HomeMy WebLinkAbout062403-A1 - Construction-Related - Contract - Karl UnnaschCSC No. 62403 -Al
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 62403
AGREEMENT BETWEEN THE CITY OF FORT WORTH
AND KARL UNNASCH FOR PUBLIC ART FOR RAY WHITE ROAD
This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 62403 ("First
Amendment"), as previously addended by the Final Design Addendum (City Secretary Contract No.
62403-AD1), is entered into by and between the City of Fort Worth, Texas ("City"), a home -rule
municipality of the State of Texas, acting by and through Dana Burghdoff, its duly authorized
Assistant City Manager, and Karl Unnasch ("Artist"), an individual located at 31314 Highway 30,
Chatfield, MN, 55923. The City has designated the Arts Council of Fort Worth and Tarrant County,
Inc. D/B/A Arts Fort Worth ("Contract Manager") to manage this Agreement on its behalf. The
Contract Manager shall act through its designated Public Art Project Manager.
WHEREAS, on December 4, 2024, the City and Artist entered into City Secretary Contract
No. 62403 (the "Agreement") to develop a Preliminary Design for Public Art for the Site; and
WHEREAS, on May 18, 2026, the FWAC approved Artist's Preliminary Design and
recommended that the Artist develop a Final Design based on the Preliminary Design; and
WHEREAS, on July 14, 2026, the City and Artist entered into City Secretary Contract No.
62403-ADI (the "Final Design Addendum") to develop a Final Design for Public Art for the Site;
and
WHEREAS, after the Final Design Addendum was executed, the City requested the removal
of three of Artist's twenty sculpture designs out of concerns for public safety and requested the Artist
create three new sculpture designs to replace them; and
WHEREAS, City desires to compensate Artist for the additional design work under the Final
Design Addendum by increasing the Artist's Fee by $5,000.00 for a total Artist's Fee under the Final
Design Addendum of $32,828.00; and
NOW, THEREFORE, City and Artist, for and in consideration of the covenants and
agreements hereinafter set forth, the sufficiency of which is hereby acknowledged, agree as follows:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
First Amendment to Agreement Between the City of Fort Worth and Page 1 of 5
Karl Unnasch for Public Art for Ray White Road
I.
Sections 16.1 and 16.2 of the Agreement, as previously addended by the Final Design
Addendum, are hereby deleted in their entirety and replaced with the following:
16.1. Compensation.
Total compensation to Artist under this Final Design Addendum shall be in an
amount not to exceed FORTY-NINE THOUSAND THREE HUNDRED TWENTY-
EIGHT DOLLARS AND ZERO CENTS ($49,328.00), which shall constitute full
compensation for any and all costs associated with this Final Design Addendum,
including but not limited to an Artist's Fee of $32,828.00, an engineering and
consulting fee allowance of up to $15,000.00, a travel allowance of up to $1,500.00,
insurance (if applicable), material samples, and any and all other costs for services
performed and materials furnished by Artist under this Final Design Addendum. Any
changes requested by the City shall not require City to pay Artist any additional
compensation under this Final Design Addendum. Artist and City may amend the
Agreement to allow for additional payment if additional services are required.
16.2. Payment Schedule.
City agrees to pay Artist in the following installments., each installment to
represent full and final, non-refundable payment for all services and materials
provided prior to the due date thereof:
a. SEVEN THOUSAND FIVE HUNDRED DOLLARS AND ZERO CENTS
($7,500.00) within thirty calendar days of the Effective Date of this Final
Design Addendum and after City issuance of a purchase order.
b. TEN THOUSAND FIVE HUNDRED DOLLARS AND ZERO CENTS
($10,500.00) within thirty calendar days after Artist submits the Final Design
Deliverables as required under Article 15.4. of this Addendum.
c. SEVEN THOUSAND DOLLARS AND ZERO CENTS ($7,000.00) within
thirty calendar days after Artist makes presentation of the Final Design to the
FWAC pursuant to Article 15.5.
d. SEVEN THOUSAND EIGHT HUNDRED TWENTY-EIGHT DOLLARS
AND ZERO CENTS ($7,828.00) within thirty calendar days after City's
approval of the Final Design.
First Amendment to Agreement Between the City of Fort Worth and Page 2 of 5
Karl Unnasch for Public Art for Ray White Road
e. City will provide an allowance of up to FIFTEEN THOUSAND DOLLARS
AND ZERO CENTS ($15,000.00) for engineering, material samples, mock-
ups, professional services, and conservator or other consulting fees, as
necessary. Such payment shall be made for actual services rendered only (a
retainer fee of up to 50% is allowed) and upon receipt of an invoice from Artist
with the original invoice for such services attached.
f. City will provide a travel stipend of up to ONE THOUSAND FIVE
HUNDRED DOLLARS AND ZERO CENTS ($1,500.00) for travel costs for
up to 1 trip by Artist, provided that Project Manager has approved the travel in
writing, in advance. This stipend is provided consistent with GSA Guidelines
and shall cover allowable travel expenses after travel occurs up to $1,500.00.
II.
All terms and conditions of the Agreement, as addended by the Final Design Addendum, that
are not expressly amended pursuant to this First Amendment shall remain in full force and effect.
First Amendment to Agreement Between the City of Fort Worth and Page 3 of 5
Karl Unnasch for Public Art for Ray White Road
IN WITNESS WHEREOF, the Parties hereto have executed this First Amendment as of the
date this First Amendment is signed by the Assistant City Manager.
CITY OF FORT WORTH: ARTIST:
by: Dana Burghdoff (O&'6, 2026 :261 0
Dana Burghdoff Karl Unnasch
Assistant City Manager
Date: 10/06/2026
RECOMMENDED BY:
I�liflori CI I (Qct 5 2026 16:28:53 CDT)
1 idon arLibrary Director
Contract Compliance Manager
Date: 10-1-2026
By signing, I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Name: Anne Allen
Title: Public Art Project Manager
APPROVED AS TO FORM
AND LEGALITY:
Trey Qualls
Assistant City Attorney
a nnnn
ATTESTED BY:
..o
ono o=o
" _
�j oPp,�oo vo*�
�aCpq?o5o0.0
Jannette S. Goodall
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
First Amendment to Agreement Between the City of Fort Worth and
Karl Unnasch for Public Art for Ray White Road
Page 4 of 5
City Secretary
Form 1295 Not Required
Contract Authorization:
M&C — No M&C Required
First Amendment to Agreement Between the City of Fort Worth and Page 5 of 5
Karl Unnasch for Public Art for Ray White Road
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Anne Allen
Subject of the Agreement: First Amendment to City Secretary Contract #62403 for Ray White Road Public Art Project
M&C Approved by the Council? * Yes ❑ No II
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104714
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No 0
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be