HomeMy WebLinkAbout063916-CO3 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 63916-CO3
FORT WORTH City of Fort Worth
Change Order Request
Project Name:I Water and Sanitary Sewer Replacement Contract 2019, WSM-N, Part 1 City Sec No.: 63916
Project No.(s):I 103358•t IDOE No, N/A ICity Proj. No.: 103358-1
Project Description: Water and Sanitary Sewer Repalcement on Hammond St, May St, Spurgeon St, Waggoman St, Boyce Ave and Felix St
Contraclor:I Woody Contractors, Inc. Change Order # 3 Date: 9/1712026
City Project Mgr.I Preen KC ICity Inspector: Sergio Garcia
Phone Number: 817-392-5467 IPhone Number: 817.647-2524
Dept. Water Sewer Paving Totals Contract Time
Calender days)
Original Contract Amount $6,042,129.50 $765,182.00 $6,807,311.50 540
Extras to Date $86,250.00 $0.00 $86,250.00 30
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $6,128.379,50 $765.182.00 SR-Rn3-6R1-sn sin
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$6,519,206.90
$765,182.0(
$241,685.00
$76,518.00
$155,435.00
$76,518.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 7.01%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $8,509,139.38
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 3 will provide additional temporary asphalt pavement quantities to facilitate drivabilily, as the original bid quantity was
Insufficient. The change order also Includes replacing the originally planned pulverization and overlay at Hemphill Street with mill and overlay
due to the existence of reinforced concrete subbase. In addition, it provides for the removal and replacement of an existing 18 -inch storm
drain that was encountered in direct conflict with the proposed water line,
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in iuii (Dorn time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name . _.
Ggptract4r Si nature . _
pate.
Woody Contractors, Inc.
Troy Woody
_ .
Inspector
Date
Project Man er
Date
9/18/2026
/?�gi•,
9/18/2026
Director Water Dopt)
Dale
C s u on Supervisor (TPW Dept)
Date
CGYJto hey �takdev T 5.
09/30/2026
-
Senior Assistant City Attorney
Date
Assistant City Manager
Date
09/30/2026
10/06/2026
ougas ac ( e
---
Council Action.. it Required) .
M&C Number I 26.0843 I M&C Date Approved 9/15/2026 I
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2019, WSM-N, Part 1 City Sec No,: 63916
Project No.(s): I 103358-1 I DOE No. N/A City Proj. No.: I 103358-1
Project
Description
Water and Sanitary Sewer Repalcement on Hammond St, May St, Spurgeon St, Waggoman St, Boyce Ave and Felix St
Contractor I Woody Contractors, Inc. I Change Order= Date: 612512026
City Project Mgr. I Preeti KC City Inspector I Serglo Garcia
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
4
12" PVC Water Pipe DR -14
Water
40.00
LF
$192.00
$7,680.00
6
10" PVC Water Pipe DR -14
Water
8,00
LF
$106.00
$848.00
8
6" PVC Water Pipe DR -14
Water
8.00
LF
$78.00
$624.00
14
Salvage Water Valve
Water
1.00
EA
$200.00
$200.00
18
Connection to Existing 4"-12" Water Pipe
Water
3,00
EA
$8,900.00
$26,700.00
39
Concrete Pvmt Rep with 2" Asphalt
Water
925.00
SY
$205.00
$189,625,00
40
Remove Exist Conc Pavement
Water
825.00
SY
$26.00
$21,450.00
74
2" Surface Milling
Water
600.00
SY
$5.00
$3,000.00
75
2" Asphalt Pvmt Superpave SP -D
Water
600.00
SY
$19.00
$11,400.00
82
Temporary Asphalt Paving Repair
Water
1,466,00
LF
$35.00
$51,310.00
100
Remove and Replace 18" RCP (CI. III)
Water
32.00
LF
$305.00
$9,760.00
101
10" Gate Valve
Water
3.00
EA
$3,900.00
$11,700.00
102
Abandonment Plug (6"-12")
Water
1.00
EA
$250.00
$250.00
103
Remove & Stump Grind 42" Tree (547 W.Spurgeon)
Water
1.00
LS
$6,000.00
$6,000.00
104
Temporary Asphalt Paving Repair
Water
2038.00
LF
$34.00
$69,292.00
105
1" Private Water Service
Water
150.00
LF
$65.00
$9,750.00
Water
$419,589.00
Sewer
Paving
Additions Sub Total
$419,589.00
Page 1 of 1
FdRT WORTH
City of Fort Worth
Change Order Deletions
Project Name
Water and Sanitary Sewer Replacement Contract 2019, WSM-N, Part 1 I
City Sec No.: 63916
Project No.(s):
103358-1
DOE No. N/A J
City Proj. No.: 103358-1
Project Description
Water and Sanitary Sewer Repalcement on Hammond St, May St, Spurgeon St, Waggoman St, Boyce Ave and Felix
St
Contractor
Woody Contractors, Inc.
Change Order: 0
Dale 9/17/2026
City Project Mgr.
Preeti KC
City Inspector: Sergio Garcia
DELETIONS
Page 1 of 1
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Preeti KC
Name of Employee
Sr. Professional Engineer
Title
ATTEST:
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
7.1.7 WOODY CONTRACTORS CHANGE ORDER NO.3 TO WATER AND SEWER
REPLACEMENT CONTRACT 2019
DATE: M&C FILE NUMBER:
DEPARTMENT: . .
SUBJECT
(CD 9 and CD 11) Authorize Execution of Change Order No. 3 in the Amount of $390,827.40 to a
Contract with Woody Contractors, Inc., for a Revised Contract Amount of $7,284,388.90 for the
Water and Sanitary Sewer Replacement Contract 2019, WSM-N Project and Adopt Appropriation
Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2026-2030 Capital
Improvement Program
RECOMMENDATION
It is recommended that the City Council:
1. Authorize execution of Change Order No. 3 in the amount of $390,827.40, and an
additional 180 days, to City Secretary Contract No. 63916, a contract with Woody
Contractors, Inc., for the Water and Sanitary Sewer Replacement Contract 2019, WSM-N
project for a revised contract amount of $7,284,388.90 and;
2. Adopt the attached appropriation ordinance Increasing estimated receipts and
appropriations in the Water and Sewer Capital Projects Fund In the amount of
$390,828.00, transferred from available PayGo funds within the Water and Sewer Fund,
for the purpose of funding the Water/Sanitary Sewer Replacement Contract 2019, WSM-
N project (City Project No. 103358) and to effect a portion of Water's contribution to the
Fiscal Years 2026-2030 Capital Improvement Program.
DISCUSSION
The purpose of this Mayor and Council Communication (M&C) is to authorize execution of
Change Order No. 3 to City Secretary Contract No. 63916, with Woody Contractors, Inc.
On August 12, 2025 (MSC 25-0727), the City Council authorized a construction contract with
Woody Contractors, Inc. In the amount of $6,807,311.50 for the Water & Sanitary Sewer
Replacement Contract 2019, WSM-N project.
The contract was subsequently revised by two change orders as follows:
Change Order No. 1 with a net total of $0.00 was administratively authorized February 20, 2026,
and provided for crushed rock backfill due to groundwater encountered during Installation of
the 24 -inch water line on Felix Street. Change Order No, 2 with a net total of $86,250.00 was
1 of 13
FORT WORTH.
administratively authorized April 13, 2026, for additional concrete flatwork on Hammond Street
In order to facilitate the pulverization and overlay process of the street subsequent to water
line installation.
This Change Order No. 3 will provide additional temporary asphalt pavement quantities to
facilitate drivability, as the original bid quantity was insufficient. The change order also includes
replacing the originally planned pulverization and overlay at Hemphill Street with mill and
overlay due to the existence of reinforced concrete subbase. In addition, it provides for the
removal and replacement of an existing 18 -inch storm drain that was encountered in direct
conflict with the proposed water line.
It is the practice of the Water Department to appropriate Its Capital Improvement Program
(CIP) plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as
projects commence, additional funding needs are identified, and to comply with bond
covenants.
Funding is available in the Transfer to Water/Sewer account of the Water and Sewer Fund for
the purpose of funding the water/sanitary Sewer Replacement's Contract 2019 WSM-N project
within the Water & Sewer Capital Projects Fund.
Appropriations for the Water/Sanitary Sewer Replacement's Contract 2020 WSM-N project are
as depicted below:
Fund
Existing
Additional
Project Total*
Appropriations
Appropriations
WAS Capital Projects
$8,504,490.00
$390,828.00
$8,895,318.00
Fund 56002
Project Total
$8,504,490.00
$390,828.00
$8,895,318.00
*Numbers rounded for presentation purposes.
The project is located in COUNCIL DISTRICTS 9 and 11.
This contract requires a Form 1295.
FISCAL INFORMAYION/CERTIFICATION
The Director of Finance certifies that funds are currently available in the Water & Sewer Fund,
and upon approval of the above recommendations and adoption of the attached
appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the
Contract 2019 WSM-N project to support the execution of the change order. Prior to any expense
being incurred, the Water Department has the responsibility of verifying the availability of
funds.
2 of 13
Fob W�:
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804
ORIGINATING BUSINESS UNIT HEAD: Chris Harder, # 5020
ADDITIONAL INFORMATION CONTACT: Preeti KC, # 5467
ATTACHMENTS
1. Map - Water & Sewer 2019, WSM-N, Change Order 3 [7.1.7.1 - 2 pages]
2. Ordinance Approp (R2) - Water & Sewer 2019, WSM-N, Change Order 3 [7.1.7.2 - 2
pages]
3. CONFIDENTIAL - FID Table - Water & Sewer 2019, WSM-N, Change Order 3 [7.1.7.3 - 1
page]
4. CONFIDENTIAL - Form 1295 - Woody Contractors [7.1.7.4 - 1 page]
5. CONFIDENTIAL - Project Budget Summary - Water & Sewer 2019, WSM-N, Change Order
3 [7.1.7.5 - 1 page]
6. CONFIDENTIAL - Sam.gov - Woody Contractors [7.1.7.6 - 2 pages]
7. CONFIDENTIAL - Funds Availability - Water & Sewer 2019, WSM-N, Change Order 3q
[7.1.7.7 - 1 page]
3 of 13
60WSSC I9NCSNfNCO3-AVOODY FID Table
2
TTL!
56002
0600430
4956001
•
103358
2025
$390,828.00
2
56002
0600430
103358
2026
$390,828.00
56001
0609020
5956001
..
$390,828.00
2
56002
0600430
4956001
103358
001780
9999
$ (390,828.00)
56002
0600430
5740010
103358
001780
9999
hhl1
$390,827.40
$0.60
Rounding
8 of 13
MAYOR AND COUNCIL COMMUNICATION MAP
60WSSC19WSM NCO3-WOODY
r a W ANTHONY ST t, - IS t trwry,�
FI�11 l �R7 I I' 1 t. i'' it •� r r v _ 'tt'� �' �� l \. - ' f
r 1 '1 '!�C \� •! [_ _LW ,�'� 1 f! - J�r.tjT I 1 J l 1 _ `Il `- t •� +
_J ._ • • ^ - W'SEMINARY.iDR
"- � Ql t = 1 � � f�'"' -,.+F• `y I I,,tI 11 I +� �'� P; 1 �,' dl�'
fir, 'ut I 4 � . �I_ �� .,ii 3 ' ��,� /.• t \ _ ter_ , 1 ,.
JI alt. ,A ..I .�_� G "fr `�",r--'' �1 In°.1°-• i 'r•! I�.+. 1,T► _.t; I �/ ,
.Ad , 1 : ' �k - IaWJICELLIS�STr r
u i f a I �t
!' :., � +�9WdBR0ADUS�STf� r l'',.4'r.�.i ! .., Il •�• 1 ) 1 �,t,,��� .
tl .. ! _ ' �Y. +Y £EDLLI{L&1
` 4i I...I I( �; ! I�ti T1irWF:: i r,r ,_f � i,` + aiij
t
1 � •.,1 ''lli� '�e � 1I (� Ri;1
S 1' V 1 �`"{�, .+ yr.
T ,
�,I i.� y �I; I' Ir l,< �` r� ,3 Ott �1� p t irl�• "FUi I'rj', ��jGf ti I �s u
_ ij it "l��F i•- _I�lf I. D Via' _ }, `;�'I,11 Is 1_+. I ', q
/ - - I' T '�Y • —� Q ice"-' - � t 1
-�Ij.� �. •' �I ` 1�'.`' 1. �'',•�` -Ti iI +'(4 f '1tl�lll - si<L'.b 1�?ffr' II I ��� a,,t o
�_a—rs �,� J.L•+� 1.1,+Pf +__.dt� .1, •W HAMM�NDr1STl:?'.[.-1-iii 4.�a^J' ilt-l�_d' ? .lJ�v L +:�l:.l�r,+n t
4'' �4�r I.I .,1, •I. / �'� -Airs i� ') �• � ' i;_ r, ' •�� f .����'l_ cLii
�'I '�k�,t��' <� �i� I j�'l�'_ I� }ufkt� t� 11i (.a�..14.3 L `� I,, I 1. 1'q
`r I u'• ' • / .�lo. •. �kYEb
f-'&r]
�-_LLT7P
11ii�il -�I`� -'��_ ���� ��.K .'I�I�•��y1•� � 5 r, tt ' I_ i - I t
—
fl11\
��y,;,t r �I �(�` ,I,� j r i� :: G ; . '{j°'I��11a l I 'JJ-1 %ILL' iamn'
��rl 1 ,_{ ,1 ';(, t, ]bt 1fl\AhJRGE6JTI J— iW
Jfr.lW1FELIXiST" tr c ii r W1F,ELIXyST•
w ,--i ._�/•1 _ fit. �- t,
`� ����;' -'� �-� I t � i , ' '• j. _,, . hr �a ___ 1' Wit_ '`�r�»�.-�_.1""'� ,-(� ) - 1-^
-�� 'f .• ,' 'I�b l ,l...E 1.1' - + 11 -1 ,!'° r'�°II ' +- -- - I - '; 6W.��j� _ '� 1, t
iV111FULLER AVEt ''� a i 4'J I
..-i r I ai r • ty
- -- I
IF�ORTWORTH® .; r ,,•It.a —tea �n.r�'3i�' ,_.�.�- °�
1 of 13 r, , , ,1,• ,.
MAYOR AND COUNCIL COMMUNICATION MAP
60WS
SC19WSMNCO3-WOODY
•, `\ ' .n : ,fir,,, , r l ' � �� � ' l � t4 I �i l {t' � � � '.; �
D Q ;j ii e
\ ' ,1
r� I•• � �i �i '5 � -�1� t, I r _ �/�. Q A �li Y �1r 7' RI '1r,
1
Ri f E1DICI<S0•NIST `[F
lot I ,. e •, { ea
rFrII. ii4
ti��� Fl r !• f. ,'II 1 'jj.' �, '-r+ i_. _t ,`� Is ,. < •'�" 'I •-�_
Krn., t! trr� Rio
�c ,"f -�; 11d �I' �. �• 1+1 jj ti�,,.� =•\ a �`�+� i�;
IIm.* 'F I —
•iii ;'.i I ri
' it j l I j E WAGGOMAN ST {—� F. / •-f�.. � -1 � 1-T� ( � ` �� I� 1 ' ,llt� �[ � �{i• � ` +,�s �l r!{t� tYi
4 ,+E1PAFFORMST. I
` EIF.OGGI5T I' 1
rTii to 4,d )ri
it
` EIDREWtST 1 !
1
I Ql '
^"ter
--- • 1 �, FIFa�-1[. -'� l�'� ,�+ '�{ `•ham',^ 'r'/
FORT WOR
TH ,•_ ���� F
------�---E.MASONiST'
(�Ff[i'
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc
Subject of the Agreement: Water and Sanitary Sewer Repl. Contract 2019, WSM-N Part 1
M&C Approved by the Council? * Yes 0 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 0 63916-CO3
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No LI
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103358-1
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No O
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be