HomeMy WebLinkAbout052073-PM1 - Construction-Related - Contract - Reliable Paving CompanyCSC No. 52073-PM1
FORT WORTH
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
SIDEWALK & STREET LIGHT IMPROVEMENTS
TARRANT COUNTY, BLOCK 15, PARKING LOT
City Project No 101677
Betsy Price
Mayor
David Cooke
City Manager
Douglas W. Wiersig, P.E.
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
2018
.5zo�3
. •I..*.. f�S4 ...••••••••••
BAIRD., JR.
........•.....•........
OVAL
August 9, 2018
BAIRD, HAMPTON &BROWN, INC. a - B ENGINEERING & SURVEYING
6300 Ridglea Place, Ste 700, Fort Worth, Texas 76116 1 Tel: 817-338-1277 1 Fax: 817-338-9245
TBPE Firm #44 1 TBPLS Firm #10011300 1 www.bhbinc.com
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
0000 10- I
PROJECT RECORD DOCUMENTS FOR DEVELOPER AWARDED PROJECTS
Page I of 7
SECTION 00 00 10
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
00 42 43 Proposal Form Unit Price
00 43 13 Bid Bond
00 45 11 Bidders Prequalification's
00 45 12 Prequalification Statement
00 45 13 Bidder Prequalification Application
00 45 26 Contractor Compliance with Workers' Compensation Law
00 45 40 Minority Business Enterprise Goal
00 52 43 Agreement
00 61 25 Certificate of Insurance
00 62 13 Performance Bond
00 62 14 Payment Bond
00 62 19 Maintenance Bond
00 72 00 General Conditions
00 73 00 Supplementary Conditions)
00 7310 Standard City Conditions of the Construction Contract for Developer Awarded
Projects
Division 01 - General Requirements
01 11 00
Summary of Work
0-1--2-5-O8Substituiweedues
01 31 19
Preconstru,,ction Meeting
Pro ect Mee }gs
1O1-3-1--20
0 �
46v�iStEue- }e�}-Pfegress-&y - ed
04-42-3
PreconstructieiV44ee
01 33 00
Submittals
01 35 13
Special Project Procedures
01 45 23
Testing and Inspection Services
01 50 00
Temporary Facilities and Controls
01 55 26
Street Use Permit and Modifications to Traffic Control
01 57 13
Storm Water Pollution Prevention Plan
01 60 00
Product Requirements
01 66 00
Product Storage and Handling Requirements
0440-O0
Mefiilia ienand-I ernebitia ien
01 71 23
Construction Staking
01 74 23
Cleaning
01 77 19
Closeout Requirements
01 78 23
Operation and Maintenance Data
01 78 39
Project Record Documents
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
Division 02 - Existing Conditions NONE
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 9101677
Revised September 1, 2015
00 0010- 2
PROJECT RECORD DOCUMENTS FOR DEVELOPER AWARDED PROJECTS
Page 2 of 7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Division 03 - Concrete NONE
Division 26 - Electrical NONE
Division 31— Earthwork NONE
Division 32 - Exterior Improvements NONE
Division 33 - Utilities NONE
Division 34 - Transportation NONE
Appendix
GC -4.01
Availability of Lands
GC -4.02
Subsurface and Physical Conditions
GC -4.04
Underground Facilities
GC -4.06
Hazardous Environmental Condition at Site
GC -6.06.D
Minority and Women Owned Business Enterprise Compliance
GC -6.07
Wage Rates
GC -6.09
Permits and Utilities
GC -6.24
Nondiscrimination
GR-01 60 00
Product Requirements
28 END OF SECTION
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 0101677
Revised September 1, 2015
017839-I
PROJECT RECORD DOCUMENTS
Page I of2
1 SECTION 00 11 13
2 INVITATION TO BIDDERS
3 DEVELOPER AWARDED CONTRACTS
4 FOR PUBLICLY BID PROJECTS ONLY
5
6 RECEIPT OF BIDS
7 Sealed bids for the construction of Sidewalk & Street Light Improvements, Tarrant County,
8 Block 15, Parking Lot, City Project No 101677
9
10 will be received by the
11 Tarrant County Purchasing Department
12 100 Weatherford Street, Suite 303
13 Fort Worth, Texas 76196
14 until 1:30 P.M. CST, Thursday, MONTH DAY, 2018, and bids will be publicly read aloud.
15
16 GENERAL DESCRIPTION OF WORK
17 The major work will consist of the (approximate) following: New Sidewalk and Street Light
18 Construction, including approximately 6921 Sf of new sidewalk, 320 LF curb & gutter, 16 street
19 light poles and fixtures, electrical conduit, meter pedestal and other miscellaneous work as shown
20 on the plans.
21
22 PREQUALIFICATION
23 The improvements included in this project must be performed by a contractor who is pre -
24 qualified by the City at the time of bid opening. The procedures for qualification and pre -
25 qualification are outlined in the Section 00 21 13 - INSTRUCTIONS TO BIDDERS.
26
27 DOCUMENT EXAMINATION AND PROCUREMENTS
28
29 Copies of the Bidding and Contract Documents may be purchased from Tarrant County
30 Purchasing Department, 100 Weatherford Street, Fort Worth, Texas, 76196.
31 Set of Bidding and Contract Documents with full size drawings: No Cost
32 Set of Bidding and Contract Documents with half size (if available) drawings: No Cost
33
34 PREBID CONFERENCE
35 A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO
36 BIDDERS at the following location, date, and time:
37 DATE: To Be Set By Tarrant County
38 TIME:
39 PLACE: Tarrant County Purchasing, 100 Weatherford Street, Fort Worth, Texas
40
41 LOCATION:
42
43
44 DEVELOPER/CITY'S RIGHT TO ACCEPT OR REJECT BIDS
45 Developer and City reserves the right to waive irregularities and to accept or reject bids.
46
47 FUNDING
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Proj. /1101677
Revised December 23, 2015
017839.2
PROJECT RECORD DOCUMENTS
Page 2 of 2
1
2
3
4
5
6
7
8
9
10
12
Any Contract awarded under this INVITATION TO BIDDERS is expected to be funded by
Tarrant County for the work under this INVITATION TO BIDDERS.
INQUIRIES
All inquiries relative to this procurement should be addressed to the following:
Attn: John W. Baird, Jr, PE, Baird, Hampton & Brown, Inc
Email: bbaird @bhbinc.com
Phone: 817-338-1277
ADVERTISEMENT DATES
13 END OF SECTION
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Proj. #101677
Revised December 23, 2015
017839-I
PROJECT RECORD DOCUMENTS
Page I of 9
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
SECTION 00 21 13 INSTRUCTIONS TO BIDDERS
DEVELOPER AWARDED CONTRACTS
FOR PUBLICLY BID PROJECTS ONLY
1. Defined Terms
1.1. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.1.1. Bidder: Any person, firm, partnership, company, association, or corporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.1.2.Successful Bidder: The lowest responsible and responsive Bidder to whom
Developer/City makes an award.
2. Copies of Bidding Documents
2.1. Neither Developer/City nor Engineer shall assume any responsibility for errors or
misinterpretations resulting from the Bidders use of incomplete sets of Bidding
Documents.
2.2. Developer/City and Engineer in making copies of Bidding Documents available do so
only for the purpose of obtaining Bids for the Work and do not authorize or confer a
license or grant for any other use.
3. Prequalification of Bidders (Prime Contractors and Subcontractors)
3.1. All Bidders and their subcontractors are required to be prequalified for the work types
requiring prequalification at the time of bidding. Bids received from contractors who are
not prequalified (even if inadvertently opened) shall not be considered. Prequalification
requirement work types and documentation are as follows:
3.1.1. Roadway and Pedestrian Lighting— Requirements document located at;
https://prolectpoint.buzzsaw.com/fortworthgov/Resources/02%20-
%20Construction%20Documents/Contractor%20Pregualification/TPW%20Paving
%20Contractor%20Pregualification%20Program/PREQUALIFICATION%20REQ
UIREMENTS%20FOR%20PAVING%20CONTRACTORS.PDF?public
3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within
seven (7) calendar days prior to Bid opening, the documentation identified in Section 00
45 11, BIDDERS PREQUALIFICATIONS.
3.2.1. Submission of and/or questions related to prequalification should be addressed to
the City contact as provided in Paragraph 6.1.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 4, 2014
01 78 39-2
PROJECT RECORD DOCUMENTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Page 2 of 9
3.3. In addition to prequalification, additional requirements for qualification may be required
within various sections of the Contract Documents.
4. Examination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before submitting a Bid, each Bidder shall:
4.1.1. Examine and carefully study the Contract Documents and other related data
identified in the Bidding Documents (including "technical data" referred to in
Paragraph 4.2. below). No information given by Developer/City or any
representative of the Developer/City other than that contained in the Contract
Documents and officially promulgated addenda thereto, shall be binding upon the
Developer/City.
4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and
site conditions that may affect cost, progress, performance or furnishing of the
Work.
4.1.3. Consider federal, state and local Laws and Regulations that may affect cost,
progress, performance or furnishing of the Work.
4.1.4. Study all: (i) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site (except Underground Facilities) that
have been identified in the Contract Documents as containing reliable "technical
data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any,
at the Site that have been identified in the Contract Documents as containing
reliable "technical data."
4.1.5.Perform independent research, investigations, tests, borings, and such other means
as may be necessary to gain a complete knowledge of the conditions which will be
encountered during the construction of the project. Bidder must fill all holes and
clean up and restore the site to its former conditions upon completion of such
explorations, investigations, tests and studies.
4.1.6. Determine the difficulties of the Work and all attending circumstances affecting the
cost of doing the Work, time required for its completion, and obtain all information
required to make a proposal. Bidders shall rely exclusively and solely upon their
own estimates, investigation, research, tests, explorations, and other data which are
necessary for full and complete information upon which the proposal is to be based.
It is understood that the submission of a proposal is prima-facie evidence that the
Bidder has made the investigation, examinations and tests herein required. Claims
for additional compensation due to variations between conditions actually
encountered in construction and as indicated in the Contract Documents will not be
allowed.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS Proj.9101677
Revised April 4, 2014
017839-3
PROJECT RECORD DOCUMENTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Page 3 of 9
4.1.7.Promptly notify Developer of all conflicts, errors, ambiguities or discrepancies in or
between the Contract Documents and such other related documents. The Contractor
shall not take advantage of any gross error or omission in the Contract Documents,
and the Developer shall be permitted to make such corrections or interpretations as
may be deemed necessary for fulfillment of the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00 - Supplementary Conditions for identification
of:
4.2.1.those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by Developer in preparation of the Contract
Documents. The logs of Soil Borings, if any, on the plans are for general
information only. Neither the Developer nor the Engineer guarantee that the data
shown is representative of conditions which actually exist.
4.2.2. those drawings of physical conditions in or relating to existing surface and
subsurface structures (except Underground Facilities) which are at or contiguous to
the site that have been utilized by Developer in preparation of the Contract
Documents.
4.2.3. copies of such reports and drawings will be made available by City to any Bidder
on request. Bidder is responsible for any interpretation or conclusion drawn from
any "technical data" or any other data, interpretations, opinions or information.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i)
that Bidder has complied with every requirement of this Paragraph 4, (ii) that without
exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means, methods, techniques, sequences or
procedures of construction (if any) that may be shown or indicated or expressly required
by the Contract Documents, (iii) that Bidder has given Developer written notice of all
conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
written resolutions thereof by Developer are acceptable to Bidder, and when said
conflicts, etc., have not been resolved through the interpretations by Developer as
described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient
to indicate and convey understanding of all terms and conditions for performing and
furnishing the Work.
4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated
biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material, unless
specifically identified in the Contract Documents.
5. Availability of Lands for Work, Etc.
5.1. The lands upon which the Work is to be performed, rights -of -way and easements for
access thereto and other lands designated for use by Contractor in performing the Work
are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipment to be incorporated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by Developer.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Proj. 11101677
Revised April 4, 2014
017839-4
PROJECT RECORD DOCUMENTS
Page 4 of 9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to
Developer's/City's representative. Interpretations or clarifications considered necessary
by Developer in response to such questions will be issued by Addenda delivered to all
parties recorded by Developer as having received the Bidding Documents. Only
questions answered by formal written Addenda will be binding Oral and other
interpretations or clarifications will be without legal effect
Address questions to:
Attn: John W. Baird, Jr., PE, Baird, Hampton & Brown
Email: bbaird@bhbinc.com
Phone: 817-338-1277
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
Developer/City.
6.3. A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of Developer will be present to discuss
the Project. Bidders are encouraged to attend and participate in the conference.
Developer's representative will transmit to all prospective Bidders of record such
Addenda as Developer considers necessary in response to questions arising at the
conference. Oral statements may not be relied upon and will not be binding or legally
effective.
7. Bid Security
7.1. Each Bid must be accompanied by Bid Bond made payable to Tarrant County
(Developer) in an amount of five (5) percent of Bidder's maximum Bid price on form
attached, issued by a surety meeting the requirements as listed in the General
Conditions.
7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award
have been satisfied. If the Successful Bidder fails to execute and deliver the complete
Agreement within 10 days after the Notice of Award, Developer may consider Bidder to
be in default, rescind the Notice of Award, and the Bid Bond of that Bidder will be
forfeited. Such forfeiture shall be Developer's exclusive remedy if Bidder defaults. The
Bid Bond of all other Bidders whom Developer believes to have a reasonable chance of
receiving the award will be retained by Developer until final contract execution.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 4, 2014
017839-5
PROJECT RECORD DOCUMENTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Page 5 of 9
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or -Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or -equal" items.
Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or -
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Section 01 25 00 of the General Requirements.
11. Bid Form
11.1. All blanks on the Bid Form must be completed by printing in ink and the Bid Form
signed in ink. Erasures or alterations shall be initialed in ink by the person signing
the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit
price item listed therein. In the case of optional alternatives, the words "No Bid,"
"No Change," or "Not Applicable" may be entered legibly, in ink or type, for which
the Bidder proposes to do the work contemplated or furnish materials required.
11.2. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate name, address and state of
incorporation shall be shown below the signature.
11.3. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
authority to sign. The official name and address of the partnership shall be shown
below the signature.
11.4. Bids by limited liability companies shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The name and state of
formation of the firm and the official address of the firm shall be shown.
11.5. Bids by individuals shall show the Bidder's name and official address.
11.6. Bids by joint ventures shall be executed by each joint venturer in the manner
indicated on the Bid Form. The official address of the joint venture shall be shown.
11.7. All names shall be typed or printed in ink below the signature.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 4, 2014
017839-6
PROJECT RECORD DOCUMENTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Page 6 of 9
11.8. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Form.
11.9. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
11.10. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non Resident Bidder.
12. Submission of Bids
Bids shall be submitted on the prescribed Bid Form and proposal form, provided with the
Bidding Documents, at the time and place indicated in the Advertisement or INVITATION
TO BIDDERS, addressed to Tarrant County, and shall be enclosed in an opaque sealed
envelope, marked with the City Project Number, Project title, the name and address of
Bidder, and accompanied by the Bid security, if required, and other required documents.
13. Modification and Withdrawal of Bids
13.1. Bids cannot be withdrawn prior to the time set for bid opening. A request for
withdrawal must be made in writing by an appropriate document duly executed in the
manner that a Bid must be executed and delivered to the place where Bids are to be
submitted at any time prior to the opening of Bids. After all Bids not requested for
withdrawal are opened and publicly read aloud, the Bids for which a withdrawal
request has been properly filed may, at the option of the Developer/City, be returned
unopened.
13.2 Bidders may modify their Bid by electronic communication at any time prior to the
time set for the closing of Bid receipt.
14. Opening of Bids
Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An
abstract of the amounts of the base Bids and major alternates (if any) will be made available
to Bidders after the opening of Bids.
15. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for the time period specified for Notice of Award
and execution and delivery of a complete Agreement by Successful Bidder. Developer/City
may, at their sole discretion, release any Bid and nullify the Bid security, if required, prior to
that date.
16. Evaluation of Bids and Award of Contract
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 4, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
017839-7
PROJECT RECORD DOCUMENTS
Page 7 of 9
16.1. Developer/City reserves the right to reject any or all Bids, including without
limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or
conditional Bids and to reject the Bid of any Bidder if Developer/City believes that it
would not be in the best interest of the Project to make an award to that Bidder,
whether because the Bid is not responsive or the Bidder is unqualified or of doubtful
financial ability or fails to meet any other pertinent standard or criteria established by
City. Developer/City also reserves the right to waive informalities not involving
price, contract time or changes in the Work with the Successful Bidder.
Discrepancies between the multiplication of units of Work and unit prices will be
resolved in favor of the unit prices. Discrepancies between the indicated sum of any
column of figures and the correct sum thereof will be resolved in favor of the correct
sum.
16.1.1. Any or all bids will be rejected if Developer/City has reason to believe that
collusion exists among the Bidders, Bidder is an interested party to any litigation
against Developer/City, Developer/City or Bidder may have a claim against the
other or be engaged in litigation, Bidder is in arrears on any existing contract or
has defaulted on a previous contract, Bidder has performed a prior contract ill an
unsatisfactory manner, or Bidder has uncompleted work which in the judgment
of the Developer/City will prevent or hinder the prompt completion of additional
work if awarded.
16.2. Developer/City may consider the qualifications and experience of Subcontractors,
Suppliers, and other persons and organizations proposed for those portions of the
Work as to which the identity of Subcontractors, Suppliers, and other persons and
organizations must be submitted as provided in the Contract Documents or upon the
request of the Developer/City. Developer/City also may consider the operating costs,
maintenance requirements, performance data and guarantees of major items of
materials and equipment proposed for incorporation in the Work when such data is
required to be submitted prior to the Notice of Award.
16.3. Developer/City may conduct such investigations as Developer/City deems necessary
to assist in the evaluation of any Bid and to establish the responsibility,
qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers
and other persons and organizations to perform and furnish the Work in accordance
with the Contract Documents to Developer's/City's satisfaction within the prescribed
time.
16.4. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by Developer/City indicates that the award will
be in the best interests of the Developer/City.
16.5. Failure or refusal to comply with the requirements may result in rejection of Bid.
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 4, 2014
01 7839-8
PROJECT RECORD DOCUMENTS
Page 8 of 9
1 17. Signing of Agreement
2 When Developer issues a Notice of Award to the Successful Bidder, it will be accompanied
3 by the required number of unsigned counterparts of the Agreement. The Contractor shall sign
4 and deliver the required number of counterparts of the Agreement to Developer's
5 representative with the required Bonds, Certificates of Insurance, and all other required
6 documentation.
7
8
9
10 END OF SECTION
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 4, 2014
004100
DAP BID FORM FOR PUBLICLY BID PROJECTS ONLY
Page 1 of 3
2 SECTION 00 41 00
3 DAP BID FORM FOR PUBLICLY BID PROJECTS ONLY
4
TO: Tarrant County
5
FOR: Sidewalk & Street Light Improvements
Tarrant County, Block 15, Parking Lot
6
City Project No.: 101677
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
1. Enter Into Agreement
The undersigned Bidder proposes
and agrees, if this Bid is accepted, to enter into an Agreement with Developer in the form included in the
Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other
terms and conditions of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO
BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing
with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract
award, and will provide a valid insurance certificate meeting all requirements in the
construction contract.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any
undisclosed individual or entity and is not submitted in conformity with any collusive
agreement or rules of any group, association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or
sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for
the Contract. For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of anything of value
likely to influence the action of a public official in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to
influence the bidding process to the detriment of Developer (b) to establish Bid prices at
CITY OF FORT WORTH
STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS
Form Revised April 2, 2014
00 4100 Bid Form — DAP.docx
Proj. # 101677
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
00 41 00
DAP BID FORM FOR PUBLICLY BID PROJECTS ONLY
Page 2 of 3
artificial non-competitive levels, or (c) to deprive Developer of the benefits of free and
open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with
or without the knowledge of Developer, a purpose of which is to establish Bid prices at
artificial, non-competitive levels.
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons
or their property to influence their participation in the bidding process or affect the
execution of the Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified
contractors and subcontractors:
a. Paving
b. Street Lighting
C.
d.
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within calendar days after the date
when the Contract Time commences to run as provided in the General Conditions.
4.2. Bidder accepts the provisions of the Agreement to liquidated damages, if applicable, in the event
of failure to complete the Work {and/or achievement of Milestones} within the times specified
in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Bid Bond (if required), Section 00 43 13 issued by a surety meeting the
requirements of the General Conditions.
c. Proposal Form, Section 00 42 43
d. MBE Forms (if required)
e. Prequalification Statement, Section 00 45 12
f. Any additional documents that may be required by Section 12 of the Instructions
to Bidders
g. Bidder pre -qualification application (optional)
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following
bid amount. In the space provided below, please enter the total bid amount for this project. Only
this figure will be read publicly by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid
amount entered below is subject to verification and/or modification by multiplying the unit
bid prices for each pay item by the respective estimated quantities shown in this proposal and
then totaling all of the extended amounts
CITY OF FORT WORTH
STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS
Form Revised April 2, 2014
004100 Bid Form — DAP.docx
Proj. # 101677
0041 00
DAP BID FORM FOR PUBLICLY BID PROJECTS ONLY
Page 3 of 3
1
2
3
4
5
6
7
8
9
6.3. Evaluation of Alternate Bid Items <use this if applicable, otherwise delete>
Total Base Bid
TOTAL BID
7. Bid Submittal
This Bid is submitted on
Respectfully submitted,
By:
<Month Day, Year> by the entity named below
(Signature)
(Printed Name)
Title:
Company:
Address:
State of Incorporation:
Email:
Phone:
Receipt is acknowledged of
the following Addenda:
Initial
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION BID FORM — DEVELOPER AWARDED PROJECTS
Form Revised April 2, 2014
00 41 00 Bid Form — DAP.docx
Proj. #101677
TARRANT COUNTY
Purchase Order
Page
1 of 2
BILL TO:
TARRANT COUNTY AUDITORS OFFICE
100 E. Weatherford, Suite 506
Fort Worth, Texas 76196-0103
(817)884-1205 (817)884-1104(Fax)
EMAIL INVOICES TO:
SAP-lnvoices@tarrantcounty.com
Vendor #: 7001165
Contact Person: DENO URQUIDI
RELIABLE PAVING INC
1903 N PEYCO
ARLINGTON TX 76001
Office: 817-467-0779
Fax: 817-467-9148
Please deliver to:
FACILITIES MANAGEMENT -PARKING BLOCK -15
401 E WEATHERFORD ST
FORT WORTH TX 76196
PO No:
4500257195
PO Date:
11/12/2018
Contact Person:
Elizabeth Pietzsch
Phone No:
817-884-1141
Fax No:
817-850-2966
Email: eapietzsch@tarrantcounty.com
Purchasing:
817-884-1414
Bid/Quote #:
Deliver By:
Terms of Payment
2018-182-F
FED. I. D.75-6001170
STATE 75-73-0285-K
01/31/2019
NET 30
FOB DESTINATION
Note:
RFB 2018-182
Court #128963 dated 11 /6/18
NOTE: By acceptance of this Purchase Order you certify that neither you nor your principal is presently debarred, suspended,
proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal
department or agency in accordance with Federal Executive Order 12549 "Debarment and Suspension."
Item Our Description Order Unit Price Net Value
Material # City. per Unit
00010 1 AU 26,500.0000 26,500.00
Materials -Sidewalks -Block 15 Phase 2
Materials for Sidewalk Improvement at Block 15 Phase 2 - Concrete Work
RFB 2018 -182 -Concrete - Approved by Commissioners Court 11/6/2018
Materials $ 26,500.00
Services $ 74,160.00
Equipment Rental $ 12,500.00
Required Bonds $ 2,500.00
TOTAL $ 115,660.00
Expected value of unplanned services: 26,500.00
00020 1 AU 74,160.0000 74,160.00
Services -Sidewalks -Block 15 Phase 2
Services
for Sidewalk Improvements Block 15 Phase 2 - Concrete Work
Expected value of unplanned services: 74,160.00
00030 Equipment I AU 12,500.0000 12,500.00
Rental -Block 15 Phase 2
Equipment Rental f
or Sidewalk Imoovements Block 15 Phase oncr
SPECIAL INSTRUCTIONS
This order confirms acceptance of your bid to furnish items listed herein. The above Purchase Order
Number must be shown on tab, box, bill of lading or express, receipt and invoice. No responsibility will
be assumed for verbal orders given by employees outside of the Purchasing Department. If unable to
ship material as promised, please advise when shipment can be made. The County reserves the right
to cancel all or any part it not shipped as specified. For JACK BEACHAM, C.P.M, A.P.P.
PURCHASING AGENT
TARRANT COUNTY
Purchase Order
BILL TO:
TARRANT COUNTY AUDITORS OFFICE
100 E. Weatherford, Suite 506
PO No: 4500257195
Version: 0
PO Date: 11/12/2018
Page
2 of 2
Item Our Description Order Unit Price Net Value
Material # Qty. per Unit
Expected value of unplanned services: 12,500.00
00040 Required Bonds -Block 1 AU 2,500.0000 2,500.00
15 Phase 2
Required Bonds
for Sidewalk Improvements Block 15 Phase 2 - Concrete Work
Expected value of unplanned services: 2,500.00
TOTAL VALUE $ 115,660.00
SPECIAL INSTRUCTIONS
This order confirms acceptance of your bid to furnish items listed herein. The above Purchase Order
Number must be shown on lab, box, bill of lading or express, receipt and invoice. No responsibility will
be assumed for verbal orders given by employees outside of the Purchasing Department. If unable to
ship material as promised, please advise when shipment can be made. The County reserves the right
to cancel all or any part if not shipped as specified, For JACK BEACHAM, C.P.M, A.P.P.
PURCHASING AGENT
THE STATE OF TEXAS § Agreement for Sidewalk & Street Light Improvements
COUNTY OF TARRANT § Tarrant County, Block 15 Parking Lot, Phase 2
RFB 2018-182 - Concrete
This Agreement is by and between Tarrant County, Texas (the "Owner"), and Reliable
Paving, Inc. (the "Contractor"). In consideration of the mutual promises and agreements contained
herein, the Owner and Contractor agree as follows:
The Contractor will perform the work required by and described in the Contract Documents
listed in Section 8 below of the Agreement, generally titled "Sidewalk & Street Light
Improvements Tarrant County, Block 15 Parking Lot, Phase 2" (the "Project"). The
Contractor will complete the Project no later than Forty Five (45) calendar days after the
agreed upon start date.
2. The work herein contemplated will consist of the Contractor furnishing, as an independent
contractor, all labor, tools, appliances, equipment and materials necessary for the
completion of the Project in accordance with the drawings and specifications prepared by
Facilities Management and are attached to this Agreement and made a part of this
Agreement the same as if written herein.
The Contractor hereby agrees and binds itself to commence work within ten (10) days after
) "Notice to Proceed" issued by Tarrant County.
4. Total Contract Price: The Owner will pay the Contractor for the performance of the work
required by the Contract Documents, subject to additions and deductions mutually agreed
to by Change Order, the Total Contract Price of One Hundred Fifteen Thousand Six
Hundred Sixty Dollars and Zero Cents ($115,660.00). The Total Contract Price consists of
the following components:
Materials $ 26,500.00
Services $ 74,160.00
Equipment Rental $ 12,500.00
Required Bonds $ 2,500.00
� i Total Contract Price $ 115,660.00
Based upon applications for payment submitted to Tarrant County Facilities Management
by Contractor, the Owner will make progress payments on account of the Total Contract
Price to the Contractor as follows:
There will be due and payable on Contract, approximately each thirty (30) days, an amount
equal to 95% of the value of the work completed. The Owner reserves the right to withhold
5% of the Total Contract Price for thirty (30) days after final acceptance of the work.
TO THE EXTENT PERMITTED BY TEXAS LAW. THE CONTRACTOR AGREES TO FULLY
INDEMNIFY, SAVE, AND HOLD HARMLESS THE OWNER FROM ALL COSTS OR DAMAGES
ARISING OUT OF ANY REAL OR ASSERTED CLAIM OR CAUSE OF ACTION AGAINST IT OF
WHATSOEVER KIND OR CHARACTER AND IN ADDITION. FROM ANY AND ALL COSTS OR
DAMAGES ARISING OUT OF ANY WRONGS, INJURIES. DEMANDS OR SUITS FOR DAMAGES,
EITHER REAL OR ASSERTED, CLAIMED AGAINST IT THAT MAY BE OCCASIONED BY ANY
Page I of 2
,ACT, OMISSION, NEGLECT OR MISCONDUCT OF THE SAID CONTRACTORS ITS AGENTS,
SERVANTS, AND EMPLOYEES. ALL VENUE FOR LITIGATION REGARDING THIS PROJECT IS
IN THE STATE OR FEDERAL DISTRICT COURTS PHYSICALLY LOCATED IN TARRANT
COUNTY, TEXAS.
7. Contractor acknowledges and agrees that in accordance with Section 2252.908 (b) -- (c) of
the Texas Government Code, it has fully, accurately, and completely disclosed all
interested parties on the Texas Ethics Commission's Form 1295 attached and marked
"Attachment A."
The Contract Documents consist of the following:
• This Agreement
• Request for Bid 2018-182 Bid Documents
• Bennett Benner Partners Technical Specifications & Drawings
• Reliable Paving, Inc. response to RFB 2018-182 — Concrete
• Any exhibits attached hereto, conditions of the contract (special, supplementary
and other conditions), all addenda issued prior to execution of this Agreement and
all modifications issued subsequent thereto.
To the extent of an ambiguity among the various documents, this signed Agreement
prevails. These documents collectively form the Contract, and all are as fully a part of the
Contract as if attached to this Agreement or repeated herein.
This Agreement is effective upon the date written by the last party to sign it.
COUNTY OF TARRANT RELIABLE PAVING, INC.
OWNER CONTRACTOR
______ c'& /
(SIGNATURE) (SIGNATURE)
BY: B. Glen Whitley BY: Charles M. Long
TITLE: County Judge TITLE: President
Date: N 0110 IAn h'2 r (�,Q Date:
Certification of Funds Available
*Approved as to Form: for the Amount of $115,660.00
J./
Criminal District tto ey's Office
S. Renee Tidwell
N�V ckr (0 t 6101$ Tarrant County Auditor
'By law, the Criminal DistrietAttomey's Office may only approvecontracts for its clients. We reviewed this document as to form from our client's
legal perspective. Other parties may not rely on this approval. Instead those parties should seek contract review from independent counsel.
Page 2 of 2
TARRANT COUNTY
Purchase Order
Page
1 of 2
BILL TO:
TARRANT COUNTY AUDITORS OFFICE
100 E. Weatherford, Suite 506
Fort Worth, Texas 76196-0103
(817)884-1205 (817)884-1104(Fax)
EMAIL INVOICES TO:
SAP-Invoices@tarrantcounty.com
Vendor #: 7012830
Contact Person:
BEAN ELECTRICAL INC
821 E ENON AVE
FORT WORTH TX 76140
Office: 817-561-7400
Fax: 817-561-7403
Please deliver to:
FACILITIES MANAGEMENT -PARKING BLOCK -15
401 E WEATHERFORD ST
FORT WORTH TX 76196
PO No:
4500257194
PO Date:
11/12/2018
Contact Person:
Elizabeth Pietzsch
Phone No:
817-884-1141
Fax No:
817-850-2966
Email: eapietzsch@tarrantcounty.com
Purchasing:
817-884-1414
Bid/Quote #:
Deliver By:
Terms of Payment:
2018-182
FED.I.D.75-6001170
STATE 75-73-0285-K
05/31/2019
NET 30
FOB DESTINATION
Note:
RFB 2018-182
Court #128963 dated 11/6/18
NOTE: By acceptance of this Purchase Order you certify that neither you nor your principal is presently debarred, suspended,
proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal
department or agency in accordance with Federal Executive Order 12549 "Debarment and Suspension."
Item Our Description Order Unit Price Net Value
Material # Qty. per Unit
00010 Materials -Street 1 AU 55,370.0000 55,370.00
Lights -Block 15 Phase 2
Materials for Street Light Improvements for Block 15 - Phase 2
RFB 2018-182 - Electrical Approved by Commissioners Courts 11/6/2018
Materials $ 55,370.00
Services $ 76,209.00
Equipment Rental $ 16,000.00
Required Bonds $ 3,620.00
TOTAL $ 151,199.00
Expected value of unplanned services: 55,370.00
00020 Services -Street 1 AU 76,209.0000 76,209.00
Lights -Block 15 Phase 2
Services for Street Light Improvements - Block 15 Phase 2
Expected value of unplanned services: 76,209.00
00030 Equipment 1 AU 16,000.0000 16,000.00
Rental -Block 15 Phase 2
Equipment Rental for Steet Light Improvements - Block 15 Phase 2
SPECIAL INSTRUCTIONS
This order confirms acceptance of your bid to furnish items listed herein. The above Purchase Order 1 �,
Number must be shown on tab, box, bill of lading or express. receipt and invoice. No responsibility will
be assumed for verbal orders given by employees outside of the Purchasing Department. If unable to
ship material as promised, please advise when shipment can be made. The County reserves the right - - -
tocancelalloranypartifnot shipped as specified. For JACK BEACHAM, C.P.M, A.P.P.
PURCHASING AGENT
TARRANT COUNTY
Purchase Order
BILL TO:
TARRANT COUNTY AUDITORS OFFICE
100 E. Weatherford, Suite 506
PO No: 4500257194
Version: 0
PO Date: 11/12/2018
Page
20f 2
Item Our Description Order Unit Price Net Value
Material # Qty. per Unit
Expected value of unplanned services: 16,000.00
00040 Required Bonds- 1 AU 3,620.0000 3,620.00
Block 15 Phase 2
Required Bonds
Expected value of unplanned services: 3,620.00
TOTAL VALUE $ 151,199.00
SPECIAL INSTRUCTIONS
This order confirms acceptance of your bid to lurnish items listed herein. The above Purchase Order
Number must be shown on tab, box, bill of lading or express, receipt and invoice. No responsibility will
be assumed for verbal orders given by employees outside of the Purchasing Department. If unable to
ship material as promised, please advise when shipment can be made. The Counlyreserves the right
to cancel all or any part if not shipped as specified. For JACK BEACHAM, C.P.M, A.P.P.
PURCHASING AGENT
ACT, OMISSION, NEGLECT OR MISCONDUCT OF THE SAID CONTRACTOR, ITS AGENTS,
SERVANTS, AND EMPLOYEES. ALL VENUE FOR LITIGATION REGARDING THIS PROJECT IS
IN THE STATE OR FEDERAL DISTRICT COURTS PHYSICALLY LOCATED IN TARRANT
COUNTY, TEXAS.
Contractor acknowledges and agrees that in accordance with Section 2252.908 (b) — (c) of
the Texas Government Code, it has fully, accurately, and completely disclosed all
interested parties on the Texas Ethics Commission's Form 1295 attached and marked
"Attachment A."
The Contract Documents consist of the following:
• This Agreement
• Request for Bid 2018-182 Bid Documents
• Bennett Benner Partners Technical Specifications & Drawings
• Bean Electrical Inc. response to RFB 2018-182 — Electrical
• Any exhibits attached hereto, conditions of the contract (special, supplementary
and other conditions), all addenda issued prior to execution of this Agreement and
all modifications issued subsequent thereto.
To the extent of an ambiguity among the various documents, this signed Agreement
prevails. These documents collectively form the Contract, and all are as fully a part of the
Contract as ifattached to this Agreement or repeated herein.
This Agreement is effective upon the date written by the last party to sign it.
COUNTY OF TARRANT
OWNER
(SIGN,\ RE)
BY: B. Glen Whitle
TITLE:_ County Judge
Date: _ 3oyjt44AbQ (oI aQi&S
*Approved as to Form:
ca. z
Criminal District A orney's Office
W-QJ Ioer b t ao l8
BY: Roy E. Bean II
TITLE: President
Date: // - 6 .. 7,._2.,/.x'' A
Certification of Funds Available
for the Amount of $151, 1 99.00
dG?
S. Renee Tidwell
Tarrant County Auditor
'By law, the Criminal Otstrict AttontcysOfticc may only approvc contracts for its clients. We reviewed this document as to Conn from our client's
legal perspective. Other parties may not rely nn this approval. Instead those panics should seek contract review from independent counsel.
Page 2 of 2
017839-3
PROJECT RECORD DOCUMENTS
Page 3 of 3
I d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid
2 the prequalified work types until the expiration date stated in the letter.
3
4
5
6
7
END OF SECTION
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Proj. #101677
Revised April 2, 2014
COMMENTS/REMARKS
Additional Insured Form #CGL084 10/13 Applies to the General Liability Policy. Waiver of
Subrogation Form #CGL088 10/13 Applies to the General Liability Policy. Primary &
Non -Contributory Form #CGL025 11/08 Applies to the General Liability Policy.
Additional Insured and Waiver of Subrogation Form #CAU058 01/15 Applies to the Business
Auto Policy. Primary & Non -Contributory Form #CAU042 01/15 Applies to the Business Auto
Policy.
Waiver of Subrogation Form #WC420304B Applies to the Workers' Compensation Policy.
*ALWAYS REFER TO THE ATTACHED POLICY FORMS FOR SPECIFIC WORDING OF SUCH COVERAGE, LIMITS,
CONDITIONS & EXCLUSIONS.
OFREMARK COPYRIGHT 2000, AMS SERVICES INC.
00 45 12
DAP PREQUALIFICATION STATEMENT
Page I of I
SECTION 00 45 12
DAP - PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type" box provide the complete major work type and actual description as provided by the Water
Department for water and sewer and TPW for navin>?.
Major Work Type
Contractor/Subcontractor Company Name
Prequalification
Expiration Date
Concrete Pavement, Sidewalks,
Curb & Gutter
Street Lights, Electrical, etc.
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
Name
Address
City, State Zip Code
TITLE:
DATE:
END OF SECTION
(Signature)
CITY OF FORT \VORTH
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT — DEVELOPER A\YARDED PROJECTS Project Manual
Proj. # 101677
Form Version September 1, 2015
COMMENTS/REMARKS
Additional Insured Form #CGL084 10/13 Applies to the General Liability Policy. Waiver of
Subrogation Form #CGL088 10/13 Applies to the General Liability Policy. Primary &
Non -Contributory Form #CGL025 11/08 Applies to the General Liability Policy.
Additional Insured and Waiver of Subrogation Form #CAU058 01/15 Applies to the Business
Auto Policy. Primary & Non -Contributory Form #CAU042 01/15 Applies to the Business Auto
Policy.
Waiver of Subrogation Form #WC420304B Applies to the Workers' Compensation Policy.
*ALWAYS REFER TO THE ATTACHED POLICY FORMS FOR SPECIFIC WORDING OF SUCH COVERAGE, LIMITS,
CONDITIONS & EXCLUSIONS.
I OFREMARK COPYRIGHT 2000, AMS SERVICES INC. I
Bond #4421669
006113-I
PERFORMANCE BOND
Page I or3
1 SECTION 00 6113
2 PERFORMANCE BOND
4 THE STATE OF TEXAS
6 COUNTY OF TARRANT §
7 KNOW ALL MEN BY THESE PRESENTS: That we, Reliable Paving, Inc., known
8 as "Principal" herein and SureTec Insurance Company, a corporation organized and existing
9 under the laws of the State of Texas and fully authorized to transact business in the State of, As
10 Surety, are firmly bound unto the City of Fort Worth, a municipal corporation organized and
11 existing under the laws of Texas, hereinafter called "City" and the County of Tarrant herein
12 called the Developer, in the penal sum of, One Hundred Fifteen Thousand Six Hundred Sixty and
13 No/100s Dollars ($ 115,660.00), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind
15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
16 firmly by these presents.
17 THE CONDITION OF THIS OBLIGATION is such that whereas, the City and
18 Developer entered into a community facilities agreement, which agreement is hereby referred to
19 and made a part hereof as fully and to the same extent as if copied verbatim herein, and
20 Developer entered into a certain contract with Principal, dated the O7 day of
21 eJar1 , 20j a copy of which is hereto attached and made part hereof, both of
22 such agreemen and contract being for the construction of Sidewalks and Street Lights, Tarrant
23 County Parking Lot, Block 15, Original Town of Fort Worth, City Project No. 101677, such
24 project and construction in the City of Fort Worth being hereinafter referred to as the "work", and
25 such agreement and contract and the specifications therein mentioned adopted by the City are
26 expressly made a part hereof, as though written herein in full.
27 NOW, THEREFORE, if the Principal shall well, truly and faithfully perform the work
28 in accordance with the plans, specifications and contract documents during the original term
29 thereof, and any extensions thereof which may be granted by the City or Developer with or
30 without notice to the Surety, and if he shall satisfy all claims and demands incurred under such
31 contract, including the payment of all amounts owed by the Principal to persons who furnished
32 labor, materials, or services on the Project, regardless of whether mechanics' or material men's
33 liens could be filed to secure same, and if the Principal shall fully indemnify and save harmless
34 the City for all costs and damages which it may suffer by reason of failure to do so, and shall
35 reimburse and repay the City all outlay and expense which the City may incur in making good
36 and default, then this obligation shall be void; otherwise to remain in full force and effect.
CITY OF FORT WORTH Sidewalks R. Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS , Project No. 101677
Revised July 1, 2011
Bond #4421669
0061 13-2
PERFORMANCE BOND
Page 2 of 3
1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, State of Texas.
3 AND PROVIDED FURTHER, that the said Surety, for value received, hereby
4 stipulates and agrees that no change, extension of time, alterations or additions to the terms of the
5 agreement or the contract or to the work to be performed thereunder or the specifications
6 accompanying the same shall in any way affect its obligation on this bond, and it does hereby
7 waive notice of any change, extension of time, alteration or addition to the terms of the agreement
8 or the contract or to the work or to the specifications.
9 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
10 this instrument by duly authorized agents and officers on this the O day of
ii Feb►2f/A>'i., 204.
12 PRINCIPAL:
13
14 Reliable Paving, Inc.
15
16
17
18 BY:
19
20 Signature
21 ATTEST:
22
23
24
25 (Principal) Secretary
26
27
28
tJ/TAJyScTb �2.1•J�IPA+-
29
30
31
32
33
Ll a-Atls3 (`j - T
Name and Title
Address:
1903 North Peyco
Arlington, TX 76001
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS , Project No. 101677
Revised July 1,201 1
Bond #4421669
006113-3
PERFORMANCE BOND
Page 3 of 3
1 Witness as to Principal
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22 7� z
23 Witness as to Surety
24
25
26
SURETY:
SureTec Insurance Company
BY:,„.}�,
Signature
Sophinie Hunter, Attorney -In -Fact
Name and Title
Address:
9737 Great Hills Trail, Suite 320
Austin, TX 78759
Telephone
214-989-0000
Number:
27 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
28 from the by-laws showing that this person has authority to sign such obligation. If
29 Surety's physical address is different from its mailing address, both must be provided.
30 The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS , Project No. 101677
Revised July 1, 2011
POA #: 4221097
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Don E. Cornell, Ricardo J. Reyna, V. DeLene Marshall, Sophinie Hunter, Robbi Morales,
Kelly A. Westbrook, Tina McEwan
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20'-"" of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 13th day of April A.D. 2018 .
SURETEC INS PANY
1�r5�AANC C�
By:
John Kno ., CE
State of Texas ss: 7u;`ti ,t Y
County of Harris \ •••
On this 13th day of April , A.D. 2018 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
•``;Y�'''. JACQUELYN GREENLEAF
�: ,_fdoruy Public, State of Texas
Comm. Expires 05-18-2021
Notary ID 126903029
JacqVelyn Greenleaf, Notary Public
My commission expires May 18, 2021
1, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in frill force and effect.
Given under my hand and the seal of said Company at Houston, Texas this day of A.D.
A. Bren Beaty, A istant Se tart'
Any Instrument Issued in excess of the penalty stated above Is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:30 am and 5:00 pm CST.
Bond #4421669
00 61 14 - I
PAYMENT BOND
Page I of4
I SECTION 00 61 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 KNOW ALL MEN BY THESE PRESENTS: That we, Reliable Paving, inc.
8 known as "Principal" herein and SureTec Insurance Company , a corporation organized and
9 existing under the laws of the State of Texas and fully authorized to transact business in the State
10 of, As Surety, are firmly bound unto the City of Fort Worth, a municipal corporation organized
II and existing under the laws of Texas, hereinafter called "City" and the County of Tarrant herein
12 called the Developer, in the penal sum of, , One Hundred Fifteen Thousand Six Hundred Sixty and
13 No/100s Dollars ($1 15,660.00), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves,
15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
16 presents:
17 THE CONDITION OF THIS OBLIGATION is such that Whereas, the Developer
18 entered into a Community Facilities Agreement with the City, Which Agreement is hereby
19 referred to and made a part hereof as fully and to the same extent as if copied verbatim herein,
20 and Developer /�entered into a certain contract with Principal, dated the o6 day of
21 _ �U tjjg , 20J, a copy of which is hereto attached and made part hereof, both of
22 such agreement 6nd contract being for the construction of Sidewalks and Street Lights, Tarrant
23 County Parking Lot, Block 15, Original Town of Fort Worth, City Project No. 101677, such
24 project and construction in the City of Fort Worth being hereinafter referred to as the "work", and
25 such agreement and contract and the specifications therein mentioned adopted by the City are
26 expressly made a part hereof, as though written herein in full.
27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
3 i force and effect.
32 THIS BOND iS MADE AND ENTERED into solely for the protection of all claimants
33 supplying labor and material in the prosecution of the work provided for in said contracts, as
34 claimants are defined in Chapter 2253, and all such claimants shall have a direct right of action
35 under the bond as provided in Chapter 2253 of the Texas Government Code.
36
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July I, 2011
Bond #4421669
0061 14-2
PAYMENT BOND
Page 2 of 4
1 PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie
2 in Tarrant County, State of Texas, and that the said Surety, for value received, hereby stipulates
3 and agrees that no change, extension of time, alteration or addition to the terms of the contracts or
4 to the work to be performed there under tor the specifications accompanying the same shall in any
5 way affect its obligation on this bond, and it does hereby waive notice of such change, extension
6 of time, alteration or addition to the terms of the contracts or to the work or to the specifications.
7 PROVIDED FURTHER, that no final settlement between the Developer or the City and
8 the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
Bond #4421669
006114-3
PAYMENT BOND
Page 3 of 4
1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2 this instrument by duly authorized agents and officers on this the O_ day of
3 20.1__.
4
PRINCIPAL:
Reliable Paving, Inc.
ATTEST: BY:
Signature
N. ► 'o- - P ,ASH
(Principal) Secretary
Witness as to Principal
ATTEST:
(Surety) Secretary
Name and Title
Address: 1903 North Peyco
Arlington, TX 76001
SURETY:
SureTec Insurance Company
BY:
Signature
Sophinie Hunter, Attorney -In -Fact
Name and Title
CITY OF FORT WORM I Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUC1ION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July L2011 1
Bond #4421669
006114-4
PAYMENT BOND
Page 4 of 4
Address: 9737 Great Hills Trail, Suite 320
Austin, TX 78759
Witness as to Surety
Telephone Number: 214-989-0000
2 Note: If signed by an officer of the Surety, there must be on file a certified extract from the
3 bylaws showing that this person has authority to sign such obligation. If Surety's physical
4 address is different from its mailing address, both must be provided.
5
6 The date of the bond shall not be prior to the date the Contract is awarded.
7 END OF SECTION
8
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a
complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252-
3439. You may write the Texas Department of Insurance at
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-490-1007
Web: httu://www.tdi.state.tx.us
Email: ConsumerProtection r(�r tdi.texas.gov
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the
Surety first, If the dispute is not resolved, you may contact the Texas Department of Insurance.
Texas Rider 06042014
Bond #4421669
0061 19- 1
MAINTENANCE BOND
Page 1 of 4
1
2
3
4
5
6
7
THE STATE OF TEXAS §
COUNTY OF TARRANT §
That we Reliable Paving, Inc.
SECTION 00 61 19
MAINTENANCE BOND
§ KNOW ALL BY THESE PRESENTS:
known as
8 "Principal" herein and SureTec Insurance Company , a corporate surety
9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a
11 municipal corporation created pursuant to the laws of the State of Texas, known as "City"
12 herein, in the sum of One Hundred Fifteen Thousand Six Hundred Sixty and 00/100 Dollars
13 ($ 115,660.00 ), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its
15 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns,
16 jointly and severally, firmly by these presents.
17
18 WHEREAS, the Principal has entered into a certain written contract with the City awarded
19 the day of t' 1'Li 1q , 209, which Contract is hereby
20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
21 materials, equipment labor and other accessories as defined by law, in the prosecution of the
22 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
23 the "Work") as provided for in said contract and designated as Sidewalks and Street Lights,
24 Tarrant County Parking Lot, Block 15, Original Town of Fort Worth, City Project No. 101677
25 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
26 accordance with the plans, specifications and Contract Documents that the Work is and will
27 remain free from defects in materials or workmanship for and during the period of two (2) years
28 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
006119.2
MAINTENANCE BOND
Page 2 of 4
1
2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon
3 receiving notice from the City of the need therefor at any time within the Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy
6 any defective Work, for which timely notice was provided by City, to a completion satisfactory
7 to the City, then this obligation shall become null and void; otherwise to remain in full force and
8 effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the City may cause any and all such defective Work to
12 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal
13 and the Surety under this Maintenance bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive
20 recoveries may be had hereon for successive breaches.
21
22
23
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
006119-3
MAINTENANCE BOND
Page 3 of 4
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the day of F -e iSril q /"-/
3 __________,2011.
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ATTEST:
(Principal) Secretary
Witness as to Principal
PRINCIPAL:
Reliable Paving, Inc.
BY:
Signature
Name and Title
Address:
1903 North Peyco
Arlington, TX 76001
SURETY:
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
006119-4
MAINTENANCE BOND
Page 4 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ATTEST:
(Surety) Secretary
SureTec Insurance Company
Signature
Sophinie Hunter, Attorney -In -Fact
Name and Title
Address:
9737 Great Hills Trail, Suite 320
Austin, TX 78759
Witness as to Surety Telephone Number:
214-989-0000
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
POA N: 4221097
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Don E. Cornell, Ricardo J. Reyna, V. DeLene Marshall, Sophinie Hunter, Robbi Morales,
Kelly A. Westbrook, Tina McEwan
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys) -in -Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20''' of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 13th day of April -, A.D. 2018 .
P.. SURETEC INS PANY
1a5VRANpFc
\ John Kno
State of Texas ss: Est r
1 fY
County of Harris .• ..
On this 13th day of April , A.D. 2018 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order,
JACOUELYN GREENLEAjI
,c Notary Public, State of Texas
)Y= Comm. Expires 05-18-2021
Notary ID 17.6903029
Jacq elyn Greenleaf, Notary Public
My commission expires May 18, 2021
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this day of A.D.
A. Bren Beaty, A istant Se tary
Any Instrument Issued in excess of the penalty stated above Is totally void and without any validity.
For verification of the authority of this power you may call (713) 812.0800 any business day between 8:30 am and 5:00 pm CST.
006113-1
PERFORMANCE BOND
Page I of 3
1 SECTION 00 6113
2 PERFORMANCE BOND Bond #4422961
4 THE STATE OF TEXAS
6 COUNTY OF TARRANT
7 KNOW ALL MEN BY THESE PRESENTS: That we, Bean Electrical, Inc., known as
8 "Principal" herein and SureTec Insurance Company, a corporation organized and existing
9 under the laws of the State of Texas and fully authorized to transact business in the State of, As
10 Surety, are firmly bound unto the City of Fort Worth, a municipal corporation organized and
l I existing under the laws of Texas, hereinafter called "City" and the County of Tarrant herein
12 cal led the Developer, in the penal sum of, One Hundred Fifty One Thousand One Hundred Ninety Nine and
13 No/loos Dollars ($151,199.00), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind
15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
16 firmly by these presents.
17 THE CONDITION OF THIS OBLIGATION is such that whereas, the City and
18 Developer entered into a community facilities agreement, which agreement is hereby referred to
19 and made a part hereof as fully and to the same extent as if copied verbatim herein, and
20 Developer entered into a certain contract with Principal, dated the day of
21 _ , 20_, a copy of which is hereto attached and made part hereof, both of
22 such agreement and contract being for the construction of Sidewalks and Street Lights, Tarrant
23 County Parking Lot, Block 15, Original Town of Fort Worth, City Project No. 101677, such
24 project and construction in the City of Fort Worth being hereinafter referred to as the "work", and
25 such agreement and contract and the specifications therein mentioned adopted by the City are
26 expressly made a part hereof, as though written herein in full.
27 NOW, THEREFORE, if the Principal shall well, truly and faithfully perform the work
28 in accordance with the plans, specifications and contract documents during the original term
29 thereof, and any extensions thereof which may be granted by the City or Developer with or
30 without notice to the Surety, and if he shall satisfy all claims and demands incurred under such
31 contract, including the payment of all amounts owed by the Principal to persons who furnished
32 labor, materials, or services on the Project, regardless of whether mechanics' or material men's
33 liens could be filed to secure same, and if the Principal shall fully indemnify and save harmless
34 the City for all costs and damages which it may suffer by reason of failure to do so, and shall
35 reimburse and repay the City all outlay and expense which the City may incur in making good
36 and default, then this obligation shall be void; otherwise to remain in full force and effect.
37 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
38 Tarrant County, State of Texas.
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS , Project No. 101677
Revised July 1, 2011
0061 13-2
PERFORMANCE BOND
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
AND PROVIDED FURTHER, that the said Surety, for value received, hereby
stipulates and agrees that no change, extension of time, alterations or additions to the terms of the
agreement or the contract or to the work to be performed thereunder or the specifications
accompanying the same shall in any way affect its obligation on this bond, and it does hereby
waive notice of any change, extension of time, alteration or addition to the terms of the agreement
or the contract or to the work or to the specifications.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
this instrument by duly authorized agents and officers on this the day of
__________,20.
PRINCIPAL:
ATTEST:
(Principal) Secretary
Witness as to Principal
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Signature
ame and Title
Address:
821 E Enon
Fort Worth, TX 76140
Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
, Project No. 101677
0061 13-3
PERFORMANCE BOND
Page 3 of 3
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20 22 Witness as to Surety
23 Muni Rabah. Bond Account Manager
24
25
26
SURETY:
SureTec Insurance Company
BY:
Sign Lure
Mistie Beck, Attorney -in -Fact
Name and Title
Address:
2255 Ridge Road, Ste 333
Telephone Number:
972-772-7220
27 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
28 from the by-laws showing that this person has authority to sign such obligation. If
29 Surety's physical address is different from its mailing address, both must be provided.
30 The date of the bond shall not be prior to the date the Contract is awarded.
31
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS , Project No. 101677
Revised July 1, 201 1
006114-1
PAYMENT BOND
Page 1 of 4
1 SECTION 00 61 14
2 PAYMENT BOND Bond #4422961
3
4 THE STATE OF TEXAS §
5
6 COUNTY OF TARRANT §
7 KNOW ALL MEN BY THESE PRESENTS: That we, Bean Electrical, Inc., known as
8 "Principal" herein and SureTec Insurance Company, a corporation organized and existing
9 under the laws of the State of Texas and fully authorized to transact business in the State of, As
10 Surety, are firmly bound unto the City of Fort Worth, a municipal corporation organized and
11 existing under the laws of Texas, hereinafter called "City" and the County of Tarrant herein
12 called the Developer, in the penal sum of, One Hundred Fifty One Thousand One Hundred Ninety
13 and No/100s Dollars ($_151,199.00), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves,
15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
16 presents:
17 THE CONDITION OF THIS OBLIGATION is such that Whereas, the Developer entered
18 into a Community Facilities Agreement with the City, Which Agreement is hereby referred to and
19 made a part hereof as fully and to the same extent as if copied verbatim herein, and Developer
20 entered into a certain contract with Principal, dated the day of __________________,20_,
21 a copy of which is hereto attached and made part hereof, both of such agreement and contract
22 being for the construction of Sidewalks and Street Lights, Tarrant County Parking Lot,
23 Block 15, Original Town of Fort Worth, City Project No. 101677, such project and
24 construction in the City of Fort Worth being hereinafter referred to as the "work", and such
25 agreement and contract and the specifications therein mentioned adopted by the City are
26 expressly made a part hereof, as though written herein in full.
27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
31 force and effect.
32 THIS BOND IS MADE AND ENTERED into solely for the protection of all claimants
33 supplying labor and material in the prosecution of the work provided for in said contracts, as
34 claimants are defined in Chapter 2253, and all such claimants shall have a direct right of action
35 under the bond as provided in Chapter 2253 of the Texas Government Code.
36
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No, 101677
Revised July 1, 2011
0061 14 - 2
PAYMENT BOND
Page 2 of4
i PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie
2 in Tarrant County, State of Texas, and that the said Surety, for value received, hereby stipulates
3 and agrees that no change, extension of time, alteration or addition to the terms of the contracts or
4 to the work to be performed there under tor the specifications accompanying the same shall in any
5 way affect its obligation on this bond, and it does hereby waive notice of such change, extension
6 of time, alteration or addition to the terms of the contracts or to the work or to the specifications.
7 PROVIDED FURTHER, that no final settlement between the Developer or the City and
8 the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 201 1
00 61 14 - 3
PAYMENT BOND
Page 3 of 4
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2
this instrument by duly authorized agents and officers on this the day of
3 ________________,20____
4
ATTEST:
(Principal) Secretary
_l.
Witnes s to Principal
ATTEST:
(Surety) Secretary
N/A
PRINCIPAL:
Name and Title
Address: 821 E Enon
Fort Worth, TX 76140
SURETY:
SureTec Insurance Company
Signature
Mistie Beck, Attorney -in -Fact
Name and Title
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
Witness as to Surety
Muni Rabah, Bond Account Manager
006114-4
PAYMENT BOND
Page 4 0f4
Address: 2255 Ridge Road, Ste 333
Rockwall, TX 75087
Telephone Number: 972-772-7220
2 Note: If signed by an officer of the Surety, there must be on file a certified extract from the
3 bylaws showing that this person has authority to sign such obligation. If Surety's physical
4 address is different from its mailing address, both must be provided.
G
6 The date of the bond shall not be prior to the date the Contract is awarded.
7 END OF SECTION
8
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make
a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints
at 1-800-252- 3439. You may write the Texas Department of Insurance at:
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-490-1007
Web: http://www.tdi.state.tx.us
Email: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should
contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Texas Rider 06042015
0061 19. 1
MAINTENANCE BOND
Page 1 of 4
1
2
3
4
5
6
7
8
SECTION 00 61 19
MAINTENANCE BOND Bond #4422961
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we Bean Electrical, Inc. , known as
"Principal" herein and SureTec Insurance Company , a corporate surety
9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a
11 municipal corporation created pursuant to the laws of the State of Texas, known as "City"
One Hundred Fifty One Thousand One Hundred Ninety Nine
12 herein, in the sum of and No/ loos Dollars
13 ($ 151,199.00 ), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its
15 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns,
16 jointly and severally, firmly by these presents.
17
18 WHEREAS, the Principal has entered into a certain written contract with the City awarded
19 the day of , 20__, which Contract is hereby
20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
21 materials, equipment labor and other accessories as defined by law, in the prosecution of the
22 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
23 the "Work") as provided for in said contract and designated as Sidewalks and Street Lights,
24 Tarrant County Parking Lot, Block 15, Original Town of Fort Worth, City Project No. 101677
25 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
26 accordance with the plans, specifications and Contract Documents that the Work is and will
27 remain free from defects in materials or workmanship for and during the period of two (2) years
28 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
0061 19- 2
MAINTENANCE BOND
Page 2 of 4
1
2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon
3 receiving notice from the City of the need therefor at any time within the Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy
6 any defective Work, for which timely notice was provided by City, to a completion satisfactory
7 to the City, then this obligation shall become null and void; otherwise to remain in full force and
8 effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the City may cause any and all such defective Work to
12 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal
13 and the Surety under this Maintenance bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive
20 recoveries may be had hereon for successive breaches.
21
22
23
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
006119-3
MAINTENANCE BOND
Page 3 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the day of
__________,20
ATTEST: �J
r
(Principal) Secretary
Witness as to Principal
PRINCIPAL:
Bean Electrical, Inc.
Signature
Name and Title
Address:
821 E Enon
Fort Worth, TX 76140
SURETY:
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
006119-4
MAINTENANCE BOND
Page 4of4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ATTEST:
n/a
n/a
(Surety) Secretary
SureTec Insurance Company
BY: L
Sin e
Jarrett Willson, Attorney -in -Fact
Name and Title
Address:
2255 Ridge Road, Ste 333
Rockwall, TX 75087
Witness as to Surety Amy Butler, Bond Account Manager Telephone Number:
972-772-7220
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Sidewalks & Street Lights, Tarrant County Parking Lot, Block 15
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS, Project No. 101677
Revised July 1, 2011
POA #: 4221049
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Tony Fierro, Jay Jordan, Johnny Moss, Steven W. Searcey, Robert J. Shuya, Mistie Beck,
Jeremy Barnett, Robert G. Kanuth, Jade Porter, Jennifer Cisneros, Jarrett Willson, Jack Nottingham
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20" of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 27th day of August A.D. 2018
SURETEC CE PANY
By:
w ui i n John K Jr., C ,
State of Texas ss: �� °';' f'
County of Harris"
On this 27th day of August , A.D. 2018 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
XCIJIA CHAVEl
' 1Jc+tary Public, Slate of Texas
-^''�= Comm. Expiins 09-10-2020
y��.. . tom:
N.rtaty ID 129117069
Xet avez, Notary Public ()
Jyc commission expires September 1 0, 2020
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this day of A.D.
Br tenty, Assi taut Secret*
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:30 am and 6:00 pm CST.
STANDARD CITY CONDITIONS OF
THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Page
Article I — Definitions and Terminology I
1 Defined Terms.................................................................................................................................. 1
.2 Terminology..................................................................................................................................... 5
Article 2 — Preliminary Matters 6
2.1 Before Starting Construction........................................................................................................... 6
2.2 Preconstruction Conference............................................................................................................ 6
2.3 Public Meeting................................................................................................................................. 6
Article 3 — Contract Documents and Amending 6
3.1 Reference Standards........................................................................................................................ 6
3.2 Amending and Supplementing Contract Documents.................................................................... 6
Article 4 — Bonds and Insurance 7
4.1
Licensed Sureties and Insurers........................................................................................................
7
4.2
Performance, Payment, and Maintenance Bonds...........................................................................
7
4.3
Certificates of Insurance..................................................................................................................
7
4.4
Contractor's Insurance....................................................................................................................
9
4.5
Acceptance of Bonds and Insurance; Option to Replace.............................................................
12
Article 5 — Contractor's Responsibilities 12
5.1
Supervision and Superintendent...................................................................................................12
5.2
Labor; Working Hours...................................................................................................................
13
5.3
Services, Materials, and Equipment.............................................................................................
13
5.4
Project Schedule............................................................................................................................14
5.5
Substitutes and "Or-Equals".........................................................................................................14
5.6
Pre -Qualification of Bidders (Prime Contractors and Subcontractors) .......................................16
16
5.7
Concerning Subcontractors, Suppliers, and Others.....................................................................
16
5.8
Wage Rates.....................................................................................................................................18
5.9
Patent Fees and Royalties..............................................................................................................
19
5.10
Laws and Regulations...................................................................................................................
19
5.11
Use of Site and Other Areas..........................................................................................................
19
5.12
Record Documents........................................................................................................................
20
5.13
Safety and Protection.....................................................................................................................
21
5.14
Safety Representative....................................................................................................................
21
5.15
Hazard Communication Programs...............................................................................................
22
5.16
Submittals......................................................................................................................................22
5.17
Contractor's General Warranty and Guarantee............................................................................
23
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
5.18 Indemnification.............................................................................................................................. 24
5.19 Delegation of Professional Design Services.................................................................................24
5.20 Right to Audit:...............................................................................................................................25
5.21 Nondiscrimination......................................................................................................................... 25
Article 6 — Other Work at the Site......................................................................................................................26
6.01 Related Work at Site......................................................................................................................26
Article 7 — City's Responsibilities.....................................................................................................................26
7.1 Inspections, Tests, and Approvals.................................................................................................26
7.2 Limitations on City's Responsibilities..........................................................................................26
7.3 Compliance with Safety Program.................................................................................................27
Article 8 —
City's Observation Status During Construction..............................................................................27
8.1
City's Project Representative........................................................................................................27
8.2
Authorized Variations in Work.....................................................................................................27
8.3
Rejecting Defective Work...........................................................................................................27
8.4
Determinations for Work Performed............................................................................................
28
Article9 —
Changes in the Work........................................................................................................................28
9.1
Authorized Changes in the Work..................................................................................................28
9.2
Notification to Surety....................................................................................................................28
Article 10
— Change of Contract Price; Change of Contract Time...................................................................28
10.1
Change of Contract Price..............................................................................................................28
10.2
Change of Contract Time..............................................................................................................
28
10.3
Delays.............................................................................................................................................
28
Article 11
— Tests and Inspections; Correction, Removal or Acceptance of Defective Work........................29
11.1
Notice of Defects...........................................................................................................................
29
11.2
Access to Work..............................................................................................................................29
11.3
Tests and Inspections.....................................................................................................................29
11.4
Uncovering Work........................................................................................................................
30
11.5
City May Stop the Work...............................................................................................................30
11.6
Correction or Removal of Defective Work.................................................................................30
11.7
Correction Period...........................................................................................................................
30
11.8
City May Correct Defective Work................................................................................................31
Article12
— Completion.....................................................................................................................................
32
12.1
Contractor's Warranty of Title......................................................................................................32
12.2
Partial Utilization...........................................................................................................................
32
12.3
Final Inspection..............................................................................................................................
32
12.4
Final Acceptance............................................................................................................................
33
Article13
— Suspension of Work.......................................................................................................................33
13.01
City May Suspend Work...............................................................................................................33
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
Article14— Miscellaneous................................................................................................................................. 34
14.1 Giving Notice................................................................................................................................. 34
14.2 Computation of Times................................................................................................................... 34
14.3 Cumulative Remedies.................................................................................................................... 34
14.4 Survival of Obligations..................................................................................................................35
14.5 Headings......................................................................................................................................... 35
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10- I
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page I of35
ARTICLE 1- DEFINITIONS AND TERMINOLOGY
1.1 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsa ww — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) —A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A
CFA may include private facilities within the right-of-way dedicated as private right -of- way
or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract Documents
between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes
prior negotiations, representations, or agreements, whether written or oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. 11101677
Revised December 20, 2012
0073 I0-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
c. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
m. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
p. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor The individual or entity ii'rth 1-Vhom Developer has entered into the Agreement.
11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer i•t'hich
graphically shows the scope, extent, and character of the Work to be per formed by
Contractor. Submittals are not Drawings as so defined
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled peiformance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and wworkmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto. Specifications
may be specifically made a part of the Contract Documents by attachment or, if not attached,
may be incorporated by reference cis indicated in the Table of Contents (Division 00 00
00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor —An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the peiformance of a part of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materiahncan, or vendor having
a direct contract With Contractor or with any Subcontractor to furnish materials or
equipment to be incoiporated in the Work by contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes,
vaults, tanks, tunnels, or other such facilities or attachments, and any encasements
containing such facilities, including but not limited to, those that convey electricity, gases,
steam, liquid petroleum products, telephone or other communications, cable television,
water, la'crstewcrter, storm Wcrter, other liquids or chemicals, or trcfjlc or other control
systems.
40. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5: 00 p.m., Saturday,
Sunday or legal holiday, cis approved in advance by the City.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field Order,
and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p. m.
1.2 Terminology
A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
I. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2- PRELIMINARY MATTERS
2.1 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.2 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.3 Public Meeting (Not Required)
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3- CONTRACT DOCUMENTS AND AMENDING
3.1 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.2 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4- BONDS AND INSURANCE
4.1 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.2 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.3 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of insurance
requested by City or any other additional insured) which Contractor is required to purchase and
maintain.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such insurance
coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTI-1 Tarrant County Block I5 Parking Lol
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.4 Contractor's Insurance
A. Workers Compensation and Employers' Liability Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide protection
from claims set forth below which may arise out of or result from Contractor's performance
of the Work and Contractor's other obligations under the Contract Documents, whether it is
to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly
employed by any of them to perform any of the Work, or by anyone for whose acts any of them
may be liable:
claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10- 10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page I0of35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other
insurance or self-insurance programs afforded to the City. The Commercial General Liability
policy, shall have no exclusions by endorsements that would alter of nullify premises/operations,
products/completed operations, contractual, personal injury, or advertising injury, which are
normally contained with the policy, unless the City approves such exclusions in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making
the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for
whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an
amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of35
1) $1,000,000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.5 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5- CONTRACTOR'S RESPONSIBILITIES
5.1 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTI-i Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
00 73 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.2 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.3 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction equipment
and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities,
temporary facilities, and all other facilities and incidentals necessary for the performance,
Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. N 101677
Revised December 20, 2012
00 73 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.4 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.5 Substitutes and "Or -Equals"
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
"Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A. 1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
00 73 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 01 25 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnf& and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.6 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types requiring
pre -qualification
5.7 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enter prise Compliance:
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
00 73 10- 17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
❑ Required for this Contract. XXX
❑ Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.8 Wage Rates
❑ X Required for this Contract.
❑ Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City's determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants
as the difference between wages paid and wages due under the prevailing wage rates, such
amounts being subtracted from successive progress payments pending a final determination of the
violation.
D. Arbitration Required if Violation Not Resolved An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 11th day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
00 73 10- 19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.9 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor
shall keep the Site and other areas free from accumulations of waste materials, rubbish, and
other debris. Removal and disposal of such waste materials, rubbish, and other debris shall
conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page21 of35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals
acceptable to City. City's review and acceptance will be only to determine if the items covered by the
submittals will, after installation or incorporation in the Work, conform to the information given in
the Contract Documents and be compatible with the design concept of the completed Project as
a functioning whole as indicated by the Contract Documents.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.B. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE_DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED. IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities f'or construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-26
Standard City Conditions Of The Construction Contract For DeveloperAwarded Projects
Page 26 of 35
ARTICLE 6- OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City contractors,
proper and safe access to the Site, provide a reasonable opportunity for the introduction and
storage of materials and equipment and the execution of such other work, and properly coordinate
the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may
be required to properly connect or otherwise make its several parts come together and properly
integrate with such other work. Contractor shall not endanger any work of others by cutting,
excavating, or otherwise altering such work; provided, however, that Contractor may cut or
alter otherswork with the written consent of City and the others whose work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work performed
by others under this Article 7, Contractor shall inspect such other work and promptly report to
City in writing any delays, defects, or deficiencies in such other work that render it unavailable
or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so
report will constitute an acceptance of such other work as fit and proper for integration
with Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7- CITY'S RESPONSIBILITIES
7.1 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.2 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or f'or any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.3 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8- CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.1 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.2 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.3 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. 4101677
Revised December 20, 2012
00 73 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to
Developer/Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.4 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City,
it must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.5 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
1 of any of them.
11.6 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an
acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected
by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all
claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to such correction or removal (including but not limited to all
costs of repair or replacement of work of others). Failure to require the removal of any defective Work
shall not constitute acceptance of such Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor
shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on
said Work.
11.7 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be
prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.8 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 - COMPLETION
12.1 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.2 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of
the Work which has specifically been identified in the Contract Documents, or which City, determines
constitutes a separately functioning and usable part of the Work that can be used by City for its
intended purpose without significant interference with Contractor's performance of the remainder of the
Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of
the Work which City determines to be ready for its intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work
ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor
shall make an inspection of that part of the Work to determine its status of completion. If City
does not consider that part of the Work to be substantially complete, City will notify Contractor in
writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.3 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract
Documents:
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
00 73 10-33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.4 Final Acceptmnce
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 - SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.4 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 - SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0073 10-34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a mariner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 - MISCELLANEOUS
14.1 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.2 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.3 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
I
I or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
0073 10-34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 - MISCELLANEOUS
14.1 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.2 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.3 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Prot. # 101677
Revised December 20, 2012
006125-1
DAP PROJECT RECORD DOCUMENTS
Page I of 3
1 SECTION 01 11 00
2 SUMMARY OF WORK
3 GENERAL
4 SUMMARY
5 A. Section Includes:
6 1. Summary of Work to be performed in accordance with the Contract Documents
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
11 2. Division I - General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
I. Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
I. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
3. Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0061 25 -2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 3
1 b. Excavated and waste materials shall be stored in such a way as not to interfere
2 with the use of spaces that may be designated to be left free and unobstructed
3 and so as not to inconvenience occupants of adjacent property.
4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such
5 manner as not to interfere with the operation of the railroad.
6 All Work shall be in accordance with railroad requirements set forth in Division
7 0 as well as the railroad permit.
8 D. Work within Easements
9 1. Do not enter upon private property for any purpose without having previously
10 obtained permission from the owner of such property.
11 2. Do not store equipment or material on private property unless and until the
12 specified approval of the property owner has been secured in writing by the
13 Contractor and a copy furnished to the City.
14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of
15 obstructions which must be removed to make possible proper prosecution of the
16 Work as a part of the project construction operations.
17
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery,
18
plants, lawns, fences, culverts, curbing, and all other types of structures or
19
improvements, to all water, sewer, and gas lines, to all conduits, overhead pole
20
lines, or appurtenances thereof, including the construction of temporary fences
21
and to all other public or private property adjacent to the Work.
22
5. Notify the proper representatives of the owners or occupants of the public or
23
private lands of interest in lands which might be affected by the Work.
24
a. Such notice shall be made at least 48 hours in advance of the beginning of
25
the Work.
26
b. Notices shall be applicable to both public and private utility companies and
27
any corporation, company, individual, or other, either as owners or
28
occupants, whose land or interest in land might be affected by the Work.
29
c. Be responsible for all damage or injury to property of any character
30
resulting from any act, omission, neglect, or misconduct in the manner or
31
method or execution of the Work, or at any time due to defective work,
32
material, or equipment.
33
6. Fence
34
a. Restore all fences encountered and removed during construction of the
35
Project to the original or a better than original condition.
36
b. Erect temporary fencing in place of the fencing removed whenever the
37
Work is not in progress and when the site is vacated overnight, and/or at all
38
times to provide site security.
39
c. The cost for all fence work within easements, including removal, temporary
40
closures and replacement, shall be subsidiary to the various items bid in the
41
project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. # 101677
Revised December 20, 2012
006125-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USEDI
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Proj. #101677
Revised December 20, 2012
0061 2519 - 1
DAP PROJECT RECORD DOCUMENTS
Page 1 of3
1
2
3 PART 1 -GENERAL
4 1.1 SUMMARY
SECTION 01 3119
PRECONSTRUCTION MEETING
5 A. Section Includes:
6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to
7 clarify construction contract administration procedures
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. No construction schedule required unless requested by the City.
10 C. Related Specification Sections include, but are not necessarily limited to:
11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1 — General Requirements
13 1.2 PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19 A. Coordination
20 1. Attend preconstruction meeting.
21 2. Representatives of Contractor, subcontractors and suppliers attending meetings
22 shall be qualified and authorized to act on behalf of the entity each represents.
23 3. Meeting administered by City may be tape recorded.
24 a. If recorded, tapes will be used to prepare minutes and retained by City for
25 future reference.
26 B. Preconstruction Meeting
27 1. A preconstruction meeting will be held within 14 days after the delivery of the
28 distribution package to the City.
29 The meeting will be scheduled and administered by the City.
30 2. The Project Representative will preside at the meeting, prepare the notes of the
31 meeting and distribute copies of same to all participants who so request by fully
32 completing the attendance form to be circulated at the beginning of the meeting.
33 3. Attendance shall include:
34 a. Developer and Consultant
35 b. Contractor's project manager
36 c. Contractor's superintendent
37 d. Any subcontractor or supplier representatives whom the Contractor may
38 desire to invite or the City may request
39
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
0061 2519-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
jj. Questions or Comments
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
0061 2519-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 3
1
1.5
SUBMITTALS [NOT USED]
2
1.6
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
3
1.7
CLOSEOUT SUBMITTALS [NOT USED]
4
1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5
1.9
QUALITY ASSURANCE [NOT USED]
6
1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7
1.11
FIELD [SITE] CONDITIONS [NOT USED]
8
1.12
WARRANTY [NOT USED]
9 PART 2- PRODUCTS [NOT USED]
10 PART 3- EXECUTION [NOT USED
END OF SECTION
12
Revision Log
DATE NAME SUMMARY OF CHANGE
13
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-1
DAP PROJECT RECORD DOCUMENTS
Page I of 8
1
2
3 PART 1 -GENERAL
4 1.1 SUMMARY
SECTION 01 33 00
DAP SUBMITTALS
5 A. Section Includes:
6 1. General methods and requirements of submissions applicable to the following Work -
7 related submittals:
8 a. Shop Drawings
9 b. Product Data (including Standard Product List submittals)
10 c. Samples
11 d. Mock Ups
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
16 2. Division I — General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various items bid. No
20 separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Coordination
24 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals
25 from the requirements of the Contract Documents.
26 2. Coordination of Submittal Times
27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing
28 the related Work or other applicable activities, or within the time specified in the
29 individual Work Sections, of the Specifications.
30 b. Contractor is responsible such that the installation will not be delayed by processing
31 times including, but not limited to:
32 a) Disapproval and resubmittal (if required)
33 b) Coordination with other submittals
34 c) Testing
35 d) Purchasing
36 e) Fabrication
37 0 Delivery
38 Similar sequenced activities
39 c. No extension of time will be authorized because of the Contractor's failure to
40 transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised August 30, 2013
006125-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 8
1 d. Make submittals promptly in accordance with approved schedule, and in such
2 sequence as to cause no delay in the Work or in the work of any other contractor.
3 B. Submittal Numbering
4 1. When submitting shop drawings or samples, utilize a 9 -character submittal cross -
5 reference identification numbering system in the following manner:
6 a. Use the first 6 digits of the applicable Specification Section Number.
7 b. For the next 2 digits number use numbers 01-99 to sequentially number each
8 initial separate item or drawing submitted under each specific Section number.
9 c. Last use a letter, A -Z, indicating the resubmission of the same drawing (i.e.
10 A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
11 submittal number would be as follows:
12
13 03 30 00-08-B
14
15 1) 03 30 00 is the Specification Section for Concrete
16 2) 08 is the eighth initial submittal under this Specification Section
17 3) B is the third submission (second resubmission) of that particular shop
18 drawing
19 C. Contractor Certification
20 1. Review shop drawings, product data and samples, including those by
21 subcontractors, prior to submission to determine and verify the following:
22 a. Field measurements
23 b. Field construction criteria
24 c. Catalog numbers and similar data
25 d. Conformance with the Contract Documents
26 2. Provide each shop drawing, sample and product data submitted by the Contractor
27 with a Certification Statement affixed including:
28 a. The Contractor's Company name
29 b. Signature of submittal reviewer
30 c. Certification Statement
31 1) "By this submittal, I hereby represent that I have determined and verified
32 field measurements, field construction criteria, materials, dimensions,
33 catalog numbers and similar data and I have checked and coordinated each
34 item with other applicable approved shop drawings."
35 D. Submittal Format
36 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches.
37 2. Bind shop drawings and product data sheets together.
38 3. Order
39 a. Cover Sheet
40 1) Description of Packet
41 2) Contractor Certification
42 b. List of items / Table of Contents
43 c. Product Data /Sltop Drawings/Samples /Calculations
44 E. Submittal Content
45 1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised August 30, 2013
006125-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 8
1
2.
The Project title and number
2
3.
Contractor identification
3
4.
The names of:
4
a. Contractor
5
b. Supplier
6
C. Manufacturer
7
5.
Identification of the product, with the Specification Section number, page and
8
paragraph(s)
9
6.
Field dimensions, clearly identified as such
10
7.
Relation to adjacent or critical features of the Work or materials
11
8.
Applicable standards, such as ASTM or Federal Specification numbers
12
9.
Identification by highlighting of deviations from Contract Documents
13
10.
Identification by highlighting of revisions on resubmittals
14
11.
An 8 -inch x 3 -inch blank space for Contractor and City stamps
15
F. Shop Drawings
16
1. As
specified in individual Work Sections includes, but is not necessarily limited to:
17
a.
Custom -prepared data such as fabrication and erection/installation (working)
18
drawings
19
b.
Scheduled information
20
c.
Setting diagrams
21
d.
Actual shopwork manufacturing instructions
22
e.
Custom templates
23
f.
Special wiring diagrams
24
g.
Coordination drawings
25
h.
Individual system or equipment inspection and test reports including:
26
1) Performance curves and certifications
27
i.
As applicable to the Work
28 2. Details
29 a. Relation of the various parts to the main members and lilies of the structure
30 b. Where correct fabrication of the Work depends upon field measurements
31 Provide such measurements and note on the drawings prior to submitting for
32 approval.
33 G. Product Data
34 1. For submittals of product data for products included on the City's Standard Product
35 List, clearly identify each item selected for use on the Project.
36 2. For submittals of product data for products not included on the City's Standard
37 Product List, submittal data may include, but is not necessarily limited to:
38 a. Standard prepared data for manufactured products (sometimes referred to as
39 catalog data)
40 1) Such as the manufacturer's product specification and installation instructions
41 2) Availability of colors and patterns
42 3) Manufacturer's printed statements of compliances and applicability
43 4) Roughing -in diagrams and templates
44 5) Catalog cuts
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
6) Product photographs
7) Standard wiring diagrams
8) Printed performance curves and operational -range diagrams
9) Production or quality control inspection and test reports and certifications
10) Mill reports
11) Product operating and maintenance instructions and recommended spare -parts
listing and printed product warranties
12) As applicable to the Work
H. Samples
As specified in individual Sections, include, but are not necessarily limited to:
a. Physical examples of the Work such as:
1) Sections of manufactured or fabricated Work
2) Small cuts or containers of materials
3) Complete units of repetitively used products color/texture/pattern swatches and
range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to be used by the City for independent
inspection and testing, as applicable to the Work
I. Do not start Work requiring a shop drawing, sample or product data nor any material to be
fabricated or installed prior to the approval or qualified approval of such item.
I . Fabrication performed, materials purchased or on -site construction accomplished which
does not conform to approved shop drawings and data is at the Contractor's risk.
2. The City will not be liable for any expense or delay due to corrections or remedies
required to accomplish conformity.
3. Complete project Work, materials, fabrication, and installations in conformance with
approved shop drawings, applicable samples, and product data.
J. Submittal Distribution
1. Electronic Distribution
a. Confirm development of Project directory for electronic submittals to be uploaded
to City's Buzzsaw site, or another external FTP site approved by the City.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate City
representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than I hard copy of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
c. Product Data
1) Upload submittal to designated project directory and notify appropriate City
representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-5
DAP PROJECT RECORD DOCUMENTS
Page 5 of 8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
LI
a. Shop Drawings
I) Distributed to the City
2) Copies
a. 8 copies for mechanical submittals
b. 7 copies for all other submittals
c. If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
C. Samples
I) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
3. Distribute reproductions of approved shop drawings and copies of approved product
data and samples, where required, to the job site file and elsewhere as directed by
the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal Review
I. The review of shop drawings, data and samples will be for general conformance with
the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the City does
not relieve the Contractor from his/her responsibility with regard to the fulfillment of
the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the Work
with all other associated work and trades, for selecting fabrication processes, for
techniques of assembly and for performing Work in a safe manner.
4. If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requirements which City finds to be in the interest of the
City and to be so minor as not to involve a change in Contract Price or time for
performance, the City may return the reviewed drawings without noting an exception.
5. Submittals will be returned to the Contractor under I of the following codes:
a. Code I
1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or
comments on the submittal.
a. When returned under this code the Contractor may release the equipment
and/or material for manufacture.
b. Code 2
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-6
DAP PROJECT RECORD DOCUMENTS
Page 6 of 8
1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the
2 notations and comments IS NOT required by the Contractor.
3 a. The Contractor may release the equipment or material for manufacture;
4 however, all notations and comments must be incorporated into the final
5 product.
6 c. Code 3
7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned
8 when notations and comments are extensive enough to require a resubmittal of
9 the package.
10 a) The Contractor may release the equipment or material for manufacture;
11 however, all notations and comments must be incorporated into the final
12 product.
13 b) This resubmittal is to address all comments, omissions and non -conforming
14 items that were noted.
15 c) Resubmittal is to be received by the City within 15 Calendar Days of the
16 date of the City's transmittal requiring the resubmittal.
17 d. Code 4
18 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of
19 the Contract Documents.
20 a) The Contractor must resubmit the entire package revised to bring the
21 submittal into conformance.
22 b) It may be necessary to resubmit using a different manufacturer/vendor to
23 meet the Contract Documents.
24 6. Resubmittals
25 a. Handled in the same manner as first submittals
26 1) Corrections other than requested by the City
27 2) Marked with revision triangle or other similar method
28 a) At Contractor's risk if not marked
29 b. Submittals for each item will be reviewed no more than twice at the City's expense.
30 1) All subsequent reviews will be performed at times convenient to the City and at
31 the Contractor's expense, based on the City's or City Representative's then
32 prevailing rates.
33 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all
34 such fees invoiced by the City.
35 c. The need for more than I resubmission or any other delay in obtaining City's
36 review of submittals, will not entitle the Contractor to an extension of Contract
37 Time.
38
7. Partial Submittals
39
a. City reserves the right to not review submittals deemed partial, at the City's
40
discretion.
41
b. Submittals deemed by the City to be not complete will be returned to the
42
Contractor, and will be considered "Not Approved" until resubmitted.
43
c. The City may at its option provide a list or mark the submittal directing the
44
Contractor to the areas that are incomplete.
45
8. If the Contractor considers any correction indicated on the shop drawings to constitute a
46
change to the Contract Documents, then written notice must be provided thereof to the
47
Developer at least 7 Calendar Days prior to release for manufacture.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-7
DAP PROJECT RECORD DOCUMENTS
Page 7 of 8
1 9. When the shop drawings have been completed to the satisfaction of the City, the
2 Contractor may carry out the construction in accordance therewith and no further
3 changes therein except upon written instructions from the City.
4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
5 following receipt of submittal by the City.
6 L. Mock ups
7 1. Mock Up units as specified in individual Sections, include, but are not necessarily
8 limited to, complete units of the standard of acceptance for that type of Work to be used
9 on the Project. Remove at the completion of the Work or when directed.
10 M. Qualifications
11 If specifically required in other Sections of these Specifications, submit a P.E. Certification
12 for each item required.
13
N. Request for Information (RFI)
14
1. Contractor Request for additional information
15
a. Clarification or interpretation of the contract documents
16
b. When the Contractor believes there is a conflict between Contract Documents
17
c. When the Contractor believes there is a conflict between the Drawings and
18
Specifications
19
1) Identify the conflict and request clarification
20
2. Sufficient information shall be attached to permit a written response without further
21
information.
22
23
24
25
26
1.5
SUBMITTALS [NOT USED]
27
1.6
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
28
1.7
CLOSEOUT SUBMITTALS [NOT USED]
29
1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
30
1.9
QUALITY ASSURANCE [NOT USED]
31
1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
32
1.11
FIELD [SITE] CONDITIONS [NOT USED]
33
1.12
WARRANTY [NOT USED]
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-8
DAP PROJECT RECORD DOCUMENTS
Page 8 of 8
0)
4
5 PART 2 -PRODUCTS [NOT USED]
6 PART 3- EXECUTION [NOT USED]
7
9
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
12/20/2012
D. Johnson
1.4.K.8. Working Days modified to Calendar Days
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August 30, 2013
006125-I
DAP PROJECT RECORD DOCUMENTS
Page I of 7
1 SECTION 01 35 13
2 SPECIAL PROJECT PROCEDURES
3 PART 1 -GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedures for special project circumstances that includes, but is not limited to:
7 a. Coordination with the Texas Department of Transportation
8 b. Work near High Voltage Lines
9 c. Confined Space Entry Program
10 d. Air Pollution Watch Days
11 e. Use of Explosives, Drop Weight, Etc.
12 f. Water Department Notification
13 g. Public Notification Prior to Beginning Construction
14 h. Coordination with United States Army Corps of Engineers
15 i. Coordination within Railroad permits areas
16 j. Dust Control
17 k. Employee Parking
18
19 B. Deviations from this City of Fort Worth Standard Specification
20 1. None.
21 C. Related Specification Sections include, but are not necessarily limited to:
22 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
23 2. Division 1 — General Requirements
24 3. Section 33 12 25 — Connection to Existing Water Mains
25
26 1.2 REFERENCES
27 A. Reference Standards
28 1. Reference standards cited in this Specification refer to the current reference standard
29 published at the time of the latest revision date logged at the end of this Specification,
30 unless a date is specifically cited.
31 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High
32 Voltage Overhead Lines.
33 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction
34 Specification
35 1.3 ADMINISTRATIVE REQUIREMENTS
36 A. Coordination with the Texas Department of Transportation
37 1. When work in the right-of-way which is under the jurisdiction of the Texas Department
38 of Transportation (TxDOT):
39 a. Notify the Texas Department of Transportation prior to commencing any work
40 therein in accordance with the provisions of the permit
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised August, 30, 2013
006125-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 7
1 b. All work performed in the TxDOT right-of-way shall be performed in compliance
2 with and subject to approval from the Texas Department of Transportation
3 B. Work near High Voltage Lines
4 1. Regulatory Requirements
5 a. All Work near High Voltage Lines (more than 600 volts measured between
6 conductors or between a conductor and the ground) shall be in accordance with
7 Health and Safety Code, Title 9, Subtitle A, Chapter 752.
8 2. Warning sign
9 a. Provide sign of sufficient size meeting all OSHA requirements.
10 3. Equipment operating within 10 feet of high voltage lines will require the following
11 safety features
12 a. Insulating cage -type of guard about the boom or arm
13 b. Insulator links on the lift hook connections for back hoes or dippers
14 c. Equipment must meet the safety requirements as set forth by OSHA and the safety
15 requirements of the owner of the high voltage lines
16 4. Work within 6 feet of high voltage electric lines
17 a. Notification shall be given to:
18 1) The power company (example: ONCOR)
19 a) Maintain an accurate log of all such calls to power company and record
20 action taken in each case.
21 b. Coordination with power company
22 1) After notification coordinate with the power company to:
23 a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower
24 the lines
25 c. No personnel may work within 6 feet of a high voltage line before the above
26 requirements have been met.
27 C. Confined Space Entry Program
28 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA
29 requirements.
30 2. Confined Spaces include:
31 a. Manholes
32 b. All other confined spaces in accordance with OSHA's Permit Required for
33 Confined Spaces
1i
34 D. Use of Explosives, Drop Weight, Etc.
35 1. When Contract Documents permit on the project the following will apply:
36 a. Public Notification
37 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior
38 to commencing.
39 2) Minimum 24 hour public notification in accordance with Section 01 31 13
40 E. Water Department Coordination
41
42 1. During the construction of this project, it will be necessary to deactivate, for a
43 period of time, existing lines. The Contractor shall be required to coordinate with
44 the Water Department to determine the best times for deactivating and activating
45 those lines.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August, 30, 2013
006125-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 7
1
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
2. Coordinate any event that will require connecting to or the operation of an existing
City water line system with the City's representative.
a. Coordination shall be in accordance with Section 33 12 25.
b. If needed, obtain a hydrant water meter from the Water Department for use
during the life of named project.
c. In the event that a water valve on an existing live system be turned off and
on to accommodate the construction of the project is required, coordinate
this activity through the appropriate City representative.
1) Do not operate water line valves of existing water system.
a) Failure to comply will render the Contractor in violation of Texas
Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the
Contractor will be prosecuted to the full extent of the law.
b) In addition, the Contractor will assume all liabilities and
responsibilities as a result of these actions.
F. Public Notification Prior to Beginning Construction
1. Prior to beginning construction on any block in the project, on a block by block
basis, prepare and deliver a notice or flyer of the pending construction to the front
door of each residence or business that will be impacted by construction. The notice
shall be prepared as follows:
a. Post notice or flyer 7 days prior to beginning any construction activity on each
block in the project area.
1) Prepare flyer on the Contractor's letterhead and include the following
information:
a) Name of Project
b) City Project No (CPN)
c) Scope of Project (i.e. type of construction activity)
d) Actual construction duration within the block
e) Name of the contractor's foreman and phone number
f) Name of the City's inspector and phone number
g) City's after-hours phone number
2) A sample of the `pre -construction notification' flyer is attached as Exhibit A.
3) Submit schedule showing the construction start and finish time for each block
of the project to the inspector.
4) Deliver flyer to the City Inspector for review prior to distribution.
b. No construction will be allowed to begin on any block until the flyer is delivered to
all residents of the block.
G. Public Notification of Temporary Water Service Interruption during Construction
1. In the event it becomes necessary to temporarily shut down water service to
residents or businesses during construction, prepare and deliver a notice or flyer of
the pending interruption to the front door of each affected resident.
2. Prepared notice as follows:
a. The notification or flyer shall be posted 24 hours prior to the temporary
interruption.
Prepare flyer on the contractor's letterhead and include the following information:
1) Name of the project
2) City Project Number
3) Date of the interruption of service
4) Period the interruption will take place
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
006125-4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 7
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector for
review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to all
affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USACE)
At locations in the Project where construction activities occur in areas where USACE
permits are required, meet all requirements set forth in each designated permit.
I. Coordination within Railroad Permit Areas
1. At locations in the project where construction activities occur in areas where railroad
permits are required, meet all requirements set forth in each designated railroad permit.
This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the Railroad
Company from damage arising out of and/or from the construction of the project.
Proper utility clearance procedures shall be used in accordance with the permit
guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. H 101677
Revised August, 30, 2013
006125-6
DAP PROJECT RECORD DOCUMENTS
Page 6 of 7
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
NOTICE OF
CONSTRUCTION
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF
THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 4 101677
Revised August, 30, 2013
006125-7
DAP PROJECT RECORD DOCUMENTS
Page 7 of 7
EXHIBIT B
2
FORT WORTH
Dote:
DOE HO. XXXX
Prof Name:
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
M R. AT
(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER)
OR
MR. AT
(CITY INSPECTOR)
(TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
3 -
4
,CONTRACTOR
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised August, 30, 2013
006125-1
DAP PROJECT RECORD DOCUMENTS
Page I of2
1 SECTION 01 45 23
2 TESTING AND INSPECTION SERVICES
3 PART 1 -GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Testing and inspection services procedures and coordination
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1 — General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 a. Contractor is responsible for performing, coordinating, and payment of all
17 Quality Control testing.
18 b. City is responsible for performing and payment for first set of Quality
19 Assurance testing.
20 1) If the first Quality Assurance test performed by the City fails, the
21 Contractor is responsible for payment of subsequent Quality Assurance
22 testing until a passing test occurs.
23 a) Final acceptance will not be issued by City until all required payments
24 for testing by Contractor have been paid in full.
25 1.3 REFERENCES [NOT USED]
26 1.4 ADMINISTRATIVE REQUIREMENTS
27 A. Testing
28 1. Complete testing in accordance with the Contract Documents.
29 2. Coordination
30 a. When testing is required to be performed by the City, notify City, sufficiently
31 in advance, when testing is needed.
32 b. When testing is required to be completed by the Contractor, notify City,
33 sufficiently in advance, that testing will be performed.
34 3. Distribution of Testing Reports
35 a. Electronic Distribution
36 1) Confirm development of Project directory for electronic submittals to be
37 uploaded to City's Buzzsaw site, or another form of distribution approved
38 by the City.
39
40
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PRO.IECTS Proj. #101677
Revised August 30, 2013
006125-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) I copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute I hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered
load of Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 4101677
Revised August 30, 2013
0061 25- I
DAP PROJECT RECORD DOCUMENTS
Page I of4
1 SECTION 01 50 00
2 TEMPORARY FACILITIES AND CONTROLS
3 PART 1 -GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provide temporary facilities and controls needed for the Work including, but not
7 necessarily limited to:
8 a. Temporary utilities
9 b. Sanitary facilities
10 c. Storage Sheds and Buildings
11 d. Dust control
12 e. Temporary fencing of the construction site
13 B. Deviations from this City of Fort Worth Standard Specification
14 1. None.
15 C. Related Specification Sections include, but are not necessarily limited to:
16 1 Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
17 2. Division 1 — General Requirements
18 1.2 PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Work associated with this Item is considered subsidiary to the various Items bid.
21 No separate payment will be allowed for this Item.
22 1.3 REFERENCES [NOT USED]
23 1.4 ADMINISTRATIVE REQUIREMENTS
24 A. Temporary Utilities
25 1. Obtaining Temporary Service
26 a. Make arrangements with utility service companies for temporary services.
27 b. Abide by rules and regulations of utility service companies or authorities
28 having jurisdiction.
29 c. Be responsible for utility service costs until Work is approved for Final
30 Acceptance.
31 1) Included are fuel, power, light, heat and other utility services necessary for
32 execution, completion, testing and initial operation of Work.
33 2. Water
34 a. Contractor to provide water required for and in connection with Work to be
35 performed and for specified tests of piping, equipment, devices or other use as
36 required forthe completion of the Work.
37 b. Provide and maintain adequate supply of potable water for domestic
38 consumption by Contractor personnel and City's Project Representatives.
39 c. Coordination
40 1) Contact City 1 week before water for construction is desired
41
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. 4101677
Revised JULY 1.2011
006125-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
1 d. Contractor Payment for Construction Water
2 1) Obtain construction water meter from City for payment as billed by City's
3 established rates.
4 3. Electricity and Lighting
5 a. Provide and pay for electric powered service as required for Work, including
6 testing of Work.
7 Provide power for lighting, operation of equipment, or other use.
8 b. Electric power service includes temporary power service or generator to
9 maintain operations during scheduled shutdown.
10 4. Telephone
11 a. Provide emergency telephone service at Site for use by Contractor personnel
12 and others performing work or furnishing services at Site.
13 5. Temporary Heat and Ventilation
14 a. Provide temporary heat as necessary for protection or completion of Work.
15 b. Provide temporary heat and ventilation to assure safe working conditions.
16 B. Sanitary Facilities
17 1. Provide and maintain sanitary facilities for persons on Site.
18 a. Comply with regulations of State and local departments of health.
19 2. Enforce use of sanitary facilities by construction personnel at job site.
20 a. Enclose and anchor sanitary facilities.
21 b. No discharge will be allowed from these facilities.
22 c. Collect and store sewage and waste so as not to cause nuisance or health
23 problem.
24 d. Haul sewage and waste off -site at no less than weekly intervals and properly
25 dispose in accordance with applicable regulation.
26 3. Locate facilities near Work Site and keep clean and maintained throughout Project.
27 4. Remove facilities at completion of Project
28 C. Storage Sheds and Buildings
29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
30 above ground level for materials and equipment susceptible to weather damage.
31 2. Storage of materials not susceptible to weather damage may be on blocks off
32 ground.
33 3. Store materials in a neat and orderly manner.
34 a. Place materials and equipment to permit easy access for identification,
35 inspection and inventory.
36 4. Equip building with lockable doors and lighting, and provide electrical service for
37 equipment space heaters and heating or ventilation as necessary to provide storage
38 environments acceptable to specified manufacturers.
39 5. Fill and grade site for temporary structures to provide drainage away from
40 temporary and existing buildings.
41 6. Remove building from site prior to Final Acceptance.
42 D. Temporary Fencing
43 1. Provide and maintain for the duration or construction when required in contract
44 documents
45 E. Dust Control
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. 4101677
Revised JULY 1.2011
0061 25 -3
DAP PROJECT RECORD DOCUMENTS
Page 3 of4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
1. Contractor is responsible for maintaining dust control through the duration of the
project.
a. Contractor remains on -call at all times
b. Must respond in a timely manner
F. Temporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporary Facilities
1. Maintain all temporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE -INSTALLATION
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 4 101677
Revised JULY 1, 2011
0061 25 -4
DAP PROJECT RECORD DOCUMENTS
Page 4 of4
1 1. Remove all temporary facilities and restore area after completion of the Work,
2 to a condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
4 3.13 MAINTENANCE [NOT USED]
5 3.14 ATTACHMENTS [NOT USED]
6 END OF SECTION
7
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 4101677
Revised JULY 1, 201 1
006125-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 3
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
1. Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Street Sign
1. If it is determined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirements of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD).
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
27 1.5 SUBMITTALS [NOT USED]
28 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
29 1.7 CLOSEOUT SUBMITTALS [NOT USED]
30 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
31 1.9 QUALITY ASSURANCE [NOT USED]
32 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
33 1.11 FIELD [SITE] CONDITIONS [NOT USED]
34 1.12 WARRANTY [NOT USED]
35 PART 2- PRODUCTS [NOT USED]
36 PART 3- EXECUTION [NOT USED]
37 END OF SECTION
38
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised July 1, 2011
0061 25 -3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
I
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Proj. #101677
Revised July 1, 2011
006125 -
DAP PROJECT RECORD DOCUMENTS
Page I of 3
1 SECTION 01 57 13
2 STORM WATER POLLUTION PREVENTION
3 PART 1 -GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Procedures for Storm Water Pollution Prevention Plans
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the
11 Contract
12 2. Division 1 — General Requirements
13 3. Section 31 25 00 — Erosion and Sediment Control
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Construction Activities resulting in less than I acre of disturbance
17 A. Work associated with this Item is considered subsidiary to the various Items
18 bid. No separate payment will be allowed for this Item.
19 2. Construction Activities resulting in greater than I acre of disturbance
20 Measurement and Payment shall be in accordance with Section 31 25 00.
21 1.3 REFERENCES
22 A. Abbreviations and Acronyms
23 1. Notice of Intent: NOI
24 2. Notice of Termination: NOT
25 3. Storm Water Pollution Prevention Plan: SWPPP
26 4. Texas Commission on Environmental Quality: TCEQ
27 5. Notice of Change: NOC
28 B. Reference Standards
29 1. Reference standards cited in this Specification refer to the current reference
30 standard published at the time of the latest revision date logged at the end of this
31 Specification, unless a date is specifically cited.
32 2. Integrated Storm Management (iSWM) Technical Manual for Construction
33 Controls
34 1.4 ADMINISTRATIVE REQUIREMENTS
35 A. General
36 1. Contractor is responsible for resolution and payment of any fines issued associated
37 with compliance to Stormwater Pollution Prevention Plan.
38
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 0101677
Revised July 1, 201 1
0061 25 -2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 3
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
B. Construction Activities resulting in:
1. Less than I acre of disturbance
a. Provide erosion and sediment control in accordance with Section 31 25 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR1 50000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send I copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) 'TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR1 50000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
40 1.5 SUBMITTALS
41
42
43
44
45
46
47
A. SWPPP
1. Submit in accordance with Section 01 33 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) I copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH Tarrant County Block IS Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised July 1, 2011
006125-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
B. Modified SWPPP
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
in accordance with Section 01 33 00.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- -PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised July 1, 201 1
0061 25 - I
DAP PROJECT RECORD DOCUMENTS
Page I of 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division I — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. A list of City approved products for use is located on Buzzsaw as follows:
1. Resources\02 - Construction Documents\Standard Products List
B. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
C. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
D. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
E. See Section 01 33 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
006125-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
10/12/12
D. Johnson
Modified Location of City's Standard Product List
4/7/2014
M.Dornenech
Revised for DAP application
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
01 66 00 - 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page I of4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
SECTION 01 66 00
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
I. Scheduling of product delivery
2. Packaging of products for delivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
I. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. 0101677
Revised April 7, 2014
016600-2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
4. Deliver products or equipment in manufacturer's original unbroken cartons or other
containers designed and constructed to protect the contents from physical or
environmental damage.
5. Clearly and fully mark and identify as to manufacturer, item and installation
location.
6. Provide manufacturer's instructions for storage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
manufacturer's recommendations and instructions.
C. Storage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Make necessary provisions for safe storage of materials and equipment.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts of Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locations that will
cause minimum inconvenience to other contractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
4. Restrict storage to areas available on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide off -site storage and protection when on -site storage is not adequate.
a. Provide addresses of and access to off -site storage locations for inspection by
City's Project Representative.
6. Do not use lawns, grass plots or other private property for storage purposes without
written permission of owner or other person in possession or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and compactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property owners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public and private driveways and street crossings open.
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
satisfaction of City's Project Representative.
a. Total length which materials may be distributed along route of construction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Representative.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
016600-3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2- PRODUCTS [NOT USED]
4 PART 3- EXECUTION
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
►Z:
30
31
32
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD Ion] SITE QUALITY CONTROL
A. Tests and Inspections
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non -Conforming Work
1. Reject all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
016600-4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
017423-I
DAP CLEANING
Page I of4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
SECTION 01 74 23
CLEANING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Intermediate and final cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division I — General Requirements
3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to final
inspection.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 7, 2014
017423-2
DAP CLEANING
Page 2 of4
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2-PRODUCTS
2.1 OWNER -FURNISHED loR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning Agents
1. Compatible with surface being cleaned
2. New and uncontaminated
3. For manufactured surfaces
a. Material recommended by manufacturer
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3- EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 7, 2014
017423-3
DAP CLEANING
Page 3 of4
1
6.
Handle materials in a controlled manner with as few handlings as possible.
2
7.
Thoroughly clean, sweep, wash and polish all Work and equipment associated with
3
this project.
4
8.
Remove all signs of temporary construction and activities incidental to construction
5
of required permanent Work.
6
9.
If project is not cleaned to the satisfaction of the City, the City reserves the right to
7
have the cleaning completed at the expense of the Contractor.
8
10.
Do not burn on -site.
9
B. Intermediate Cleaning during Construction
10
1.
Keep Work areas clean so as not to hinder health, safety or convenience of
11
personnel in existing facility operations.
12
2.
At maximum weekly intervals, dispose of waste materials, debris and rubbish.
13
3.
Confine construction debris daily in strategically located container(s):
14
a. Cover to prevent blowing by wind
15
b. Store debris away from construction or operational activities
16
c. Haul from site at a minimum of once per week
17
4.
Vacuum clean interior areas when ready to receive finish painting.
18
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
19
5.
Prior to storm events, thoroughly clean site of all loose or unsecured items, which
20
may become airborne or transported by flowing water during the storm.
21 C. Exterior (Site or Right of Way) Final Cleaning
22 1. Remove trash and debris containers from site.
23 a. Re -seed areas disturbed by location of trash and debris containers in accordance
24 with Section 32 92 13.
25 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
26 that may hinder or disrupt the flow of traffic along the roadway.
27 3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
28 junction boxes and inlets.
29 4. If no longer required for maintenance of erosion facilities, and upon approval by
30 City, remove erosion control from site.
31 Clean signs, lights, signals, etc.
32 3.11 CLOSEOUT ACTIVITIES [NOT USED]
33 3.12 PROTECTION [NOT USED]
34 3.13 MAINTENANCE [NOT USED]
35 3.14 ATTACHMENTS [NOT USED]
36
37
38
39
40
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
017423-4
DAP CLEANING
Page 4 of 4
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 7, 2014
017719-I
DAP CLOSEOUT REQUIREMENTS
Page I of3
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
SECTION 01 77 19
CLOSEOUT REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
1. Division I — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
I. No application for final payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. ₹1101677
Revised April 7, 2014
01 77 19-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USED]
3 PAT 2- PRODUCTS [NOT USED]
4 PART 3- EXECUTION
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 01 78 39
2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 7423.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
Ii. Other expendable items as required for initial start-up and operation of all
equipment
D. Notice of Project Completion
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 7, 2014
01 77 19-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
29
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR /RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTI I Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
017823-I
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
1
2
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
SECTION 01 78 23
OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
I. Product data and related information appropriate for City's maintenance and
operation of products furnished under Contract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division I —General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Schedule
1. Submit manuals in final form to the City within 30 calendar days of product
shipment to the project site.
1.5 SUBMITTALS
A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be
approved by the City prior to delivery.
1.6 INFORMATIONAL SUBMITTALS
A. Submittal Form
1. Prepare data in form of an instructional manual for use by City personnel.
2. Format
a. Size: 8 '/2 inches x 11 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
017823-2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly -leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
f. Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
3. Binders
a. Commercial quality 3 -ring binders with durable and cleanable plastic covers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form of the O&M Manual.
B. Manual Content
Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
I) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
017823-3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
I. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PRO.IECTS Proj. #10! 677
Revised April 7, 2014
017823-4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Provide operation and maintenance data by personnel with the following criteria:
1. Trained and experienced in maintenance and operation of described products
2. Skilled as technical writer to the extent required to communicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH Tarrant County Block I5 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
01 7823 -5
DAP OPERATION AND MAINTENANCE DATA
Page5of5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
4 PART 2- PRODUCTS [NOT USED]
5 PART 3- EXECUTION [NOT USED]
C
7
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/3 1/20 12
D. Johnson
1.5.A. I — title of section removed
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. #101677
Revised April 7, 2014
01 78 39 - I
DAP PROJECT RECORD DOCUMENTS
Page I of4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
SECTION 01 78 39
PROJECT RECORD DOCUMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.3 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and proper entries on each page of Specifications and each sheet of Drawings and
other Documents where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtained from the approved Project
Record Documents.
CITY OF FORT WORTH Tarrant County Block 15 Parking Lot
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Proj. # 101677
Revised April 7, 2014
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
5. Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
I ) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
I) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
1. Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH Tarrant Comity Block 15 Parking Lot