HomeMy WebLinkAbout025685 - Construction-Related - Contract - American Audio and Visual, Inc.• ��"� � CTEr�RY �a. ��"� �� __ ��►�� THE CITY OF FORT WORTH, TEXA.S �� . �: cor�ctars �v co. SYSTEM '� `�'�"�'� AC�USTICAL ��,��,s� ���� a�. COWTOWN COLISEUM �'"''y�°°� or�T or�TH -4 �� .► �- J �� '��' KENNETH BARR MAYOR BOB TERRELL CITY MANAGER Hugo Malanga, P.E. Director, Transportation and Public Works Kirk Slaughter Public Events Director Soward and Associates OCTUBER, 1999 !���''Lr�i'�`:Vir�:'�� G���':;'�'� U�� 1, ' �`p'_ ��4 �'^•QT ' E � ; l ;:F ��.����;,-�� City of FoYt WoYtli, Texas MG�yDY G�YIGi CDUYICiI COYf'I.�IUYtICG�ti0Y1 DATE REFERENCE NUMBER LOG NAME PAGE 10/19/99 C-17713 20SPEAKERS 1 of 2 SUBJECT AWARD OF CONSTRUCTION CONTRACT TO AMERICA AUDIO AND VISUAL, INC. FOR THE iNSTALLATION OF AN ACOUSTICAL SYSTEM IN THE COWTOWN COLISEUM AND AWARD OF A DESIGN AGREEME�VT WITH SOWDEN AND ASSOCIATES F�R THE DESIGN OF THE REPLACEMENT SYSTEM RECOMMENDATION: It is recommended that the City Council: Authorize the transfer of $70,300 from the Insurance Fund (Property and Casualty) to the portion of the 1998 Capital Improvements Program designated for renovation of the Cowtown Coliseum; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 1998 Capital Improvements Program by $70,300; and 3. Authorize the City Manager to execute a construction contract with American Audio and Visual, Inc. for the installation of an acoustical system in the Cowtown Coliseum in the amount of $76,643, to be completed in 60 calendar days; and 4. Authorize the City Manager to execute a design contract with the acoustical engineer, Sowden and Associates, for $6,500, plus up to $250 in expenses, for the design of a replacement acoustical system for the Cowtown Coliseum. DISCUSSION: On June 2, 1999, during renovation of the Cowtown Coliseum, the central speaker ciuster for the facility's sound system fell to the floor and was damaged beyond repair. Since that time, a temporary speaker system has been utilized. The estimated cost to replace the system (components, frame, rigging, and acoustical system) with a like-kind and quality system is $63,550. With the addition of $6,750 for design services by an acoustical engineer, the total replacement cost of a like-kind and quality system is $70,300. The City is using appropriate means to collect this amount in damages from the responsible parties. Following their study of the system, the acoustical engineering firm (Sowden and Associates) was of the oprnion that the previous sound sysfem was inadequate to serve the Coliseum. Sowden and Associates recommended an alternate acousttcal system that would (1) be permanently hung from the north end of the Coliseum, and (2) incorporate the addition of "delay speakers" along the side and end seating areas to improve coverage of the sound system. This alternate system would produce an adequate sound system for the Coliseum. The cost of the new system is $76,643. Of this amount, $63,550 will be funded by Insurance funds with the remaining $13,093 from 1998 CIP funds (available from the $700,000 approved by voters for the renovation of the Coliseum). The design fee for the acoustical engineer ($6,750) will be funded entirely with {nsurance funds. All Insurance funds will be transferred to the 1998 CIP fund for payment. - City of Fort Wortlt, Texas MGiyOY Giy1d COUYICIl C0��1r�luYllCQfrOYI DATE REFERENCE NUMBER LOG NAME PAGE 10/19/99 C-17713 20SPEAKERS 2 of 2 SUBJECT AWARD OF CONSTRUCTION CONTRACT TO AMERICA AUDIO AND VISUAL, INC. FOR THE INSTALLATION OF AN ACOUSTICAL SYSTEM IN THE CO1/VfOWN COLISEUM AND AWARD OF A DESIGN AGREEMENT WITH SOWDEN AND ASSOCIATES FOR THE DESIGN OF THE REPLACEMENT SYSTEM On August 6, 1999, after consultation with the Department of Law, the City Manager's Office approved waiving bids on this project as necessary because of unforeseen damage to public machinery, equipment or other p�operty. Due to the need to expedite the installation of a permanent sound system, City staff (with the assistance of Sowden and Associates) selected American Audio and Visual, Inc. of Fort Wor#h and negotiated a scope and fee for the installation of the speaker cluster and defay speakers. FISCAL INFORMATION/CERTIFICATION: The Finance Director ce�tifies that funds are available in the Insurance Fund and the 1998 Capital Improvements for renovation of the Cowtown Coliseum. MG:j Submitted for City 1�lanager's Office by: Mike Groomer Originating Bepartment Head: Hugo Malanga Additional Information Contact I FUND � �c�> I 1&2) C192 6140 � 2) C192 7801 I (from) 1) FE71 3&4) C192 I ACCOUNT I CENTER I AMOUNT 481306 020192066001 $70,300.00 � 541200 020192066001 $70,300.00 534260 0157140 $70,300.00 541200 020192066001 $83,393.00 CITY SECRETARY APPROVED ]0/19/99 ORDINANCE NO. 13976 Hugo Nfalanga 7801 � �� Ordinance No. AN ORDINANCE INCREASING THE ESTIIv1ATED RECEIPTS AND APPROPRIATTONS IN THE 1998 CAPITAL IIvIPROVEMENTS PROGRAM IN T'HE AMOUNT OF $70,300.00 FROM AVAILABLE FUNDS FOR THE PURPOSE OF FUNDING A CONTRAGT WITH AMERICAN AUDIO ANU VISUAL INC., FROM Tf-iE INSTALLATION OF AN ACOUSTICAL SYSTEM IN THE COWTOWN COLISEUM AND AWARD OF DESIGN AGREEMENT' WITH SOWDEN AND ASSOCIATES FOR THE DESIGN OF A REPLACEMENT SYSTEM; PROVIDING FOR A SEVERA.BILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY TEiE CIT'Y COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for the Fiscal Year 1999-00 and in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in ihe 1998 Capital Improvement Program in the amount of $70,300.00 from available funds for the purpose of funding a contract with American Audio and Visual Inc., for the installation of an acoustical system in the Cowtown Coliseum and award of design agreement with Sowden and Associates for the design of a replacement system. SECI'ION 2. Should any portion, section or part of a secrion of this ordinance be declared invalid, inoperarive or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, secrions, or j� paris of secrions of this ordinance, which said remauung provisions shall be and remain in full force and effect. � SEGTION 3. That this ordinance shall be cumulative of Ordinance No. 13886 and all other ordinances and appropriarions amending the . same except in those instances where ihe provisions of this ordinance are in d'uect conflict with such other ordinances and I appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4 This ordinance shall take effect and be in full force and effect and after the date of its passage, and it is so ordained. APPROVED AS TO FORM AND LEGALIT'Y: ��� Assistant�ity�Attorney � � �� � �� Date ��~ I�t`�'i� Adopted ��,- .��-�� Effective City of Fort Worth, Texas Transportation/Public Works Department Building Services DivJsion/Architectural Services Section GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION SECTION A DEFINITIONS, PROCEDURES AND INTERPRETATIONS A-1 CONTRACT DOCUMENTS. By the term Contract Documents is meant all of the written and drawn documents setting forth or affecting the rights of the parties, including but not necessarily limited to, the Contract, Notice to Bidders, Proposal, General Conditions, Special Conditions, Specifications, Plans, Bonds and all Addenda, Amendments signed by all parties, Change Orders, written Interpretations and any written Field Order for a minor change in the Work. A-2 ENTIRE AGREEMENT. The Contract Documents represent the entire agreement between the Parties, and no prior or contemporaneous, oral or written agreements, instruments or negotiations shall be construed as altering the terms and effects of the Contract Documents. After being execufed, the Contract Documents can be changed only by a written Amendment signed by the Contractor and the Owner, or Change Order, or by a written Field Order for a minor change. A-3 WORK. By the term Work is meant all labor, supervision, materials and equipment necessary to be used or incorporated in order to produce the construction required by Contract Documents. A-4 EXECUTION OF THE CONTRACT DOCUMENTS. The Contract Documents shall be executed in six originals by the Contractor and the Owner in such form as may be prescribed by law. A-5 FAMILIARITY WITH PROPOSED WORK. Before filing a bid, the bidder shall examine carefully the proposal, plans, specifications, special provisions, and the form of contract to be entered into for the work contemplated. He shall examine the site of work and satisfy himself as to the conditions that will be encountered relating to the character, quality and quantity of work to be performed and materials to be furnished. The filing of a bid by ihe bidder shall be considered evidence that he has complied with these requirements and has accepted the site as suitable for the work. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated by the plans will not be allowed. A-6 ONE UNIFIED CONTRACT. Insofar as possible, the Contract Documents will be bound together and executed as a single unified Contract, the intention of the Contract Documents being to provide for all labor, supeivision, materials, equipment and other items necessary for the proper execution and completion of the Work. Words that have well recognized technical or trade meanings are used herein in accordance with such recognized meanings. A-7 DIVISION OF WORK. The arrangement of Drawings and/or Specifications into Divisions, Sections, Articles, or other Subdivisions shall not be binding upon the contractor in dividing the work among Subcontractors or Trades. A-8 INTERPRETATIONS. The Architect will furnish such Interpretations of the Plans and Specifications as may be necessary for the proper execution or progress of the work. Such Interpretations shall be furnished at the instance of the Architect or at the request of the Contractor, or Owner, and will be issued with reasonable promptness and at such times and in accordance with such schedule as may be agreed upon. Such Interpretations shall be consistent with the purposes and intent of the Plans and SpeciFications and may be effected by Field Order. In the event of any dispute between any of the parties to the Contract and the Architect or each other involving the interpretation of the Contract Documents, the evaluation of work or materials performed or furnished by the Architect Contractor, or any subcontractor or materialsman, or involving any question of fault or liability of any party, the decision of the Owner shall be final and binding. In the event of inconsistency in the contract documents, the following sequence for interpretation shall be used in order of precedence: Change Orders and/or Field Orders (by date of issuance); Addenda (by date of issuance); Drawings; Notes and dimensions on Drawings; Technical Specifications; Special Provisions; Supplementary General Conditions; General Conditions; and, Construction Contract. A-9 COPIES OF WORKING DRAWINGS AND SPECIFICATIONS. The Architect will furnish to Contractor free of charge 15 sets of working Drawings and 15 sets of Specifications. Contractor shall pay the cost of reproduction for all other copies of Drawings and Specifications furnished to him. All Drawings, Specifications and copies thereof furnished by the Owner of the Architect are and shall remain the property of the Owner. They are not to be used on any other project and, with the exception of one ConUact set for each Party to the Contract, are to be retumed to the Owner on request at the completion of the work. A-10 MINORITY AND WOMENS BUSINESS ENTERPRISE POLICY. The City of Fort Worth has goals for the participation of disadvantaged business enterprises in City contracts. Compliance with the policies designed to meet these goals is mandatory in order to be considered a responsive bidder. The Ciry policy and procedures to be followed in submitting bids is included. The City of Fort Worth MWBE Program will take precedence over other subcontractor utilization programs on Block Grant and other Federally funded Projects. A-11 CORRELATION AND INTENT. In general, the drawings indicate dimension, locations, positions, quantities, and kinds of construction; the specifications indicate the quality and construction procedures required. Work indicated on the drawings and not specified of vice-versa, shall be furnished as though set forth in both. Work not detailed, marked or specified shall be the same as similar parts that are detailed, marked or specified. If the drawings are in conflict or conFlict with the specifications the better quality or greater quantity or work or materiais shall be estimated and shail be furnished or included. Dimensions on drawings shall take precedence over small-scale drawings. Drawings showing locations of equipment, piping, ductwork, electrical apparatus, etc., are diagrammatic and job conditions may not allow installation in the exact location 8/31 /99 GC - 1 of 23 shown. Relocation shall not occur wilhout the Architects approval. SECTION B IDENTITY OF ARCHITECT B-1 CONTRACT ADMINISTRATION. Where the term "Architect" is used in the "General Conditions of the Contract for Construction", it shall refer to the Director, Transportation and Public Works or his designated Project Manager. The Director, Transportation will designate a Project Manager and Construction Manager to administer this contract and perform the functions of the "Architect" as indicated in the General Conditions. The design architect or engineer may also be designated to perform the duties of "ArchitecP'. B-2 TERMINATION AND SUSPENSION OF WORK: The Owner has the right to terminate the Project for any reason. If the project is terminated, the Contractor shall: a) Stop work under the Contract on the date and to the extent specified on the notice of termination. b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated. c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice of termination. After termination as above, the City will pay the coniractor a proportionate part of the contract price based on the work completed; provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion thereof allocatable to ihe work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor shall submit its claim for amounts due after termination as provided in this paragraph within 30 days aker receipt of such claim. In the event of any dispute or controversy as to the propriety or allowability of all or any portion of such ciaim under this paragraph, such dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the City Council of the City of Fort Worth shall be final and binding upon all parties to this contract B-3 DUTIES OF THE ARCHITECT As used herein, the term Architect means the Architect or his authorized representative. Nothing contained in these Contract Documents shall create any privity of Contract between the Architect and the Contractor. B-4 ARCHITECT AS REPRESENTATIVE OF THE OWNER The Architect will provide general administration of the Contract on behalf of the Owner and will have authority to act as the representative of the Owner to the extent provided in the Contract Documents unless changed in writing by the Owner. The Architect will be available for conferences and consultations with the Owner or the Contractor at all reasonable times. B-5 ACCESS TO JOB SITES. The Architect shall at all times have access to the Work whenever it is in preparation and progress. The Contractor shall provide facilities for such access so the Architect may perform its assigned functions under the Contract Documents. The Architect will make periodic visits to the Site to familiarize himself with the progress and quality of the work and to determine if the work is proceeding in accordance with the Contract documents. On the basis of on-site observations, the Architect will keep the Owner informed of the progress of the Work and will endeavor to guard the Owner against defects and deficiencies in the Work of the Contractor. Based upon such observations and the Contractor's applications for payments, the Architect will make determinations and recommendations concerning the amounts owing to the Contractor and will issue certificates for payment amounts. B-6 INTERPRETATIONS. The Architect will be, in the first instance, the interpreter of the requirements of the Plans and Specifications and the judge of the performance thereunder by the Contractor, subject to the final decision of the Owner. The Architect's decisions in matters relating to artistic effect will be final if consistent with the intent of the Contract Documents. B-7 AUTHORITY TO STOP WORK. The Architect will have authority to reject work that does not conform to ihe Plans and Specifications. In addition, whenever, in its reasonable opinion, the Architect considers it necessary or advisable in order to insure the proper realization of the intent of the Plans and Specifications, the Architect will have authority to require the Contractor to stop lhe Work or any portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated, installed or completed. B-8 MISCELLANEOUS DUTIES OF ARCHITECT. Sho� Drawinas. The Architect wiil review Shop Drawings and Samples as provided in Section D. Two copies of each approved Shop Drawing and submittal will be provided to the Owner by the Architect. Chanae Orders. Change Orders and Field Orders for Minor Changes in the Work will be issued by ihe Owner through the Architect in accordance with the provisions of Section L. Guarantees. The Architect will receive on behalf of the Owner all written guarantees and related documen[s required of the Contractor. Upon completion of the project the Contractor shall provide the Architect five copies of each guarantee. The Architect will provide three copies of each guarantee to the Owner. Insoections. The Architect will conduct inspections for ihe purpose of determining and making his recommendations concerning the dates of substantial completion and final completion. Ooeration and Maintenance Manuals. The Architect will receive on behalf of the Owner, six copies of all applicable equipment installation, operation, and maintenance brochures and manuals required of the Contractor. The Architect will provide three copies of this information to the Owner. B-9 TERMINATION OF THE ARCHITECT. In case of the termination of the employment of the Architect by the Owner, the Owner shall either assume the duties of the Architect through the Director of the Department of Transportation and Public Works, or shall appoint a successor Architect against whom the Contractor makes no reasonable objection. SECTION C OWNER C-1 IDENTIFICATION. By the term Owner is meant lhe City of Fort Worth acting herein by its duly authorized representatives in the manner provided by law. Authorized GC-2of23 8/31!99 representatives include the Ciry Manager, Assistant City Manager, the Director and of Transportation and Public Works Department and members of the Building Services Division. Generally speaking a designated representative will be identified from within the Building Services Division to act as a point of contact for day to day contract administration. C-2 DUTIES OF THE OWNER. The Owner shall furnish surveys describing the physical characteristics, legal limits and utility locations for the si[e of the Work; provided, however, that the Contractor hereby covenants that he has inspected the premises and familiarized himself therewith and that the locations of utilities and other obstacles to the prosecution of the Work as shown on the Owner's survey are for information only, are not binding upon the Owner, and the Owner shall not incur any liability for loss or damage by virtue of any inaccuracies or deficiencies in such surveys. The Owner shall secure and pay for title to the site and all necessary permanent or construction easements. The Owner will cooperate with the Contractor in the prosecution of the Work in such manner and to such extent as may be reasonable and shall furnish information under its control with reasonable promptness at the request of the Contractor. C-3 INSTRUCTIONS. The Owner shall issue all instructions to the Contractor through the Architect. C-4 ACCESS TO JOB SITE. The Owner shall at all times have access to the Work whenever it is in preparation and progress. The Contractor shatt provide facilities for such access so the Owner may perform its assigned functions under the Contract Documents. C-5 PROGRESS INSPECTIONS. The Owner and the Architect will make visits to the Site to familiarize themselves with the progress and quality of the Work and to determine if the work is proceeding in accordance with the Contract documents. On the basis of on-site observations and reports provided by the Architect conceming the progress and quality of the work, the Owner will approve and authorize the Contractor's applications for paymenis. C-6 AUTHORITY TO STOP WORK. The Owner will have authority to reflect work that does not conform to the Plans and Specifications. Whenever, in its reasonable opinion, the Owner considers it necessary or advisable in order to insure the proper realization of the intent of the Plans and Specifications, the Owner will have authority to require the Contractor to stop the work or any portion thereof, or to require the Contractor to stop the Work or any portion thereof, or to require special inspection or testing of ihe Work whether or not such Work be then fabricated, installed or completed. C-7 SUBSTANTIAL COMPLETION INSPECTION. Upon agreement of the Contractor and Architect ihat the Work is substantially complete, the Owner will schedule a Substantial Completion Inspection to be conducted by the Architect and attended by representatives of the Architect, Owner and Contractor. Items identified during this inspection as being incomplete, defective or deficient shall be incorporated into a punch list to be prepared by the Architect and attached to the AIA document G704, which is to be prepared and signed by the Contractor, and accepted, approved and signed by the Owner. C-8 RIGHT TO AUDIT: Contractor agrees that the Ciry shall, until the expiration of three years after final payment under this contract, have access to and the right to examine any directly periinent books, documents, papers and records of the contractor involving transactions relating to this contract. Contractor further agrees to include in all his subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three years after final payment under the subcontract, have access to and the right to examine any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract. The term "subcontracP' as used herein includes purchase orders. Contractor agrees to photocopy such documents as may be requested by the ciry. The city agrees to reimburse Contractor for the costs of copies at the rate published in the Texas Administrative Code. SECTION D CONTRACTOR D-1 IDENTIFICATION. The Contractor is the person or organization identified as such in the Contract. The term Contractor means the Contractor or his authorized representative. D-2 INDEPENDENT CONTRACTOR Contractor shall perform all work and services hereunder as an independent contractor, not as an officer, agent, or employee of the Ciry. Contractor shall have exclusive control of and the exclusive right to control the details of the work and services performed hereunder, and all persons performing same, and Contractor shall be solely responsibie for the acts and omissions of its officers, agents, and empioyees. Nothing herein shall be consirued as creating a partnership or joint enterprise between City and the Contracror, its officers, agents and employees, and the doctrine of respondeat superior shall not apply. D-3 SUBLETTING It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of Transportation and Public Works of the City of Fort Worth. D-4 REVIEW OF CONTRACT DOCUMENTS. The Contractor shall carefully study and compare the Agreement, Conditions of the Contract, Drawings, Specifications, Addenda and modifications and shall at once report to the Owner and to the Architect any error, rnconsistency or omission he may discover. The Contractor shall do no work without Drawings, Specifications and Interpretations. D-5 SUPERVISION. The Contractor shall supervise and direct the Work, using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract Documents. D-6 LABOR AND MATERIALS. Unless otherwise specifically noted, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Work. The successful low bidder will use its reasonable best efforts to hire local laborers, workmen and materialmen. The general condition is not to be constructed as limiting the right of any bidder to employee laborers, workmen or materialmen from outside local area. GC - 3 of 23 8/31 /99 The Contractor shall at all times enforce strict discipline and good order among his employees, and shall not employ on the Work any unfit person or anyone not skilled in the task assigned to him. D-7 PREVAILING WAGE RATE. The Contractor agrees to pay not less than the general prevaiting rate of per diem wages for Work of a similar character in the locality in which the Work is performed, and not less than the general prevailing wage of per diem wages for a legal holiday and overtime work to all laborers, workmen and mechanics employed on the Work under this Contract. The Contractor agrees to pay at least ihe minimum wage per hour for all labor as the same is classified and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copies verbatim herein. D-8 WARRANTY. The Contractor warrants to the Owner and the Architect that all materials and equipment furnished under this Contract wili be new unless otherwise specified, and that all work will be of good quality, free from faults and defects, and in conformance with the Coniract Documents. All work not so conforming to these standards may be considered defective. If required by the Architect or the Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. The warranty provided in this Section shall be in addition to and not in limitation of any other warranry or remedy provided by law or the Contract Documents. D-9 TAXES. The Contractor is exempt from State Sates Tax on material incorporated into the finished construction, Excise and Use Tax. D-10 LICEN5ES. NOTICES AND FEES. The Contractor shall obtain all Permits, Licenses, Certificates, and Inspections, whether permanent or temporary, required by law or these Contract Documents. The Contractor shall give all Notices and comply with all Laws, Ordinances, Rules, Regulations and Orders of any public authority bearing on the performance of the Work. If the Contracror observes or becomes aware that bearing on the performance of the Work. If the Contractor observes or becomes aware that any of the Contract Documents are at variance therewith in any respect, he shall promptly notify the Architect in writing and any necessary changes will be made. If the Contractor performs any Work knowing that it is in violation of, or contrary to, any of such Laws, Statutes, Charter, Ordinances, Orders or Directives, or Regulations without furnishing Notice to ihe Architect, the Contractor will assume full responsibility therefor and bear all costs attributable thereto. D-11 CASH ALLOWANCES. The Contractor shall include in the Conlract Sum all allowances stated in the Contract 0ocuments. These ailowances shall cover the net cost of the materials and equipment delivered and unloaded at lhe site, and all applicable taxes. The Contractor's handling costs on ihe site, labor, installation costs, overhead, profit and other expenses contemplated for ihe original allowance shall be included in the Contractor Sum and not in the allowance. The Contractor shall cause the Work covered by these allowances to be performed for such amounts and by such persons as the Architect may direct, but he will not be required to employ persons against whom he makes a reasonable objection. If the cost, when determined, is more than or less than the allowance, the Contraci Sum shall be adjusted accordingly by Change Order which will include additional handling costs on the site, labor, installation costs, field overhead, profit and other direct expenses resulting to the Contractor from any increase over the original allowance. D-12 SUPERINTENDENT. The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site during the progress of the Work. The superintendent shall be satisfactory to the Contractor and the Owner. The superintendent shall represent the Contractor and all communications given to the superintendent shall be binding as if given to the Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in each case. D-13 RESPONSIBILITIES FOR EMPLOYEES AND SUB-CONTRACTORS. The Contractor shall be responsible to the Owner for the acts and omissions of all his employees and all Sub-contractors, their agents and employees, and all other persons performing any of the Work under a contract with the Contractor. D-14 FAILURE TO COMMENCE WORK: Should the Contractor fail to begin the work herein provided for within ihe time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if, in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof. said excess cost. D-15 PROGRESS SCHEDULE. The Contractor, immediately after being awarded the contract, shall prepare and submit for the ArchitecYs approval, an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project. This schedule shall indicate the dates for ihe starting and completion of the various states of construction and shall be revised as required by the conditions of the Work, subject to the Architect's approval. It shall also indicate the dates for submission and approval of shop drawings and submittals as well as the delivery schedule for major pieces of equipment and/or materials. The progress schedule shall be updated at least monthly by the contractor and submitted to the Architect for approval with lhe Contractor's monthly progress payment requests. D-16 DRAWINGS AND SPECIFICATIONS AT THE SITE. The Contractor shall maintain at the site for the Owner one copy of all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders, and other Changes and Amendments in good order and marked to record all changes made during construction. These shall also be available to the Architect. The Drawings, marked to record all changes made during construction, shall be delivered to the Architect upon completion of the Work, and the Architect will prepare, and provide to the Owner, one complete set of reproducible record drawings of the work. D-17 SHOP DRAWINGS AND SAMPLES. Shop Drawings are drawings, diagrams, illustrations, schedules, performance charts, brochures and other data which are prepared by the Contractor or any Subcontractor, manufacturer, supplier or distributor, and which illustrate some portion of the Work. Samples are physical examples furnished by the Contractor to illustrate materials, equipment or workmanship, and to establish standards by which the Work will be judged. GC-4of23 8/31 /99 The Contractor shall review, stamp with his approval and submit, with reasonable promptness and in orderly sequence so as to cause no delay in the Work or in the work of any other contractor, normally within the first 90 days of the work, six copies of all shop Drawings and Samples required by the Contract Documents or subsequently by the Architect as covered by changes or amendments. Shop Drawings and Samples shall be properly identified as specified, or as the Architect may require. At the time of submission the Contractor shall inform the Architect in writing of any deviation in the Shop Drawings or Samples from the requirements of the Contract Documents. By approving and submitting Shop Drawings and Sampies, the Contractor thereby represents that he has determined and verified all field measurements, field construction criteria, materials, catalog numbers and similar data, and that he has checked and coordinated each shop drawing given in the Contract Documents. The Architect's approval of a separate item shall not indicate approval of an assembly in which the item functions. The Architect will review and approve Shop Drawings and Samples with reasonable promptness so as to cause no delay, but only for conformance with the design concept of the Project and with the information given in the Contract Documenis. The Architect's approval of a separate item shall not indicate approval of an assembly in which the item functions. The Contractor shall make any corrections required by the Architect and shall resubmit the required number of corrected copies of Shop Drawings or new Samples until approved. The Contractor shall direct specific attention in writing or on resubmitted Shop Drawings to revisions other ihan the corrections requested by the Architect on previous submissions. The ArchitecPs approval of Shop Drawings or Samples shall not relieve the Contractor of responsibility for any deviation from the requirements of the Contraci Documents unless the Contractor has informed the Architect in writing of such deviation at the time of submission and the Architect has given written approval to the specific deviation. Architect's approval shall not relieve the Contractor from responsibility for errors or omissions in the Shop Drawings or Samples. No portion of the Work requiring a Shop Drawing or Sample submission shall be commenced until the Architect has approved the submittal. All such portions of the Work shall be in accordance with approved Shop Drawings and Samples. D-18 SITE USE. The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and shall not unreasonably encumber the site with any materials or equipment. Until acceptance of the work by the City Council of the City of Fort Worth, the entire site of the Work shall be under the exclusive control, care and responsibility of the Contractor. Contractor shall take every precaution against injury or damage to persons or property by the action of the elements or from any other cause whatsoever. The Contractor shall rebuild, repair, restore and make good at his own expenses all injuries or damages to any portions of the Work occasioned by any of the above, caused before acceptance. D-19 SAFE WORK PRACTICES. The Contractor shall employ safe practices in handling materials and equipment used in performing required work so as to insure the safety of his workmen, City employees and the pubtic. The Contractor shall keep the premise free at all times from accumulation of waste materials or rubbish. At the completion of the work, the Contractor shall remove all his wastes and rubbish from and about the work area, as well as his tools, equipment and surplus materials and shall leave the area as clean and free of spot, stains, etc., as before the work was undertaken. D-20 FIELD OFFICES AND SHEDS The Contractor is not required to provide a temporary field o�ce or telephone for projects under $500,000. Contractor shall equip the Project Superintendent with a pager and provide 24-hour conlacts to the City. D-21 TRENCH SAFETY The Contractor shall be responsible for all design and implementation of trench shoring and stabilization to meet regulatory requirements. If the Proposal requires, the Contractor shall include a per unit cost for trench safety measures in his bid. If not included in the Proposal, the Contractor shall include a cost for trench safety measures for all trenches over 5 feet in depth in his Schedule of Values. D-22 CUTTING AND PATCHING OF WORK. The Contractor shall do all cutting, fitting or patching of his Work that may required to make its severai parts fit together properly, and shall not endanger any Work by cutting, excavating or otherwise altering the Work or any part of it. D-23 CLEAN UP. The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At the completion of the Work he shall remove all his waste materials and rubbish from and about the Project as well as all his tools, conslruction equipment, machinery and surplus materials, and shall clean all glass surfaces and leave the Work "Broom-clean" or its equivalent, except at otherwise specified. In addition to removal of rubbish and leaving the buildings "broom-clean", Contractor shall clean all glass, replace any broken glass, remove stains, spots, marks and dirt from decorated work, clean hardware, remove paint spots and smears from all surfaces, clean fixtures and wash ali concrete, tile and terrazzo floors. If the Contractor fails to clean up, the Owner may do so, and the cost thereof shall be charged to the Contractor. D-24 COMMUNICATIONS. As a general rule, the Contractor shall forvvard all communications to the Owner through the Architect, and in all other instances the Contractor shall furnish the Architect a copy of any communication sent directly to the Owner. SECTION E SUBCONTRACTORS E-1 DEFINITION. A Subcontractor is a person or organization who has a direct coniract with the Contractor to perform any of the Work at the site. The term Subcontractor is referred to throughout the Coniract Documents as if singular in number and masculine in gender and means a Subcontractor or his authorized representative. Nothing contained in ihe Contract, Documents shall create any contractual relation between the Owner and the Architect and any subcontractor or any of his sub- subcontractors or materialmen. E-2 AWARD OF SUBCONTRACTS. The bidder shall furnish a list of the names of the subcontractors or other persons or organizations (including those who are to furnish materials or equipment fabricated to a special design) proposed for such portions of the Work as may be designated in the bidding requirements, or if none is so GC-Sof23 8/31 /99 designated in the bidding requirements, the names of the Subcontractors proposed for the principal portions of the Work. Prior to the award of the Contract, the Architect shall notify the successful bidder in writing if either the Owner or Architect, after due investigation, has reasonable objection to any person or organization on such list. Failure of the Owner and Architect to make an objection to any person or organization on the list prior to the award of this Contract shall not constitute acceptance of such person or organization. If, prior to the award of the Contract, the Owner or Architect has an objective to any person or organization on such list, and refuses to accept such person or organization, the apparent low bidder may, prior [o the award, withdraw his bid without forfeiture of bid security. If such bidder submits an acceptable substitute, the Owner may, at its discretion, accept the bid or he may disqualify the bid. If, after the award, the Owner or Architect objects in writing to any person or organization on such list, the Contractor shall provide an acceptable substitute. The Contractor shall not make any substitution for any Subcontractor or person or organization that has been accepted by the Owner and the Architect, unless the substitution is also acceptable to the Owner and the Architecl. E-3 TERMS OF SUBCONTRACTS. All work performed for the Contractor by a Subcontractor shall be pursuant to an appropriate agreement between the Contractor and the Subcontractor (and where appropriate between Subcontractors and Sub-subcontractors) which shall contain provisions that: 1. preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed under the subcontract so that the subcontracting thereof will not prejudice such rights; 2. require ihat such Work be performed in accordance with the requirements of the Contract Documents; 3. require submission to ihe Contractor of applications for payment under each subcontract to which the Contractor is a party, in reasonable time to enable the Contractor to apply for payment; 4. require that all claims for additional costs, extensions of time, damages for delays or otherwise with respect to subconlracted portions of the Work shall be submitted to the Contractor (via any Subcontractor or Sub- subcontractor where appropriate) in the manner provided in the Contract Documents for like claims by the Contractor upon the Owner; 5. waive all rights the contracting parties may have against one another for damages caused by fire or other perils covered by the property insurance, except such rights, if any, as they may have to proceeds of such insurance held by the Owner, and, 6. obligate each Subcontractor specifically to consent to the provisions of this Section All of the provisions set out in this section shall be deemed to have been included in every subcontract, and every subcontract shall be so construed and applied as to the Owner and the Architect, whether or not such provisions are physically included in the sub-contract. E-4 MINORITY AND WOMENS BUSINESS ENTERPRISE IMIWBE). Should the base bid be less than $25,000, the requirements of this section do not apply. In accordance with City of Fort Worth Ordinance No 11923, the Ciry of Fort Worth sets goals for the participation of minority business enterprises and women business enterprises in City contracts. Ordinance No 11923 is incorporated in these Specifications by reference. A copy of the Ordinance may be obtained from the O�ce of the Ciry Secretary. Failure to comply with the Ordinance shall be a material breach of contract. The M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM and GOOD FAITH EFFORT FORM, as applicable, must be submitted within five city business days after bid opening. Failure to submit the post bid information shall render the bid non-responsive. The City will consider the contractor's performance on other City Projects regarding its M/WBE program i� the evaluation of bids. Failure to comply with the City's M/WBE program, or to demonstrate a"good faith effort", shall result in a bid being considered irresponsible. Upon request, Contractor must provide the City with complete and accurate information regarding actual work performed by a Minority or Women Business Enterprise (M/WBE) on the contract and proof of payment thereof. Contractor furlher agrees to permit an audit and/or examination of any books, records or files in iYs possession that will substantiate the actual work performed by an M/ WBE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the commission of fraud by the Contraclor will be grounds for termination of the contract and/or initiating action under appropriate federal, state, or local laws or ordinances relating to false statement. Further any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud witl result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. Contractor shall provide copies of subcontracts or cosigned letters of intent with approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the Construction Manager. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the M/WBE participation in ihe joint venture for a clearly defined portion of the work to be performed. All subcontractors used in meeting the goals must be certified prior to the award of the Contract. Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE shall be given an opportunity to perForm the work. Whenever a change order is in excess of 10% of the originai contract, the M/WBE coordinator shali determine the goals applicable to the work to be performed under the change order. During the term of the contract the contractor shall: 1. Make no unjustified changes of deletions in it's M/WBE participation commitments submitted with or subsequent to the bid, and, 2. If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the contractor had represented he would perform with his forces, the contractor shall notify the City before subcontracts or purchase orders are let, and shall be GC-6of23 8/31 /99 required to comply with modifications to goals as determined by the Ciry, and, storage of their materials and equipment and the execution of their work, and shall properly connect and coordinate his work with theirs. 3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the contractor desires to change or delete any of the M/WBE subcontractors or suppliers. Justification for change may be granted for the following: 1. Failure of subcontractor to provide evidence of coverage by Workers' Compensation Insurance 2. Failure of subcontractor to provide required general liability or other insurance. 3. Failure of subcontractor to execute a standard subcontract form in the amount of the proposal used by the Contractor in preparing his M/WBE Participation plan 4. Default by the M/WBE subcontractor or supplier in the performance of the subcontract. Other reasons at the discretion of the M/WBE Coordinator Within ten days after final payment from the Ciry the contractor shall provide the M/WBE Office with documentation to reflect final participation of each M/WBE subcontractor and supplier used on the project. E-5 PAYMENTS TO SUBCONTRACTORS. The Contractor shall pay each Subcontractor, upon receipt of payment from the Owner, an amount equal to the percentage of completion allowed to the Contractor on account of such Subcontractor's Work. The Contractor shall also require each Subcontractor to make similar payments to his subcontractors. If the Architect refuses to issue a Certificate for Payment for any cause which is the fault of the Contractor and not the fault of a particular subcontractor, ihe Contractor shall pay that Subcontractor on demand, made at any time after the Certificate for Payment would otherwise have been issued, for his Work to the extent completed, less the retained percentage. The Contractor shall pay each Subcontractor a just share of any insurance monies received by the Contractor, and he shall require each Subcontractor to make similar paymenLs to his Subcontractors. The Architect may, on request and at its discretion, furnish to any Subcontractor, if practicable, information regarding percentages of completion certified to the Contractor on account of Work done by such Subcontractors. Neither the Owner nor the Architect shall have any obligation to pay or to see to the payment of any monies to any Subcontractor. SECTION F SEPARATE CONTRACTS F-1 OWNER'S RIGHT. The Owner reserves the right to award separate contracts in connection with other portions of the Work. When separate contract are awarded for other portions of the Work, "the Contractor' in the Contract Documents in each case shall be the contractor who signs each separate contract. F-2 MUTUAL RESPONSIBILITY OF CONTRACTORS. The Contractor shall afford other contractors reasonable opportunity for the introduclion and If any part of the Contractor's Work depends for proper execution or results upon the work of any other separate contractor, the Contractor shall inspect and promptly report to the Architect any apparent discrepancies or defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to inspect and report shall constitute an acceptance of the other contractor's work as fit and proper to receive his Work, except as to defects which may develop in the other separate contractor's work after the execution of the Contractor's Work. Should the Contractor cause damage to the work or property of any separate contractor on the site, the Contractor shall, upon due notice, settle with such other contractor by agreement, if he will so settle. If such separate contractor sues the Owner on account of any damage alleged to have been so sustained, the Owner shall notify the Contractor who shall defend against such suit at the Contractor's expense, and if any judgment against the Owner arises therefrom, the Contractor shall pay or satisfy such judgment and shall reimburse the Owner for all attorney's fees, court costs and expenses which the Owner has incurred in connection with such suit. F-3 CUTTING AND PATCHING UNDER SEPARATE CONTRACTS. The Contractor shall do all cutting, fitting or patching of his Work that may be required to fit it to receive or be received by the work of other contractors shown in the Contract Documents. The Contractor shall not endanger any work or any other contractors by cutting, excavating or otherwise altering any work and shall not cut or aiter the work of any other contractor except with the written consent of the Archilect. Any costs caused by defective or ill-timed work shall be borne by the party responsible therefor. F� OWNER'S RIGHT TO CLEAN UP. If a dispute arises between the separate contractors as to their responsibiliry for cleaning up, the Owner may clean up and charge the cost thereof to the several contractors as the Director of the Depa�tment of Transportation and Public Works shall determine to be just. SECTION G MISCELLANEOUS PROVISIONS G-1 CONFLICT OF LAWS. The law of the place where the site is located shall govern the Contract. The Contractor must familiarize himself and strictly comply with all Federal, State, and County and Ciry Laws, Statutes, Charter, Ordinances, Regulations, or Directives controlling the action or operation of those engaged upon the work affecting the materials used. He shali indemnify and save harmless the City and all of its officers and agents against any claim or liability arising from or based on ihe violation of any such Laws, Statutes, Charter, Ordinances, Regulations, or Directives, whether by himself, his employees, agents or subcontractors. G-2 GOVERNING LAWS. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with reference to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with reference to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. �c - � ot 23 8/31%99 G-3 PERSONAL LIABILITY OF PUBLIC OFFICIALS. In performing their duties under the Statutes of the State of Texas and the Charter and Ordinances of the City of Fort Worth in connection with this Contract, or in exercising any of the powers granted the Owner herein, the officers, agents and employees of the City of Fort Worth are engaged in the performance of a governmental function and shall not incur any personal liability by virtue of such performance hereunder, except for gross negligence or willful wrong. G� COMPUANCE WITH LAWS. Contractor agrees the comply with all laws, Federal, state and local, including all ordinances, rules and regulations of the City of Fort Worth, Texas. Materials incorporated into the finished Project are not subject to State Sales Tax. Contractors are responsible for obtaining construction permits from the goveming agencies. Contractor shall schedule all code inspections with the Code Inspection �ivision in accordance with the permit requirements and submit a copy of updated schedule to the Construction manager weekly. Building, plumbing, electrical and mechanical building permits are issued without charge. Water and sewer access fees will be paid by the City. Any other permit fees are the responsibility of the Contractor. GS INDEMNIFICATION: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or imitees, whefher or not anv such iniurv. damaae or death is caused. in whole or in part. bv the nealiaence or alleaed nealiaence of Owner, its o�cers. servants, or emalovees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damaqe is caused in whole or in nart bv the nealiaence or alleaed nealiaence of Owner. its o�cers. servants or emvlovees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contraclor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. G-6 SUCCESSORS AND ASSIGNS. Except as provided in Paragraph E-2, this contract shall be binding upon and insure to the benefit of the parties hereto, their Successors or Assigns. Contractor shall not assign or sublet all or any part of this Contract or his rights or duties hereunder wilhout the prior written consent of the Owner. Any such purported assignment or subletting without the prior written consent of Owner shall be void. G-T WRITTEN NOTICE. Written Notice shall be deemed to have been duly served if delivered in person to the individual or member of the firm or to an officer of the corporation for whom it was intended, or if delivered at or sent by registered or certified mail to the last business address known to him who gives the notice. G-8 SURETY BONDS: Surety Bonds are required on all Ciry contracts in excess of �25,000. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said Ciry of Fort Worin good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be 100 percent of the total contract price, and the said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. Bonds shall be made on the forms furnished by or otherwise acceptable to the City. Each bond shall be properly executed by both the Contractor and the Surety Company. Bonds required by the City shall be in compliance with all relevant local. state and federal statutes. To be an acceptable surery on the bond the name of the surety should be included on ihe current U. S. Treasury List of Acceptable Securities [Circutar 570j, and must be authorized to do business in Texas. Sureties not listed in Circular 570 may write performance and payment bonds on a project without reinsurance to the limit of 10 percent of its capital and surplus. Such a surety must reinsure any obligation over 10 percent. The amount in excess of 10 percent must be reinsured by reinsurers who are duly authorized, accredited, or trusteed to do business in the State of Texas. Should any surety for the contracted project be determined unsatisfactory at any time during same, the Contractor shall immediately provide a new surety bond satisfactory to the City. G-9 OWNER'S RIGHT TO CARRY OUT THE WORK. If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents or fails to perform any provision of the Contract, the Owner may, without prejudice to any other remedy he may have, enter the site and make good such deficiencies. In such case an appropriate Change Order shall be issued deducting from the payments then or thereafter due the Contractor the cost of correcting such deficiencies, including the cost of the Architecl's additional services made necessary by such default, neglect or failure. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contract shall pay the difference to the Owner. G-10 ROYALTIES AND PATENTS. The Contractor shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the Owner harmless from loss on account thereof and shall be responsible for all such loss when a particular design, process or the product of a particular manufacturer or manufacturers is specified; however, if the Contracfor has reason to believe that the design, process or product specified is an infringement of a patent, he shall be responsible for such loss unless he promptly gives such information to Architect. GC-8of23 8/31 i99 G-11 TESTS. If the Contract Documents, Laws, Ordinances, Rules, Regulations or Orders of any public authority having jurisdiction require any Work to be inspected, tested or approved, the Contractor shall give the Architect timely notice of its readiness and the date arranged so the Architect may observe such inspection, testing or approval. The Owner shall bear all costs of such inspection, tests and approvals unless otherwise provided. If after the commencement of the Work, the Owner or Architect determine that any Work requires special inspection, testing or approval not included above, the Owner or the Architect, upon written authorization from the Owner, will instruct the Contractor to order such special inspection, testing or approval, and the Contractor shall give notice as required in the preceding paragraph. If such special inspection or testing reveals a failure of the Work to comply (1) with the requirements of the Contract Documents or (2) with respect to the performance oF the work, with Laws, Statutes, Charter, Ordinances, Regulations or Orders of any public authoriry having jurisdiction, the Contractor shall bear all costs thereof, including the Architect's additional services made necessary by such costs; otherwise the Owner shall bear such costs, and an appropriate Change Order shall be issued. The Contractor shall secure certificate of inspection, testing or approval, and three copies will be promptly delivered by him to the Architect. The Architect will review the certificates and forward one copy of each with his recommendation(s) to the Owner. If the Architect or Owner wish to observe the inspections, tests or approvals required by this Section, they wiil do so promptly and, where practicable, at the source of supply. Neither the observations of the Architect or the Owner in their administration of the Construction Contract, nor inspections, tests or approvals by persons other than the Contractor shall relieve the Contractor from his obligations to periorm the Work in accordance with the Contract Documents. G-12 INTERRUPTION OF EXISTING UTILITIES SERVICES. The Contractor shall perform the work under ihis Contract with a minimum of outage time for all utilities. Interruption shall be by approved sections of the utiliry. In some cases, the Contractor may be required to perform the work while the existing utility is in service. The existing utility service may be inlerrupted only when approved by the Owner. When it is necessary to interrupt the existing utilities, the Contractor shall notify the Owner in writing at least ten days in advance of the time that he desires the existing service to be interrupted. The interruption time shall be kept to a minimum. Depending upon the activities at an existing facility that requires continuous service from the existing utility, an interruption may not be subject to schedule at the time desired by the Coniractor. In such cases, the interruption may have to be scheduled at a time of minimum requirements of demand for the utility. The amount of time requested by the Contractor of existing utility services shall be as approved by the Owner. G-13 LAYING OUT WORK. The Contractor shall verify dimensions and elevations indicated in layout of existing work. Discrepancies between Drawings, Specifications, and existing conditions shall be referred to Architect for adjustment before work affected is performed. Failure to make such notification shall place responsibility upon Contractor to carry out work in satisfactory workmanlike manner at the Contractor's sole expense. The Contractor shall be held responsible for the location and elevation of all the construction contemplated by the Construction Documents. Prior to commencing work, the Contractor shall carefully compare and check all Architectural, Structural, Mechanical an Electrical drawings; each with the other that in any affects the locations or elevation of the work to be executed by him, and should any discrepancy be found, he shall immediately report the same to the Architect for verification and adjustment. Any duplication of work made necessary by failure or neglect on his part to comply with this function shall be done at the contractors sole expense. G-14 MEASUREMENTS: Before ordering any material or doing any work, the Contractor shall verify all measurements at the site or at the building and shall be wholly responsible for the correctness of same. No extra charge or compensation will be allowed on account of any difference between actual dimensions and dimensions indicated on the drawings. Any difference which may be found shall be submitted to the Architect for consideration and adjustment before proceeding with the project. G-15 EXISTING OVERHEAD OR UNDERGROUND WORK. The Contractor shall carefully check the site where the project is to be erected and observe any existing overhead wires and equipment. Any such work shall be moved, replaced or protected, as required, whether or no shown or specified at the contractor's sole expense. Attention is directed to the possible existence of pipe and other underground improvements that may or may not be shown on the Drawings. All reasonable precautions shall be taken to preserve and protect any such improvements whether or not shown on the Drawings. Location of existing underground lines, shown the Drawings are based on the best available sources, but are to be regarded as approximate only. Exercise extreme care in locating and identifying these lines before excavation in adjacent areas. G-16 ALIGNMENT OF JOINTS IN FINISH MATERIALS. It shall be the responsibility of the Contractor to make certain in the installation of jointed floor, wall and ceiling materials that: 1. preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed under the subcontract so that the subcontracting thereof will not prejudice such rights; 2. Place joints to relate to all opening and breaks in the structure and be symmetrically placed wherever possible. This indudes heating registers, light fixtures, equipment, etc. If because of the non-related sizes of the various materials and locations of openings, etc., it is not possible to accomplish the above, the Contractor shall request the Architect to determine the most satisfactory arrangement. The Contractor shall establish centerlines for all trades. G-17 INTEGRATING EXISTING WORK. The Contractor shall protect all existing street and other improvements from damages. Contractor's operations shall be confined to the immediate vicinity of the new work and shall not in any interfere with or obstruct the ingress or egress to an from existing adjacent facilities. GC - 9 of 23 8/31 /99 Where new site work is to be connected to existing work, special care shall be exercised by the Contractor not to disturb or damage the existing work more than necessary. All dama9ed work shall be replaced, repaired and restored to its original condition at no cost to the Owner. G-18. HAZARDOUS MATERIAL CERTIFICATION: It is the intent of the contract documents, whether expressly stated or not, that nothing containing hazardous materials, such as asbestos, shall be incorporated in to the project. The contractor shall exercise every reasonable precaution to ensure that asbestos-containing materials are not incorporated into any portion of the project, including advising all materials suppliers and subcontractors of this requirement. The contractor shall verify that components containing lead do not contact the potable water supply. G-19 LOCATION OF EQUIPMENT AND PIPING. Orawing showing location of equipment, piping, ductwork, etc. are diagrammatic and job conditions may not always permit their installation in the location shown. When this situation occurs, it shall be brought to the Architect's attention immediately and the relocation determined in a joint conference. The Contractor will be held responsible for the reiocating of any items without first obtaining the Architect's approval. He shail remove and relocate such items at his own expense if so directed by the Architect. Where possible uniform margins are to be maintained between parallel lines and or adjacent wall, floor or ceiling surfaces. G-20 OVERLOADING. The Contractor shall be responsible for loading of any part or parts of structures beyond their safe carrying capacities by placing of materials, equipment, tools, machinery or any other item thereon. No loads shall be placed on floors or roofs before they have attained their permanent and safe strength. G-21 MANUFACTURER'S INSTRUCTIONS. Where it is required in the Specifications that materials, products, processes, equipment, or the like be installed or applied in accordance with manufacturer's instructions, direction or specifications, or words to this effect, it shall be construed to mean that said application or installation shall be in strict accordance with printed instructions furnished by the manufacturer of the material concerned for use under conditions similar or those at the job site. Six copies of such instructions shall be furnished to the Architect and his approval thereof obtained before work is begun. G-22 CLEANING UP. The Contractor shall keep the premises free from accumulation of waste material or rubbish caused by employees or as a result of the work. At completion of work, the General Contractor shall, immediately prior to final inspection of complete building, execute the following final cleaning work with trained janitorial personnel and with material methods recommended by the manufactures of installed materials. 1. Sweep and buff resilient floors and base, and vacuum carpeting. 2. Dust all metal and wood trim and similar finished materials. 3. Clean all cabinets and casework. 4. Dust all ceilings and walls. 5. Dust, and if necessary wash, all plumbing and electrical fixtures. 6. Wash all glass and similar non-resilient materials. 7. All hardware and other unpainted metals shall be cleaned and polished and all equipment and paint or decorated work shall be cleaned and touched-up if necessary, and all temporary labels, tags, and paper coverings removed throughout the buildings. Surfaces that are waxed shall be polished. The exterior of the building, the grounds, approaches, equipment, sidewalks, streets, etc. shall be cleaned similar to interior of buildings and left in good order at the time of final acceptance. All paint surfaces shall be clean and unbroken, hardware shall be clean and polished, all required repair work shall be completed and dirt areas shall be scraped and cleared of weed growth. 9. Clean all glass surfaces and mirrors of putty, paint materials, etc., without scratching or injuring the glass and leave the work bright, clean and polished. Cost of this cleaning work shall be borne by Contractor. 10. Cleaning, polishing, scaling, waxing and all other finish operations indicated on the Drawings or required in the Specifications shall be taken to indicate the required condition at the time of acceptance of all work under the Contract. 11. Burning: Burning of rubbish on the premises will not be permitted. G-23 DUST CONTROL. Precaution shall be exercised at all times to control dust created as a result of any operations during the construction period. If serious problems or complaints arise due to air-borne dust, or when directed by the Architect, operations causing such problems shall be temporarily discontinued and necessary steps taken to control the dust. G-24 FIRE PROTECTION. The contractor shall at all times maintain good housekeeping practices to reduce the risk of fire damage or injury to workmen. All scrap materials, rubbish and trash shall be removed daily from in and about the building and shall not be permitted to be scattered on adjacent property. Suitable storage space shall be provided outside the immediate building area for storing flammable materials and paints; no storage will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal container and removed from the building during unused periods. A fire extinguisher shall be availabie at each location where cutting or welding is being performed. Where electric or gas welding or cutting work is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot metal. When temporary heating devices are used, a watchman shall be present to cover periods when other workmen are not on the premises. The Contractor shall provide fire extinguishers in accordance with the recommendations and NFPA Bulletins Nos. 10 and 241. However, in all cases a minimum of two fire extinguishers shall be available for each floor of consiruction. G-25 CUTTING AND PATCHING Wherever cutting and removal of portions of the existing work is indicated, such work shall be neatly sawed or cut by contractor in a manner that will produce a neat straight line, parallel to adjacent surfaces or ptumb for vertical surfaces. Care should be exercised not to damage any work that is to remain. GC - 10 of 23 8/3 I /99 At no time shall any structural members be cut without written consent from the Architect. G-26 PROJECT CLOSEOUT. Final Inspection. Record Drawinqs: Attention is called to General Conditions Section 1 entitled, "Payments and Completion." Maintenance Manual: Sheets shall be 8 Yz"' x 11", except pull out sheets may be neatly folded to 8 Yz " x 11 ". Manuals shall be bound in plastic covered, 3 ring, loose leaf binder with tille of project lettered on front and shall contain: 1) Name, address and trade of all sub-contractors. 2) Complete maintenance instructions; name, address, and telephone number of installing Contractor, manufacturer's local representative, for each piece of operative equipment. 3) Catalog data on plumbing fixtures, valves, water heaters, heating and cooling equipment, temperature control, fan, electrical panels, service entrance equipment and light fixtures. 4) Manufacturer's name, type, color designation for resilient floors, windows, doors, concrete block, paint, roofing, other materials. Submit six copies oF Maintenance Manual, prior to request for final payment. O�erational InsAection and Maintenance Instruction: The Contractor shall provide at his expense, competent manufacturer's representatives to completely check out all mechanical and electrical systems and items covered by the Drawings and Specifications. This requirement shall be scheduled just prior to and during the initial start up. After all systems are functioning properly the representatives shall instruct maintenance personnel of the Owner in the proper operation and maintenance of each item. G-27 GUARANTEE AND EXTENDED GUARANTEE. Upon completion of the Project, prior to final payment, guarantees required by technical divisions of Specifications shall be properly executed in quadruplicate by subcontractors and submitted through the Contractor to Architect. Delivery of guarantees shall not relieve Contractor from any obligation assumed under Contract. The Contractor shall guarantee the entire Project for one year. In addition, where separate guarantees, for certain portions of work, are for longer periods, General Coniracfor's guarantee shall be extended to cover such longer periods. Manufacturer's extended warrantees shall be included in this contract. Guarantees shall become valid and operative and commence upon issuance of Certificate of Inspection and Acceptance by Owner. Guarantees shall not apply to work where damage is result of abuse, neglect by Owner or his successor(s) in interest. The Contractor agrees to warrant his work and materials provided in accordance with this contract and the terms of the Technical Specifications contained herein. Unless supplemented by the Technical Specifications or the manufacturers normal extended warrantees, the Contractor shall warrant all work materials, and equipment against defects for a period of one year from the date of final acceptance. The Contractor further agrees to bear all costs of making good all work that is found to be defective or not provided in accordance with the Contract Documents. Additionally if the facility or contents are damaged due to defective materials or workmanship of the Contractor, the Contractor further agrees to bear all cost of repairing and/or replacing damaged items and components to bring such items back to at least their original condition. G-28 Y2K COMPLIANCE REQUIREMENTS The Contractor warrants that each hardware, software and firmware product delivered for incorporation into the Work be able to accurately process date/time data between the years 1999 and 2000, including leap year calculations and as described below: 1. Date/time data between the information technology incorporated into the Work shall transfer accurately to and from information technology purchased separately from the Work but intended to be used in association with warranted products or systems. 2. Where the contract documents require that products must perform as a system with respect to date/time data transfer, the wa«anty described herein applies to Ihe performance of the system rather than to individual products. 3. The duration of this warranty and the remedies available to the Owner for the breach of this warranty shall be as defined in and subject to, ihe terms and limitations of the Contractor's standard commercial warranty or warranties. 4. The remedies available to the Owner under this warranty shall include repair or replacement of any product or system whose noncompliance is discovered and made known to the Contractor, in writing, within one year following the date of substantial completion. 5. Nothing in the provisions of this warranty shall be construed to limit any rights or remedies the Owner may have with respect to defects discovered in the Work not related to compliance requirements of this section. The contractor agrees to correct defective Work within a one year period after Date of Substantial Completion, and provide one year warranty for accurate transfer of date/time data between the years 1999 and 2000 as described within this section. G-29 RECORD DRAWINGS. Upon completion of the Work and prior to application for final payment, one print of each of the drawings accompanying this specification shall be neatly and clearly marked in red by the Contractor to show variations between the construction actually provided and that indicated or specified in the Contract Documents. The annotated documents shall be delivered to Architect. Where a choice of materials and/or methods is permitted herein and where variations in the scope or character of the work from the entire work indicated or specified are permitted either by award of bidding items specified for that purpose, or by subsequent change to the drawings, the record drawings shall define the construction actually provided. The representation of such variations shall conform to standard drafting practice and shall include supplementary notes, legends and details which may be necessary for legibility and clear portrayal of the actual construclion. The record drawings shall indicate, in addition, the actual location of all sub-surface utiliry lines, average depth below the surface and other appurtenances. G-30 CONSTRUCTION FENCE. At the Contractor's option, he may provide a substantial chain-link construction fence around all or a part of the site. The fences and gates must be maintained throughout the construction period. Remove the fences and gates upon completion of the Project and restore the site to the required original or contract condition. GC - 11 of 23 8/31/99 G-31 PRODUCT DELIVERY. STORAGE. HANDI.ING. The Contractor shall handle, store and protect materials and products, including fabricated components, by methods and means which will prevent damage, deterioration and loss, including theft (and resulting delays), thereby ensuring highest quality results as the work progresses. Control delivery schedules so as to minimize unnecessary long-term storage at project site prior to installation. G-32 AGE In accordance with the policy ("Policy") of the Executive Branch oF the federal government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agenLs, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limil is based upon a bona fide occupational qualification, retirement plan or statutory equipment. Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontrac- tor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. G-33 DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will �ot unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold Ciry harmless against any claims or allegalions asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above-referenced laws concerning disability discrimination in the performance of this agreement. SECTION H CONTRACT TIME H-1 DEFINITIONS. The Contract Time is the period of time allotted in the Contract Documents for completion of the Work. The date of commencement of the Work is the date estabiished in the Notice to Proceed. If there is no notice to proceed, it shall be the date of the Agreement or such other date as may be estabtished lherein. The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect with the approval of the Owner that construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the Work or designated portion thereof for the use for which it is intended. Final acceptance of the completed work or any portion thereof can be made only by ihe City Council of the Ciry of Fort Worth or it's designated Assistant City Manager, and no other form of acceptance will be binding upon the Owner. A calendar day constitutes 24 hours of time and is any one of the seven days of a week, including Sunday, regardless of whether a"Working Day" or not, and regardless of weather conditions or any situation which might delay construction. An extension of contract time shall be in accordance with this Section. Extensions of time will be as recommended by the Architect with final approval by City of Fort Worth. A working day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other conditions not under the control of the Contractor permit the performance of work for a continuous period of not iess than seven hours between 7:00 a.m. and 6:00 p.m. However, nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturdays if he so desires. Should the Contractor choose to work on Saturdays, one day will be charged as contract working time when weather or other conditions permit seven hours of work as delineated above. Legal holidays are defined as being New Year's Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, Memorial Day, and Veteran's Day. H-2 PROGRESS AND COMPLETION. All the time limits stated in the Contract Documents are of essence to the Contract. The Contractor shall begin the Work on the date of commencement as defined in this Section. He shall carry the Work forward expeditiously with adequate forces and shall complete it within the Contact Time. H-3 DELAYS AND EXTENSIONS OF TIME. If the Contractor is delayed at any time in the progress of the Work by any act or neglect of the Owner or the Architect, or by any employee of the Owner, or by any separate contractor employed by the Owner, or by any separate contractor employed by ihe Owner, or by changes ordered in the Work, or by labor disputes, fire, unusual delay in transportation, unavoidable casualties or any causes beyond the Contractor's control, or by any cause which the Architect determines may justify the delay, then the contract time may be extended by Change Order for such reasonable time as recommended by the Architect and approved by the Owner. When the Contractor is delayed due to abnormal weather conditions, the weather table provided as WT-1 in these Contract Documents shall be used as the basis for providing a fair and equitable adjustment of the contracl time. All claims for extension of time shall be made in writing to the Architect no more than fifteen days after the occurrence of the delay; otherwise they shall be waived. If no schedule or agreement is made stating the dates upon which written interpretations shall be furnished, then no claim for delay shall be allowed on account of failure to furnish such interpretation until fifteen days after demand is made for lhem, and not then unless such a claim is reasonable. H� NO DAMAGE FOR DELAY. No payment, compensation or adjustment or any kind (other than the extensions of time provided for) shall be made to the contractor for damages because of hindrances or delays from an cause in the progress of the work, whether such hindrances or delays be avoidable or unavoidable, and the contractor agrees that he will make no claim for GC - 12 of 23 8/31 /99 compensation, damages or mitigation of liquidated damages for any such delays, and will accept in full satisfaction for such delays said extension of time. revised monthly work progress schedule must be attached before the pay request can be accepted. SECTION I PAYMENTS AND COMPLETION I-1 CONTRACT SUM. The Contract Sum is stated in the proposal as accepted and is the total amount payable by the Owner to the Contractor for the performance of the Work under the Contract Documents. I-2 SCHEDULE OF VALUES. Before the first Applicable for Payment, the Contractor shall submit to the Architect a Schedule of Values of the various portions of the Work, including quantities if required by the Architect, aggregating the total Contract Sum, divided so as to facilitate payments to Sub-contractors, prepared in such form as specified or as the Architect and the Contracror may agree upon, and supported by such data to substantiate its correctness as the Architect may require. Each item in the Schedule of Values shall include its proper share of overhead and profit. This Schedule, when approved by the Architect and the Owner, shall be used as a basis for the Contractor's Applications for Payment. I-3 ADJUSTMENT OF QUANTITIES. Where unit prices and estimated quantities are used to compute the contract amount, the Owner may increase the quantities by an amount that is 20% of the total cost for that section. Unit prices for adjustments to unit quantities in excess to 20% may be negotiated at the request of either party. I-4 PROGRESS PAYMENTS. On the first day of each month after the first month's work has been completed, the Contractor will make current estimates in writing for review by the Architect of materials in place complete and ihe amount of work performed during the preceding month or period and the value thereof at the prices contracted for as shown on the approved Schedule of Values and Progress Schedule. If payments are to be made on account of materials or equipment not incorporated in the Work but delivered and suitably stored at the site or in an independent, bonded warehouse such payments shall be conditioned upon submission by the Contractor of bills of sale or such other procedures satisfactory to the Owner to establish the Owner's title to such materials or equipment or otherwise protect the Owner's interest including applicable insurance and transportation to the site. The Contractor warrants and guarantees that title to all Work, materials and equipment covered by an Application for Payment, whether incorporated in the Project or not, will pass to the Owner upon the receipt of such payment by the Contractor, free and clear of all liens, claims, security interesls or encumbrances hereinafter referred to as "liens"; and that no Work, materials or equipment covered by an Application for Payment will have been acquired by the Contractor, or by any other persons performing the Work at the site or furnishing materials and equipment for the Work, subject to an agreement under which an interest therein or an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such other person. The Contractor shall prepare each application for payment on AIA Document G702, "Application and Certificate for Payment", and attached thereto AIA Document G703, "Continuation Sheet", to indicate lhe progress made to date and the period or month for which payment is requested for each Item listed in the Schedule of Values. A copy of the I-5 CERTIFICATES FOR PAYMENT. If the Contractor has made Application for Payment as above, the above, the Architect will, with reasonable promptness but not more than seven days after the receipt of the Application, prepare a Certificate of Payment, with a copy to the Contractor, for such amount determined to be properly due, or state in writing reasons for withholding a Certificate. The issuance of a Certificate for Payment will constitute a representation by the Architect to the Owner, based on the Architect's observations at the site and the data comprising the Application for Payment, that the Work has progressed to ihe point indicated; that the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole upon Substantial Completion, to the results of any subsequent tests required by the Contract Documenls, to minor deviations from the Contract Documents correctable prior to completion, and to any specific qualifications stated in the Certificate); and recommendations to the Owner that the Contractor be paid in the amount certified. In addition, the Architect's approval of final payment assures the Owner that the conditions precedent to the Contractor's being entitled to final payment as set forth in this Section have been fulfilled. After the Architect has issued a Ce�tificate for Payment, the Owner shall approve or disapprove same within ten days after it has been delivered to the Director of the Department of Transportation and Public Works. For contracts less than 5400,000, Owner shall pay 90% of the approved estimate to the Contractor within seven days after its approval, and the remaining 10% of each such estimate will be retained by the Owner until the final estimate is approved and the Work is accepted by the City Council of the City of Fo�t Worth. For contracts in excess of 5400,000, the Owner will retain only 5°/a of each estimate until the final estimate is approved and work accepted by the City Council of the Ciry of Fort Worth. No Certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by the Owner, shall constitute an acceptance of any Work not in accordance with the Contract Documents, or relieve the Contractor of liability in respect to any warranties or responsibility for faulty materials or workmanship. The Contractor shall promptly remedy any defects in the Work and pay for any damage to other work resulting therefrom that shall appear within a period of one year from the date of final acceptance of the Work unless a longer period is specified. I-6 PAYMENTS WITHHELD. The Architect may decline to approve an Application for Payment and may withhold his Certificate in whole or in part if in his opinion he is unable to make the representations to the Owner as provided in this Section. The Architect may aiso decline to approve any Applications for Payment or, because of subsequently discovered evidence or subsequent inspections, may nullify the whole or any part of any Certificate for Payment previously issued to such extent as may be necessary in his opinion to protect the Owner from loss because of: 1) defective work not remedied; 2) claims filed or reasonable evidence indicating probable filing of claims; 3) failure of the Contractor to make payments properly to Subcontractors, or for labor, materials or equipment; 4) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Sum; GC - 13 of 23 8/31/99 5) damage to another contractor; 6) �easonable indication that the Work will not be completed within the Contract Time; or 7) unsatisfactory prosecution of the Work by the Contractor. When such grounds for the refusal of payment are removed, payment shall be made for amounts withheld because of them. The Owner reserves the right to withhold the payment of any monthly estimate, without payment of interest, if the Contractor fails to perform the Work in accordance with the specifications or instructions of the Architect. I-7 UNRESOLVED CLAIMS: In the event a written claim for damages against the Contractor or its subcon- tractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Transportation and Public Works Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Transportation and Public Works Depa�tment for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. Although the claim concerned remains unsettled at the expiration of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of Ihe performance of such work, and such semi-final payment may then be recommended by the Oirector. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that: 1) The claim has been settled and a release has been obtained from the claimant involved, or 2) Good faith efforts have been made to settle such out- standing claims, and such good faith efforts have failed. If condition (1) above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the six-month period, the Director may recommend that the final payment to the Contractor be made. At the expiration of the six- month period the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Transportation and Public Works Department contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City contract. I-8 LIQUIDATED DAMAGES: The deduction for liquidated damages shall be as follows: Amount of Contract Liquidated Damages Per Day $15,000 or less $45 $15,001 to $25,000 $ 63 �25,001 to $50,000 �u105 $50,001 to 5100,000 3154 $100,000 to $500,000 $210 $500,001 to �1,000,000 $315 $1,000,001 to $2,000,000 $420 $2,000,001 to $5,000,000 $630 $5,000,001 lo 510,000,000 $840 over$10,000,000 $980 I-9 FAILURE OF PAYMENT If, without fault on the pa�t of the Contractor, the Architect should fail to issue any Certificate for Payment within seven days afte� receipt of the Contractor's Application for Payment, if the Contractor's Application for Payment, or if, without fault on the part of the Contractor, the Owner should fail to approve such estimate or to pay to the Contractor 90% or 95% (as applicable) of the amount thereof within the period of time specified, then the Contractor may, upon seven (7) days additional written notice to the Owner and to the Architect, stop the Work until payment of the amount owing has been received. I-10 SUBSTANTIAL COMPLETION AND FINAL PAYMENT Prior to the request for final payment, the Contractor must meet all provisions for Project Closeout. When the Contractor determines that ihe Work or a designated portion thereof acceptable to the Owner is substantially complete, the Contractor shall prepare the submission to the Architect a list of items to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Architect, on the basis of an inspection, determines that the Work is substantially complete, he then will prepare a Certificate of Substantial Compietion (G704) which, when approved by the Owner, shall establish the Date of Substantial Completion, shall siaie the responsibilities of the Owner and the Contractor for maintenance, heat, utilities, and insurance, and shall fix the time within which lhe Contractor shall complete the items listed therein, said time to be within the Contract time unless extended. Upon receipt of written notice that lhe Work is ready for final inspection and acceptance and upon receipl of a final Application for Payment and upon receipt of a final application for payment, providing the record drawings have been received by the Architect, the Architect will conduct such test and/or inspections as he deems necessary, and if in his opinion the Work has been completed in accordance with the Contract Documents, the Architect will promptly issue a final Certificate of Substantial Completion stating that to the best of his knowledge, information and belief, and on the basis of his observations and inspections, ihe Work has been completed in accordance with the terms and conditions of the Contract Documents and that the entire balance found to be due the Contractor is due and payable. Final acceptance can be made by the City Council of the City of Fort Worth or it's designated representative, and no oiher form of acceptance will be binding upon the Owner. Final payment and release of the retainage amount will become due within fifteen days following approval of the City Council of the Ciry of Fort Worth in accepting the work as complete. Neither the final payment nor the remaining retained percentage shall become due until the Contractor submits to the Architect: 1) Contractor's Affidavit of Payment of Debts and Claims (G706) stating that all payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or his propeRy might in any way be responsible, have been paid or otherwise satisfied, 2) Consenl of Surety to Final Payment (G707), if any, to final payment, GC - 14 of 23 8/31 /99 3) Contractor's Affidavit of Release of Liens (G706A), and, 4) Other data establishing payment or satisfaction of all such obligations, such as receipts, releases and waivers of liens arising out of the Contract, to the extent and in such form as may be designated by the Owner. If any Subcontractor, materialman or laborer refuses to furnish a release or waiver required by the Owner, the Contractor may, at the election of the Owner, furnish a bond satisfactory to the Owner to indemnify him against any right, claim or lien which might be asserted by such Subcontractor, materialman or laborer. If any such right, claim or lien remains unsatisfied alter all payments are made. The Contractor shall refund to the Owner all monies that the latter may be compelled to pay to discharging such right, claim or lien, including all costs and reasonable attorney's fees. The acceptance of final payment shall constitute a waiver of all claims by the Contractor except those previously made in writing and still unsettled. SECTION J PROTECTION OF PERSONS AND PROPERTY J-1 SAFETY PRECAUTIONS AND PROGRAMS The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. The Contractor shall designate a responsible member of his organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless othenvise designated in writing by the Contractor to the Architect. J-2 SAFETY OF PERSONS AND PROPERTY. The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury or loss to: (1) all employees on the Work and all other persons who may be affected thereby; (2) all the Work and all materials and equipment to be incorporated therein, whether in storage on or-off the site, under the care, custody or control of the Contractor or any of his Subcontractors or Sub-contractors; and (3) other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. Until acceptance of the Work, it shall be under the charge and care of the Contractor, and he shall take every precaution against injury or damage to the Work by the action of the elements or from any other cause whatsoever, whether arising from the execution or from the non-execution of the Work. The Contractor shall rebuild, repair, restore and make good, at his own expense, all injuries or damages to any po�tion of the Work occasioned by any of the above, caused before its completion and acceptance. The Contractor shall comply with all applicable Laws, Ordinances, Rules, Regulations and Orders of any public authority having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. He shall erect and maintain, as required by existing conditions and progress of the Work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities. When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the Work, the Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel. All damage or loss to any property referred to in the preceding paragraphs caused in whole or in part by the Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acLs any of them may be liable, shall be remedied by the Contractor, including damage or loss attributable to faulry Drawings or Specifications and acts or omissions of the Architect or anyone employed by him or for whose acts he may be liable, and not attributable to the fault or negligence of ihe Contractor or anyone claiming through the Contractor for such damage or loss. The Contractor shall not load or permit any part of the Work to be loaded so as to endanger its safety. J-3 HARD HATS. Hard Hats will be required at all construction sites included in this Contraci from start to completion of work. Each Contractor, employee and visitor at any construction site sncluded in the Contract will be required to wear a hard hat. The Contractor shall enforce the wearing of hard hats by Contractor, employees and visitors. These requirements are in addition to the Accident Prevention Clause in the General Conditions o( the Contract. Contractor shall provide ten hard hats for use by the consulting Architects and Engineers and visitors. J-4 EMERGENCIES. In any emergency affecting ihe safery of persons or property, the Contractor shall act at his discretion to prevent threatened damage, injury or loss. Any additional compensation or extension of time claimed by the Contractor on account of emergency work shall be determined as provided in Changes in the Work. SECTION K - INSURANCE K-1 Insurance Reauired. The Contractor shall not commence work under this Contract until he has obtained all insurance required under this Section and such insurance has been approved by the City of Fo�t Worth, nor shall the Contractor allow any Subcontractor to commence work to be performed under this Contract until all similar insurance of the Subcontractor has been so obtained and approved. K-1 Insurance Reauired. The Contractor shall not commence work under this Contract until he has obtained all insurance required under this Section and such insurance has been approved by the City of Fort Worth, nor shall ihe Contractor allow any Subcontractor to commence work to be performed under this Contract until all similar insurance of the Subcontractor has been so obtained and approved. K-2 Workers' Com�ensation Insurance: 1) General a) Contractor's Worker's Compensation Insurance. ConUactor agrees to provide to the Owner (Ciry) a certificate showing that it has obtained a policy of workers compensation insurance covering each of its employees employed on the project in compliance with state law. No Notice to Proceed will be issued until the Contractor has complied with this section. b) Subcontractor's Worker's Compensation Insurance. Conlractor agrees to require each and every subcontractor who will perform work on the project to provide to it a certificate from such subcontractor stating that the subcontractor has a GC - 15 of 23 8/31 /99 2) policy of workers compensation insurance covering each employee employed on the project. Contractor will not permit any subconiractor to perform work on the project until such certificate has been acquired. Contractor shall provide a copy of all such certificates to the Owner (Ciry). c) By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the City that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of cfassification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the Texas Worker's Compensation Commission's Division of Self- Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. d) The coniractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. Definitions: a) Certificate of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by ihe Texas Workers' Compensation Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. b) Duration of ihe Project. Includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the City. c) Persons providing services on the project ("subcontractor" in section 406.096)-includes all persons or entities performing all or part of the services the contractor has unde�taken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entiry which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Seivices" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 3) Requirements a) The contractor shall provide coverage, based on proper reporting of classificaiion codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services of the project, for the duration of the project. b) The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. c) If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the City showing that coverage has been extended. d) The contractor shall obtain from each person providing services on a project, and provide to the City: i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and ii) no later than seven days aker receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. e) The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. f) The contractor shall notify the City in writing by certified mait or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. g) The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. h) The contractor shall contractually require each person with whom it contracts to provide services on a project, to: i) provide coverage, based on proper reporting on the classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; ii) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; iii) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; GC - 16 of 23 8/31/99 iv) obtain from each other person with whom it contracts, and provide to the contractor: (1) a certificate of coverage, prior to the other person beginning work on the project and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current cercificate of coverage ends during the duration of the project; v) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. vi) �notiiy the City in writing by ce�tified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and vii) contractually require each person with whom it contracLs, to perform as required by paragraphs h-i) - vii), with the certificates of coverage to be provided to the person for whom they are providing services. 4) Posting of Required Worker's Compensation Coverage. a) The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19-point normal type, and shall be in both English and 5panish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee". Call the Texas Worker's Compensation Commission at 512-440-3789 to recelve information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." K-3 LIABILITY INSURANCE. The Contractor shall procure and maintain during the term of this Contract such Liabiliry Insurance as shall protect him, the City of Fort Worth and any Subcontractor performing work covered by this Contract, from claims of damage which may arise from operations under this Contract, including blasting, when blasting is done on, or in connection with the Work of the Project, whether such operations be by himself or by any Subcontractor or by anyone directly or indirectly employed by either of them and the limits of such insurance shall be noi less than the following: 1) Automo6ile Liability: $1,000,000 each accident, or reasonably equivalent split limits for bodily injury and property damage. Coverage shall be on "any auto" including leased, hired, owned, non-owned and borrowed vehicles used in connection with this Contract. 2) Commercial General Liability: 51,000,000 each occurrence. Coverage under the policy shall be as comprehensive as that provided in a current Insurance Services Office (ISO) policy form approved for use in Texas and the policy shall have no exclusions by endorsement unless such are approved by ihe City. 3) Asbestos Abatement Liability Insurance: When the Project specifically requires the removal of Asbestos Containing Materials, the Contractor shall be required to maintain Asbestos Abatement Liability Insurance as follows: 51,000,000 per occurrence; $2,000,000 aggregate limit. The coverage shall include any pollution exposure, including environmental impairment liability, associated with the services and operations performed under this contract in addition to sudden and accidental contamination or pollution liability for gradual emissions and clean-up costs. K-4 BUILDER'S RISK INSURANCE. Unless stated otherwise in the Proposal or Invitation, the Contractor shafl procure, pay for and maintain at all times during the term of this Contract, Builder's Risk Insurance against the perils of fire, lightning, windstorm, hurricane, hail, riot, explosion, civic commotion, smoke, aircraft, land vehicles, vandalism, and malicious mischief, at a limit equal to 100% of the Contract Sum. The policy shall include coverage for materials and supplies while in transit and while being stored on or off site. If specifically required in the Instructions to Bidders, the policy shall include coverage for flood and earthquake. Different sublimits for these coverages must be approved by the City. Consequential damage due to faulty workmanship and/or design performed by the Contractor or his agents shall be covered. Upon completion of the Work, the Contractor shall notify the City of Fort Worth in writing before terminating this insurance. K-5 PROOF OF CARRIAGE OF INSURANCE. The Contractor shal� provide a cerlificate of insurance documenting the Transportation and Public Works Department, City of Fort Worth as a"Certificate Holder", and noting the specific project(s) covered by the Contractor's insurance as documented on the certificate of insurance. More than one certificate may be required of the Contractor depending upon the agents allor insurers for the Contractor's insurance coverages specified for the project(s). K-6 OTHER iNSURANCE RELATED REQUIREMENTS. 1) The City of Fort Worth shall be an additional insured, by endorsement, on all applicable insurance policies. GC - 17 of 23 8/31/99 2) Applicable insurance policies shall each be endorsed with a waiver of subrogation in favor of the City of Fort Worth. 3) Insurers of policies maintained by Contractor and its subcontractor(s), if applicable, shall be authorized to do business in the State of Texas, or otherwise approved by the City of Fort Worth, and such shall be acceptable to the Ciry of Fort Worth insofar as their financial strength and solvency are concerned. Any company through which the insurance is placed must have a rating of at least A:VII, as stated in current edition of A. M. BesPs Key Rating Guide. At the City's sole discretion, a less favorable rate may be accepted by the City. 4) Deductible limits on insurance policies and/or self insured retentions exceeding $10,000 require approval of the City of Fort Worth as respecls this Contract. 5j The City of Fort Worth shall be notified in writing a minimum of thirty days prior to an insurer's action in the event of cancellation, non-renewal or material change in coverage regarding any policy providing insurance coverage required in this Contract. 6) Full limits of insurance shall be available for claims arising out of this Contract with the City of Fort Worth. 7) Certificates of insurance shall be provided by the Contractor to the City prior to commencement of operations pursuant to this Contract. Any failure on part of the City of Fort Worth to request such documentation shall not be construed as a waiver of insurance requirements specified herein. 8) The Ciry of Fort Worth shall be entitled, upon request and without incurring expense, to review the insurance policies including endorsements thereto and, at its discretion, to require proof of payment for policy premiums. 9) The City of Fort Worth shall not be responsible for paying the cost of insurance coverages required herein. 10) Notice of any actual or potential claim and/or litigation that would affect insurance coverages required herein shall be provided to the City in a timely manner. 11) "Other insurance" as referenced in any policy of insurance providing coverages required herein shall not apply to any insurance policy or program maintained by lhe City of Fort Worth. 12) Contractor shall agree to either require its subcontractors to maintain the same insurance coverages and limits thereof as specified herein or such coverage on the Contractor's subcontractors shall be provided by the Contractor. SECTION L CHANGES IN THE WORK L-1 CHANGE ORDER. The Owner, without invalidating the Contract, may order Changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and the Contract Time being adjusted accordingly. All Such Changes in the Work shall be authorized by Change Order, and shall be executed under the applicable conditions of the Contract Documents. A Change Order is a written order to the Contractor signed by lhe Contractor, Owner and the Architect, issued after the execution of the Contract, authorizing a Change in the Work or adjustment in the Contract Sum or the Contract Time. The Contract Sum and the Contract Time may be changed only by Change Order. Any changes in work required due to changed or unforeseen conditions, or by request of either the Contractor or the City, shall be coordinated with the Director, Department of Transportation and Public Works. A change order must be written and duly negotiated and executed prior to performing changed work. The cost or credit to the Owner resuiting from a Change in the Fort Worth shall be determined in one or more of the following ways: 1) by mutual acceptance of a lump sum property itemized, including the allowance to Contractor for overhead and profit stipulated in the original contract proposal; 2) by unit prices stated in the Contract Documents or subsequently agreed upon; or 3) by cost and a mutually acceptable fixed or percentage fee. If none of the methods set forth herein above is agreed upon, the Contractor, provided he receives a Change Order, shall promptly proceed with the Work involved. The cost of such work shall then be determined on the basis of the Contractor's reasonable expenditures and savings, including a reasonable ailowance for overhead and profit as indicted in the original contract proposal. In such cases, the Contractor shall keep and present, in such form as the Architect shall prescribe, an itemized accounting together with appropriate supporting data. Pending final delermination of cost to the Owner, payments on account shall be made on the ArchitecYs Certificate of Payment as approved by the Owner. If after the contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in scope of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in writing. The Architect shall review the price quotation and if approval is recommended, forward the proposed change order request and price proposal to the Owner for approval. If the Architect will attempt to negotiate with Contractor to revise the proposal to a figure which is fair and reasonable and forward it on to the Owner for approval. If the negotiations do not result in an equitable solution, the Architect shall prepare a cost-plus rype Change Order with a price-not-to-exceed figure for approval by the City and require specific documentation to be provided by Contractor in accordance with the paragraph above. Contractor is advised that according to City of Fort Worth Charter, that when the cumulative effect of Change Orders results in an increase in cost of the contract amount by over 53,000, the City Council must approve all such Change Orders which will exceed this limit. Normal processing time for the City Staff to obtain City Council approval, once the recommended change order has been received at the City, is approximately thirty (30) days . Owner, Architect and Contractor shall endeavor to identify Change Order items as early in the Construction process as possible to minimize their impact on the construction schedule. If unit prices are stated in the Contract Documents or subsequently agreed upon, and if lhe quantities originally contemplated are so changed in a proposed Change Order that application of the agreed unit prices to the quantities of Work proposed will create a hardship on the Owner or the GC - 18 of 23 8/31 /99 Contractor, the applicable unit prices shall be equitably adjusted to prevent such hardship. If the Contractor claims that additional cost or time is involved because of (1) any written interpretation issued pursuant ro Section A, (2) any order by the Architect or Owner to stop the Work pursuant to Section B, where the Contract was not at fault, or (3) any written order for a minor change in the Work, the Contractor shall make such claim. L-2 CLAIMS FOR ADDITIONAL COST OR TIME. If the Contractor wishes to make a claim for an increase in the Contract Sum or an extension in the Contract Time, he shall give the Architect written notice thereof within a reasonable time after the occurrence of the event that gave rise to such claim. This notice shall be given by the Contractor before proceeding to execute the Work, except in an emergency endangering life or property in which case the Contractor shall proceed in accordance with Section J. No such claim shail be valid unless so made. Any change in the Contract Sum or Contract Time resulting from such claim, if approved by the Owner, shall be authorized by Ghange Order. L-3 OVERHEAD ALLOWANCES FOR CHANGES: Should any change in the work or extra work be ordered, the following applicable percentage shall be added to Material and Labor costs to cover overhead and profit: 1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed fifteen percent 1( 5%l. 2. Allowance to the Contractor for overhead and profit for extra work performed by a Subcontractor and supervised by the Contractor shall not exceed ten percent 1I 0%l. L-4 MINOR CHANGES IN THE WORK. The Architect shall have authority to order minor changes in the Work not involving an adjustment in the Contract Sum or an extension of the Contact Time and not inconsistent with the intent of lhe Contract Documents. Such changes may be effected by Field Order or by other written order. Such changes shall be confirmed in writing by the Architect and shall be binding on the Owner and the Contractor. L-5 FIELD ORDERS. The Architect may issue written Field Orders which interpret the Coniract Documents in accordance with Section A, or which order minor changes in the Work in accordance with Section L without change in Contract Sum or Contract Time. The Contractor shall carry out such Field Orders promptly. SECTION M UNCOVERING AND CORRECTION OF WORK M-1 UNCOVERING OF WORK. If any Work should be covered contrary to the request of the Owner or Architect, it must be uncovered for observation and replaced, at the Contractor's expense. If any other work has been covered which the Owner or Architect have not specifically requested to observe prior to being covered, the Architect or the Owner may request to see such work and it shall be uncovered by the Contractor. If such Work be found in accordance with the Plans and Specifications, the cost of uncovering and replacement shall, by appropriate Change Order, be charged to the Owner. If such work be found not in accordance with the Plans and Specifications, the Contractor shall pay such costs unless it be found that this condition was caused by a separate contractor employed by the Owner. M-2 CORRECTION OF WORK. The Contractor shall promptly correct all work rejected by the Owner or Architect as defective or as failing to conform to the Plans and Specifications whether observed before or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including the cost of the ArchitecYs additional service thereby made necessary. IF, within one year after the Date of Substantial Completion or within such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents, any of the work is found to be defective or not in accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the Owner to do so, unless the Owner has previously given the Contractor a written acceptance of such condition, describing same specifically and not generally. The Owner shall give such notice promptly after discovery of the condition. All such defective or non-conforming work under the preceding paragraphs shall be removed from the site where necessary, and the work shall be corrected to comply with the Contract Documents without cost to the Owner. The Contractor shall bear the cost of making good all work of separate contractors destroyed or damaged by such removal or correction. If the Contractor does not remove such defective or non- conforming work within a reasonable time fixed by written notice from the Architect or the Owner, the Owner may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does not pay the cost of such removal and storage within ten days thereafter, the Owner may upon ten additional days' written notice sell such work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have been borne by the Contractor including compensation for additional architectural services. If such proceeds of sale do not cover all costs that the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order shall be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the Owner. If the Contractor fails to correct such defective or non- conforming work, the Owner may correct it in accordance with Section G. The obtigation oi the Contractor under this Section shall be in addition to and not in limitation of any obligations imposed upon him by special guarantees required by the Contract Documents or otherwise prescribed by law. M-3 ACCEPTANCE OF DEFECTIVE OR NON- CONFORMING WORK. If the Owner prefers to accept defective or non-conforming work, he may do so instead of requiring its removal and correction, in which case a Change Order will be issued to reflect an appropriate reduction in the Contract Sum, or, if the amount is determined after final payment, it shall be paid by the Contractor. SECTION N TERMINATION OF THE CONTRACT N-1 TERMINATION BY THE CONTRACTOR. If the work is stopped for a period of 30 days under an order or any court or other public authority having jurisdiction, through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons GC - 19 of 23 8/31 /99 pe�forming any of the work under a contract with the Contractor, or if the work should be stopped for a period of 30 days by the Contractor for the Owner's failure to make payment thereon as provided in Section I, then the Contractor may aker the end of such period of 30 days and upon seven additional days' written notice to the Owner and the Architect, terminate the Contract. N-2 TERMINATION BY THE OWNER. If the contractor is adjudged as bankrupt, or if he makes a general assignment for the benefit of his creditors, or if a receiver is appointed on account of his insotvency, of if the Contractor refuses, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or iF he fails to make prompt payment to Subcontractors or for materials or labor, or faiis to comply with al Laws, Statutes, Charter, Ordinances, Regutations or Orders of any public authoriry having jurisdiction, or otherwise is guilry of a substantial violation of a provision of the Contract Documents, then the Owner, on its own initiative or upon certification by the Architect that sufficient cause exists to justify such action, may, without prejudice to any rights or remedy and after giving the Contractor and his surety, if any, seven (7) days' written notice, terminate the employment of the Contractor and take possession of the site and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor and may finish the work by whatever method he may deem expedient. In such case the Contractor shall not be entitled to receive any further payment until the Work is finished. If the costs of finishing the Work, including compensation for the ArchitecPs additional services., exceed the unpaid balance of the Contract, the Contractor shall pay the difference to the Owner. The City of Fort Worth may terminate this contract in whole, or from time to time, in part, whenever such termination is in the best interest of the City. Termination will be effected by delivering to the Contractor a notice of termination specifying to what extent performance of the work of the contract is being terminated and the effective date of termination. After receipt of termination the contractor shall: a) Stop work under the Contract on the date and to the extent specified on the notice of termination. b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminated. c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice of termination. After termination as above, the City will pay the contractor a proportionate part of the contract price based on the work completed; provided, however, that the amount of payment on termination shall not exceed the total contract price as reduced by the portion thereof allocatable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor shall submit its ciaim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In the event of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph, such dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the City Council of the Ciry of Fort Worth shall be final and binding upon all parties to this contract SECTION O SIGNS The Contractor shall construct and install the project designation sign as required in the Contract Documents and in strict accordance with the Specifications for "Project Designation Signs." This sign shall be a part of this Contract and shall be included in the Contractor's Base Bid for the Project. SECTION P TEMPORARY FACILITIES P-1 SCOPE. The Contractor shall furnish, erect, and maintain facilities and perform temporary work required in the performance of this Contract, including those shown and specified. P-2 USE OF TEMPORARY FACILITIES. All temporary facilities shall be made available for use by all workmen and subcontractors employed on the project, subject to reasonable directions by the Contractor as to their proper and most e�cient utilization. P-3 MAINTENANCE AND REMOVAL. The Contractor shall maintain temporary tacilities in a proper, safe operating and sanitary condition for the duration of the Contract. Upon completion of the Contract, all such temporary work and facilities shall be removed from the premises and disposed of unless otherwise directed or specified hereunder. P� FIELD OFFICES AND SHED. The Contractor shall provide a temporary field o�ce building for himself, his subcontr,actors and use by the Architect. For construction contracts with a bid price in excess of S1,000,000.00, ihe Contractor shall provide a separate field office for the City's field representative (but the separate office may be in the same structure). The buildings shall afford protection against the weather, and each office shall have a lockable door, at least one window, adequate electrical outleLs and lighting, and a shelf large enough to accommodate perusal of the project drawings. Openings shall have suitable locks. Field offices shall be maintained for the full time during the operation of the work of the Contract. During cold weather months, the field offices shall be suitably insulated and equipped with a heating device to maintain 70 degree Fahrenheit temperature during the workday. During warm weather the offices shall be equipped with an air conditioning device to maintain temperature below 75 degrees F. Upon completion of the work of the Contract, the Contractor shall remove the building from ihe premises. In addition to the drawing shelf, provide for the City field representatives office: one deck, four chairs, plan rack and a four drawer filing cabinet (with lock). Each office shall contain not less than 120 square feet of floor space. The Contractor shall provide and maintain storage sheds, other temporary buildings or trailers on the project site as required for his use. Location of sheds and trailers shall be as approved by the Architect. Remove sheds when work is completed, or as directed. P-5 TELEPHONE. The Contractor shall provide and pay for telephone installation and service to the field offices described above. Service shall be maintained for the duration of operations under this contract. The Contractor shall provide for and pay for an automatic telephone- answering device at the site office for the duration of the project. The contractor shall provide a separate telephone line, and instrument for use by the City's field representatives. P-6 TOILET FACILITIES. The Contractor shall provide proper, sanitary and adequate toilet facilities for the GC - 20 of 23 8/31!99 use of all workmen and subcontractors employed on the project. P-9 TEMPORARY CONSTRUCTION. E�UIPMENT AND PROTECTION P-7 UTILITIES. Contractor shall make all necessary arrangements and provide for temporary water and electricity required during the construction. Contractor shall provide and install temporary utility meters during the contract construction period. These meters will be read and the Contractor will be billed on ihis actual use. The Contractor shall provide all labor and materials required to tap into the utilities. The Contractor shall make the connections and extend the service lines to the construction area for use of all trades. Upon completion of the work all utiliry lines shall be removed and repairs made to the existing lines. Only utilities at existing voltages, pressures, frequencies, etc. will be available to the Contractor. Water. Provide an ample supply of potable water for all purposes of construction at a point convenient to the project or as shown on the Drawings. Pipe water from the source of supply to all points where water will be required. Provide sufficient hose to carry water to every required part of the construction and allow the use of water facilities to subcontractors engaged on the work. Provide pumps, tanks and compressors as may be required to produce required pressures. Electric Service. Provide adequate electric service for power and lighting to all points where required. Temporary, electric service shall be of sufficient capacity and characteristics to supply proper current for various types of construction tools, motors, welding machines, lights, heating plant, air conditioning system, pumps, and other work required. Provide sufficient number of electric outlets so that 50 foot long extension cords will reach all work requiring light or power. Liahtinq. Supply and maintain temporary lighting so that work of all trades may be properly and safely performed, in such areas and at such time that day-lighting is inadequate. Provide at least 0.75 watts of incandescent lighting per squqr4e foot and maintain a socket voltage of at least 110 volts. Use at least 100 watt lamps. In any event, the lighting intensity shall not be less than 5 foot candles in the vicinity of work and traffic areas. P-8 HEATING. Heating devices required under this paragraph shall not be electric. The Contractor shall provide heat, ventilation, fuel and services as required to protect all work and materials and to keep the humidity down to the extent required to prevent corrosion of any metal and to prevent dampness or mildew which is potentially damaging to materials and finishes. All such heating, ventilation and services shall be provided and maintained until final acceptance of all work. In addition, the Contractor shall provide heat ventilation prior and during the following work operations as follows: a) At all times during the placing, setting and curing of concrete provide sufficient heat to insure the heating of the spaces involved to not less than 40 F. b) From the beginning of the application of drywall and during the setting and curing period, provide sufficient heat to produce a temperature in the spaces involved of not less than 55 F. c) For a period of seven (7) days previous to the piacing of interior finish materials and throughout the placing of finish painting, decorating and laying of resilient flooring materials, provide sufficient heat to produce a temperature of not less than 60 F. The Contractor shall provide, maintain, and remove upon completion of the work all temporary rigging, scaffolding, hoisting equipment, rubbish chutes, ladders to roof, barricades around openings, and all other temporary work as required to complete all work of the Contract. Contractor shall coordinate the use and furnishing of scaffolds with his sub-contractors. The Contractor shall provide, maintain, and remove upon completion of the work, or sooner, if authorized by the Architect, all fences, barricades, lights, shoring, pedestrian walkways, temporary fire escapes, and other protective structures or devices necessary for the safety of workmen, City employees, equipment, the public and property. All temporary construction and equipment shall conform to all regulations, ordinances, laws and other requiremenLs of the authorities having jurisdiction, including insurance companies, with regards to safety precautions, operation and fire hazard. The Contractor shall provide and maintain pumping facilities, including power, for keeping the site, all times, whether from underground seepage, rainfall, drainage of broken lines. The Contractor shall maintain provision for closing and locking the building at such time as possible to do so. If this is not feasible, maintain a night The Contractor shall provide and maintain all barricades or enclosures, required to protect the work in progress from outside elements, dusts, and other disturbances as a result of work under this Contract. Such protection shall be positive, shall meet the approval of the Architect and shall be maintained for the duration of the construction period or as required to provide for the protection as specified. P-10 PROJECT BULLETIN BOARD. The Contractor shall furnish, install and maintain during the life of the project a weather-tight bulletin board approximately 3 feet high by 5 feet wide having not less than two hinged or sliding glass doors with provisions for locking. The bulletin board shall be mounted where and as approved by the Architect, in a prominent place accessible to employees of the Contractor and sub-contractors, and to applicants for employment. The bulletin board shall remain the property oi the Contracior and shall be removed by him upon completion of the Contract work. The following information which will be furnished by the City to the Contractor, shall be posted on the bulletin board and shall be maintained by the Contractor in easily readable condition at all times for the duration of the Contract. a. The Equal Opportunity Poster and Notice Nondiscrimination of Employment (Standard Form 38). b. Wage Rate Information Poster (Form SOL 155), with lhe Contract Schedule of minimum wage rates as required by the Davis-Bacon Act. c. Safety Posters. SECTION Q VENUE Should any action arise out oF the terms and conditions of this contract, venue for said action shall lie in Tarrant County, Texas. GC-21 of23 8/3 l l99 GENERAL CONDITIONS INdEX A A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 A-11 B DEFINITIONS PROCEDURES AND INTERPRETATIONS Contract Documents Entire Agreement Work Execution of the Contract Documents Familiarity with Proposed Work One Unified contract Division of Work Interpretations Copies of Working Orawings and Specifications Minoriry and Women's Business Enterprise Policy Correlation and Intent IDENTITY OF ARCHITECT B-1 Contract Administration B-2 Termination and Suspension of Work B-3 Duties of Architect B-4 Architect as Representative of the Owner B-5 Access to Job Site B-6 Interpretations B-7 Aulhority to Stop Work 6-8 Miscellaneous Duties of Architect B-9 Termination of Architect C OWNER C-1 Identification G2 Duties of the Owner C-3 Instructions C-4 Access to Job Site C-5 Progress Inspections C-6 Authority to Stop Work C-7 Substantial Completion Inspection C-8 Right to Audit D CONTRACTOR D-1 Identification D-2 Independent contractor D-3 Subletting D-4 Review of contract Documents D-5 Supervision D-6 Labor and Materials D-7 Prevailing Wage Rate D-8 Warranty D-9 Taxes D-10 Licenses, Notices and Fees D-11 Cash Allowances D-12 Superintendent D-13 Responsibility for Employees and Sub- contractors D-14 Failure to Commence work D-15 Progress Schedule D-16 Drawings and Specifications at the Site D-17 Shop Drawings and Samples D-18 Site Use D-19 Safe Work Practices D-20 Field Offices and Sheds D-21 Trench Safety D-22 Cutting and Patching of Work D-23 Cleaning Up D-24 Communications SUBCONTRACTORS E-1 Definition E-2 Award of Subcontracts E-3 Terms of Subcontracts E-4 Minority and Women's Business Enterprise (M/WBE) E-5 Payments to Sub-Contractors SEPARATE CONTRACTS F-1 Owner's Right F-2 Mutual Responsibility of Contractors F-3 Cutting and Patching Under Separate Contracts F-4 Owner's Right to Clean Up G G-1 G-2 G-3 G-4 G-5 G-6 G-7 G-8 G-9 G-10 G-11 G-12 G-13 G-14 G-15 G-16 G-17 G-18 G-19 G-20 G-21 G-22 G-23 G-24 G-25 G-26 G-27 G-28 G-29 G-30 G-31 G-32 G-33 H MISCELLANEOUS PROVISIONS Conflict of Laws Governing Laws Personal liability of Public Officials Compliance with Laws Indemnification Successors and Assigns Written Notice Surety Bonds Owner's Right to Carry Out the Work Royalties and Patents Tests Interruption of Existing Utilities Services Laying Out Work Measurements Existing Overhead or Underground Work Alignment of Joints in Finish Materials Integrating Existing Work Hazardous Material Certification Location of Equipment and Piping Overloading Manufacturer's Instruction Cleaning Up Dust Control Fire Protection Cutting and Patching Project Closeout Guarantee and Extended Guarantee Y2K Compliance Requirements Record Drawings Construction Fence Product Deliver, Storage, Handling Age Disability CONTRACT TIME H-1 Definitions H-2 Progress and Completion H-3 Delays and Extension of Time H-4 No Damage for Delay I PAYMENTS AND COMPLETION I-1 Contract Sum I-2 Schedule of Values I-3 Adjustment of Quantities I-4 Progress Payments I-5 Certificates for Payment 8/31 /99 GC - 22 of 23 l-6 Payments Withheld I-7 Unresolved Claims I-8 Liquidated Damages I-9 Failure of Payment I-10 Substantial Completion and Final Payment J PROTECTION OF PERSONS ANO PROPERTY J-1 Safety Precautions and Programs J-2 Safety of Persons and Property J-3 Hard Hats J-4 Emergencies K INSURANCE K-1 Insurance Required K-2 Workers' Compensation Insurance K-3 Liability Insurance K-4 Builder's Risk Insurance K-5 Proofoflnsurance K-6 Other Insurance Related Requirements L CHANGES IN THE WORK L-1 Change Order L-2 Claims for Additional Cost or Time L-3 Overhead Allowance for Changes L-4 Minor Changes in the Work L-5 Field Orders ' � 00O00 M UNCOVERING AND CORRECTION OF WORK M-1 Uncovering of Work M-2 Correction of Work M-3 Acceptance of Defective or Non-Conforming Work N TERMINATION OF THE CONTRACT N-1 Termination by the Contractor N-2 Termination by the Owner O SIGNS P P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 �� TEMPORARY FACILITIES Scope Use of Temporary Facilities Maintenance and Removal Field O�ces and Sheds Telephone Toilet Facilities Utilities Heating Temporary Consiruction, Equipment and Protection Project Bulletin Board VENUE _ GC - 23 of 23 � 8/31 /99 AUV li jj �� I 7 C� �.��. '/ '" 1999 BU�LD�NG & CONSTRUCTION TRADES STANDARD WAGE RATE FOR TARRANT COUNTY � CLASSIFACTYON AIR CONDIT�ONING MECHAMC AIR CONDI?IONING MECHANIC HELPER ACOUSTIC CEIL[NG INSTALLER ACOUSTIC CEILING INSTALLER HELPER BRICKLAYER/STONE MASON BRICKLAYER/STONE MASON NELPER CAR.PENT�R CARPENTER H�LPER CONCRETE FINISHER CONCRETE FINISHER HELPER CONCRET� FORM BUILDER CONCRETE FORM RUILDER HEL�ER DRYWALL TAPER bRYWALL TA�'ER HELPER ELECTRICIAN JOURNEYMAN ELECT'RICIAN HELPER ELECTRONIC TECHIVICIAN ELECTROMC TECHNICIAN HELPER FLOOR I.AYER (CARPET) FLOOR LAYER (RESILIENT) FLOOR LAYER HELPER GLAZIER GLAZI��t HELPE�t INSULATOkt INSULATOR HEI.PER LABORER COIv�MON LABORER SKTLLED LATHER LATHER HELPER METAL BUILllING ASSEMBLER METAL BUILDING ASSEMBLER HELPER PAINTER PAINTER HELPER HOURLY RATE $15.96 8.81 13.82 9.79 15.25 9.86 13.00 9.34 1 z.00 9.44 11.59 8.87 11.87 8.25 16.29 10.20 12.86 12.67 13.58 14.48 8.56 13.66 9.26 15.89 9.46 7.82 9.G6 15.$0 11.75 13.34 7.85 l l .93 8.30 � , k�i��-"6-�� F�! �'�E ?l�1 1999 BUI�,DING & CONSTRUCTION TRA,DES STANDARD WAGE RATE FOR TARRANT COUN'�'Y � ' CI� � � CLASSI�'ACTION �1PEFITTER PIPE�ITTER HELPER PLASTERPR PLASTERER HELPER PLUMBER PLUMBER HELPER RLINFORCTNG STEF,L SETTER REINFORCiNG STEEL HELPER ROOFER ROOFER HELPER SHEET METAL WORKER SHEET METAL WORKER HELPER SHEETROCK HANGER SHEE7ROCK HANGER H�LPER SPRINKLER SYSTEM iNSTALLER SPRTNKLER SYSTEM INSTALLF,R HELPER STEEL WORKER STRUCTLTRAL STEEL WORKF,R STRUCTURAL HELPER WELDER WELDER HELPER HEAVY EQUIPvIENT OPERATORS EQUIPMENT OPER.ATO�tS CONCRETE Pt)MP OPERATORS CRANE, CLAMSHFLL, BACKHOE, DER.RJCK, D'L1NE SHO FORKLIFT OPERA,TOR FOUNDATION llRII,L OPERATOR FRONT END LOADER OPERATOR TRUCK DRIVER 2 HOURLY RA.TE $14.35 10.93 1529 8.63 l G.26 9.59 11.88 9.18 13.17 7.sz 15.87 9.29 12.'l0 9.�1 1 G.95 7.81 14,66 7.91 14.87 9.67 14.66 l 5.50 13.05 10.54 11.66 11.G0 9.80 ^-� Fv �r +� �r� � �. ��� TEXA,S CERTIFICATE OF EXEMPTION I claim an exemption from payment of sales and use taxes for the purchase of taxable items described below or on the attached order or invoice. Descriptioa of Items ( or an attached order or invoice) To be Purchased: All Items I claim this exemprion for the following reason: Name of exemption organization: Citv of Fort Worth Texas Sales and Usc Tax Permit #1-75-6000528-6 I understand that I will be liable for payment of sales taz whic6 may become due for failure to compiy with the provision oC t6e states, city and or metropolits►n transit authority sales and use taa laws and comptroller rules regarding ezempt purchases. Liability for the taz will be determine by the price pAid for the tazable Items purchased or the fair market rental value for the period oC time use. I understand that it is a misdemeanor to give an ezemption certificate to the seller tazable items which I know, at the time of purchase, will be used in a manner other thau that ezpensed in this certificate and upon couviction, may be �ned up to 5500 per offense. Municipalities are granted taz ezempt status per the Tezas Constitution, ART 8, Section I. Purchasers: Citv of Fort Worth Street Address: 1000 Throckmorton City, State, Zip Code: Fort Worth Tezas 76102 �igaaturrl�itic: �-� ��s�� Purchasing Manager Date: Phone: Faz: This certificate does not require a number to be valid. Sates and use taz "ezemption numbers" or "taz ezempt" numbers do not eaist. This certificate should be furnished to the supplier. Do not send the completed certificate to the Comptroller of Public Accounts. FfNANCE DEPARTMENT PURCHASING DIVISION THf CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, �C6XAS 76IO2 lR171 R71_R��n � c.., •^•" ^"'. ".._ WEATHER TABLE Month January February March April May June July Auyust September October November December ANNUALLY I Average Days of Rain 7 7 7 8 8 6 5 5 7 5 6 6 Inches of Snow/Ice Rainfall Pellets 1.80 2.36 2.54 4.30 4.47 3.05 1.84 2.26 3.15 2.68 2.03 1.82 1 . . 0 0 0 0 0 0 0 . . 77 I 32.30 I 1 (1) Mean number of days �ainfall, 0.01" or more (2) Average normal precipitation, in inches (3) Mean number of days 1.0 inch or more ' Less than 0.5 inches This table is based on information reported from Dallas-Fort Worth Regional Airport, Texas. Latitude 32 deg 54 min north, longitude 97 deg 02 min West, elevation (ground) 551 ft. Average number of days of rain, snow, and ice are based on records covering 27 years. Precipitation is based on record of 1941-1970 period. This table is to be used as a basis for calculation of excess rain or weather days for projects with duration in calendar days. If the site records indicate that the Contractor was unable to carry out operations due to weather, it is counted as a weather day. If the number of weather days exceeds the number of average rain days plus the snow/ice-pellet days for a given month, the contract period will be adjusted by Change Order. rW� � I 1.1 PROPOSAL INCLUDES A. Integration of Equipment (OFE) and furnishing and installation of specified products, as well as incidental equipment, hardware and cabling required to provide complete and fully functional systems. Fumish, delrver, erect, and connect all the material and equipment described herein, and also all other incidental material and tools, transportation, etc. required to make the wo�k complete, in accordance with these plans and specifications, as required to leave the system in first class operating condition, excluding those items designated WORK BY OTHERS, or NOT IN CONTRACT (NIC). B. Verify dimensions and conditions at the job site prior to installation, and pe�form installation in accordance with these specifications, manufacturers recommendations and all applicable code requirements. C. The system includes the following major items: 2. 3. 4. 5. 6. 7. 8. 9. 10 11 12 13 14 Provision of rental systems for use by owner at all scheduled events during the construction contract period Loudspeakers and speaker mounting or support Hardware; structural platforms Equipment Racks Control Equipment Control System accessories Cables, Connectors, Plates, and Wiring Electrical systems including engineering, conduits, panelboards and circuit wiring Rigging system including engineering, structural frames, drop points Verification of dimensions and conditions at the job site Preparation of submittal information Installation in accordance with the contract documents, manufacturer's recommendations, and all applicable code requirements Initial tests and adjustments, written report, demonstration for approval, final adjustments, and documentation Instruction of operating personnel; provision of manuals Maintenance services; warranty D. Provision of system testing, system documentation and instruction of Owner Personnel. E. Gua�antees and Warranties. F. Equalization Allowance. Contractor to include an equalization allowance of $1,500.00 within their bid for the obsenration of system tests and adjustments by an Equalizing Engineer. Equalization Engineer shall be a licensed electrical engineer registered in the State of Texas with experience in signal alignment and sound system adjustment on a minimum of five projects simila� in scope and magnitude within the past two years. 1.3 DESCRIPTION OF SYSTEMS ' A. Audio Control System to provide central operation and control of the system. Audio Control to be located in the central equipment racks. System operation shall be performed by a dedicated operator either at the racks or at a portable console located where desired within ' the facility. B. Sound Reinforcement System to provide a single loudspeaker cluster with three dual-18" sub- � woofers and five full-range loudspeakers. Full range loudspeakers shall be three-way tri- amplified systems. � Page 1 C. Power and Electrical System to be compliant with local and state codes, providing power to new equipment racks, and signal wiring to control equipment. Electrical work to be designed and submitted by a professional engineer �egistered in the State of Texas. D. Rigging Systems provided for suspension of new loudspeaker cluster from existing steel roof structure. Rigging work shall be designed and submitted by a professronal engineer registered in the State of Texas. 1.4 REFERENCES � ' A. In addition to the references in the General Conditions, all requirements of the latest published edition, unless otherwise noted, including but not limited to the following, shall apply. In the event of conffict between cited or referenced standards, the more stringent shall govern. � B. National Electric Code (NEC). IC. Federal Communications Commission (FCC) Rules and Regulations, Part 76. D. Society of Motion Picture and Television Engineers (S M P.T.E.) ' E. American Society for Testing Mate�ials (A.S.T.M.) IF. National Cable Television Association (N.C T A) G. Electronic Industries Association (EIA) � H. Telecommunications Industries Association (T IA.) I. "Handbook for Riggers", 1977 Revised Edition, Newberry, W. G., Calgary, Alberta Canada. i J. "Basic Principles for Suspended Loudspeaker Systems", Technical Notes Volume 1, Number 19, JBL Professional. IK. Davis, Don and Carolyn, Sound System Engineering, Second Edition, Howard W. Sams and Co., Indianapolis, Indiana, 1986. � 1.6 QUALIFICATION AT TIME OF BID A. Bidder shall be a sound system contractor, normally engaged in the full time business of y sound system installation. Show proof, as a part of the bid, that bidder has been in the communications system installation business for a period of not less than five years and has I completed projects of similar size and scope. The Owner reserves the right to reject any bids submitted by firms without sufficient experience in projects of this size or complexity. ' B. No sub-contractor or contract employees will be permitted to periorm the Contractor's responsibilities as herein defined, unless specifically identified in the bid submission and approved in writing by the Owner. The Contractor shall have sole responsibility for the satisfactory execution of the work, even though he may have sub-contracted a portion of the Iwork, or had certain manufacturers install their own products. � 1.7 QUALITY ASSURANCE A. Review existfng architectural, civil, structural, mechanical, electrical, and other project Page 2 documents relative to this work. B. Verify all dimensions on the site. C. Coordinate the specified work with all other trades. D. Provide all items not indicated on the drawings or mentioned in the specifications that are necessary, required or appropriate for this work to realize complete, stable and safe operation. E. Review project documentation and continuously make known any conflicts discovered and provide all items necessary to complete this work to the satisfaction of the Owner without additional expense. In all cases where a device or item or equipment is referred to in singular number or without quantity, each such reference shall apply to as many such devices or items as are required to complete the work. F. Provide additional support o� positioning members as required for the proper installation and operation of equipment, materials and devices provided as part of this work as approved by the Owner, without additional expense. G. Regularly examine all construction, and the work of others which may affect the work to ensure proper conditions for the equipment and devices before their manufacture, fabrication or installation. Contractor shall be responsible for the proper fitting of the systems, equipment, materials, and devices provided as part of this work. H. Pramptly notify the Owner in writing of any di�culties that may prevent proper coordination or timely completion of this work. Failure to do so shall constitute acceptance of construction as suitable in all ways to receive this work, except fo� defects that may develop in the work of othe�s after its execution. 1.8 OWNER'S RIGHT TO USE EQUIPMENT A. The Owner reserves the right to use equipment, material and services provided as part of this work prior to final acceptance without incurring any obligation to: 1. Accept material and equipment or completed systems until all punch list work is completed and all systems are acceptable. 2. Pay additional cost or charge. 3. Commence the war�anty period for any system or device provided as part of the work. 1.9 PERMITS AND INSPECTIONS A. Obtain all required permits and inspections. B. Furnish material and workmanship for this work in conformance with all code requirements C. Perform all tests required herein, or as may be reasonably required to demonstrate conformance with the specifications. D. Obtain review from compliance officials �esponsible for enforcement of applicable codes and regulations to establish that the work is in compliance with all requirements of reference codes indicated herein. Make corrections, changes acceptance, operation, and/ or compliance with the final submittal as described herein. 1.10 SUBMITTAL Page 3 A. Provide the following: 1. Provide shop drawings and record drawings using the following scales: 2. Details - not less than 1"=1'-0" 3. Plans - not less than 1/8"=1'-0" B. Mark all submittal documents to show the project name, date, Contractor, Sub-Contractor, and this project number. 1.11 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES A. Submit catalog data sheets, neatly bound with title page and space for submittal stamps with proposal for use in evaluating proposed system equipment. Provide a complete list of proposed equipment with reference to its corresponding specification paragraph number o� equipment title in specification paragraph order. Denote all proposed substitutions. B. Submit shop drawings in one package with fifteen (15) days after award of the Contract and prior to ordering equipment. C. Submit point-to-point wiring diagrams and typed wire lists identifying every connection. Include electronic devices such as switches, transformers and terminal blocks. Indicate locations of all components. Identify cables by types, colors and wire numbers. Complete, detailed wiring diagrams for the systems, including cable types, identification and color codes, and detailed wiring of connections, both at equipment and between equipment racks and wiring in conduit, connector types, expansion loops and cable lengths. D�awings shall comply with ANSI and Intemational Electrotechnical Commission recommendations and standards as appropriate. D. Submit conduit riser diagrams showing required conduits and junction boxes along with types and quantities of cables to be contained in each conduit. Show details of weatherproofing, lightning protection and grounding, strain relief and cable support and fire stop protection and wall penetrations through all rated partitions E. Submit rack layouts indicating the proposed arrangement of mounted equipment including junction boxes and locations of conduit penetrations. F. Submit const�uction details of all custom fabricated items and approved equipment modifications. Include complete parts lists, schematic diagrams, and all dimensions required for proper assembly. G. Submit mounting and support details for all items mounted overhead, including loudspeaker complete with pa�ts lists and dimensions. Include a full plan view, front elevation and side elevation of each unique item with corresponding support structure and mounting hardware. H. Submit samples as required in various specification paragraphs. No materials or equipment shall be installed without receipt of approved samples. Approval of shop drawings or submittal indicates only the acceptance of the manufacturer and quality. Specific requirements, arrangements, and quantities still must comply with the intent of the contract documents as interpreted by the Owner unless specifically approved in writing. K. Submittals which are incomplete, deviate significantly from the requirements of the Contract Documents, or contain numerous errors will be returned without review for rework and Page 4 resubmittal, and may �esult in back charges to the Contractor. 1.12 QUALITY CONTROL SUBMITTAL A. Before delivery of equipment to the job site, submit test repo�ts for all measurements specified under Sou�ce Quality Control Tests. B. Immediately after installation, submit photographs showing cable entries and terminations within equipment racks, enclosures at the job site. 1.13 CONTRACT CLOSEOUT SUBMITTAL A. The following shall be required: B. When the installation is substantially complete including the Field Quality Control Tests in Part 3 of this Section, submit one (1) complete initial set of contract closeout submittal to the Owner for review. C. Project Record Drawings (As-Built Drawings). Approved shop drawings, updated to accurately document the final conditions of the system installation. Legibly mark to record actual construction: a. Field changes of dimension and detail. b. Changes made by Revision Order, Directive or other modifications. c. Details not in original contract drawings. d. Any other miscellaneous items installed under this contract. At a minimum, the ends of each line should have the coordinate and elevation indicated. 2. Layouts of system devices showing actual device locations. 3. Results of all Field Quality Control Tests in this Section. 1.14 OPERATION MANUAL A. Table of Contents. B. Typed description of system including key features and operational concepts (e.g. remote control features, switching functions, and mixing capabilities). C. Setup diagrams and typed instructions for use in typical situations as directed by the Owner. D. Single-line block diagrams showing all major components of the systems. E. Manufacturer's ope�ation manuals for user-operated equipment (processors, amplifiers, etc.). 1.15 MAINTENANCE MANUAL A. Table of Contents B. Contractor's name, address and service department telephone number. C. Listing of manufacturer's addresses for all products in this Section. D. Listing of all equipment and materials supplied under this Section with names of Page 5 manufacturer's and model numbers or part numbers. E. Approved catalog data sheets for all products. 1. Legibly mark-up each Section to record: a. Manufacturer, trade name, catalog number, and supplier of each product and item of equipment actually installed. b. Changes made by Revision Order, Directive and other contract modifications. c. Service manuals and manufacturers operating manuals for each and every equipment item furnished. e. Other matters not originally specified. F. Service Manuals 1. Manufacturer's service manuals for all products specified in this Section including replacement parts lists with specific part ordering numbers. 2. All test reports required under Source Quality Control Tests and Field Quality Control Tests. 3. Documentation of final settings for all non-user-adjusted devices and controls after Final Adjustment and Equalization. Include physical settings as well as input and output signal levels. H. All equipment warranties and a notarized System Warranty, in duplicate. 1.16 DELIVERY, STORAGE, AND HANDLING A. Store equipment and materials safely and securely inside at the job site in a manner which will not interfere with facility maintenance or operation. B. Deliver afl materials to the job site in manufacturer's containers, as applicable, with each container and each item within each container clearly marked as to item, quantity, size and/or model number. Retain all original manufacturer's invoices and packing lists for inspection by the Owner. Provide copies of each with project record drawings. C. Replace all damaged or defective work or material at no additional cost, prior to acceptance. D. Check, and if necessary, clean all systems, equipment, devices and components included in the work after acceptance and completion of the work of all other trades. E. Store materials in designated areas. F. Provide and maintain suitable barriers, guards, fences and signs wherever necessary for the safety of others relative to and/ or for the protection of this work. G. Protect all materials and equipment to prevent the entry or adhesion of concrete, plaster, unintended paint, or other damaging debris of materials. 1.17 PROJECT CONDITIONS A. If project conditions indicate a need to vary from the Specifications or Drawings, notify the Owner, make recommendations, and proceed with the necessary changes only after receipt of written approval from the Owner. Page 6 1.18 SEQUENCING AND SCHEDULING A. Coordinate Work with other trades and coordinate scheduling with the Owner to minimize delays. 1.19 WARRANTY A. Provide a one (1) year System Warranty at no additional cost to the Owner. B. Warranty shall contain the following: 1. Date, project title and number, 2. Contractors name and address, 3. Title and number of each as-built document, 4. Certification that each document as submitted is complete and accurate, 5. Nota�ized signature of Contractor, or its authorized representative 6. Include the name of a contact person for service or maintenance and define the limits of the system warranty. C. During the System Warranty period, answer all service calls and requests for information within twenty-four (24) hours. Repair or replace faulty items and correct faulty workmanship on site within twenty-four (24) hours of all senrice calls. D. Conduct all warranty repairs and service at the job site unless in violation of manufacturer's warranty. In the later event, provide substitute systems, equipment, and/or devices, acceptance to the Owner, for the duration of such off site repairs. Transport warranty materials, parts, and personnel to and from the job site at no additional cost. E. For products with manufacturer's warranties lasting more than one (1) year, register warranties in the Owner's name. 1.20 MAINTENANCE A With the bid, submit an annually renewable service and maintenance proposal for all systems specified in this Section. If accepted, the service and maintenance proposal shall commence upon conclusion of the one (1) year System Warranty. 1.21 SUBSTITUTIONS A. Substitutions shall be considered only if requested in writing no later than ten working days before bid. 1.22 BRAND NAMES AND ACCEPTABLE AI.TERNATES A. The brand name and model number(s) mentioned are used in this specification as a measure of quality and performance. The Owner reserves the right to reject and deny any substitution that it may, at the Owner's sole discretion, deem unequal, and the findings in this regard shall be accepted by the bidder as final and binding. B. Substitutions may be submitted in writing for approval during bidding only. Bid only the listed items and approved substitutions. Where more than one manufacturer is listed, bid the same manufacturer throughout the project. 1.23 OWNER FURNISHED EQUIPMENT Page 7 A. Certain equipment may be provided for use as Owner Furnished (OFE). This Owner Furnished Equipment may presently be part of the Owner's system, or will be provided by the Owner, and will be delivered to Contractor's off-site construction facility, delivered to the Contractor's on-site secured storage area, or installed on site by others, as appropriate, for incorporation into the system. B. Clean and inspect the OFE to be reused, and notify the Owner in writing of damage or defect and the extent of repair and/or adjustment required to bring the OFE to original specification. Senrice OFE only as directed by the Owner under the arrangements of a separate contract. C. Incorporate into the system as if provided new, excepting warranty coverage. 1.24 INSURANCE A. Insure materials against theft, vandalism, damage due to the elements, fire, etc., to their full value. Materials and the flawless condition of materials shall remain the responsibility of the Contractor until acceptance of the system by the Owner. 6. Provide policies of insurance, in compliance with the requirements of the City. 1.25 FIBER OPTIC CABLE SAFETY A. The following warnings shall be posted on the job site: WARNING: PERMANENT EYE DAMAGE CAN RESULT FROM LOOKING DIRECTLY INTO A LIGHT BEAM GENERATED BY AN LED OR LASER SOURCE OR INTO THE END OF A CABLE FIBER CONNECTED TO ONE OR THESE SOURCES. CAUTION: LIGHT GENERATED BY THESE SOURCES MAY NOT BE VISIBLE, YET REMAIN HAZARDOUS TO THE EYE. LOOK FOR WARNING LABELS ON SOURCE DEVICES. B. Observe all warning signs on equipment and all written safety precautions in the instruction manual or equipment technical manual. C. Afways handle cable carefully to avoid personal injury. Care should be taken with individual fibers to prevent injury to the eyes or penetration of the fibers into the skin. 1.26 WORK BY OTHERS A. As required by the Bid and Constn�ction Documents. PART2-PRODUCTS 2.1 GENERAL A. All equipment, except OFE, and materials shall be new, latest version at time of bid, and sha11 conform with applicable UL, CSA, or ANSI provisions. Re-manufactured or "B" stock equipment will not be accepted without written consent from the Owner. Evidence of unauthorized re-manufactured, or "B" stock equipment on the project site wili be deemed evidence of the Contractor's Failure to Perform the Work. Take care during installation to prevent scratches, dents, chips or disfiguration. B. Regardless of the length or completeness of the descriptive paragraph herein, each device Page 8 shall meet all of its published manufacturer's specifications. Verify performance as required. C. Asbestos Prohibition: No materials containing asbestos shall be used under this section. The Contractor shall insure that all materials incorporated in the project are Asbestos free unless specifically authorized in writing by the Owner. D. Afl products listed below are listed for the level of quality required by this project. E. Install all rack mounted equipment with stainless steel 10-32, oval head machine screws with plastic cup washers protecting equipment panel. F. Some rack mounted equipment may require covers, or removal of knobs; provide and install during Acceptance Testing. G. Connections shall be made with approved connectors and/or terminal blocks equal to Cinch 140. "Interlocked" switches shall be mutual release blocking type. Mount trim potentiometers, custom circuit cards, relays, and transformers (except large 70V units) in shielded enclosures, and mark their function and connections with engraved lamicoid labels. H. Per IEC-268 standard, all XLR connectors not mounted on equipment shall be wired pin 2 hot (high), pin 3 low, and pin 1 screen (shield). 2.2 SYSTEM COMPONENTS A. Not all equipment items specified are needed or used. B. Outlet, Receptacle, and Custom Function Plates are to be type 430 stainless steel, unless noted. All will mount with box-mount screw hole centering except devices designed to have center-mount or strap-mount covers. Cover plates for outdoor use will have approved weatherproof cover flaps. Coordinate and verify required enclosure or box type and mounting screw spacing. C. Equipment Racks and Accessories. Racks to be 30" deep constructed of 16-gauge or heavier � cold-rolled steel. Wall-mounted racks to be 24" deep. Provide rear mounting rails and an extra set of front mounting rails for recessed equipment. Provide shelves as required for mounting equipment within racks. Fill unused mounting spaces with blank panels to fully enclose the rack assembly. Provide thermostatically controlled fan units to ensure in-rack temperatures of less than 100 F. Finish entire rack assembly in semi-gloss black paint. Install 120 VAC, 15 amp isolated ground duplex outlets (Hubbell 1 G5262) for all equipment, spaced to match equipment, with at least iwo spares in rack. Install a ground buss in rack, insulated from the rack. Attach to rack at one point using #4 insulated copper wire. Ground any equipment chassis without a three-conductor power cord direct to the buss bar with #12 insulated copper wire. Tie each and every power receptacle ground contact to this buss bar with #12 insulated copper wire. Common the ground buss bar to an isolated ground with an additional #4 insulated copper wire. Interconnecting signal cables shall be routed from junction boxes through metallic flexible conduit(s) (1" - 2" diameter) as appropriate; flexible conduit shall be insulated from racks by approved insulating bushings. Approved products: 1. Soundolier 320 wall-mount series specially built 24" deep (Quantity: as required) with power distribution described 2. Crenlo/ Emcor SFR 128A-1032-2-EN2BK (Quantity: as required) with power distribution described 3. Soundolier 520 series, 30" deep (Quantity: as required) with power distribution described 4. As Approved Page 9 D. Power Amplifiers to be solid state throughout and located in the Sound Equipment Racks. Amplifiers to include positive protection of circuit components in the event of input over-drive, output ove�load, or short circuits. Each ampl'rfier connected as shown on the drawings for proper output load impedance. Amplifiefs to have a frequency response of +1 d6 from 20 Hz to 20 kHz with less than 0.1 % THD at rated power into 8 ohms. Input impedance to be 10k ohms balanced, minimum. Provide isolation transformer(s) where required to minimize noise. Input sensitivity to be such that 0 dBm (0.7 volts) produces rated output. Output regulation to be within 1.5 dB from no load to full load conditions. Noise generation to be less than 85 dB below rated output with input shorted. Provide sufficient quantities to support all loudspeaker loads. Sub Woofer Power Amplifiers to be: a. Crown 5000 (Quantity: 1) b. Or approved substitution 2. Low Frequency Power Amplifiers to be: a. Crown 3600 (Quantity: 1) b. Or approved substitution 3. Mid Frequency Power Amplifiers to be: a. Crown MA-2400 (Quantity: 1) b. Or approved substitution 4. High Frequency Power Amplifiers to be: a. Crown MA-1200 (Quantity: 1) b. Or approved substitution E. Signal Relays provided to control inputs to power amplifiers and electrically switch audio lines. Relays to be 24 volt DC coil types with bifurcated contacts having at least a 2 amp, 120 volt rating. Relays to mount in a recessed rack panel allowing replacement from the front of the racks. Relays to mount in sockets. Quantity to include 5% spares, six minimum. Signal Relays to be: 1. Potter & Brumfield R10-E172V700 (2-Pole) 2. As Approved F. Power Supplies provided for lamp illumination and relay operation. Power Supplies to be 18 and 24-volt DC regulated with a minimum current rating of 3 2 amps Adjust paging selection power supply for partial illumination of indicators. Power Supplies to be 1. Lambda LOS-X-24 2. Power-Mate EMA-18/24CC 3. As Approved G. Audio Control Computer to allow computer adjustment of system. System to be rack mounted and IBM software compatible. System software to run successfully without failure. Additional RS-232 port and null modem to be provided to allow control of the computer through communications software from another computer located in the facility. Audio Control Computer to be: 1. BSS Soundweb (Quantity: 2) 2. Or approved substitute Page 10 H. Full Range loudspeaker shall be t�iamped three-way loudspeake� system with minimum 1.4" high frequency driver. Loudspeaker to contain full rigging support hardware within the enclosure to allow suppo�t and suspension from external rigging hardware. Full Range Loudspeaker to be: 1. EAW KF-850 (Quantity: 5) with full rigging hardware and ATM Flyware. 2. Or approved substitute Sub Woofer loudspeake� shall be a minimum dual driver loudspeaker system with 18" drivers. Loudspeaker to contain full rigging support hardware within the enclosure to allow support and suspension from extemal �igging hardware. Sub Woofer Loudspeaker to be: 1. EAW BH-850 (Quantity: 3) with full rigging hardware and ATM Flyware. 2. Or approved substitute 2.3 CABLES AND CONTROL WIRING A. All electrical conductors installed under this contract, except where othenNise specified, shall be soft drawn annealed stranded copper having a conductivity of not less than 98% of pure copper and shall be Anaconda, Triangle, Genera! or approved equal for power, and Alpha, Belden, or West Penn for low voltage. Cables in plenum rated ceilings outside conduit shall be similar to those listed below, except plenum rated. Cables equal to those listed below: 1. New Homerun Loudspeaker Cables, Reinforcement Speaker Cables, Monitor and Foldback Loudspeaker Cables in conduit between loudspeakers, interconnect junction boxes and racks to be two-color at feast No. 10 THWN unless othenNise noted 2. Other Loudspeaker Cables to be at least No. 14 jacketed equal to West Penn CL3-227 3. Line Level and Microphone Level Cables to be at least No. 22 shielded jacketed equal to West Penn CL3-452 B. Cable Markers. Permanent labels corresponding to the drawings affixed to all cables. Approved Products: Telecrafter Products: a. Ci�cuits, Series 100. b. Homeruns, Series 300A using a fine point, acid base�, indelible ink marker or Series 100. c. As Approved 2.4 FABRICATION A. Equipment Racks 1. Pre-assemble and test all racks before delivery to the job site 2. Verify the depth of each rack prior to assembly to ensure that mounted equrpment will fit completely inside with the rear door closed 3. Photograph rack assemblies as described under Quality Control Submittals B. Loudspeaker Support Structure Fabricate suppo�t structure for loudspeakers in the shop before delivery to job. 2.5 SOURCE QUALITY CONTROL TESTS Page 11 A. Test Equipment Use the following test equipment meeting the following minimum specifications to perform the Source Quality Control Tests and Field Quality Control Tests. Furnish the same test equipment for the performance of Acceptance Testing. 1. Digstal Multimete� a. DC to 20 kHz bandwidth b. 300 V �ange, 100 mV �esolution c. 10 megohms input impedance d. Direct reading of dBm across 600 ohm load e. DC resistance to .1 ohm 2. Dual Trace Oscilloscope a. 100 MHz bandwidth b. 1 mV/CM sensitivity c. Dual timebase capability 3. Sine/Square Wave Generator a. 5 Hz to 5 kHz bandwidth b. Output level of 0 dBm with less than .5% THD 4. Impedance Bridge a. Range: 1 ohm to 1 megohm b. Three test frequencies, minimum, ranging from 250 Hz to 4 kHz 5. Sound Level Meter - ANSI Type 2 with one-octave filter set B. Measurements 1. Measure and record the input and output impedance of each electronic device at 1000 Hz. Measure and record impedances curves for each loudspeaker line entering rack at 1000 Hz. 2. After pre-assembly of racks, measure and record the following for all rack-mounted components: a. DC resistance between the chassis and the rack ground busbar. b. DC resistance between the signal common and the rack ground busbar. c. Use a sine-wave signal generator, dual trace oscilloscope and dBin meter to measure and document the input level which produces clipping at each component. d. Using a+4 dBm sine-wave input, set controls of each component to produce a+4 dBin sine-wave output. Under these operating conditions (uniry gain), the presence of any waveform distortion, interference signals, or oscillations shall be unacceptable. 2.6 MISCELLANEOUS CONNECTORS Page 12 A. Ce�tain connectors not identified in specific paragraphs, or indicated on the drawings, are specified by generic "type". Refer to the cross-reference chart below for approved products. Asterisks indicated number of pins or sockets. At all times, match connector types used in adjacent project areas, including existing sound, television and audio visual systems. � I r 1 2 3 4 5 6 7 D(')F - D(`)M - TRS-F - TRS-M - TRS-FJ - S4FC - S4MP - PART 3- EXECUTION 3.1 INSTALLATION A B C D E F Switchcraft D(')F or Neutrik NC(")F Switchcraft D(')M o� Neutrik NC(')MP Switchcraft 121 Switchcraft 280 or Neutrik NP3C-BAG Switchcraft 146 0� Neutrik NJ3FP6C-BAG Neutrik NL4FC Neutrik NL4MP Execute all work in accordance with the NEC, and with all local and state codes, ordinances, and regulations. Install equipment according to manufacturers recommendations. Rack Equipment shall be mounted into racks and fully wired and tested, before delivery to job site. Ensure that levels and impedances are properly matched between components. Choose colors and finishes of all exposed and custom fabricated items and labels to blend in with the sur�oundings as approved by the Owner. Firmly and permanently attach electrical boxes, enclosures and permanent equipment to the building. Rigidly mounted equipment and devices shall be plumb and square. 2 Set "flush-mounted" units so that the face of the cover, bezel, or escutcheon is in the same plane as the surrounding finished surface. Mount boxes, panels and trim so that there are no gaps, cracks, or obvious lines between the trim and the adjacent finished surface, and ready them to receive final finish, as applicable. Provide access panels where needed to access boxes, panels and enclosures in walls or ceilings, as indicated and dimensioned on the shop drawings. Finish panels to match the surrounding surfaces. G. Supports and mounts for equipment to be installed over public areas shall be adequate to suppo�t the equipment loads with a safety factor of at least five. Use attachment ha�dware with a minimum SAE Grade 5 load �ating. Do not use formed eye bolts or lag screws for support of suspended equipment. Verify capacity of mounting methods used in the Work and associated liabilities. � H. Grounding and Shielding r � Mount and enclose ail electrical and electronic equipment in metal enclosures, pedestals or equipment racks. Use EMT type conduit for all wiring outside of equipment racks except plenum rated wiring above a lay-in ceiling, and outdoor conduits and raceways, where separate Page 13 insulated ground wiring shall be supplied. 3. Use flexible conduits and PVC fittings to provide insulated connections of the building electrical raceways to equipment racks. Mount all equipment �acks at the job site in a manner which provides electrical isolation from the building structure and electrical raceways. Wiring Practices 1. Where specific instructions are not given, perform all wiring in strict adherence to standard broadcast and sound engineering practices in accordance with the references listed in Part 1. 2. Group all wirrng into the following classifications by power level or signal type: a. Microphone Level: less than -20 dBm. - b. Line Level Audio and DC Control Circuits: -20 dBm to +30 dBm. c. Speaker Level: greater than +30 dBm. d. AC Power Circuits 3. Separate wiring of differing classifications by at least six (6) inches, wherever possible. Wherever lines of differing classification must come closer together than six (6) inches, cross them perpendicular to each other. 4. Neatly hamess wires together within racks by power level classification using horizontal and vertical wiring supports as �equired. Rigidly support all wires within 6" of fixed connection points. Leave service loops of sufficient lengths to allow rack hinges or slides to fully extend to facilitate access to rear panel connectors from the front of each rack. Do not use self-adhesive "Ty-Wrap" pads for support of cables. 5. Obsenre consistent polarity throughout the audio systems as follows: a. Use only balanced differential inputs throughout all audio systems unless otherwise noted. b. Use approved transformers where di�ected to reduce objectionable system noise to acceptable levels. 6. Exercise care in wiring to avoid damaging the cabfes and equipment. Use grommets around cut-outs and knock-outs where conduit or chase nipples are not installed. 7. Cut off unused wire ends approximately one-half inch (1/2") past the wire jacket. Fold them back over the jacket, and secure in place with heat-shrink tubing. In multi- conductor cables, preserve all unused conductors for future use. Failure to do so may result in replacement of cables at the Contractor's expense. 8. Make connecfions using rosin-core solder or approved mechanical connectors. Connect microphone, control, and line level wiring through approved connectors. Connect speaker level wiring using approved terminal barrier strips. Mount all terminal devices on a non-conductive (electrically) rigid surface. Provide 10% spare terminals at each location. Label each terminal with a unique number. 9. All fiber splicing shall utilize the fusion splice method. The maximum allowable loss per fusion splice shall be 05 d6. Cable Installation in Duct Banks 1. Pull mandrel one size smaller than the conduit, through entire length of all underground conduits. 2. Cable pulling lubrication shall be utilized when pulling cable. 3. A dynamometer shall be used to measure pulling tension during long or difficult runs, The dynamometer is to be placed between the cable puller and the pull line to monitor pulling tension. The manufacturer's pulling tension maximum range shall not be exceeded. 4. Pulling grips suitable for use with fiber cables shall be applied to the ends of the cable. Page 14 Consult cable manufacturer to determine appropriate pulling grip and method of attachment. Breakaway or fuse links shall be used at the pulling grip. Insure that the correct "fuse pin" is installed in the fuse link. 5. The bend radius for all cables shall conform to manufacturers specifications. K. Labeling 1. Label products in a logical, legible, and permanent manner corresponding to the ' Drawings. Wording, format, style, color, and arrangement of text will be subject to the Owner's approval. Submit samples and labeling schedule for approval. Labeling will be verified at final adjustment a�d equalization. � 2. Label all wall plates for input, output, and control receptacles as well as connector mounting plates in all boxes using 1/8" engraved lette�ing filled with black or contrasting paint, as approved. 3. Use engraved plastic labels similar to Lamicoid, squarely and permanently attached, �to � label the following: a. Patch panel designation strips. � b. Front and back of all rack mounted equipment including controls c. Barrier strips, terminals, transformers, switches, relays, volume controls, and similar devices. � 4. Label pushbutton switches with eng�aved lettering filled with contrasting color paint. 5. Label all permanently installed wires on both ends with approved permanent clip-on type or sleeve type markers. Wrap-around adhesive labels will not be accepted unless completely covered with clear heat shrink tubing. 6. Label all portable equipment with engraved block letters using initials and/or words. � Label all portable cables similarly with printed heat-shrinkable tags located 12 inches from the male connector end. Verify lettering through the Owner prior to engraving or I printing. 7. Label access panels and backboards with designations corresponding to the drawings. Where devices are concealed above access ceilings, provide permanent lamicoid labels, � on the ceiling "tees", corresponding to the drawings in finishes and sizes approved by the Owner. 3.2 FIELD QUALITY CONTROL TESTS A. Maintain a competent supervisor and supporting technical personnel, acceptable to the Owner r� during the entire installation. Change of supervisor during the project shall not be acceptable without prior written approval from the Owner. B. Before connecting any equspment to AC power outlets, measure and record the AC voltages k between hot, neutral, and ground and verify correct polarity of AC power. Verify, test and document correct and safe function of isolated ground power systems. � C. Upon completion of the system installation, it shall be the �esponsibility of the Contractor to perform the necessary adjusiments and balancing of all signals and amplifier gain, and other level controls to ensure proper system operation. The system shall be physically inspected by � the Owner to assure that all equipment is installed in a neat and workmanlike manner as called for by the plans and specifications. D. Determine the proper sequence of energizing systems to minimize the risk of damage. � E. After successfully energizing the systems, make all preliminary adjustments and document �the setting of all controls, parameters of all corrective networks, voltages at key system �, interconnection points, gains and losses, as applicable. Tabulate all data along with an Page 15 inventory of test equipment, a description of testing conditions, and a list of test personnel as itemized below. Copies of preliminary test data shall accompany copies of performance testing data as part of the final submittal. F. Ve�ify the perfo�mance parameters of the individual systems following established professional procedures, in addition to those specified herein. G. Document all acceptance testing, calibration and correction procedures described herein using the included documents at the end of these specifications, being careful to include the following information: 1. Performance date of the given procedure. 2. Condition of performance of procedure. 3. Type of procedure, and description. - 4. Parameters measured and their values, including values measured prior to calibration or correction, as applicable. 5. Parameters associated with calibration or corrective networks, components, or devices. 6. The names of personnel conducting the procedure. 7. The equipment used to conduct the procedure H. Apply a sine-wave sweep signal to each loudspeaker system, sweeping from 50 Hz to 5000 Hz at a sound pressure level which is 10 d6 below the loudspeake�s rated electrical input power. Listen for rattles or objectionable noise and correct if apparent. Using a+4 dBm sine-wave input, set cont�ols of each component to produce a+4 dBm sine- wave output. Under these conditions (unity gain), the presence of any waveform, distortion, interference signals, or oscillations shall be unacceptable. J. Check for proper polarity of ceiling mounted loudspeakers by applying music program or pink noise to each system and walking through the transition areas of coverage from one loudspeaker to the ne�ct. Transition should be smooth with no apparent shifting of source from one loudspeaker to the next. K. Individually drive each reinforcement loudspeaker with one octave of pink noise centered at 1000 Hz at a sound pressure level which is at least 10 d6 above the ambient noise. Adjust powe� amplifiers to provide an equal sound pressu�e level from each loudspeaker on its aiming axis in the seating area. Use an ANSI Type 2 sound level meter set for slow meter damping to take readings at seated ear height. L. Upon completion of initial tests and adjustments, submit written report of tests to the Owner along with all documents, diagrams, and reco�d drawings required herein. Report shall include date of each test, pertinent conditions such as control settings, etc., test circuit, and test equipment employed. In addition, submit written notification that the installation has been completed in accordance with the requirements of the Contract Documents, and is ready for final equalization and acceptance testing. 3.3 TEST EQUIPMENT W A. Provide the following test equipment on site during construction and available to the Owner ' during final adjustment and acceptance testing: 1. Dual-trace oscilloscope - 100 MHz bandwidth, 1 mV/cro sensitivity, N sync separator � and delayed trigger circuit. Acceptable: Tektronix 2247A 2. Multimeter - Measurement range, DC to 20,000 Hz, 100 mV to 300 V, 10 ma to 10A. Page 16 � Acceptable: Fluke 75 or as approved 3.4 FINAL ADJUSTMENT AND EQUALIZATION A. Schedule a time for the Owner to perform the Final Adjustment and Equalization. Notify the Owner at least seven (7) days in advance. B. Furnish a technician who is familiar with the system to assist the Owner during the Final Adjustment and Equalization. C. System acceptance tests shall employ an approved sound level meter, and spectrum analyzer to be provided by the contractor. Measurements shall be made at the combined output of the amplifie�s and at selected locations throughout the facility. D. Record final settings on all equipment and submit with contract closeout documents. E. Heat shrinking tubing shall be shrunk to cover the external connection to amplifier/passive components only after system alignment and acceptance has been completed. 3.5 CLEAN-UP A. Remove all unnecessary tools and equipment, unused materials, packing materials, and debris from each area where Work has been completed unless designated for storage. B. Clean all areas around system equipment and be sure that the inside of each equipment rack is free of wire strippings and other debris. •3.6 DEMONSTRATION AND TRAINING A. Furnish a technician who is qualified to operate and maintain the systems specified in this Section to instruct Owner designated personnel regarding the design features and proper operation of the systems. B. If requested by the Owner, furnish the same technician/ instructor during the first formal use of each system to further instruct and assist Owner personnel in system operation. C. Upon completion of the Work, the Owner may elect to verify test data as part of the acceptance procedure. Provide personnel and equipment, at the convenience of the Owner, to reasonably demonstrate system performance and to assist with such tests without additional cost to the Owner. 3.7 FINAL PROCEDURES A. Perform any and all remedial work to correct inadequate performance or unacceptable conditions of, or relating to any of this work, as determined by the Owner, at no additional expense to the Owner. ■ � B. Furnish all portable equipment to the Owner along with complete documentation of the materials presented. All portable equipment shall be presented in the original manufacturer's packing, complete with all included instructions and miscellaneous manuals and documents. C. Test Reports and Certificates: ' 1. Document all acceptance testing, calibration and correction procedures described herein ' Page 17 with the following information: a. Performance date of the given procedure. b. Condition of pe�Formance of procedure. c. Type of p�ocedu�e and description. d. Parameters measured and their values, including values measured prior to calibration or correction, as applicable. 2. All Tests and Reports shall be reviewed and approved by the Owner's representative and shall include: a. The names of personnel conducting the procedure. b. The equipment used to perform the procedure. 3. All software shall have certified backups and escrow provisions reviewed with the Owner and equipment supplier. D, Present, review and clarify all materials to the Owner and/ or operating personnel and fully demonstrate the operation and maintenance of the systems, equipment, and devices specified herein. E. Check, inspect, and if necessary, adjust all systems, equipment, devices and components specified, at the Owners convenience, approximately thirty (30) days after the Owner acceptance of this work. 1 ' r_ i Page 18 �'�������' � � � � _ � . � � I ' � �' t'-}�L� �x C.tt-�_�fj . CITY OF FORT WORTH, TEXAS LUMP SUM CONSTRUCTION CONTRACT EMERGENCY BUILDING REPAIRS THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT � t,� y This agreement made and entered into this the day of i __,,�AD, 9�9 , by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11 th day of December, AD 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meejin of the City Council of said city, hereinafter called OWNER, and American Audio Visual Cnr.��o��� l�. of the � City of Fort Worth County of Tarrant , State of Texas hereinafter called CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Provide and install main speaker cluster and fifteen delay speakers in the Cowtown Coliseum as outlined in the attached quotes dated 9/1/99, updated by the detailed breakout of components and labor dated 10/6/99. The work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. The General Conditions of the Contract for Construction, Building Services Division, City of Fort Worth, are made a part of this agreement. The undersigned has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Transportation and Public Works Director of the City of Fort Worth. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance 7278 as amended by City Ordinance 7400 (Fort Worth City Code Section 13A-21 through 13A-29). The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Owner. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Transportation and Public Works Director of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 90 calendar days. � ���� 0 `�� ������ � 0��� �5�'G�?�Q�% � �. ��:'�,�1�, � , , i ,f City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions there from, the price shown on the Proposal hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount shall be 76 643. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the liquidated damages outlined in the Generai Conditions, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in four counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in two counterparts with its corporate seal attached. Done in Fort Worth, Texas, this the l��day of L`t�'�! A.D., �J�:��'��t' A�nerican Audro Visu�l Co anv%�'f. '�y' Coanpany � + �y: �"//�f���� �ig�ature �'}. J�d. Mike Horn. Pr ' ent �rn.anri��r� r Type�f Nar�e, C�f�fice r �PPRGVED: Y� / � Mi3ce Graorner Assista�r4 �ity fV�anager � l^Y �J APp�AL��FC�3MI�Eh�� � By: �� � � � �__ _-- - gy Transportakion anc! PubZic WQrks APPROVED AS TO FORM AND LEGALITY: �y: Assis a ity Attorney R CflRDED�,- _ ���'�p/.��!"r� l ,�-� � City Secr+�tary �- l�l -OC� Date C� - 1 �'� I � Contract Authorization � CJ = � � � � � � �� Uate ��UO����, ��C� ��� ����� �. ���, �1� � Oct U6 99 12:33p Michael Horn 817292-1810 p.2 ' 1 I �,.�t: ....,, . � � _ - _ _ - � `, �N �i�'�M:��' - - . � - �. . l�� . . � .t.� .-. �✓ . � C 0 M P A N Y COWTOWN COUSEUM 121 EAST EXCHANGE FORT WORTH,TEXAS 76106 Attention JACK DURHAM Job Description: INVOICE/BID # 100699CCB Date: COWTOWN COLISEUM SOUND SYSTEM I QUQNTITY DESCRIPTION � FIVE EAW KFSSOEP MID-HIGH SPEAKERS I THREE EAW S8850 SUF3 SN�AKERS FIFTHTEEN EAW FR122HP DELAY SPEAKERS ONE CROWN MASOOOvz POWER AMP I ONE CROWN MA3600 POWER AMP � ----- -- ----- � ONE CROWN MA2400 POaVER AMP � ONE CROWN MA1200 POW�2 AMP � ONE DSP PROCESSING UNIT ONE RIGGING SUPPORT PLATFORM � A/R MISCELLANEOU5 RIGGING HARDWARE I A/R ELECTRICAL POWER TO NEW RACKS fA/R C0N0UIT MODIFICATIONS TO NEW CLUST�R I A/R STRUCTURAL SURVEY ANO DESIGN � A/R RIGGING SYSTEM DESIGN � A/R LABOR AND INSTALLATION fA/R HIGH LIFT RENTAL I A/R SHIPPING AND HANDLING Subtotal T�I TOTAL I October 06, 1999 TOTAL �21,115 $9, 273 $8,625 �2, 800 $2, 265 51,725 T�1,400 $4, 500 $6, 063 $1,705 $651 5925 $1,150 $425 $9, 846 �3, 500 $675 Bt7!?92-a257 � Fax 292-1810 ^ 31U8 Ureen R�dge � Ft. Worth, TX 76133 $a.oa S76,643.00 PAYMENT BOND THE STATE OF TEXAS COUNTY OF TARRANT BOND NO. Tx767 14 ] 100 �/ �{. � KNOW ALL MEN BY THESES PRESENTS: That we, American Audio Visn�al, IA�. a corporation of Tarrant County, Texas , hereinafter called Principal and � (3)Universal Surety of America , a corporation organized and existing under the laws ��f tl�ie State and fully authorized to transact business in the State of Texas, as Surety, are held and firnily I�ound urto the City of Fort Worth, a municipal corporation organized and existing under the laws of the ��tate of Texas, hereinafter called Owner, and unto all persons, firms, and corporations who may furni�li materi<ils for, or perform labor upon, the building or improvements hereinafter referred to in the penal sum o1': Seventv Six Thousand Six Hundred and Fortv Three and no cents $76.643.00 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Te�;as. for the payment of whicl� sum well and truly be made, we bind ourselves, our heirs, executors, admini:�trators a�d successors jointly and severally, firmly by these presents. THE COND[T1ON OF THIS OBLIGATION is such that Whereas, the Principal enlered intc a certain contract with the City of Fort Worth, the Owner dated the 19`h day of October , 1995�, a c:opy of which is hereto attached and made a part hereof for the construction of: Installation o�' an Acoustical System Cowtown Coliseum designated as Project Number TPW 99-019 copy of which contract is hereto attached, referred to, a�d made a part hereof as fully and to the same extent as if copied at length herein, such �:irojE;ct a.�d construction being hereinafter referred to as the "works". NOW, THEREFORE, the condition of the obligation is such that, if the Principal sha'_I prompcly make payment to all claimants as defined ir Article 5160 of the Revised Civil Statutes of Tex:is, supplying labor and materials in the prosecution of the work provided for in said Conirace, tlien t}iis obligation shall be null and void, otherwise it shall remain in full force and effect. THIS BOND IS MADE AND ENTERED into solely for the protection of all claimant; supplyi�g labor and material in the prosecution ofthe work provided for in said Contract, as claimants arc° delined in said Article 5160, and all such claimants shall have a direct right of action under the bond as ��ro•��ided in Article 5160 of the Revised Civil Statutes. PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall li�� in 'Tarr2nt County, State of Texas, and that the said Suret�, for value received, hereby stipulates and agrees that ��o change extension of time, alteration or addition to the terms of the contract or to the work tu be perfonn�d thereunder or the specification accompanying the same shall in any wise affect its oblibati�:>ns on ttiis bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or the specifications. a q PROVIDED FURTHER, tl�at no final settlement between the Owner and the Contrac:tor shall abridge the right of any beneficiary hereunder whose claim shall be unsatisfied. S (Five) IN WI`fNESSETH WHEREOF, this instrument is executed in -6--Efi�}�counterpan:s, e;iCll one of which shall be deemed an original, this the 19'h da,y of October , 1999. American Audio Visual� � {�,�I', Principal (4) ATTEST: (Principal) Secretary (SEAL) ATTEST: (Surety) Secretary (�EALL) � _ f ,r � l� � , �. � Q. '� ��� �'',�.J�,''�_` � � �I � W rtn�ss as t� ��kety Phyllis Carnley 2501 Parkview Dr., Ste. ��100 Fort Worth, TX 76102 BY: (Contractor Principal i Michael Horn, Pronrietor (Printed Name/Ti'le) 3108 GreenridQe ADDRESS Fort Worth, TX 76133 CITY/STATE/ZIP' Universal Surety of America Surety P. 0. Box ]068 Houston, TX 77251 Surety Address 4.7ti%£'~~s;:��"�3Y/ ��e;�lr!�3—' ,/ (AtEorn�y4�ct? {51 Glenna S. Davis P. 0. Box 1068, Houston, TX 77251 (Printed Attorney-in-Fact) Da1e ojBond mus[ no1 b:r pr�i�r to dale of Contract Correcr name of Cnnrra�:lor A Corporatron, a ?arlcrrshr;� or and /ndivrdual, as case ��iay he Correct Narne ojSurety /j Conlracfor is Parlm��shic cd! Partners should ex�eule •5ond � UNIVERSAL SURETY OF AMERICA P.O. BOX 1068 •Houston, Texas 77251-1068 GENERAL POWER OF ATTORNEY - CERTIFIED COPY Agency Infortnaum GPAJ+ ioo�iis TX 7671411 00 Agents [nsurance Services, [nc. Know All Men by These Presents, That UMVERSAL SURETY OF AMERICA, a corporation duly organized and existing under the laws of the State ofTexas, and having its pricipal office in Houston, Texas, does by these presenis make, constitute and appoint Cathy Vinson Gwen W. Biehler Michael A. Delabano Rick Bondurant Glenna S. Davis of Fort Worth and State of Texas its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver Bonds not to exceed �200,000.00 unless such is accompanied by Ietter of aulhority signed by the President, Secretary or Executive Vice President of Universal Surery of America. and to bind the Company thereby as Iully and to the same extent as if such bonds were signed by the I'resident, sealed with the corporate sea! of the Company and duly attes[ed by its Secretary, hereby ratitying and confinning all that the said Attomey(s)-in-Fact may do within the stated limitations, and such authonry is to continue in force until 9�30�2001 . Said appointment is made under and by authority of the following resolution adopted by the 13oard of Directors of Universal Surery of America at a meeting held on [he 1 lth day of July, 1984. "Be It Resolved, that the President, and any Vice President, Secretary or any Assistant Secretary shall be and 'rs hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company." "R1iSOLVED that the signature of any officer of the corporation, and the seal of the corporation may be affixed or printed by facsimilie to any power oCattorney of [hc corporation, and that such printed facsimilie signattue and seal shall be valid and binding upon the corporation." In Witness Whereof, Universal Surety of America has caused these presents to be signed by its President, Jack McReynolds and its corporate seal to be hereto affixed this 2nd day of January, A.D.,1998. 4���N1������.1�11/�r4 fJN�V��AL SUR:�TY �F AMER�C�. � .+ +VREay o^,y � . � � � �.. • ,�� � s�? `�- - Stare ai Texa�s ' p = �'�s tf r4is _ 56: �''• rcr�c :: � J�k McReynolcis � Presidenl �dlltl�' i�� �SCC�� �'� 1 �+F M�, n On this 2nd day of January, in the year 1998, before me, Estela Leija, a notary public, personally appeared Jack McReynolds, personally known to me to be the person who executed [he within instrument as President , on behalf of the corporation herein named and acknowledged to me that the corporation executed It. ��, � ►"'_ ~� " �' I � � �f �'� _ �_ .��• k .��� � , I, the undersigned Secre�ary of Universal Surery o1' America, hereby certi "ty tha[ the above and foregoing is a full, true and correct copy of [he Original Power of Attorney issued by said Company, and do hereby further certify that che said Power of At[orney is still in effect. GNEN under my hand and the seal of said company, a[ I louston, Texas, this 19th �Y o f October .� 9 99 �sI � _ � f As�t�nt Secretazy Any instrument issued in excess of the penalry stated above is totally void and without any validity. For verification of the authority of this power you may telephone (713) 722-4600. I401-1425/025 -- � CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor, American Audio Visual Companv, certifies that it provides worker's comper.sation insurance coverage for all of its employees employed on City of Fort Worth projec,t Installation o� an Acoustical System Cowtown Coliseum project number, TPW 99-019 �y: .�1���"�/�.r� � . . - _ . � G� r���� � � Title l�r?��,��,� � � .� �r��C, Date � STATE OF TEXAS 0' COUNTY OF TARRANT G�' BEFORE ME, the undersigned authority, on this day personally appea.red �,�� : � �, ., . �, ;� �--,�,� , knawn to �me to be the person whose name is subscribed to the foregoing instrument, �.nd a/cknowled+ged ,., to mje that he executed �!the same as the � act and deed of \��-7'L �fl.k Aa-a�" � �f1t.,�i^ f lf.c�f'. . u;i� �'J �li�in, I ��r2,� rt.::, � i Lk.. f/l f{1.a �� � fOT the purposes and cansiderations therein expressed �nd in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this �. day of �l�+1 - .aw��.�� "'"""","""'.�,.� " ��� � �� LYN NEII YEATTS f�r� ,l� y �, �f r_P�' ''-�1,:, ,,l� . Note�y Pubnc, �tate o� i exes � �r A, ��`�F My Comm. Exp. 3•12•00 ����xY ����� �� and for the State of� Texa� . .. ..------ -� (a) Contractor agrees to provide to tl�e City a certificate showing that it has obtained a policy of workers compensation insurance covering each of its employees on the project in compliance with state law. No Notice to Proceed will be issue�:l uiitil the Contractor has complied with this section. (b) Contractor agrees to require each and every subcontractor who will perforni work on the project to provide to it a certificate from such subcontractor stating tllat the subcontractor has a policy of �vorkers compensation insurance coverin�; e<<cti employee employed on the project. Contractor will not permit any subconcractor to perform work on the project until such certificate has been aa:�uired. Contractor shall provide a copy of all such certificates to the City. Se�,�l 99 04:33p Michael Horn 817292-1810 p.l P ' , --. �� � ., - �. P. � �:� �_.,. M M;- _ _� � � �����- _ - - � . _. , �. . -. - � �,.•-�3 V x � V . � C O M P A N `( BID COWTOWN COL[SEUM 121 EAST EXCHANGE AVE FORT WURTH,TX 76106 QUANTITY 5 3 15 1 1 l 1 1 1 A/R A/R A/R A/R A/R A/R A/R A/R COWTOWIY COLISEUM SOUND SYSTEM DESCR 1P1'IOA1 EAW KF 850EP Mid-High Speakers EAW SB850EP Subs EAW FR122HP Delay speakers Crown MA5000vz Power amp Crown MA3600 Power amp Crown MA2400 Powcr amp Crown MA1200 Power amp DSP Processin� Ri�ging support platform Misccllancous ri��ing hardware Electrical power to new racks Conduit modiFcations to new cluster Structural Survey and design Rigging system dcsign Labor and installation High lift rental Shippin� and handlin� B[D# 090199CCB DATE: 9-1-99 - _� TOTAL $76,643.00 3 Ei 3 .-: � '?i. •- -. ; t '•� � � r 817/292-8257 + FdX 292-1810 • 3108 Green Ridge � Fl. Worth, TX 76133