Loading...
HomeMy WebLinkAbout049880-PM1 - Construction-Related - Contract - BH Development Two, L.P., and Conatser Construction TX, L.P.( ( ( ( . ( ( ( ( ( ( l ( ( ( FORT WORTH ' ,_,_# PROJECT MANUAL FOR THE CONSTRUCTION OF PAVING, DRAINAGE, STREET LIGHTS, WATER & SANITARY SEWER IMPROVEMENTS TO SERVE HIGHPOINT HILL -PHASE 3 Betsy Price Mayor City Project No. 100967 John Robert Carman Water Director Douglas W. Wiersig, P.E. David Cooke City Manager Director, Transportation and Public Works Department 2017 BAIRD, HAMPTON & BROWN, INC. 6300 RIDGLEA PLACE, SUITE 700 FORT WORTH, TEXAS 76116 FIRM REG. NO. 00044 8/24/17 CSC No. 49880-PM1 ( ( ( ( ( ( ( ( ( ( ( ( ( ( l ( t 00 00 10-I TABLE OF CONTENTS FOR DEVELOPER A WARDED PROJECTS SECTION 00 00 10 2 3 4 TABLE OF CONTENTS DEVELOPER AW ARD ED PROJECTS 5 Division 00 -General Conditions 6 00 11 13 hlYitatioR to Bidders 7 00 21 13 lRstrnetioRs to Bidders 8 00 41 00 Bid ForrR 9 00 42 43 Proposal Form Unit Price IO 00 43 13 Bid BoRd I I 00 45 11 Bidders PreqimlifieatioR's 12 00 45 12 Prequalification Statement I 3 00 4 5 13 Bidder PreqHalifieatioR ApplieatioR 14 00 45 26 Contractor Compliance with Workers' Compensation Law 15 00 45 40 MiRority BHsiRess ERterprise Goal 16 00 52 43 Agreement I 7 00 6 I 25 Certificate of Insurance I 8 00 62 13 Performance Bond 19 00 62 14 Payment Bond 20 00 62 I 9 Maintenance Bond 2 I 00 72 00 GeReral CoRditioRs 22 00 73 00 gHpplerReRtary CoRditioRs Page I of 4 23 00 73 IO Standard City Conditions of the Construction Contract for Developer Awarded 24 Projects 25 26 Division 01 -General Requirements 27 0 l 11 00 glirRFRary of Work 28 0 I 25 00 gHastitHtioR ProeedHres 29 0 I 31 19 PreeoRstrHetioR MeetiRg 30 01 31 20 Prajeet MeetiRgs 3 I 0 l 32 16 CoRstrnetioR Progress gehedHle 32 0 l 32 33 PreeoRstrnetioR Video 33 01 33 00 Submittals 34 01 35 13 Special Project Procedures 35 01 45 23 Testing and Inspection Services 36 01 50 00 Temporary Facilities and Controls 37 01 55 26 Street Use Permit and Modifications to Traffic Control 38 01 57 13 Storm Water Pollution Prevention Plan 39 01 58 13 TerRporary Prajeet gjgnage 40 0 I 60 00 Product Requirements 41 0 I 66 00 Product Storage and Handling Requirements 42 0 I 70 00 Mobilization and Remobilization 43 0 I 71 23 C01�struetioR gtakiRg 44 01 74 23 Cleaning 45 01 77 19 CloseoHt ReqHiren1eRts 46 0 I 78 23 OperatioR aRd MaiRtenanee Data 47 01 78 39 Project Record Documents 48 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised September I, 2015 Highpoilll Hill -Phase 3 City Project No. /00967 00 00 10-2 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS Page 2 of 4 Technical Specifications which have been modified by the Engineer specifically for this 2 Project; hard copies are included in the Project's Cont.-act Documents 3 4 NONE 5 6 Technical Specifications listed below are included for this Project by reference and can be 7 viewed/downloaded from the City's Buzzsaw site at: 8 9 htps://proj ectpo int. buzzsa w .com/ c I ient/fortworth gov /Resources/02%20- 10 %20Construction%20Documents/Specifications 11 12 Division 02 -Existing Conditions 13 02 41 13 Seleeti1,1e Site De1Holition 14 02 41 14 Utility Remo1,1al/AbandoF1ment 15 02 41 15 PaviAg Removal 16 17 Division 03 -Concrete 18 03 30 00 Cast-In-Place Concrete 19 03 34 13 Controlled Low Strength Material (CLSM) 20 03 34 16 Concrete Base Material for Trench Repair 21 03 80 00 ModifieatioAs to E,dstiAg Conerete Struetures 22 23 Division 26 -Electrical 24 26 05 00 Common Work Results for Electrical 25 26 05 IO Demolitiofl for Eleetrieal Systems 26 26 05 33 Raceway and Boxes for Electrical Systems 27 26 05 43 Underground Ducts and Raceways for Electrical Systems 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Division 31 -Earthwork 31 10 00 Site Clearing 31 23 16 Unclassified Excavation 3 1 23 23 Borrow 31 24 00 Embankments 31 25 00 Erosion and Sediment Control 31 3 (i 00 Gab ions 31 37 00 Riprap Division 32 -Exterior Improvements 3 2 01 17 Pertflafleflt Asphalt Paying Repair 3 2 01 18 Temporary Asphalt Paying Repair 32 01 29 Conerete Paving Repair 32 11 23 Fle,(ible Base Courses 32 11 29 Lime Treated Base Courses 32 11 33 CemeAt Treated Base Courses 32 12 1 (i Asphalt Paving 32 12 73 Asphalt Paving Craek Sealants 3 2 13 13 Concrete Paving 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 13 73 Concrete Paving Joint Sealants 32 14 I (i Brielc Unit Paving CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised September I, 2015 Highpoint Hill -Phase 3 City Project No. 100967 ( \ ( ( ( ( ( l ( ( ( 00 00 10-3 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS 1 2 3 4 5 6 7 8 9 10 32 16 13 32 17 23 32 31 13 32 31 26 32 31 29 32 32 13 32 91 19 32 92 13 32 93 43 Concrete Cure and Gutters and Valley Gutters Pavement Markings Chain Link Fences and Gatos Wire Fences and Gatos Wood Fences and Gatos Cast in Place Concrete Retaining Walls Topsoil Placement and Finishing of Parkways Hydro-Mulching, Seeding, and Sodding Trees and Shrues 11 Division 33 -Utilities 12 33 01 30 Sewer and Manhole Testing 13 33 0 I 31 Closed Circuit Television (CCTV) Inspection 14 33 Q3 IQ Bypass Pumping of Existing Se:wor Systems 15 33 Q4 IQ Joint Bonding and Electrical Isolation 16 33 Q4 11 Corrosion Control Test Stations 17 3 3 Q4 12 Magnesium Anode Cathodic Protection System 18 33 Q4 3Q TotHporary Water Son•icos 19 33 04 40 Cleaning and Acceptance Testing of Water Mains 20 33 05 IO Utility Trench Excavation, Embedment, and Backfill 21 33 05 12 Water Line Lowering 22 33 05 13 Frame, Cover and Grade Rings 23 33 QS 14 Adjusting Manholes, Inlets, Vat..•e Boxes, and Other Structures to Grado 24 33 QS Hi Concrete \Vator Vaults 25 3 3 QS 17 Concrete Collars 26 33 QS 2Q Auger Boring 27 33 QS 21 Tunnel Liner Plato 28 33 QS 22 Stool Casing Pipe 29 33 QS 23 Hand Tunneling 30 33 QS 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plato 31 33 QS 26 Utility Marl,ors/Locators 32 33 QS 30 Exploratory E�wa:vation for E�dsting Utilities 33 33 11 IO Ductile Iron Pipe 34 33 11 11 Ductile Iron Fittings 35 33 11 12 Polyv inyl Chloride (PVC) Pressure Pipe 36 33 11 13 Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Typo 37 33 11 14 Buried Steel Pipe and Fittings 38 33 11 15 Pre stressed Concrete Cylinder Pipe 39 33 12 10 Water Services I-inch to 2-inch 40 33 12 11 Large Water Meters 41 33 12 20 Resilient Seated Gate Valve 42 33 12 21 AWWA Russer Seated Butterfly Val¥es 43 33 12 25 Connection to Existing Water Mains 44 33 12 30 Comeination Air Valve Assemelies for Potaele Water Systems 45 33 12 40 Dry-Barrel Fire Hydrants 46 33 12 50 Water Sample Stations 47 33 12 60 Blow ofP/al1res 48 3 3 31 12 Cured iA Place Pipe (GIPP) 49 33 31 13 Fieerglass Reinforced Pipe for Gravity SaAitary Sowers 50 33 31 15 HOPE Pipe For SaAitary Sewers (Gravity and Force MaiAs) Page 3 of 4 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised September I, 2015 Highpoint Hill -Phase 3 City Project No. 100967 2 3 4 5 6 7 8 9 10 I I 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 00 00 10-4 TABLE OF CONTENTS FOR DEVELOPER AW ARD ED PROJECTS 33 31 20 33 31 21 33 31 22 33 31 23 33 31 50 33 31 70 33 39 10 33 39 20 33 39 30 33 39 40 33 39 60 33 41 10 33 41 11 33 46 00 33 46 01 33 46 02 33 49 10 33 49 20 33 49 40 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe Pol)01 in)·I Chloride (PVC) Closed Profile GraYit.,· Sm�itary Sewer Pipe Sanitary Se11,·er Slip LiRing Sanitary Sewer Pipe EnlargemeRt Sanitary Sewer Service Connections and Service Line CombiRation Air Vah·e for Sanitary Se¥,·er Foree Mains Cast-in-Place Concrete Manholes Precast Concrete Manholes Fiberglass MaRholes '.Vastewater Aeeess ChatHber (WAC) Epoxy Liners for Sanitary Sewer Structures Reinforced Concrete Storm Sewer Pipe/Culverts HDPE StonH Se>,>11er Pipe SHb drainage Slotted StonH Drains TreReh Drains Cast-in-Place Manholes and Junction Boxes Curb and Drop Inlets Storm Drainage Headwalls and Wingwalls Division 34 -Transportation 34 41 10 Traffie SigRals 3 4 41 13 RemoYing Traffie Signals 34 41 20 Roadway Illumination Assemblies 34 41 30 Aluminum Signs 34 71 13 Traffic Control Appendix GC-4.01 GC-4.02 GC 4.04 GC 4.06 GC 6.06.D GC 6.07 GC 6.09 GC 6.24 GR 01 60 00 Availability of Lands Subsurface and Physical Conditions UndergroH�d Faeilities Haz;ardoHs Environmental Condition at Site Minority and Women O•wned BHsiRess Enterprise CompliaRee V/age Rates Per1Hits and Utilities �londiseri1HiRatioR ProdHet ReqHirements END OF SECTION CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised September I, 2015 Page 4 of 4 Highpoint Hill -Phase 3 City Project No. I ()()967 ( ( ( ( l ( ( ( ( SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Project Item lnfonnation Description Specification Unit of Section No. Measure UNIT I: WATER IMPROVEMENTS 3311.0261 8" PVC Water Pipe 3312.3003 8" Gate Valve 3312.0001 Fire Hydrant 3312.2003 1" Water Service 3311.0001 Ductile Iron Water Fittings w/ Restraint 3305.0003 8" Waterline Lowering 3305.0109 Trench Safety 9999.0001 1" Water Service (Irrigation) 33 11 12 LF 33 12 20 EA 33 12 40 EA 33 12 10 EA 33 11 11 TON 33 05 12 EA 33 05 10 LF 33 12 10 EA 00 42 43 DAP -BID PROPOSAL Page I of7 Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity 2050 $35.00 $71,750.00 3 $1,250.00 $3,750.00 2 $4,200.00 $8,400.00 69 $950.00 $65,550.00 0.6 $4,500.00 $2,700.00 1 $1,500.00 $1,500.00 2050 $0.25 $512.50 1 $950.00 $950.00 TOTAL UNIT I: WATER IMPROVEMENTS $155,112.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECll'ICATION DOCUMENTS· DEVELOPER AWARDED PROJECTS Form Version Seplembcr I, 2015 0042 4J_B1d Proposal_DAP.xls SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM UNIT PRICE BID Bidlisl llem No. 1 2 3 4 5 6 7 8 9 -. - 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Projecl llem Infonnalion Descriplion Specificalion Unil of Seclion No. Measure UNIT II: SANITARY SEWER IMPROVEMENTS 3331.4115 8" PVC Sewer Pipe 9999.0002 Connect to Existing Sewer Manhole 3339.1001 4' Manhole 3339.1003 4' Extra Depth Manhole 3331.3101 4" Sewer Service 3301.0002 Post-CCTV Inspection 3301.0101 Manhol� Vacuum Testin-9_ 3305.0109 Trench Safety 3331.4116 8" Sewer Pipe, CSS Backfill 3339.0001 Epoxy Manhole Liner (Warren Enviornmental) 33 31 20 33 39 20 33 39 10 33 39 10 33 31 50 33 01 31 33 01 30 - -33 05 10 33 11 10 33 39 60 LF EA EA VF EA LF EA LF LF VF 00 42 43 DAP -BID PROPOSAL Page 2 of7 Bidder's Application Bidder's Proposal Bid Unil Price Bid Value Quanlity 2020 $39.75 $80,295.00 1 $1,500.00 $1,500.00 10 $3,400.00 $34,000.00 36 $185.00 $6,660.00 69 $650.00 $44,850.00 2020 $2.00 $4,040.00 10 $1§0.QQ $1,500.00 2020 $1.00 $2,020.00 50 $30.00 $1,500.00 75 $195.00 $14,625.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENT! $190,990.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Form Version September I, 2015 00 42 4J_Bid Proposal_DAP.xls • ( ( ( ( ( ( ( { l ( ( ( l ( SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Project Item lnfonnation Description Specification Unit of Section No. Measure UNIT Ill: DRAINAGE IMPROVEMENTS 3341.0201 21" RCP, Class Ill 3341.0205 24" RCP, Class Ill 3341.0309 36" RCP, Class Ill 3349.5001 1 O' Curb Inlet 3349.0001 4' Storm Junction Box 3305.0109 Trench Safety 9999.0003 Erosion Protection/Control 33 41 10 33 41 10 33 41 10 33 49 20 33 49 10 33 05 10 31 25 00 - - LF LF LF EA EA LF LS 00 42 43 DAP -BID PROPOSAL Page 3 of7 Bidder's Application Bid Quantity 69 186 99 6 1 354 1 Bidder's Proposal Unit Price $55.00 $60.00 $90.00 $3,400.00 $4,500.00 $1.00 $24,550.00 - I Bid Value -- $3,795.00 $11,160.00 $8,910.00 $20,400.00 $4,500.00 $354.00 $24,550.00 TOTAL UNIT Ill: DRAINAGE IMPROVEMENT $73,669.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Form Version September I, 2015 00 42 43_Bid Proposal_DAP :,c;ls SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM UNIT PRICE BID Project Item lnfonnation Bidlist Item Description Specification Unit of No. Section No. Measure UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6" Cone Pvmt 32 13 13 SY 2 3211.0501 6" Lime Treatment 32 11 29 SY 3 3211.0400 Hydrated Lime 32 11 29 TN 4 3213.0301 4" Cone Sidewalk 32 13 20 SF 5 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 6 3213.0501 Barrier Free Ramp, Type M-2 32 13 20 EA 7 3441.4006 Install Alum Sign Ground Mount 34 41 30 EA 8 9999.0004 Install Alum Sign Prop. Pole Mount 34 41 30 EA 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 00 42 43 DAP -BID PROPOSAL Page4of7 Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity 6595 $38.00 $250,610.00 7054 $3.25 $22,925.50 106 $185.00 $19,610.00 1918 $3.25 $6,233.50 2 $1,200.00 $2,400.00 1 $1,200.00 $1,200.00 2 $550.00 $1,100.00 1 $450.00 $450.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $304,529.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September I, 2015 00 42 43_Bid Proposal_DAP.xls ( ( ( ( ( ( ( l l { ( SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Project Item I nfonnation Description Specification Unit of Section No. Measure UNIT V: STREET LIGHTING IMPROVEMENTS 2605.3015 2" CONDT PVC SCH 80 (T) 3441.3401 6-6-6 Triplex Alum Elec Conductor 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 3441.1646 Furnish/Install Type 338 Arm 3441.3050 Furnish/Install LED Lighting Fixture (70 watt ATB0 Cobra Head) - -- 26 05 33 LF 34 41 20 LF -34 41 20 EA --34 41 20 EA 34 41 20 EA 34 41 20 EA - - 00 42 43 DAP -BID PROPOSAL Page 5 of7 Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity 505 $12.00 $6,060.00 505 $3.00 $1,515.00 7 $2,400.00 $16,800.00 7 $1,200.00 $8,400.00 7 $300.00 $2,100.00 7 $600.00 $4,200.00 -- - ,_ TOTAL UNIT V: STREET LIGHTING IMPROVEMENT! $39,075.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Form Vcrs10n September I, 2015 00 42 43_81d Proposal_DAP xis UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 Developer Awarded Projects • PROPOSAL FORM Project Item Infonnation Description Specification Unit of Section No. Measure UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS 00 42 43 OAP -BID PROPOSAL Page 6 of? Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENn CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Form Version September I, 2015 00 42 43_Bid Proposal_DAP.xls I ' ( ( ( ( ( ( SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM UNIT PRICE BID Bidlist ltem11 No. Project Item Infonnation Description I Specification Section No. Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT Ill: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS -••-- --- - Contractor agrees to com11lete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as pro\'ided in the General Conditions, 00 42 43 DAP -BID PROPOSAL Page 7 of7 Bidder's Application Bidder's Proposal I Unit of I Bid Unit Price I Bid Value Measure Quantity $155,112.50 $190,990.00 $73,669.00 $304,529.00 $39,075.00 -·- Total Construction Bid $763,375.50 ltltl calendar days after the date when the END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Form Version September I, 2015 00 42 4J_B1d Proposal_DAP.xls ( ( l ( ( SECTION 00 45 12 00 45 12 DAP PREQUALIFICATION STATEMENT Page I of I DAP -PREQUALIFICA TION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Type" box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Prequalification Name Expiration Date WATER DISTRIBUTION, CONATSER CONSTRUCTION TX, DEVELOPMENT, 12-INCH L.P.4/30/2019 DIAMETER AND SMALLER SEWER COLLECTION SYSTEM, CONATSER CONSTRUCTION TX, DEVELOPMENT, 12-INCHES AND L.P.4/30/2019 SMALLER CONCRETE PAVEMENT CONATSER CONSTRUCTION TX, CONSTRUCTION/RECONSTRUCTION 1/1/2019 (< 15,000 SY) L.P. ROADWAY AND PEDESTRIAN CONATSER CONSTRUCTION TX, 10/27/2019 LIGHTING L.P. The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: CONATSER CONSTRUCTION TX, L.P. 5327 WICHITA ST. FORT WORTH, TX 76119 CITY OF FORT WORTH BY: BROCK HUGGINS �I ,--� (Signature) TITLE: PRESIDENT DATE: END OF SECTION STANDARD CONSTRUCTION PREQUAUFICATION STATEMENT-DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 00 4S 12_prequalification Statement 201S_DAP ( ( ( ( ( ( l ( ( ( 00 45 26 - I CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 100967. Contractor further ce11ifies that, pursuant to Texas Labor Code, Section 7 406.096(b ), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 10 CONTRACTOR: 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 CONATSER CONSTRUCTION TX, L.P. By: BROCK HUGGINS Company 5327 WICHITA ST. Address FORT WORTH, TX 76119 City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT § § (Please Print) Signature: �'11/ ' Title: PRESIDENT (Please Print) e riuthority, on this day personally appeared ---'-""-L-"-'""-.,..,.,,'-4---1--Y--1'""--\>44-_.___...;:\ ____ , known to me to be the person whose name is subscribed to the fore iw.\l�tr\,r\?�lacknowledged to me that he/she executed the same asthe act and deed of ____ j-J-++_,,l ... � ..... .L-A ...,.U<.O-J1_1 _______ for the purposes and consideration therein expressed and in the capacity therein stated. GIYEl:ll/>DW MY HAND Al)l,Q SEAL OF OFFICE this \ 1, �h day ofctwuu._ ' 2011 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Highpoint Hill -Phase 3 City Project No. 100967 ( ( ( ( ( ( ( ( l ( l ( ( 2 3 SECTION 00 52 43 AGREEMENT 00 52 43 - I Developer Awarded Project Agreement Page I of4 4 THIS AGREEMENT, authorized on \Q-2--?,-\?is made by and between the Developer, 5 (BH Development Two, L.P.), authorized to do business in Texas ("Developer") , and 6 CONATSER CONSTRUCTION TX. L.P., authorized to do business in Texas, acting by and 7 through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: IO Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 Paving, Drainage, Street Lights, Water & Sanitary Sewer Improvements 17 18 19 20 21 22 to serve Highpoint Hill -Phase 3 Proiect No. I 00967 Article 3. CONTRACT TIME 3. I Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 23 3.2 Final Acceptance. 24 25 26 The Work will be complete for Final Acceptance within I 00 calendar days after the date when the Contract Time commences to run as provided in Paragraph 2.04 of the Standard City Conditions of the Construction Contract for Developer A warded Projects. 27 3 .3 Liquidated damages 28 29 30 31 32 33 34 35 36 37 38 Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Three Hundred Fifty Dollars ($350.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 2, 2014 Highpoint Hill -Phase 3 City Project No. 100967 00 52 43 - 2 Developer Awarded Project Agreement 39 Article 4. CONTRACT PRICE Page 2 of 4 40 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 41 Documents an amount in current funds of Seven Hundred Sixty Three Thousand Three Hundred 42 Seventy Five Dollars and Fifty Cents ($763,375.50) 43 Article 5. CONTRACT DOCUMENTS 44 5.1 CONTENTS: 45 A.The Contract Documents which comprise the entire agreement between Developer and 46 Contractor concerning the Work consist of the following: 47 I.This Agreement. 48 2.Attachments to this Agreement: 49 a.Bid Form (As provided by Developer) 50 I)Proposal Form (OAP Version) 51 2)Prequalification Statement 52 3)State and Federal documents (project specific) 53 b.Insurance ACORD Form(s) 54 c.Payment Bond (OAP Version) 55 d.Performance Bond (OAP Version) 56 e.Maintenance Bond (OAP Version) 57 f.Power of Attorney for the Bonds 58 g.Worker's Compensation Affidavit 59 h.MBE and/or SBE Commitment Form (If required) 60 3.Standard City General Conditions of the Construction Contract for Developer 61 A warded Projects. 62 4.Supplementary Conditions. 63 5.Specifications specifically made a pa1t of the Contract Documents by attachment 64 or, if not attached, as incorporated by reference and described in the Table of 65 Contents of the Project's Contract Documents. 66 6.Drawings. 67 7.Addenda. 68 8.Documentation submitted by Contractor prior to Notice of Award. 69 9.The following which may be delivered or issued after the Effective Date of the 70 Agreement and, if issued, become an incorporated part of the Contract Documents: 71 a.Notice to Proceed. 72 b.Field Orders. 73 c.Change Orders. 74 d.Letter of Final Acceptance. 75 76 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Revised April 2, 2014 Highpoint Hill -Phase 3 City Project No. /00967 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 ( 96 97 98 ( 99 ( 100 IOI 102 ( 103 ( 104 ( 105 { 106 { 107 ( 108 ( 109 110 l I I I 112 l 113 ( 114 l 115 116 117 Article 6. INDEMNIFICATION 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article I of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7 .2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Coutt for the Northern District of Texas, Fort Wo1th Division. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 2, 2014 Highpoint Hill -Phase 3 City Projec/ No. I 00967 118 119 7 .6 Authority to Sign. 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 4 120 Contractor shall attach evidence of authority to sign Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 127 128 Contractor: CONATSER CQNSTRl lCIIQN TX I, P. By: BROCK HUGGINS (Printed Name) Title: PRESIDENT Company Name: CONATSER Address: 5327 WICHITA ST. City/State/Zip: FORT WORTH, TX 76119 Date CITY OF FORT WORTH Developer: BH Development Two, L.P. a Texas limited partnership B By: FM 1187 Management, LLC, a Texas limited ompany, 1 y: Interests, Inc., Texas corporation, Manager (Signature) ROBERT BARHAM (Printed Name) Title: PRES! DENT Company name: BARHAM INTERESTS, INC Address: 600 SUMMIT AVE. City/State/Zip: FORT WORTH, TX 76102 Date STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised April 2, 2014 Highpoint Hill -Phase 3 City Project No. 100967 ( ( ( ( ( ( ( ( � ( 2 3 SECTION 00 62 13 PERFORMANCE BOND 00 62 13. I PERFORMANCE BOND Page I of2 Bond No. 021216 7 4 THESTATEOFTEXAS 5 § § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 9 IO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 That we, Conatser Construction TX, L.P. known as -------------�-----------' "Principal" herein and Berkley Insurance Company , a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, BH Development Two, L.P. , authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Seven Hundred Sixty Three Thousand, Three Hundred Seventy Fjye and 50/100 Dollars ($_7_6....c3 ..... ,3c....;7....c5c..;...5.:;_0-=--------'), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligecs, we bind ourselves, our heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents, WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CF A Number 2017-125 ;and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the �ay of � , 2012, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Highpoint Hill -Phase 3. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perfonn it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part oft he Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS-DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Highpoint Iii/I -l'hase J City Project No. /00967 2 3 4 5 6 7 8 9 10 11 12 13 14 15 00 62 13 - 2 PERFORMANCE 13OND Page 2 of2 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the _l�3-�I��-_day of __ _ CUco 'ow" , 20 r:1-, ATTEST: M�-· (Principal) Sccre\iry PRINCIPAL: Conatser Construction TX L.P BY:�1, Sigrrntur Brock Huggins, President Name and Title 16 17 18 19 20 21 �l JiJ2iw Address: 5327 Wichita St. Ft. Worth TX 76119 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 *Note: SURETY: Berkley Insurance Company Robbi Morales, Attorney-in-fact Name and Title Address: 2711 N. Haskell Ave., Suite 800 Dallas, TX 75204 Telephone Number: 214/989-0000 If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY or FORT WORTH 1/ighpoinl I/ill -/'hose 3 Clry Project No. 100967 STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised January 31, 2012 ( ( ( 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 SECTION 00 62 14 PAYMENT BOND 00 62 14 - I PAYMENT OOND Page I of2 Bond No. 0212167 THE ST ATE OF TEXAS COUNTY OFT ARRANT § § § KNOW ALL BY THESE PRESENTS: That we, Conatser Constru ction TX, L.P. known as "Principal" herein, and ___ B _er_k_le__.y_l_n_su_r_a _n_ce_C _o_m�p_a_n�y _____________ _,, a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, BH Development Two, L.P. , authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum Seven Hu ndred Sixty Th ree Thou sand, of Three Hundred Seventy Five and 501100---------------Dollars ($ 76 3 ,375 .5 0 ). lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made joint ly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administ rators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CF A Number 2017-125 ;and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 2-''y<J day of M� . 20fl_, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in. the prosecution of the Work as provided for in said Contract and designated as Highpoint Hill -Phase 3. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and nil) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. CITY Or r:oRT WORTI I STANDARD CITY CONDITIONS -DEVELOPER AW ARDl;D PROJECTS Revised Jnnunry 31, 2012 Hlghpo/111 HIii - Phase 3 City Project No. /00967 00 62 14 - 2 l'A YMl:NT DOND Page 2 of2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 2-O ,J... day of 6 7 ATTEST: (Principaijse; ary ATTEST: PRINCIPAL: Conatser Construction TX L.P. BY: A,,//1 '1' 1 • Signature Brock Huggins, President Name and Title Address: 5327 Wichita St. Ft. Worth, TX 76119 SURETY: Berkley Insurance Company BY: r:·;Z,44� ·?v, �/ Signature Robbi Morales, Attorney-in-fact Name and Title Address: 2711 N. Haskell Ave., Suite 800 Dallas, TX 75204 Telephone Number: 214/989-0000 8 9 Note: If signed by an officer of the Surety, there must be on file a certified extract from the IO bylaws showing that this person has authority to sign such obligation. If Surety's physical 11 address is different from its mailing address, both must be provided. 12 13 The date of the bond shall not be prior to the date the Contract is awarded. 14 END OF SECTION CITY OF FORT WORT! I STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revise ti Jnnunry 3 I, 2012 I ligltpo/11I / Iii/ -/'/,ase 3 City Project No. /00967 ( ( ( ( 2 3 4 5 6 7 8 9 THE ST ATE OF TEXAS COUNTY OFT ARRANT SECTION 00 6219 MAINTENANCE BOND 00 62 19- IMAINTENANCE BOND Pngc I ofJ Bond No. 0212167 § § § KNOW ALL BY THESE PRESENTS: That we Conatser Construction TX L.P. known as _______ ....,;,,,;_..,;:_.c,..;.,;,,;;,,,;,;,,,,;;;,.;;;,,;,;...:;,,;,,,;_:...;..,;.J-=-:.:.....:.... _______ __, "Principal" herein and __ B _er_k_le..J.y_l....,;n..:..suc..cr...c.a....,;n-=-cec:.....,;:C�o"'"'m""'p:;,,,;:ac..:.n:.iy _______ __,, a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State ofTexas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, BH 12 Development Two, L.P. authorized to do business in Texas ("Developer") and the City of Fort 13 14 Worth, a Texas municipal corporation ("City"), in the sum Seven Hundred Sixty Three Thousand of Three Hundred Seventy Five and 50/100-------------Dollars ($_7_6_3 ___ ,3_7_5 _.5_0 _____ __,), 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment I 6 of which sum well and truly be made jointly unto the Developer and the City as dual obligees and 17 their successors, we bin d ourselves, our heirs, executors, administrators, successors and assigns, 18 jointly and severally, firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreement, CFA Number20l7-l25; and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 2,-3Jday of o-vfo&:Y-:, 20.12, which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forth hereii1, to furnish all 26 materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as Highpoint Hill -Phase 3; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, specifications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 34 CITY or FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTSRevised Jnnuary JI. 2012 /lighpoinf I fl/I -Phase 3 City Project No. /00967 00 62 19-2 MAINTENANCE BOND Pngc 2of3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 8 remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A \V ARD ED PROJECTS Revised Jnnuury 31, 2012 Jlighpo/111 HIii - Phase 3 City Project No. 100967 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 ( 33 34 35 36 37 38 39 40 41 42 0062 19-3 MAINTENANCE BOND Page 3 of3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the Z 3r/ day of _____ _ {T(,,-f;-o� , 20./1_. ATTEST: J..pr (Principal) Sura tness as to Principal PRINCIPAL: Conatser Construction TX, L.P. BY: � l!!/IJ d •_'s/gnatur� Brock Huggins, President Name and Title Address: 5327 Wichita St. Ft. Worth TX 76119 SURETY: Berkley Insurance Company BY:Q M.td✓·zn m&&-4/Signature Robbi Morales, Attorney-in-fact Name and Title Address: 2711 N. Haskell Ave., Suite 800 Dallas, TX 75204 Telephone Number: 214/989-0000 *Nole: If signed by an officer of the Surety Company, there must be on file a certified extractfrom the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS-DEVELOPER AWARDED PROJECTS Revised January 31.2012 llighpoll1t Iii/I -Phase 3 City Projcc/ No. /00967 POWER OF ATTORNEY BERKLEY INSURANCE COMP ANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. -o KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly ,§ organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted � ..::.: and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Comell; Vena DeLene� i:: -o ·-Mars/tall; Sopltinie Hunter,· Robbi Morales; Kelly A. Westbrook,· or Tina McE111a11 of Aon Risk Services Soutltwest, Inc. of ro V v ;:1 Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,i � acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no "' v single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds ] � had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own � E proper persons . . � --i:: V ;::l � I� � 0 V > ...."' i::·-0>-,'-' V v, E i:: 0 -� .g t:<+--=0 !::t =� ·-0 i:: 0. -�� �.s:::: c.Jf-i;: . ·c: 0 � V > §]..c: roe �o0. ·-� E .... ro i:: � V • 6 t:: g ·;:: 0 0. 0 6 "'·­·-"O s i:: <+-- ;::l o ei:: oJ) 0� ·,= ge "° 2 V - ..c:� f-0 i:: "O 0 � 'B � ;::l .D -0 6e V 0. "' V ·- i-. E 0 0 � t:: ·;:: 0 :::, .D ..C: V � -:5:s:l -i:: ro ;:1 _ 2� < � I o c., -� 7 u .;;;� � � � -5 This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, unde1takings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF, the Comp�ny has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed thi�day ofJ}.d!.<.U�=---=-=• 2016. (Seal) Ira S. Lede1man WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE "BERKLEY" SECURITY PAPER. STA TE OF CONNECTICUT) ) ss: COUNTY OF FAIRFIELD ) ..J I • Sworn to before me, a Notary Public in the State of Connecticut, this --1-z' day o� , 2016, by Ira S. Lederman and Jeffrey M. Hafter who are sworn to me to be the Executive Vice President and Secretary, and 1e Senior Vice President, respectively, of Berkley Insurance Company.MARI AC. RUNDBAl<EN NOTARY PUBLIC MY COMMISSION EXPIRES Notary Public, State of Connecticut APRIL 30, 2019 CERTIFICATE I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given und" my hand ond seal of tho Company, this� d,y of C'J:tk-o \afK 'il:Q \ !) , � (Seal) Vine�� _ _,_.'-He------ Please verify the authenticity of the instrun1ent attached to this Power by: Toll-Free Telephone: (800) 456-5486; or Electronic Mail: BSGinquiry@]:,erkleysurety.com Any written notices, inquiries, claims or demands to the Surety on the bond attached to this Power should be directed to: Berkley Surety Group 412 Mount Kemble Ave. Suite 3 I0N Morristown, NJ 07960 Attention: Surety Claims Department Or Email: BSGClaim@berkleysurety.com Please include with all communications the bond number and the name of the principal on the bond. Where a claim is being asse1ied, please set forth generally the basis of the claim. In the case of a payment or performance bond, please also identify the project to which the bond pertains. Berkley Surety Group is an operating unit of W.R. Berkley Corporation that underwrites surety business on behalf of Berkley Insurance Company, Berkley Regional Insurance Company and Carolina Casualty Insurance Company. ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( <.. IMPORTANT NOTICE To obtain information or make a complaint: You may call Berkley Surety Group, LLC and its affiliates by telephone for information or to make a complaint: BERKLEY SURETY GROUP, LLC Please send all notices of claim on this bond to: . Berkley Surety Group, LLC •(866) 768-3534 412 Mount Kemble Avenue, Suite 310N Morristown, NJ 07960 Attn: Surety Claims Department You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.0. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your agent or Berkley Surety Group, LLC first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: •This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( l ( {_ CITY OF FORT WORTH STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AW ARD ED PROJECTS STANDARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 ( STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AW ARD ED PROJECTS TABLE OF CONTENTS Page Article 1 -Definitions and Terminology .......................................................................................................... 1 1.01 Defined Terms ............................................................................................................................... 1 ( l 1.02 Terminology .................................................................................................................................. 5 ( ( ( ( ( ( ( ( ( ( ( t ( Article 2 -Preliminary Matters ......................................................................................................................... 6 2.01 Before Starting Construction ........................................................................................................ 6 2.02 Preconstruction Conference .......................................................................................................... 6 2.03 Public Meeting .............................................................................................................................. 6 Article 3 -Contract Documents and Amending ............................................................................................... 6 3.01 Reference Standards ..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents .................................................................. 6 Article 4 -Bonds and Insurance ....................................................................................................................... 7 4.01 Licensed Sureties and Insurers ..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds ........................................................................ 7 4.03 Certificates of Insurance ............................................................................................................... 7 4.04 Contractor's Insurance .................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace ........................................................... 12 Article 5 -Contractor's Responsibilities ........................................................................................................ 12 5.01 Supervision and Superintendent ................................................................................................. 12 5.02 Labor; Working Hours ................................................................................................................ 13 5.03 Services, Materials, and Equipment.. ......................................................................................... 13 5.04 Project Schedule .......................................................................................................................... 14 5.05 Substitutes and "Or-Equals" ....................................................................................................... 14 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) ..................................... 16 5.07 Concerning Subcontractors, Suppliers, and Others ................................................................... 16 5.08 Wage Rates .................................................................................................................................. 18 5.09 Patent Fees and Royalties ........................................................................................................... 19 5 .10 Laws and Regulations ................................................................................................................. 19 5.11 Use of Site and Other Areas ....................................................................................................... 19 5 .12 Record Documents ...................................................................................................................... 20 5 .13 Safety and Protection .................................................................................................................. 21 5.14 Safety Representative ................................................................................................................. 21 5.15 Hazard Communication Programs ............................................................................................. 22 5 .16 Submittals .................................................................................................................................... 22 5.17 Contractor's General Warranty and Guarantee .......................................................................... 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January I 0, 2013 5 .18 Indemnification ........................................................................................................................... 24 5 .19 Delegation of Professional Design Services .............................................................................. 24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination ....................................................................................................................... 25 Alticle 6 -Other Work at the Site ................................................................................................................... 26 6.01 Related Work at Site ................................................................................................................... 26 Article 7 -City's Responsibilities ................................................................................................................... 26 7.01 Inspections, Tests, and Approvals .............................................................................................. 26 7.02 Limitations on City's Responsibilities ....................................................................................... 26 7.03 Compliance with Safety Program ............................................................................................... 27 Alticle 8 -City's Observation Status During Constrnction ........................................................................... 27 8.01 City's Project Representative ..................................................................................................... 27 8.02 Authorized Variations in Work .................................................................................................. 27 8.03 Rejecting Defective Work .......................................................................................................... 27 8.04 Determinations for Work Performed .......................................................................................... 28 Article 9 -Changes in the Work ..................................................................................................................... 28 9.01 Authorized Changes in the Work ............................................................................................... 28 9.02 Notification to Surety .................................................................................................................. 28 Article 10 -Change of Contract Price; Change of Contract Time ................................................................ 28 10.01 Change of Contract Price ............................................................................................................ 28 10.02 Change of Contract Time ............................................................................................................ 28 10.03 Delays .......................................................................................................................................... 28 Article 11 -Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29 11.01 Notice of Defects ........................................................................................................................ 29 11.02 Access to Work ........................................................................................................................... 29 11.03 Tests and Inspections .................................................................................................................. 29 11.04 Uncovering Work ....................................................................................................................... 30 11.05 City May Stop the Work ............................................................................................................. 30 11.06 Correction or Removal of Defective Work ................................................................................ 30 11.07 Correction Period ........................................................................................................................ 30 11.08 City May Correct Defective Work ............................................................................................. 31 Article 12 -Completion .................................................................................................................................. 32 12.01 Contractor's WatTanty of Title ................................................................................................... 32 12.02 Partial Utilization ........................................................................................................................ 32 12.03 Final Inspection ........................................................................................................................... 32 12.04 Final Acceptance ......................................................................................................................... 33 Alticle 13-Suspension ofWork .................................................................................................................... 33 13.01 City May Suspend Work ............................................................................................................ 33 Article 14 -Miscellaneous .............................................................................................................................. 34 14.01 Giving Notice .............................................................................................................................. 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 20 I 3 ( ( ( ( ( ( ( ( ( ( l l l 14.02 Computation of Times ................................................................................................................ 34 14.03 Cumulative Remedies ................................................................................................................. 34 14.04 Survival of Obligations ............................................................................................................... 35 14.05 Headings ...................................................................................................................................... 35 CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January IO, 2013 { ( { ( ( ( ( ( { ( ( ( 00 73 10-I Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page I of35 ARTICLE 1 -DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A.Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. l.Agreement -The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2.Asbestos-Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3.Business Day - A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4.Buzzsaw -City's on-line, electronic document management and collaboration system. 5.Calendar Day-A day consisting of24 hours measured from midnight to the next midnight. 6.City-The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7.Community Facilities Agreement (CFA) -A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CF A may include private facilities within the right-of way dedicated as private right-of way or easement on a recorded plat. 8.Contract-The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9.Contract Documents-Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a.An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 IO-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects b.Attachments to the Agreement1.Bid Form11.Vendor Compliance with State Law Non-Resident Bidder m.Prequalification Statement c.Current Prevailing Wage Rates Table (ifrequired by City) d.Insurance Accord Form e.Payment Bond f.Performance Bond g.Maintenance Bond h.Power of Attorney for Bonds1.Workers Compensation Affidavit J.MWBE Commitment Fmm( If required by City) k.General Conditions 1.Supplementaiy Conditions m.The Standard City Conditions Page 2 of35 n.Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Document.s o.Drawings p.Documentation submitted by contractor prior to Notice of Award. q.The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents1.Notice to Proceed11.Field Orders m.Change Orders iv.Letters of Final Acceptance r.Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10.Contractor-The individual or entity with whom Developer has entered into the Agreement. 11.Day or day -A day, unless otherwise defined, shall mean a Calendar Day. 12.Developer -An individual or entity that desires to make certain improvements within the City of Fort Worth 13.Drawings-That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be pe1formed by Contractor. Submittals are not Drawings as so defined. 14.Engineer-The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15.Final Acceptance -The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 ( ( ( ( ( ( ( ( ( ( l ( (.. 0073 10-3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of35 16.Final Inspection -Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof fully, entirely, and in conformance with the Contract Documents. 17.General Requirements-A part of the Contract Documents between the Developer and a Contractor. 18.Laws and Regulations-Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having Jurisdiction. 19.Liens-Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20.Milestone-A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21.Non-Participating Change Order-A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an acijustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22.Participating Change Order-A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an acijustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23.Plans -See definition of Drawings. 24.Project Schedule-A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25.Project-The Work to be pe1formed under the Contract Documents. 26.Project Representative-The authorized representative of the City who will be assigned to the Site. 27.Public Meeting -An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28.Regular Working Hours -Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29.Samples-Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 I 00 73 10-4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30.Schedule of Submittals-A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled pe,formance of related construction activities. 31.Site-Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be pe,formed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32.Specifications-That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incmporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33.Standard City Conditions -That part of the Contract Documents setting forth requirements of the City. 34.Subcontractor-An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35.Submittals-All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36.Superintendent-The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37.Supplementa,y Conditions-That part of the Contract Documents which amends or supplements the General Conditions. 38.Supplier-A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39.Underground Facilities-All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40.Weekend Working Hours-Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH ST AN DARO CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 ( ( ( ( ( ( ( ( ( ( ( ( 00 73 10-5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of35 41.Work-The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of pe1forming or providing all labor, services, and documentation necessa,y to produce such construction including any Participating Change Order, Non-Participating Change Order, or Field Order, and fi1rnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42.Working Day -A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract pwposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A.The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B.Defective: 1.The word "defective," when modifying the word "Work," refers to Work that 1s unsatisfactory, faulty, or deficient in that it: a.does not conform to the Contract Documents; or b.does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c.has been damaged prior to City's written acceptance. C.Furnish, Install, Pe,form, Provide: 1.The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D.Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 -PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to staiting the Work. New schedules will be submitted to City when Participating Change Orders or Non­ Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 -CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A.Standards, Specifications, Codes, Laws, and Regulations 1.Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids ( or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2.No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, paitners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A.The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non-Participating Change Order. B.The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1.A Field Order; CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ( ( ( ( l ( ( ( ( ( ( ( ( ( l l 00 73 10-7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1.City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2.City's written interpretation or clarification. ARTICLE 4 -BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A.Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B.Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2)years after the date of Final Acceptance by the City. C.All bonds shall be in the f01m prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D.If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions ce1iificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of35 1.The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2.The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3.The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4.The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5.All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6.If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the pnmary coverage. 7.Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8.Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9.Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 ( ( ( ( ( { ( ( ( 00 73 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10.Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 11.City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12.City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13.City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A.Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1.claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2.claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3.The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a.Statutory limits b.Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January I 0, 2013 00 73 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 1)$100,000 2)$100,000 3)$500,000 each accident/occurrence Disease -each employee Disease -policy limit Page 10 of35 B.Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or adve1tising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1.For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2.Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a.$1,000,000 each occurrence b.$2,000,000 aggregate limit 3.The policy must have an endorsement (Amendment -Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4.The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C.Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1.Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a.Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 ( 00 73 10-II Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of35 1)$1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2)$250,000 3)$500,000 4)$100,000 Bodily Injury per person Bodily Injury per accident / Property Damage D.Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1.The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: _N_O_N_E ______________________ _Write the name of the railroad company. (If none. then write none) 2.The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3.The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a.General Aggregate: NONE------------------Enter limits provided by Railroad Company (If none. write none) b.Each Occurrence:: NONE------------------Enter limits provided by Railroad Company (If none. write none) 4.With respect to the above outlined insurance requirements, the following shall govern: a.Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b.Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of- CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 00 73 IO-12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c.If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at-grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d.If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5.No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6.The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E.Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Atticle 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates ( or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 -CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A.Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expe1tise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January IO, 2013 ( ( ( l ( { l l ( ( l 00 73 10-13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B.At all times during the progress of the Work, Contractor shall assign a competent, English­ speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C.Contractor shall notify the City 24 hours pnor to moving areas during the sequence of construction. 5.02 Labor; Working Hours A.Contractor shall provide competent, suitably qualified personnel to perf01m construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B.Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1.for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2.for Weekend Working Hours request must be made by noon of the preceding Thursday 3.for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A.Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transp011ation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B.All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special wan-anties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including rep011s of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of35 C.All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instrnctions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A.Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1.Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2.Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City pai1icipation shall be made by pai1icipating change orders. 5.05 Substitutes and "Or-Equals" A.Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. I."Or-Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A. l, a proposed item of material or equipment will be considered functionally equal to an item so named if: a.City determines that: 1)it is at least equal in materials of constrnction, quality, durability, appearance, strength, and design characteristics; 2)it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3)it has a proven record of performance and availability of responsive service; and b.Contractor ce11ifies that, if approved and incorporated into the Work: 1)there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 ( ( l ( ( ( 00 73 10-15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2)it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2.Substitute Items: a.If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b.Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c.Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0 1 25 00 and: CITY OF FORT WORTH 1)shall certify that the proposed substitute item will: 1. perform adequately the functions and achieve the results called for by the general design; 11.be similar in substance to that specified; m.be suited to the same use as that specified; and 2)will state: 1.the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; 11.whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents ( or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; n1. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3)will identify: 1.all variations of the proposed substitute item from that specified; 11.available engineering, sales, maintenance, repair, and replacement services; and STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 10-16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of35 4)shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B.Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C.City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal." City will advise Contractor in writing of its determination. D.Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, wananty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E.City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F.Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. G.Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Paiticipating Change Order. 5.06 Pre-Qualification of Bidders (Prime Contractors and Subcontractors) A.The Contractor and any subcontractors are required to be prequalified for the work types requiring pre-qualification 5.07 Concerning Subcontractors, Suppliers, and Others A.Minority and Women Owned Business Ente,prise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: Janual)' I 0, 2013 ( ( { ( ( ( { ( l 00 73 10-17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects D Required for this Contract. (Check !his box iflhcrc is any Cily Participalion) � Not Required for this Contract. Page 17of35 It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1.Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2.Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3.Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B.Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1.shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2.shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C.Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D.All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E.All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 00 73 IO-18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates D Required for this Contract. lliJ Not Required for this Contract. A.Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates dete1mined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B.Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or patt of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C.Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D.Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all patties and may be enforced in any court of competent jurisdiction. E.Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January IO, 2013 ( ( ( ( ( ( ( ( l ( 00 73 10-19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F.Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G.Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H.Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A.To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the inc01poration in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A.Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B.If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all comi or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A.Limitation on Use of Site and Other Areas: 1.Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2.At any time when, in the judgment of the City, the Contractor has obstructed or closed or is canying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3.Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4.Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B.Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C.Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to conect the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D.Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E.Loading Structures: Contractor shall not load nor permit any pait of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A.Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (I) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 ( ( ( l 00 73 10-21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of35 Samples and a counterpaii of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A.Contractor shall be solely responsible for initiating, maintammg and superv1smg all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1.all persons on the Site or who may be affected by the Work; 2.all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3.other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B.Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or prope1iy, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C.Contractor shall comply with the applicable requirements of City's safety programs, if any. D.Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E.All damage, injury, or loss to any property refe1Ted to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F.Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5 .16 Submittals A.Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1.Submit number of copies specified in the General Requirements. 2.Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3.Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4.When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5.For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6.Submit required number of Samples specified in the Specifications. 7.Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B.Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C.City's Review: 1.City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January 10, 2013 ( ( ( 00 73 10-23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of35 2.City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction ( except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3.City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5 .17 Contractor's General Warranty and Guarantee A.Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B.Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1.abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2.normal wear and tear under normal usage. C.Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1.observations by City; 2.recommendation or payment by City or Developer of any progress or final payment; 3.the issuance of a ce1tificate of Final Acceptance by City or any payment related thereto by City; 4.use or occupancy of the Work or any part thereof by City; 5.any review and acceptance of a Submittal by City; 6.any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 IO-24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 7.any correction of defective Work by City. Page 24 of 35 D.The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5 .18 Indemnification A.Contractor covenants and agrees to indemnify, hold hatmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERA TE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B.Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destrnction of prope1ty of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A.Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B.If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or ce1tifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, ce1tifications, and Submittals prepared by such professional. Submittals related to the Work designed or ce11ified by such professional, if prepared by others, shall bear such professional' s written approval when submitted to City. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 ( ( ( ( ( ( 00 73 10-25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of35 C.City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, ce11ifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D.Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals ( except design calculations and design drawings) will be only for the purpose stated in Paragraph 5 .16.C. 5.20 Right to Audit: A.The City reserves the right to audit all projects utilizing City funds B.The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C.Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D.Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5 .21 Nondiscrimination A.The City is responsible for operating Public Transportation Programs and implementing transit­ related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transp011ation and the Federal Transit Administration (FT A), without discriminating against any person in the United States on the basis of race, color, or national ongm. B.Title VI, Civil Rights Act of I 964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects ARTICLE 6 -OTHER WORK AT THE SITE 6.01 Related Work at Site Page 26 of35 A.City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B.Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C.If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 -CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7 .02 Limitations on City's Responsibilities A.The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B.City will notify the Contractor of applicable safety plans pursuant to Paragraph 5 .13. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January I 0, 2013 ( ( ( ( ( ( ( { ( ( l 00 73 10-27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 7.03 Compliance with Safety Program Page 27 of35 While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5 .13. ARTICLE 8 -CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A.City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B.City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January 10, 20 I 3 00 73 10-28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 8.04 Determinations for Work Pe,formed Page 28 of35 Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 -CHANGES IN THE WORK 9.01 Authorized Changes in the Work A.Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B.For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 -CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A.The Contract Price may only be changed by a Participating Change Order for projects with City paiiicipation. 10.02 Change of Contract Time A.The Contract Time may only be changed by a Paiiicipating Change Order for projects with City paiiicipation. 10.03 Delays A.If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all comi or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 I ( l ( ( ' ( ( ( l ( ( ( l 0073 10-29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11-TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A.Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B.If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work ( or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C.Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations approved by City. D.City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any pmi of the Work, as determined solely by City. 1.City will coordinate such Testing to the extent possible, with Contractor; 2.Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of35 3.Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4.If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E.If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concmTence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A.If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A.Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such con-ection or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. 8.When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A.If within two (2) years after the date of Final Acceptance ( or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS Revised: January I 0, 2013 ( ( ( ( ( ( ( ( ( ( ( ( ( ( l ( 00 73 10-31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page31of35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5 .1 0.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1.repair such defective land or areas; or 2.correct such defective Work; or 3.if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4.satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B.If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C.Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B.In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or pait of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 00 73 10-32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C.All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all comt or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessaiy revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D.Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 -COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A.Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1.Contractor at any time may notify City in writing that Contractor considers any such pa1t of the Work ready for its intended use. 2.Within a reasonable time after notification as enumerated in Paragraph 14.05 .A.1, City and Contractor shall make an inspection of that pait of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3.Paitial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A.Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH ST AND ARD CITY CONDITIONS -DEVELOPER AW ARD ED PROJECTS Revised: January I 0, 2013 ( ( ( { ( { { ( l ( 00 73 10-33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects 1.within 10 days, City will schedule a Final Inspection with Contractor. Page 33 of35 2.City will notify Contractor in writing of all paiticulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A.Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1.All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2.consent of the surety, if any, to Final Acceptance; 3.a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4.affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5.after all Damage Claims have been resolved: a.directly by the Contractor or; b.Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6.Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 -SUSPENSION OF WORK 13.01 City May Suspend Work A.At any time and without cause, City may suspend the Work or any p01tion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B.Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 00 73 10-34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C.If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstrnct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary strnctures where necessary. ARTICLE 14 - MISCELLANEOUS 14.01 Giving Notice A.Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1.delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2.delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B.Business address changes must be promptly made in writing to the other party. C.Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation ofTimes When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January I 0, 2013 { ( ( ( ( ( ( ( 14.04 Survival of Obligations 00 73 10-35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of35 All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS -DEVELOPER A WARDED PROJECTS Revised: January 10, 2013 ( { ( ( ( { ( ( l SECTION 0133 00 2 SUBMITTALS 3 PART 1-GENERAL 4 1.1 SUMMARY A.Section Includes: 013300-1 SUBMITTALS Page I of8 5 6 7 1.General methods and requirements of submissions applicable to the following Work-related submittals: 8 a.Shop Drawings 9 b.Product Data (including Standard Product List submittals) IO c.Samples 11 d.Mock Ups 12 B.Deviations from this City of Fort Worth Standard Specification 13 1.None. 14 C.Related Specification Sections include, but are not necessarily limited to: 15 I.Division O -Bidding Requirements, Contract Forms and Conditions of the Contract 16 17 18 19 20 2.Division I -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment I.Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 1.4 ADMINISTRATIVE REQUIREMENTS A.Coordination I.Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2.Coordination of Submittal Times a.Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b.Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a)Disapproval and resubmittal (if required) b)Coordination with other submittals c)Testing d)Purchasing e)Fabrication f)Delivery g)Similar sequenced activities c.No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Highpoint Hill -Phase 3 City Project No. /00967 01 33 00 - 2 SUBMITTALS Page 2 of 8 d.Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B.Submittal Numbering 5 1.When submitting shop drawings or samples, utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a.Use the first 6 digits of the applicable Specification Section Number. 8 b.For the next 2 digits number use numbers O 1-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c.Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. 11 A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 12 submittal number would be as follows:13 14 03 30 00-08-B 15 16 1)03 30 00 is the Specification Section for Concrete 17 2)08 is the eighth initial submittal under this Specification Section 18 3)B is the third submission (second resubmission) of that paiticular shop 19 drawing 20 C.Contractor Certification 21 1.Review shop drawings, product data and samples, including those by 22 subcontractors, prior to submission to determine and verify the following: 23 a.Field measurements 24 b.Field construction criteria 25 c.Catalog numbers and similar data 26 d.Conformance with the Contract Documents 27 2.Provide each shop drawing, sample and product data submitted by the Contractor 28 with a Ce1tification Statement affixed including: 29 a.The Contractor's Company name 30 b.Signature of submittal reviewer 31 c.Certification Statement 32 I)"By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D.Submittal Format 37 1.Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11 inches. 38 2.Bind shop drawings and product data sheets together. 39 3.Order 40 a.Cover Sheet 41 1)Description of Packet 42 2)Contractor Ce1tification 43 b.List of items I Table of Contents 44 c.Product Data /Shop Drawings/Samples /Calculations 45 E.Submittal Content 46 I.The date of submission and the dates of any previous submissions CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Highpoint Hill -Phase 3 City Project No. 100967 ( ( ( ( ( ( 01 33 00 - 3 SUBMITTALS 2.The Project title and number 2 3.Contractor identification 3 4.The names of: 4 a.Contractor 5 b.Supplier 6 c.Manufacturer Page 3 of 8 7 5.Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6.Field dimensions, clearly identified as such 10 7.Relation to adjacent or critical features of the Work or materials 11 8.Applicable standards, such as ASTM or Federal Specification numbers 12 9.Identification by highlighting of deviations from Contract Documents 13 10.Identification by highlighting of revisions on resubmittals 14 11.An 8-inch x 3-inch blank space for Contractor and City stamps 15 F.Shop Drawings 16 1.As specified in individual Work Sections includes, but is not necessarily limited to: 17 a.Custom-prepared data such as fabrication and erection/installation (working) 18 drawings 19 b.Scheduled information 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 c.Setting diagrams d.Actual shopwork manufacturing instructions e.Custom templates f.Special wiring diagrams g.Coordination drawings h.Individual system or equipment inspection and test reports including: 1)Performance curves and certifications 1.As applicable to the Work 2.Details a.Relation of the various pa1ts to the main members and lines of the structure b.Where correct fabrication of the Work depends upon field measurements 1)Provide such measurements and note on the drawings prior to submitting for approval. G.Product Data 1.For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2.For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a.Standard prepared data for manufactured products (sometimes referred to as catalog data) 1)Such as the manufacturer's product specification and installation instructions 2)Availability of colors and patterns 3)Manufacturer's printed statements of compliances and applicability 4)Roughing-in diagrams and templates 5)Catalog cuts 6)Product photographs CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Highpoint Hill -Phase 3 City Project No. /00967 7)Standard wiring diagrams 2 8)Printed performance curves and operational-range diagrams 01 33 00 - 4 SUBMITTALS Page 4 of 8 3 9)Production or quality control inspection and test repo1ts and certifications 4 I 0) Mill reports 5 11)Product operating and maintenance instructions and recommended 6 spare-paits listing and printed product warranties 7 12)As applicable to the Work 8 H.Samples 9 I.As specified in individual Sections, include, but are not necessarily limited to: 10 a.Physical examples of the Work such as: 11 I)Sections of manufactured or fabricated Work 12 2)Small cuts or containers of materials 13 3)Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4)Specimens for coordination of visual effect 16 5)Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I.Do not stait Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 I.Fabrication performed, materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2.The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 26 3.Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. 27 J.Submittal Distribution 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1.Electronic Distribution a.Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b.Shop Drawings 1)Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2)Hard Copies a)3 copies for all submittals b)If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c.Product Data I)Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2)Hard Copies a)3 copies for all submittals d.Samples I)Distributed to the Project Representative 2.Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Highpoint Hill -Phase 3 City Project No. 100967 ( ( l l ( 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 013300-5 SUBMITTALS a.Shop Drawings I)Distributed to the City 2)Copies a)8 copies for mechanical submittals b)7 copies for all other submittals Page 5 of 8 c)If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b.Product Data 1)Distributed to the City 2)Copies a)4 copies c.Samples 1)Distributed to the Project Representative 2)Copies a)Submit the number stated in the respective Specification Sections. 3.Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a.Provide number of copies as directed by the City but not exceeding the number previously specified. K.Submittal Review 1.The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a.Permitting any departure from the Contract requirements b.Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c.Approving departures from details furnished by the City, except as otherwise provided herein 2.The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a.All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3.The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4.If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5.Submittals will be returned to the Contractor under I of the following codes: a.Code I I)"NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a)When returned under this code the Contractor may release the equipment and/or material for manufacture. b.Code 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Highpoint Hill -Phase 3 City Project No. 100967 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 33 00 - 6 SUBMITTALS Page 6 of 8 1)"EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a)The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c.Code 3 1)"EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a)The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b)This resubmittal is to address all comments, omissions and non-conforming items that were noted. c)Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d.Code 4 1)"NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a)The Contractor must resubmit the entire package revised to bring the submittal into conformance. b)It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6.Resubmittals a.Handled in the same manner as first submittals I)Corrections other than requested by the City 2)Marked with revision triangle or other similar method a)At Contractor's risk if not marked b.Submittals for each item will be reviewed no more than twice at the City's expense. I)All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2)Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c.The need for more than I resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7.Pattial Submittals a.City reserves the right to not review submittals deemed partial, at the City's discretion. b.Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c.The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8.If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Highpoint Hill -Phase 3 City Project No. 100967 01 33 00 - 7 SUBMITTALS Page 7 of 8 9.When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no fut1her 3 changes therein except upon written instructions from the City. 4 I 0. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L.Mock ups 7 I.Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. IO M.Qualifications 11 I.If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N.Request for Information (RPI) 14 I.Contractor Request for additional information 15 a.Clarification or interpretation of the contract documents 16 b.When the Contractor believes there is a conflict between Contract Documents 17 c.When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 I)Identify the conflict and request clarification 20 2.Use the Request for Information (RPI) form provided by the City. 21 3.Numbering of RPI 22 a.Prefix with "RPI" followed by series number, "-xxx", beginning with "0 I" and 23 increasing sequentially with each additional transmittal. 24 4.Sufficient information shall be attached to permit a written response without further 25 information. 26 5.The City will log each request and will review the request. 27 a.If review of the project information request indicates that a change to the 28 Contract Documents is required, the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITT ALS/INFORMA TIONAL SUBMITT ALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Higl1poi11t Hill -Phase 3 City Project No. 100967 PART 2 -PRODUCTS [NOT USED] 2 PART 3 -EXECUTION [NOT USED] 3 END OF SECTION 4 5 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 01 33 00 - 8 SUBMITTALS Page 8 of8 Highpoint Hill -Phase 3 City Project No. 100967 ( ( ( ( ( ( ( 01 35 13 - I OAP SPECIAL PROJECT PROCEDURES 2 3 4 PARTl-GENERAL 5 1.1 SUMMARY 6 A.Section Includes: SECTION 01 35 13 SPECIAL PROJECT PROCEDURES Page I of7 7 1.The procedures for special project circumstances that includes, but is not limited to: 8 a.Coordination with the Texas Department of Transportation 9 b.Work near High Voltage Lines IO c.Confined Space Entry Program 11 d.Air Pollution Watch Days 12 e.Use of Explosives, Drop Weight, Etc. 13 f.Water Department Notification 14 g.Public Notification Prior to Beginning Construction 15 h.Coordination with United States Army Corps of Engineers 16 1.Coordination within Railroad permits areas 17 J.Dust Control 18 k.Employee Parking 19 !. {Coordination with North Central Texas Council of Govemments Clean 20 Constrnction Spec(flcation [remove {/ not required}} 21 22 B.Deviations from this City of Fort Worth Standard Specification 1.None. C.Related Specification Sections include, but are not necessarily limited to:23 24 25 26 27 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division 1 -General Requirements 3.Section 33 12 25 -Connection to Existing Water Mains 28 1.2 REFERENCES 29 A.Reference Standards 30 31 32 1.Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 33 34 2.Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 35 36 3.N01th Central Texas Council of Governments (NCTCOG) -Clean Construction Specification 37 1.3 ADMINISTRATIVE REQUIREMENTS 38 A.Coordination with the Texas Depattment of Transpottation 39 I.When work in the right-of-way which is under the jurisdiction of the Texas 40 Department of Transportation (TxDOT): CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised August, 30, 2013 Highpoilll Hill -Phase 3 City Project No. 100967 0 I 35 13 - 2 OAP SPECIAL PROJECT PROCEDURES Page 2 of7 a.Notify the Texas Depat1ment of Transportation prior to commencing any work 2 therein in accordance with the provisions of the permit 3 b.All work performed in the TxDOT right-of-way shall be performed in 4 compliance with and subject to approval from the Texas Department of 5 Transpottation 6 B.Work near High Voltage Lines 7 1.Regulatory Requirements 8 a.All Work near High Voltage Lines (more than 600 volts measured between 9 conductors or between a conductor and the ground) shall be in accordance with 10 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 11 2.Warning sign 12 a.Provide sign of sufficient size meeting all OSHA requirements. 13 3.Equipment operating within 10 feet of high voltage lines will require the following 14 safety features 15 a.Insulating cage-type of guard about the boom or arm 16 b.Insulator links on the lift hook connections for back hoes or dippers 17 c.Equipment must meet the safety requirements as set forth by OSHA and the 18 safety requirements of the owner of the high voltage lines 19 4.Work within 6 feet of high voltage electric lines 20 a.Notification shall be given to: 21 1)The power company ( example: ONCOR) 22 a)Maintain an accurate log of all such calls to power company and record 23 action taken in each case. 24 b.Coordination with power company 25 1)After notification coordinate with the power company to: 26 a)Erect temporary mechanical barriers, de-energize the lines, or raise or 27 lower the lines 28 c.No personnel may work within 6 feet of a high voltage line before the above 29 requirements have been met. 30 C.Confined Space Entry Program 31 1.Provide and follow approved Confined Space Entry Program in accordance with 32 OSHA requirements. 33 2.Confined Spaces include: 34 a.Manholes 35 b.All other confined spaces in accordance with OSHA's Permit Required for 36 Confined Spaces 37 D.Use of Explosives, Drop Weight, Etc. 38 1.When Contract Documents permit on the project the following will apply: 39 a.Public Notification 40 1)Submit notice to City and proof of adequate insurance coverage, 24 hours 41 prior to commencing. 42 2)Minimum 24 hour public notification in accordance with Section 0 1 31 13 43 E.Water Depattment Coordination CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Revised August, 30, 2013 Highpoint Hill -Phase 3 City Project No. 100967 ( l ( ( ( 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 0 I 35 13 • 3 OAP SPECIAL PROJECT PROCEDURES Page 3 of7 1.During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. 2.Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a.Coordination shall be in accordance with Section 33 12 25. b.If needed, obtain a hydrant water meter from the Water Depattment for use during the life of named project. c.In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1)Do not operate water line valves of existing water system. a)Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b)In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. F.Public Notification Prior to Beginning Construction I.Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a.Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. I)Prepare flyer on the Contractor's letterhead and include the following information: a)Name of Project b)City Project No (CPN) c)Scope of Project (i.e. type of construction activity) d)Actual construction duration within the block e)Name of the contractor's foreman and phone number f)Name of the City's inspector and phone number g)City's after-hours phone number 2)A sample of the 'pre-construction notification' flyer is attached as Exhibit A. 3)Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4)Deliver flyer to the City Inspector for review prior to distribution. b.No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. 42 G.Public Notification of Temporary Water Service Interruption during Construction 43 I.In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2.Prepared notice as follows: 47 a.The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised August, 30, 2013 Highpoint Hill -Phase 3 City Project No. 100967 01 3513-4 DAP SPECIAL PROJECT PROCEDURES b.Prepare flyer on the contractor's letterhead and include the following 2 information: 3 I)Name of the project 4 2)City Project Number 5 3)Date of the interruption of service 6 4)Period the interruption will take place 7 5)Name of the contractor's foreman and phone number 8 6)Name of the City's inspector and phone number Page 4 of7 9 c.A sample of the temporary water service interruption notification is attached as IO Exhibit B. 11 d.Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e.No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f.Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 H.Coordination with United States Army Corps of Engineers (USA CE) 18 I . At locations in the Project where construction activities occur in areas where 19 USACE permits are required, meet all requirements set forth in each designated 20 permit. 21 I.Coordination within Railroad Permit Areas 22 23 24 25 26 27 28 29 30 31 32 33 I.At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a.Flagmen b.Inspectors c.Safety training d.Additional insurance e.Insurance certificates f.Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 34 35 2.Obtain any supplemental information needed to comply with the railroad's requirements. 36 J.Dust Control 37 I.Use acceptable measures to control dust at the Site. 38 a.If water is used to control dust, capture and properly dispose of waste water. 39 b.If wet saw cutting is performed, capture and properly dispose of sluny. 40 K.Employee Parking 41 I.Provide parking for employees at locations approved by the City. 42 L.{Coordination with North Central Texas Council of Governments (NCTCOG) Clean 43 Construction Specification [if required for the project] 44 I.Comply with equipment, operational, repo11ing and enforcement requirements set 45 forth in NCTCOG's Clean Construction Specification.} CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised August, 30, 2013 Highpoint Hill -Phase 3 City Project No. 100967 ( ( ( ( l l 01 35 13 - 5 OAP SPECIAL PROJECT PROCEDURES 1.4 SUBMITT ALS [NOT USED] 2 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITT ALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 -PRODUCTS [NOT USED] 10 PART 3-EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE Page 5 of7 1.3.8 -Added requirement of compliance with Health and Safety Code, Title 9. 13 8/31/2012 D.Johnson Safety, Subtitle A Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised August, 30, 20 I 3 Highpoint Hill -Phase 3 City Project No. 100967 01 3513-6 OAP SPECIAL PROJECT PROCEDURES 2 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 15 16 Page 6 of7 EXHIBIT A (To be printed on Contractor's Letterhead) 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT< TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FL YER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised August, 30, 2013 Highpoint Hill -Phase 3 City Project No. 100967 ( ( t ( l 2 3 4 01 3513-7 DAP SPECIAL PROJECT PROCEDURES Date: _____ _ EXHIBITB DOENO.XXXX Projec:t Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION Page 7 of7 DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON __________ _ BETWEEN THE HOURS OF _________ AND ______ _ IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE CALL: MR.-------=------,....,..-,---=--------------=-AT-----,,-=:-====-:=:-=-=-,----(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. ______ .,--_______ AT __ =:-====-:-=c-==,.,.---(CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, _____________ _,CONTRACTOR CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised August, 30, 2013 Highpoint Hill-Phase 3 City Project No. 100967 I 2 3 4 5 6 7 8 9 IO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 014523-1 OAP TESTING AND INSPECTION SERVICES PART 1 -GENERAL 1.1 SUMMARY A.Section Includes: SECTION 01 45 23 TESTING AND INSPECTION SERVICES I.Testing and inspection services procedures and coordination B.Deviations from this City of Fort Worth Standard Specification I.None. C.Related Specification Sections include, but are not necessarily limited to: Page I of2 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division I -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment I.Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a.Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b.City is responsible for performing and payment for first set of Quality Assurance testing. I)If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a)Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A.Testing I.Complete testing in accordance with the Contract Documents. 2.Coordination a.When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b.When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3.Distribution of Testing Repo11s a.Electronic Distribution I)Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another form of distribution approved by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised August 30, 2013 Highpoilll Hill -Phase 3 Cily Projecl No. 100967 01 45 23 - 2 DAP TESTING AND INSPECTION SERVICES Page 2 of2 2)Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3)Hard Copies 4 a)1 copy for all submittals submitted to the Project Representative 5 b.Hard Copy Distribution (if required in lieu of electronic distribution) 6 1)Tests performed by City 7 a)Distribute I hard copy to the Contractor 8 2)Tests performed by the Contractor 9 a)Distribute 3 hard copies to City's Project Representative IO 4.Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a.Name of pit 13 b.Date of delivery 14 c.Material delivered 15 B.Inspection 16 I.Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2-PRODUCTS [NOT USED] 27 PART 3 -EXECUTION [NOT USED] 28 END OF SECTION 29 30 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised August 30, 2013 Higl,poinl Hill -Phase 3 Cily Project No. /00967 ( 01 50 00 - I OAP TEMPORARY FACILITIES AND CONTROLS 1 SECTION 01 50 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: Page I of4 6 1.Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a.Temporary utilities 9 b.Sanitary facilities 10 c.Storage Sheds and Buildings 11 d.Dust control 12 e.Temporary fencing of the construction site 13 B.Deviations from this City of Fort Worth Standard Specification 14 1.None. 15 C.Related Specification Sections include, but are not necessarily limited to: 16 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 17 2.Division 1 -General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A.Measurement and Payment 20 1.Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A.Temporary Utilities 25 1.Obtaining Temporary Service 26 a.Make arrangements with utility service companies for temporary services. 27 b.Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c.Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 I)Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2.Water 34 a.Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b.Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c.Coordination 40 I)Contact City I week before water for construction is desired CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised JULY I, 2011 Highpoint Hill -Phase 3 City Project No. 100967 0150 00-2 OAP TEMPORARY FACILITIES AND CONTROLS d.Contractor Payment for Construction Water Page 2 of 4 2 1)Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3.Electricity and Lighting 5 a.Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1)Provide power for lighting, operation of equipment, or other use. 8 b.Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4.Telephone 11 a.Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5.Temporary Heat and Ventilation 14 a.Provide temporary heat as necessary for protection or completion of Work. 15 b.Provide temporary heat and ventilation to assure safe working conditions. 16 B.Sanitary Facilities 17 1.Provide and maintain sanitary facilities for persons on Site. 18 a.Comply with regulations of State and local departments of health. 19 2.Enforce use of sanitary facilities by construction personnel at job site. 20 a.Enclose and anchor sanitary facilities. 21 b.No discharge will be allowed from these facilities. 22 c.Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d.Haul sewage and waste off-site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4.Remove facilities at completion of Project 28 C.Storage Sheds and Buildings 29 1.Provide adequately ventilated, wate11ight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2.Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3.Store materials in a neat and orderly manner. 34 a.Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4.Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5.Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6.Remove building from site prior to Final Acceptance. 42 D.Temporary Fencing 43 1.Provide and maintain for the duration or construction when required in contract 44 documents 45 E.Dust Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Revised JULY I, 2011 Highpoint Hill -Phase 3 City Project No. 100967 01 50 00 - 3 OAP TEMPORARY FACILITIES AND CONTROLS Page 3 of4 1.Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a.Contractor remains on-call at all times 4 b.Must respond in a timely manner 5 F.Temporary Protection of Construction 6 1.Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] IO 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2-PRODUCTS [NOT USED] 17 PART 3 -EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A.Temporary Facilities 23 1.Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REP AIR] / [RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A.Temporary Facilities CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Revised JULY I, 2011 Highpoi/11 Hill -Phase 3 City Project No. /00967 0150 00-4 OAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1.Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to stait of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AW ARD ED PROJECTS Revised JULY I, 20 I I Highpoint Hill -Phase 3 City Project No. 100967 015526-1 OAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL SECTION 01 55 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 1.Administrative procedures for: 7 a.Street Use Permit 8 b.Modification of approved traffic control 9 c.Removal of Street Signs 10 B.Deviations from this City of Fort Worth Standard Specification I I 1.None. 12 C.Related Specification Sections include, but are not necessarily limited to: Page I of3 13 1.Division O -Bidding Requirements, Contract Forms and Conditions of the Contract 14 2.Division 1 -General Requirements I 5 3.Section 34 71 13 -Traffic Control I 6 1.2 PRICE AND PAYMENT PROCEDURES I 7 A.Measurement and Payment 18 1.Work associated with this Item is considered subsidiary to the various Items bid. I 9 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 2 I A.Reference Standards 22 1.Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2.Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A.Traffic Control 28 1.General 29 a.When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b.When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 I)Allow minimum IO working days for review of proposed Traffic Control. 35 B.Street Use Permit 36 I.Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a.To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transp011ation and Public Works Department. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised July I, 2011 Highpoint Hill -Phase 3 City Project No. 100967 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 1)Allow a minimum of 5 working days for permit review. Page 2 of3 2 2)Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C.Modification to Approved Traffic Control 5 1.Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Depat1ment Transpmtation and 7 Public Works Department. 8 1)Revise Traffic Control plans in accordance with Section 34 71 13. 9 2)Allow minimum 5 working days for review of revised Traffic Control. 10 3)It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D.Removal of Street Sign 13 1.If it is determined that a street sign must be removed for construction, then contact 14 City Transpo11ation and Public Works Depattment, Signs and Markings Division to 15 remove the sign. 16 E.Temporary Signage 17 1.In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices (MUTCD). 20 2.Install temporary sign before the removal of permanent sign. 21 3.When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transpo11ation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F.Traffic Control Standards 25 1.Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 -PRODUCTS [NOT USED] 35 PART 3 -EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised July I, 2011 Highpoint Hill -Phase 3 City Project No. 100967 2 DATE NAME CITY OF FORT WORTH 0 I 55 26 - 3 OAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of3 Revision Log SUMMARY OF CHANGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Revised July I, 2011 Highpoint Hill -Phase 3 City Project No. 100967 ( 01 57 13 - I OAP STORM WATER POLLUTION PREVENTION SECTION 01 57 13 2 STORM WATER POLLUTION PREVENTION 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 1.Procedures for Storm Water Pollution Prevention Plans 7 B.Deviations from this City of F01t Worth Standard Specification 8 1.None. 9 C.Related Specification Sections include, but are not necessarily limited to: 10 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the 11 Contract I 2 2.Division 1 -General Requirements I 3 3.Section 31 25 00 -Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment 1.Construction Activities resulting in less than 1 acre of disturbance Page I of3 15 16 17 18 a.Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2.Construction Activities resulting in greater than 1 acre of disturbance19 20 a.Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 23 A.Abbreviations and Acronyms 1.Notice of Intent: NOi 24 2.Notice of Termination: NOT 25 3.Storm Water Pollution Prevention Plan: SWPPP 26 4.Texas Commission on Environmental Quality: TCEQ 27 5.Notice of Change: NOC 28 A.Reference Standards 29 1.Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2.Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A.General 36 1.Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised July I, 2011 Highpoint Hill -Phase 3 City Project No. /00967 B.Construction Activities resulting in: 01 57 13 - 2 OAP STORM WATER POLLUTION PREVENTION Page 2 of3 2 I.Less than I acre of disturbance 3 a.Provide erosion and sediment control in accordance with Section 31 25 00 and 4 Drawings. 5 6 7 8 9 JO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 2.I to less than 5 acres of disturbance a.Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b.Complete SWPPP in accordance with TCEQ requirements I)TCEQ Small Construction Site Notice Required under general permit TXRl50000 a)Sign and post at job site b)Prior to Preconstruction Meeting, send I copy to City Department of Transpo1tation and Public Works, Environmental Division, (817) 392- 6088. 2)Provide erosion and sediment control in accordance with: a)Section 31 25 00 b)The Drawings c)TXRl50000 General Permit d)SWPPP e)TCEQ requirements 3.5 acres or more of Disturbance a.Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b.Complete SWPPP in accordance with TCEQ requirements 1)Prepare a TCEQ NOi form and submit to TCEQ along with required fee a)Sign and post at job site b)Send copy to City Depaitment of Transportation and Public Works, Environmental Division, (817) 392-6088. 2)TCEQ Notice of Change required if making changes or updates to NOi 3)Provide erosion and sediment control in accordance with: a)Section 31 25 00 b)The Drawings c)TXR 150000 General Permit d)SWPPP e)TCEQ requirements 4)Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a)Send copy to City Depa1tment of Transportation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A.SWPPP 42 1.Submit in accordance with Section O I 33 00, except as stated herein. 43 a.Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1)1 copy to the City Project Manager 46 a)City Project Manager will forward to the City Depa1tment of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised July I, 2011 Highpoint Hill-Phase 3 City Project No. /00967 ( ( 01 57 13 - 3 OAP STORM WATER POLLUTION PREVENTION Page 3 of3 B.Modified SWPPP 2 1.If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 0 1 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED) 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 -PRODUCTS [NOT USED] 12 PART 3- EXECUTION [NOT USED] 13 END OF SECTION 14 15 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised July I, 2011 Highpoilll Hill -Phase 3 City Project No. 100967 ( ( ( ( 0160 00-1 DAP PRODUCT REQUIREMENTS I SECTION 0160 00 2 PRODUCT REQUIREMENTS 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 1.References for Product Requirements and City Standard Products List 7 B.Deviations from this City of Fort Worth Standard Specification 8 1.None. 9 C.Related Specification Sections include, but are not necessarily limited to: Page I of2 IO 1.Division O -Bidding Requirements, Contract Forms and Conditions of the Contract I I 2.Division 1 -General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A.A list of City approved products for use is located on Buzzsaw as follows: I 6 1.Resources\02 -Construction Documents\Standard Products List 17 18 B.Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 19 20 21 22 23 24 25 26 27 28 29 1.Any subsequently approved products will only be allowed for use upon specific approval by the City. C.Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1.The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D.Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E.See Section 01 33 00 for submittal requirements of Product Data included on City's Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. 100967 01 60 00 - 2 OAP PRODUCT REQUIREMENTS 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 -PRODUCTS [NOT USED] 5 PART 3 -EXECUTION [NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME SUMMARY OF CHANGE I 0/12/12 D.Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for OAP application CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised April 7, 2014 Page 2 of2 Highpoint Hill -Phase 3 City Project No. 100967 l ( 01 66 00 - I DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS SECTION 01 66 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PARTl-GENERAL 4 1.1 SUMMARY 5 A.Section Includes: 6 I.Scheduling of product delivery 7 2.Packaging of products for delivery 8 3.Protection of products against damage from: 9 a.Handling IO b.Exposure to elements or harsh environments 11 B.Deviations from this City of Fort Worth Standard Specification 12 I.None. 13 C.Related Specification Sections include, but are not necessarily limited to: Page I of4 14 I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 15 2.Division 1 -General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A.Measurement and Payment 18 1.Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS (NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS (NOT USED] 24 1.7 CLOSEOUT SUBMITTALS (NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE (NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A.Delivery Requirements 29 I.Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2.Provide appropriate personnel and equipment to receive deliveries. 32 3.Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Projec/ No. /00967 016600-2 OAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4.Deliver products or equipment in manufacturer's original unbroken ca11ons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5.Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6.Provide manufacturer's instructions for storage and handling. 7 B.Handling Requirements 8 I.Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. IO C.Storage Requirements 11 I.Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2.Make necessary provisions for safe storage of materials and equipment. 14 a.Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3.Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a.Arrange storage to provide easy access for inspection. 22 4.Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5.Provide off-site storage and protection when on-site storage is not adequate. 25 a.Provide addresses of and access to off-site storage locations for inspection by 26 City's Project Representative. 27 6.Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7.Store in manufacturers' unopened containers. 30 8.Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to propet1y owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9.Keep public and private driveways and street crossings open. 34 I 0. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a.Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoi11t Hill -Phase 3 City Project No. 100967 l 016600-3 OAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 PART 3 -EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED) 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD !oR) SITE QUALITY CONTROL A.Tests and Inspections 1.Inspect all products or equipment delivered to the site prior to unloading. B.Non-Conforming Work I.Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED) 3.9 ADJUSTING [NOT USED) 3.10 CLEANING [NOT USED) 3.11 CLOSEOUT ACTIVITIES [NOT USED) 3.12 PROTECTION A.Protect all products or equipment in accordance with manufacturer's written directions. B.Store products or equipment in location to avoid physical damage to items while in storage. C.Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED) 3.14 ATTACHMENTS [NOT USED) END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoilll Hill -Phase 3 City Project No. /00967 DATE NAME 4/7/2014 M.Domenech CITY OF FORT WORTH 01 66 00 - 4 OAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log SUMMARY OF CHANGE Revised for DAP application STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised April 7, 2014 Highpoinl Hill -Phase 3 Cily Projec/ No. 100967 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ( 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 01 70 00 - I DAP MOBILIZATION AND REMOBILIZATION PART 1 -GENERAL 1.1 SUMMARY SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION A.Section Includes: 1.Mobilization and Demobilization a.Mobilization Page I of 4 1)Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2)Establishment of necessary general facilities for the Contractor's operation at the Site 3)Premiums paid for performance and payment bonds 4)Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5)Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b.Demobilization 1)Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2)Site Clean-up 3)Removal of all buildings and/or other facilities assembled at the Site for this Contract c.Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2.Remobilization a.Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: l)Demobilization a)Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b)Site Clean-up as designated in the Contract Documents 2)Remobilization a)Transpot1ation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b)Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3)No Payments will be made for: a)Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b)Stand-by or idle time c)Lost profits 3.Mobilizations and Demobilization for Miscellaneous Projects a.Mobilization and Demobilization CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised April 7, 2014 Highpoilll Hill -Phase 3 City Project No. /00967 01 70 00 - 2 OAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1)Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a)Transp01tation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b)Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2)Demobilization shall consist of the activities and cost necessary for: 8 a)Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b)Site Clean-up for each issued Work Order 12 c)Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b.Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4.Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a.A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B.Deviations from this City of Fort W01th Standard Specification 20 1.None. 21 C.Related Specification Sections include, but are not necessarily limited to: 22 1.Division 0 -Bidding Requirements, Contract Forms and Conditions of the Contract 23 2.Division 1 -General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A.Measurement and Payment 26 I.Mobilization and Demobilization 27 a.Measure 28 1)This Item is considered subsidiary to the various Items bid. 29 b.Payment 30 1)The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2.Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a.Measurement 36 1)Measurement for this Item shall be per each remobilization performed. 37 b.Payment 38 1)The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c.The price shall include: 43 I)Demobilization as described in Section 1.1.A.2.a.1) 44 2)Remobilization as described in Section 1.1.A.2.a.2) 45 d.No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. 100967 ( 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 70 00 • 3 DAP MOBILIZATION AND REMOBILIZATION 3.Remobilization for suspension of Work as required by City a.Measurement and Payment Page 3 of 4 1)This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2)No payments will be made for standby, idle time, or lost profits associated with this Item. 4.Mobilizations and Demobilizations for Miscellaneous Projects a.Measurement 1)Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b.Payment 1)The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c.The price shall include: 1)Mobilization as described in Section 1.1.A.3 .a. I) 2) Demobilization as described in Section 1.1.A.3.a.2) d.No payments will be made for standby, idle time, or lost profits associated this Item. 5.Emergency Mobilizations and Demobilizations for Miscellaneous Projects a.Measurement 1)Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b.Payment 1)The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c.The price shall include 1)Mobilization as described in Section 1.1.A.4.a) 2)Demobilization as described in Section 1.1.A.3 .a.2) d.No payments will be made for standby, idle time, or lost profits associated this Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. /00967 01 70 00 - 4 OAP MOBILIZATION AND REMOBILIZATION 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 -PRODUCTS [NOT USED] 4 PART 3 -EXECUTION [NOT USED] 5 END OF SECTION 6 7 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for OAP application CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AW ARD ED PROJECTS Revised April 7, 2014 Page 4 of 4 Highpoint Hill -Phase 3 City Project No. 100967 I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 017423-1 OAP CLEANING PART 1 -GENERAL 1.1 SUMMARY A.Section Includes: SECTION 01 74 23 CLEANING Page I of 4 1.Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B.Deviations from this City of Fort Worth Standard Specification 1.None. C.Related Specification Sections include, but are not necessarily limited to: 1.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division 1 -General Requirements 3.Section 32 92 13 -Hydro-Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment 1.Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A.Scheduling 1.Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2.Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A.Storage and Handling Requirements 1.Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. /00967 01 74 23 - 2 DAP CLEANfNG 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2-PRODUCTS 4 2.1 OWNER-FURNISHED loR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A.Cleaning Agents 7 1.Compatible with surface being cleaned 8 2.New and uncontaminated 9 3.For manufactured surfaces 10 a.Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3-EXECUTION 14 15 16 17 18 19 3.1 3.2 3.3 3.4 3.5 3.6 INSTALLERS [NOT USED] EXAMINATION [NOT USED] PREPARATION [NOT USED] APPLICATION [NOT USED] REPAIR/ RESTORATION [NOT USED] RE-INSTALLATION [NOT USED] 20 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A.General 25 1.Prevent accumulation of wastes that create hazardous conditions. Page 2 of 4 26 2.Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3.Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4.Dispose of degradable debris at an approved solid waste disposal site. 31 5.Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AW ARD ED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. 100967 ( ( l 0 I 74 23 - 3 OAP CLEANING 6.Handle materials in a controlled manner with as few handlings as possible. Page 3 of 4 2 7.Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8.Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9.If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 I 0. Do not burn on-site. 9 B.Intermediate Cleaning during Construction 10 I.Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2.At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3.Confine construction debris daily in strategically located container(s): 14 a.Cover to prevent blowing by wind 15 b.Store debris away from construction or operational activities 16 c.Haul from site at a minimum of once per week 17 4.Vacuum clean interior areas when ready to receive finish painting. 18 a.Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 19 5.Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 22 23 24 25 26 27 28 29 30 31 C.Exterior (Site or Right of Way) Final Cleaning 1.Remove trash and debris containers from site. a.Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2.Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3.Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4.If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5.Clean signs, lights, signals, etc. 32 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 3.12 PROTECTION [NOT USED] 34 3.13 MAINTENANCE [NOT USED] 35 3.14 ATTACHMENTS [NOT USED] 36 37 38 39 40 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. /00967 2 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for OAP application CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFIC A TJON DOCUMENTS -DEVELOPER AW ARD ED PROJECTS Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 Highpoint Hill-Phase 3 City Project No. /00967 2 3 4 5 6 7 8 9 JO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 78 39 - I DAP PROJECT RECORD DOCUMENTS PART 1 -GENERAL 1.1 SUMMARY A.Section Includes: SECTION 01 78 39 PROJECT RECORD DOCUMENTS Page I of 4 1.Work associated with the documenting the project and recording changes to project documents, including: a.Record Drawings b.Water Meter Service Reports c.Sanitary Sewer Service Reports d.Large Water Meter Reports B.Deviations from this City of Fort Worth Standard Specification I.None. C.Related Specification Sections include, but are not necessarily limited to: I.Division 0-Bidding Requirements, Contract Forms and Conditions of the Contract 2.Division I -General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A.Measurement and Payment 1.Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITT ALS A.Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS (NOT USED] 1.9 QUALITY ASSURANCE A.Accuracy of Records I.Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2.Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. /00967 01 78 39 - 2 OAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 3.To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4.Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A.Storage and Handling Requirements 8 1.Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2.In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a.In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 -PRODUCTS 18 2.1 OWNER-FURNISHED (oR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A.Job set 21 I.Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, I complete set of all Documents comprising the Contract. 23 B.Final Record Documents 24 I.At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City I complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 -EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A.Maintenance of Job Set 34 I.Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS -JOB SET". CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. 100967 r ( ( ( ( ( ( ( ( ( l ( ( l c, L· L 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 B. 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of4 2.Preservation a.Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b.Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c.Maintain the job set at the site of work. 3.Coordination with Construction Survey a.At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4.Making entries on Drawings a.Record any deviations from Contract Documents. b.Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c.Date all entries. d.Call attention to the entry by a "cloud" drawn around the area or areas affected. e.In the event of overlapping changes, use different colors for the overlapping changes. 5.Conversion of schematic layouts a.In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1)Final physical arrangement is determined by the Contractor, subject to the City's approval. 2)However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b.Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1)Final physical arrangement is determined by the Contractor, subject to the City's approval. 2)Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3)Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c.The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. Final Project Record Documents I.Transfer of data to Drawings a.Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b.Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c.Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Highpoint Hill -Phase 3 City Project No. /00967 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 2 3 4 5 6 7 8 9 10 11 01 78 39 - 4 OAP PROJECT RECORD DOCUMENTS d.Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2.Transfer of data to other Documents Page 4 of 4 a.If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b.If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 12 3.5 REPAIR/ RESTORATION [NOT USED] 13 3.6 RE-INSTALLATION [NOT USED] 14 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 15 16 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 24 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for OAP Application CITY OF FORT WORTH ST AND ARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER A WARDED PROJECTS Revised April 7, 2014 Highpoint Hill -Phase 3 City Project No. 100967 \ I