HomeMy WebLinkAbout26-28764 - City Council - OrdinanceORDINANCE 26-28764 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE WATER AND SEWER CAPITAL PROJECTS FUND IN THE AMOUNT OF $1,014,943.00, TRANSFERRED FROM AVAILABLE PAYGO FUNDS WITHIN THE WATER AND SEWER FUND, FOR THE PURPOSE OF FUNDING WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2025 WSM-D RIDGLEA HILLS - PART 3 PROJECT (CITY PROJECT NO. 106909); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: SECTION 1. The budget of the City of Fort Worth for Fiscal Year 2025-2026, as enacted by Ordinance 27979- 09-2025, as amended, is hereby further amended by increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,014,943.00, transferred from available PayGo funds within the Water and Sewer Fund, for the purpose of funding Water and Sanitary Sewer Replacement Contract 2025 WSM-D Ridglea Hills — Part 3 project (City Project No. 106909). SECTION 2. Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. This ordinance shall be cumulative of Ordinance No. 27979-09-2025 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 28, 2026 17:33 11 CDT) Douglas W. Black Sr. Assistant City Attorney ADOPTED: September 15.2026 EFFECTIVE: September 15.2026 0 Jarmette S. Goodall City Secretary 0 �� SEX 44 oA� Ordinance No. 26-28764 Page 1 of I MAYOR AND COUNCIL COMMUNICATION MAP 60WSSC25WS M D- U I D D ITY FORTUNEJRD k r C BRANTS LN y Q f 0 O D � X R D Q �JG S v , I t9 I k*'�/ r vP Z V OPT. y CHICKERING ILL RD Z Off: SPRINGH , % CUMBERLAND RDy�� CULVER po O =lam y w SEM�PO/ ly9l! lGps�t0 BvNQ BLVD TREEHAVEN RD -V p F� 1 �� 9. 1 : ; • 4��J� 00� p _PINON' ST FORT WORTH. ��� �,. �� , R� A FORT WORTH„ MAYOR AND COUNCIL COMMUNICATION 7.1.29 QUIDDITY ENGINEERING, LLC AGREEMENT FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2025 WSM-D RIDGLEA HILLS - PART 3 DESIGN DATE: 09/15/26 M&C FILE NUMBER: M&C 26-0885 DEPARTMENT: WATER EVj-111*«4I (CD 3) Authorize Execution of an Engineering Agreement with Quiddity Engineering, LLC, in the Amount of $691,655.00 for the Water and Sanitary Sewer Replacement Contract 2025 WSM-D Ridglea Hills - Part 3 Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2026-2030 Capital Improvement Program RECOMMENDATION It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Quiddity Engineering, LLC, in the amount of $691,655.00, for the Water and Sanitary Sewer Replacement Contract 2025 WSM-D Ridglea Hills - Part 3 project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,014,943.00, transferred from available PayGo funds within the Water and Sewer Fund, for the purpose of funding Water and Sanitary Sewer Replacement Contract 2025 WSM-D Ridglea Hills - Part 3 project (City Project No. 106909) to effect a portion of Water's contribution to Fiscal Years 2026-2030 Capital Improvement Program. DISCUSSION The purpose of this Mayor and Council Communication (M&C) is to authorize execution of an engineering agreement with Quiddity Engineering, LLC, in the amount of $691,655.00 for Water and Sanitary Sewer Replacement Contract 2025 WSM-D Ridglea Hills - Part 3 project for the preparation of plans and specifications for sanitary sewer and water main replacements on the following streets and easements: Street Brants Lane Shannon Drive Angus Drive From Shannon Drive Brants Lane Brants Lane To 893 feet East Rowan Drive Clayton Road 1 of 4 Scope of Work Sewer Water/Sewer Water FORT WORTH. Gammer Drive Standering Road Dwight Street Kirk Drive Angus Drive Angus Drive Springhill Road Tamworth Road Stonedale Road Cumberland Road Mike Lane Cumberland Road Easement east of Rowan Drive Easement south of Brants Lane Easement east of Rowan Drive Easement west of Mike Lane Easement 181 feet East of Cumberland Angus Drive Angus Drive Angus Drive Angus Drive Springhill Road 150 feet South of Angus Drive/Cumberland Road intersection Angus Drive Stonedale Road Springhill Road Angus Drive Cumberland Road Mike Lane/Cumberland Road intersection Brants Lane Rowan Drive Rowan Drive Rowan Drive Rowan Drive Cumberland Road 359 feet South Stonedale Road Cumberland Road Tamworth Road East 1910 feet North 385 feet North 608 feet Southeast 730 feet 330 feet west of Southeast 546 feet, then Clayton Road/Brants Northeast 369 feet, then Lane intersection East 554 feet Clayton Road Northwest 214 feet Cumberland Road Hyatt Court North 246 feet, then Northeast 236 feet North 111 feet Water/Sewer Water Water/Sewer Water/Sewer Sewer Water Water/Sewer Water/Sewer Water Water/Sewer Sewer Sewer Sewer Sewer Sewer Sewer Sewer 2 of 4 FORT WORTH. Road/Hyatt Lane intersection Easement between 130 feet east of Mike Northwest 167 feet Sewer Cumberland Lane/Cumberland Road/Hyatt Lane Road intersection Easement 340 feet Hyatt Court Southwest 146 feet Sewer Northwest of Hyatt Court Cul-de-sac Easement 190 feet Hyatt Court Southwest 146 feet Sewer Northwest of Hyatt Court Cul-de-sac Easement east of Cumberland Road 190 feet northwest and 146 feet southwest of Hyatt Court Southeast 110 feet Sewer In addition to the contract amount, $323,288.00 (Water: $160,870.00; Sewer $162,418.00) is required for project management, real property acquisition, utility coordination, and material testing. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2025 WSM-D Ridglea Hills - Part 3 project within the Water & Sewer Capital Projects Fund. Appropriations for WSM-D W/S REPL 2025RidgleaPH3 project are as depicted below: Fund WAS Capital Projects Fund 56002 Project Total Existing Appropriations $0.00 $ 0.00 The project is located in COUNCIL DISTRICT 3. Additional Appropriations $1,014,943.00 $1,014,943.00 Project Total* $1,014,943.00 $1,014,943.00 3 of 4 FORT WORTH. This contract requires a Form 1295. FISCAL INFORMATION/CERTIFICATION The Director of Finance certifies that funds are currently available in the Water & Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, in the W&S Capital Projects Fund for the WSM-D W/S REPL 2025RidgleaPH3 project to support the execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804 ORIGINATING BUSINESS UNIT HEAD: Chris Harder, # 5020 ADDITIONAL INFORMATION CONTACT: Jaikson Jacob, # 7866 ATTACHMENTS 1. Map - Water and Sewer Replacement 2025 WSM-D Ridglea Hills Part 3 [7.1.29.6 - 1 page] 2. Ordinance Approp (R2) - Water and Sewer Replacement 2025 WSM-D Ridglea Hills Part 3 [7.1.29.7 - 2 pages] 4 of 4 ORDINANCE 26-28765 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE WATER & SEWER CAPITAL PROJECTS FUND IN THE AMOUNT OF $1,436,665.00, FROM AVAILABLE PAYGO FUNDS IN THE WATER & SEWER FUND, FOR THE PURPOSE OF FUNDING THE LARGE DIAMETER PIPE BURSTING CONTRACT ICAP PROJECT (CITY PROJECT NO.101339) PART 2 (M-468); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: SECTION 1. The budget of the City of Fort Worth for Fiscal Year 2025-2026, as enacted by Ordinance 27979- 09-2025, as amended, is hereby further amended by increasing estimated receipts and appropriations in the Water & Sewer Capital Projects Fund in the amount of $1,436,665.00, from available PayGo funds in the Water & Sewer Fund, for the purpose of funding the Large Diameter Pipe Bursting Contract ICAP project (City Project No.101339) Part 2 (M-468). SECTION 2. Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. This ordinance shall be cumulative of Ordinance No. 27979-09-2025 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 28, 2026 17:33 11 CDT) Douglas W. Black Sr. Assistant City Attorney ADOPTED: September 15.2026 EFFECTIVE: September 15.2026 b 1:t�OR A oOO00% Jannette S. Goodall /•o °� d City Secretary a� nEXA5��a Ordinance No. 26-28765 Page 1 of 1 MAYOR AND COUNCIL COMMUNICATION MAP 60ICAPPIIM468LDPBCO1-CIRCLEC C ER LAKE DR 4m ' �rf� 4M �p� _ U lJU l7 �ULI IXJU _ i p� �,GQ��r TULAROSA DR A E� ps 7v ���p v Gam► WARM TRL IIgO a zr + L U�TAl�1/!RD '^ m SPRING RII Arcadia Trail ! " t FOX RUN�DR 9,QfJP Park South 'r I — w LU W S � GE DR rrc I:. -. ......- . -...; •6n - p l RIDGE VIEW Y !_ __\ _ G� Y MPA TRL 0 0 0 Cly ASHTON AVE LODGEPpLE LN O — I px�r DOUGAL AVE I m` r oe 1 F. O(( , .L - --_ /l.�r—ter North Richland Hills Ground Storage Tank & Pump Station Wlo y%``��I i; WESTERN 6E •` } —.vas 7�1 111 `mom' - acciI4jjj 4 III ,' P4E' tIt :v $ J\ r ail: �� .n �� .�t C� `'�� �:•� A >a„ �• � , ,f."i F FORT WORTH. MAYOR AND COUNCIL COMMUNICATION 7.1.30 CIRCLE C CONSTRUCTION COMPANY CONTRACT FOR LARGE DIAMETER PIPE BURSTING DATE: 09/15/26 M&C FILE NUMBER: M&C 26-0887 DEPARTMENT: WATER SUBJECT (CD 4, City of Watauga, and City of Haltom City) Authorize Execution of Change Order No. 1 in the Amount of $1,436,665.00 to a Contract with William J. Schultz, Inc. dba Circle C Construction Company for the Large Diameter Pipe Bursting Contract ICAP Project Part 2 (M-468) and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2026- 2030 Capital Improvements Program RECOMMENDATION It is recommended that the City Council: 1. Authorize execution of Change Order No. 1 in the amount of $1,436,665.00 and the addition of 90 calendar days to a contract with William J. Schultz, Inc. dba Circle C Construction Company (City Secretary Contract No. 63720), for the Large Diameter Pipe Bursting Contract ICAP project Part 2 (M-468) for a revised contract amount of $8,106,315.00; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water & Sewer Capital Projects Fund in the amount of $1,436,665.00, from available PayGo funds in the Water & Sewer Fund, for the purpose of funding the Large Diameter Pipe Bursting Contract ICAP project (City Project No.101339) Part 2 (M- 468) to effect a portion of Water's Contribution to the Fiscal Years 2026-2030 Capital Improvement Program. DISCUSSION The purpose of this Mayor and Council Communication (M&C) is to execute amendment No. 1 to City Secretary Contract No. 63720 with William J. Schultz, Inc. dba Circle C Construction Company for the Large Diameter Pipe Bursting Contract ICAP project Part 2 (M-468). On June 10, 2025, by M&C 25-0529 the City Council authorized a construction contract with William J. Schultz, Inc. dba Circle C Construction Company, in the amount of $6,669,650.00 for Large Diameter Pipe Bursting Contract ICAP project Part 2 (M-468). Change Order No. 1 primarily provides for open cut trench installations in lieu of trenchless pipe enlargement due to extremely hard rock material (which does not allow for bursting and 1 of 2 FORT WORTH. enlargement) that was encountered when pipe enlargement commenced. Furthermore, open cut necessitates new and increased pay item quantities for the following: Additional bypass pumping, seeding, bank stabilization for stream crossings native grass seeding, the removal and replacement of a 5 -foot reinforced concrete trail and by other than open cut installation across Watauga Road. It is the practice of the Water Department to appropriate its Capital Improvement Program plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. Funding is available in the Transfer to Water/Sewer account of the Water and Sewer Fund for the purpose of funding the Large Diameter Pipe Bursting Contract ICAP, Part 2 (M-468) project. Funding for the Large Diameter ICAP Pipe Burst project Part 2 (M-468) is depicted below: Fund W&S Capital Projects Fund 56002 Project Total Existing Appropriations $10,736,082.00 $10,736,082.00 Additional Appropriations $1,436,665.00 $1,436,665.00 Project Total* $12,172,747.00 $12,172,747.00 The project is located in Council District 4, City of Watauga, and City of Haltom City. This contract requires a Form 1295. FISCAL INFORMATION/CERTIFICATION The Director of Finance certifies that funds are currently available in the Water & Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, in the WAS Capital Projects Fund for the Large Diameter ICAP Pipe Burst project to support the execution of the contract. Prior to any expense being incurred, the Water Department has the responsibility of verifying the availability of funds. SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804 ORIGINATING BUSINESS UNIT HEAD: Chris Harder, # 5020 ADDITIONAL INFORMATION CONTACT: Parvathi S., # 7803 ATTACHMENTS 1. Map - Large Diameter Pipe Bursting Contract [7.1.30.6 - 1 page] 2. Ordinance Approp (R2) - Large Diameter Pipe Bursting Contract [7.1.30.7 - 2 pages] 2 of 2 ORDINANCE 26-28766 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE WATER & SEWER CAPITAL PROJECTS FUND IN THE TOTAL AMOUNT OF $920,324.30, TRANSFERRED FROM AVAILABLE PAYGO FUNDS WITHIN THE WATER AND SEWER FUND FOR THE PURPOSE OF FUNDING THE EMERGENCY 84 -INCH RAW WATER LINE REPAIRS AT ROLLING HILLS WATER TREATMENT PLANT (CIRCLE C) AND EMERGENCY AT ROLLING HILLS WATER TREATMENT PLANT DUCT BANK (ACME) PROJECTS (CITY PROJECT NOS. 106893 AND 106894 RESPECTIVELY); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: SECTION 1. The budget of the City of Fort Worth for Fiscal Year 2025-2026, as enacted by Ordinance 27979- 09-2025, as amended, is hereby further amended by increasing estimated receipts and appropriations in the Water & Sewer Capital Projects Fund in the total amount of $920,324.30, transferred from available PayGo funds within the Water and Sewer Fund for the purpose of funding the Emergency 84 -inch Raw water line repairs at Rolling Hills Water Treatment Plant (Circle C) and Emergency at Rolling Hills Water Treatment Plant Duct Bank (ACME) projects (City Project Nos. 106893 and 106894 respectively) SECTION 2. Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. This ordinance shall be cumulative of Ordinance No. 27979-09-2025 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. Ordinance No. 26-28766 Page 1 of 2 SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 28, 2026 17:33:11 CDT) Douglas W. Black Sr. Assistant City Attorney ADOPTED: September 15, 2026 EFFECTIVE: September 15.2026 A,A `vr o+n0 Jannette S. Goodall City Secretary �OR �p�*0000c:, °C, = O O OOOOOOOO,cr �t1 nEX A5aAx Ordinance No. 26-28766 Page 2 of 2 FORT WORTH„ MAYOR AND COUNCIL COMMUNICATION 7.1.31 EMERGENCY CONTRACTS FOR 84 -INCH RAW WATER LINE REPAIRS AT ROLLING HILLS WATER TREATMENT PLANT DATE: 09/15/26 M&C FILE NUMBER: M&C 26-0894 DEPARTMENT: WATER SUBJECT (CD 8) Ratify Emergency Contracts with William J. Schultz, Inc. dba Circle C Construction Company and Winston Electric, Inc. dba Acme Electric Company, in the Final Amounts of $588,424.30 and $331,900.00, Respectively, for the Emergency 84 -inch Raw Water Line Repairs at Rolling Hills Water Treatment Plant and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2026-2030 Capital Improvement Program RECOMMENDATION It is recommended that the City Council: Ratify City Secretary Contract No. 64890, an emergency agreement with William J. Schultz, Inc. dba Circle C Construction Company in the amount of $588,424.30; and 2. Ratify City Secretary Contract No. 64888, an emergency agreement with Winston Electric, Inc. dba Acme Electric Company in the amount of $331,900.00, both for the emergency 84 -inch raw water line repairs at Rolling Hills Water Treatment Plant; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water & Sewer Capital Projects Fund in the total amount of $920,324.30, transferred from available PayGo funds within the Water and Sewer Fund for the purpose of funding the Emergency 84 -inch Raw water line repairs at Rolling Hills Water Treatment Plant (Circle C) and Emergency at Rolling Hills Water Treatment Plant Duct Bank (ACME) projects (City Project Nos. 106893 and 106894 respectively) and to effect a portion of Water's contribution to the Fiscal Years 2026 -2030 Capital Improvement Program. DISCUSSION 1 of 3 FORT WORTH. In March 2026, a leak was found near a joint where a tapping saddle was previously installed on the 84 -inch diameter pre -stressed concrete raw water line that provides service to Rolling Hills Water Treatment Plant, which was installed in 1972. Excavation of the leak revealed that the pipe defect could not be easily repaired and required the replacement of two 16 -foot -long joints. To complicate matters, accessing one of the joints for replacement required the removal of the existing medium voltage reinforced concrete duct bank, which provides electrical service to the ozonation system and blower building. It was necessary to repair the existing raw water pipeline and to reroute electrical conductors out of the duct bank to provide power to critical treatment processes while the repairs were taking place. The portion of the duct bank that was removed in order to perform the raw water pipeline repairs was reinstalled upon completion of the raw water pipeline repair work, and electrical conductors were reinstalled within the duct bank system. It was imperative that these repairs be completed prior to the summer demand season. Under an emergency authorization memorandum of March 17, 2026, William J. Schultz, Inc. dba Circle C Construction Company, (City Secretary Contract No. 64890) and Winston Electric, Inc. dba Acme Electric Company, (city Secretary Contract No. 64888) were engaged for repairs to the water mains. The total cost for both of these contracts was $920,324.30, which is fair and reasonable for the work performed. Upon ratification of these contracts, staff will close them out. Section 252.022 of the Local Government Code exempts from normal bidding requirements projects that are necessary to preserve or protect public health or safety of the municipality's residents and procurements that are necessary because of unforeseen damage to public machinery, equipment or property. It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. Funding is budgeted in the Transfer to Water/Sewer account of the Water operating budget for the purpose of funding the Emergency temporary duct bank relocation for 84 -inch water line repair at RHWTP (ACME) and the EMER 84 -inch water line repair at RHWTP (Circle C) projects within the Water & Sewer Capital Projects Fund. Appropriations for emergency repair contracts 64890 and 64888 in projects Water Main repair and temporary duct bank relocation at Rolling Hills Water Treatment Plant are depicted below: EMER 84 -in RAW RHWTP (Circle C) Project No. 106893 2 of 3 Fund W&S Capital Projects - Fund 56002 Project Total FORT WORTH„ Existing Additional Appropriations Appropriations $0.00 $588,424.30 $0.00 $588,424.30 EMER W RHWTP Duct Bank (ACME) City Project No. 106894 Fund Existing Additional Appropriations Appropriations W&S Capital Projects $0.00 $331,900.00 - Fund 56002 Project Total $0.00 $331,900.00 *Numbers rounded for presentation purposes. This project was located in COUNCIL DISTRICT 8. FISCAL INFORMATION/CERTIFICATION Project Total* $588,424.30 $ 588,424.30 Project Total* $331,900.00 $331,900.00 The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and, upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, in the W&S Capital Projects Fund for the Emer 84 -in RAW RHWTP Circle C and EMER W RHWTP Duct Bank (ACME) projects. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. SUBMITTED FOR CITY MANAGER'S OFFICE BY: Jesica L. McEachern, # 5804 ORIGINATING BUSINESS UNIT HEAD: Chris Harder, # 5020 ADDITIONAL INFORMATION CONTACT: Tony Sholola, # 6054 ATTACHMENTS 1. Ordinance Approp (R2) - Emergency Raw Water Line Repairs [7.1.31.7 - 2 pages] 3 of 3 ORDINANCE 26-28767 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE WATER AND SEWER CAPITAL PROJECTS FUND IN THE AMOUNT OF $5,660,817.00, TRANSFERRED FROM AVAILABLE PAYGO FUNDS IN THE WATER AND SEWER FUND, FOR THE PURPOSE OF FUNDING THE SANITARY SEWER REHABILITATION CONTRACT 116 PROJECT (CITY PROJECT NO. 102787); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: SECTION 1. The budget of the City of Fort Worth for Fiscal Year 2025-2026, as enacted by Ordinance 27979- 09-2025, as amended, is hereby further amended by increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $5,660,817.00, transferred from available PayGo funds in the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 116 project (City Project No. 102787). SECTION 2. Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. This ordinance shall be cumulative of Ordinance No. 27979-09-2025 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 28, 2026 17:33:11 CDT) Douglas W. Black Jannette S. Goodall Sr. Assistant City Attorney City Secretary ADOPTED: September 15.2026 EFFECTIVE: September 15.2026 44d�l1: 1:t� ao�°FORr��a cLo A -O Pvo 8X 0 oy O T� d OOOO �at1 1EXPi Ordinance No. 26-28767 Page 1 of I MAYOR AND COUNCIL COMMUNICATION MAP 60SS RC 116 -WOODY _ � �•�,� tiIii III I U_ lily I�� DIbTRI(!fl18 1111 1 11 Fo Woh • 1 11� 5 i..L MAA.w.uw�+ II 11 • • ,• • *LliI' v 7- Q � 0 I i 'rilk:' I m '_ •o- - - • � I' �� „ ilea r¢ ac ta• 77l� 4.b 1 ii. YF r ulo»F. iwn•} 1 . _ I� Ii■ w • ' 7 �r F. �r ��� �� -� .fie �•. ®__ 0 0 1 MAYOR AND COUNCIL COMMUNICATION MAP 60SS RC 116 -WOODY AMSPOKER AVE � E MALTA AVE.-. ; '� • ^ � . � ",M . _ HATHCOX AVE ;_'' •, 4'"? N wo o BRITTON AVE w O LL '- EuGENEAvETTh E ANTHONY ST JPRINCE ST E SEMINARY OR 5 w sf GP _ e Pte. +, z.. s . •' - .fir AHARA E PJ� A y .SAX PURL ' ',. :' �_ T � y � •� 1NP`�' CARD 'PJ� • � - E F 1 NpR '..�• — UGC, , ` �; y'%, '�: t It-- x. s•}.�.— • 4 � _ FORT WORTHo ,,�;, az. ter.. MAYOR AND COUNCIL COMMUNICATION MAP 60SS RC 116 -WOODY MAYOR AND COUNCIL COMMUNICATION MAP 60SS RC 116 -WOODY Y (-a' W U) W Ow � R 11 � fY 1 : • -- rjatk. • " L ±JJ E-LANCASTER'AVE ' p J w p.., : U) - Y I VIRGIN IA LN � FORT WORTH® MAYOR AND COUNCIL COMMUNICATION MAP 60SS RC 116 -WOODY FORT WORTH. MAYOR AND COUNCIL COMMUNICATION 7.1.32 WOODY CONTRACTORS, INC. CONSTRUCTION CONTRACT FOR SANITARY SEWER REHABILITATION CONTRACT 116 PROJECT DATE: 09/15/26 M&C FILE NUMBER: M&C 26-0895 DEPARTMENT: WATER SUBJECT (CD 8, CD 9, and CD 11) Authorize Execution of a Contract with Woody Contractors, Inc., in the Amount of $4,980,914.30 for Sanitary Sewer Rehabilitation Contract 116 Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2026- 2030 Capital Improvement Program RECOMMENDATION It is recommended that the City Council: 1. Authorize execution of a contract with Woody Contractors, Inc., in the amount of $4,980,914.30 for Sanitary Sewer Rehabilitation Contract 116 project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $5,660,817.00, transferred from available PayGo funds in the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 116 project (City Project No. 102787) and to effect a portion of Water's contribution to the Fiscal Years 2026-2030 Capital Improvement Program. DISCUSSION The purpose of this Mayor & Council Communication (M&C) is to authorize execution of a construction contract with Woody Contractors, Inc., in the amount of $4,980,914.30 for the replacement of cast iron water and/or deteriorated sanitary sewer mains as indicated on the following streets: Street From To Scope of Work COUNCIL DISTRICT Tucker Street S. Virginia Luxton Street Water 8 Avenue Berke Road Broadus Street Seminary Drive Water/ Sewer 8 1 of 4 FORT WORTH. Pate Drive Killian Street Hardeman Water/Sewer 11 Street Briarwood Lane Jenson Road Wilson Road Water/Sewer 11 Carter Park 400 feet South 400 feet North of Water/Sewer 8 Drive of Arrowwood Broadus Drive Street/Carter Park Drive intersection Alley between 260 feet North of North 305 feet Sewer 8 Berke Road and Broadus Avenue Sahara Place Oakland 200 feet North of North 900 feet Sewer 11 Boulevard Lancaster Avenue Easement South 170 feet North of East 385 feet Sewer 9 of Brown Drive Oak Grove Road Easement east 200 feet North of North 700 feet Sewer 11 of Sargent Lancaster Street Avenue Easement east Avenue G South 350 feet Sewer 8 of Cobb Park Drive Easement South 612 feet South of East 250 feet Sewer 11 of Meadowbrook the Drive Meadowbrook Drive/Sargent Street Intersection Easement North 200 feet North of West 500 feet Sewer 11 of Lancaster the Lancaster Avenue Avenue/Oakland Boulevard intersection 2 of 4 FORT WORTH. Additionally, asphalt pavement rehabilitation will be conducted on all the roadways curb to curb subsequent to the water and sanitary sewer main replacement. The project was advertised for bids on June 3, and June 10, 2026, in the Fort Worth Star - Telegram. On July 2, 2026, the following bids were received: Bidder Woody Contractors, Inc. William J. Schultz, Inc. dba Circle C Construction Company Jackson Construction, Ltd. Western Municipal Construction of Texas, LLC Blackrock Construction Venus Construction Co, Inc Amount Time of Completion $4,980,914.30 480 Calendar Days $ 5,770,779.00 $5,997,008.55 $6,526,016.00 $ 6,615,287.50 $6,653,050.20 Small Business (SB) Goal - In accordance with the City's Small Business Ordinance, the City has established a 30% Small Business goal for this solicitation/contract. Woody Contractors, Inc. is a certified small business and has committed to 57% of the total contract award, thereby meeting the requirements of the City's Small Business Ordinance. In addition to the contract amount, $430,857.00 (Water: $179,268.00, Sewer: $251,589.00) is required for project management, material testing, and inspection. Project contingencies are provided in the amount of $249,045.00 (Water: $102,943.00; Sewer: $146,102.00). The sanitary sewer component of this project is part of the Sanitary Sewer Overflow Initiative Program of the Water Department. Approximately 2,756 linear feet of cast iron water pipe and 7,069 linear feet of sanitary sewer pipe will be removed/replaced or rehabilitated as part of this project. It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. 3 of 4 FORT WORTH. Funding is budgeted in the Transfer to Water/Sewer account within the Water & Sewer operating budget for the purpose of funding the Sanitary Sewer Rehabilitation Contract 116 project within the Water & Sewer Capital Projects Fund. Appropriations for the Sanitary Sewer Rehabilitation Contract 116 project are as depicted below: Fund WAS Capital Projects - Fund 56002 Project Total Existing Appropriations $ 530,444.00 $ 530,444.00 *Numbers rounded for presentation purposes. Additional Appropriations The project is located in COUNCIL DISTRICTS 8, 9 and 11. This contract requires a Form 1295. FISCAL INFORMATION/CERTIFICATION $ 5,660,817.00 $ 5,660,817.00 Project Total* $6,191,261.00 $6,191,261.00 The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, in the W&S Capital Projects Fund for the SS Rehab Contract 116 project to support the execution of the contract. Prior to an expense being incurred, the Water Department has the responsibility of verifying the availability of funds. SUBMITTED FOR CITY MANAGER'S OFFICE BY: ORIGINATING BUSINESS UNIT HEAD: ADDITIONAL INFORMATION CONTACT: ATTACHMENTS Jesica L. McEachern, # 5804 Chris Harder, # 5020 Dena Johnson, # 1. Map - Sewer Rehabilitation Contract 116 [7.1.32.7 - 5 pages] 2. Ordinance Approp (R2) - Sewer Rehabilitation Contract 116 [7.1.32.8 - 2 pages] 4 of 4 ORDINANCE 26-28769 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE GRANTS CAPITAL PROJECTS FEDERAL FUND, IN THE AMOUNT UP TO (I) $6,376,000.00, SUBJECT TO RECEIPT OF THE GRANT, AND (H) $1,594,000.00 AS A TRANSFER FROM THE 2026 BOND PROGRAM TO SATISFY THE CITY'S MATCH REQUIREMENT, FOR THE PURPOSE OF FUNDING THE MCPHERSON-SUMMER CREEK SAFE STREETS PROJECT (CITY PROJECT NO. 106786); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS THAT: SECTION 1. In addition to those amounts allocated to the various City departments for Fiscal Year 2025-2026 in the Budget of the City Manager, there shall also be increased estimated appropriations in the Grants Capital Projects Federal Fund, in the amount up to (i) $6,376,000.00, subject to receipt of the grant, and (ii) $1,594,000.00 as a transfer from the 2026 Bond Program to satisfy the City's match requirement, for the purpose of funding the McPherson -Summer Creek Safe Streets project (City Project No. 106786). SECTION 2. Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. This ordinance shall be cumulative of Ordinance 27979-09-2025 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. Ordinance No. 26-28769 Page 1 of 2 SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: Doualas Black ($eD 28. 2026 17:33:11 CDT) Assistant City Attorney ADOPTED: September 15.2026 EFFECTIVE: September 15.2026 Jannette S. Goodall City Secretary °R ook% *000 OOO0 ICY 4 o Ordinance No. 26-28769_ Page 2 of 2 Mayor & Council Map I McPherson -Summer Creek Safe Streets Chisholm Trail Parkway to S Hulen Street I CSJ 0902-90-379 CD #6 CAP H dl P k' FORT WORTH® . �.a_ey�,,ar._�, I', ^��;`,,,,v �� O Project Limits 1 Summer CreekO. IRanch Parsk'� Schools Parks P I RUSH DR EDENWOOD-DR OPR5 Fort Worth City Limits G� iFWINn SLIPPERY ROB /E DUSTY SPUR LN SIERRA SPRINGS LN S !S7UN,Fr.o'WER RIDGE RD HAN LN MCMAHAN LN iJ CANTLE CT BEAUTYBERRY DR 4- Council Districts 6 - Mia Hall ,?E L z' z NORTH CROWLEY HS I� NORTH CROWLEY NINTH GRADE CAMPUS a �s O 4 NQ W m S 0 __l_ Elf y4RT J C ~ MCPHERSON BLVD u O p Nu Cypress '9 Park J Cl) w z J DR FRINGETR a J J O a O m FELTLEAF AVE CORKTREE LN w U o w 4 p SASSAFRAS DR O O J z 2 = U Q Q Z ZLU U_ Map generated January 2026 I TRW Business Support Services 1,000 2,000 Copyright © 2026 City of Fort Worth. Unauthorized reproduction is a violation of applicable laws. This data is to be use for graphical Feet representation only. The accuracy is not to be taken/used as data produced for engineering purposes or by a registered professional land surveyor. The City of Fort Worth assumes no responsibility for the accuracy of said data. FORT WORTH. MAYOR AND COUNCIL COMMUNICATION 7.1.35 TXDOT ADVANCE FUNDING AGREEMENT FOR MCPHERSON-SUMMER CREEK SAFE STREETS PROJECT DATE: 09/15/26 M&C FILE NUMBER: M&C 26-0639 DEPARTMENT: TRANSPORTATION PUBLIC WORKS SUBJECT (CD 6) Adopt Resolution Authorizing Execution of an Advance Funding Agreement with the Texas Department of Transportation in the Amount Up to $9,601,126.00, with Federal Participation in the Amount of $6,376,000.00, State Indirect Costs in the Amount Up to $25,126.00, and Local Participation in the Amount of $3,200,000.00 plus cost overruns, for the McPherson -Summer Creek Safe Streets Project, Adopt Appropriation Ordinances, and Amend the Fiscal Years 2026-2030 Capital Improvement Program (2022 Bond Program and 2026 Bond Program) RECOMMENDATION It is recommended that the City Council: 1. Adopt the attached resolution authorizing execution of an Advance Funding Agreement with the Texas Department of Transportation (CSJ# 0902-90-379) for the McPherson - Summer Creek Safe Streets project (City Project No. 106786) in the amount up to $9,601,126.00, with Federal Participation in the amount Up to $6,376,000.00, State Indirect Costs in the amount Up to $25,126.00, Local Participation in the amount up to $3,200,000.00 plus cost overruns; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Grants Capital Projects Federal Fund, in the amount up to (1) $6,376,000.00, subject to receipt of the grant, and (2) $1,594,000.00 as a transfer from the 2026 Bond Program, to satisfy the City's match requirement, for the purpose of funding the McPherson -Summer Creek Safe Streets project (City Project No. 106786); 3. Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program fund, by increasing appropriations in the McPherson -Summer Creek Safe Streets project (City Project No. 106786) in the amount up to $57,500.00, and decreasing appropriations in the East 4th Street & East 1st Street Improvement project (City Project No. 102601) by the same amount, for the initial payment for the City participation; and 4. Amend the Fiscal Years 2026-2030 Capital Improvement Program. I'] I.1I,E:1.1[. I 1 of 4 FORT WORTH. The purpose of this Mayor and Council Communication (MSC) is to adopt a resolution authorizing execution of an Advance Funding Agreement (AFA) with the Texas Department of Transportation (TxDOT) in the amount of $9,601,126.00 with Local Participation in the amount of $3,200,000.00 for the McPherson -Summer Creek Safe Streets project (City Project No. 106786), accept federal funding from TxDOT, adopt appropriation ordinances, and amend the Fiscal Years 2026-2030 Capital Improvement Program. The Federal participation portion will be in the amount of $6,376,000.00, and State Indirect Costs will be in the amount of $25,126.00. The initial payment for the City participation is $57,500.00. The State Indirect Costs will not be appropriated in the City's financial system. The scope of work for the project consists of a safe connection to Summer Creek Middle School, North Crowley Ninth Grade Campus, and North Crowley High School together, along with the Chisholm Trail Skate Park and Community Center, and numerous commercial and residential developments. The proposed improvements are located along McPherson Boulevard from Chisholm Trail Parkway to Hulen Street, Summer Creek Drive from Risinger Road to Sunflower Ridge Drive, and Hulen Street from Nightingale Drive to McPherson Boulevard. The project includes 5 -foot on -street bike lanes with 1 -foot raised barriers and 10 -feet to 12 -feet shared - use paths (SUP) with a precast pedestrian bridge on McPherson Boulevard and Summer Creek Drive, and SUP on the southbound side of Hulen Street. The project will install traffic signals and modify medians at two intersections: Risinger Road & Summer Creek Drive, and Hulen Street & McPherson Boulevard. The project will include safety improvements at the roundabout located at the intersection of McPherson Boulevard and Summer Creek Drive. Additional elements to enhance pedestrian and bicyclist safety include a Pedestrian Hybrid Beacon (PHB) and a median cut on Summer Creek Drive at the north entrance to Chisholm Trail Park, raised crosswalks, LED -enhanced pedestrian crossing signs at the McPherson Boulevard and Summer Creek Drive roundabout, LED -enhanced pedestrian crossing signs at Summer Creek Drive roundabout, LED -enhanced pedestrian crossing signs at Summer Creek Drive at Beautyberry Drive, and a PHB on McPherson Boulevard at the south entrance to Chisholm Trail Parkway. The scope also includes a bike signal, bike boxes and crosswalks on Hulen Street at Chaparral Creek Drive, adjacent to North Crowley High School. This project has federal funding for construction improvements and is scheduled to start construction in February 2028. The City of Fort Worth will let this project. The funding appropriated by this M&C will be used for design, right-of-way acquisition, environmental clearance, utilities, project management, and construction. The AFA requires the City of Fort Worth to fund cost overruns. The total project budget is summarized below: 2 of 4 FORT WORTH„ Participation Federal State Local Local - Initial Payment Total AFA Contract Amount Fund Grants Capital Federal Fund State 2026 Bond Program Fund 2022 Bond Program Fund Authority Original (M&C) Budget This M&C $6,376,000.00 This MSC $25,126.00 M&C 26- 0855 $3,142,500.00 This M&C $57,500.00 $9,601,126.00 Upon sale of bonds, funding will be budgeted in the 2026 Bond Program for the Transportation Public Works (TPW) Department and will be appropriated through delegated authority that has been awarded on August 25, 2026 (M&C 26-0855) for the purpose of funding the McPherson - Summer Creek Safe Streets project (City Project No.106786). This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). Funding for the grant portion of the project was not included in the Fiscal Years 2026-2030 Capital Improvement Program because grant funding is appropriated at the time of the grant award. The action in the M&C will amend the Fiscal Years 2026-2030 Capital Improvement Program as approved in connection with Ordinance 27979-09-2025. The Regional Transportation and Innovation Division, Business Support Division, and Capital Delivery Division will charge salaries to this grant project as incurred. Indirect Cost recovery does not apply. This project is located in COUNCIL DISTRICT 6. 3 of 4 FORT WORTH„ FISCAL INFORMATION/CERTIFICATION The Director of Finance certifies that upon the sale of bonds, funds will be available in the 2026 Bond Program Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, in the Grants Cap Projects Federal Fund, the 2026 Bond Program Fund, and the 2022 Bond Program Fund. The Transportation & Public Works Department (and Financial Management Services) will be responsible for the collection and deposit of funds due to the City. Prior to any expenditures being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. This is a State Advance Funding Agreement. SUBMITTED FOR CITY MANAGER'S OFFICE BY: DEPARTMENT DIRECTOR ORIGINATING BUSINESS UNIT HEAD: ADDITIONAL INFORMATION CONTACT: Jesica L. McEachern, #5804 Lauren Prieur, #6035 Monty Hall, #8662 Kelly Porter, #7259 ATTACHMENTS 1. Map - McPherson -Summer Creek Safe Streets [7.1.35.6 - 1 page] 2. Ordinance Approp (R2) - McPherson -Summer Creek Safe Streets [7.1.35.7 - 2 pages] 3. Ordinance Approp (R3) - McPherson -Summer Creek Safe Streets [7.1.35.8 - 2 pages] 4. Resolution (R1) - McPherson -Summer Creek Safe Streets [7.1.35.9 - 2 pages] 4 of 4