HomeMy WebLinkAbout066042 - Construction-Related - Contract - Venue Solutions Group, LLCCSC No. 66042
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR GENERAL PROFESSIONAL SERVICES
This agreement ("Agreement") is between the City of Fort Worth, a Texas home -rule
municipality ("City"), and Venue Solutions Group, LLC, authorized to do business in Texas
("Consultant"), for a project generally described as: Will Rogers Memorial Center Facilities
Assessment Study ("Project") — Project No. 106447.
Article I
Scope of Services
(1) Consultant hereby agrees to perform professional services as set forth in this
Agreement and the Scope of Services, attached hereto as Attachment "A"
("Services"). These Services shall be performed in connection with the Project.
(2) Additional services, if any, will be memorialized by an amendment to this Agreement.
(3) All reports, whether partial or complete, prepared under this Agreement, including
any original drawings or documents, whether furnished by City, its officers, agents,
employees, consultants, or contractors, or prepared by Consultant, shall be or
become the property of City, and shall be furnished to the City, prior to or at the time
such services are completed, or upon termination or expiration of Agreement.
Article II
Compensation
Consultant shall be compensated an amount up to $1,370,920.00 ("Contract Amount") in
accordance with the Fee Schedule shown in Attachment "B". Payment shall be considered
full compensation for all labor (including all benefits, overhead and markups), materials,
supplies, and equipment necessary to complete the Services.
Consultant shall provide monthly invoices to City. Payments for services rendered shall be
made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch.
2251).
Acceptance by Consultant of said payment shall release City from all claims or liabilities
under this Agreement for anything related to, performed, or furnished in connection with the
Services for which payment is made, including any act or omission of City in connection with
such Services.
Article III
Term
Time is of the essence. The term of this Agreement shall commence on the Effective Date and
shall continue until the expiration of the funds or completion of the subject matter pursuant to
OFFICIAL RECORD
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services CITY SECRETARY 106447]
Revision Date: March 8, 2024 FT. WORTH, TX
Page 1 of 8
the schedule, whichever occurs first, unless terminated in accordance with the terms of this
Agreement. Unless specifically otherwise amended, the original term shall not exceed five
years from the original effective date.
Article IV
Independent Contractor
Consultant shall operate hereunder as an independent contractor and not as an officer, agent,
servant, or employee of City. Consultant shall have exclusive control of and the exclusive right
to control the details of the work to be performed hereunder and of all persons performing
same, and shall be solely responsible for the acts and omissions of its officers, agents,
employees, contractors and subcontractors. The doctrine of respondeat superior shall not
apply as between City and Consultant, its officers, agents, employees, contractors, and
subcontractors, and nothing herein shall be construed as creating a partnership or joint venture
between City and Consultant.
Article V
Professional Competence
Work performed by Consultant shall comply in all aspects with all applicable local, state and
federal laws and with all applicable, standards, codes, rules and/or regulations promulgated
by local, state and national boards, bureaus and agencies. Approval to proceed by City of
Consultant's work or work product shall not constitute or be deemed to be a release of the
responsibility and liability of Consultant or its officers, agents, employees, contractors and
subcontractors for the accuracy and competency of its performance of the Services.
Article VI
Indemnification
CONSULTANT, AT NO COST TO THE CITY, AGREES TO INDEMNIFYAND HOLD CITY,
ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES, HARMLESS AGAINST ANY
AND ALL CLAIMS, LAWSUITS, ACTIONS, COSTS AND EXPENSES OF ANY KIND,
INCLUDING, BUT NOT LIMITED TO, THOSE FOR PROPERTY DAMAGE OR LOSS
(INCLUDING ALLEGED DAMAGE OR LOSS TO CONSULTANT'S BUSINESS AND ANY
RESULTING LOST PROFITS) AND/OR PERSONAL INJURY, INCLUDING DEATH, THAT
MAY RELATE TO, ARISE OUT OF OR BE OCCASIONED BY CONSULTANT'S BREACH
OF (i) ANY OF THE TERMS OR PROVISIONS OF THIS AGREEMENT OR (ii) ANY
NEGLIGENT ACT OR OMISSION OR INTENTIONAL MISCONDUCT OF CONSULTANT,
ITS OFFICERS, AGENTS, ASSOCIATES, EMPLOYEES, CONTRACTORS (OTHER
THAN THE CITY) OR SUBCONTRACTORS RELATED TO THE PERFORMANCE OR
NON-PERFORMANCE OF THIS AGREEMENT. THIS SECTION SHALL SURVIVE ANY
TERMINATION OR EXPIRATION OF THIS AGREEMENT.
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447]
Revision Date: March 8, 2024
Page 2 of 8
Article VII
Insurance
Consultant shall not commence work under this Agreement until it has obtained all insurance
required under Attachment F and City has approved such insurance.
Article VIII
Force Majeure
City and Consultant shall exercise their best efforts to meet their respective duties and
obligations as set forth in this Agreement, but shall not be held liable for any delay or
omission in performance due to force majeure or other causes beyond their reasonable
control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural
disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
Article IX
Transfer or Assignment
Consultant, its lawful successors and assigns, shall not assign, sublet or transfer any interest
in this Agreement without prior written consent of City.
Article X
Termination of Contract
(1) City may terminate this Agreement for convenience by providing written notice to
Consultant at least 30 -days prior to the date of termination, unless Consultant agrees
in writing to an earlier termination date.
(2) Either City or Consultant may terminate this Agreement for cause if either party fails
to substantially perform, through no fault of the other and the nonperforming party
does not commence correction of such nonperformance within 5 days after receipt of
written notice or thereafter fails to diligently pursue the correction to completion.
(3) If City chooses to terminate this Agreement, upon receipt of notice of termination by
Consultant, Consultant shall discontinue Services on the date such termination is
effective. City shall compensate Consultant for such services rendered based upon
Article II of this Agreement and in accordance with Exhibit "B".
Article XI
Right to Audit
(1) Consultant agrees that City shall, until the expiration of three (3) years after final
payment under Agreement, have access to and the right to examine any directly
pertinent books, documents, papers and records of Consultant involving transactions
relating to Agreement. Consultant agrees that City shall have access during normal
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447]
Revision Date: March 8, 2024
Page 3 of 8
working hours to all necessary facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section.
City shall give Consultant reasonable advance notice of intended audits.
(2) Consultant further agrees to include in all its subcontracts hereunder, a provision to
the effect that the subcontractor agrees that City shall, until the expiration of three (3)
years after final payment under the subcontract, have access to and the right to
examine any directly pertinent books, documents, papers and records of such
subcontractor(s), involving transactions to the subcontract, and further, that City shall
have access during normal working hours to all subcontractor facilities, and shall be
provided adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this article. City shall give Consultant and any
subcontractor reasonable advance notice of intended audit.
(3) Consultant and subcontractor(s) agree to photocopy such documents as may be
requested by City. City agrees to reimburse Consultant for the cost of copies at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
Article XII
Observe and Comply
Consultant shall at all times observe and comply with all federal, state, and local laws and
regulations and with all City ordinances and regulations which in any way affect Agreement
and the work hereunder, and shall observe and comply with all orders, laws ordinances and
regulations which may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. Consultant agrees to defend, indemnify and hold harmless City and all of its
officers, agents and employees from and against all claims or liability arising out of the violation
of any such order, law, ordinance, or regulation, whether it be by itself or its employees or its
subcontractor(s).
Article XIII
Immigration Nationality Act
Consultant shall verify the identity and employment eligibility of its employees and
employees of all subcontractor(s) who perform work under Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by City, Consultant shall
provide City with copies of all 1-9 forms and supporting eligibility documentation for each
employee who performs work under Agreement. Consultant shall adhere to all Federal and
State laws as well as establish appropriate procedures and controls so that no services will
be performed by any Consultant employee who is not legally eligible to perform such
services. CONSULTANT SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM
ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS
PARAGRAPH BY CONSULTANT, CONSULTANT'S EMPLOYEES,
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447]
Revision Date: March 8, 2024
Page 4 of 8
SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Consultant,
shall have the right to immediately terminate Agreement for violations of this provision by
Consultant.
Article XIV
Venue and Jurisdiction
If any action, whether real or asserted, at law or in equity, arises on the basis of any provision
of Agreement, venue for such action shall lie in state courts located in Tarrant County, Texas
or the United States District Court for the Northern District of Texas — Fort Worth Division.
Agreement shall be construed in accordance with the laws of the State of Texas.
Article XV
Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed
and revised Agreement and that the normal rule of contract construction, to the effect that
any ambiguities are to be resolved against the drafting party, must not be employed in the
interpretation of Agreement or any amendments or exhibits hereto.
The failure of City or Consultant to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Consultant's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
Article XVI
Severability
The provisions of Agreement are severable, and if any word, phrase, clause, sentence,
paragraph, section or other part of Agreement or the application thereof to any person or
circumstance shall ever be held by any court of competent jurisdiction to be invalid or
unconstitutional for any reason, the remainder of Agreement and the application of such
word, phrase, clause, sentence, paragraph, section, or other part of Agreement to other
persons or circumstances shall not be affected thereby and Agreement shall be construed
as if such invalid or unconstitutional portion had never been contained therein.
Article XVII
Notices
Notices regarding Articles IX or X are to be provided to the other Party by hand -delivery or
via U.S. Postal Service certified mail return receipt requested, postage prepaid, to the
address of the other Party shown below:
City of Fort Worth
Attn: Robert Tate
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447]
Revision Date: March 8, 2024
Page 5 of 8
Property Management
100 Fort Worth Trail
Fort Worth, Texas 76102
Consultant:
Venue Solutions Group, LLC
Attn: Tom Williams
7105 Peach Court, Suite 108
Brentwood, Tennessee 37027
All other notices may be provided as described above or via electronic means.
Article XVIII
Prohibition On Contracts With Companies Boycotting Israel
Consultant, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Consultant has 10 or more full time -employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of
the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed
to those terms in Section 808.001 of the Texas Government Code. By signing this
contract, Consultant certifies that Consultant's signature provides written verification
to the City that if Chapter 2271, Texas Government Code applies, Consultant: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the contract.
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447
Revision Date: March 8, 2024
Page 6 of 8
Article XIX
Prohibition on Boycotting Energy Companies
Consultant acknowledges that in accordance with Chapter 2276 of the Texas Government
Code, the City is prohibited from entering into a contract for goods or services that has a
value of $100,000 or more, which will be paid wholly or partly from public funds of the City,
with a company (with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the
Texas Government Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, Consultant certifies that
Consultant's signature provides written verification to the City that Consultant: (1)
does not boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
Article XX
Prohibition on Discrimination Against Firearm and Ammunition Industries
Consultant acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, the City is prohibited from entering into a contract for goods or services
that has a value of $100,000 or more which will be paid wholly or partly from public funds of
the City, with a company (with 10 or more full-time employees) unless the contract contains
a written verification from the company that it: (1) does not have a practice, policy, guidance,
or directive that discriminates against a firearm entity or firearm trade association; and (2)
will not discriminate during the term of the contract against a firearm entity or firearm trade
association. The terms "discriminate," "firearm entity" and "firearm trade association" have
the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement,
by signing this Agreement, Consultant certifies that Consultant's signature provides
written verification to the City that Consultant: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
Article XXI
Headings
The headings contained herein are for the convenience in reference and are not intended to
define or limit the scope of any provision of Agreement.
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447
Revision Date: March 8, 2024
Page 7 of 8
Article XXII
Attachments, Schedules and Counterparts
This Agreement may be executed in one or more counterparts and each counterpart shall,
for all purposes, be deemed an original, but all such counterparts shall together constitute
but one and the same instrument.
The following attachments and schedules are hereby made a part of Agreement:
Attachment A - Scope of Services
Attachment B — Compensation
Attachment C — Insurance Requirements
City of Fort Worth, Texas Will Rogers Memorial Center Facilities Assessment Study
Standard Agreement for Professional Services 106447
Revision Date: March 8, 2024
Page 8 of 8
Duly executed by each party's designated representative to be effective on the date subscribed
by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
V im. (%4't
Valerie Washington (Oct 14, 2026 14:58:29 CDT)
Valerie Washington
Assistant City Manager
Date: 10/14/2026
Ilnnq
ATTEST:
oA
v�o °,DAAd
of:
l`�� OaQp nExa B.00
Jannette Goodall
City Secretary
APPROVED AS TO FORM AND LEGALITY
Stephen Hines (Oct 14, 26 12:28:40 CDT)
Stephen M. Hines
Sr. Assistant City Attorney
Contract Compliance Manager:
BY:
CONSULTANT
Venue Solutions Group, LLC
Tom Williams
Partner
10/07/2026
Date:
APPROVAL RECOMMENDED:
Marilyn Marvin
Director Property Management
M&C No.: 26-0626
M&C Date: 09/29/26
By signing I acknowledge that I am the person responsible for the monitoring and administration
of this contract, including ensuring all performance and reporting requirements.
By:
Name: Nikita N. Watts
Title: Sr. Capital Project Officer
City of Fort Worth, Texas
Standard Agreement for Professional Services
Revision Date: March 8, 2024
Page 8 of 8
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Will Rogers Memorial Center Facilities Assessment Study
106447
FORT WORTH.
MAYOR AND COUNCIL COMMUNICATION
7.5.13 WRMC FACILITIES ASSESSMENT SELECTION
DATE: 09/29/26 M&C FILE NUMBER: M&C 26-0626
DEPARTMENT: PUBLIC EVENTS
SUBJECT
(CD 7) Authorize Execution of a Professional Services Agreement with Venue Solutions Group,
LLC in an Amount Up to $1,370,920.00 for the Will Rogers Memorial Center Facilities
Assessment Study, Adopt Appropriation Ordinance and Amend the Fiscal Years 2026-2030
Capital Improvement Program
RECOMMENDATION
It is recommended that the City Council:
1. Authorize execution of a Professional Services Agreement with Venue Solutions
Group, LLC, in an amount up to $1,370,920.00, for the Will Rogers Memorial Center
Facilities Assessment Study project (City Project No. 106447);
2. Adopt the attached appropriation ordinance adjusting estimated receipts and
appropriations in the Public Events Capital Fund, by increasing estimated receipts
and appropriations in the WRMC Facilities Assessment 2026 project (City Project
No. 106447) in the cumulative amount of $463,926.82, by (i) decreasing estimated
receipts and appropriations in the WRMC Welcome Center Roof Replacement
project (City Project No. 106450) in the amount of $350,000.00; and (ii) decreasing
estimated receipts and appropriations to the WRMC Minor Renovation & Repair
programmable project (City Project No. P00054) in the amount of $113,926.82, for
the purpose of funding the Will Rogers Memorial Center facilities assessment study;
3. Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the Public Events Capital Fund, in the amount of $325,800.00, from
available transfers from culture and tourism Hotel and transfers from DEW Revenue
share funds within the Unspecified -All Funds project (City Project No. UNSPEC), for
the purpose of funding the WRMC Facilities Assessment 2026 project (City Project
No. 106447); and
4. Amend the Fiscal Years 2026-2030 Capital Improvement Program.
DISCUSSION
The purpose of this Mayor and Council Communication is to authorize execution of a
professional services agreement with Venue Solutions Group, LLC to perform a
comprehensive facilities assessment of the Will Rogers Memorial Center (WRMC).
1 of 20
FORT WORTH.
The Will Rogers Memorial Center is a major public assembly and event campus serving
equestrian, livestock, entertainment, cultural, sporting, and civic uses. The campus includes
multiple large public assembly facilities, barns, arenas, exhibition areas, support buildings,
service areas, site infrastructure, and operational systems that must remain functional while
supporting a year-round event schedule.
The purpose of this study is to provide the City with a comprehensive, engineering- and
operations -informed assessment of the physical condition of WRMC facilities and
infrastructure. The final deliverables are expected to support long-range capital planning,
asset renewal, deferred maintenance prioritization, operational risk reduction, and future
budget development.
The scope of work is anticipated to include, but is not limited to:
• Assessment of major building systems, site systems, and facility infrastructure;
• Review of architectural, structural, mechanical, electrical, plumbing, fire protection, life
safety, accessibility, technology, vertical transportation, roofing, building envelope, and
related facility systems;
• Identification of observed deficiencies and recommended corrective actions;
• Development of planning -level cost estimates;
• Prioritization of capital needs based on life safety, operational risk, facility condition,
remaining useful life, deferred maintenance, and event continuity;
• Development of a long-range capital improvement plan covering approximately 20 to
30 years;
• Preparation of summary -level and detailed deliverables suitable for use by City staff,
facility operators, executive leadership, and future funding discussions.
On February 6, 2027, the City issued a Request for Qualifications (RFQ) for the Will Rogers
Memorial Center Facilities Assessment Study. The City received statements from the following
twelve (12) firms:
• Venue Solutions Group;
• Huitt-Zollars;
• Bureau Veritas Technical Assessments;
• Elements of Architecture;
• Terracon;
• Lockwood, Andrews & Newnam;
• Grace Design Studios;
• TVS;
• Parkhill;
• EwingCole;
2 of 20
FORT WORTH.
• Bennett Partners;
• Procon Consulting.
The RFQ closed on March 12, 2026. Following review of the written submissions, the selection
committee shortlisted the four highest -ranked firms for interviews:
• Venue Solutions Group;
• Huitt-Zollars;
• Bureau Veritas Technical Assessments;
• Elements of Architecture.
Interviews were conducted on April 30, 2026, at City Hall. Each shortlisted firm was evaluated
further based on its understanding of WRMC's operational environment, proposed
deliverables, methodology for translating field observations into a long-range capital plan,
prioritization framework, data/reporting approach, and ability to assess a complex event -
driven campus.
A selection committee composed of representatives from the Public Events Department,
Property Management Department, Will Rogers Memorial Center operations, and venue
partner representatives reviewed and evaluated the statements of qualifications in
accordance with the published evaluation criteria. The criteria included relevant project
experience and firm qualifications, deliverable examples, staffing plan and individual
qualifications, preliminary work plan, firm work within the City of Fort Worth, and
supplemental information.
The selection committee recommends award to Venue Solutions Group, LLC (VSG) as the
most qualified firm and the firm offering the best overall value to the City for this assessment.
Venue Solutions Group was determined to be the strongest overall selection because its team
demonstrated direct experience assessing large public assembly, sports, entertainment, and
event facilities; a strong understanding of venue operations; and the ability to translate
facility condition findings into actionable long-term capital planning. VSG's qualifications
emphasized public assembly venue assessments, operational risk, event continuity, major
system renewal, and capital expense planning. The firm's experience is directly aligned with
the City's need for a practical facilities assessment that can support future capital funding
decisions rather than a report limited to general observations.
VSG's submitted experience included comparable facility condition assessment work for
major public assembly venues and multi -venue campuses, including projects involving
stadiums, convention facilities, arenas, public assembly venues, infrastructure, and long-
range capital expense planning. Their approach is particularly relevant to WRMC because the
campus must be assessed not only as a collection of buildings, but as an operating event
3 of 20
FORT WORTH.
complex with heavy load-in/load-out demands, livestock and equestrian uses, public
assembly life -safety requirements, aging infrastructure, and limited downtime windows.
The recommended agreement will allow the City to establish a defensible technical baseline
for future WRMC capital investment decisions. The study will also help the City identify near -
term critical needs, sequence future projects, reduce emergency repair exposure, and
support future budget requests through documented facility condition data and planning -
level cost estimates.
The assessment is currently scheduled for 28 -weeks from Notice to Proceed through
presentation of findings. Event schedules may impact completion time.
The overall project costs are expected to be as described in the table below:
PROJECT COSTS
TOTALS
Professional Services Agreement - Venue
$1,370,920.00
Solutions Group, LLC
Project Administration / City Staff Support /
$209,080.00
Contingency, if applicable
PROJECT TOTAL
$1,580,000.00
Additional funding for the WRMC Facilities Assessment 2026 project was identified through
existing funding programmed in the Fiscal Year 2026 Capital Improvement Program, together
with available funds from the WRMC Welcome Center Roof Replacement project (City Project
No. 106450). The Welcome Center roof replacement scope was completed in May 2026 as
part of another project; therefore, the remaining appropriation in City Project No. 106450 is
available for reappropriation. This action reallocates a portion of those funds to the WRMC
Facilities Assessment 2026 project to support the professional services agreement with Venue
Solutions Group, LLC, with any remaining funds being appropriated to the WRMC Minor
Renovation & Repair programmable project for future eligible WRMC facility repair and
renovation needs.
Waiver of Building Permit Fees: Not applicable. This action authorizes a professional services
agreement for a facilities assessment study and does not authorize construction work.
The Will Rogers Memorial Center is located in COUNCIL DISTRICT 7 but serves residents,
visitors, event organizers, and stakeholders from all council districts.
This contract requires a Form 1295.
FISCAL INFORMATION/CERTIFICATION
4 of 20
FORT WORTH.
The Director of Finance certifies that funds are currently available in the WRMC Facilities
Assessment 26, WRMC Welcome Center Roof Rep, WRMC Minor Renovation & Repair and
Unspecified -All Funds projects within the Public Events Capital Fund and upon approval of the
above recommendations and adoption of the attached appropriation ordinance, funds will
be available in the Public Events Capital Fund for the WRMC Facilities Assessment 26 project
to support the execution of the agreement. Prior to an expenditure being incurred, the Public
Events Department has the responsibility of verifying the availability of funds.
SUBMITTED FOR CITY MANAGER'S OFFICE BY: Giordano, Dianna, # 7783
ORIGINATING BUSINESS UNIT HEAD: Sanchez Serrano, Cynthia, #2598
ADDITIONAL INFORMATION CONTACT: Keith A. Chisolm, #2525
ATTACHMENTS
1. VSG SA M.gov [7.5.13.1 - 5 pages]
2. VSG Certificate of Insurance [7.5.13.2 - 1 page]
3. Facilities Assessment Map [7.5.13.3 - 1 page]
4. ORD.APP_WRMC FACILITIES ASSESSMENT SELECTION_30205_AO26(R2) [7.5.13.4 - 2
pages]
5. ORD.APP_WRMC FACILITIES ASSESSMENT SELECTION_30205_AO26(R3) [7.5.13.6 - 2
pages]
6. CONFIDENTIAL - VSG Form 1295 [7.5.13.7 - 1 page]
7. CONFIDENTIAL - PED WRMC Facilities Assessment 2026 FID Table [7.5.13.8 - 1 page]
8. CONFIDENTIAL - WRMC FACILITIES ASSESSMENT SELECTION funds availability [7.5.13.9 - 2
pages]
5 of 20
oIVENUE
August 20, 2026
Mr. Keith A. Chisolm, MPA, PMP
Capital Projects Manager
Public Events Department
City of Fort Worth
100 Fort Worth Trail
Fort Worth, TX, 76102
Creating the Science ofFacility Management
Facility Operations, Evaluation & Analysis
RE: Facility Condition Assessment of Will Rogers Memorial Center
Advisor/Client Letter of Agreement
Dear Keith:
Thank you for your confidence in engaging Venue Solutions Group to perform this
significant service to the City of Fort Worth. This letter and all attachments hereto shall
constitute both a proposal as well as the entire agreement ("Agreement") between Venue
Solutions Group, LLC (the "Advisor") and The City of Fort Worth (the "Client"), for the
consulting services described above ("Project"). If you would like to use a City agreement
document, we are happy to oblige.
The specific description and schedule of services to be provided by the Advisor to the
Client are defined in Attachment A, "Scope of Services."
The terms of compensation and reimbursements which the Advisor will receive for
rendering services to the Client are defined in Attachment B, "Compensation for
Services."
The general terms and conditions of this Agreement are defined in Attachment C,
"General Conditions to Agreement."
If you are in agreement with these terms and conditions, please sign below. Upon my
receipt of one signed copy of this Agreement, we will begin work on the Project. Should
you wish to make any alterations to our scope or methodology, I'm happy to work with
you to ensure we provide exactly what you're seeking.
7105 Peach Court, Suite 108, Brentwood, Tennessee 37027 venuesolutionsgroup.com
Russ Simons, Managing Partner russ.simons@venuesolutionsgroup.com p 816.352.6494
Mike Wooley, Partner mike.wooley@venuesolutionsgroup.com p 615.484.2565
Tom Williams, Partner tom.williams@venuesolutionsgroup.com p615.481.6974
Mr. Chisolm
August 20, 2026
Page 2
We look forward to working with you, and please call if you have any questions.
Sincerely,
Tom Williams
Partner
cc: Mike Wooley, Venue Solutions Group
Russ Simons, Venue Solutions Group
Attachments
ACCEPTED BY ADVISOR:
Title
Date
ACCEPTED BY CLIENT:
Title
Date
Mr. Chisolm
August 20, 2026
Page 3
ATTACHMENT A
Scope of Services
Task 1: Asset Tagging (by Bureau Veritas)
Assessment of Existing Conditions
Plumbing
• Identify the material plumbing systems including domestic water supply and hot
water production, sanitary sewer, or any special or unusual plumbing systems
(such as water features, grease traps, fuel systems, gas systems, etc.). Also
identify the type and condition of observed restroom fixtures, drinking fountains,
and/or other miscellaneous plumbing equipment. Where readily visible, observe
the general conditions and note any reported physical deficiencies or any unusual
items or conditions observed or reported.
Heating
• Identify the material heat generating systems. Observe the general conditions,
identify the reported age of the equipment, note reported component
replacements/upgrades, note the apparent level of maintenance, and identify if a
maintenance contract is in place (and the name of the contractor). If heating
equipment is not operational at the time of the walk-through survey, provide an
opinion of the condition to the extent reasonably possible. Note any reported
physical deficiencies or any unusual items or conditions observed or reported.
Include any reported system problems. Identify and observe any special or unusual
heating systems or equipment (such as fireplaces, solar heat, etc.).
Air -Conditioning and Ventilation
• Identify the material air-conditioning and ventilation systems. Include material
equipment such as cooling towers, chillers, package units, split systems, air
handlers, etc. Identify the material distribution systems at the subject property.
Generally note reported tenant -owned equipment/systems that are not included in
this review. Observe the general conditions, identify the reported age of the
equipment, note reported component upgrades/ replacements, note the apparent
level of maintenance, and identify if a maintenance contract is in place (and the
name of the contractor). If air-conditioning and ventilation systems are not
operational at the time of the walk-through survey, provide an opinion of the
condition to the extent reasonably possible. Note any reported physical
deficiencies or any unusual items or conditions observed or reported. Include any
reported system problems. Identify and observe any special or unusual air-
conditioning and ventilation systems or equipment (such as cold storage systems,
special computer cooling equipment, etc.).
Mr. Chisolm
August 20, 2026
Page 4
Electrical
Identify the electrical service provided and distribution system. Include primary
electrical equipment such as material switchgear disconnects, circuit breakers,
transformers, meters, emergency generators, general lighting systems, and other
such equipment or systems. Where readily visible, observe general electrical items
such as distribution panels, type of wiring, energy management systems, etc.
Observe the general conditions and note any reported physical deficiencies or any
unusual items or conditions observed or reported. Include any reported material
system problems. Identify any special or unusual electrical systems or equipment
present.
Life Safety/Fire Protection
• Identify the material life safety/fire protection systems, including sprinklers and
stand pipes, fire hydrants, presence of fire alarm systems, smoke detectors, fire
extinguishers, emergency lighting, and other like safety systems that are readily
visible. Observe the general conditions and note any reported material physical
deficiencies or any unusual items or conditions observed or reported. Include any
reported material system problems.
ASSET / EQUIPMENT INVENTORY
During the assessment, each field team will be responsible for collection and storing all
of the equipment and asset inventory in an electronic format that is readily transferable to
a standardized CMMS system. Where appropriate, the following data will be collected
for each component:
HVAC (level of detail for which Preventive Maintenance would be performed)
o Heating System
■ Identify boilers, furnaces, unit heaters and major labeled
equipment
o Ventilation System
■ Identify the major labeled equipment; exhaust hoods, fans
o Air Conditioning System
■ Identify the material air-conditioning components, including
cooling towers, compressors, chillers, package units, roof top
units, split systems and major labeled equipment. Excluded are
window units, terminal units, VAV boxes, and thermostatic
controls
• Electrical
o Major panels only -for identification to track maintenance
o Transformers
o Switchgear
Mr. Chisolm
August 20, 2026
Page 5
• Equipment
o Building Automation System
• Commercial Kitchen equipment
o Ranges
o Commercial grills
o Exhaust Hoods
o Exhaust Fans (rooftop)
o Ice Machines
o Refrigerators (Walk -In)
o Freezers (Walk -In)
BARCODING
For the above referenced equipment, BV will apply a durable barcode with unique bar
code number for use as an identifier in the CMMS system. We will use a vinyl tag for
indoor applications, and a durable foil tag for outdoor use. Barcode numbers will be
recorded in the database and all future work orders etc., can be tied back in to a single
piece of equipment or system.
0.125° RADIUS
2.000"
D
I
0000000 01 corrigo
QRCODE READS
Tagging- where equipment has not been named or tagged — BV will use standard naming
conventions to generate an equipment number for that component, and will use a durable
vinyl tag to label the equipment.
Methodology
Bureau Veritas (BV) will be prepared to begin this scope of work approximately two weeks
after execution of the Prime agreement. The firm will provide 8 to 12 representatives and
be on site between 5 and 10 days. Given the nature of the work of the Facility Condition
Assessment, BV will tag the HVAC and electrical equipment first, and provide the list to
Venue Solutions Group for the on -site visit of their MEP subconsultant. BV will tag the
Mr. Chisolm
August 20, 2026
Page 6
foodservice equipment after Venue Solutions Group's on -site visit, as they will inventory
a larger list of equipment than Bureau Veritas.
(end of Task 1)
Mr. Chisolm
August 20, 2026
Page 7
Task 2: Facility Condition Assessment
The purpose of the Facility Condition Assessment is to establish a baseline on the
facility's current condition, focusing on infrastructure elements. The condition of the
infrastructure will provide 1) an owner with a reasonable set of expectations regarding
future repairs and replacement and 2) assist the design team with critical information in
developing cost estimates for future renovations. The proposed comprehensive
assessment involves the following areas:
Architectural
Condition of interior finishes, exterior components
Major Systems
Mechanical, electrical, plumbing and fire protection, irrigation systems
Structural
Load -bearing walls, exterior sidewalks and building facade, light standards,
parking lots and parking structures
Entertainment Electronic Systems
Audio, fly system, theatrical lighting
Operations and Electronic Systems
Security, Telephone/Data
Vertical Transportation
Elevator, escalator, pit lift and ADA lift function; current operation and ongoing
maintenance (only elevators to be assessed, but all units included in capital
expense plan)
Roofs
Membranes, water diversion and penetrations; conduct a moisture scanning
Food Service, Concessions, and Catering
Fixed concession stand equipment, Point of Sale, cooking and food prep
equipment (kitchens/pantries)
Civil — Add Alternate Scope of Work
Assess major sanitary and storm sewer lines
Furniture, Fixtures & Equipment
Select FF&E, both equestrian and non -equestrian, will be included in the Capital
Expense Plan
Other Items
Hazardous material testing may be included in this project
Capital Expense Plan
Research, develop, and deliver a capital expenditure matrix that will assist the
owner/operator in budgeting and making capital improvement decisions
Mr. Chisolm
August 20, 2026
Page 8
VSG's process for performing the assessment consists of direct observation,
review and interpretation of documents, interviews with personnel and input from
management and ownership, evaluation of the actual condition of the major
physical elements, systems, and operations. In addition to the physical review,
VSG will provide commentary on the level and quality of repairs and maintenance
currently being performed by the operator.
Our Approach
Venue Solutions Group has developed an approach to help the City better understand
where the Will Rogers Memorial Center and associated buildings ("Complex") are in their
life cycle. The project team we have assembled comprises national firms with specific
expertise in designing and assessing large public assembly facilities, including equestrian
venues, and is versed in both entertainment venues and equestrian facilities.
This scope of work is based on assessing the following venues:
Mr. Chisolm
August 20, 2026
Page 9
Will Rogers Memorial Center Facility Condition Assessment
Scope of Work
SIZE
Scope of Assessment[1] [21
ROOF
building
Square Feet
No. Parking
Spaces
SF OT Roof
SF Domed/Arched
Roofs
Total SF of
Roofs
Access
WRde altnrium
46,000
A,MEP, S. F, T, R.V
30.000
30,000
saw accessible by hatr5094er (tlrone recommentledd Dome accesaa,o bV netcMUtltler
In perbalcany. Eauandboolirrgemon8 beceml9abydnmamne. 00 14
only by lntararane.
Waflgliogum
94,000
a , MEP,S, F,T,R,V
14,000
62,000
76,000
Nonheastana northwest re00m roots accessible bynatchnaatler Ie cuc0aialc00eh
dornao000oo,blin,ccp004enaccrin 6ackotag0CWb, eaatwinglctb0ngoflico0)
dC 00458 nlyby It, 8490,, 0,1,000.
Amy n ('art,. FV RaA idp
182,500
A, MEP, S, F,TR, V
176,000
175,800no
ssibU by hatch/lame, lone north of name, one sown or aome)In ezaanlnes.
noples/orernangs onlyaccessiblb by d,(or drone.
175.400
A, MEP,S, F,T,R,V
206,000
206,001
eca04cocy narcnnaaaerinmeaaninea5000 onices
CooingTowerBldg
MEP,S,R
1,500
1,500
Acceible by Utldertram Burnett roof
Central PlantBld
MEP,S,R
3,000
Accessible only 05 60 or drone
PloneerTswer
6,000
MEP,5.R
4,700
4,700
P0nee,Te0orcbbyrmtsaccemlble by ladderfrom CudseumnonM1we0rebn00Mroof.
Welcome Center
6,000
A, MEP,S, T, R
6,650
6,850
8000598560 halm/Inane,ie000cmalc80e.
RICha dmn ni- RW ld I-
219,000
A, MEP, S,F, T, R, V
208,000
57,500
265,500
s0utnwestmeuanlne_waft Orwecanopy-Accessible lmm
JustinArena
Inc
Inc
Inc
Inc
Westkena
Inc
Inc
Intl
ad Inc
Monte 018100
156.000
A, MEP,S, F,T,R,V
102,000
102,000
Acceib0 b/mepsle00, In nartn muamn0; canopwsoreman000e000ressible by 1100,
a,me.
watt.aoafla
Inc
Inc
36,000
38,000
Fe is0*r art MP Rlae
104,800
A. MEP, S. F. T, R.V
6,500
50,500
57,000
Accescb8b,hatch/IaatlerinwsatrneaanNa
_tta[k Barns
300,000
A,MEP,S,F,T,R
322,900
322,900
-Svineaam
Acces99oonly bylitt, la000r, or 4160
Jaen
NonscoAaccess8U bynarcnnaaaerin/wboom, n0nhwest acceible W M1atcn/Utltler In
a ,b.1c- boo mechanicalac une, by hetcNUdder In Uadingama subs[
closet.
-9nmpaam
Acceiba any bydn. ladder. crtlrone
Smell{shorts (paudrypigeon. rsUbtt deA
NoonreAroomsaccesoblebynatch iddi,r incuoddulcloset. tlomeacttc4bleonly by
un,laaaecmarune.
-came cant
memardaalaaaesaib�e by hamhnadoer In eremnca1 rmm, dome aorma nmy
by..uotle,. or amne; small CxC4lts-Nonhresbodmsacceibkbyhatcllu/Ud,n,-
set. some acceible onry by 1X, lands, er drone
awem ane
tnc004bccokbyat. Uaam, or 1,000
cattU 90m2
Accessible ark by I6, Utltler, orar00e
Lame A•ena/Wena2
N � Inn m 0aoble by na a ncaat0alalcbsetaomeaccee0bacnty by
dill Utlderortlmne
,Xe bIns
AccessibleonlybyIll,Udder,ord,-
-C 389Bg,nA0cnnector
A.-tokby I.,U409r, ordrane.
ThePavilibn
42,000
MEP,S
30,000
30,000
AcceibieunI, by 11110,4000.
Site
North Rip Johns n electricaivault
(retl circle on map)
3, MEP
eon
Ni, roon9pIr. bnckstructure wan caeoone caps
Amon Carter Parkin Gara
399
SMEP
Justin Garage
364
S, MEP
Western Heritage Sara
1145
S, MEP,V
Sr ar-BewerA,alns
TBU
U
Pe4nererfending
4.900
S
MdrAe
252,000
MEP Irrigation only)
50,609 P9081 36
rte,Wastlet
449
S
-Mo4eanoe
7]
104
S
Cclrse meas,lot
119
S
-asm ands, m,
21
S
-Moncrieysoul/,lot
17
S
-aou- barn lo,
190o24pullthru
trailer spots
S.
RVLats
aea (NE WRMc Scot/cal
104
S. MEP( pedestals
Fpaeo Plem
7
5, MEP edestalsl
Swie0gp
10
5,MEP(padestalsl
East and West Lancaster ticket
offices (shown as Gees 27 & 28)
A, MEP, S. R
Acc000ble any by Im, badcr, 44000.
Gate 23
A, MEP
9140 20
A, MEP
5140 17
A, MEP
00.0018
A,MEP
9140 13
A, MEP, S, R
Acc06000nyby Mt. Utltler, crdrone.
Gate 14
A
Acceib0 onybndtt, Utltler, ordroro,
Gate42
A, MEP, S, R
Accesslbc onry bnon, bade, ordrmre,
Gate-
A, MEP, S, R.
fete ibis onybydtt,Utltler, or drm-,
Gets 34
A, MEP, 5, R
Acceibc onry bybe, Utltler, or bone.
off£
A=architectural fl nishes
MEP=meth/elec/plumb/FP/irrigation
S=Structure
F=food service equipment
T=technologg
R=rriof
Vweoicaltransporatlon
Um001ltlesyclvlcstorm-son drain
Stormwaterplpes are RCP
[2] Exact location ofelevators Is090, but project will Include 9 passenger elevator assessments
Mr. Chisolm
August 20, 2026
Page 10
Note: The interior of Pioneer Tower will be structurally assessed from vantage points
offered by the internal stairwell. The exterior will be structurally assessed by personnel
on the ground. The roof will be assessed using a drone.
VSG, acting as the prime respondent, will supervise all activities of the subconsultant
group, including requests for information, scheduling of staff interviews, and on -site
access. We then manage the subconsultants throughout the report analysis and
preparation phase, and we will be the entity that provides each deliverable and presents
the findings. Our project approach is divided into the following tasks:
1. Upon receipt of Notice to Proceed, VSG will work with the designated City
representative to coordinate timing and schedules. We will submit a request for
information to be provided by the City and venue operators, including MEP
record documents, capital plans, drawings, information on any major repairs or
renovations, and major system operating and maintenance materials. Given the
size of the complex, we propose multiple site visits: two visits for Bureau Veritas
to apply inventory tags, and two (2) site visits, occurring 10-14 days apart to
capture all relevant information for the Facility Condition Assessment; each of
these visits will last 4 to 5 days. The remainder of this scope of work applies to
the Facility Condition Assessment.
2. The consultant team will meet with the City, facility representatives and relevant
subcontractor service providers to discuss the current views of the arena,
including their primary concerns with regard to:
• Current maintenance issues
• Operational issues - review and prioritize operator's current working list
• Plans for future improvements or updating
This site visit will include not only meetings with staff, but also tours accompanied
by general discussions with tour leaders. Topics of discussion will include
significant equipment failures, unusual wear and tear, excessive oxidation of metal
surfaces, and abnormally high utility invoices.
3. At the conclusion of the on -site assessment and observations, the individual team
members will spend time compiling and analyzing their data, creating
recommendations and presenting it in way that is easily understood. VSG will
compile subconsultants' work into a "draft" report and present it to the City for
review. The City will provide feedback and clarification to VSG, which will then be
incorporated into the "final" version. A final report will be issued and a presentation
of the findings and recommendations can be made at the discretion of the City.
Mr. Chisolm
August 20, 2026
Page 11
Scope Detail by Discipline
Finishes Review
The facility's finish review would consist of inspecting and evaluating the condition of the
interior and exterior finish components of each building. It may also include a review of
the functional efficiency of particular areas. This portion of the assessment will:
• Provide an objective review of current conditions for the following:
— Seating
— Animal/Tenant Spaces
— Premium Spaces
— Social Spaces
— Media Spaces
— Event Production Spaces
— Groundskeeping Spaces
— Storage
— Restrooms
— Concourses
— Entry Gates
— Circulation
— Overhead Doors
— Stairwells
— Terraces
— Wayfinding
— Metal Cladding and Glazing
— Exterior Features to the Curb Line (Pedestrian Plazas & Walkways)
— High level review of each venue's compliance with current ADAAG and
TAS requirements
• Provide an objective view on the functionality of a given space in order to develop
recommendations on modifications for improvement
Major Systems Reviews
The two primary goals for this section are: first, to identify equipment that needs
replacement or will need replacement within the next 20 years, and second, to identify
potential system upgrades and emerging technologies that would provide benefits in utility
savings, maintenance, guest comfort, and indoor air quality. Ultimately, the review will
Mr. Chisolm
August 20, 2026
Page 12
provide an engineering "high-level" evaluation of existing systems and guidelines aiding
in annual (and more immediate) capital expenditures for MEP systems.
This review will assess the following equipment and systems:
• Mechanical
Chilled water systems, building automation system (BAS), air handlers, heating
systems, fan coils and terminal units, exhaust and grease fans, piping
insulation and louvers.
• Electrical
Site electrical distribution, switchgear, condition of electrical rooms, show and
truck power, emergency generator, site lighting, interior lighting, sports lighting,
lighting control systems, energy management systems and fire alarm system.
• Plumbing
Domestic cold and hot water systems, grease traps, bathroom fixtures, drinking
fountains and sewage lift pumps.
• Fire Protection
Fire pumps, sprinklers, and standpipes.
• Irrigation System
Controllers, pumps, filters, valves, sprinkler heads (252,000 SF of coverage)
• Building Automation System - Assess the existing BAS for its capability to be
BACnet IP or MS/TP
0 Review BAS Management Level (graphical front end) for latest S/W and
H/W to support BACnet IP configuration.
0 Review BAS controller information to ensure it supports the correct
system configuration, BACnet IP and/or MS/TP, and Supervisor or
Equipment controllers.
0 Review the Network infrastructure to determine whether it has all the
necessary equipment to support the BAS Network Topology.
0 Review and document the current DDC versus Pneumatic controls (for
potential upgrades to DDC).
The gas and diesel fuel tanks will also be assessed by this subconsultant.
Our methodology for performing the review consists of the following:
• Observe and document the physical and operating condition of equipment and
systems.
Mr. Chisolm
August 20, 2026
Page 13
• Interview the operations and engineering staff to determine event day and non-
event day sequences of operation of selected equipment and systems. Evaluate
how the systems are actually operating.
• Observe and document the physical and operating condition of equipment and
systems.
We will evaluate each selected system and comment on the following:
• The current physical and operating condition of selected components, equipment,
and building systems with an estimate of their remaining useful life. The estimate
of remaining useful life will be based on no changes to the current PM program for
the respective equipment or system.
• Identification of systems that are not operating as designed or as needed to
satisfactorily serve the patrons and users. We will recommend other sequence of
control modifications that may reduce operational costs, as applicable.
• Recommendations on preventive maintenance actions to be implemented in the
short term and the long term to prolong useful life and increase the operating
efficiency of the equipment. Based on the equipment's remaining useful life,
recommendations for replacement may be made.
Structural Review
The assessment team will evaluate the condition, capacity, suitability, and performance
of the facility's structural systems. The team will conduct reviews of documents, on -site
observations, and conceptual analysis to evaluate the condition, capacity, suitability, and
performance of the building structural systems.
Structural systems include:
• Catwalks
• Foundations, basement walls, elevated slabs
• Fixed seating area
• Structure to support rigging
• Walls supporting roofs
• Exterior sidewalks/plazas
• Surface parking and parking structures
• Perimeter fencing (4,850 linear feet of iron/brick and 50 linear feet of wood)
Enclosures will include:
• Exterior walls, facade cladding, waterproofing
Mr. Chisolm
August 20, 2026
Page 14
• Condition of fenestration systems
• Waterproofing at window and door rough openings
• Waterproofing at wall penetrations, signage
• Exposed wall coatings (e.g., elastomeric coating over concrete or CMU walls)
• Waterproofing at plazas, terraces, and balconies
• Waterproofing at slab -on -grade conditions
Entertainment Electronic Systems Review
In each of the following areas, we will review the current condition, setup, and operation
of equipment to maximize performance and identify opportunities for system upgrades.
• Sound Systems
• Theatrical fly system
• Theater production lighting
Operations Electronic Systems
Access Control & Monitoring
• Review current perimeter door monitoring (efficiency and potential gaps).
• Review access control (card readers) and control points within current facility
operations.
• Review and discuss current deployment of video surveillance at perimeter points,
within the seating bowl, and areas of recent security concern (e.g., air handling
areas).
• Review exterior surveillance. Identify obstructed areas, propose solutions (e.g., it
is very common for trees to grow and block cameras).
• Identify potential locations where biometric access (e.g., thumb/palm reader) may
be appropriate.
• Review the extent of surveillance cameras and what they can and cannot see.
• Review surveillance with regard to operational control (crowds, concessions, cash
rooms, commissary) vs. potential external threats, such as the surrounding streets,
entrances, and parking lots.
Telecommunications and IT
• Review data backbone topology and media for bandwidth and speed
• Review phone system including switch
• Wireless internet systems
Mr. Chisolm
August 20, 2026
Page 15
The following chart identifies the technology components that will be assessed in
each building:
Place an "x" in the
appropriate box
Sound/
PA
System
Security
Alarm
System
CCTV
Equipment
or Card
Access
IT/Network
System/IDF/
MDF
Site
WR Auditorium
X
X
X
X
WR Coliseum
X
X
X
X
Amon Carter Ex Hall Bldg
X
X
X
X
Burnett Bldg
X
X
X
Pioneer Tower
Richardson Bass Building
X
X
X
Justin Arena
X
X
X
West Arena
X
Moncrief Bldg
X
X
X
X
Watt Arena
X
X
X
Equestrian MP Bldg
X
X
X
Livestock Barns
X
X
X
The Pavilion
X
X
Welcome Center
X
X
X
Garage, W Heritage
X
X
X
Garage, Justin Arena I
X
X
X
Mr. Chisolm
August 20, 2026
Page 16
Food Service Equipment
• General Food and Beverage Issues
o General wear and tear on facilities and equipment
o Review cleaning and pest control programs
o Review preventative maintenance programs
o Ice machines and other service equipment
o Concession stands and bars
o Counters
o Menu boards
o Cooking and preparation equipment
o Point of Sale
• Concession Stands
o Counters and casework
o Cooking and preparation equipment
o Wall and floor finishes
• Commissary and Kitchens
o Cooking and preparation equipment
o Wall and floor finishes
This work will entail developing a complete inventory of all fixed F&B equipment for the
City's use (not smallwares or portable equipment), and the list will be provided to Bureau
Veritas to assist in their required scope of work.
Vertical Transportation Review
This includes the review of elevators, escalators, and lifts with the following examples of
the work in this area:
• Observe and document the physical and operating condition of equipment and
systems.
• Interview the operations and engineering staff to determine the event -day and non-
event -day sequences of operation for selected equipment and systems.
• Evaluate how the systems are operating.
• Evaluate the existing preventive maintenance program.
• Review the condition of vertical transportation components.
Mr. Chisolm
August 20, 2026
Page 17
• Provide order -of -magnitude costs for repair and replacement based on current
conditions.
Evaluate each selected system and comment on the following:
• The current physical and operating condition of selected components, equipment,
and building systems with an estimate of their remaining useful life. The estimate
of remaining useful life will be based on no changes to the current PM program for
the respective equipment or system.
• Identification of systems that are not operating as designed or as needed to
satisfactorily serve the patrons and users. We will recommend other sequence of
control modifications that may reduce operational costs, as applicable.
• Recommendations on PM actions to be implemented in the short term and long
term to prolong the equipment's useful life and increase its operating efficiency.
Based on the equipment's remaining useful life, recommendations for replacement
may be made.
This project will include assessment of nine (9) passenger elevators. We will also include
the 4 escalators and 4 ADA lifts in the capital expense plan.
Roofs
Assess the condition of the roofing membranes, penetrations, seams, flashings, and
water diversion devices. We will review the original construction (if design drawings are
available) and any repairs that have occurred, identify problem areas with standing water
and their sources, and create a roof key plan for future use.
Our approach will include the use of drones for access where required, as well as a
Tramex DEC SCANNER (or equivalent) to determine moisture levels. Moisture scans
would require access to facility after hours to conduct a thermal drone survey at the
inaccessible roof areas.
Civil/Site (Utilities) Review (Add Alternate Scope of Work)
General Utility System Assessment Scope
1. Meet with the Owner and stakeholders to kick off the project and confirm
understanding of concerns, priorities and expectations for the project. Confirm all work
will be completed in formats that will integrate into the City of Fort Worth Public Works
Work Order and Asset Management Systems.
Mr. Chisolm
August 20, 2026
Page 18
2. Obtain as -built drawings, work order maintenance records, and existing mapped utility
system data in either paper or electronic formats. Through scanning or digitizing or
creating new shapes in existing or proposed mapping layers, produce as complete of
a map as possible of all known utility information, including reviewing and updating
utility attributes such as age, material, as -built documentation etc..
3. Meet with Facility and Public Works Staff to review updated utility mapping information
and identify missing data and attempt to obtain and document as much institutional
knowledge as possible. Update the utility mapping accordingly.
4. Review overall status and completeness of the updated Utility Mapping with the owner
and discuss next steps to complete required field investigative work including potential
phasing of work to fit budget allocations.
Sanitary Sewer System Assessment
1. Clean and inspect existing sanitary sewer systems throughout the campus starting
with the oldest and or most problematic line segments.
2. Verify pipe alignment, grades and conditions of manholes and update the Utility
Mapping Data accordingly, including adding lines where no prior mapping existed.
a. Determine Overall Pipe & Manhole Conditions
b. Service Connection locations and conditions
c. Documented damages, failures, etc.
3. Depending on conditions and noted concerns, Smoke Testing would then be
performed to confirm potential illicit connections from roof or storm drains etc. and
significant sources of storm/ground water infiltration.
4. Develop a 5 to 10 -year Maintenance and CIP Plan to cover all identified system
deficiencies and life cycle replacement needs.
Systems Capacity Analysis
1. Once each utility system existing conditions are known, and mapping data updated,
each system will be evaluated to determine whether or not each segment is sufficiently
sized to meet the current and or anticipated future service conditions. This would
mostly likely entail updating existing water or wastewater master plans and or models
or coordinating with other City consultants as needed to accomplish the same.
2. Identify all system upgrades required and update each CIP Update Plan as needed to
ensure all recommendations are consistent with the latest modeling results and
system recommendations.
Mr. Chisolm
August 20, 2026
Page 19
Furniture, Fixtures & Equipment
The FF&E described in the amenities & FF&E document provided to bidders during the
RFQ process will be the basis of the FF&E review.
We will use existing lists/documents from the Complex or the City, in conjunction with our
own observations, to exert best efforts to document accurate quantities. The FF&E will
not appear in the written facility condition assessment of the Complex, but will be included
in the Capital Expense Plan, with priority, costs, and replacement schedule applied. VSG
will use its judgment to determine when each item should be replaced, based on our
experience managing facilities and on information from performing over 75 facility
condition assessments.
The following two pages identify the FF&E that VSG will inventory. Through text
highlights, we have separated equestrian FF&E from non -equestrian FF&E for the
purposes of internally assigning responsibility. We have also highlighted the amenities
that will be included in the facility condition assessment.
Assessment of amenities will include physical condition, not general usefulness or
applicability (e.g., we will not opine on enlarging kids' zones or if you should have more
pressure washers).
Please note that the scope of work assumes the City will provide significant information
related to estimated quantities and locations of FF&E. This project does not include
deploying personnel to every location on campus to locate each piece of designated
FF&E, which may be hidden from a normal inspection.
Mr. Chisolm
August 20, 2026
Page 20
FF&E Assessment -non equestrian FF&E Assessment-equestrian/Populous
Facility Condition Assessment
Generic List of Visitor Amenities (Grouped by Function)
Essential Guest Comfort & Services
• Visitor Lobby! Reception Area
Comfortable check -in space with clear signage,
event info screens, and staff support.
• Restrooms & Family/Accessible Facilities
ADA-compliant, well -lit, climate -controlled
facilities near main viewing and barn areas.
• Seating & Shade Structures
Bleachers, Adirondack chairs, or picnic tables
with shade sails or pergolas.
• Water Stations
Hydration stations with filtered water — for guests
and horses.
2. Spectator Enhancers
• Grandstand Seating with Clear Sightlines
Tiered seating oriented for best viewing of arena
activity.
• VIP/Reserved Seating Areas
Premium benches, covered tents, or box seating
with service access.
• Live Video Scoreboards/Timing Displays
Digital screens showing ride times, class results,
and announcements.
• PA System + Event Announcer Booth
Clear audio for schedules, rider introductions,
and safety messages.
3. Food & Beverage Services
• Concession Stands / Food Trucks Zone
Options for snacks, meals, beverages — clustered
for flow and queuing logic.
• Picnic Lawn or Outdoor Dining Area
Landscaped spaces where families can relax
between events.
4. Retail & Engagement
• Tack Shop / Equestrian Retail Store
Branded gear, supplies, souvenirs, and day -of
event merchandise.
• Information & Sponsor Kiosks
Maps, event programs, and community partner
booths.
5. Safety, Support & Healthcare
• First Aid Station (Human)
Easily accessible medical support with visible
wayfinding.
• Farrier & Vet Staging Area
On -site service point for equine care during
events.
• Lost & Found / Customer Service Desk
6. Kids & Family Zones
• Play Area / Petting Zone
Fenced, supervised space with equestrian-
themed equipment.
• Storytelling/ Education Corner
Interactive exhibits about horse care, breeds, and
history.
7. Parking & Access
• Designated Parking with Equestrian Trailer Spaces
Pull -through spaces, wide aisles, and convenient
access to arenas.
• Valet Trailer Drop / Unloading Zone
• Shuttle Loop (for larger complexes)
• Bike Racks & EV Charging Stations
8. Digital & Connectivity
• Wi-Fi Coverage Across Spectator Zones
• Mobile App / QR Code Info Points
Event schedules, maps, live results, and sponsor
messaging.
9. Relaxation & Scenic Spaces
• Outdoor Gathering Plazas
Fire pits, benches, landscaped gardens with
interpretive signs.
• Viewing Decks / Raised Platforms
Elevated vantage points for panoramic arena
views.
10. Overnight & Extended Stay (If Applicable)
• Camping Sites / RV Hookups
• On -Site Lodges or Bunk Rooms
• Shower Facilities for Extended Events
Mr. Chisolm
August 20, 2026
Page 21
Equestrian Arena & Barn FF&E — Organized by Function
1. Competition & Riding Operations (Arena Use)
• Jump standards, rails, breakaway cups
• Dressage letters, cones, boundary rails
• Cavaletti sets and cross rails
• Arena clocks and electronic scoreboards
• PA system (speakers, mixer, microphones)
• Judge booths (portable or fixed)
• Announcer stand with desk and monitors
• Timing equipment (sensors and displays)
• Arena fencing panels, gates, kick rails
2. Horse Housing & Daily Care (Barn Core)
• Stall fronts, grills, and sliding doors
• Rubber stall mats
• Feed bins and hay racks
• Automatic or bucket waterers
• Stall nameplates and ID holders
3. Grooming, Washing & Preparation
• Wash racks with cross -ties
• Hot/cold hose bibs and spray nozzles
• Mounting blocks
• Grooming bays and caddies
• Floor drain grates and splash guards
4. Tack, Feed & Equipment Storage
• Saddle racks (wall -mounted and rolling)
• Bridle hooks and saddle pad racks
• Lockable tack trunks
• Feed room shelving (sealed)
• Rolling storage carts
5. Spectator & Public Comfort
• Portable or fixed bleachers
• Benches and Adirondack seating
• Picnic tables (HDPE)
• Shade umbrellas or canopies
6. Guest Services, Wayfinding & Event Support
• Directional and regulatory signage
• Event information boards
• Sponsor banner frames
• Trash and recycling receptacles
• Portable water refill stations
7. Safety, Medical & Veterinary Support
• Human first -aid cabinets
• AED units
• Emergency eyewash stations
• Veterinary exam tables (portable)
• Farrier stands and hoof vises
• Bio-waste containers
8. Maintenance & Facility Operations
• Arena drags and grooming equipment
• Utility carts (manual or electric)
• Lockable equipment cages
• Pressure washers
• Hose reels and extension reels
• Tables & chairs
• Forklifts
• Trucks
• Scrubbers
• Trailers
• Skid steer
• Concert staging
Mr. Chisolm
August 20, 2026
Page 22
Other
Hazardous Material Testing
VSG will include an allowance of $20,000 for hazardous materials investigation and
testing at the Will Rogers Memorial Complex. The allowance is intended to provide a
reasonable level of investigation based on the age, size, construction, and observed
conditions of the facilities and is not intended to constitute a comprehensive hazardous
building materials survey.
The specific materials evaluated and the number and location of samples will be
determined either by the City, in the field based on observed conditions, representative
building materials, renovation history where known, accessibility, and the professional
judgment of the FCA project team, or a combination of the two. The investigation may
include testing for asbestos -containing materials (ACM), lead -based paint, and other
potentially hazardous materials reasonably suspected based on building age and
observed conditions.
The allowance includes consultant field investigation, collection of a reasonable number
of representative samples, laboratory analysis, and documentation of findings for
incorporation into the facility condition assessment. Testing will generally be non-
destructive or minimally invasive and limited to readily accessible areas.
The $20,000 allowance is a not -to -exceed amount unless additional testing is authorized
by the Client. If field conditions indicate that additional sampling, specialized testing,
destructive investigation, or other services are warranted beyond the available allowance,
VSG will identify the recommended additional work and associated cost for Client
approval prior to proceeding.
This allowance does not include hazardous -material abatement or remediation;
development of abatement plans or specifications; contractor monitoring; clearance
testing; extensive destructive investigation; testing of concealed or inaccessible
materials; soil or groundwater testing; environmental site assessment; or other
specialized environmental investigations unless specifically authorized by the Client.
The presence or absence of hazardous materials cannot be conclusively established for
materials or areas that are not sampled or otherwise evaluated as part of this limited
investigation.
Mr. Chisolm
August 20, 2026
Page 23
Our Approach
The capital expense plan is a tool to be used by the City for planning and prioritization
and reflects information provided by our subconsultants, manufacturers, and current
facility users, based on "best practices" for similar -sized facilities. The plan is in Excel
format and is intended to be a "living" document that is continually updated as
operator/owner priorities, CPI changes, and construction costs change, and will extend
for a period of 20 years or as directed by the City. Below is a representative excerpt from
a VSG Capital Expense document.
6) t.ENUE
0950308071 100% 709% 103%
Kaaeya Center 20 Year Capital Plan
2027
2028
2029
am.ft
ten
lautl.n Oa'w9
aevae0wyl
8uea —2
711847
15nl Y.Mp
08980.o,.,83181 mpep
2.,
M9 nwn 5q
11.780.08.11
ryM
R.y.myp
r�Yi5p.10001.18808p.10001.188081,p.10001.188081,7.811
009508129
Y.w2
Yaar3
MEPA Rn Ro2plen
PBb aM FnmaMel Ean.n
Q1.8YM1b Gown
Mapapml
Cea.9 YYMM
2
2028
15
1
[5]]2
.2.21.7082l
531,800
8]03]]
MEP&Rn7108pbn
Fm08wMn CI15e0 W0017200
fl2dWIe80011
Mepapcp
00084 Ye*,
2
202820
33,50
35105
.00300
MEPBfba Pr0lapon
Runeawmp Co5Y�mgnNe
eenlMMapOp Roam
M.MapON
eowlCdB
Hgem
1
302]
25
12.82
18.28
Su p
11820.9,20D1NDumn
J
2029
,
235532.
Flw 770000009
Fan Cpl UNe
284.010920,09.02.1.0
8282+97.1
0
2001A
751820
um
YMN.
D801Wtlm
5
2031
20
MEP B Poe Pr9ltlpon
OenaM Eew MF8n8
M.pMNral
8N0818rrlbn
M.Olum
5
231
2
53..500
MEP_Fm P____
Greaw Fens
NrM*1p0mn
5
2001
135,000
Rr. Pralban
Bmbb Ei5reuMF.m
Balm V
MweenKN
MOMtlrrtlm
52.2,20
8
2031
0380,000
MEPe Fn Pnlepan
___
Gen
N Cara
60.[EM2mI
*130107
~DBMOutlon
0
203.
20
8].000
]a05.000
I0MF
aM0Pw07801 F.m
aMm Lawl
Mspupul
L80101
8
2001
20
MEP BRn Pmwpon
cal
201 0.0010.,007
Me01um
5
2001
20
0898,97Fans
Dwnnb
EOwOLna1
012351
E8oMo1
M.08m
5
2031
5
07200
138]b00
0177 E98Pmem
E914
2
M®5 FN1 Pnbpon
erm0m+V7pC
Lwp DW
Ele0Mml
DMi0999n mtl
Low
10
202
270.000
MEPBFn PmwNon
Romanic Tri Cnun&mMn
Event Level
Ei.Mul
l
2020
20
20
2]0300
2]812
MEPL Fln 71obttl9n
9ulnreYri
U8N001,E b
2011
15
2],500
MEPIRn Pmlamm
Un0SUWlms
Event L.wl
58mb1
R.*1292
Di*1em71
.LOW20
M.Ilbm
5
5
2031
30]5,000
YEP071w7198p0,
MEPe Fn. Pm ten
eu.DupMWm.0
Ntr.nO Bmnnl
EwM Level
Event Level
EBbbl
El.mkel
Meinbnenq
091107,1*
Low
low
1
202]
2010
J
13.500
1J 500
13305
10305
18y2
11,]52
The involvement of facility and appropriate venue staff will be crucial to developing a
document with sufficient depth to be actionable. Staff involvement will begin with VSG's
request for information that will likely include drawings, utility data, CMMS and building
automation system capabilities, past studies, list of improvements since opening, and a
list of current challenges and opportunities from venue management.
The on -site assessment will begin with a kickoff meeting that will include multiple
members from each consulting firm and will require the presence of at least one facility
staff member from each area (a supervisor or someone who works within the areas under
review). After introductions and a description of the assessment process, we will then
assign facility staff to consultants. It is VSG's expectation that the client will have venue
staff available to our team members as they move about the Complex. The venue staff
will be needed to access spaces and answer questions during the walkthrough.
VSG typically works from 8:30 a.m. to 5:00 p.m. during our on -site work, with a one -hour
working lunch during which time we would like the venue staff to participate so additional
questions can be asked. For this project, we request that the in-house food service vendor
provide lunch so our project team can remain on site; this cost is included in our fee.
Mr. Chisolm
August 20, 2026
Page 24
We would also request staff availability on an as -needed basis after our site visit to
address any follow-up questions. These questions would be posed via email or telephone.
The line items in the capital expense plan will represent a variety of single pieces of
equipment, complete systems, and groupings of items where there are more individual
pieces than can be reasonably observed.
We will produce a capital plan for each venue and the site (to capture any elements not
specifically part of a building).
Tentative Schedule
We anticipate the overall project will encompass a total of 28 weeks, beginning with a
contract execution (or Notice -To -Proceed) and concluding with delivery of final versions
of the facility condition assessment report and corresponding capital expense plans.
During this period, Bureau Veritas will also complete its work tagging the designated
assets.
Mr. Chisolm
August 20, 2026
Page 25
ATTACHMENT B
Compensation for Services
Fee:
All-inclusive fee of $1,370,920.00, which includes travel costs for all project team
members to attend the site visits/walkthroughs as described herein, including all costs
related to Bureau Veritas' work.
Add Alternate Services
Utilities [ 1
General Utility System Assessment (a) $20,000 - $40,000
Sanitary Sewer System Assessment (b) $10-$15/linear foot
Systems Capacity Analysis (c) $TBD
[1] These figures are for discussion purposes and not formal budgeting. Final pricing
depends on several factors, including:
(a) Assumes a reasonable number of as-builts and documents to scan and review
(hundreds, not thousands)
(b) If there is uncertainty about where drains connect flow to, Dyed Water Flood
testing can occur at $1000-$1500 per trace
(c) Must be handled on a case -by -case basis and depends considerably on what
models already exist for each utility
Invoicina Schedule
• 25% of total fee due upon conclusion of final site visit
• 50% of total fee due upon delivery of draft assessment reports and capital
expense plans
• 25% of total fee due upon delivery of final assessment report and capital
expense plans
FORT WORTH®
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Venue Solutions Group, LLC
Subject of the Agreement: Professional services to perform a facility assessment of the Will Rogers Memorial
Center buildings. The assessment will document all buildings, equipment, electrical, mechanical and plumbing systems. The
assessment will also look at all functioning pieces on the property to determine the life cycle and repair costs for all systems and
structures.
M&C Approved by the Council? * Yes 9 No ❑
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes ❑ No 8
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date: 12-31-2027
If applicable.
Is a 1295 Form required? * Yes 8 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106447
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No O
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.