Loading...
HomeMy WebLinkAbout049794-PM1 - Construction-Related - Contract - D.R. Horton-Texas, Ltd. and Burnsco Construction, Inc.I fl l f I ( ( l l LJ l l FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SANITARY SEWER, & STORM DRAIN IMPROVEMENTS HAWTHORNE MEADOWS PHASE 3 SEPTEMBER 2017 WATER PROJECT NO. 56008-0600430-100958-001480 SANITARY SEWER PROJECT NO. 56008-0700430-100958�001380 FILE NO. W-2489 "X" NO. 24369 CITY PROJECT NO.100958 -Betsy PriceMayor David Cooke City Manager Kara L. Shuror Interim Water Director Douglas W. Wiersig, P .E. Director, Transportation and Public Works Department t\(\"l·C\\\ The City of Fort Worth PREPARED BY PELOTON LAND SOLUTIONS 9800 HILLWOOD PARKWAY, SUITE 250 FORT WORTH, TX 76177 817-562-3350 C.f A- c.v\ 1- -O�ki ................. 113220 CSC No. 49794-PM1 f r I r l I l l l l l 00 00 10-I TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS SECTION 00 00 10 2 3 4 TABLE OF CONTENTS DEVELOPER AW ARD ED PROJECTS 5 Division 00 -General Conditions 6 00 11 13 hrvitation to Bidders 7 00 21 13 Instruetions to Bidders 8 00 41 00 Bid Form 9 00 42 43 Proposal Form Unit Price 10 00 43 13 Bid Bond 11 00 45 11 Bidders Preq1,1alifieation's 12 00 45 12 Prequalification Statement 13 00 45 13 Bidder Prequalifieation Applieation 14 00 45 26 Contractor Compliance with Workers' Compensation Law 15 00 45 40 Minority Business Enterprise Goal 16 00 52 43 Agreement 17 00 61 25 Certificate of Insurance 18 00 62 13 Performance Bond 19 00 62 14 Payment Bond 20 00 62 19 Maintenance Bond 21 00 72 00 General Conditions 22 00 73 00 Supplemental)' Conditions Page I of 4 23 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded 24 Projects 25 26 Division 01 -General Requirements 27 01 11 00 Summary of Work 28 01 25 00 Substitution Procedures 29 01 31 19 Preconstruction Meeting 30 01 31 20 Pr�eet Meetings 31 01 32 16 Con struetion Progress Sehedule 32 01 32 33 Preconstruction Video 33 01 33 00 Submittals 34 01 35 13 Special Project Procedures 35 01 45 23 Testing and Inspection Services 36 01 50 00 Temporary Facilities and Controls 37 01 55 26 Street Use Permit and Modifications to Traffic Control 38 01 57 13 Storm Water Pollution Prevention Plan 39 01 58 13 Temporary Project Signage 40 01 60 00 Product Requirements 41 01 66 00 Product Storage and Handling Requirements 42 01 70 00 Mobilization and Remobilization 43 01 7 I 23 Construction Staking 44 01 74 23 Cleaning 45 01 77 19 Closeout Requirements 46 01 78 23 Operation and Maintenance Data 47 01 78 39 Project Record Documents 48 Technical Specifications which have been modified by the Engineer specifically for this 49 Project; hard copies are included in the Project's Contract Documents CITY OF FORT WORTH Hall'thome :\fmdmrs Phase 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS City Projl!ct No. 10095/'i Revised April 2, 2014 00 00 10- 2 TABLE OF CONTENTS FOR DEVELOPER A WARDED PROJECTS Page 2 of4 Technical Specifications listed below are included for this Project by reference and can be 2 viewed/downloaded from the City's Buzzsaw site at: 3 4 htps:/ /projectpoi nt.buzzsaw .comic I ient/fortworthgov/Resources/02%20- 5 %20Construction%20 Doc uments/Speci ti cati ons 6 7 8 9 Division 02 -Existing Conditions IO 02 41 13 Selective Site Demolition 11 02 41 14 Utility Re1no:val/Abando111nent 12 02 41 15 Paving Removal 13 14 Division 03 -Concrete 15 03 30 00 Cast-In-Place Concrete 16 03 34 13 Controlled Low Strength Material (CLSM) 17 03 34 16 Concrete Base Material for Trench Repair 18 03 80 00 Modifications to Existing Concrete Structures 19 20 Division 26 -Electrical 21 26 05 00 Common Work Results for Electrical 22 26 05 IO Demolition for Electrical Syste1ns 23 26 05 33 Racev,·ay and Bm .. es for Electrical Systems 24 26 05 4 3 Underground Ducts and Race\1,'a)'S for Electrical Systems 25 26 Division 31 -Earthwork 27 31 10 00 Site Clearing 28 31 23 16 Unclassified Excavation 29 31 23 23 Borrow 30 31 24 00 Embankments 31 31 25 00 Erosion and Sediment Control 32 31 36 00 Gabions 33 31 37 00 Riprap 34 35 Division 32 -Exterior Improvements 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 32 01 17 320118 32 01 29 32 11 23 32 11 29 32 11 33 32 12 16 32 12 73 32 13 13 32 13 20 32 13 73 3214 16 32 16 13 32 17 23 32 31 13 Permanent Asphalt Paving Repair Temporary Aspl�alt Paving Repair Concrete Paving Repair Fle,dble Base Courses Li1ne Treated Base Courses Cement Treated Base Courses Asphalt Paving Asphalt Paving Crack Sealants Concrete Side•,>,·alks, Dri•teways and Barrier Free Ramps Concrete Paving Joint Sealants Brick Unit PaviAg Concrete Curb and Gutters and Valley Gutters Pa:veinent Markings Clrnin Link Fences and Gates CITY OF FORT WORTH Hawthomf! ,\feaclows Phase 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS City Project No. 1009511 Revised April 2, 2014 r I l l l 00 00 IO- 3 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS I 32 31 26 2 32 31 29 3 323213 4 3291 19 5 32 92 13 6 32 93 43 7 '>lire Fenees and Gates \Vood Fenees and Gates Cast in Plaee Conerete Retaining Walls Topsoil Plaeement and Finishing of Parkways Hydro Mulehing, Seeding, and Sodding Trees and Shrubs 8 Division 33 -Utilities 9 33 01 30 Sewer and Manhole Testing 10 33 01 31 Closed Circuit Television (CCTV) Inspection 11 33 03 IO Bypass Pumping of Existing Sewer Systems 12 33 04 10 Joint Bonding and Eleetrieal Isolation 13 3 3 04 11 Corrosion Control Test Stations 14 33 04 12 Magnesimn A1rnde Cathodie Proteetion S)'Stem 15 33 04 30 Temporary Water Sen·iees 16 33 04 40 Cleaning and Acceptance Testing of Water Mains 17 33 05 10 Utility Trench Excavation, Embedment, and Backfill 18 33 05 12 Water Line Lowering 19 33 05 13 Frame, Cover and Grade Rings 20 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 21 3 3 05 16 Conerete Water Vau Its 22 33 05 17 Concrete Collars 23 33 05 20 Auger Boring 24 33 05 21 Tunnel Liner Plate 25 33 05 22 Steel Casing Pipe 26 33 05 23 Hand Tmrneling 27 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 28 33 05 26 Utility Markers/Locators 29 33 05 30 Exploratory Excavation for Existing Utilities 30 33 11 10 Ductile Iron Pipe 31 33 11 11 Ductile Iron Fittings 32 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 33 33 11 13 Conerete Pressure Pipe, Bar Wrapped, Steel Cylinder T)·pe 34 33 11 14 Buried Steel Pipe and Fittings 35 33 11 15 Pre stressed Conerete Cylinder Pipe 36 33 12 10 Water Services I-inch to 2-inch 3 7 3 3 12 11 Large Water Meters 38 33 12 20 Resilient Seated Gate Valve 39 33 12 21 AWWA Rubber Seated Butterfly Valves 40 33 12 25 Connection to Existing Water Mains 41 33 12 30 Combination Air Vah·e Assemblies for Potable Water Systems 42 33 12 40 Dry-Barrel Fire Hydrants 43 33 12 50 \Vater Sample Stations 44 33 12 60 Blow off Valyes 45 33 31 12 Cured in Plaee Pipe (GIPP) 46 33 31 13 Fiberglass Reinforeed Pipe for Gravity Sanitary Se•Ners 47 33 31 15 HOPE Pipe For Sanitary Sev,·ers (Gravity and Foree Mains) 48 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 49 33 3 I 21 Pol)·vinyl Chloride (PVC) Closed Profile Grw.·ity Sanitary Se\ver Pipe 50 33 31 22 Sanitat)' Sewer Slip Lining Page 3 of 4 CITY OF FORT WORTH 1-/awthome M1!ado1Fs Phase 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS City Project No. 111095H Revised April 2, 2014 2 3 4 5 6 7 8 9 IO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 00 00 10-4 TABLE OF CONTENTS FOR DEVELOPER A WARDED PROJECTS 33 3 l 23 33 31 50 33 3 l 70 33 39 I 0 33 39 20 33 39 30 33 39 40 33 39 60 33 41 10 33 41 l l 33 46 00 33 46 01 33 46 02 33 49 10 33 49 20 33 49 40 Sanitary Sewer Pipe Enlarge1Hent Sanitary Sewer Service Connections and Service Line Combination Air Valve for Sanitary Sev,•er Foree Mains Cast-in-Place Concrete Manholes Precast Concrete Manholes Fiberglass Manholes Wastewater Access Chamber (WAC) Epoxy Liners for Sanitary Sewer Structures Reinforced Concrete Storm Sewer Pipe/Culve1ts HDPE Storm Sewer Pipe S1:1b drainage Slotted Stenn Drains Treneh Drains Cast-in-Place Manholes and Junction Boxes Curb and Drop Inlets Storm Drainage Headwalls and Wingwalls Division 34 -Transportation 3 4 4 l 10 Traffic Signals 3 4 41 13 Ren:ioving Traffic Signals 34 4 l 20 Roadway I111:11nination Assemblies 34 41 30 Aluminum Signs 34 71 I 3 Traffic Control Appendix GC 4.01 GC 4.02 GC 4.04 GC 4.06 GC 6.06.D GC 6.07 GC 6.09 GC 6.24 GR Ol 60 00 AYailability of Lands Subs1:1rface and Physieal Conditions Underground Faeilities Ha2:ardo1:1s E1wironmental Condition at Site Minority and Women Owned Business Enterprise Complianee Wage Rates Permits and Utilities �Jondiseriinination Prod1:1et Req1:1irements END OF SECTION Page 4 of 4 CITY OF FORT WORTH Haw/home 1\kadows Plwse 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Cily Projt>cl No. /00958 Revised April 2, 2014 r r I I r l l l l l SECTION 00 41 00 -PROPOSAL DEVELOPER A WARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: D.R. Horton-Texas, LTD PROPOSAL FOR: SINGLE FAMILY DEVELOPMENT PROJECT NAME: HAWTHORNE MEADOWS PHASE 3 WATER, SANITARY SEWER, AND STORM DRAIN IMPROVEMENTS Includes the furnishing of all materials, equipment and labor for the installation of water, sanitary sewer, and storm drain improvements and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: HAWTHORNE MEADOWS PHASE 3 Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the Technical Specifications listed in this contract, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Depaiiment of Transportation & Public Works of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: Furnish and install, including all appurtenant work, complete in place, the following items Page I ofJ r SECTION 00 42 43 PROPOSAL FORM UNIT PRICE HAWTHORNE MEADOWS PHASE 3 UNIT PRICE BID Bidders's Application Project Item Information Bidder's Proposal Bidlist hem Description Specification Unit of Bid Quaulily Unit Price Bid Value No. Section No. Measure WATER IMPROVEMENTS 3311.0261 8" PVC Water Pipe 33 II 12 LF 2,878 $21.70 $62,452.60 3312.2003 I" Water Service 33 12 IO EA 84 $780.00 $65,520.00 3312.2103 I 1/2" Waler Service 33 12 10 EA 4 $1,300.00 $5,200.00 3312.3003 8" Gate Valve 33 12 20 EA 5 $1,200.00 $6,000.00 3312.0001 Fire Hydrant 33 12 40 EA 2 $3,550.00 $7,100.00 3311.0001 Ductile Iron Waler Fittings w/ Restraint 33 11 11 TON 3 $3,600.00 $10,800.00 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 4 $800.00 $3,200.00 3305.0109 Trench Safety 33 05 10 LF 2,878 $0.10 $287.80 TOTAL WATER IMPROVEMENTS $160,560.40 I SANITARY SEWER IMPROVEMENTS 3331.4115 8" Sewer Pipe 33 31 20 LF 2,572 $28.60 $73,559.20 3339.1001 4' Manhole 33 39 20 EA 8 $2,670.00 $21,360.00 9999.0001 CSS Encasement for Utility Pipes 33 05 10 CY 7 $200.00 $1,400.00 3339.1003 4' Extra Depth Manhole 33 39 20 VF IO $130.00 $1,300.00 3301.0101 Manhole Vacuum Testing 33 01 30 EA 8 $( 10.00 $880.00 3331.3101 4" Sewer Service 33 31 50 EA 86 $650.00 $55,900.00 9999.0013 Connect to Ex IO" SS to 8" SS 33 3 I 20 EA 3 $590.00 $1,770.00 I 3305.0109 Trench Safety 33 05 IO LF 2,572 $1.00 $2,572.00 3301.0002 Post-CCTV Inspection 33 01 31 LF 2,572 $1.50 $3,858.00 TOTAL SANITARY SEWER IMPROVEMENTS $162,599.20 STORM DRAIN IMPROVEMENTS 3341.0205 24" RCP, Class lII 33 41 10 LF 27 $64.00 $1,728.00 3349.5001 10' Curb Inlet 33 49 20 EA 3 $3,600.00 $10,800.00 9999.0018 Remove Headwall 02 41 13 EA 2 $500.00 $1,000.00 9999.0005 24" Sloping Headwall 33 49 40 EA I $2,200.00 $2,200.00 3305.0109 Trench Safety 33 05 10 LF 27 $0.50 $13.50 3137.0102 Large Stone Riprap, dry 31 37 00 SY 9 $60.00 $540.00 TOTAL STORM DRAIN IMPROVEMENTS $16,281.50 Bid Summary Base Bid Waler Improvements $ I 60,560.40 l Sanitary Sewer Improvements $162,599.20 Storm Drain Improvements $16,281.50 Total Base Did $339,44 I. IO I l r f ( I l l l l PART B -PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required, is to become the property of the Developer. The successful bidder shall be required to perform the work in accord with these contract documents and the technical specifications available in the City of Fort W01ih's Buzzsaw site and incorporated herein and made a part hereof for all purposes. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or refen-ing employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. Page 2 of3 I r l l l l I l l l The Bidder agrees to begin construction within \0 (____tQ_J calendar days after issue of the work order, and to complete the contract within 'S t"i,b ( (en) calendar days after beginning construction as set forth in the written work orderto be furnished by the Owner. I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 2 (Initials) Addendum No. 3 (Initials) Addendum No. 4 (Initials) Respectfully submitted, By: Title: (Signat re) Jdoo ':-Ru.co �s (Printed Name) Tu.e::s LPenT"" Company Name: BURNSCO CONSTRUCTION, INC Address: 6331 SOUTHWEST BLVD. BENBROOK, TEXAS 76132 Email: Telephone: h-tr'n m� nc._';).@..Qi ol. C...0r?---)81l-138-�J;1cc, Page 3 of3 I I I I l l l l l SECTION 00 4512 DAP-PREQUALIFICATION STATEMENT 00 45 12 DAP PREQUALIFICATION STATEMENT Page I or I Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water Distribution, Development, 8-inch diameter BURNSCO CONSTRUCTION, INC 6/30/2018 and smaller Sewer Collection System, Development, 8-inches and BURNSCO CONSTRUCTION, INC 6/30/2018 smaller The undersigned hereby ce11ifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: BY: � (Signature) TITLE. v�,o�, DATE: t�I bl l1 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT-DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 45 12_Prequalification Statement_DAP I l l l l 00 45 26 - I CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor ce1tifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 100958 Contractor fu1ther ce1tifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's ce1tificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: IO 11 12 13 14 15 16 17 18 19 20 BURNSCO CONSTRUCTION, INC Company By: Joko'.31ucn5 /2e se Print) -"--63=3'-'1:....;S:a:...O=--U=--=--T-=--=H:....:.W.:....:E=S:a:...T=---=B-=L:....:.V-=D:....:.. _______ Signature: yAddress BENBROOK, TEXAS 76132 City /State/Zip Title: �E'.:') ;.oe:;:,--n· (Please Print) 21 THE STATE OF TEXAS 22 § § 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 COUNTY OF TARRANT BEFORE ME, the undersigned authority, on this day personally appeared Joho 8 L-ll--n � , known to me to be the person whose name issubscribed to the foregoing instr nnent, and acknowledged to me that he/she executed the same as the act and deed of f ,i (.�, •. Z>; n e , for the purposes and consideration therein expressed and in the capacity therein stated. e_ __ -Ti-IGIV� UNDER MY HAND AND SEAL OF OFFICE this __ .,.,, ___ day of U.io\o e.v::: , 2ol1. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 1-/mrthome Aleadm,·s l'lwse 3 City Project No: I 00958 r I I l I l I l l l l SECTION 00 52 44 STANDARD FORM OF AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § THIS AGREEMENT, made and entered into this 5 ·ru day of Dc....:h?bec A.D. 2017, by and between D.R. Hmton-Texas, Ltd. of the County of TARRANT and State of Texas, acting through Mark P. Allen thereunto duly authorized so to do, Patty of the First Patt, hereinafter termed DEVELOPER, and BURNSCO CONSTRUCTION, INC of the City of BENBROOK, County of Tarrant and state of Texas, Patty of the Second Patt, hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and perfo1med by the Patty of the First Part (DEVELOPER), and under the conditions expressed in the bonds bearing even date herewith, the said Patty of the Second Part (CONTRACTOR), hereby agrees with the said Patty of the First Pait (DEVELOPER) to commence and complete the construction of certain improvements described as follows: HAWTHORNE MEADOWS PHASE 3 and all extra work in connection therewith, under the terms as stated in the General Conditions of the Agreement and at his ( or their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said construction, in accordance with the conditions and prices stated in the Proposal attached hereto, and in accordance with the Notice to Contractors, General and Special Conditions of Agreement, Plans and other drawings and printed or written explanatory matter thereof, and the Specifications and addenda therefor, as prepared by Peloton Land Solutions, Inc. 9800 Hillwood Parkway, Suite 250 Fort Worth, TX 76177 herein entitled the DEVELOPER'S ENGINEER, each of which has been identified by the CONTRACTOR and the DEVELOPER'S ENGINEER, together with the CONTRACTOR'S written Proposal, the General Conditions of the Agreement, and the Performance and Payment Bonds hereto attached: all of which are made a part hereof and collectively evidence and constitute the entire contract. Page I of2 r I t I I l I l l The CONTRACTOR hereby agrees to commence work within \ � C.1.0....)calendar days after the date written notice and to substantially complete the same within 'Si-'>'l� (JdJJ calendar days after the date of the written notice to commence work, subject to sue extensions of time as are provided by the General and Special Conditions. The DEVELOPER agrees to pay the CONTRACTOR in current funds the price or prices shown in the proposal, which forms a part of this contract, such payments to be subject to the General and Special Conditions of the contract. IN WITNESS WHEREOF, the parties to these presents have executed this Agreement in the year and day first above written. Pa1iy of the First Part (OWNER/DEVELOPER) D.R. Hmion-Texas, Ltd.,a Texas Limited Partnership By: D.R. Hmion Inc., a Delaware Corporation Its: authorized agent By: �ature Mark P. Allen Printed Name Assistant Vice President Title ATTEST: Patiy of the Second Pati (CONTRACTOR) BURNSCO CONSTRUCTION, INC a By: By: �Si�e J D�r-. :isu,n �s Printed Name 11u::$ a Den,Title ATTEST: Page 2 of2 - (.) ') 3 ., 5 6 7 8 J () 10 II 12 13 1,1 15 16 17 18 19 20 21 22 ')' _.) 2·1 2_� 2(i 27 28 2<) 30 ; I 3� THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 62 IJ PFIU'(llUvlANCI•: BOND Bond #022059345 llOh2 LI -I 1'1 1(1\ll(�l:\NU: ll(lNI> ((NOW ALL BY THESE PRESENTS: s That we. IHJRNSCO CONSlRl llTION, INC. knowll as ··Prillcipal"' here ill and Liberty_ Mu���l�suranc� Company ____ . a corporate surety(surel ies, i r more than nlle) duly aulhnrized lo do busillcss in the Stale of' Te.\ns. known as ··Surdy" herein (whether one or more). arc hl'ld alld firmly bound unto the I kvelnpcr. D.R. I lurtoll -Texas. LTD. authorized lo dn business in Te.\as (·'Developer'') alld the City of' Furl Worth. a Texas munieipal corporation ("City"). in the pcllal sum of, Tl IREE I IUNDRED Tl IIRTY-NINE Tl IOUS;\Nf) FOUi� illlNl)_RED FOl JRTY-01'J 1.'.J)_OI..LA RS AND TEN CENTS {$339.4 1 11.10). lawful money of the llll itecl States, lo be paid in Fort Wurth. lnrrnnt County. Texas li.1r the pa�•rncnt nf ,vhich sum well and truly lo be made jointly unto the Developer and the City as dual obligees. we bind nurse Ives. our heirs. e.\l'l'Utors. mln1inisIrators. successors nlld assigns. _joilltly alld severally. linnly by thesl' presents. \VII El{EAS, I )cvelopL'r a11d City have entered i11to an Agreement for the collstruclion of' L'o111111uni1y facilities ill the Cit>' or l·'t,rt Worth by and through a Community Facilities Agrecmenl. CTA Number :�o 17-0% :and \VHF:REAS. the l'rillcipal has entered illlo a cerlaill written contract with the fkveloper awnrdcd the� day nf' October . 20JL. which Contract is hcn:by rclern.:d to and made a part hereof' lor all purposes as if fully set li.1rlh herein. lo furnish all nrnterials, equipment lahnr and other acecssmil's dclilll:d by l,m. ill the prnsccution Pl' the Wnrk. including any Change Orders. as provided lc1r in said Contract dcsi g.llalcd as Waler. Snnitarv Scwl'r and Storm Draill lill_provemrnts In Serve I IA WTI IORNF rvlF,\DOWS Pl 1/\SF 3. NOW, TIIEIU:F ORE, the cPndition of this obligation is such that if the said Principal slwll l:1ithl'ull�, pe1form its \1bligatiolls 1111dn the Cu11lrncl alld shall in all respects duly and l:lithl'ully perl'unn the Work, im:luding Change Onk:rs, under the Contract. according lo the plans. spccilic:11iolls. and contract documl:nts therein referred lo, alld as well during ally pniod of' cxlcllsiPll or the Cnnlracl that may he grnlltcd \in the par! ol'thc lkvelnpcr aml/nr City, then this nhlig:11ion shall he and bcc\lmc null and void. otherwise to remain in rull lcirce and efkcl. !'I I"\' 1 >I 11 >1(1 \\< >l<ll I /!,n1:ili·111, 11/,·c1:/.r11, /·/1r1-.t' 3 ( ·,fj• !':;,'/1'1 f \,; iU!i'J i_\ 2 J :� ) (l 7 8 l) 10 11 12 I,) l•I I) 16 17 18 19 20 21 "') 1 ..,, __ ) 24 25 ".?.6 27 28 29 30 31 '1 -'- J) _',,I .15 3(1 37 .18 VJ 40 ,11 ,12 I 43 -1·1 ,15 ,1 (, 0111,.� 1.1 - ,, l'I lff< 11\ �-I1\Nl "I. I I! 11'11 J PnOVI IH'.D Flll{Tlll-'.n, that ii" :111:,-legal action bl' riled llll this l�o11d. wnue shall lie in Tarran I ( ·uunly. Tc:--.as llr lhc l !nilcd Sl.11L's Dislricl Cnurl f()r the Northern I )istricl or Texas. I:1,rt Wmlh Division. This hund is made and c:--.:cc11Icd in L'lln1pliance with lhL' provisions or Chapter 2253 or II1L' Tt:--.:as Cin,crn111cnI Code. as ;1111endcd. and all liabilities 011 this bond shall he dclennined i11 acu1rd:111LT \\'illi lhL' provisions or said stalUL'. IN WITNESS WHEREOF, Ihe Principal and the Surely have SIGNED and SEALED this i11stru111e11t by duly a11thori1ed agents and uniccrs nn this the __ l_O_t_h ___ day of' __ _ October . 20___ll_. Witness as lo 1-'ri� NC Dale R. Gilreath, Vice President NamL� a11d Tit le 1\tldrl'sS: (1.:U I SOI.Ill I WEST nI .VD. 131:NBIWOI<. TLXJ\S 76132 SLJRLTY: Liberty Mutual Insurance Company Sophini e Hunter, Attorney-ln-F_a_c_t __ Name and Title 1\ddrl's�: 175 Berkeley _St_r��t Bos.ton, MA 02_1�16�---- ll'kphnnl' N11111lll'r: 214-989-0000 *Note: II" signed h)' an oflicer or the S11rcIy C.'urnpany. there 111usI he 011 lile a ccrtilicd c:,.;lraet rrn111 the by-laws shPwi11g that this person has authority In sign such obligation. 11· S11n.:Iy's ph)·�k.d address is dillerl'lll l"ru1ll its mailing address. both must ht: pruvidt:d. ll1c dall' or lhl' bond shall llOI he prior lo lhc dall' lhL· Cu11tracl i-, a\\ardcd.l 'llY < ii' Fl >I< I \\'I JR 111 SI ,\NI l,\RIJ < 'ITY c ·11NI JITII Jt-!\ I JI \'11.l Jl'I H t\ \\' ,\l<l>I ·1 J l'l/t I.II:\' IS l/11,r1/,,,n/l' \!t·,tcl,m, /'lt.ih .i < I/ I /'! fl/,·, I \, J i {}0() \S .:I 5 (i 7 Tl-IE STATE OF TEXAS COUNTY OF TARRANT SECTION 01162 1-t P/\ Yrv!FNT llONI) Bond #022059345 01) <•2 1-1 · I I';\ Y:--IL"T llONll KNOW ALL BY THESE PIU:SENTS: 8 That we. Hl JRNSCU CONSTRl ICTION. INC. known as ·'Principal .. herein, and l) _Li?erty Mutual lnsuran�ei _Co_m�p_a_n�y ___ _a corporate surely ( or 10 sun:·ties ir more lhan one). duly aulhuri1.cd lo do husint'ss m lhc State nr Tt'xas, known as 11 .. Surety"· hcn.:in (\\·llL'thcr onL� or more). ;ire held and lirmly bound unto lhe Dcvelupcr. D.R. 13 I lurlon -Tcx:_1_�_,_J_JJL auIhnri1cd lo d11 business in Texas '·( I )eve loper .. ). and the City of I:orl Worth. a Texas n11111ieipal corporation ("City"), in the penal su111 or TIIRLE HUNDRED 1.:1 Tl lll <TY-NINE Tl IOllSAND __ HJUI< I IUNDRLU H)URTY-ONI� DOLLARS AND TEN 15 CENTS ($3]1).44I. l_(l). lawful money or the United Stales. to be paid in hirt Worth. Tarrant 1(1 County. Texas. for the payment or which sum well nnd truly hl' mndc_jointly unto the Developer 17 and the City as dual obli g.ees. we bind nur sclvcs. our heirs, executors. acl111inistrators. successors 18 and assig.ns._jointly and severally. lirmly by these prcsL'llts: l lJ WHEREAS, Developer and L'ily have e11Icrccl into an Agreement for the construelion of 20 co11111H1niIy fi1cilities in lhc C'ily or l\)rt Worth. by and through a Co111nH1nily Facilities 2 I 1\grcernt'nl. (TA Number 2017-0% and 22 WII EH.EAS, Principal has entered i11tl1 a certain written Cont met with Developer. awankd Ihe 5th clay or ____ O_c_to_b_e_r , 20_1_7 __ . which Conlntcl is hereby referred to and mack a part hereof ror all purposes as ir fully set forth herein, lo furnish all nrnlcrials. cquipmenl. labur and nlher acccssurics ,ts dclinl'd by law. in lhl' prosecution or the 2<i Work as pnwided lclr in said Cn11Irncl and dcsignalcd as Water. Sanitarv Sewer and Storn1 Drain 27 lmproverncnls lo )erycilA WTI IORNF M LI\ DOWS Pl I1\SI-'. .1. 28 NOW, Tl·IEREFOIH:, Tl 11: CONDITION rn: llllS OIH,l(i!\TION is such lhal ir -:!_lJ Principal shall pa)' all fl)(lnics nwinµ tn :111)· (and all) payml'nt bond hc11elieiary (as dcli11cd in 30 Ch aplcr 2253 or the Texas (iovern111c11I Code. as a111e11dl'd) in the prosecution of !he Work under ]I the Cu11lr,1c1. lhc11 lhis nbligatillll shall be nnd hernlllL' 111111 and void: olhcrwisc lo remain in full 32 li·1rcl' and effect. < IIY(ll· ll>KI \\CJ){J'II \ I ;\NI >,\IW ( ·11 \ ( ·c >NI >I II( 1�:s I >I VI I c >1'1 ·11. :\\\ _\1(1)1 I> l'l<c •II < • 1 :; /l,111ti1//II/,' \/, .Ji!t111 't /'li1,�1 i < ·:11 /'1u1,·, / \ , /IJ(l•J:,, l I (II) (,2 1-1 - 2 I',\ Yt\11:N I I\ONll This hond is 111:ide a11d L'\(·cuted i11 rn111pl iancc with the prn\'isions tll' Cliaplcr 2253 or the 2 Tc.,as (imLTlllllL'11t ( 'l1de. as :1111c1Hkd. and all liahilitiL'S n11 this bond shall he determined i11 1 accordance with thl' prcwisions ni' said statute. •I IN WITNl�SS WIIEREOF, the Principal and Surely have each SIGNED and SL!\Ll:,l) 7 () 10 11 12 this i11stru111ent hv dulv authori1.ed agents nnd ol'licL'rs 011 this the 10th October ATTFST: • ., (l'rincipal). e , 20_11_ ,V;u� ,kl�---- ATTF:S-l: lllJR NSC nY: Name and Title 1\ddress: (1.n I SOlJTl·IVv'EST Bl.VD. llLNBIWOK TEXAS 7(ilY2 SUIZETY: Liberty Mutual Insurance Company 13 y: -�/\t, • ;_ : Jl I 4 Sig�YLI Sophinie Hunter, Attorney-In-Fact Na111c nnd Title Addr(·ss: 175 Berkeley Street Boston, MA 02116=----- Telephone Number: 214-989-0000 Note: II' signed hy an ol'licL'r nf the SurL·ty. there must he n11 file a L'l'rtilicd e:-;tract l'rnm the hyl:l\\s sl1t1\\·i11g that this person ha\ authmity lo sign such ohlignIio11. II' SurcIy·s physical addre:-.s is dilkrcnl fni111 ih 11wili11g address. hoth must he prm·idcd. I .1 The date of the huml '>hall not he prior to the date the l'n11tract i\ a\\:1rdcd. 1-1 f.ND OF SECTION ( llY I )I' Hun\\ ( )I( 111 \Jf\i,:l.lJ\I(1)1 IIYl'llNllll'l(l'.,\ Ill Vl.llll'I R,\\\.-\RDI lll'l{(l.llTI\ I/n i,l•d .f ,llllHIII .11 .. 1111 .' il:111th11:111· \/t·u:/,111.\ /'h1.,,· { t ·,1, l',·u;,·, r \,, fpr,,;_,,\ ) 3 ,1 5 8 <) 10 II 12 13 1,1 15 I(> 17 18 19 20 21 22 2.1 2,1 25 26 27 28 29 l JO 31 , ) ·'- , , _,_) 3.1 TIIF: STATE OF TEXAS COllNTY OF TAR HANT SECTION Oil 62 19 MAINTLN1\NCF nOND Bond #022059345 OIi 62 i<I -I MAIN 11:Ni\N!T II< !NI> KNOW ALL BY THESE PRESENTS: That \\e._ lHll{NSCO CONSTRll(TION INC. known as "l'rincipnl"· herein and Liberty Mutual lnsur�_nce Company ___ . a eorpurnte surety (sureties, if" more than one) duly authorized to do business in the State or Texas. known as "Surely"' herein (whether one or 111orc), are held and lirmly bound unto the Developer. D.R. Horton -le:-:ns. I ,TD. authori1cd to do business in Tc:-:ns ('"Developer'") and the City nf' F1irt Worth. a Tc:-:ns nwnieipal corporation ("'City"). in the sum ofTIIREL-: I IUNDRED THIR TY-NINE Tl IOUS/\ND FOUR I ll!NDRED _H)UlffY-ONL DOLLARS /\ND TEN CENTS Cl1)9.4,l 1. I 0). lawl'ul money or the United States. lo he paid in Fort \Vorth, Tarrant Counly. Tc:-:as. for payment of which st1111 well nncl truly he made jointly u11tn the Developer and the City as dual obli µ.ees and their successors, we bind Pursclvcs. our heirs. executors. :idministratms. successors and assigns. _jointly nnd severally. lirmly by these presL·nts. WII El{EAS, Dcvcluper and City have entered inhl an ;\g.rccment for the construction or co11111H1nity fi1cilities in the City or Fort Worth by :111d through a Community 1-"acilitk·s t\grccmcnt. CFA Number 2tl 17-0 l )(i and WI I !•:Rf.AS, the Principal has L'ntcrcd into a certain \\riltcn contract with the Developer awnrdccl the 5th day or ___ 0-=-=cc-'-'toc..cbc...:e:..:.r ___ ____ . 20 _1Z_. which Contracl is hereby rel'erred to a1HI a 1nade part hen:or f"ur all purposes :1s ii' f'ully set li.lrth herein. lo l"urnish all materials. equip111enl labor and other acn·ssnrics ns ddined by law, in the proserntinn of the Wmk. including any Work resulting from a duly authori1cd Change Ordn (colkclivcly herein. the ··Work'") as 1mwided rm in said Contract and designated as Water. Sanilarv Sewer and Storm Drain l111provc111cnts t(1 SL·nc I Ii\ \V-1 I IORNI: IVIL;\1)0\\!_,� Pl li\SF l: and WIIEIU'.AS. Principal hinds itsdl"to use such 111:itcrials and to Stl construct the Work in accordance with the plan'i. specilications and Contract I h11.:un1ents that the Wnrk is and will rl'main li'L'L' from dcrl'cts in 111atL·rials or \,orknrnnship fi>r and during the period or two (2) years al"ter the dale 1ll' 1 .-inal 1\cceptancc ol' the Work hy the l'ity ('"l'vlai11te11:111ce Periml''): and I /,111·//,11,·11, • 1, !1 ·11)m1 .� I '/1, 1 ,i • 3 \ ·:11 /'1·u11, I \1 • }(liJ'.J5 \ l 001,2 I'>·� �l,\IN l'l:NAN<"I' llOND 2 WIIEREAS. l 1ri11cip,il hinds itsl'll'to repair or rL'rnnslrncl the Work i11 whole or i11 parl _, upon receiving 1101icL' from !Ill· lkvclopl'r and/or Ci1y ol' !he 11t·t·d lherl'ol' al any 1i111L' wi1hi11 lhc ,1 !'vlai111rna11cL' Period. <> NOW TIIEREFOl{E. lhl' eo11di1ion or this obligation is such I hat ii" Principal shall 7 reml'dy any dckc1ive Wmk. ror which timely notice wns providl'd by l.kvclopcr ur City, 10 a 8 completinn s:itisl;1clory to the City. 1hen this obliga1io11 shall heeo111c null and void: 01hcrwisl' In 9 rcmnin in l"ull rorce and eflixt. 10 11 PROVI DEi), l·IOWEVER, ii" Principal shall i"ail so I() rl'pair or n .. •rnnstruct any time I�, 12 1101 icl'd dcfi..·cl ivc \Vork. ii is agrcl'd thal lhc Dcvel1ipcr or Cit�, may cause any and all such 13 dcli:clive Work to he rcpairl'd and/or rcco11structcd wilh all assol'i:ilcd costs thtTenl" being borne 14 b:-,, lhl' Principal and lhe Surely under this l'vlaintc11a11ce 13ollll: nnd 16 PROVIDED FllHTIIFR. lhal ii" a11:-,1 legal aclinn he: filed 011 1his Rom!, Vl'llllL' shall lie in 17 Tarrant County. Te:--.:as or 1hc lJ11ill'd Stales Dislrict Court for the Norlhcrn Dislrict of Texas, Fort 18 Wnrth Division: and 20 24 PROVIDED FU lfrtlFR, that this obligation shall be cu11tin11ous i11 nature n11d successive recoveries may be had hereon li:,r successive breaches. t I IY l II I l ll(I \\'< ll<l 11 \ I :\:•.I l:\l{I > t Tl Y ("{)1'1 >1 1 ll >,,<, I >I VI IC 11'1 I( .\ \\ .\IWI I> l'l{l J.11 c. IS I(�\ h,·d ,1;11111;11, _\I .. 'Ill_, !l,in//;!111I<' l/,·t1./r•11 \ /'i,11 1v i I //t i 11 ''h't / \ ,1 /Iii I'),.\ .., 3 5 6 7 8 9 10 11 12 1.1 14 l:'i l(i 17 18 ll) 20 11 22 ? ' __ ) 2·1 25 H1 27 28 29 .10 31 3(i 37 38 3l) ,)() .J I IHI (,2 )I) - .1 ;\lt\lNll:N,.\N<T !!UNI l IN WITNESS WIIEI U:OF. tile Principal and tliL· Sml'I_\' lia,e L'.tch SICiNl:I) and Sl:/\1.F.D this i11stn111H.:11t h:· dul_\' a11th11ri1ed agents and oniccrs 011 this the_ 10th __ O_c_t_o_b_e_r ____ , 20 _ll_. /\TIT.ST: *Nott·: BY: Dale R. Gilreath, Vice President Name and Title Address: 6JJ I SOlJTI !WEST HLVU. IJ[NI-\R( lOK, TEX1\S 7(11.12 Sl JRl-:TY: Liberty Mutu_a! Insurance Com_e��- Sophinie Hunter, Attorney-In-Fact Name nml Tit it' ,1\ddress: 175 Berkeley ?t_re_e_t ___ _ Boston MA 0211 § ___ _ Tt:lt'pl10ne Number: 214-989-0000 I I' signed by ,111 onicer of the Surety Compan:', therc I1HIsl bc nn file a ccrlilicd cxlrnct l'rulll Ilic hy-1:iws ,;l1u1Vi11g that I his perstlll has aulhority to sign such obligation. Ir Surct<s physical address is dilTcrc11l li·o111 its mailing address, buth must be provided. ThL' date of lhc hu11d sh:ill 1H1l he prior lu the date the ( ·0111rncl is awanbl. I 'II Y l ii 1-1 >I{ I \\'< IHll I ll1tl! tlt1JJll(' \/1 •11,/, ltt .\ I·;,,, ,.l .1 , ·(I•· l'r,,;,·,·r \'n /(}{J').,,\ '-, I ,\NI ).,\l{I) ( 'II Y ( f l'•:1>II Ii 1:,s I ll\TI.< 11'1 I{ ,\\\ ·\IU >I I> l'lil lll'l "I<; lk1i,nl.l,11111;111 .<I. ,101:• (/) Q)� C: i� : (1' -' :::s � C) u Q)'::J ,_(1' ;> �­Q) � ."'O :·<ii I Q) I'- THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 7876975 Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casually Insurance Company is a corporation duly organized under the laws of the Slate of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the Stale of Massachusetts. and West American Insurance Company is a corporation duly organized under the laws of the Stale of Indiana (herein collectively called the "Companies"), pursuant lo and by authority herein set forth. does hereby name, constitute and appoint, Don E. Cornell; Kelly A. Westbrook; Ricardo J. Reyna; Robbi Morales; Sophinie Hunter; Tina McEwan; V. Delena Marshall all of the city of Dallas , state of TX each individually if there be more than one named. its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds. recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 25th day of August , --1Q..!l__. STATE OF PENNSYLVANIA COUNTY OF MONTGOMERY ss The Ohio Casualty Insurance Company Liberty Mutual Insurance Company Wes�merican Insurance Company By: _t!._,,_1,_V�· -+-7�:�.-_.:_., ----- David M. Carey-:Assistanl Secretary On this 25th day of August , 2017 . before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so lo do, execute the foregoing instrument for the purposes therein contained by signing on behalf of lhe corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal al King of Prussia, Pennsylvania, on the day and year first above written. COMMONWEALTH OF PENNSYLVANIA Notarial Soal Teresa Pastella. Notary PtJblir. Upper Menon Tw" .. Montgonmry County � �V' My Commission Expires March 28. 2021 1,,0,:Ar:t���'l.)C, Mumber. Pcnnsylvrtnm As:wc1,1tion nt NrJl,1r1e!> By:�� Mt/µ Teresa Paslella, Notary Public This Power of Attorney is made and executed pursuant lo and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV -OFFICERS-Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President. and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds. recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective : ai powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so o � executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under >. the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. g ARTICLE XIII -Execution of Contracts -SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, � and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute,:i seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their U respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation -The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in­ f act as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization -By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney execl1led by said Companies, is in full force and effect and has not been revoked . IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 110of400 U,1S_ 12873_022017 >­!1l "C (/) rJJ OJ C: ·;;;::I .c >. C: !1lC:-0 �1->.cn Q) w EE 0 0. �o <(M 0� ... "'OQ) C: � !1l OE Q. !1l.!!!o .c: 0 ::m 0 C: z,� :a� = OJ � .c Q)o .s� EC? .:: � 'E <:? 00 u..-o<9 I- .... I I I I r l l I I I I I �Libertx � Mutual.SURETY TEXAS IMPORT ANT NOTICE To obtain information or make a complaint: You may call toll-free for info1mation or to make a complaint at 1-877-751-2640 You may also write to: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Depai1ment of Insurance Consumer Protection (111-lA) P.0. Box 149091 Austin, TX 78714-9091 FAX: (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the agent or call 1-800-843-6446. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a pai1 or condition of the attached document. NP70680901 TEXAS AVISO IMPORTANTE Para obtener informacion o para someter una queJa: Usted puede llamar al numero de telefono gratis para info1macion o para someter una queja al 1-877-751-2640 Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, cobe1turas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas Consumer Protection (111-1 A) P.0. Box 149091 Austin, TX 78714-9091 FAX# (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi. texas. gov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiena una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o primero. Si no se resuelve la disputa, puede entonces comunicarse con el depai1amento (TDI) UNA ESTE A VISO A SU PO LIZA: Este aviso es solo para proposito de infom1acion y no se convie11e en parte o condicion del documento adjunto. r r I I I I I l l I l CITY OF FORT WORTH STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AW ARD ED PROJECTS STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 -Definitions and Tenninology .......................................................................................................... 1 1.01 Defined Tern1s ............................................................................................................................... l 1.02 Tern1inology .................................................................................................................................. 5 Article 2 -Preli1nina1y Matters ......................................................................................................................... 6 2.01 Before Sta11ing Construction ........................................................................................................ 6 2.02 Preconstluction Conference .......................................................................................................... 6 2.03 Public Meeting .............................................................................................................................. 6 At1icle 3 -Contract Documents and Atnending ............................................................................................... 6 3.01 Reference Standards ..................................................................................................................... 6 3. 02 Amending and Supplementing Contract Documents .................................................................. 6 At1icle 4 -Bonds and Insurance ....................................................................................................................... 7 4.01 Licensed Sureties and Insurers ..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7 4.03 Ce11ificates of Insurance ............................................................................................................... 7 4.04 Contractor's Insurance .................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12 At1icle 5 -Contractor's Responsibilities ........................................................................................................ 12 5.01 Supervision and Superintendent ................................................................................................. 12 5.02 Labor; Working Hours ................................................................................................................ 13 5.03 Services, Materials, and Equipment.. ......................................................................................... 13 5.04 Project Schedule .......................................................................................................................... 14 5.05 Substitutes and "Or-Equals" ....................................................................................................... 14 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16 5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16 5.08 Wage Rates .................................................................................................................................. 18 5.09 Patent Fees and Royalties ........................................................................................................... 19 5.10 Laws and Regulations ................................................................................................................. 19 5.11 Use of Site and Other At·eas ....................................................................................................... 19 5 .12 Record Docun1ents ...................................................................................................................... 20 5 .13 Safety and Protection .................................................................................................................. 21 5 .14 Safety Representative ................................................................................................................. 21 5 .15 Hazard Communication Programs ............................................................................................. 22 5 .16 Submittals .................................................................................................................................... 22 5.17 Contractor's General Warranty and Guarantee .......................................................................... 23 CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 20 I 3 I r 11 I l l l l l l 5 .18 Indenmification ........................................................................................................................... 24 5 .19 Delegation of Professional Design Services .............................................................................. 24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrin1ination ....................................................................................................................... 25 Article 6-Other Work at the Site ................................................................................................................... 26 6.01 Related Work at Site ................................................................................................................... 26 Article 7 -City's Responsibilities ................................................................................................................... 26 7.01 Inspections, Tests, and Approvals .............................................................................................. 26 7.02 Limitations on City's Responsibilities ....................................................................................... 26 7.03 Compliance with Safety Program ............................................................................................... 27 Article 8 -City's Observation Status During Constrnction ........................................................................... 27 8.01 City's Project Representative ..................................................................................................... 27 8.02 Authorized Variations in Work .................................................................................................. 27 8.03 Rejecting Defective Work .......................................................................................................... 27 8.04 Determinations for Work Performed .......................................................................................... 28 Article 9-Changes in the Work ..................................................................................................................... 28 9.01 Authorized Changes in the Work ............................................................................................... 28 9.02 Notification to Surety .................................................................................................................. 28 Alticle 10 -Change of Contract Price; Change of Contract Time ................................................................ 28 10.01 Change of Contract Price ............................................................................................................ 28 10.02 Change of Contract Time ............................................................................................................ 28 10.03 Delays .......................................................................................................................................... 28 Alticle 11 -Tests and Inspections; C01Tection, Removal or Acceptance of Defective Work ...................... 29 11.01 Notice of Defects ........................................................................................................................ 29 11.02 Access to Work ........................................................................................................................... 29 11.03 Tests and Inspections .................................................................................................................. 29 11.04 Uncovering Work ....................................................................................................................... 30 11.05 City May Stop the Work ............................................................................................................. 30 11.06 Correction or Removal of Defective Work ................................................................................ 30 11.07 Correction Period ........................................................................................................................ 30 11.08 City May C01Tect Defective Work ............................................................................................. 31 Alticle 12 -Completion .................................................................................................................................. 32 12.01 Contractor's WatTanty ofTitle ................................................................................................... 32 12.02 Pa1tial Utilization ........................................................................................................................ 32 12.03 Final Inspection ........................................................................................................................... 32 12.04 Final Acceptance ......................................................................................................................... 33 Alticle 13-Suspension ofWork .................................................................................................................... 33 13.01 City May Suspend Work ............................................................................................................ 33 Altic le 14 -Miscellaneous .............................................................................................................................. 34 14.01 Giving Notice .............................................................................................................................. 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS-DEVELOPER A WARDED PROJECTS Revised: January I 0, 20 I 3 14.02 Co111putation of Ti111es ................................................................................................................ 34 14.03 Cun1ulative Ren1edies ................................................................................................................. 34 14.04 Survival ofObligations ............................................................................................................... 35 14.05 Headings ...................................................................................................................................... 35 CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 r I [ I l l l l 0073 10-1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page I of35 ARTICLE 1 -DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A.Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to te1ms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. I.Agreement -The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2.Asbestos-Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above cu1Tent action levels established by the United States Occupational Safety and Health Administration. 3.Business Day - A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4.Buzzsaw -City's on-line, electronic document management and collaboration system. 5.Calendar Day-A day consisting of24 hours measured from midnight to the next midnight. 6.City-The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf 7.Community Facilities Agreement (CFA) -A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of way or easement: Water, Sanita,y Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of way dedicated as private right-of way or easement on a recorded plat. 8.Contract-The entire and integrated written document inc01porating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9.Contract Documents-Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a.An Agreement CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January I 0, 2013 00 73 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects b.Attaclunents to the Agreement1.Bid Form11.Vendor Compliance with State Law Non-Resident Bidder m.Prequalification Statement c.Current Prevailing Wage Rates Table (ifrequired by City) d.Insurance Accord Form e.Payment Bond f.Performance Bond g.Maintenance Bond h.Power of Attorney for Bonds1.Workers Compensation Affidavit J.MWBE Commitment Form( If required by City) k.General Conditions 1.Supplementary Conditions m.The Standard City Conditions Page 2 of35 n.Specifications specifically made pait of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o.Drawings p.Documentation submitted by contractor prior to Notice of Award. q.The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated pait of the Contract Documents1.Notice to Proceed11.Field Orders m.Change Orders iv.Letters of Final Acceptance r.Approved Submittals, other Contractor submittals, and the rep01ts and drawings of subsurface and physical conditions are not Contract Documents. 10.Contractor-The individual or entity with whom Developer has entered into the Agreement. 11.Day or day -A day, unless othe,wise defined, shall mean a Calendar Day. 12.Developer -An individual or entity that desires to make certain improvements within theCity of Fort Worth 13.Drawings-That part of the Contract Documents prepared or approved by Engineer whichgraphically shows the scope, extent, and character of the Work to be pe,formed by Contractor. Submittals are not Drawings as so defined. 14.Engineer-The licensed professional engineer or engineering firm registered in the State of Texas pe1forming professional services for the Developer. 15.Final Acceptance -The written notice given by the City to the Developer and/or Contractorthat the Work specified in the Contract Documents has been completed to the satisfaction ofthe City. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 ( I I I l l l l 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of35 16.Final Inspection -Inspection carried out by the City to verify that the Contractor hascompleted the Work, and each and eve,y part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents.17.General Requirements-A part of the Contract Documents between the Developer and aContractor. 18.Laws and Regulations-Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts havingjurisdiction.19.Liens-Charges, security interests, or encumbrances upon Project funds, real property, or personal property.20.Milestone-A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work.21.Non-Participating Change Order-A document, which is prepared for and reviewed by theCity, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued onor after the Effective Date of the Agreement.22. Participating Change Order-A document, which is prepared for and approved by the City,which is signed by Contractor, Developer, and City and authorizes an addition, deletion, orrevision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement.23. Plans -See definition of Drawings.24. Project Schedule-A schedule, prepared and maintained by Contractor, in accordance withthe General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time.25. Project-The Work to be pe,formed under the Contract Documents.26. Project Representative-The authorized representative of the City who will be assigned to the Site.27. Public A1eeting -An announced meeting conducted by the Developer to facilitate publicparticipation and to assist the public in gaining an informed view of the Project. 28.Regular Working Hours -Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29.Samples-Physical examples of materials, equipment, or workmanship that arerepresentative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS - DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of35 30.Schedule of Submittals-A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled pe,formance of related construction activities.31.Site-Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be pe,formed, including rights-of-way, permits, and easements for access thereto, and such other lands fumished by City or Developer which are designated for the use of Contractor.32.Specifications-That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be inc01porated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project.33.Standard City Conditions -That part of the Contract Documents setting forth requirements of the City.34.Subcontractor-An individual or entity having a direct contract with Contractor or with any other Subcontractor for the pe1formance of a part of the Work at the Site.35.Submittals-All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.36.Superintendent -The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37.Supplementmy Conditions-That part of the Contract Documents which amends or supplements the General Conditions.38.Supplier-A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be inc01porated in the Work by Contractor or Subcontractor.39.Underground Facilities-All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.40.Weekend Working Hours-Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 l I I I I I l l l l l l 007310-5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of35 41.Work-The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of pe,forming or providing all labor, services, and documentation necessa,y to produce such construction including any Participating Change Order, Non-Participating Change Order, or Field Order, and furnishing, installing, and inc01porating all materials and equipment into such construction, all as required by the Contract Documents. 42.Working Day -A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract pwposes, in which weather or other conditions not under the control of the Contractor will permit the pe1formance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.111. and 6 p.m. 1.02 Terminology A.The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B.Defective: 1.The word "defective," when modifying the word "Work," refers to Work that 1s unsatisfactory, faulty, or deficient in that it: a.does not conf01m to the Contract Documents; or b.does not meet the requirements of any applicable inspection, reference standard, test, or approval refe1Ted to in the Contract Documents; or c.has been damaged prior to City's written acceptance.C.Furnish, Install, Pe,form, Provide: 1.The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D.Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or constrnction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 20 I 3 00 73 10-6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of35 ARTICLE 2 -PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to staiting the Work. New schedules will be submitted to City when Paiticipating Change Orders or Non­ Paiticipating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is sta1ted, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 -CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A.Standards, Specifications, Codes, Laws, and Regulations 1.Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids ( or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2.No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, pa1tners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to unde1take responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A.The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Paiticipating Change Order or a Non-Pa1ticipating Change Order. B.The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1.A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS-DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 I I 1 I I I I t 007310-7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of35 1.City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2.City's written interpretation or clarification. ARTICLE 4 -BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Pe,formance, Payment, and Maintenance Bonds A.Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B.Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2)years after the date of Final Acceptance by the City. C.All bonds shall be in the f01m prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D.If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions ce1tificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 00 73 10- 8 Standard City Conditions Of The Con struction Contract For Developer Awarded Projects Page 8 of35 1.The ce11ificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2.The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the ce11ificate of insurance provided to the City. 3.The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Prope11y & Casualty Guide 4.The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5.All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such ce11ificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6.If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the pnmary coverage. 7.Unless otherwise stated, all required insurance shall be written on the "occmTence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the ce11ificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such msurance coverage. 8.Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9.Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 [ I { I I I I t 1 l l 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10.Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11.City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, comi decision or the claims history of the industry as well as of the contracting paiiy to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12.City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of paiiicular policy te1ms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13.City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A.Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being perf01med and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1.claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2.claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3.The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a.Statutory limits b.Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS-DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 1)$100,000 2)$100,000 3)$500,000 each accident/occunence Disease -each employee Disease -policy limit Page 10 of35 B.Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injmy, or advertising injury, which are nmmally contained with the policy, unless the City approves such exclusions in writing. 1.For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2.Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a.$1,000,000 each occurrence b.$2,000,000 aggregate limit 3.The policy must have an endorsement (Amendment -Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4.The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks A1iicle of the Ce1iificate of Insurance. C.Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or prope1iy damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1.Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a.Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 l ( I l I I I l l l l 00 73 10-11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of35 I)$1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2)$250,000 3)$500,000 4)$100,000 Bodily Injury per person Bodily Injury per accident / Property Damage D.Railroad Protective Liability. If any of the work or any wa1Tanty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1.The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: Write t he_n_m-ne -o-,---ft.,....he-r -ai -lro-ad.,....c-·o -m-pan-)-'. -(1-,---f n -o-ne-, t -he_n_\\_'l'i-te-no-n-e) _____________ _ 2.The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad prope1ties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's prope1ties. 3.The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad prope1ty: a.General Aggregate: ________________ _En ter l imits provide d by R ail road Company (If none, write none) b.Each Occu1Tence::------------------En ter limits provided by R ailroad Company (If none, write none) 4.With respect to the above outlined insurance requirements, the following shall govern: a.Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b.Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- CIT Y OF FORT W ORTH STANDARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 00 73 10-12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c.If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d.If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5.No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6.The insurance specified above must be canied until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E.Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance,· Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates ( or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 -CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A.Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expe1tise as may be necessary to perform the CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January IO, 2013 r I r I I I t ! l l l 00 73 10-13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B.At all times during the progress of the Work, Contractor shall assign a competent, English­ speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C.Contractor shall notify the City 24 hours pnor to movmg areas during the sequence of construction. 5.02 Labor; Working Hours A.Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B.Except as otherwise required for the safety or protection of persons or the Work or prope1ty at the Site or adjacent thereto, and except as othe1wise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1.for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2.for Weekend Working Hours request must be made by noon of the preceding Thursday 3.for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A.Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessaiy for the perfmmance, Contractor required testing, start-up, and completion of the Work. B.All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special wananties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfact01y evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of35 C.All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A.Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1.Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2.Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Alticle 9. Adjustments in Contract Time for projects with City paiticipation shall be made by paiticipating change orders. 5.05 Substitutes and "Or-Equals" A.Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a paiticular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1."Or-Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A. l, a proposed item of material or equipment will be considered functionally equal to an item so named if: a.City determines that: 1)it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2)it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3)it has a proven record of performance and availability of responsive service; and b.Contractor ce1tifies that, if approved and incorporated into the Work: 1)there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH ST ANDA RD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 I ( I I I l l l l 00 73 10-15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of35 2)it will conform substantially to the detailed requirements of the item named in the Contract Documents.2.Substitute Items: a.If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b.Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c.Contractor shall make written application to City for review of a proposed su bstitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: CITY OF FORT WORTH 1)shall ce1iify that the proposed substitute item will: 1.perform adequately the functions and achieve the results called for by the general design; 11.be similar in substance to that specified; iii.be suited to the same use as that specified; and 2)will state: 1.the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; 11.whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents ( or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; m.whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3)will identify: 1.all variations of the proposed substitute item from that specified; 11.available engineering, sales, maintenance, repair, and replacement services; and STANDARD CITY CONDITIONS-DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of35 4)shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B.Substitute Construction Methods or Procedures: If a specific means, method, teclmique, sequence, or procedure of constrnction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C.City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal." City will advise Contractor in writing of its determination. D.Special Guarantee: City may require Contractor to furnish at Contractor's expense a special perforn1ance guarantee, wananty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them .fi·om and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E.City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F.Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. G.Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A.The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.07 Concerning Subcontractors, Suppliers, and Others A.Minority and Women Owned Business Ente,prise Compliance: CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 I I I I l l l 00 73 10-17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects D Required for this Contract. (Check this box if there is any City Pm1icipation) D Not Required for this Contract. Page 17 of35 It is City policy to ensure the full and equitable paiiicipation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1.Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2.Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3.Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work perf01med by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B.Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities perfmming or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1.shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2.shall create any obligation on the paii of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C.Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D.All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E.All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates D Required for this Contract. D Not Required for this Contract. A.Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of F01t Wo1th to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B.Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or pait of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C.Complaints of Violations and City Determination of Good Cause. On receipt of infom1ation, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occmTed. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D.Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Alticle 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district comt shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all paities and may be enforced in any comt of competent jurisdiction. E.Records to be A1aintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 I I I f l t l l l 00 73 10-19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F.Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G.Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H.Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A.To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbih·ation or other dispute resolution costs) arising out of or relating to any in.fi·ingement of patent rights or copyrights incident to the use in the pe1formance of the Work or resulting .fi·om the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A.Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B.If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all comt or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make ce1tain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A.Limitation on Use of Site and Other Areas: 1.Contractor shall confine constmction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2.At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is conunenced on any additional area of the Site. 3.Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4.Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B.Removal of Debris During Pe1for111ance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C.Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a mam1er unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D.Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent prope1ty owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all prope1ty disturbed by the Work. E.Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent prope1ty to stresses or pressures that will endanger it. 5.12 Record Documents A.Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January JO, 2013 l I l l l 00 73 10-21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of35 Samples and a counterpait of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A.Contractor shall be solely responsible for initiating, maintaining and superv1smg all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessaiy protection to prevent damage, injmy or loss to: 1. all persons on the Site or who may be affected by the Work; 2.all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3.other prope1ty at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B.Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or prope1ty, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent prope1ty and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their prope1ty. C.Contractor shall comply with the applicable requirements of City's safety programs, if any. D.Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E.All damage, injmy, or loss to any prope1ty referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in pait, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F.Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5 .14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard conununication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A.Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1.Submit number of copies specified in the General Requirements. 2.Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3.Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4.When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5.For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7.Clearly identify each Sample as to material, Supplier, pe1tinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B.Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pe1tinent submittal will be at the sole expense and responsibility of Contractor. C.City's Review: 1.City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January IO, 2013 f I I l l l l 0073 10-23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2.City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction ( except where a paiticular means, method, teclmique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3.City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5 .17 Contractor's General Warranty and Guarantee A.Contractor wairnnts and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, paitners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's wananty and guarantee. B.Contractor's wananty and guarantee hereunder excludes defects or damage caused by: 1.abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2.normal wear and tear under normal usage. C.Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1.observations by City; 2.recommendation or payment by City or Developer of any progress or final payment; 3.the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4.use or occupancy of the Work or any part thereof by City; 5.any review and acceptance of a Submittal by City; 6.any inspection, test, or approval by others; or CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 7.any correction of defective Work by City. Page 24 of35 D.The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of A1ticle 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indenmification A.Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERA TE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indenmity for costs, expenses and legal fees incuned by the City in defending against such claims and causes of actions. B.Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5 .19 Delegation of Professional Design Services A.Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to cany out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B.If professional design services or ce1tifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all perfmmance and design criteria that such services must satisfy. Contractor shall cause such services or ce1tifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, ce1tifications, and Submittals prepared by such professional. Submittals related to the Work designed or ce1tified by such professional, if prepared by others, shall bear such professional' s written approval when submitted to City. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January IO, 2013 I I 1 00 73 10-25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of35 C.City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D.Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A.The City reserves the right to audit all projects utilizing City funds B.The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pe1tinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessaiy Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C.Contractor fu1ther agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pe1tinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and fuither, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D.Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A.The City is responsible for operating Public Transp01tation Programs and implementing transit­ related projects, which are funded in pait with Federal financial assistance awarded by the U.S. Depaitment of Transp01tation and the Federal Transit Administration (FT A), without discriminating against any person in the United States on the basis of race, color, or national origin. B.Title VL Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as fu1ther defined in the Supplementaiy Conditions for any project receiving Federal assistance. CITY OF FORT WORTH ST ANDA RD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects ARTICLE 6 -OTHER WORK AT THE SITE 6.01 Related Work at Site Page 26 of35 A.City may perform other work related to the Project at the Site with City's employees, or other City contractors, or tlu·ough other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to stai1ing any such other work; and B.Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opp011unity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C.If the proper execution or results of any pai1 of Contractor's Work depends upon work performed by others under this A11icle 7, Contractor shall inspect such other work and promptly rep011 to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so rep011 will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 -CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to ce11ain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A.The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of constrnction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B.City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 f f I 11 l I f I l 00 73 10-27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8-CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during constrnction are set fmih in the Contract Documents. A.City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's eff011s will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B.City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Aliicle 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 8.04 Determinations for Work Pe1for111ed Page 28 of35 Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written reconunendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 -CHANGES IN THE WORK 9.01 Authorized Changes in the Work A.Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Pa1ticipating Change Order which may or may not precede an order of Extra work. B.For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City paiticipation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 -CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A.The Contract Price may only be changed by a Paiticipating Change Order for projects with City paiticipation. 10.02 Change of Contract Time A.The Contract Time may only be changed by a Pa1ticipating Change Order for projects with City paiticipation. 10.03 Delays A.If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, at"chitects, attorneys, and other professionals and all comt or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 r r f I r I ( i I I l l l 00 73 10-29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of35 ARTICLE 11 -TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A.Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B.If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work ( or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Depaitment of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C.Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D.City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any pait of the Work, as determined solely by City. 1.City will coordinate such Testing to the extent possible, with Contractor; 2.Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS-DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of35 3.Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4.If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E.If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A.If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perfonn the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the pait of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A.Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all comt or arbitration or other dispute resolution costs) arising out of or relating to such conection or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B.When conecting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A.If within two (2) years after the date of Final Acceptance ( or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the ContractCITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 f II I I I r I l l l l 00 73 10-31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1.repair such defective land or areas; or 2.correct such defective Work; or 3.if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4.satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B.If Contractor does not promptly comply with the terms of City's written instrnctions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all comt or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs ofrepair or replacement of work of others) will be paid by Contractor. C.Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A.If Contractor fails within a reasonable time after written notice from City to c01Tect defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, c01Tect, or remedy any such deficiency. B.In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or pait of the Site, take possession of all or pait of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH ST ANDA RD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C.All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessaiy revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D.Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 -COMPLETION 12.01 Contractor's Warranty ofTitle Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A.Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed pait of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such patt of the Work which City determines to be ready for its intended use, subject to the following conditions: 1.Contractor at any time may notify City in writing that Contractor considers any such pait of the Work ready for its intended use. 2.Within a reasonable time after notification as enumerated in Paragraph 14.05.A. l, City and Contractor shall make an inspection of that pa.it of the Work to determine its status of completion. If City does not consider that patt of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3.Paitial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A.Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January JO, 2013 f I I I l l l 00 73 10-33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 1.within 10 days, City will schedule a Final Inspection with Contractor. Page 33 of35 2.City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor s!--gll immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A.Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1.All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2.consent of the surety, if any, to Final Acceptance; 3.a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4.affidavits of payments and complete and legally effective releases or waivers (satisfactmy to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5.after all Damage Claims have been resolved: a.directly by the Contractor or; b.Contractor provides evidence that the Damage Claim has been repmted to Contractor's insurance provider for resolution. 6.Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 -SUSPENSION OF WORK 13.01 City May Suspend Work A.At any time and without cause, City may suspend the Work or any pmtion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During tempora1y suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City paiticipation projects. B.Should the Contractor not be able to complete a pmtion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C.If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a maimer that they will not obstruct or impede the public mmecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 -MISCELLANEOUS 14.01 Giving Notice A.Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: I.delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2.delivered at or sent by registered or ce1tified mail, postage prepaid, to the last business address known to the giver of the notice. B.Business address changes must be promptly made in writing to the other patty. C.Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving patty. 14.02 Computation ofTimes When any period of time is refen-ed to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each paiticular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 20 I 3 f r I ( l l l l l 14.04 Survival of Obligations 00 73 10-35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of35 All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Atiicle and paragraph headings are inse1ied for convenience only and do not constitute paiis of these General Conditions. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 OJ 11 00-I SUMMARY OF WORK 1 SECTION 01 11 00 2 SUMMARY OF WORK 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: Page I of3 6 I.Summary of Work to be performed in accordance with the Contract Documents 7 B.Deviations from this City of Fo1t Worth Standard Specification 8 1.None. 9 C.Related Specification Sections include, but are not necessarily limited to: 10 1.Division O -Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2.Division I -General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A.Measurement and Payment 14 1.Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A.Work Covered by Contract Documents 19 1.Work is to include furnishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B.Subsidiary Work 23 1.Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C.Use of Premises 30 I.Coordinate uses of premises under direction of the City. 31 2.Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3.Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights-of-way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a.A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'll10me Afemlows Phase 3 C'irv Pr<!if!Ct No. /00958 ( J l l l 01 11 00-2 SUMMARY OF WORK Page 2 of3 b.Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c.If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 I)All Work shall be in accordance with railroad requirements set fo1th in 7 Division Oas well as the railroad permit. 8 D.Work within Easements 9 I.Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such prope1ty. 11 2.Do not store equipment or material on private prope1ty unless and until the 12 specified approval of the prope1ty owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3.Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a pa1t of the project construction operations. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 4.Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culve1ts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appmtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5.Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a.Such notice shall be made at least 48 hours in advance of the beginning of the Work. b.Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c.Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6.Fence a.Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b.Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c.The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 /·law1home ,\ll!mlmrs l'huse 3 Ci/1-' Projl!cl No. /()()958 1.5 SUBMITTALS [NOT USED] 01 I I 00 - 3 SUMMARY OF WORK Page 3 of 3 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING (NOT USED] 7 1.11 FIELD (SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 -PRODUCTS [NOT USED] 10 PART 3 -EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 SUMMARY OF CHANGE Hall'tl10m<? Meadows Phase 3 li(I' Pr<Jjl'ct No. 100950 [ 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (16 17 I 18 19 (20 21 22 I 23 24 r 25 26 27 28 29 30 l 31 32 33 l 34 35 36 1 37 38 39 l 40 01 25 00 - I SUBSTITUTION PROCEDURES PART 1-GENERAL 1.1 SUMMARY A.Section Includes: SECTION 01 25 00 SUBSTITUTION PR OCEDURES Page I of 4 I.The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to I or more of the following: a.Name of manufacturer b.Name of vendor c.Trade name d.Catalog number 2.Substitutions are not "or-equals". B.Deviations from this City of Fo11 Wm1h Standard Specification I.None. C.Related Specification Sections include, but are not necessarily limited to: I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division l -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment I.Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A.Request for Substitution -General I.Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2.Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a.When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equals," as determined by City. 3.Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a.Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 20 I I flmo•1/10m1? ,\fl'mloll's Phase 3 Cil y Project No. //l/195fi 01 25 00 - 2 SUBSTITUTION PROCEDURES Page 2 of 4 b.Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A.See Request for Substitution Form (attached) 4 B.Procedure for Requesting Substitution 5 1.Substitution shall be considered only: 6 a.After award of Contract 7 b.Under the conditions stated herein 8 2.Submit 3 copies of each written request for substitution, including: 9 a.Documentation IO 1)Complete data substantiating compliance of proposed substitution with I I Contract Documents 12 2)Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3)Data relating to changes in cost 15 b.For products I 6 1)Product identification 17 a)Manufacturer's name 18 b)Telephone number and representative contact name 19 c)Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2)Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3)Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a)Size 27 b)Composition or materials of construction 28 c)Weight 29 d)Electrical or mechanical requirements 30 4)Product experience 31 a)Location of past projects utilizing product 32 b)Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c)Available field data and rep011s associated with proposed product 35 5)Samples 36 a)Provide at request of City. 37 b)Samples become the prope11y of the City. 38 c.For construction methods: 39 1)Detailed description of proposed method 40 2)Illustration drawings 41 C.Approval or Rejection 42 1.Written approval or rejection of substitution given by the City 43 2.City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3.In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hawlhomf! 1'ff'adoll's Phase 3 Cif)' Project No. 100958 r l I ( I [ l l l l l 01 25 00 - 3 SUBSTITUTION PROCEDURES 4.No additional contract time will be given for substitution. 2 5.Substitution will be rejected if: 3 a.Submittal is not through the Contractor with his stamp of approval 4 b.Request is not made in accordance with this Specification Section Page 3 of 4 5 c.In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d.In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] IO 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A.In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1.Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 19 20 21 22 23 24 25 26 27 28 29 30 31 2.Will provide same guarantee for substitute item as for product specified 3.Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4.Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING (NOT USED] 1.11 FIELD (SITE] CONDITIONS (NOT USED] 1.12 WARRANTY (NOT USED] PART 2 -PRODUCTS [NOT USED] PART 3 -EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 SUMMARY OF CHANGE Hawthorne Afeadoll'.1· Phase 3 City Project No. /0095N EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: 0 I 25 00 - 4 SUBSTITUTION PROCEDURES Page 4 of 4 2 3 4 5 ----- - - - - - - -------------------------- -PROJECT: __________ _ _ _ __ DATE: __________ _ 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SEC TION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: _____________________________ _ 12 Reason for Substitution: __ _ _ _ _______________ _ _ _ _ _ _ __ __ 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design, including engineering18 and detailing costs caused by the requested substitution? 19 20 21 B.What effect does substitution have on other trades? 22 23 24 C.Differences between proposed substitution and specified item? 25 26 27 D.Differences in product cost or product delivery time? 28 29 30 E.Manufacturer's guarantees of the proposed and specified items are: ___ Equal ___ Better (explain on attachment)31 32 33 34 35 36 37 38 39 40 41 42 43 The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature ____________ _ as noted Firm ______________ _ Address ____________ _ Date ---------------44 Telephone ___________ _ 45 46 For Use by City: 47 48 49 ___ Approved City ___________ _ CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Recommended Recommended Not recommended __ Received late By _________________ _ Date ________________ _ Remarks ---------------- ___ Rejected Date _________________ _ Hall'thorne Meadows Phase 3 City Project No. 100958 r ( I r ( I l l l l l l SECTION 01 3119 01 31 19 - I PRECONSTRUCTION MEETING Page I of3 2 PRECONSTRUCTION MEETING 3 PART1-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 1.Provisions for the preconstruction meeting to be held prior to the stait of Work to 7 clarify construction contract administration procedures 8 B.Deviations from this City of Fo1t Wrnth Standard Specification 9 1.None. 10 C.Related Specification Sections include, but are not necessarily limited to: 11 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 12 13 14 15 16 17 2.Division I -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment I.Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A.Coordination I.Attend preconstruction meeting. 2.Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3.Meeting administered by City may be tape recorded. a.If recorded, tapes will be used to prepare minutes and retained by City for future reference. B.Preconstruction Meeting I.A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is staited. a.The meeting will be scheduled and administered by the City. 2.The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all pa1ticipants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3.Attendance shall include: a.Project Representative b.Contractor's project manager c.Contractor's superintendent d.Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 / -/aw/home Meadm,·s Phase 3 City Project No. J0095fi 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 e.Other City representatives f.Others as appropriate 4.Construction Schedule 013119-2 PRECONSTRUCTION MEETING Page 2 of3 a.Prepare baseline construction schedule in accordance with Section 01 32 16 and provide at Preconstruction Meeting. b.City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a.Introduction of Project Personnel b.General Description of Project c.Status of right-of-way, utility clearances, easements or other pertinent permits d.Contractor's work plan and schedule e.Contract Time f.Notice to Proceed g.Construction Staking h.Progress Payments 1.Extra Work and Change Order Procedures j.Field Orders k.Disposal Site Letter for Waste Material I.Insurance Renewals m.Payroll Ce1tification n.Material Ce1tifications and Quality Control Testing o.Public Safety and Convenience p.Documentation of Pre-Construction Conditions q.Weekend Work Notification r.Legal Holidays s.Trench Safety Plans t.Confined Space Entry Standards u.Coordination with the City's representative for operations of existing water systems v.Storm Water Pollution Prevention Plan w.Coordination with other Contractors x.Early Warning System y.Contractor Evaluation z.Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc.Substitution Procedures dd.Correspondence Routing ee. Record Drawings ff. Tempora1y construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii.Final Payment jj. Questions or Comments CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 Hawthome ,\fl!adows Phase 3 City Project No. 100958 r ( ( ( I l { l l l t l l 1.5 SUBMITTALS [NOT USED] 013119-3 PRECONSTRUCTION MEETING Page 3 of3 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED) 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITT ALS [NOT USED] 5 1.9 QUALITY ASSURANCE (NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 -PRODUCTS [NOT USED] IO PART 3 -EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 SUMMARY OF CHANGE / -/awthome M<'admrs Phase 3 City Projl!cl No. /0095H SECTION 01 32 33 2 PRECONSTRUCTION VIDEO 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 I.Administrative and procedural requirements for: 7 a.Preconstruction Videos 8 B.Deviations from this City of Fort Worth Standard Specification 9 I.None. 01 32 33 - I PRECONSTRUCTION VIDEO Page I of2 10 C.Related Specification Sections include, but are not necessarily limited to: 11 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 12 2.Division I -General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A.Measurement and Payment 15 I.Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A.Preconstruction Video 20 I.Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a.Provide digital copy of video upon request by the City. 23 2.Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 -PRODUCTS [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 201 I Hm,,t/10mf! ,\f!!adows Phase 3 City Projf'Ct No. 100958 I l ( l l l l l 2 3 4 PART 3 -EXECUTION [NOT USED] END OF SECTION Revision Log 013233 -2 PRECONSTRUCTION VIDEO Page 2 of2 DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 lfawtlwme Al<!mloll's Phase 3 Cizr Project No. 100958 SECTION 01 33 00 2 SUBMITT ALS 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 01 33 00 - I SUBMITTALS Page I of8 6 1.General methods and requirements of submissions applicable to the following 7 Work-related submittals: 8 a.Shop Drawings 9 b.Product Data (including Standard Product List submittals) IO c.Samples 11 d.Mock Ups 12 B.Deviations from this City of Fo1t W01th Standard Specification 13 1.None. 14 C.Related Specification Sections include, but are not necessarily limited to: 15 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 16 2.Division 1 -General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A.Measurement and Payment 19 1.Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A.Coordination 24 1.Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2.Coordination of Submittal Times 27 a.Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b.Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a)Disapproval and resubmittal (if required) 33 b)Coordination with other submittals 34 c)Testing 35 d)Purchasing 36 e)Fabrication 37 f)Delivery 38 g)Similar sequenced activities 39 c.No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'thome Meadolt's Phase 3 Ci(v Projf!Ct No. /00958 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 l 27 28 29 l 30 31 32 I 33 34 35 l 36 37 l 38 39 40 L 41 42 43 44 45 46 l l 01 33 00 - 2 SUBMITTALS Page 2 of8 d.Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B.Submittal Numbering I.When submitting shop drawings or samples, utilize a 9-character submittal cross­ reference identification numbering system in the following manner: a.Use the first 6 digits of the applicable Specification Section Number. b.For the next 2 digits number use numbers O 1-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c.Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B =3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1)03 30 00 is the Specification Section for Concrete 2)08 is the eighth initial submittal under this Specification Section 3)B is the third submission (second resubmission) of that pa1ticular shop drawing C.Contractor Ce1tification I.Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a.Field measurements b.Field construction criteria c.Catalog numbers and similar data d.Conformance with the Contract Documents 2.Provide each shop drawing, sample and product data submitted by the Contractor with a Ce1tification Statement affixed including: a.The Contractor's Company name b.Signature of submittal reviewer c.Ce1tification Statement 1)"By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D.Submittal Format 1.Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11 inches. 2.Bind shop drawings and product data sheets together. 3.Order a.Cover Sheet I)Description of Packet 2)Contractor Ce1tification b.List of items / Table of Contents c.Product Data /Shop Drawings/Samples /Calculations E.Submittal Content 1.The date of submission and the dates of any previous submissions CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 1 -/awthome ,\/�adu1rs Phase 3 Citv Pr,!f<'Ct Nn. I 00951:i 01 33 00 - 3 SUBMITTALS 1 2.The Project title and number 2 3.Contractor identification 3 4.The names of: 4 a.Contractor 5 b.Supplier 6 c.Manufacturer Page 3 of 8 7 5.Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6.Field dimensions, clearly identified as such 10 7.Relation to adjacent or critical features of the Work or materials 11 8.Applicable standards, such as ASTM or Federal Specification numbers 12 9.Identification by highlighting of deviations from Contract Documents 13 10.Identification by highlighting of revisions on resubmittals 14 11.An 8-inch x 3-inch blank space for Contractor and City stamps 15 F.Shop Drawings 16 I.As specified in individual Work Sections includes, but is not necessarily limited to: 17 a.Custom-prepared data such as fabrication and erection/installation (working) 18 drawings 19 b.Scheduled information 20 c.Setting diagrams 21 d.Actual shopwork manufacturing instructions 22 e.Custom templates 23 f.Special wiring diagrams 24 g.Coordination drawings 25 h.Individual system or equipment inspection and test repo1ts including: 26 I)Performance curves and ce1tifications 27 1.As applicable to the Work 28 2.Details 29 a.Relation of the various pa1ts to the main members and lines of the structure 30 b.Where correct fabrication of the Work depends upon field measurements 31 1)Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G.Product Data 34 I.For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2.For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a.Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1)Such as the manufacturer's product specification and installation 41 instructions 42 2)Availability of colors and patterns 43 3)Manufacturer's printed statements of compliances and applicability 44 4)Roughing-in diagrams and templates 45 5)Catalog cuts 46 6)Product photographs CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Haw/hum<! 1\/(!ado11's Phase 3 Ci(\' Proj<'CI No. !0095fi r r r l l 1 l l l ( l l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 7)Standard wiring diagrams 8)Printed performance curves and operational-range diagrams 01 33 00 - 4 SUBMITTALS Page 4 of 8 9)Production or quality control inspection and test repo1ts and ce1tifications 10)Mill repo1ts 11)Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12)As applicable to the Work H.Samples 1.As specified in individual Sections, include, but are not necessarily limited to: a.Physical examples of the Work such as: 1)Sections of manufactured or fabricated Work 2)Small cuts or containers of materials 3)Complete units ofrepetitively used products color/texture/pattern swatches and range sets 4)Specimens for coordination of visual effect 5)Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I.Do not stait Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1.Fabrication performed, materials purchased or on-site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2.The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3.Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J.Submittal Distribution 1.Electronic Distribution a.Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b.Shop Drawings l ) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2)Hard Copies a)3 copies for all submittals b)If Contractor requires more than l hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c.Product Data I)Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2)Hard Copies a)3 copies for all submittals d.Samples 1)Distributed to the Project Representative 2.Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Nmr1/wml! 1\1<'11cl01rs Phase 3 Ci1,, Pn!fecr No. /{)()')58 013300-5 SUBMITTALS a.Shop Drawings 2 I)Distributed to the City 3 2)Copies 4 a)8 copies for mechanical submittals 5 b)7 copies for all other submittals Page 5 of8 6 c)If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b.Product Data 9 I)Distributed to the City 10 2)Copies 11 a)4 copies 12 c.Samples 13 I)Distributed to the Project Representative 14 2)Copies 15 a)Submit the number stated in the respective Specification Sections. 16 3.Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples, where required, to the job site file and elsewhere as 18 directed by the City. 19 a.Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K.Submittal Review 22 I.The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a.Permitting any depaiture from the Contract requirements 25 b.Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c.Approving depmtures from details furnished by the City, except as otherwise 28 provided herein 29 2.The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a.All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3.The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4.If the shop drawings, data or samples as submitted describe variations and show a 38 depa11ure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an 41 exception. 42 5.Submittals will be returned to the Contractor under I of the following codes: 43 a.Code I 44 I)"NO EXCEPTIONS TAKEN" is assigned when there are no notations or 45 comments on the submittal. 46 a)When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b.Code 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hawthotw! A!t?adoll's Phase 3 City Projt?ct No. /00958 1 I l I l l l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 33 00 - 6 SUI3MITT ALS Page 6 of 8 I)"EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a)The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c.Code 3 I)"EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a)The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b)This resubmittal is to address all comments, omissions and non-conforming items that were noted. c)Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d.Code 4 I)"NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a)The Contractor must resubmit the entire package revised to bring the submittal into conformance. b)It may be necessa1y to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6.Resubmittals a.Handled in the same manner as first submittals I)Corrections other than requested by the City 2)Marked with revision triangle or other similar method a)At Contractor's risk if not marked b.Submittals for each item will be reviewed no more than twice at the City's expense. I)All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2)Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c.The need for more than I resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7.Paitial Submittals a.City reserves the right to not review submittals deemed pa1tial, at the City's discretion. b.Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c.The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8.If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hmrtlwml! :\ll!ado1rs !'hose 3 Cit,• l'mjffl No, /IJ0958 01 33 00 - 7 SUBMITTALS Page 7 of8 9.When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no futther 3 changes therein except upon written instructions from the City. 4 I 0. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L.Mock ups 7 I.Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M.Qualifications 11 I.If specifically required in other Sections of these Specifications, submit a P.E. 12 Cettification for each item required. 13 N.Request for Information (RFI) 14 I.Contractor Request for additional information 15 a.Clarification or interpretation of the contract documents 16 b.When the Contractor believes there is a conflict between Contract Documents 17 c.When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1)Identify the conflict and request clarification 20 2.Use the Request for Information (RFI) form provided by the City. 21 3.Numbering of RFI 22 a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and 23 increasing sequentially with each additional transmittal. 24 4.Sufficient information shall be attached to permit a written response without fmther 25 information. 26 5.The City will log each request and will review the request. 27 a.If review of the project information request indicates that a change to the 28 Contract Documents is required, the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'lhome :\IC'adows Phase 3 lily Projl!CI No. 100958 1 ( l l l l i l l PART 2 -PRODUCTS (NOT USED] 2 PART 3 -EXECUTION (NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 01 33 00 - 8 SUBMITTALS Page 8 of8 12/20/2012 D.Johnson 1.4.K.8. Working Days modified to Calendar Days 5 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Haw//10me ,\feaJ01r� Phase 3 CitF Project No. /009.il-i 01 35 13 - I SPECIAL PROJECT PROCEDURES SECTION 013513 2 SPECIAL PROJECT PROCEDURES 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: Page I of8 6 I.The procedures for special project circumstances that includes, but is not limited to: 7 a.Coordination with the Texas Depa1tment of Transportation 8 b.Work near High Voltage Lines 9 c.Confined Space Entry Program 10 d.Air Pollution Watch Days 11 e.Use of Explosives, Drop Weight, Etc. 12 f.Water Department Notification 13 g.Public Notification Prior to Beginning Construction 14 h.Coordination with United States Army Corps of Engineers 15 1.Coordination within Railroad permits areas 16 j.Dust Control 17 k.Employee Parking 18 I. {Coordinatio11 with North Central Texas Council ofGovemments Clea11 19 Co11struction Specification [remove tlnot required]} 20 B.Deviations from this City of Fott Wotth Standard Specification 21 I.None. 22 C.Related Specification Sections include, but are not necessarily limited to: 23 I.Division O -Bidding Requirements, Contract Forms and Conditions of the Contract 24 2.Division 1 -General Requirements 25 3.Section 33 12 25 -Connection to Existing Water Mains 26 1.2 PRICE AND PAYMENT PROCEDURES 27 A.Measurement and Payment 28 I.Coordination within Railroad permit areas 29 a.Measurement 30 I)Measurement for this Item will be by lump sum. 31 b.Payment 32 I)The work performed and materials furnished in accordance with this Item 33 will be paid for at the lump sum price bid for Railroad Coordination. 34 c.The price bid shall include: 35 I)Mobilization 36 2)Inspection 37 3)Safety training 38 4)Additional Insurance 39 5)Insurance Ce1tificates CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Haw/home ,\feadoll's Phase 3 Ci!y Projec/ No. 100951; f 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 (20 21 22 I 23 24 25 l 26 27 I 28 29 30 31 32 33 l 34 35 36 l 37 38 39 40 41 42 43 44 45 01 35 13 - 2 SPECIAL PROJECT PROCEDURES Page 2 of 8 6)Other requirements associated with general coordination with Railroad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising out of and/or from the construction of the Project. 2.Railroad Flagmen a.Measurement 1)Measurement for this Item will be per working day. b.Payment 1)The work performed and materials furnished in accordance with this Item will be paid for each working day that Railroad Flagmen are present at the Site. c.The price bid shall include: 1)Coordination for scheduling flagmen 2)Flagmen 3)Other requirements associated with Railroad 3.All other items a.Work associated with these Items is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A.Reference Standards 1.Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2.Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 3.N01th Central Texas Council of Governments (NCTCOG)-Clean Construction Specification 1.4 ADMINISTRATIVE REQUIREMENTS A.Coordination with the Texas Department ofTranspo1tation 1.When work in the right-of-way which is under the jurisdiction of the Texas Depa1tment ofTransp01tation (TxDOT): a.Notify the Texas Department ofTransp01tation prior to commencing any work therein in accordance with the provisions of the permit b.All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B.Work near High Voltage Lines 1.Regulatory Requirements a.All Work near High Voltage Lines ( more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2.Warning sign a.Provide sign of sufficient size meeting all OSHA requirements. 3.Equipment operating within 10 feet of high voltage lines will require the following safety features CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 1-/awthoml! All!admrs Phase 3 City Project No. 1//09511 0 I 35 13 - 3 SPECIAL PROJECT PROCEDURES a.Insulating cage-type of guard about the boom or arm 2 b.Insulator links on the lift hook connections for back hoes or dippers Page 3 of 8 3 c.Equipment must meet the safety requirements as set forth by OSHA and the 4 safety requirements of the owner of the high voltage lines 5 4.Work within 6 feet of high voltage electric lines 6 a.Notification shall be given to: 7 I)The power company ( example: ONCOR) 8 a)Maintain an accurate log of all such calls to power company and record 9 action taken in each case. 10 b.Coordination with power company 11 I)After notification coordinate with the power company to: 12 a)Erect temporary mechanical barriers, de-energize the lines, or raise or 13 lower the lines 14 c.No personnel may work within 6 feet of a high voltage line before the above 15 requirements have been met. 16 C.Confined Space Entry Program 17 I.Provide and follow approved Confined Space Entry Program in accordance with 18 OSHA requirements. 19 2.Confined Spaces include: 20 a.Manholes 21 b.All other confined spaces in accordance with OSHA's Permit Required for 22 Confined Spaces 23 D.Air Pollution Watch Days 24 I . General 25 a.Observe the following guidelines relating to working on City construction sites 26 on days designated as "AIR POLLUTION WATCH DAYS". 27 b.Typical Ozone Season 28 I)May 1 through October 3 1. 29 c.Critical Emission Time 30 I)6:00 a.m. to I 0:00 a.m. 31 2.Watch Days 32 a.The Texas Commission on Environmental Quality (TCEQ), in coordination 33 with the National Weather Service, will issue the Air Pollution Watch by 3:00 34 p.m. on the afternoon prior to the WATCH day. 35 b.Requirements 36 I)Begin work after 10:00 a.m. whenever construction phasing requires the 37 use of motorized equipment for periods in excess of I hour. 38 2)However, the Contractor may begin work prior to 10:00 a.m. if: 39 a)Use of motorized equipment is less than I hour, or 40 b)If equipment is new and ce1tified by EPA as "Low Emitting", or 41 equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or 42 alternative fuels such as CNG. 43 E.TCEQ Air Permit 44 I.Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 45 F.Use of Explosives, Drop Weight, Etc. 46 I.When Contract Documents permit on the project the following will apply: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Haw/home Afeadows Phase 3 City Project No. /00958 I r l I l l l l l 013513-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 I a.Public Notification 2 I)Submit notice to City and proof of adequate insurance coverage, 24 hours 3 prior to commencing. 4 2)Minimum 24 hour public notification in accordance with Section O 1 31 13 5 G.Water Depa1tment Coordination 6 I.During the construction of this project, it will be necessary to deactivate, for a 7 period of time, existing lines. The Contractor shall be required to coordinate with 8 the Water Depaitment to determine the best times for deactivating and activating 9 those lines. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2.Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a.Coordination shall be in accordance with Section 33 12 25. b.If needed, obtain a hydrant water meter from the Water Depaitment for use during the life of named project. c.In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1)Do not operate water line valves of existing water system. a)Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b)In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. H.Public Notification Prior to Beginning Construction 1.Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a.Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. I)Prepare flyer on the Contractor's letterhead and include the following information: a)Name of Project b)City Project No (CPN) c)Scope of Project (i.e. type of construction activity) d)Actual construction duration within the block e)Name of the contractor's foreman and phone number f)Name of the City's inspector and phone number g)City's after-hours phone number 2)A sample of the 'pre-construction notification' flyer is attached as Exhibit A. 3)Submit schedule showing the construction sta1t and finish time for each block of the project to the inspector. 4)Deliver flyer to the City Inspector for review prior to distribution. b.No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. I.Public Notification of Temporary Water Service Interruption during Construction CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 l-lmrtl10mc> :lfl!adows Phase 3 City l'r<!ft!cl No. /0095fi 0 I 35 13 - 5 SPECIAL PROJECT PROCEDURES Page 5 of8 I 2 3 I.In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2.Prepared notice as follows:4 5 6 7 8 9 a.The notification or flyer shall be posted 24 hours prior to the temporary interruption. b.Prepare flyer on the contractor's letterhead and include the following information: I)Name of the project 2)City Project Number 3)Date of the interruption of service 4)Period the interruption will take place 5)Name of the contractor's foreman and phone number 6)Name of the City's inspector and phone number IO 11 12 13 14 15 16 17 18 19 20 21 22 c.A sample of the temporary water service interruption notification is attached as Exhibit B. d.Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e.No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f.Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. 23 J.Coordination with United States Army Corps of Engineers (USA CE) 24 I. At locations in the Project where construction activities occur in areas where 25 USACE permits are required, meet all requirements set f011h in each designated 26 permit. 27 K.Coordination within Railroad Permit Areas 28 I.At locations in the project where construction activities occur in areas where 29 railroad permits are required, meet all requirements set fo11h in each designated 30 railroad permit. This includes, but is not limited to, provisions for: 31 a.Flagmen 32 b.Inspectors 33 c.Safety training 34 d.Additional insurance 35 e.Insurance ce11ificates 36 f. Other employees required to protect the right-of-way and prope11y of the 37 Railroad Company from damage arising out of and/or from the construction of 38 the project. Proper utility clearance procedures shall be used in accordance 39 with the permit guidelines. 40 2.Obtain any supplemental information needed to comply with the railroad's 41 requirements. 42 3.Railroad Flagmen 43 a.Submit receipts to City for verification of working days that railroad flagmen 44 were present on Site. 45 L.Dust Control 46 1.Use acceptable measures to control dust at the Site. 47 a.If water is used to control dust, capture and properly dispose of waste water. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Haw1homr! 1\ft'adows Phase 3 City Project No. 100958 I I I I I I l l l l 0 I 35 13 - 6 SPECIAL PROJECT PROCEDURES b.If wet saw cutting is performed, capture and properly dispose of slurry. 2 M.Employee Parking 3 I.Provide parking for employees at locations approved by the City.Page 6 of8 4 N.{Coordination with North Central Texas Council of Governments (NCTCOG) Clean 5 Construction Specification [if required for the project -verify with City] 6 I.Comply with equipment, operational, reporting and enforcement requirements set 7 forth in NCTCOG's Clean Construction Specification.} 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2-PRODUCTS [NOT USED] 17 PART 3 -EXECUTION [NOT USED] 18 END OF SECTION 19 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.B -Added requirement of compliance with Health and Safety Code, Title 9. 20 8/31/2012 D.Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E -Added Contractor responsibility for obtaining a TCEQ Air Permit CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'thome ,11.,admrs Phase 3 City Project No. /00958 0 I 35 13 - 7 SPECIAL PROJECT PROCEDURES I 2 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 15 16 Page 7 of8 EXHIBIT A (To be printed on Contractor's Letterhead) 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR > AT< TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 37 PLEASE KEEP THIS FL YER HANDY WHEN YOU CALL CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hawthome Meadow, Phase 3 City Project No. /00958 { I l l l l l 2 3 4 0 I 35 13 - 8 SPECIAL PROJECT PROCEDURES Date: _____ _ EXHIBITB DOE NO.XX.XX Projecl Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON __________ _ BETWEEN THE HOURS OF _________ AND ______ _ IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE CALL: Page 8 of8 MR. ______________ AT _________________________ _ (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. ______________ AT ____________ _ (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ______________ CONTRACTOR CITY OF FORT WORTH ---------·---- STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'/home Aleadull's Phase 3 Cit y Projec/ No. 100958 01 45 23 - I TESTING AND INSPECTION SERVICES SECTION 01 45 23 2 TESTING AND INSPECTION SERVICES 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes:6 I.Testing and inspection services procedures and coordination7 B.Deviations from this City of Fo1t Worth Standard Specification 8 I.None.9 C.Related Specification Sections include, but are not necessarily limited to:Page I of2 10 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract11 2.Division I -General Requirements12 1.2 PRICE AND PAYMENT PROCEDURES 13 A.Measurement and Payment14 I.Work associated with this Item is considered subsidiaiy to the various Items bid.15 No separate payment will be allowed for this Item.16 a.Contractor is responsible for performing, coordinating, and payment of all17 Quality Control testing.18 b.City is responsible for performing and payment for first set of Quality19 Assurance testing.20 I)If the first Quality Assurance test performed by the City fails, the21 Contractor is responsible for payment of subsequent Quality Assurance22 testing until a passing test occurs.23 a)Final acceptance will not be issued by City until all required payments24 for testing by Contractor have been paid in full.25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A.Testing28 I.Complete testing in accordance with the Contract Documents.29 2.Coordination30 a.When testing is required to be performed by the City, notify City, sufficiently31 in advance, when testing is needed.32 b.When testing is required to be completed by the Contractor, notify City,33 sufficiently in advance, that testing will be performed.34 3.Distribution of Testing Repo1ts35 a.Electronic Distribution36 1)Confirm development of Project direct01y for electronic submittals to be37 uploaded to City's Buzzsaw site, or another external FTP site approved by38 the City.39 40 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hawtl10ml! Meadows Phase 3 Ci�v Projf!CI No. 100958 \ I I l l I. l 01 45 23 - 2 TESTING AND INSPECTION SERVICES Page 2 of2 I 2)Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3)Hard Copies 4 a)1 copy for all submittals submitted to the Project Representative 5 b.Hard Copy Distribution (if required in lieu of electronic distribution) 6 1)Tests performed by City 7 a)Distribute I hard copy to the Contractor 8 2)Tests performed by the Contractor 9 a)Distribute 3 hard copies to City's Project Representative 10 4.Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a.Name of pit 13 b.Date of delivery 14 c.Material delivered 15 B.Inspection 16 1.Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED) 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 -PRODUCTS [NOT USED] 27 PART 3 -EXECUTION [NOT USED] 28 END OF SECTION 29 30 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 201 I SUMMARY OF CHANGE Ha11'thome Aleado1rs Phase 3 n1,, Project No. /00958 0 I 50 00 - I TEMPORARY FACILITIES AND CONTROLS SECTION 01 50 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: Page I of4 6 I.Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a.Temporary utilities 9 b.Sanitary facilities 10 c.Storage Sheds and Buildings 11 d.Dust control 12 e.Temporary fencing of the construction site 13 B.Deviations from this City of Fort Worth Standard Specification 14 I.None. 15 C.Related Specification Sections include, but are not necessarily limited to: 16 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 17 2.Division 1 -General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A.Measurement and Payment 20 1.Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A.Temporary Utilities 25 1.Obtaining Temporary Service 26 a.Make arrangements with utility service companies for temporary services. 27 b.Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c.Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 I)Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2.Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b.Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c.Coordination 40 1)Contact City 1 week before water for construction is desired CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hawthome 1\Ieadu\l's l'huse 3 City Project No. /00958 I (. l 1 l l d.Contractor Payment for Construction Water 01 50 00 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of4 2 I)Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3.Electricity and Lighting 5 a.Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 I)Provide power for lighting, operation of equipment, or other use. 8 b.Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. IO 4.Telephone 11 a.Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5.Temporary Heat and Ventilation 14 a.Provide temporary heat as necessary for protection or completion of Work. 15 b.Provide temporary heat and ventilation to assure safe working conditions. 16 B.Sanitary Facilities 17 I.Provide and maintain sanitary facilities for persons on Site. 18 a.Comply with regulations of State and local departments of health. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 2.Enforce use of sanitary facilities by construction personnel at job site. a.Enclose and anchor sanitary facilities. b.No discharge will be allowed from these facilities. c.Collect and store sewage and waste so as not to cause nuisance or health problem. d.Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3.Locate facilities near Work Site and keep clean and maintained throughout Project. 4.Remove facilities at completion of Project C. Storage Sheds and Buildings I.Provide adequately ventilated, wate11ight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2.Storage of materials not susceptible to weather damage may be on blocks off ground. 3.Store materials in a neat and orderly manner. a.Place materials and equipment to permit easy access for identification, inspection and inventory. 4.Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5.Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6.Remove building from site prior to Final Acceptance. 42 D.Temporary Fencing 43 44 45 I.Provide and maintain for the duration or construction when required in contract documents E.Dust Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 flmr//10me M<!ado1rs Phase 3 Ciry Projecr No. /0095/i 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of4 I.Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a.Contractor remains on-call at all times 4 b.Must respond in a timely manner 5 F.Temporary Protection of Construction 6 I.Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 -PRODUCTS [NOT USED] 17 PART 3 -EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A.Temporary Facilities 23 1.Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR]/ [RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A.Temporary Facilities CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Haw/home i\fl!ac/ow� Phme 3 City Project No. 100958 I ( l 01 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 I.Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to stait of Work. 3 3.12 PROTECTION [NOT USED) 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 SUMMARY OF CHANGE / -/awthomi: ,\fi:adows Phase 3 City Projl!Ct No. //1/195/-i 015526-1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL SECTION 01 55 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 1.Administrative procedures for: 7 a.Street Use Permit 8 b.Modification of approved traffic control 9 c.Removal of Street Signs 10 B.Deviations from this City of Fo1t Wmth Standard Specification 11 1.None. 12 C.Related Specification Sections include, but are not necessarily limited to: Page I of3 13 1.Division O -Bidding Requirements, Contract Forms and Conditions of the Contract 14 2.Division 1 -General Requirements 15 3.Section 34 71 13 -Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A.Measurement and Payment 18 1.Work associated with this Item is considered subsidia1y to the various Items bid. I 9 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A.Reference Standards 22 1.Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2.Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A.Traffic Control 28 1.General 29 a.When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b.When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 l ) Allow minimum l O working days for review of proposed Traffic Control. 35 B.Street Use Permit 36 1.Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a.To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transpo1tation and Public Works Department. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 l-law1l10rm? ,\leadows f'hase 3 Ci/I' Pnyl!cf No. /00950 I l 015526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL I I)Allow a minimum of 5 working days for permit review.Page 2 of 3 2 2)Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C.Modification to Approved Traffic Control 5 I.Prior to installation traffic control: 6 a.Submit revised traffic control plans to City Depa1tment Transportation and 7 Public Works Depa1tment. 8 I)Revise Traffic Control plans in accordance with Section 34 71 13. 9 2)Allow minimum 5 working days for review of revised Traffic Control. 10 3)It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D.Removal of Street Sign 13 I.If it is determined that a street sign must be removed for construction, then contact 14 City Transpo1tation and Public Works Depa1tment, Signs and Markings Division to 15 remove the sign. E.Temporary Signage16 17 18 19 I.In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 20 2.Install temporary sign before the removal of permanent sign. 21 3.When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transp01tation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F.Traffic Control Standards 25 26 I.Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS (NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITT ALS (NOT USED] 30 1.9 QUALITY ASSURANCE (NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING (NOT USED] 32 1.11 FIELD (SITE] CONDITIONS (NOT USED] 33 1.12 WARRANTY (NOT USED] 34 PART 2 -PRODUCTS (NOT USED] 35 PART 3 -EXECUTION (NOT USED] 36 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 /·lmrthom<' :\!c'mlmrs l'huse 3 Ci/1-· l'mject No. /00958 2 DATE NAME CITY OF FORT WORTH 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of3 Revision Log SUMMARY OF CHANGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hawthom<' Ml'ado11's Phase 3 City Projl'ct No. /00958 r " l l I l 015713-1 STORM WATER POLLUTION PREVENTION SECTION 01 57 13 1 2 STORM WATER POLLUTION PREVENTION 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes:6 I.Procedures for Storm Water Pollution Prevention Plans7 B.Deviations from this City of F01t W01th Standard Specification 8 I.None.9 C.Related Specification Sections include, but are not necessarily limited to:10 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the11 Contract12 2.Division I -General Requirements13 3.Section 31 25 00 -Erosion and Sediment Control1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and PaymentI.Construction Activities resulting in less than I acre of disturbance Page I of3 14 15 16 17 18 a.Work associated with this Item is considered subsidiary to the various Itemsbid. No separate payment will be allowed for this Item.19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 2.Construction Activities resulting in greater than I acre of disturbancea.Measurement and Payment shall be in accordance with Section 3 I 25 00.1.3 REFERENCES A.Abbreviations and AcronymsI.Notice of Intent: NOi2.Notice of Termination: NOT3.Storm Water Pollution Prevention Plan: SWPPP4.Texas Commission on Environmental Quality: TCEQ5.Notice of Change: NOCA.Reference StandardsI.Reference standards cited in this Specification refer to the current referencestandard published at the time of the latest revision date logged at the end of thisSpecification, unless a date is specifically cited.2.Integrated Storm Management (iSWM) Technical Manual for ConstructionControls34 1.4 ADMINISTRATIVE REQUIREMENTS 35 36 37 A.GeneralI.Contractor is responsible for resolution and payment of any fines issued associatedwith compliance to Stormwater Pollution Prevention Plan.CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 /-lm,•1/10me Meadows Phase 3 Ci11· Projl'CI No. /0095X 01 57 13 - 2 STORM WATER POLLUTION PREVENTION Page 2 of3 1 B.Construction Activities resulting in: 2 I.Less than I acre of disturbance 3 a.Provide erosion and sediment control in accordance with Section 31 25 00 and 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Drawings. 2.I to less than 5 acres of disturbance a.Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b.Complete SWPPP in accordance with TCEQ requirements I)TCEQ Small Construction Site Notice Required under general permit TXRl 50000 a)Sign and post at job site b)Prior to Preconstruction Meeting, send 1 copy to City Department of Transpo1tation and Public Works, Environmental Division, (817) 392- 6088. 2)Provide erosion and sediment control in accordance with: a)Section 31 25 00 b)The Drawings c)TXRl 50000 General Permit d)SWPPP e)TCEQ requirements 3.5 acres or more of Disturbance a.Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b.Complete SWPPP in accordance with TCEQ requirements 1)Prepare a TCEQ NOi form and submit to TCEQ along with required fee a)Sign and post at job site b)Send copy to City Depaitment ofTranspmtation and Public Works, Environmental Division, (817) 392-6088. 2)TCEQ Notice of Change required if making changes or updates to NOi 3)Provide erosion and sediment control in accordance with: a)Section 31 25 00 b)The Drawings c)TXR 150000 General Permit d)SWPPP e)TCEQ requirements 4)Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a)Send copy to City Depaitment of Transpmtation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A.SWPPP 42 1.Submit in accordance with Section O I 33 00, except as stated herein. 43 a.Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1)1 copy to the City Project Manager 46 a)City Project Manager will forward to the City Depa1tment of 47 Transpo1tation and Public Works, Environmental Division for review CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hawtlwmf' Alf'adows f'hase 3 Citv Pr<ljl!CI No. 100958 f r l 11 11 11 I I I I l l l l B.Modified SWPPP 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of3 2 1.If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 0 I 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 -PRODUCTS [NOT USED] 12 PART 3-EXECUTION [NOT USED] 13 END OF SECTION 14 15 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 SUMMARY OF CHANGE /1mr//wml! ,\lt!admrs Phase 3 City l'rojl!ct No. /0/1958 015813-1 TEMPORARY PROJECT SIGNAGE SECTION 01 58 13 2 TEMPORARY PROJECT SIGNAGE 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 I.Temporary Project Signage Requirements 7 B.Deviations from this City of Fo1t Worth Standard Specification 8 I.None. 9 C.Related Specification Sections include, but are not necessarily limited to: Page I of3 IO I.Division O -Bidding Requirements, Contract Forms and Conditions of the Contract I I 2.Division I -General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A.Measurement and Payment 14 I.Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART2-PRODUCTS 27 2.1 OWNER-FURNISHED !OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 29 A.Design Criteria 30 1.Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 201 I Hawthoml! Afl!adows Phase 3 City Project No, /00958 r r B.Materials I.Sign 015813-2 TEMPORARY PROJECT SIGNAGE Page 2 of3 2 3 a.Constructed of ¾-inch fir plywood, grade A-C ( exterior) or better r 11 I I l l 4 2.3 ACCESSORIES (NOT USED] 5 2.4 SOURCE QUALITY CONTROL (NOT USED] 6 PART 3 -EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION (NOT USED] 9 3.3 PREPARATION (NOT USED] 10 3.4 INSTALLATION 11 A.General 12 1.Provide ve11ical installation at extents of project. 13 2.Relocate sign as needed, upon request of the City. 14 B.Mounting options 15 a.Skids 16 b.Posts 17 c.Barricade 18 3.5 REPAIR/ RESTORATION (NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES (NOT USED] 25 3.12 PROTECTION (NOT USED] 26 3.13 MAINTENANCE 27 A.General 28 1.Maintenance will include painting and repairs as needed or directed by the City.l 29 3.14 ATTACHMENTS (NOT USED] 30I31 l l END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hall'liwml! ,\fl!admrs Phase 3 Ci�r l'rojecr No. /0095/-i 2 0 I 58 13 - 3 TEMPORARY PROJECT SIGNAGE Page 3 of3 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 20 I I SUMMARY OF CHANGE Hm,,thom<' ,\feadoll's !'hose 3 City Project No. /()()958 r f r I l 11 l 0160 00-1 PRODUCT REQUIREMENTS I 2 3 PART 1 - GENERAL SECTION 0160 00 PRODUCT REQUIREMENTS 4 1.1 SUMMARY 5 6 7 8 9 A.Section Includes: 1.References for Product Requirements and City Standard Products List B.Deviations from this City of Fo1t W01th Standard Specification 1.None. C.Related Specification Sections include, but are not necessarily limited to: Page I of2 10 11 1.Division 0-Bidding Requirements, Contract Forms and Cond itions of the Contract 12 2.Division 1 -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A.A list of City approved products for use is located on Buzzsaw as follows: 16 1.Resources\02 -Construction Documents\Standard Products List 17 B.Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1.Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C.Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1.The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D.Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E.See Section O 1 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITT ALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 11,mthome Meadmrs Phasl! 3 Citv Proj<?Ct No. /00951-i 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 -PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log 0160 00-2 PRODUCT REQUIREMENTS Page 2 of2 DATE NAME SUMMARY OF CHANGE 8 10/12/12 D.Johnson Modified Location of City's Standard Product List CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 f-lmrlhome Meadmrs Phase 3 C'iry Pr<!Jl!CI No. 100958 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 I 20 21 I 22 23 [24 25 (26 27 28 29 I 30 31 32 I 33 l 01 66 00 - I PRODUCT STORAGE AND HANDLING REQUIREMENTS SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART 1 -GENERAL 1.1 SUMMARY A.Section Includes: 1.Scheduling of product delivery 2.Packaging of products for delivery 3.Protection of products against damage from: a.Handling b.Ex posure to elements or harsh environments B.Deviations from this City of Fo1t Wmth Standard Specification I.None. C.Related Specification Sections include, but are not necessarily limited to: Page I of4 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division 1 -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment 1.Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITT ALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A.Delivery Requirements I.Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2.Provide appropriate personnel and equipment to receive deliveries. 3.Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 l-lall'thom<' ,\l<!mlmrs Phase 3 Cily Project No. /00958 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4.Deliver products or equipment in manufacturer's original unbroken cmtons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5.Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6.Provide manufacturer's instructions for storage and handling. 7 B.Handling Requirements 8 1.Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C.Storage Requirements 11 I.Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2.Make necessary provisions for safe storage of materials and equipment. 14 a.Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any patt of Work or existing facilities and to maintain free access at I 6 all times to all pmts of Work and to utility service company installations in 17 vicinity of Work. 18 3.Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a.Arrange storage to provide easy access for inspection. 22 4.Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5.Provide off-site storage and protection when on-site storage is not adequate. 25 a.Provide addresses of and access to off-site storage locations for inspection by 26 City's Project Representative. 27 6.Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7.Store in manufacturers' unopened containers. 30 8.Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to prope1ty owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9.Keep public and private driveways and street crossings open. 34 I 0. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a.Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Haw1/10m<' Af<'mlows Phase 3 City Project No. /00958 r I l I l l I 01 66 00 - 3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED) 3 PART 2 -PRODUCTS [NOT USED] 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 PART 3 -EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION (NOT USED] 3.3 PREPARATION (NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL A.Tests and Inspections 1.Inspect all products or equipment delivered to the site prior to unloading. B.Non-Conforming Work 1.Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED) 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED) 3.12 PROTECTION A.Protect all products or equipment in accordance with manufacturer's written directions. B.Store products or equipment in location to avoid physical damage to items while in storage. C.Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED) END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 20 I I Hawlhom<! Al<!admrs Phase 3 City l'roject 1\'n. /0095?; 016600 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 SUMMARY OF CHANGE Hawtl10me Aleadows Phase 3 City Project No. 100958 I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (17 18 19 I 20 21 22 I 23 24 25 I 26 27 28 r 29 30 31 32 I 33 34 35 l 36 37 38 l 39 40 41 l 42 43 44 l 45 l 01 70 00 - I MOBILIZATION AND REMOBILIZATION PART 1 -GENERAL 1.1 SUMMARY SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION A.Section Includes: 1.Mobilization and Demobilization a.Mobilization Page I of4 1)Transp01tation of Contractor's personnel, equipment, and operating supplies to the Site 2)Establishment of necessary general facilities for the Contractor's operation at the Site 3)Premiums paid for performance and payment bonds 4)Transpo1tation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5)Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b.Demobilization 1)Transpo1tation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2)Site Clean-up 3)Removal of all buildings and/or other facilities assembled at the Site for this Contract c.Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2.Remobilization a.Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1)Demobilization a) Transp01tation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b)Site Clean-up as designated in the Contract Documents 2)Remobilization a)Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b)Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3)No Payments will be made for: a)Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b)Stand-by or idle time c)Lost profits 3.Mobilizations and Demobilization for Miscellaneous Projects a.Mobilization and Demobilization CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 /-lawlhoml' Ml!aclows f'lwse 3 City Proiect 1\'o. /0095/i 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 2 3 4 5 6 7 8 9 I)Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a)Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b)Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2)Demobilization shall consist of the activities and cost necessary for: 10 11 12 13 14 15 a)Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b)Site Clean-up for each issued Work Order c)Removal of all buildings or other facilities assembled at the Site for each Work Oder b.Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 16 4.Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a.A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B.Deviations from this City of Fott Wmth Standard Specification 20 I.None. 21 C.Related Specification Sections include, but are not necessarily limited to: 22 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 23 2.Division I -General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A.Measurement and Payment 26 I.Mobilization and Demobilization 27 a.Measure 28 1)This Item is considered subsidiary to the various Items bid. 29 b.Payment 30 I)The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2.Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a.Measurement 36 I)Measurement for this Item shall be per each remobilization performed. 37 b.Payment 38 I)The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c.The price shall include: 43 I)Demobilization as described in Section 1.1.A.2.a. I) 44 2)Remobilization as described in Section I. I .A.2.a.2) 45 d.No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hm,,1/10me ,\fr!aduws Phase 3 City Project No. ///0958 f r 11 r I I l l l l 2 3 4 5 6 7 8 9 IO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 70 00 - 3 MOBILIZATION AND REMOBILIZATION 3.Remobilization for suspension of Work as required by City a.Measurement and Payment Page 3 of 4 I)This shall be submitted as a Contract Claim in accordance with Article I 0 of Section 00 72 00. 2)No payments will be made for standby, idle time, or lost profits associated with this Item. 4.Mobilizations and Demobilizations for Miscellaneous Projects a.Measurement I)Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b.Payment I)The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c.The price shall include: I)Mobilization as described in Section 1.1.A.3 .a. I) 2)Demobilization as described in Section 1.1.A.3 .a.2) d.No payments will be made for standby, idle time, or lost profits associated this Item. 5.Emergency Mobilizations and Demobilizations for Miscellaneous Projects a.Measurement I)Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b.Payment I)The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c.The price shall include I)Mobilization as described in Section 1.1.A.4.a) 2)Demobilization as described in Section 1.1.A.3.a.2) d.No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS (NOT USED] 41 42 43 44 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 1-fmrthome ,\leadows Phase 3 City Project No. //109511 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 -EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log 01 70 00 -4 MO Bl LIZA TION AND REMOBILIZATION Page 4 of 4 DATE NAME SUMMARY OF CHANGE 7 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Haw/home ;\(11adows Phase 3 City Project No. l/1/1958 I I I ( l l l 01 71 23 - I CONSTRUCTION STAKING AND SURVEY Page I of 4 I 2 3 PART 1 -GENERAL 4 1.1 SUMMARY SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY 5 A.Section Includes: 6 I.Requirements for construction staking and construction survey 7 B.Deviations from this City of F011 W011h Standard Specification 8 I.None. 9 C.Related Specification Sections include, but are not necessarily limited to: 10 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 11 2.Division I -General Requirements 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment I.Construction Staking a.Measurement I)This Item is considered subsidiary to the various Items bid. b.Payment I)The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2.Construction Survey a.Measurement I)This Item is considered subsidiary to the various Items bid. b.Payment 1)The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUB MITT ALS 31 A.Submittals, if required, shall be in accordance with Section 0 I 33 00. 32 B.All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A.Ce11ificates 35 36 37 38 I.Provide certificate ce1tifying that elevations and locations of improvements are in conformance or non-conformance with requirements of the Contract Documents. a.Ce1tificate must be sealed by a registered professional land surveyor in the State of Texas. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 1/aw//wme A!c'admrs l'lwsc 3 Cily l'rojl!CI No. /0095?/ 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of4 2 B. Field Quality Control Submittals I.Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A.Construction Staking 7 I.Construction staking will be performed by the City. 8 2.Coordination 9 a.Contact City's Project Representative at least 2 weeks in advance for IO scheduling of Construction Staking. 11 b.It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 3.General 14 a.Contractor is responsible for preserving and maintaining stakes furnished by 15 City. 16 b.If in the opinion of the City, a sufficient number of stakes or markings have 17 been lost, destroyed or disturbed, by Contractor's neglect, such that the 18 contracted Work cannot take place, then the Contractor will be required to pay 19 the City for new staking with a 25 percent markup. The cost for staking will be 20 deducted from the payment due to the Contractor for the Project. 21 B.Construction Survey 22 I.Construction Survey will be pe1formed by the City. 23 2.Coordination 24 a.Contractor to verify that control data established in the design survey remains 25 intact. 26 b.Coordinate with the City prior to field investigation to determine which 27 horizontal and ve1tical control data will be required for construction survey. 28 c.It is the Contractor's responsibility to coordinate Construction Survey such that 29 construction activities are not delayed or negatively impacted. 30 d.Notify City if any control data needs to be restored or replaced due to damage 31 caused during construction operations. 32 I)City shall perform replacements and/or restorations. 33 3.General 34 a.Construction survey will be performed in order to maintain complete and 35 accurate logs of control and survey work as it progresses for Project Records. 36 b.The Contractor will need to ensure coordination is maintained with the City to 37 perform construction survey to obtain construction features, including but not 38 limited to the following: 39 I)All Utility Lines 40 a)Rim and flowline elevations and coordinates for each manhole or 41 junction structure 42 2)Water Lines 43 a)Top of pipe elevations and coordinates for waterlines at the following 44 locations: 45 (I)Every 250 linear feet CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 /-law1!10m1? ,\Ieadows f'huse 3 City f'roject No. /00958 r I ' I I t ( I I l l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of4 (2)Horizontal and vertical points of inflection, curvature, etc. (All Fittings) (3)Cathodic protection test stations ( 4)Sampling stations (5)Meter boxes/vaults (All sizes) (6)Fire lines (7)Fire hydrants (8)Gate valves (9)Plugs, stubouts, dead-end lines (I 0) Air Release valves (Manhole rim and vent pipe) (11)Blow off valves (Manhole rim and valve lid) ( 12)Pressure plane valves (13)Cleaning wyes (14)Casing pipe (each end) b)Storm Sewer (I)Top of pipe elevations and coordinates at the following locations: (a)Every 250 linear feet (b)Horizontal and ve1tical points of inflection, curvature, etc. c)Sanitary Sewer (I)Top of pipe elevations and coordinates for sanitary sewer lines at the following locations: (a)Every 250 linear feet (b)Horizontal and ve,tical points of inflection, curvature, etc. (c)Cleanouts c.Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. d.The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: I)Established benchmarks and control points provided for the Contractor's use are accurate 2)Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3)Lines and grades were used to establish the location of the pipe 4)Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to beginning each tunneling drive. 5)Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6)The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7)Monitor line and grade continuously during construction. 8)Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9)If the installation does not meet the specified tolerances, immediately notify the City and correct the installation in accordance with the Contract Documents. 49 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 /-law//wi-111! M<!mlo1t's Phase 3 Ci�v l'rojecr No. 111095H 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 -PRODUCTS [NOT USED] 4 PART 3 -EXECUTION 5 6 7 8 9 10 11 3.1 3.2 3.3 3.4 3.5 3.6 3.7 INSTALLERS [NOT USED] EXAMINATION [NOT USED] PREPARATION [NOT USED] APPLICATION REPAIR I RESTORATION [NOT USED] RE-INSTALLATION [NOT USED] FIELD [oR] SITE QUALITY CONTROL 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 4 12 A.It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B.Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 24 Revision Log DATE NAME 8/31/2012 D.Johnson CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 SUMMARY OF CHANGE Hall'thome Mt!adoll's Phase 3 City Project No. 111//958 I I I l [ l l l I SECTION 01 74 23 2 CLEANING 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 017423-1 CLEANING Page I of4 6 I.Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B.Deviations from this City of Fort Worth Standard Specification 9 I.None. IO C.Related Specification Sections include, but are not necessarily limited to: 11 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 12 2.Division I -General Requirements 13 3.Section 32 92 13 -Hydro-Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A.Measurement and Payment 16 I.Work associated with this Item is considered subsidiaty to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A.Scheduling 21 I.Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2.Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING A.Storage and Handling Requirements31 32 33 I.Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 f-!alt'lhome ,\f<!ado11•J Phase 3 Ci�1· Projecr Nn. /00958 1.11 FIELD [SITE) CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED) 3 PART2-PRODUCTS 01 7423-2 CLEANING Page 2 of 4 4 2.1 OWNER-FURNISHED loR) OWNER-SUPPLIEDPRODUCTS [NOT USED) 5 2.2 MATERIALS 6 A.Cleaning Agents 7 I.Compatible with surface being cleaned 8 2.New and uncontaminated 9 3.For manufactured surfaces IO a.Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED) 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 -EXECUTION 14 15 16 17 18 19 3.1 3.2 3.3 3.4 3.5 3.6 INST ALLERS [NOT USED) EXAMINATION [NOT USED) PREPARATION [NOT USED) APPLICATION [NOT USED) REPAIR/ RESTORATION [NOT USED) RE-INSTALLATION [NOT USED] 20 3.7 FIELD toR) SITE QUALITY CONTROL [NOT USED) 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED) 23 3.10 CLEANING 24 A.General 25 I.Prevent accumulation of wastes that create hazardous conditions. 26 2.Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3.Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4.Dispose of degradable debris at an approved solid waste disposal site. 31 5.Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 /-law/home 1\fc>aduws Phase 3 City Project No. 100958 r I I ( ( l l 6.Handle materials in a controlled manner with as few handlings as possible. OJ 74 23 - 3 CLEANING Page 3 of4 2 7.Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8.Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9.If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 I 0. Do not burn on-site. 9 B.Intermediate Cleaning during Construction 10 I.Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 2.At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3.Confine construction debris daily in strategically located container(s): a.Cover to prevent blowing by wind b.Store debris away from construction or operational activities c.Haul from site at a minimum of once per week 4.Vacuum clean interior areas when ready to receive finish painting. a.Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5.Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transp011ed by flowing water during the storm. C.Interior Final Cleaning I.Remove grease, mastic, adhesives, dust, di11, stains, fingerprints, labels and other foreign materials from sight-exposed surfaces. 2.Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3.Wash and shine glazing and mirrors. 4.Polish glossy surfaces to a clear shine. 5.Ventilating systems a.Clean permanent filters and replace disposable filters if units were operated during construction. b.Clean ducts, blowers and coils if units were operated without filters during construction. 6.Replace all burned out lamps. 7.Broom clean process area floors. 8.Mop office and control room floors. D.Exterior (Site or Right of Way) Final Cleaning I . Remove trash and debris containers from site. a.Re-seed areas disturbed by location of trash and debris containers in accordance with Section 3 2 92 13. 2.Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3.Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 /-lall'lhvml! 1\lt?ad01rs Phase 3 C'i�i· Pmjt?CI No. /009511 017423-4 CLEANING Page 4 of 4 4.If no longer required for maintenance of erosion facilities, and upon approval by 2 City, remove erosion control from site. 3 5.Clean signs, lights, signals, etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 END OF SECTION 9 JO Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 SUMMARY OF CHANGE Hall'lhome Afl!adull's Phase 3 City Projecl No. /00958 r 1 2 3 4 5 6 7 8 9 10 11 I ' 12 13 I 14 15 16 17 I 18 19 20 ( 21 22 23 24 25 I 26 l l 01 77 19 - I CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A.Section Includes: SECTION 01 77 19 CLOSEOUT REQUIREMENTS 1.The procedure for closing out a contract B.Deviations from this City of Fo11 W 01th Standard Specification 1.None. C.Related Specification Sections include, but are not necessarily limited to: Page I of3 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division 1 -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment 1.Work associated with this Item is considered subsidiaiy to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A.Guarantees, Bonds and Affidavits 1.No application for final payment will be accepted until all guarantees, bonds, ce1tificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B.Release of Liens or Claims 1.No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITT ALS A.Submit all required documentation to City's Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Haw/home Aff!ado\l'� Phase 3 Citl' Project A'o. /00958 1.6 INFORMATIONAL SUBMITTALS (NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 -PRODUCTS (NOT USED] 4 PART 3 -EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION (NOT USED] 7 3.3 PREPARATION (NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A.Prior to requesting Final Inspection, submit: 0177 19-2 CLOSEOUT REQUIREMENTS Page 2 of3 10 I.Project Record Documents in accordance with Section 01 78 39 11 2.Operation and Maintenance Data, if required, in accordance with Section O I 78 23 12 B.Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 74 23. 14 C.Final Inspection 15 I.After final cleaning, provide notice to the City Project Representative that the Work 16 is completed. 17 a.The City will make an initial Final Inspection with the Contractor present. 18 b.Upon completion of this inspection, the City will notify the Contractor, in 19 writing within IO business days, of any paiticulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2.Upon receiving written notice from the City, immediately unde1take the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3.Upon completion of Work associated with the items listed in the City's written 25 notice, inform the City, that the required Work has been completed. Upon receipt 26 of this notice, the City, in the presence of the Contractor, will make a subsequent 27 Final Inspection of the project. 28 4.Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include, but are not limited to: 30 a.Specified spare paits 31 b.Adequate oil and grease as required for the first lubrication of the equipment 32 c.Initial fill up of all chemical tanks and fuel tanks 33 d.Light bulbs 34 e.Fuses 35 f.Vault keys 36 g.Handwheels 37 h.Other expendable items as required for initial stait-up and operation of all 38 equipment 39 D.Notice of Project Completion CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Haw/home Afeadoll's Phase 3 Ci(\' Pr,!fect No. /00958 r I I I I l l 0177 19-3 CLOSEOUT REQUIREMENTS Page 3 of3 1.Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 3 E.Suppo1ting Documentation 4 1.Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a.Final Payment Request 7 b.Statement of Contract Time 8 c.Affidavit of Payment and Release of Liens 9 d.Consent of Surety to Final Payment IO e.Pipe Repmt (if required) 11 f.Contractor's Evaluation of City 12 g.Performance Evaluation of Contractor 13 F.Letter of Final Acceptance 14 1.Upon review and acceptance of Notice of Project Completion and Suppmting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR/RESTORATION [NOT USED] 18 3.6 RE-INST ALLA TI ON [NOT USED] 19 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 22 23 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 29 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 201 1 SUMMARY OF CHANGE Hall'lhom<! :ll<!mlows Phase 3 Cilv Projffl No. /0095/i 0 I 78 23 - I OPERATION AND MAINTENANCE DATA SECTION 017823 2 OPERATION AND MAINTENANCE DAT A 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 I.Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2.Such products may include, but are not limited to: 9 a.Traffic Controllers IO b.Irrigation Controllers (to be operated by the City) 11 c.Butterfly Valves 12 B.Deviations from this City of Fo1t Wmth Standard Specification 13 1.None. 14 C.Related Specification Sections include, but are not necessarily limited to: Page I of5 15 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 16 2.Division 1 -General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A.Measurement and Payment 19 1.Work associated with this Item is considered subsidiaiy to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A.Schedule 24 1.Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A.Submittals shall be in accordance with Section 01 33 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A.Submittal Form 31 1.Prepare data in form of an instructional manual for use by City personnel. 32 2.Format 33 a.Size: 8 ½ inches x 11 inches 34 b.Paper 35 1)40 pound minimum, white, for typed pages 36 2)Holes reinforced with plastic, cloth or metal 37 c.Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH ST ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'thome Meadu11•s Phase 3 City Project No. 100958 f r 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I 21 22 23 24 25 26 I 27 28 29 l 30 31 32 (33 34 35 I 36 37 38 l 39 40 41 l 42 43 44 45 46 47 48 01 78 23 - 2 OPERATION AND MAINTENANCE DATA d.Drawings 1)Provide reinforced punched binder tab, bind in with text 2)Reduce larger drawings and fold to size of text pages. e.Provide fly-leaf for each separate product, or each piece of operating equipment. Page 2 of 5 1)Provide typed description of product, and major component pa1ts of equipment. 2)Provide indexed tabs. f.Cover 1)Identify each volume with typed or printed title "OPERA TING AND MAINTENANCE INSTRUCTIONS". 2)List: 3.Binders a)Title of Project b)Identity of separate structure as applicable c)Identity of general subject matter covered in the manual a.Commercial quality 3-ring binders with durable and cleanable plastic covers b.When multiple binders are used, correlate the data into related consistent groupings. 4.If available, provide an electronic form of the O&M Manual. B.Manual Content 1.Neatly typewritten table of contents for each volume, arranged in systematic order a.Contractor, name of responsible principal, address and telephone number b.A list of each product required to be included, indexed to content of the volume c.List, with each product: 1)The name, address and telephone number of the subcontractor or installer 2)A list of each product required to be included, indexed to content of the volume 3)Identify area of responsibility of each 4)Local source of supply for parts and replacement d.Identify each product by product name and other identifying symbols as set f01th in Contract Documents. 2.Product Data a.Include only those sheets which are pe1tinent to the specific product. b.Annotate each sheet to: 1)Clearly identify specific product or part installed 2)Clearly identify data applicable to installation 3)Delete references to inapplicable information 3.Drawings a.Supplement product data with drawings as necessary to clearly illustrate: 1)Relations of component pa1ts of equipment and systems 2)Control and flow diagrams b.Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c.Do not use Project Record Drawings as maintenance drawings. 4.Written text, as required to supplement product data for the pa1ticular installation: a.Organize in consistent format under separate headings for different procedures. b.Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hm,•fhvml! Afi?adows Phase 3 Cizv Projec1 No. //1/195/i 0 I 78 23 - 3 OPERATION AND MAINTENANCE DATA 5.Copy of each warranty, bond and service contract issued 2 a.Provide information sheet for City personnel giving: 3 I)Proper procedures in event of failure 4 2)Instances which might affect validity of warranties or bonds 5 C.Manual for Materials and Finishes 6 I.Submit 5 copies of complete manual in final form. 7 2.Content, for architectural products, applied materials and finishes: 8 a.Manufacturer's data, giving full information on products 9 1)Catalog number, size, composition 10 2)Color and texture designations 11 3)Information required for reordering special manufactured products 12 b.Instructions for care and maintenance Page 3 of 5 13 I)Manufacturer's recommendation for types of cleaning agents and methods 14 2)Cautions against cleaning agents and methods which are detrimental to 15 product 16 3)Recommended schedule for cleaning and maintenance 17 3.Content, for moisture protection and weather exposure products: 18 a.Manufacturer's data, giving full information on products 19 1)Applicable standards 20 2)Chemical composition 21 3)Details of installation 22 b.Instructions for inspection, maintenance and repair 23 D.Manual for Equipment and Systems 24 I.Submit 5 copies of complete manual in final form. 25 2.Content, for each unit of equipment and system, as appropriate: 26 a.Description of unit and component pa1ts 27 I)Function, normal operating characteristics and limiting conditions 28 2)Performance curves, engineering data and tests 29 3)Complete nomenclature and commercial number of replaceable parts 30 b.Operating procedures 31 I)Start-up, break-in, routine and normal operating instructions 32 2)Regulation, control, stopping, shut-down and emergency instructions 33 3)Summer and winter operating instructions 34 4)Special operating instructions 35 c.Maintenance procedures 36 1)Routine operations 37 2)Guide to "trouble shooting" 38 3)Disassembly, repair and reassembly 39 4)Alignment, adjusting and checking 40 d.Servicing and lubrication schedule 41 I)List of lubricants required 42 e.Manufacturer's printed operating and maintenance instructions 43 f.Description of sequence of operation by control manufacturer 44 1)Predicted life of paits subject to wear 45 2)Items recommended to be stocked as spare paits 46 g.As installed control diagrams by controls manufacturer 47 h.Each contractor's coordination drawings 48 I)As installed color coded piping diagrams CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'thome Meadows Phase 3 City Project No. 1//0958 r I J I I l l I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 7823-4 OPERATION AND MAINTENANCE DATA 1.Charts of valve tag numbers, with location and function of each valve Page 4 of 5 J.List of original manufacturer's spare pa11s, manufacturer's current prices, and recommended quantities to be maintained in storage k.Other data as required under pe1tinent Sections of Specifications 3.Content, for each electric and electronic system, as appropriate: a.Description of system and component pat1s 1)Function, normal operating characteristics, and limiting conditions 2)Performance curves, engineering data and tests 3)Complete nomenclature and commercial number of replaceable pat1s b.Circuit directories of panelboards 1)Electrical service 2)Controls 3)Communications c.As installed color coded wiring diagrams d.Operating procedures 1)Routine and normal operating instructions 2)Sequences required 3)Special operating instructions e.Maintenance procedures 1)Routine operations 2)Guide to "trouble shooting" 3)Disassembly, repair and reassembly 4)Adjustment and checking f.Manufacturer's printed operating and maintenance instructions g.List of original manufacturer's spare pat1s, manufacturer's current prices, and recommended quantities to be maintained in storage h.Other data as required under pe11inent Sections of Specifications 4.Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED) 1.9 QUALITY ASSURANCE A.Provide operation and maintenance data by personnel with the following criteria: 1.Trained and experienced in maintenance and operation of described products 2.Skilled as technical writer to the extent required to communicate essential data 3.Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Hall'lhome ,\lt'adoll's Phase 3 City Pmject 1\'o. 10095H 017823-5 OPERATION AND MAINTENANCE DATA 1.10 DELIVERY, STORAGE, AND HANDLING (NOT USED] 2 1.11 FIELD (SITE] CONDITIONS (NOT USED] 3 1.12 WARRANTY (NOT USED] 4 PART 2 - PRODUCTS (NOT USED] 5 PART 3 - EXECUTION (NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME 8/31/2012 D.Johnson CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 SUMMARY OF CHANGE 1.5.A. l -title of section removed Page 5 of5 Haw/home Meadows l'huse 3 City Project No. 100958 l l ( I l I l l 01 78 39 - I PROJECT RECORD DOCUMENTS SECTION 017839 2 PROJECT RECORD DOCUMENTS 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: Page I of4 6 1.Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a.Record Drawings 9 b.Water Meter Service Repo11s IO c.Sanitary Sewer Service Repo11s I I d.Large Water Meter Rep011s 12 B.Deviations from this City of F011 W011h Standard Specification 13 1.None. 14 C.Related Specification Sections include, but are not necessarily limited to: 15 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 16 2.Division 1 -General Requirements I 7 1.2 PRICE AND PAYMENT PROCEDURES 18 19 20 A.Measurement and Payment 1.Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 23 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS 24 A.Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 27 28 29 30 31 32 33 34 35 36 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS (NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS (NOT USED] 1.9 QUALITY ASSURANCE A.Accuracy of Records I.Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2.Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 /-111w1/10m1? 1'!1111do,rs Phase 3 Ci!)· Project No. J/1095/i 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 4 3.To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4.Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A.Storage and Handling Requirements 8 I.Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2.In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a.In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 -PRODUCTS 18 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A.Job set 21 I. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, I complete set of all Documents comprising the Contract. 23 B.Final Record Documents 24 1.At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 -EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A.Maintenance of Job Set 34 1.Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS-JOB SET".CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Hawthonu! Meadows Phase 3 City Project No. 1/10958 l I l l l l l L l. l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 B. 2.Preservation 01 78 39 - 3 PROJECT RECORD DOCUMENTS Page 3 of 4 a.Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b.Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c.Maintain the job set at the site of work. 3.Coordination with Construction Survey a.At a minimum, in accordance with the intervals set f011h in Section 01 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4.Making entries on Drawings a.Record any deviations from Contract Documents. b.Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c.Date all entries. d.Call attention to the entry by a "cloud" drawn around the area or areas affected. e.In the event of overlapping changes, use different colors for the overlapping changes. 5.Conversion of schematic layouts a.In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. I)Final physical arrangement is determined by the Contractor, subject to the City's approval. 2)However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b.Show on the job set of Record Drawings, by dimension accurate to within I inch, the centerline of each run of items. I)Final physical arrangement is determined by the Contractor, subject to the City's approval. 2)Show, by symbol or note, the ve11ical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3)Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c.The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. Final Project Record Documents I . Transfer of data to Drawings a.Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b.Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH Hmr1home A!l!aduws Phase 3 Ci�v Project No. l//095X STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 201 I 01 78 39 -4 PROJECT RECORD DOCUMENTS Page 4 of 4 2 3 4 c.Call attention to each entry by drawing a "cloud" around the area or areas affected. d.Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2.Transfer of data to other Documents5 6 7 8 9 a.If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. 10 11 12 13 b.If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 14 3.5 REPAIR/ RESTORATION [NOT USED] 15 3.6 RE-INSTALLATION [NOT USED] 16 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 26 Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 SUMMARY OF CHANGE Hall'thom<! A/(!(u/oll's Phase 3 City Project No. /()(/958 ' I ' I