HomeMy WebLinkAbout065633-PM1 - Construction-Related - Contract - 821 E. Terrell Avenue, LLC, and Tejas Commercial Construction, LLCCSC No. 65633-PM1
FORT WORTH
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER AND SANITARY SEWER IMPROVEMENTS TO SERVE:
821 AND 901 E TERRELL AVE IMPROVEMENTS
City Project No. 106853
FID NO. 30114-0200431-106853-E07685
IPRC 26-0036
X- 28912
File #: W -N/A
Mattie Parker Jesus "Jay" Chapa
Mayor City Manager
Christopher P. Harder, P.E.
Director, Water Department
Lauren Prieur, P.E.
Director, Transportation and Public Works Department
Prepared for
821 E. TERRELL AVE, LLC.
2255 8TH AVE.
FORT WORTH, TX 76110
SEPTEMBER 2026
CONSULTANT, !,.!.,;.
A.N.A. Consultants. L.L.C.
5000 Thompson Terrace
Colleyville, TX, 76034
(817) 335-9900
TBPE Registered Firm No. F-20
A.N.A. CONSULTANTS LLC
TBPE REGISTERED FIRM IJO. F-20
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
ALEX SRUR, P.E. #127967
ON 09/14/2026
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
00 00 10
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 5
SECTION 00 00 10
TABLE OF CONTENTS
Division 00 - General Conditions
Last Revised
00o 1�3
Invitation to Bidders
03/��o
0n3
Instructions to Bidders
03/20/2020
00 400
BidForm
04 /02/2014
0042 43
Proposal Form Unit Price
05/22/2019
00o n�3
Bid Bond
04/02/2014
00o nom=
Bidders Pregualification'
04 /02/20
0045 12
Pre ualification Statement
09/01/2015
Ono
Bidder03/09/2020
0045 26
Contractor Compliance with Workers' Compensation Law
04/02/2014
00 45 8
Minority Business Enterprise Goal
04nQi8
00 52 43
Agreement
06/16/2016
00 61 25
Certificate of Insurance
07/01/2011
00 62 13
Performance Bond
01/31/2012
00 62 14
Payment Bond
01/31/2012
00 62 19
Maintenance Bond
01/31/2012
00 72 00
General Conditions
11/15/2017
00 73 00
07/01/2011
00 73 10
Standard City Conditions of the Construction Contract for Developer
Awarded Projects
01/10/2013
Division 01 - General Requirements
Last Revised
0111 00
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
08/30/2013
01 3119
Preconstruction Meeting
08/30/2013
01 31 20
Project Meetings
07/01/2011
01 32 33
Preconstruction Video
08/30/2013
01 33 00
Submittals
08/30/2013
01 35 13
Special Project Procedures
08/30/2013
01 45 23
Testing and Inspection Services
03/20/2020
01 50 00
Temporary Facilities and Controls
07/01/2011
01 55 26
Street Use Permit and Modifications to Traffic Control
07/01/2011
01 57 13
Storm Water Pollution Prevention Plan
07/01/2011
01 60 00
Product Requirements
03/20/2020
01 66 00
Product Storage and Handling Requirements
04/07/2014
01 70 00
Mobilization and Remobilization
04/07/2014
01 71 23
Construction Staking
02/14/2018
01 74 23
Cleaning
04/07/2014
01 77 19
Closeout Requirements
04/07/2014
01 78 23
Operation and Maintenance Data
04/07/2014
01 78 39
Project Record Documents
04/07/2014
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
00 00 10
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents.
NONE
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
http://fortworthtexas.2ov/tpw/contractors/
or
https://apps.fortworthtexas.gov/ProectResources/
Division 02 - Existing Conditions Last Revised
02 4113 Selective Site Demolition 12/20/2012
r�-zvrzvzz
02 4114 Utility Removal/Abandonment 12/20/2012
02 4115 Paving Removal 02/02/2016
Division 03 - Concrete
03 30 00 Gast In Place Concrete 12/T�z
03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012
033 34 16 Concrete Base Material for Trench Repair 12/20/2012
03 80 00 Modifications to Existing Concrete Stmcres 12/20/2012
Division 26 - Electrical
Division 31 - Earthwork
311 10 00 Site C1eing 12/20/20
31 23 16 Unclassified Excavation 01/28/2013
31 23 3 Bonow 01/28/2013
31 24 0 Embankments 01/28/2013
31 25 00 Erosion and Sediment Control 12/20/2012
31 36OO Gabions 121 /2z
X 00 Riprap 12/20/2012
mvlsion iz - Exterior Improvements
32 0117 Permanent Asphalt Paving Repair 12/20/2012
32 0118 Tempory Asphalt Paving Repair 11 /�1,T
3`1 01 7 Concrete Paving Repair 12/20/2012
�
32 11 23 Flexible Base Courses 12/20/2012
32 11 29 Time Treated Base Courses 12/20/20 z
32 11 33 Cement Treated Base Courses 12/20/2012
32 11 Liquid Treated Soil Stabilizer !14/7vrnz1/2015
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
00 00 10
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
32 12 16
Asphalt Paving
12/20/2012
32 12
Asphalt Paving Crack Sealants
12/20/2012
32 13
Concrete Paving
12/20/2012
32 13 20
Concrete Sidewalks, Driveways and Barrier Free Ramps
06/05/2018
32 13 73
Concrete Paving Joint Sealants
12/20/2012
32 14 6
Brick Unit Paving
12/2t7-202012
32 16 13
Concrete Curb and Gutters and Valley Gutters
10/05/2016
37 17 23
Pavement AM.,rl s
1 11 1 /�-3
32 17 25
Curb Address Painting ti g
11/04/2013
32 3113
Chain Fences and Gates
12/20/2012
32 31 26
Wire Fences and Gates
1 2/2/'%2
32 31 29
Wood Fences and Gates
1 21 M1z� 202012
32 32 13
Cast in Place Concrete Retaining Walls
06/05/2018
3'1 9119
Topsoil Placement and Tin sh;ng of Parkways
12/20/2012
32 92 13
Hydro -Mulching, Seeding, and Sodding
12/20/2012
32 93
Trees and Shrubs
12/'0/2011-2
Division 33 - Utilities
33 01 30
Sewer and Manhole Testing
12/20/2012
33 01 31
Closed Circuit Television (CCTV) Inspection
03/03/2016
3'2 03 0Bypass
Pumping of Existing Sewer Systems,2/'zv12
33-0449
Joint Bonding and Electrical Isolation
12/20/2012
33 04
Corrosion Control Test Stations
12/20/2012
33 04 12
Magnesium ode Cathodic Protection System
12/20/2012
3
07/01/2011
33 04 40
Cleaning and Acceptance Testing of Water Mains
02/06/2013
33 04 50
Cleaning of Sewer Mains
12/20/2012
33 05 10
Utility Trench Excavation, Embedment, and Backfill
12/12/2016
33 05 12
Water Line Lowering
17/2-2
33 5 P
01/�22/2010
33 05
Frame, Cover and Grade Rings Composite
01/22/2016
33 05 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
Grade
12/20/2012
22E16
Concrete Water Vaults
12/20/2012
33 05 17
Concrete Collars
12/20/2012
305 29
Auger Boring
12/20/2012
33 05
Tunnel Liner er Plato
12/20/2012
33 05 2
Steel Casing Pipe
1 2PzzT 0/20.12
33 05 23
Hand Tunneling
12/2-2
33 05
Carrier Pipe in Casing Tunnel Liner er Plato
Installation
06/19/2013
r�v
of or
3305 0Markers/Locators1''1/zz7'
0z0/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 11 05
Belt Nuts, and Gaskets
12/20/2012
33 1110
Ductile Tr..,, Pipe
12/2 2
33 11 11
Ductile Iron Fittings
12/20/2012
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
00 00 10
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018
33 3 Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type 12/20/2012
33 Buried Steel Pipe and Fittings 1'7/7z
33 12 10 Ware,- Se fyiees 1 inch to 2 inch 02 /1vz.�-14/2017
33 12 Large ge Wate.. Meters 12/20/2012
33 12 20 Resilient Seated Gate Valve 12/20/2012
33 11 /�12
33 12 25 Connection to Existing Water Mains 02/06/2013
33 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012
33 12 40 Fire Hydrants 01/03/2014
33123A Water Sample Stations 12/20/2012
33 12 Standard 121.x... off Valve Assembly 0tiv/1rn 2013
33 3112inpe12/20/2012
33 3113 Fiberglass Reinforced Pipe fef Gravity Sanitary Sewers 12/20/2012
WSJ 1 '11 /'1z
33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013
P id hl
Polyvinyl Core (PVC) Closed ,-ofile Gravity Santa Sewer 33 31 21i 12/20/2012
ee
1 • • • 1� • 1
ee
• • e e
ee
ee
.. .. . 0
._ ••00
00
.• • ■ cc
Division 34 - Transportation
34 Traffic Signals 10/12/2015
34 4110.01 Attachment A Controller Cabinet 12/18/2015
rr� m�r� Cabinet
34 ^poi Attachment B Controller Specification 92/2012
34 4110.03 Attachment tC f Specification 2
�v� rrtcaC�2riie���6rtadb�irrc-crpvC�f?C-&ti6a
34 Temporary Traffic Signals 1 11 1 /'3
3�1� Removing Traffic Signals 12/20/2012
35 Rectangular Rapid Hashing Beacon 1 11 1 /'3
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
00 00 10
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 5
. �.
CC 6.24 Nod ieriminution
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
00 42 43
DAP - BID PROPOSAL
Page 1 of3
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No.
Description
Specification Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT I: WATER
IMPROVEMENTS
1
3311.0161 6" PVC Water Pipe DR -14
33 1 1 12
LF
41
$108.00
$ 4,428.00
2
3305.0109 Trench Safety
3305 10
LF
41
$7.00
$ 287.00
3
3311.0001 Ductile Iron Water Fittings
33 1111
TN
0.1
$14,000.00
$ 1,400.00
4
3312.0117 Connection to Existing 4"-12" Water Main
33 1225
EA
1
$8,000.00
$ 8,000.00
5
3312.3002 6" Gate Valve
33 12 20
EA
1
$3,000.00
$ 3,000.00
6
3201.0111 4' Wide Asphalt Pvmt Repair, Residential
3201 17
LF
27
$120.00
$ 3,240.00
7
3213.0301 4" Conc Sidewalk
32 1320
SF
100
$12.00
$ 1,200.00
8
3216.0101 6" Cone Curb and Gutter
32 16 13
LF
8
$80.00
$ 640.00
9
3292.0401 Utility Service Surface Restoration Hydromulch
32 92 13
LS
1
$750.00
$ 750.00
10
3471.0001 Traffic Control
34 71 13
MO
0.5
$2,500.00
$ 1,250.00
TOTAL UNIT I: WATER IMPROVEMENTS
$24,195.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
821 AND 901 E TERRELL AVE IMPROVEMENTS
CPN 106853
Copy of 0042 43_Bid Proposal_DAP_ (004)
00 42 43
DAP - BID PROPOSAL
Page 2 of 3
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No.
Description
Specification Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT II: SANITARY SEWER IMPROVEMENTS
1
0241.1506 2" Surface Milling
02 41 15
SY
98.50
$30.00
$ 2,955.00
2
0241.2001 Sanitary Line Grouting
02 41 14
CY
0.80
$2,000.00
$ 1,600.00
3
0241.2102 6" Sewer Abandonment Plug
0241 14
EA
2
$1,200.00
$ 2,400.00
4
3201.0111 4' Wide Asphalt Pvmt Repair, Residential
32 01 17
LF
30
$120.00
$ 3,600.00
5
3213.0301 4" Conc Sidewalk
32 1320
SF
345
$12.00
$ 4,140.00
6
3212.0302 2" Asphalt Pvmt Type D
32 12 16
SY
98.5
$100.00
$ 9,850.00
7
3213.0401 6" Concrete Driveway
32 1320
SF
50.5
$15.00
$ 757.50
8
3216.0101 6" Cone Curb and Gutter
32 16 13
LF
8
$80.00
$ 640.00
9
3292.0401 Utility Service Surface Restoration Hydromulch
3292 13
LS
1
$750.00
$ 750.00
10
3301.0001 Pre -CCTV Inspection
33 01 31
LF
150
$10.00
$ 1,500.00
11
3301.0002 Post -CCTV Inspection
33 01 31
LF
140
$9.00
$ 1,260.00
12
3301.0004 Final MH-CCTV Inspection
3301 31
EA
2
$300.00
$ 600.00
13
3301.0101 Manhole Vacuum Testing
33 01 30
EA
2
$550.00
$ 1,100.00
14
3305.0109 Trench Safety
33 05 10
LF
140
$6.00
$ 840.00
15
3305.0112 Concrete Collar for Manhole
3305 17
EA
1
$900.00
$ 900.00
16
3305.0113 Trench Water Stops
33 05 10
EA
1
$1,000.00
$ 1,000.00
17
3331.4115 8" Sewer Pipe
LF
120
$110.00
$ 13,200.00
18
3331.5747 8" Sewer Pipe, CLSM Backfill
A ii IV, I I 33 31
LF
20
$220.00
$ 4,400.00
19
3339.1001 4' Manhole
33 39 10, 33 39 20
EA
2
$8,700.00
$ 17,400.00
20
3471.0001 Traffic Control
34 71 13
MO
0.5
$2,500.00
$ 1,250.00
TOTAL
UNIT II: SANITARY SEWER IMPROVEMENTS
$70,142.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
821 AND 901 E TERRELL AVE IMPROVEMENTS
CPN 106853
Copy of 0042 43_Bid Proposal_DAP_ (004)
00 42 43
DAP - BID PROPOSAL
Page 3 of 3
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
Description
Specification Section No.
Unit of
Bid
Unit Price
Bid Value
No.
Measure
Quantity
Bid Summary
UNIT I: WATER IMPROVEMENTS $24,195.00
UNIT II: SANITARY SEWER IMPROVEMENTS $70,142.50
Total Construction Bid $94,337.50
This Bid is submitted by the entity named below:
BIDDER:
Texas Commercial Construction, LLC.
P.O. Box 10395
River Oaks, Texas, 76114
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
Charles D. Allen
TITLE: Vice President
DATE: 5/21/2026
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
30 working days after the date when the
821 AND 901 E TERRELL AVE IMPROVEMENTS
CPN 106853
Copy of 0042 43_Bid Proposal_DAP_ (004)
0045 12
DAP PREQUALJFICATION STATEMENT
Page I ofl
SECTION 00 4512
DAP-PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type" box provide the complete major work type and actual description as provided by the Water
Department for water and sewer and TPW for paving.
Major Work Type
Contractor/Subcontractor Company Name
Prequalification
Expiration Date
Water Distribution,
Tejas Commercial Construction
Development, 8 -inch diameter
4/30/2027
and smaller
Sewer Collection System,
Tejas Commercial Construction
Development 8 -inches and
4/30/2027
smaller
Sanitary Sewer Manhole /
BCCA -Warren
Structure Interior Lining
4/30/2027
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
Tejas Commercial Construction, LLC
P.O. Box 10395
River Oaks, Texas, 76114
BY: Charles D. Allen
(Signature)
TITLE: Vice President
DATE: 9/16/26
END OF SECTION
CITY OF FORT WORTH 00 45 12_Prequaliication Statement 2015_DAP.docxform
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT - DEVELOPER AWARDED PROJECTS 821 AND 901 E TERRELL AVE IMPROVEMENTS
Form Version September 1, 2015 CITY PROJECT # 106853
00 45 26-1
CONTRACTOR COMPLIANCE Wl'FH WORKER'S COMPENSATION LAW
Page 1 of I
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides
worker's compensation insurance coverage for all of its employees employed on City Project No. # 106853,
Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will
provide to City its subcontractor's certificates of compliance with worker's compensation coverage.
CONTRACTOR:
TEJAS COMMERCIAL CONSTRUCTION, LLC. - By: Charles Allen
Company (Please Print)
P.O. Box 10395
Address
River Oaks, TX 76114
City/State/Zip
THE STATE OF TEXAS
COUNTY OF TARRANT
Signature: eew(./�
Title: Vice President
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
Cl rlal 2. A//z,. known to me to be the person whose name is subscribed to the
foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of
T�s4s C'o....;, LC-� for the purposes and consideration therein expressed and in
the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of
A t ,20.
�.���1111111tIbIry�� � %�
Ci
' y%JO&/.••, Notary Public in and for the to of Texas
Lit,
A11
fEND OF SECTION
"I,,,•
H:#
Ilrrtli1i+► 2�`\`
C1TY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT # 106853
Revised April, 2014
005243-1
Developer Awarded Project Agreement
Page 1 of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on 09/22/26 is made by and between the Developer, (Insert
Full Legal Name of Developer), authorized to do business in Texas ("Developer"), 821 E. TERRELL
AVE, LLC. and TEJAS COMMERCIAL CONSTRUCTION, LLC., authorized to do business in Texas,
acting by and through its duly authorized representative, ("Contractor").
Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
821 AND 901 E TERRELL AVE IMPROVEMENTS
CITY PROJECT # 106853
Article 3. CONTRACT PRICE
Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount in current funds of ninety-four thousand three hundred thirty-seven
dollars and fifty cents (S94,337.50).
Article 4. CONTRACT TIME
4.1 Final Acceptance.
The Work will be complete for Final Acceptance within _30 working days after the date when
the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City
Conditions of the Construction Contract for Developer Awarded Projects.
4.2 Liquidated damages
Contractor recognizes that time is of the essence of this Agreement and that Developer will
suffer financial loss if the Work is not completed within the times specified in Paragraph 4.1
above, plus any extension thereof allowed in accordance with Article 10 of the Standard City
Conditions of the Construction Contract for Developer Awarded Projects. The Contractor
also recognizes the delays, expense and difficulties involved in proving in a legal proceeding
the actual loss suffered by the Developer if the Work is not completed on time. Accordingly,
instead of requiring any such proof, Contractor agrees that as liquidated damages for delay
(but not as a penalty), Contractor shall pay Developer Five hundred Dollars ($500.00) for
CITY OF FORT WORTFI 821 AND 901E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN# 106853
Revised September 1,2025
005243-2
Developer Awarded Project Agreement
Page 2 of 6
each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the
City issues the Final Letter of Acceptance.
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A.The Contract Documents which comprise the entire agreement between Developer and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form (DAP Version)
1) Proposal Form (DAP Version)
2) Vendor Compliance to State Law Non -Resident Bidder
3) Prequalification Statement
4) State and Federal documents (project specific)
b. Current Prevailing Wage Rate Table
c. Insurance Certification Form (ACORD)
d. Payment Bond (DAP Version)
e. Performance Bond (DAP Version)
f. Maintenance Bond (DAP Version)
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. SBE Small Business Utilization Form
3. Standard City Conditions of the Construction Contractfor Developer Awarded Projects.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment or, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents.
6. Drawings.
7. Addenda.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN# 106853
Revised September 1,2025
005243-3
Developer Awarded Project Agreement
Page 3 of 6
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which maybe delivered or issued after the Effective Date of the Agreement
and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN# 106853
Revised September 1,2025
00 52 43 - 4
Developer Awarded Project Agreement
Page 4 of 6
Article 6. INDEMNIFICATION
Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense,
the city, its officers, servants and employees, from and against any and all claims arising
out of, or alleged to arise out of, the work and services to be performed by the contractor,
its officers, agents, employees, subcontractors, licenses or invitees under this contract.
This indemnification provision is specifically intended to operate and be effective even if
it is alleged or proven that all or some of the darns es being sought were caused, in whole
or in part,by any act, omission or neglisence of the city. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees
incurred by the city in defending against such claims and causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the
city, its officers, servants and employees, from and against any and all loss, damage or
destruction of property of the city, arising out of, or alleged to arise out of, the work and
services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification provision
is specifically intended to operate and be effective even if it is alleged or proven that all or
some of the damages being sought were caused, in whole or in part, by any act, omission
or negligence of the city.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the
Construction Contract for Developer Awarded Projects.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the Developer.
7.3 Successors and Assigns.
Developer and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining
provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN# 106853
Revised September 1,2025
00 5243-5
Developer Awarded Project Agreement
Page 5 of 6
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of Texas.
Venue shall be Tarrant County, Texas, or the United States District Court for the Northern
District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized
signatory of the Contractor.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN# 106853
Revised September 1,2025
00 52 43 -6
Developer Awarded Project Agreement
Page 6 of 6
IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties ("Effective Date").
Contractor:
TEJAS COMMERCIAL
CONSTRUCTION, LLC.
Developer:
821 E. TERRELL AVE, LLC.
BY _/d'1 --- By: :I��
(Signature) , `�! /Sijnaturel
Charles Allen
(Printed Name)
Title: Vice President _
Company Name:
Address:
P.O. Box 10395
City/State/Zip: Fort Worth, TX, 76119
9lz. $.
Date
David Robb Farmer, Jr. _
(Printed Name)
Title: Managing Member
Company name: 821 E. TERRELL AVE, LLC.
Address:
2255 8TH AVE
City/State/Zip: FORT WORTH, TX, 76110
Date
CITY OF FORT WORTII 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN# 106853
Revised September 1,2025
�
00 62 13- 1
PERFORMANCE BOND
Page Iof2
SECTION 00 6213
PERFORMANCE BOND
Bond Number: 022247376
THE STATE OF TEXAS
KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT
That we, TEJAS COMMERCIAL CONSTRUCTION, LLC., known as "Principal" herein and
Liberty Mutual Insurance Company , a corporate surety(sureties, if more than one) duly
authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held
and firmly bound unto the Developer, 821 E. TERRELL AVE, LLC., authorized to do business in
Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum
of, ninety-four thousand three hundred thirty-seven dollars and fifty cents. ($94,337.50). lawful
money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum
well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our
heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Developer and City have entered into an Agreement for the construction of community
facilities in the City of Fort Worth by and through a Community Facilities Agreement,
CFA Number 26-0076; and
WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the ZZ nd
day of 5=b"✓ , 20, which Contract is hereby referred to and made a part hereof for all
purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined
by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract
designated as 821 AND 901 E TERRELL AVE IMPROVEMENTS - COFW Project No. # 106853
NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully
perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work,
including Change Orders, under the Contract, according to the plans, specifications, and contract documents
therein referred to, and as well during any period of extension of the Contract that may be granted on the
part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to
remain in full force and effect.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised January 31, 2012
0062 13-2
PERFORMANCE BOND
Page 2 of 2
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant
County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this
instrument by duly authorized agents and officers on this the 22 ~at day of 5 f 'o -r
____,20Z.
PRINCIPAL:
TEJAS COMMERCIAL CONSTRUCTION,
LLC.
;�tiU�ja6tal��
p+ J CO/
J
ATTEST: BY: /W.J;
err •''�?��,� ,��.%
,1<
Signatures : U
Charles Allen, Vice Pre • �'� ! r
(Principal) Secr ry Name and Title S.AL
Address:
P.O. Box 10395
Fort Worth, TX, 76119
Witness as to Principal
SURETY:
Liberty Mutual Insurance Company -
ATTEST: BY:
Signature
Jordan Pitts, Attorney -In -Fact
(Surety) Secretary Melissa Pitts Name and Title _ -
Address:
PO Box 34526
Seattle. WA 98124
Witness as to Sule Loyd Ray Pitts Jr
Telephone Number: 469-661-0314
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the
by-laws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised January 3L2012
0062 14- 1
PAYMENT BOND
Page 1 of 2
SECTION 0062 14
PAYMENT BOND
Bond Number: 022247376
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT
That we, TEJAS COMMERCIAL CONSTRUCTION, LLC. , known as "Principal"
herein, and Liberty Mutual Insurance Company , a corporate surety ( or
sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein
(whether one or more), are held and firmly bound unto the Developer, 821 E. TERRELL
AVE, LLC. , authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas
municipal corporation ("City"), in the penal sum of ninety-four thousand three hundred thirty-seven
dollars and fifty cents. ($94,337.50) lawful money of the United States, to be paid in Fort Worth, Tarrant
County. Texas, for the payment of which sum well and truly be made jointly unto the Developer and the
City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents:
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA
Number 26-0076 ; and
WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the
2 2. day of Sop s• b:.. , 20?-+:, which Contract is hereby referred to and made a part
hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other
accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated
as 821 AND 901 E TERRELL AVE IMPROVEMENTS — COFW Project No. # 106853
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall
pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas
Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation
shall be and become null and void; otherwise to remain in full force and effect.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of said statute.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised January 31. 2012
006214-2
PAYMENT BOND
Page 2 of 2
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the ZZ' day of S=j+%
b"'r
2026
PRINCIPAL:
TEJAS COMMERCIAL CONSTRUCTION,
LLC.
,`, ` 1lIBItBr�ll�lr,-
C
ATTEST: BY: / F'C3F"••
l .�
Signature �#,• ��
Charles Allen, Vice President •
(Principal) cretary Name and Title SEAL
Address: �°•'' ••.=
P.O. Box 10395 �f'rs �• 19�a� `' �\``
Fort Worth, TX, 76119
Witness as to Principal
SURETY:
Liberty Mutual Insurance Compan,
ATTEST: BY:
Signature
Jordan Pitts, Attorney -In -Fact
(Surety) Secretary Melissa Pitts Name and Title
Address:
PO Box 34526
Seattle, WA 98124
Witnes, s to Sure Lloyd Ray Pitts Jr
Telephone Number: 469-661-0314
Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws
showing that this person has authority to sign such obligation. If Surety's physical address is different from
its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised January 31, 2012
Liberty POWER OF ATTORNEY
Mutual° Liberty Mutual Insurance Company
SURETY The Ohio Casualty Insurance Company
West American Insurance Company
Certificate No: 8216390-992468
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Jordan Pitts;
Lloyd Ray Pitts, Jr.: William D. Birdsong
all of the city of Garland state of TX each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 10th day of June , 2026
11)
a)
a)
t6
cu State of PENNSYLVANIA
County of MONTGOMERY
Liberty Mutual Insurance Company
P{ ttasupR POSY INgV {Nsr�Rq The Ohio Casualty Insurance Company
�J 4OR ORgr�y� yJ ooRPo��r92 \P4oRPok 1' West American Insurance Company
0 o y 2 o m
y 1912�y� sy1919�w n a 1991 on f
o
Y�j19S`SACHU5� da O � �a� ACS �NOIAtl ,aa _
Nathan J. Zangerle, Assistant Secretary
oOn this 10th day of June 2026 before me personally appeared Nathan J. Zangerle, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance a)
to Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes `=
therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written.
OR) f °d,Sp d0
I - � 5iiW' Commonwealth of Pennsylvania - Notary Seal
O jjjt~op� ?:,` '_ Teresa Pastella, Notary Public /n/
O Montgomery CMarcy /1 /rll�%� 0)
O 2 OF My commission expires March 28, 2029O
CO q c Commission number 1126044 By:
N \ 2 < YC1l,G. Member, Pennsylvania Association of Notaries Teresa Pastella, Notary Public Q O
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ao M
ARTICLE IV — OFFICERS: Section 12, Power of Attorney. co
0
O Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the a
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety m
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall -o
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such o ar
Zinstruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the _Q '
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. T
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangerle, Assistant Secretary to appoint such
attorneys -in -fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and
other surety obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of linty assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and -Binding upon the'rtoinpany with
the same force and effect as though manually affixed. —
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and Vest Ahterican Insurance Go'mpanydo
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said C irnpanies, is in fi. l force add effect znd
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of
P4 {NSU,�q P�'jy INSU� a 1NSU'D �° _
Y� U o m W i o cn
,-
1912CO O ;1919 o 1991 0
add ssgcxu5`�dD yo �HamPy' dD may, NDrANA da By. Renee C. Llewell n Assistant Secreta
LMS-12873 LMIC OCIC WAIC Multi Co 02/24
Liberty
tr Mutual.
SURETY
Figure: 28 TAC § 1.601(a)(2)(B)
Have a complaint or need help?
If you have a problem with a claim or your premium, call your insurance company or
HMO first. If you can't work out the issue, the Texas Department of Insurance may be
able to help.
Even if you file a complaint with the Texas Department of Insurance, you should also file
a complaint or appeal through your insurance company or HMO. If you don't, you may
lose your right to appeal.
Liberty Mutual Insurance Company
To get information or file a complaint with your insurance company or HMO:
Call: Liberty Mutual Surety Claims at 206-473-6210
Online: www.LibertyMutua]SuretyClaims.com
Email: HOSCL@Iibertymutual.com
Mail: P.O. Box 34526 Seattle, WA 98124
The Texas Department of Insurance
To get help with an insurance question or file a complaint with the state:
Call with a question: 1-800-252-3439
File a complaint: www.tdi.texas.gov
Email: ConsumerProtection@tdi.texas.gov
Mail: MC 111-1A, P.O. Box 149091, Austin, TX 78714-9091
,Tiene una queja o necesita ayuda?
Si tiene, un problema con una reclamacion o con su prima de seguro, [lame primero a
su compania de seguros o HMO. Si no puede resolver el problema, es posible que el
Departamento de Seguros de Texas (Texas Department of Insurance, por su nombre en
ingles) pueda ayudar.
Aun Si usted presenta una queja ante el Deparamento de Seguros de Texas, tambien
debe presentar una queja a traves del proceso de quejas o de apelaciones de su
compania de seguros o HMO. Si no lo hace, podr1a perder su derecho para apelar.
Liberty Mutual Insurance Company
Para obtener informacion o para presentar una queja ante su compania de seguros o
HMO:
LMS-15292e 9/20
Llame a: Liberty Mutual Surety Claims all 206-473-6210
En linear www.LibertyMutualSuretyClaims.com
Correo electronico: HOSCL@Iibertymutual.com
Direccion postal: P.O. Box 34526 Seattle, WA 98124
El Departamento de Seguros de Texas
Para obtener ayuda con una pregunta relacionada con los seguros o para presentar
una queja ante el estado:
Llame con sus preguntas al: 1-800-252-3439
Presente una queja en: www.tdi.texas.gov
Correo electronico: ConsumerProtection@tdi.texas.gov
Direccion postal: MC 111-1A, P.O. Box 149091, Austin, TX 78714-9091
LMS-15292e 9120
0062 18- 1
MAINTENANCE BOND
Page I of 3
SECTION 0062 19
MAINTENANCE BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
Bond Number: 022247376
KNOW ALL BY THESE PRESENTS:
That we TEXAS COMMERCIAL CONSTRUCTION, LLC. , known as "Principal" herein
and Liberty Mutual Insurance Company , a corporate surety (sureties, if more than one)
duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are
held and firmly bound unto the Developer, 821 E. TERRELL AVE. LLC., authorized to
do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in
the sum of ninety-four thousand three hundred thirty-seven dollars and fifty cents. ($94,337.50),
lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which
sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors,
we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly
by these presents.
WHEREAS, Developer and City have entered into an Agreement for the construction of community
facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number
26-0076 ; and
WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
the Z z day of s-tP .'- b'✓ 20ZG, which Contract is hereby referred to and
a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and
other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a
duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and
designated as 821 AND 901 E TERRELL AVE IMPROVEMENTS — COFW Project No. # 106853,
and
WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance
with the plans, specifications and Contract Documents that the Work is and will remain free from defects
in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance
of the Work by the City ("Maintenance Period"); and
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT # 106853
From Version September 1, 2015
00 6218- 2
MAINTENANCE BOND
Page 2 of 3
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon
receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance
Period.
NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any
defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory
to the City, then this obligation shall become null and void; otherwise to remain in full force and effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed
defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be
repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety
under this Maintenance Bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant
County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division;
and
PROVIDED FURTHER, that this obligation shall be continuous in nature and successive
recoveries may be had hereon for successive breaches.
CITY OF FORT WORTH 821 AND 901 E TERRELLAVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT # 106853
From Version September 1, 2015
006218-3
MAINTENANCE BOND
Page 3 of 3
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the ZZ % j day of Sep
TEJAS COMMERCIAL CONSTRUCTION,
LLC.
ATTEST: BY: VA'.P
SignatureP
0Z. Charles Allen, Vice Press �`*'•; '"
(Principal) Secretary Name and Title ' •
Address: 47�+
P.O. Box 10395 .�, '�
Fort Worth, TX, 76119��
•
Witness as to Principal ' Y� �mA'79,••••4,s'
SURETY:
Liberty Mutual Insurance Company
ATTEST: BY:
Signature _ M
Jordan Pitts, Attorney -In -Fact _ ` ` (Surety) Secretary Melissa Pitts Name and Title
Address:
PO Box 34526
Seattle, WA 98124
Witn ss as to urety Lloyd Ray Pitts Jr
Telephone Number: 469-661-0314
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the
by-laws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT # 106853
From Version September 1.2015
Liberty POWER OF ATTORNEY
MLituale Liberty Mutual Insurance Company Certificate No: 8216390-992468
SURETY The Ohio Casualty Insurance Company
West American Insurance Company
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Jordan Pitts,
Lloyd Ray Pitts, Jr.: William D. Birdsong
all of the city of Garland state of TX each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons,
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 10th day of June , 2026 .
to
c
MI State of PENNSYLVANIA
I County of MONTGOMERY ss
On this 10th day of June 2026 before me personally appeared Nathan J. Zangerle, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance f j a)
ca Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
therein contained by sionine on behalf of the corporations by himself as a duly authorized officer. >
N �
-•a
Mtn
m
o�
0
0 (6
Liberty Mutual Insurance Company
�Jpc %NsJ R9y Op\ 1 INS, PThe Ohio Casualty Insurance Company
qr h o qr yO
West American Insurance Company
1919 By.
Nathan J. Zanqerle, Assistant Secretary
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written.
P4
commonweallh of Pennsylvania - Notary Seal
lYcp<''y` Teresa Ptstelle, Notary CPublic
OF MontgomeryCounty
My commission Ma
rch Marcch 28, 2029
Commission number 1126044
Member. Pennsylvania Association at Notaries
rn
O
� tB
By: /14-t'--) LLJ0 m
Teresa Pastella, Notary Public i< o
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangerle, Assistant Secretary to appoint such
attorneys -in -fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and
other surety obligations. •-
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary. of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid•and-binding.upoh the Gompany with
the same force and effect as though manually affixed. - -
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West -American Insurance Company do -
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said CcmpaniJs in full farce and effect aid
has not been revoked. ' `_
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this day of
c -0k
9120 0 1919
cusa OFhHaMPy�aa3
LMS-12873 LMIC OCIC WAIC Multi Co 02124
INSU�p - - •
VP�oRPORq-1y -
� zo Fe C1m •
1991
a
g '4'e, "' ,4b y Renee C. Llewellyn, Assistant Secretary
Liberty
Mutual
SURETY
Figure: 28 TAC § 1.601(a)(2)(B)
Have a complaint or need help?
If you have a problem with a claim or your premium, call your insurance company or
HMO first. If you can't work out the issue, the Texas Department of Insurance may be
able to help.
Even if you file a complaint with the Texas Department of Insurance, you should also file
a complaint or appeal through your insurance company or HMO. If you don't, you may
lose your right to appeal.
Liberty Mutual Insurance Company
To get information or file a complaint with your insurance company or HMO:
Call: Liberty Mutual Surety Claims at 206-473-6210
Online: www.LibertyMutualSuretyClaims.com
Email: HOSCL@Iibertymutual.com
Mail: P.O. Box 34526 Seattle, WA 98124
The Texas Department of Insurance
To get help with an insurance question or file a complaint with the state:
Call with a question: 1-800-252-3439
File a complaint: www.tdi.texas.gov
Email: ConsumerProtection@tdi.texas.gov
Mail: MC 111-1 A, P.O. Box 149091, Austin, TX 78714-9091
,Tiene una queja o necesita ayuda?
Si tiene, un problema con una reclamacion o con su prima de seguro, Ilame primero a
su compania de seguros o HMO. Si no puede resolver el problema, es posible que el
Departamento de Seguros de Texas (Texas Department of Insurance, por su nombre en
ingles) pueda ayudar.
Aun si usted presenta una queja ante el Deparamento de Seguros de Texas, tambien
debe presentar una queja a traves del proceso de quejas o de apelaciones de su
compania de seguros o HMO. Si no lo hace, podria perder su derecho para apelar.
Liberty Mutual Insurance Company
Para obtener informacion o para presentar una queja ante su compania de seguros o
HMO:
LMS-15292e 9120
Llame a: Liberty Mutual Surety Claims al 206-473-6210
En Iinea: www.LibertyMutualSuretyClaims.com
Correo electronico: HOSCL@Iibertymutual.com
Direccion postal: P.O. Box 34526 Seattle, WA 98124
El Departamento de Seguros de Texas
Para obtener ayuda con una pregunta relacionada con los Seguros o para presentar
una queja ante el estado:
Llame con sus preguntas al: 1-800-252-3439
Presente una queja en: www.tdi.texas.gov
Correo electronico: ConsumerProtection@tdi.texas.gov
Direccion postal: MC 111-1A, P.O. Box 149091, Austin, TX 78714-9091
LMS-15292e 9120
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Page
Article I — Definitions and Terminology............................................................................................................I
1.01
Defined Terms...............................................................................................................................1
1.02
Terminology..................................................................................................................................
5
Article2 — Preliminary Matters...........................................................................................................................
6
2.01
Before Starting Construction.........................................................................................................6
2.02
Preconstruction Conference..........................................................................................................
6
2.03
Public Meeting..............................................................................................................................
6
Article 3 — Contract Documents and Amending.................................................................................................
6
3.01
Reference Standards......................................................................................................................
6
3.02
Amending and Supplementing Contract Documents...................................................................
6
Article 4 — Bonds and Insurance..........................................................................................................................
7
4.01
Licensed Sureties and Insurers......................................................................................................7
4.02
Performance, Payment, and Maintenance Bonds.........................................................................
7
4.03
Certificates of Insurance...............................................................................................................
7
4.04
Contractor's Insurance..................................................................................................................
9
4.05
Acceptance of Bonds and Insurance; Option to Replace...........................................................12
Article 5 — Contractor's Responsibilities...........................................................................................................12
5.01
Supervision and Superintendent.................................................................................................12
5.02
Labor; Working Hours................................................................................................................13
5.03
Services, Materials, and Equipment...........................................................................................13
5.04
Project Schedule..........................................................................................................................14
5.05
Substitutes and "Or-Equals".......................................................................................................14
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors) ......................................16
5.07
Concerning Subcontractors, Suppliers, and Others....................................................................16
5.08
Wage Rates..................................................................................................................................18
5.09
Patent Fees and Royalties...........................................................................................................19
5.10
Laws and Regulations.................................................................................................................19
5.11
Use of Site and Other Areas........................................................................................................19
5.12
Record Documents......................................................................................................................
20
5.13
Safety and Protection..................................................................................................................21
5.14
Safety Representative..................................................................................................................
21
5.15
Hazard Communication Programs.............................................................................................22
5.16
Submittals....................................................................................................................................
22
5.17
Contractor's General Warranty and Guarantee..........................................................................
23
CITY OF FORT
WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January
10, 2013
5.18 Indemnification........................................................................................................................... 24
5.19 Delegation of Professional Design Services............................................................................... 24
5.20 Right to Audit:............................................................................................................................. 25
5.21 Nondiscrimination....................................................................................................................... 25
Article6 — Other Work at the Site..................................................................................................................... 26
6.01 Related Work at Site................................................................................................................... 26
Article 7 — City's Responsibilities.................................................................................................................... 26
7.01 Inspections, Tests, and Approvals................................................................................................... 26
7.02 Limitations on City's Responsibilities........................................................................................26
7.03 Compliance with Safety Program............................................................................................... 27
Article 8 — City's Observation Status During Construction..............................................................................27
8.01 City's Project Representative......................................................................................................27
8.02 Authorized Variations in Work...................................................................................................27
8.03 Rejecting Defective Work...................................................................................................... 27
8.04 Determinations for Work Performed..........................................................................................28
Article9 — Changes in the Work....................................................................................................................... 28
9.01 Authorized Changes in the Work................................................................................................ 28
9.02 Notification to Surety..................................................................................................................28
Article 10 — Change of Contract Price; Change of Contract Time................................................................... 28
1001 Change of Contract Price............................................................................................................28
10.02 Change of Contract Time............................................................................................................28
1003 Delays.......................................................................................................................................... 28
Article 11 — Tests and Inspections; Correction, Removal or Acceptance of Defective Work.........................29
11.01 Notice of Defects........................................................................................................................29
11.02 Access to Work...........................................................................................................................29
11.03 Tests and Inspections.................................................................................................................. 29
11.01 Uncovering Work.................................................................................................................. 30
11.05 City May Stop the Work............................................................................................................. 30
11.06 Correction or Removal of Defective Work............................................................................ 30
11.07 Correction Period........................................................................................................................ 30
11.08 City May Correct Defective Work............................................................................................. 31
Article12— Completion.................................................................................................................................... 32
1201 Contractor's Warranty of Title.................................................................................................... 32
1202 Partial Utilization........................................................................................................................ 32
1203 Final Inspection........................................................................................................................... 32
1204 Final Acceptance......................................................................................................................... 33
Article13 — Suspension of Work...................................................................................................................... 33
13.01 City May Suspend Work......................................................................................................................... 33
Article14 — Miscellaneous................................................................................................................................ 34
1401 Giving Notice.............................................................................................................................. 34
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
14.02 Computation of Times................................................................................................................34
14.03 Cumulative Remedies................................................................................................................. 34
1404 Survival of Obligations...............................................................................................................35
14.05 Headings...................................................................................................................................... 35
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of 35
ARTICLE 1- DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents orforms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) --A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
c. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
m. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if not
attached, as incorporated by reference and described in the Table of Contents of the
Project's Contract Documents
o. Drawings
p. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are notContract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
H. Day or day —A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the City
of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by Contractor.
Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations —Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an intermediate
Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of theAgreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of theAgreement.
23. Plans — See definition of Drawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of theProject.
28. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6: 00 p.m., Monday thru
Friday (excluding legal holidays).
29. Samples —Physical examples of materials, equipment, or workmanship that are representative
of some portion of the Work and which establish the standards by which such portion of the
Work will be judged.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
007310-4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and certain
administrative requirements and procedural matters applicable thereto. Specifications may be
specifically made a part of the Contract Documents by attachment or, if not attached, may be
incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each
Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements of
the City.
34. Subcontractor An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a part of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a
direct contract with Contractor or with any Subcontractor to furnish materials or equipment
to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes,
vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing
such facilities, including but not limited to, those that convey electricity, gases, steam, liquid
petroleum products, telephone or other communications, cable television, water, wastewater,
storm water, other liquids or chemicals, or traffic or other control systems.
40. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field Order,
and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal
holidays authorized by the City for contract purposes, in which weather or other conditions
not under the control of the Contractor will permit the performance of the principal unit of
work underway for a continuous period of not less than 7 hours between 7 a.m. and 6p.m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory,
faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the
word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing
and incorporating in the Work including all necessary labor, materials, equipment, and
everything necessary to perform the Work indicated, unless specifically limited in the context
used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2- PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3— CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty or authority to
supervise or direct the performance of the Work or any duty or authority to undertake
responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the
Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -
Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4— BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such
surety and insurance companies shall also meet such additional requirements and qualifications as
may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal
to the Contract Price as security to protect the City against any defects in any portion of the Work
described in the Contract Documents. Maintenance bonds shall remain in effect for two (2)
years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise
by Laws or Regulations, and shall be executed by such sureties as are named in the list of
"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by
an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which
shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its
right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply with
the requirements of Paragraphs 4.01 and4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of insurance
requested by City or any other additional insured) which Contractor is required to purchase and
maintain.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured,
be complete in its entirety, and show complete insurance carrier names as listed in the current
A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII
in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management. If the rating is below that required,
written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of
the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full compliance
with the insurance requirements or failure of the City to identify a deficiency from evidence
that is provided shall not be construed as a waiver of Contractor's obligation to maintain such
lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such insurance
coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -
dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to make
reasonable adjustments to insurance coverage's and their limits when deemed necessary and
prudent by the City based upon changes in statutory law, court decision or the claims history
of the industry as well as of the contracting party to the City. The City shall be required to
provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the
Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions, revisions,
or modifications shall not be required where policy provisions are established by law or
regulations binding upon either party or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers'
Liability as is appropriate for the Work being performed and as will provide protection from
claims set forth below which may arise out of or result from Contractor's performance of the
Work and Contractor's other obligations under the Contract Documents, whether it is to be
performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly
employed by any of them to perform any of the Work, or by anyone for whose acts any of them
may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of 35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services
Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other
insurance or self-insurance programs afforded to the City. The Commercial General Liability
policy, shall have no exclusions by endorsements that would alter of nullify premises/operations,
products/completed operations, contractual, personal injury, or advertising injury, which are
normally contained with the policy, unless the City approves such exclusions in writing.
1. For construction projects that present a substantial completed operation exposure, the City may
require the contractor to maintain completed operations coverage for a minimum of no less
than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making
the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an
amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired andnon-owned.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of 35
1) $1,000,000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and operated
by: None
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate: None
Enter limits provided by Railroad Company (If none, write none)
b. Each Occurrence: None
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the amount
stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's right-
of-way, all such other work may be covered in a single policy for that railroad, even though
the work may be at two or more separate locations.
No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as the
insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or
other loss of insurance coverage. Contractor shall stop work until replacement insurance has been
procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain
all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify
the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain
prior to any change in the required coverage.
ARTICLE 5- CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such
attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at the
Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the
Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction equipment
and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities,
temporary facilities, and all other facilities and incidentals necessary for the performance,
Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and
the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for
projects with City participation shall be made byparticipating change orders.
5.05 Substitutes and "Or -Equals"
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless the
specification or description contains or is followed by words reading that no like, equivalent, or
"or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be accomplished
without compliance with some or all of the requirements for approval of proposed substitute
items. For the purposes of this Paragraph 5.05.A. 1, a proposed item of material or equipment
will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2 Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 01 25 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with the
Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence,
or procedure of construction is expressly required by the Contract Documents, Contractor may
furnish or utilize a substitute means, method, technique, sequence, or procedure of construction
approved by City. Contractor shall submit sufficient information to allow City, in City's sole
discretion, to determine that the substitute proposed is equivalent to that expressly called for by
the Contract Documents. Contractor shall make written application to City for review in the same
manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal
or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to
furnish additional data about the proposed substitute. City will be the sole judge of acceptability.
No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete,
which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal
for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out of
the use of substituted materials orequipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types requiring
pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
1:1 Required for this Contract.
(Check this box if there is any City Participation)
❑ Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work under a
direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
Required for this Contract.
allot Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter
2258, Texas Government Code (as amended), including the payment of not less than the rates
determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated
in these contract documents. This penalty shall be retained by the City to offset its administrative
costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial determination,
before the 31st day after the date the City receives the information, as to whether good cause
exists to believe that the violation occurred. The City shall notify in writing the Contractor or
Subcontractor and any affected worker of its initial determination. Upon the City's determination
that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the
City shall retain the full amounts claimed by the claimant or claimants as the difference between
wages paid and wages due under the prevailing wage rates, such amounts being subtracted from
successive progress payments pending a final determination of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration
Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected
worker does not resolve the issue by agreement before the 15th day after the date the City makes
its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under
this section do not agree on an arbitrator before the 11th day after the date that arbitration is
required, a district court shall appoint an arbitrator on the petition of any of the persons. The City
is not a party in the arbitration. The decision and award of the arbitrator is final and binding on
all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
00 73 10-19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
occupation of each worker employed by the Contractor in the construction of the Work provided for
in this Contract; and (ii) the actual per diem wages paid to each worker. The records shallbe open at
all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall
pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the requirements
of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise
require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited to
all fees and charges of engineers, architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent
rights or copyrights incident to the use in the performance of the Work or resulting from the
incorporation in the Work of any invention, design, process, product, or device not specified in the
Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or
Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it
shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in
accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's
obligations under Paragraph 3.01.
5.11 Use of Site and OtherAreas
A. Limitation on Use of Site and OtherAreas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to any
such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting
from the performance of the Work.
2 At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional area
of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or action,
legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor
shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other
debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to
applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-
up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written
notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so.
The City may withhold Final Acceptance until clean-up is complete and cost are recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the
Work and make it ready for utilization by City or adjacent property owner. At the completion of
the Work Contractor shall remove from the Site all tools, appliances, construction equipment and
machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in
any manner that will endanger the structure, nor shall Contractor subject any part of the Work or
adjacent property to stresses or pressures that will endangerit.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and
approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders,
Field Orders, and written interpretations and clarifications in good order and annotated to show
changes made during construction. These record documents together with all approved
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon
completion of the Work, these record documents, any operation and maintenance manuals, and
Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate
locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take
all necessary precautions for the safety of, and shall provide the necessary protection to prevent
damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on or
off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements,
roadways, structures, utilities, and Underground Facilities not designated for removal,
relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons
or property, or to the protection of persons or property from damage, injury, or loss; and shall erect
and maintain all necessary safeguards for such safety and protection. Contractor shall notify
owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or among
employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will
be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the services,
materials, and equipment Contractor proposes to provide and to enable City to review the
information for the limited purposes required by Paragraph5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance
with the design concept shall be executed in conformity with the Contract Documents unless
otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the ContractDocuments.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design concept
of the completed Project as a functioning whole as indicated by the Contract Documents.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence, or
procedure of construction is specifically and expressly called for by the Contract Documents)
or to safety precautions or programs incident thereto. The review and acceptance of a separate
item as such will not indicate approval of the assembly in which the item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each such
variation by specific written notation thereof incorporated in or accompanying the Submittal.
City's review and acceptance shall not relieve Contractor from responsibility for complying
with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage causedby:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible;
or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to perform
the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or finalpayment;
the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other
work or property resulting therefrom which shall appear within a period of two (2) years from the
date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good
and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City
will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents,
employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION
PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE
EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES
BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION
OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without
limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against
such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be performed
by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this
Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO
OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL
OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN
PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such services
are required to carry out Contractor's responsibilities for construction means, methods, techniques,
sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified by
such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified to
Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance and
design criteria given and the design concept expressed in the Contract Documents. City's review
and acceptance of Submittals (except design calculations and design drawings) will be only for the
purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing Cityfunds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment
under this Contract, have access to and the right to examine and photocopy any directly pertinent
books, documents, papers, and records of the Contractor involving transactions relating to this
Contract. Contractor agrees that the City shall have access during Regular Working Hours to all
necessary Contractor facilities and shall be provided adequate and appropriate work space in order
to conduct audits in compliance with the provisions of this Paragraph. The City shall give
Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City.
The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published
in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6- OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by utility
owners. If such other work is not noted in the Contract Documents, then written notice thereof
will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City contractors,
proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage
of materials and equipment and the execution of such other work, and properly coordinate the
Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be
required to properly connect or otherwise make its several parts come together and properly
integrate with such other work. Contractor shall not endanger any work of others by cutting,
excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter
others' work with the written consent of City and the others whose work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work performed
by others under this Article 7, Contractor shall inspect such other work and promptly report to
City in writing any delays, defects, or deficiencies in such other work that render it unavailable
or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so
report will constitute an acceptance of such other work as fit and proper for integration with
Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7- CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph
5.13.
ARTICLE 8- CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on information
obtained during such visits and observations, City's Project Representative will determine, in
general, if the Work is proceeding in accordance with the Contract Documents. City's Project
Representative will not be required to make exhaustive or continuous inspections on the Site to
check the quality or quantity of the Work. City's Project Representative's efforts will be directed
toward providing City a greater degree of confidence that the completed Work will conform
generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on authority
and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will prejudice
the integrity of the design concept of the completed Project as a functioning whole as indicated by the
Contract Documents. City will have authority to conduct special inspection or testing of the Work as
provided in Article 11, whether or not the Work is fabricated, installed, or completed.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to reflect
changed factual conditions or more accurate data).
ARTICLE 9- CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or from
time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly
proceed with the Work involved which will be performed under the applicable conditions of the
Contract Documents (except as otherwise specifically provided). Extra Work shall be
memorialized by a Participating Change Order which may or may not precede an order of Extra
work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project
with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the general
scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract
Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount
of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change.
ARTICLE 10 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on
or in connection with any other project or anticipatedproject.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11- TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will have
access to the Site and the Work at reasonable times for their observation, inspection, and testing.
Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests,
or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of
the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or approvals,
pay all costs in connection therewith, and furnish City the required certificates of inspection or
approval; excepting, however, those fees specifically identified in the Supplementary Conditions
or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as
described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such
inspections, tests, re -tests, or approvals shall be performed by organizations approved by City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform
any inspections or tests ("Testing") for any part of the Work, as determined solely by City.
City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar
negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until
the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the
cause for such order has been eliminated; however, this right of City to stop the Work shall not give
rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an
acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been
rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or areas
made available for Contractor's use by City or permitted by Laws and Regulations as contemplated
in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in
accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs) arising
out of or relating to such correction or repair or such removal and replacement (including but not
limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to
such Work may be required to be extended for an additional period of one year after the end of
the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously.
In connection with such corrective or remedial action, City may exclude Contractor from all or
part of the Site, take possession of all or part of the Work and suspend Contractor's services related
thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored
at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights and
remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 - COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which City,
determines constitutes a separately functioning and usable part of the Work that can be used by
City for its intended purpose without significant interference with Contractor's performance of
the remainder of the Work. City at any time may notify Contractor in writing to permit City to
use or occupy any such part of the Work which City determines to be ready for its intended use,
subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of
the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other
requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 - SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall
resume the Work on the date so fixed. During temporary suspension of the Work covered by these
Contract Documents, for any reason, the City will stop contract time on City participation
projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract Time,
directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 - MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the otherparty.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies available
hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation
of, any rights and remedies available to any or all of them which are otherwise imposed or available
by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract
Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duty, obligation, right, and remedy to which
they apply.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
0073 10-35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised: January 10, 2013
011100-1
SUMMARY OF WORK
Page 1 of 3
SECTION 01 1100
SUMMARY OF WORK
GENERAL
SUMMARY
A. Section Includes:
1. Summary of Work to be performed in accordance with the Contract Documents
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
2. Division 1 - General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
1. Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised December 20, 2012
011100-2
SUMMARY OF WORK
Page 2 of 3
b. Excavated and waste materials shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
c. If the street is occupied by railroad tracks, the Work shall be carried on in such
manner as not to interfere with the operation of the railroad.
All Work shall be in accordance with railroad requirements set forth in Division
0 as well as the railroad permit.
B. Work within Easements
1. Do not enter upon private property for any purpose without having previously
obtained permission from the owner of such property.
2. Do not store equipment or material on private property unless and until the
specified approval of the property owner has been secured in writing by the
Contractor and a copy furnished to the City.
3. Unless specifically provided otherwise, clear all rights -of -way or easements of
obstructions which must be removed to make possible proper prosecution of the
Work as a part of the project construction operations.
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery,
plants, lawns, fences, culverts, curbing, and all other types of structures or
improvements, to all water, sewer, and gas lines, to all conduits, overhead pole
lines, or appurtenances thereof, including the construction of temporary fences
and to all other public or private property adjacent to the Work.
5. Notify the proper representatives of the owners or occupants of the public or
private lands of interest in lands which might be affected by the Work.
a. Such notice shall be made at least 48 hours in advance of the beginning of
the Work.
b. Notices shall be applicable to both public and private utility companies and
any corporation, company, individual, or other, either as owners or
occupants, whose land or interest in land might be affected by the Work.
c. Be responsible for all damage or injury to property of any character
resulting from any act, omission, neglect, or misconduct in the manner or
method or execution of the Work, or at any time due to defective work,
material, or equipment.
6. Fence
a. Restore all fences encountered and removed during construction of the
Project to the original or a better than original condition.
b. Erect temporary fencing in place of the fencing removed whenever the
Work is not in progress and when the site is vacated overnight, and/or at all
times to provide site security.
c. The cost for all fence work within easements, including removal, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised December 20, 2012
011100-3
SUMMARY OF WORK
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised December 20, 2012
012500-1
DAP SUBSTITUTION PROCEDURES
Page 1 of 4
SECTION 0125 00
SUBSTITUTION PROCEDURES
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. The procedure for requesting the approval of substitution of a product
that is not equivalent to a product which is specified by descriptive or
performance criteria or defined by reference to 1 or more of the
following:
a. Name of manufacturer
b. Name of vendor
c. Trade name
d. Catalog number
2. Substitutions are not "or -equals".
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various
items bid. No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the
City will consider formal requests from Contractor for substitution
of products in place of those specified.
2. Certain types of equipment and kinds of material are described in
Specifications by means of references to names of manufacturers and
vendors, trade names, or catalog numbers.
a. When this method of specifying is used, it is not intended to
exclude from consideration other products bearing other
manufacturer's or vendor's names, trade names, or catalog
numbers, provided said products are "or -equals," as determined
by City.
3. Other types of equipment and kinds of material may be acceptable
substitutions under the following conditions:
a. Or -equals are unavailable due to strike, discontinued production
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised August 30, 2013
012500-2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
of products meeting specified requirements, or other factors
beyond control of Contractor; or,
b. Contractor proposes a cost and/or time reduction incentive to the City.
1.5 SUBMITTALS
A. See Request for Substitution Form (attached)
B. Procedure for Requesting Substitution
1. Substitution shall be considered only:
a. After award of Contract
b. Under the conditions stated herein
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Complete data substantiating compliance of proposed
substitution with Contract Documents
2) Data relating to changes in construction schedule, when a
reduction is proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number and representative contact name
c) Specification Section or Drawing reference of
originally specified product, including discrete name or
tag number assigned to original product in the Contract
Documents
2) Manufacturer's literature clearly marked to show compliance
of proposed product with Contract Documents
3) Itemized comparison of original and proposed product
addressing product characteristics including, but not
necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrical or mechanical requirements
4) Product experience
a) Location of past projects utilizing product
b) Name and telephone number of persons associated with
referenced projects knowledgeable concerning
proposed product
c) Available field data and reports associated with proposed product
5) Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
1. Written approval or rejection of substitution given by the City
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised August 30, 2013
012500-3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
2. City reserves the right to require proposed product to comply with color
and pattern of specified product if necessary to secure design intent.
3. In the event the substitution is approved, if a reduction in cost or time
results, it will be documented by Change Order.
4. Substitution will be rejected if:
a. Submittal is not through the Contractor with his stamp of approval
b. Request is not made in accordance with this Specification Section
c. In the Developer's opinion, acceptance will require substantial
revision of the original design
d. In the City's or Developer's opinion, substitution will not perform
adequately the function consistent with the design intent
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. In making request for substitution or in using an approved product, the
Contractor represents that the Contractor:
1. Has investigated proposed product, and has determined that it is
adequate or superior in all respects to that specified, and that it will
perform function for which it is intended
2. Will provide same guarantee for substitute item as for product specified
3. Will coordinate installation of accepted substitution into Work, to
include building modifications if necessary, making such changes as
may be required for Work to be complete in all respects
4. Waives all claims for additional costs related to substitution which
subsequently arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised August 30, 2013
012500-4
DAP SUBSTITUTION PROCEDURES
Page 4 of 4
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
TO:
PROJECT:
DATE:
We hereby submit for your consideration the following product instead of the
specified item for the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete information on changes to Drawings and/or Specifications which
proposed substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including
engineering and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or
superior to the specified item.
Submitted By: For Use by City
Signature
as noted
Firm
Address
Date
Telephone
For Use by City:
Approved
City
Recommended _Recommended
Not recommended Received late
By:
Date:
Remarks:
Rejected
Date:
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CITY PROJECT # 106853
Revised August 30, 2013
013119-1
PRECONSTRUCTION MEETING
Page 1 of 3
SECTION 0131 19
PRECONSTRUCTION MEETING
PART 1- GENERALPREV
1.1 SUMMARY
A. Section Includes:
1. Provisions for the preconstruction meeting to be held prior to the start of Work to
clarify construction contract administration procedures
B. Deviations from this City of Fort Worth Standard Specification
1. No construction schedule required unless requested by the City.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Attend preconstruction meeting.
2. Representatives of Contractor, subcontractors and suppliers attending meetings
shall be qualified and authorized to act on behalf of the entity each represents.
3. Meeting administered by City may be tape recorded.
a. If recorded, tapes will be used to prepare minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A preconstruction meeting will be held within 14 days after the delivery of the
distribution package to the City.
The meeting will be scheduled and administered by the City.
2. The Project Representative will preside at the meeting, prepare the notes of the
meeting and distribute copies of same to all participants who so request by fully
completing the attendance form to be circulated at the beginning of the meeting.
3. Attendance shall include:
a. Developer and Consultant
b. Contractor's project manager
c. Contractor's superintendent
d. Any subcontractor or supplier representatives whom the Contractor may
desire to invite or the City may request
e. Other City representatives
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
01 3119-2
PRECONSTRUCTION MEETING
Page 2 of 3
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements, or other pertinent
permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
S. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
jj. Questions or Comments
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013119-3
PRECONSTRUCTION MEETING
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013233-1
PRECONSTRUCTION VIDEO
Page 1 of 2
SECTION 01 32 33
PRECONSTRUCTION VIDEO
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for:
a. Preconstruction Videos
B. Deviations from this City of Fort Worth Standard Specification
1. Though not mandatory, it is highly recommended on infill developer projects.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produce a preconstruction video of the site/alignment, including all areas in the
vicinity of and to be affected by construction.
a. Provide digital copy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
period.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013233-2
PRECONSTRUCTION VIDEO
Page 2 of 2
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
01 3300- 1
DAP SUBMITTALS
Page 1 of 7
SECTION 0133 00
DAP SUBMITTALS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
General methods and requirements of submissions applicable to the following Work -
related submittals:
a. Shop Drawings
b. Product Data (including Standard Product List submittals)
c. Samples
d. Mock Ups
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid. No
separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Notify the City in writing, at the time of submittal, of any deviations in the submittals
from the requirements of the Contract Documents.
2. Coordination of Submittal Times
a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing
the related Work or other applicable activities, or within the time specified in the
individual Work Sections, of the Specifications.
b. Contractor is responsible such that the installation will not be delayed by processing
times including, but not limited to:
a) Disapproval and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
f) Delivery
Similar sequenced activities
c. No extension of time will be authorized because of the Contractor's failure to
transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013300-2
DAP SUBMITTALS
Page 2 of 7
d. Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the work of any other contractor.
A. Submittal Numbering
When submitting shop drawings or samples, utilize a 9 -character submittal cross-
reference identification numbering system in the following manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. For the next 2 digits number use numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each specific Section number.
c. Last use a letter, A -Z, indicating the resubmission of the same drawing (i.e.
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
submittal number would be as follows:
[II6�C1IIIIIZII:
1) 03 30 00 is the Specification Section for Concrete
2) 08 is the eighth initial submittal under this Specification Section
3) B is the third submission (second resubmission) of that particular shop
drawing
B. Contractor Certification
Review shop drawings, product data and samples, including those by
subcontractors, prior to submission to determine and verify the following:
a. Field measurements
b. Field construction criteria
c. Catalog numbers and similar data
d. Conformance with the Contract Documents
2. Provide each shop drawing, sample and product data submitted by the Contractor
with a Certification Statement affixed including:
a. The Contractor's Company name
b. Signature of submittal reviewer
c. Certification Statement
1) "By this submittal, I hereby represent that I have determined and verified
field measurements, field construction criteria, materials, dimensions,
catalog numbers and similar data and I have checked and coordinated each
item with other applicable approved shop drawings."
C. Submittal Format
1. Fold shop drawings larger than 8th inches x 11 inches to 8 t/2 inches x l linches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples /Calculations
D. Submittal Content
1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013300-3
DAP SUBMITTALS
Page 3 of 7
2. The Project title and number
3. Contractor identification
4. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the Work or materials
8. Applicable standards, such as ASTM or Federal Specification numbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
11. An 8 -inch x 3 -inch blank space for Contractor and City stamps
E. Shop Drawings
1. As specified in individual Work Sections includes, but is not necessarily limited to:
a. Custom -prepared data such as fabrication and erection/installation (working)
drawings
b. Scheduled information
C. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Special wiring diagrams
g. Coordination drawings
h. Individual system or equipment inspection and test reports including:
1) Performance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts to the main members and lines of the structure
b. Where correct fabrication of the Work depends upon field measurements
Provide such measurements and note on the drawings prior to submitting for
approval.
F. Product Data
1. For submittals of product data for products included on the City's Standard Product
List, clearly identify each item selected for use on the Project.
2. For submittals of product data for products not included on the City's Standard
Product List, submittal data may include, but is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data)
1) Such as the manufacturer's product specification and installation instructions
2) Availability of colors and patterns
3) Manufacturer's printed statements of compliances and applicability
4) Roughing -in diagrams and templates
5) Catalog cuts
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013300-4
DAP SUBMITTALS
Page 4 of 7
6) Product photographs
7) Standard wiring diagrams
8) Printed performance curves and operational -range diagrams
9) Production or quality control inspection and test reports and certifications
10) Mill reports
11) Product operating and maintenance instructions and recommended spare -parts
listing and printed product warranties
12) As applicable to the Work
H. Samples
As specified in individual Sections, include, but are not necessarily limited to:
a. Physical examples of the Work such as:
1) Sections of manufactured or fabricated Work
2) Small cuts or containers of materials
3) Complete units of repetitively used products color/texture/pattern swatches and
range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to be used by the City for independent
inspection and testing, as applicable to the Work
1. Do not start Work requiring a shop drawing, sample or product data nor any material to be
fabricated or installed prior to the approval or qualified approval of such item.
1. Fabrication performed, materials purchased or on -site construction accomplished which
does not conform to approved shop drawings and data is at the Contractor's risk.
2. The City will not be liable for any expense or delay due to corrections or remedies
required to accomplish conformity.
3. Complete project Work, materials, fabrication, and installations in conformance with
approved shop drawings, applicable samples, and product data.
J. Submittal Distribution
1. Electronic Distribution
a. Confirm development of Project directory for electronic submittals to be uploaded
to City's Buzzsaw site, or another external FTP site approved by the City.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate City
representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than 1 hard copy of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
c. Product Data
1) Upload submittal to designated project directory and notify appropriate City
representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013300-5
DAP SUBMITTALS
Page 5 of 7
a. Shop Drawings
1) Distributed to the City
2) Copies
a. 8 copies for mechanical submittals
b. 7 copies for all other submittals
c. If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Samples
1) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
Distribute reproductions of approved shop drawings and copies of approved product
data and samples, where required, to the job site file and elsewhere as directed by
the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal Review
1. The review of shop drawings, data and samples will be for general conformance with
the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the City does
not relieve the Contractor from his/her responsibility with regard to the fulfillment of
the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the Work
with all other associated work and trades, for selecting fabrication processes, for
techniques of assembly and for performing Work in a safe manner.
4. If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requirements which City finds to be in the interest of the
City and to be so minor as not to involve a change in Contract Price or time for
performance, the City may return the reviewed drawings without noting an exception.
5. Submittals will be returned to the Contractor under 1 of the following codes:
a. Code 1
1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or
comments on the submittal.
a. When returned under this code the Contractor may release the equipment
and/or material for manufacture.
b. Code 2
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013300-6
DAP SUBMITTALS
Page 6 of 7
1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the
notations and comments IS NOT required by the Contractor.
a. The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the final
product.
c. Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned
when notations and comments are extensive enough to require a resubmittal of
the package.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the final
product.
b) This resubmittal is to address all comments, omissions and non -conforming
items that were noted.
c) Resubmittal is to be received by the City within 15 Calendar Days of the
date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED" is assigned when the submittal does not meet the intent of
the Contract Documents.
a) The Contractor must resubmit the entire package revised to bring the
submittal into conformance.
b) It may be necessary to resubmit using a different manufacturer/vendor to
meet the Contract Documents.
6. Resubmittals
a. Handled in the same manner as first submittals
1) Corrections other than requested by the City
2) Marked with revision triangle or other similar method
a) At Contractor's risk if not marked
b. Submittals for each item will be reviewed no more than twice at the City's expense.
1) All subsequent reviews will be performed at times convenient to the City and at
the Contractor's expense, based on the City's or City Representative's then
prevailing rates.
2) Provide Contractor reimbursement to the City within 30 Calendar Days for all
such fees invoiced by the City.
c. The need for more than 1 resubmission or any other delay in obtaining City's
review of submittals, will not entitle the Contractor to an extension of Contract
Time.
7. Partial Submittals
a. City reserves the right to not review submittals deemed partial, at the City's
discretion.
b. Submittals deemed by the City to be not complete will be returned to the
Contractor, and will be considered "Not Approved" until resubmitted.
c. The City may at its option provide a list or mark the submittal directing the
Contractor to the areas that are incomplete.
8. If the Contractor considers any correction indicated on the shop drawings to constitute a
change to the Contract Documents, then written notice must be provided thereof to the
Developer at least 7 Calendar Days prior to release for manufacture.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013300-7
DAP SUBMITTALS
Page 7 of 7
9. When the shop drawings have been completed to the satisfaction of the City, the
Contractor may carry out the construction in accordance therewith and no further
changes therein except upon written instructions from the City.
10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
following receipt of submittal by the City.
L. Mock ups
1. Mock Up units as specified in individual Sections, include, but are not necessarily
limited to, complete units of the standard of acceptance for that type of Work to be used
on the Project. Remove at the completion of the Work or when directed.
M. Qualifications
If specifically required in other Sections of these Specifications, submit a P.E. Certification
for each item required.
N. Request for Information (RFI)
Contractor Request for additional information
a. Clarification or interpretation of the contract documents
b. When the Contractor believes there is a conflict between Contract Documents
c. When the Contractor believes there is a conflict between the Drawings and
Specifications
1) Identify the conflict and request clarification
2. Sufficient information shall be attached to permit a written response without further
information.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
12/20/2012
D. Johnson
1.4.K.8. Working Days modified to Calendar Days
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August 30, 2013
013513-1
DAP SPECIAL PROJECT PROCEDURES
Page 1 of 7
SECTION 01 35 13
SPECIAL PROJECT PROCEDURES
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
The procedures for special project circumstances that includes, but is not limited to:
a. Coordination with the Texas Department of Transportation
b. Work near High Voltage Lines
c. Confined Space Entry Program
d. Air Pollution Watch Days
e. Use of Explosives, Drop Weight, Etc.
f. Water Department Notification
g. Public Notification Prior to Beginning Construction
h. Coordination with United States Army Corps of Engineers
i. Coordination within Railroad permits areas
j. Dust Control
k. Employee Parking
1. [Coordination with North Central Texas Council of Governments Clean
Construction Specification [remove if not required]]
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
3. Section 33 12 25 — Connection to Existing Water Mains
1.2 REFERENCES
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this Specification,
unless a date is specifically cited.
2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High
Voltage Overhead Lines.
3. North Central Texas Council of Governments (NCTCOG) - Clean Construction
Specification
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordination with the Texas Department of Transportation
1. When work in the right-of-way which is under the jurisdiction of the Texas Department
of Transportation (TxDOT):
a. Notify the Texas Department of Transportation prior to commencing any work
therein in accordance with the provisions of the permit
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
01 35 13 -2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
b. All work performed in the TxDOT right-of-way shall be performed in compliance
with and subject to approval from the Texas Department of Transportation
B. Work near High Voltage Lines
1. Regulatory Requirements
a. All Work near High Voltage Lines (more than 600 volts measured between
conductors or between a conductor and the ground) shall be in accordance with
Health and Safety Code, Title 9, Subtitle A, Chapter 752.
2. Warning sign
a. Provide sign of sufficient size meeting all OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage -type of guard about the boom or arm
b. Insulator links on the lift hook connections for back hoes or dippers
c. Equipment must meet the safety requirements as set forth by OSHA and the safety
requirements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
a. Notification shall be given to:
1) The power company (example: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
b. Coordination with power company
1) After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower
the lines
c. No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Space Entry Program
1. Provide and follow approved Confined Space Entry Program in accordance with OSHA
requirements.
2. Confined Spaces include:
a. Manholes
b. All other confined spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Use of Explosives, Drop Weight, Etc.
1. When Contract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior
to commencing.
2) Minimum 24 hour public notification in accordance with Section 01 3113
E. Water Department Coordination
1. During the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to determine the best times for deactivating and activating
those lines.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
01 35 13 -3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
2. Coordinate any event that will require connecting to or the operation of an existing
City water line system with the City's representative.
a. Coordination shall be in accordance with Section 33 12 25.
b. If needed, obtain a hydrant water meter from the Water Department for use
during the life of named project.
c. In the event that a water valve on an existing live system be turned off and
on to accommodate the construction of the project is required, coordinate
this activity through the appropriate City representative.
1) Do not operate water line valves of existing water system.
a) Failure to comply will render the Contractor in violation of Texas
Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the
Contractor will be prosecuted to the full extent of the law.
b) In addition, the Contractor will assume all liabilities and
responsibilities as a result of these actions.
B. Public Notification Prior to Beginning Construction
1. Prior to beginning construction on any block in the project, on a block by block
basis, prepare and deliver a notice or flyer of the pending construction to the front
door of each residence or business that will be impacted by construction. The notice
shall be prepared as follows:
a. Post notice or flyer 7 days prior to beginning any construction activity on each
block in the project area.
1) Prepare flyer on the Contractor's letterhead and include the following
information:
a) Name of Project
b) City Project No (CPN)
c) Scope of Project (i.e. type of construction activity)
d) Actual construction duration within the block
e) Name of the contractor's foreman and phone number
f) Name of the City's inspector and phone number
g) City's after-hours phone number
2) A sample of the `pre -construction notification' flyer is attached as Exhibit A.
3) Submit schedule showing the construction start and finish time for each block
of the project to the inspector.
4) Deliver flyer to the City Inspector for review prior to distribution.
b. No construction will be allowed to begin on any block until the flyer is delivered to
all residents of the block.
C. Public Notification of Temporary Water Service Interruption during Construction
1. In the event it becomes necessary to temporarily shut down water service to
residents or businesses during construction, prepare and deliver a notice or flyer of
the pending interruption to the front door of each affected resident.
2. Prepared notice as follows:
a. The notification or flyer shall be posted 24 hours prior to the temporary
interruption.
b. Prepare flyer on the contractor's letterhead and include the following information:
1) Name of the project
2) City Project Number
3) Date of the interruption of service
4) Period the interruption will take place
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
013513-4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector for
review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to all
affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USACE)
1. At locations in the Project where construction activities occur in areas where USACE
permits are required, meet all requirements set forth in each designated permit.
I. Coordination within Railroad Permit Areas
At locations in the project where construction activities occur in areas where railroad
permits are required, meet all requirements set forth in each designated railroad permit.
This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the Railroad
Company from damage arising out of and/or from the construction of the project.
Proper utility clearance procedures shall be used in accordance with the permit
guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
L. { Coordination with North Central Texas Council of Governments (NCTCOG) Clean
Construction Specification [if required for the project]
1. Comply with equipment, operational, reporting and enforcement requirements set forth
in NCTCOG's Clean Construction Specification.}
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
01 35 13 -5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
1.4 SUBMITTALS [NOT USED]
1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.6 CLOSEOUT SUBMITTALS [NOT USED]
1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.8 QUALITY ASSURANCE [NOT USED]
1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.10 FIELD [SITE] CONDITIONS [NOT USED]
1.11 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
1.3.B — Added requirement of compliance with Health and Safety Code, Title 9.
Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
01 35 13 -6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
NOTICE OF
CONSTRUCTION
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF
THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
01 35 13 -7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
EXHIBIT B
FORT WORTH
DOE NO. XXXX
Project Name:
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD,
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT)
OR
MR.
(CITY INSPECTOR)
YOUR
(TELEPHONE NUMBER)
AT
(TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
CONTRACTOR
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
Revised August, 30, 2013
014523-1
DAP TESTING AND INSPECTION SERVICES
Page 1 of 2
SECTION 0145 23
TESTING AND INSPECTION SERVICES
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordination
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
3. Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to City's document management system, or another form of
distribution approved by the City.
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
014523-2
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered
load of Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
03/20/2020
D.V. Magana
Removed reference to Buzzsaw and noted that electronic submittals be uploaded
through the City's document management system.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS CITY PROJECT # 106853
015000-1
DAP TEMPORARY FACILITIES AND CONTROLS
Page 1 of 4
SECTION 0150 00
TEMPORARY FACILITIES AND CONTROLS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
Provide temporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b. Sanitary facilities
c. Storage Sheds and Buildings
d. Dust control
e. Temporary fencing of the construction site
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Temporary Utilities
Obtaining Temporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules and regulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, heat and other utility services necessary for
execution, completion, testing and initial operation of Work.
2. Water
a. Contractor to provide water required for and in connection with Work to be
performed and for specified tests of piping, equipment, devices or other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised JULY 1, 2011
015000-2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and others performing work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off -site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Final Acceptance.
D. Temporary Fencing
1. Provide and maintain for the duration or construction when required in contract
documents
E. Dust Control
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised JULY 1, 2011
015000-3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1. Contractor is responsible for maintaining dust control through the duration of the
project.
a. Contractor remains on -call at all times
b. Must respond in a timely manner
F. Temporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporary Facilities
1. Maintain all temporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE -INSTALLATION
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised JULY 1, 2011
015000-4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1. Remove all temporary facilities and restore area after completion of the Work,
to a condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised JULY 1, 2011
01 5526-1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 1 of 3
SECTION 0155 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative procedures for:
a. Street Use Permit
b. Modification of approved traffic control
c. Removal of Street Signs
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
3. Section 34 71 13 — Traffic Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES
A. Reference Standards
1. Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
1.4 ADMINISTRATIVE REQUIREMENTS
A. Traffic Control
1. General
a. When traffic control plans are included in the Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
b. When traffic control plans are not included in the Drawings, prepare traffic
control plans in accordance with Section 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for review of proposed Traffic Control.
B. Street Use Permit
1. Prior to installation of Traffic Control, a City Street Use Permit is required.
a. To obtain Street Use Permit, submit Traffic Control Plans to City
Transportation and Public Works Department.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised July 1, 2011
01 5526-2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
1. Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Street Sign
1. If it is determined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirements of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD).
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised July 1, 2011
01 5526-3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised July 1, 2011
01 57 13- 1
DAP STORM WATER POLLUTION PREVENTION
Page 1 of 3
SECTION 015713
STORM WATER POLLUTION PREVENTION
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1 — General Requirements
3. Section 31 25 00 — Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Activities resulting in less than 1 acre of disturbance
A. Work associated with this Item is considered subsidiary to the various Items
bid. No separate payment will be allowed for this Item.
2. Construction Activities resulting in greater than 1 acre of disturbance
Measurement and Payment shall be in accordance with Section 31 25 00.
1.3 REFERENCES
A. Abbreviations and Acronyms
1. Notice of Intent: NOT
2. Notice of Termination: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on Environmental Quality: TCEQ
5. Notice of Change: NOC
B. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Integrated Storm Management (iSWM) Technical Manual for Construction
Controls
1.4 ADMINISTRATIVE REQUIREMENTS
A. General
1. Contractor is responsible for resolution and payment of any fines issued associated
with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised July 1, 2011
01 57 13-2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 31 25 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR 150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
3. 5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) 'TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 31 25 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
1.5 SUBMITTALS
A. SWPPP
Submit in accordance with Section 01 33 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised July 1, 2011
01 57 13-3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
B. Modified SWPPP
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
in accordance with Section 01 33 00.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- -PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised July 1, 2011
016000-1
DAP PRODUCT REQUIREMENTS
Page 1 of 2
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A list of City approved products for use is available through the City's website at:
https://apps.fortworthtexas.gov/ProiectResources/ and following the directory
path: 02 - Construction Documents\Standard Products List
A. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
B. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
C. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
D. See Section 01 33 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
016000-2
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
10/12/12
D. Johnson
Modified Location of City's Standard Product List
4/7/2014
M.Domenech
Revised for DAP application
03/20/2020
D.V. Magana
Removed reference to Buzzsaw and noted that the City approved products list is
accessible through the City's website.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised March 20, 2020
01 6600- 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page I of 4
SECTION 01 66 00
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Scheduling of product delivery
2. Packaging of products for delivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 66 00- 2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
4. Deliver products or equipment in manufacturer's original unbroken cartons or other
containers designed and constructed to protect the contents from physical or
environmental damage.
5. Clearly and fully mark and identify as to manufacturer, item and installation
location.
6. Provide manufacturer's instructions for storage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
manufacturer's recommendations and instructions.
C. Storage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Make necessary provisions for safe storage of materials and equipment.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts of Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locations that will
cause minimum inconvenience to other contractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
4. Restrict storage to areas available on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide off -site storage and protection when on -site storage is not adequate.
a. Provide addresses of and access to off -site storage locations for inspection by
City's Project Representative.
6. Do not use lawns, grass plots or other private property for storage purposes without
written permission of owner or other person in possession or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and compactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property owners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public and private driveways and street crossings open.
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
satisfaction of City's Project Representative.
a. Total length which materials may be distributed along route of construction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Representative.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 66 00- 3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3- EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. Tests and Inspections
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non -Conforming Work
1. Reject all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 66 00- 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 0l 4
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017000-1
DAP MOBILIZATION AND REMOBILIZATION
Page 1 of 4
SECTION 0170 00
MOBILIZATION AND REMOBILIZATION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mobilization and Demobilization
a. Mobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Contractor's operation
at the Site
3) Premiums paid for performance and payment bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another location within the designated Site
5) Relocation of necessary general facilities for the Contractor's operation
from 1 location to another location on the Site.
b. Demobilization
1) Transportation of Contractor's personnel, equipment, and operating supplies
away from the Site including disassembly
2) Site Clean-up
3) Removal of all buildings and/or other facilities assembled at the Site for this
Contract
c. Mobilization and Demobilization do not include activities for specific items of
work that are for which payment is provided elsewhere in the contract.
2. Remobilization
a. Remobilization for Suspension of Work specifically required in the Contract
Documents or as required by City includes:
1) Demobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly or temporarily securing
equipment, supplies, and other facilities as designated by the Contract
Documents necessary to suspend the Work.
b) Site Clean-up as designated in the Contract Documents
2) Remobilization
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site necessary to resume the Work.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site necessary to resume the Work.
3) No Payments will be made for:
a) Mobilization and Demobilization from one location to another on the
Site in the normal progress of performing the Work.
b) Stand-by or idle time
c) Lost profits
3. Mobilizations and Demobilization for Miscellaneous Projects
a. Mobilization and Demobilization
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017000-2
DAP MOBILIZATION AND REMOBILIZATION
Page 2 of 4
1) Mobilization shall consist of the activities and cost on a Work Order basis
necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies to the Site for the issued Work Order.
b) Establishment of necessary general facilities for the Contractor's
operation at the Site for the issued Work Order
2) Demobilization shall consist of the activities and cost necessary for:
a) Transportation of Contractor's personnel, equipment, and operating
supplies from the Site including disassembly for each issued Work
Order
b) Site Clean-up for each issued Work Order
c) Removal of all buildings or other facilities assembled at the Site for
each Work Oder
b. Mobilization and Demobilization do not include activities for specific items of
work for which payment is provided elsewhere in the contract.
4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
a. A Mobilization for Miscellaneous Projects when directed by the City and the
mobilization occurs within 24 hours of the issuance of the Work Order.
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Mobilization and Demobilization
a. Measure
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and materials furnished in accordance with this Item
are subsidiary to the various Items bid and no other compensation will be
allowed.
2. Remobilization for suspension of Work as specifically required in the Contract
Documents
a. Measurement
1) Measurement for this Item shall be per each remobilization performed.
b. Payment
1) The work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Specified Remobilization" in accordance with Contract
Documents.
c. The price shall include:
1) Demobilization as described in Section 1.1.A.2.a.1)
2) Remobilization as described in Section I.1.A.2.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017000-3
DAP MOBILIZATION AND REMOBILIZATION
Page 3 of 4
3. Remobilization for suspension of Work as required by City
a. Measurement and Payment
1) This shall be submitted as a Contract Claim in accordance with Article 10 of
Section 00 72 00.
2) No payments will be made for standby, idle time, or lost profits associated
with this Item.
4. Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and Demobilization
required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Mobilization" in accordance with Contract
Documents. Demobilization shall be considered subsidiary to mobilization
and shall not be paid for separately.
c. The price shall include:
1) Mobilization as described in Section 1.1.A.3.a.1)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
Emergency Mobilizations and Demobilizations for Miscellaneous Projects
a. Measurement
1) Measurement for this Item shall be for each Mobilization and Demobilization
required by the Contract Documents
b. Payment
1) The Work performed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price per each "Work Order Emergency Mobilization" in accordance with
Contract Documents. Demobilization shall be considered subsidiary to
mobilization and shall not be paid for separately.
c. The price shall include
1) Mobilization as described in Section 1.l.A.4.a)
2) Demobilization as described in Section 1.1.A.3.a.2)
d. No payments will be made for standby, idle time, or lost profits associated this
Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017000-4
DAP MOBILIZATION AND REMOBILIZATION
Page 4 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED] PART 2- PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 71 23- 1
CONSTRUCTION STAKING AND SURVEY
Page 1 of 7
1 SECTION 01 71 23
2 CONSTRUCTION STAKING AND SURVEY
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Requirements for construction staking and construction survey
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. See Changes (Highlighted in Yellow).
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1 — General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Construction Staking
15 a. Measurement
16 1) This Item is considered subsidiary to the various Items bid.
17 b. Payment
18 1) The work performed and the materials furnished in accordance with this
19 Item are subsidiary to the various Items bid and no other compensation will
20 be allowed.
21 2. Construction Survey
22 a. Measurement
23 1) This Item is considered subsidiary to the various Items bid.
24 b. Payment
25 1) The work performed and the materials furnished in accordance with this
26 Item are subsidiary to the various Items bid and no other compensation will be
27 allowed.
28 3. As -Built Survey
29 a. Measurement
30 1) This Item is considered subsidiary to the various Items bid.
31 b. Payment
32 1) The work performed and the materials furnished in accordance with this
33 Item are subsidiary to the various Items bid and no other compensation will be
34 allowed.
35 1.3 REFERENCES
36 A. Definitions
37 1. Construction Survey - The survey measurements made prior to or while
38 construction is in progress to control elevation, horizontal position, dimensions and
39 configuration of structures/improvements included in the Project Drawings.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised February 14, 2018
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
017123-2
CONSTRUCTION STAKING AND SURVEY
Page 2 of 7
2. As -built Survey —The measurements made after the construction of the
improvement features are complete to provide position coordinates for the features
of a project.
3. Construction Staking — The placement of stakes and markings to provide offsets
and elevations to cut and fill in order to locate on the ground the designed
structures/improvements included in the Project Drawings. Construction staking
shall include staking easements and/or right of way if indicated on the plans.
4. Survey "Field Checks" — Measurements made after construction staking is
completed and before construction work begins to ensure that structures marked on
the ground are accurately located per Project Drawings.
B. Technical References
1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw
website) — 01 71 23.16.01_ Attachment A_Survey Staking Standards
2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available
on City's Buzzsaw website).
3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision
4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land
Surveying in the State of Texas, Category 5
20 1.4 ADMINISTRATIVE REQUIREMENTS
21 A. The Contractor's selection of a surveyor must comply with Texas Government
22 Code 2254 (qualifications based selection) for this project.
23 1.5 SUBMITTALS
24 A. Submittals, if required, shall be in accordance with Section 01 33 00.
25 B. All submittals shall be received and reviewed by the City prior to delivery of work.
26 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS
27 A. Field Quality Control Submittals
28 1. Documentation verifying accuracy of field engineering work, including coordinate
29 conversions if plans do not indicate grid or ground coordinates.
30 2. Submit "Cut -Sheets" conforming to the standard template provided by the City
31 (refer to 01 71 23.16.01— Attachment A — Survey Staking Standards).
32 1.7 CLOSEOUT SUBMITTALS
33 B. As -built Redline Drawing Submittal
34 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of
35 constructed improvements signed and sealed by Registered Professional Land
36 Surveyor (RPLS) responsible for the work (refer to 0171 23.16.01 — Attachment A
37 — Survey Staking Standards) .
38 2. Contractor shall submit the proposed as -built and completed redline drawing
39 submittal one (1) week prior to scheduling the project final inspection for City
40 review and comment. Revisions, if necessary, shall be made to the as -built redline
41 drawings and resubmitted to the City prior to scheduling the construction final
42 inspection.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised February 14, 2018
017123-3
CONSTRUCTION STAKING AND SURVEY
Page 3 of 7
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
2 1.9 QUALITY ASSURANCE
3 A. Construction Staking
4 1. Construction staking will be performed by the Contractor.
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
2. Coordination
a. Contact City and Developer's Project Representative at least one week in
advance notifying the City of when Construction Staking is scheduled.
b. It is the Contractor's responsibility to coordinate staking such that
construction activities are not delayed or negatively impacted.
3. General
a. Contractor is responsible for preserving and maintaining stakes. If
Developer's Project Representative is required to re -stake for any reason, the
Contractor will be responsible for costs to perform staking. If in the opinion of
the City, a sufficient number of stakes or markings have been lost, destroyed
disturbed or omitted that the contracted Work cannot take place then the
Contractor will be required to stake or re -stake the deficient areas.
B. Construction Survey
1. Construction Survey will be performed by the Contractor.
2. Coordination
a. Contractor to verify that horizontal and vertical control data established in the
design survey and required for construction survey is available and in place.
3. General
a. Construction survey will be performed in order to construct the work shown
on the Construction Drawings and specified in the Contract Documents.
b. For construction methods other than open cut, the Contractor shall perform
construction survey and verify control data including, but not limited to, the
following:
1) Verification that established benchmarks and control are accurate.
2) Use of Benchmarks to furnish and maintain all reference lines and grades
for tunneling.
3) Use of line and grades to establish the location of the pipe.
4) Submit to the City copies of field notes used to establish all lines and
grades, if requested, and allow the City to check guidance system setup prior
to beginning each tunneling drive.
5) Provide access for the City, if requested, to verify the guidance system and
the line and grade of the carrier pipe.
6) The Contractor remains fully responsible for the accuracy of the work and
correction of it, as required.
7) Monitor line and grade continuously during construction.
8) Record deviation with respect to design line and grade once at each pipe
joint and submit daily records to the City.
9) If the installation does not meet the specified tolerances (as outlined in
Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct
the installation in accordance with the Contract Documents.
C. As -Built Survey
1. Required As -Built Survey will be performed by the Contractor.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised February 14, 2018
017123-4
CONSTRUCTION STAKING AND SURVEY
Page 4 of 7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
2. Coordination
a. Contractor is to coordinate with City to confirm which features require as -
built surveying.
b. It is the Contractor's responsibility to coordinate the as -built survey and
required measurements for items that are to be buried such that construction
activities are not delayed or negatively impacted.
c. For sewer mains and water mains 12" and under in diameter, it is acceptable
to physically measure depth and mark the location during the progress of
construction and take as -built survey after the facility has been buried. The
Contractor is responsible for the quality control needed to ensure accuracy.
3. General
a. The Contractor shall provide as -built survey including the elevation and
location (and provide written documentation to the City) of construction
features during the progress of the construction including the following:
1) Water Lines
a) Top of pipe elevations and coordinates for waterlines at the following
locations:
(1) Minimum every 250 linear feet, including
(2) Horizontal and vertical points of inflection, curvature,
etc.
(3) Fire line tee
(4) Plugs, stub -outs, dead-end lines
(5) Casing pipe (each end) and all buried fittings
2) Sanitary Sewer
a) Top of pipe elevations and coordinates for force mains and siphon
sanitary sewer lines (non -gravity facilities) at the following locations:
(1) Minimum every 250 linear feet and any buried fittings
(2) Horizontal and vertical points of inflection, curvature,
etc.
3) Stormwater — Not Applicable
b. The Contractor shall provide as -built survey including the elevation and
location (and provide written documentation to the City) of construction
features after the construction is completed including the following:
1) Manholes
a) Rim and flowline elevations and coordinates for each manhole
2) Water Lines
a) Cathodic protection test stations
b) Sampling stations
c) Meter boxes/vaults (All sizes)
d) Fire hydrants
e) Valves (gate, butterfly, etc.)
f) Air Release valves (Manhole rim and vent pipe)
g) Blow off valves (Manhole rim and valve lid)
h) Pressure plane valves
i) Underground Vaults
(1) Rim and flowline elevations and coordinates for each
Underground Vault.
3) Sanitary Sewer
a) Cleanouts
(1) Rim and flowline elevations and coordinates for each
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised February 14, 2018
01 71 23-5
CONSTRUCTION STAKING AND SURVEY
Page 5 of 7
1 b) Manholes and Junction Structures
2 (1) Rim and flowline elevations and coordinates for each
3 manhole and junction structure.
4 4) Stormwater — Not Applicable
5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
6 1.11 FIELD [SITE] CONDITIONS [NOT USED]
7 1.12 WARRANTY
8 PART 2- PRODUCTS
9
A. A construction survey will produce, but will not be limited to:
10
1.
Recovery of relevant control points, points of curvature and points of intersection.
11
2.
Establish temporary horizontal and vertical control elevations (benchmarks)
12
sufficiently permanent and located in a manner to be used throughout construction.
13
3.
The location of planned facilities, easements and improvements.
14
a. Establishing final line and grade stakes for piers, floors, grade beams, parking
15
areas, utilities, streets, highways, tunnels, and other construction.
16
b. A record of revisions or corrections noted in an orderly manner for reference.
17
c. A drawing, when required by the client, indicating the horizontal and vertical
18
location of facilities, easements and improvements, as built.
19
4.
Cut sheets shall be provided to the City inspector and Survey Superintendent for all
20
construction staking projects. These cut sheets shall be on the standard city template
21
which can be obtained from the Survey Superintendent (817-392-7925).
22
5.
Digital survey files in the following formats shall be acceptable:
23
a. AutoCAD (.dwg)
24
b. ESRI Shapefile (.shp)
25
c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use
26
standard templates, if available)
27
6.
Survey files shall include vertical and horizontal data tied to original project
28
control and benchmarks, and shall include feature descriptions
29 PART 3- EXECUTION
30 3.1 INSTALLERS
31 A. Tolerances:
32 1. The staked location of any improvement or facility should be as accurate as
33 practical and necessary. The degree of precision required is dependent on many
34 factors all of which must remain judgmental. The tolerances listed hereafter are
35 based on generalities and, under certain circumstances, shall yield to specific
36 requirements. The surveyor shall assess any situation by review of the overall plans
37 and through consultation with responsible parties as to the need for specific
38 tolerances.
39 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical
40 tolerance. Horizontal alignment for earthwork and rough cut should not exceed
41 1.0 ft. tolerance.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised February 14, 2018
017123-6
CONSTRUCTION STAKING AND SURVEY
Page 6 of 7
1
b. Horizontal alignment on a structure shall be within .0. lft tolerance.
2
c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and
3
walkways shall be located within the confines of the site boundaries and,
4
occasionally, along a boundary or any other restrictive line. Away from any
5
restrictive line, these facilities should be staked with an accuracy producing no
6
more than 0.05ft. tolerance from their specified locations.
7
d. Underground and overhead utilities, such as sewers, gas, water, telephone and
8
electric lines, shall be located horizontally within their prescribed areas or
9
easements. Within assigned areas, these utilities should be staked with an
10
accuracy producing no more than 0.1 ft tolerance from a specified location.
11
e. The accuracy required for the vertical location of utilities varies widely. Many
12
underground utilities require only a minimum cover and a tolerance of 0.1 ft.
13
should be maintained. Underground and overhead utilities on planned profile,
14
but not depending on gravity flow for performance, should not exceed 0.1 ft.
15
tolerance.
16 B. Surveying instruments shall be kept in close adjustment according to manufacturer's
17 specifications or in compliance to standards. The City reserves the right to request a
18 calibration report at any time and recommends regular maintenance schedule be
19 performed by a certified technician every 6 months.
20 1. Field measurements of angles and distances shall be done in such fashion as to
21 satisfy the closures and tolerances expressed in Part 3.1.A.
22 2. Vertical locations shall be established from a pre -established benchmark and
23 checked by closing to a different bench mark on the same datum.
24 3. Construction survey field work shall correspond to the client's plans. Irregularities
25 or conflicts found shall be reported promptly to the City.
26 4. Revisions, corrections and other pertinent data shall be logged for future reference.
27
28 3.2 EXAMINATION [NOT USED]
29 3.3 PREPARATION [NOT USED]
30 3.4 APPLICATION
31 3.5 REPAIR / RESTORATION
32 A. If the Contractor's work damages or destroys one or more of the control
33 monuments/points set by the Developer's Project Representative, the monuments shall be
34 adequately referenced for expedient restoration.
35 1. Notify City or Developer's Project Representative if any control data needs to be
36 restored or replaced due to damage caused during construction operations.
37 a. Contractor shall perform replacements and/or restorations.
38 b. The City or Developer's Project Representative may require at any time a
39 survey "Field Check" of any monument or benchmarks that are set be verified
40 by the Developer's Project Representative before further associated work can
41 move forward.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised February 14, 2018
01 71 23-7
CONSTRUCTION STAKING AND SURVEY
Page 7 of 7
1 3.6 RE -INSTALLATION [NOT USED]
2 3.7 FIELD [OR] SITE QUALITY CONTROL
3
4
5
6
7 3.8
8
9
10
11
12
13
14
15
16
A. It is the Contractor's responsibility to maintain all stakes and control data
placed by the
Developer's Project Representative in accordance with this Specification. This
includes
easements and right of way, if noted on the plans.
B. Do not change or relocate stakes or control data without approval from the City.
SYSTEM STARTUP
A. Survey Checks
1. The City reserves the right to perform a Survey Check at any time deemed
necessary.
2. Checks by City personnel or 3rd party contracted surveyor are not intended to
relieve the contractor of his/her responsibility for accuracy.
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
17 3.12 PROTECTION [NOT USED]
18 3.13 MAINTENANCE [NOT USED]
19 3.14 ATTACHMENTS [NOT USED]
20 END OF SECTION
21
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
Added instruction and modified measurement & payment under 1.2; added
8/31/2017
M. Owen
definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal
requirements; modified 1.9 Quality Assurance; added PART 2— PRODUCTS ;
Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup.
Removed "blue text"; revised measurement and payment sections for Construction
Staking and As -Built Survey; added reference to selection compliance with TGC
2/14/2018
M Owen
2254; revised action and Closeout submittal requirements; added acceptable depth
measurement criteria; revised list of items requiring as -built survey "during" and
"after" construction; and revised acceptable digital survey file format
821 AND 901 E TERRELL AVE IMPROVEMENTS
CITY OF FORT WORTH COFW # 106853
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Revised February 14, 2018
01 7423-1
DAP CLEANING
Page 1 of 4
SECTION 0174 23
CLEANING
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Intermediate and final cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to fmal
inspection.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 7423-2
DAP CLEANING
Page 2 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning Agents
1. Compatible with surface being cleaned
2. New and uncontaminated
3. For manufactured surfaces
a. Material recommended by manufacturer
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3- EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 7423-3
DAP CLEANING
Page 3 of 4
6. Handle materials in a controlled manner with as few handlings as possible.
7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
this project.
8. Remove all signs of temporary construction and activities incidental to construction
of required permanent Work.
9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
have the cleaning completed at the expense of the Contractor.
10. Do not burn on -site.
B. Intermediate Cleaning during Construction
1. Keep Work areas clean so as not to hinder health, safety or convenience of
personnel in existing facility operations.
2. At maximum weekly intervals, dispose of waste materials, debris and rubbish.
3. Confine construction debris daily in strategically located container(s):
a. Cover to prevent blowing by wind
b. Store debris away from construction or operational activities
c. Haul from site at a minimum of once per week
4. Vacuum clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which
may become airborne or transported by flowing water during the storm.
C. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers from site.
a. Re -seed areas disturbed by location of trash and debris containers in accordance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flow of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junction boxes and inlets.
4. If no longer required for maintenance of erosion facilities, and upon approval by
City, remove erosion control from site.
Clean signs, lights, signals, etc.
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
0174 23-4
DAP CLEANING
Page 4 of 4
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 77 19-1
DAP CLOSEOUT REQUIREMENTS
Page 1 of 3
SECTION 017719
CLOSEOUT REQUIREMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
1. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
1. No application for final payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 77 19-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
PAT 2- PRODUCTS [NOT USED]
PART 3- EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 01 78 39
2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 74 23.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
D. Notice of Project Completion
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 77 19-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 7823- 1
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
SECTION 01 7823
OPERATION AND MAINTENANCE DATA
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Product data and related information appropriate for City's maintenance and
operation of products furnished under Contract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Schedule
1. Submit manuals in final form to the City within 30 calendar days of product
shipment to the project site.
1.5 SUBMITTALS
A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be
approved by the City prior to delivery.
1.6 INFORMATIONAL SUBMITTALS
A. Submittal Form
1. Prepare data in form of an instructional manual for use by City personnel.
2. Format
a. Size: 81/2 inches x 11 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017823-2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly -leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
f. Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
Binders
a. Commercial quality 3 -ring binders with durable and cleanable plastic covers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form of the O&M Manual.
B. Manual Content
Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017823-3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
3. Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
0178 23-4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Provide operation and maintenance data by personnel with the following criteria:
1. Trained and experienced in maintenance and operation of described products
2. Skilled as technical writer to the extent required to communicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
017823-5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3- EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
1.5.A.1 — title of section removed
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
Revised April 7, 2014
01 78 39 - 1
DAP PROJECT RECORD DOCUMENTS
Page 1 of 4
SECTION 0178 39
PROJECT RECORD DOCUMENTS
PART 1- GENERAL
1.1 SUMMARY
A. Section Includes:
Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.1 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and proper entries on each page of Specifications and each sheet of Drawings and
other Documents where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtained from the approved Project
Record Documents.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
017839-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
information that the change has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enable future modification of the Work to proceed without lengthy and
expensive site measurement, investigation and examination.
1.10 STORAGE AND HANDLING
A. Storage and Handling Requirements
1. Maintain the job set of Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
data to the final Project Record Documents.
2. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2- PRODUCTS
2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED]
2.2 RECORD DOCUMENTS
A. Job set
1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
charge to the Contractor, 1 complete set of all Documents comprising the Contract.
B. Final Record Documents
1. At a time nearing the completion of the Work and prior to Final Inspection, provide
the City 1 complete set of all Final Record Drawings in the Contract.
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3- EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
1. Immediately upon receipt of the job set, identify each of the Documents with the
title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
017839-4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
APPENDIX
GR-0 1 60 00 Product Requirements
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
GC -01 60 00 Product Requirements
THIS PAGE LEFT INTENTIONALLY BLANK
CITY OF FORT WORTH 821 AND 901 E TERRELL AVE IMPROVEMENTS
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS COFW # 106853
FORT WORTH,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval Spec No. Classsification Manufacturer Model No. National Spec Size
Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16)
07/23/97
3305 13
Urethane Hydrophilic Wotorstop
Asahi Kogyo K.K.
Adeka Ultra -Seal P-201
ASTM D2240/D412/D792
04/26/00
3305 13
Offset Joint for 4' Diam. MH
Hanson Concrete Products
Drawing No. 35-0048-001
04/26/00
3305 13
Profile Gasket for 4' Diam. MB.
Press -Seal Gasket Corp.
250-4G Gasket
ASTM C -443/C-361
SS MH
1/26/99
3305 13
FIDPE Manhole Adjustment Rings
Ladtech Inc
HOPE Adjustment Ring
Traffic and Non -traffic area
5/13/05
3305 13
Manhole External Wrap
Cannsa - CPS
Wra idSeal Manhole Encapsulation System
Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/131
1/26/99
3339 13
Fiberglass Manhole
Fluid Containment Inc.
Flowtite
ASTM 3753
Non -traffic area
08/30/06
33 39 13
Fiberglass Manhole
L.F. Manuleeturin
Non -traffic area
Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16)
3305 13 Manhole Frames and Covers I Western Iron Works, Bass & Hays Foundry
1001
24"x40" WD
Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16)
3305 13
Manhole Frames and Covers
Western Iron Works, Bass & Hays Foundry
30024
24" Dia.
3305 13
Manhole Frames and Covers
McKinley Iron Works Inc.
A 24 AM
24" Dia.
08/24/18
3305 13
Manhole Frames and Covers
Neenah Foun
R-1272
ASTM A40 & AASHTO M306
24" Dia.
08/24/18
3305 13
Manhole Frames and Covers
Neenah Foundry
NF 1274
ASTM A48 & AASHTO M306
30" Dia.
3305 13
Manhole Frames and Covers
Sigma Corporation
MH-144N
3505 13
Manhole Frames and Covers
Sigma Corporation
MH-143N
3305 13
Manhole Frames and Covers
Pont-A-Mousson
GTS-STD
24" dia.
3305 13
Manhole Frames and Covers
Neenah Casting
24" dig.
10/31/06
3305 13
Manhole Frames and Covers Hin ed)
Pewoeseal
Hinged Ductile Iron Manhole
ASTM A536
24" Dia.
7/25/03
3305 13
Manhole Frames and Covers
Saint-Gobain Pipelines Pameex/nexus
RE32-R8FS
30" Dia.
01/31/06
3305 13
30" Dia. MH Ring and Cover
East Jordan Iron Works
V1432-2 and V1483 Designs
AASHTO M306-04
30" Dia.
11/02/10
3305 13
30" Dia. MH Ring and Cover
Sigma Co ration
MH1651 FWN & MHI 6502
30" Dia
07/19/11
3305 13
30" Dia. MH Ring and Cover
Star Pipe Products
MH32FTWSS-DC
30" Dia
08/10/11
3305 13
30" Dia. MH Ring and Cover
Accucast
220700 Heavy Dutywith Gasket Ring
30" Dia
10/14/13
3305 13
30" Dia. MHRing and Cover (Biased & Lockable
East Jordan Iron Works
30" ERGO XL Assembly
with Cam Lock/MPIC/T-Gasket
ASSHTO M105 & ASTM A536
30" Dia
06/01/17
3405 13
30" Dia. MH Ring and Cover Lockable) Cl
SIP Industries
2280 (32"
ASTM A 48
30" Dia.
12/05/23
3405 13
30" Dia. MH Ring and Cover Hinged & Lockable) Cl
SIP Industries
4267 WT - Hinged (32")
ASTM A 48
30" Dia.
09/16/19
3505 13
30" Dia. MH Ring and Cover
Composite Access Products, L.P.
CAP-ONE-30-FTW, Composite, w/ Lock
w/o Fling
30" Din.
10/07/21
3405 13
30" Dia. MH Ring and Cover
Trumbull Manufacturing
32(30") Frame and Cover
30" Dia.
Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16)
O
3305 13
Manhole Frames and Covers
Pont-A-Mousson
Pamti ht
24" Dia.
•
3305 13
Manhole Frames and Covers
Neenah Cawing
24" Dia.
3305 13
Manhole Frames and Covers
Western Iron Works,Bass & Has Foundry
300-24P
24" Dia.
3305 13
Manhole Frames and Covers
McKinley Iron Works Inc.
WPA24AM
24" Dia.
03/08/00
3505 13
Manhole Frames and Covers
Accucast
RC -2100
ASTM A 48
24" Dia.
04/20/01
3305 13
Manhole Frames and Covers
SIP Semm ore Industries Private Ltd.
300-24-23.75 Ring and Cover
ASTM A 48
24" Dia.
Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13)
3339 10
Manhole, Precast Concrete
Hydro Conduit Corp
SPL Item #49
ASTM C 478
48"
3339 10
Manhole, Precast Concrete
Wall Concrete Pie Co. Inc.
ASTM C-443
48"
09/23/96
3339 10
Manhole. Precast Concrete
Concrete Product Inc.
48" LD. Manhole w/ 32" Cone
ASTM C 478
48" w/32" cone
12105/23
3339 10
Manhole, Precast Concrete
The Turner Company
72" I.D. Manhole w/ 32" Cone
ASTM C 478
72"
05/08/18
3339 10
Manhole, Precast Concrete
The Turner Company
48", 60" I.D. Manhole w/ 32" Cone
ASTM C 478
48", 60"
09/03/24
3339 10
Manhole, Precast Concrete
Oldoastle Precast Inc.
Manhole, 32" Opening and Flat top, (Na
Transition Cones)
ASTM C 478
48" to 84" I.D.
06/09/10
3339 10
Manhole, Precast Reinforced PetynoerlCoaoreto
US Composite Pie
Reinforced Polymer Concrete
ASTM C-76
48" 10 72"
09/06/19
33 39 20
Manhole, Precast Concrete
Forterra Pie and Precast
60" & 72" I.D. Manhole w/32" Cone
ASTM C-76
60" & 72"
10/07/21
32 39 20
Manhole, Precast Concrete
Forterea Pipe and Precast
48" I.D. Manhole w/32" Cone
ASTM C-77
48"
10/07/21
33 39 20
Manhole Precast Reinforced PolymerPelymnrl Concrete
Armorock
48" & 60" I.D. Manhole w/32" Cone
48" & 60"
10/07/21
33 39 20
Manhole, Precast lHt4seidl Polymer & PVC
Geneva Pipe and Precast IPrudI Systems)
48" & 60" I.D. Manhole w/32" Cone
48" & 60" Non Traffic Areas
03/07/23
33 39 20
Manhole, Precast Concrete
AmeriTex Pipe and Products, LLC
48" & 60" I.D. Manhole w/32" Cone
ASTM C-478; ASTM C-923;
ASTM CA43
03/07/23
33 39 20
Manhole, Precast Reinforced Polymer) Concrete
P3 Polymers, RockHardse
48" & 60" I.D. Manhole w/32" Cone
04/28/07
Manhole, Precast Reinforced Polysoerl Concrete
Amitech USA
Meer Pol erete Pipe
02/04/26
33 39 20
Manhole Precast Concrete
Thompson Pie Group
48" 60" 72" I.D. Manhole w/36" Cone
Sewer -(WAC) Wastewater Access Chamber 33 39 40
12/29/23
333020
For use when Std.. MH cannot be
Wastewater Access Chamber Ooiekstroant Solutions, Inc.. Type 8 Maintenace Shaft (Poopiti installed due to depth
Water & Sewer - Manholes & Bases/Rehab Systems/Cementitious
E1-14
Manhole Rehab Systems
Quadex
04/23/01
EI-14
Manhole RehabSystems
Standard Cement Materials, Inc.
Reliner MOP
El -14
Manhole Rehab Systems
AP/M Permaf m
4/20/01
EI-14
Manhole Rehab System
Strong Company
Strong Seal MS2A Rehab System
5/12/03
El -14
Manhole Rehab System Liner
Triplex Lining System
MH r air product to stop infiltration
ASTM D5813
08/30/06
General Concrete Repair
FlexKrete Technologies
Vinyl Polyester Repair Product
Misc. Use
' From Original Standard Products List
FORT WORTH,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval
Spec No. Classsification Manufacturer
Model No.
National Spec
Size
Water & Sewer - Manholes & Bases/Rehab Systems/NonCementitious
05/20/96
EI-14
Manhole Rehab Systems
Spraynog,
Spray Wall Polyrcrrlbmno Coating
ASTM D639/D790
12/14/01
Coating for Corrosion rotection Exterior
ERTECH
Series 20230 and 2100 )Asphn6c Emulsion)
Structures Only
01/31/06
0/outings for Corrosion Protection
Chesterton
Are 791, SIHB, SI, S2
Acid Resistance Test
Sewer Applications
8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications
03/19/18
33 05 16,3339 10, 33
3920
Coating for Corrosion otecdon Exterior
Sherwin Williams
RR&C Dampproofing Non-Fibered Spray
Grade (Asphatic Emulsion)
For Exterior Coating of Concrete
Structures Only
02/04/26
Exterior Precast Joint Seat
Wra p idseal
Exterior Sealant Tape/Shrinkwrap
Does not replace rubber gasket or
Ram-Nek
Water & Sewer - Manhole Inserts - Field Operations Use Only (Rev 2/3/16)
3305 13
Manhole Insert
Knutson Enterprises
Made to Order - Plastic
ASTM D 1248
For 24" dia.
3303 13
Manhole Insert
South Western Packaging
Made to Order - Plastic
ASTM D 1248
For 24" dia.
3305 13
Manhole Insert
Noflow-Inflow
Made to Order - Plastic
ASTM D 1248
For 24" dia.
09/23/96
3303 13
Manhole Insert
Southwestern Packing & Seals Inc.
LifeSaver - Stainless Steel
For 24" dia.
09/23/96
3305 13
Manhole Insert
Southwestern Packing & Seals, Inc.
TetherLok - Stainless Steel
For 24" dia
Water & Sewer - Pipe Casing Spacers 33-05-24 (07/01/13)
11/04/02
Steel Band Casing Spacers
Advanced Products and Systems, Inc.
Carbon Steel Spacers, Model SI
02/02/93
Stainless Steel Casing Spacer
Advanced Products and Systems, Inc.
Stainless Steel Spacer, Model SSI
04/22/87
Casing Spacers
Cascade Waterworks Manufacturing
Casing Spacers
09/14/10
Stainless Steel Casing Spacer
Pipeline Seal and Insulator
Stainless Steel Casing Spacer
Up 10 48"
09/14/10
Coated Steel Casin Spacers
Pipeline Seal and Insulator
Coated Steel Casing Spacers
Up to 48"
05/10/1 l
Stainless Steel Casing Spacer
Powerseal
4810 Powerehock
Up 10 48"
03/19/18
Casing Spacers
BWM
SS -12 Casing Spaeer(Stainless Steel)
03/19/18
Casing Spacers
BWM
FB-12 Casing Spacer (Coated Carbon Steel) for
Non_tressure Pipe and Grouted Casing
03/29/22
3305 13
Casing Spacers
CCI Pipeline Systems
CSC12, CSS12
09/03/24
3305 13
Casing Spacers
Rani (Completely HDPE)
Per Manufacturers Requirements (Sewer
Applications Only)
8" - 12" (Sewer Only)
Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13)
33 11 10
Ductile Iron Pipe
Griffin Pipe Products, Co.
Super Bell-Tite Ductile Iron Pressure Pipe,
AWWA C150, 0151
3" thou 24"
08/24/18
33 11 10
Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Fastite Pipe (Bell Spigot)
AWWA C150, CI5I
4" thou 30"
00/24/18
33 1 1 10
Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Flex Ring (Restrained Joint)
AWWA C 150, C 151
4" thou 30"
"
33 11 10
Ductile Iron Pipe
U.S. Pipe and Foundry Co.
AWWA C) 50, C151
a
33 1110
Ductile Iron Pipe
McWane Cast Iron Pipe Co.
AWWA C150, 0151
Water & Sewer -Utility Line Marker (08/24/2018)
Sewer - Coatings/Epoxy 33-39-60 (01/08/13)
02/25/02
Epoxy Lining System
Sauereisen, Inc
SewerGard 2l0RS
LA County #210-1.33
12/14/01
'°.puxyLining Sexton,
Ertoch Technical Coatings
Ertech 2030 and 2100 Series.
04/14/05
Interior Ductile Iron Pi. a Coating
Induron
Protecto 401
ASTM B-117
Ductile Iron Pie Only
01/31/06
Coatings for Corrosion Protection
Chesterton
Arc 791 SIHB SI, S2
Acid Resistance Test
Sewer Applications
8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications
Sewer - Coatines/Polyurethane
Sewer - Combination Air Valves
05/25/18
33-31-70 Air Release Valve
AR.!. USA, Inc.
D025LTP02 Com osite Body(
2"
Sewer - Pipes/Concrete
El -04
Conc. Pie, Reinforced
Wall Concrete Pie Co. Inc.
ASTM C 76
EI-04
Conc. Pie, Reinforced
Uyxlro Conduit Corporation
Class Ill T&G SPL Item #77
ASTM C 76
E1-04
Conc. Pie, Reinforced
Hanson Concrete Products
ASTM C 76
E1-04
Conc. Pipe, Reinforced
Concrete Pie & Products Co. Inc.
ASTM C 76
Sewer - Pipe Enlargment System (Method)33-31-23 (01/18/13)
PIM System
PIM Corporation
Polyethylene
PIM Corp., Piscam Way, N.J.
Approved Prcviously
McConnell systems
MnLat Construction
polyethylene
Houston, Texas
Approved Proxiocsly
'RS Systems
Trenchless Roplucoment System
Polyethylene
Calgary. Canada
Approved Proviously
Sewer - Pipe/Fiberglass Reinforced/ 33-31-13(1/8/13)
7/21/97
3331 13
Cent. Cast Fiber lass FRP
Hobas Pie USA, Inc.
Hobas Pie on -Pressure
ASTM D3262/D3754
03/22/10
33 31 13
Fiber lass Pi (FRP)
Ameron
Bondstrand RPM!' Pipe
ASTM D3262ID3754
04/09/21
33 31 13
Glass -Fiber Reinforced Polymer Pi a (FRP)
Thompson Pie Group
Thomson Pipr Flowtite
ASTM D3262/D3754
03/07/23
33 31 13
Fiberglass Pie (FRP)
Future Pipe Industries
Fiberstrcng FRP
ASTM 03262, ASTM D3681,
ASTM D4161, AWWA M45
09/03/24
33 31 13
Fiberglass Pipe (FRP)
Superlit Borg Sanayi A.S.
Superlit FRP
ASTM D3262, ASTM D3517,
ASTM 3754, AWWA C950
" From Original Standard Products List
FORT WORTH,,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval Spec No. Classsification Manufacturer Model No. National Spec Size
* From Original Standard Products List
FORT WORTH[,,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval
Spec No. Classsification
Manufacturer
Model No.
National Spec
Size
Sewer - Pipe/Polymer Pipe
4/14/05
Polymer Modified Concrete Pipe
Amitreh USA
Meer Pol Crete Pipe
ASTM C33, A276, F477
8" to 102", Class V
06/09/10
El -9
Reinforced Polymer Concrete Pipe
US Composite Pipe
Reinforced Polymer Concerto Pie
ASTM C-76
Sewer - Pipes/HDPE 33-31-23(1/8/13)
'-tigh-density potpedsylene pipe
Phillips Driscopipe, e, Inc.
O ticore Ductile Polyethylene Pipe
ASTM D 1248
8"
ligh-density potynthyleno pipo
Plexco Inc.
ASTM D 1248
8"
High -density of eth lene pipe
Polly Pipe, Inc.
ASTM D 1248
8"
°-Iigh-donsity polyethylene pipe
CSR Hydro Conduit/Pi cline Syatooss
McConnell Pipe Enlargement
ASTM D 1248
Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13)
12/02/11
33-11-12
DR -14 PVC Pressure Pipe
Pipelife Jetstream
PVC Pressure Pipe
AWWA C900
4" then 12"
10/22/14
33-11-12
DR -14 PVC Pressure Pipe
Royal Building Products
Royal Seal PVC Pressure Pipe
AWWA C900
4" then 12"
Sewer — Pipes/PVC* 33-31-20 (7/1/13)
33-31-20
PVC Sewer Pipe
J -M Manufacturin Co. Inc. JM Eagle)
SDR-26 1PS1I5
ASTM D 3034
4" - 15"
12/23/97"
33-31-20
PVC Sewer Pipe
Diamond Plastics Co oration
SDR-26 PSI 15
ASTM D 3034
4" then 15"
33-31-20
PVC Sewer Pie
Lamson V lon Pie
SDR-26 (PSI 15)
ASTM D 3034
4" then 15"
12/05/23
33-31-20
PVC Sewer Pipe
Vin ltech PVC Pie
SDR-26 PSI15
ASTM 03034
4" then 15"
12/05/23
33-31-20
PVC Sewer Pie
Vinyttech PVC Pipe
Gravity Sewer PS 115
ASTM F 679
18"
33-31-20
PVC Sewer Pie
J -M Manufacturing Co Inc. JM Eagle)
PS 115
ASTM P679
18" - 28"
05/06/05
33-31-20
PVC Solid Wall Pipe
Diamond Plastics Corporation
PS 115
ASTM F-679
18" to 48"
04/27/06
33-31-20
PVC Sewer Fittings
Harco
SDR-26 PS 115) Gasket Fittings
ASTM D-3034, D-1784, etc
4" - 15"
33-31-20
PVC Sewer Fittings
Plastic Trends, Inc.(Westlake)
(indicted PVC Sewer Main Fittings
ASTM D 3034
3/19/2018
3531 20
PVC Sewer Pipe
Pi elite Jet Stream
SDR 26 (PS 115)
ASTM F679
18"- 24"
3/19/2018
33 31 20
PVC Sewer Pie
Pipelife Jet Stream
SDR 26
ASTM D3034
4"- 15"
3/29/2019
3331 20
Gasketed Fittings (PVC)
GPK Products, Inc.
SDR 26
ASTM D3034
4"- 15"
10/21/2020
3331 20
PVC Sewer Pie
NAP( Westlake)
SDR26
ASTM 03034
4" - 15"
10/22/2020
3331 20
PVC Sewer Pie
Sanderson Pipe Corp.
SDR 26
ASTM 03034
4"- 15"
10/21/2020
33 31 20
PVC Sewer Pie
NAPCO(Westlake)
SDR 26 PS 115
ASTM F-679
18"- 36"
2/4/2026
33 31 20
PVC Sewer Pipe
Hawk Plastics Corp.
SDR 26
ASTM 03034
4"- l5"
' From Original Standard Products List
FORT WORTH,,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval
Spec No. Classsification
Manufacturer
Model No.
National Spec
Size
Water - Appurtenances 33-12-10 (07/01/13)
09/03/24
33-12-10
Double Strap Saddle
Ford Meter Box Co., Inc.
202B
I "-2" SVC, op to 16" Pipe
01/18/18
33-12-10
Double Strap Saddle
Romac
202NS Nylon Coated
AWWA C800
1"-2" SVC, ap to 24" Pipe
08/28/02
Double Strap Saddle
Smith Blair
#317 Nylon Coated Double Strap Saddle
07/23/12
33-12-10
Double Strop Service Saddle
Mueller Company
DR2S Double SS Strop DI Saddle
AWWA C800
1"-2" SVC UP 10 24" Pipe
03/07/23
33-12-10
Double Strap Service Saddle
Powerseal
3450AS, locl. Corp. Stop, Dbl Strap, Stainless
NSF ANSI 372
1"-2" SVC, up to 24" Pipe
10/27/87
Curb Stops -Boll Meter Valves
McDonald
6100M,6100MT & 61OMT
3/4" and I"
10/27/87
Cub Stops -Ball Meter Valves
McDonald
4603B, 4604B, 6100M, 610OTM and 6101M
I /4" and 2"
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co. Inc.
FB600-7NL, FB1600-7-NL, FV23-777-W-NL,
L22-77NL
AWWA 0800
2"
5/25/2018
33-12-10
Curb Slops -Ball Meter Valves
Ford Motor Box Co. Inc.
FB600-6-NL, FB1600-6-NL, FV23-666-W-NL,
L22-66NL
AWWA 0800
1-1/2"
5/25/2018
33-12-10
Cub Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
FB600-4-NL, FB1600-4-NL, Bl1-044-WR-NL,
B22444-WR-NL, L28-44NL
AWWA C800
1"
5/25/2018
33-12-10
Cub Stops -Bull Meter Valves
Mueller Co., Ltd.
B -25005N, B -24277N-3, B -20200N-3, H-
15000N, , H -1552N, H142276N
AWWA C800, ANSF 61,
ANSI/NSF 372
2"
5/25/2018
33-12-10
Curb Stops -Boll Meter Valves
Mueller Co. Ltd.
B-25000N,B-20205N-3, B -24277N -3,H-
15005N, H -14276N H -15525N
AWWA 0800, ANSF 61,
ANSI/NSF 372
1-1/2"
5/25/2018
33-12-10
Curb Slops -Ball Meter Valves
Mueller Co., Ltd.
B -25000N, B -20200N -3,H -15000N, H-
15530N
AWWA C800, ANSF 61,
ANSI/NSF 372
01/26/00
Coated Tapping Saddle with Double SS Straps
JCM Industries Inc.
#406 Double Band SS Saddle
1 "-2" Taps on ap to 12"
0/5/21/12
33-12-25
Tapping"apping Sleeve Coated Steel)
JCM Industries, Inc.
412 Tapping Sleeve ESS
Ass/WA C-223
Up to 30" w/12" Out
03/29/22
33-12-25
"repine Sleeve Coated or Stainless Stroll
JCM Industries, Inc.
415 Tapping Sleeve
AWWA C-223
Concrete Pie Only
05/10/11
Tapping Sleeve Stainless Stroll
Powerseal
3490AS )Flange) & 3490MJ
4"-8" and 16"
02/29/12
33-12-25
Tapping Sleeve Coated Steel
Romac
FTS 420
AWWA C-223
U pta 42" w/24" Out
02/29/12
33-12-25
"'upping Sleeve Stainless Steel)
Romac
SST Stainless Steel
AWWA C-223
Up 10 24" w/12" Om
02/29/12
33-12-25
"Upping Sleeve (Stainless Steel)
Romac
SST III Stainless Steel
AWWA C-223
Up to 30" w/12" Oct
05/10/11
Joint Repair Clamp
Powerseal
3232 Bell Joint Re air Clam
4" 10 35"
Plastic Meter Box w/Com osite Lid
DFW Plastics Inc.
DFW37C-12-IEPAF FTW
Plastic Meter Box so/Composite Lid
DFW Plastics Inc.
DFW39C-12-1EPAF FTW
08/30/06
Plastic Meter Box w/Com osite Lid
DFW Plastics Inc.
DFW65C-14-IEPAF FTW
Class "A"
Concrete Meter Box
Bass & Hays
CMB37-B12 1118 LID -9
Concrete Meter Box
Bass & Hays
CMB-18-Dual 1416 LID -9
Concrete Meter Box
Bass & Has
CMB65-B65 1527 LID -9
Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13)
None
Water - Combination Air Release 33-31-70 (01/08/131
a
El -II
Combination Air Release Valve
GA Industries, Inc.
Empire Air and Vacuum Valve, Model 935
ASTM A 126 Class B, ASTM A
1" & 2"
E1-11
Combination Air Release Valve
Multiples Manufacturing Co.
Crispin Air and Vacuum Valves, Model Na.
I /2", 1" & 2"
EI-11
Combination Air Release Valve
Valve and Primer Corp.
APCO #143C #145C and #147C
I ". 2" & 3"
Water - Dry Barrel Fire Hydrants 33-12-40 (01/15/14)
10/01/87
E-1-12
'3ry Barrel Fire Hrant
American-DarlingValve
Drawing Nos, 90-18608 94-18560
AWWA C-502
03/31/88
E-1-12
Dry Barrel Fire Hydrant
American Dueling Valve
Shop Drawing No. 94-18791
Ass/WA C-502
09/30/87
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Shop Drawing No, D-19895
AWWA C-502
01/12/93
E-1-12
Dry Barrel Fire Hydrant
American AVK Company
Model 2700
AWWA C-502
08/24/88
E-1-12
Dry Barrel Fire H drent
Clow Corporation
Drawings D20435, D20436 820506
AWWA C-502
E-1-12
Dry Barrel Fire Hant
ITT Keanedy Valve
Shop Drawing No. D-80783FW
AWWA C-502
09/24/87
E-1-12
Dry Barrel Fire Hydrant
M&H Valve Company
Shop Drawing No. 13476
AWWA C-502
10/14/87
E-1-12
0ry Barrel Fire Hydrant
Mueller Company
Shop Drawings No. 6461
A-423 Centurion
AWWA C-502
01/15/88
EI-12
Dry Barrel Fire H drent
Mueller Company
Shop Drawing FH-12
A-423 Super Centurion 200
AWWA C-502
10/09/87
E-1-12
Dry Barrel Fire Hant
U.S. Pipe & Faun
Shop Drawing No. 960250
AWWA C-502
09/16/87
E-1-12
DryBserol Fire Hydrant
American Flow Control )AFC)
Watereus Pacer WB67
AWWA C-502
08/12/16
33-12-40
Dry Barrel Fire Hydrant
EJ lEast Jordan Iron Works)
WaterMaster 5CD250
Water - Meters
02/05/93
E101-5
Detector Check Meter
Ames Company
Model 1000 Detector Check Valve
AWWA C550
4" - 10"
08/05/04
Magnolia Drive Vertical Turbine
Hersey
Magnetic Drive Vertical
AWWA 0701 Class 1
3/4" - 6"
' From Original Standard Products List
FORT WORTH,,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval Spec No. Classsification Manufacturer Model No. National Spec Size
Water - Pipes/PVC (Pressure Water) 33-31-70 01/08/13
12/05/23
33-11-12
PVC Pressure Pipe
Vinyltech PVC Pipe
DR14
AWWA C900, AWWA C605,
ASTMD1784
4"-16"
12/05/23
33-1.1-12
PVC Pressure Pipe
Vin ltech PVC Pipe
DRIB
AWWA C900, AWWA C605,
ASTMD1784
l6-18"
09/03/24
33-11-12
PVC Pressure Pipe
Northern Pipe Products
DR14
AWWA C900, AWWA C605,
ASTM DI 784
4"-16"
09/03/24
33-11-12
PVC Pressure Pipe
Northern Pipe Products
01518
AWWA C900, AW WA C605,
ASTMD1784
16-18"
3/19/2018
331112
PVC Pressure Pipe
Pi elite Jet Stream
DR14
AWWA C900
4"-12"
3/19/2018
331112
PVC Pressure Pipe
Pi elite Jet Stream
DR18
AWWA C900
16-24"
5/25/2018
33 11 12
PVC Pressure Pie
Diamond Plastics Corporation
DR 14
AWWA C900
4"-12"
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Co ration
DR 18
AWWA C900
l6"-24"
12/6/2018
33 11 12
PVC Pressure Pipe
J -M Manufacturing Co., Inc d/b/a JM Eagle
DR 14
AWWA C900-16
UL 1285
ANSI/NSF 61
FM 1612
4"-28"
12/6/201%
33 1 1 12
PVC Pressure Pipe
J -M Manufacturing Co., Inc d/b/a JM Eagle
DR 18
AWWA C900-16
UL 1285
ANSJMSF 61
FM 1612
l6"-24"
9/6/2019
33 11 12
PVC Pressure Pipe
Underground Solutions Inc.
DR14 Fusible PVC
AWWA C900
4" - 8"
9/6/2019
331112
PVC Pressure Pipe
NAPCO(Westlake)
DRI 8
AWWA C900
16"- 24"
9/6/2019
33 1112
PVC Pressure Pipe
NAPCO(Westlake)
DR14
AWWA C900
4"- 12"
9/6/2019
33 1112
PVC Pressure Pipe
Sanderson Pipe Corp.
DR14
AWWA C900
4"- 12"
Water - Pipes/Valves & Fittinps/Ductile Iron Fittings 33-11-11 (01/08/13)
07/23192
EI-07
Ductile loon Fittings
Star Pipe Products, Inc.
Mechanical Joint Fittings
AWWA C153 & CI 10
E 1-07
Ductile Iron Fittings
Griffin Pie Products, Co.
Mechanical Joint Fittings
AWWA C 110
E1-07
Ductile Jean Fittings
McWene/T ler Pi Union Utilities Division
Mechanical Joint Fittings, SSB Class 350
AWWA C 153, C 110, C III
08/11/98
E 1-07
Ductile Iron Fittings
Sigma, Co.
Mechanical Joint Fittings, SSB Class 351
AWWA C 153, C 110, C 112
02/26/14
EI-07
MJ Fittings
Accucast
Class 350 C-153 MJ Fittings
AWWA C153
4"-12"
05/14/98
EI-07
Ductile Iron Joint Restraints
Ford Meter Box Co./Uni-Flan
Uni-Flange Series 1400
AWWA CII I/C153
4" to 36"
05/14/98
E1-24
PVC Joint Restraints
Ford Meter Box Co./Uni-Flan a
Uni-Flange Series 1500 Circle -Lock
AS/WA Cl I I/C153
41024"
11/09/04
E1-07
Ductile Iron Joint Restraints
One Bolt, Inc.
One Bolt Restrained Joint Fitting
A'S/WA C I 11/C 116/C 153
4" to 12"
02/29/12
33-11-11
Ductile Iron Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
Megalug Series 1100 (for DI Pipe)
A'S/WA Cl 11/Cl 16/C153
4" to42"
02/29/12
33-11-11
PVC Pipe Mechanical Joint Restraint
EBAA Iron, inn.
Megalug Series 2000 (for PVC Pipe)
AWWA C I I 1/Cl 16/C 153
4" to 24"
08/05/04
E1-07
Mechanical Joint Retainer GlandaPVC
Sigma. Co.
Sigma One-Lok SLC4 - SLCI0
AWWA CII I/C153
4"to 10"
03/06/19
33-11-I1
Mechanical Joint Retainer GlandsPVC
Sigma, Co.
Sigma One-Lok SLCS4 - SLCS12
AWWA CIlI/C153
4" to 12"
08/05/04
E1-07
Mechanical Joint Retainer Glands PVC
Si to Co.
Sigma One-Lok SLCE
A'S/WA Cl I I/C153
12" to 24"
08/10/98
E1-07
MJ Finings(DIP)Sigma,
Co.
Sigma One-Lok SLDE
AWWA C153
4" - 24"
10/12/10
P1-24
Interior Restrained Joint System
S & B Techncial Products
Bulldog System) Diamond Lok 21 & JM Eagle
ASTM F-1624
4" 10 12"
04/07/69
Interior Restrained Joint System
Huller
Hydrogrip-R
ASTM D395, D412, D471, D573,
D883, D1149, D1229, D1349,
D1414, D1415, D1566, F913
4'-12"
08/16/06
E1-07
Mechanical Joint Fittings
SIP Industries Scram ore
Mechanical Joint Fittings
AWWA 1/153
4" 1024"
11/07/16
33 -I1 -I I
Mechanical Joint Retainer Glands
Star Pipe Products Inc.
PVC Stargrip Series 4000
ASTM A536 AWWA CI l l
11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
DIP Stargrip Series 3000
ASTM A536 AWWA CIII l
03/19/18
33-I 1-11
Mechanical Joint Retainer Glands
SIP Industries Scram or
EZ Grip Joint Restraint (EZD) Black For DIP
ASTM A536 AWWA C111
3"-48"
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Saesmporr)
EZ Grip Joint Restraint (EZD) Red for C900
DR14 PVC Pipe
ASTM A536 AWWA Cl II
4"-12"
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
EZ Grip Joint Restraint (EZD) Red for C900
DR18 PVC Pipe
ASTM A536 AWWA CIII I
16-24"
* From Original Standard Products List
FORT WORTH,,
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:2-26-26
Approval
Spec No. Classsification
Manufacturer
Model No.
National Spec
Size
Water - Pipes/Valves & Fittines/Resilient Seated Gate Valve*
33-12-20 (05/13/15)
Resilient Wedged Gate Valve w/no Gears
American Flow Control
Series 2500 Grassing #94-25247
16"
12/13/02
Resilient Wedge Gate Valve
American Flow Control
Series 2530 and Series 2536
AWWA 0515
30" and 36"
08/31/99
Resilient Wedge Gate Valve
American Flow Control
Series 2520 & 2524 SD 94-20255)
AWWA C515
20" and 24"
05/18/99
Resilient Wedge Gate Valve
American Flow Control
Series 2516 SD 94-20247)
AWWA C515
16"
10/24/00
E1-26
Resilient Wedge Gate Valve
American Flow Control
Series 2500 Ductile Iron)
AWWA 0515
4" to 12"
08/05/04
Resilient Wedgo Gate Valve
American Flow Control
42" and 48" AFC 2500
AWWA C515
42" and 48"
05/23/91
El -26
Resilient Wedge Gate Valve
American AVK CompanyCompaey
American AVK Resilient Sealed GV
AWWA C509
4" to 12"
01/24/02
E1-26
Resilient Wedge Gate Valve
American AVK Company
20" and smaller
E1-26
Resilient Seated Gate Valve
Kennel
4" - 12"
E1-26
Resilient Seated Gate Valve
M&H
4"- 12"
EI-26
Resilient Seated Gate Valve
Mueller Co.
4" - 12"
11/08/99
Resilient Wedge Gate Valve
Mueller Co.
Series A2361 SD 6647)
AWWA C515
16"
01/23/03
Resilient Wedge Gate Valve
Mueller Co.
Series A2360 for 18-24" SD 6709)
AWWA C515
24" and smaller
05/13/05
Resilient Wedge Gate Valve
Mueller Co.
Mueller 30" & 36", C-515
AWWA (.515
30" and 36"
01/31/06
Resilient Wedge Gate Valve
Mueller Co.
Mueller 42" & 48", C-515
AWWA C515
42" and 48"
01/28/88
E1-26
Resilient Wedge Gate Valve
Clow Valve Co.
AWWA C509
4"- 12"
10/04/94
Resilient Wedge Gate Valve
Clow Valve Co.
16" RS GV (SD D-20995)
AWWA C515
16"
11/08/99
E1-26
Resilient Wedge Gate Valve
Clow Valve Co.
Clow RW Valve SD D-21652)
AWWA C515
24" and smaller
11/29/04
Resilient Wedge Gate Valve
Clow Valve Co.
Clow 30" & 36" C-515
AWWA C515
30" and 36"Note 3)
11/30/12
Resilient Wedge Gate Valve
Clow Valve Co.
Clow Valve Model 2638
AWWA C515
24" to 48" (Note 3
05/08/91
El -26
Resilient Seated Gate Valve
Stnckham Valves & Fittings
AWWA C 509, ANSI 420 - stem,
4" - 12"
El -26
Resilient Seated Gate Valve
U.S. Pipe and Foundry Co.
Menoseal 250, re meements SPL #74
3" to 16"
10/26/16
33-12-20
Resilient Seated Gate Valve
EJ lEast Jordan Iron Works)
EJ FlowMaster Gate Valve & Boxes
Remove Marc. 225 MR 2-4-26
Water - Pipes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14)
El -30
Rubber Seated Butterfly Valve
HenryPratt Co.
AWWA C-504
24"
El -30
Rubber Seated Butterfly Valve
Mueller Co.
AWWA C-504
24"and smaller
1/11/99
E1-30
Rubber Seated Butterfly Valve
Dezurik Valves Co.
AWWA C-504
24" and larger
06/12/03
E1-30
Valmatic American Butterfly Valve
Valmatie Valve and Manufacturing Corp.
Valmatic American Butterfly Valve.
AWWA C-504
Up 10 84" diameter
04/06/07
El -30
Rubber Seated Butterfly Valve
M&H Valve
M&H Style 4500 & 1450
AWWA C-504
24" 10 48"
03/19/18
33 1221
Rubber Seated Butterfly Valve
G. A. Industries Golden Anderson)
AWWA C504 Butterfly Valve
AWWA C-504
30-54"
09/03/24
33 1221
Rubber Seated Butterfly Valve
American AVK Company
AWWA C504 Butterfly Valve Class 250B
AWWA C-504
24" - 48"
02/04/26
331221
Rubber Seated Butterfly Valve
Mueller Water Products Pratt
XR-75W/Segmented Seats
AWWA C-504
24"- 54"
Water -Polyethylene Encasement 33-11-10 (01/08/13)
05/12/05
El -13
Polyethylene Encasment
Flexsol Paekagieg
Fulton Enterprises
AWWAC105
8 mil LLD
05/12/05
E1-13
Polyethylene Encasment
Mountain States Plastics (MOF( and AEP Ind.
Standard Hardware
AWWA C105
8 mil LLD
05/12/05
El -13
Polyethylene Encasment
AEP Industries
Bultvtraeg by Cowtown Bolt & Gasket
AWWA 0105
8 mit LLD
09/06/19
33-I1-11
Polyethylene Encasment
Northtown Products Inc.
PE Encasement for DIP
AWWA C105
8 mil LLD
Water - Sampling Station
03/07/23
33 1250 Water Sampling Station
Kupferle Foundry Company
Eclipse, Number 08, 12 -inch Depth of Bury
As shown in spec. 33 12 50
Water - Automatic Flusher
10/21/20
Automated Flashing System
Mueller Hdroguard
HG6-A-IN-2-BRN-LPRR(Portable)
HGZ-A-IN--2-PVC-018-LPLG(Permanent
04/09/21
Automated Flushing System
Kupferle Foundry Company
Eclipse #9800we
04/09/21
Automated Flushing System
Kupferle Foundry Company
Eclipse #9700 (Portable)
The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications
for specific products, are included as pan ofthe Construction Contract Documents, the requirements ofthe Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List
and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Department's Standard Products
Yellow Highlight indicates recent changes
a From Original Standard Products List
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 08/01/2026
!1!!!!!! Attention: Mix Desiens do not supersede CFW Snecifications !!!!!!!!!!
Concrete
C1jSidewalk, ADA Rams, Driveways, Curb/Gutter, Median Pavement)
1/14/2026
32 13 13
Mix Design
AM Corp
1071
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
American Concrete Company
30CAF029
3000 psi
3-5" Slump; 3-6% Air
4/3/2025
32 13 20
Mix Design
Big Town Concrete
2211
3000 psi
3-5" Slump; 3-6% Air
7/16/2025
32 1320
Mix Design
Big Town Concrete
22113
With 30% Slag
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Borneo Texas
30U l01AG
3000 psi
3-5" Slump; 3-6% Air
4/1/2024
32 13 20
Mix Design
Bumco Texas
30U500BG
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
Carder Concrete
FWCC502001
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Carder Concrete
FWCC502021
3500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
Chisholm Trail Redi Mix
C13020AE
3000 psi
3-5" Slump; 4.5-7.5% Air
4/28/2025
32 1320
Mix Design
Chisholm Trail Redi Mix
CT6020A
3600 psi
3-5" Slump; 3-6% Air
7/20/2026
32 13 20
Mix Design
Chisholm Trail Redi Mix
CT5020A
With 20% Fly Ash
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
City Concrete Company
30HA2011
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
Cow Town Redi Mix
253-W
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
Cow Town Redi Mix
250
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Cow Town Redi Mix
350
3000 psi
3-5" Slump; 3-6% Air
1/29/2024
32 13 20
Mix Design
Estrada Ready Mix
R3050AEWR
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Holcim/ Amrize
1261
3000 psi
3-5" Slump; 3-6% Air
9/23/2024
32 13 20
Mix Design
Holcim/ Amrize
5177
3000 psi
3-5" Slump; 3-6% Air
5/8/2025
32 13 20
Mix Design
Holcim/ Amrize
530WA-T1
3000 psi
3-5" Slump; 3-6% Air
4/7/2023
32 1320
Mix Design
Liquid Stone
C301D
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Martin Marietta
R2136214
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Mix Design
Martin Marietta
R2136014
3000 psi
3-5" Slump; 3-6% Air
4/1/2023
32 1320
Mix Design
Martin Marietta
36Nl4
3000 psi
3-5" Slump; 3-6% Air
6/1/2023
32 13 20
Mix Design
Martin Marietta
R2136R20
3000 psi
3-5" Slump; 3-6% Air
6/1/2023
32 13 20
Mix Design
Martin Marietta
R2136N20
3000 psi
3-5" Slump; 3-6% Air
11/2/2022
32 13 20
Mix Design
Martin Marietta
41 924
4000 psi
3-5" Slump; 3-6% Air
4/7/2023
32 1320
Mix Design
Martin Marietta
36K14
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Martin Marietta
R2131314
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Martin Marietta
R2132214
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Martin Marietta
D9490SC
3000 psi
3-5" Slump; 4.5-7.5% Air
5/9/2025
32 1320
Mix Design
Martin Marietta
36R14
3000 psi
3-5" Slump; 3-6% Air
10/4/2023
32 13 20
Mix Design
NBR Ready Mix
CLS A-YY
3000 psi
3-5" Slump; 3-6% Air
10/4/2023
32 13 20
Mix Design
NBR Ready Mix
CLS A -NY
3000 psi
3-5" Slump; 3-6% Air
7/10/2023
32 1320
Mix Design
Gsburn
30A50MR
3000 psi
3-5" Slump; 3-6% Air
1/18/2023
32 13 20
Mix Design
Ra id Redi Mix
RRM5020A
3000 psi
3-5" Slump; 3-6% Air
1/24/2023
32 13 20
Mix Design
Ra id Redi Mix
RRM5525A
3600 psi
3-5" Slump; 3-6% Air
1222/2025
32 1320
Mix Design
Ra id Redi Mix
3250AL
With 50% Slug
3000 psi
3-5" Slump; 3-6% Air
10/24/2024
32 1320
Mix Design
SRM Concrete
30850
With 20% Fly Ash
3000 psi
3-5" Slump; 3-6% Air
10/24/2024
32 1320
Mix Design
SRM Concrete
30350
3000 psi
3-5" Slump; 3-6% Air
10/18/2024
32 13 20
Mix Design
SRM Concrete
30050
With 20% Fly Ash
3000 psi
3-5" Slump; 3-6% Air
1/9/2026
32 1320
Mix Design
SRM Concrete
36822
With 20% Fly Ash
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Tarrant Concrete
FW5025A
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Tarrant Concrete
CP5020A
3000 psi
3-5" Slump; 3-6% Air
10/10/2022
32 13 20
Mix Design
Tarrant Concrete
TCFW5020A
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Tarrant Concrete
FW5525A2
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
Titan Reudy Mix
3020AE
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1320
Mix Design
True Grit Redi Mix
0250.230
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 20
Olin Design
True Grit Redi Mix
0250.2301
3000 psi
3-5" Slump; 3-6% Air
11/17/2025 32 1320 Mix Design
True Grit Redi Mix
450.230
With 30% Slug
3000 psi
3-5" Slump; 3-6% Air
Class CIP Inlets Manholes, Junction Boxes, Encasement, Blocking, Collars, (Spread Footing Pedestal Pole Foundations —Reference Detail 34 41 10-D605A
9/9/2022
32 13 13
Mix Design
American Concrete Company
40CNF065
4000 psi
3-5" Slump; 0-3% Air
9/9/2022
32 13 13
Mix Design
Bumco Texas
40U500BG
4000 psi
3-5" Slump; 3-6% Air
8/21/2025
33 13 13
Mix Design
Bumco Texas
36U500BG
1" 20% MRWR AIR (Lighting and Signal Footing Foundation)
3600 psi
3-5" Slump; 3-6% Air
4/8/2026
03 3000
xDesign Design
umco Texas
30U500BG
4000 psi
3-5" Slump; 3-6% Air
4/28/2025
34 13 13
xDesign Design
hisholm Trail Redi Mix
CT6020A
3600 psi
3-5" Slump; 3-6% Air
4/28/2025
35 13 13
Mix Design
Chisholm Trail Redi Mix
CTFW5520A
3600 psi
3-5" Slump; 3-6% Air
4/28/2025
36 1313
Mix Design
Chisholm Trail Redi Mix
CTFW6020A
4000 psi
3-5" Slump; 3-6% Air
8/4/2025
37 1313
Mix Design
Chisholm Trail Redi Mix
CTFW5020A
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
xDesign Design
ow Town Redi Mix
2/5-2
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1313
Mix Design
Cow Town Redi Mix
55
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
nDesign Design
ow Town Redi Mix
255
3500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
270
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
370
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1313
Mix Design
Cow Town Redi Mix
353
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
nDesign Design
ow Town Redi Mix
257
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
357
3600 psi
3-5" Slump; 3-6% Air
5/7/2025
32 13 13
nDesign Design
ow Town Redi Mix
265-42
4200 psi
3-5" Slump; 3-6% Air
3/3/2026
03 3000
--Design
strada Ready Mix
R3555AESC
3500 psi
3-5" Slump; 3-6% Air
Page 1 of 7
FORT WORTH CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 08/01/2026
!!!!!!!! Attention: Mix Designs do not supersede CFW Specifications !!ll!!!!1
1
... Class CIP Concrete (Continues)
5/26/2026
03 3000
Mix Design
Chisholm Trail Redi Mix
CT60A
4000 psi
3-5" Slump; 3-6% Air
2/7/2025
32 13 13
Mix Design
Holcim/ Amrize
1701
4000 psi
3-5" Slump; 3-6% Air
2/7/2025
32 13 13
Mix Design
Holcim/ Amrize
1551
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Holcim/ Amrize
5409
4000 psi
3-5" Slump; 3-6% Air
8/14/2025
321313
Mix Design
Holcim/ Amrize
540WA-Tl
With 20% Fly Ash and 30% Slag
4000 psi
3-5" Slump; 3-6% Air
4/27/2023
32 13 13
Mix Design
Liquid Stone
C361DNFA
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2141230
4000 psi
3-5" Slump; 3-6% Air
8/4/2023
32 13 13
Mix Design
Martin Marietta
R2141R24
4000 psi
3-5" Slump; 3-6% Air
1.1/20/2023
32 13 13
Mix Design
Martin Marietta
R21461833
4000 psi
3-5" Slump; 3-6% Air
11/20/2023
32 13 13
Mix Design
Martin Marietta
R2146K33
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2142233
3600 psi
3-5" Slump; 4.5-7.5% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2136224
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2141233
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146038
4500 psi
3-5" Slump; 3-6% Air
10/24/2024
321313
Mix Design
Martin Marietta
R2146K34
4000 psi
3-5" Slump; 3-6% Air
5/5/2025
32 13 13
Mix Design
Martin Marietta
R2146R35
4000 psi
3-5" Slump; 3-6% Air
5/5/2025
33 13 13
Mix Design
Martin Marietta
R2146K35
4000 psi
3-5" Slump; 3-6% Air
5/5/2025
33 13 13
Mix Design
Martin Marietta
R2146N33
4000 psi
3-5" Slump; 3-6% Air
9/12/2023
321313
Mix Design
NBR Read Mix
CLS PI-YY
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
NBR Ready Mix
TX C-YY
3000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
NBR Ready Mix
TX C -NY
3000 psi
3-5" Slump; 3-6% Air
4/30/2026
32 13 13
Mix Design
NBR Ready Mix
CLS C-YY
3600 psi
3-5" Slump; 3-6% Air
4/30/2026
32 13 13
Mix Design
NBR Ready Mix
CLS C -NY
Straight Cement
3600 psi
3-5" Slump; 3-6% Air
1/18/2023
32 13 13
Mix Design n
Rapid Redi Mix
RRM5320A
3000 psi
3-5" Slump; 3-6% Air
1/18/2023
32 13 13
Mix Design
Ra id Redi Mix
RRM6020ASS
4000 psi
3-5" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
40350
4000 psi
3-5" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
40850
4000 psi
3-5" Slump; 3-6% Air
9/16/2024
321313
Mix Design
SRM Concrete
35050
3500 psi
3-5" Slum; 3-6% Air
4/28/2025
32 13 13
Mix Design
SRM Concrete
36850
3600 psi
3-5" Slump; 3-6% Air
11/24/2025
03 3000
Mix Design
Sum Concrete
45852
4500 psi
3-5" Slump; 4.5-7.5% Air
2/27/2026
32 13 13
Mix Design
SRM Concrete
35850
With 20% Fly Ash
3500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW5320A
3000 psi
3-5" Slump; 3-6% Air
10/10/2022
32 13 13
Mix Desi g
Tarrant Concrete
TCFW6025A2
4000 psi
3-5" Slump; 3-6% Air
2/25/2026
32 13 13
Mix Design
True Grit Redi Mix
450.230CIP
With 30% Slag
3000 psi
3-5" Slump; 3-6% Air
Class C Drilled Shaft for Traffic Signal Pole Foundations Reference Detail 31 41 10-D605
8/21/2025
321313
Mix Design
Bumco Texas
40U502BG
120% HRWR AIR
3600 psi
6-8"Slump; 3-6%Air
7/20/2026
32 13 13
Mix Design
Chisholm Trail Redi Mix
CT6520MR-67
With
4500 psi
5-7" Slump, 0-3% Air
6/21/2023
32 13 13
Mix Design
Cow Town Redi Mix
360 -DS
3600 psi
5.5-7.5" Slump; 3-6% Air
3/12/2026
32 13 13
Mix Design
Cow Town Redi Mix
360-2DS
3600 psi
5.5-7.5" Slump; 11-3% Air
10/30/2024
32 13 13
Mix Design
Estrada Ready Mix
R36575AEWR
3600 psi
5.5-7.5" Slump; 3-6% Air
9/11/2025
32 13 13
Mix Design
Gonzalez Brothers
P6020LA
3600 psi
5.5-7.5" Slump; 3-6% Air
12/5/2022
32 13 13
Mix Design
Holcim/ Amrize
1822
3600 psi
5.5-7.5" Slump; 0-3% Air
9/9/2022
32 13 13
Mix Design
Holcim/ Amrize
1859
4000 psi
5.5-7.5" Slump; 3-6% Air
1/14/2026
32 13 13
Mix Design
City Concrete Company
36LA20H-MR
With 20% Fl28% Fly Ash
3600 psi
5.5-7.5" Slump; 3% Air
4/7/2023
32 1313
Mix Design
Liquid Stone
C361DHR
3600 psi
5.5-7.5" Slump; 3-6% Air
6/27/2023
321313
Mix Design
Martin Marietta
U2146N41
3600 psi
5-7"Slump; 3-6%Air
6/27/2023
32 13 13
Mix Design
Martin Marietta
U2146K45
3600 psi
5-7" Slump; 3-6% Air
5/9/2025
32 1313
Mix Design
Martin Marietta
U2146R41
3600 psi
5-7" Slump; 3-6% Air
8/22/2024
32 13 13
Mix Design
NBR Ready Mix
1351(2524
3600 psi
5.5" Slump; 3-6% Air
8/22/2024
32 13 13
Mix Design
NBR Ready Mix.
135KO524
3600 psi
5.5" Slump; 3-6% Air
5/6/2026
32 13 13
Mix Design
SRM Concrete
40351
4000 PSI STRT COMMERCIAL SP AIR
4000 psi
5.5-7.5" Slump; 3-6% Air
Class C eadwalls, Wing walls, Culverts)
4/8/2026
03 3000
Mix Design
Borneo Texas
36U500BC
With 20% Fly Ash
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Carder Concrete
FWCC602001
4000 psi
3-5" Slump; 3-6% Air
2/24/2026
03 3000
Mix Design
Chisholm Trail Redi Mix
CT7020A
With 20% Fly Ash
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
CilyConcrete Company
40LA201 I
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
260-2
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
360-1
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1313
Mix Design
Cow Town Redi Mix
260-1
3600 psi
3-5" Slump; 3-6% Air
8/11/2025
32 13 13
Mix Design
Cow Town Redi Mix
275
With 20% Fly Ash
5000 psi
4-6" Slump; 3-6% Air
8/11/2025
32 13 13
Mix Design
Cow Town Redi Mix
375
5000 psi
4-6" Slump: 3-6% Ar
1/29/2024
32 13 13
Mix Design
Estrada Ready Mix
R3655AEWR
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 1313
Mix Design
GCH Concrete Services
GCH4000
4000 psi
3-5" Slump; 3-6% Air
4/12023
32 13 13
Mix Design
Martin Marietta
310LBP
3600 psi
3-5" Slump; 4-7% Air
8/30/2023
32 13 13
Mix Design
Martin Marietta
R2141R30
4000 Psi
3-5" Slump; 3-6% Air
Page 2 of 7
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 08/01/2026
!1!!!!!! Attention: Mix Desiens do not supersede CFW Snecifeotions !!!!!!!!!!
1'
Class C Concrete continues
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146035
4000 psi
3-5" Slump; 3-6% Air
3/10/2026
03 30 00
Mix Design
NBR Ready Mix
TX-C-YY
3600 psi
3-5" Slump: 3-6% Air
/I0/2026
03 3000
Mix Design
NBR Ready Mix
TX -C -NY
3600 psi
3-5" Slump: 3-6% Air
9/9/2022
32 13 13
Mix Design
SRM Concrete
40050
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
SRM Concrete
35022
With 20% Fl Ash
3600 psi
3-5" Slump; 3-6% Air
3/6/2026
03 30 00
Mix Design
SRM Concrete
45350
4500 psi
3-5" Slump; 3-6% Air
5/26/2026
03 3000
Mix Design
SRM Concrete
36322
3600 PSI NCTCOG STRT CLASS C
3600 psi
3-5" Slump; 3-6% Air
6/15/2026
03 3000
Mix Design
SRM Concrete
36822
With 20% Fly Ash
3600 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW6020A2
4000 psi
3-5" Slump; 3-6% Air
2/26/2026
03 3000
Mix Design
True Grit Redi Mix
455.230C
With 30% Slog
3600 psi
3-5" Slump; 3-6%% Au
Class P (Machine Placed Pavinu)
6/4/2026
32 13 13
Mix Design
Amrize/ Hocim
540LWA-Tl
With 20% Slag
4000 psi
1-3" Slump: 3-6% Air
4/3/2025
32 13 13
Mix Design
Bi g Town Concrete
45!!
3600 psi
1-3" Slump; 3-6% Air
4/3/2025
32 13 13
Mix Design
Bi Town Concrete
4411
3600 psi
1-3" Slump; 3-6% Air
6/30/2025
321313
Mix Design
Big Town Concrete
5211
With 20% Fly Ash
4000 psi
I-3" Slum; 3-6%, Au
1-3" Sit
6/30/2025
30 13 13
asDesign Design
Town Concrete
5311
4000 psi
1-3" Slump; 3-6% Air
9/30/2025
30 13 13
nsDesign Design
umco Texas
40U553BG
1"20% MRWR AIR
4000 psi
1-3" Slump; 3-6% Air
9/9/2022
321313
Mix Design
Carder Concrete
FWCC552091
3600 psi
1-3"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Carder Concrete
FWCC602091
4000 psi
1-3" Slump; 3-6% Air
11/6/2025
32 13 13
Mix Design
Chisholm Trail Redi Mix
CT5520AMP
With 20% Fly Ash
3600 psi
1-3" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Ci Concrete Company
36LA2011
3600 psi
1-3" Slump; 3-6% Air
9/9/2022
33 13 13
Mix Design
Cow Town Redi Mix
257-M
3600 psi
1-3" Slump; 3-6% Air
11/14/2022
32 13 13
Mix Design
Cow Town Redi Mix
357-M
3600 psi
1-3" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
260-M
4000 psi
1-3" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
ow Town Redi Mix
360-M
4000 psi
1-3" Slump; 3-6% Air
2/6/2024
32 13 13
Mix Design
Estrada Ready Mix
TD3655AEWR
3600 psi
1-3" Slump; 3-6% Air
5/12/2025
32 13 13
Mix Desi g
Holcim/ Antrize
1703
4000 psi
1-3" Slump; 3-6% Air
10/3/2025
32 13 13
Mix Design
Holcim/ Amrize
5405
With 20%Fl FlyAsh
4000 psi
1-3" Slump; 3-6% Air
8/4/2023
32 13 13
Mix Design
Martin Marietta/ Quilcrete
Q214IR27
4000 psi
1-3" Slump; 3-6% Air
11/2/2022
32 13 13
Mix Design
Martin Marietta/ Quilrete
Q214IK30
4000 psi
1-3" Slump; 3-6% Air
5/5/2025
32 13 13
Mix Design
Martin Marietta/ Quikrete
Q214IN27
4000 psi
1-3" Slump; 3-6% Air
1/23/2026
32 13 13
Mix Design
Martin Marietta/ Quikrete
Q2146K33
4000 psi
1-3" Slump: 3-6% Air
7/30/2026
32 13 13
Mix Design
Martin Marietta/ . ete
- 2146833
4000 psi
1-3" Slump: 3-6% Air
10/4/2023
32 13 13
Mix Design
NBR Ready Mix
TX C SF-YY
3600 psi
1-3" Slump; 3-6% Air
10/4/2023
32 13 13
Mix Design
NBR Ready Mix
TX C SF -NY
3600 psi
1-3" Slump; 3-6% Air
12/22/2025
32 13 13
Mix Design
Rapid Redi Mix
4050AL
With 50% Slag
4000 psi
1-3" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
40068
4000 psi
1-3" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
40825
4000 psi
1-3" Slump; 3-6% Air
9/16/2024
32 13 13
Mix Design
SRM Concrete
40025
With 20% F1' Ash
4000 psi
1-3" Slump; 3-6% Air
10/18/2024
32 13 13
Mix Design
SRM Concrete
35023
3600 psi
I-3" Slump; 3-6% Air
6/5/2025
32 13 13
Mix Design
SRM Concrete
40324
4000 psi
1-3" Slump; 3-6% Air
7/212025
1313
Mix Design
SINACOLA
24011-4000MP 20%
With 20% Fl Ash
4000 psi
1-3" Slump; 3-6% Air
7/21/2025
32 13 13
Mix Design
SWACOLA
24011-4000MP Straight Cement
4000 psi
1-3"Slump; 3-6% Air
2/3/2026
32 13 13
Mix Design
Sunrise Redi Mix
1451
4000 psi
I-3" Slump: 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW5520AMP
3600 psi
I-3" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
0255.2301
3600 psi
1-3" Slump; 3.5-6.5% Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
0260.2302
4000 psi
1-3"Slump; 3.5-6.5% Air
6/17/2025
32 13 13
Mix Design
Tme Grit Redi Mix
460.230M
4000 psi
1-3" Slump; 3-6% Air
623/2025
32 13 13
Mix Design
Tme Grit Redi Mix
360.230M
4000 psi
1-3" Slump; 3-6% Air
1/2/1900
32 13 13
Mix Design
Tme Grit Redi Mix
455.230M
With 30% Slag
3600 psi
1-3" Stump; 3-6% Air
Class H (Hand Placed Paving, Vallev Gutter)
9/9/2022
32 13 13
Mix Design
American Concrete Company
45CAF076
4500 psi
3-5" Slump; 3-6% Air
5/2/2023
32 13 13
Mix Design
Big D Concrete
CMI4520AE
4500 psi
3-5" Slump; 3-6% Air
4/3/2025
32 13 13
Mix Design
Big Town Concrete
6211
4500 psi
3-5" Slump; 3-6% Air
4/3/2025
32 13 13
Mix Design
Big Town Concrete
6311
4500 psi
3-5" Stump; 3-6% Air
4/5/2025
32 13 13
Mix Design
Big Town Concrete
6017
4500 psi
3-5" Slump; 3-6% Air
7/16/2025
32 13 13
Mix Design
Big Town Concrete
62113
With 30% Slag
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Burnco Texas
45U500BG
4500 psi
3-5" Slump; 3-6% Air
9/302025
33 13 13
Mix Design
Bumco Texas
45U100AG
4000 psi
3-5" Stump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Carder Concrete
FWCC602021
4500 psi
3-5" Slump; 3-6% Air
4/28/2025
32 13 13
Mix Design
Chisholm Trail Redi Mix
CTFW6520A
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
City Concrete Company
45NA20B
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
265
4500 psi
3-5" Stump; 3-6% Air
9/92022
32 13 13
Mix Design
Cow Town Redi Mix
365
4500 psi
3-5" Slump; 3-6% Air
1/29/2024
32 13 13
Mix Design
Estrada Ready Mix
R4560AEWR/
4500 psi
3-5" Slump; 4-6% Air
9/9/2022
32 13 13
Mix Design
GCH Concrete Services
GCH4500
4500 psi
3-5" Slump; 3-6% Air
10/4/2024
32 13 13
Mix Design
Holcim/ Amrize
5507
4500 psi
3-5" Slump; 3-6% Air
Page 3 of 7
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 08/01/2026
!!!!!!!! Attention: Mix Desiens do not supersede CFW Specifications 111!!!!!!!
11511. 1'
Class H Concrete continues
9/9/2022
321313
Mix Design
Holcim/Amrize
1851
4500 psi
3-5"Slump; 3-6% Air
5/8/2025
32 13 13
Mix Design
Amrize/ Hocim
545WA-Tl
4500 psi
3-5" Slump; 3-6% Air
4/5/2025
32 13 13
Mix Design
Liquid Stone
C451D
4500 psi
3-5" Slump; 3-6% Air
11/2/2022
32 13 13
Mix Design
Martin Marietta
R2146N35
4500 psi
3-5" Slump; 3-6% Air
8/4/2023
32 13 13
Mix Design
Martin Marietta
R2146R36
4500 psi
3-5" Slump; 3-6% Air
11/2/2022
32 13 13
Mix Design
Martin Marietta
R2146N36
4500 psi
3-5" Slump; 3-6% Air
5/22/2023
32 13 13
Mix Design
Martin Marietta
R2146K37
4500 psi
3-5" Slump; 3-6% Air
12/22/2023
321313
Mix Design
Martin Marietta
R2146R44
4500 psi
3-5"Slump; : 3-6% Air
12/22/2023
32 1313
Mix Design
Martin Marietta
R2146K44
4500 psi
3-5" Slump; 3-6% Air
11/15/2022
32 1313
Mix Design
Martin Marietta
R2146P36
4500 psi
3-5" Slump; 3-6% Air
11/152022
32 13 13
Mix Design
Martin Marietta
R2146K36
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
321313
Mix Design
Martin Marietta
R2147241
4500 psi
3-5"Slump; 4.5-7.5% Air
9/9/2022
321313
Mix Design
Martin Marietta
R2146236
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146036
4500 psi
3-5" Slump; 3-6% Air
9/92022
32 13 13
Mix Design
Martin Marietta
R2146242
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Martin Marietta
R2146042
4500 psi
3-5" Slump; 3-6% Air
6/3/2025
32 13 13
Mix Design
Martin Marietta
R2146K43
4500 psi
3-5" Slump; ; 3-6% Air
1/29/2026
32 13 13
Mix Design
Martin Marietta
R2146R43
4500 psi
3-5" Slump; 3-6% Air
10/4/2023
32 13 13
Mix Design
NBR Ready Mix
CLS P2-YY
4500 psi
3-5" Slump; 3-6% Air
10/4/2023.
32 13 13
Mix Design
NBR Ready Mix
CLS P2 -NY
4500 psi
3-5" Slump; 3-6% Air
7/10/2023
321313
Mix Design
Osborn
45A60MR
4500 psi
3-5" Slump; 3-6% Air
1/24/2023
32 13 13
Mix Design
Raid Redi Mix
RRM6320AHP
4500 psi
3-5" Slump; 3-6% Air
12/22/2025
32 13 13
Mix Design
Ra id Redi Mix
4550AL
With 50% Slag
4500 psi
3-5" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
45350
4500 psi
3-5" Slump; 3-6% Air
10/24/2024
32 13 13
Mix Design
SRM Concrete
45850
With 20% Fly Ash
4500 psi
3-5" Slump; 3-6% Air
10/18/2024
321313
Mix Design
SRM Concrete
45050
4500 psi
3-5" Slum; 3-6% Air
7/21/2025
321313
Mix Design
SINACOLA
24011-4500HP 20%
With 20% FlAsh
4500 psi
3-5"Slump; 3-6%Air
7/21/2025
32 13 13
Mix Design
SINACOLA
24011-4500BP Straight Cement
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW6020AHP
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
321313
Mix Design
Tarrant Concrete
FW60ABP
4500 psi
3-5"Slump; 3-6%Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
TCFW6020AHP
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Titan Ready Mix
TRC4520
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
0260.2301
4500 psi
3-5" Stump; 3-6% Air
9/9/2022
32 1313
Mix Design n
True Grit Redi Mix
0265.2301
4500 psi
3-5" Slump; 3.5-6.5% Air
9/9/2022
32 13 13
Mix Design
True Grit Redi Mix
270.230
4500 psi
3-5" Slump; 3-6% Air
6/12/2025
32 13 13
Mix Design
True Grit Redi Mix
465.23014
With 30% Slag
4500 psi
3-5" Slump: 3-6% Air
6/23/2025
32 13 13
Mix Design
True Grit Redi Mix
365.230H
4500 psi
3-5" Stump: 3-6% Air
10/9/2024
32 13 13
Mix Design
Wildcatter
4520AI
4500 psi
3-5" Slump; 3-6% Air
Class HES High Farly Strength Paving)
9/9/2022
32 13 13
Max Design
Bi D Concrete
14500AE
4500 psi
3-5"Slump; 3%,Air
12/10/2025
32 13 13
Mix Design
Bumco Texas
70UI00AG
I day average comp strength >4000 psi
7000 psi
3-5" Slump; 3-6% Air
11/18/2025
32 13 13
Mix Design
Chisholm Trail Redi Mix
CTTX70AHES
2600 @24 hex and/or
3000 @72hrs;4500@28 days
3-5" Slump; 3-6% Air
2/24/2026
32 13 13
Max Design
Chisholm Tmil Redi Mix
CT75AHES
3000 psi @ 24 hours and 5000 psi @ 28 days
3-5" Slump; 3-6% Air
5/26/2026
32 13 13
Max Design
Chisholm Trail. Redi Mix
CT65A
4500 psi @ 24 hours
3-5"Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
370-INC
4500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
375 -NC
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
370 -NC
4500 psi
-5" Slump; 3-6% Air
1/18/2023
32 13 13
Max Design
Cow Town Redi Mix
380 -NC
4500 psi
3-5"Slump; 3-6% Air
1/29/2024
32 13 13
Mix Design
Estrada Ready Mix
4575AESC
4500 psi / 3000 psi @3 days
3-5" Slump; 3-6% Air
9/9/2022
321313
Mix Design
Holcim/Amrize
2125
5000 psi
3-5"Slump; 3-6%Air
1/24/2023
32 13 13
Mix Design
Liquid Stone
C451DHR-A
4500 psi
3-5" Slump; 3-6% Air
4/7/2023
32 13 13
Mix Design
Martin Marietta
R2161K70
6000 psi / 3000 psi @ 24hrs.
-5" Slump; 3-6% Air
6/17/2026
32 13 13
Mix Design
SINACOLA
Class HES 3200psi 24hrs
With l0% Fly Ash
3200psi 24hrs
1-5" Slump; 3-6% Air
2/10/2023
32 13 13
Mix Design
SRM Concrete
50310
5000 psi
3-5" Stump; 3-6% Air
2/7/2025
32 13 13
Mix Design
SRM Concrete
40326
4500 psi / 3000 psi @3 days
3-5" Slump; 3-6% Air
2/3/2026
32 13 13
Mix Design
Sunrise Redi Mix
1477
3 day average comp strength>3000 psi
5500 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW6520AMR
4500 psi / 3000 psi @3 days
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Tarrant Concrete
FW7520AMR
4500 psi / 3000 psi @3 days
3-5" Stump; 3-6% Air
3/30/2026
32 13 13
Mix Design
True Grit Redi Mix
370.230HES
4500 psi / 3000 psi @24 hex
3-5" Slump; 3-6% Air
Class S (Bridt?e Slabs. Ton Slabs of Direct Traffic Culverts. ADnroach Slabs)
2/24/2026
03 3000
Mix Design
Chisholm Trail Redi Mix
CT7020A
With 20% FlyAsh
5000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
260
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
360
4000 psi
3-5" Slump; 3-6% Air
9/9/2022
32 13 13
Mix Design
Cow Town Redi Mix
365-STX
4000 psi
3-5" Slump; 3-6% Air
7/28/2026
32 13 13
Mix Design
Cow Town Redi Mix
273
With 20% Fly Ash
5000 psi
3-5" Slump; 3-6% Air
1/29/2024
32 13 13
Mix Design
Estrada Ready Mix
R4060AEWR
4000 psi
4-6" Slump; 3-6% Air
5/3/2023
32 13 13
Mix Design
Martin Marietta
M7842344
4000 psi
3-5" Slump; 4.5-7.5% Air
4/1/2023
32 13 13
Mix Design
Martin Marietta
R2146P33
4000 psi
3-5" Stump; 3-6% Air
Page 4 of 7
FORT WORTH- CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 08/01/2026
!!!!!!!! Attention: Mix Desiens do not sunersede CFW Snecifications !!!!!!!!!!
Class S Concrete continues
8/18/2025
32 13 13
Mix Design
Martin Marietta
61 OLBT
4000 psi
3-5" Slump; 3-6% Air
4/15/2024
32 13 13
Mix Design
NBR Ready Mix
TX S -NY
4000 psi
3-5" Slump; 3-6% Air
4/15/2024
32 13 13
Mix Design
NBR Ready Mix
TX S-YY
4000 psi
3-5" Slump; 3-6% Air
4/5/2025
32 13 13
Mix Design
SRM Concrete
40850
With 20% Fly Ash
4000 psi
3-5" Slump; 3-6% Air
4/5/20?5
32 13 13
Mix Design
SRM Concrete
40350
4000 psi
3-5" Slump; 3-6% Air
3/6/2026
03 3000
Mix Design
SRM Concrete
45350
4500 psi
3-5" Slump; 3-6% Air
5/5/20?3
32 13 13
Mix Design
SRM Concrete
D100008553CB
4000 psi
3-5" Slump; 3-6% Air
/8/2026
03 30 00
Mix Design
True Grit Redi Mix
460.230S
35% Slag, AEA, Class S Concrete
4000 psi
3-5" Stump; 3-6% Air
Concrete Base Trench Repair
4/1/2023
0334 16
Mix Design
Borneo Texas
IOYH50BF
1000 psi
Flowable; 8.5-11.5% Air
9/9/2022
03 34 16
Mix Design
Burnco Texas
08Y450BA
800 psi
5-7" Slump; 3-6% Air
12/19/2025
0334 16
Mix Design
Cow Town Redi Mix
330-58
750 psi
5.5-8.5" Slump; 5-15%
9/30/2025
0334 16
Mix Design
Martin Marietta
YN81O001
750 psi
8-12" Slump; 5-10% Air
12/26/2025
03 34 16
Mix Design
SRM Concrete
915
750 psi
Flowable; 3-6% Air
Controlled Low Strength Material (Flowable Fill)
2/7/2025
03 3413
Mix Design
Bunten Texas
OIY69OBF
100 psi
Flowable; 9.5-11.5% Air
5/19/2025
033413
Mix Design
Bunten Texas
OIZ180AF
100 psi
Flowable; 9.5-11.5% Air
11/18/2025
033413
Mix Design
Bumco Texas
OIZ401BF
SAND 25% MRWR 17% AIR FLOW FILL
100 psi
Flowable; 174-/-l.5% air
9/9/2022
03 3413
Mix Design
Carder Concrete
FWCC359101
50-150 psi
3-5" Slump; 8-12% Air
9/9/2022
03 3413
Mix Design
Carder Concrete
FWFF237501
50-150 psi
Flowable; 8.5-11.5% Air
8/4/2025
03 34 13
Mix Design
Chisholm Trail Redi Mix
CT150FF
50-150 psi
Flowable; 7-9.0% Air
12/26/2025
03 3413
Mix Design
Chisholm Trail Redi Mix
CTFWCLSM
100-150 psi
5-7" slump; 8.5-11.5% Air
9/9/2022
3413
Mix Design
Cilv Concrete Company
11-350-FF
50-150 psi
Flowable; 8-12% Air
9/9/2022
03 3413
Mix Design
Cow Town Redi Mix
9
70 psi
7-9" Slump; 8-11% Air
4/30/2026
03 3413
Mix Design
Cow Town Redi Mix
9-S
Flowable fill/ Straight Cement
70 psi
6-12" Slump; 5-15% Air
9/9/2025
03 3413
Mix Design
Cow Town Redi Mix
I 0
Min 50 psi
Min 9" Slump; 10-20% Air
5/12/2025
033413
Mix Design
Holcim/ Amrize
3741
100 psi
Flowable; 12.0-24.0% Air
8/4/2025
03 34 13
Mix Design
Holcim/ Antrize
901
100 psi
9-11" Slump; 10-30% Air
8/14/2025
03 34 13
Mix Design
Holcim/ Amrize
904
150 psi
9-11" Slump; 10-30% Air
2/27/2026
03 34 13
Mix Design
Holcim/ Amrize
3747
150 psi
Flowable; 12.0-24.0% Air
9/11/2025
033413
Mix Design
Martin Marietta
FLOW25A
150 psi
8"-12" Slum; 10% Air
10/4/2023
03 34 13
Mix Design
NBR Ready Mix
FTW FLOW FILL
150 psi
7-10" Slump; 8-12% Air
/30/2026
03 3413
Mix Design
NBR Ready Mix
FO000022
150 psi
8.5-12" Slump; 10%-20% Air
2/7/2025
03 34 13
Mix Design
SRM Concrete
910
150 psi
Flowable; 8-12% Air
12/26/2025
3413
Mix Design
SRM Concrete
900
100 psi
Flowable; 10-30% Air
9/9/2022
033413
Mix Design
Tarrant Concrete
FWFF150CLSM
50-150 psi
Flowable; 8-12% Air
4/8/2026
03 34 13
Mix Design
True Grit Redi Mix
FF420.230CS
CISM Flowable Fill, 100% Concrete Sand
150 psi
Flowable; 8-12% Air
4/8/2026
03 34 13
Mix Design
True Grit Redi Mix
FF420.230MS
CLSM Flowable Fill, 100% Manufactured Sand
150 psi
Flowable; 8-12% Air
Concrete Rip Rap
4/1/2023
31 3700
Mix Design
Martin Marietta
R2141030
4000 psi
3-5" Slump; 3-6%Air
4/1/2023
31 3700
Mix Design
Martin Marietta
R2146033
4000 psi
3-5" Slump; 3-6% Air
7/29/2026
31 3700
Mix Design
SRM Concrete
20900
2000 psi
7 -IS" Stomp; 0-4.5% Air
Cement- Stabilized Sand (CSS)
11/21/2025
330510
Mix Design
Burnco Texas
04Z500BA
SAND 20% MRWR 17% AIR FLOW FILL
250 psi
Flowable; 15.5-18.5% Air
7/7/2026
33 05 10
Mix Design
ARCOSA
010
6% Cement with Ave 108 psi @7 days
165 psi
Grout
4/24/2026
Mix Design
Bumco Texas
FMG75
Pipe Collars Grout
3000 psi
7"-10" Slump; 2.0% Air
5/26/2026
Mix Design
Cow Town Redi Mix
O8
Grout for Stone Ripmp
3000 psi
5"-1 t" slump
6/17/2026
Mix Design
SRM Concrete
30900
Fine Grout
3000 psi
7-10" Slump; 0-4.5%Air
Cellular Grout
4/22/2026
33 05 10
Mix Design
SRM Concrete
CC0090CG
Cellular Grout
300 psi
Flowable; >50% Air
7/23/2026
33 05 10
Mix Design
Superior
965-55-500
With SRM grout mix of 5000 psi @28 dus
500 psi
Flowable
As halt Pavin
9/9/2022
32 12 16
Mix Design
Austin Asphalt
FT5BI17965
FT5B117965 PG64-22 Type B Fine Base
9/9/2022
321216
Mix Design
Austin Asphalt
FTIBI39965
FTIBI39965 PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
Austin Asphalt
FTIB117.2
FTIB117.2 PG64-22 Type B Fine Base
5/1/2024
32 12 16
Mix Design
"ynolds Asphalt
340 -DG -B P
340 -DO -B PG64-22 Type B Base Course
9/9/2022
32 12 16
Mix Design
Reynolds Asphalt
1112B
1112B PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
Reynolds Asphalt
1612B
1612B PG64-22 Type B Fine Base
4/4/2025
32 12 16
Mix Design
Reynolds Asphalt
2315B
2315B PG64-22 Type B Fine Base
4/13/2026
32 12 16
Mix Design
Reynolds Asphalt
2409B
3076_DG-B_SAC B P064-22_RAP
19.8% RAP/Binder
4/13/2026
321216
Mix Design
Reynolds Asphalt
2525D
341_DG-D_PG70-22 Virgin
0% RAP
12/5/2022
33 12 16
Mix Design
Sunntount Paving
3076BV6422
3076BV6422 PG62-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
Sunmount Paving
341-BRAP6422ERG
341-BRAP6422ERG PG64-22 Type B Fine Base
5/7/2026
32 12 16
Mix Design
Texas Materials
202DI 031500
SP -D SAC B 70-22 R (2-215122-25) — 344 -SP -D
14.2% RAP/ Binder
9/9/2022
32 12 16
Mix Design
TXBIT
37-211305-20
37-211305-20 PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
TXBIT
44-211305-17
44-211305-17 PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
TXBIT
211305 (1757)
211305 (1757) PG64-22 Type B Fine Base
9/9/2022
32 12 16
Mix Design
TXBIT
64-224125-1S PG
64-224125-18 PG70-22 Type D Fine Surface
/1/2024
32 12 16
Mix Design
TXBIT
344 MAC -SP -D 70-22XR
344 MAC -SP -D 70-22XR SAC A -R Type D Fine Surface
5/7/2026
32 12 16
Mix Design
TXBIT
202D2031500
SP -D SAC A 70-22 R (1-215120-25) SS -3077 -SP -D
13.8% RAP/Binder
Page 5 of 7
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
_- STANDARD PRODUCTS LIST AS OF 08/01/2026
!! Attention: Mix Desiens do not supersede CFW Snecificatinns !!!!!!!!!!
1
Detectable Warning Surface
9/9/2022
32 13 20
DWS - Pavers
Pine Hall Brick (Winston Salem, NC)
Tactile Pavers
9/9/2022
32 13 20
DWS - Pavers
Western Brick Co. (Houston, TX)
Detectable Warning Pavers
9/9/2022
32 13 20
DWS - Composite
Armor Tile
9/9/2022
32 13 20
DWS - Composite
ADA Solutions (Wilmington, MA)
Heritage e Brick CIP Composite Paver
4/7/2023
32 13 20
DWS - Pavers
ADA Solutions (Wilmington, MA)
Detectable Warning Pavers
10/16/2025
32 13 20
DWS - Pavers
EQUALTILE
E t ualTile Brick Pattern Wet -Set Replaceable
10/16/2025
32 13 20
DWS - Pavers
EQUALTILE
E ualTile Cast -In -Place Replaceable
4/13/2026
32 13 20
DWS
Tuffile Inc
Polymer Surface applied detectable warning s
4/13/2026
32 13 20
DWS
Tuffile Inc
Galvanized steel Surface applied detectable warnings
4/13/2026
32 13 20
DWS
TutTile Inc
Polymer wet set detectable warnings for cast in place
4/13/2026
32 13 20
DWS
TutTile Inc
Galvanized steel wet set detectable warnings for cast in place
4/13/2026
32 13 20
DWS
Tuffile Inc
Cast iron wet set detectable warnings for cast in place
Silicone .joint Sealant
9/9/2022
32 13 73
Joint Sealant
Dow
890SL
890SL - Cold Applied, Single Component, Silicone Joint Sealant
ASTM D5893
9/9/2022
32 13 73
Joint Sealant
Tremco
900SL
900SL - Cold Applied, Single Component, Silicone Joint Sealant
ASTM D5893
9/9/2022
32 13 73
Joint Sealant
Pecora
300SL
300SL - Cold Applied, Single Component. Silicone Joint Sealant
ASTM D5893
9/9/2022
32 13 73
Joint Sealant
Crafco
RoadSaver Silicone
RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant
ASTM D5893
Utility Trench Embedment Sand
9/9/2022
33 05 10
Embedment Sand
Silver Creek Materials
Utility Embedment Sand
ASTM C33
9/9/2022
33 05 10
Embedment Sand
Crouch Materials
Utility Embedment Sand
ASTM C33
9/9/2022
33 05 10
Embedment Sand
F and L Dirt Movers
Utility Embedment Sand
ASTM C33
9/9/2022
33 05 10
Embedment Sand
F and L Dirt Movers
Utility Embedment Sand
ASTM C33
9/9/2022
33 05 10
Embedment Sand
Tin Top Martin Marietta
Utility Embedment Sand
ASTM C33
Storm Sewer - Manholes & Races/Frames & Covers/Standard (Rmmd) 33-05-13
9/28/2018.
33 05 13
Manholc Frames and Covers
AccuCast (Govind Steel Company, LTD)
MHRC #220605
MHRC #220605 Size - **24" Dia.)
ASTM A48 AASHTO M306
9/28/2018
33 05 13
Manhole Cover
Neenah Foundry
NF -1274-T91
NF -1274-T91 (Size - 32" Dia.)
ASTM A48 AASHTO M306
9/28/2018
33 05 13
Manhole Frames and Covers
Neenah Foundry
NF -1743 -LM (Hinged)
NF -1743 -LM (Hinged) (Size - 32" Dia.)
ASTM A48 AASHTO M306
9/28/2018
33 0513
Manhole Frame
Neenah Foundry
NF -1930-30
NF -1930-30 (Size - 32.25" Dia.)
ASTM A48 AASHTO M306
9/28/2018
33 05 13
Manhole Frames and Covers
Neenah Foundry
R -1743-13V
R-1743-HV (Size - 32" Dia.)
ASTM A48 AASHTO M306
2/13/2026
33 05 13
Round Manhole lid and
frame
Neenah Foundry
Pan number 101560 and 12940110
Size- 24" Dia clear opening
AASHTO M306 H-20
4/3/2019
33 05 13
Manhole Frames and Covers
SIP Industries ++
2279ST
2279ST (Size - 24" Dia.)
ASTM A48 AASHTO M306
4/3/2019
33 05 13
Manhole Frames and Covers
IS Industries -H-
2280ST
2280ST (Size - 32" Dia.)
ASTM A48 AASHTO M306
10/8/2020
33 05 13
Manhole Frames and Covers
EJ ( Formally East Jordan Iron Works)
EA033 Z2/A
NJ 1033 Z2/A (Size - 32.25" Dia.)
ASTM A536 AASHTO M306
3/8/2024
33 05 13
Curb Inlet Covers
SIP Industries ++
2296T
2296T (Size - ***24" Dia.)
ASTM A48 AASHTO M306
6/18/2024
33 0513
Curb Inlet Covers
SIP Industries ++
2279STN
2279STN (Size - 24" Dia.)
ASTM A48 AASHTO M306
**Note: All new development and new installation manhole lids shall meet the minimum 30 -inch opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed fu r existing manholes that require replacement frames and covers
Storm Sewer - Inlet & Structures 33-05-13
10/8/2020
33 4920
Curb inlets
Footman
FRT-10x3-405-PRECAST** Size - 10' X 3'
ASTM C913
10/8/2020
33 4920
Curb Inlets
Farterra
FRT-10x3-406-PRECAST** (Size - 10' X 3')
ASTM C913
10/8/2020
33 4920
Curb Inlets
Forterra
FRT-10x4.5-407-PRECAST** Size - 10' X 4.5')
ASTM C913
10/8/2020
33 4920
Curb Inlets
Forterra
FRT-10x4.5-420-PRECAST** (Size - 10' X 4.5')
ASTM C913.
10/8/2020
33 39 20
Manhole
Forterra
FRT-4X4-409-PRECAST-TOP (Size - 4' X 4')
ASTM C913
10/8/2020
33 3920
Manhole
Forterra
FRT-4X4-409-PRECAST-BASE (Size - 4' X 4')
ASTM C913
10/8/2020
33 3920
Manhole
Forterra
FRT-5X5-410-PRECAST-TOP Size - 5' X 5'
ASTM C913
10/8/2020
33 3920
Manhole
Forterra
FRT-5X5-41 0 -PRECAST -BASE Size - 5' X 5')
ASTM C913.
10/8/2020
33 3920
Manhole
Forterra
FRT-6X6-41 1 -PRECAST -TOP (Size - 6' X 6')
ASTM C913
10/8/2020
33 3920
Manhole
Forterra
FRT-6X6-41 1 -PRECAST -BASE (Size - 6' X 6')
ASTM C913
3/19/2021
33 4920
Curb Inlets
Thompson Pipe Group
TPG-IOX3-405-PRECAST INLET'* (Size - 10' X 3')
ASTM 615
3/19/2021
33 4920
Curb Inlets
Thompson Pipe Group
TPG-15X3-405-PRECAST INLET** (Size - 15' X 3)
ASTM 615
3/19/2021
33 4920
Curb Inlets
Thompson Pipe Group
TPG-20X3-405-PRECAST INLET** (Size - 20' X 7')
ASTM 615
3/ 19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-4X4-409-PRECAST TOP (Size - 4' X 4')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-4X4-409-PRECAST BASE (Size - 4' X 4')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-4X4-412-PRECAST 4 -FT RISER (Size - 4' X 4')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-5X5-410-PRECAST TOP (Size - 5' X 5')
ASTM 615
3/ 19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-5X5-410-PRECAST BASE (Size - 5' X 5')
ASTM 615
3/ 19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-5X5-412-PRECAST 5 -FT RISER (Sire -S 5 X 5')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-6X6-411-PRECAST TOP (Size - 6'X 6')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-6X6-4I 1 -PRECAST BASE (Size - 6' X 6')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-6X6-412-PRECAST 6 -FT RISER (Si- - 6' X 6')
ASTM 615
Page 6 of 7
FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 08/01/2026
!1!!!!!! Attention: Mix Desiens do not supersede CFW Snecifleations !!!!!!!!!!
1
Starrrr Surer...
3/19/2021.
33 3920
Manhole
Thompson Pipe Group
TPG-7X7-411-PRECAST TOP (Size - 7' X 7')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-7X7-411-PRECAST BASE (Size -7' X 7')
ASTM 615
/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-7X7-412-PRECAST 4 -FT RISER (Size -7' X 7')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Group
TPG-8X8-411-PRECAST TOP (Size - 8' X 8')
ASTM 615
3/19/2021.
33 3920
Manhole
Thompson Pipe Grasp
TPG-8X8-411-PRECAST BASE (Size - 8' X 8')
ASTM 615
3/19/2021
33 3920
Manhole
Thompson Pipe Grasp
TPG-8X8-412-PRECAST 5 -FT RISER (Size - 8' X 8')
ASTM 615
3/19/2021
33 4920
Drop Inlet
Thompson Pipe Group
TPG-4X4-408-PRECAST INLET (Size - 4' X 4')
ASTM 615
/19/2021
33 4920
Drop Inlet
Thompson Pipe Grasp
TPG-5X5-4O8-PRECAST INLET (Size -5' X 5'
ASTM 615
3/19/2021
33 4920
Drop Inlet
Thom son Pipe Group
TPG-6X6-408-PRECAST INLET (Size - 6' X 6')
ASTM 615
8/28/2023
33 4910
Manhole
Oldcastle
Precast 4' x 4' Stacked Manhole (Size - 4' X 4')
ASTM C478
8/28/2023
33 4910
Manhole
Oldcastle
Precast 5' x 8' Storm Junction Box (Size -S 5 X 8')
ASTM C478
8/28/2023
33 4910
Manhole
Oldcastle
Precast 4'x 4' Storm Junction Box (Size - 4' X 4')
ASTM C478
8/28/2023
33 4910
Manhole
Oldcastle
Precast 5'x5' Storm Junction Box (Size - 5' X 5')
ASTM C478
8/28/2023
33 4910
Manhole
Oldcastle
Precast 6' x 6' Storm Junction Box (Size -6' X 6')
ASTM C478
8/28/2023
33 4910
Manhole
Oldcastle
Precast 8's 8' Storm Junction Box Base (Size - 8' X 8')
ASTM C478
8/28/2023
33 4910
Manhole
Oldcastle
Precast 5'x 8' Storm Junction Box Base (Size -S 5' X 8')
ASTM C478
8/28/2023
33 4910
Manhole
Rinker Materials
Reinforced 48" Diameter Spread Footing Manhole (Size - 4' X 4')
ASTM C433
/21/2028
34 49 10
Manhole
Rinker Materials
4'0"x4'-0" Reinforced Maximum Pipe connection 036"
/21/2026
3449 10
Manhole
Rinker Materials
SO"x5'-0" Reinforced Maximum Pipe connection 048"
/21/2026
34 4910
WYE Inlet
Rinker Materials
5'O"x5'-0" Reinforced Maximum Pipe connection 048"
8/28/2023
33 3920
Curb Inlet 10 'x3' Riser
Thom son Pipe Group
Inlet Riser (Size -3 FT)
ASTM C913-16
8/28/2023
33 3920
Curb Inlet 15 x 3' Riser
Thom son Pipe Group
Inlet Riser (Size -5 FT)
ASTM C913-16
8/28/2023
33 3920
Curb Inlet 20's 3' Riser
Thompson Pipe Group
Inlet Riser (Size -3 FT)
ASTM C913-16
1/12/2024
33 4920
Drop Inlet
AmeriTex Pipe &Products
Drop Inlet 4' X 4')
ASTM C913.
1/12/2024
33 4920
Drop Inlet
AmeriTex Pipe &Products
Drop Inlet (5' X 5'
ASTM 0913
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
Precast 4'x4' Storm Junction Box
ASTM C913
/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
Precast 5'x5' Storm Junction Box
ASTM C913
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
5' Precast Transition MH (41st/Hon the tap of 5' JB
ASTM C913.
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
Precast 6'x6' Storm Junction Box
ASTM C913
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
6' Precast Transition MH (4' MH on the top of 6' JB
ASTM C913
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
Precast 8'x8' Storm Junction Box
ASTM C913
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
'Precast Transition MH 4' MH on the top of 8' JO)
ASTM C913.
1/19/2024
33 4920
Manhole
AmeriTex Pipe &Products
T e C Storm Drain Manhole on Box 4' MH.on the top of RCB
ASTM C913
/16/2024
33 4920
Curb Inlets
AmeriTex Pipe &Products
] 0x3 Precast**(Size 10' x 3'
ASTM C9t3
/16/2024
33 4920
Curb Inlets
AmeriTex Pie &Products
15x3 Precast**Size 15's 3'
ASTM C913
^-/vote: rte -cast mien are approved/or roe surge t portion l me srrucrure (dawn) only. stage a portion J tae structure are required ro de cast m place. lye exceptions retain requirement soda ae auowea.
Storm Sewer - Pines & Boxes 33-05-13
4/9/2021
33 4113
Storm Drain Pipes
Advanced Drainage Systems, Inc. (ADS)
ADS HP Storm Polypropylene (PP) Pipe Size - 12" - 60")
ASTM F2881 & AASHTO M330
8/28/2023
33 4110
Storm Drain Pipes
Rinker Materials
Reinforced Concrete Pipe e Tongue and Groove Joint Pipe (Size - 21" or larger)
ASTM C76, C655
8/28/2023
33 4110
Culvert Box
Rinker Materials
Reinforced Concrete Box Culvert (Sze - Various)
ASTM C789, C850
/21/2026
33 4110
Reinforced Concrete Pipe
Rinker Materials
Tongae and Groove —Straight Wall (Size -Various)
ASTM C76, C655
5/21/2026
33 4110
Reinforced Concrete Pipe
Rinker Materials
Tangue and Groove —WSize-Various
ASTM C76, C655
5/21/2026
33 4110
Reinforced Concrete Pipe
Rinker Materials
Tonue and Groove —Bend (Size -Various)
ASTM C76, C655
5/21/2026
33 4110
Reinforced Concrete Pipe
Rinker Materials
Tonue and Groove —Bend (Size -Various)
ASTM C76, C655
5/21/2026
33 4110
Reinforced Concrete Pipe
Rinker Materials
Tongac and Grease —Straight Wall —Tee. Vertical/ Horizontal .Size -Various
ASTM C76, C655
5/2112026
33 4110
Reinforced Concrete Pipe
Reducers
Rinker Materials
Tongue and Groove —Option 2 (Size-Varieius)
ASTM C76, C655
10/12/2023
33 4110
Storm Drain Pipes
AmeriTex Pipe &Products
Reinforced Concrete Pipe Tongue and Groove Joint Pie* (Size - 15" or
larger)
ASTM C76, C506
10/12/2023
34 4110
Culvert Box
AmeriTex Pie &Products
Reinforced Concrete Box Culvert (size - Various)) I
ASTM C1433,C1577
10/18/2023
35 4110
Storm Drain Pipes es
The Turner Co.
Reinforced Concrete Pipe e Tongue and Groove Joint Pie* (Size - 15" or larger)
ASTM C76, C506
10/18/2023
33 4110
Culvert Box
The Turner Co.
Reinforced Concrete Box Culvert (size - Various) I
ASTM CI433,CI577
4/12/2024
33 4110
Storm Drain Pipes
Thompson Pipe Group
Reinforced Concrete Pipe Tongue and Groove Joint Pie* (Size Various)
ASTM C76, C506
6/25/2024
33 4110
Culvert Box
Oldcastle
Reinforced Concrete Box Culvert I
ASTM C 1433,C 1577
6/252024
33 4110
Storm Drain Pipes
Oldcastle
Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various)
ASTM C76, C506
Removed due to slump value revision by the supplier
Monthly New Entire,.
Page 7 of 7