HomeMy WebLinkAbout025690 - Construction-Related - Contract - McClendon Construction, Inc.A � � � 1 C 1 �� � �� SE�CIRETI�R' ' ' �C�NTRAGT NC) . ��'� �'�� � SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CITY SECRETARY � 1998 CAPITAL IMFROVEMENT PROJECT �.0.�. FP�.� FOR ��r�TR��I����'�IINSON, AND HALE AVENUES CONSTRUCTIC�t�-C��'" T� STREET IMPROVEMENTS CL{ENT DEPARTMEN�' CONTRACT 3 DOE PROJECT NOS. 2135, 2136, 2137, 2138 UNIT I: WATER AND SANITARY SEWER REPLACEMENT ' WATER PROJECT NO. PW53-060530175280 SEWER PROJECT NO. PS58-070580174420 Il A r- r UNIT II: PAVEMENT RECONSTRUCTION TPW PROJECT NO. C115-020115040536 FOR THE CITY OF FORT WORTH, TEXAS 1999 � KENNETH BARR MAYOR � � � � � � � �� BOB TERRF;LL CITY MANAGER HUGO MALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS DEPARTMENT LEE C. BRADLEY, JR., P.E. DIRECTOR OF WATER DEPARTMENT A. DOUGLAS RADEMAKER, P.E. DIRECTOR OF ENGINEERING DEPARTMENT Prepared by: TranSy� �oration 500 West �uite 600 Fort .;102 �,, � ,'� i;�+ � �:'�, �, V�:_i, ,,; - ; � ;i , � ;�-L � -Ve :._ �._ '�� ���"�'���'���:'� �� �J�?��g ���n , I r , City of Fort Wo�th, Texas �1►�A�ar �nd Caunc�il Car»n�un�cAt,ion DATE REFERENCE NUMBER LOG NAME PAGE 2/29/00 **C-17890 30OSCAR 2 of 2 suaJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO MCCLENDON CONSTRUCTION, INC. FOR RECONSTRUCTION OF OSCAR AVENUE (28TH STREET TO 32ND STREET); HUTCHiNSON STREET (28TH STREET TO 29TH STREET); 29TH STREET (HUTCHINSON STREET TO RUNNELS AVENUE) AND HALE AVENUE (28TH STREET TO 31ST STREET) This project is located in COUNCIL DISTRICT 2, Mapsco 63A. McClendon Construction Company, Inc. is in compliance with the City's M/WBE Ordinance by committing to 8% M/WBE participation and documenting good faith effort. McClendon Construction Company, Inc. identified several subcontracting and supplier opportunities on the above listed project. However, the M/WBEs contacted in the areas identified did not respond or did not submit the lowest bids. The City's goal on this project is 25%. Funding in the amount of $35,000.00 (Water: $25,000.00; Sewer: $10,000.00) is included for associated water and sanitary sewer construction inspection and survey. Contrngency funds to cover change orders for water and sanitary sewer improvements total $25,000.00. (Water: $18,000.00; Sewer: $7,000.00). The contingency for possible change orders for paving and drainage improvements is $25,000.00 FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon completion of recommendation 1, and the adoption of the attached appropriations ordinance, funds will be available in the current capital budgets, as appropriated, of the Water and Sewer Capital Projects Funds and the Street Improvements Fund. MG:j Submitted for City l�tanager's Office by: Mike Groomer Originatiug Department Head: A. Douglas Rademaker Additional Information Contact: A. Douglas Rademaker 6140 cis� 61�7 I FUND � (to) I 1) PW53 1) PS58 2) PW53 I2) PS58 2) PW53 � 2) PS58 I (f�om) 1) PE45 1) PE45 I 3) PW53 � 3) PS58 I C115 ACCOUNT � CENTER � An1OUNT 472045 060530175280 $390,455.00 472045 070580174420 $154,703.50 541200 060530175280 $365,455.00 541200 070580174420 $144,703.50 531350 030530175280 $ 25,000.00 531350 030530174420 $ 10,000.00 538070 538070 541200 531200 541200 0609020 0709020 060530175280 070580174420 02011504Q536 $390,455.00 $154, 703.50 $347,455.00 $137,703.50 $753,078.00 C1TY SECRETARY �v� � VF 1 1 �Vl�VlE. FE8 29 Z�0 �''.,t�• �'ur.., Citp SearvEaa� d CY� �ity ot Fort W�rti►,?sza! �o�ted �ixdinance PJo. ��� � City of Fort Worth, Texas �1►�A�a� And Council Ca�nmun�cAtrian DATE REFERENCE NUMBER LOG NAME PAGE 2/29/00 **C-17890 30OSCAR 1 of 2 sue�ECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO MCCLENDON CONSTRUCTION, iNC. FOR RECONSTRUCTION OF OSCAR AVENUE (28TH STREET TO 32ND STREET); HUTCHINSON STREET (28TH STREET TO 29TH STREET); 29TH STREET (HUTCHINSON STREET TO RUNNELS AVENUE) AND HALE AVENUE (28TH STREET TO 31ST STREET} RECOMMENDATION: It is recommended that the City Council: Authorize the transfer of $545,158.50 from the Water and Sewer Operating Fund to the Water Capital Project Fund ($390,455.00) and the Sewer Capital Project Fund ($154,703.50); and 2. Adopt the attached appropriatton ordinance increasing estimated receipts and appropriations rn the Water Capitai Project Fund in the amount of $390,455.00 and the Sewer Capital Project Fund in the amount of $154,703.50 from avaifable funds; and �3.,?Authorize the City Manager to execute a contract with McClendon Construction Company, Inc. in - the amount of $1,238,236.50 for the reconstruction of Oscar Avenue (28th Street to 32nd Street); Hutchinson Street (28th Street to 29th Street); 29th Street (Hutchinson Street to Runnels Avenue) and Hale Avenue (28th Street to 31 st Street). DISCUSSION: The 1998 Capital Improvement Program included funds for the reconstruction of Oscar Avenue (28th Street to 32nd Street); Hutchinson Street (28th Street to 29th Street); 29th Street (Hutchinson Street to Runnels Avenue) and Hale Avenue (28th Street to 31 st Street), Project No. 115-040536. All four streets were previously constructed to City standards. The proposed improvements include the construction of standard concrete and asphalt pavement, driveway approaches, sidewalk and storm drain improvements. Water and sanitary sewer improvements are also to be made. The project was advertised for bid December 16 and 23, 1999. On January 13, 2000, the following bids were received: BIDDER McClendon Construction Comqanv, Inc. Stabile & Winn, Inc. Cqnatser Construction, Inc. Jackson Construction, Inc. J.L. Bertram Construction & Engineering Inc. Walt Williams Construction, Inc. Ed A. Wilson, Inc. AMOUNT $1,238,236.50 1,286,823.30 1,354,991.75 1,362,443.95 1,386,881.58 1,414,607.41 1,509,930.45 TIME OF COMPLETION 200 Working Days L CITY OF FORT WORTH DEPARTMENT OF ENGINEERING � ADDENDLIM NO. 1 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR � 1998 Capital Improvement Project for OSCAR, AUTCHINSON, AND HALE AVENUES � AND 29TH STREET IlVIPROVEMENTS CONTRACT 3 D.O.E. PROJECT NOS. 2135, 2136, 2137, 2138 UNIT I: WATER AND SANITARY SEWER REPLACEMENT UNIT II: PAVEMENT RECONSTRUCTION BID RECEIPT DATE: January 13, 2000 ISSUED: January 7, 2000 Prospective bidders are hereby notified of the following change to the project plans and specifications: � 1. Specifications, Part 7— PROPOSAL, Unit I— Section A(Water Improvements) Pay Item #2, the material type has changed from 8" PVC DR-14 Water Pipe (Other than � open cut) to 8" Class 51 Ductile Iron Pipe (Other than open cut). The quantity (183 LF) remains the same. The entire revised PROPOSAL section has been provided, please use this revised PROPOSAL section to record your bid. � 2. Specifications, Part 7— PROPOSAL, Unit I— Section B(Sanitary Sewer Improvements), narrative was provided at the bottom of pages 7(10) and 7(11) � • directing the contractor to complete the appropriate City approved method form on page 7(18). The entire revised PROPOSAL section has been provided, please use this revised PROPOSAL section to record your bid. � 3. Specifications, Part 7— PROPOSAL, Unit II, the Pay Items within Section's A-1, A- 2, A-3, and B were combined into one section. Therefore, there is only one pay item for Utility Adjustment, Project Designation Sign, Sawcut Existing Street, etc. � However, the yuantities for the following Pay Items have been revised: • Install 6" Reinforced Concrete Paving — Sireet � • 6" Lime Stabilized Subgrade • Hydrated Lime @ 30#/SY • 7" Attached Concrete Curb � • Construct Concrete Sidewalks, Leadwalks, and Wheel Chair Ramps • 6" Reinforced Concrete Driveways � UFTWORTH�PROJECTS�202\98\98039WDMWdendum I January 7.doc — _ . � � • 7" HMAC Transition • 7" Concrete Curb and Gutter. - The entire revised PROPOSAL section has been provided, please use this revised � PROPOSAL section to record your bid. 4. Specifications, Part 7— PROPOSAL, the description for UNIT II at the beginning of this section has been revised to reflect the combining of Pay Items within this unit. The entire revised PROPOSAL section has been provided, please use this revised PROPOSAL section to record your bid. � � �� 5. Specifications, Part 7— PROPOSAL, the description of old Pay Item #84 and revised Pay Item # 88 has changed from Relocate Brick Steps to Remove and Replace Brick Steps. The entire revised PROPOSAL section has been provided, please use this revised PROPOSAL section to record your bid. - 6. Specifications, Part 8— Supplementary Conditions to Section C. This section has been revised, the new section has been provided, please insert this revised section into the Specifications and Contract Documents. 7. Construction Plans - Sheet 36, the Longitudinal Construction Butt Joint detail has � been revised. The dowel reinforcing steel changed from a No. 5 x 36" Dowel Bars @ 24" OC. to a No. 4 x 36" Dowel Bars @ 24" OC. � 8. Construction Plans - Sheet 37, the Typical Roadway Section for the 5" HMAC Pavement on 6" Lime Stabilized Subgrade has been revised. The application rate of lime on the 6" Lime Stabilized Subgrade has changed from 28 LB/SY to 30 LB/SY. � 9. All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shal) remain in full force and effect. � Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal. � REC �Kl�`{3WLED A. Douglas Rademaker, P.E., Director �' � A �! � B ,��.�et �sra�+� Y� )''• Rick ''�ic�, P,�,., Manager �n�sultant � Services , � � \�FfWORTH�PROJECTS�202198198039WDM�Adendum 1 January 7.doc 01 '10 �00 iii)� 11 :��i F.�Y 817 �3a 224 i TRANSYSTEIiS C0RP F"Tw'ORTH C1T�' OF FORT WORTH D�PARTMENT OF �NGINE�RING ADD�NDUM Np. 2 TO THE PLAHS, SPECIFICATIONS AND C�NTRACT DOCUME'YTS FOR 1998 Capital Improvement Projcci fur OSCAR, HUTCI�INSON, AND HALE AVENUES AND 24T" STREET rR1pROV1,MENTS CONTRACT 3 D.O.E. PRO.JECT NOS. 2135, 2136, 2137, 2138 UNIT 1: wATER Ano SANITaRv SEWER REPLACEMENT UNIT II: PAVEMENT RECONSTRlTCTION BID RECE�PT bATE: January 13, 200u rSSUED; Janu�ry �0, 200U Prospective b�dders are hereby notified of the following change to the project plans and specifications 1. Specifications, Part 7— PROPOSAL, Unit T- Section B(Sanitary Sewer lmproveinents) Pay Ite�n �29, thz matenel description is changed from "6" SDR-35 Sanitary Sewer P�pe by dpen-cut, All depths" to "i*' 6" PvC Sanitary Sewer Pipe by Open-cut, Afl depth�". Thr. quantiry (5 LF) remains the samc 2. Speci�cations, Part 7— PROPOSAL, L`nit 1— Section B(Sanitary Sewer Improvements), Pay ltem , #32, the material description is changed from "8" SbR-35 Sanitary Sew�er Pipe by Open-cut, All �epths" to "�'"" 8" PVC Sanitary Sewer Pipe by Open-cut. All depths". The quai�tiry (1263 LF) ren�ains the same. 3. Specifications, Psrt 7— PROPOSAL, Unit I— Section B(Sanitary Scwe�� Improvemen�s} ""'`Contractor to indicate type of pipe to be used for Item �29 and Ttem #32 per table on incliided sl�eet. 4. Specifications, Part 7— PROPOSAL, Unit I- Section B(S�u,itary Sewer Improv�ments), D�LETE Pay Item #44 "Rehnb San�tary Sewer Manhole". 5. Specificat�ons, Part 7-- PROPpSAL, Unit I— Section B{Sanitary Sewer i�n�pcovements}, DELETE Pay [tcm #47 "Re;nstate Services,Open Cut'vlethod" 6. AU other provisions of the plans, specifieations and eontract doeuments for the project wh�ch are not e!cpressly amended herein silall remain in fuil force and effect. Failure to return a signed co�y of the addendum`with the pro�osal 9hall be �rounds for rendering the bid non- responsi��e. A signed copy of this addendum sltall be placed into the proposal at the time of bid subm�ttal. R��E1P7�,CICNOW�,F,DCED � �y, A, Douglas Rademaker, P.E., Director Bv: � �.s+.�-" Rlck '�r�ce, P.E., Manager Consultant Services [�; o o : � P �?U?!98'96039'.ADM'�qdendum 2 lanu�tr}� 10 duc a1�1��nA K0�' il:dl F.4� 817 �SB Z247 TRANSYSTEMS C0RP FTH'0RTH r� oos CITY APPROVED PRODUCT AND.4►PPROVED M�THOD FOR *** **'`COIVTRACTOR SI�ALL SEL�CT TYPE O�' PIP� TO B� USED: STA:VD�lRD SPEC NO. I S1ZE I E 1-3 l I 4" thru 30" r __ /LE 1-? 5 4" thru 15" �� � 3�.— � 1-27 4" tluv 1 S" I E 1-28 18" thru 27„ i � 100-2 18" tlu-u 48" � Consult the "City of Fort Worth, Texas Standard Aroduct List" to obtain the GenericlTrade Name and rhe Manufacturer for the pipcs listed above. Failurr to provide the information required abovc may result in rejection of b;d as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rzjection of bid as non-responsive. P'.202�98\98039L�.DM1Final Spccs for C(T1Pipe Table.doc 7(18•b) TABLE OF CONTENTS � � 1 - Notice to Bidders 2- Comprehensive Notice to Bidders 3 — Prevailing Wage Rates 4- Special Instructions to Bidders (Water Department) 5- Special Instructions to Bidders (TPV� 6- City of Fort Worth Minority/Women Business Enterprise Policy 7 - Proposal 0 Unit I- Water & Sanitary Sewer 0 Unit II - Pavement Reconstruction 8 - General Conditions (Water Department) 9 - Special Conditions (Water Department) 10 - Additional Special Conditions (Water Department) 11 — Specifications (Water Department) 12 — Project Designation Sign (Water Department) 13 - Special Provisions (T/PW Department) 14 — Silicone Joint Sealing Specifications 15 — Project Designation Sign (T/PW Department) 16 — Vendor Compliance to State Law 17 — Contractor Compliance with Workers' Compensation Law 18 - Certificate of Insurance 19 - Bonds (City of Fort Worth) 0 Performance Bond 0 Payment Bond 0 Maintenance Bond 20 - Contract (City of Fort Worth) 21 — Soil Tests P:1202\98\98039WDM�Final Specs for CIP\98039tc.doc TC-1 ' 1 ' 1 1 , ' , 1 w � , 1 � 1 ' , � � 98039_SPECS.doc ' -1 - NOTICE TO BIDDERS � NOTICE TO BIDDERS Sealed proposals for the following � For: 1498 Capital Improvement Project — CONTRACT 3 Oscar, Hutchinson, and Hale Avenues, and 29'" Street Improvements R Unit I- Water & Sanitary Sewer Replacement Water Project No.: PW 53-060530175280 Sewer Project No.: PS 58-070580174420 Unit II - Pavement Reconstruction y T/PW Project No.: C115-020115040536 � DOE Nos. 2135, 2I36, 2137, 2138 Addressed to Mr. Bob Terrell, City Manager for the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 PM, January 13, 2000, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. � � Plans, Specifications and Contract Documents for this project may be obtained at the office of the Departrnent of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00). A pre-bid conference will be held on Monday, January 3, 2000 at 9:00 a.m., in Room 255A ot the Department of Engineering. All bidders are encouraged to attend. The major work on the above-referenced project shall consist of the following: Unit I- Water and Sanitary Sewer Improvements � 5,934 L.F. 8" Water Pipe 608 L.F. 8" Sewer by Open Cut , 205 L.F. 8" Sewer Rehab. by Pipe Enlargement Method 181 L.F. 6" Sewer Rehab. By CIPP or FAF'P Unit II - Pavement Reconstruction 13,255 S.Y. 6" Reinforced Concrete Pavement � 6,748 L.F. 7" Reinforced Concrete Curb 6,200 S.Y. 5" Asphalt Pavement 2,641 L.F. 7" Concrete Curb & Gutter 19,304 S.F. 6" Reinforced Concrete Driveway � 17,256 S.F. Concrete Sidewalk This project is a combined contract as defined in the Ordinance No. 13781. The offeror shall list all first and second tier subcontracting and/or supplier opportunities. All other provisions of Attachment 1 of Ordinance 13471 as amended by Ordinance 13781 apply to this contract. For additional information, please contact Mr. Bruce Nelson, P.E. at (817) 339-8950, or Ms. Dena Johnson, P.E., at (817) 871-7866 Advertising Dates: December 16, 1999 December 23, 1999 Fort Worth, Texas 98039nb.doc � 1 -2- � COMPREHENSIVE NOTICE TO BIDDERS �J 98039_SPECS.dx � .�i,l�l I I I � ��1 . COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following For: 1998 Capital Improvement Project — CONTRACT 3 Oscar, Hutchinson, and Hale Avenues, and 29t° Street Improvemenks Unit I - Unit II - Water & Sanitary Sewer Replacement Water Project No.: PW 53-060530175280 Sewer Project No.: PS 58-070580174420 Pavement Reconstruction T/PW Project No.: C11�02011504053¢ DOE Nos. 2135, 2136, 2137, 2138 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 P.M., January 13, 2000, and then publicly opened and read aloud at 2:00 P.M. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. A fifty dollar ($50.00) deposit is required for the first set of documents and additional sets may be purchased on a non-refiindable basis for fifty dollars ($50.00) per set. These documents contain additional information for prospective bidders. 1 A pre-bid conference will be held on Monday, January 3, 2000 at 9:00 a.m., in Room 255A ot the Department of Engineering offices. All bidders are encouraged to attend. � All bidders will be required to comply with Provisions 5159a of "Vemon's Annotated Civil Statutes" of the State of Texas with respect to ihe payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400, prohibiting discrimination in employme�t practices. Bidders are encouraged to review the project plans and specifications prior to the pre-bid conference and be prepared to actively participate in the conference. A{I bidders' questions will be answered at the pre-bid conference. The major work on ihe above-referenced project shall consist of the following: Unit I- Water and Sanitary Sewer Improvements 5,934 L.F. 8" Water Pipe 608 L.F. 8" Sewer by Open Cut 205 L.F. 8" Sewer Rehab. by Pipe �nlargement Method 181 L.F. 6" Sewer Rehab. By CIPP or FAFP Unit II - Pavement Reconstruction 13,255 S.Y. 6" Reinforced Concrete Pavement 6,748 L.F. 7" Reinforced Coacrete Curb 6,200 S.Y. 5" Asphalt Pavement 2,641 L.F. 7" Concrete Curb & Gutter 19,304 S.F. 6" Reinforced Concrete Driveway 17,256 S.F. Concrete Sidewalk This project is a combined contract as defined in the Ordinance No. 13781. The offeror shall list all fvst and second tier subcontracting and/or supplier opportunities. All other provisions of Attachment 1 of Ordinance 13471 as amended by Ordinance 13781 apply to this contract. Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. 98039nb.doc 2 (1) � COMPREHENSIVE NOTICE TO BIDDERS `" The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. Wo bid may be withdrawn until the expiration of forty-nine (49) days from the date the M/WBE UTILIZATION FORM, � PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation°) as appropriate, is received by the City. The award of contract, if made, will be within forty-nine (49) days after this documentation is received, but in no case will the award be made until all the �esponsibility of the }�" bidder to whom it is proposed to award the contract has been verified. SUBMISSION OF BIDS: The proposal consists of Unit I(water and sewer) and Unit II (paving). The City reserves the right to award the contract to the responsive low bidder. � � Bidden are responsible for obtaining all addenda to the contract documents prior to the bid receipt time and adrnowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not � acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of , addenda may be obtained by contacting the Departrnent of Engineering at (817) 871-7910. Bidders shall not separate, detach or remove any portion, segment or sheeks from the contract document at any � time. Bidders shall submit the complete specifications book or risk rejection of bid. In accord with the City of Fort Worth Ordinance, No. 13471, as amended by Ordinance No. 13781, the City of � Fort 1�Vorth has goals for the participatioo of minority business enterprises and womeo business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the MBE/WBE U1'ILIZATION FORM� PRIIV� CON'I'RACTOR WAIVER FORM aod/or the GOOD �" FAITIi EFFORT FORM ("Documentation") as appropriate. The Documentation roust be received by the contractiog department no later than 5:00 PM, five (5) City business days after the bid opening date. The Bidder shall obtain a receipt from the appropriate employee of the managing department to whom the delivery was made. Such receipt shall be evidence that the Documentation was received by the City. Failure to comply shall render the bid non-responsive. �r � "Ihe Managing Deparhnent for this project is the Departrnent of Engineering. For additional information concerning this project, please contact Mr. Bntce Nelson, P.E. at (817) 339-8950, or Ms. *r Dena Johnson, P.E., Project Manager, at (817) 871-7866. Bob Terrell City Manager � i � Advertising Dates: December 16, 1999 �" December 23, 1999 Fort Worth, Texas � 98039nb.doc " Alice Church Ciry Secretary A. Douglas Rademaker, P.E., Director Departrnent of Engineering 1 By' �'tr�' �f�tick Trice, .E. � Manager, Consultant Services 2 (2) 1 -3- PREVAILING WAGE RATES 98039 SPECS.doc � r� PREVAILING WAGE RATES ' 1 CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATES FOR 1999 CLASSIFICATION RATE Air Tool Operator $9.00 Asphalt Raker $9.55 Asphalt Shoveler $8.80 Batching Plant Weigher $11.51 Carpenter $10.30 Concrete Finisher (Paving) $10.50 Concrete Finisher (Structures) $9.83 Concrete Rubber $8.84 Electrician $15.37 Flagger $7.55 Form Builder (Structures) $9.83 Form Liner $9.00 Form Setter (Pav & Curb) $9.24 Form Setter (St�uctures) $9.09 Laborer, Common $7.32 Laborer, Utility $8.94 Mechanic $12.68 Oiler $10.17 Servicer $9.41 Painter (Structures) $11.00 Pipelayer $8.98 Blaster $11.50 POWER EGIUIPMENT OPERATORS Asphalt Distributor Operator $10.29 Asphalt Paving Machine $10.30 Broom or Sweeper Operator $8.72 Bulldozer $10.74 Concrete Curing Machine $9.25 Concrete Finishing Machine $11.13 Concrete Paving Joint Machine $10.42 Concrete Paving Joint Sealer $9.00 Concrete Paving Saw $10.39 Concrete Paving Spreader $10.50 Slipform Machine Operator $9.92 CLASSIFICATION RATE Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel $11.04 Foundation Drill Operator (Crawler Mounted) $10.00 Foundation Drill Operator (Truck Mounted) $11.83 Front End Loader $9.96 Milling Machine Operator $8.62 Mixer $10.30 Motor Grader Operator (Fine Grade) $11.97 Motor Grader Operator $10.96 Pavement Marking Machine $7.32 Roller, Steel Wheel {Plant-Mix Pavements) $9.06 Roller, Steel Wheel (Other Flatwheel or Tamping) $8.59 Roller, Pneumatic Self-Propelled Scraper $8.48 Scraper $9.63 Tractor - Crawler Type $10.58 Tractor - Pneumatic $9.15 Traveling Mixer $8.83 Wagon-Drill, Boring Machine $12.00 Reinforcing Steel Setter (Paving) $13.21 Reinforcing Steel Setter (Structures) $13.31 Steel Worker - Structural $14.80 Spreader Box Operator $10.00 Work Zone Barricade $7.32 Truck Driver - Single Axle (Light) $8.965 Truck Driver - Single Axle (Heavy) $9.02 Truck Driver - Tandem Axle (Semi-Trailer) $8.77 Truck Driver - Lowboy/Float $10.44 Truck Driver - Transit Mix $9.47 Truck Driver - Winch $9.00 Vibrator Operator - Hand Type $7.32 Welder $11.50 98039 Wage Rate doc 3 (1) � L! � -4- SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) � 98039_SPECS.doc SPECIAL INSTRUCTIONS TO BIDDERS (Water Department) � i. PREQUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be pre-qualified by the Forth Worth Water Department prior to submitting bids. This pre- � qualification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidders responsibility to submit the foflowing documentation: a current financial statement, an acceptable experience record, an �!+ acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) cafendar days prior to the date of the opening of bids. a. The financial statement required shall have been prepared by an independent `�' certified publrc accountant or an independent public accountant holding a valid permit rssued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more that one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous "� statement shall be updated by proper verification. b. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be � received. c. The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. � d. Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. � e. The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/ar expertise. '" f. Any proposals submitted by a non-pre-qualified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g. The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude �'�` of the project on which bids are to be received. Failure to notify shatl not be a waiver of any necessary pre-qualification. 2. BID SECURITY: A cashier's check or acceptable bidder's bond payable to the City of Fort Worth in an amount of nat less than five percent (5%) of the largest possible total of 'r' the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within (10} days after the contract has been awarded. To be an acceptable surety o the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital � and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount .w shown on the t�easury list or one-tenth (U10) the total capital and surplus. 3. BONDS: A performance bond, a payment bond and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. � 98039 Speclnst(WD).doc 4 � I � � SPECIAL INSTRUCTIONS TO BIDDERS (Water Department) +� 4. WAGE RATES: Not less than the prevailing wage rates estabiished by the City of Fort Worth, Texas, and set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal the City reserves the right to adopt the most advantageous construction thereof .� to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civi! Statutes, the City of Fo�t Worth will not award this contract to a nonresident bidder unfess the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the State in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business in not in the State of Texas, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in the State of Texas. This provision does not apply if this contract involves Federal funds. �- The appropriate blanks of the Proposa! must be filled out by all nonresident bidders rn order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualsfy that bidder. 8. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be paid +� within forty-five (45) calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it, nor any of its officers, members, agents, employees, program participants or subcontractors while engaged in performsng this contract, shall, in connection with the employment, advancement or discharge of employees in connection with the terms, conditions or privileges of their empioyment, discriminate against persons because of their age except on the basrs of a bona fide occupational qualification, retirement plan, or statutory requirement. ww Contractor further covenants that neither it nor its o�cers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in � solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. � Contractor warrants it will fuliy comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asse�ted by third parties or subcontractors and/or its subcontractors' alleged failure to comply with the above referenced policy concerning age discrimination in the performance of this agreement. � 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of '" 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully drscriminate on; the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of empfoyment for iw 96039 Speclnst(WD).doc 4 (2) SPECIAL INSTRUCTIONS TO BIDDERS (Water Department) .r applicants for employment with or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with the ADFA's provisions and any other applicable Federal, State and local laws concerning dssability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of contractor's and/or its subcontractors; alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13781, the City of Fort " Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the O�ce of the City Secretary. The brdder shall submit the MBE/WBE UT���zA,T�oN FoRnn, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The documentation must be received no later that 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. "� Upon request, Contractor agrees to provide the Owner complete and accurate � information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Women Business Enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) �► and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal state or local laws or � ordinances relating to false statements. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a � period of time of not less than three (3) years. Revised 9/24/97 98039 Speclrst(VYD).doc 4 (3) -5- SPECIAL INSTRUCTIONS TO BIDDERS (T/PW DEPARTMENT) 98039_SPECS Goc SPECIAL INSTRUCTIONS TO BIDDERS (T/PW Department) BID SECURITY: Cashier's check or an acceptable bidde�'s bond payabie to the City of Fort Worth, in an amount of not less than five percent (5%} of the total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten (10) days after the contract has been awarded. Ta be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten (10) times the limit of the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth (1/10) the total capital and surpfus. 2. PAYMENT BOND AND PERFORMANCE BOND: The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. In this connection, the successful bidder shall be required to furnish a performance bond, as well as a payment bond, both in a s�m equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall mee# the requirements of Article 5160 of the Revised Civil Statutes of Texas, as amended. In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties (Circular 870), or (2) the surety must have capital and surplus equal to ten (10) times the amount of the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the Treasury List or one-tenth (1/10) of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be authorized, accredited, or trusted to do business in Texas. No sureties will be accepted by the City which are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be deterrnined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and materials in the prosecution of the work. If the contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount of the contract conditioned on the faithful perFormance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. 3. LIQUIDATED DAMAGES: The Contractor's attention is called in Part 1, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard Specifications for Construction of the City of Fort Worth, Texas, concerning liquidated damages for late completion of projects. 4. AMBIGUITY: In case of ambiguity or lack of clearness in stating prices in the proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the proposal. 96039 Spaclnsl(TPVh doc .J � � � SPECIAL INSTRUCTIONS TO BIDDERS (T/PW Department) 5. EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. 6. WAGE RATES: All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailsng wage rates as established by the City of Fort Worth, Texas, and set forth in Contract Documents for this project. 7. FINANCIAL STATEMENT: A current certified financial statement may be required by the Department of Engineering if required for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, if required, is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 8. INSURANCE: Within ten (10) days of receipt of notice of award of contract, the Contractor must provide, along with executed contract documents and appropriate bonds, proof of insurance for Worker's Compensation and Comprehensive General Liability (Bodily Injury -$25Q,000 each person, $500,00 each occurrence; Property Damage -$300,000 each occurrence). The City reserves the right to request any other insurance coverages as may be required by each individual project. 9. NONRESfDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas �esident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder' means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. "Texas resident bidder" means a bidder whose principal place of business is in this state, and rncludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not appfy if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for its bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 10. MIN�RITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fo�t Worth Ordinance No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals fo� the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBENVBE UTiu7�,Tiory FoRM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The documentation must be received no later that 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery 98039 Speclnst(TP1/� tloc �J �2� SPECIAL INSTRUCTIONS TO BIDDERS (TIPW Department) was made. Such receipt shall be evidence that the documentation was received by the City. Faifure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work perfo�med by a Minority Business Enterprise (MBE) and/or a Women Business Enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that wilS substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for temnination of the cont�act and/or initiating action under appropriate federal state or local laws or ordinances relating to false statements. Furthe�, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determsned to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. 11. AWARD OF CONTRACT: Contract will be awarded to the lowest responsive bidder. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. No bid may be withdrawn until the expiration of forty-nine (49) days from the date bids are opened. The award of contract, rf made, will be within forty-nine (49) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. 12. PAYMENT: The Cont�actor will receive full payment (minus 5% retainage) from the City for all work for each pay period. Payment of the remaining amount shalf be made with the final payment, and upon acceptance of the project. 13. ADDENDA: Bidders are responsible for obtaining all addenda to the contract documents prior to the bid receipt time and acknowledging them at the time of bid receipt. Information regarding the status of addenda may be obtained by contacting the Department of Engineering Construction Division at (817) 871-7910. Bids that do not acknowledge all applicable addenda may be rejected as non-responsive. 14. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: a. Workers Compensation Insurance Coverage: Definitions: Certification of coverage ("ce�tificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project sncludes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 98039 Speclnst(TPVt� doc 5 (3) SPECIAL INSTRUCTIONS TO BIDDERS (T/PW Department) Persons providing services on the project ("subcontracto�' in §406.096} includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the contractor providing services on the project, for the duration of the project. 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 5. The contractor shall obtain from each person providing services on a project, and provide to the governmental entity: a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file ce�tificates of coverage showing coverage for all persons providing services on the project; and b) no later than seven (7) days after receipt by the contractor, a new certificate af coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6. The contractor shall retain all required cert'rficates of coverage for the duration of the project and for one year thereafter. 7. The contractor sha11 notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The contractor shall post on each project site a notice, in the text, form, and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that 98039 Speclnst(TPV�.tloc 5 (4) SPECIAL INSTRUCTIONS TO BIDDERS (T/PW Department) they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: a) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees prov':ding services on the project, for the duration of the project; b) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; c) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; d) obtain from each other person with whom it contracts, and provide to the contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current cert'rficate of coverage ends during the duration of the project; e) retain all required certsficates of coverage on file for the duration of the project and for one year thereafter. fl notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and g) contractually require each person with whom it contracts, to perForm as required by paragraphs (1) -(7), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all emplayees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the dura#ion of the project, that the coverage will be based on proper �eporting of classification codes and payroll amounts, and that all coverage 98039 Speclnst(TPVJ�.doc 5 (5) SPECIAL INSTRUCTIONS TO BIDDERS (T/PW Department) agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties, or other civil actions. 11. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. b. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any o#her language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE" "The law requires that each person working on this site o� providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, haufing, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Worker's Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." 15. NON DISCRIMINATION: The Contractor shall not discriminate against any person or persons because of sex, race, religion, color, or nationa! origin and shall comply with the provisions of City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13A-21 through 13A-29), prohibiting discrimination in employment practices. 16. AGE DISCRIMINATION: In accordance with the pol Branch of the federal government, Contractor covenan officers, members, agents, or employees, will engage in in connection with the employment, advancement, or connection with the terms, conditions, or privileges of against persons because of their age except on the ba qualification, retirement plan, or statutory requirement. icy ("Policy") of the Executive ts that neither it nor any of its performing this contract, shall, discharge of employees or in their employment, discriminate sis of a bona fide occupational Contractor further covenants that neither it nor its officers, members, agents, or employees, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this Contract, a maximum age limit for such 98039 Speclnst(TPVV) doc rJ �6� SPECIAL INSTRUCTIONS TO BIDDERS (T/PW Department) employment unless the specified maxrmum age fimit is based upon a bona fide occupational qualification, retirement plan, or statutory requirement. Contractor warrants it wiil fully comply with the Policy and will defend, indemnify, and hold City harmless against any and all claims or allegations asserted by third parties against Crty arising out of Contractor's alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this Contract. 17. DISCRIMINATION DUE TO DISABILlTY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor waRants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the avaslability, terms, andJor conditions of employment for applicants for employment with, or cur�ent employees of Contractor. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state, and local laws concerning disability and will defend, indemnify, and hold City harmless against any claims or allegations asserted by third parties against City arising out of Contractor's alleged failure to comply with the above-referenced laws concerning disability discrimination in the performance of this Contract. Revised March 15, 1996 98039 Speclnst(TPVJ� doc �J �%� L C� r , ATTACHMENT 'f,^-, Page 1 O' � c�t�y of Fort wortn Minority and Women Business Enterpris�e��S���ifications , MBE/VNBE UTILIZA�'i,� 'EE�FIN�/C��� /' V �' � �f � v7 �c�� I' —��G. 5 � c- �(�(]� �� � �"' ��Yr� ��tIM� C�7N4RA'�Y MA /' ,�7 {`� BYD'D�` J��/ '�,�', f � � �I�e� i Pr fi� f �i �.r ?`I�Ct C � � P ws3 — (.� (�OS�,�)� 7.7 Z �� PROJECT NAME � U � PROJECT NUMBER BI CITY'S M/WBE PROJECT GOAL: Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Departmer,t r+ on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the b:d �r being considered non-responsive to bid specifications. 'I The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in th:s � schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowirg ; misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considerEd I non-responsive to specifications. � � I M/WBE PERCENTAGE ACHIEVED: W � C� �i � Company Name, Contact Name, Address, and Telephone No. ,l.l�.t,.�_��y wC��'r �`�.�. ����� � c.�.���.,7����� _,�, II►���.�r�� �� � �r � a �f � +�i rl N ! � '� %�Lr r � .4� +� �� � � � ��� ��C�s E�� � �-�" � I� � (� .'S� Z� 1� r� � �� � r'��_=T"��i I .i __!�} —�+ r �, �.��� �-7�a2�a _. - � l'`� � r� .. . }� I't C.�- �` �tl- r�F�.� � Certified � � � Specify All Contracting Scope of Work (') ' ��Q �. I�� �a� �ic�� �.�k � ���r���r����� ��'{ � f��� �t Lr e� � 1•� , Specify All Items to be Supplied(") �„ rr. u � m � , sn i= s � �,�' �� � � � � � .! r Dollar Amount Z 8, soo � �� St'� �i a� c�'� SA�C) � M/WBEs must be located in the 9(nine) county marketplace or currently doing business in the marketplace at the time of bid. i (') Specify all areas in which MWBE's are to be utilized and/or items to be supplied: (') A complete listing of items to be supplied is required in order to receive credit toward the M/WBE goal. (") Identify each Tier level. Tier: Means the level of subcontracting below the prime contractor/consultant, i.e., a direct payment from the prime contractor to a subconiractor is considered 1" tier, a payment by a subcontractor to its supplier is considered 2^° tier. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Pages 1 and 2 of Attachment 1A must be received by the Managing Department Rev. 6/2/�: ATTACHMENT 1A Page 2 of 2 city of Fort worth Minority and Women Business Enterprise Specifications MBE/WBE UTILIZATION Company Name, Contact Name, Certified Specify All Contractinq Specify All Items to be � Address, and Telephone No. Q� � Scope of Work (') Supplied(') ,�� U � p � g U � # V1 I- Z � �i.�AL.�-� ��'�r.i � 1 fG��l�ic r�r,� .A �"�. - ,�`-� c.�}� , 7',r 7 ra � _��► �'.._r�. �'I �������� _�C1rr,r �+�� �Pi _� 1��1�{�,��,�,.� l�ci� �e�( ���f t�� _�� I�c� � �i T�'� � i� � ���- �'9�rr_� � � � � ���� . �-� r,����. .���� _ c�4�c�.��'� --- � ��,-�08 � F�ro,� �c� S�ytis � � �..�'"1 f/1 CG�Q ���� � �����s �' � ���r� a� ���� � ��� �� r C� � ( _ ,� Dollar Amount I� Z0O� c? ��, c��� °,� ,The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) andlor WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that wili substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or 1 employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Locat laws concerning false statements. Any failure to comply with this ordinance and creates a material � breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. ALL MBEs a d WBEs Cl53 B� �C TIFIED BY TH CITY BEFORE CONTRACT A1N�ARD f �7 Li'C. � I e/? ��f,G� O(/'1 I P K. `� � VI �, � � Authorized Signature ` Printed Signature ' Title Company Name Address CitylStatelZip Code Contact Name and Title (if different) Telephone Number (s) Fax Number Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev. 6f2198 Pages 1 and 2 of Attachment 1A must be received by the Managing Department ATTACHMENT 1A Page2of2 city ot Fort worth Minority and Women Business Enterprise Specifications MBE/WBE UTILIZATION Company Name, Contact Name, Certified Specify All Contractinq Specify All Items to be Address, and Telephone No. .-. Scope of Work {') Supplied(`) ,z.; , Q F≥ . u F o� ad x � u� ►- z ~ x . __►�1.�'� -T"�'t� �. � r +�� � 701 J�P�v� �irSf'' - �`� r�����.T���LrL ---��Gt�..���u� r� � s�3�-�r�� To�s o, l, �� s � ��`, �G � Dollar Amount / /� /0 0 �° 1 The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional andlor knowing misrepresentation of facts will be grounds for terminating the cont�act or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach�ontract may result in a determination of an irresponsible offeror and barred from participating in City work for a,flenod�of time not less than one (1) yea�.� A s an B �TjBE CERTIFIED BY THECITY BEFO.RE C TR�#C�7' AWARD ��1'�,� �� �[1 C� rn /f✓' �' �����Ov� Authorized Signature , � Printed Signature �a L'� I V + G �� � �f+ , �l�i .S ICC.�Gt Title '' Contact Name nd Title (if different) { � ( � � �e �(it �€'�O L�] �� Ge .C 7�" LU' � ���. � � �l ,1 � �� � � 4� I� 4Q Co any Na �� . '�eleph ne N�amher (s) � Q � CJ 3C `7 � � � � / � ' 7 .,� x C�v /� � � Y'� A �ress � � � ` � � Fax Number f ,r r �r���9V� � ���� d7 r� �a� �c� CitylState/Zip Code � Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev. 612/98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department ATTACHMENT 1C Page 1 of 3 city of Fort wortn Minority and Women Business Enterprise GOOD FAITH EFFORT /VI �lP���drr f �DG�' �� .-.L��� Prime Company Name ' ���� C/f� r�'r� i��� ��r�r .� Project Name v c� r,/�r�I'�� Bid Date ��.c���� Q��]S��'�'7,� � Project Number If you have failed to secure MiWBE participation and you have subcontracting andlor supplier opportunities or if your M/WBE participation is less than the City's project goal, you must complete this form. � ' If the bidder's method of compliance with the MNVBE goal is based upon demonstration of a � "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. � Failure to complete this, �:form, in -its entirety with supporting documentation, and received -by the Managing Department on�or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid ' opening date, will result in the bid being considered non-responsive to bid specifications. � � 1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF FIRMS) which will be used in the completion of this project, regardless of whether it is to be provided by a M/WBE or non- M/WBE. (Use additional sheefs, if necessary) List of: Subcontractinp Opportunities �G�nC7�iP f ', Gr � ' U �►'� � �• C I� S �Glf7 ��� +�-+r'i dl'r .�ry .�"� 1 � � s ' . hll r. �, ,�r� a �f � ,��,'��-� SP�I�� � r.�J�, � � � -� � �,cr P � ��e � G� cr �r �i�c� � � �`. V. �w� s Pc �'dw,. � 1 � � � ✓3 ��-t i�s �". � +y 1�' ` �''�� c� l � � �-' T�rc� c ��, `� � List of: Supplier Opportunities Ir,.�G �# r� � /�f �! ��I1(�i r� � �2. � G � r� � � � � �'�,���� � �� � rr� cc�r�f� � ,I�rQ�'ec� S�q�s � Gc �� 1...1"�'N f� .� 1 c,► ,�r � �'r� �, f � � �"�" - ���� j�,oc.� ��r�soi/ �!s ��q /�- 1 � � ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of MIWBE firms from the City's M/WBE Office? The list is considered in compliance, if it is not more than 3 months old from the date of bid opening. 1„/rYes Date of Listing �LI �� l� No 3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously � listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? "� Yes If yes, attach M1WBE mail listing to include name of firm and address and a dated No copy of letter mailed. � � 4.) Did you solicit bids from M/WBE firms, within the subcontracting andlor supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? � +i Yes If yes, attach list to include name of M/WBE firm, erson contacted, No phone number and date and time of contact. NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M1WBE name, date, time, fax number and documentation faxed. NOTE: If a S{C list of M/WBE is ten or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If a sic list of M1WBE is more than ten, the bidder must contact at least two-thirds of the list but not less than ten to be in complfance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/VNBEs? ''' Yes No 6.) If M/WBE bids were received and rejected, you must: , (1) List the M/WBE firms and the reason(s) for rejection (i.e., quotation not commercially reasonable, qualifications, etc.) and (2) Attach affidavit and/or documentation to support the reason(s) listed below (i.e.. letters, memos, • bids, telephone calls, meetings, etc.) � (Please use addiUonal sheels, !f necessary, and attach.) � Company Name Telephone Contact Person Scope of Work Reason for l;��avr�% � So�,s 4'7?-S4�df f'�.L � i,�'�`1 dr�r�s NN1 A c�� vr"�►� , � Rejection 700 �-�/ e cs��,r�� �� � ��� 1 � L ATTACHMENT1C Page 3 of 3 ADDITI0NAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. � s� �������1 n n ��,���� /.����� I��. � w ' The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. � The bidder also agrees to allow an audit andlor examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. �- Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three ' (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from ' participating in City work for a period of time not less than one (1) year. ' � ' � ' The undersigned certifies that the information provided and the M/WBE(s) listed waslwere contacted in good faith. It is understood that any MIWBE(s) listed in A ent 1 C will be contacted and the reasons for not using them will be verified by t e �i 's MIV�J � C}ffice. : �f / � Ct (�7 � C �(U G�e [�j r.,,,,� Authorized Signatu e � Printed Sig�ature f � 5 l ct� � � �'rtCe Contact Name and Title (if different) 1� G�PG� � G� �+� ,S `� � r�+� C� G�rnpany Nam� �r� ���� �'�� . Addr�ss ���r�s��, l � 7���� City/State/Zip 8[�' ,/��. 9 S� C�C� l� � Telephone Number(s) �c��'2�s— ��'�� Fax Number O l 'I2 �'%O J Date � Revised 06l02/98 � CITY OF FORT WORTH MINORITY AND WOMEN BUSINESS ENTERPRISES SPECIFICATIONS APPLICATION OF POLICY SPECIAL INSTRUCTIONS FOR BIDDERS ��iY�'I►'i�t��aiM:i'.+c't'3`'i'7�'�� LiY}��,�.� :34Y�-� �:El'i�.�.*r�i-�'-�Y :: =11�_.�.f��'—.�'�s�'Y.�.�� � -�,i�•�:e��i��:� � � ii the i�tal do4far value of tt�e contract is �25,000 or more, the h1.NVBE goals are applicable_ if'the total ` dolla; valu� of the contract is less than $25,G00, the tiUVtBE goais are not appl�cable -_ _ - � �,�� r I . . .. i���i�"�'t:�`:�-�S�'��It:� +e's.'���--� �' V ��� �. � POLICY STATEMENT � tt is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and senrices to the City on a contractual � basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. � � � M/WBE PROJECT GOALS The Ciry's MBE/V1IBE goal on this project is 25 % of the total bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of ihe following: 1. Meet or exceed the above stated minimum M1WBE goals, or � 2. Good Faith Effort documentation, or 3. Waiver documentation. � ■r� SUBMITTAL OR REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. � 2. ' M/WBE Utilization Form Prime Contractor Waiver Form: Good Faith Effort Form: received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City bussness days after the bid ope�ting date, excl�sive of the bid opening date. - e'' ' !�p!` _ : �'.: -,. , . ;- ` . e.. ; ,.,, ;-� .' xti�"`'? b.�?t�a'� '.�^, ' ' �- •. � r. � `" � �A � TU CC3M1F'LY �fTT�I THE �fTY'S M�V�� �RE�i�VA1�GE'�YYI� R�SUL�.I�C iME,�I� ,,- �` ` , ,�„"� , -� '. E3Ell'�i� GONS�4�L'tf.i.0 i+iON�^+',ESF�SU' i'i,5PUr��U"�1r.,��..11`CC`.{�`�i�]It,iS �;'. 4 ;' -^.� -,;o;.;� r .���t�.�S�'.:�{��=r�: _, .�� ' _ � . � _ . -. � _ 14 � ..� _ . .�. _ •�r r r.��r �-' _ �� Any questions, please contact the M/WBE Office at (817) 871�104. �.4 , 98039_MWBE.doc �_ -' 6 (1) �- CITY APPROVED METHOD AND APPROVED PRODUCT FOR * AND ** PART 7 - PROPOSAL ' TO: BOB TERRELL Fl� (Bidder's N } � � � ���� � CITY MANAGER ��� t�'' J�,�"`� �,��� �t� c FORT WORTH, TEXAS ,�'C� � �.t �'`�1,G, ' ( (Address / � �- �=� ��' a' ��.� ��''`7 ,� � �"i L�' c� '%' % r � � FOR: UNIT I: SECTION `A' - WATER MAIN REPLACEMENT SECTION `B' - SANITARY SEWER MAIN REPLACEMENT, PRIOR TO PAVEMENT CONSTRUCTION, FOR OSCAR, HUTCHMSON, HALE AVENUES AND 29� STREET. WATER DEPT PROJEcr Nos. PW53-060530175280 AND PS58-070580174420 FOR: iTr1IT II: PAVING IMPROVEMENTS OSCAR AVE. �FROM ZHT" ST. TO 32ND ST.� � HUTCHINSON AVE. (FROM ZR'� ST. TO 29'}' ST.� 29"' ST. (FROM HUTCHMSON AVE. TO RUNNELS� HALE AVE. �FROM ZSTM ST. TO 31 � ST.� T/PW PRorECT No. C 115-020115040536 DOE PROJECT NO. 2135, 2136, 2137, 2138 Pursuant to the foregoing "Notice to Bidders," the undersigned has thoroughly examined the plans, � specifications, and the site, understands the amount of work to be done and hereby proposes to do all the work and f�urnish all labor, equipment, and materials necessary to fully complete the work as provided in the Plans and Specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. � Upon acceptance of this proposal, the bidder is bound to execute a contract and iurnish Performance and � Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums to-wit: � Pay Approximate Dcscription of Bid Item Prices Uoit Total Item Quantity Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. LTNIT I- SECTION A(WATER IMPROVEMENTS) 1. 5380 LF 8" PVC DR-14 Water Pipe - Open Cut $�SG �� (includes removal or abandoning of existing pipe) �./ _�.'L''���'�l-�� Y' �� ! f' ��. _! � ���. ;,F IIF7tiVORTNIPROJEC7S12021981980391ADMIFina1 Specs jor C/P198039 Proposal.doc D�rllers 8c Cents per LF 7 (1) , $ /�� SDD. i�� �. �-�_ _ �_�_ _ Pay Item 2. K� 4 5. Approiiroate Description of Bid ltem Prices Unit Quantity Written in Words Price Furnish and install, install all appurtenant work, complete in place, the following items. 183 LF 88 LF 50 LF �"' , ,������ 8" Class 51 Ductile Iron Pipe (Other than $�'��'; open cut) �� C��-�.t,. �p�,s & . ��l `a � r "' c�„e� � t..� 6" PVC DR-14 Water Pipe (includes removal or abandoning of existing water pipe) �C�4-i.' 'h.�c-�t. -���.c � �- na��� � � 12.�:� csn� � �� 8" Class 51 Ductile Iron Pipe. (Polyethylene wrapped only); $ �S, D�� Total Price $ /�f C� y�'�. �' �� $o�<�OG, ° o �,-.f $ /.3sG' ��G(,�?'11.�� J�C.� � ��� ���� n�i��� � �`� �. �" Cents per LF C;.1 , ��°C,� 1 LS Furnish and Lay Two Inch (2") Pipe and $��`7, E" �'�. $�-�� c*��r � Fittings for Temporary Service Water � ' Line for entire project � I . �l�'�-f, '��i. �-3-, s� 1' .� � �_ � ,�. � _ � ,�,� `'' ' , �. i'�`Lt.� cL.�C � �. Dollars & �'i � L� Cents per LS IIF7'fi'ORTfIIPROJECTS12021981980391ADMIFinalSpecsforClPI98039proposal.doc % �2� I � Pay Approiimate DcscripHoo of Bid ltem Prices Unit Item Quantity Written in Words Pric� Furnish and install, install all appurtenant work, complete in place, the following items. , e- v 6. 17 EA Install8" Gate Valve with Cast Iron Box $�' c? �' and Lid 'l� 8. �� 10. � ��'� 1`�!c�a r� k.r ��:�- nou� & � J �-� a� i Cents per EA ,, i�. 6 EA Remove Existing Fire Hydrant $ �' ���°' ��' � y� f ,� l-tl Rf°L� �. �.F C� Douars & � �J� � �" � Cents per EA �;���� 8 EA Install Standard Fire Hydrant; 3'6" Bury $,� r'��-','', (Includes 8 LF 6" PVC Service Line) ,'/' ' ,,I' " � 4,' I,� �-1 . 1-� t d� C 1� I'+_ rt r-� � "��'-1'' ,�� �-+P� �C�"ti,'' C � Dollars & � i 7Z ��-' Cents per EA �; � 2 VF Barrel Extension for Fire Hydrant over $�'r �`' • ,„ 3 6 Bury; � ��i.+�.� uftift-� J�_ C'f- tir �!� nouars 8c � �� Cencs per VF 2.80 TON Cast Iron Fittings /� � Z2� C e G�.d't.�- ,1�-•� t� nonar� & �'��' �:' Cents per T0N IIF7ff'OR7NiPROJEC7J12021981980391ADbllFinalSpecsjorCIP198039proposaldx % �3� x C' � �l ��'C�'� . L I Total Price $ /.3 �ODQno $ ����,��`,�;, ��', DO � / � � ���,��Ri � � �� �1�, � � ,/ �" G� ����Y^� Pay Item 11. 12 13 14. Approximate Description of Bid Item Prices Unit Total QuanHty Written in Words Price Price Furnish aod install, install all appurtenant work, complete in place, the folloyving items. 128 EA One Inch Service Taps to Main $�'�'�� �� $ ��, l.� �,� . �f�."�� ��f..�-,LC�'�e C� nou� & �-� i_!�'� Cents per EA _ � �' 126 EA Class "A" Meter Box $`-' �' � � �- �--�-r-- �on� & (' ;/ ` �7 / ? Cents per EA s �l 2430 LF One Inch Copper Service from Main to $+� f?' Meter including Setting Meter Box �. �Gt�C.'� �-�-7°� ' �ouars & � _ � � �C- ��- r Cents per LF � �;r 3 EA Bullhead Meter Box �P� ,� �� t ��.� � tk non� & � ,� � `/ `7 � C� Cents per EA IIF7'WOR7FlIPROJECTS12021981980391ADhllFinalSpecsjorC1P198039yroposal.doc % �4� r���' $ (� 3G'0 ` � �`! r � � . - OC) � >, � , $ �5, c � � � .�'��, �, B� Pay Item 15 fC� 17 Approzimate DescripHon of Bid Item Prices linit Total Quantiry Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the lollowing items. - •, r'� P� 60 LF One Inch Copper Service from Main to $�l _'� - $ ���� ' Bullhead Meter including Setting Meter Box °—��- �+� z�rc� � � <-,�` �,- cG,�� �r s,� c J 75 EA Relocate Meter Box �. �r � i L� �-L(�+L�`t.e c�C nouars & �1,(,' Cents per EA 352 LF '/a" Copper Service Meter to Exist. Service �/'G c,�e.���� nou� & ` �-"`T- �- � f- Cenu per LF f /� 1 EA Adjust Water Vault � }[��.C-C:(-E Z� f�l-!.6'iL�.''71C��ollars& � /��' Cents per EA � ' ' IIF7iVORTffIPROJEC73'1202198198U39UD�L1lf'irrn! Specs jor CIP198039 proposal.doc � �� _ �.. 7 (5) ��'r $ ��'� '� $ /�'�' j r 'U $ �� �� r � �1 �-C's� . ��J � ��, � '��� :. � �7���r � �, ' r Pay Item 19. 20 21 22. Approximate Description of Bid Item Prices Unit Total Quantiry Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. d��' 50 LF Two Inch Copper Service from Main to $���I� �� $`A-r � 2" Meter including Setting Meter Box � ,�,v �O'S-'� � Y - '� f '� , � �. � . 2 EA Two Inch Meter Box L7QY1�r5 Bt Cents per LF r �+ 'i � C� � _ ���. � � �j �. ! ��p � �c�l ��f non� & "' ;1 �'�.�' Cents per EA 2 EA Two Inch Service Tap to Main $�G'�" y� �I $ ���� `. �� /� �/� � i.L � `�-�-1�[ C{ Do��ars & �' � ., " Cents per EA �+�� 58 LF Extra Depth for Water Main; per Linear $ �' �'"' r �� �= � � ; �� , �� , Foot � 7.� ��_�'rs= � e_� �, 1' +-' Douars 8c Cents per LF � IIF7WORTfflPROJEC7311011981980391ADbllFinal Specs jor CIPI98039 proposaLdoc 7 (6) 1 ' `1 �' 1 ' �I , ��� C u LJ � C �� �J � GENERAL CONDITIONS (Water Department) � 98039_SPECS.dx PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, l, 1987 TABLE OF CONTENTS � Cl-1 C1-1.1 C1-1.2 CZ-1.3 C1-1.4 C1-1.5 C1-1.6 C1-1.7 C1-1.8 C1-1.9 C1-1.10 C1-1.11 C1-1.12 C1-1.13 C1-1.14 C1-1.15 C1-1.16 C1-1.17 C1-1.18 C1-1.19 C1-1.20 C1-1.21 C1-1.22 C1-1.23 C1-1.24 C1-1.2S C1-1.26 C1-1.27 C1-1.28 C1-1.29 C1-1.30 C1-1.31 C1-1.32 DEFINITIONS Definition of Terms Contract Documents Notice to Bidders Proposal Bidder General Conditions Special Conditions Specifications Bond Contract Plans City City Council Mayor City Manager City Attorney Director of Public Works Director, City Water Department Engineer Contractor Sureties The Work or Project Working Day Calendar Day Legal Holiday Abbreviations Change Order Paved Streets and Alleys Unpaved Streets and Alleys City Streets Roadway Gravel Street C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2.2 Interpretation of Quantities C2-2.3 Examination of Contract Documents and Site C2-2.4 Submitting of Proposal C2-2.5 Rejection of Proposals C2-2.6 3id Security (1) C1-1 C1-1 C1-1 C1-1 C1-1 C1-1 C1-1 Cl-1 C1-1 C1-1 C1-1 C1-1 Cl-1 C1-1 C1-1 C1-1 C1-1 C1-1 C1-1 Cl-1 Cl-1 C1-1 C1-1 C1-1 C1-1 Cl-1 C1-1 Cl-1 Cl-1 C1-1 C1-1 C1-1 (1) tl? (2) (2) (2) (2) (2) (2) (2) (3) (3) (3) (3) (3) (3) (3) (4) (4) (4) (4) (4) (4) (4) (4) (4) (5) (6) (6) (6) (6) (6) (6) C2-2 (1) C2-2 (1) C2-2 (2) C2-2 (3) C2-2 (3) C2-2 (3) � C2-2.7 Delivery of Proposal C2-2.8 Withdrawing Proposals C2-2.9 Telegraphic Modification of Proposals C2-2.10 Public Opening of Proposal C2-2.11 Irregular Proposals C2-2.12 Disqualification of Bidders C3-3 C3-3.1 C3-3.2 C3-3.3 C3-3.4 C3-3.5 C3-3.6 C3-3.7 C3-3.8 C3-3.9 C3-3.10 C3-3.11 C3-3.12 C3-3.13 C3-3.14 C3-3.15 AWARD AND EXECUTION OF DOCUMENTS Consideration of Proposals Minority Business Enterpise Women-Owned Business Enterprise compliance Equal Employment Provisions Withdrawal of Proposals Award of Contract Return of Proposal Securities Bonds Execution of Contract Failure to Execute Contract Beginning Work Insurance Contractor's Obligations Weekly Payroll Contractor's Contract Administration Venue C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4.2 Special Provisions C4-4.3 Increased or Decreased Quantities C4-4.4 Alteration of Contract Documents C4-4.5 Extra Work C4-4.6 Schedule of Operations C4-4.7 Progress Schedules for Water and Sewer Plant Facilities CS-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5.2 Conformity with Plans CS-5.3 Coordination of Contract Documents C5-5.4 Cooperation of Contractor C5-5.5 Emergency and/or Rectification Work C5-5.6 Field Office CS-5.7 Construction Stakes CS-5.8 Authority and Duties of Inspectors CS-5.9 Inspection CS-5.10 Removal of Defective and Unauthorized Work CS-5.11 Substitute Materials or Equipment C5-5.12 Samples and Tests of Materials C5-5.13 Storage of Materials CS-5.14 Existing Structures and Utilities C5-5.15 �nterruption of Service C5-5.16 Mutual Responsibility of Contractors C5-5.17 Cleanup C5-5.18 Final Inspection C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (4) C2-2 (5) C3-3 (1) C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 C3-3 (1) (1) (2) (2) (2) (2) (4) (4) (4) (4) (7) (7) (7) (8) C4-4 (1) C4-4 (1) C4-4 (1> C4-4 (2) C4-4 (2) C4-4 (3) C4-4 (4) C5-5 CS-5 CS-5 C5-5 C5-5 C5-5 C5-5 C5-5 CS-5 C5-5 C5-S C5-5 C5-5 CS-5 C5-5 C5-5 C5-5 C5-5 (1) (1) (2) (2) (3) (3) (3) (4) (5) (5) (5> (6) (6) (7) (7) (8) (8) (9) (2) C6-6 C6-6.1 C6-6.2 C6-6.3 C6-6.4 C6-6.5 C6-6.6 C6-6.7 C6-6.8 C6-6.9 C6-6.10 C6-6.11 C6-6.12 C6-6.13 C6-6.14 C6-6.15 C6-6.16 C6-6.17 C6-6.18 C6-6.19 C6-6.20 C6-6.21 C7-7 C7-7.1 C7-7.2 C7-7.3 C7-7.4 C7-7.5 C7-7.6 C7-7.7 C7-7.8 C7-7.9 C7-7.10 C7-7.11 C7-7.12 C7-7.13 C7-7.14 C7-7.15 C7-7.16 C7-7.17 C8-8 C8-8.1 C8-8.2 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY Laws to be Observed Permits and Licenses Patented Devices, Materials and Processes Sanitary Frovisions Public Safety and Convenience Privileges of Contractor in Streets, Alleys, and Right-of-Way Railway Crossings Barricades, Warnings and Watchmen Use of Explosives, Drop Weight, etc. Work Within Easements Independent Contractor Contractor's Responsibility for Damage Claims Contractor's Claim for Damages Adjustment of Relocation of Public Utilities, etc. Temporary Sewer Drain Connecti.ons Arrangement and Charges of Water Furni.shed ny City Use of a Section of Portion of the Work Contractor's Responsibility for Work No Waiver of Legal Rights Personal Liability of Public Officials State Sales Tax PROSECUTION AND PROGRESS Subletting Assignment of Contract Prosecution of the Work Limitations of Operations Character of Workman and Equipment Work Schedule Time of Commencement and Completion Extension of time of Completion Delays Time of Completion Suspension by Court Order Temporary Suspension Termination of Contract due to Nat�ional Emergency Suspension of Abandonment of the Work and Annulment of Contract Fulfillment of Contract Termination for Convenience of the Onwer Safety Methods and Practices MEASUREMENT AND PAYMENT Measurement of Quantities linit Prices C6-6 (1) C6-6 (1) C6-6 (1> C6-6 (2> C6-6 (2) C6-6 (3) C6-6 (4) C6-6 (4) C6-6 (5) C6-6 (6) C6-6 (8) C6-6 (8) C6-6 (10) C6-6 (10) C6-6 (10) C6-6 C6-6 C6-6 C6-6 C6-6 C6-6 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 C7-7 (1) (1) (1) (2) (2) (3) (4) (4) (4) (5) (6) (6) C7-7 (7) C7-7 (7) C7-7 (9) C7-7 (10) C7-7 (13) C8-8 (1) C8-8 (1) (3) C8-8.3 C8-8.4 C8-$.5 C8-8.6 C8-8.7 C8-8.8 C8-8.9 C8-S.10 C8-8.11 C8-8.12 C8-8.13 Lump Sum Scope of Payment Partial Estimates and Retainage Withholding Payment Final Acceptance Final Payment Adquacy of Design General Guaranty Subsidiary Work Miscellaneous Placement of Material Record Documents (4) C8-8 (1) C8-8 (1) C8-8 (2) C8-8 (3) C8-8 (3) C8-8 (3) C8-8 (4) C8-8 (4) C8-8 (5) C8-8 (5) C8-8 (5) PART C - GENERAL CONDITIONS C1-I DEFINITIONS SECTION Cl-1 DEFINITIONS C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are � used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance oF the contract. These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A- NOTICE TO BIDDERS (Sample) PART B - PROPOSAL (Sample) PART C - GENERAL CONDITIONS (CITY? ' (Developer> PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT (Sample) (Sample) White White Canary Yellow Brown Green E1-White E2-Golden Rod E2A-White Blue White White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A- NOTICE TO BIDDERS above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H- PLANS (Usually bound separately) (Advertisement) Same as �l � C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders, C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. CZ-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for perForming the work contemplated under th� Contract Documents, constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions, the latter shall take precedence and shall govern. C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1.9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) i L � � 1 � � , ' � C� � � � faithful performance of the contract and include the following: a. Performance Bond b. Payment Bond (see c. Maintenance Bond d. Proposal or Bid to Bidders, Part (see paragraph C3-3.7) paragraph C3-3.7) (see paragraph C3-3.7) Security (see Special Instructions A and C2-2.6) C1-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of the various elements of the project, including such profiles, typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents, but they are a part of the Contract Documents just as though they were bound therein. C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manger, each of which is required by charter to perform specific duties. Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1.13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fo.rt Worth, Texas, or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. C1-1 (3) . ' � C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-I.18 DIRECTOR{ CITY WATER DEPARTMENT: The duly appointed Director of the City Water Deoartment of the City of Fort Worth, Texas, or his duly authorized reoresent�tive, assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.20 CONTRACTOR: The person, persons, partnership, company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes ther2in. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1.23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which the weather or other co�ditions not under the control of the Contractor permit the perFormance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m, and 6:00 p.m,, with exceptions as permitted in paragraph C7-7.6. C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be prescribed by the City Council of the City of Fort o'oservance by City employees as follows: C1-1 (4) � � � � observed as � Worth for �J � 1. 2. 3. 4. 5. 6. 7. 8. 9. New Year's Day January 1 M. L. King, Jr. Birthd�y, Third Monday in January Memorial �ay I�ast Monday in May Independence Day July 4 Labar Day First Monday in September Thanksgiving Day Fourth Thursday in November Thanksgiving Friday Fourth Friday in November Christmas Day December 25 Such other days in lieu of holidays as the City Council may determine When one of th� above named holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday shal.l be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1.26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: AASHTO - American Association of MGD - Miltion Gallons Per State Highway Transportation Day Officials ASCE - American Society of Civil CFS - Cubic Foot �er Engineers Second LAW - In Accord�nce With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Wat�r Works $ - Percentum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O.D. - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C � Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yar3 Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron C1-1 (5) ' �� C1-1.27 CHANGE ORDER: A"Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specific�lly included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25$ of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatinenL, not including an oiled surface, with or without separate ba�z material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. � � � C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, � roadway or other surface is any �3rea excePt those defined above for "Paved Streets and Alleys." C1-1.30 CITY STREETS: A city street is defined as th�t area � between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: parallel lines two (4') feet back of exists. The roadway is defined as the area betwe�n � (2'> feet back of the curb lines or four the average edge oE pavzment where no curb C1-1.32 GRAVEL STREET: A gravel street is any unpaved strPet to which has been added one or more applications of gravel or simil�r material other than the natural material found on the street surface beF�re any improveme�t was made. Cl-1 (6) � I � I 11 ' SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL F�RM: The Owner will furnish bidders with � proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state j the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal � contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial � Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for openinq of bids. The financial statement required shall have been prepared by � an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so ' prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be , updated by proper verification. Liquid assets in the amount of ten (10$) percent of the estimated project cost will be required. , For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature anrl � magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to the date on � which are to be received. The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water �'" Department Qroject. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the � project on which he submits a bid. � C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal �! C2-2(1) 1 .� � forms or other parts of the Conzract Documents will be � considered as approximate only and wi11 be used For the ourpose of comparing bids on a uniform basis. Payment will be made to the Cantractor for only the actual guantities of work perfor,ned or materials furnished in strict accordance with the � Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of � the Contract Documents. C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: � Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. Al1 additional information and data which � the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just � as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read �s and become familiar with the Contract Documents, to visit the �� site of the project and examine carefully all local conditions, to inform themselves by their own independent � research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction � of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time requi�ed for its completion, and obtain all information required to make an � intelligent proposal. No information given by the Owner or any representative of the Owner othe.r than that contained in the Contract Documents and ofFicially promulgated addenda � ther�to, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other 3ata � which are necessary for full and complete information upon which the proposal is to be bas�d. It is mutually agreed that the submission of a proposal is Prima-Facie evidence that the bidder has made the investigations, examinations and tests � herein required. Claims f�r additional compensation due to variations between conditions actually encountered in construction and as indicat�d in the Contract Documents will � not be allowed. �� The logs of Soil Borings, if any, showing on the plans are for � general information o�ly and may not be correct. Neith�r the C2-2(2) � �- _- — --- ' � ' � Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. � � � � C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. � If a proposal is submitted by an individual, his or her name must be signed by him {her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or �" partnership, the name and address of each member must be , given, and the proposal must be signed by a member of the firm, association, or partnership, or by a person duly authorized. If a proposal is submitted by a company or � corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. � Power of Attorney authorizing agents or others to sign propasal must be properly certified and must be in writing and submitted with the proposal. � r» � C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it -� is accompanied by a"Proposal Security" of the character and r„ in the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as � evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will `" within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of � the three lowest bidders will be retained until the contract . is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. � C2-2(3) � L_: � C2-2.7 DELIVERY OF PROPOSAL: No proposal will be consider2d � unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official olace of business as set Eorth in the "Notice to Bidders." It is the Bidder's sole responsibil.ity to deliver � the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidd�r must have the proposal actually deliv�red. Each � proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. � C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed m�, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may � modify his proposal by telegraphic communication at any time �„ prior to the time set Eor opening proposals, provided such telegraphic communication is received by the City Manager �. prior t� the said proposal opening time, and provided further, ; that the City Manager is satisfied that a written and duly � authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the r` proposal opening time. If such conFirmation is not received � within forty-eight (48) hours after the proposal openrng time, no further conside.ration will be qiven to the proposal. �r C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" �, has been received will be publicly opened and read aloud by � the City Manager or his authorized reoresentative at the time and olace indicated in the "Notice to Bidders." All �roposals which have b�en opened and read will remain on file with the � Owner until the contract haa been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. � C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as " being "Irregular" if they show 3ny omissions, alterations of form, additions, or conditions not called for, unauthorizPd j alternate bids, or irregularities of any kind. However, the C2-2(4) � � i � Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of � the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered for any of, but not limi.ted to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds £or believing that any bidder is interested in more than one proposal For work contemplated, c. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior cont.ract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquir.ies as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the oQening of proposals the following: 1. � 3. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(S) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been � opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the � proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actuai work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE> on the contract and the payment therefor. Contractor further agrees, upon request by Owner, to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1) � � The Contractor shall post the required notice to that effect on the project site, and, at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qua�ified �pplicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the �wner it cannot be withdrawn by the Bidder within forty-five (45) days after thP date on which the proposals were opened. C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee.. The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become ef£ective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders, will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise diaposed of the bids, after which they will be returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufFicient performance bond in an amount n�t less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwis?, guaranteeing the full and faithFul execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or impr�per execution of the work or the use of_ inferior �naterials. This perFormance C3-3 (2) � � � 1 � �� � � LJ � � � � , ' � bond shall guarantee the payment for all labor, � materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above � stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND: A goad and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwisP, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. c. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3) � ' new surety satisfactory to the Owner. No payment will be made under the contract unti.l the new surety or sureties, as � required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been , attested by the City Secretary, approved as to form and legality by the City Attorney, and sxecuted for the Owner by either the Mayor or City Manager. � C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the � required contract within ten (10) days after the contract is � awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, � and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee's failure to execute said bonds and � contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on � the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance � of this provision by the Bidder. C3-3.10 BEGINNING WORK: The Contractor shall not commence � work until authorized in writing to do so by the Owner. Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed � Order", it is agreed that the Sur�ty Company will, within ten � (10) days after the commencement date set forth in such written authorization, commence the physical execution of the � contract. C3-3.11 INSURANCE: The Contractor sha11 not commence work ' under this contract until he has obtained all th� insurance required under the Contract Documents, and such insurance has been approved by the Owner. The �r_ime Contractor shall be responsible for delivering to the Owner the sub-contractors' , C3-3 (4) � � certif.icate of insurance for approval. The prime contractor shall indicate on the certificate of insurance inrluded in the documents for execution whether or not his insura�ce covers sub-contractors. It is the intention o£ the Owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Workers' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contracto.rs. In case any class of employees engaged in hazardous work on the project under this cont.ract is not protected under the Workers' Compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain dliring the life of this contract Contractor's Comnrehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $500,00� covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence on account of property damage with $2,000,000 umbrella policy cov?rage. c. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set forth for public liability and property damage,,the following insurance: 1. � Contingent Liability (covers Gene.ral Contractor's Liability for acts of sub-contractors). Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation (if excavations are to �e performed adjacent to same). 4. namage to underground utilit.ies for $500,000. C3-3 (5) . 1 � 5. 6. Builder's risk (where above-ground structures are involved>. Contractual Liability (covers all indemnification requirements of Contract>. d� AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and mai�tain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on account of one accident, and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his su�-contractors, respectively, against damage claims which may arise from operations un3er this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, an3 also against any of the following special hazards which may be encountered in the performance of the Contract. f, PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these �ontr3ct Documents in amounts and by carriers satisfactory to the Owner. (Sample attached.) Al1 insurance requirements made upon the Contractor shall apply to the sub-contractor, shoutd the Prime Contractor's insurance not covPr the sub-contractor's work oparations. q. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and performance, payrnent, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the i �� [� � i i � � � � � r� � � C3-3 (6) ' � 1 ' City of Fort Worth, Tarrant County, Texas. Each ' such �gent shal.l be a diily quali�ied, one up�n whom service of process may be had, and must have authority and power to act on behalf o.f the � insurance and/or bonding campany to negotiate and settle with the City of Fort Worth, or ariy other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been � damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so empowered by the � insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the M�troplex, the Fort Worth-Dallas � area. The name of the agent or agents shall be set forth on all oF such bonds and certificates of insurance. , C3-3.12 CONTRACTOR'S OBLIGATZONS: Under tl�e Contract, the Contractor shall pay for all materials, labor and services when due. � C3-3.13 WEEKLY PAYROLL: A certified cooy of each payroll covering payment of wages to all person engage3 in work on the � project at the site of the project shall be furnished to the Owner's reoresentative within seven (7) days after the close of each payroll period. P, copy or copies of the applicable ' minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the c�urse of the Contract. Copies of the wage rates will be furnished the Contractor, by R! the Owner; however, gosting and protection of the wage rates . shall be the responsibility of the Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, � whether a p�rson, p�rsons, partnership, company, firm, association, corporation or other who is approved to do business with and enters into a contract with the City for � construction of wat?r �nd/or sanitary sewer facilities, will have or shall establish a fully onerational business office within the Fort Wo.rt'n-Dallas metr000litan ar�a. The �'!' Contractor shall charge, delegate, or assign this office (or _ h� may delegate his project �uperintendent) with Full authority to transact all business actions required in the ��rfo�mance of the Contract. Thi:� local authority shall be mad� resnonsible to act for the Contractor in all matters �' pertaining to t'ne work governed by the Contract whether it be administrative or other�aise and as such shall be empowered, �" thus delegated and dir�cted, to settle all material, labor or other �xpenditure.s, all claims against the wark or any other � C3-3 (7) ' �� � matter associated such as maintaining adequate an3 ap�ropriate ' insurance or security cove.rage f�r the project. Such local authority for administration of the work under the Cont.ract shall be maintained until all business transactions executed as part of the C�ntract are complete. � v Should the Contractor's princiQal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification *' of the Contractor's assigninent of local authority shall be � made in writing to the Engineer in advance of any work on the project, all appropriately signed and sealed, as applicable, � by the Cont.ractor's responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents. The � intent of these requir.ements is that all matters associated with the Contractor's administration, whether it be oriented in furthering the work, or other, be governed direct by local � authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative Fail to perform to the satisfaction of Engineer, the Engineer, � at his sole discretion, may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of � working time will be for periods in which woric stoppages are in effect for this reason. C3-3.15 VENUE: Venue of any action hereinunder shall be � exclusively in Tarrant County, Texas. � , � , � ' � C3-3 (8) PART C - GENERAL CONDI'I'IONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK F�� C4-4.1 INTENT OF CONTRACT UOCUMENTS: It is the definite � intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full comnliance with the � requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or � special work as may be considered by the Owner as necessary to . complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in - these Contract Documents, furnish all labor, tools, materials, � machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. � C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract � Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering aIl such work , wi11 be prepared by the Owner previous to the time of receiving bids or proposals For such work and furnished to the Bidder in the form of Addenda. Al1 such "Special Provisions" shall be considered to be a part of the �ontract nocuments � just as though they were originally written therein. C4-4.3 INCREASED OR DECREASED QUANTITIES: The Owner reserves ��' the right to alter the quantities of the work to be performed � or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the � work as altered, increased ar decreased at the uait prices. � Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes incr`ase or decrease the original quantity � of any item or items of work to be done or materials to be � furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be -� entitled to a revised consideration upon that portion of the � work above or 'Qelow the 25 percent of the original quantity stated in the proposal; such revised con�ideration to be determined by special agreeme;�t or as hereinafter provided for � "Extra Work." No allowance will be made for any changes in anticipated orofits nor shall such changes be consic�ered as � C4-4 (1) , _� � waiving or invalidating any r_ondi.tions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pip�, in depth categcries, shall be interpr�ted l�erein as ��plying to the overall quantities or sanitary sewer pipe in each pi�e size, but not to the various depth categories. C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provid�d such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considere3 as waiving or invalidating any c�ndition or provision of the Contract Documents. C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations oE the Contract Documents or of quantities or for other reasons f�r which no prices ars provided in the Contract Documents, shall be defined as "Extra 'vVork" and shall be performed by the Contractor in accordance with these Contract Documents or av��roved additions thereto; provided, however, that beEore any extra work is begun a"Change Order" shall be executed or written order issued by the Owner to do the work for naymPnts or credits as shall be determined by one or more combination of the following m��thods: � b. Unit bid price previously approved. An agreed luanp sum, c. The actual reasonable cost of (1) labor, (2) rental of equipment used on th? ex�ra work for the time so used at Associated i,eneral Contractors oF America current equioment rental rates; (3) materials entering permanently into the orojer_t, and (4) actual cost of ins�i.rancP, bonds, and social security as det2rmined by the Owner, plus a fixed fee to be agreed ueon bu� not to ex�eed 10� oE the actual cost of such ex`ra work. The Fixed f�e is not to include any additional pro�it to the Contractor for rental of equipment own��i �y him and used for the extra work. Th� f�� shall be f��ll and compl?te compensation to r_ov�r the co�t of sun?rintendence, overhea�, otner prof_it, general and al1 other exp�ns� not included in (1), (2), i3>, and (4) abov?. The Contractor �hall keeP accurate cost r�cords on th-� form and i�z the met'nod , � � 1 � � � �� 1 C4-4 (2) � � sugges t�d by the Ow�ner and shall give ti�e Owner access to all accounts, bills, vouchers, and r?cords relating to the Extra Work. �. No "Change Order" shall becom? effective untit it has been approved and signed by each of the Contracting parti�s. . No claim for Extra Work oF any kind will be allowed unless ordered in writing by the Owner.. In case any orders or � instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive � compensation, he shall make written request to the Engineer For written orders authorizing such Extra Work, prior to beginning such work. r Should a difference arise as to whar_ does or does not � constitute Extra Work, or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall "' proceed with the work after making written request for written �, orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method (Item C>. Claims for extra work will not be paid unless the Contractor � shall file his claim with the Ownzr within five (5) days before the time for making the first estimat� after such work � is done and u�nless the claim is s�apported by sat i s f actory � vouchers and certiEied payrolls covering all labor and - materials expended upon the said Extra Work. " The Contractor shall furnish the Owner such installation r,, records of all deviations from the original Contract Documents as may be necessary to enable ti�e Owner to �repar� for �permanent record a corrected set of plans showing the actual � installation. The compensation agreed upon for 'extra work' whether or not � iniitiat�d by a'change order' shall be a full, complete and final payment Eor all cost� Contractor incurs as a r�sult or relating to the change or extra work, whether said costs are kr.own, �inknown, foreseen or unforeseen �t that time, includi:�g without limitation, any costs for delay, extended overh�ad, ripple or impact co�t, or any ot'ner effect on changed or �. unchanged work as a r�sult or the ���ange or ext.r� work. C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Ownar and receive the Owner's anproval theraof_, a"Schedule of � On�rations," showing by a straight line method the date of commencing and finishing each of the major elements oE r_he � contract. Ther� shall be also s'nown tn� estimate�l rnonthly cost of wor.k for whic-h estimat�s ara to be �xpect?d. Ther.� � � �4-4 (3) -, � ' , shall be presented also a composite graph showing the � anticioated progress of construction wit'n the time being plotted horizontally and the percentage of complstion plotted vertically. The orogress charts shall be prepared on 8-1/2" x , 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10) days prior to submission of first monthly progress payment, the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start th� several major activities (including Procurement of_ materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall ent�r on the diagram the actual progress at the end of each pa.rtial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a�ninimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technzcal specifications. Prior to tk►e final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirPments. The £ollowing guidelines shall be a�kiered t� in preparing the construction schedule: � L � � � , L a. Milestone dates and final oroject com�letion � dates shall b? d�veloped to conform to time constraiats, sequencing requir.ements and completion time. � b. The construction procec� shall be divided into activities with time durations oi aoproximately fourt�en (14) days and constru�tion values not to exceed $50,000. Fabrication, delivery and submit�al activities ar� exce�tions to this guideline. �I C4-4 (4) � c. Durations shall be in calendar days and normal holidays and weather conditions over the duration oF the contract shalt be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is deFined as the amount of time between the earliest skart date and the latesr start date of a chai� of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. � The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be � broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. �"' For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. � � For each of the trades or subcontracts, the construction schedule shall indicat� the following �orocurement�, construction and �reacceptance activities and events in their logical sequence for equipment and mat�rials. 1. Preparation and tr.ansmittal of submittals. 2. Submittal review neriods. 3. Shoo Ea�rication and delivery. 4. Erzction or installation. r , 5. � 6. Transmittal of manufactsrnr's operation and maintenance instructions. Installed equipment and matarials tes�ing. Owner's operator instruction (if apolic�bl?). F'inal insDection. C4-4 (5) , C 9. Operatic�nal testing. 10. Final inspection. � If, in the opinion of the Owner, wo.rk accumplished falls ir behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Cor►tractor to submiL a revised � schedule demonstrating his �rogram and proposed plan to ma'Ke ua lag in scheduled orogress and to insure com�l�tion � of the wor;c within the contract time. If the �wner finds the oroposed plan not acceptable, 1�e may require the Contractor to increas� the work force, the construction plant and equip�nent, the number of_ work shifts or the � overtime operations without additional cost to the Owner. Failure of the Cont:ractor to comply with thes� r�quirements , shall be considered grounds For determination by tile Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time soecified. ' 1 I � u , L � � 1 �II L� � r4-4 (6) � �ART C - GENERAL C5-5 CONTROL OF MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS CONDITIONS WORK AND C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all otheX questions or disputes which may arise. Engineer will not be responsible for Contractor's means, methods, techniques, sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. � In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon � written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines, grades, cross-sections, finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents. Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. CS-S (1) ' � C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements a�pearing in one of tk�e sections is as binding as though it accurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over sp�cifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparznt error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5.4 COOPERATION OF CONTRACTOR: The Contr3ctor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the prngress thereof and shall cooperate with the Engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who ara fully authorized to act as the Contractor's agent on the work. Such superintend�nt and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor's agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of tlie week on which the Engineer c�etermines that circumstances require the presence on the project site of a representative of the Contractor to � � � , � , � �� ' � � � 1 , � C5-5 (21 � ' 1 ' adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the �A project routing. � The Contractor shall provide all facilities to enable the Engineer and his in5pector to examine and inspect the � workmanship and materials entering into the work. C5-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the � opinion of the Owner or �ngineer, a condition of emergency exists related to any �art of the work, the Contractor, or the (�ontractor through his designated representative, shall � respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition. Such a � response shall occur day ar night, whether the project is _. scheduled on a calendar-day or on a working-day basis. � Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or � corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be � performed. The written notice shall direct attention to the discrepant condition and reguest the Contractor to take remedial action to correct the condition. In the event the Contr3ctor does not take positive steps to fulfill this � written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City �"'f shall then deduct an amount equal to the entire costs for such , remedial action, plus 25$, from any funds due the Contractor on the project. � CS-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if speciEically called For. The field office shall � be not less than 10 by 14 feet in floor area, substantially constructed,, well heated, air conditioned, lighted, and weather-proof, so that documents will not be damaged by the � elements. CS-5.7 CONSTRUCTION STAKES: The City, through its Engine�r, will furnish the Contractor with all lines, grades, and measurements necessary to the proper prosecution and control � of the work contracted for under these Cantract Documents, and lines, grades and measurements wilt be established by means of �'' stakes or other rustomary metnod of marking as may be f�und _ consistent with good practice. � CS-5 (3) � t �� These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings as may be established for the Contractor's use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of replacing such stakes or marks plus 25$ will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the prepar�tion or manufacturing of the mat�rials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor £ails to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract nocuments. In case �f any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of perForming the work, the City Inspector will have authority to reject materials or �quipment to suspend work until the question at issue can be referred to and be decided by the Engineer. The City Inspector will not, however, be authorized to revok?, alte.r, enlarge, or release any requirement of these Contzact Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents. He will in no case act as superintendent or foreman or,perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing a�y duties. The Contractor shall regard and obey the directions and instructions of the City Inspector or Enginezr when the same are consistent witll the obligations of the Contract Documents, r�rovided, however, should the Contractor object to any orders or instructions of the City Inspector, the Contractor may within six days make written appeal to the Engineer for nis decision on tlze matter in controversy. � � � ' , L1 1 � ' , � �I ' � 'I � C5-5 (4> 1 �� 1 � C5-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements � of the Contract Documents. If the Engineer so requests, the - Contractor shall, at any time before acceptance oF the work, remove or uncover such po.rtion of the finished work as may be -• directed. After examination, the Contractor shall restore � said portions of the work to the standard required by the Contract Documents. � Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but � should be work so exposed or examined prove to be _ unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used � without suitable supervision or inspection. ' C5-5.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines � and grades given or as shown on the plans, except as herein _ specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the - expense of the Contractor and will not be paid for by the � Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the � Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the - authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost ��� thereof may be deducted from any money due or to become due to � the Contractor. Failure to require the removal of any defective or unauthorized work shall not constitute acceptance � of such works. �' C5-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications, law, ordinance, codes or regulations permit � Contractor to furnish or use a substitute that is equal to any , material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conFerence, make written application to � ENGItVEER for approval of such substitute certifying in writing that the proposed substitute will oerForm adequately the functions called for by th� general design, be similar and of ' equal substance to that sneciEied and be suited to the same use and capable of performing the same function as that specified; and identifying all variations of the proposed f" CS-S (5) u � 1 substitute from that specified and indicating available maintenance service. No substitute shall be ordered or installed without the written,approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's expense. Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employed by either of them from and against the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. CS-5.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and Qaid for direct to the testing agency by the �wner unless otherwise speciFically provided. The failure of the Owner to make any tests of materials shall be in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise specified, will be madP in accordance with the latest methods prescribed by the American Society for Testing �Iat�rials or specific requirements of the Owner. The Contractor shall orovide such facilities as the Engineer may require for collecting and forwarding samples and shall not, without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnisil adequate samples without charge to the Owner. In case of concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Cont3ctor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of coticrete, using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. , lI � 1 � � � L � CS-5.13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored so as to � insure the preservation of the quality and fitness of the work. � When directed by the Engine?r, th�y shall ba placea on wooden platforms or other hard, clean durable surfaces and not on the � C5-5 (6) � J ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing tt�e pay quantities in any manner whatsoever, unless an obstruct.ion encountered i.s such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract Documents, in which case the provision in these Contract Uocuments for Extra Work shall apply. It shall be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction orocess to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities, structures and service lines. Verification of existing utilities, structures and service lines shall include notification of all utility companies at least forty eight (48) hours in advance of construction including exploratory excavation if necessary. Al1 verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosectuion of work where the int�rruption of service is necessary, the Contractor, at least 24 hours in advance, shall be r�quired to: 1. Notify the Wat2r Department's Distribution Division as to location, time, and schedule of service interruption. CS-5 (7) ' � 2. Notify each customer persanally through responsible �ersonnel as to time and schedule of the interruption of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer's entrance door knob. The tag shall be durable in composition, and in large bold type shall say: "NOTICE" Due to Utility Improvement in your neighborhood, your (water> (sewer) service will be inter- rupted on between the hours of and This inconvenience will be as short as possible. Thank you, Contractor Address Phone b. Emerqency: In the event that an unforeseen service interruption occurs, notice shall be as above,but immedi�te. C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or neglect on the part oF the Contractor, any other Contractor or any sub-contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub-contractor by agreement or arbitration. If such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor, who shall indemnify and save harmless the Owner against any such claim. C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer. Twenty-f�urs fours aFter written notice is given to the Contractor that the clean-up on the job si}�a is proceeding in a manner unsatisfactory to the Engineer, if the Contractor fails to corre�t the �� � � � � � ' � � � C5-5 (8) � C 1 � unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, � and the costs of such direct action, plus 25$ of such costs, shall be deducted from monies due or to become due to the Contractor. �„ Upon the completion of the project as a whole as covered by these Contract Documents, and before £inal acceptance and � final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He shall leave the site of a11 work in a neat and orderly � condition equal to that which originally existed. Surplus and wa5te materi.als removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials � installed by him and shall deliver over such mate.rials and equipment in a bright, clean, polished and new appearing condition. No extra compensation will be made to the � Contractor for any clean-up required on the project. C5-5.18 FINAL INSPECTION: Whenever the work provided for in �and contemplated under the Contract Documents has been ' satisfactorily completed and final cleanup performed, the Engineer will notify the proper officials of the Owner and � request that the Final inspection be ma3e. Such inspection will be made within 10 days after such notification. After such final inspection, if the work and mat�.rials and equipment �, are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper • resolution has been passed by the City Council. No time charge will be made against the Contractor between said date � of notification of the Engineer and the date of final � inspection of the work. LJ CI C, ' � � CS-5 (9) , � , PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITX � SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times �r observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct � of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or � authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his - Sureties shall indemnify and save harmless the City and all of its officers, agents, and employees against any and alI claims � or liability arising from or based on the violation of any W such law, ordinance, regulation, or order, whether it be by himself or his employees. � C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges, costs and fees, and give all notices necessary and incident to the due and lawful � prosecution of the work. C6-6.3 PATENTED DEVICESC MATERIALS AND PROCESSES: If the "" Contractor is required or desires to use any design, device, y,,, material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with � the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents, trade-marks, and copy rights in any � way invol.ved in the work. The Contractor and his sureties shall indemnify and save harmless the Owner from any and all claims for infringement by reason of the use of any such �* patented design, device, material or process, or any L trade-mark or copy right in connection with the work agreed to be performed under these Contract Documents, and shall r,., indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any - time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits brought for the �„ infringement of any patent claimed to be infringed upon by the design, type of construction or material or equip'ment � specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6 (1) � � � i C6-6.4 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor. All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted, as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations, at all driveway crossings. Such provisions may include bridging, placement of crushed stone or gravel or such other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate. Such other means may include the diversion of driveway traffic, with specific approval by the Engineer. If diversion of traffic is approved by the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer for the diversion of traffic, and shall, at his own expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. The materials excavated and the construction materials such as pipe used in the construction of the work shall be placed so as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves, �I ' � LJ � � � � L� J � � u � C6-6 (2) �� _� � 1 ' gas valves, or manholes in the vicinity, The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety whicii may come to � its attention, after twenty-four hours notice in writing to the Contractor, save in cases of emergency when it shall have � the right to remedy any neglect without notice, and in either _ case, the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to �i become due to the Contractor. � The Contractor, after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and Police Department, when any street or alley is requested to be closed � or obstructed or any fire hydrant is to be made inaccessible, and, when so directed by the Engineer, shall keep any street, � streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall promptly notify the Fire - Department Headquarters when all such obstructed streets, � alleys, or hydrants are again placed back in service. � Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams, his responsibility for accidents in connection � with such crossings shall include the roadway approaches as � well as the structures of such crossings. The Contractor shall at all times conduct his operation and � the use of construction machinery so as not to damage or � destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, � the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in ' settlement of such claims. The Contractor shall file with the _ Engineer a written statement showing all such claims adjusted. � C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract, the � Contractor will be permitted to use and occupy such portions of the public streets and alleys, or other public places or other rights-of-way as provided for in the ordinances of the � City, as shown in the Contract Documents, or as may be � specifically authorized in writing by the Engineer. A � reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more � than is necessary to avoid delay in the construction � operations. Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of � spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be � � C6-6 (3> 1 �� carried on operation o contractors contract, Contractor assistance additional be provided in such manner as not to interfere with the f trains, loading or unloading of cars, etc. Other of the Owner may, for all purposes required by the enter upon the work and premises used by the and shall be provided all reasonable facilities and for the completion of adjoining work. Any grounds desired by the Contractor for his use shall by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway, the City will secure the necessary eas�ment for the work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for safety of property and the public. Negotiations with the railway companies for permits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties. The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street, alley, or public place, the Contractor shall at his own expense furnish, erect, and maintain such barricades, fences, lights and danger signals, shall provide such watchmen, and shall take all such other precautionary measures for the protection of persons or Property and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away from, and vehicles from being driven on or into, any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. All installations and procedures shall be consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on i3ighways", codified as Article 6701d Veron's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. � � � � � � � � � � � � 1� C6-6 (4) � The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works department, Signs and Markings Division (phone number 8780-8075), to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign ca►i be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held responsible for all damage to the work or the public due to failure of barricades, signs, fences, lights, or watchmen to protect them. Whenev�r evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The Contractor's responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation, except as specifically provided in these Contract Documents, will be paid to the Contractor for the work and materials involved in the constructing, providing, and maintaining of barricades, signs, fences, and lights or for salaries of watchmen, for the subsequent removal and disposal of such barricades, signs, or for any other incidentals necessary for the proper protection, safety, and convenience of the public during the contract period, as this work is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. C6-6.9 USE OF EXPLOSIVES, DROP WEIGHT, ETC.: Should the Contractor elect to use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property. The Contractor shall notify the proper representative of any public service corporation, any company, individual, or utility, and the Owner, not less than twenty-four hours in C6-6 (5> advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor's insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The City shall proceed to give notice to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. Whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times. All vehicles in which explosives are being transported sha1Z be plainly marked as mentioned above and shall, insofar as possible, not use heavy traffic routes. C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of the wor.k. Any additional rights-of-way or work area considered necessary by the Contractor shall �e provided by him at his own expense. Such additional rights-of-way or work area shall be acquired for the benefit of the City. The City shall be notified in writing as to the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owne.r has been secured in writing by the Contractor and a copy furnished to the Engineer. Unless soecifically provided otherwise, the Contractor shall clear all rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the pr2servation of and shall use C6-6 (6) every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pol� lines, or appurtenances thereof, including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or Private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. When and where any direct or indirect or injury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof on the �art of the Contractor, he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done� by repairing, rebuilding, or otherwise replacing and restoring as may be directed by the Owner, or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. All fences encountered and removed during construction oF this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Cont.ractor shall set cross braced posts on either side of permanent easement before the fence is cut. S�ould additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site is vacated overnight, and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to the various items bid in the project C6-6 (7) proposal. Therefore, no separate p3yment shall be allowed for any service associated with this wo.r�. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the Owner may, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, proceed to r.epair, rebuild, or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor uRder this Contract. C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agr2ed by the parties hereto that Contractor shall perform all work and services hereunder as an inde�endent contractor, and not as an officer, agent, servant or employee of the Owner. Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractors, subcontractors, licensees and invitees. The doctrine of respondeat superior shall not apoly as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors, and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner, its oEficers, agents, servants, and employees from and ag�inst any an all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or character, whether real or �sserted, arisiag out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, empl�yees, contractors, subcontractors, licensees or invitees, whether or not caused, in whole or in part, by alleged negligence on the part of officers, agents, servants, employees, contractors, subcontractors, licensees and invitees of the Owner; and said Contractor does hereby covenant and agree to assume all liability �nd respon5ibility of Owner, its officers agents, servants and em�loy�es For property damage or loss, and/or personal injuries, includi�g death, to any and all persons of whatsoever kind or character, whether real or asserted, arising out of or in connection with, directly �r indirectly, the work and services to oe perFormed hereunder by Contractor, its officers, agents employe�s, contractors, subcontractors, licensees and invitee,s, whether or not cause�, C6-6 (8) in whole or in part, by alleged negligence of officers, agents, servants, employees, contractors, subcontractors, licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers, agents, servants, employees, contractors, subcontractors, licenses, or invitees of the Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of the above 30-day period, the Contractor may be deemed ta be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that: l. The claim has been settled and a release has been obtained from the claimant involved, or 2. Good faith efforts hav� been made to settle such outstanding claims, and such good faith efforts have failed. If condition (1> above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2> above is met at any time within the six month period, the Director may recommend that the final payment to the Contractor be made. At the C6-6 (9) expiration of the six month period the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City contract. C6-6.13 CONTRACTOR'S CLAIM FnR DAMAGES: Should the Contractor claim compensation far any alleged damage by reason of the acts or omissions of the Owner, he sha11 within three days after the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as hereinabove required, the Contractor's claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages. C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES� ETC.: In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer. The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract. C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall, at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers, and for this purpose he shall provide and main�ain, at his own cost and ex�ense, adequate pumping facilitiPs and tem�orary outlets or div�rsions. The Contractor, at his own cost and expense, shall construct such troughs, pipes, or other structures necessary, and be prepared at all times to dispose of drainage and sewage C6-6 (10) , received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disoosed of in a satisfactory manner so that no nuisance is created and so that the work under construction will be adequately protected. C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main. Al1 piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor's responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1.2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water will be at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be performed by the Contractor at his own expense. C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORK: �ntil written acceptance by the Owner as provided for in these Contract Documents, the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 (11) � Limited Sale, Excise and Use Tax permits and information can be obtained from: Comptroller of Public Accounts Sale Tax Division Capitol Station Austin, TX C6-6 (13) PART C - GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS: C7-7.1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workman under his immediate superintendance, work of a value of not less than fifty (50�) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents. All transactions of the Engineer will be with the Contractor. Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, or interest therein or any part thereof, to any person or persons, partnership, company, firm, or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state, attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall successfully complete said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any construction operation, the Contractor shall submit to the Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a brief outlining in detail and step by step the manner of C7-7 (1) prosecuting the work and ordering mat2rials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate �eriod. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials, and labor as is necessary to insure its completion within the time limit. The sequence requested of all construction operations shall be at all times as specified in the Special Contract �ocuments. Any deviation from scuh sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until he has received written approval from the Engineer. Such speeification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only �s set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, and a progress schedule shall not constitute a change in the contract time. C7-7.4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the �ontractor has obstructe� or closed or is carrying on operations in a portion of a st.reet or public way greater than is necessary for the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional sectian or street. C7-7.5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor is avai�able, The Contractor may bring in from outside the City of Fort Worth his key men and his superintendent. Alt othar workmen, including equipment operators, may be imported only after the local supply is exhausted. The Contractor shall employ �nly such superintendents, foremen, ana wor'�men who ar� carzfut, competent, and fully qualif_ied to perfor�n tne duties or tasks assigned to them, and the Engine�r may demacld and secure the summary dismissal oF any person or persons employed by the Contractor in or about or on the work who, in the opinion oE the Owner, shall misconduct himself or be found to b� incomPetent, disrespectful, internperate, dishonest, or C7-7 (2) otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out �he directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill, ability, and experience to properly perform the work assigned to them and operate an� equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress. All equipment, tools, and machinery used for handling materials and executing any pa.rt of the work shall be subject to the approval �f the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment on any portion oF the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7.6 WORK SCHEDULE: Elapse3 working days shall be computed starting with the first day of work completed as definPd in C1-1.23 "WORKING DAY" or the date stipulated in the "WORK ORDER" for beginning work, whichever comes first. Nothing in these Contract DQcusnents shall be construed as prohibiting the Contractor from working on S�turday, Sunday o.r Legal Holidays, providing that the fol.lowing requirements are met: a. A request to work on a specific Legal Holiday must be made to the than the proceeding Thursday. Saturday, Sunday or Engineer no later b. Any work to oe done on the project on such a specific Saturd�y, Sunday or Legal Holiday must be, in the opinion oP the Engineer, essential to the timely completion of the project. The Engineer's decision shalt be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor For any work perEormed on such a specific Saturday, Sunday or Legal :.�oliday. Calendar Days shall be deEined in C1-1.24 and the Contracto.r may work as he so desires. C7-7 t3) C7-7.7 TIME OF COMMENCEMENT AND CUMPLETION: The Contractor shall commence the working operations within the timP specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. The Contractor shall maintain a rate oF progress such as will insure that the whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension o£ the time of completion be requested such request will be for_warded to the City Council for ap�roval . In adjusting the contract time For completion of work, consideration will be given to unForseeable causes beyond the control of and without the fault or negligence o£ the Contractor, including but limited to acts of the public enemy, acts of the Owner, fire, flood, torna�oes, epidemics, quarantin� restrictions, strikes, freight embargoes, or delays of sub-contractors due to such causes. When the dat� of completion is �ased on a calendar day bid, a request for extension of time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be considered only when a r�view of the Contractor's purchase order dates and other per�inent data as requested by the Engineer indicates that the Contractor has made a bonaFide attempt to secure deliv�ry on schedule. This shall include efforts to abtain t'ne supplies and materials from alternate sources in case the first source cannot malce delivery. If satisfactory execution and completion of the contract should require worK and matPriat� in great�r amou�ts or quantities than �hose set forth in the a�proved Contract Documents, then the contract ti.me may b? iricr�ased by Change Order. C7-7.9 DELAYS: The Contr�ctor shall receive no com��ensation Eor delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by thz failure of the City to provide information or mat�rial, iF C7-7 (�1 any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and reFerred by him to the Council for final approval or disapproval; and the action thereon by the Council shall bs final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of ti�e, his application for which shall, however, be subject to the approval of the City Council; and no such extension of time sha11 release the Contractor or the surety on his perFormance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. C7-7.10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page oP the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the contract docu.ments. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will bec�me the time oF completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after th2 time speci:Eied in the Contract nocuments, or the increased time gr.anted by the Owner, or as atitomatically increased by additional worK or materials ord�red after the contract is signed, the sum per day given in the following schedule, unless otherwise specified in other parts of the Contract Docuinents, will be deducted from monies due the Contractor, not as a penalty, but as liquidated damages suffered by the Owner. AMOUNT OF CONTRACT Less than $ 5,000 $ 5,001 to $ 15,000 $ 15,001 to $ 25,000 $ 25,001 to $ 50,000 $ 50,001 to $ 10�,000 $ 100,001 to $ 500,000 C7-7 (5) inclusive $ inclusive $ inclusive $ inclusiv� $ inclusiv� $ inclusive $ 35.00 45.00 63.00 105.00 154.00 210.00 $ 500,001 to $1,000,000 inclusive $ 315.00 $1,000,001 to $2,0U0,000 inclusive $ 420.00 $2,000,001 and ov�r a 630.00 The parties her_eto understand and agree that any ha�m to the City caused by �he Contractor's de13y in completing the work hereunder in the time s�ecified by the Contract Documents would be incapaple or very difEicult of accurate estimation, and that the "Amount of Liquidated Damages Per Day", as set out above, is a reasonable forecast of just cornpensation due the City for harm caused by any delay. C7-7.11 SUSPENSION BY COURT ORUER: The Contr�ctor shall suspend operations on such part or parts of the work ordered by any court, and will not �e �ntitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is suspended by a Court Order. Neither will tne Owner b� liable to the Contractor by virtue of any Court Order or a.ction far which the Owner i5 not solely res�onsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest oF the project. Durin� te:nporary suspension of work covered by this contract, for any r�ason, the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become n�c�ssary to suspend work for an indefinite period, the Contractor shall store all materials in such manner tnat they will not abstruct or impede the public unnecessarily nor become damaged in any way, and he shatl tak? every precaution to prevent damage or deterioration of the work perfozmed; he shall provide suitable 3rainage about the work, and erect te,nporary structures wh�re necessary. Should the Contractor not be �blz to comZ�lete a portion of the project due to causes beyond the �ontrol of and without the fault or negligence of the Contractor as set Forth in Paragraoh C7-7.8 EXTENSION OF THE 'rIME OF COMPLETION, and should it be determined by mutual cons�nt of the Contractor_ and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor m�y be reimbursed f�r the cost of moving his equipment off the job and retur.ning the necessary equipment to the job w�en it is determined by the Engineer C7-7 (6) that const.ruction �nay bQ rasumed. Such reimbursement shall be based �n actual cost to the Contractor of moving tne equipment and ;�o orotit will be allowed. No reimbursement shall be allowed if_ the equipment is mov�c] to another construction project ior the City of Fort 'vVorth. The Contracror shall not susoend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the President oE the United States or other law£ul authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution o.E the work with reasonable continuity For a�eriod of two months, the Contractor shall within seven days notify the City in writing; giving a detail�d statement of tne efforts w'nich have been made and listing all necessary it�ms of labor, materials, and equipment not obtainable. If, after investigatio�s, the Owner finds that such conditions existing and that the inability of the Contractor to oroceed is not attributable in whole or in part to the fa��lt or �iegl�ct of the Contract, tk�en i.f_ the Owner cannot after reasonal�le effort assist the Contractor in procuring and making available the nec�ssary labor, �naterials and equipment within t}iirty days, the Contractor may request the Owner to terminatP the contr.act and th� �wner may comply wit)1 the request, and th? termination shall be conditioned and base� u�on � Einal settlement mutually acceptable to both th� Owner an3 thP Contractor and f inal payment stiall be made in ac�ordanc? with the t�rms o.E tc►� agreed settlement, which shall include, but not be limited i_n, rhe payment Eor all work executed but no anticipated profits on work which has not be�n performed. C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF' CONTRACT: The work ooPrations on all or any portion or section of the work under Contract s'n�ll be suspendecl immed.iately on written �rder of_ the Engineer or the Co,nteac.t m�y be a��clared cancell?d by the Ci.ty Council f.or any gooci �n.� sufficient caase. The foLlowing, by way ot ;�xamnle, 'out not oE limitation, may be considered gr�unds E�r susoension or cancellation; �. Fai.lure oF the Contr�ctor to commence work o�erat.i�ns within `h� tim� soecified in the W�r'K ��rde.r issued by the Own�r. �7-7 (7) b. c. d. e. Substantial �vidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. Substantial evidence that the Contractor has abandoned the work. Substantial evidence that the Contractor has become insolvent or bankrupt, or. ottierwise financially unable to carry on the work satis£actorily. f. Failure on the part of the Contractor to observe any requir�ments of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. g. Fail�are of the Contractor promptly to make good any defect in materials or w�rkmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under contract. i. A substantial indication that the Contr.sctar has made an unauthorized assignment of the contract or any funds due ther�from for the benefit of any c.redit�r or for any other �urpose. J• k. If the Contractor shall for any cause whatsoever not carry on the working operation in ari acceptable manner_. If the Contractor commences legal action against the Owner. A copy of the suspension order er action of the City Council shall be served on the Contractor's Sur�ti�s. When work is suspended for any cause or causes, or when the contract is cancelled, the Contractor shall discontinue the worK or such p�rt thereof as the �wner shall desiqnate, whereupon the Sureties may, at their option, assume the contract or that portion thereo.E whi�h the Owner has ordered the Contractor to discontinue, and may perform th� same or may, with the written ^7-7 (8) consent of tlze �wner, sublek the work or that po.rtio� of tlle work as taken ov�r, provided however, that the Sureties shall ex�rcise their option, if at atl, within two wee'r,., after tkze written notice to discontinue the work has been se.rved upon the Contractor and upon the Sureti�s or t'neir authorizad agents. The Sureties, in such event shall assume th� Contr�ctor'5 place in all respects, and shall be paid by the Owner for all work p�rFormed by them in accordance with the terms o£ the Contract Docum�nts. Al1 monies remaining due the Contractor at th� time o.E this default shall thereupon 'oecome due and payable to the Sureties as the work progress�s, subject to all of the terms of the Contract Documents. In case the Sureties do not, within the hereinabove specified time, exercise their ri�ht and option to a�sume t'ne contract res�onsiUilities, or tnat �ortion therQof whicn t'ne Owner has ordPred by the Contracto.r to discontinu?, then the Owner shall have the power to complete, by contract or otherwis�, as it may determine, the w�rk herein described or such part th�reof a� it ;nay deem necessary, and the Contractor herato agr�es that the Owner sh�ll have tll� right to take pos:.��ssion oE an3 use any materials, plants, tools, equiPment, supplies, and property oF any kind provided by the Contractor for the purpose of carrying oci the work and to �rocure other. tools, equipment, materials, labor and groperty Eor the completion of the work, an3 to charge to t'ne account of the Contractor. ��E said contract expense for labor, materials, tools, equipment, and all ?xpenses incidental thereto. The expense so charged shall bP deducted by ttte Own�r .fr��m sucn monies as may be due or �nay become due at any time ti�e.reaFt�r to the �ontractor under_ and by virtue of_ the Contract �r any �art tn�re�f. Th? Owner shall not be requirad to obtai�� the lowest bi�� for tiie work completing the contract, but tn� exp�ns� to be deducted sha11 be the actu�l cost of the own�r ot such wor�c. In case such expenses shall exceed the amoiint which wosld hav� been payable under thP Contract if th� same had been compt�ted by the Contractor, then the Coriicracfipr and his Surnties shail oay the amount oE such exces5 to the City on noti:;�� fr.om th� Owner oE the excess due. When any particular ��rt �F the w�r'�c is being ca.rried on hy the Owr��r by contract or ot;i ;rwis� under the provisions of this sec+:.ion, t�e Contractor shall continu? t11e remainder of the w��r'K in conEormity wi.t11 the terms oF the Contract Documents a��d i:� such a manner as to no�: }Zinder or interCere witl� performa�lce oE tne wor'�c by ti�e ��wner. C7-7.15 FULFILLMENT OF CONTRACT: The Contrac:L will be consia�red as havi.ng been fulfitted, aav� as pr���ic�e<� i�1 any bond or aonds or by law, jahen atl the worK an�� �11 s�ctions or parts of the projec� cov��r��.� by the � o�►�ract Docur�ent� h�ve C7-7 (9) been finished and completed, the final inspection made by the Engineer, and the f.inal acceptance and final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of the �ork under this contract may be terminated by the Owner in whole, or from time to tiine in part, in accordance with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. Any sucn termination shall be effected by mailing a notice oF termination to the Contractor soecifying the extent to which performance of work under tl�e contract is terminated, an� the date upon which such termination becomes effective. Rece.ipt of the notice shall be deemed conclusively presumed and established when the lettPr is placed in the United States Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no prooF in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a noticp oF termination, and exc�pt as otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the cont.ract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts Cor materials, services or facilities except as may be necessary for completion oF such oortion of the work under the contract as is not terminated; 3. terminate all orders and subcont.r3cts to the extent that tt�ey retate to the r�erformance of work t�rminated by t:la notice oE termination� 4, transfer titLe to the Owner. and deliver in the mann�r, at the times, and to t'n� extent, i.f any, dir�cced by the Gngineer: C7-7 (10) 3, the Eabricat�d or �.in`abricat�d �art5, wor;c in process, comnl:�ted work, suv�oli�s and other mat�rial Qroduc?d as a part o£, o.r acqui,=�d in connection with the perforrnance of, the work t�rminated by the notice of termination; and b, the completed, or partially completed plans, drawings, in£ormation and other property which, if the contract had been completed, would t�ave been rec�uired to be furnished to the Own�r., 5. complete performance of_ such par� oF t}ie work as sh�ll n�t hav� been te.rmin�ted by the notice of termination; and 6. take such action as :nay be necessary, or as the Engineer may �3irect, for the protection and oreservation of t�ie property related to its contract which is in the possession of_ the Contractor and in which the Owner has or_ �nay acquire the rzst. At a time not later than 30 days aiter the termination date specifzed in the notice of termination, the Contractor_ may sub►nit to the Engineer a list, ce.rtifi?d as to quantity and guality, of any or all items of termination inventory not previously disposed of, exclusive of it�m5 th� disposition of_ which has been dir�c�ed r�r authorized 'oy the Engineer. Not later than 15 da�� ther�aft�r, the Owner shall accept title to such items �ro��ided, that the list submitted shall 'oe subject to ver.iEication by tl�e Eng.ineer upon removal of thF� i tems or, i E the i tems are s tor��d, within 45 days from tt�e date of submission of tn� list, and any neces5ary �djiistments to correct t:ic list as su�mittEd, shall_ be made �rior t<� Final settlement. C. 'I'ERMINATION CLAIM: Wi`hin oU days ait�r notice o£ t�rmination, tlie Con{�raccor sha11 su�rnit his termination cl�im to the Engi�eer in tne f-or_!n and wir_h the certification ��r�s�rioPr] k�y ttle Engi�e�r. Unl�ss one or more ext�nsions ia wri�ing ar,: granted by t�i� Uwn��r u�o�i requ�st of_ tc�: Contractor, �nade in HTriting within such b0-3ay period or auth�rized �xtension th�reof, any an�� a11 sucn claims s?ialt �ae concl�lsively deem+�:i ��ai•.T�a. C7-7 (11) D. AMOUNTS: Subject to the provi�ions of Item C7-7.16(C), the Contractor and Owner may agree upon the whole or any part of the arnount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the total contract orice as reduced by the amount of payments otherwise made and as furt:ner reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due Por lost or anticipated profits, Nothing in C7-7.16(E> hereaFter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deerned to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragranh. E. FAILURE TO AGREE: In the ev2nt of the failure of the Contractor and the Owner to agree as provided in C7-7.I6 (D> iipon the whole amount to be �aid to the Contractor by rzason of the termination of worK pursuant to this s�ction the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. F. DEDUCTIONS: In arriving at the arnount due the contractor under this section, th�re shall be deducted ta) a11 unliquidated advance or other payments on �ccount theretofore made to the Contractor, applicable to the terminated �ortion of this contract; (b) any claim which the Owner rnay have against the Contractor in connection with this contract; and (c) the agreed price Eor, or the proceeds of sale of, any materials, suppli�s or other things kept by the Contractor or sold, pursuant to the provisions of this cl�use, 3nd n�t otherwise r�cover��d 'Uy or credited to the Owner. G. ADJUSTMENT: If the termination hereunder 'oe partial, prior to the settlement of the terminated portion of this contract, the Contractc�r may file with the Engineer a request in writing E�r an C7-7 (12) equitable adjustment of the price or prices specified in the contract relating to the continued portion of the eontract (the portion not terminated by the notice o£ termination), such equitable adjustment as may be agreed upon shall be made in such price or prices; nothing contained herein, however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter th� rights which the Owner may have for termination of this contract under C7-7.14 hereof entitled "Suspension of Abandonment of the work and Amendment of Contract" or any other right which Owner may have for default or breach oF contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall co�nply with fed�ral, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. C7-7 (13) PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT C8-8.1 MEASUREMENT OF QUANTITIES: The determination of quantities o£ work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and items installed. C8-8.2 UNIT PRICES: When in the Proposal a"Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these �ontract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finished, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, delays, profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation. C8-8.3 LUMP SUM: When in the Proposal a"Lump Sum" is set forth, the said "Lump Sum" shall reoresent the total cost for the Contractor to furnish all labor, tools, materials, machinery, equipment, appurtenances, and all subsidary work necessary for the construction and completion of all the work to provide a compl�te and functional item as detailed in the Special Contract Documents and/or Plans. C8-8.4 SCOPE OF PAYMENT: The i:ontractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered durin�3 the prosecution of the work at any time C8-8 (1) before its final acceptance by the Owner, (except as provided in paragraph CS-5.14) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence oF suspension or discontinuance of such prosecution af the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completeing the work in an acceptaole manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, matPrials, or equipment, nor in any way prejudice or affect the obligations oE the Contractor to repair, correct, renew, or replace at his own and proper expense any deEects or imperfections in th� construction or in the strength or quality of the material used or equipment ar machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such def.ects, which defects, imperfection, or damage shall hav� been discovered on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and Sth day of eac}i month the Conkractcr shall submit to the Engineer a statement showing an estimate of the valae of the work done during the previous month, ar estimate pPriod under the Contract Documents. No�t later than the lOth day of the month the Engineer shall verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ($100.00) in amount, 90$ of such estimated sum will be paid to the Contractor if the total contract amount is less than $400,000, or 95$ of such estimated sum will be paid to the Cont�actor if the total contract amount is $400,000 or greater within twenty-fiv� (25) days aFter the regular estimate period. The City will have the option of pre�aring estimat�s on FormS furnished by the City. The partial estimate may include acceptable nonp�rishaule mat�rials delivered to the work which are to be incorporated into tne work as a oermanent part thereof, but which at the th� time �f the estimate liave not been installed. (such payment will be allowed on a basis of 85$ of the n�t invoice value thereof.> The Contraccor shall furnish the Engineer such information as he may r�qu?st to aid .�� him as a guide in the verif ication or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an erro.r in any previous estimate,and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or oF its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contractor, the Contractor shall notify the Engineer in writing that the improvements 3re ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner, will within a reasonable time make such final inspection, and if the work is satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract Documents and all app.roved modification5 ther�of, the Engineer will initiate the processing of the final estimate and recommend final acceptance of the project and final payment thereFor as outlined in C8-8.8 below. C8-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary mea�urements, computations, and checks can be made. All prior estimates uQon which payment has been made are subject to necessary corrections or r�visions in the final payment. C8-8 (3) The amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after final accep`ance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as L-urnished by the City, certifying that all persons, firms, associations, corporations, or otner organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that ther� are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. The making of the final payment by the Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which speciEically continue thereaft?r. C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and design�rs to prepare the Contract Documents and all modifications of the approved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own design features, sufficiency of the Contract Documents, the saf�ty of the structure, and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all a�proved modifications thereof, and additions and alterations thereto approved in writing by the Owner. The burden of proof af such complianc� shall be upon the Contractor to show that he has complied with the said requirements of t��e Contract Documents, approved modifications thereof, and all approved additions and alterations thereto. C8-8.10 GENERAL GUARANTY: Neither the final certificate of payment nor any provision in tne Contract Docume�ts nor partial or entire occupancy �r use of the pre�nisPs by thz Owner shall constitute an acceptance of work not done i� accordance witn the Contract Documents or relieve the Contractor of liability in res�ect to any ex�ress warranties or responsibility for faulty mat�ri.als or workmanshiP. The Contractor shall remedy any defPcts or 3amag?s in the work and CS-8 (4) pay for any damage to other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unlesa a langer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure t.he perFormance of the general guaranty as above outline. The Owner will give notice of observe3 defects with reasonable promptness. CS-8.11 SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific it�m for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration, rock excavation and cleanup are general it?ms of work which fall in the category of subsidiary work. CS-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in th,e Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of mat?rial will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for misc�llaneous placement of materia� shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. CS-8.13 RECORD DOCUMENTS: Contractor shall keeQ on record a copy af all specifications, plans, addenda, modifications, shop drawings and samples at the site, in good order and annotated to sllow all changes made during the construction process. These shall be delivered to Engine�r upon completion of the work. C8-8 (5) Supplementary Conditions to Section C SECTION Cl: SUPPLEMENTARY C�NDITIONS TO SECTION C- GENERAL CONDITIONS A. General These Supplementary Conditions amend or supplement the General Conditions of the Coniract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. B. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Page C3-3 (1), should be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. C. C3-3.7 BONDS: Page C3-3 (3), the paragraph after subparagraph d. Change the paragraph to read as follows: "No sureties will be accepted by the owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against ihe Owner. All bonds shall be made on the forms f'urnished by the Owner and the swety shall be acceptable to the owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties {Circular 870}, or (2) the surety must have capital and surplus equal to ten times ihe amount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be authorized, accredited or trusteed to do business in Texas." D. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the Sth day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the lOth day and 25th day respectively. Estimates will be paid within 25 days following ihe end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials 98039 Gen Sup Cond. DOC C 1-1 delivered to ihe work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this pazagraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform ihe work in strict accordance with the specifications or other provisions of this contract. E. C3-3.11 INSURANCE: Page C3-3 (5): Delete subparagraph "a. COMPENSATION INSURANCE" F. C3-3.11 INSUR.ANCE: Page C3-3 (6): Delete subpazagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" G. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), should be deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for properry loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not anv such iniurv, dama�e or death is caused, in whole or in part, bv the nePli�ence or allesed negligence of Owner, its oflcers. servants, or emplovees. Contractor likewise covenants and agrees to indemnify and hold hannless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damaQe is caused in 98039 Gen Sup Cond. DOC C�_2 whole or in nart bv the nePliQence or alleQed ne�liQence of Owner, its ofrcers, servants or emvlovees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Coniractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 98039 Gen Sup Cond.DOC C1-3 -9- SPECIAL CONDITIONS (Water Department) 98039_SPECS.doc PART D- SPECIAL CONDITIONS (WATER DEPARTMENT) D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13 D-14 D-15 D-16 D-17 D-18 D-19 D-20 D-21 D-22 D-23 D-24 D-25 D-26 D-27 D-28 D-29 D-30 D-31 D-32 D-33 D-34 D-35 D-36 D-37 D-38 D-39 D-40 D-41 D-42 D-43 D-44 D-45 D-46 D-47 D-48 D-49 D-50 D-51 D-52 D-53 AWARD OF CONTRACT ............................................... .............. 9-3 .............................................. SUBMISSIOIV OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND PRE- CONSTRUCTION SUBMITTALS ............................................................................................... 9-3 GENERAL.................................................................................................................................. 9-4 TAXEXEMPTIONS .................................................................................................................... 9-6 PROJECTDESIGNATION ......................................................................................................... 9-6 EQUAL EMPLOYMENT PROVISIONS ...................................................................................... 9-6 PRE-CONSTRUCTION CONFERENCE ................................................................................... 9-6 COORDINATION MEETINGS ................................................................................................... 9-6 PROJECT ABANDONMENT ..................................................................................................... 9-6 BREAKDOWN OF BID PROPOSAL .......................................................................................... 9-6 OMIT.......................................................................................................................................... 9-6 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW ........................... 9-7 MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE ... ................ 9-9 CALENDARDAY ..................................................................................................................... 9-11 SUBSIDIARYWORK ............................................................................................................... 9-11 WAGERATES ......................................................................................................................... 9-11 EASEMENTS AND PERMITS .................................................................................................. 9-13 COORDINATION WITH FORT WORTH WATER DEPARTMENT .......................................... 9-13 DAMAGE TO PRIVATE PROPERTY ....................................................................................... 9-13 SHOPDRAWINGS .................................................................................................................. 9-13 CROSSING OF EXISTING UTILITIES .................................................................................... 9-14 EXISTING UTILITiES AND IMPROVEMENTS ........................................................................ 9-14 CONSTRUCTION TRAFFIC OVER PIPELINES ..................................................................... 9-15 TRAFFICCONTROL ............................................................................................................... 9-15 PAYMENT................................................................................................................................ 9-16 DELAYS ................................................................................ ....................................... 9-16 ............ DETOURS................................................................................................................................ 9-16 BARRICADES AND WARNING SIGNS ................................................................................... 9-17 EXAMINATIONOF S17E .......................................................................................................... 9-17 ZONINGCOMPLIANCE .......................................................................................................... 9-17 WATER FOR CONSTRUCTION .............................................................................................. 9-17 WASTEMATERIAL .................................................................................................................. 9-17 CLEANUP FOR FINAL ACCEPTANCE ................................................................................... 9-17 PROPERTY ACCESS .............................................................................................................. 9-17 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK ............................................ 9-17 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES ....................................... 9-17 OMITTED................................................................................................................................. 9-18 SANITARY FACILITIES FOR WORKERS ............................................................................... 9-18 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ......................................... 9-18 RIGHTTO AUDIT .................................................................................................................... 9-18 INCREASE UR DECREASE IN QUANTITIES ......................................................................... 9-19 CUTTING OF CONCRETE ...................................................................................................... 9-19 PROJECT DESIGNATION SIGN ............................................................................................. 9-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT ................................................. 9-20 MISCELLANEOUS PLACEMENT OF MATERiAL ................................................................... 9-20 TYPE„C., BACKFILL ................................................................................................................ 9-20 CRUSHED LIMESTONE BACKFILL ........................................................................................ 9-21 2:27 CONCRETE ..................................................................................................................... 9-21 TRENCH EXCAVATION, BACKFILL AND COMPACTION ..................................................... 9-21 PAVEMENTREPAIR (E2-19} .................................................................................................. 9-23 TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY .................... 9-23 SANITARY SEWER MANHOLES ............................................................................................ 9-24 SANITARY SEWER SERVICES .............................................................................................. 9-27 Pertd-WATER.doc 9� 1 PART D SPECIAL CONDITIONS (WATER DEPARTMENT) D-54 D-55 D-56 D-57 D-58 D-59 D-60 D-61 D-62 D-63 D-64 D-65 D-66 D-67 D-68 D-69 D-70 D-71 D-72 D-73 D-74 D-75 D-76 D-77 D-78 D-79 D-80 80.1 802 80.3 80.4 80.5 80.6 80.7 80.8 80.9 80.10 80.11 80.12 80.13 80.14 D-81 D-82 D-83 D-84 D-85 D-86 NOTUSED ............................................................................................................................... 9-28 REMOVAL, SALVAGE AND ABANDONMENT OF EXISTING FACILITIES ........................... 9-28 DETECTABLE WARNING TAPES ........................................................................................... 9-30 PIPECLEANING ...................................................................................................................... 9-30 BARRICADES, WARNINGS AND FLAGMEN ......................................................................... 9-30 DISPOSAL OF SPOIUFILL MATERIAL ................................................................................... 9-30 MECHANICS AND MATERIALMEN'S LIEN ............................................................................ 9-31 SUBSTITU71ONS..................................................................................................................... 9-31 PRECONSTRUCTION TELEVISION INSPECTION/SANITARY SEWER LINES ................... 9-31 VACUUM TESTING OF SANITARY SEWER MANHOLES ..................................................... 9-34 BYPASSPUMPING ................................................................................................................. 9-35 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS .................. 9-36 SAMPLES AND QUALITY CONTROL TESTING .................................................................... 9-38 TEMPORARY EROSION SEDIMENTS AND WATER POLLUTION CONTROL .................... 9-38 INGRESS AND EGRESS/ ACCESS TO DRIVES ................................................................... 9-39 PROTECTION OF TREES, PLANTS AND SOIL ..................................................................... 9-39 SITE RESTORATION .............................................................................................................. 9-39 STANDARDPRODUCT LIST .................................................................................................. 9�10 STATE REVOLVING FUND (SRF) REQUIREMENTS ............................................................ 9-40 TOPSOIL, SODDING AND SEEDING ..................................................................................... 9-40 CONFINED SPACE ENTRY PROGRAM ................................................................................ 9�15 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ...................................... 9-46 EXCAVATION NEAR TREES ................................................................................................. 9-46 CONCRETE ENCASEMENT OF SEWER PIPE ..................................................................... 9-47 CLAYDAM ............................................................................................................................... 9-47 EXPLORATORY EXCAVATION (D-HOLE) ............................................................................. 9-47 INSTALLATION OF WATER FACILITIES ............................................................................... 9-4$ POLYVINYAL (CHLORIDE PVC) WATER PIPE ..................................................................... 9-48 BLOC KI N G .. ...... ................ . .... ...... ... .. . .... . . . . .... . .. ....................................................... .. ...... ........ 9-48 TYPE OF CASING PIPE .......................................................................................................... 9-48 TIE-INS ..................................................................................................................................... 9-48 CONNECTION OF EXISTING MAINS ..................................................................................... 9-49 VALVECUT-INS ...................................................................................................................... 9-49 WATER SERVICES ................................................................................................................. 9-49 2-INCH TEMPORARY SERVICE LINE .................................................................................... 9-51 ADJUST MANHOLES AND VAULTS (UTILITY CUT) ............................................................. 9-52 ADJUST WATER VALVE BOXES ........................................................................................... 9-52 PURGING AND STERILIZATION OF WATER LINES ............................................................. 9-52 WORK NEAR PRESSURE PLANE BOUNDARIES ................................................................. 9-53 WATER SAMPLE STATION .................................................................................................... 9-53 DUCTILE IRON AND GRAY IRON FITTINGS ......................................................................... 9-53 SPRINKLING FOR DUST CONTROL ..................................................................................... 9-54 DEWATERING......................................................................................................................... 9-54 TRENCH EXCAVATION FOR DEEP TRENCHES .................................................................. 9-54 TREEPRUNING ...................................................................................................................... 9-54 TREE REMOVAL ..................................................................................................................... 9-55 TESTHOLES .......................................................................................................................... 9-56 980J9-Partd doc 9 �2) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) FOR: 1998 CAPITAL IMPROVEMENT PROJECT - CONTRACT 3 PAVEMENT RECONSTRUCTION & WATER AND SEWER REPIACEMENTS ON OSCAR, HUTCHINSON, AND HALE AVENUES, AND 29T'�' STREET FORT WORTH, TEXAS SEWER PROJECT NO. PS 58-070580174420 WATER PROJECT NO. PW 53-060530175280 TIPW PROJECT NO. C1 1 5-0201 1 5040536 D.O. E. NO. 2135, 2136, 2137, 2138 D-1 AWARD OF CONTRACT: The City reserves the right to abandon without obligation to the contractor, any part of the project, or the entire project, at any time before the contractor begins any construction work authorized by the City. Award, if made, shall be to the responsive low bidder. The following shall apply for contract documents with multiple units of work. Each unit represents a separate project, each with an individual M/WBE specification and proposal section. The proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of the units, or all of the units. Award of contract(s), if made, shall be to the responsive low bidder for each individual unit. If a contractor is the responsive low bidder on two units or more, a single set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each unit. Bidders shall submit individual and separate monthly M/WBE reports for each Unit included in the Contract. Construction time on ail units will run concurrently. For situations involving approved contracts with multiple units, the total allowable construction completion time period for all the units shal! be the same as the unit with ihe longest construction time period. D-2 SUBMISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND PRE-CONSTRUCTION SUBMITTALS: The contractor(s) shall execute and return the contract documents to the Department of Engineering within ten (10) working days after notification by the City. A Pre-Construction meeting date will be established and noted in the Letter to Contractor. The effective work order date will be set at the pre-construction conference. The contractor(s) shall be required to start construction on the project no later than ten (10) calendar working days after the pre-constructron meeting date. The City shall begin to charge time on the project to the contractor eleven days after the pre-construction meeting date. Per City ordinance 13471, as amended by Ordinance No. 13781, the contractor(s) shall submit the letters of intent or a copy of the agreements with the approved M/WBE subcontractor(s) at or before the pre-construction conference. To expedite M/WBE compliance contractors are strongly encouraged to submit the executed letters of intent (with M/WBE subcontractors) at the time of submittal of the UTILIZATION FORM or GO�D FAITH EFFORT FORM. The letter(s) must be signed by both parties. If the contractor(s) fails to submit the letter(s) or agreement(s), the contractor(s) will not be allowed to begin work. Time on the project wi11 start to accumulate at the end of the ten (10) days as stipulated above. 960J9-Panddoc 9 (3) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) Additional submittals at time of pre-construction meeting shall include (but not limited to): Contractors Work Plan and Schedule Disposal Site for Waste Material Information Sub-Contractor ldentification Trench Safety Design (if required) Confined Space Entry Program Name and number of a responsible person for off hour emergencies Project schedule which must reflect a project completion date to be determined by the completion time period stipulated in the proposal section. The pre-construction conference is intended as a forum befinreen the contractor and the appropriate City staff to go over the project in detail and to afford the contractor the opportunity to submit all the required documents listed above. If the contractor faifs to submit any of the required documents, the contractor will not be allowed to begin work and time on the project will start to accumulate. D-3 GENERAL: The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project and shall govern over any conflicts with the General Cont�act Documents under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of one (1) year from date of final acceptance of this project by the City Council of the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorized by the City. Contract, if awarded, shall be as described in "Award of Contract" above. Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shaH be considered coope�ative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. 98039-Pend doc 9 �4� PART D SPECIAL CONDITIONS (WATER DEPARTMENT) Any Contractor performing any work on Fort Worth water or sanitary sewer facrlities must be pre-qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NC�RTH CENTRALTEXAS A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call- out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fo�t Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non- consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner be returned unopened. C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said 98039-Pand.doc 7 (5) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. D-4 TAX EXEMPTIONS: This contract is issued by an organization which qualifies for exemption pursuant of the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales tax under House Bill 11, enacted August 15, 1991. All such taxes shall be included in the various amounts on the Proposal Form. The successful Bidder shall be required to submit a breakdown between labor and material costs prior to execution of the contract. D-5 PROJECT DESIGNATION: Construction under these Special Documents shall be perFormed under the Project Designation: Project No. PS58-070580974420 D-6 EQUAL EMPLOYMENT PROVISIONS: Contractor shall comply with City Ordinance Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13- A-21 through 12-A-29) prohrbiting drscrimination in employment practices. The Contractor shall post the required notice to that effect on the project site, and at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. D-7 PRE-CONSTRUCTION CONFERENCE: Before the project work order is issued, a pre- construction conference shall be held with representatives of the following agencies present: City Engineering Department, City Water Department, City Public Works Department, other interested City Departments (such as Traffic), interested utility companies (such as gas, telephone, and electric), Design Engineer and the successful Contractor. Contractor shall submit a schedule of operations at the pre-construction conference. D-8 COORDINATION MEETINGS: For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The Contractor shall be present at all meetings. D-9 PROJECT ABANDONMENT: The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorized by the City. D-10 BREAKDOWN OF BID PROPOSAL: When requested by the Engineer, the Contractor shall furnish a cost breakdown of those bid items shown in the Proposal as lump sum items. This information is for use in the preparation of a recommendation to the City for award of contract. D-11 OMIT: 98039-Partd.doc 9 (6) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) D-12 CONTRACTOR COMPLfANCE WITH WORKER'S COMPENSATION LAW: A. Definitions: 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a caverage agreement (TWCC- 81, T1NCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. 2. Du�ation of the project - includes the time from the beginnrng of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materiais, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the govemmental entity p�ior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prsor to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, sf the coverage period shown on the current certificate of coverage ends during the duration of the project. 98039-Pand doc 9 � / � PART D SPECIAL CONDITIONS (WATER DEPARTMENT) F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known„ of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shaH post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing afl persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper feporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duratian of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new ce�tificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current ce�tificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 980J9-Pertd.doc 9 (O) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persvns providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provid�d the required coverage, or to report an employer's farlure to provide coverage". D-13 MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In accordance with City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business enterprises and women business ente�prises in City contracts. The Ordinance is incorporated in these specifications by reference. A copy of the Ordinance may be obtained from the Office of the City Sec�etary. Failure to comply with the ordinance shall be a material breach of contract. The M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM AND GOOD FAITH EFFORT FORM, as applicable, must be submitted within five (5) city business days after bid opening. Failure to comply shall render the bid non-responsive. Upon request, contractor agrees to provide the City complete and accurate information regarding actual work perFormed by a Minority or Women Business Enterprise (MlWBE) on the 98039-Pend doc 9 (9) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) contract and payment thereof. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state, or local laws or ordinances relating to false statement. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. The City will consider the contractor's performance regarding its M/WBE program in the evaluation of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate "good faith effort", shall result in a bid being rendered non-responsive to specifications. Contractor shall provide copies of subcontracts or co-signed letters of intent with approved M/V11BE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City's M/WBE office. The Contractor may count first and second tier subcont�actors and/or suppliers toward meeting the goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the M/WBE participation in the joint venture for a clearly defined portion of the work to be performed. All M/WBE contractors used in meeting the goals must be certified prior to the award of the Contract. The M/WBE contractor(s) must be certified by either the North Central Texas Regional Certification Agency (NCTRCA) or Texas Department of Transportation (TxDOT), Highway Division and must be located in the nine (9) county marketpface at time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE utilization or good faith effort forms as applicable. Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the original contract, the M/WBE coordinator shall determine the goals applicable to the work to be performed under the change order. During the term of the contract the contract shall: 1. Make no unjustified changes or deletions in it's MIWBE participation commitments submitted with or subsequent to the bid, and, 2. If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the contractor had represented he would perform with his forces, the contractor shall notify the City before subcontracts or purchase orders are let, and shall be required to comply with modifications to goals as determined by the City, and , 3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the contractor desires to change or delete any of the M/VVBE subcontractors or suppliers. Justificatson for change may be granted for the following: 980J9-Pertd.doc 9 (10) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) a. Failure of Subcontractor to provide evidence of coverage by Worker's Compensation Insurance. b. Failure of Subcontractor to provide required general liability of other insu�ance. c. Failure of Subcontractor to execute a standard subcontract fo�m in the amount of the proposal used by the Contractor in preparing his M/WBE Participation plan. d. Default by the M/WBE subcontractor or supplier in the performance of the subcontractor. Within ten (10) days after final payment from the City, the contractor shall provide the M/WBE Office with documentation to reflect final participation of each subcontractor and supplier used on the project, inclusive of M/WBEs. )-14 CALENDAR DAY: Delete paragraph C1-1.24, in Part C-General Conditions, in its �ntirety and substitute the following new paragraph: C1-1.24 Calendar Dav: A Calendar day is any day of the week or month. The Contractor will not be allowed to work on Sundays or any holidays observed by the City of Fort Worth. )-15 SUBSIDIARY WORK: Any and all work specifically governed by documentary �equirements for the project, such as conditions imposed by the Plans, the General Cont�act �ocuments or these Special Contract Documents, in which no specific item for bid has been �rovided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal for each bid item. Surface restoration, removal and replacement of fencing, and cleanup are general items of work which fall in the category of subsidiary work. D-16 WAGE RATES: The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on al{ work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates of wages be paid. 980J9-Pand doc 9 (11) PART D SPECIAL CONDITIONS (WATER DEPARTMENT) CiTY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATES FOR 1999 CLASSIFICATION RATE Air Tool Operator $9.00 Asphalt Raker $9.55 Asphalt Shoveler $8.80 Batching Plant Weigher $11.51 Carpente� $10.30 Concrete Finisher (Paving) $10.50 Concrete Finisher (Structures) $9.83 Concrete Rubber $8.84 Electrician $15.37 Flagger $7.55 Form Builder (Structures) $9.83 Form Liner $9.00 Form Setter (Pav & Curb) $9.24 Form Setter (Structures) $9.09 Laborer, Common $7.32 Laborer, Utility $8.94 Mechanic $12.68 Oiler $10.17 Servicer $9.41 Painter (Structures) $11.00 Pipelayer $8.98 Blaster $11.50 POWER EQUIPMENT OPERATORS Asphalt Distributor Operator $1 p.29 Asphalt Paving Machine $10.30 Broom or Sweeper Operator $8.72 Bulldozer $10.74 Concrete Curing Machine $9.25 Concrete Finishing Machine $11.13 Concrete Paving Joint Machine $10.42 Concrete Paving Joint Sealer $9.00 Concrete Paving Saw $10.39 Concrete Paving Spreader $10.50 Slipform Machine Operator $9.92 Crane, Clamshell, Backhoe, Oerrick, Dragline, Shovel $11.04 Foundation Drill Operator (Crawler Mounted) $10.00 CLASSIFICATION RATE Foundation Drill Operator (Truck Mounted) $11.83 Front End Loader $9.96 Milling Machine Operator $8.62 Mixer $10.30 Moto� Grader Operator (Fine Grade) $11.97 Motor Grader Operator $10.96 Pavement Marking Machine $7.32 Roller, Steel Wheel (Plant-Mix Pavements) $9.06 Roller, Steel Wheel (Other Flatwheel or Tamping) $8.59 Roller, Pneumatic Self-Pro Scraper $8.48 Scraper $9.63 Tractor - Crawler Type $10.58 Tractor - Pneumatic $9.15 Traveling Mixer $8.83 Wagon-Drill, Boring Machine $12.00 Reinfo�cing Steel Setter (Paving) $13.21 Reinforcing Steel Setter (Structures) $13.31 Steel Worker - Structural $14.80 Spreader Box Operator $10.00 Work Zone Banicade $7.32 Truck Driver - Single Axle (Light) $8.965 Truck Driver - Single Axle (Heavy) $9.02 Truck Driver - Tandem (Semi-Trailer) $8.77 Truck Driver - Lowboy/Float $10.44 Truck Driver - Transit Mix $9.47 Truck Driver - Winch $9.00 Vibrator Oprerator - Hand Type $7.32 Welder $11.50 98039-Partd doc 9� 1 2> PART D - SPECIAL CONDITIONS D-17 EASEMENTS AND PERMITS: The performance oi this contract requires certain "`�` temporary construction, right-of-entry ag�eements, and/or permits to perform work on private ,,, property. '" The City has attempted to obtain the temporary construction and/or right-of-entry agreements for *„� properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements which the City has obtained are available to the Contractor for review by contacting the plans desk at the Department of "" Enginee�ing, City of Fo�t Worth. Afso, it shall be the responsibility of the Contractor to obtain � written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requi�ements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additronal work room is required by the Contractor, it shall be the -• Contractors responsibility to obtain written permission from the property owners involved for the � use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits and shall pay any and all costs associated with the permit(s). It is the � Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. Any and all costs associated with compliance with permits(s) including payment for flagmen shall � be subsidiary to the project price. No additional payment will be allowed for this item. � D-18 COORDINATION W1TH FORT WORTH WATER DEPARTMENT: During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. �.. D-19 DAMAGE TO PRIVATE PROPERTY: The Contractor shall immediately repair or replace � any damage to private property, including but not limited to fences, walls, pavement and water and sewer services, at no cast to the Owner. This shall be subsidiary to the contract and not a separate pay item. ** � ... D-20 SHOP DRAWINGS: Shop drawings shall be submitted by the Contractor to the Construction Engineer, for all equipment and materials for this project. Contractor shall submit seven (7) copies of shop drawings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review. Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated action by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and speciircations unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the 980J9-Pend doc 9 (13) PART D - SPECIAL CONDITIONS submitted data. Processed shop drawing submittal are not change orders. The purpose of submittals, by the Contractor, is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for all dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of construction, coordination of his work with that of other trades and satisfactory perFormance of his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted, and sign or initial a statement included with the submittal, which signifies compliance with the plans and specifications and dimensions suitable for the application. Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Shop drawings shall be submitted for the following items prior to installation: 1. All pipe 2. Reinforced steel fabrication for structures 3. Cast lron structural appurtenances Shop drawings must be approved by the Engineer prior to the start of work. D-21 CROSSING OF EXISTING UTILITIES: Where a proposed water line crosses over a w► sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line anc! the clear verticaf distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made water tight or be constructed of ductile iron pipe. The required length of replacement shall be determined by the Engineer. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Payment for work such as backfill, fittings, tie-ins and all other associated appurtenances required, shall be included in the linear foot price of the appropriate bid item. D-22 EXISTING UTILITIES AND IMPROVEMENTS: The plans show the locations of a{I known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered su�cient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions for the support, protection, relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and ai{ other utilities and structures both above and below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or 98039-Pand.doc 9 ( l 4) PART D - SPECIAL CONDITIONS temporary relocation of such facilities shall be included in the cost bid per finear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility o� service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. `" Any and all permanent structures such as parking lot surface, fencing, and like structures shall be replaced at no cost to the City by material of equal value and quality as that damaged. In case it is necessary to change or move the property of any Owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by perfo�mance of this contract. � The utility lines and conduits shown on the plans are for information onfy and are not guarantesd by the City of the Engrneer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D-23 CONSTRUCTION TRAFFIC OVER PIPELINES: It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Anv damaqe to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. � In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results f�om any phase of his construction operation. � D-24 TRAFFIC CONTROL: The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provision set forth in the "1980 Texas f' Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701 d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. In addition, the Contractor shall comply with City of Fort Worth, Texas, February 1979, Traffic Control Handbook � for Construction and Maintenance Work Areas. �- The Contractor will not remove any regulatory sign, instructional sign, street name sign or othe� sign which has been erected by the City. If it is determrned that a sign must be removed to permit required construction, the Contractor shall contact the Transportation/Public Works Department, Signs and Markings Division, (Phone Number 871-8100) to remove the sign. In the 98039-Pertd doc 9 (15) � PART D - SPECIAL CONDITIONS case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, #he permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. � 1. The Contractor shall furnish barricades, flares, etc., for the protection of the public and the � work. 2. The cost of the traffic control shail be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be allowed. 3. The Contractor shall furnish a traffic control plan to the City at the pre-construction meeting. The cost for traffic control shall be subsidiary to the unit prices for this project. D-25 PAYMENT: Payment for all work and material involved in salvaging, abandoning, and/or removing of existing facilities shall be included in the linear foot bid price of the pipe except as follows: 1. Separate payment will be made for removal of all fire hydrants, gate valves 16-inch and larger, and sanitary sewer manholes regardless of location. 2. Payment will be made for salvaging, abandoning, and/or removing of all other existing facilities when said facility is not being replaced in the same trench, i.e., when removal requires a separate trenching operation. D-26 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed, a written statement thereof shall be presented by the Contractor to the Engineer, and if by him found correct, shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the perFormance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approvaf of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. D-27 DETOURS: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. 980J9-Pand doc 9 (16) PART D - SPECIAL CONDITIONS D-28 BARRICADES AND WARNING SIGNS: Barricades, warning and detour signs shall `"' conform to the Standard Specifications "Barriers and Warning and/or Detour Signs," Item 524, and/or as shown on the plans. Construction signing and barricades shall conform with "1980 � Texas Manual on Uniform Traffic Control Devices, Vol. No. 1" or latest edition there of. � D-29 EXAMINATION OF SITE: It shall be the responsibility of the prospective hidder to visit the project site and make such examinations and explorations as may be necessary to determine ail conditions which may affect construction of this project. Particular attention should be given ta methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper '� consideration should be given to these details during the preparation of the Proposal and all � unusual conditions which may give rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D-30 ZONING COMPLIANCE: During the construction of this project, the Contractor sha11 comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. D-31 WATER FOR CONSTRUCTION: Water for construction will be furnished by the -- Contractor at his own expense. "" D-32 WASTE MATERIAL: All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obst�uct proper drainage or to cause injury to street improvements or to abutting property. � D-33 CLEANUP FOR FfNAL ACCEPTANCE: Final cleanup work shall be done for this project � as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right-of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work � before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. Final acceptance of the completed project work shall be given by the City of Fo�t Worth Department of 4, Engineering. D-34 PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. � D-35 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK: Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. � D-36 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following .. procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, � Pand-WATFR doc 9� � 7 � � PART D - SPECIAL CONDITIONS _ . derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS � EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." _ 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating � cage-type of guard about the boom or arm, except back hoes or dippers, and insulator A links on the lift hook connections. 3. When necessary to work within six feet of high voltage elect�ic lines, notification shall be given the power company (Texas Utility Electric) who will erect temporary mechanical barriers, de-energize the lines, or raise or lower the lines. The work done by the power � company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to Texas Utility Electric, and shall record � action taken in each case. 4. The Contractor is required to make arrangements with the Texas Electric Service � company for the temporary relocation or �arsing of high voltage lines at the Contractor's •- sole cost and expense. R 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D-37 OMIT: � D-38 SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary � sanitary conveniences for the use of workers at the project site. Specific attention is directed to �„ this requirement. D-39 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item C-6-6, "Legal Relations and Responsibilities to the Public" of the Fort Worth General Conditions. D-40 RIGHT TO AUDIT: A. Contractor agrees that the City shall, until the expiratron of three (3) years after final payment '� under this contract have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions � relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this � section. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect � I that the subcontractor agrees that the City shall, under the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy I any directly pertinent books, documents, papers and �ecords of such subcontractor, involving � � transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with � r � 98039-Pend duc 7( 1 O) � PART D - SPECIAL CONDITIONS subsection (c) hereof. City shail give subcontractor reasonable advance notice of intended "' audits. � C. Contractor and subcontractor agree to photocopy such documents as may be requested by the City_ The City agrees to reimburse Contractor for the cost of copies as follows: � 1. copies and under - 10 cents per page 2. more than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter � D-41 INCREASE OR DECREASE IN QUANTITIES: The quantstres shown in the proposal are approximate. It is the Contractor's sole responsibility to verify all pay item quantities prior to "�` submitting a bid. When the quantity of the work to be done or materials to be furnished under any pay item of the contract is more than 125% of the quantity stated in the contract, whethe� stated by Owner or by Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for revised cons�deration on the portion of work above 125% of the quantity in the contract. .., When the quantity of the work to be done or materials to be furnished under any pay item of the contract is less than 75% of the quantity stated in the contract, whether stated by Owner or by ^ Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for revised consideration on the portion of work below 75°/a of the quantity stated in the contract. This paragraph shall not apply in the event Owner deletes a pay item in its entirety from this contract. � In the event Owner and Contractor are unable to agree on a negotiated price, Owner and Contractor agree that the consideration will be the actual field cost of the work plus 15% as described herein below, agreed upon in writing by the Contractor and Director of Department of Engineering and Contractor and Director of Department of Engineering and approved by the City �► Council after said work is completed, subject to all other conditions of the contract. As used herein, field cost of the work will include the cost of all workmen, foremen, time keepers, mechanics and laborers; all materials, supplies, trucks, equipment renta( for such time as actually used on such work only, plus all power, fuel, lubricants, water and similar operating expenses; and a ratable portion of premiums on performance and payment bonds, public liability, Workers `` Compensation and all other insurance required by law or by ordsnance. The Director of � Department of Engineering will direct the form in which the accounts of actual field cost will be kept and will recommend in writing the method of doing the work and the type and kind of equipment to be used, but such work will be performed by the Contractor as an independent �.. Contractor and not as an agent or employee of the City. The 15% of the actual field cost to be paid to the Contractor shall cover and compensate him for profit, overhead, general supervision and field office expense, and all other efements of cost and expense not embraced within the actual field cost as herein specified. Upon request, the Contractor shall provide the Director of Department of Engineering access to all accounts, bills and vouchers relating thereto. ,,. D-42 CUTTING OF CONCRETE: When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. � 98039-Fend d�c 9 (19) PART D - SPECIAL CONDITIONS D-43 PROJECT DESIGNATION SIGN: Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on sksds or posts. The exact locations and methods of mounting shall be approved by the Engineer. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shail be 1'-0" by 2'-0" in size. The information box shal{ have the following information: For Questions on this Project Call: (817)871-8306 M-F 7:30 am to 4:30 p.m. or (817)871-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the praject and no additional compensation will be allowed. D-44 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT: At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. Payment for cutting, backfill, required, shall be included driveway repair. concrete, forming materials and all other associated appurtenances „ n the square yard price of the bid item for concrete sidewalk or D-45 MISCELLANEOUS PLACEMENT OF MATERIAL: Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D-46 TYPE "C" BACKFILL: Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence the P.i. of the excavated material is less then 8.' Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, wrth a map showing the location and depth of the various test holes. � '� � � � 96019-Pend doc 9 �2�) 7 PART D - SPECIAL CONDITIONS If excavated material is obviously granula� in nature, containing little or no plastic material, the " Engineer may waive the test report requirement. See E-1.24, Type "C" Backfill, and E2.11 Trench Backfill.** * Revised 3/20/81 ** Revised 4/20/81 D-47 CRUSHED LIMESTONE BACKFILL: Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall ,�, conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill � and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, General Contract Documents. D-48 2:27 CONCRETE: Transportation and Publrc Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as �. base repair. Since this call-out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two {2) sacks of cement per cubic yard of concrete. D-49 TRENCH EXCAVATION, BACKFILL, AND COMPACTION: Trench excavation and �"' backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Section E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. A. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the � stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loading of the pipe will be exceeded, the Contractor wiH be required to support the pipe with an improved trench bottom. The expense of such remedial measures shall be entirely the Contractor's own. All trenching operations shall be � confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety � Systems Special Condition of this document. � � � B. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment mate�ial with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I, of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soi{s in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 T�ench Backfill for additional requirements. When Type "C" backfill material is not suitable, at the direction of the 98039-Pand doc 9 �21 > � PART D - SPECIAL CONDITIONS Engineer, Type "B" backfill material shall be used. In general, all backfill material for t�enches in existing paved streets shall be in accordance with Figure(s) A, B, C, or D. Sand material specified in Figure(s) A-D shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: Size Sieve % Retained #4 0-5 #16 0-20 #50 0-50 #100 60-95 #200 90-100 (P.I. = 8 or less) C. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by means of tamping only. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by jetting, mechanical taRiping, or a combination of inethods. Backfill material to be mechanicaUy tamped must be within +-4% of its optimum moisture content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water line may be rolled in with heavy equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfilf material to meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City_ These soil density tests shall be performed at two (2) foot vertical intenrals beginning at a level finro (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the Csty. D. MEASUREMENT AND PAYMENT: All material, including any and all Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. 980]9-Pand doc 9 �22> PART D - SPECIAL CONDITfONS D-50 PAVEMENT REPAIR (E2-19�: The unit price bid under the appropriate bid item of the " proposal shall cover all cost for providing pavement repair equal to or superior in composition, _ thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 1 through 5. All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with �equired materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential " driveways shall be accessible at night and over weekends. � It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement �epair wrll not hold up if such strip of existing pavement is two (2) feet or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet ar less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches � outside the trench wall nearest the center of the street to the gutter line. "'� The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Depa�tment of Engineering. � D-51 TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY: A. GENERAL: This specification covers the trench safety requirements for all trench �, excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and - all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. B. STANDARDS: The latest ve�sion of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P- Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. � C. DEFINITIONS: r 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in whrch the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. � 9 (23) 98039-Partd doc � A PART D - SPECIAL CONDfTIONS � � 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a � series of horizontal level or steps, usually with vertical or near-vertical surfaces between levels. � 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. � 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or . "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent �' structures or can be designed to be portable and move along as the work progresses. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. � 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or timer system that supports the sides of a trench and which is dessgned to prevent cave- ''� ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), •► horizontal rails (wales) and/or sheeting. � D. MEASUREMENT - Trench depth is the vertical measurement from the top of the exssting ground to the battom of the pipe or structures. The quantity of trench safety systems shafl be based on the linear foot amount of t�ench depth greater than five (5) feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench � safety systems. .. D-52 SANITARY SEWER MANHOLES: . r A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract � Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract � Documents and Specifications, unless amended or superseded by requirements of this Special Condition. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as � per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasketed manhole inserts shall be i installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according � to the manufacturer's recommendations. Stainless Steel manhole inserts shall be required for all pipe diameters 18" and greater. � 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal �i 98039-Partd doc 9 (24) � PART D - SPECIAL CONDITIONS sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one {1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. �' The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1/8 inch gap � between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans. Certainteed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with � two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Warth Water Department, excluding only the �� joints using a trapped type performed O-�ing rubber gasket shall require Bitumastic joint � sealants as per Figure M. This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded � pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by � a suitable removable wrapper and shall not in any way depend on oxidation, evaporatron, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidszing ,.. regardless of the length of time it is exposed to the elements. The manufacturer shali furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. � 98039-Panddoc 7 (LS} PART D - SPECIAL CONDITIONS B. EXECUTION: 1. INSTALIATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. A primer shall be applied to all surfaces prior to installing the joint sealant in accordance with the recommendations by the manufactu�er. The protective wrapper shall remain on the joint sealant until immediateiy prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhofe frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjuslments allowed. In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this leve3 are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhofe surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of a quick setting hydraulic cement to provide a smooth working surface. If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint materiai along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stanes, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 98039-Pand doc 9 (26) PART D - SPECIAL CONDITIONS `" 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with � two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46- 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. �„� 4. The exterior surface of all pre-cast section joints shall be thoroughfy cleaned with a wire brush and then waterproofed with a 1!2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. " C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include ,,,, all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint seaiing, lift hole sealing and exterior surface coating and pavement repair. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing, exterior surface coating and pavement repair. —� The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or seafing the manhole, including but � not limited to, joint sealing, lifthole sealing, and exterior surface coating. Payment fo� concrete collars will be made per each. Payment for manhole inserts will be made per each. +`° D-53 SANITARY SEWER SERVICES: Any reconnection, relocation, re-routes, replacement, or � new sanitary sewer service shall be required as shown on the plans, andlor as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing *„ standa�d factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case by case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when � taps will be required. Severed senrice connections shall be maintained as specified in section C6-6.15. � A. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection � and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer -� services on sewers being rehabilitated using prpe enlargement methods shall be replaced to the property or easement line or as directed by the Engineer. Procedures listed below for � Sewer Service Replacement shali be adhered to for the installatian of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four V 98039-Pand doc 9 (2 / } � PART D - SPECIAL CONDITIONS (4) feet of service line and a!I other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. B. SEWER SERVICE REPLACEMENT: All building sewer services encauntered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The length of the replacement shall be determined by the Engineer. All sewer services shall be installed at a minimum of two (2) percent slope or as approved by the Engineer. Connection to the existing sewer service line shall be made with appropriate adapter fitting. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. Payment for work and materials such as backfill, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D-54 NOT USED D-55 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES: Any removal, salvaging and/or abandanment of existing facilities will necessarily be required as shown on the plans, and/or described in these Specia! Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter bax shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Sectson E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor rn accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. 98039-Pand doc 9 (2O) PART D - SPECIAL CONDITIONS ... � D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shalf be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Bac�ll material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the vafve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be " abandoned by first closing the valve to the fully closed position and demolishing the valve box �„ in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vautts to be demolished in place shall have top slab and lid removed and vauit walls demolished to a point not less than 18" below final �- grade. The void area caused sha11 then be backfilled and compacted in accordance with backfifl method as specified in Section E2-2.9 Backfill. Backfill material shal{ be suitable � excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. � G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance � with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface � restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item - Abandon Existing Sewer Manhole. � L .-. H. REMOVAL OF MANHOLES: Manholes to be removed sha{I have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full ba�rel diameter section, and base section shalf be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the Engineer. Surface restoratron shall be compatible with su�rounding surface. I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer � mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred wili be considered to be � included in the linear foot bid price of the pipe, unless separate trenching is required. � J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be •- the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. � 98039-Partd doc 9 (29} PART D - SPECIAL CONDITIONS K. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). D-56 DETECTABLE WARNING TAPES: Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2'/z pounds/1 inchl100'. The tape shall be color coded and imprinted with the message as follows: Tvpe of Utilitv Color Code Water Sewer Safety Blue Safety Green Leqends Caution! Buried Water Line Below Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). D-5T PIPE CLEANING: Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D-58 BARRICADES, WARNINGS, AND FLAGMEN: Reference Part C- General Conditions, Section C6-6.8 Barricades, Warnings, and Watchmen: A. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word Flagmen. B. In the first paragraph, lines five (5) and six (6), change the phrase "take all such other precautionary measures" to "take all reasonable necessary measures". D-59 DISPOSAL OF SPOIUFILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Engineering Department, acting as the City of Fort Worth's Flood Plain Administrator ("Administratar"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the 980J9-Partd doc 9 (30) PART D - SPECIAL CONDITIONS Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must " be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contracto�'s disposal sites shail be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes oi spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoil/fill `"' material at its expense and dispose of such materials in accordance with the Ordinances of the r City and this section. D-60 MECHANICS AND MATERIALMEN'S LIEN: The Cont�actor shall be required to execute a release of inechanics and materialmen's liens upon receipt of payment. D-61 SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a �-- substitution for the material which has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name `� so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the proposed substitute is procured by the Contractor. Where the term "or equal", or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full respansibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub-section as related to "substitutions" shall be applicabie to all sections of *� these specifications. D-62 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER �„ A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment � necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. � � � 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scou�ing action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring manhole walls and floor. The gun shall be capable of producing flows fram a fine spray to 98U79-Parld dot 9 (31) PART D - SPECIAL CONDiTIONS a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any trme during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment which cannot be collapsed is used, special precautions ta prevent flooding of the sewers and public or private property shal! be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. When additional quantities of water from fire hydrants is necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to c{eaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shal! be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. 98079-Pand doc 9 (32) PART D - SPECIAL CONDlTIONS B. EXECUTION: � �- 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, N cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation sha{1 be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the fine, �' telephones or other suitable means of communications shall be set up between the two ,,.. manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of ineter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidenta! to Television � inspection. � 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of �"` significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. ,�. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the �` Engineer, as long as such photographing does not interfere with the Contractor's operations. � 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual �„ and audio record of problem areas af the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes � shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. r-- Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of revrew by the Engineer. Tapes shall not be erased without the permission of the Engineer. W 980J9-Partddoc 9 (33) PART D - SPECIAL CONDITIONS If the tapes are of such poor quality that the Engineer is unable to evatuate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made fo� portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. Tapes will be returned to the Contractor upon completion of review by the Engineer. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre-Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidentaf and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for N Inspections. The cost of retrieving the N Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspectian. The item shall also include all costs of installing and maintaining required to provide reliable, regular sewer service to the area residents shall be incidental to the project. D-63 VACUUM TESTING OF SANITARY SEWER MANHOLES any bypass pumping — . All bypass pumping ,,,,� ... s A. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer � manholes. � � 98039-Pertd doc 9 (34) � PART D - SPECIAL CONDlTIONS , B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be tested with all connections in place. Lift holes � shall be plugged, and all drop-connections and gas sealing connections shall be installed prior to testing. �- The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop-connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturers recommendations. A vacuum of ten inches of inercury (10"Hg) shall be drawn and the ' vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read _ after the �equired test time. The required test time shall be determined from the Table I befow in accordance with ASTM C1244-93: Table I MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg - 9"Hg) (SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.} Manhole Manhole 0 to 16' 40 sec. 52 sec. � r� 1$' 20' 22' 24' 26' 28' 30' For Each Additional 2' 45 sec. 50 sec. 55 sec. 59 sec. 64 sec. 69 sec. 74 sec. 5 sec. 59 sec. 65 sec. 72 sec. 78 sec. 85 sec. 91 sec. 98 sec. 6 sec. 2. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one-inch of inercury (1" Hg) after the required test time. Any manhole which fails to pass the initial test must be repaired with a suitable material which conforms to the construction material of the manhole. The manhole shal! be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, r and all incidentals, including all bypass pumping, required to complete the test as specified herein. D-64 BYPASS PUMPING: The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging 98019•pnrtd doc .... 9 (35) PART D - SPECIAL CONDITIONS � � � existing upstream manhole and pumping the sewage into a downstream manhole o� adjacent � system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. P�ovisions shall be made at driveways and street crossings to permit � safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental R to rehabilitation or replacement of the sewer line. D-65 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER: � r A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television ""�' inspectian performed. Work shal! consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory � precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. wR B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection �- shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and ` other components of the video system shall be capable of producing picture quality to the w satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. � C. EXECUTION: � 1. TELEVISION INSPECTION: The camera shall be moved through the line in either �,„ direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater ! than 30 feet per minute. Manual winches, power winches, N cable, and powered i„r rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. � When manualfy operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure goad communications between members of the crew. The importance of accurate distance measurements is emahasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of ineter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the — passage of a camera. The methods used for securing passage of the camera are to be at � the option of the Contractor. The cost or retrieving the Television camera, under all ' circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. � � 96039-Pend.dot 9 (3b) � � � PART D - SPECIAL CONDfTIONS Sanitary sewer mains must be laced with enough water to fill all low pinis. The television - inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image af sewer being inspected. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Cont�actor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to stationing as shown on the plans. A copy of these television logs will be supplied to the City. r 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the televisron picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be rep{ayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of revrew by the Engineer. Tapes shall not be erased without the permission of the Engineer. .. !f the tapes are of such poor qualitv that the Enaineer is unable to evaluate the condition i of the sewer line or to locate service connections, the Contractor shall be required to re- Z.� televsse and provide a qood tape of the line at no additional cost to the Citv. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no "" payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portsons where manholes cannot be negotiated with the television camera. ,,... D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be �` per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality that the particular prece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Televis'ron inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be ` included in the appropriate bid item - Post-Construction Television Inspection. •- The item shall also include all costs of installing and maintaining required to provide reliable, regular sewer servrce to the area residents shall be incidental to the project. r� any bypass pumping . All bypass pumping � 98039-Pand doc 9 (37) PART D - SPEClAL CONDITIONS D-66 SAMPLES AND QUALITY CONTROL TESTING: A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials praposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactu�ed items to be used in the project and will bear any expense related thereto. 6. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provrde a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D-67 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL: A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble tiners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surFace area of erodible-earth material exposed by preparing nght-of-way, clearing and grubbing� the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to con#rol soil erosion. Temporary pollution-control measures shall be used to prevent or correct � � 98039-Pertddoc 9 (38) � PART D - SPECIAL C�NDITIONS erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures cur�ent in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 1. Waste or disposal areas and construction roads shall be located and constructed in a "" manner that will minimize the amount of sediment entering streams. 2. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 3. All waterways shall be cleared as soon as practicable of false work, piling, debris or othe� obstructions placed during construction operations that are not a part of the finished work. 4. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be grven for this work. D-68 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES: The Contractor �' shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be ieft accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall �„ be made to an owner prior to his driveway being removed and/or rebuilt. r D-69 PROTECTION OF TREES, PLANTS AND SOIL: All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than existed prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owneFs' consent). Pruned limbs of 1" diameter or larger shall be thoroughly ,M treated as soon as possible with a tree wound dressing. � D-TO SITE RESTORATION: The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer wil{ be grade restoration to plus minus one- tenth (0.1) of a foot. W 98039-Partdd« 9 (39) � PART D - SPECIAL CONDITIONS D-71 CITY OF FORT WORTH STANDARD PRODUCT LIST: Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List, shall be considered to meet City of Fort Worth minimum technical requirements. D-72 STATE REVOLVING FUND (SRF) REQUIREMENTS: This project, in addition to standard City of Fort Worth requirements, may involve certain State requirements. These requirements, if applicable, are provided in the following documents and should thoroughly be reviewed and completed by the contractor. They include: 1. At the Time of Contract Document Execution • ED-103-Contractors Act of Assurance • ED-104-Resolution Work required to conform to these requirements shall be considered subsidiary and no extra payment will be made. The SRF requirements are included in Appendix A. D-73 TOPSOIL, SODDING AND SEEDING: This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding and Seeding. 1. TOPSOIL DESCRIPTION: This item will consist of furnishing and placi�g a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shali be alive and acceptable. Bermuda and Buffalo grass sod shall have a 98019-Pand doc 9 (40) i PART D - SPECIAL CONDITIONS healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum `'" thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existtng lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the saurce shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the i- requirements hereinafter described. Sodding shall be either "spoY' or "block' ; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-haif (1/2) � inch beiow the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be ca�efully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. � At locations on the Drawings or where directed, sod bfocks shall be carefully pfaced on the prepared areas. The sod shall be so placed that the entire designated area shall be � covered, and any voids left in the block sodding shall be filfed with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact �. solid mass. SurFaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall,. upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. ` When necessary, the sodded areas shall be smoothed after planting has been completed .- and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. 98019-Pend doc r 9 (41) PART D - SPECIAL CONDITIONS The sodded areas shall be thoroughly watered immediately after they are ptanted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. The specified seed shall equal or exceed the following percentages of Purity and germination: Common Name Purity Germination Common Bermuda Grass Annua! Rye Grass Tall Fescue Western Wheatgrass Buffalo Grass Varieties Top Gun Cody 95% 95% 95% 95% 95% 95% 90% 95% 90% 90% 90% 90% Table 120.2.(2)a. URBAN AREA WARM-SEASON SEEDING RATE (Ibs.); Pure Live Seed (PLS) Mixture for Clav or Tiqht Soils Mixture for � Sandv Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 98039-Partd doc 9 (42) PART D - SPECIAL CONDITIONS Table, 120.2.(2)b TEMPORARY COOL-SEASON SEEDING RATE; (Ib.) Pure Live Seed (PLS) � � � � DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall � be loosened to a minimum depth of three (3) inches and a{I particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-46, Construction Methods. Dates Aug 15 to May 1 (All Sections) Tall Fescue Western Wheatgrass Annual Rye Total: 50 50 50 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertslizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D-46, Construction Methods, is not applicable since no seed bed preparation is required. � The seed, or seed mixture, specified shall then be planted at the rate required and the � application shall be made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked or harrowed inta the soil to a depth of approximately one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of � the "Cultipacker" type. All rolling of the slope areas shall be on the contour. �: � � ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and ali particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 46, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. 96039-Penddoc 9 (43) � � PART D - SPECIAL CONDITIONS � r After the watering, when the ground has become sufficiently dry to be loose and pliable, the '"� seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, � the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may rl� be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of � approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface ��- without ruts or tracks. In befinreen the time compacting is completed and the asphalt is � applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth. '� The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall ' be of the type and grade as shown on the Drawings and shall conform to the �equirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawrngs are not included, then MS-2 shall be used. Applications of """ the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied •� to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. ` � RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 � with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turF and achieve adequate +� soil penetration. �, '` Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the - soil and places the seed in the slit which is then pressed close with a cultipacker wheel. y�, CONSTRUCTlON WITHIN PARK AREAS ,.. TURF RESTORATION OF PARK AREAS: FERTILIZER F DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas � as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis af 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. � 98039-Partd dot 9 (44) � PART D - SPECIAL CONDITIONS CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and `' proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to � be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physicai condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. � Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and faur hundred (400) pounds per acre for all types of "Seeding". " MEASUREMENT: Topsoil secured from borraw sources will be measured by the square yard � in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for "Seeding" will be measured by the linear foot, complete in place. Acceptable material for "Sodding" will be measured by the linear foot, complete in place. Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding. � PAYMENT: All work perforrned as ordered and measured as provided under "Measurement" "� shall be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. a� All tabor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items � and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, wrll be paid for at the contract unit r" price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for ali watering; for disposal of all surplus materials; and for all materials, labor, equipment, tools and incidentals necessary to complete the work, all in accordance with �„ the Drawings and these Specifications. � The work performed and materials furnished and measured as provided under Measurement shall be paid for at the unit price for Seeding , or Sodding , of the type specified, as the case may be, which price shall each be full compensation for furnishing all � materiais and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered � subsidiary to Sodding and Seeding. •- D-74 CONFINED SPACE ENTRY PROGRAM: It shall be the responsrbility of the contractor to imp(ement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA as "permit required confined � 98039-Partd doc 9 (45) � PART D - SPECIAL CONDITIONS spaces". Cont�actors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for a11 applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. D-75 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTtON: 1. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the p�oject is substantially complete. 2. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantiafly completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 3. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 4. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall stitl be required to address afl other deficiencies which are discovered at the time of final inspection. 5. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspectron" of PART C- GENERAL CONDITIONS. D-76 EXCAVATION NEAR TREES: 1. The Contractor shall be responsible fo� taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a"snow fence" along the drip line or edge of the tree root system between tree and the construction area. 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. 5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 98039-Pend doc 9 (46) PART D - SPECIAL CONDITIONS .�► "� � 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. � �„ D-77 CONCRETE ENCASEMENT OF SEWER PIPE: Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with instal{ation and reinforcement of the conerete encasement. i"' D-78 CLAY DAM: Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations � indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shal{ consist of compacted bentonite clay or 2:27 concrete. Payment for �" work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. D-79 EXPLORATORY EXCAVATION (D-HOLE): The Contractor shall be responsible for ++ verifying the locations of all existing utilities prior to construction, in accordance with item D-22. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D- � Hofe), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans *' or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. .w The cantractor shail make the necessary repairs at the exploratory excavation (D-Hole) to obtain � a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). � Payment shall not be made for verification of existing utilities per item D-22. Payment for explo�atory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surFace restoration, field ,,,,, surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. � 9R0)9-Partd doc 9 (47) � PART D - SPECIAL CONDITIONS D-80 INSTALLATION OF WATER FACILITIES 80.1 Polyvinyl Chloride (PVC) Water Pipe: POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). 80.2 Blocking: Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the Gene�al Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 80.3 Type of Casing Pipe: 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AVWVA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of Genera{ Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AVWVA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering siyle) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. 80.4 Tie-Ins: The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of exssting line tie-ins between the contract drawings and what may be encountered in the field shaU be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. 98079-Partd doc 9 (48) PART D - SPECiAL CONDITIONS �.. r 80.5 Connection of Existing Mains: The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48- hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C- GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. 80.6 Valve Cut-Ins: It may be necessary to cut-in gate valves to isolate the water main �- from which the extension and/or replacement rs to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time `� necessary to cut in the new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. � Payment for work such as backfill, bedding, fittings, blocking and all other associated �"' appurtenants required, shall be included in the price of the appropriate bid items. 1�.,, 80.7 Water Services: The relocation, replacement, or reconnection of water services '�" will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured �, tap saddles (when required) and corporation stops, type K copper water tubing, cu�b stops with lock wings, meter boxes, and if required approved manufactured �� service b�anches. All materials used shall be as specified in the Material Standards (E1- 17 & E1-18) contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- �, inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. � All services which are to be replaced or relocated shall be installed with the service main tap and service line being in line with the service meter unless otherwise directed by the Engineer. � 98039-Pertd doc 9 (49) � PART D - SPECIAL CONDITIONS A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTfON OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After tnstallation of the water service in the proposed location and receipt of a mete� from the project inspector the contractor shall install the meter. The mete� box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shal{ be performed by a licensed plumber. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. 2. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is coppe� and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as �equired for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each servtce reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5) feet behind the Meter. 3. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the servrce meter relocation. All other costs will be included in other appropriate bid item(s). 98039-Pand doc 7 �JD) PART D - SPECIAL CONDITiONS This item will also be used to pay for all service meter and meter box relocations as `"� required by the Engineer when the service line is not being replaced. Adjustment of only .-. the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. `" Payment for all work and materials such as backfill, fittings, type K copper tubing, and ,�, curb stop with lock wings shaA be included in the Linear Foot price bid for Service Line from Main to Meter five (5) feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. � 5. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the � contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). � 6. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple � service lines with taps senricing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. F Payment shall be made at the unit bid price in the appropriate bid item(s). 80.8 2-Inch Temporary Service Line: The 2-inch temporary service main and 3/4-inch r„ service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor �- shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be perfarmed in an expeditious manner. Severed water senrice must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of " connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" � temporary service line shall be cleaned and sterilized by using chforine gas or chlorinated lime (HTH) prior to installation. � 99079-Partd.doc 9 (51) PART D - SPECIAL CONDITIONS A two-inch meter will be furnished by the Water Department Meter Shop and installed by the Contractor at its point of connection to the City water supply for record keeping purposes only. The out-of-service meters shall be �emoved, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Coniractor shall re-install the meters at the correct iocation. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Enginee�. The temporary service layout shall have a minimum avaiiab{e flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next successive project location. Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. 80.9 Adjust Manholes, and Vaults (Utility Cut): Contractor will be responsible for adjusting water valve boxes, manholes and vaults to match new pavement grade. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 80.10 Adjust Water Valve Boxes: Contractor will be responsible for adjusting water valve boxes to match new pavement grade. The water valves themselves will be adjusted, if necessary, by City of Fort Worth Water Department forces. Prior to the beginning of work, the Contractor shall make an inventory of the condition of existing water valve boxes. The Construction Engineer will field verify this inventory and provide the Contractor replacements for broken valve boxes. The contractor shall replace the valve boxes which are damaged during construction at no cost to the City. The unit price bid per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. 80.11 Purging and Sterilization of Wate� Lines: Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50} PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The iine may not be placed in service until two 98039-Pertddoc 9 (SZ) PART D - SPECIAL CONDITiONS successive sets of samples, taken 24 hours apart, have met the established standards of `" pu�ity. � Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the �„ pipe. 80.12 Work Near Pressure Plane Boundaries: Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" `" valves installed are installed closed and no cross connections are made between pressure P, planes 80.13 Water Sample Station: GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. �- The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations � Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper senrice line will be shall be � included in the price bid for copper Service Line from Main to Meter. �"' Payment for all work and materials necessary for the installation tap saddle (if required), L corporation stops, and fittings shall be included in the price bid for Service Taps to Main. �"' Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid fo� Water Sample Stations. �„ PAYMENT FOR FIGURE 33 INSTALIATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the � price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, �^ modification to the vault, fittings, and all type K copper service line which are required to p�ovide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. � 80.14 Ductile Iron and Gray Iron Fittings: �- Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: the first Paragraph shall be revised to read as follows: � � 980J9-Partd doc 9 (53) PART D - SPECIAL CONDITIONS E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle necessary fo� construction as designed. All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie- down cancrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included rn bid items for vales and fittings and no other payments will be allowed. D-81 SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shali apply. However, no direct payment will be made for this item and it shall be considered to this contract. D-82 DEWATERING: The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D-83 TRENCH EXCAVATION ON DEEP TRENCHES: Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D-84 TREE PRUNING: A. � REFERENCES: National Arbo�ist Association's "Pruning Standards for Shade Trees". ROOT PRUNING EQUIPMENT 1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner 98039-Pand doc 9 (54) PART D - SPECIAL CONDITIONS C. NATURAL RESOURCES PROTECTION FENCE � 1. Steel "T" = Bar stakes, 6 feet long. 2. Smooth Horse-Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). � 3. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 4. Combination Fence: Commercially manufactured combination soil separator fabric on `" wire mesh backing as shown on the Drawings. .- D. ROOT PRUNING 1. Survey and stake location of root pruning trenches as shown on drawings. � 2. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. 3. BackfiN and compact the trench immediately after trenching. � 4. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 5. Within 24 hours, prune flush with ground and backfill any exposed roots due to W construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 6. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, r' equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. � F. Tree Pruning shall be considered subsidiary to the project contract price. D-85 TREE REMOVAL: � Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and burfed. The Contractor shall immediately repair or replace any � damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shaN be considered subsidiary to the project contract � price and no additional payment will be allowed. � 98019-Pend doc 9 (55) � PART D - SPECIAL CONDITIONS D-86 TEST HOLES: �'� The matter of subsurface exploration to ascertain the nature of the soils, including the amount of �„ rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. "' Whether prospective bidders perform this subsurface exploration jointly or independently, and � whether they make such determination by the use of test holes or other means, shall be feft to the � discretion of such prospective bidders. If test borings have been made and are provided for bidder's information, at the locations shown � on the lags of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material .. encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations w- as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the � required excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appu�tenances, if required, shall be included in °'* the linear foot bid price of the pipe. +� � � 1 �� � t ' � � � 980J9-Pendd« 9 �SIJ) � Pay Item 23. 24. 25 26. Approximate DescripHon of $id Item Prices Unit Quantiry Written in Words Price Furnish and install, install all appurtenant work, complete in place, the following items. � 5 CY Type "E" (1500 psi) Concrete for $l't� � Miscellaneous Placement � ,�f.c�c_. t- nou�rs & 1 �J' �i��'�.' Cents per CY 5 CY Crushed Limestone for Miscellaneous ����' ��vl Placement ���+�'lt,�,k noii� & :l �_ �-� ' Cents per CY � 5 CY Ballast Stone for Miscellaneous $,�:��' ' F� Placement .��.f� "�t� � �n� & ,� ��' � % ' Cenu per CY 5 CY Type "B" (2500 psi) Concrete for Miscellaneous Placement hl��-c�.� •_��GLc.-� nouars& 1 � ��� �L- ` Cents per CY IIF73VORTNIPROJEC731202198198039L1D�L11FinalSpecsforCIP198039proposaldoc 7 �%� Total Price . f� $ -�� �.� �� � /�'� , s L' $ / S Z� $ �.a%-�, �'�-' $ ��_-=`'�.��' � . Pay Item 27 28. Approximate Descnption of Bid Item Prices llnit QuanHty Written in Words Price Furnish and install, insiall all appurtenant work, complete in place, the following items. �° jt �C,' 290 LF Permanent Asphalt Paving Repair, Fig. 4$��:'� �. r7 � ,,G c. .�'� v(. ��C.C_-l:� �onars & �l 1 =<-' Cents per LF 7230 LF Two Inch Hot Mix Temporary Paving Repair, Fig. A, Case 3 �ouan & Cencs per LF $ �i`i',�1 "i'o[ai �'rice $ �/�� ��� O'V $ •-� � A �� L}�� :�t�' r UNIT 1- SECTION A-(WATER IMPROVEMENTS) SUBTOTAL $ ?�'�, �f`� �. �� � IIF7IVORTHIPROJEC7J12021981980391AD,ti1lFinalSpecsjo�CIP198039proposaLdoc % �g� NO.OF FITTINGS 7 3 9 2 2 2 12 LIST OF CAST IRON FITTINGS TO BE SUBMITTED WITH BID SIZE OF FITTINGS 8" x 6" 8„ X 8„ 8"x6" g,� g,� g„ g„ TYPE OF FITTING TEES TEES REDUCER CROSS SOLID SLEEVE 22.5 BEND 45 BEND IIF7'fVORTfiIPROJECT312021981980391AD,ti1lFina! SpecsJor C/P198039 proposal.doc WEIGHT PER EACH FITTING INCLUDING ACCESSORIES FITTING 241 Ib 260 lb 136 lb 251 lb 143 lb 601b 851b TOTAL: 7 (9) TOTAL WEIGHT (TONS) 0.84 0.39 0.61 0.25 0.14 0.06 0.51 2.80 Tons � ri Pay Approzimate DescripNon of Bid It�m Prices Unit Total Item Quantity Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the tollowing items. UNIT I- SECTION B(SA1vITARY SEWER IMPROVEMENTS) 29. 30. 31. ** 32. .��;-- L!�J 5 LF Insta116" SDR-35 Sanitary Sewer Pipe $�' � by Open-cut, All Depths ^�'�� `� ����L-C non� & � /1�� � w Cents per LF 50 LF Insta116" Class 51 D.I. Sanitary Sewer Pipe by Open-cut, All Depihs � �� ,,_�, 7ti �,J�LU�-� �(,�,� �' A it � � - �ou ar� & ,� `��� � � � Cents per LF ; � �- st! 158 LF Rehab 6" Sanitary Sewer Pipe by CIPP $�-'''� � or FAFP / L(, ��L � r no��ars & `,r J� � Cents per LF ��� 1263 LF Install 8" SDR-35 Sanitary Sewer Pipe $-_� 4� by Open-cut, All Depths ��-L- �c., � ,� , \ � c t� L 7` Dollars & � �1� ��-' Cents per LF ** Contractor must complete City approved method form on page 7(18) �nfl $ �?�� • �- O �� ' �' �� �' . �. eU $ /`�. �� ��"�, .� b' � $���,.��C��. x � IlF7'WORTHIPROJEC731202198198039L4DA�IFirralSpecsforCIP198039proposal.doc % �1�� �. ' ■ A Pay Item 33. * 34. 35. 36 Approximate DescripHon of Bid ltem Prices Unit Total QuanNry Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. ,, t.r 60 LF Rehabilitation and Enlazgement of $ ��' �� � $��`�L� d�- E�cisting 6" Sewer to 8" Sewer by Pipe Bursting Method ��,� �l c,� �"��,c �� � C�.�� � c�. ���-,�r non� & . , ,�� �.y Ccnts per LF �:.C'i �'�' 316 LF Install 8" Class 51 Ductile Iron Sanitary $.� � $�%'� ,���' � Sewer Pipe by Open-cut, All Depths �1,�..h,�L� ,'� i ��C.J 1385 LF Trench Safety System> 5' Uouars 8c Cents per LF � '� nou� & y�� Cents per LF 3 EA Remove Existing Sanitary Sewer Manhole c� a _ �,(,L.Q�3 t f �.�'� �"Za � nouar� & y�,(,� Cents per EA * Contractor must complete City approved method form on page 7(18) IIF7�f'ORTf�1PROJEC731202198198039UDMIFinalSpecs jor CIP198039 proposal.doc %� 1 1� � / � i N �.' $ 'i G c, � ' i' r � � �, $ �' � �� . $ ..�'� �� : 1 � � Pay Item � 37. r , 38. � 40 Approximate Description o[ Bid Item Prices Unit Quantiry Written in Words Price Furnish and install, install all appurtenant work, complete in place, the following items. � _-�! 5 EA Construct Standazd 4' Diameter Sanitary $(�"r�-� ' Sewer Manhole , �' Jn�u r ����'.��_� a-��''�v���� �u�& , �`�� { ='� Cenis per EA OD 1 EA Construct 4' Diameter Drop Sanitary $�� +� e"�'' Sewer Manhole � �� � �-��� �s'1.� F°�l,l. 1 �� �'�-' no��ars & `i �./_� Cents per EA 1 EA Construct 4' Diameter Shallow Sanitary ��`� �•' ��M � Sewer Manhole � c� ��� , .1 ��"� '� `� �ouars & � ����'�� Cents per EA ,� �. ='Ls 3 EA Concrete Collar for Manhole $ rl ��' - �./ � , � 1'�( �r '�� c�. 13uFtaas dc ��-� Cents per EA IlF7WORTHIPROJEC7312021981980391ADMIFinalSpecsjorCIPI98039proposal.doc % �I2� Total Price ,� ti' ,• Q" L,) .�/��i �._ / a+ �U $ �' �" �"'��� .�-� � $ i ����: • � c!i�1 $ F�� ; �+�� k J � pay Item 41. 42. 43 44. 45. Approximate De9cription of Bid Item Prica Uait Quantity Written in Words Price Furnis6 and install, install all appurtenant work, complete in place, the following items. �, �' 7 EA Watertight Sanitary Sewer Manhole �{�� � Inserts (: f ����- -. ��°L�' r�it�� �`J � �`� i ' Cents per Fn 7 VF Additional Depth over 6' of Standard Manhole l__- �c �!�"�.e.�{..t ,� �i��xa� ,� 1 ,•� ��• l�C. Cenu per VF 2.5 VF Additional Depth over 6' of Drop Manhole ��� Y � �J�l� �- i -` � (-1 � �- J� : � Total Price , _`'� ` .� ,d� � � K, � �"C� � � /:'' ---�'� Jp.-i.— �i(J $ , �' .�r ` a, � �'�•'�.•� :�` nouars & ,� � f'`�! Cents per VF � �A Rehab Sanitary Sewer Manhole $ � $ � � � _ �' 1"��, � +� � :�� � �� � � nou� & - Cents per EA ��I s'�t` �41 44 LF Concrete Encase of Sanitary Sewer Pipe $ �U� $--� -� ��� ( �G ��� r, C7�na�s & � '� ��.�� Csnts�er YF IIF714'ORTHIPROJEC73120219819803944DMIF'inalSpecsjorCIPI98039proposaLdx % �13� � � � � � � �ay Approzimate Descripdon of Bid Item Prices Unit Item 46. QuanHty Written in Words Price Furnish and install, install all appurteoant work, complete in place, the following items. 6iJ 7 EA Vacuum Testing of Sanitary Sewer $/` l��' � Manholes f �,!�T �[ �F� �-�C�`�.( C � nou� & �= �' Cents per VF Total Price 47. EA Re' Services; +Qpen Cut M�thvd $ � $ � . � �� � � � � � � cC"�� � 48. 49. 50. nat�� � Cents per EA GL� 2 EA Reinstate Services; Pipe Enlazge Method $�/ C�� � ���� � �� ���� �",�.,�',�.�'� ,�- �,�� ��� GG�!'��..� ���.c.��`�.Q �`� nou�& � i �� Cents per EA 1866 LF Pre-Construction TV Inspection of $�i -�' � Sanitary Sewer Line ��-�--+�� non� & � + ? _ l�1'��lQ �, �l ;-- ���L��-�-f Ccntsper LF J 41 EA Four Inch Sanitary Sewer Tap �l(J-0 l�G�'�e c� �L��. non� & �'' : I �"�'� r'' Cents per EA IIF7IVORTtflPROJEC731202198198039WDb11FinalSpecsjo�C/P198039proposaLdoc % �14� ,,, a � � ,-� _��, . �^, � $���i��'� �i�Ll� • $ �/ �I�, ��} � c� � Ic�' �'��, � Pay Item 51 52. 53. 54 Approximate Descriptioa of Bid Item Prices Unit QuanHty Written io Words Price Furnish and install, install all appurtenant work, complete in place, the following items. , 1010 LF Four Inch PVC Sanitary Sewer Service $ ��G', �`" Line Replacement � .r� Y- ���_ mu� & , � l n�� Cents per LF Total Price $ /�' �`�c��� `� tY �I 50 LF Four Inch Sanitary Sewer DIP $ l�7 ��� $��'`� ir� ,�.L'���-�F, 7t�-�-�='�'� m���& / �L� � Cents per LF f - �� 2 EA Four Inch DIP Sewer Tap $.��=� 'a e .l�,�Q �h1��,��i4�,f0� . �Ll��� �onars & _ �! �,W �"%�1 {�� Cents per EA 2096 LF Post Construction Television Inspection $�� �, J for Sanitary Sewer ^�L��-f' nou�& ��. �4. � � � �- � �. Cents per LF U IIF7'iVORTFIIPROJEC7312011981980391ADMlFinal Specsjor CIPI98039 proposal.doc %� 1$� � ��9cy. � y $ �f "7/�%. o-U Pay Item 55. 56. 57. 58. Approzimate DescripHon of Bid Item Prices Unit Total QuanHty Written in �Vords Price Price Furnish and install, install all appurteoant work, complete in place, the following items. 5 CY Type "B" (2500 psi) Concrete for $ d�:' `� . � � $�'"' �� a� Miscellaneous Placement ��J�s .� +� .� � ��Ct.l nou� & � � � `,�n —f ! I" N Cents per CY �C :. , r, �J 5 CY Type "E" (1500 psi) Concrete for $�% �. $..�C�% Miscellaneous Placement � ,cl�c nouars & � � I � �" Cents per CY � y(' `• [, 5 CY Crushed Limestone for Miscellaneous $���' � $ f���' Placement �� JL�,� nou� & � �� �. f�� Cents per CY � �� 5 CY Ballast Stone for Miscellaneous $��� � Placement ��t.(_ ^ �"; l.' ,�� ��% Dollars & Cenis per CY IIFTWORTHIPROJEC7S12021981980391ADMIFinalSpecsjorClP198039proposaLdoc % ��6� Pay Item 59. Approximate DescnpNon ot Bid ltem Prices Unit QuanHty �Vritten ia Words Price Furnish and install, install all appurtenant work, complete in place, the following items. 2232 LF Two Inch Hot Mix Temporary Paving $ 5,`��� Repair, Fig. A, Case 3 nou� & Cents per LF UNIT I- SECTION B(SAiVITARY SEWER IMPROVEMENTS) UMT I- SECTION A(WATER IMPROVEMENTS) TOTAL AMOUNT BID iJ1VIT I(SECTION A+ SECTION B) IIF1fVORT1iIPROJEC73120219819803941DA11F'inalSpecsjorClPI98039proposaLdoc % �17� `T+�tal Price $ 1 i , l��'L�J, �� � 1 � Pay Approximate Description of Bid Item Prices Unit Total Item QuanNty Writtco in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. � CITY APPROVED METHOD AND APPROVED PRODUCT FOR * AND *� � '� CONTRACTOR TO INDICATE PIPE ENLARGEMENT METHOD BEING USED: �" Y PIM Method /—"� GZ `( ' ,� � �O�P /� , � � � Name of Subcontractor if Applicable � T.R.S. System Name of Subcontractor if Applicable McConnell Method Name of Subcontractor if Applicable � Expanded System Name of Subcontractor if Applicable Note: Only tee service connections will be allowed. Failure to provide the information required above may result in rejection of bid as non-responsive. '�'� CONTRACTOR TO INDICATE T�tENCHLESS METHOD, IDENTIFY APPROVED LINER PROCESS, AND PROVIDE NAME OF CONTRACTOR FOR INSTALLATION: Cured-in-Place Pipe (CIPP) (Approved CIPP Liners: Insituform; National Liner [Demo Purpose Only]; and Inliner] / Approved CIPP Liner Name of Subcontractor if Applicable V Fold and Form Pi e /��C ���!"" d'� 1�`,�' ��/ S��' � P ; Approved FAFP Liner Name of Subcontractor if Applicable � ti,� (Approved FAFP Liner: Ultra Liner) IIFTWORTfi1PROJEC7J1202198198039WDMIFinalSpecsjorC1P198039proposaLdoc % �IB� � Pay Approzimate Description of Bid Item Prices l)nit Item Quandty Written in Words Price 'fotal Price Furnish aod install, install all appurtenant work, complete in place, the following items. UNIT II -- PAVING IMPROVEMENTS 60. 1 LS Utility Adjustment $ 20,000.00 $ 20,000.00 :� 62 63. Twentv Thousand �ou� & Zero Cents per LS 8 EA Project Designation Sign 1�l�J' f'd1',� L� ��t .(� c't Dollars & � � (,' Cen[s per EA 360 LF Sawcut E�cisting Street. �GC�-�`� nou� & C��t ��� �- Cents per LF � % 5582 CY Unclassified Street Excavation ��.�� LC � 1 .�=' Dollars & �'�''�-i��� :- Cenu per CY c �� P:1201198198039L4DMIFirw! Specs jor CIP198039 proposal.dx %� 19� $ :�CrL�, '� � $ �C� Oi�• �� 0 � :��.��� � � II J r.� r $ CiOG• co $,� y. l 93, ao , Pay Item 64. 65. .. 67. Approximatc Dncripdon of Bid Item Prices Unit Total QuauHty Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. 14345 SF Removal of Existing Concrete $�'�� `` l $�� 3'�S , D U Driveways, Sidewalks, Wheel Cha'v � Ramps, Steps and Lead Walks ��I'�.-�� nou� & ��C-�� Cents per SF 5709 LF Remove Existing Curbs and Gutters $�t ���-� $ �l� �-1�,� , � ��C C�--C � mn� & ��� t-� Cents per LF u 13040 SY Install 6" Reinforced Concrete Paving — $ / (� � s � $ , � /5 , / � G. � � Street rC l,�..l�'�'..�.�t o- non�& I r�r . "� -( u� -�` . Cents per SY ;r � � 6200 SY Insta115" HMAC Pavement — Street $,�'`. �� r` l �l�- �` non� & ;'/ `���'U Cents per SY P:1202198198039L4D�MF'irral SpecsforCIP198039 proposal.doc % �2�� ,�. �� �-rt� �����'�r_ , Pay Item ,. : 69. 71. Approximste Dacription of Bid Item Prices Unit Total Quantiry Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. 20474 SY 6" Lime Stabilized Subgrade $ � - `� �' 9+ ��o, � �a. � '� . ��-f ' noii� & � �'i,�k�.� �t,�3 - ��.�C E"�'� Cents per SY � 306 TON Hydrated Lime @ 30#/SY $ /C70, °t �D, l�Od. e� � / 'Y�P ���c a�+�`� C'� nouazs & Y �'� Cents per TON 7094 LF 7" Attached Concrete Curb $ 4�� a� ► -�,c.�" noii� & �=/" � i " Cents per LF 3621 LF 7" Concrete Curb & 18" Gutter � ��C-1 7�� J Dollars & r � � Cenu per LF 72. 18991 SF Construct Concrete Sidewalks, Leadwalks, and Wheel Chair Ramps �Lt�'?��' , �u� & / �t/ Cenu per SF P.•1202198198039UDti11FinalSpecsjorCIP198039proposaLdoc % �21� $ '1 �/ C� C ) � �• $.� �', .�'1G�, �' `' $.-�P'� ,��1�. °'�' $��? l;-, CI r,� � D�) � Pay Item 73. 74. ��� 77 Approximate Descripdon of Bid Item Prices Unit Total QuanHty Written io Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. r� �"� ��0 125 SF Construct Concrete Steps $ r-� <=' ' $1f.�, d ���� ��_�ti_��, �- m���� ,/� ,l `% i �' C�nts per 5F 11.7 CY Construct Concrete Retaining Wall �..CCUL ���G��'�r r��'�, nou�s & /' i.G� ' Cenu per CY 21352 SF 6" Reinforced Concrete Driveways � �4`C-c,� nou� & � _�� {��v i Cents per SF � � 594 SY 7" HMAC Transition _I-�t-t-'�-�'c.� t ?"..r c.c � �iid,s,� � ,�i- l � c��r� � s�r 14030 LF Silicone Joint Sealant �i �-�C' r�u� �t ,� ,�r{ �f.�t �-t',f ., I.( a',t �' Cero� per LF � r/ IIF7�YORTHIPROJEC7312021981980391ADMIFinalSpecsjorCIP198039proposaLdoc % �22� D �) � �� $.5C�D. $ r ��l} . $`�� �� $ �'i�, (78� d� $ �S'�3, �`'�' $ -�'v, ��l� "�`� �' t i�-' J , ���,�,�`�,, �� �� Pay Item 78. ��� 80. 81. Approzimate Description of Bid ltem Prices Unit Total Quantity Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. 16 EA Adjust Water Valve $ 200.00 $ 3,200.00 Two Hundred nou� & Zero Cents per EA 1 EA Adjust Water Vault Two Hundred nou� & Zero Cents per EA 7 EA Adjust Sanitary Sewer Manhole Three Hundred Fiftv Dou� & Zero Cents per EA 3 EA Adjust Storm Drain Manhole $ 200.00 $ 200.00 $ 350.00 $ 2,450.00 $ 350.00 $ 1,050.00 Three Hundred Fifly non� & Zero Cents per EA g ' , j"�}�! � ` � r; L � . `�'c � 82. 1 EA Remove Existin 10 Storm Drain Inlet $ �'" _p�,,/ � � �lf=� �� t� ) r ��( nou� & ;% _ � % �.. t � Cenu per EA IIfT�VOR7NIPROJEC7S12021981980391ADh41FinalSpecsforCIP198039proposaldoc �l �23� I ^ Pay Item 83. 84. 85. 86. s�. ss. Approzimate Description of Bid Item Prices Uoit Total Quantity Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the following items. 1 EA Construct Standard 10' Curb Inlet �.-�'�"�"� �� $�� �� �� �. �f �-U � � t��-Lc,d-�--rt � c� `;' *�fi./�Gp ( '4_.e � l Dol�ars & ' l-�� Cents per EA ', r' 1 EA Remove Existing Storm Drain Inlet Top $�%'�'�-' l� , � ; -.'�, � �t,r ..��1�� �t� ��� 1,�,� ;. ��f.t�G�YI I`�- �'L� � � nouars & {' "% �- C�' Cents per EA 1 EA Construct New Storm Drain Inlet Top $����' -�� ^,1`�U�D �Ld�4.-� � �f nou� & ��� Cents per EA 20 LF Remove and Replace 21" RCP Storm $/ l�-G' . yw Drain Pipe /f,f �/ � IV.i(.E . 1� �!�-�"�`'�.�f r� �ouars& �"� Cents per LF 2 EA Relocate Brick Mailbox $��'J. �� r'l' !t .4 . � �f �C � .� `-�� � � c� � `�-i L-•�-c�.., Dollars & G � � / w Cents per EA 15 SF Remove and Replace Brick Steps $`�? �.'�. ��� � ��-�r ,� nau� & � � ��'� Cents per SF P:12021981980391ADMIFinalSpecsjorC/P198039proposaLdoc % �24� DD $ f �0��. $ _1�''7�, c-�I $ .3�� �`' �eE_� � ���� Pay Item 89. 90. 91. 92. Approximate DescripHoo of Bid Item Prices Unit Total Quantity Written in Words Price Price Furnish and install, install all appurtenant work, complete in place, the tollowing items. �k� 1068 LF Remove and Replace Existing Fence $�'� c`� $ r�(.�' �`.� �'� � i r.�J[.��'L/� �O��NS 8t �� i•�( � Cents per LF �, _ti „ � �i 4 EA Relocate Brick Planters $ J Sr:'' � $� C��� ( �G11..Q l ��� Ct ,, �`� � noii� & � �` i��� �_ � Cents per EA 1566 CY Topsoil $ 11.00 $ 17,226.00 Eleven Zero 150 LF 6" Subdrain �'� % yw TOTAL BID AMOUNT UNIT II �u� & Cents per CY DO��NS Bt Cents per LF IlFllf'ORTFIIPROJECTS1202198198039L4DbflFinalSpecsjorC1P198039proposaLdoc % �25� , $ f(� � � $ l 5�v(� c ,-, �D � �M '� '�S 3� O'7�3 , �� , ESTIMATE SUMMARY SUBTOTAL - Unit 1 SECTION `A' -Water . SUBTOTAL — Unit 1 SECTION `B' - Sanitary Sewer TOTAL — UNIT I 1 1� TOTAL - UNIT II GRAND TOTAL UNIT I+ UNIT II: P:12021981980391ADM1Fina1 Specsjor CIP198039 proposal.doc % �26� $ 3�7,yS5°° $ �37, ?O35O $ ���, �.S� �o , � �i�.�'rC���a� � /, �",3�,Z.�� �'� PART 7 - PROPOSAL (Continued) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Survey Bond and such other bonds as required by the Contract Documents, for the faith{'ul performance of the Contract. The attached bid security in the amount of 5% is to become the property af the City of Fort Worth, Texas, in the event the contract and bond or bonds aze not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been fiunished at least one set of the General Contract Documents and General Specifications for Water Department Project dated January 1, 1978, and that he _ has read and ihoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 working days after issue of the work order, and to complete the contract within 200 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable): [] A. The principal place of business of our company is in the State of [] Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [] Nonresident bidders in ihe State of , our principal place of business, are not �e`quired to underbid resident bidders. B. The rinci al lace of business of our com an or our arent com an or ma'ori owner is in the �i P P P P Y P P Y J h' State of Texas. � 1 � IIF7'fVOR7NIPROJEC7311011981980391AD�L11FinalSpecsJorC1P198039proposaLdoc % �2%� Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 (Seal) If Bidder Corporation Respectfiilly submitted, gy; W� �N��D Ci�l�� C�O. IN�1�, ti W , Titie: � H �cC�HD ;���1Qf �--`�, Address: !�'.U. �'ti:.}X 98�5 B�.FF�t��N, TX 7'6�87 ��C //�C:�J-�V�� r�:�C ��-�i7� IIF7iVORThRPROJECT51202198198039L4DMlFinalSpecsjorCIP198039 proposal.doc 7 (28) A SECTION C1: . SUPPLEMENTARY CONDITIONS TO PART C- GENER.AL CONDTTIONS A. General These Supplementary Conditions amend or supplement ihe General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which aze not so amended or supplemented remain in full force and affect. B. , C3-3.2 NIlNORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTER.PRISE COMPLIANCE: Page C3-3 (1), should be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a ; Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor f'urther agrees to pemut an audit and/or examination of any books, records or files in its possession that will substantiate ihe actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negiigent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; f'urther, any such misrepresentation (other than a negligent misrepresentation) and/or comuiission of fraud will result in the Contractor being deterniined to be irresponsible and barred from participating in City work for a period of t�rne of not less than ihree (3) yeazs. C. C3-3.7 BONDS: Page C3-3 (3), the pazagraph after subparagraph d. Change the paragraph to read as follows: "No sureties will be accepted by the owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on ihe forms fiirnished by the Owner and the surety shall be acceptable to the owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties {Circular 870}, or (2) the surety must have capital a.nd surplus equal to ten times the amount of the bond. The surety must be licensed to busi.ness in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be authorized, accredited or trusteed to do business in Texas." D. C8-8.5 PARTIAL ESTTMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the followin;: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the Sth day and 20th day of each month that the work is in pragress. The estimate shall be proceeded by the City on the lOth day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent Revised 12J28/99 Pg. l t ._ �. � .�_ part thereof, but which at ihe time of ihe pay estimate have not been so installed. If such materials are included within a pay estunate, payment shall be based upon 85% of the net voice value thereof. The Conh�actor will fumish the Engineer such information as may be reasonably requested to aid in ihe verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). . Contractor shall pay subcontractors in accord with the subcontract a;reement within five (5) business days after receipt by Conh-actor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments fiom ihe Contractor until compliance with this paragraph is accomplished. . It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction i.n the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. E. Part C- General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and ' replaced with D-12 of Part D- Special Conditions. F F. C3-3.11 INSUR.ANCE: Paae C3-3 (�: Delete subparagraph "g. LOCAL AGENT FOR INSUR.ANCE AND BONDING" G. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), should be is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify. City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Conh-actor covenants and agrees to indemnify, hold harrnless and defend, at its own expense, the - Owner, its officers, servanis and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not anv such iniurv. damaae or death is caused, in whole or in part. bv the ne�liQence or alle�ed ne�li�ence of Owner, its offcers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harn�less the Ovmer from and against any. and all injuries to Owner's officers, servants and employees and any damage, loss or . destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, wlietlier or not anv suclt iniury or dama�e u caused in . whole or in vart bv the ne�li�ence or alle�ed ne�li�ence of Owner, its ofrcers. servants Revised Pg. 2 1?I18199 .. •' r ,� ,..- or emnlovees.. In the event Owner receives a written claim for dama�es a�ainst the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insL�nce cazrier that the claim has been referred to the insurance camer. The D'uector may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstandina as a result of work performed under a City Contract. : � , • � 1 ' . t ' � � • ,.. . - �. , r , 1 � � Revised ' Pg.3 .._. 12l28/99 -10- ADDITIONAL SPECIAL CONDITIONS (Water Department) � � u 98039_SPECS doc ; PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) " DA-1 PIPELINE REHABILfTATION CURED-IN-PLACE PIPE ...................................................... 10-3 DA-2 PIPELINE REHABILITATION PIPE ENLARGEMENT SYSTEM ......................................... 10-8 DA-3 PIPELINE REHABILITATION FOLD AND FORM PIPE ................................................... 10-16 DA-4 SLIPLINING ...................................................................................................................... 10-20 , DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT ............................................................ 10-27 � DA-6 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR (Omitted) ................................... 10-30 DA-7 PROTECTIVE MANHOLE COATiNG FOR CORROSION PROTECTION (Omitted) ........ 10-30 DA-8 MANHOLE REHABILITATION ITEMS (Omitted) .............................................................. 10-30 DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION (Omitted) ...................... 10-30 DA-10 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM (Omitted)....... 10-30 DA-11 INTERIOR MANHOLE COATING - QUADEX SYSTEM (Omitted) .................................... 10-30 DA-12 INTERIOR MANHOLE COATING - SPRAYWALL SYSTEM (Omitted) ............................. 10-30 DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM (Omitted) .......................... 10-31 � DA-14 INTERIOR MANHOLE COATING - PERMACAST SYSTEM WITH EPOXY LINER (Omit) 10-31 , DA-15 INTERIOR MANHOLE COATING-STRONG-SEAL SYSTEM (Omitted) ............................ 10-31 '' ' DA-16 RIGID FIBERGLASS MANHOLE LINERS (Omitted) ........................................................ 10-31 DA-17 PVC LINED CONCRETE WALL RECONSTRUCTION (Omitted) ..................................... 10-31 DA-18 PRESSURE GROUTING ................................................................................................. 10-31 u DA-19 VACUUM TESTING OF REHABILITATED MANHOLES (Omitted) ................................... 10-34 DA-20 FIBERGLASS MANHOLES (Omitted) ............................................................................... 10-34 DA-21 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES ........................... 10-34 � DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER (Omitted) .................................. 10-35 DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS (Omitted) .......................................... 10-35 DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE (Omitted) ................................... 1Q-35 DA-25 GRADED CRUSHED STONES (Omitted) ......................................................................... 10-35 j 98039 Partda-2.doc 10-1 04/1f/99 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) DA-26 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE (Omitted) ................................................. 10-35 DA-27 BUTT JOINTS - MILLED (Omitted) .................................................................................. 10-35 DA-28 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) (Omitted) ........................................... 10-35 DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER (Omitted) ................................... 10-35 DA-30 NEW 7" CONCRETE VALLEY GUTTER (Omitted) ........................................................... 10-35 DA-31 NEW 4" STANDARD WHEELCHAIR RAMP .................................................................... 10-35 DA-32 8" PAVEMENT PULVERIZATION (Omitted) ..................................................................... 10-36 DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) ............................... 10-36 DA-34 RAISED PAVEMENT MARKERS (Omitted) ...................................................................... 10-37 DA-35 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING (Omitted)........ 10-37 DA-36 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL (Omitted) 10-37 DA-37 ROCK RIPRAP - GROUT - FILTER FABRIC (Omitted) ...................................................... 10-37 DA-38 CONCRETE PIPE FITINGS AND SPECIALS (Omitted) .................................................... 10-37 ' � 1 1 98039 Partda-2.doc � �-2 04/16/99 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) DA-1 PIPELINE REHABILITATION CURED-IN-PLACE PIPE: A. WORK TO BE DONE: The work to be done under this contract consists of rehabilitation of existing sewer lines by the Cure-in-Place Pipe Method or approved equal. Cured-in- place pipe consists of a resin impregnated flexible tube, coated with an elastomeric coating, when inverted into an existing sewer pipe through existing access manholes, and which, under proper hydrostatic and thermal conditions, is cured-in-place, becoming a structurally sound cured-in-place pipe. The thickness of the pipe will be dictated by the structural requirements of the sewer pipe with no loss of cross sectional area other than the thickness of the resin-impregnated tube. The pipe will be impermeable to water, provide corrosion resistance, and an optimum friction factor for the sewer flow. Branch connections shall be reinstated by a remote controlled cutting device. The work consists of providing all labor, equipment, transportation, matersafs, and supervision necessary to : 1. Thoroughly clean sewers as required for the installation of the resin-impregnated tube. 2. Inspect sewers by closed circuit color television (CCTV), including identifying and marking the location of each service connection. Cost subssdiary to Pre- Construction TV Inspection. 3. Notify residents at least 48 hours prior to service interruption. 4. Install the resin-impregnated tube of the correct thickness as specified. 5. Cut out all service connections by remote cutters and restore service within 18 hours. 6. Reinspect by CCN to verify satisfactory completion of work at time of lateral reinstatement. Cost subsidiary to Post-Construction N Inspection. 7. Pump around all dry and wet weather flows to accommodate the process at each separate installation, as required. 8. Comply with all appropriate governmental agencies' regulations regarding traffic, safety procedures and permits, the cost of which is the responsibility of the Contractor. B. MATERIALS: The fiber felt tube shall be fabricated to a size that when installed will tightly fit the interna! circumference of the conduit specified by the Owner. Allowance for circumferential stretching during inversion shall be made and shall meet ASTM-1216. The minimum length shall be that deemed necessary by the Contractor to effectively span the distance from the inlet to the outlet of the respective manholes, unless otherwise specified. The Contractor shall verify the lengths in the field before impregnation. Individual inversion may be made over one or more manhole sections, as determined in the field by the Contractor. 98039-Partda.doc 10 (3) 04/1f✓9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) Unless otherwise specified, the Contractor shall furnish a general purpose unsaturated polyester resin and catalyst system that meets ASTM standards and the finished cured physical strengths specified. C. REQUlRED THICKNESS OF CURED-IN-PLACE PIPE: The thickness of the pipe will be determined from information supplied or manufacture's recommendation for the condition of the existing pipe. Should pre-installation inspections reveal the sewers to be in substantially different conditions than those in the design considerations, the Contractor can request such changes in pipe thickness, supporting such request with design data in accordance with the pipe manufacturer's standard design criteria as follows: D LINER THICKNESS Sewer Pipe Invert Pipe Invert Diameter Depth up to 10' Depth 10'-15' 6" $,. 10" 12" 15" 18" 21" 24° 30" 36" 42" 48" 54" 60" (also the minimum) 4.5mm 6.0mm 6.0mm 6.0mm 7.5mm 9.0mm 10.5mm 12.0mm 15.0mm 16.5mm 19.5mm 22.5mm 25.5mm 28.5mm 4.5mm 6.0mm 6.0mm 7.5mm 9.0mm 12.0mm 13.5mm 15.0mm 18.0mm 21.0mm 24.0mm 28.5mm 30.0mm 34.5mm Pipe Invert Depth Over 15' 4.5mm 6.0mm 7.5mm 9.0mm 10.5mm 13.5mm 15.0mm 16.5mm 21.0mm 24.0mm 28.5mm 33.0mm 36.0mm 39.0mm PREPARATORY WORK: The installation procedures shall be as follows unless otherwise approved by the City. 1. Safety - The contractor shall carry out his operations in strict accordance with a!I safety requirements. Particular attention is drawn to those safety requirements that involve working with scaffolding and enterrng confined spaces. 2. All easements shall be cleaned up after use and restored to their original conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the Property Owners involved for the use of additional property required. No additional payment will be allowed for this item. If a street must be closed to traffic 98039-Parida.doc �� �4� 04/1fz�9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) because of the orientation of the sewer, the Department of Engineering shall institute the actions necessary to do this for the mutually agreed upon time period. 3. Before using any water from the City of Fort Worth, the Contractor shall be responsible for the water meter and related charges for the set up, including the water usage bill. All expenses shall be considered incidental to cleaning. 4. Cleaning of Sewer Line - It shali be the responsibility of the Contractor to remove all internal debris out of the sewer iines and flush the sewer lines clean, disposing of debris off-site. Debris is not to be washed downstream into other sewers. All solids or semisolids resulting from the cleaning operations shall be removed from the site and disposed of at no additional cost to the City. ft is the responsibiiity of the Contractor to secure a legal dump site for the disposal of this material. All materials shall be removed from the site no less often than at the end of each work day. All cost for the above-described work shall be paid for by the price bid per finear foot for Cleaning and Television Inspection. 5. Inspection of Pipelines - Inspection of pipelines shall be performed by experienced personnel trained in locating breaks, obstacles, and service connections by closed circuit color television. Television inspection shall be in accordance with the specifications contained herewith for "Pre- and Post-Construction Television Inspection of Sanitary Sewer Lines". E. INSTALLATION OF THE RESIN IMPREGNATED TUBE: The Contractor shall designate a location where the uncured resin in the original containers and the unimpregnated fiber-felt tube will be vacuum impregnated prior to installation. The Contractor shall allow the Owner to inspect the materials and "wet-ouY' procedure. A resin and catalyst system compatible with requirements of this method shall be used. The quantities of the fiquid thermosetting materials shall be per manufacturer's standards to provide the wall thickness specified. All felt shall be impregnated under vacuum. 2. The wet-out fiber felt tube shall be installed through an existing manhole or othe� approved access by means of an inversion process and the application of a hydrostatic head sufficient to fulfy extend it to the next designated manhole. The impregnated tube shall generally be inserted into the vertical inversion standpipe with the impermeable plastic membrane side out. At the lower end of the rnversion standpipe, the felt tube shall be turned inside out and attached to the standpipe so that a leak-proaf seal is created. The inversion head will be adjusted to be of sufficient height to cause the impregnated tube to invert from manhole to manhole and hold the tube tight to the pipe wall and produce dimples at the side connections. A lubricant, if used, shall be as approved by manufacturer's standards. Manufacturer's standards shall be closely followed during the elevated temperature curing so as not to over-stress the felt fiber and cause damage or failure prior to cure. In certain cases, the Contractor may elect to use a tap inversion. 98039-Partda.doc � � �J� 04/1 fa�J PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) 3. Curing: After inversion is complete, the Cont�actor shall supply a suitable heat source and water or steam recirculation equipment. The equipment shall be capable of delivering hot water or steam throughout the section by means of a pre- strung hose, which has been perforated per manufacturer's recommendations, to uniformly raise the water temperature above the temperature required to effect a cure of the ressn. This temperature shall be determined by the resin/catalyst system employed and shall be per manufacturer's standards. 4. The heat source shall be fitted with suitable monitors to gauge the temperature of the incoming and outgoing water or steam supply. Another such gauge shall be placed at the remote manholes to determine the temperatures during cure. Initial cure shall be deemed to be completed when inspection of the exposed portions of the cured-in-place pipe appear to be hard and sound. The cure period shafl be of a duration recommended by the resin manufacturer, as modified for the inversion process, during which time the recirculation of the water and/or steam and cycling of the heat exchanger to maintain the temperature continues. 5. Cool-down: The Contractor shall cool the hardened cured-in-place pipe to a temperature below 100 F before relieving the static head in the inversion standpipe. Cool-down may be accomplished by introducing cool water into the inve�sion standpipe to replace water or steam being drained from a small hole made in the downstream end. Care shall be taken in the release of the static head so that a vacuum will not be developed that could damage the newly installed cured-in-place pipe. F. SERVICE CONNECTIONS: After the pipe has been installed, the Contractor shall reconnect the active service connections. This shall generally be done without excavation, and, in the case of non-man entry pipes, from the interior of the pipeline by means of a television camera and a cutting device that re-established them to not less than 90 percent capacity. Existing services shall be reinstated within 18 hours of installation. Should internal reinstatement not be possible, the services must be reconnected externally by excavation immediately. Service saddles acceptable to the Engineer shall be utilized. Bac�ll at service connections shall be cement stabilized (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these specifications. Each reconnection shall be paid for separately. Six inch sewer lines shall have service connectsons completed by external means. Contractor may re-connect the 6" sewer line connections by internal means in special cases with the approval of the Engineer. G. ACCEPTANCE: The finished cure-in-place pipe shall be continuous over the entire length of an inversion run between manholes and be smooth and free from substantial wrinkles, as well as defects, and improper house connections. Should any of these defects occur, the line shall be excavated, repaired and/or rep{aced and complete restoration made to the satisfaction of the City at no additional cost. The watertightness of the pipe shall be tested for leaks under a positive head during cure with allowances being made for end leakage and temperature effects. 98039-Partda.doc 10 (6) 04/1E✓9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) H. CLEAN-UP: Upon acceptance of the installation work and testing, the Contractor shall restore the p�oject area affected by his operations to original or better conditions. PATENTS: The Contractor shall warrant and save harmless the City and all of its officers, agents, and employees against all claims for patent snfringement and any loss thereof. J. SPECIAL NOTES: The Contractor shall be liable for damages to ihe homes or basements from backups which may result during the installation of new pipe. K. MEASUREMENT AND PAYMENT: 1. Cured-in-Place Ptpe (CIPP) Installation: CIPP installatian wil{ be measured for payment by the linear foot of CIPP actually installed in the various diameters of sewers measured along the centerline of the sewer from centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. 2. Service Reconnection: Payment will be made for the quantities measured at the unit price per each listed in the bid proposal. Payment shall include all labor, materials, and the lateral connection, including all necessary pipe and fittings to connect the existing service line. Payment shall not include pavement replacement, which if required, shall be paid separately. 3. Television Inspection and Cleaning: Special Condition for Post-Construction Television Inspection applies. 4. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for P�e-Construction Television Inspection of Sanitary Sewer. 5. By-Pass Pumping: The Contractor sha!! provide diversion for the flow of sewage around the section or sections of pipe designated for the inversion of the resin- impregnated tube. The pumps and by-pass lines shall be of adequate capacity and size to handle all flows. All costs for by-pass pumping required during installation of the pipe shall be subsidiary to the pipe reconstruction item. 6. Point Repairs: Point repairs shall be made before or after a cured-in-place pipe installation at the Contractor's option. Point repairs shall be conducted only if mutually agreed to by the Department of Engineering and the Contractor prior to acceptance of the line for reconstruction. Before any excavatron is done for any purpose, it will be the responsibility of the Contractor to check with various utility companies and determine the location of thei� facilities. Point repairs shall be measured and paid for by the linear foot for the appropriate depth of cut. Payment shalf include all labor, material and equipment for pipe replacement according to standards. 7. Subsidiary Work: Any damage resulting to utilities and property, resulting repairs, temporary service costs, etc., shall be borne by Contractor. Repair and/or 98039-Parida.doc � � �%� 04/1f✓9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) � , replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the '� project and no additional payment will be allowed. � DA-2 PIPE ENLARGEMENT SYSTEM: A. GENERAL: �., � 1. Description: This specification includes requirements to �ehabilitate existing . sanitary sewers by the pipe enlargement system, herein called Pipe Bursting or Pipe Crushing (Pipe Bursting/Crushing). This system includes splitting or bursting "- the existing pipe to install a new polyethylene pipe and reconnect existing sewer .� service connections. a 2. Methods: This section specifies the approved system method or process to include all labor, materials, tools, equipment and incidentals necessary to provide ' for the complete rehabilitation of deteriorated gravity sewer lines by the Pipe � Bursting/Crushing systems. App�oved methods include: the PIM Corporation (PIM System}, Prscata Way, New Jersey; McLat Construction (McConnell System ' for Pipe Crushing), Houston, Texas; and Trenchless Replacement Systems, (TRS � u System), Calgary, Canada. Refer to Part D- SPECIAL CONDITIONS D-61 SIBSTITUTIONS for information regarding pre-approval procedures for alternative ' pracesses. � 3. Definition: The Pipe Bursting/Crushing system is defined as the reconstruction of • gravity sewer pipe by installing an approved pipe material, by means of one of the . pre-approved methods set forth in Section A.2 of this specification. The process involves the use of a static, hydraulic or pneumatic hammer "moling" device, r suitably sized to break out the ofd pipe or using modified boring "knife" with a ,,., flared plug that implodes and crushes the existing sewer pipe. Forward progress of the "mole" or the "knife" may be aided by the use of hydraulic equipment or r other apparatus, as specified in the approved methods. The replacement pipe is _ either pulled or pushed into the bore. The method allows for replacement of pipe sizes from 8" through 21" and/or upsizing in varying increments up to 21". This . specification is based on the precedent that the Pipe Bursting/Crushing system m. used has been pre-approved by the City of Fort Worth Department of Engineering, and Fort Worth Water Department. . 4. Quality Assurance: '� f The Contractor shall be certified by the particular Pipe Bursting/Crushing system manufacturer that such firm is a licensed installer of their system. No other Pipe ` Bursting/Crushing system other than those listed in Section A.2. of these � specifications is acceptable. � a. Personnel directly involved with installing the new pipe shall receive training in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. � � r 98039-Partda. doc � �� g� 04/i 6/9 �' � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) b. Personnel directly involved with installing the new pipe shall receive training in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. 5. Submittals: Submit for review and acceptance, the following Contractor's Work Plan and Drawings to the Department of Engineering (DOE): a. Shop drawings, catalog data, and manufacturer's technical data showing complete information on material composition, physical properties, and dimensions of new pipe and fittings. Include manufacturer's recommendation for handling, storage, and repair of pipe and fittings if damaged. b. Location and number of insertion or access pits shall be planned by Contractor and submitted in writing prior to excavation for approval by DOE. c. Method of construction and restoration of existing sewer service connections. This shall include: 1) Detail drawings and written description of the entire construction procedure to install pipe, bypass sewage flow and reconnection of sewer service connections. 1 2) Working drawings for information only showing sewage flow bypass, and maintenance of traffic. Contractor shall provide for continuous sewerage flow. Dewatering shall be the Contractor's responsibility. 3) Certification of workmen training for installing pipe. 4) Television inspection reports and video tapes made after new pipe installation. 6. Delivery, Storage, and Handling: a. Transport, handle, and store pipe and fittings as recommended by manufacturer. � b. If new pipe and fittings become damaged before or during installation, it + shall be repaired as recommended by the manufacturer or replaced as required by the Project Manager at the Contractor's expense, before � proceeding further. c. Deliver, store and handle other materials as required to prevent damage. 98039-Panda.doc 10 (9) 04/16/9 � PART DA - ADDITIONAL SPECiAL CONDITIONS (WATER DEPT.) � MATERIALS: 1. Polyethylene Piping Material: The pipe and fitting material shall be high density, extra molecular weight (EHMV� polyethylene pipe material conforming to ASTM D1248, Type III, Class C, Category 5, Grade P34, and have a PPI (Plastic Pipe Institute) recommended designation of PE3408 and cell classification 345434C per ASTM D3350. The molecular weight category shall be extra high (250,000 to 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. a. The interior of the pipe shall be a light reflective color to facilitate closed circuit television inspection. b. The pipe material shall be listed by the Plastic Pipe Institute (PPI) in PPI TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi at 73 F and 800 psi at 140 F. c. The manufacturer's certification shall state that the pipe was manufactured from one specific resin and shall state the resin used and its source. All pipe shall be made of virgin material. No rework, except that obtained from the manufacturer's own production of the same formulation, shall be used. d. Pipe supplied under this specification shall have a nominal IPS (Iron Pipe Size) outside diameter. The Standard Dimension Ratio (SDR) and minimum pressure ratina of the pipe shall be SDR 17 - 100 qsi. Pipe with a lower SDR ratio and higher pressure rating may be used in lieu of the minimum specified. 2. Tests: The Contractor shall be required to send submittals to the City of Fort Worth on the production material. a. The pipe manufacturer shall provide certification that samples of the production product meets these specifications. The certification will state that production product has been tested in accordance with ASTM D2837, and validated in accordance with the latest revision of PPI TR-3. b. The pipe manufacturer shall provide certsfication that stress regression testing has been performed on the specific product. Certification shall include a stress life curve per ASTM D2837 and testing shall have been performed in accordance with ASTM D2837. c. Rejection: Polyethylene plastic pipe and fittings may be rejected for failure to meet any of the requirements of this specification. C. SEWER SERVICE CONNECTIONS: 1. Sewer Service Connections: Sewer service connections shall be connected to the new pipe by mechanical or fusion methods. Once the saddle is secured, a hole shall be drilled in the pipe the full inside diameter of saddle outlet. 98039-Partda. doc � �� 1 �� 04/16✓9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) 2. Pipe Saddles: Mechanical saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D1248, Class C, have stainless stee! straps and fasteners, neoprene gasket and backup plate. Mechanical saddles shall be Strap-on-Saddle Type as manufactured by Driscopipe or Tapping Saddle manufactured by DuPont, or approved equal. Fusion saddles shall be electrofusion branch saddles as manufactured by Central Plastics Company, or approved equal. 3. Connection to Existing Service: Connections to the existing sewer senrice connections pipe shall be made using flexible couplings. All flexible couplings shafl conform to ASTM C425 and shall be as manufactured by Fernco Joint Sealer Co., DFW Plastics, Inc. or approved equal. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these specifications. The Contractor shall, upon request, permit the Engineer to take elevations on both the existing and new portions of the service connection pole to determine final grade and invert elevations. Elevation changes greater than 0.10 feet from the house lateral piping and shall be reconnected as directed by the Engineer. 4. Service Interruptions: Service interruptions to homes shall not exceed 18 hours. D. PREPARATION: 1. Bypassing Sewage: a. The Contractor shall bypass the sewage around the section or sectrons of sewer to be rehabilitated. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handie ihe flow without sewage backup occurring to facilities connected to the sewer. b. The Contractor shall be responsible for continuity of sanitary sewer service to each facility connected to the section of sewer during the execution of the work. If sewage backup occurs and enters buildings, the Contractor shall be responsible for clean-up, repair, property damage costs and claims. 2. Line Obstructions: If pre-installation (TV) inspection reveals an obstruction in the existing sewer (heavy solids, dropped joints, protruding service taps or collapsed pipe) which will prevent completion of the pipe bursting/crushing process, and cannot be removed by conventional sewer cleaning equipment, then an obstruction removal shall be made by the Contractor, with the approval of the Engineer. 98039-Partda. doc � �� 1 1� 04/1 fi�9 v ��� PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) 3. Sags in Sewer Line: ALL SAGS AND GRADE PROBLEMS IN EXISTING SEWER LINES SHALL BE CORRECTED AS PART OF THIS CONTRACT. If the pre- construction television inspection reveals a sag in the sewer line, the Contractor shall be responsible for bringing the proposed sewer pipe to an acceptable grade without a sag. A sag is defined as any sewer line segment more than 3 feet in length which ponds water in the absence of sewage flow. The contractor shall take the necessary measures to eliminate the sag by the method of: pipe replacement, digging a sag elimination pit and bringing the bottom of the pipe trench to a uniform grade in line with the existing pipe invert or by other measures that shall be acceptable to the Engineer and the City. a. Identification of Sags: Sags shall be identified by television inspection in the absence of sewage flow. If available, the Contractor shall be furnished television tapes from the City identifying the sag location. Flow shall be blocked at an upstream manhole and diverted to another sewer line or downstream manhole below the segment of pipe to be inspected. TV inspection shall be performed in accordance with television inspection of sanitary sewer lines. Video tapes shall be submitted to the Department of Engineering for review. b. Correction of Sags: Sags shall be corrected by open cut and by adding additional bedding material to bring the sag back to grade where access is available. For pipe enlargement methods, all sags identified on the pre- construction video tapes shall be corrected prior to commencing with pipe enlargement. In instances where sags are located under existsng structures, the existing sewer line may be relocated using open cut or boring methods. The Department of Engineering shall specifically review potential relocation's and evaluate the constructability, economics and engineering feasibility prior to construction work. c. Measurement and Payment: Measurement and payment to correct sags shall be per linear foot of pipe construction to correct the sag. For pipe bursting methods, open-cut or bore construction, the applicable bid pnces in the proposal section shall apply. 4. Television Inspection: Inspection of the pipelines shall be performed by experienced personnel trained in locating breaks, obstacles and service connections by closed circuit color television. Television inspection shall be in accordance with the specifications contained herewith for "Pre- and Post- Construction Television Inspection of Sanitary Sewer Lines". 98039-Panda.doc � 0� 1 �� 04/i6/9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) E. PIPE ENLARGEMENT SYSTEM AND PIPE INSTALLATION: - � 1. Site Organization: a. Insertion or access pits shall be located such that their tota{ number shall be minimized and the length of replacement pipe installed in a single pull shall be maximized. b. Existing manholes shall be utilized wherever practical. Manhole inverts and bottoms may be removed to permit access for installation equipment. c. Equipment used to perform the work shall be located away from buildings so as not to create a noise impact. Provide silencers or other devises to reduce machine noise as needed to meet requirements. 2. Finished Pipe: The installed replacement pipe shall be continuous over the entire length of each pipe segment from manhole to manhole and shall be free from visual defects such as foreign inclusions, concentrated ridges, discoloration, pitting, varying wall thickness, pipe separation, other deformities. Replacement pipe with gashes, nicks, abrasions, or any such physical damage which may have occurred during storage and/or handling, which are larger/deeper than 10% of the wall thickness shall not be used and shall be removed from the construction site. The replacement pipe passing through or terminating in a manhole shall be carefully cut out in a shape and manner approved by the Engineer. The invert and benches shall be streamlined and improved for smooth flow. The installed pipe shall meet the leakage requirements of the pressure test specified later. 3. Pipe Jointing: a. Sections of polyethylene replacement pipe shall be assembled and joined on the job site above the ground. Jointing shall be accomplished by the heating and butt-fusion system in strict conformance with the manufacturer's printed instructions. b. The butt-fusion system for pipe jointing shall be carried out in the field by operators with prior experience in fusing polyethylene pipe with similar equipment using proper jigs and tools per standard procedures outlined by the pipe manufacturer. These joints shall have a smooth, uniform, double rolled back bead made while applying the proper melt, pressure, and alignment. It shall be the sole responsibility of the Contractor to provide an acceptable butt-fusion joint. All joints shall be made available for inspection by the Engineer before insertion. The replacement pipe shall be joined on the site in appropriate working lengths near the insertion pit. The maximum length of continuous replacement pipe which shall be assembled above ground and pulled on the job site at any one time shall be 600 linear feet. c. For situations where the replacement pipe is not pulled all the way to the manhole or if it is impossible to pull the missle all the way through, the following shall apply: At the direction of the Engineer, a 12"-18" full circle steel clamp shall be utilized to connect segments of the HDPE pipe. 98039-Partda.doc � �� 13� 04/16✓9 r PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) � 4 � � New Pipe Installation: . � . a. Thread winch cable or chain and associated lines through sewer section to be rehabilitated. Keep lines away from pedestrian and vehrcular traffic. `'' b. Existing manholes may be used for launch and receiving access. Remove manhole invert and bottom as required. Pull winch chain through sewer section and attach to cutter and machine head. Lower into launching manhole, apply winch tension pulling the cutter and head into the sewer until the rear of the machine is flush with the manhoie wall. Attach steel starter pipe and advance assembly until the rear of the steel starter pipe is flush with the manhole wall. Lower hydraulic jack into the manhole and align. Insert new pipe by simultaneous operation of the jack and winching the cutter and head forward. Anchoring New Pipe and Sealing Manholes: a. After the new pipe has been installed in the entire length of the sewer section, anchor the pipe at manholes. The new pipe shall protrude in the manholes for enough distance to allow sealing and trimming. b. Sealing the new pipe at manholes shall not begin for a minimum of ten (10) hours after installation. Provide a flexible gasket connector in the manhole wall at the end of the new pipe, centered in the existing manhole wall. Grout flexible connector in the manhole, filling all voids the full thickness of the manhole wall. c. Restore manhole bottom and invert. Field Testing: a. Low Pressure Air Test of Replacement Pipe: After a manhole-to-manhole section of sanitary sewer main has been pipe bursUcrushed and prior to any service lines being connected to the replacement pipe, the pipe shall be plugged at each manhole with pneumatic plugs. The design of the plugs shall be such that they will hold against the test pressure without requi�ing external blocking or bracing. One of the plugs shall have three air hose connections; one for the inflation of the plug, one for reading the air pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting from any ground water that may be over the pipe. At least two minutes shall elapse to allow the pressure to stabilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting from any ground water that may be over the pipe, shall not be less than the time shown for a given pipe diameter in the following table: 98039-Partda. doc 10 (14) 04/1 &/9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) � Carrier Pipe Diameter (inches) 8 10 12 15 Minimum Elapsed Time (minutes) 4 5 6 7 b. Post-Construction Television Inspection of New Pipe: Refer to Special Condition for Post-Construction Television Inspection of Sanitary Sewer. F. MEASUREMENT AND PAYMENT: 1. 2. 3 4 Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed in the various diameters of sewers measured along the centerline of the sewer from centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. Service Reconnections: Installation of sewer service connections will be measured for payment by each actually reconnected to the installed pipe. Payment will be made for the quantities measured at the unit price per each listed. Payment shall include required excavation and backfill, saddles, flexible connections, and all other incidentals necessary to successfully reconnect sewer service lines to the rehabilitated sewer. Payment sha{i not include pavement replacement, which if required, shall be paid separately. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Pre-Construction Television Inspection of Sanitary Sewer Lines. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage a�ound the section or sections of pipe designated for rehabilitation. The pumps and by-pass lines shall be of adequate capacity and size to handle all flows. All costs for by-pass pumping required during installation of the pipe shall be subsidiary to pipe enlargement. 5. Subsidiary Work: Any damage to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. � 98039-Partda.doc Testing: All cost for testing the replacement pipe by a pressu�e method will be incidental to pipe installation. 10 (15) oai�c,�s PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) DA-3 FOLD AND FORM PIPE: A. GENERAL: 1. Description: The Contractor shall utilize the installation of polyethylene or PVC sewer lines to restore the watertight condition of sanitary sewer lines. B. MATERIALS: 1. Polyethylene Liner Material: The polyethylene liner material shall be a high density polyethylene pipe compound which conforms to ASTM D-1248. The polysthylene pipe liner sha11 meet manufacturer's standards. The lining shall be a hard impermeable pipe whsch shall conform to the minimum structural standards applicable, including ASTM D-368 for 3,300 psi tensile stress, ASTM D-638 for 4,500 psi for flexural stress, and ASTM D-790 for 145,000 psi for modules of elasticity. The finished liner shall incorporate materials which will withstand the corrosive effects of normal sewage. The Contractor shall provide a written guarantee of his compliance with these standards. The liner shall be light in color to facilitate closed circuit television inspection. 2. Polyvinyl Chloride (PVC) Liner Material: Polyvinyl pipe shall conform to ASTM D3034. The PVC compound used for the folded pipe shall conform to ASTM D1784 classification 12334-B, 12344B or 124546 or C. Compounds that have different cell classifications which are superior to those of the specified compounds are also acceptable. The lining shall conform to the minimum structural standards applicable including ASTM D-790 for 6,000 psi flexural stress and 350,000 psi modulus of elasticity. 3. Sizing of the Liner. The liner diameter, length and wall thickness shall be appropriate for each designated location. The Contractor shall verify the actual sewer lengths and diameters in the field prior to cutting the liner to length and sizing the diameter. a. The liner shall be fabricated to a size that when installed will neatly fit the internal circumference of the sewer to be lined. Allowance for circumferential stretching of the liner during insertion shall be made as per manufacturer's standards. b. The length of liner shall be that deemed necessary by the Contractor to effectively carry out the insertion and seal the liner at the inlet and outlet points. When reformed, the hardened liner should extend from end to end of the sewer segment being lined in a continuous tight fitting watertight pipe-within-a-pipe. c. The wa�l thickness of the folded pipe liner shall conform to the design criteria of the manufacturer or the licensee; however, the minimum wall thickness shall conform to the following table: 98039-Partda. doc 10 (16) oai� s�s PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) C. � Existing Pipe I.D. (inches) 6 8 10 12 EXECUTION: Minimum Wall Thickness (inches) 0.236 0.265 0. 331 0. 392 1. General: Liner installation shall be accomplished by pulling the liner through the existing sanitary sewer pipeline utilizing a power winch and steel cable with an appropriate pulling head at the end of the liner. Raunding of Ehe line� shall be accomplished by utilizing a heat source such as water or steam with a rounding device to reform the folded pipe into a hard, impermeable round pipe. 2. Preliminary Cleaning and Inspection: a. Prior to any lining of designated sanitary sewer line segments, the Contractor shall remove internal deposits as necessary to assure proper liner installation. b. Inspection of pipelines shall be performed by experienced personnel trained in locating breaks, obstacles, and service connections by closed circuit television. The interior of the pipeline shall be carefully inspected to determine the locatian and extent of any structural failures, which may prevent proper installation of lining materials into the pipelines and location of service laterals. c. It shall be the responsibility of the Contractor to clear the line of obstructions such as solids, roots, dropped joints, protruding branch connections or broken pipe that will prevent the insertion of the iiner. If inspection reveals an obstruction not indicated in these specificatians that cannot be removed by canventional cleaning equipment, then the Contractor shall notify the Engineer. The Engineer may authorize an excavation in order to remove such obstruction. 3. Documentation: Special Conditions for Pre- and Post-Construction Television inspection apply. 4. Flow Bypassing: The Contractor, when required, shall provide for the transfer of flow around the section or sections of pspe that are to be lined. The bypass shall be made by diversion of the flow at an existing upstream access point and pumping the flow Into a downstream access point or adjacent system. The pump and bypass lines shall be of adequate capacity and size to handle the flow. The proposed bypassing system shall be approved in advance by the Owner. All costs of flow bypassing shall be considered incidental to cost of rehabilitating the pipe. 5 98039-Partda.doc Notification of the Public: The Contractor shall notify all Property Owners affected by the liner installation work at least 48 hours prior to commencement of the work 10 (17) oai�s�s � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) � 7 which will temporariiy plug the sanitary services of the Property Owners connected to the sewer line segment being lined. Notification shall be by written notice and, when possible, shall be verbal, also. Customer complaints during installation shall be resolved by the Contractor. Liner Installation: a. The liner shall be snserted into the existing sewer line with a power winch and steel cable connected to the end of the liner by use of an appropriate pulling head. A second pulling head may be attached to the other end of the liner for attachment of a tag line to pull the liner back out of the sewer line, if necessary. Precautions should be taken during insertion to protect the liner pipes to prevent scoring the outside of the liner as it is being pulled into the sewer. b. Prior to reforming the liner, "O" Ring gaskets shall be installed on the liner at each manhole connection. '� c. After insertion is completed, the installer shall supply a suitable heaUpressure source and water recirculation equipment. The equipment shall be capable of delivering water/pressure throughout the section to uniformly raise the water temperature above the temperature required to reform the liner. d. The heat source shall be fitted with suitable monitors to gauge the temperature of the incoming and outgoing water supply. e. The installer shall cool the liner to a temperature below 100 F before relieving the reforming pressure. Cool down may be accomplished by the introduction of cool water or other appraved method into the recirculation network. f. The finished lining shall be continuous over the entire length of an insertion run and be free from visual defects such as foreign inclusions and pinholes. The lining shall be impervious and free of any leakage from the pipe to the surrounding ground or from the ground to the inside of the lined pipe. Any defects which will affect, in the fareseeable future, or warranty period, the integrity or strength of the linings, shall be repaired at the Contractor's expense, in a manner mutually agreed by the Owner and the Contractar. Completion of Lining: a. After the liner has been reformed, the Contractor shall reconnect the existing active service connections. This shall be done from the interior of the pipeline by means of a television camera and a cutting device that re- establishes their operability or by excavation. Any bypass pumping that is required shall be provided at no additional cost for sewer lines where lining is being performed. Service interruptions to any homes tributary to this sewer line shall not exceed 18 hours. Connection of the service lateral by excavation shall be made with a Neoprene Gasket Saddle which inserts •y � f �� 98039-Partda.doc � �� 1 g� 04/1fii9 � O � � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) into the lined pipe for a watertight fit. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these specifications. b. Excavation pits for externally reinstated service laterals shall �emain open for 24 hours after reinstatement of the service. The Contractor shall be responsible for verifying that shrinkage of the polyethylene sewer liner has not occurred. c. The water tightness of the liner shall be gauged while the liner is curing, and under a positive head. After the work is completed, the Contractor will provide the Owner with a video tape showing both the before iined and after lined conditions, including the restored connections. Upon completion of the installation work after required testing indicates the lining is acceptable, the Contractor shall reinstate the project area affected by his operations and perform any surface restoration in accordance with these Specifications. 8. Special Notes: The instalfer shall be liable for darnages to the homes or basement from backups which may result during the installation of the liner. Installer will be allowed to open clean outs. D. MEASUREMENT AND PAYMENT: 1. Liner Installation: Liner installation will be measured for payment by the linear foot of liner actually installed in the various diameters of sewers measured along the centerline of the sewer from centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot fo� the various sewer diameters listed. 2. Service Reconnection: Payment will be made for the quantities measured at the unit price per each listed in the bid proposal. Payment shall include all labor, materials, and the lateral connection, including all necessary pipe and fittings to connect the existing service �ine. Payment shall not include pavement replacement, which if required, shall be paid separately. 3. Television Inspection and Cleaning: Special Conditions for Pre- and Post- Construction Television Inspection apply. 4. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shal! be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Cleaning and Television Inspection of Sanitary Sewer Lines. 5. By-Pass Pumping: The Contractor shall provide diversion for the flow of sewage around the section or sections of pipe designated for rehabilitation. The pumps and by-pass lines shall be of adequate capacity and size to handle all flows. All 98039-Partda. doc 10 (19) 04/1 fi�9 PART DA - ADDITfONAL SPECIAL CONDITIONS (WATER DEPT.) costs for by-pass pumping required during installation of the pipe shall be subsidiary to the pipe reconstruction item. 6. Point Repairs: Point repairs shall be made before or after liner installation at the Contractor's option. Point repairs are available for payment only if mutualfy agreed by the Department of Engineering and the Contractor prior to acceptance of the line for reconstruction. Before any excavation is done for any purpose, it will be the responsibility of the Contractor to check with various utility companies and determine the location of their facilities. Point repairs shall be measured and paid for by the linear foot for the appropriate depth of cut. Payment shall include all labor, materials, and equipment for pipe replacement according to FW1ND standards. 7. Subsidiary Work: Any damage resulting to utilities and property, resulting repairs, temporary senrice costs, etc., shall be borne by Contractor. Repair and/or replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. DA-4 SLIPLINING: A. GENERAL: This section includes requirements to rehabilitate existing sanitary sewers by sliplining with polyethylene pipe. B. MATERIALS 1 Polyethylene Slipline Pipe: a. The properties of the material shall be determined in accordance wsth ASTM D638. ASTM D638 shall be used to determine that the thermal butt- fusion joints are stronger than the materials joined. b. The malt index of the polyethylene resin shall be determined in accordance with ASTM D1238, Condition E, and shall be equal to, or between 0.05 g/10 min. and 1.00 g/10 min. c. The density of the base polyethylene resin shall be determined in accordance with ASTM D1505 and be equal to, or between, 0.941 g/cc and 0.955 g/cc. � e The material shall be tested in accordance with ASTM D1693, Condition C Polyethylene pipe and fittings may be rejected for failure to meet any of the �equirements of this specification. f. The sewer liner pipe and fittings shall be made of a polyethylene pipe compound that meets the requirements for Type III, Class C, Grade P-34, Category 5, polyethylene material as defined in ASTM D1248 or ASTM D3350, and having a PPI rating of PE3408, and cell classification 345434D 98039-Panda.doc � � �2�� 04/lf✓9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) or E per ASTM D3350. A higher numbered cell classification limit which gives a desirable higher primary property, per ASTM 3350, may also be accepted by the Engineer at no addstionaf cost to the City. The rnolecular weight category shall be extra high (250,000 #0 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. g. Before beginning work, the Contractor sha11 submit for approval, the vendor's specific technical data with the complete information on resin, physical properties of pipe and pipe dimensions pertinent to this job. A certificate of "Compliance With Specification" shall be furnished for all materials to be supplied. The manufacturer's certificate shall state the pipe was manufactured from one specific resin and shall state the resins used and its source. All pipe shall be made of virgin material. No rework except that obtained from the manufacturer's own production of the same formutation shall be used. The City will run tests on field samples per applicable ASTM specifications at an independent laboratory for veriflcation of the required physical properties and characteristics. The number of samples taken shall be at the City's discretion. All samples shall be provided by the Contractor at no charge to the City. The City shall pay all charges for all testing of the liner material if they are found to meet specification. All retesting of materials not initially meeting these specifications shall be at the Contractor's expense. h. All polyethylene sliplining pipe shall conform to the sizes and Standard Dimension Ratio (SDR) requirements shown on the drawings. Lengths: Standard lengths shall be used whenever possible, (40 foot sections). Where construction difficulties prevent the use of standard pipe sizes, other pipe sizes may be specified. Pipes shall be joined to one another and to polyethylene fittings by thermal butt-fusion in accordance with ASTM D2657 and ASTM D3350. Butt-fusion joining and site location, joining shall be performed within or outside the excavation. Joints between pipe sections shall be smooth on the inside and internal projection beads shall not be greater than 3/16 inch. k. The tensile strength at yield of the butt-fusion joints shall not be less that of the pipe. 2. Sewer Service Connections: Mechanical and fusion-bonded saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D- 2448, Type IV, Class C. Mechanical saddles shall have stainless steel straps and fasteners and neoprene gaskets. Mechanical saddles shall be Strap-on-Saddle Type as manufactured by Drisco Pipe or Tapping Saddle as manufactured by DuPont, or approved equal. Fusion saddles shall be electrofusion branch saddles as manufactured by Central Plastics Company, or approved equal. 98039-Partda.doc 10 (21) 04/16/9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) Saddles for use an PVC pipe shall be molded fittings as recommended by the PVC pipe manufacturer, and shall conform to the requirements of ASTM D3034, SDR 35. C EXECUTION 1. Cleaning and Television Inspection of Sanitary Sewers: Cleaning and television inspection of sanitary sewers to be sliplined shafl be completed per the requirements of Special Condition for pre-construction television inspection. All material encountered in the existing sewers shall be removed and disposed of by the Contractor. All video tapes shall be delivered to the City's representatives for evaluation prior to any sliplining operations. 2. Obstruction Removal: The Engineer shall determine where obstruction removal (due to dropped joints, collapsed pipe, roots, rocks, obstructions in the pipe which cannot be removed by the cleaning equipment or other reasons) will be required. The Contractor shall locate the insertion pits at these obstruction locations whenever possible, and no additional payment will be authorized to the Contractor. When obstructron removal is required at locations other than insertion pits, payment for the obstruction excavation at the appropriate Contract unit price will be authorized. 3. Sewer Cleaning by Bucket Machine and Root Cutting: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines or root cutting, as required. No additional payment for such cleaning and/or root cutting shall be made. 4. Insertion or Access Pits: The location and number of insertion or access pits shall be planned by the Contractor and submitted in writing for approval by the Engineer prior to excavation. The pits shall be located such that their total number shall be minimized, and the footage of liner pipe installed in a single pull shall be maximized. Before excavation is begun, it will be the responsibility of the Contractor to check with the various utility companies and determine the loca#ion of the utilities in the vicinity of the work area. Damage done to utilities and the resulting repair, temporary service cost, etc., shall be borne by the Contractor. All excavations shall be properly sheeted/shored in accordance with OSHA specifications for trench safety systems. Any damage resulting from improperly shored excavations shall be corrected to the satisfaction of the Engineer with no compensation to the Contractor. All open excavations shall be kept secure at all times by the use of barricades with appropriate lights and signs, construction tape, covering with steel plates, etc., or as directed by the Engsneer. 98039-Partda.doc � � �2�� 04/1f✓9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) The cost for bypass pumping if �equired around an insertion pit, from a manhole upstream to a manhole downstream, shall be included in the Unit Price Bid for sliplining. Excavation for insertion pits shall not be paid for separately, but shall be included in the Unit Price Bid for sliplining. 5. Insertion of Polyethylene Liner Pipe into Carrier Pipe: The existing sewer will remain in operation during the sliplining process whenever possible. Obstructions such as roots, large joint offsets, rocks or other debris, etc., that would prevent passage or damage to the other pipe sections must be removed or repaired prior to installing the new pipe. After compfeting the insertion pit excavation, the top of the existing sanitary sewer line shall be removed, where required, down to the spring line. A power winch cable shall then be connected to the end of the Irner by use of a suitable pulling head, equal to the outside diameter of the liner. The pulling head shalf be adequately secured to the liner and then attached to the power winch cable so that the liner can be satisfactorily fed and pulled through the sanitary sewer main. Proper bumpers shall be provided in the insertion pit in order to prevent the ragged edges of the existing pipe from scarring the outside of the liner as it is pulled into the existing sewer. Precautions shall be taken not to damage the liner or b�eak or separate any of the butt-fused joints. Sufficient time (a minimum of 24 hours) shall be allowed for the liner to return to its normal length assuming the over-elongation is due to a higher temperature at the time of installation) based upon the average temperature in the sewer. The length of the liner pulled in any one segment shall be limited to prevent any backup of service lines which may result due to restrrcted flow through the annular space. Maximum Allowable Pullinq Force. in order to ensure the integrity of the polyethylene liner, the pulling force exerted on the liner shall be limited to that indicated on the following table for the appropriate outside diameter of the polyethylene liner: 98039-Partda. doc POLYETHYLENE LINE OUTSIDE DIAMETER (INCHES) 5.375 7.125 8.625 10.750 14.000 18.000 21.000 24.004 MAXIMUM PULLING FORCE (TONS) 3.5 4.0 7.5 10.5 12.0 21.5 35.0 52.0 The Contractor shall use a suitable pulling head so that the pulling head and liner will separate from each other when the pulling force exerted on the liner reaches the amount indicated above. The pulling head design (including calculations) shali be approved by the Engineer prior to its use. �a �23� 04/1 &/9 � PART DA - ADDlTIONAL SPECIAL CONDITIONS (WATER DEPT.) As an alternative, the Contractor may be permitted to use a measuring device (spring, gauge, etc.) connected to the pulling cable which shall register the pulling force being exerted on the liner. The pulling force shall not exceed those values indicated above for the applicable outside diameter of the polyethylene liner. The measuring device shall be approved by the Engineer prior to its use. The Coniractor may be allowed to push the liner subject to the Engineer's approval. Care shall be taken to avosd any buckling of the liner by limiting the stroke of the backhoe. Any portion of the liner damaged during this insertion process shall be cut out and the liner rejected. In certain cases, the Contractor may be permitted to use a combination of pulling and pushing to enhance the insertion of the liner. A liner that is permitted to be pushed shall not have an open end which can allow sand or other debris to be pushed into the liner. A pipe manufacturer's representative shall be onsite to assist the Contractor for the first full day of slipline pipe installation. 6. Use of Clamps and Encasement for Polyethylene Pipe: Where excavations for the insertion of the liner are made between two manholes, the ends of the liner will be cut smooth, square to the axis of the liner, so that it can be joined in a workman- like manner. The liner shall be joined wrth a JCM Industries Type 108 or equal, all stainless steel (including bolts and lugs}, full circle, Universal Clamp Coupling with a 1/4-inch minrmum thickness grid type gasket. Clamps shall be selected to fit the outside diameter of the liner pipe. Minimum clamp widths shall be selected from the following table: OUTSIDE DIAMETER MINIMUM OF LINER PIPE WIDTH OF CLAMP (Inches) (Inches� 5.375 12 7.125 15 8.625 18 10.750 or Greater 30 In all excavations where the liner is not within the existing sanitary sewer line (carrier pipe) cement stabilized sand bedding shall be installed. Visual inspection is required for approval of bedding before backfill is completed. 7. Testing of the Liner: Testing will be required after the liner has been installed in the existing sanitary sewer main. The first is a low pressure air test of the liner before it has been sealed in place at the manholes and before any service reconnections have been made to the liner. The purpose of this test is to check the integrity of the joints that have been made and to verify that the liner has not been damaged by inserting it into the sanitary sewer. a. Low Pressure Air Test Procedure: After a manhole-to-manhole section of sanitary sewer main has been sliplined and prior to any service lrnes being connected to the new liner, the liner shall be plugged at each manhole with pneumatic plugs. The design of the plugs shall be such that they will hold against the test pressure without requiring external blocking or bracing. 98039-Parida.doc � � �24� 04/16/9 PART DA - ADDfTIONAL SPECIAL CONDITIONS (WATER DEPT.) One of the plugs shall have three (3) air hose connections; one for the inflation of the plug, one for reading the air-pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting from any groundwater that may be over the pipe. At least two (2) minutes shall elapse to allow the pressure to stabilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting from any ground water that may be over the pipe, shall not be less than the time shown for a given pipe diameter in the following table: CARRIER PIPE MINIMUM OUTSIDE DIAMETER ELAPSED TIME (tnches) (Minutes) 5.375 3 7.125 4 8.625 5 10.750 6 14.000 7 18.000 8 Lines over 18 inches shall be approved for payment by Visual and T.V. Inspection in accordance with Special Condition D-65. 8. Sealing Liner in Manholes: After the pipe has reached equilibrium the annular space between the liner and the existing sanitary sewer main must be sealed at each manhole with a chemical seal and nonshrink grout. Oakum soaked in Scotchseal 5600 or equal shafl be placed in a band to form an effective water-tight gasket in the annular space between the liner and the existing pipes in the manholes. The width of the band shall be a minimum of 12" or one-half the diameter of the pipe, whichever is greater. It shall be finished off with a non-shrink grout placed around the annular space from inside the manhole and shall not be less than 6" wide. The chosen method, including chemicals and materials, must be approved by the Engineer. The Contractor shall cut the iiner so that it extends 4" into ihe manhole. The Contractor shall make a smooth, vertical cut and slope the area over the top of the exposed finer using non-shrink grout. The Contractor shall also use cementitious grout to form a smooth transition with a reshaped invert and a raised manhole bench such that neither the shape edges of the liner pipe, nor the concrete bench, nor the channeled invert shall exist to catch debris and create a stoppage. The invert of the manhole shall also be reworked (smoothed and built-up) to match the flow line of the new liner. The liner pipe shall be allowed to normalize to ambient temperatures, as well as recover from any imposed stretch, a msnimum of 24 hours in the case of 98039-Partda. doc 10 (25) oai� e✓s ..+ � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) polyethylene, before being cut to fit between manholes and proceeding with reshaping and/or smoothing the manhole invert. 9. Sewer Service Connections: a. Sewer service connections shall be connected to the new pipe by mechanical or fusion methods. Once the saddle is secu�ed, a hole shall be drilled in the pipe, the fuil inside diameter of the saddle outlet. b. Connectfons ta the existing sewer service connection pipe shall be made using flexible Fernco sewer connectors, or approved equal. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service iateral to trench intersection and shall be in accordance with these Specifications. c. The Contractor shall upon request, permit the Engineer to take elevations on both the existing and new portions of the service connections pipe to determine final grade and invert elevations. Elevation changes greater than 0.10 feet from the house lateral piping shall be reconnected as directed by the Engineer. d. Service interruptions to homes shall not exceed 18 hours. D. MEASUREMENT AND PAYMENT 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed in the various diameters of sewers measured along the centerline of the sewer from centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. 2. Service Reconnections: a. Installation of sewer service connections will be measured for payment by each actually reconnected to the installed pipe. Payment will be made for the quantities measured at the unit price per each listed. b. Payment includes al� required excavation and backfill, surface restoration, saddles, flexible couplers, up to 5' of service line, and all appurtenant work. c. Payment for additional service line (over 5' at each service reconnection) will be paid for at the appropriate Cont�act Unit Price. Payment includes all required additional excavation, backfill, surface restoration, and all appurtenant work. 3. Television Inspection and Cleaning: Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of N inspection shall be measured as the total length of pipe actually cleaned and televised. This contract requi�es the Contractor to TV 98039-Partda.doc 10 (26) 04/16/9 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) inspect the sewer lines twice, once before and once after construction. Pre- Cleaning and Television Inspection shall be paid at the Contract Unit Price for all pipe successfully cleaned and television inspected. The amount paid to the Contractor for Post Construction Television Inspection shall be the Unit cost times the length of pipe lined. 4. Obstructions: Obstructions such as roots, large offset joints, rocks, or other debris, that would prevent passage or cause damage to pipe and must be removed or repaired before installing the pipe will be paid for at the Contract Unit Price per obstruction removal. Payment shall include all excavation and backfill costs, pipe replacement, surface restoration and appurtenant work required to compfete each obstruction removal. Obstruction located within ten feet of each other shall be included in only one obstruction removal. Trench Safety System, if required, shall be paid for at the Contract Unit Price. Contractor will not be paid for obstruction removal located at insertion pits. 5. Subsidiary Work: Any damage resulting to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement fences, sprinkler system piping, and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method will be incidental to the instalfation. DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT: A. GENERP,L: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad company, as applicable. B. MATERIALS: 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the following: a. Field Strength: 35,000 psi minimum. b. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings}. 98039 Partda-2.doc 10-27 04/1 &/99 � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) C E 3 c. d. Diameier: As shown on the drawings (minimum size requirements). Joints: Continuous circumferential weld in accordance with AWS D1.1. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or as designated on the plans. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the �ailroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2 3 Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. c. The pits of trenches excavated to facititate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if 98039_Partda-2. doc 10-2 8 oai� s�ss PART DA - ADDITiONAL SPECIAL CONDITIONS (WATER DEPT.) acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted anly to the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. b. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. c. Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 4. Installation of Carrier Pipe in Casing: a. Sanitary sewer pipe focated within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of ihe casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skrds should extend for the full length af the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. c. The Contractor shall prevent over-belling the pipe while installing it through the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer. 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indreated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ducti{e iron pipe. b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. 98039_Partda-2. doc 10-29 04/16/99 � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.� -- c. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used, with the approval of the Engineer or �ailroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a I'rcensed professtonal engineer in the State of Texas. ApprovaE by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b c. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud-jacked. Access holes for placing concrete shall be space at maximum intervals of 10 feet. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labar, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. DA-6 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR (OMITTED) DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION (OMITTED) DA-8 MANHOLE REHABILITATION (OMITTED) DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION (OMITTED) DA-10 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM (OMITTED) DA-11 INTERIOR MANHOLE COATING - QUADEX SYSTEM (OMITTED) DA-12 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM (OMITTED) 98039 Partda-2.doc 10-30 oai�s�ss PART DA - ADDlTIONAL SPEC{AL CONDITIONS (WATER DEPT.) DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM (OMITTED) DA-14 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPOXY LINER (OMIT) DA-1S INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM (OMITTED) DA-16 RIGID FIBERGLASS MANHOLE LINERS (OMITTED) DA- 17 PVC LINED CONCRETE WALL RECONSTRUCTION (OMITTED) DA-18 PRESSURE GROUTING: A. GENERAL 1. Scope. This Section governs all work, materials and testing required for the pressure grouting of manhole defects. Manholes or sections of manholes with active leaks shall be repaired as indicated in the Manhole Rehabilitation Schedule. 2. Description, The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of pressure grouting of manhole defects in accordance with the Contract Documents. 3. Manufacturer's Recommendations. Materials, additives, mixture ratios, and procedures utilized for the grouting process shall be in accordance with manufacturer's recommendations. 4. Manholes. Manholes to be grouted are of brick, concrete, or fiberglass construction. A. MATERIALS 1. Grouting Materials: a. Urethane Gel Grout: Urethane gel grout, such as Scotch-Seal 5610 gel or equal shall be a hydrophilic polymer. The chemical shall be mixed within the range of from 8 to 10 parts of water and shall contain a reinforcing agent supplied by the same manufacturer. The material shall gel and cure to a tough flexible elastomeric condition. When wet, the gel shall exhibit strength properties of at least 25 psi tensile at 150 percent elongation. The material shall not change in linear dimension more than eight percent when subjected to wet and dry cycles. b. The chemical grout shall be applied so as to have the grout material flow freely into the defects. To avoid any wastage of the material flowing through the defects, a gel control agent may be added. The following properties shall be exhibited by the grout: 1) Documented service of satisfactory performance in similar usage. 98039 Partda-2.doc 10-31 04/1&/99 � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) 2) Controllable reaction times and shrinkage through the use of chemicals supplied by the same manufacturer. The minimum gel set time shall be established so that adequate grout travel is achieved. 3) 4) Resistance to chemicals; resistant to most organic solvents, mild acids and alkali. Compressive recovery return to origina! shape after repeated defo�mation. 5) The chemical shall be essentially non-toxic in a cured form. 6) Sealing material shall not be rigid or brittle when subjected to dry atmosphere. The material shall be able to withstand freeze/thaw and moving load conditions. 7) Sealing material shall be noncorrosive. a. A reinforcing agent such as Scotch-Seal Brand 5612 reinforcing agent or equivalent shall be utilized in accordance with manufacturer's recommendations. Any 5612 reinforcing agent which contains lumps must be discarded. Care must be taken to be sure that the pH of the water in the tank is from 5 to 9. As a precaution against the possibility of the pH being outside this range, take a small amount of water from the tank to which Gel Reinforcing Agent 5612 rs to be added. Add a few drops of 5612 to this test sample. Scotch-Seal Brand Gel Reinforcing Agent 5612 should disperse readily. If precipitation occurs, drain the tank and retest. Repeat as necessary until dispersion occurs. If dispersion does not occur, do not use the water source. b. A filler material such as Celite 292 (diatomaceous earth) from Johns Mansville or equivalent shall be utilized. The addition of the filler materia! shall not exceed the quantity specified by the manufacturer, and continuous agitation of the water side of the mixture is required. The filler material may also be utilized as a reinforcing agent in accordance with the urethane gel grout manufacturer's recommendations. 1. Additives: Grout additions may be utilized for catalyzing the gel reaction, inhibiting the gel reaction, buffering the solution, lowering the freezing temperature of the solution, acting as a filler, providing strength or for inhibition of root growth. 2. Root Control: A root inhibiting chemical such as dichlobenil shall be added to the chemrcal grout mixture at a safe level of concentration and shall have the ability to remain active within the grout for a minimum of 12 months. 3. Material Identification: Contractor shall completely identify the types of grout, mortar, sealant, and/or root control chemicals used and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical 98039 Partda-2.doc 10-32 oai�s✓ss PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) properties, ease of application, and expected performance, to the satrsfaction of the Engineer. 4. Mixing and Handling: Mixing and handling of chemical grout and forming constituents, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that chemicals or gels produced by the chemicals are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engsneer. Only personnel thoroughly familiar with the handling of the grout material and additives shall perform the grouting operations. C. EXECUTION 1. General. Manhole grouting shall not be performed until sealing of manhole frame and grade adjustments, partial manhole replacement, or manhole repairs are complete. 2. Preliminary Repairs: a. Seal all unsealed lifting holes, unsealed step holes, voids larger than approximately one-half (1/2) inch in thickness. All cracked or deteriorated matersal shall be removed from the area ta be patched and replaced with Octocrete, as manufactured by IPS Systems, Inc. or equal, in accordance with manufacturers specifications. b. Cut and trim all roots within the manhole. 3. Temperature_ Norma! grouting operations including application of interior coating shall be performed in accordance with manufacturer's recommendations. 4. Grouting Material Usage. Grouting of the manhole may include corbel, wall, pipe seals, manhole joints, wall to flattop joint, and/or bench/trough. Areas of the manhole designated to be grouted will be directed by the Engineer. If entire manhole is scheduled for grouting, grouting shall include the entire manhole including corbel, wall, pipe seals and bench/trough. Pipe seal grouting shall include a►I pipe seals in the specified manhole and grouting of the specified manhole including the bench/trough to the maximum height of 18 inches from the crown. 5. Drilling and Injection: a. Injection holes shall be drilled through the manhole wall at locations indicated in the appropriate detail(s). b. Grout shall be injected through the holes under pressure with a suitable probe. Injection pressure shall not cause damage to the manhole structure or surrounding surface features. Grout shall be injected through the lowest 98039 Parida-2.doc 10-33 04/16/99 ,.. PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) holes first. The procedure shall be repeated until the manhole is e�cternally sealed with grout. c. Grouting from the ground surface shall not be allowed. d. Grout travel shall be verified by observation of grout to defects or adjacent injection holes. Provide additional injection hofes, if necessary, to ensure grout travel. e. Injection holes shall be cleaned with a drill and patched with a waterproof quick setting mortar for brick and concrete manholes. 6. Testing of Rehabilitated Manholes. Testing of rehabilitated manholes for water tightness shall be performed by the Contractor in the presence of the Engineer in accordance with the requirement of Section DA-18, VACUUM TESTING OF REHABILITATED MANHOLES of these specifications. D MEASUREMENT AND PAYMENT If the entire manhole is grouted, the Contract Unit Price shall be per vertical foot grouted as indicated on the Manhole Rehabilitation Schedule included in these specifications or as required by the Engineer. Payment for grouting pipe seals, bench and trough, and 18 inches above crown of pipe, and grouting flattop to wall joint, shall be based on the Contract Unit Price per each manhole rehabilitated as indicated on the Manhole Rehabilitation Schedule. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment, preliminary repairs and testing necessary to complete the work including grouting with urethane grout. DA-19 VACUUM TESTING OF REHABILITATED MANHOLES (OMITTED) DA-20 FIBERGLASS MANHOLES (OMITTED) DA-21 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfacing process commences for a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the contractors responsibiiity to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next 98039_Partda-2. doc 10-34 04/16✓99 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) one in order for the utilities to adjust facilities accordingly. The following are utrlity contact persons: Companv Telephone Number Southwestern Bell Telephone 338-6275 Texas Utilities 336-9411 Ext. 2121 Lone Star 336-8381 Ext. 6982 City of Fort Worth, 871-8100 Street Light and Signal Contact Person "Hot Line" Mr. Roy Kruger Mr. Jim Bennett Mr. Jim Bob Wakefield Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5} working days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER (OMfTTED) DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS (OMITTED) DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE (OMITTED) DA-25 GRADED CRUSHED STONES (OMITTED) DA-26 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE (OMITTED) DA-27 BUTT JOINTS - MILLED (OMITTED) DA-28 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) (OMITTED) DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER (OMITTED) DA-30 NEW 7" CONCRETE VALLEY GUTTER (OMITTED) DA-31 NEW 4" STANDARD WHEELCHAIR RAMP: The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. The removal of existing substandard wheelchair ramps and sidewalk as required for the installation of new wheelchair ramps shall be subsidiary to this pay item. The removal and replacement of existing curb and gutter as required for the installation of new wheelchair ramps shall be included in Pay Item 5(Removal and Replacement of Curb and Gutter). Pay limits for 98039 Parida-2.doc 10-35 04/16✓99 � PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) laydown curb and gutter are as shown in the Standard Pay Lrmit Detail (WR-1). The pay limit will extend from 9" outside the lip of gutter to 15" back from the face of curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the ramp and sidewalk. All applicable provision of standard Specifications Item 104 "Removing Old Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as herein modified. All concrete flared surface shall be colored with LITHOCHROME colo� hardener as manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake type, and shall be used in accordance with manufactures instructions. Concrete stain may be applied after concrete is poured (Product sold by BAER). "Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item. The method of application shall be by screen, sifter, sieve or other means sn order to provide for a uniform color distribution." The unit price bid per square yard for 4" standard wheelchair ramp as shown on the proposa! will be full compensation for materials, labor, equipment, tools and incidentals necessary to compete the work. DA-32 8" PAVEMENT PULVERIZATION (OMITTED) DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) The following specifications are for the furnishing and placing of reinforced concrete pavement or base as shown on detail and as directed by the Engineer. A. GENERAL: Reinforced concrete pavement or base shall conform to Specification Item No. 314 herein except for finishing and curing. B. FINISHING: The reinforced concrete shall be brought to a uniform surface by working with a wooden float. The surface shall be flush with the adjacent pavement and shall have a finish similar to the surrounding pavement. The surface shall be even and shall provide a smooth ride. C. CURING The reinforced concrete pavement surfaces shall be sprayed uniformly with a membrane curing compound conforming to the requirements of ASTM C-309, Type 2, white-pigmented compound, which shall not produce permanent discoloration of the concrete. Concrete shall be allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades. w � � 98039 Parida-2.doc 10-36 04/16/99 PART DA - ADDITIONAL SPECIAL CONDITIONS (WATER DEPT.) D. EXECUTION: Included in this item will be the removal of the existing reinforced concrete pavement. The existing pavement shall be sawed so as to maintain an even, straight pavement cut. The existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the new reinforced concrete pavement. The existing steel shall be thoroughly cleaned before lapping. The following work method will be perFormed on each utility cut: 1. Place safety signs, barricades and/or other warning devices where necessary and as required. 2. Replace pavement to nearest joint. 3. Mark out the damaged area with keel, chalk line or paint being sure to include all areas requiring repair. 4. Saw cut along marked lines a minimum of two (2) inches deep. 5. Remove existing concrete. 6. Form joints and place reinforcing steel and Dowel Bars (as required} according to standard specifications. 7. Place and finish concrete. 8. Clean up job site, removing all debris. 9. Maintain traffic control devices to protect the area until the concrete has cured seven days or concrete reaches 3000 psi compressive strength. E. PAYMENT: Payment shall be made at the unit price per linear foot as shown on the proposal and shall be full compensation for furnishing all labor, materiafs, equipment tools and incidentals necessary to complete the work. DA-34 RAISED PAVEMENT MARKERS (OMITTED) DA-35 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING (OMITTED) DA-36 LOADING, TRANSPORT, AND DISPOSAL OF CONTAMINATED SOIL (OMITTED) DA-37 ROCK RIPRAP - GROUT - FILTER FABRiC (OMfTTED) DA-38 CONCRETE PIPE FITTINGS AND SPECIALS (OMITTED) 98039 Partda-2.doc 10-37 04/16/99 � -11- SPECIFICATIONS (Water Department) 4 98039_SPECS doc � SPECIFICATIONS � L CITY OF FORT WORTH, TEXAS WATER DEPARTMENT (January 1, 1978) All materials, construction methods and procedures used in this project shall conform to � Sections E1, E2, and E2A of the Fort Worth Water Department General Contract Documents and General Specifications, together with any additional material specification(s), construction(s) or later revision(s). (See revisions listed on this sheet.) Sections E1, E2 and E2A of the Fort Worth Water Department General Contract Documents and General �. Specifications are hereby made a part of this contract document by reference for all purposes, the same as if copies verbatim herein, and such Sections are filed and kept in the office of the r' City Secretary of the City of Fort Worth as an official record of the City of Fort Worth. INDEX '' CONTACT CITY OF FORT WORTH FOR COMPLETE DOCUMENTS: E1 MATERIAL SPECIFICATIONS E2 CONSTRUCTION SPECIFICATIONS E2A GENERAL DESIGN DETAILS Revisions as of April 20, 1981, follow: E1-2.4 Backfill: (Correct minimum compaction requirement to 95% Procter density and correct P.I. values as follows:) c. Additional backfill requirements when approved for use in streets: Type 'B' Backfill (c) Maximum plastic index (PI) shall be 8 2. Type 'C' Backfill Material meeting requirements and having a PI of 8 or less shall be considered as suitable for compaction by jetting. Material meeting requirements and having a PI of 9 or more shall be considered for use only with mechanical compaction. E2-2.11 Trench Backfill: (Correct Minimum compaction requirement wherever it appears in this section to 95% Procter density except for paragraph a.1. where the "95% modified procter density" shall remain unchanged. 98039_Spers_WD doc ' `J LJ � G. � ' C 1 � 1 � � -12- PROJECT DESIGNATION SIGN (Water Department) R. 98039_flysheets. doc L� .� `' 7.. 1;'. 1 -�5 �'� f r..�. ' -�t 1 t..y � t,-.L .� _'� i >Fti y' - J�.� 'ROJECT NAME � ' r ,�„' f �, ,� .�'�'� �.� ,,�� L W � � �, , t fyz r.. vp � r� . . � 4 � � i rt�,twl��fP. �" ri'h" n�f�,S �ti� m����� �� n r P � � r� , ' + � T �i < k ��1 � r� -� �o � �'�«":��..�� '1' ..� e., • r.i � - ` y.:+"+��.,r1 �. }L.•f' 7c. +4.�- ���Y, , +t�.- r ,�� ' d R � "�e,'� � ; : � _� � � � � ��§.�OQ th'�s�p'r'o ec�; call�87:: '�ii�r. ��atCr, and' ser . •5x'= �. P. �" ` f �yf ���� ` � ~1 i! .1 y�T,1 r9rf i t. a s���1A.P � =.�•� ���� �4} SF � . . , . -� .,. , . . . 0000�oo �,� o0�0000V V0iAj,'r �{ `,* 1 e�S t�' -�/��E r u�: � , ! d"h > � i , � , i � , ; ti �� , + ���o�:aa - � �a � � , �- ��. , - - ;:�. �?' � [�. �t n . . . . S306� (Weekdays 7:30. a.m. -�4:30 p.m.) � `r;e�aergenc�es r�cal �1:�8�1-S300��'�'��..,� � y�- � � �ir� lr�y� �hk �''M,, ax'f ��w tJ Si��art�;j� `..e..�,./�'.� 6*-.��i� = 4�� �° b�. 'a.� f���'i�`T�')a 1 J� .tW.t '• R� _ �� 'S� 4 � i�a.�;� f�' � :• r�`'Y?C1 � �3�.,� i'� ;wi , t + . +� q'.i `"I,'�w,e"-�` � :`{`��; �.�.�,2 . yti '�'� ! 'C j � �� � A�. 6�;. a m�",P c rxx .P � .','� �.jv,�r 3'ti ��`-* "�; :',R r �;c . °�.ii � `�'�•- °a , , .•�' G;:. "•': r�7�" �,,�*.��r�,. r:f�; i1`�`� �� c;,. ..�'��� 1 ' 1 -13- � SPECIAL PROVISIONS (Transportation & Public Works Department) � 1 ' � —, � � u � � 98039_SPECS doc � � FOR: � DOE NO � UNIT I: SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS DEPARTMENT 1998 CAPITAL IMPROVEMENT PROJECTS - CONTRACT 3 Oscar, Hutchinson, and Hale Avenues, and 29"' Street Improvements 2135, 2136, 2137, 2138 WATER & SANITARY SEWER REPLACEMENT Water Project No.: PW 53-060530175280 Sewer Project No.: PS 58-070580174420 � UNIT II: PAVING RECONSTRUCTION & STORM DRAINAGE IMPROVEMENTS T/PW Project No.: C115-020115040536 f" -- 1. SCOPE OF WORK: This work shall include all materials, labor, equipment, tools and incidentals necessary to construct the proposed paving improvements and other appurtenances in accordance �' with the plans and specifications. �. � Award of Contract and Working Days: (1) Bid Alternatives: The proposal section of this document is designed as one proposal: UNIT I: WATER & SANITARY SEWER REPLACEMENT Water Project No.: PW 53-060530175280 Sewer Project No.: PS 58-070580174420 UNIT II: PAVING RECONSTRUCTION & STORM DRAINAGE IMPROVEMENTS T/PW Project No.: C115-020115040536 � (2) Submission of Bids: The proposal sections of the special contract documents are �, arranged to allow the Contractor to submit one single bid on all units combined; this document is designed as one set of contract documents and shall be construed as a single package. Award of contractor shall be to the low bidder of Units I and II combined. �" (3) The number of working days shall be as follows: Units I and II combined: working days. � 2. Contract will be awarded to the lowest responsive bidder. 3. The Contractor agrees to complete the Contract within the allotted number of working days. If the � Contractor fails to complete the work within the number of working days specified, liquidated damages shall be charged, as outlined in Part 1, Item 8, Paragraph 8.6 of the "General Provisions" of the Standard Specification for Construction of the City of Fort Worth, Texas. � r �. 4. INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the Proposal are approximate. It is the Contractor's sole responsibility to verify all the minor pay item quantities prior to submitting a bid. When the quantiry of the work to be done or materials to be furnished under any major pay item of the Contract is more than 125% of the quantity stated in the Contract, whether stated by Owner or by Contractor, then either party to the Contract, upon demand, shall be entitled to negotiate for revised consideration on the portion of work above 125% of the quantity stated in the Contract. When the quantity of the work to be done or materials to be furnished under any major pay item of the Contract is less than 75% of the quantity stated in the Contract, whether stated by Owner or by � 98039_SpecProv(TP1M aoc 1 3 (1) � SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION 8� PUBLIC WORKS DEPARTMENT ` Contractor, then either party to the Contract, upon demand, shall be entitled to negotiate for revised � consideration on the portion of work below 75% of the quantity stated in the Contract. This paragraph shall not apply in the event Owner deletes a pay item in its entirety from this Contract. A major pay item is defined as any individual bid item included in the proposal that has a total cost equal to or greater than five (5%) percent of the original contract. A minor pay item is defined as any individual bid item included in the proposal that has a total cost less than five (5%) percent of the original contract. r. In the event Owner and Contractor are unable to agree on a negotiated price, Owner and Contractor agree that the consideration will be the actual field cost of the work plus fifteen (15%) percent as described herein below, agreed upon in writing by the Contractor and Director, Department of - Engineering and approved by the City Council after said work is completed, subject to all other conditions of the Contract. As used, herein, field cost of the work will include the cost of all workmen, � foremen, time keepers, mechanics and laborers; all materials, supplies, trucks, equipment rental for such time as actually used on such work only, plus all power, fuel, lubricants, water and similar operating expenses; and a ratable portion of premiums on performance and payment bonds, public liability, Workers Compensation and all other insurance required by law or by ordinance. The Director, � Department of Engineering will direct the form in which the accounts of actual field cost will be kept and will recommend in writing the method of doing the work and the type and kind of equipment to be used, but such work will be performed by the Contractor as an independent Contractor and not as an � agent or employee of the Ciry. The fifteen (15%) percent of the actual field cost to be paid to the Contractor shall cover and compensate him for profit, overhead, general supervision and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein specified. Upon request, the Contractor shall provide the Director, Department of Engineering � access to all accounts, bills and vouchers relating thereto. 5. The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or � the entire project, at any time before the Contractor begins any construction work authorized by the City. 6. This Contract and project are governed by the two following published specifications, except as � modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH; STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRAL TEXAS. A copy of either of these specifications may be purchased at the ofFce of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each � pay item are indicated in the call-out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of � the North Central Texas document. 7. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract documents at any time. Failure to bid or fully execute contract without retaining contract documents intact may be ground for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate and as determined by the City Engineer. 8. The Contractor shall be responsible for defects in this project due to faulty materials and ' workmanship, or both, for a period of one (1) year from date of final acceptance of this project by the Ciry Council of the City of Fort Worth and will be required to replace at this expense any part or all of � the project which becomes defective due to these causes. 9. Construction stakes for line and grade will be provided by the City as outlined on P-17, Standard � Specifications for Construction, City of Fort Worth. 98039_SpecProv(TPV� doc 13 (2) �I � SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION 8 PUBLIC WORKS DEPARTMENT � � 10. TRAFFIC CONTROL: The Contractor shall be responsibie for providing traffic control during the construction of this project consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Vernon's Civil Statutes, �"' pe�tinent sections being Section Nos. 27, 29, 30 and 31. The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the Ciry. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, � Signs and Markings Division (telephone number 817-870-8075) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign wrth a temporary sign meeting the � requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign � requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the - permanent sign and shall leave his temporary sign in place until such reinstallation is completed. 11. PAYMENT: The Contractor will receive full payment from the City for all work. �"' 12. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to � provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and, if by him found correct, shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is � caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for whrch shall, � however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. r- 13. DETOURS: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. � Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning and/or Detour Signs", Item 524, and/or as shown on the plans. Construction signing and barricades shall conform with "1980 Texas manual on Uniform Traffic Control Devices, Vol. No. 1". �- 14. During the construction of this project, it will be required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer. 15. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Department of Engineering, acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be 99039_SpecProv(TPVV) doc f � 13 (3) SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION 8 PUBLIC WORKS DEPARTMENT � issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are � not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associates with obtaining the fill permit, including any necessary engineering studies, shall be at Contractor's expense. In the event that the Contractor F' disposes of spoil/fill material at a site without a fill permit or a letter from the Administrator approving the disposal site, upon notification by the Director of Transportation and Public Works, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. �" 16. During the construction of this project, the Contractor shall comply with present zoning requirements �.. of the City of Fort Worth in the use of vacant property for storage purposes. 17. All objectionable matter required to be �emoved within the right-of-way and not particuiarly described under these specifications shall be covered by Item No. 102, "Clearing and Grubbing" and shall be subsidiary to the other items of the contract. 18. Final cleanup work shall be done for this project as soon as paving and curb and gutter have been constructed. No more than seven (7) days shall elapse after completion of construction before the roadway and right-of-way is cleaned up to the satisfaction of the Engineer. "" 19. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. � 20. CONSTRUCTION SCHEDULE: It shall be the responsibility of the Contractor to furnish the Construction Engineer, prior to construction, a schedule outlining the anticipated time each phase of construction will begin and be completed, including sufficient time being allowed for cleanup. �. 21. SAFETY RESTRICTION WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: � a. A warning sign not less than five inches by seven inches (5" x 7"), painted yellow with black letters that are legible at twelve (12') feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drive, hoisting equipment or similar apparatus. �"' The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES" �- � � b. Equipment that may be operated within ten (10') feet of high voltage lines shall have an insulating cage type or guard about the boom or arm, except backhoes or dippers, and insulator links on the lift hook connections. c. When necessary to work within six (6') feet of high voltage electric lines, notification shall be given the power company (T.U. Electric Service Co.) who will erect temporary mechanical barriers, de- energize the line, or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to T.U. Electric Service Company and shall record action taken in each case. "' d. The Contractor is required to make arrangements with the TU Electric Service Company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. r e. No person shall work within six (6') feet of a high voltage line without protection having been taken as outlined in Paragraph (3). 98039_SpecProv(TPVh.doc 13 (4) � �- SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION S PUBLIC WORKS DEPARTMENT � 22. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described � in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. � 23. RIGHT TO AUDIT: a. Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this `• contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in � order to conduct audits in compliance with provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. ,., Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such subcontractor, involving transactions to the subcontract, and further, that the City shall have access during normal working hours to all subcontractor facilities, and sha{I be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. c. Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse contractor for the cost of copies as follows: � 1) 50 copies and under - 10 cents per page �., 2) More than 50 copies - 85 center for the first page plus fifteen cents for each page thereafter � 24. OBSTRUCTION OF ACCESS TO DRIVES: The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification should � be made to an owner prior to his driveway being rebuilt. 25. TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL: a. DESCRIPTION: This item shall consist of temporary soil erosion, sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These ` control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the F CONTRACTOR to control conditions created by this construction operations. The temporary , measure shall include dikes, dams, berms, sediment basins, fiber mats, jut netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, diked, slope � drains and other devices. b. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution control measures shall be used to prevent or correct erosion that may develop during � 98039_SpecProv(TPW�.doc � 13 (5) � SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS DEPARTMENT construction prior to installation of permanent pollution control features, but are not associated r with permanent control features on the project. The Engineer will limit the area of preparing the right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding and other such permanent pollution control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil erosion control measures shall be performed as directed by the Engineer. "r The contractor shall also conform to the following practices and controls. All labor, tools, equipment and incidentals to complete the work will not be paid for directly, but shall be "' considered as subsidiary work to the various items included in the contract. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the ,�„ muddying of a stream. All waterways shall be cleared as soon as practicable of falsework, piling, debris or other obstructions placed during construction operations that are not part of the finished work. The CONTRACTOR shall take sufficient precautions to prevent pollution of streams, lakes and � reservoirs with fuels, oils, bituments, calcium chloride or other harmful materials. He shall conduct � and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. � c. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide L� temporary erosion control shall be considered subsidiary to the contract and not extra pay will be given for this work. R". � 26. EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit the project site and make such examination and explorations as may be necessary to determine all conditions which may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing �,, improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions which may give rise to � later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. 27. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own �" expense. 28. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take adequate measures to protect all existing structures, improvements and utilities which may be encountered. k. Any and all permanent structures such as parking lot surface, fencing and like structures shall be r replaced at no cost to the Ciry by material of equal value and quality as that damaged. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City or the Engineer to be accurate as to extent, location and depth; they are shown on the plans � 98039_SpecProv(TPV� doc � 13 (6) � SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION 8 PUBLIC WORKS DEPARTMENT ... as the best information available at the time of design from ihe owners of the utilities involved and from evidences found on the ground. 29. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to � indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subconiractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of Owner, its officers, � servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any • damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in � part by the negligence or alleged negligence of Owner, its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or �. (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. r- ' The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public � work from a Contractor against whom a claim for damages is outstanding as a result of work . performed under a Ciry Contract. ,, 30. TEST BORINGS: It shall be the responsibiliry of the bidder to make subsurface investigations as he deems necessary to determine the nature of material to be excavated. This item shall be considered r as subsidiary to the other items of the contract. . 31. QUALITY CONTROL TESTING: _ a. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The Contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will ,, bear any expense related thereto. r b. Tests of the design concrete mix shall be made by the Contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement and mortar which are to be � used later in the concrete. The Contractor shall provide a certified copy of the test results to the Ciry. c. Quality control testing of an in-place material on this project will be performed by the Ciry at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the Contractor and will be billed at commercial rates as determined by the Ciry. The failure of the City to make any tests of materials shall in no way relieve the Contractor of its responsibility to furnish materials and equipment conforming to the requirements of the Contract. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safery system (if required) for 98039_SpecProv(TPV� doc 13 (7) SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS DEPARTMENT the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. e. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the jobsite. The ticket shall specify the name of the pit supply the fill material. 32. FINISHING EQUIPMENT FOR CONCRETE PAVEMENT: Shall be governed by Specification Item No. 314.3(8) and 314.5(8) with the modifications: Slip Form Construction: At the option of the Contractor and with the approval of the Owner, concrete � pavement may be constructed by the use of slip form paving equipment. "'` Slip form paving equipment shall be provided with traveling side forms of sufficient dimensions, shape and strength so as to support the concrete laterally for a sufficient length of time during placement to produce pavement of the require cross section. The equipment shall spread, consolidate, screed and float-finish the freshly placed concrete in such a manner as to provide a dense and homogeneous pavement. The concrete for the full paving width shall be effectively consolidated by internal vibration with transverse vibrating units; or with a series of longitudinal vibrating units loaded with the specified � thickness of pavement section and a minimum distance ahead of the screed equal to the pavement thickness. � When concrete is being placed adjacent to an existing pavement, that part of the equipment which is supported on existing pavement shall be equipped with protective pads on crawler tracks or rubber- tired wheels offset to run a sufficient distance from the edge of the pavement to avoid breaking or cracking the pavement edge. C� � � Final finishing for slip form pavement construction shall be to the tolerance as specified in Section 314.5(8). 33. CUTTING OF CONCRETE: When existing concrete is cut, such cut shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. 34. SANITARY FACILITIES FOR WORKMEN: The Contractor shall provide all necessary sanitary conveniences for the use of workmen at the project site. Specific attention is directed to this requirement. � 35. SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for the project such as conditions imposed by the Plans, the General Contract Documents or these Special � Contract Documents, in which no specified item for bid has been provided in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price in the Proposal for each bid item. Surface restoration, cleanup and relocation of mailboxes are general items of work which fall in the category of subsidiary work. f 36. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the Public" of the Standard Specifications. � CONSTRUCTION r NON-PAY ITEM NO. 1— CLEARING AND GRUBBING: All objectionable items within the limits of this project and not otherwise provided for shall be removed under this item in accordance with Standard i � 98039_SpecProv(TPV�.doc 13 (8) � SPECIAL PROVISIONS CITY OF FORT WORTH TRANSPORTATION 8� PUBLIC WORKS DEPARTMENT W Specification Item 102, "Clearing and Grubbing". However, no direct payment will be made for this item and it shall be considered incidental to this contract. � NON-PAY ITEM NO. 2- SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. NON-PAY ITEM NO. 3- BARRICADES AND TRAFFIC CONTROL: Contractor shall be responsible for providing barricades and traffic control as set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" and per Standard Specification Item No. 524, "Barrier and Warning �' and/or Detour Signs", Fort Worth Public Works. � Payment for traffic control and traffic control devices shall be considered subsidiary to work performed as stated in Standard Specification Item No. 524, City of Fort Worth and no additional compensation will be allocated. NON-PAY ITEM NO. 4- MAINTAINING ACCESS: Contractor shall be responsible for maintaining access to all homes and businesses during construction. NON-PAY ITEM NO. 5- COORDINATION, MEETING. AND PRESENTATION: Contractor to schedule �, one meeting with the Homeowner's Associations. The following will be present at the meeting: � • An officer of the prime construction company • All the foremen that will be supervising work Agenda of items to be covered: 1' • Construction schedule • Construction methods • Impact on homeowners k: Traffic re-route plan � PAY ITEM NO. 1- PROJECT DESIGNATION SIGN: The Contractor shall construct and install one (1) Project Designation Signs for each end of project and it will be the responsibiliry of the Contractor to maintain the signs in a presentable condition at all times on each project under construction. Maintenance will include painting and repairs as directed by the Engineer. '" It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed detail. � �. PAY ITEM NO. 2- 7-INCH REINFORCED CONCRETE PAVEMENT: All applicable provisions of Standard Specifications Item 314, "Concrete PavemenY', shall apply. The contractor shall use a six (6) � sack concrete mix for all hand placement in the intersections. The unit price bid per square yard shall be full payment for all labor, material, equipment and incidentals necessary to complete the work. � � � � PAY ITEM NO. 5- HMAC TRANSITION: This item will consist of the furnishing and placing at varying thicknesses an HMAC surface in transition areas where indicated on the plans and at other locations as may be directed by the Engineer. This item shall be governed by all applicable provisions of Standard Specifications Item No. 312. The price bid per ton for HMAC Transition as shown on the Proposal will be full payment for all materials, labor, equipment, tools and incidentals necessary to complete the work. 98039_SpecProv(TPV�.Goc 13 (9) � � � SPECIAL PROVISIONS ,� CITY OF FORT WORTH TRANSPORTATION 8� PUBLIC WORKS DEPARTMENT � PAY ITEM NOS. 7, 9, AND 11 - DEMOLITION OF CONCRETE FEATURES: This item shall be for a sawcutting, removal and disposal of all existing concrete curb, gutter, sidewalks, driveways, and concrete pavement required to construct the new paving improvements as indicated on the plans. Item 104 applies. The unit price bid shall be full compensation for all labor, tools, and equipment necessary to complete the work. As subsidiary to this Pay Item, contractor shall provide gravel dikes for pollution prevention as shown on plans or directed by engineer. PAY ITEM NO. 8— 7-INCH CONCRETE CURB: The Contractor may, at his option, construct either integral or superimposed curb. Standard Specification Item 502 shall apply except as herein modified. (a) Inteqral Curb Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited not more than thirty (30) minutes after the concrete in the slab. (b) Superimposed Curb � Concrete shall have a minimum compressive strength of three thousand (3,000) pounds per ^� square inch at twenry-eight (28) days. The quantity of mixing water shall not exceed seven (7) U.S. gallons per sack (94 Ibs.) of Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is required. r PAY ITEM NO. 10 - 7-INCH CONCRETE VALLEY GUTTER: This item shall include the construction of concrete valley gutters at various locations to be determined in field. See Standard Specification Item Nos. 314 "Concrete PavemenY', 312 "Hot-Mix Asphaltic Concrete", 106 ' "Unclassified Street Excavation", and 208 "Flexible Base". Measurement for final quantities of valley 0 gutter will be by the square foot of concrete pavement and the curb and gutter section will be included. � The concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch. Contractor shall work on one-half of valley gutter at a time, and the other half shall be open to � trafFc. Work shall be completed on each half within seven (7) calendar days. The unit price bid per square yard for concrete valley as shown on the proposal will be full compensation for materials, labor, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO. 12 - 6-INCH REINFORCED CONCRETE DRIVEWAY: All applicable provisions of Standard Specifications Item 314, "Concrete PavemenY', shall apply. The contractor shall use a five (5) sack concrete mix. The unit price bid per square foot shall be full payment for all labor, material, equipment and incidentals necessary to complete the work. PAY ITEM NO. 14 - REPLACE 4: STANDARD WHEELCHAIR RAMP: The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. Pay limits for laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-1). The pay limit will extend from 9" outside the lip of the gutter to 15" back from the face of curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the ramp and sidewalk. 13 (10) 98039_SpecProv(TPNJ�doc S � SPECIAL PROVISIONS � CITY OF FORT WORTH TRANSPORTATION 8 PUBLIC WORKS DEPARTMENT All applicable provision of Standard Specifications Item No. 504 "Concrete Sidewalk Driveways" shall � apply except as herein modified. PAY ITEM NO. 15 - ADJUST EXISTING MANHOLE RIM TO GRADE: The Contractor shall be responsible to provide all labor, materials, equipment and incidentals necessary to adjust manhole tops, regardless of type, to appropriate grades associated with the street and right-of-way improvements of this �- project. � The unit price for this item is a pre-bid amount of three hundred fifty dollars ($350.00) each and shall be full compensation to complete this work. �,,. PAY ITEM NO. 16 - TOPSOIL: This item shall be governed by Item 116 of the City of Fort Worth Standard Specifications for Construction. Locations of the topsoil shall be directed by the Engineer. The proposal quantities shown are calculated to p�ovide topsoil four to six inches in depth (compacted) over the parkway area and do not include material deeper than design depth behind the curb. The pay � item is intended to pay for topsoil that must be imported where suitable material is either not avaiiable on the job or cannot reasonably be stored on-site. Payment will be made on the basis of loose truck volume � (full truck with sideboards up) tickets and material must meet City of Fort Wo�th standards for topsoil. Only the volume imported will be paid for and may be substantially less than the proposed quantities listed. The unit price for this pay item is a pre bid amount of eleven dollars ($11.00) per cubic yard. �r PAY ITEM NO. 18 - UNCLASSIFIED STREET EXCAVATION: See Standard Specification Item No. 106, "Unclassified Street Excavation" for specifications governing this item. Removal of existing penetration or asphalt pavement shall be included under this item. � All objectionable material found within the limits of excavation shall be removed from the job site and disposed of in a manner satisfactory to the Engineer. Removal of such shall be subsidiary to this item � unless otherwise provided herein. Operations necessary to windrow existing gravel bare in order to lower or raise subgrade shall be considered a subsidiary to this item and no additional compensation shall be given as such. The intention of the Owner to pay only the plan quantity without measurement. Should either contracting party be able to show an error in the quantities exceeding 10 percent, then actual quantities will be paid for the unit price bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing any survey and/or measurement costs necessary to verify the actual quantities. � Proposed cross sections are available upon request. �" PAY ITEM NO. 38 - TEMPORARY ACCESS TO ALL DRIVEWAYS: This item shall include all the measures necessary to allow temporary access of homeowners to all driveways adjacent to the construction area. �, r- � 1 1 LJ 1 � s -14- �' SILICONE JOINT SEALING SPECIFICATIONS 1 1 � � �J � � � 98039_SPECS.tloc SILICONE JOINT SEALING SPECIFICATIONS CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS DEPARTMENT (Revision 1 - October 18, 1989) {Revision 2 - May 12, 1994) SCOPE This specification for silicone joint sealing Portland Cement Concrete pavement and curbs shall supersede Item 314.2. (11) "Joint Sealing Materials" of STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH, and Item 2.2.10 "Joint Sealing" of STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS. 2. DESCRIPTION This specification for silicone joint sealing shall apply to, but shall not be limited to, all Portland Cement Concrete street pavement and curbs. 3. MATERIALS 3.1 The silicone joint sealant shall meet Federal Specifications TT-S-001543A for Class A sealants except as modified by the test requirements for the Class I, Class II and Class III silicone joint sealants of this specification. Before the instatlation of the joint sealants, the Contractor shall furnish the Engineer certification by an independent testing laboratory that the silicone joint sealants meet these requirements. 3.2 The manufacturer of the silicone joint sealant shall have a minimum two-year demonstrated, documented successful field performance with Portland Cement Concrete pavement silicone joint sealant systems. Verifiable documentation shall be submitted to the Engineer. Acetic acid cure sealants shall not be accepted. The silicone sealant shall be cold applied. 3.3 Self-Levelina Silicone Joint Sealant The joint sealant shall be Dow Corning 890-SL self-leveling silicone joint sealant for asphalt as manufactured by Dow Corning Corporation, Midland, MI 48686- 0994, or an approved equal. , � ' � 98039_Silicone.doc ..s SILICONE JOINT SEALING SPECIFICATIONS Self-Leveling Silicone Joint Sealant for Asphalt Test Method As Supplied Test ••• Non Volatile Content, % min. MIL-S-8802 Extrusion Rate, grams/minute ASTM D 1475 Specific Gravity ••• Skin-Over Time, minutes mad. ... ... Cure Time, days Full Adhesion, days As Cured - After 21 Days at 25°C (77°F) and 50% RH � ASTM D 412, Die C Mod. Elongation, % min ASTM C 719 Movement, 10 cycles �" @ + 100/-50% ASTM D 3583 Adhesion to Concrete, (Sect. 14 Mod.) % Elonqation min. Requirement 96 to 99 227 to 550 1.260 to 1.340 60 14 to 21 14 to 21 1400 No Failure 600 3.4 The joint filler stop shall be of a closed cell expanded polyethylene foam backer rod and polyethylene bond breaker tape of sufficient size to provide a tight seal. The back rod and breaker tape shall be installed in the saw cut }oint to prevent the joint sealant from flowing to the bottom of the joint. The backer rod and breaker tape shall be compatible with the silicone joint sealant and no bond or reaction shall occur between them. Reference is made to the "Construction Detail" sheet for the various joint details with their respective dimensions. TIME OF APPLICATION On newly constructed Portland Cement Concrete pavement, the joints shall be initially saw cut to the required depth with the proper joint spacing as shown on the "Construction Detail" sheet or as directed by the Engineer within 12 hours of the pavement placement. (Note that for the "dummy" joints, the initial 1/4 inch width "green" saw cut and the "reservoir" saw cut are identical and should be part of the same saw cutting operation. Immediately after the saw cutting pressure water washing shall be applied to flush the concrete slurry from the freshly saw cut joints.) The pavement shall be allowed to cure to a minimum of 7 days. Then the saw cuts for the joint sealant reservoir shall be made, the joint cleaned, and the joint sealant installed. During the application of the joint sealant, the weather shall not be inclement and the temperature shall be 40°F (4°C) and rising. EQUIPMENT 5.1 All necessary equipment shall be furnished by the Contractor. The Contractor shall keep his equipment in a satisfactory working condition and shall be inspected by the Engineer prior to the beginning of the work. The minimum requirements for construction equipment shall be as follows: 5.2 Concrete Saw: The sawing equipment shall be adequate in size and power to complete the joint sawing to the required dimensions. � 98039_Silicone.dx SILICONE JOINT SEALING SPECIFICATIONS � 5.3 Hiqh Pressure Water Puma: The high pressure cold water pumping system shall be capable of delivering a sufficient pressure and volume of water to thoroughly '" flush the concrete slurry from the saw cut joint. 5.4 Air Compressors: The delivered compressed air shall have a pressure in excess of 90 PSI and 120 CFM. There shall be suitable traps for the removal of all free � water and oil from the compressed air. The blow tube shall fit into the saw cut joint. � 5.5 Extrusion Pumq: The output shall be capable of supplying a sufficient volume of sealant to the joint. � 5.6 Iniection Tool: This mechanical device shall apply the sealant uniformly into the joint. 5.7 Sandblaster: The design shall be for commercial use with air compressors as specified in Paragraph 5.4. �. 5.8 Backer Rod Roller and Toolina Instrument: These devices shall be clean and � free of contamination. They shall be compatible with the joint depth and width requirements. � 6. CONSTRUCTION METHODS 6.1 General: The joint reservoir saw cutting, cleaning, bond breaker installation, and joint sealant placement shall be performed in a continuous sequence of operations. � 6.2 Sawin4 Joints: The joints shall be saw cut to the width and depth as shown on � the "Construction Detail" sheet. The faces of the joints shall be uniform in width and depth along the full length of the joint. 6.3 Cleanina Joints: Immediately after sawing, the resulting concrete slurry shall be completely removed from the joint and adjacent area by flushing with high pressure water. The water flushing shall be done in one direction to prevent joint contamination. „� When the Contractor elects to saw the joint by the dry method, flushing the joint with high pressure water may be deleted. The dust resulting from the sawing � shall be removed from the joint by using compressed air. (Paragraph Rev. 1- October 18, 1989) After complete drying, the joints shall be sandblasted. The nozzle shall be attached to a mechanical aiming device so that the sand blast will be directed at � an angle of 45 degrees and at a distance of one to finro inches from the face of the joint. Both joint faces shall be sandblasted in separate, one directional passes. Upon the termination of the sandblasting, the joints shall be blown-out using � compressed air. The blow tube shall fit into the joints. The blown joint shall be checked for residual dust or other contamination. If any dust or contamination is found, the sandblasting and blowing shall be repeated � � 98039_Silicone.doc SILICONE JOINT SEALING SPECIFICATIONS until the joint is cleaned. Solvents will not be permitted to remove stains and contamination. Immediately upon cleaning, the bond breaker and sealant shall be placed in the joint. Open, cleaned joints shall not be left unsealed overnight. 6.4 Bond Breaker Rod and Tape: The bond breaker rod and tape shall be installed in the cleaned joint prior to the application of the joint sealant in a manner that will produce the required dimensions. 6.5 Joint Sealant: Upon placement of the bond breaker rod and tape, the joint sealant shall be applied using the mechanical injection tool. The joint sealant application shall not be permitted when the air and pavement temperature is less than 40°F (4°C). Joints shall not be sealed unless they are clean and dry. Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the pavement surface shall be removed and discarded and shall not be used to seal the joints. The pavement surface shall present a clean final condition. Traffic shall not be allowed on the fresh sealant until it becomes tack free. 6.6 Approval of Joints: A representative of the sealant manufacturer shall be present at the job site at the beginning of the final cleaning and sealing of the joints. He shall demonstrate to the Contractor and the Engineer the acceptable method for sealant installation. The manufacturer's representative shall approve the clean, dry joints before the sealing operation commences. 7. WARRANTY The Contractor shall provide the Engineer a manufacturer's written guarantee on all joint sealing materials. The manufacturer shall agree to provide any replacement material free of charge to the City. Also, the Contractor shall provide the Engineer a written warranty on all sealed joints. The contractor shall agree to replace any failed joints at no cost to the City. Both warranties shall be for one year after final acceptance of the completed work by the Engineer. 8. BASIS OF PAYMENT Payment will be made at the Contract Bid Item unit price per linear foot (LF) as provided in "MEASUREMENT" for "SILICONE JOINT SEALING", which price of shall be full compensation for furnishing all materials and for all preparation, delivery, and application of those sealing materials and for all labor, equipment, tools, and incidentals necessary to complete the silicone joint sealing in conformity with the plans and these specifications. I� J � 98039_Silicone doc � -15- PROJECT DESIGNATION SIGN (T/PW Department) 98039_flysheets.doc PROJECT DESIGNATION SIGN ./ � , � � 1 � / �r , . _ "_ . � � � • i . -i � . � I � c� , . � . ' �� �• ��. � ��� � -��� � ��. �. � � # �� 9 ij� � � t � �,,,, � • - �,,,, �" 3" � 1 � ,. � � � I . ` + - :��� Pro eG� �`���� �. . � � . ,, - . {.. � � � �,z�� i i c=. � r: � r� c� o r � � - �: - �,z�, ; � . 2�,��, I._. ��� ���c�� d.��5 �.�c��� .. !� -� <�-fl� ( r.; ; si<.. � �`4��� � � Sch�duled Compl�tion Da�� � ' �'� I i � . � � ��z•�� i i � � �e � � �+ � • 5.. � : # . . � � � � i .. I t/2" ` � 4�- O�� . ` L�ctc►t�Rl1 wxtTE ( BLUE encxcRouuo w/ wxiTE LE7TER5 ) IETTEFJNG-CIT7 0F F0RT L70RTH-EO�:c1.tLK CEuI IT:LIC � PROJE�CT T�7L , qNTR1.CT0R D CaT� 1`1 H�! V�i1C,C s VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. The law that, in order to be awarded a contract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the state of Texas) bid projects for construction, improvements, supplies or services in Texas at an mount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the state in which the non-resident's principle place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failu�e of out-of-state or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give state�, our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident vendors in (give state), or principal place of business, are not required to underbid resident bidders. �� B. Our principal place of business or corporate offices are in the State of Texas. � BIDDER: � � " ' ,� � � ��� �� � ��.' iv'� r 1 l rf1�{ � I'� ��'P �, � �r � �J ,+� i � . �� �'L_ �'Z ��1 � -���i�L� '✓ ��""� � � _ -! d. �_ ]� � _ Crlmpany R {pl�ase prir�t} � � � � , ' L': L� �/`l ,(� �'� �� O f �� �� � ��`_' Signature: JG !/1 /V I C ( vr ��r� ,� ' � �- -� / �f �"'�t �+ i ��' � , 1, � ;� � (�� (�; J � Title: � � {� ' � � �t �`" r�.f f — City ` `� Staie Zip (please print) THIS FORM MUST BE RETURNED W/TH YOUR QUOTATION 98039_comply doc 16 (1) � � IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. �C0RD25-S(7l97)2 of 2 #M13960 � . .. . CERTIFICATE OF INSURANCE � "I'O: CITY OF FORT WORTH Date_ NAME OF PRO.fECT: � PROJECT NUMBER: IS "1'0 CERTIFY THAT : � is, at the date of this ccrtificate, Insurcd by this Company with respect to the business operations hereinafrer described, for " thc typc of insurance and accordance with provisions of the standard policies used by this Company, and further hcreinafter described. Exceptions to standard policy noted on rcverse side hereof. �„ TYPE OF INSURANCE Policy Effective Expires Limits of Liability � Worher's Compensation Comprehensive General Liability Insurance (Public Li abi I ity) � . Blasting Collapsc of Building or • - structures adjacent to excavations r'" Damage to Underground Utilitics � Builder's Risk . Comprchcnsivc Automobile Liability � C C P1 .wl � Contractual LiaUility Othcr E3odily Injury: Ea.Occurrence: $ Property Damage: Ea.Occurrcnce: $ Ea.Occunence: $ Ea.Occurrence: $ Ea.Occurrence: $ Bodily [njury: Ea. Person: $ Ea. Occurrence: $ E'roperty Damage: Ea. Occurrence: $ Bodily Injury: E2. o��urr�„��: $ Property Damage: Ea.Occurrence: $ Locations covcrcd: Description of operations covered: Thc abovc policies either in the body thercof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in Icss than five (5) days after the insured has received written notice of such change/or cancellation. Where applicaUle local laws or regulations requirc more than tive (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. A�cncv �ort Worth Aeent By Address Title 1 ' CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Project Number PW53- 0G0530175280,PS_58-070580174420,C115-020115040536 M�C�,�NT)(3N CC3NSTRLICTTON COll�'1?AN�Y. il'VC. �'ON CT � : �� Y t� ' DAN IY+kGLENt?Q{�, PRf�IQENT Title �. , � � C-C .'� � -- �G,� l ,� , � l� a'� L� Date ` STATE OF TEXAS � - COUNTY OF TARRANT § � BEFORE ME, the undersigned authority, on this day personally appeared �f 4 yt /�( f' /�� �. ic���l..- la�own to me be the person whose name,is,subscribed to the foregoing instn�nent, and acknowledged to me that he executed the same as the act and deed or�tCEO �L.- i/ �t�t-T.Ce� 'v=k G for the purpose and consideration tl�erein expressed and in the capacity therein stated. . ;., GIVEN UNDER MY HAND AND SEAL OF OFFICE this �� ��' day of � . 20 d 0 � . / .�t' ���'-!! i�'� l 7''�'f��"-? Notary Publi6%m and for the State of Texas � � � i � � B0ND N0. 89800890 PERFORMANCE BOND THE STATE OF TEXAS � �r - � i COUNTY OF TARRANT � KNOW ALL MEN BY THESE PRESENTS: That we (1) MCCLENDON CONSTRUCTION COMPANY, INC. a (2) CORPORATION of TEXAS, hereinafter call Principal, and (3) VIGILANT INSTJRANCE COMPANY &* a corporation organized and exisring under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and finnly bound unto the City of Fort Worth, a municipal corporarion organized and existing under the laws of the State of Texas, hereinafter cailed Owner, in the penal sum of: One Million, Two Hundred Thirty-EiQht Thousand. Two Hundred Thirtv-Six & 50/1QQ ��" (S1238236.�Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, adnuuistrators and successors, jointly and severally, firrrily by these presents. - * FEDERAL INSURANCE C0MPANY THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the of�� a copy of which is hereto attached and made a part hereof, for the construction of: F�2 � LUUQ � RECONSTRUCTION OF 0SCAR AVENUE, HUTCHINSON STREET, 29TH STREET AND HALE AVENUE designated as Project No. (s) PW53—060530174280 , a copy of which contract is hereby attached, referred to, and made a part hereof as fully and to ihe same extent as if copied at length herein, such project and construction bein� hereinafter referred to as the "«�ork". F i NOVV THEREFORE, if the Principal sha11 well, truly, and faithfully perform the work in accordance with � the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which � j may be granted by the Owner, widi or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages P"; " which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner a!1 outlay and expense iL,,, which the Owner may incur in making good any default, then dus obligation shall be void; otherwise to remain in full � force and effect. ri ' � �" PROVIDED FURTHER, that if any legal acrion filed upon this bond, venue shall lie in Tarrant County, State of Texas. � � AND PROVIDED FURTHER, that the said Surety, for value received, hereby sripulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to ihe terms of ihe contract or to the work or to die specifications. IN WITNESS WHEREOF, this instrument is executed in 8 counterparts each one of which shalt be deemed an original, this the of ATTEST: F�� 2 9 20Q0 (Principal) Secretary (SEAL) �'[CCLENll()1V �03vSTRi�C'Tp�N �C]MPA.k"�T"�', INC. P�iNN IPAL �( BY: .,�.Ir,�l �� �- _ - - — .,- Title: o� �c� ��nn� PRF!4ltlfiNT PO BOX 996 BURLESON, TX 76097 (v � (Address) �` u / �4 ,!L-�',r 1 � ; � L �d'!' ,� VIGILANT INSURANCE COMPANY Wimess as t��'ri.�ipai FEDERAL SuretylNSURANCE COMPANY Po. ��i � � [, ,�y Address �L.�i�1, �( 7'�07 BY: �,,�'Y�{�,�,�. i. I f��� ATTEST: Tamara E. Murray(Attorney-in-fact) (5) � . (SEAL) �. (Surety) Secretary 15 Mountain View Road Warren, NJ 07061 (Address) NOTE: Date of Bond must not be prior to date of Con�ract I�`-� Q X� Y't, ��t .� �� -��. +�v� ' V�tness as to Setrety P.O. �ox 8700,�Fort Worth, TX 76124 (Address) (1) �2) �3) (4) (5) Correct Name of Contractor A Corporation, a Partnership or an Individual, as case may be Conect name of Surety If contractor is Partnership all Parniers should execute Bond A true copy of Power of Attorney shall be attached to Bond by Attomey-in-Fact.. - F2 1 1 C � �. � � � � L r IMPORTANT NOTICE To obtain information or make a complaint: You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P.O. Box 149104 Austin, Texas 78714-9104 Fax # (512) 475-1771 PRENIIUM OR CLAIM DISPUTES Should you have a dispute concerning your premium or about a claim, you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached document. ' ,� B0ND N0. 89800890 PAYMENT BOND �� THE STATE OF TEXAS � COUNTY OFTARRANT § P � . i„ KNO��V ALL MEN BY THESE PRESENTS: That we (1) MCCLENDON CONSTRUCTION �1"i� COMPANY. INC. a (2) Corporation of Texas, hereinafter call Principal, and (3) VIGILANT INSURANCE C0MPANY *a coiporation or� �nized and existing under the laws of the State and fully - authorized to transact business in the State of Texas, as � urety, are held and firmly bound unto the City of Fort i Worth, a municipal corporation organized and existing u lder the laws of the State of Texas, hereinafter called � Owmer, and unto all person, firms, and corporations who may fiirnish materials, for or perform labor upon the r� building or improvements hereinafter referred to in the pens ! sum of : * FEDERAL INSUR.ANCE C0MPANY � ONE MILLION TWO HUNDRED THIRTY EIGHT "HOUSAND TWO HUNDRED THIItTY SIX AND 50/100 ............................................................... ................................................................... ($1.238.236.501 Dollars in lawful money of the United St� �s, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we herel � bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firnily to these presents. THE CONDITION OF THIS OBLIGATION i� .;uch that Whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the _day of A.D. , 2000, a copy of which is hereto attached and made a part thereof, for the construction of:: �-E� 2 9 2000 REC�NSTRUCTION OF OSCAR AVENUE (28���� S> LEET TO 321v° STREETl; HUTCHINSON STREET (28T� STREET TO 29T" S�'REET); 29TH S`j'�2EET (I UTCHINSON STREET TO RUNNELLS AVENUEI AND HALE AVENUE (28 STREET TO 31y STREE 'Z Project 1�'a (s) PVV53-060530174280, PS58-0', 580174420, C115-020115040536 a copy of which is hereto attached, refen�ed to and made a part hereof as full� tnd to the same extent as if copied at length herein, such project and construction being hereinafter referred to as thc `work". � � � NOW TH�REFORE, the condition of this obli� ation is such that, if the Principal shall promptly make '-"- pa}�nent to all claimants as defined in ,4rtreie-����69*Revise � 1 Civil Statutes of Texas, supplying labor and materials in the prosecution of the work provided for in said Contract. then this obligation shall be null and void, odier��ise it ��' shall remain in full force and effect. ,y *Chapter 2253 F10 I� I� . � � THE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, as claimants are defined in said �r�e�e S�b9,* and all such claimants shall have a direct right of action under the bond as provided in-Aa-�ic-�e 5-l��of the Revised Civil Statutes. *Chapter 2253 PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tarrant County, State of Texas, that d�e said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration of addition to the terms of the contract or to the work to be performed thereunder or the specification s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to tlie wark to the specifications. PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary l�ereunder whose claim may be unsatisfied. �r-. IN Wi"I'NESS WH�REOF, this insmunent is executed in 8 counterparts each one of which shall be deemed - an original, this the day of A.D., 2000. •� F E B 2� 2000 MCC � CON T UCTION CO - I_N� ATTEST: / �4 BY: 11f� � v v — -- � Title: Q� ����DOPI, PR.f SID�NT (Principal) Secretary `����r� � � ���� ������ � WiMess as t�Pry�icipal 6�'.�. ;��� � �+ ��'�+, � T�C�iT Address A"fTEST: (SEAL) PO BOX 996 BURLESON. TX 76097 (SEAL) (Address) VIGILANT INSURANCE C0MPANY EFDERAL INSURANCE C0MPANY �urety , BY: � �,l"I�Y1(.�� � . � i "w'' (Attorney-in-fact) (5) � Tamara E. Murray (Address) (Surety) Secretary 15 Mountain View Road Warren, NJ 07061 (Address) NOTE: Date of Bond must not be prior to date of contract (1) Correct Name of Contractor (2) A Corporation, a Partnership or an Individual, as case may be (3) Correct name of Surety (4) If contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact.. VVitness as to Surety (Address) � MAINTENANCE BOND � THE STATE OF TEXAS � f� � COUNTY OF TARRANT � � L. B0ND N0. 89800890 rr- KNOVJ ALL MEN BY THESE PRESENTS: That (1) MCCLENDON CONSTRUCTION COMPANY, �as Principal, acting herein by and through (2) Dan McClendon its duly authorized ''. President and (3)VIGILANT INSURANCE C0MPANY &* a coiporation organized under the laws of the State of 'P�XX�, as surety, do hereby acknowledge themselves to be held and bound to pay unto the � City of Fort Worth, A Municipal Cocporation, chartered by virriae of Constitution and laws of the State of Texas, at L Fort Worth, in TaiYant County, Texas the sum of *FEDERAL INSURANCE C0MPANY �- ONE MILLION TWO HUNDRED THIRTY EIGHT THOUSAND TWO HUNDRED THIRTY SIX AND � 50/100 ................................................................................................................................ �_ '*t (�1.238,236.501 in lawful money of the United States, for the payment of which sum well and tnily be made unto said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heus, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however; that, � FE8 2 9 2000 WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, the � perfom�ance of the following described public work and the construction of the following described public � improvements: � RECONSATItUCTION OF OSCAR AVENiTE (28TH STREET TO 32"° STREET); HUTCHIINSON STREET (28T�� STREET TO 29TH STREET); 29T" STREET (HUTCHINSON STREET TO RUNNELLS AVENUE) AND HALE AVENUE (28TH STREET TO 31ST STREET) of sa�ne being refen-ed to herein and in said contract as the Work and being designated as project PW53- � 060530175280. PS58-070580174420, C115-020115040536and said contract, including all of the specifications, conditions and written instruments referred to therein as contract documents being hercby incorporated herein by ` reference for all purposes and made a part hereof, the same as if set out verbatun herein; and , � WHEREAS, in said Coniract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during the period One (11 Year afrer the date of the final `' ' acceptance of the work by d�e City; and � WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of �One (1) Year; and, r WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any tune withiii said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be necessary; and, ll WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said City shall have and recover from ihe said Contractor and its surety damages in the premises prescribed by said Contract. Tliis obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie in Tarrant County, Texas; and, IN WITNESS WHEREOF, this instrument is executed in 8_counterparts, each one of which shall be deemed an orig'v�al, dated ATTEST: ��� � � ���� (Principal) Secretary (Seal) PRINCTPAI. �4) I �� ��l �C��, '� ��'��-�-' Wimess as to �rinFiipal �.�. r..r�.)r� ��i(I� �!l.CSO�Ai, TX 7'8t797 (Address) ATTEST: (Surety) Secretary (SEAL) ��''� _K'� l,f\. J+� C_ �. �-�'� X''�.C� �� � W�ness as to Surety MCCLENDON CONSTRUCTION COMPANY, INC. E3Y': �l _ ' Title: DAN MCCIEND0N, Pf�EbIDENT PO BOX 996 BLTRLESON, TX 76097 (Address) VIGILANT INSUR.ANCE C0MPANY FEDERA INSURANCE C0MPANY , ,� Surety BY: I �/YY�C� �C • (Attorney-in-fact) (5) (,�I Tamara E. Murray (.4ddress) NOTE: Date of Bond must not be prior to date of Contract (1) �2) (3) (4) (5) Correct Name of Contractor A Corporation, a parmership or an Individual, as case may be Correct uame of Surety If Contractor is Partnership all Partners should execute Bond A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. F6 �, Chubb POWER � Surety QF ATTORNEY �' Know Ap by These Presents, That FEDERAL INSURMICE COMPANY, an Ind�ana corporaGon, VIGILANT INSURANCE COMPANY, a New Yoric corporation, and PACIFIC INDEMNITY COMPANY, a Wiscansin corporation, do each hereby constitute and appoint Ky le W. Sweeney , 'j� Charles D. Sweeney, Bobby E. P1ayo and Tamara E. Murray of Fort Worth, Texas--------- Federal Insurance Company Attn.: Surety Department Vigilant Insurance Company i5 Mountain View Road Pacific Indemnity Company Wanen, NJ 07059 each as their true and law(ul Attomey-in-Fact to execute under such designation in their names and to affa their corporate seals to and deliver for and � on their behalf as surety thereon or othervvise, bonds and undertaltings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the wurse of business, and any instruments amending or aftering the same, and consents to the modification or aReration of any instrumertt referred to in said bonds or obligations. �. �- In Witness VYhereot, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each �wecuted an� attested tY�ese presents anct �iTi�d thef� ccrporat�a sesls on this L 5 th d ay �£ �ov e� r, 19 4 9 J. ��/y� F �� l � // % � � � . "/.� � � ! � lfenneth �. Wendet, Assi�rrt Secretery � Fra� E. R+at�e san, Vie�e Pr'es�rat STA'f� OF f�EW J�RSEY � ss. Cmur�ly af SomeraeE On Ihis I S t�lday of Novemb e r, 19 9 9 , before me, a Notary Public of New Jersey, personally came Kenneth C. Wendel, lo me known to be Assistant Secretary o( FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANI', the companies which execufed the foregoing Power of Aftomey, and the said Kenneth C. Wendel being by me duy swom, did depose and say ihat he is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, a�d PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affaed to the foregoing Power of Attomey are such corporate seals and were thereto aR'aed by authoriy of the By-Laws o( said Companies; and that he signed said Power oi Attomey as Assistanl Secretary of said Companies by like eulhority; and that he is acquainted with Frank E. RobeAson, and Imows him to be Vice President o( said Companies; and that Ihe sipnature of Frank E. Robertson, subscribed to said Pow�er of Attomey is in the genuine handvvriting of Frank E. Robertson, and was Ihereto subscribed by eulhority d sald By-Laws and in deponent's presence. Nolarial Seal � ��'�'.a, � C�f�F" � � JOAhihtE ft. PIU�SAK ��� a�y � FJb1w, S►':,+r� �'+""''4e"'y - LI� ' tw4 � yk+`suB / / Nals�ry Publi� �� � a�a++ �Fj�ppBr 9�uns � 7,�?C�'3� /� ' C�RT�FICATiCahC { Extract from the By-Laws of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY: 'All powers of attomey for and on behalf of the Company may and shall be executed in the name and on behalf of the Company, either by the Chairtnan or the President or a Vice President or an Assistant Vice President, jointly with the Secretary or an Assistant Secretary, under their respective designations. The signature of such oKcers may be engraved, printed or Ifthographed. The signature of each of the following officers: Chairman, President, any vice President, any Assistant Vice President, any Secretary, any Assistant Secretary and the seal of the Company may be aKxed by facsimile to any power of attomey or to any certificate relating thereto appointing Assistant Secretanes or Attomeys-in-Fact for purposes onty of executing and attesting bonds and undertakings and other wrttings obligatory in the nature thereof, and any such power of attomey or certificate bearing such facsimile signature or tacsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached' I, Kenneth C. Wendel, Assistant 5ecretary o( FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY (the 'Companies') do hereby certify that (i) the foregoing extract of the By-Laws of the Companies is true and correct, (ii) the Companies are duy lioensed and auttar¢ed to transact surety business in all 50 0l the United States of America and the Disb�t of Cdumbia and are auttw�Qed by the U. S. Treasury Departrnent; furthe�, Federal and Vgilarrt are licensed in Puerto Rico and the U. S. Virgin Istands, and Federal is Iicensed in Ame►ican Samoa, Guam, and each of Uie Provir�ces of Carmda except Pnnce Ed�nrdrd Island; and (iii) the foregoing Power of Attomey is true, correct and in full force and eHect. Given under my hand and seals ot said Companies at Warten, NJ this day of . `,�61}�fC,� g+oFktl�r �p ��5�R'q�y'C�. C�Q � X�a�rc,r,p� � �~/ ��p3 � � , :� � � 3 —'�— * � f z� v" ,C * 'ri Nti�' �" # �'t�IAN►' '�15t4ot5'��` �'�'�'W 1104� Kenneth C. Wendel, Assistant Secretary IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY Telephone (908) 903-3485 Fax (908) 903-3656 e-mail: surety�chubb.com 15-10-0225 (Ed. 4-98) CONSENT r W � CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS �` COUNTY OF TARRANT FEB 2 9 2000 � This agreement made and entered into this the _day of A.D., 19_, by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters � within said City on the 11`�' day of December, A.D. 1924, under the authoriry (vested in said voters by the "Home Rule" provision) of the Constitution of TeYas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort � Worth being hereinafter termed Owner, MCCLENDON CONSTRLICTION COMPANY, INC. , HEREINAFTER CALLED Contractor. � WITNESSETH: That said parties have agreed as follows: 1. �, That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and �, complete the construction of certain improvements described as follows: RECONSTRL1CTION OF OSCAR AVENUE (28T" STREET TO 32N° STREET); � HLITCHINSON STREET (28T" STREET TO 29 STREET); 29T" STREE'j' (HL?TCHINSON STREET TO RUNNELLS AVENUE) AND HALE AVENUE {2gr� STREET TO 31ST STREETI � i�l � That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract � Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. � 3. � The Conh�actor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being noti�ed in writing to do so by the Deparhnent of Engineering of the City of Fort Worth. � 4. �IG9������� �LS��'u� ���� �� ����a� �, �����'�i , �. �, "The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencemeni thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the C'ity of Fort Worth within a period of TWO HUNDRED (200) workin� days. [f the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Docuinents within the time so stipulated, plus any additional time allowed as provided tn the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of FOUR HUNDRED TWENTY DOLLARS (�420.00) Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and cmployees, fi�om and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractars, licensees or invitees, whetlier or not any such injury, damaQe or death is caused, in whole or in part, bv tlre ize�li�ence or alle�ed ne,�li�ence o�' Owner, its of�cers, servants, or eiyrploVees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not a�ry such iniury or dama,�e is caused i�i whole or iiz part by tlie ne�li�ence or alleped ne,�li;�ence of Owner, its officers, servants or efnployees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involvcd, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. t�����s�9�-'�� �C���� ���� ��������� � ��' G�� � ���, ��. I oo nnerrr_nnn or�en I -21- SOIL TEST 98039 SPECS.dx _ �„ a.� .�, . _ ,� �;�s:� i s . 1 � CITY OF FORT WORTH CONSTRUCTION SERVICES LABORATORY RESULTS FOR TEST HOLE AND PLASTICITY INDEX PROJECT� 1998 CAPITAL IMPOROVEMENT HALE (28TH TO 31STj DOE N0.: 1952 E'IJND CODE : 03 PROGRAM ��-.____ ����_��___�___---_--_-. .r- __ _-'_'._:a����xxs��-----_-=�3��'=s- I HOLE � 1 LAB NO.: 32690 � LOCATION: 3104 HALE W/4 i --------------------------------------------------------------------------) 3 . 50"' �IIKAC I 3.50"' GRAY CLAY W/CRUSHED STONE I L3.00"' BROWN CLAY � � i __ ---------------------------------------------------------------------� 4TTERBURG I,tMITS: LL: 51.8 PL: 32.9 PI: 28.9 SHRKG: 16.O�S I �(JNSEL COLOR CHART : 4/ 2 DARK GRAY I S H BROZ�+3d CLAY I JNIT WEIGHT: 138.0 LBS PER CUBIC FOOT i - --------------- -------��-----_-_-- ------ __________________ iOLE # 2 :OCATION: -_= -_-_-�� ---- -_=--=_=__�-_____________________ I LAB NO.: 32691 I 3054 HALE CL ( ----------------------------------------------------------------� 1. 50 "' HMAC ! 5.50"' GRAY CLAY W/CRUSHED STONE I 10.00"' BROL�I CLAY I tSTREET HAS BEEN CHIP SEALED I --------------------------------------------------------------------------� 1TTERBURG LIMITS: LI�: 34.5 PL: 20.9 PI: 13.6 SHRKG: 9.0$ 1 4IJNSEL COLOR CHART: 6/3 PALE BROWN CLAY I 1NIT WEIGHT: 130.0 LBS CUBIC FOOT -- -__=__------_�___- ---� -_.---.. .� �� -----_--------_-=---= I .��-_-__���__�_�---!_-__-____�-___�_����_��.�����__�a��.��� � iOLE $ 3 LAB NO.: 32692 I ,OCATION: 3000 HALE E14 I --------------------------------------------------------------------------� 3.00" E�1AC I 4.00" BROWN CLAY TO BED ROCK I `STREET HAS BEEN CHIP SEALED I --------------------------------------------------------------------------� �TTERBURG LIMITS: LL: 58.2 PL: 46.1 PI: 12.1 SHRKG: 17.0$ ( 1UNSEL COLOR CHART: 4/3 BROWN CLAY 1 JNIT WEIGHT: 138.0 LBS PER CUBIC FOOT I ___=___===__________________________________________________________======1 � � � 1952 PAGE 2 . �" .. . . :..�� _:_- ���.��.��������- ==�����r��T�-��������_=_- � LE � 4 LAB NO.: 32693 I ,0CATION: 2812 HALE CL I �------------------------------------------------------------------------� ?..OO" HMAC I S.00"' PALE BROWN CLAY W/CRUSHED STONE I _ 1. O0" BROG�I CLAY I --------------------------------------------------------------------------� ►TTERBURG LIMITS: LL: 32.7 PL: 18.2 PI: 14.5 SHRKG: 9.0$ I NNSEL COLOR CHART: 6I3 PALE BROL�Il�I CLAY ( ►NIT WEIGHT: 134.0 LBS PER CUBIC FOOT I _ .. ��._ . _---___--------,.�,._-.--_,�-------_ . . ��____=====I .P PR+C}VAL ; R �IERI � �ATE TESTED: 04-23-98 �ATE REPORTED: 04-30-98 ESTED BY: CARDWELL,PATTERSON, DESAI ROUTING JP,MES ANDERSON NAJIB FARES FILE � � � CI TY OF F'ORT WUF�7'fi CGN� TRl1("i'7 ciN SEFVI.c_ F;� I,ABORATC�RY REtiIiL'!'S FOI; TFST HOLE AND PLASTICITY-INDEX �RUJECT: 1�+98 CAPITAL IMPOROVEMENT PROGRAM HUTCHINSON STREET (NE 28TH TO NE 29TH) iUE iJO. : 19 52 'UND CODE: 03 :�.�- __________________________--__________________________________=====1 �OI�E � 1 LAB NO.: 30926 I ,C�CA1'lON: 2906 HUTCHINSON ST. W/4 t --------------------------------------------------------------------------� 0.50"' W�IAC I .4.50" CRUSHED STONE (NO SAMPLE DUE TO CRUSHED STONE) I .������.�.���.�.�.�.�����¢���,������,�,���s��===___=�.,.��____����,���_�__�__�_ � _=,��_�T==--«�----.�a--�-�-�------- -_=_-�_=_�_______�_____ _��-_ I .�_� �__��.__ �,��---���__-_----��-=__=�=� IOLE $ 2 LP.B NO.: 30927 I �OCATION: 2808 HUTCHINSON ST. CL I •-------------------------------------------------------------------------� 1.00" HN1AC I 5.00"' BkOWN CLAY W/CRUSHED STONE I 2.00" BROWN CLAY I •-------------------------------------------------------------------------� ►TTERBURG,LIMITS: LL: 31.9 PL: 19.0 PI: 12.9 SHRKG: 6.0� I NNSEL COLOR CHART: 6/2 LIGHT BROL�TISH GR.AY CLAY I R�IIT WEIGHT: 130.0 LBS PER CUBIC FOOT I ���_______�_____________________________________________________________1 ►�'FR{3YAL : ,� . R JFRI �hTE TFSTED: 03-26-98 �k7'E kE�U}:TEI�: 03-31-98 'ESTED BY: CARDWELL,DESAI ROUTING JT1I�l�:S IaNDERSO!� NAJIB E'ARES FILE CITY OF FORT WOFcTH CONSTRUCTION SERVICES LABORATOF;;' RE�tJLTS FOF: TEST HOLE AND PLAcTICITY INDEX � jRi,�JL(;7': l�u� ::J�F'I'I'AL 1MPOkOVEMEN7' PRUG1�AM L' OSCAF AVENUE ( NE 32ND TO NE ,� 8 TH ) �OE NCI. : ] °52 r vND coL�F : 0 3 r :���,��=���:d�_���=== =��-,�����__�.�s.�.-� �_____�-=�,_���=���������=_=� I !OLE � 1 LAB NO.: 31267 � ,OCATION: 3209 OSCAR AVE. W/4 � --------------------------------------------------------------------------) 1.50'" HMI�C � � 4.00" BROWI� CLAY W/CRUSHED ST�NE 1 ; 3. UU" GF2AY CI.J�1Y � � ( -------------------------------------------------------------------------� � TTERBUFG LIMITS: LL: 47_4 PL: 24.0 PI: 23.4 SHRKG: 16.4�S � UNSEL COLOR CNART: 4/1 DARK GRAY CLAY I NIT WEIGHT: 126.0 LBS PER CUBIC FOOT I a���r�ecaa-------------------�-----------------------------�_�__�______= I _ ____ ______________��__�_____--___— ---______—_ .�__�____=�- a�==--===,���c�.���s_�.�:ct��_.—,--_— ., .. I OLE � 2 LAB NO.: 31268 ( OCATION: 3152 OSCAR AVE. CL � -------------------------------------------------------------------------� S.00" HMAC � 5.00" BROWN CLAY W/CRUSHED STONE I 9.00" BROWN CLAY W/GRAVEL � -------------------------------------------------------------------------) TTERBURG LIMITS: LL: 23.7 PL: 14.3 PI: 9.4 SHRKG: 5.0$ � � UNSEL COLOR CHART: 7/4 VERY PALE BROWN CLAY I NIT WEIGHT: 136.0 LBS PER CUBIC FOOT I _�.,_ _.___=________________________________________________________________� --__�__________________________________________________________________1 �LE � 3 � LAB NO.: 31269 I �CATION: 3060 OSCAR AVE. E/4 I -------------------------------------------------------------------------) 1.5�" HN�AC � ?.0n" CRiI� HrD STGNE (NO SAMPLE DUF. TO CkUSHED STOIJE) 1 =���as-�-:����s_�===__��_�__��������_��,���������e====�����_=_a-�c=======�1 � � � � � � �` � � 19 52 � L, PAGE 2 �►LE # 4 LAB NO.: 31270 ' � �O�'�'"1nN: 3�(?3 O�('Ar^. A>>E. CI. � ---------------------------------------------------------------------------� � . � S" HTiF�C � 4�.0Q" l3I;�JWN CLAY W/GI�`,VEL � �4.�G" BROWN CLAY � •-------------------------------------------------------------------------� �TTERIIURG LIMITS: LL: 39.1 PL: 18.0 PI: 21.1 SHRKG: 13.4�S � tUNSEL COLOR CHART: 4/3 BROWN CLAY ( 1NIT WEIGHT: 130.0 LBS PER CUBIC fOOT � ,����������---_-__-_�=_===__=_-__�==�_--_=_-��--__��,_���_=_=_==_==��� � ,r�_��=---s�a���.�_�.�.����.� ���_�«����=�s�_=������������=z�m���_a�� ��� iOLE � S LAB NO.: 31271 I .OCATION: 2813 OSCAR AVE. W/4 I •-------------------------------------------------------------------------� 1.00" I-iMAC - I 3.00"' CRUSHED STONE (NO SAMPI,E DUE TO CFtiJSHEll STONE) I :=���gz��=��=�=_____�-----------------�_._..�_� -- _�--___-��-----___- i ____�___�__ --_�..�.�--------------°o���._��-__ ►PPROVAL: > R JERI �ATE TESTED: 03-26-98 �ATE REPORTED: 04-07-98 'ESTED BY: CARDWELL,DESAI ROUTING JAMES ANDERSON NAJI B F'ARES FILE � ' CI T�' OF F'ORT WORTH �C>IJSZ'Rtit'.TIOIJ SL•'RVICF.S LflBGRl�TOF': RESULTS E'��R TEST HOLE AIJD FLASTICITY 1NDEX �ROJECT: 1998 CAPITAL IMPOROVEMENT PROGRAM NE 29TH STFFET {kUNNELS TO NUTCHINSON) ?OE NO.: 1952 ='CJND CODE: 03 �����.���___________________________________________________ ______________� �OLE � 1 LAFi NO.: 309,28 I �G�(rATION: 150' �ST OF I?t�T��HINSON ST. N/4 I --------------------------------------------------------------------------� 2.50"' I-IIKAC I 5.00"' BRO4�IISH GRAY CLAY W/CRUSHED STONE I 11.00"' DARK BROWN CLAY I -------------------------------------------------------------------------� �TTERBURG I,IMITS: LL: 51.3 PL: 29.6 PI: 21.7 SHRKG: 15.O�S � dUNSEL COLOR CHART: 4/3 BROWN CLAY ( JNIT WEIGHT: 134.0 LBS PER CUBIC FOOT I �--- __________________________________= ==___________________=====1 =����__________________________________________________________________1 �OLE � 2 LAB NO.: 30929 I �OCATION: 175' WEST OF' RUNNELS ST. CL I --------------------------------------------------------------------------� 2.00" �II�IP,C I 4.00"' BROWN CLAY W/CRUSHED STONE ( 12.00" BROWN CLAY ( ------------------------------------------------------------------------=-� �TTERBURG LIMITS: LL: 47.3 PL: 23.8 PI: 23.5 SHRKG: 12.0$ I �'IUNSEL COLOR CHART: 4/2 DARK GRAYISH BROWN CLAY I lNIT WEIGHT: 136.0 LBS PER CUBIC FOOT I r���=���==__�-=------------------------�----______�__--- � I �PPROVnI� : �� � X7�N JEFI )ATE TESTED: 03-25-98 �ATE REPORTED: 03-31-98 TES;ED Bt: CARDYJFLL,DESAI ROUTING JAMF.S ANDERSON NAJIB FARES FILE