relevant government authorities, the
grant recipient has not made an irreversible or irretrievable commitment of resources with respect to the
project that has or had the effect of foreclosing the formulation or implementation of any reasonable
prudent alternative measures in compliance with section 7(A)(2) of the ESA.
National Historic Preservation Act The recipient, and any subrecipients, agree to identify to the awarding
agency all property listed or eligible for listing on the National Register of Historic Places that will be
affected by this award, and to provide all the help the awarding agency may need, with respect to the
award. 16 U.S.C. 470f. The recipient agrees to take no action that may perform any destruction,
excavation, or other ground -disturbing work (including (a) construction, reconstruction, rehabilitation and
replacement activities; (b) modifying, removing, or demolishing structures; and (c) changing the visual,
atmospheric, audible, or land use characteristics of the area) until the borrower has demonstrated to the
awarding agency that the NHPA Section 106 consultation process related to the project has concluded.
Native American Graves Protection and Repatriation The recipient, and any subrecipients, agree to
comply with the following general national policy requirements: 25 U.S.C. 3001-3013. The recipient
agrees to take no action that may have an adverse environmental impact (e.g., physical disturbance of a
site such as breaking of ground) until the awarding agency provides written notification that the relevant
NAGPR consultation processes have been completed.
P. Solid Waste Infrastructure for Recycling Grants Davis -Bacon Labor Standards Term and Condition
4Z - 03F05001 -0 Page 15
1. Program Applicability
a. Program Name: Solid Waste Infrastructure for Recycling Grants
b. Statute requiring compliance with Davis -Bacon: Save Our Seas 2.0 Act (Public Law 116-224) as
codified at 33 USC 4282 Sec. 302(e)(1)
c. Activities subject to Davis -Bacon: Activities subject to Davis -Bacon include certain construction
costs and contractual costs. Construction costs may include site preparation, demolishing and
building facilities, making permanent improvements to facilities or other real property, remediation
of contamination, and related architectural or engineering services. With very few exceptions,
recipients carry out construction projects by hiring contractors which typically include a general
contractor and an architectural or engineering firm for design work and in some cases purchasing
equipment for installation at the site. Hiring general contractors and other contractors performing
activities described in the EPA Disadvantaged Business Enterprise (DBE) rule's definition of
Construction at 40 CFR 33.103 will be categorized as "Construction."
d. Prevailing Wage Classification: Building
2. Davis -Bacon and Related Acts
Davis -Bacon and Related Acts (DBRA) is a collection of labor standards provisions administered by the
Department of Labor that are applicable to grants involving construction. These labor standards include
the:
• Davis -Bacon Act, which requires payment of prevailing wage rates for laborers and mechanics on
construction contracts of $2,000 or more
• Copeland "Anti -Kickback" Act, which prohibits a contractor or subcontractor from inducing an
employee into giving up any part of the compensation to which he or she is entitled; and
• Contract Work Hours and Safety Standards Act, which requires overtime wages to be paid for
over 40 hours of work per week, under contracts in excess of $100,000.
3. Recipient Responsibilities When Entering Into and Managing Contracts
a. Solicitation and Contract Requirements:
• Include the Correct Wage Determinations in Bid Solicitations and Contracts: Recipients are
responsible for complying with the procedures provided in 29 CFR 1.6 when soliciting bids and
awarding contracts.
• Include DBRA Requirements in All Contracts: Include the following text on all contracts under this
grant: "By accepting this contract, the contractor acknowledges and agrees to the terms provided
in the DBRA Requirements for Contractors and Subcontractors Under EPA Grants."
b. After Award of Contract:
• Approve and Submit Requests for Additional Wage Rates: Work with contractors to request
additional wage rates if required for contracts under this grant, as provided in 29 CFR 5.5(a)(1)
• Provide Oversight of Contractors to Ensure Compliance with DBRA Provisions: Ensure contractor
4Z - 03F05001 -0 Page 16
compliance with the terms of the contract, as required by 29 CFR 5.6.
4. Recipient Responsibilities When Establishing and Managing Additional Subawards
a. Include DBRA Requirements in All Subawards (including Loans):
Include the following text on all subawards under this grant:
"By accepting this award, the EPA subrecipient acknowledges and agrees to the terms and conditions
provided in the DBRA Requirements for EPA Subrecipients."
b. Provide Oversight to Ensure Compliance with DBRA Provisions:
Recipients are responsible for oversight of subrecipients and must ensure subrecipients comply with the
requirements in 29 CFR 5.6.
5.The contract clauses set forth in this Term & Condition, along with the correct wage determinations, will
be considered to be a part of every prime contract covered by Davis -Bacon and Related Acts (see 29
CFR 5.1), and will be effective by operation of law, whether or not they are included or incorporated by
reference into such contract, unless the Department of Labor grants a variance, tolerance, or exemption.
Where the clauses and applicable wage determinations are effective by operation of law under this
paragraph, the prime contractor must be compensated for any resulting increase in wages in accordance
with applicable law.
Q. Health and Safety Training
The recipient agrees that all staff, contractors, or subrecipients involved in construction work will take or
show evidence of having taken safety training for equipment such as balers, compactors, shredders,
crushers, skid steers, recycling trucks, and similar equipment that may be purchased and used under the
grant.
R. Permits
The recipient agrees to ensure that all necessary permits are obtained prior to implementation of any
grant funded activity that may fall under applicable federal, state, Tribal, or local laws. The recipient's
project implementation plan must identify permits that may be needed to complete work plan activities.
The recipient must keep documentation regarding necessary permits in the project file. EPA approval of
a workplan does not imply nor guarantee that a federal, state, Tribal, or local permit will be issued for a
particular activity.
S. Description of Travel Costs
Only add this term and condition if the recipient does not include the necessary information in the
Travel category of their budget description.
The recipient shall notify and receive approval from the PO of proposed domestic travel before travel can
occur. The recipient shall include in their request information such as the purpose/type of the trip,
4Z - 03F05001 -0 Page 17
estimated number of trips, planned destinations and estimated number of travelers. The amount and type
of travel the recipient proposes must be necessary to effectively carry out the project.
Under 2 CFR 200.475(d) allowable travel costs may not exceed the rates and amounts for Federal travel
unless the recipient's cognizant Federal audit agency (or EPA if requested by the recipient to do so) has
accepted a travel policy that provides differently. Federal lodging and per diem rates are available a
https://www.gsa.gov/travel/plan-book/per-diem-rates. The costs of first class and business class
transportation are generally not allowable unless the requirements at 2 CFR 200.475(e) are met. If the
application indicates that the recipient anticipates using EPA funds for first or business class travel, EPA
staff will verify that regulatory requirements are met.
Any costs incurred for unapproved travel by the recipient are at its own risk.
ACCEPTED AND AGREED:
CITY OF FORT WORTH:
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person
responsible for the monitoring and administration of this
V � 1fr14.6- contract, including ensuring all performance and
By:
Valerie Washington (Oct 2, 2026 08:01:46 CDT) reporting requirements.
Name: Valerie Washington
Title: Assistant City Manager
Date: 10/02/2026
APPROVAL RECOMMENDED:
K��eee
By: O
Name: James Keezell
Title: Environmental Assistant Director
ATTEST:
By: _
Name: Julie Bassett
Title: Sr Management Analyst
APPROVED AS TO FORM AND LEGALITY:
� (/C/
By: M. Kevin Anders, II (Oct 1, 2026 16:4335 CDT)
Name: M Kevin Anders, II
Title: Assistant City Attorney
CONTRACT AUTHORIZATION:
ORnIIIIII M&C: 24-1104
sg �eOpOo
J1� 0 e c
PIIaII uEXus�44
By:
Name: Jannette S. Goodall
Title: City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Environmental Protection Agency
General Terms and Conditions
Effective October 1, 2025
Revision History:
The Environmental Protection Agency's General Terms and Conditions are published and become effective
October 1st at the start of the federal fiscal year. Any additions, revisions, or changes to the terms and
conditions after October 1 will be summarized below.
T&C Number
Effective Date
Description of Changes
30
June 1, 2026
Revised to reflect reactivation with iEdison
Table of Contents
Preface............................................................................
Financial Information......................................................
Selected Items of Cost ....................................................
Reporting and Additional Post -Award Requirements.....
Programmatic General Terms and Conditions................
Public Policy Requirements.............................................
....................................................................................... 2
....................................................................................... 3
....................................................................................... 5
.....................................................................................11
.....................................................................................24
.....................................................................................32
Preface
1. Introduction
(a) These terms and conditions are in addition to the assurances and certifications made as part of
the award, the terms and conditions, and restrictions reflected on the official assistance award
document. Recipients must review their official award document for additional administrative
and programmatic requirements. Failure to comply with the EPA General Terms and Conditions
outlined below and those directly reflected on the official assistance award document may
result in enforcement actions as outlined in 2 CFR 200.339 and 2 CFR 200.340.
(b) If the EPA General Terms and Conditions have been revised, EPA will update the terms and
conditions when it provides additional funding (incremental or supplemental) prior to the end of
the period of performance of this agreement. The recipient must comply with the revised terms
and conditions after the effective date of the EPA action that leads to the revision. Revised terms
and conditions do not apply to the recipient's expenditures of EPA funds or activities the
recipient carries out prior to the effective date of the EPA action. EPA will inform the recipient of
revised terms and conditions in the action adding additional funds.
2. Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal
Awards
This award is subject to the requirements of the Uniform Administrative Requirements, Cost
Principles and Audit Requirements for Federal Awards; Title 2 CFR Part 200 and 2 CFR Part 1500. 2
CFR 1500.2, Adoption of 2 CFR Part 200, states the EPA adopts the Office of Management and
Budget (OMB) Uniform Administrative Requirements, Cost Principles, and Audit Requirements for
Federal Awards (subparts A through F of 2 CFR Part 200), as supplemented by 2 CFR Part 1500, as
the EPA policies and procedures for financial assistance administration. 2 CFR Part 1500 satisfies the
requirements of 2 CFR 200.110(a) and gives regulatory effect to the OMB guidance as supplemented
by 2 CFR Part 1500. This award is also subject to applicable requirements contained in EPA
programmatic regulations located in 40 CFR Chapter 1 Subchapter B.
3. Termination
Consistent with 2 CFR 200.340, EPA may terminate this award in part or its entirety:
(a) If a recipient or subrecipient fails to comply with the terms and conditions of the award,
including statutory or regulatory requirements;
(b) With the consent of the recipient when both the recipient and the EPA agree upon the
termination conditions, which include the effective date and, in the case of partial termination,
the portion to be terminated;
(c) If a recipient sends the EPA a written notification of the reasons for such termination, the
effective date, and in the case of partial termination, the portion to be terminated; however, if
the EPA determines that the remaining portion of the Federal award will not accomplish the
purposes for which the Federal award was made, the EPA may terminate the award in its
entirety; or
Page 2 of 43
(d) Pursuant to the programmatic terms and conditions specified in the Federal award.
(e) By the EPA or pass -through entity to the extent authorized by law, if an award no longer
effectuates the program goals or agency priorities.
Financial Information
4. Reimbursement Limitation
EPA's financial obligations to the recipient are limited by the amount of Federal funding awarded to
date as reflected on the award document. If the recipient incurs costs in anticipation of receiving
additional funds from EPA, it does so at its own risk. See 2 CFR 1500.9.
5. Automated Standard Application Payments (ASAP) and Proper Payment Draw Down
Electronic Payments. Recipients must be enrolled or enroll in the Automated Standard Application
for Payments (ASAP) system to receive payments under EPA financial assistance agreements unless:
• EPA grants a recipient -specific exception;
• The assistance program has received a waiver from this requirement;
• The recipient is exempt from this requirement under 31 CFR 208.4; or,
• The recipient is a fellowship recipient pursuant to 40 CFR Part 46.
EPA will not make payments to recipients until the ASAP enrollment is completed or if recipients fall
under one of the above categories. EPA's Research Triangle Park Finance Division (RFD) will initiate
the ASAP enrollment based on the key contact information on the grant application. The "payee" on
the key contacts form will receive an email from ASAP indicating the steps required for completing
the enrollment. Recipients may request exceptions using the procedures below.
Under this payment mechanism, the recipient initiates an electronic payment request online via
ASAP, which is approved or rejected based on the amount of available funds authorized by EPA in
the recipient's ASAP account. Approved payments are credited to the account at the financial
institution of the recipient organization set up by the recipient during the ASAP enrollment process.
Additional information concerning ASAP and enrollment can be obtained by contacting the EPA RFD,
at rtpfc-grants@epa.gov, or by visiting: https://www.fiscal.treasury.gov/asap/.
EPA will grant exceptions to the ASAP enrollment requirement only in situations in which the
recipient demonstrates to EPA that receiving payment via ASAP places an undue administrative or
financial management burden on the recipient or EPA determines that granting the waiver is in the
public interest. Recipients may request an exception to the requirement by following the
procedures specified in RAIN -2018 -G06 -R.
Proper Payment Drawdown (for recipients other than States)
(a) As required by 2 CFR 200.305(b), the recipient must draw funds from ASAP only for the
minimum amounts needed for actual and immediate cash requirements to pay employees,
contractors, subrecipients or to satisfy other obligations for allowable costs under this assistance
Page 3 of 43
agreement. The timing and amounts of the drawdowns must be as close as administratively
feasible to actual disbursements of EPA funds. Disbursement within five (5) business days of
drawdown will comply with this requirement and the recipient agrees to meet this standard
when performing this award.
(b) Recipients may not retain more than 5% of the amount drawn down, or $1,000 whichever is
less, five (5) business days after drawdown to materially comply with the standard. Any EPA
funds subject to this paragraph that remain undisbursed after 5 business days must be fully
disbursed within fifteen (15) business days of draw down or be returned to EPA.
(c) If the recipient draws down EPA funds in excess of that allowed by paragraph b., the recipient
must contact rtpfc-grants@epa.gov for instructions on whether to return the funds to EPA. The
recipient must comply with the requirements at 2 CFR 200.305(b)(11) regarding depositing
advances of Federal funds in interest bearing accounts.
(d) Returning Funds: Pay.gov is the preferred mechanism to return funds. It is free, secure,
paperless, expedient, and does not require the recipient//vendor to create an account. Contact
EPA RFD at rtpfc-grants@epa.gov to obtain complete instructions. Additional information is
available at the Pay.gov website. Information on how to repay EPA via check is available at
https://www.epa.gov/financial/makepayment. Instructions on how to return funds to EPA
electronically via ASAP are available at https://www.fiscal.treasury.gov/asap/.
(e) Failure on the part of the recipient to materially comply with this condition may, in addition to
EPA recovery of the un-disbursed portions of the drawn down funds, lead to changing the
payment method from advance payment to a reimbursable basis. EPA may also take other
remedies for noncompliance under 2 CFR 200.208 and/or 2 CFR 200.339.
(f) If the recipient believes that there are extraordinary circumstances that prevent it from
complying with the five (5) business day disbursement requirement throughout the performance
period of this agreement, recipients may request an exception to the requirement by following
the procedures specified in RAIN -2018 -G06 -R. EPA will grant exceptions to the five (5) business
day disbursement requirement only if the recipient demonstrates that compliance places an
undue administrative or financial management burden or EPA determines that granting the
exception is in the public interest. EPA will grant exceptions to the five (5) business day
disbursement requirement only if the recipient demonstrates that compliance places an undue
administrative or financial management burden or EPA determines that granting the exception is
in the public interest.
Proper Payment Drawdown for State Recipients
In accordance with 2 CFR 200.305(a), payments are governed by Treasury -State Cash Management
Improvement Act (CM IA) agreements and default procedures codified at 31 CFR Part 205, Subparts
A and B and Treasury Financial Manual (TFM) 4A-2000, "Overall Disbursing Rules for All Federal
Agencies" unless a program specific regulation (e.g. 40 CFR 35.3160 or 40 CFR 35.3560) provides
otherwise. Pursuant to 31 CFR Part 205, Subpart A —Rules Applicable to Federal Assistance Programs
Included in a Treasury -State Agreement, States follow their Treasury -State CMIA Agreement for
major Federal programs listed in the agreement. For those programs not listed as major in the
Page 4 of 43
Treasury -State agreement, the State follows the default procedures in 31 CFR Part 205, Subpart B —
Rules Applicable to Federal Assistance Programs Not Included in a Treasury -State Agreement, which
directs State recipients to draw -down and disburse Federal financial assistance funds in anticipation
of immediate cash needs of the State for work under the award. States must comply with 2 CFR
200.302(a) in reconciling costs incurred and charged to EPA financial assistance agreements at time
of close out unless a program specific regulation provides otherwise.
Selected Items of Cost
6. Prohibition on Certain Telecommunications and Video Surveillance Service Equipment or Services
Prohibition on covered telecommunications and video surveillance services or equipment is
effective on all obligations and expenditures of EPA financial assistance funding as of August 13,
2020, including awards made before that date.
As required by 2 CFR 200.216, EPA recipients and subrecipients, including borrowers under EPA -
funded revolving loan fund programs, are prohibited from obligating or expending Federal loan or
grant funds to procure or obtain covered telecommunications equipment or services; extend or
renew a contract to procure or obtain covered telecommunications equipment or services; or enter
into a contract (or extend or renew a contract) to procure or obtain covered telecommunications
equipment or services. As described in section 889 of Public Law 115-232, "covered
telecommunications equipment or services" means any of the following:
1. Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation
(or any subsidiary or affiliate of such entities);
2. For the purpose of public safety, security of government facilities, physical security surveillance
of critical infrastructure, and other national security purposes, video surveillance and
telecommunications equipment produced by Hytera Communications Corporation, Hangzhou
Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or
affiliate of such entities);
3. Telecommunications or video surveillance services provided by such entities or using such
equipment;
4. Telecommunications or video surveillance equipment or services produced or provided by an
entity that the Secretary of Defense, in consultation with the Director of the National
Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an
entity owned or controlled by, or otherwise connected to, the government of a covered foreign
country.
Pursuant to 2 CFR 200.216(c), "covered telecommunications equipment or services" also include
systems that use covered telecommunications equipment or services as a substantial or essential
component of any system, or as critical technology as part of any system. Consistent with 2 CFR
200.471, costs incurred for telecommunications and video surveillance services or equipment such
as phones, internet, video surveillance, and cloud servers are allowable except for the following
circumstances:
Page 5 of 43
(a) Obligating or expending EPA funds for covered telecommunications and video surveillance
services or equipment or services as described in 2 CFR 200.216 to:
(1) Procure or obtain, extend or renew a contract to procure or obtain;
(2) Enter into a contract (or extend or renew a contract) to procure; or
(3) Obtain the equipment, services, or systems.
Certain prohibited equipment, systems, or services, including equipment, systems, or services
produced or provided by entities identified in section 889 of Public Law 115-232, are recorded in the
System for Award Management exclusion list.
7. Consultant Cap
EPA participation in the salary rate (excluding overhead) paid to individual consultants retained by
recipients or by a recipient's contractors or subcontractors shall be limited to the maximum daily
rate for a Level IV of the Executive Schedule, available at: https://www.opm.gov/policy-data-
oversight/pay-leave/salaries-wages/, to be adjusted annually. This limit applies to consultation
services of designated individuals with specialized skills who are paid at a daily or hourly rate. This
rate does not include transportation and subsistence costs for travel performed (the recipient will
pay these in accordance with their normal travel reimbursement practices).
Information on how to calculate the maximum daily rate and the daily pay limitation is available at
the Office Of Personnel Management's Fact Sheet: How to Compute Rates of Pay and Fact Sheet:
Expert and Consultant Pay. Specifically, to determine the maximum daily rate, follow these steps:
(1) Divide the Level IV salary by 2087 to determine the hourly rate. Rates must be rounded to
the nearest cent, counting one-half cent and over as the next higher cent (e.g., round
$18.845 to $18.85).
(2) Multiply the hourly rate by eight (8) hours. The product is the maximum daily rate.
Contracts and subcontracts with firms for services that are awarded using the procurement
requirements in Subpart D of 2 CFR Part 200 are not affected by this limitation unless the terms of
the contract provide the recipient with responsibility for the selection, direction and control of the
individuals who will be providing services under the contract at an hourly or daily rate of
compensation. See 2 CFR 1500.10.
8. Establishing and Managing Subawards
If the recipient chooses to pass funds from this assistance agreement to other entities, the
recipient must comply with applicable subaward provisions of 2 CFR Part 200 and the EPA
Subaward Policy.
As a pass -through entity, the recipient agrees to:
1. Select subrecipients and conduct subaward competitions, as appropriate, using a
system that properly differentiates between subrecipients and procurement
contractors consistent with the differentiating characteristics explained in 2 CFR
Page 6 of 43
200.331 and EPA's supplemental guidance in Appendix A of the EPA Subaward Policy.
2. Verify that the potential subrecipient is not excluded or disqualified in accordance
with the verification methods provided in 2 CFR 180.300, such as confirming in
SAM.gov that a potential subrecipient is not suspended, debarred, or otherwise
excluded from receiving Federal funds.
3. Establish and follow a system that ensures all subaward agreements are in writing and
contain all of the elements required by 2 CFR 200.332(b). EPA has developed a
template for subaward agreements that is available in Appendix D of the EPA
Subaward Policy.
4. Prior to making subawards, ensure that each subrecipient has a "Unique Entity
Identifier" (UEI). The UEI is required by 2 CFR Part 25 and 2 CFR 200.332(b).
Subrecipients are not required to complete full System for Award Management
(SAM.gov) registration to obtain a UEI. Information regarding obtaining a UEI is
available at the System for Award Management (SAM.gov) Internet site:
http://www.sam.gov/SAM/and in the General Condition of the pass -through entity's
agreement with EPA entitled "System for Award Management and Universal
Identifier Requirements" T&C of the pass -through entity's agreement with the EPA.
5. Ensure that subrecipients are aware of the requirements that apply to the subaward,
including those that flow down from the recipient, as required by 2 CFR 200.332(b)
and monitor the activities of the subrecipient to ensure compliance with these
requirements per 2 CFR 200.332(e). These requirements include, among others:
a. Title VI of the Civil Rights Act and other Federal statutes and regulations
prohibiting discrimination in Federal financial assistance programs, as
applicable, including provisions protecting free speech, religious liberty, public
welfare, and the environment per 2 CFR 200.300(a), as well as regulations,
including 2 CFR 200.300(b) prohibiting discrimination based on sex.
b. Reporting Subawards and Executive Compensation under Federal Funding
Accountability and Transparency Act (FFATA) set forth in the General
Condition pass -through entity's agreement with EPA entitled "Reporting
Subawards and Executive Compensation."
c. Limitations on individual consultant fees as set forth in 2 CFR 1500.10 and the
General Condition of the pass -through entity's agreement with EPA entitled
"Consultant Fee Cap."
d. EPA's prohibition on paying management fees as set forth in General
Condition of the pass -through entity's agreement with EPA entitled
"Management Fees."
e. The Procurement Standards in 2 CFR Part 200 including those requiring
competition when the subrecipient acquires goods and services from
contractors (including consultants) and Domestic preferences for
procurements at 2 CFR 200.322.
f. Other statutes, regulations and Executive Orders that may apply to subawards
Page 7 of 43
are described at Information on Requirements that Pass -Through Entities must
"Flow Down" to Subrecipients. Many Federal requirements are agreement- or
program -specific, and EPA encourages pass -through entities to review the
terms of their assistance agreement carefully and consult with their EPA
Project Officer for advice if necessary.
6. Establish and follow a system for evaluating subrecipient fraud risk and risk of
noncompliance with a subaward to determine the appropriate monitoring described at 2
CFR 200.332(c) and consider whether, based on the evaluation of risk, additional
monitoring tools may be useful as described in 2 CFR 200.332(f). When evaluating a
subrecipient's risk, a pass -through entity should consider:
a. The subrecipient's prior experience with same or similar subawards;
b. Results of previous audits, including considering whether the subrecipient receives a
Single Audit, in accordance with 2 CFR Part 200, Subpart F and the extent to which the
same or similar subawards have been audited as a major program;
c. Whether the subrecipient has new personnel or new or substantially change systems,
and
d. The extent and results of any Federal agency monitoring (for example, if the subrecipient
also receives Federal awards directly from the Federal agency).
7. Establish and follow a process for deciding whether to implement specific
conditions in subawards based on risk factors, as described in 2 CFR 200.208,
and notify EPA of the specific conditions as required by 2 CFR 200.332(d).
Examples of specific conditions, per 2 CFR 200.208, may include:
a. Requiring payments as reimbursements rather than advance payments;
b. Withholding authority to proceed to the next phase until receipt of evidence of
acceptable performance;
c. Requiring additional or more detailed financial reports;
d. Requiring additional or project monitoring;
e. Requiring the recipient or subrecipient to obtain technical or management assistance; or
f. Establishing additional prior approvals.
8. Establish and follow a system for monitoring subrecipient performance that includes
the elements required at 2 CFR 200.332(e), such as reviewing financial and
performance reports, and report the results of the monitoring in performance reports
as provided in the reporting terms and conditions of this agreement.
9. Ensure that a subrecipient provides a plan for and takes corrective action on all
significant developments that negatively affect the subaward. Per 2 CFR
200.332(e)(2), significant developments include Single Audit findings related to the
subaward, other audit findings, site visits, and written notifications from a
subrecipient of adverse conditions that will impact their ability to meet the
milestones or objectives of the subaward.
10. Establish and maintain an accounting system which ensures compliance with
the $50,000 limitation at 2 CFR 200.1, Modified Total Direct Costs, if applicable,
Page 8 of 43
on including subaward costs in Modified Total Direct Costs for the purposes of
distributing indirect costs. Recipients with Federally approved indirect cost
rates that use a different basis for distributing indirect costs to subawards
must comply with their Indirect Cost Rate Agreement.
11. Work with EPA's Project Officer to obtain the written consent of EPA's
Office of International and Tribal Affairs (OITA) prior to awarding a
subaward to a foreign or international organization or a subaward to be
performed in a foreign country, even if that subaward is described in a
proposed scope of work.
12. Obtain prior written approval from the EPA's Award Official for any
subawards or subaward activities that are not described in the approved
work plan in accordance with 2 CFR 200.308. As provided in 2 CFR
200.308(f)(6), recipients must obtain prior approval to change a named
subrecipient from the EPA Award Official if the pass -through entity
described the original subrecipient's qualifications and/or performance
history in the competitive application. Recipients must contact their
Project Officer to begin the prior approval process.
13. Obtain prior written approval from the EPA's Award Official before awarding a
subaward to an individual if the EPA -approved scope of work does not include
a description of subawards to individuals.
14. Establish and follow written procedures under 2 CFR 200.302(b)(7) for determining that
subaward costs are allowable in accordance with 2 CFR Part 200, Subpart E and the
terms and conditions of this award. These procedures may provide for allowability
determinations on a pre -award basis, through ongoing monitoring of costs that
subrecipients incur, or a combination of both approaches provided the pass -through
entity documents its determinations.
15. Verify that the subrecipient is audited, as applicable, per 2 CFR part 200, Subpart F,
and establish and maintain a system under 2 CFR 200.332(g) and 2 CFR 200.521 for
issuing management decisions for audits of subrecipients that relate to the Federal
award from the recipient. The recipient remains accountable to EPA for ensuring that
unallowable subaward costs initially paid by EPA are either reimbursed or offset with
allowable costs, regardless of whether the recipient recovers those costs from the
subrecipient.
16. As provided in 2 CFR 200.333, pass -through entities must obtain EPA approval to
make fixed amount subawards. Recipients should consult with their EPA Project
Officer regarding how to obtain EPA approval.
By accepting this award, the recipient is certifying that it either has systems in place to comply with
the requirements described in Items 1 through 16 above or will refrain from making subawards until
the systems are designed and implemented.
Page 9 of 43
Subawards to Federal Agencies — Clarity on Applicable EPA Terms and Conditions: If the subrecipient
is a Federal agency, the only provisions of the EPA General Terms and Conditions implementing 2 CFR
Part 200 on subawards that apply are: (1) the requirement for the Federal agency to obtain a Unique
Entity Identifier (UEI) in accordance with 2 CFR Part 25 as described in Item 4 above and (2) the
requirement for the recipient to report on first -tier subawards as described in EPA General Term and
Condition 15.1, "Reporting of first tier subawards."
As provided within 2 CFR 200.101(a)(2), all other provisions of 2 CFR Part 200, Subparts A through E,
do not apply to subawards with federal agencies. Transactions between the recipient and the
Federal agency subrecipient will be governed by the Federal agency subrecipient's cost
reimbursement agreement with the recipient.
9. Management Fees
Management Fees or similar charges in excess of the direct costs and approved indirect rates are
not allowable. The term "management fees or similar charges" refers to expenses added to the
direct costs in order to accumulate and reserve funds for ongoing business expenses; unforeseen
liabilities; or for other similar costs which are not allowable under this assistance agreement.
Management fees or similar charges may not be used to improve or expand the project funded
under this agreement, except to the extent authorized as a direct cost of carrying out the scope of
work.
10. Federal Employee Costs
The recipient understands that none of the funds for this project (including funds contributed by the
recipient as cost sharing) may be used to pay for the travel of Federal employees or for other costs
associated with Federal participation in this project unless a Federal agency will be providing
services to the recipient as authorized by a Federal statute.
11. Foreign Travel
EPA policy requires that all foreign travel must be approved by its Office of International and
Tribal Affairs. The recipient agrees to obtain prior EPA approval before using funds available under
this agreement for international travel unless the trip(s) are already described in the EPA approved
budget for this agreement. Foreign travel includes trips to Mexico and Canada but does not include
trips to Puerto Rico, the U.S. Territories or possessions. Recipients that request post -award approval
to travel frequently to Mexico and Canada by motor vehicle (e.g., for sampling or meetings) may
describe their proposed travel in general terms in their request for EPA approval. Requests for prior
approval must be submitted to the Project Officer for this agreement.
12. The Fly America Act and Foreign Travel
The recipient understands that all foreign travel funded under this assistance agreement must
comply with the Fly America Act. All travel must be on U.S. air carriers certified under 49 U.S.C.
Page 10 of 43
Section 40118, to the extent that service by such carriers is available even if foreign air carrier costs
are less than the American air carrier.
13. Union Organizing
Grant funds may not be used to support or oppose union organizing, whether directly or as an offset
for other funds.
Reporting and Additional Post -Award Requirements
14. System for Award Management and Universal Identifier Requirements
14.1 Requirement for System for Award Management (SAM) Unless exempted from this
requirement under 2 CFR 25.110, the recipient must maintain current and active
registration SAM.gov. The recipient's registration must always be current and active
until it submits all final reports required under this Federal award or receive the final
payment, whichever is later. The recipient must review and update its information in
SAM.gov at least annually from the date of its initial registration or any subsequent
updates to ensure it is current, accurate, and complete. If applicable, this includes
identifying the recipient's immediate and highest -level owner and subsidiaries and
providing information about the recipient's predecessors that have received a Federal
award or contract within the last three (3) years.
14.2 Requirement for Unique Entity Identifier (UEI). If the recipient is authorized to make
subawards under this award, the recipient:
a. Must notify potential subrecipients that no entity may receive a subaward unless
the entity has provided its UEI to the recipient.
b. Must not make a subaward to an entity unless the entity has provided its UEI.
Subrecipients are not required to complete full registration in SAM.gov to obtain a
UEI.
14.3 Definitions. For the Purpose of this award term:
a. System for Award Management (SAM.gov) means the Federal repository into
which an entity must provide the information required for the conduct of business
as a recipient. Additional information about registration procedures may be found
in SAM.gov (currently at: https://sam.gov/.)
b. Unique Entity Identifier means the universal identifier assigned by SAM.gov to
uniquely identify an entity.
c. Entity is defined at 2 CFR 25.400 and includes all of the following types as defined in
2 CFR 200.1:
1) Non-federal entity,
2) Foreign organization;
3) Foreign public entity;
4) Domestic for-profit organization; and
5) Federal agency.
Page 11 of 43
d. Subaward has the meaning given in 2 CFR 200.1
e. Subrecipient has the meaning given in 2 CFR 200.1
15. Reporting Subawards and Executive Compensation
15.1 Reporting of first tier subawards.
a. Applicability. Unless the recipient is exempt as provided in paragraph 15.4. of this
award term, the recipient must report each action that obligates $30,000 or more in
Federal funds for a subaward to an entity or Federal agency. The recipient must also
report a subaward if a modification increases the Federal funding to an amount that
equals or exceeds $30,000.
b. Reporting Requirements. (1) The entity or Federal agency must report each
subaward described in paragraph 15.1.a of this award term at the System for Award
Management (SAM.gov). (2) For subaward information, report no later than the end
of the month following the month in which the subaward was made. (For example,
if the subaward was made on any date during the month of November of a given
year, the obligation must be reported by no later than December 31 of that year.)
15.2 Reporting Total Compensation of Recipient Executives.
a. Applicability. The recipient must report the total compensation for each of its five
(5) most highly compensated executives for the preceding completed fiscal year, if:
15.2.a.1. The total Federal funding authorized to date under this award is $30,000
or more;
15.2.a.2. In the preceding fiscal year, the recipient received: (i.) 80 percent or more
of their annual gross revenues from Federal procurement contracts (and
subcontracts) and Federal awards (and subawards) subject to the Transparency
Act); (ii.) and $25,000,000 or more in annual gross revenues from Federal
procurement contracts (and subcontracts) and Federal awards (and subawards)
subject to the Transparency Act; and
15.2.a.3. The public does not have access to information about the compensation
of the executives through periodic reports filed under section 13(a) or 15(d) of the
Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the
Internal Revenue Code of 1986 after receiving this subaward. (To determine if the
public has access to the compensation information, see the U.S. Security and
Exchange Commission total compensation filings at:
http:// www.sec.gov/answers/execomp.htm.)
b. Reporting Requirements. The recipient must report executive total compensation
described in paragraph 15.2.a of this award term: (i.) As part of the recipient's
registration profile at https://www.sam.gov (ii.) No later than the end of the month
following the month in which this award is made, and annually thereafter (For
example if this award was made on any date of November in a given year, the
executive total compensation must be reported by no later than December 31 of
that year.)
Page 12 of 43
15.3 Reporting Total Compensation of Subrecipient Executives.
a. Applicability. Unless a first -tier subrecipient is exempt as provided in paragraph
15.4. of this award term, the recipient must report the executive total
compensation of each of the subrecipient's five most highly compensated
executives for the subrecipient's preceding completed fiscal year, if:
15.3.a.1. The total federal funding authorized to date under the subaward equals or
exceeds $30,000; and
15.3.a.2. In the subrecipient's preceding fiscal year, the subrecipient received: (i.) 80
percent or more of its annual gross revenues from Federal procurement contracts
(and subcontracts) and Federal awards subject to the Transparency Act; and (ii.)
$25,000,000 or more in annual gross revenues from Federal procurement contracts
(and subcontracts), and Federal awards (and subawards) subject to the
Transparency Act; and
15.3.a.3. The public does not have access to information about the compensation
of the executives through periodic reports filed under section 13(a) or 15(d) of the
Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the
Internal Revenue Code of 1986 after receiving this subaward. (To determine if the
public has access to the compensation information, see the U.S. Security and
Exchange Commission total compensation filings at:
http:// www.sec.gov/answers/execomp.htm.)
b. Reporting Requirements. Subrecipients must report their executive total
compensation described in paragraph 15.3.a. of this award term to the recipient.
The recipient is required to submit this information to SAM.gov no later than the
end of the month following the month in which the subaward was made. (For
example, if a subaward was made on any date during the month of October of a
given year, the subaward must be reported no later than November 30th of that
year).
15.4 Exemptions
a. If, in the previous tax year, the recipient had gross income, from all sources, under
$300,000, the recipient is exempt from the requirements to report:
15.4.a.1. (i) subawards, and (ii) the total compensation of the five most highly
compensated executives of any subrecipient.
15.5 Definitions. For purposes of this award term:
a. Entity: includes:
(1) whether for profit or nonprofit: (i) A corporation; (ii) An association; (iii) A
partnership; (iv) A limited liability company; (v) A limited liability partnership; (vi) A
sole proprietorship; (vii) Any other legal business entity; (viii) Another grantee or
contractor that is not excluded by subparagraph (2); and (ix) Any State or locality.
(2) It does not include: (i) An individual recipient of Federal financial assistance; or
(ii) A Federal employee.
Page 13 of 43
b. Executive means an officer, managing partner, or any other employee holding a
management position.
c. Subaward: has the meaning given in 2 CFR 200.1.
d. Subrecipient has the meaning given in 2 CFR 200.1.
e. Total compensation means the cash and noncash dollar value an executive earns
during the recipient's or subrecipient's preceding fiscal year. This includes all items
of compensation as prescribed in 17 CFR 229.402(c)(2)).
16. Recipient Integrity and Performance Matters — Reporting of Matters Related to Recipient Integrity
and Performance
16.1 General Reporting Requirement
If the total value of your currently active grants, cooperative agreements, and
procurement contracts from all Federal awarding agencies exceeds $10,000,000 for any
period of time during the period of performance of this Federal award, then you as the
recipient during that period of time must maintain the currency of information reported
to SAM.gov that is made available in the designated integrity and performance system
(currently the responsibility/qualification information) about civil, criminal, or
administrative proceedings described in paragraph 2 of this award term and condition.
This is a statutory requirement under section 872 of Public Law 110-417, as amended
(41 U.S.C. 2313). As required by section 3010 of Public Law 111-212, all information
posted in the designated integrity and performance system on or after April 15, 2011,
except past performance reviews required for Federal procurement contracts, will be
publicly available.
16.2 Proceedings About Which You Must Report
Submit the information required about each proceeding that:
a. Is in connection with the award or performance of a grant, cooperative agreement,
or procurement contract from the Federal Government;
b. Reached its final disposition during the most recent five-year period; and
c. Is one of the following:
16.2.c.1. A criminal proceeding that resulted in a conviction, as defined in
paragraph 5 of this award term and condition;
16.2.c.2. A civil proceeding that resulted in a finding of fault and liability and
payment of a monetary fine, penalty, reimbursement, restitution, or damages of
$5,000 or more;
16.2.c.3. An administrative proceeding, as defined in paragraph 5. of this award
term and condition, that resulted in a finding of fault and liability and your payment
of either a monetary fine or penalty of $5,000 or more or reimbursement,
restitution, or damages in excess of $100,000; or
16.2.c.4. Any other criminal, civil, or administrative proceeding if:
16.2.c.4.1. It could have led to an outcome described in paragraph 16.2.c.1,
16.2.c.2, or 16.2.c.3 of this award term and condition;
Page 14 of 43
16.2.c.4.2. It had a different disposition arrived at by consent or compromise
with an acknowledgment of fault on your part; and
16.2.c.4.3. The requirement in this award term and condition to disclose
information about the proceeding does not conflict with applicable laws and
regulations.
16.3 Reporting Procedures
Enter in SAM.gov Entity Management area the information that SAM.gov requires
about each proceeding described in paragraph 2 of this award term and condition. You
do not need to submit the information a second time under assistance awards that you
received if you already provided the information through SAM.gov because you were
required to do so under Federal procurement contracts that you were awarded.
16.4 Reporting Frequency
During any period of time when you are subject to the requirement in paragraph 16.1 of
this award term and condition, you must report proceedings information through
SAM.gov for the most recent five-year period, either to report new information about
any proceeding(s) that you have not reported previously or affirm that there is no new
information to report. Recipients that have Federal contract, grant, and cooperative
agreement awards with a cumulative total value greater than $10,000,000 must
disclose semiannually any information about the criminal, civil, and administrative
proceedings.
16.5 Definitions
For purposes of this award term and condition:
a. Administrative proceeding means a non -judicial process that is adjudicatory in
nature in order to make a determination of fault or liability (e.g., Securities and
Exchange Commission Administrative proceedings, Civilian Board of Contract
Appeals proceedings, and Armed Services Board of Contract Appeals proceedings).
This includes proceedings at the Federal and State level but only in connection with
performance of a Federal contract or grant. It does not include audits, site visits,
corrective plans, or inspection of deliverables.
b. Conviction, for purposes of this award term and condition, means a judgment or
conviction of a criminal offense by any court of competent jurisdiction, whether
entered upon a verdict or a plea, and includes a conviction entered upon a plea of
nolo contendere.
c. Total value of currently active grants, cooperative agreements, and procurement
contracts includes —
16.5.c.1. Only the Federal share of the funding under any Federal award with a
recipient cost share or match; and
16.5.c.2. The value of all expected funding increments under a Federal award and
options, even if not yet exercised.
Page 15 of 43
17. Federal Financial Reporting (FFR)
Pursuant to 2 CFR 200.328 and 2 CFR 200.344, EPA recipients must submit the Federal Financial
Report (SF -425) at least annually and no more frequently than quarterly. EPA's standard reporting
frequency is annual unless an EPA Region has included an additional term and condition specifying
greater reporting frequency within this award document in accordance with 2 CFR 200.208. EPA
recipients must submit the SF -425 no later than thirty (30) calendar days after the conclusion of
each specified reporting period for quarterly and semi-annual reports and ninety (90) calendar days
for annual reports. Final reports are due no later than one hundred and twenty (120) calendar days
after the conclusion of the period of performance of the award. Extension of reporting due dates
may be approved by EPA when requested and justified by the recipient. The FFR form is available on
the internet at: https://www.epa.gov/grants/`sf-425-federal-financial-report. All FFRs must be
submitted to the EPA Research Triangle Park Finance Division (RFD) via email at rtpfc-
grants@epa.gov or mail it to:
US Environmental Protection Agency
Research Triangle Park Finance Division (Mail Code AA216-01)
4930 Page Rd.
Durham, NC 27703
The EPA RFD will make adjustments as necessary, to obligated funds after reviewing and accepting a
final Federal Financial Report. Recipients will be notified and instructed by EPA if they must
complete any additional forms for the closeout of the assistance agreement.
18. Indirect Cost Rate Agreements
This term and condition provides requirements for recipients using EPA funds for indirect costs and
applies to all EPA assistance agreements unless there are statutory or regulatory limits on IDCs. See
also EPA's Indirect Cost Policy for Recipients of EPA Assistance Agreements (IDC Policy).
In order for the assistance agreement recipient to use EPA funding for indirect costs, the IDC
category of the recipient's assistance agreement award budget must include an amount for IDCs and
at least one of the following must apply:
• With the exception of "exempt" agencies and Institutions of Higher Education as noted
below, all recipients must have one of the following current (not expired) IDC rates, including
IDC rates that have been extended by the cognizant agency:
— Provisional
— Final
— Fixed rate with carry -forward
— Predetermined
— Grants awarded before October 1, 2024 - 10% de minimis rate of modified total direct
costs authorized by 2 CFR 200.414(f)
— Grants awarded on or after October 1, 2024 — up to a 15% de minimis rate of modified
total direct costs authorized by 2 CFR 200.414(f)
Page 16 of 43
— Grants amended to incorporate the October 2024 Revisions to 2 CFR 200 — up to a
15% de minimis rate of modified total direct costs authorized by 2 CFR 200.414(f),
effective as of the date of the amendment and going forward, cannot be applied
retroactively
— EPA -approved use of an expired fixed rate with carry -forward on an exception basis, as
detailed in section 6.4.a. of the IDC Policy
"Exempt" State or local governmental departments or agencies are agencies that receive up
to and including $35,000,000 in Federal funding in its fiscal year and must have an IDC rate
proposal developed in accordance with 2 CFR Part 200, Appendix VII, with documentation
maintained and available for audit.
• Institutions of Higher Education must use the IDC rate(s) on the approved rate agreement in
place at the time of award during the life of the assistance agreement (unless the rate was
provisional at time of award, in which case the rate will change once it becomes final). As
provided by 2 CFR Part 200, Appendix III(C)(7), the term "life of the assistance agreement",
means each competitive segment of the project. If negotiated rate agreements do not
extend through the life of the Federal award at the time of the initial award, then the
negotiated rate for the last year of the Federal award must be extended through the end of
the award. Additional information is available in the regulation.
IDCs incurred during any period of the assistance agreement that are not covered by the provisions
above are not allowable costs and must not be drawn down by the recipient. Recipients may budget
for IDCs if they have submitted a proposed IDC rate to their cognizant Federal agency, or requested
an exception from EPA under subsection 6.4 of the IDC Policy. However, recipients may not draw
down IDCs until their rate is approved, if applicable, or EPA grants an exception. IDC drawdowns
must comply with the indirect rate corresponding to the period during which the costs were
incurred. If the recipient's indirect cost rate has not been finalized within one year after the period
of performance ends, the EPA Grants Management Officer is authorized to close the recipient's
award using their most recently negotiated rate per 2 CFR 200.344(h).
This term and condition does not govern indirect rates for subrecipients or recipient procurement
contractors under EPA assistance agreements. Pass -through entities are required to comply with 2
CFR 200.332(b)(4)(i) and (ii) when establishing indirect cost rates for subawards.
19. Audit Requirements
In accordance with 2 CFR 200.501(a), the recipient hereby agrees to obtain a single audit from an
independent auditor, if their organization expends $1,000,000 or more in total Federal funds in the
recipient's fiscal year.
The recipient must submit a single audit report within nine (9) months of the end of the recipient's
fiscal year or thirty (30) days after receiving the report from an independent auditor. The single
audit report MUST be submitted using the Federal Audit Clearinghouse available at:
https://fac.gov/. For complete information on how to accomplish the single audit submissions, the
recipient will need to visit the Federal Audit Clearinghouse Web site: https://fac.gov/.
Page 17 of 43
20. Closeout Requirements
Reports required for closeout of the assistance agreement must be submitted in accordance with
this agreement. Submission requirements and frequently asked questions can also be found at:
https://www.epa.gov/grants/frequent-questions-about-closeouts.
21. Suspension and Debarment
Recipient shall fully comply with Subpart C of 2 C.F.R. Part 180 entitled, "Responsibilities of
Participants Regarding Transactions Doing Business With Other Persons," as implemented and
supplemented by 2 C.F.R. Part 1532. Recipient is responsible for ensuring that any lower tier
covered transaction, as described in Subpart B of 2 C.F.R. Part 180, entitled "Covered Transactions,"
and 2 C.F.R. § 1532.220, includes a term or condition requiring compliance with 2 C.F.R. Part 180,
Subpart C. Recipient is responsible for further requiring the inclusion of a similar term and condition
in any subsequent lower tier covered transactions. Recipient acknowledges that failing to disclose
the information required under 2 C.F.R. § 180.335 to the EPA office that is entering into the
transaction with the recipient may result in the delay or negation of this assistance agreement, or
pursuance of administrative remedies, including suspension and debarment. Recipients may access
the SAM.gov exclusion list at https://sam.gov to determine whether an entity or individual is
presently excluded or disqualified.
22. Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under
any Federal Law
This award is subject to the provisions contained in an appropriations act(s) which prohibits the
Federal Government from entering into a contract, memorandum of understanding, or cooperative
agreement with, make a grant to, or provide a loan or loan guarantee to any corporation having a
delinquent Federal tax liability or a felony conviction under any Federal law, unless the agency has
considered suspension or debarment of the corporation and has made a determination that this
further action is not necessary to protect the interests of the Government. A "corporation" is a legal
entity that is separate and distinct from the entities that own, manage, or control it. It is organized
and incorporated under the jurisdictional authority of a governmental body, such as a State or the
District of Columbia. A corporation may be a for-profit or non-profit organization.
As required by the appropriations act(s) prohibitions, the Government will not enter into a contract,
memorandum of understanding, or cooperative agreement with, make a grant to, or provide a loan
or loan guarantee with any corporation that — (1) Has any unpaid Federal tax liability that has been
assessed, for which all judicial and administrative remedies have been exhausted or have lapsed,
and that is not being paid in a timely manner pursuant to an agreement with the authority
responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax
liability, unless an agency has considered suspension or debarment of the corporation and made a
determination that suspension or debarment is not necessary to protect the interests of the
Government; or (2) Was convicted of a felony criminal violation under any Federal law within the
preceding twenty-four (24) months, where the awarding agency is aware of the conviction, unless
Page 18 of 43
an agency has considered suspension or debarment of the corporation and made a determination
that this action is not necessary to protect the interests of the Government.
By accepting this award, the recipient represents that it is not a corporation that has any unpaid
Federal tax liability that has been assessed, for which all judicial and administrative remedies have
been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an
agreement with the authority responsible for collecting the tax liability; and it is not a corporation
that was convicted of a felony criminal violation under a Federal law within the preceding twenty-
four (24) months.
Alternatively, by accepting this award, the recipient represents that it disclosed unpaid Federal tax
liability information and/or Federal felony conviction information to the EPA. The recipient may
accept this award if the EPA Suspension and Debarment Official has considered suspension or
debarment of the corporation based on tax liabilities and/or Federal felony convictions and
determined that suspension or debarment is not necessary to protect the Government's interests.
If the recipient fails to comply with this term and condition, EPA will annul this agreement and may
recover any funds the recipient has expended in violation of the appropriations act(s) prohibition(s).
The EPA may also pursue other administrative remedies as outlined in 2 CFR 200.339 and 2 CFR
200.340 and may also pursue suspension and debarment.
23. Disclosing Conflict of Interest
23.1 For Awards to Recipients, Subrecipients, and Individuals (other than States and Tribes that
have procurement policies and procedures, and fellowship recipients under 40 CFR Part 46)
As required by 2 CFR 200.112, EPA has established a policy (COI Policy) for disclosure of
conflicts of interest (COI) that may affect EPA financial assistance awards. EPA's COI Policy is
posted at https://www.epa.gov/grants/epas-financial-assistance-conflict-interest-policy. The
posted version of EPA's COI Policy is applicable to new funding (initial awards, supplemental
and incremental funding) awarded on or after October 1, 2015.
For competitive awards, recipients must disclose any competition related COI described in
section 4.0(a) of the COl Policy that are discovered after award to the EPA Grant Specialist
listed on the Assistance Agreement/Amendment within thirty (30) calendar days of discovery
of the COI. The Grant Specialist will respond to any such disclosure within thirty (30) calendar
days.
EPA's COI Policy requires that recipients have systems in place to address, resolve and
disclose to EPA COls described in sections 4.0(b), (c) and/or (d) of the COI Policy that affect
any contract or subaward regardless of amount funded under this award. The recipient's COI
Point of Contact for the award must disclose any COI to the EPA Grant Specialist listed on the
Page 19 of 43
Assistance Agreement/Amendment within thirty (30) calendar days of the discovery of the
potential COI and their approach for resolving the COI.
EPA's COI Policy requires that subrecipients have systems in place to address, resolve and
disclose COI's described in section 4.0(b)(c) and (d) of the COI Policy regardless of the
amount of the transaction. Recipients who are pass -through entities as defined at 2 CFR
200.1 must require that subrecipients being considered for or receiving subawards disclose
COI to the pass -through entities in a manner that, at a minimum, is in accordance with
sections 5.0(d) and 7.0(c) of EPA's COI Policy. Pass -through entities must disclose the
subrecipient COI along with the approach for resolving the COI to the EPA Grant Specialist
listed on the Assistance Agreement/Amendment within thirty (30) calendar days of receiving
notification of the COI by the subrecipient.
EPA only requires that recipients and subrecipients disclose COI's that are discovered under
their systems for addressing and resolving COI. If recipients or subrecipients do not discover
a COl, they do not need to advise EPA or the pass -through entity of the absence of a COI.
Upon notice from the recipient of a potential COI and the approach for resolving it, the
Agency will then make a determination regarding the effectiveness of these measures within
thirty (30) days of receipt of the recipient's notice unless a longer period is necessary due to
the complexity of the matter. Recipients may not request payment from EPA for costs for
transactions subject to the COI pending notification of EPA's determination. Failure to
disclose a COI may result in cost disallowances.
Disclosure of potential COI will not necessarily result in EPA disallowing costs, with the
exception of procurement contracts that the Agency determines violate 2 CFR 200.318(c)(1)
or (2), provided the recipient notifies EPA of measures the recipient or subrecipient has
taken to eliminate, neutralize or mitigate the conflict of interest when making the disclosure.
23.2 For Awards to States and Tribes, Including State Universities that are State Agencies or
Instrumentalities and Tribal Colleges and Universities that are Tribal Agencies or
Instrumentalities
As required by 2 CFR 200.112, EPA has established a policy (COI Policy) for disclosure of
conflicts of interest (COI) that may affect EPA financial assistance awards. EPA's COI Policy is
posted at: https://www.epa.gov/grants/epas-financial-assistance-conflict-interest-policy.
The posted version of EPA's COI Policy is applicable to new funding (initial awards,
supplemental, incremental funding) awarded on or after October 1, 2025.
For competitive awards, recipients must disclose any competition related COI described in
section 4.0(a) of the COl Policy that are discovered after award to the EPA Grant Specialist
listed on the Assistance Agreement/Amendment within thirty (30) calendar days of discovery
Page 20 of 43
of the COI. The Grant Specialist will respond to any such disclosure within thirty (30) calendar
days.
States, including State universities that are State agencies and instrumentalities, and Tribes
including Tribal Colleges and Universities that are Tribal Agencies or Instrumentalities,
receiving funding from EPA are only required to disclose subrecipient COl as a pass -through
entity as defined by 2 CFR 200.1. Any other COI are subject to State and Tribal laws,
regulations, and policies. EPA's COI Policy requires that subrecipients have systems in place
to address, resolve and disclose COls described in section 4.0(b)(c) and (d) of the COI Policy
that arise after EPA made the award regardless of the amount of the transaction. States and
Tribes who are pass -through entities as defined at 2 CFR 200.1 must require that
subrecipients being considered for or receiving subawards disclose COI to the State or Tribe
in a manner that, as a minimum, in accordance with sections 5.0(d) and 7.0(c) of EPA's COI
Policy. States and Tribes must disclose the subrecipient COI along with the approach for
resolving the COI to the EPA Grant Specialist listed on the Assistance
Agreement/Amendment within thirty (30) calendar days of receiving notification of the COI
by the subrecipient.
EPA only requires that subrecipients disclose COI's to State and Tribal pass -through entities
that are discovered under their systems for addressing, resolving, and disclosing COl. If
subrecipients do not discover a COI, they do not need to advise State and Tribal pass -through
entities of the absence of a COI.
Upon receiving notice of a potential COI and the approach for resolving it, the Agency will
make a determination regarding the effectiveness of these measures within thirty (30) days
of receipt of the State's or Tribe's notice of a subrecipient COI unless a longer period is
necessary due to the complexity of the matter. States and Tribes may not request payment
from EPA for costs for transactions subject to the COI pending notification of EPA's
determination. A subrecipient's failure to disclose a COI to the State or Tribe and EPA may
result in cost disallowances.
Disclosure of potential subrecipient COI will not necessarily result in EPA disallowing costs,
with the exception of procurement contracts that the Agency determines violate 2 CFR
200.318(c)(1) or (2), provided the subrecipient has taken measures that EPA and the State or
Tribe agree eliminate, neutralize or mitigate the conflict of interest.
24. Transfer of Funds
24.1 Transfer of Funds
Applicable to all assistance agreements other than Continuing Environmental Program Grants
subject to 40 CFR 35.114 and 40 CFR 35.514 when EPA's share of the total award exceeds the
Page 21 of 43
Simplified Acquisition Threshold. Simplified Acquisition Threshold is defined at 2 CFR 200.1 and is
currently set at $350,000 but the amount is subject to adjustment.
(1) As provided at 2 CFR 200.308(i), the recipient must obtain prior approval from EPA's Grants
Management Officer if the cumulative amount of funding transfers among direct budget
categories or programs, functions and activities exceeds 10% of the total budget, as last
approved by EPA, including cost share. Recipients must submit requests for prior approval to
the Grant Specialist and Grants Management Officer with a copy to the Project Officer for
this agreement.
(2) Recipients must notify EPA's Grant Specialist and Project Officer of cumulative funding
transfers among direct budget categories or programs, functions and activities that do not
exceed 10% of the total budget for the agreement. Prior approval by EPA's Grants
Management Officer is required if the transfer involves any of the items listed in 2 CFR
200.407 that EPA did not previously approve at time of award or in response to a previous
post -award request by the recipient.
24.2 Post -Award Changes for Continuing Environmental Program Grants
Applicable to Continuing Environmental Program Grants subject to 40 CFR 35.114 and 40 CFR
35.514 when EPA's share of the total project costs exceeds the Simplified Acquisition Threshold.
Simplified Acquisition Threshold is defined at 2 CFR 200.1 and is currently set at $350,000 but the
amount is subject to adjustment.
To determine if a post -award change in work plan commitments is significant and requires prior
written approval for the purposes of 40 CFR §35.114(a) or 40 CFR §35.514(a), the recipient
agrees to consult the EPA Project Officer before making the change. The term work plan
commitments is defined at 40 CFR §35.102. If the PO determines the change is significant, the
recipient cannot make the change without prior written approval by the EPA Award Official or
Grants Management Officer.
The recipient must obtain written approval from the EPA Award Official prior to transferring
funds from one budget category to another if the EPA Award Official determines that such
transfer significantly changes work plan commitment(s). All transfers must be reported in
required performance reports. In addition, unless approved with the budget at the time of
award, Continuing Environmental Program (CEP) recipients must also obtain prior written
approval from the EPA Award Official or Grants Management Officer to use EPA funds for
directly charging compensation for administrative and clerical personnel under 2 CFR 200.413(c
and the General Provisions for Selected Items of Cost allowability at 2 CFR 200.420 through 2
CFR 200.476 as supplemented by EPA's Guidance on Selected Items of Cost. The recipient is not
required to obtain prior written approval from the EPA Award Official for other items requiring
prior EPA approval listed in 2 CFR 200.407.
25. Electronic/Digital Signatures on Financial Assistance Agreement Form(s)/Document(s)
Throughout the life of this assistance agreement, the recipient agrees to ensure that any
form(s)/document(s) required to be signed by the recipient and submitted to EPA through any
Page 22 of 43
means including but not limited to hard copy via U.S. mail or express mail, hand delivery or through
electronic means such as e-mail are: (1) signed by the individual identified on the form/document,
and (2) the signer has the authority to sign the form/document for the recipient. Submission of any
signed form(s)/document(s) is subject to any provisions of law on making false statements (e.g., 18
U.S.C. 1001).
26. Extension of Project/Budget Period Expiration Date
EPA has not exercised the waiver option to allow automatic one-time extensions for non -research
grants under 2 CFR 200.308(g)(2). Therefore, if a no -cost time extension is necessary to extend the
period of availability of funds, the recipient must submit a written request to the EPA at least ten
(10) calendar days before the conclusion of the period of performance as required by 2 CFR
200.308(f)(10). The written request must include: a justification describing the need for additional
time, an estimated date of completion, and a revised schedule for project completion including
updated milestone target dates for the approved workplan activities. In addition, if there are
overdue reports required by the general, administrative, and/or programmatic terms and conditions
of this assistance agreement, the recipient must ensure that they are submitted along with or prior
to submitting the no -cost time extension request.
27. Utilization of Disadvantaged Business Enterprises
The recipient agrees to comply with the following requirements of EPA's Disadvantaged Business
Enterprise (DBE) Program for procurement activities under assistance agreements as described
below.
1) Six Good Faith Effort, 40 CFR Part 33, Subpart C
Pursuant to 40 CFR 33.301, the recipient agrees to make good faith efforts whenever
procuring construction, equipment, services and supplies under an EPA financial assistance
agreement, and to require that sub -recipients, loan recipients, and prime contractors also
comply. The specific six good faith efforts can be found at: 40 CFR 33.301 (a) -(f).
For EPA assistance agreements that are for the benefit of Native Americans, the recipient
must solicit and recruit Native American organizations and Native American -owned
economic enterprises and give them preference in the award process prior to undertaking
the six good faith efforts (40 CFR 33.304). If recruiting efforts are unsuccessful, the recipient
must follow the six good faith efforts.
2) Contract Administration Provisions, 40 CFR 33.302
The recipient agrees to comply with the contract administration provisions of 40 CFR Section
33.302 (a) -(d) and (i).
3) Bidders List, 40 CFR 33.501(b) and (c)
Recipients of a Continuing Environmental Program (CEP) Grant or other annual reporting
grant, agree to create and maintain a bidders list. Recipients of an EPA financial assistance
agreement to capitalize a revolving loan fund also agree to require entities receiving
identified loans to create and maintain a bidders list if the recipient of the loan is subject to,
Page 23 of 43
or chooses to follow, competitive bidding requirements. Refer to 40 CFR 33.501 (b) and (c)
for specific requirements and exemptions.
The EPA has suspended the following DBE Program requirements in accordance with class
exceptions authorized pursuant to the authority in 2 CFR 1500.4(b). Refer to RAIN -2025-G02 and
RAIN -2019-G10 for details.
1) EPA MBE/WBE Certification, 40 CFR Part 33, Subpart B
2) Fair Share Objectives, 40 CFR Part 33, Subpart D
3) MBE/WBE Reporting, 40 CFR Part 33, Subpart E
rammatic General Terms and Conditions
28. Sufficient Progress
EPA will measure sufficient progress by examining the performance required under the workplan in
conjunction with the milestone schedule, the time remaining for performance within the project
period and/or the availability of funds necessary to complete the project. EPA may terminate the
assistance agreement for failure to ensure reasonable completion of the project within the project
period.
29. Copyrighted Material and Data
In accordance with 2 CFR 200.315, EPA has the right to reproduce, publish, use and authorize others
to reproduce, publish and use copyrighted works or other data developed under this assistance
agreement for Federal purposes. This includes the right to require recipients and subrecipients to
make such works available through agency -designated public access repositories.
Examples of a Federal purpose include but are not limited to: (1) Use by EPA and other Federal
employees for official Government purposes; (2) Use by Federal contractors performing specific
tasks for [i.e., authorized by] the Government; (3) Publication in EPA documents provided the
document does not disclose trade secrets (e.g. software codes) and the work is properly attributed
to the recipient through citation or otherwise; (4) Reproduction of documents for inclusion in
Federal depositories; (5) Use by State, Tribal and local governments that carry out delegated Federal
environmental programs as "co -regulators" or act as official partners with EPA to carry out a
national environmental program within their jurisdiction and; (6) Limited use by other recipients to
carry out Federal grants provided the use is consistent with the terms of EPA's authorization to the
other recipient to use the copyrighted works or other data.
Under Item 6, the recipient acknowledges that EPA may authorize another recipient(s) to use the
copyrighted works or other data developed under this grant as a result of:
• The selection of another recipient by EPA to perform a project that will involve the use of the
copyrighted works or other data, or
• Termination or expiration of this agreement.
Page 24 of 43
In addition, EPA may authorize another recipient to use copyrighted works or other data developed
with Agency funds provided under this grant to perform another grant when such use promotes
efficient and effective use of Federal grant funds.
30. Patents and Inventions
The EPA is a current active agency in iEdison. This T&C was updated on June 1, 2026, to reflect the
requirement to submit through iEdison.
Rights to inventions made under this assistance agreement are subject to Federal patent and
licensing regulations, which are codified at Title 37 CFR Part 401 and Title 35 USC Sections 200-212.
Pursuant to the Bayh-Dole Act (set forth in 35 USC 200-212), EPA retains the right to a worldwide,
nonexclusive, nontransferable, irrevocable, paid -up license to practice the invention owned by the
assistance agreement holder, as defined in the Act. To streamline the invention reporting process
and to facilitate compliance with the Bayh-Dole Act, the recipient must utilize the Interagency
Edison extramural invention reporting system at https://www.nist.gov/iedison. Annual utilization
reports must be submitted through the system. The recipient is required to notify the Project Officer
identified on the award document when an invention report, patent report, or utilization report is
filed at https://www.nist.gov/iedison. EPA elects not to require the recipient to provide a report
prior to the close-out of a funding agreement listing all subject inventions or stating that there were
none.
In accordance with Executive Order 12591, as amended, government owned and operated
laboratories can enter into cooperative research and development agreements with other Federal
laboratories, State and local governments, universities, and the private sector, and license, assign, or
waive rights to intellectual property "developed by the laboratory either under such cooperative
research or development agreements and from within individual laboratories."
31. Acknowledgement Requirements for Non -Research Assistance Agreements
The recipient agrees that any reports, documents, publications, or other materials developed for
public distribution supported by this assistance agreement shall contain the following statement:
"This project has been funded wholly or in part by the United States Environmental Protection
Agency under assistance agreement (number) to (recipient). The contents of this document do not
necessarily reflect the views and policies of the Environmental Protection Agency, nor does the
Environmental Protection Agency endorse trade names or recommend the use of commercial
products mentioned in this document, as well as any images, video, text, or other content created
by generative artificial intelligence tools, nor does any such content necessarily reflect the views and
policies of the Environmental Protection Agency."
Page 25 of 43
Recipients of EPA research awards must follow the acknowledgement requirements outlined in the
research T&Cs available at: https://www.nsf.gov/awards/managing/rtc.isp. In accordance with the
Research Terms and Conditions Overlay to the Uniform Administrative Requirements, Cost
Principles and Audit Requirements for Federal Awards (Uniform Guidance), 2 CFR §200, recipients of
EPA research must abide by the research T&Cs.
32. Electronic and Information Technology Accessibility
Recipients are subject to the program accessibility provisions of Section 504 of the Rehabilitation
Act, codified in 40 CFR Part 7, which includes an obligation to provide individuals with disabilities
reasonable accommodations and an equal and effective opportunity to benefit from or participate
in a program, including those offered through Electronic and Information Technology ("EIT"). In
compliance with Section 504, EIT systems or products funded by this award must be designed to
meet the diverse needs of users (e.g., U.S. public, recipient personnel) without barriers or
diminished function or quality. Systems shall include usability features or functions that
accommodate the needs of persons with disabilities, including those who use assistive technology.
At this time, the EPA will consider a recipient's websites, interactive tools, and other EIT as being in
compliance with Section 504 if such technologies meet standards established under Section 508 of
the Rehabilitation Act, codified at 36 CFR Part 1194. While Section 508 does not apply directly to
grant recipients, we encourage recipients to follow either the 508 guidelines or other comparable
guidelines that concern accessibility to EIT for individuals with disabilities.
Recipients may wish to consult the latest Section 508 guidelines issued by the U.S. Access Board or
W3C's Web Content Accessibility Guidelines (WCAG) 2.0 (see https://www.access-
board.gov/about/policy/accessibility.html).
33. Human Subjects
Human subjects research is any activity that meets the regulatory definitions of both research AND
human subject. Research is a systematic investigation, including research development, testing and
evaluation, designed to develop or contribute to generalizable knowledge. Human subject means a
living individual about whom an investigator (whether professional or student) conducting research:
(i) Obtains information or biospecimens through intervention or interaction with the individual, and
uses, studies, or analyzes the information or biospecimens; or (ii) Obtains, uses, studies, analyzes, or
generates identifiable private information or identifiable biospecimens 40 CFR 26.102(e)(I).
No research involving human subjects shall be conducted under this agreement without prior
written approval of the EPA Human Subject Research Review Official (HSRRO) to proceed with that
research. If engaged in human subjects' research as part of this agreement, the recipient agrees to
comply with all applicable provisions of EPA Regulation 40 CFR 26 (Protection of Human Subjects).
This includes, at Subpart A, the Basic Federal Policy for the Protection of Human Research Subjects,
also known as the Common Rule. It also includes, at Subparts B, C, and D, prohibitions and
Page 26 of 43
additional protections for children, nursing women, pregnant women, and fetuses in research
conducted or supported by EPA.
The recipient further agrees to comply with EPA's procedures for oversight of the recipient's
compliance with 40 CFR 26, as given in EPA Order 1000.17A (Policy and Procedures on Protection of
Human Research Subjects in EPA Conducted or Supported Research). As per this order, no human
subject may be involved in any research conducted under this assistance agreement, including
recruitment, until the research has been approved or determined to be exempt by the EPA HSRRO
after review of the approval or exemption determination of the Institutional Review Board(s)
(IRB(s)) with jurisdiction over the research under 40 CFR 26.
For HSRRO approval, the recipient must forward to the Project Officer: (1) copies of all documents
upon which the IRB(s) with jurisdiction based their approval(s) or exemption determination(s), (2)
copies of the IRB approval or exemption determination letter(s), (3) copy of the IRB-approved
consent forms and subject recruitment materials, if applicable, and (4) copies of all supplementary
IRB correspondence.
Following the initial approvals indicated above, the recipient must, as part of the annual report(s),
provide evidence of continuing review and approval of the research by the IRB(s) with jurisdiction,
as required by 40 CFR 26.109(e). Materials submitted to the IRB(s) for their continuing review and
approval are to be provided to the EPA HSRRO via the Project Officer upon IRB approval. During the
course of the research, investigators must promptly report any unanticipated problems involving
risk to subjects or others according to requirements set forth by the IRB. In addition, any event that
is significant enough to result in the removal of the subject from the study should also be reported
to the EPA HSRRO via the Project Officer, even if the event is not reportable to the IRB of record.
34. Animal Subjects
The recipient agrees to comply with the Animal Welfare Act of 1966 (P.L. 89-544), as amended, 7
USC 2131- 2156. Recipient also agrees to abide by the "U.S. Government Principles for the
Utilization and Care of Vertebrate Animals used in Testing, Research, and Training." (Federal
Register 50(97): 20864-20865. May 20,1985). The nine principles can be viewed at
https://olaw.nih.gov/policies-laws/phs-policy.htm. For additional information about the Principles,
the recipient should consult the Guide for the Care and Use of Laboratory Animals, prepared by the
Institute of Laboratory Animal Resources, National Research Council.
35. Light Refreshments and/or Meals
(a) APPLICABLE TO ALL AGREEMENTS EXCEPT STATE CONTINUING ENVIRONMENTAL PROGRAMS
(AS DESCRIBED BELOW):
Unless the event(s) and all of its components are described in the approved workplan, the recipient
agrees to obtain prior approval from EPA for the use of grant funds for light refreshments and/or
Page 27 of 43
meals served at meetings, conferences, training workshops and outreach activities (events). The
recipient must send requests for approval to the EPA Project Officer and include:
(1) An estimated budget and description for the light refreshments, meals, and/or beverages to
be served at the event(s)
(2) A description of the purpose, agenda, location, length, and timing for the event, and
(3) An estimated number of participants in the event and a description of their roles
Costs for light refreshments and meals for recipient staff meetings and similar day-to-day activities
are not allowable under EPA assistance agreements.
Recipients may address questions about whether costs for light refreshments, and meals for events
may be allowable to the recipient's EPA Project Officer; however, the Agency Award Official or Grant
Management Officer will make final determinations on allowability. Agency policy prohibits the use
of EPA funds for receptions, banquets and similar activities that take place after normal business
hours unless the recipient has provided a justification that has been expressly approved by EPA's
Award Official or Grants Management Officer.
EPA funding for meals, light refreshments, and space rental may not be used for any discrete
portion of an event or meeting, such as a reception, banquet, or another similar entertainment -
oriented activity, where alcohol is served, purchased, or otherwise available as part of the discrete
portion of the event or meeting, even if EPA funds are not used to purchase the alcohol. This
restriction does not prohibit a recipient from using its own funds, private donations, or separate
fees charged to the meeting attendees (that are not program income) for discrete portions of events
or meetings, such as receptions, banquets, or another similar entertainment -oriented activity where
alcohol is served.
Note: U.S. General Services Administration regulations define light refreshments for morning,
afternoon, or evening breaks to include, but not be limited to, coffee, tea, milk, juice, soft drinks,
donuts, bagels, fruit, pretzels, cookies, chips, or muffins. (41 CFR 301-74.7)
(b) FOR STATE CONTINUING ENVIROMENTAL PROGRAM GRANT RECIPIENTS EXCLUDING STATE
UNIVERSITIES:
If the State maintains systems capable of complying with Federal grant regulations at 2 CFR 200.432
and 2 CFR 200.438, EPA has waived the prior approval requirements for the use of EPA funds for
light refreshments and/or meals served at meetings, conferences, and training, as described in
paragraph (a) above. The State may follow its own procedures without requesting prior approval
from EPA. However, notwithstanding State policies, EPA funds may not be used for (1) Meetings
(e.g. routine staff meetings) that do not meet the definition of "Conference" in 2 CFR 200.432, (2)
evening receptions, or (2) other evening events (with the exception of working meetings). Examples
of working meetings include those evening events in which small groups discuss technical subjects
on the basis of a structured agenda or there are presentations being conducted by experts. EPA
funds for meals, light refreshments, and space rental may not be used for any portion of an event
Page 28 of 43
(including evening working meetings) where alcohol is served, purchased, or otherwise available as
part of the event or meeting, even if EPA funds are not used to purchase the alcohol.
By accepting this award, the State is certifying that it has systems in place (including internal
controls) to comply with the requirements described above.
36. Tangible Personal Property
36.1 Reporting
Pursuant to 2 CFR 200.312 and 2 CFR 200.314, property reports, if applicable, are required for
Federally -owned property in the custody of a recipient or subrecipient upon completion of the
Federal award or when the property is no longer needed. Additionally, upon termination or
completion of the project, residual unused supplies with a total aggregate fair market value
exceeding $10,000 not needed for any other Federally funded programs or projects must be
reported. For Superfund awards under Subpart O, refer to 40 CFR 35.6340 and 40 CFR 35.6660 for
property reporting requirements. Recipients should utilize the Tangible Personal Property Report
form series (SF -428) to report tangible personal property.
36.2 Disposition
36.2.1. Most Recipients or Subrecipients. Consistent with 2 CFR 200.313, unless instructed
otherwise on the official award document, this award term, or at closeout, the recipient or
subrecipient, including a subrecipient of a State or an Indian Tribe, may keep the equipment and
continue to use it on the project originally funded through this assistance agreement or on other
Federally funded projects whether or not the project or program continues to be supported by
Federal funds.
36.2.2. State Agencies. Per 2 CFR 200.313(b), recipients that are State agencies must manage
and dispose of equipment acquired under this assistance agreement in accordance with State
laws and procedures.
36.2.3. Indian Tribes. Per 2 CFR 200.313(b), recipients that are Indian Tribes must manage and
dispose of equipment acquired under this assistance agreement in accordance with Tribal laws
and procedures. If such laws and procedures do not exist, Indian Tribes, unless instructed
otherwise on the official award document or at closeout, may keep the equipment and continue
to use it on the project originally funded through this assistance agreement or on other
Federally funded projects whether or not the project or program continues to be supported by
Federal funds.
36.2.4. Superfund Recipients. Equipment purchased for Superfund projects under Subpart O is
subject to specific disposal options in accordance with 40 CFR Part 35.6345.
37. Dual Use Research of Concern (DURC)
The recipient agrees to conduct all life science research* in compliance with EPA's Order on the
Policy and Procedures for Managing Dual Use Research of Concern (EPA DURC Order) and United
States Government Policy for Institutional Oversight of Life Sciences Dual Use Research of Concern
(iDURC Policy). If the recipient is an institution within the United States that receives funding
Page 29 of 43
through this agreement, or from any other source, the recipient agrees to comply with the iDURC
Policy if they conduct or sponsor research involving any of the agents or toxins identified in Section
6.2.1 of the iDURC Policy. If the institution is outside the United States and receives funding through
this agreement to conduct or sponsor research involving any of those same agents or toxins, the
recipient agrees to comply with the iDURC Policy. The recipient agrees to provide any additional
information that may be requested by EPA regarding DURC and iDURC. The recipient agrees to
immediately notify the EPA Project Officer should the project use or introduce use of any of the
agents or toxins identified in the iDURC Policy. The recipient's Institution/Organization must also
comply with USG iDURC policy and EPA DURC Order and will inform the appropriate government
agency if funded by such agency of research with the agents or toxins identified in Section 6.2.1 of
the iDURC Policy. If privately funded the recipient agrees to notify the National Institutes of Health
at DURC@od.nih.gov.
* "Life Sciences Research," for purposes of the EPA DURC Order, and based on the definition of
research in 40 CFR §26.102(d), is a systematic investigation designed to develop or contribute to
generalizable knowledge involving living organisms (e.g., microbes, human beings, animals, and
plants) and their products. EPA does not consider the following activities to be research: routine
product testing, quality control, mapping, collection of general-purpose statistics, routine
monitoring and evaluation of an operational program, observational studies, and the training of
scientific and technical personnel. [Note: This is consistent with OMB Circular A-11.]
38. Research Misconduct
In accordance with 2 CFR 200.329, the recipient and subrecipient agree to notify the EPA Project
Officer in writing about research misconduct involving research activities that are supported in
whole or in part with EPA funds under this project. EPA defines research misconduct as fabrication,
falsification, or plagiarism in proposing, performing, or reviewing research, or in reporting research
results [65 FR 76262. I], or ordering, advising or suggesting that subordinates engage in research
misconduct. The recipient agrees to:
(1) Immediately notify the EPA Project Officer who will then inform the EPA Office of Inspector
General (OIG) if, at any time, an allegation of research misconduct falls into one of the
categories listed below:
A. Public health of safety is at risk
B. Agency resources or interests are threatened
C. Circumstances where research activities should be suspended
D. There is a reasonable indication of possible violations of civil or criminal law
E. Federal action is required to protect the interests of those involved in the investigation
F. The research entity believes that the inquiry or investigation may be made public
prematurely so that appropriate steps can be taken to safeguard evidence and protect
the rights of those involved
G. Circumstances where the research community or public should be informed. [65 FR
76263.111]
Page 30 of 43
(2) Report other allegations to the OIG when they have conducted an inquiry and determined that
there is sufficient evidence to proceed with an investigation. [65 FR 76263. III]
39. Scientific Integrity Terms and Conditions
The recipient agrees to comply with EPA's Scientific Integrity Policy when conducting, supervising,
and communicating science and when using or applying the results of science. For purposes of this
award condition scientific activities include, but are not limited to, computer modelling, economic
analysis, field sampling, laboratory experimentation, demonstrating new technology, statistical
analysis, and writing a review article on a scientific issue. The recipient agrees to:
39.1 Scientific Products
39.1.1. Produce scientific products of the highest quality, rigor, and objectivity, by adhering to
applicable EPA information quality guidelines, quality policy, and peer review policy.
39.1.2. Prohibit all recipient employees, contractors, and program participants, including
scientists, managers, and other recipient leadership, from suppressing, altering, or otherwise
impeding the timely release of scientific findings or conclusions.
39.1.3. Adhere to EPA's Peer Review Handbook, 4th Edition, for the peer review of scientific and
technical work products generated through EPA grants or cooperative agreements which, by
definition, are not primarily for EPA's direct use or benefit.
39.2 Scientific Findings
39.2.1. Require that reviews regarding the content of a scientific product that are conducted by
the project manager and other recipient managers and the broader management chain be based
only on scientific quality considerations, e.g., the methods used are clear and appropriate, the
presentation of results and conclusions is impartial.
39.2.2. Ensure scientific findings are generated and disseminated in a timely and transparent
manner, including scientific research performed by employees, contractors, and program
participants, who assist with developing or applying the results of scientific activities.
39.2.3. Include, when communicating scientific findings, an explication of underlying
assumptions, accurate contextualization of uncertainties, and a description of the probabilities
associated with both optimistic and pessimistic projections, if applicable.
39.2.4. Document the use of independent validation of scientific methods.
39.2.5. Document any independent review of the recipient's scientific facilities and testing
activities, as occurs with accreditation by a nationally or internationally recognized sanctioning
body.
39.2.6. Make scientific information available online in open formats in a timely manner,
including access to data and non-proprietary models.
39.3 Scientific Misconduct
39.3.1. Prohibit intimidation or coercion of scientists to alter scientific data, findings, or
professional opinions or non-scientific influence of scientific advisory boards. In addition,
recipient employees, contractors, and program participants, including scientists, managers, and
other leadership, shall not knowingly misrepresent, exaggerate, or downplay areas of scientific
uncertainty.
Page 31 of 43
39.3.2. Prohibit retaliation or other punitive actions toward recipient employees who uncover
or report allegations of scientific and research misconduct, or who express a differing scientific
opinion. Employees who have allegedly engaged in scientific or research misconduct shall be
afforded the due process protections provided by law, regulation, and applicable collective
bargaining agreements, prior to any action. Recipients shall ensure that all employees and
contractors of the recipient shall be familiar with these protections and avoid the appearance of
retaliatory actions.
39.3.3. Require all recipient employees, contractors, and program participants to act honestly
and refrain from acts of research misconduct, including publication or reporting, as described in
EPA's Policy and Procedures for Addressing Research Misconduct, Section 9.C. Research
misconduct does not include honest error or differences of opinion. While EPA retains the
ultimate oversight authority for EPA -supported research, grant recipients conducting research
bear primary responsibility for prevention and detection of research misconduct and for the
inquiry, investigation, and adjudication of research misconduct alleged to have occurred in
association with their own institution.
39.3.4. Take the actions required on the part of the recipient described in the EPA's Policy and
Procedures for Addressing Research Misconduct, Sections 6 through 9, when research
misconduct is suspected or found.
39.4 Additional Resources
For more information about the Scientific Integrity Policy, an introductory video can be accessed
at: https://youtu.be/FQJCv8BXXg8. A training video is available at:
https://youtu. be/Zc0T7f000t8.
40. Procurement of Synthetic Nucleic Acids and Benchtop Nucleic Acid Synthesis Equipment
The recipient must procure synthetic nucleic acids and benchtop nucleic acid synthesis equipment,
as defined in the 2024 Office of Science and Technology Policy (OSTP) Framework for Nucleic Acid
Synthesis Screening (Framework), from providers or manufacturers that attest to adhering to the
Framework. The attestation may be posted on a public website or provided directly to the recipient
upon request. The recipient must include this requirement in all lower tier agreements (for example
subrecipients or subcontractors).
Public Policy Requirements
41. Civil Rights Obligations
This term and condition incorporates by reference the signed assurance provided by the recipient's
authorized representative on: 1) EPA Form 4700-4, "Preaward Compliance Review Report for All
Applicants and Recipients Requesting EPA Financial Assistance"; and 2) Certifications and
Representations in SAM.gov or Standard Form 424D, as applicable.
These assurances and this term and condition obligate the recipient to comply fully with applicable
civil rights statutes and implementing Federal and EPA regulations.
Page 32 of 43
(a) Statutory Requirements
i. In carrying out this agreement, the recipient must comply with:
1) Title VI of the Civil Rights Act of 1964, which prohibits discrimination based on race,
color, and national origin, by entities receiving Federal financial assistance.
2) Section 504 of the Rehabilitation Act of 1973, which prohibits discrimination against
persons with disabilities by entities receiving Federal financial assistance; and
3) The Age Discrimination Act of 1975, which prohibits age discrimination by entities
receiving Federal financial assistance.
ii. If the recipient is an education program or activity (e.g., school, college, or university) or if
the recipient is conducting an education program or activity under this agreement, it must
also comply with:
1) Title IX of the Education Amendments of 1972, which prohibits discrimination on the
basis of sex in education programs and activities operated by entities receiving Federal
financial assistance.
iii. If this agreement is funded with financial assistance under the Clean Water Act (CWA), the
recipient must also comply with:
1) Section 13 of the Federal Water Pollution Control Act Amendments of 1972, which
prohibits discrimination on the basis of sex in CWA-funded programs or activities.
(b) Regulatory Requirements
i. The recipient agrees to comply with all applicable EPA civil rights regulations, including:
1) For Title IX obligations, 40 C.F.R. Part 5; and
2) For Title VI, Section 504, Age Discrimination Act, and Section 13 obligations, 40 C.F.R
Part7.
Note that for financial assistance awarded to any entity, including any subrecipient, in
the State of Louisiana, pursuant to a permanent injunction issued by the U.S. District
Court for the Western District of Louisiana, EPA will not impose any disparate -impact or
cumulative -impact -analysis requirements under Title VI of the Civil Rights Act of 1964 in
any pre -award assurances or terms and conditions accompanying the application for and
receipt of this grant award.
3) The statutory and national policy requirements at 2 CFR 200.300(a).
4) For Federal awards that are subject to a Federal statute prohibiting discrimination based
on sex, the Federal agency or pass -through entity must ensure that the award is
administered in accordance with 2 CFR 200.300.
5) As noted on the EPA Form 4700-4 signed by the recipient's authorized representative,
these regulations establish specific requirements as applicable, including, but not limited
to collecting, maintaining, and providing upon request compliance information,
establishing grievance procedures, designating a Civil Rights Coordinator, and providing
notices of non-discrimination.
Page 33 of 43
(c) Title VI — Limited English Proficiency (LEP) and Affirmative Compliance Obligation
i. Recipients of EPA financial assistance shall provide services to individuals with limited English
proficiency in a manner consistent with applicable Federal civil rights statutes, regulations,
and Executive Orders. Recipients may refer to Executive Order 14224.
ii. In accepting this assistance agreement, the recipient acknowledges it has an affirmative
obligation to implement effective federal civil rights compliance programs, as required by
EPA's nondiscrimination regulations at 40 C.F.R. Parts 5 and 7, and ensure that it does not
discriminate in its programs and activities in violation of federal civil rights laws and
regulations. The recipient must be prepared to demonstrate to EPA that such compliance
programs exist and are being implemented, or to otherwise demonstrate how it is meeting
its Federal civil rights obligations. For further assistance on civil rights compliance, the
recipient may refer to the EPA document entitled, "Civil Rights Guidance on Procedural
Safeguards: Requirements and Best Practices." The Guidance can be found at:
https://www.epa.gov/external-civil-rights/civil-rights-guidance-procedural-safeguards.
42. Drug -Free Workplace
The recipient organization of this EPA assistance agreement must make an ongoing, good faith
effort to maintain a drug -free workplace pursuant to the specific requirements set forth in Title 2
CFR Part 1536 Subpart B. Additionally, in accordance with these regulations, the recipient
organization must identify all known workplaces under its Federal awards and keep this information
on file during the performance of the award.
Those recipients who are individuals must comply with the drug -free provisions set forth in Title 2
CFR Part 1536 Subpart C.
The consequences for violating this condition are detailed under Title 2 CFR Part 1536 Subpart E.
Recipients can access the Code of Federal Regulations (CFR) Title 2 Part 1536 at www.ecfr.gov/.
43. Hotel -Motel Fire Safety
Pursuant to U.S.C. 2225a, the recipient agrees to ensure that all space for conferences, meetings,
conventions, or training seminars funded in whole or in part with Federal funds complies with the
protection and control guidelines of the Hotel and Motel Fire Safety Act (PL 101-391, as amended).
Recipients may search the Hotel -Motel National Master List at https://apps.usfa.fema.gov/hotel/ to
see if a property is in compliance, or to find other information about the Act.
44. Lobbying Restrictions
a) This assistance agreement is subject to lobbying restrictions as described below. Applicable to
all assistance agreements:
i. The chief executive officer of this recipient agency shall ensure that no grant funds
awarded under this assistance agreement are used to engage in lobbying of the Federal
Government or in litigation against the U.S. unless authorized under existing law. The
recipient shall abide by the Cost Principles available at 2 CFR Part 200 which generally
Page 34 of 43
prohibits the use of Federal grant funds for litigation against the U.S. or for lobbying or
other political activities.
ii. The recipient agrees to comply with Title 40 CFR Part 34, New Restrictions on Lobbying.
The recipient shall include the language of this provision in award documents for all
subawards exceeding $100,000 and require that subrecipients submit certification and
disclosure forms accordingly.
iii. In accordance with the Byrd Anti -Lobbying Amendment, any recipient who makes a
prohibited expenditure under Title 40 CFR Part 34 or fails to file the required certification
or lobbying forms shall be subject to a civil penalty of not less than $10,000 and not more
than $100,000 for each such expenditure.
iv. Contracts awarded by a recipient shall contain, when applicable, the anti -lobbying
provision as stipulated in the contract provisions provided in Appendix II to Part 200.
v. By accepting this award, the recipient affirms that it is not a nonprofit organization
described in Section 501(c)(4) of the Internal Revenue Code of 1986 as required by
Section 18 of the Lobbying Disclosure Act; or that it is a nonprofit organization described
in Section 501(c)(4) of the Code but does not and will not engage in lobbying activities as
defined in Section 3 of the Lobbying Disclosure Act. Nonprofit organizations exempt from
taxation under section 501(c)(4) of the Internal Revenue Code that engage in lobbying
activities are ineligible for EPA subawards.
b) Applicable to assistance agreements when the amount of the award is over $100,000:
i. By accepting this award, the recipient certifies, to the best of its knowledge and belief
that:
1) No Federal appropriated funds have been or will be paid, by or on behalf of the
recipient, to any person for influencing or attempting to influence an officer or
employee of any agency, a Member of Congress, an officer or employee of Congress,
or an employee of a Member of Congress in connection with the awarding of any
Federal contract, the making of any Federal grant, the making of any Federal loan,
the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any Federal contract, grant, loan, or
cooperative agreement.
2) If any funds other than Federal appropriated funds have been paid or will be paid to
any person for influencing or attempting to influence an officer or employee of any
agency, a Member of Congress, or any employee of a Member of Congress in
connection with this Federal grant or cooperative agreement, the recipient shall
complete and submit the linked Standard Form -- LLL, "Disclosure Form to Report
Lobbying," in accordance with its instructions.
3) The recipient shall require that the language of this certification be included in the
award documents for all subawards exceeding $100,000 at all tiers (including
subcontracts, subgrants, and contracts under grants, loans, and cooperative
agreements) and that all subrecipients shall certify and disclose accordingly.
Page 35 of 43
ii. This certification is a material representation of fact upon which reliance was placed
when this transaction was made or entered into. Submission of this certification is a
prerequisite for making or entering into this transaction imposed by Section 1352, Title
31, U.S. Code. Any person who fails to file the required certification shall be subject to a
civil penalty of not less than $10,000 and not more than $100,000 for each failure.
45. Recycled Paper
When directed to provide paper documents, the recipient agrees to use recycled paper and double -
sided printing for all reports which are prepared as a part of this agreement and delivered to EPA.
This requirement does not apply to reports prepared on forms supplied by EPA.
46. Resource Conservation and Recovery Act
Consistent with goals of section 6002 of RCRA (42 U.S.C. 6962), State and local institutions of higher
education, hospitals and non-profit organization recipients agree to give preference in procurement
programs to the purchase of specific products containing recycled materials, as identified in 40 CFR
Part 247.
a) Consistent with section 6002 of RCRA (42 U.S.C. 6962) and 2 CFR 200.323, the recipient or
subrecipient that is a State agency or agency of a political subdivision of a State and its
contractors are required to purchase certain items made from recycled materials, as
identified in 40 CFR Part 247, when the purchase price exceeds $10,000 during the course of
the recipient's or the subrecipient's fiscal year or where the quantity of such items acquired
in the course of the recipient's or subrecipient's preceding fiscal year was $10,000 or more.
Pursuant to 40 CFR 247.2(d), the recipient or subrecipient may decide not to procure such
items if they are not reasonably available in a reasonable period of time; fail to meet
reasonable performance standards; or are only available at an unreasonable price.
47. Trafficking in Persons
a) Provisions applicable to a recipient that is a private entity receiving funds under the award.
The recipient, the recipient's employees, subrecipients under this award, and
subrecipients' employees may not engage in:
1) Severe forms of trafficking in persons
2) The procurement of a commercial sex act during the period of time that this
award or any subaward is in effect;
3) The use forced labor in the performance of this award or any subaward; or
4) Acts that directly support or advance trafficking in persons, including the
following acts:
i. Destroying, concealing, removing, confiscating, or otherwise denying an
employee access to that employee's identity or immigration documents;
ii. Failing to provide return transportation or pay for return transportation costs
to an employee from a country outside the United States to the country from
Page 36 of 43
which the employee was recruited upon the end of employment if requested
by the employee, unless:
A. Exempted from the requirement to provide or pay for such return
transportation by the Federal department or agency providing or entering
into the grant or cooperative agreements; or
B. The employee is a victim of human trafficking seeking victim services or
legal redress in the country of employment or a witness in a human
trafficking enforcement action;
iii. Soliciting a person for the purpose of employment, or offering employment,
by means of materially false or fraudulent pretenses, representations, or
promises regarding that employment;
iv. Charging recruited employees a placement or recruitment fee; or
v. Providing or arranging housing that fails to meet the host country's housing
and safety standards.
ii. EPA may unilaterally terminate this award or take any remedial actions authorized by 22
U.S.C. 7104b(c), without penalty, if any private entity under this award:
1) Is determined to have violated a prohibition in paragraph 47.a.i. of this award
term; or
2) Has an employee that is determined by the agency official authorized to
terminate the award to have violated a prohibition in paragraph 47.a.i. of this
award term through conduct that is either:
i. Associated with the performance under this award; or
ii. Imputed to the recipient or subrecipient using the standards and due process
for imputing the conduct of an individual to an organization that are provided
in 2 CFR Part 180, "OMB Guidelines to Agencies on Government -wide
Debarment and Suspension (Non- procurement)," as implemented by EPA at
2 CFR Part 1532.
b) Provision applicable to a recipient other than a private entity. EPA may unilaterally terminate
this award or take any remedial actions authorized by 22 U.S.C. 7104b(c), without penalty, if a
subrecipient that is a private entity under this award:
i. Is determined to have violated an applicable prohibition in paragraph 48.a.i. of this
award term; or
ii. Has an employee that is determined to have violated a prohibition in paragraph 48.a.i. of
this award term through conduct that is either:
1) Associated with the performance under this award; or
2) Imputed to the subrecipient using the standards and due process for imputing the
conduct of an individual to an organization that are provided in 2 CFR Part 180,
"OMB Guidelines to Agencies on Governmentwide Debarment and Suspension
(Nonprocurement)," as implemented by EPA at 2 CFR Part 1532.
Page 37 of 43
c) Provisions applicable to any recipient
i. The recipient must inform the EPA and the EPA's 0IG immediately of any information
received from any source alleging a violation of a prohibition in paragraph 48.a.i. of this
award term.
ii. The EPA's right to terminate unilaterally that is described in paragraphs 48.a. and 48.b.:
1) Implements the requirements of 22 U.S.C. Chapter 78, and
2) Is in addition to all other remedies for noncompliance that are available to the
EPA under this award.
iii. The recipient must include the requirements of paragraph 48.a.1. of this award term in
any subaward made to a private entity.
iv. If applicable, the recipient must also comply with the compliance plan and certification
requirements in 2 CFR 175.105(b).
d) Definitions. For purposes of this award term:
i. "Employee" means either:
1) An individual employed by you or a subrecipient who is engaged in the
performance of the project or program under this award; or
2) Another person engaged in the performance of the project or program under this
award and not compensated by the recipient including, but not limited to, a
volunteer or individual whose services are contributed by a third party as an in -
kind contribution toward cost sharing requirements.
ii. "Private Entity" means any entity, including for-profit organizations, nonprofit
organizations, institutions of higher education, and hospitals. The term does not include
foreign public entities, Indian Tribes, local governments, or States as defined in 2 CFR
200.1
iii. The terms "severe forms of trafficking in persons," "commercial sex act," "sex
trafficking," "Abuse or threatened abuse of law or legal process," "coercion," "debt
bondage," and involuntary servitude" have the meanings given at section 103 of the
Trafficking Victims Protection Act of 2000, as amended (22 U.S.C. 7102).
48. Build America, Buy America — Required Use of American Iron, Steel, Manufactured Products, and
Construction Materials (effective October 23, 2023, and forward)
Buy America Preference. Recipients of an award of Federal financial assistance from a program for
infrastructure are hereby notified that none of the funds provided under this award may be used for
an infrastructure project unless:
(1) All iron and steel used in the project are produced in the United States —this means all
manufacturing processes, from the initial melting stage through the application of coatings,
occurred in the United States;
(2) All manufactured products used in the project are produced in the United States— this means
the manufactured product was manufactured in the United States; and the cost of the
Page 38 of 43
components of the manufactured product that are mined, produced, or manufactured in the
United States is greater than 55 percent of the total cost of all components of the manufactured
product, unless another standard that meets or exceeds this standard has been established under
applicable law or regulation for determining the minimum amount of domestic content of the
manufactured product; and
(3) All construction materials are manufactured in the United States —this means that all
manufacturing processes for the construction material occurred in the United States. The
construction material standards are listed below.
Incorporation into an infrastructure project. The Buy America Preference only applies to articles,
materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure
project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding,
brought to the construction site and removed at or before the completion of the infrastructure
project. Nor does a Buy America Preference apply to equipment and furnishings, such as movable
chairs, desks, and portable computer equipment, that are used at or within the finished
infrastructure project but are not an integral part of the structure or permanently affixed to the
infrastructure project.
Categorization of articles, materials, and supplies. An article, material, or supply should only be
classified into one of the following categories: (i) Iron or steel products; (ii) Manufactured products;
(iii) Construction materials; or (iv) Section 70917(c) materials. An article, material, or supply should
not be considered to fall into multiple categories. In some cases, an article, material, or supply may
not fall under any of the categories listed in this paragraph. The classification of an article, material,
or supply as falling into one of the categories listed in this paragraph must be made based on its
status at the time it is brought to the work site for incorporation into an infrastructure project. In
general, the work site is the location of the infrastructure project at which the iron, steel,
manufactured products, and construction materials will be incorporated.
Application of the Buy America Preference by category. An article, material, or supply incorporated
into an infrastructure project must meet the Buy America Preference for only the single category in
which it is classified.
Determining the cost of components for manufactured products. In determining whether the cost
of components for manufactured products is greater than 55 percent of the total cost of all
components, use the following instructions:
(a) For components purchased by the manufacturer, the acquisition cost, including transportation
costs to the place of incorporation into the manufactured product (whether or not such costs are
paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is
issued); or
(b) For components manufactured by the manufacturer, all costs associated with the
manufacture of the component, including transportation costs as described in paragraph (a), plus
Page 39 of 43
allocable overhead costs, but excluding profit. Cost of components does not include any costs
associated with the manufacture of the manufactured product.
Construction material standards. The Buy America Preference applies to the following construction
materials incorporated into infrastructure projects. Each construction material is followed by a
standard for the material to be considered "produced in the United States." Except as specifically
provided, only a single standard should be applied to a single construction material.
(1) Non-ferrous metals. All manufacturing processes, from initial smelting or melting through final
shaping, coating, and assembly, occurred in the United States.
(2) Plastic and polymer -based products. All manufacturing processes, from initial combination of
constituent plastic or polymer -based inputs, or, where applicable, constituent composite
materials, until the item is in its final form, occurred in the United States.
(3) Glass. All manufacturing processes, from initial batching and melting of raw materials through
annealing, cooling, and cutting, occurred in the United States.
(4) Fiber optic cable (including drop cable). All manufacturing processes, from the initial ribboning
(if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All
manufacturing processes also include the standards for glass and optical fiber, but not for non-
ferrous metals, plastic and polymer -based products, or any others.
(5) Optical fiber. All manufacturing processes, from the initial preform fabrication stage through
the completion of the draw, occurred in the United States.
(6) Lumber. All manufacturing processes, from initial debarking through treatment and planing,
occurred in the United States.
(7) Drywall. All manufacturing processes, from initial blending of mined or synthetic gypsum
plaster and additives through cutting and drying of sandwiched panels, occurred in the United
States.
(8) Engineered wood. All manufacturing processes from the initial combination of constituent
materials until the wood product is in its final form, occurred in the United States.
Waivers. When supported by rationale provided in IIJA §70914, the recipient may submit a waiver
request in writing to EPA. Recipients should request guidance on the submission instructions of an
EPA waiver request from the EPA Project Officer for this agreement. A list of approved EPA waivers
(general applicability and project specific) is available on the EPA Build America, Buy America
wPhsitP_
EPA may waive the application of the Buy America Preference when it has determined that one of
the following exceptions applies:
(1) applying the Buy America Preference would be inconsistent with the public interest;
(2) the types of iron, steel, manufactured products, or construction materials are not produced in
the United States in sufficient and reasonably available quantities or of a satisfactory quality; or
(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the
United States will increase the cost of the overall project by more than 25 percent.
Page 40 of 43
For questions regarding the Build America, Buy America Act requirements for this assistance
agreement or to determine if there is an approved waiver in place, please contact the EPA Project
Officer for this agreement.
Definitions. For legal definitions and sourcing requirements, the recipient must consult the EPA Build
America, Buy America website, 2 CFR Part 184, and the Office of Management and Budget's (OMB)
Memorandum M-24-02 Implementation Guidance on Application of Buy America Preference in
Federal Financial Assistance Programs for Infrastructure.
49. Required Certifications and Consequences of Fraud
Per 2 CFR 200.415(a), financial reports must include a certification that must be signed by an official
who is authorized to legally bind the recipient which reads as follows:
"By signing this report, I certify to the best of my knowledge and belief that the report is true,
complete, and accurate, and the expenditures, disbursements and cash receipts are for the
purposes and objectives set forth in the terms and conditions of the Federal award. I am aware that
any false, fictitious, or fraudulent information, or the omission of any material fact, may subject me
to criminal, civil or administrative penalties for fraud, false statements, false claims or otherwise.
(U.S. Code Title 18, Section 1001 and Title 31, Sections 3729-3730 and 3801-3812)."
As outlined in 2 CFR 200.415(b), subrecipients of all tiers under the Federal award must certify to
the pass -through entity whenever applying for funds, requesting payment, and submitting financial
reports as follows:
"I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent information,
or the omission of any material fact, may subject me to criminal, civil, or administrative
consequences including, but not limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343
and Title 31, Sections 3729-3730 and 3801-3812."
The certifications must be maintained in accordance with the record retention requirements at 2
CFR 200.334.
50. Reporting Waste, Fraud and Abuse
Consistent with 2 CFR 200.113, the recipient and any subrecipients of this award must promptly
report in writing whenever there is credible evidence of the commission of a violation of Federal
criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of
the United States Code or a violation of the civil False Claims Act (31 U.S.C. 3729-3733) to the EPA
Project Officer, the pass -through entity (if applicable), and the EPA Office of Inspector General (OIG).
The methods to contact the EPA OIG are (1) online submission via the EPA OIG Hotline Complaint
Page 41 of 43
Form; (2) email to OIG Hotline@epa.gov; (3) phone 1-888-546-8740; or (4) mail directed to
Environmental Protection Agency, Office of Inspector General, 1200 Pennsylvania Avenue, N.W.
(2410T), Washington, DC 20460.
To support awareness of the OIG hotline, recipients and/or subrecipients receiving an EPA award or
subaward of $1,000,000 or more must display EPA OIG Hotline posters in facilities where the work is
performed under the grant. EPA OIG Hotline posters may be downloaded or printed or may be
obtained by contacting the OIG at 1- 888-546-8740. Recipients and subrecipients need not comply
with this requirement if they have established a mechanism, such as a hotline, by which employees
may report suspected instances of improper conduct and have provided instructions that encourage
employees to make such reports.
Recipients and subrecipients are also required to report matters related to recipient integrity and
performance in accordance with Appendix XII to 2 CFR Part 200.
51. Whistleblower Protections
This award is subject is to whistleblower protections, including the protections established at 41
U.S.C. 4712 and 2 CFR 200.217 providing that an employee of the recipient or subrecipient may not
be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing to a person
or body described in paragraph (a)(2) of 41 U.S.C. 4712 information that the employee reasonably
believes is evidence of gross mismanagement of a Federal contract or grant, a gross waste of
Federal funds, an abuse of authority relating to a Federal contract, grant, or subaward, a substantial
and specific danger to public health or safety, or a violation of law, rule, or regulation related to a
Federal contract (including the competition for or negotiation of a contract), grant. These covered
persons or bodies include:
a. A member of Congress or representative of a committee of Congress.
b. An Inspector General.
c. The Government Accountability Office.
d. A Federal employee responsible for contract or grant oversight or management at the
relevant agency.
e. An authorized official of the Department of Justice or other law enforcement agency.
f. A court of grand jury.
g. A management official or other employee of the contractor, subcontractor, or grantee who
has the responsibility to investigate, discover, or address misconduct.
Consistent with 41 U.S.C. 4712(d), the recipient and subrecipients must inform their employees in
writing, in the predominant language of the workforce or organization, of employee whistleblower
rights and protections under 41 U.S.C. 4712. Additional information about whistleblower
protections, including protections for such employees may be found at the EPA Office of Inspector
General's Whistleblower Protection pate.
Page 42 of 43
52. Access to Records
In accordance with 2 CFR 200.337, EPA, the pass -through entity, the EPA OIG, and the Comptroller
General of the United States have the right to access any records of the recipient and subrecipient
pertinent to this award, to perform audits, execute site visits, or for any other official use. This right
of access also includes timely and reasonable access to the recipient and subrecipient's personnel
for the purpose of interview and discussion related to such documents or the Federal award in
general. This right of access shall continue as long as the records are retained.
53. Federal Anti -Discrimination Laws
By accepting this EPA financial assistance agreement, (A) the recipient agrees that its compliance in
all respects with all applicable Federal anti -discrimination laws is material to the government's
payment decisions for purposes of section 3729(b)(4) of title 31, United States Code; and (B) the
recipient certifies that it does not operate any programs violating any applicable Federal anti-
discrimination law or promoting any such violation.
Page 43 of 43
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 12/10/24 M&C FILE NUMBER: M&C 24-1104
LOG NAME: 22ENV SOLID WASTE INFRASTRUCTURE FOR RECYCLING GRANT
SUBJECT
(ALL) Authorize Application for, and if Awarded, Acceptance of, a Solid Waste Infrastructure for Recycling Grant in Fort Worth from the United
States Environmental Protection Agency in an Amount Not to Exceed $5,000,000.00, Authorize Execution of a Grant Agreement with the United
States Environmental Protection Agency, and Adopt Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize application for, and if awarded, acceptance of, a Solid Waste Infrastructure for Recycling Grant in Fort Worth from the United States
Environmental Protection Agency in an amount not to exceed $5,000,000.00;
2. Authorize execution of a grant agreement with the United States Environmental Protection Agency; and
3. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the Grants Operating Federal Fund, subject
to the receipt of the grant in an amount not to exceed $5,000,000.00, for the purpose of funding the Solid Waste Infrastructure for Recycling Grant
in Fort Worth.
DISCUSSION:
The United States Environmental Protection Agency's (USEPA) Solid Waste Infrastructure for Recycling (SWIFR) Grant program, funded through
the Infrastructure Investment and Jobs Act, offers grant funding for eligible projects. If awarded, funds requested through this SWIFR application will
be used to enhance post -consumer materials management and recycling infrastructure, support improvements to local recycling programs, and
assist the City of Fort Worth in strengthening its waste management systems.
This grant application is a competitive federal funding opportunity. If awarded, funding is requested to improve access to recycling and reuse
activities through the following:
• Improve the Old Hemphill Drop -Off station to support scrap metal and scrap tire recycling areas;
• Acquire six (6) compactors for use at drop-off stations to support single -stream household recycling and source -separated cardboard
diversion;
• Acquire four (4) pre -crush compactors to reduce the volume of waste before it is loaded into containers;
• Pilot a reuse program at all four (4) drop-off stations to support diversion of quality, reusable items, such as furniture or electronics;
• Upgrade electronic signboards at all four (4) drop-off stations to promote recycling, landfill diversion, and solid waste education;
• Support three (3) years of expanded education and outreach focused on the reuse pilot program, additional recycling options at drop-off
stations, and reducing contamination rate of recycling.
No local match is required. The Grant Application repository number is GRNT-APPL-0000000089.
No employee salaries will be supported with this grant so Indirect Cost does not apply.
If awarded, grant funds are expected in 2025, and the performance period of this grant is anticipated to end in 2028. If received, the performance
period of this grant cannot exceed three (3) years.
These projects will serve ALL COUNCIL DISTRICTS.
A Form 1295 is not required because: This contract will be with a governmental entity, state agency or public institution of higher education:
USEPA
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds
will be available in the current operating budget, as appropriated, in the Grants Operating Federal Fund. The Environmental Services Department
(and Financial Management Services) will be responsible for the collection and deposit of funds due to the City. Prior to an expenditure being
incurred, the Environmental Services Department has the responsibility to validate the availability of funds. This is an advance grant.
Submitted for City Manager's Office by. Valerie Washington 6199
Originating Business Unit Head: Cody Whittenburg 5455
Additional Information Contact: Jim Keezell 5153
Chris Harper 2488
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: U.S. Environmental Protection Agency (EPA)
Subject of the Agreement: OMB Form 03F05001-0_Award Letter
Solid Waste Infrastructure and Reuse Program
Reuse Program and Recycling Enhancement Project
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes El No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ❑ No 0
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: 10/1/2026
If different from the approval date.
Expiration Date:
9/30/2029
If applicable.
Is a 1295 Form required? * Yes ❑ No El
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be